Professional Documents
Culture Documents
Tanggal
Vol. Rate Amount Vol. Rate Amount Vol.
5.81 275,000 1,597,750 1.00 350,000 350,000 1.00
5.81 275,000 1,597,750 1.00 350,000 350,000 1.00
5.66 275,000 1,556,500 1.00 350,000 350,000 1.00
6.67 275,000 1,834,250 1.00 340,000 340,000
10/6/2022
7.18 275,000 1,974,500 1.00 340,000 340,000
5.81 275,000 1,597,750 1.00 350,000 350,000
6.13 275,000 1,685,750 1.00 350,000 350,000
6.29 275,000 1,729,750 1.00 350,000 350,000
Sub-Total 49.36 275,000 13,574,000 8.00 347,500 2,780,000 3.00
Total 16,
Rasio/m3
Jual 49.36 360,000 17,
Untung 1,3
7.38 275,000 2,029,500 1.00 350,000 350,000 1.00
6.67 275,000 1,834,250 1.00 350,000 350,000 1.00
6.15 275,000 1,691,250 1.00 350,000 350,000
6.65 275,000 1,828,750 1.00 350,000 350,000
6.85 275,000 1,883,750 1.00 350,000 350,000
5.81 275,000 1,597,750 1.00 340,000 340,000
6.49 275,000 1,784,750 1.00 340,000 340,000
6.29 275,000 1,729,750 1.00 340,000 340,000
5.49 275,000 1,509,750 1.00 340,000 340,000
5.96 275,000 1,639,000 1.00 340,000 340,000
6.29 275,000 1,729,750 1.00 340,000 340,000
5.90 275,000 1,622,500 1.00 340,000 340,000
6.13 275,000 1,685,750 1.00 340,000 340,000
5.60 275,000 1,540,000 1.00 340,000 340,000
10/7/2022 7.10 275,000 1,952,500 1.00 340,000 340,000
5.77 275,000 1,586,750 1.00 340,000 340,000
5.13 275,000 1,410,750 1.00 340,000 340,000
5.81 275,000 1,597,750 1.00 340,000 340,000
6.14 275,000 1,688,500 1.00 340,000 340,000
5.62 275,000 1,545,500 1.00 340,000 340,000
5.60 275,000 1,540,000 1.00 340,000 340,000
5.78 275,000 1,589,500 1.00 340,000 340,000
6.30 275,000 1,732,500 1.00 340,000 340,000
7.50 275,000 2,062,500 1.00 340,000 340,000
6.49 275,000 1,784,750 1.00 340,000 340,000
7.22 275,000 1,985,500 1.00 340,000 340,000
5.78 275,000 1,589,500 1.00 340,000 340,000
6.30 275,000 1,732,500 1.00 340,000 340,000
- 6.00 275,000 - 1,650,000
Sub-Total 168.20 275,000 46,255,000 28.00 341,786 9,570,000 2.00
Total 55,
Rasio/m3
Jual 174.20 360,000 62,
Untung 6,8
6.00 350,000 2,100,000 1.00 280,000 280,000 1.00
6.00 350,000 2,100,000 1.00 280,000 280,000 1.00
6.00 350,000 2,100,000 1.00 280,000 280,000
6.00 350,000 2,100,000 1.00 280,000 280,000
6.00 350,000 2,100,000 1.00 280,000 280,000
6.00 350,000 2,100,000 1.00 280,000 280,000
6.00 350,000 2,100,000 1.00 280,000 280,000
6.00 350,000 2,100,000 1.00 280,000 280,000
10/17/2022 6.00 350,000 2,100,000 1.00 280,000 280,000
6.00 350,000 2,100,000 1.00 280,000 280,000
6.00 350,000 2,100,000 1.00 280,000 280,000
6.00 350,000 2,100,000 1.00 280,000 280,000
6.00 350,000 2,100,000 1.00 280,000 280,000
6.00 350,000 2,100,000 1.00 280,000 280,000
6.00 350,000 2,100,000 1.00 280,000 280,000
6.00 350,000 2,100,000 1.00 280,000 280,000
4.00 350,000 1,400,000 1.00 280,000 280,000
Sub-Total 100.00 350,000 35,000,000 17.00 280,000 4,760,000 2.00
Total 39,
Rasio/m3
Jual 100.00 435,000 43,
Untung 3,6
5.62 275,000 1,545,500 1.00 340,000 340,000 1.00
4.80 275,000 1,320,000 1.00 340,000 340,000 1.00
5.50 275,000 1,512,500 1.00 340,000 340,000
5.83 275,000 1,603,250 1.00 340,000 340,000
5.62 275,000 1,545,500 1.00 340,000 340,000
6.02 275,000 1,655,500 1.00 340,000 340,000
10/18/2022
5.10 275,000 1,402,500 1.00 340,000 340,000
5.50 275,000 1,512,500 1.00 340,000 340,000
6.15 275,000 1,691,250 1.00 330,000 330,000
6.06 275,000 1,666,500 1.00 330,000 330,000
5.92 275,000 1,628,000 1.00 330,000 330,000
6.02 275,000 1,655,500 1.00 330,000 330,000
Sub-Total 68.14 275,000 18,738,500 12.00 336,667 4,040,000 2.00
Total 22,
Rasio/m3
Jual 68.14 360,000 24,
Untung 1,6
5.81 - - 5.81 75,000 435,750 1.00
7.22 - - 7.22 75,000 541,500 1.00
6.84 - - 6.84 75,000 513,000
7.52 - - 7.52 75,000 564,000
10/31/2022
7.22 - - 7.22 75,000 541,500
6.84 - - 6.84 75,000 513,000
7.52 - - 7.52 75,000 564,000
5.81 - - 5.81 75,000 435,750
Sub-Total 54.78 - - 54.78 75,000 4,108,500 2.00
Total 4,1
Rasio/m3
Jual 54.78 108,333 5,
Untung 1,7
18,333 55,000
16,409,000
332,435
17,769,600
1,360,600
50,000 50,000
2,500 2,500
26,250 52,500
55,877,500
320,766
62,712,000
6,834,500
20,000 20,000
50,000 50,000
35,000 70,000
39,830,000
398,300
43,500,000
3,670,000
50,000 50,000
2,500 2,500
26,250 52,500
22,831,000
335,060
24,530,400
1,699,400
50,000 50,000
2,500 2,500
26,250 52,500
4,161,000
75,958
5,934,500
1,773,500
50,000 50,000
2,500 2,500
26,250 52,500
11,250,000
75,352
16,174,167
4,924,167
6,500 6,500
-
6,500 6,500
2,657,000
75,184
3,828,500
1,171,500
2,500 2,500
-
2,500 2,500
11,149,000
75,017
16,100,500
4,951,500
2,500 2,500
-
2,500 2,500
1,541,250
97,240
2,217,083
675,833
27,061,000
-
Saldo Keterangan
46,851,600 Pembelian agregate base A = 78.19 m3
160,318,800 Pembelian agregate base A = 101.48 m3
97,606,800 Pembelian agregate base A = 174.2 m3
84,286,800 Rental CP L-Mix harian
Keterangan
Pembelian agregate base A = 78.19 m3 78.19 360,000 28,148,400
Pembelian agregate base A = 101.48 m3 101.48 360,000 36,532,800
Pembelian agregate base A = 174.2 m3 174.20 360,000 62,712,000
Pembayaran rental CP L-Mix harian
Pembelian split 1-2 = 100 m3 100.00 388,500 38,850,000
Pembayaran rental DT split 1-2 = 17 Rit
Pembelian agregate base A = 68.14 m3 68.14 360,000 24,530,400
Ganti uang CP L-Mix harian
Deposit Petty Cash
Pembayaran split 1/2 78 m3 77.99 435,056 33,930,000
Pembayaran base a 49 m3 49.71 416,250 20,691,787
Pembayaran angkutan split 2/3
Pembayaran angkutan split 2/3
Pembayaran angkutan split 2/3
Pembayaran rental towing exca PC50
Pembayaran angkutan split 2/3
Pembayaran angkutan split 2/3
Pembayaran rental DT harian
Pembayaran rental CP KMM harian
Pembayaran angkutan base a
Pembayaran base a 130.25 m3 130.25 415,000 54,053,750
Pembayaran rental CP L-Mix harian
Pembayaran rental towing exca PC50
Pembayaran angkutan base a
Pembayaran base a 30.34 m3 30.34 415,000 12,591,100
Pembayaran rental CP L-Mix harian
Pembayaran angkutan base a
Pembayaran base a 59.68 m3 59.68 415,000 24,767,200
Pembayaran angkutan base a
Pembayaran base a 31.26 m3 31.26 415,000 12,972,900
Deposit Petty Cash
Pembayaran base a 100.72 m3 100.72 435,316 43,845,000
Pembayaran base a 14.49 m3 14.49 415,000 6,013,350
Pembayaran base a 14.49 m3 14.49 415,000 6,013,350
Pembayaran angkutan base a
Deposit Petty Cash
Pembayaran base a 108.85 m3 108.85 415,000 45,172,750
Pembayaran angkutan base a
Deposit Petty Cash
Pembayaran base a 48.41 m3 48.41 415,000 20,090,150
Pembayaran angkutan base a
Pembayaran besi tulangan
Pembayaran pasir 12.10 m3
Pembayaran pasir 24.08 m3
Pembayaran angkutan split 2/3
Pembayaran angkutan split 2/3