GANTT CHART

 According to the Gantt Chart, the project titled: A Web-based OJT E-Portfolio for
CTU - CC started on October 12, 2022.
 As we can see, the legends of the Gantt Chart show us the completed and
ongoing activities.
 In the first column, we can see here the sequence number of activities.
 In the second column, we can see the various activities that will be carried out
when developing the project.
 In the third column, you can see who is the assigned group member for that
particular activity.
 The start date of each activity is placed in the fourth column of the Gantt chart,
and the end date is shown in the next column.
 The sixth column shows the number of days when the activities were performed,
as well as the status of each activity, whether it is complete, in progress, or not
started.
 The percentage of progress on the specified tasks is shown in the week starting
column.
 And, of course, on the right side, you can see the progress of the project's
development from the start date to the end date. Using the legends at the top of
the Gantt Chart, we highlight each day based on the progress of the activities.
NETWORK MODEL

 Based on the network model, all devices are linked to the internet. We can see
that the INTERNET was represented by a cloud shape.
 There is only one router in the network model, and all devices are connected to
it.
 Before connecting to other devices, both load balancers and switches must pass
through a firewall.
 As shown in the network model, three devices are connected to the load
balancer and perform as web servers.
 There are two linked devices on the switch device, and both database and
application servers are connected to the switch.