WorleyParsons
resources & enerey
WESTNET ENERGY
CS2, CS4 & CS7 Gas Turbine Air
Inlet Filtration System
FEED Study and Cost Estimate Report
ate 20-Feb-08
Document No: TEB-C06-0501-01
WNE Costs not included
Projects + Technologies « Services + DevelopmentsDBNGP
WorleyParsons gee
resources & energy
\WesTWer ENERGY
682, 694 & C97 OAS TURBINE AIR INLET FILTRATION SYSTEM
FEED STUDY AND COST ESTIMATE REPORT
Disclaimer
‘This report has been prepared on behalf of and forthe exclusive use of Wester Energy, and is
subject to and iesved in accordance wih the agreement between Waste Eneyy and
WorleyParsons Senvces Ply Lid. WoreyParsons Sences Ply Ld accepts no Habity oF
responsi whatsoever fr fn rpact of any use of oF rekance ypon tis part by any tid
pay.
Copying ts repont witout the parmsson of WestNet Energy or WaxleyParsns Services Py Lid
‘snot permite.
Wee Chega tion ct Arts Aa Margaret
"ROJECT 400/A0054 - 682, C64 & C57 GAS TURBINE AIR INLET FILTRATION SYSTEM
aga tse ee =
legge” oe —— iad aWorleyParsons
resources & energy
WesTNET ENERGY
(052, 684 & C87 GAS TURBINE AIR INLET FILTRATION SYSTEM
FEED STUDY AND COST ESTIMATE REPORT
CONTENTS
4. Introduction 3
4:4 Project Deception 3
42 Stakeholders 4
13 FEED Susy Output = 4
14 Acronyms & Abbreviations, 4
2. Capital Estimate Summary. 6
3. Preliminary Basis of Design 8
31 MajorDesign Parameters 8
32 Codes and Standards 8
33° Equipment & Facies 4
34 Staton Standards & Requirement. ”
344 Mechanical & Process 1"
842. Cll & Stuctra 12
343. Eletical and Instrumentation 12
344 Instrumentation & Cont - 13
4, Construction Contractors Scope of Work. 14
44 Mechanical. 4
42 Eletoa Instruments, ard Contr. 1“
43 Project Battery Lim, . = 16
491 Commissioning 16
44 Saety Consteraton. 18
45 Approvals 16
5, Construction Logistics and otheer interfaces. ent 7)
51 Porto Commencement sf Dual Design one 7
6, Preliminary Schedule ener x 18
7. Basis of Capital Cost Estimate 19
71 Project Tine Frame - 10WorleyParsons
resources & energy
WeSTWET ENERGY
(82, €94 & C57 GAS TURBINE AIR INLET FILTRATION SYSTEM.
FEED STUDY AND COST ESTIMATE REPORT
72 Escalation Fectors Applied 10
73° Equipment Pring son 18
794 Mechanical Equant 19
73.2 Seca an Insrumertaion Equipment. . 19
74 NTO Acourzey 19
7.5 Conatueton Coss 19
78 EPCMCost. Fy
8 Outstanding Issues and area's of Uncertainty 2
9. Project Key Success Factors. 22
Appendices
‘Appendix 1. ~ WorleyParsons Drawings
‘Appendix 2. - Donaldson Drawings & Technical Description
‘Appendix 3. Intel Technical Specification for Ar Intake Fiters & Data Sheets
‘Appendix 4. - Preliminary Project Execution Plan
Appendix 5 - Preliminary Project Schedule
Appendix 6, ~ Cost Estimation InformationWorleyParsons
resources & energy
WasTHET ENERGY
(082, 084 & C87 GAS TURBINE AIR INLET FILTRATION SYSTEM
[FEED STUDY AND COST ESTIMATE REPORT
INTRODUCTION
Curent, tho Unt 2 gas tufsines at each ofthe compressor stalens $2, CS4 and CST on the
DDANGP ae ited wan non propitary air ntake fiers. These were installed as rar of the Sige 3
Upgrade around 1990. Since the time ol nsallaton they have been problematic in tems of high
oie, contaminafon, water Ingress aed coresin. I isthe intniion to replace these wih more
ficient se caning Maton aysteme tha rein ne wh the requirements of Solar Turbines.
“The existing structural see! supports forthe fiters rein good cancion and as such, thse wil be
reused as wil he aocess platorms, slanwaye and lacars, Some modifications may be required to
‘oct the naw Rian eystem,
\Wisthet Energy (WNE) has contracted WeceyParsons to conduct a Front End Engineering Design
(FEED) study and Cost Estimate to evaluate tis proposton.
‘Stout this propestion proceed, thenew fiers wl be required dung 2008.
‘This document encompasses the Ini desig and presen a proposal including a cos estimate to
supply and insta row rita os,
“This project wilbe generically tiled CS2, 4 & 7 Ai Intake Fitration FEED Study 8 Cost Estimats and
{ats under tn ‘Stay n Business produ category of DEP.
4.4 Project Description
“The project wil era:
+ Generation iter speclestions
+ Assessing the sonoos require o operate the rs,
+ Speeying any tin equitemens oie senses and the WINE SCADA syst,
+ vations ta tender
+ Appointeg Vendor.
+ Appoining Main Construction Contractor.
+ Proparaton of Constustion Scope of Work
‘+ Project Management
‘Sela to previous FEED’, overall cots ar bul up trom deSverabes, They se presented in a CTR
‘Stucure such al they can be easy iu la & NorteCare worksheet or a workshep analysis in
‘ation WorleyParsons would expect to paraWorleyParsons
resources & energy
WESTNET ENERGY
(082, C84 & C$7 GAS TURBINE AIR INLET FILTRATION SYSTEM
FEED STUDY AND COST ESTIMATE REPORT
Stakeholders
‘CompanyrPostion Nome
WINE Projet Sponsor Brien Bateman
WINE Project Manager aut Rely TEC
WorleyParsons Project Manager Hedley Bone
Wirt Parsons Project Engnaer Jol Lovavise
Constucion Contactor Project Manager {Gen Mawson (Ener) TBC
4.3. FEED Study Output
“The outputs fom the inl FEED sty are:
‘+ This FEED sty document,
+ Baseline projet cost astnate for use ina Monte Galo cost risk analysis."
+ Deverbies 8 CTR!
+ Conceptual projet drawings.”
+ Protiminary project schedule”
+ Protminary Projet Execution Plan”
+ tia! Technical Speccation fr the Al Ite Fier *
+ Manta Carlo Cos Estat,
[ter the MonieCato worishop has taken plac, Sna os values may be inceporaes into Section
20.
(72 savas ne oped)
40
‘Abbreviations vsed within his documert are surmarised as follows (his doss not include unt
designations where unis lise conform othe Sse
Acronyms & Abbreviations
aw Aint Aseet Managaret (Now called WestNet Energy
ac ‘Atemating Curent
as ‘Australian Standard (standard dsignton)WorleyParsons
resources & energy
WESTWET ENERGY
(082, 684 & C57 GAS TURBINE AIR INLET FILTRATION SYSTEM
FEED STUDY AND COST ESTIMATE REPORT
ASME
AUS Ex
CeNELEC
cal
comms
om
BNP
BP
oc
cal
&
POM
Fat
FEED
Hazan
HAZ0
HazoP
rece
mma
ase
Pa
sat
SCADA
s
sn?
sue
We
we
‘American Saciely ef Mechanical Enginssr (candard designation)
[Astaian acheme for conifiation to standards reltng to equipment lor use in
‘explosive atmospheres
European Comite lo Electro Techical Standarizaton
Cont! & instrumentation
‘Communications
(Gost Tne Resource — estimate
Damper to Bunbury Natural Gas Piping
Damper Bunbury Pipeline
Dec Currant
Elctial Conte! and Instrumentation
Generic scheme for certain of equpment fr se in explosive atmospheres
tlnng 2 varity ol designs, eg l= minal sale
Engineering, Procurement, and Construction Management
Factory Acceptance Test
Fron rd Engineering and Design
Hazard Anaysc Sud
zat dertfcation Stuy
Hazard and Operbilty Stody
Internationa Electo Technical Commission scheme fr cei o standards
‘eating equipment for use n exlosne atmospheres
Inspection and Test Record
Light Small Power
Phase
Revision
Software Acceptance Test
‘SunencoryContol ard Osta Acquistion
Intraoral Sytem of Units
Standard ebie metre
Seley Management Plan
WostNet Energy (previously known as AM)
WorleyParsons Sencos Pty LisWorleyParsons
resources & energy
\WESTNET ENERGY
(082, C84 & C57 GAS TURBINE AIR INLET FILTRATION SYSTEM
FEED STUDY AND COST ESTIMATE REPORT
2. CAPITAL ESTIMATE SUMMARY
Fler o Appendix fr futher cost astmaton information and cts
Capital Estimate Summary
“The folowing costs donot includ for WestNotEnorgy costs
“Thebaselne estimated copa cot fr his projet (Completion of 3 stations), based on he proposal
mantoned as above, $2,721,028. WorleyParsons have reviawed ths bassline cost estimate
internally. This estimate wit be used ta form the Case ofa More Carl cost sk assessmont
condeted by WINE. Cost estimate tals are proved inthe CTR's included in Appendix.
“The Monte Caro Bassline to P50 cantingency budget has been calculated as being STBA
“The Monte Carlo P50 PBS contingency budget has been calculated as beng STBA,
Insummary>
‘aatine Faration Sytem Project Cost $2,721,928
P50 Meloring Sato Projet Cost = STB,
PES Hetoing Station Project Cost = STB,
Fitton System Lead Time
It ehould be noted that dring preparation ofthe cost estimates, i was observed thatthe lend ime for
_ single iain asta wa ndeatd a beng 24 week rom ocevng a purchase oder.
Coste Per Station
Flor to able overeat. This breakdown stows the approximate costs pe tationWorleyParsons
resources & energy
(082, 654 & C57 GAS TURBINE AIR INLET FILTRATION SYSTEM
FEED STUDY AND COST ESTIMATE REPORT
ec sora
Enoriox 210.208 | s229.77_| sra9,tse_| $621,731
a scarica cere
a sso [xo__[20 |e
cee Sisco sacl Tao
ae °
eral cre ere corel ae
ios
1), Fite costs per ste dono change 25 deer is made to Pet
2) WoreyParsons & Enarox costs vary pr site by vue of wansportation and access logs.
2) WorteyParsons Costa. The costs are shown above as beng spit between 3 locaton.
Homever tis is purely to help show eta cost par ste. Should the poet preceed, tis
sssumed tat WerieyParsons wile allowed to compel all engineering end project
‘management a5 necessary.WorleyParsons
resources & energy
(82, C94 & C87 GAS TURBINE AIR INLET FILTRATION SYSTEM
FEED STUDY AND COST ESTIMATE REPORT
PRELIMINARY BASIS OF DESIGN
3.1 Major Design Parameters
“The able below detala major design parameter lor Sle Mars 100 Gas Turbine aint eondtion,
‘Ges Turbine Parameters
nit [Vvaiue [Comments
‘inks Few Rae in| 2008
Partie Sze um 10
Pareles com | soo
Combustible som 5.
Max dP alowed arose Tier [kPa [5
without parmanent
Setomnation
‘ilies avaiable to arive Mraion system (max Hints)
Unit Value | Comments |
‘Gempressed ArAvaiabiiy | m‘imin [026
Dewpoet ‘ceo
‘Air Preesire wag | 700
Eiscieal vy ee0v
Wiis, by no means cored Ie Hkly tha he firaton eytem tobe ital will be povided by
‘Denson Fitton, These wil be the TTD range and aready ext at some DBNGP compressor
‘ae and ware nctalied a pat ofthe Stage projet. These are el cleaning fers and he choice of
these would help rationales variation i spare inveioy.WorleyParsons
resources & energy
\WaSTNET ENERGY
(052, 084 & C87 GAS TURBINE AIR INLET FILTRATION SYSTEM
FEED STUDY AND COST ESTIMATE REPORT
3.2 Codes and Standards
“The design shall comply wth the Codes and Standards shown below. The I sytem of units wil
sed for ts project.
“ble 2 - DBP Standards
DESIGN AREA DOCUMENT NUMBER | DOCUMENT TITLE
{Geneve Design G.000.01.6-001 Generic Design Basis Document
| cson-so2.001301
‘Quay Requiements end Speatic
Inapection Plans
‘coating ‘esooso2.coceo1 | Technical Specifications: Above
Grune Coating Supply and Applicaton
Requtemens
Mechanica (0900-802-1500-01 | Technical Specioatn: Piping Design
Guide ana Specleston
Instumentaton and Elcteal | TE8-007-00001 ‘Ausralan Natural Gas Ppaines |
Eathing Piesoph
‘csons02.9507-01 | Teemnicl Spctiation or Genera
Electes,
cso0s0235101
Teetnicl Specticaton for Cable and
abe instalation,
cesons02a51201
‘Tecnical Spcticaton for Switchboard
Cubiel arc Panel Construction.
‘oso0.s02050801
‘Technical Specifeston er Becta
Testing
ccs00-£02.0510-01
‘Techical Specfeaton for
Inerumeniation stalin and
‘Testing.
csoo-802.9500.01
Technical Speciation for Genera
Insrumenition Equipment
(os00.802.2601-01
‘ca works Sosticaton,WorleyParsons
resources & energy
(082, C84 & CS7 GAS TURBINE AIR INLET FILTRATION SYSTEM
FEED STUDY AND COST ESTIMATE REPORT
“Table 3~ Codes and Stan
DESIGN AREA, DOCUMENT NUNBER_| DOCUMENT TTLE
Vetves ASME 16.24 Valves — Flanged, Threaded are
Welaing End
Cri stuses asii702 ‘Structural Design Actions ~ Wind
- Loads
asii704 Minimum Design Loads on Stutures—
Earthquake Leads.
asaio0 Stoo Sucre.
asies7 Fixed platforms wala stays
‘and Inder ~ Design, constuction and
instalation.
Lightening Protection asi7e8 Lightning Protection.
Eletical Eavement ‘assoo0 lta! installations (SAA Wring
ule)
Ast930 (Degrees of Protection Provided By
Enclosures Fr Elecies| Equipment
‘887080 Electrical Equipment for Exgosive
‘maspheres~ Exlesien Protection
Tecaniques,
scat octal Equpment For Explosive
{mosphares~ Selection Instalaon
and Maintenance,
asso8o lectealnstalatons ~Seacton of
asata7 Approval and Test Speaeation
letra! Cables -
aserso8 Functional Safty o Eletical/
Electronic Programmebie Eltron
Salty and ether Rested Systome,WorleyParsons
resources & energy
(082, 084 & C87 GAS TURBINE AIR INLET FILTRATION SYSTEM
FEED STUDY AND COST ESTIMATE REPORT
3.3 Equipment & Facilities
The nature of this project means tat he work area should be considered a brown fd ste. The
fotowing shouldbe given corsidraton.
+ Location of semen entering and laving the turbine made
‘+ Location of senoes close tothe turbine module which have to be crossed when ere
‘mecrarical handling equipment are being used io remove and replace equipment
3.4 Station Standards & Requirements
3.4.1 Mechanical & Process
344.141 Piping & Connections
Pipework is ony roquied for compressed ai. Per OBP specfcaton CS00-502-1508-0, this
pipework shall be to ASME B21.2 Class #150 Carbon Stel to ASTM A123 ~ Galvanised. Siilary,
fry manual ball aves wil be per CS0002-1$03-01 and category BAC
“The plpework onthe fier bodyork willbe fnshad insane ste, Relerto he Fitton Technical
Speciation TEB-006-0502-01 as shown in Append 3
3.4.1.2 Coating
Wher required, eure raiment of nw above ound equipment shall be the standard th
‘jetem m accordance wth DBP specication CS00-$02 0009-01. Final clours to be confi.
3.4.1.3 Filter Body & Ductwork Construction Mater
“The materials of constuction fr the maln iter body an anlional ductwork wil be trom stainless
4.1.4 Solenoid Valves
“Te solenoid andl sening sche relate o any valves shal be hous n a metalic exsosion
prot enclosure in accordance wth CSA and to CENELEC standards (EexlC-T8),
‘Actuators on these types of vale are normaly operated and ited wih EX aint sche anc Ex
Sa elanod valves for hazadous area use. Lit sth housings shale of metal contractionWorleyParsons
resources & ener
(WESTNET ENERGY
(652, C64 & C57 GAS TURBINE AIR INLET FILTRATION SYSTEM
PEED STUDY AND COST ESTIMATE REPORT
3.4.2 Civil & Structural
“The vendor shal cay out the sttura design of he Ar Inst Systom to withstand econ loads 1
asi702
CConerate Foundations & fotng willbe reused but Is envisaged that footings and brackets will be
quiet high pressure a ipewerk.
3.4.3. Electrical and Instrumentation
24.3.1 Power Supply
240VAC Power Supply
“The 240VAC supply willbe sourced ram the Gas Turbine Module such tata gas alarm s sense,
allmains power tothe ration system is elminted ul such tes that gas alas have ben ese
‘This methodology ie prsentyulized on some existing DBNGP instalation. tis anticpated he
‘tran sytem wil ot ew move than 1A.
‘2av0c Power
For the Miraion sytem on beard PLC eystem, 24VDG is required. Ths supply wil be incorporates
othe main itr contol panel.
Construction & Commissioning Power
{tthe te of constuction an AC power supply wil be required. Int easly avaiable the suppy wll
be om DEA set tobe proved bythe Consuction Contractor.
24.3.2 earthing
‘The earthing shal be in accordance wth DBP standard earthing phiosephy and practice as detaled
Inthe Earhng Philosophy (Socument number TES-007-0001-").
Earhing for eecvial equoment, enclosures and intnsicay safe equipment shall be caiad out in
‘accordance win AS2000 & AS2281. The new iter shal be conneced to eat al Wo points
Precige deta however wil be included later iin detaled design,
3.4.3.8 Equipotenti
Bonding
Al metalic pars of structures shal be equpotential bonded in accordance wth ASZ2E1
24.34 Cables
New cables and cable insalleton wil be in accordance with ASSO00 and AS2SS
eye ear nema aN NT aTWorleyParsons
resources & energy
(082, C84 & C87 GAS TURBINE AIR INLET FILTRATION SYSTEM
FEED STUDY AND COST ESTIMATE REPORT
94.3.5 Hazardous Ar
‘A clasoiation study fr new equipment in accordance wih AS2430.3 shal be performed prior to
select of equipment, In order to determine the extent and zoning of hazardous ereas. Were
possible, stenderd equpment Spee wih prevously eblalned ceifeation shal be used. Al fd
fsgupment and insiumantaton loated in hazardous areas shall be ratod accordingly for sale
‘operation within the designieg zone. The prefered mathod of elects protection in ll hazardous
lafees sninic aty (Ex a) for low powered ele equipment to spy hazardous ara ratings and
osslets. Aus Ex or EC Ex carted slectal equipment shal be used in hazardous acess wher
‘utable and eccnomicaly available. Where cher catfetien i upplod (09 ATEX, FM, CSA, UL), 8
conform assezement ll eed tobe undertaken
24.26 Haze
jous Area Equipment Dot
\Ventiation dossirs shall be prepared as requred by ASZSEt. These are necessary fo voy the
design andistalabon agains! the certieton reeictons.
2.4.8.7 Lightning Protection
‘All above ground tacit wi ba adequately erthed anol robust constuction.
3
Instrumentation & Control
2.4.41 General
Stable instrumentation and coniol wil be supplied with the now system, prenstalled and
commissioned. For genral faut arms to interlace with the OBNGP SCADA system, vol free
contact wl be provided
These wit be for:
1) High aP alarm (ouput)
2) High dP Shutdown (Outpt)
9) Marsa Clean Swich (np)WorleyParsons
resources & energy
westwer ENERoy
(C82, C84 & C87 GAS TURBINE AIR INLET FILTRATION SYSTEM
FEED STUDY AND COST ESTIMATE REPORT
CONSTRUCTION CONTRACTORS SCOPE OF WORK
4.1 Mechanical/civil
“The mecharicall scope of work wine the ofowing
+ Deccuping, removal fom ste and dispose ot existing titer attenuator and cuctng.
+ Proparaion of stuctura tel o make good any defects and paintwork damage.
‘+ Temporary remevalo any platlorms and stars.
“+ Installation of naw fer, attenuator and ducing on existing stool stnctue. Secure by wsing
sppropit fasteners an brackets.
1+ Reintate pation and stainrays
+ Run new compressed air pipework from compressor house 10 new fit. Pipework to be
tinal at Filer peur panel Pipawor o be adequally supported,
[Al ofthe fitation equipment and components wl be tree sue to canton contactor and wil be
Geivered to their remaes in Perth, The contusion contractor wil procure and supply cther non
free issue equipment tame such a pneumatic ne pipe. valves gaskets, bls and any afer such
‘consumes as nacesary o complete he instalation at each ste,
\Wnere possible the constuction contractor wilundrake as much peparstory Wom in hr workshop
‘ard hen anspod ast oral assembly
4.2 Electrical, Instrumentation, and Control
“The electical. contol an Instrumentation scape of instalation work fer the constuction contactor
vwiincude:
+ Supoly and instalation of electrical supply eablng, Cabling to be eecured to eable tray or within
condul and auably suppred
+ Supply, instal & terminate all instumeriston cabling and juneton boxes sssoiated wih the
fiteton system. This inchides where the conto! & strumeniaion syiem required to
intertace wth he existing st faites,
+ Earingconnactons a equite,
+A equipment ot sted as tee lacus, such as cable, cable glands, label, instrument tubing and
figs, te.
‘+ Termite retmen of cables and cans on ste.
+ Atnisicay se cable shall be bus shoathed.WorleyParsons
resources & energy
(652, ¢84 & C87 GAS TURBINE AIR INLET FILTRATION SYSTEM
FEED STUDY AND COST ESTIMATE REPORT
+ Cary out tosing ofthe elacticl instalation se per he standard requirements including sath
rest, ein resistance, conn and pln to pir testing, visual inspecton of ables, este
‘lan, able, ferus nd IP ratlogs
‘+The contactors approved inspection an test roo (TR) sees sal be usd for recording
abe test recor ana instrument caleatons,
+ Cabling be instaod teow ground ove whore possible
‘+ Supply and insial cable ler on kids and run esbes from instruments on sk to juncton
bones and he elactcl equipment enclosure
4.3. Project Battery Limits
“Te inet project bar limit is om the ai intake plenum to the GBs turbine ai intake Herbie
‘connacton Farge,
4.3.1. Commissioning
Commissioning procedures wil be developed by WorleyParsons wih assistance from WNE 28
reauited. The eansucton contractor wil be respensible fr pe-commissonng ofthe new frabon
sjstems a described above
Commissioning will be winessad by WorleyParsons and undertaken by WNE seised by the
‘onatucton contacto.
“The preliminary schedule included in Appendix 5, has an assumed stat date (Board Sanction to
proceed) dung Apri 2008 The works would be done at CS2, CS4 & CS7 sequently, puting
Commissioning staring dung September 2008 and tial project closeout eround March 2008
‘Delays approval ad stat Sates wi ave implications on comssining,
4.4 Safety Considerations
Generally al works wil be completed win the WNE Operational Safty Case. However, the work
vill be conducted under a Project Safty Management Pian (SMP). WNE wil produce the SMP, wih
review and endorsement ty DBP, and the canstucton contactor. The SMP wil be similar to
prevous WNE projects wth minor changes to ensure the subi forthe partiuar scope of works
fSthand. Al personnel working onthe project wil conform oll requirements of the SMP.
‘A genera desig isk assessment and Constucon!Commisioning HAZIDS willbe conducted price 0
Inoblisain fo ste. Representatives from WNE, WorleyParsons, and the contruction contractor wil
be requested o aon as requtedWorleyParsons
resources & energy
WESTNET ENERGY
(82, 684 & C57 GAS TURBINE AIR INLET FILTRATION SYSTEM
FEED STUDY AND COST ESTIMATE REPORT
4.5 Approvals
Approval wil nat be required trom Deparment of Consumer and Employment Protection (DeCEF).
Howaver formal approvals wit be required from DBP so that constucton artes can be
cordateWorleyParsons
resources & energy
WesTNET ENERGY
(082, C84 & CS7 GAS TURBINE AIR INLET FILTRATION SYSTEM
[FEED STUDY AND COST ESTIMATE REPORT
5. CONSTRUCTION LOGISTICS AND OTHEER
INTERFACES
5.1 Prior to Commencement of Detailed Design
‘Some minor ferences seo ste shouldbe expacted ad as such ste survey work wil be required.
‘So tha all const achiies can be fuly planced and detaled, WNE, WP and the main
cenatructon contactor wil edt age the order which he work at each sation I undertaken,
is however ancpated thal each system wil be instal progressively one str tha other. Other
‘separa construct ative wl sleo need obs taken ino consideration.
WINE wi adie WP end ne Contucton Contraco ofr compressor une shutsown dates,
'As construcion wil be take place on operating compressor sisons, paricuar cae is 10 be
Undertaken to enaure tha avaiabity ofthe operating compressor unit isnot impacted, Alison
‘and nttacing wih existing equement wil be arranged by the WNE FO.WorleyParsons
resources & energy
\WESTNET ENERGY
(052, C84 & CS7 GAS TURBINE AIR INLET FILTRATION SYSTEM
FEED STUDY AND COST ESTIMATE REPORT
6. PRELIMINARY SCHEDULE
‘Aprelminay schedule fe provided in Appendix 5. The schedule provides estimated project duration
‘on the basis of procurement of long lead tems, and fabsicaon and isalsion with Key mistone
‘ates a flow
ate Milestone
7 apr 2008 Board Sanction & Approval
12" May 2008 Preliminary & Detaled Engineering Complete
‘a May 2008 Construction Package Issued
10 June 2008 Matarials Procurement tems complete
6 Nov 2008, ‘Commence C52 constructon
10? Feb 2008 Const construction complete at CS7
10 mar 2008 Clese Out CompleteWorleyParsons
resources & energy
\WESTHET ENERGY
(652, C84 & C57 GAS TURBINE AIR INLET FILTRATION SYSTEM
FEED STUDY AND COST ESTIMATE REPORT
BASIS OF CAPITAL COST ESTIMATE
7.1 Project Time Frame
‘The capil cost esimats has beon ps he tration systems othe 9 sites are
constncied per the aiached drawings using the existing suppor stots and as described within tis
‘cument with mistenes as indicated in Secon 6, The capil cost estimete assumes only one
‘mabissaton per st fr construct,
7.2 Escalation Factors Ay
"No escalate faces for market pricing have been apple.
7.3. Equipment Pricing
7.3.4 Mechank
Equipment
Costing of mechanical equipment where posible 8 based on budget prices given by Australian
suppliers in Australian curtency, No adjustment factor has been added to mechanical equipment
‘costs or for cureny Ructuations effecting local cosls. Coasidertion shuld be given fo adding &
‘ominal man to Super budget pies during Morte Caro cost risk analysis as a provision for
Unforessan costs,
7.3.2 Electri ment
and Instrumentation Equi
Costing of ctricel equipment where possible i based on budget press given by ca supplies. No
adustment actor has been added fo elctrial and instrumentation equipment costs. Consteraton
Should be given to adding a nominal mark-up to Supplier budget pices Cwing Mone Carlo cost rk
‘analysis as a provision fr unoreseen costs.
7.4 MTO Accuracy
[MTO’s have been taken from concept drevings produced forth study. No ausiment factor has
on neue fo ll for accuracy of MTO takeo. Consideration should be von fo purchasing @
inal amount of apere pipework ems such as gaskols and other misealaneous consumables.
7.5 Construction Costs
CConsinuton costs ar based on estimates given by the construction contrat forthe mechanical,
Cl, electial end insrumeniatonecopes of wor,WorleyParsons
resources & energy
\WESTNET ENERGY
(082, C84 & CS7 GAS TURBINE AIR INLET FILTRATION SYSTEM
FEED STUDY AND COST ESTIMATE REPORT
7.6 EPCM Costs
[EPCM cost are based cn daverables wih assocted hous estimates based on WorleyParsons
curent rtos. Flor to Appenices 6 & 7 for further detaWorleyParsons
resources & energy
\WESTNET ENERGY
82, 684 & C57 GAS TURBINE AIRINLET FILTRATION SYSTEM
FEED STUDY AND COST ESTIMATE REPORT
OUTSTANDING ISSUES AND AREA’S OF
UNCERTAINTY
Compressed Ar Avalaty Sat sir consumptons on sxsing drawings ave assumed to be
accurate, Similarly, specod ai delivery ie assumed fo be accurate. Ath time of preparing this
ecument, no other pieces of equipment have been identtied that consume compressed ai.
However itis recommended hat st aveluaon i undertaken at each site to con ts
Compressed ar quay Ae requod with pressure dewpoint of less that zero cele, The
quai of ar shuld be checked o con hat tis boing delve to the standardWorleyParsons
resources & energy
\WESTWeT ENERGY
(682, 684 & C87 GAS TURBINE AIR INLET FILTRATION SYSTEM
FEED STUDY AND COST ESTIMATE REPORT
9. PROJECT KEY SUCCESS FACTORS
“The projet wil be considered a success:
+ 1s detvere on time and wahin he approved budget
‘+ WNE and WP are sate with he quality ofthe dlvorod projet
+ Project comple without any Lost Tine nur o Medical Atendance Injury.
+ Project completes without ny unplanned impact othe ongoing operations of DENGP.
« Ta megane ee a a a EEO