Republic ofthe Phillppines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
ROMBLON
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE IV-8
‘Odiongan, Romblon
CERTIFICATION
This is to certify that the herein attached contract was made and entered into by and
between the Department of Public Works and Highways represented by ELENA M,
CASTILAN, in her capacity as District Engineer, with office address at Odiongan,
Rombion, herein after called the Owner and MT. GUITING-GUITING CONSTRUCTION
by MARTIN R. GUTIERREZ, Poblacion, Magdiwang, Romblon, herein called the Contractor
for the Concreting of Brgy. Dulangan FMR, Bray. Dulangan, Magdiwang, Romblon
Is In accordance with all existing law, rules and regulations,
Issued this 17th day of August 2021 in accordance with section 7 c of Executive
Order No.109 dated March 27, 2002.
ne
ELENA M. CASTILAN
OIC-District EngineerRepublic ofthe Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
ROMBLON
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE IV-B
‘Odiongan, Romblon
Contract 1D : 21EH0103
Contract Name : Concreting of Brgy. Dulangan FMR
CONTRACT AGREEMENT
Lr
el
‘Owner/Manager
mre
MARTIN|
MT. GUITING-GUITING CONSTRUCTION
By:
THIS CONTRACT AGREEMENT, made this 17 day of August 2021
between The Department of Public Works and Highways (DPWH),
Rombion District Engineering Office, represented herein by ELENA M.
CASTILAN, District Engineer, with main office address at 014 J.P. St. Rizal,
Tabin-Dagat, Odiongan, Romblon,
hereinafter called the “ENTITY”, and
MT. GUITING-GUITING CONSTRUCTION, with main address at Poblacion,
Magdiwang, Rombion, represented herein by
Owner/Manager, hereinafter called the "CONTRACTOR".
WHEREAS, the ENTITY is desirous that the CONTRACTOR execute
Contract ID NO. 21£H0103 — Concreting of Brgy. Dulangan FMR, Bray.
Dulangan, Magdiwang, Rombion, hereinafter called the "Works", and the
ENTITY has accepted the Bid for Eleven Million Seven Hundred Ninety-Five
‘Thousand One Hundred Sixty-Six Pesos and Five Centavos Only
(Php 11,795,166.05) by the Contractor for the execution and completion of
such Works and remedying of any defects therein.
MARTIN R. GUTIERREZ,
gineer OI
Description Unit | quantity | unitcost | Total cost
Provision of Combined Field Office, |
Laboratory & Living Quarters Building for | months | 4.00 | 13,125.00 52,500.00
the Enginzers (Rental Basi)
Provision of 4x2 pick Up Type Service
Vehicle for the Engineers on Bare Rental | months | 4.00 | 26,250.00| 305,000.00
Basis I
—Sb-totar
‘Construction Survey and Staking ion__[_ 0.478 | 33,908.78 5
Project Billboard/Sign board ‘each [1.00 | 4,593.75 4,593.75.
‘Occupational Safety and Health Program | month | 4.00 | 32,968.75 91,875.00,
‘Traffic Management. ‘month | 4.00 | 26,748.75 106,995.00
Mobilization /Demobilization [tes 1.00 [331,250.00 131,250.00
seoaeae |
Individual Removal of Trees
(4150-300 mm dias small) 2.00 278.74 1729.92
%
ict Engineering Office
Remaval of Structures and Obstruction Loo | 74,583.75 FASB IS
Remaval of Act
‘Obstruction, 610 mm dia. (RCPC) peas | uae: anes
Surplus Common Excavation um_| S027.55_| —asa.ez | —s50,955.66
‘Structure Excavation cum] 45a5__| 3617.01 324,497.70
Embankment from Roadway Excavation |,
emneen 5 ajase74 | 503.00] — 1,662,409.01,
‘Subgrade Preparation a
(Goumon Maret) ig sam | 504092 | 5251
Sub-total |
‘Aagregats Subbass course sam. asses | aeese7
Sub-total
tepartment of Public Works and Highways
LENA M. CASTILAN
‘epublic of the Philippines
istrict EngineerContract 1D + 24EH0103
Contract Name : Concreting of Brgy. Dulangan FMR
Location of the Contract : Brgy. Dulangan, Magdiwang, Romblon
Item No, Desert Une | eanty | Unitcont | tot cont
| PART E= SURFACE COURSE — -
axicaet_| Farlnd Comeni Gnciets Pavement] case Ga
MT. GUITING-GUITING CONSTRUCTION
x 727626 | 7550458
506(1) —| Stone Maso cum. —| ~a2t0 | 4.99690. 210,369.49
: A en — Sut-tota | 43885807 |
ee —————————
= 2 6122) ieurepaeeeaine sam | 10950 | 4,310.72 143,523,84
2 612(2) | Bavement Markings Yellow sqm_| 9018 | 3161.38 104,733.24
ge Subiatal
ES = cemoora | — manana |
& Z é NOW THIS AGREEMENT WITNESSETH AS FOLLOWS:
1. In this Agreement, words and expressions shall have the same
meanings as are respectively assigned to them in the Conditions of
Contract hereinafter referred to,
2. The following documents as required by the 2016 revised
Implementing Rules and Regulations of Republic Act No. 9184 shall be
deemed to form and be read and construed as part of this Agreement,
viz:
5 a. Philippine Bidding Documents (PBD’s);
a i. Drawings/Plans;
li, Specifications;
ili, Bill of Quantities;
iv. General and Special Conditions of Contract;
v. Supplemental or Bid Bulletins, if any;
b. Winning Bidder’s bid, including the Eligibility requirements,
Technical and Financial Proposals, and all other documents or
statements submitted;
Bid form, including all the documents/statements contained in the
Bidder's bidding envelopes, as annexes, and all other documents
@ submitted (e.9., Bidders response to request for clarifications on
§ the bid), including corrections to the bid, if any, resulting from the
Se Procuring Entity’s bid evaluation;
g 5 & . Performance Security
a 8 g z d. Notice of Award of Contract and the Bidder’s conforme
Bos thereto; and
aia
3S
B55 358
SBs =:
3 8
seadeejoe
(Owner/Mahager
Gi
MT. GUITING-GUITING CONSTRUCTION
By:
MARTIN
Engineer I
District Engineering Office
tment of Public Works and Highways
ENA M. CASTILAN
public of the Philippines
strict Engineer
im
Contract 1D + 21EHO103
Contract Name Concreting of Brgy. Dulangan FMR
Location of the Contrac rgy. Dulangan, Magdiwang, Romblon
e. Other contract documents that may be required by existing
laws and/or the Procuring Entity concerned in the PBDs.
3. In consideration for the sum of Eleven Million Seven Hundred
Fifty-Nine Thousand One Hundred Sixty-Six Pesos and Five
Centavos Only (Php 11,759,166.05) or such other sums as may
be ascertained, MT. GUITING-GUITING CONSTRUCTION agrees
to execute and complete the works and remedy of any defects therein
in accordance with his/her/its Bid.
4. The Department of Public Works and Highways (DPWH),
Romblon District Engineering Office, represented herein by
ELENA M. CASTILAN, District Engineer, agrees to pay the above-
mentioned sum in accordance with the terms of the Bidding.
5. That, after completion of the project, failure or refusal on the
contractor to undertake repair works within ninety (90) days from
demand of the HOPE on account of the use of materials of inferior
quality, *
works and shall be entitled to full reimbursement of expenses
incurred_therein_upon_demand” as provided ay Seetion
62.2.2.1 of the RA 9184.
Shall be offset to recover the cost” (Underlining supplied)
IN WITNESS whereof the parties thereto have caused this Agreement to be
executed the day and year first before written.
ELENA M. CASTILAN ( marrin ah fles
1
District Engineer Owner/Manager
for: for:
Department of Public Mt. Guiting-Guiting Construction
Works and Highways
Witnessed by:
ief, Construction Sectionz
g
i
ae
g
: 5
* a
g oS
3 2
Boel ss
B
be
a
g
35
yg? eC
58
og 2
255303
a begs F
aries
eae ds
REPUBLIC OF THE PHILIPPINES )
PROVINCE OF ROMBLON )ss.
MUNICIPALITY OF ODIONGAN )
BEFORE ME, as the Notary Public for and within the Province of Romblon,
personally appeared ELENA M. CASTILAN, District Engineer, representing the
REPUBLIC OF THE PHILIPPINES (Department of Public Works and Highways),
with Residence Certificate No. 10912020 issued on January 15, 2021 at
Carmona, Cavite and MARTIN R. GUTIERREZ, Owner/Manager, representing
MT. GUITING-GUITING CONSTRUCTION with Residence Certificate No.
28251945 issued on January 7, 2024 at Magdiwang, Romblon known to
me to be the same persons who executed the foregoing CONTRACT and
AGREEMENT and they acknowledged to me that the same is their true act and
deed for and in behalf of the parties they represented.
This instrument consist four (4) pages, including on this page, on which this
acknowledgement is written duly signed by the contracting parties and their
witnesses on the left margin of the other page.
IN WITNESS WHEREOF, I have hereunto affixed my Signature and Official
Seal this day of August 2021.
3 (Notary Public)
Doc No. $4 OF bs
Pace P IFICO M, ANTANGAIR,
Book No. tpi
Series of 2021 ee
Roll No, 338%
IBP. OR No.1 140:
DPWH-INFR-51-2036
Page 407 4‘Giles
R.
Owner/Manager
the
MARI
MMT. GUITING-GUITING CONSTRUCTION
By:
Engineer III
ELENA M, CASTILANQ)
ct Engineering Office
District Engineer
Republic of the Philippines
Department of Public Works and Highways
Rom
Republic ofthe Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
ROMBLON
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE 1V-8
‘Odiongan, Romiblon
Contract 1D : 21EH0103
Contract Name Concreting of Brgy. Dulangan FMR
Location of the Contract : Brgy. Dulangan, Magdiwang, Romblon
CONTRACT AGREEMENT
THIS CONTRACT AGREEMENT, made this 17" day of August 2021
between The Department of Public Works and Highways (DPWH),
Rombion District Engineering Office, represented herein by ELENA M,
CASTILAN, District Engineer, with main office address at 014 J.P, St. Rizal,
‘Tabin-Dagat, Odiongan, Romblon, hereinafter called the “ENTITY”, and
MT, GUITING-GUITING CONSTRUCTION, with main address at Poblacion,
Magdiwang, Romblon, represented herein by MARTIN R. GUTIERREZ,
Owner/Manager, hereinafter called the "CONTRACTOR".
WHEREAS, the ENTITY is desirous that the CONTRACTOR execute
Contract ID NO. 21£H0103 — Concreting of Brgy. Dulangan FMR, Brgy.
Dulangan, Magdiwang, Romblon, hereinafter called the "Works", and the
ENTITY has accepted the Bid for Eleven Million Seven Hundred Fifty-Nine
Thousand One Hundred Sixty-Six Pesos and Five Centavos Only
(Php 11,759,166.05) by the Contractor for the execution and completion of
such Works and remedying of any defects therein.
Item No, Description Unit | Quantity | nitcast | Totat cost
RE ‘Combined = Office, ae aaa
‘AL1(6) | Laboratory & Living Quarters Building for | months | 4.00 | 13,125.00 52,500.00
{the Engincors (Rental Basis) .
Provision of 4x2 pick Up Type Service
A1.2(4) | vehicle forthe Engineers on Bare Rental | months | 4.00 | 26,250.00| 105,000.00
®
ss ‘Sub-total,
B.A(E) | Construction Survey and Staking kore [aap 78
B.5_| Project silboard/ Sign board ‘each | ~1.00
'3.7(1) | Occupational Safety and Health Progfani_|~month | —a.00
B.8(1) | Trafic Management = menti|—4.00
8.9 | Mobillzation/Demabiliza ts. [4.00
Tncvicual Removal of Trees
snograd_| renee neal ot hs eo | e00 | 23 1742092 |
TOU{G)_—| Removal of Structires and Obstruction —| Us | —~a.00—|—7a.g0n.75-| —vasaa.z5
Removal of Actus! Seuctures?
spate, | Seren area cy nm | 1600 | ssza7 8,030.52
102(2) | Surplus Contmon Excavation ‘am_|"3,027.39|—seaea-| —ss03553.66 |
[205(i)e | Structure Excavation ‘eim—[ 4545 | 461701 24,497.70 |
soigts | | ere rears | ca | 0028 | simam | aanaroeon
(Common Soil)
a sam | sotose | s2si| 26460870
‘Sub-total [aaa |
200(3) | Aggregate Subbese Course cam. 538839 [—¥
DPWH-INFR-51-2016 Page 10F4