Professional Documents
Culture Documents
National Oilwell Varco has produced this brochure for general Rig Systems Headquarters
information only, and it is not intended for design purposes. 10353 Richmond Avenue
Although every effort has been made to maintain the accuracy
Houston, Texas 77042
and reliability of its contents, National OIlwell Varco in no way
assumes responsibility for liability for any loss, damage or USA
injury resulting from the use of informaiton and data herein. All
applications for the material described are at the user’s risk and
the user’s responsibility.
rig@nov.com nov.com
NOVOS™ Rig Differentiation *For reference only, please contact your local sales contact for more information.
10
8.53 8.33
7.58 7.75
8 7.33
A 12-hour installation with minimal hardware
Ease of footprint - Easily install NOVOS across your entire
Minutes
rig fleet. 6
Minutes
6
9 Hours per Well 4.76 4.77
• 67% Slips to Bottom • 41% Overall 4.67 4.66 4.5
4
Combining NOVOS with a foundation of field-
Differentiate proven NOV equipment, you have the rig of the
future today.
“...It’s making Saving time on a pad means you can plan services
better, and move onto your next opportunity faster.
2
my job easier.”
2.25 Days per Pad
4691 4785 4880 4975 5069
Connection Depth
Total Connections 165 Cost Savings Per Pad (120 days) ~$123,750 • Higher day-rates • Cumulative savings in drilling days analysis
NOV Controls NOV Top Drive NOV Drawworks NOV Mud Pumps Operator Daily Cost (24hrs.) $50k • Zero loss of knowledge transfer • Control – automated control apps
Amphion or Cyberbase
Contractor Day Rate (24hrs.) $20k
• Ability to plan ahead • Automate – closed-loop drilling