1 11 Marathon Pipe Line LLC’s publication by the


GUIDELINES FOR PROPERTY DEVELOPMENT GUIDELINES FOR ROADS, RAILROADS, same name was the model for this work.
PAVED LOTS, AND HEAVY EQUIPMENT VEHICLES

3
GUIDELINES FOR CROSSING PIPELINES, GAS 13
TRANSMISSION LINES, MAINS AND SERVICE GUIDELINES FOR PROPERTY IMPROVEMENTS
CONNECTIONS

15
5 GUIDELINES FOR NON-EXPLOSIVE SEISMIC
GUIDELINES FOR AGRICULTURE: FIELD TILE TESTING AND BLASTING OPERATIONS
DITCHING AND DEEP PLOWING

17
7 PIPELINE SAFETY AWARENESS
GUIDELINES FOR BORING, DRILLING, AND
TUNNELING
19
THE ONE CALL SYSTEM
9
GUIDELINES FOR OVERHEAD AND BURIED
POWER AND COMMUNICATION CABLES INCLUDING 20
FIBER OPTICS SPECIAL NOTES

DISTRIBUTED BY
GUIDELINES_PROP_DEV_CHEVRON_Layout 1 8/8/11 10:51 AM Page 4

GUIDELINES
FOR PROPERTY DEVELOPMENT
GUIDELINES
FOR PROPERTY DEVELOPMENT

THE LIQUID PETROLEUM PIPELINE INDUSTRY A pipeline requires regular observation, integrity The pipeline company and the landowner There are multitudes of underground facilities,
has developed these guidelines to improve assessment and maintenance to maintain the granting the pipeline easement are not the some transporting volatile liquids or natural gas
understanding and increase awareness of the safety of its operations. Part of that task is to only ones who have access to the pipeline under high pressure. Many pipelines were
nature of underground pipelines that transport ensure that the pipeline ROW is kept clear of ROW. Third parties doing business along the placed in the ground years ago. Over time,
oil, petroleum products, natural gas liquids and trees, structures and other encroachments that ROW are also vital partners in protecting the what was once pastureland may now be
other hazardous liquids (collectively “pipelines” might interfere with the safe operation of the environment by keeping pipelines safe and someone’s backyard, a residential development
or “pipeline” throughout this document) and pipeline and the pipeline company’s access to free of accidents. The cooperation of everyone or a new business. With advance planning
how to conduct land development and use the line. involved in property development – including, and shared information, future economic
activity near pipeline rights-of-way. but not limited to, real estate brokers, agents, development can be done safely and in the
One of the key facilitators of ROW inspection developers, engineers, architects, general most cost-effective manner for the developer
The guidelines are intended for use by anyone is ROW clearing. Good communications between contractors and their subcontractors, and local and the pipeline company.
who is involved in land development, agriculture the pipeline operator and the public are important elected officials and government staff – is
and excavation/construction activities near a in minimizing any issues between the public essential. Construction work done anywhere Most damage to pipelines is avoidable through
pipeline. The industry’s goal is to protect public and the pipeline operator, especially during near a pipeline, even in a homeowner’s backyard, better advance planning and using the ONE
safety of the people who live and work along initial clearing activities. can affect the integrity and safety of underground CALL SYSTEM, which can be accessed by
pipeline rights-of-way, protect the environment pipelines. dialing 811 on your telephone. The One Call
ROW clearing is performed for a variety of System is a free public service established by
along rights-of-way, and maintain the integrity
reasons with the paramount reason being The pipeline industry hopes that these guidelines state agencies, non-profit entities or public
of the pipeline so that petroleum products can
safety. ROW clearing enables: will help both pipeline operators and people utilities to provide underground utility locating
be delivered to customers safely and without
interruption. • Aerial surveillance – Patrols are completed working and living along pipeline rights-of- and marking for those who plan to dig or
to detect potentially harmful excavation way to better understand their respective excavate in the vicinity of a utility.
A pipeline right-of-way (ROW) is property in responsibilities for maintaining the safety of
activities along the pipeline ROW and Always use the One Call System in your state
which a pipeline company and a landowner this vital, but invisible, transportation system.
visually assure no releases have occurred. before undertaking a project that includes
both have a legal interest. Each has a right to
be there, although each has a different type of • Damage prevention – A clear ROW provides excavation or digging underground. Never
use for the land. Pipeline companies are granted a visual corridor so the pipeline can be assume that you know the location of pipelines.
permission from private landowners to transport protected from unauthorized excavation The permanent aboveground markers along the
petroleum products across their private lands. and development. pipeline route are not exact indicators of the
That permission is documented in a written pipeline location – pipelines have bends and
agreement called an easement, and it is • Routine maintenance access – Clear access can change direction with no aboveground
obtained though purchase, license, or by to the pipeline is critical to completing indication; the depths of the pipeline may vary
agreement with the landowner. In cases required maintenance in a safe, efficient substantially within even short distances; and
where the land is owned by the government – and effective manner. more than one line or utility may exist within
whether local, state or federal – similar a single right-of-way.
arrangements for easements, licenses or • Emergency response access – Clear access
occupancy agreements are obtained. to the pipeline allows for a prompt response
in the event of an emergency.

• Corrosion protection – Tree roots can wrap


around a pipeline, damaging the protective
coating of the pipeline, compromising efforts
to avoid pipeline corrosion.

1 2
GUIDELINES_PROP_DEV_CHEVRON_Layout 1 8/8/11 10:51 AM Page 6

GUIDELINES
FOR CROSSING PIPELINES, GAS TRANSMISSION LINES, MAINS AND SERVICE
GUIDELINES
FOR CROSSING PIPELINES, GAS TRANSMISSION LINES, MAINS AND SERVICE
CONNECTIONS ON OR NEAR PIPELINES, FACILITIES AND RIGHTS-OF-WAY CONNECTIONS ON OR NEAR PIPELINES, FACILITIES AND RIGHTS-OF-WAY

OPTIONAL
WARNING TAPE

COMMON GUIDELINES A foreign pipeline should cross underneath an METALLIC PIPELINES


“Foreign pipeline” means any hazardous liquid existing pipeline with a minimum clearance of Foreign pipelines, other than utility lines, 25 FEET
pipeline, gas transmission line, main, service 24 inches. This elevation should be maintained should install cathodic protection bonds and
connection, and utility pipe such as water line, across the entire width of the right-of-way for potential leads at all crossings and terminate
sewer line or any other pipeline installed the existing pipeline. Clearance of at least 24 them at aboveground locations. The operator
within the right-of-way (ROW) of an existing inches should also be maintained between the of the existing pipeline will install all test leads CATHODIC PROTECTION BONDS
hazardous liquid pipeline. existing pipeline and any other buried structure. on the existing pipeline. AND POTENTIAL LEADS AT ALL
DOT APPROVED CROSSINGS TERMINATED AT
A foreign pipeline crossing should cross If the existing pipeline is unusually deep at the The foreign pipeline should be coated with a PIPELINE ABOVEGROUND LOCATIONS
perpendicular, or as close as possible to 90 crossing location, the operator of the existing suitable pipe coating for a distance of at least MARKERS OR
IDENTIFYING
degrees to the existing pipeline and its pipeline may consider allowing the foreign 50 feet on either side of the crossing. (Note MARKERS
designated ROW. pipeline to cross over the existing pipeline as this distance may vary among pipeline
long as the facility is protected in some other operators so it is important to check with
A foreign pipeline should not run parallel or manner acceptable to the operator of the the pipeline operator during the design
nearly parallel to an existing pipeline within existing pipeline. phase of the project.)
the boundaries of the ROW for the existing
pipeline, or within 25 feet of the existing Pipeline markers or identifying markers should A warning tape, or warning mesh, should be CROSSING ANGLE
pipeline without specific written approval from be located to indicate the route of the foreign used to indicate the location of a foreign AS CLOSE TO 90°
the company operating the existing pipeline. pipeline across the ROW of an existing pipeline. pipeline for a distance of 25 feet on either side AS POSSIBLE OPTIONAL
(Note this distance may vary among Such markers should adhere to regulatory of the existing pipeline. WARNING TAPE
pipeline operators so it is important to standards and API Recommended Practice
check with the pipeline operator during 1109, Marking Liquid Petroleum Pipeline
NONMETALLIC PIPELINES
the design phase of the project.) The Facilities.
A tracer wire for a nonmetallic foreign pipeline
placement of the foreign pipeline should also should be installed to assist in locating it in
be consistent with the existing easement addition to the above-mentioned warning tape.
agreement.

24" CLEARANCE UNDER


PETROLEUM PIPELINE

OPTIONAL
WARNING TAPE

3 4
GUIDELINES_PROP_DEV_CHEVRON_Layout 1 8/8/11 10:51 AM Page 8

GUIDELINES
FOR AGRICULTURE: FIELD TILE DITCHING AND DEEP PLOWING
GUIDELINES
FOR AGRICULTURE: FIELD TILE DITCHING AND DEEP PLOWING
ON OR NEAR PIPELINES, FACILITIES AND RIGHTS-OF-WAY ON OR NEAR PIPELINES, FACILITIES AND RIGHTS-OF-WAY

FIELD TILE GUIDELINES 4. It is recommended that long runs of parallel The pipeline operator’s representative should
This Guideline is intended to guide the field tile and pipeline should be spaced 25 feet prepare a Depth Survey Report, which should
FIELD TILE
tile installer and the pipeline operator’s from the existing pipeline. If a closer distance include photographs showing the yellow flags.
representative on the safe installation of is necessary, the pipeline operator should be
contacted for prior approval. When working within 50 feet either side of the
agricultural drainage tile around a pipeline MINIMUM
pipeline, the pipeline operator’s representative 24" CLEARANCE
system. CROSSING ANGLE
5. The pipeline should be crossed carefully, should monitor the activity verifying pipeline AS CLOSE TO 90°
1. The project should be planned in advance. and only when the pipeline operator’s depths and installation clearances. AS POSSIBLE
A representative of the pipeline operator or representative is on site and able to observe
the work. The crossing should be as near Due to erosion and the removal of earthen
utility will help prevent dangerous and costly
to perpendicular (ninety [90] degrees) as cover in some areas, the existing depth of
accidents and help avoid surprises during the
possible and clear the pipeline by a minimum the pipeline may not support Deep Plowing. PIPELINE OPERATOR’S
work. The project plan should be followed.
of 24 inches. The pipeline operator should not allow Deep REPRESENTATIVE SHOULD
Many states establish required time frames MONITOR THE ACTIVITY
Plowing in areas where the integrity of the
for advance planning. Ample time is required
6. Where the field tile crosses the pipeline, it is pipeline may be compromised.
to review the design and verify pipeline
recommended that solid tile be used and
depths and operational requirements. Prior
that pea gravel be used to prevent settling. OTHER LAND CONTOUR MODIFICATIONS
to the installation of any field tile within the
The pipeline operator should conduct a field Projects near the pipeline that involve altering the
pipeline right-of-way (ROW), the installer
inspection of this work verifying pipeline land contour, including the installation of ponds,
should communicate and plan the project
depths and installation clearances.
with the pipeline operator. The pipeline lakes and drainage ditches, require expert DEEP PLOWING AND
engineering in planning and implementation
operator should coordinate the safe installation
within their ROW.
7. Plastic pipe is preferred when crossing the
to ensure pipeline integrity. A plan should be
LAND CONTOUR
pipeline.
developed and provided to the pipeline operator MODIFICATIONS
2. When working within 50 feet of the pipeline, well in advance and take into consideration the
the pipeline operator’s representative should DEEP PLOWING integrity and safety of the pipeline system.
monitor the activity. This practice will provide “Deep Plowing” is defined as the ripping or There may be a conflict between the current
adequate time and distance to maintain a other cultivation method where the ground is location of the pipeline and the needs of the
safe operation. disturbed at a depth of 16 inches or more. land modification project. The project planning
Prior to any Deep Plowing, the pipeline operator process may indicate the need to relocate the
3. The pipeline should be located and a depth
pipeline or alter the land modification project.
analysis or pipeline depth profile performed
by a representative of the pipeline operator.
should be notified well in advance. The pipeline
should be located and a depth analysis or pipeline When planning the project, please call the PLAN AHEAD WORK SAFE
depth profile performed by a representative pipeline operator. The operator should assign
The pipeline should be marked in accordance
of the pipeline operator. Yellow flags should a pipeline expert to help with the planning
with the APWA Uniform Color Code. Yellow
be placed to mark the pipeline. These flags process and advise on matters of pipeline NOTIFY PIPELINE PROJECT PLANNING IS
flags should be placed to mark the pipeline.
should be numbered and placed at frequent safety. Ample time is required to review OPERATOR WELL THE KEY TO SAFETY
These flags should be numbered and placed
the design and verify pipeline depths and IN ADVANCE
at frequent intervals and should also indicate intervals, and should also indicate station
and approximate depth. operational requirements.
station and depth. The pipeline operator’s WHEN PLANNING YOUR PROJECT
representative should prepare a Depth Survey CALL THE PIPELINE OPERATOR
PIPELINE OPERATOR’S
Report, which should include photographs REPRESENTATIVE SHOULD
showing the yellow flags. MONITOR THE ACTIVITY WHEN
YOU’RE WORKING WITHIN 50 FEET PIPELINE EXPERTS CAN HELP WITH THE
EITHER SIDE OF THE PIPELINE PLANNING PROCESS AND PIPELINE SAFETY

5 6
GUIDELINES_PROP_DEV_CHEVRON_Layout 1 8/8/11 10:51 AM Page 10

GUIDELINES
FOR BORING, DRILLING, AND TUNNELING
GUIDELINES
FOR BORING, DRILLING, AND TUNNELING
ON OR NEAR PIPELINES, FACILITIES AND RIGHTS-OF-WAY ON OR NEAR PIPELINES, FACILITIES AND RIGHTS-OF-WAY

BORING, DRILLING, AND TUNNELING No crossing should run parallel or nearly parallel SITE SPECIFIC DIAGRAMS
PROCEDURES NEAR PIPELINES to an existing pipeline within the boundaries The plan should include diagrams that are
Because both pipelines and the process of of the ROW for that existing pipeline, or within site specific. The diagrams must show a plan
boring, drilling and tunneling are underground 25 feet of the pipeline, without the pipeline and profile view. Generic plans should be RESPECT THE NEED FOR SAFETY
and not visible, special care must be given to operator’s express written approval. “Nearly redeveloped to include the title, date, and
the planning and execution of these operations parallel” means parallel to, or running at an names, addresses and phone numbers of the PIPELINE OPERATOR’S
angle 60 degrees or less to the pipeline. REPRESENTATIVE SHOULD
when other utilities and pipelines are nearby. responsible party and the tunneling contractor. MONITOR THE ACTIVITY
A pipeline operator representative should be Items that should be shown in the specific WHEN BORING, DRILLING,
“Cable” means any power or communications OR TUNNELING IN CLOSE
given an opportunity to review and approve diagrams include:
cable, including fiber optic. PROXIMITY TO THE PIPELINE
the plan for the operation, the equipment to
be used and the proposed procedure well in • Survey benchmark locations.
No splice box, service riser, or energized
advance of beginning the project. Two critical equipment should be installed within 25 feet • Property descriptions.
elements of the plan are the involvement of of the pipeline.
competent equipment operators who respect • A clear depiction of all other pipelines and
the primary need for safety, and the presence utilities, along with measurements.
of the pipeline operator’s representative when
ADVANCED PREPARATION REQUIREMENTS
Depending on the many factors that may affect • Planned location of inspection trenches and
boring, drilling or tunneling occurs in close
these jobs, the pipeline operator may also holes.
proximity to the pipeline.
require:
• Allowance for proper clearance between
COMMON GUIDELINES • Inspection trenches and holes that view the pipe and new utility.
Before beginning any conventional bore/utility tool and pipe prior to and during the crossing
service line boring, drilling or tunneling across operations to ensure proper clearance. • Description of method and instruments used
or within a pipeline right-of-way (ROW), or to follow the tool.
within 25 feet of the pipeline, consultation and • Special location equipment.
The pipeline operator may also request an
design approval permission should be received • Group meetings with other utilities, and “as-built” drawing depicting the verified angle
from the pipeline operator. validation of One-Call responses. CROSSING ANGLE AS CLOSE
of crossing, depth of the pipeline, and the TO 90°AS POSSIBLE
The pipeline operator should have a representative clearance of the foreign line. This “as-built”
• Review time by engineers qualified to
on site to monitor the crossing within the ROW. drawing provides important information for
evaluate the job.
later excavations and operational design
Common crossings include all foreign pipelines compliance data.
and pipes, cable or other utility facilities. All
crossings should be perpendicular, or as near
to 90 degrees as possible, to the existing
pipeline and its designated ROW, and should
be designed to clear the pipeline by four (4)
feet.

7 8
GUIDELINES_PROP_DEV_CHEVRON_Layout 1 8/8/11 10:51 AM Page 12

GUIDELINES
FOR OVERHEAD AND BURIED POWER AND COMMUNICATION CABLES INCLUDING
GUIDELINES
FOR OVERHEAD AND BURIED POWER AND COMMUNICATION CABLES INCLUDING
FIBER OPTICS ON OR NEAR PIPELINES, FACILITIES AND RIGHTS-OF-WAY FIBER OPTICS ON OR NEAR PIPELINES, FACILITIES AND RIGHTS-OF-WAY

“CABLE” is defined as all wires and fiber BURIED CABLES OVERHEAD CABLES
optic facilities that transmit electrical power Buried cables should have at least a 24-inch All overhead cable should maintain a minimum
20 FEET
or communications signals. It is important clearance of the pipeline. The pipeline operator height of 20 feet above grade for a distance of
that a pipeline operator knows the location of may require additional clearance or require 25 feet each side of the pipeline.
25 FEET
all cables that are buried near its pipelines. implementation of corrosion control procedures.
No part or portion of mechanical supports and OPTIONAL
Unintentional excavation of a cable may create WARNING TAPE
a hazardous situation and costly repairs may Cable crossings should be installed with service drops, including poles, towers, guy
CROSSING ANGLE
be required. Buried electrical cables can emit warning tape above the cable and signage wires, ground rods and anchors, should be AS CLOSE TO 90°
electrical currents that interfere with the aboveground. An extra length of cable should within 25 feet of the existing pipeline. AS POSSIBLE
pipeline cathodic protection system, and thus be looped to help with future excavations. 25 FEET OPTIONAL
cause or accelerate corrosion of the pipe. WARNING TAPE
Critical buried cable should cross under an
These potential hazards can be easily mitigated existing pipeline, should be contained within a 24" CLEARANCE UNDER
with advance planning by first calling the
PVC conduit of schedule 40 or greater strength, PETROLEUM PIPELINE
statewide One Call number (811), then conferring
and either have a red colored concrete slab 6
at the site with a representative of the pipeline
inches thick above the conduit for a distance
operator. It is also important to remember that
of 10 feet on each side of the existing pipeline, 10 FEET
communications cables, while not hazardous, or be encased within concrete as long as there
are critical facilities that could affect the local
is 6 inches of red colored concrete above the
emergency telephone system.
conduit, or be otherwise installed according to CABLES INSTALLED
National Electrical Code or local electrical code IN PVC WITH 6"
PLACEMENT OF CABLES RED COLORED
standards. The top of the concrete slab should CONCRETE ABOVE
All cable crossings should cross underneath have at least a 24-inch clearance of the pipeline. THE BURIED CABLE
and perpendicular to (or as near ninety [90] If metallic encasement is used as a conduit TRACER WIRE
degrees as possible) an existing pipeline and instead of PVC, it is important that cathodic
its designated right-of-way (ROW). protection and other issues be addressed with
the pipeline operator.
No cable should run parallel or nearly parallel
to a pipeline within the boundaries of its All power cables should be marked with red
designated ROW, or within 25 feet of the signs indicating “buried power cable,” according
pipeline, without the pipeline operator’s to National Electrical Code standards.
consultation and design review with express
written approval. No splice box, service riser, Non-critical buried cable may be buried directly
or energized equipment should be installed below the pipeline and without a conduit.
within 25 feet of the pipeline. In certain cases, the pipeline operator may
approve installation above the pipeline if
A warning tape placed above the cable should cable is encased in protective conduit. Note
be used to indicate the location of a cable for a the requirements for this section may vary
distance of 25 feet on either side of the pipeline, among pipeline operators so it is important
if possible, or within the pipeline ROW. to check with the pipeline operator during
the design phase of the project.
All buried cables should be marked with proper
signage and designation so that future work at
these sites can be done without damage or
interruption to the pipeline or cables.
9 10
GUIDELINES_PROP_DEV_CHEVRON_Layout 1 8/8/11 10:51 AM Page 14

GUIDELINES
FOR ROADS, RAILROADS, PAVED LOTS, AND HEAVY EQUIPMENT VEHICLES
GUIDELINES
FOR ROADS, RAILROADS, PAVED LOTS, AND HEAVY EQUIPMENT VEHICLES
ON OR NEAR PIPELINES, FACILITIES AND RIGHTS-OF-WAY ON OR NEAR PIPELINES, FACILITIES AND RIGHTS-OF-WAY

For all the following examples, the responsible PERMANENT CROSSING (AND TEMPORARY The crossing party should maintain a minimum
party should submit advance notice to the CROSSING FOR AXLE LOADS 15,000 of 36 inches from the top of pipe to grade at
pipeline operator, and receive the operator’s POUNDS AND GREATER) drainage ditches on either side of a road or
approval. Permanent vehicle crossings, such as roads, railroad, or at the perimeter of a paved lot.
railroads and paved lots, as well as temporary The edge of a proposed surface improvement
TEMPORARY CROSSING FOR AXLE LOADS crossings for heavy equipment (15,000 pounds should maintain 25 feet of clearance, if possible,
LESS THAN 15,000 POUNDS and greater) that are planned over or near a with a buried pipeline when running parallel TEMPORARY (15,000
pipeline, will require engineering evaluation to with the underground facility. LBS. OR LESS)
Any off-road traffic over a pipeline creates a
stress on the underlying pipeline and should ensure that the installation/crossing will not
Ground cover should not exceed 6 feet over
be minimized unless adequate precautions cause an excessive amount of stress on the
the top of the pipeline unless approved by the
(discussed herein) are taken. Equipment with underlying pipeline. The crossing party should
pipeline operator.
tracks, as opposed to having tires, is preferred provide the pipeline operator with a plan and RECOMMENDED
profile drawing indicating the existing and DISTANCES: 72" 36" 48" 72" 48"
if off-road travel over the pipeline is required.
In general, a minimum cover of 48 inches over proposed elevations of the proposed project; PAVED LOTS
a pipeline is required where a vehicle crossing the pipeline and buried utilities within 25 feet Any concrete paving, other than for road, street
is to be made for axle loads up to 15,000 pounds. of either side of the crossing should be clearly or driveway crossings of the pipeline (e.g.,
Site conditions (such as damp soil) may require indicated in all views. The proposed surface parking lots), to be installed over the pipeline
that the crossing location be matted or provided encroachments should cross a buried pipeline, should:
with additional cover to compensate for soil where reasonably possible, in a perpendicular
a) Be unreinforced,
displacement due to the subsidence caused by alignment (90 degrees) to minimize the length
crossing. Each location is unique and should be of the impact to the underground facility, but in b) Not exceed four (4) inches in thickness,
evaluated by a representative of the pipeline no event less than 45 degrees. A geotechnical
operator to determine site-specific protective report may be required to identify soil profile c) Be sectioned seven and one-half (7.5)
requirements. Note the weight and cover components. This subsoil study will show the feet from either side of the pipeline, with
may vary among pipeline operators so it load array characteristics of the site. appropriate asphalt expansion joints every
is important to check with the pipeline ten (10) feet, and
operator during the design phase of the COVER OVER PIPELINE d) Conform to the minimum cover requirements.
project. A minimum cover of the pipeline of 48 inches
for roads and 72 inches for railroads should be Any deviation from these recommendations
planned for both permanent installations over
the pipeline, and temporary crossings of heavy
should be confirmed with written approval
from the pipeline operator.
STUDY THE LOCATION EVALUATE CAREFULLY
equipment, unless the pipeline operator has
provided written approval to the contrary.
Temporary roads used for construction activity,
such as for lumber trucks, logging wagons, or
concrete trucks, may require extra cover and
road matting to protect the pipeline from the
additional loading stresses.

11 12
GUIDELINES_PROP_DEV_CHEVRON_Layout 1 8/8/11 10:51 AM Page 16

GUIDELINES
FOR PROPERTY IMPROVEMENTS
GUIDELINES
FOR PROPERTY IMPROVEMENTS
ON OR NEAR PIPELINES, FACILITIES AND RIGHTS-OF-WAY ON OR NEAR PIPELINES, FACILITIES AND RIGHTS-OF-WAY

TO MAINTAIN SAFE OPERATING PIPELINES, license or easement agreement may contain pipeline ROW at less than a 60-degree angle
pipeline operators routinely perform maintenance specific language prohibiting structures within to the pipeline. Fences parallel to a pipeline
and required federal/state inspections on their the ROW. The U. S. Department of Transportation/ should be at least 10 feet from the pipeline.
pipelines. In order to perform these critical Pipeline and Hazardous Materials Safety
Administration, as well as fire departments, Fences that are perpendicular to a pipeline
activities, the operator’s maintenance personnel 50 FEET
refer to distances from the pipeline where the should include a gate (12 to 16 feet minimum
must be able to access the pipeline right-of-way
pipeline operator should be consulted prior to width, depending on the pipeline operator)
(ROW), as provided in the easement agreement.
any building or excavation in that area. The or removable panels across the entire width
Required access is accomplished by keeping
table embedded in the figure outlines suggested of the ROW to allow the operator access to
the area on either side of the pipeline contained
guidelines for acceptable buffer zone distances inspect and maintain the pipeline. No masonry, 25 FEET
within the ROW clear of trees, shrubs, buildings, 50 FEET CROSSING
from the pipeline. These distances may exceed brick or stone fences should be installed on a
structures or any other encroachments that CROSSING ANGLE
rights-of-way and are not intended to replace pipeline ROW. No fences should obstruct the ANGLE 60° TO 90°
might interfere with access to the pipeline.
more stringent local regulatory requirements. view of a pipeline ROW. 60° TO 90°
Pipeline operators typically use aerial patrol to
survey the ROW, providing critical information
regarding potential issues involving the safe LANDSCAPING DRIVEWAYS OR LANES
operation of the pipeline. The landowner, as Trees and bushes should not be planted within Driveways or lanes should cross pipelines at 5 FEET
well as potential land purchasers and/or the cleared and maintained pipeline ROW. no less than a 60-degree angle and should not
developers, have the obligation to respect the However, the pipeline operator may give written run parallel within 25 feet of the pipeline.
pipeline ROW by not placing obstructions or approval for landscape planting of ground cover Generally, a minimum cover over the pipeline
encroachments within the ROW and in planning and small ornamental trees not greater than of 36 inches for driveways or lanes and 36
developments in a manner that maintains the three feet in height within 25 feet of the pipeline. inches for side ditches is recommended, but
visibility and accessibility of the ROW, such Under no circumstances should landscape the pipeline operator may want to evaluate the
impact of the encroachment to the pipeline on
RECOMMENDED
as in the platting of “greenbelts” or common
ground across the ROW area.
planting be allowed any closer than 10 feet
to a pipeline. The pipeline operator may clear a case-by-case basis. The pipeline operator DISTANCES
any vegetation within the ROW. Mechanical should approve in advance any lesser amount
The encroaching or crossing party should provide NEW HOUSE, BUSINESS, PLACE OF PUBLIC ASSEMBLY 50 FEET
mowing and tree canopy trim removal vary of cover.
the pipeline operator with a plan and profile ADDITION TO AN EXISTING DWELLING, ETC. 50 FEET
based on geographical location, but are UNOCCUPIED PERMANENT STRUCTURE 50 FEET
drawing indicating the existing and proposed
completed as needed or on scheduled intervals DRAINAGE AND SEPTIC SYSTEMS GARAGE 50 FEET
property improvements within 50 feet of the
that may span several years. Tree canopy Drainage and septic systems work on the BARN 50 FEET
pipeline, and such drawings should depict the
removal may extend to trees rooted outside principle of gravity. It is important that grade DECK AND PATIO 50 FEET
distance and relationship between the property
of the ROW but have canopy that overhangs elevations and slope are considered before SWIMMING POOL 50 FEET
improvements and pipeline. At the encroaching
into the ROW. No vegetation should obstruct these systems are created. Septic systems POND 50 FEET
or crossing party's request, the pipeline operator
pipeline markers or signage. and their leach fields should not be located SEMI-MOVEABLE STRUCTURE 25 FEET
will locate and mark its pipeline location and
within 25 feet of the pipeline. GARDEN SHED 25 FEET
depths to enable the location of the pipeline
to be accurately surveyed and depicted on the FENCING SEPTIC TANK AND LEACH FIELD 25 FEET
plan and profile drawings. The pipeline operator Fences generally impede the operator’s access REMOVAL OR DEPOSIT OF DIRT PARKING LOT LIGHT POLE 25 FEET
may choose to have a representative at the site to inspect and maintain the pipeline and thus No amount of cover should be either removed WATER WELL 25 FEET
during improvement activities. should be discouraged from being installed from, or added to, a pipeline ROW without MAIL BOX 10 FEET
across the ROW. Fences, where permitted within written approval by the pipeline operator. This YARD LIGHT 10 FEET
the ROW, should be installed so that posts are recommendation applies to removal or burying NOTE: SITE-SPECIFIC PLANS ARE REQUESTED
STRUCTURES WHENEVER THE STRUCTURE DISTANCE CANNOT
not within five (5) feet of any pipeline and, if of rocks and ditching for farm drainage, as an MEET THE RECOMMENDATIONS.
In general, no structure or obstruction is allowed
crossing the pipeline, should be equidistant example.
within the pipeline’s ROW. The terms of the
from the pipeline. No fence should cross a
13 14
GUIDELINES_PROP_DEV_CHEVRON_Layout 1 8/8/11 10:51 AM Page 18

GUIDELINES
FOR NON-EXPLOSIVE SEISMIC TESTING AND BLASTING OPERATIONS
GUIDELINES
FOR NON-EXPLOSIVE SEISMIC TESTING AND BLASTING OPERATIONS
ON OR NEAR PIPELINES, FACILITIES AND RIGHTS-OF-WAY ON OR NEAR PIPELINES, FACILITIES AND RIGHTS-OF-WAY

THE PARTY RESPONSIBLE FOR THE SEISMIC NON-EXPLOSIVE SEISMIC TESTING BLASTING OPERATIONS
TESTING or blasting operations should be in No seismic testing with steady state vibrator For any blasting operation within one-fourth
compliance with all applicable local, state and or thumper sources should be conducted within mile of a pipeline, the pipeline operator should
federal regulations and requirements. 150 feet of a pipeline. All other non-explosive be supplied with a pre-work survey, including 150 FEET STEADY STATE VIBRATOR
OR THUMPER SOURCE
seismic sources, including the use of air guns, a written report documenting any special
A seismic testing or blasting plan should be should not be used within 600 feet of a conditions or proposed adjustments which
submitted to the pipeline operator for approval pipeline. are to be incorporated into the seismic testing
prior to the start of the project. or blasting activity plan to prevent possible
damage to pipeline systems. This survey 600 FEET
Only experienced personnel who are trained
should be performed by an accredited third-
and certified in such operations and who are
party surveyor and reviewed by appropriately
aware of the hazards involved should conduct
qualified personnel of the pipeline operator.
any seismic testing or blasting operations.
A seismic monitoring unit should be inserted
The party responsible for the seismic testing OTHER NON-EXPLOSIVE
directly over the pipeline and covered with TESTING DEVICES
or blasting should notify the pipeline operator
sandbags if soil conditions prevent adequate
immediately if any changes are made to the
insertion. The Peak Particle Velocity (PPV)
seismic testing or blasting plans.
should not exceed two (2) inches per second
(IPS) for any blast. The pipeline operator should
be notified of any PPV readings approaching
or exceeding 2 IPS.

P
E
T
R
O
L
E
U
M

1,320 FEET

BLASTING OPERATIONS
15 16
GUIDELINES_PROP_DEV_CHEVRON_Layout 1 8/8/11 10:51 AM Page 20

PIPELINE SAFETY AWARENESS


CALL 811 BEFORE YOU DIG
PIPELINE SAFETY AWARENESS
MARKER SIGNS ARE IMPORTANT!

FOLLOWING THE PRACTICES RECOMMENDED ACTIONS TO TAKE IF YOU SUSPECT A JOB SITE SAFETY IS VITAL Pipelines are marked with aboveground signs Pipeline markers are located at varying intervals Remember, as the job site develops, the
IN THESE GUIDELINES WILL HELP PREVENT PIPELINE RELEASE: If you are a contractor, you should be able to (markers) within the right-of-way (ROW), as along the ROW and typically on both sides of topography changes. Points of reference
PIPELINE ACCIDENTS. BUT, IN CASE OF AN answer “yes” to these important questions: required by federal/state regulations, to alert most road crossings. All pipeline markers list become unclear. New workers arrive. The
ACCIDENT, ALL WORKERS ON THE SITE • If you are operating equipment or a motorized the public, landowners and potential excavators a telephone number for reporting pipeline pipeline marker becomes more critical when
SHOULD KNOW HOW TO RECOGNIZE, vehicle near a pipeline and suspect a leak, 1. Do you hold regular weekly safety meetings to the existence and approximate location of a emergencies and will indicate the product activity increases in the area. As people come
RESPOND TO AND REPORT PIPELINE turn off the ignition immediately and walk that all workers attend? pipeline. Removal or tampering with marker being transported in that pipeline. The to live and work near the pipeline system, the
DAMAGE OR A RELEASE. into the wind and away from the site. signs is unsafe and violates federal law. The placement of these markers indicates the awareness and the respect for these markers
2. Are regular reminders of job safety reinforced
permanent pipeline signs and markers also general position of the buried pipeline and must be maintained.
• Leave the area and prohibit non-emergency and updated?
help keep workers safe by keeping their focus should never be used as a reference for the
INDICATIONS OF A PIPELINE RELEASE persons from accessing the area.
3. Are there methods to track those meetings on the High Pressure Pipeline System. exact location of the pipeline.
INCLUDE:
• Avoid contact with any fluids or vapors and who attends?
• A hissing, roaring or rumbling sound near the escaping from the pipeline. Walk into the
pipeline. wind and away from the site. 4. Are safety procedures enforced by
management?
• Vapor clouds, heat waves, dying or discolored • From a safe area, call your local emergency
vegetation near a pipeline. officials or 911 to report the suspected leak. 5. Are new employees and subcontractors SIGNS LOCATED NEAR ROADS, RAILROADS,
required to follow those same procedures? AND ALONG PIPELINE RIGHT-OF-WAYS
• Pooling or a soil stain of crude oil or petroleum • Call the pipeline operator whose telephone
products near or downhill from a pipeline. number is listed on a nearby marker. 6. Are the safety requirements of the
subcontractor written into your contract?
• An odd or unusual odor, such as a gas, chemical • Never attempt to operate the pipeline valves
or petroleum smell near or downwind from or extinguish a pipeline fire. This could
the pipeline. Do not depend entirely on actually prolong an incident or even cause
odor to determine if there may be a leak as another leak in the pipeline.
the natural gas in most transmission gas
pipelines is not odorized. • If you suspect a leak, it’s important that you
not create a spark. Potential ignition sources
include smoking materials or open flames,
cell phones, pagers, flashlights, vehicle
keyless entry remotes, and motorized vehicles
or equipment. If you are inside your home or
business, do not operate light switches,
phones or other electrical devices.

PAINTED METAL OR TEST PIPELINE CASING VENTS MARKER FOR PIPELINE PATROL PLANE
PLASTIC POSTS STATION

17 18
GUIDELINES_PROP_DEV_CHEVRON_Layout 1 8/8/11 10:51 AM Page 22

THE ONE CALL SYSTEM


CALL 811 BEFORE YOU DIG
SPECIAL NOTES
API PUBLICATIONS NECESSARILY ADDRESS PROBLEMS OF A GENERAL NATURE

Every excavation job requires a contact with A major source of pipeline leaks is damage It’s easy – just follow these steps: WITH RESPECT TO PARTICULAR API publications facilitate the broad availability Information about API Publications, Programs
One Call, no matter who is actually doing the caused when someone accidentally strikes a CIRCUMSTANCES, LOCAL, STATE, of proven, sound engineering and operating and Services is available online at www.api.org.
digging or how small or large the project. pipeline when digging in the right-of-way. •CALL 811 BEFORE YOU DIG. AND FEDERAL LAWS AND REGULATIONS practices. These documents are not intended to
Before digging, call 811, the federally-mandated Such damage may not immediately result obviate the need for applying sound engineering All rights reserved. No part of this work may
SHOULD BE REVIEWED.
“Call Before You Dig” number, to be connected in a pipeline break but can weaken metal judgment regarding when and where these be reproduced, translated, stored in a retrieval
•ALLOW TIME FOR MARKING.
to your local One Call center. This is a free or remove a pipeline’s corrosion-prevention Neither the American Petroleum Institute (API) documents should be utilized. The formulation system, or transmitted by any means, electronic,
service. The One Call center will notify the coating, which could possibly lead to a leak nor any of API’s employees, subcontractors, and publication of API documents is not intended mechanical, photocopying, recording, or
•RESPECT THE MARKS.
appropriate utility that someone is proposing months or even years later. consultants, committees, or other assignees in any way to inhibit anyone from using any otherwise, without prior written permission
to dig near a pipeline or other buried utility, make any warranty or representation, either other practices. from the publisher. Contact the Publisher,
•EXCAVATE WITH CARE.
such as a power line or water main, and the Every state has different rules and regulations express or implied, with respect to the accuracy, API Publishing Services, 1220 L Street, NW,
about digging, some stricter than others. Any manufacturer marking equipment or Washington, DC 20005-4070, USA.
line will be marked. •FOLLOW YOUR STATE’S ONE CALL completeness, or usefulness of the information
To avoid project delays and possible fines, contained herein, or assume any liability or materials in conformance with the marking
LAWS. Copyright © 2009 American Petroleum Institute.
To dig without calling 811 is to make a risky please allow adequate scheduling time when responsibility for any use, or the results of such requirements of an API standard is solely
assumption that can be life-threatening. calling 811 or your state One Call center. use, of any information or process disclosed in responsible for complying with all the applicable
Excavation damage can cause injury, loss of this publication. Neither API nor any of API’s requirements of that standard. API does not THIS PUBLICATION WAS MODELED
life and environmental damage. Striking a employees, subcontractors, consultants, or represent, warrant, or guarantee that such AFTER GUIDELINES FOR PROPERTY
buried utility may also cause interruptions other assignees represent that use of this products do in fact conform to the applicable DEVELOPMENT PRODUCED BY
to vital services in your community and can publication would not infringe upon privately API standard. MARATHON PIPE LINE LLC.
involve tremendous repair costs. owned rights.
Nothing contained in any API publication is
API publications may be used by anyone to be construed as granting any right, by
desiring to do so. Every effort has been made implication or otherwise, for the manufacture,
by the Institute to assure the accuracy and sale, or use of any method, apparatus, or
reliability of the data contained in them; product covered by letters patent. Neither
however, the Institute makes no representation, should anything contained in the publication
warranty, or guarantee in connection with this be construed as insuring anyone against
publication and hereby expressly disclaims any liability for infringement of letters patent.
liability or responsibility for loss or damage
Questions concerning the interpretation of the
resulting from its use or for the violation of
content of this document or comments and
any authorities having jurisdiction with which
questions concerning the procedures under
this publication may conflict.
which this document was developed should
be directed in writing to:

Pipeline Segment
American Petroleum Institute
1220 L Street, NW,
Washington, DC 20005-4070
USA

19 20
GUIDELINES_PROP_DEV_CHEVRON_Layout 1 8/8/11 10:51 AM Page 24

Distributed by

Chevron Pipe Line Company


Non-Emergency Contact: (877) 596-2800
Email Contact: CPLCAO@chevron.com
www.chevronpipeline.com

An American Petroleum Institute Publication

1220 L Street, NW ORDERING INFORMATION


Washington, DC 20005-4070 Online: www.api.org/pubs
USA Phone: 1.800.854.7179 (Toll-free in the U.S. and Canada)
303.397.7956 (Local and International)
www.api.org Fax: 303.397.2740

Product Number: D0GP04

Copyright 2011 – American Petroleum Institute, all rights reserved. API and the API logo are either trademarks or registered
trademarks of API in the United States and/or other countries. The 811 logo is a registered trademark of Common Ground Alliance.
The TransCanada logo is a registered trademark of TransCanada Corporation.

API Digital Media: 2011-163 | 08.11

You might also like