The document is a maintenance log tracking work done on various units over several days. It includes details like the unit worked on, issue, work status, dates, start and end times of repairs, and technicians assigned. A variety of issues are listed like transmission problems, air conditioning issues, pump repairs and more. The log shows work being done, pending, waiting on parts or in progress over the period from June 25th to August 6th by technicians including Yadi, Padu, and others.
The document is a maintenance log tracking work done on various units over several days. It includes details like the unit worked on, issue, work status, dates, start and end times of repairs, and technicians assigned. A variety of issues are listed like transmission problems, air conditioning issues, pump repairs and more. The log shows work being done, pending, waiting on parts or in progress over the period from June 25th to August 6th by technicians including Yadi, Padu, and others.
The document is a maintenance log tracking work done on various units over several days. It includes details like the unit worked on, issue, work status, dates, start and end times of repairs, and technicians assigned. A variety of issues are listed like transmission problems, air conditioning issues, pump repairs and more. The log shows work being done, pending, waiting on parts or in progress over the period from June 25th to August 6th by technicians including Yadi, Padu, and others.
DATE UNIT HM WO TROUBLE HOURS HOURS LAMA BD EMPLOYEE NAME
JAM HM IN HM OUT RFU DATE START FINISH Sunday, August 1, 2021 25 Juni 2021 DT 212 7:00 GS WAITING PART 0:00 0.00 12:00 AM 19 Juli 2021 DT 240 7:00 HIGH LOW PROGRESS 1-Aug-21 7:20 16:40 16.67 12:00 AM YADI 22 Juli 2021 DT 210 7:00 SWITCHING APPARATUS WAITING PART 1-Aug-21 7:10 11:45 4:35 4.58 11:45 AM PADI,YUDI,JOKO 29 Juli 2021 DT 217 7:00 TRANSMISI PENDING 0:00 0.00 12:00 AM 31 Juli 2021 DT 209 7:00 AC WAITING PART 0:00 0.00 12:00 AM 01 Agustus 2021 DT 247 7:00 REM RFU 1-Aug-21 7:00 11:20 4:20 4.33 11:20 AM YUDI, YADI Monday, August 2, 2021 25 Juni 2021 DT 212 7:00 GS WAITING PART 0:00 0.00 12:00 AM 19 Juli 2021 DT 240 7:00 HIGH LOW RFU 2-Aug-21 7:20 11:45 4:25 4.42 11:45 AM YADI 22 Juli 2021 DT 210 7:00 SWITCHING APPARATUS RFU 2-Aug-21 7:10 9:00 1:50 1.83 9:00 AM YADI 29 Juli 2021 DT 217 7:00 TRANSMISI PENDING 0:00 0.00 12:00 AM 31 Juli 2021 DT 209 7:00 AC WAITING PART 0:00 0.00 12:00 AM 02 Agustus 2021 DT 240 11:45 BAN WAITING PART 0:00 0.00 12:00 AM 02 Agustus 2021 E 312 7:00 BLOWBAY PENDING 0:00 0.00 12:00 AM 02 Agustus 2021 GD 01 7:00 HYD OIL TRANSMISI WAITING PART 0:00 0.00 12:00 AM 02 Agustus 2021 E 402 7:00 AC WAITING PART 0:00 0.00 12:00 AM Tuesday, August 3, 2021 25 Juni 2021 DT 212 7:00 GS WAITING PART 0:00 0.00 12:00 AM 29 Juli 2021 DT 217 7:00 TRANSMISI PENDING 0:00 0.00 12:00 AM 31 Juli 2021 DT 209 7:00 AC WAITING PART 0:00 0.00 12:00 AM 02 Agustus 2021 DT 240 7:00 BAN WAITING PART 0:00 0.00 12:00 AM 02 Agustus 2021 E 312 7:00 BLOWBAY PENDING 0:00 0.00 12:00 AM 02 Agustus 2021 GD 01 7:00 HYD OIL TRANSMISI RFU 3-Aug-21 7:00 8:00 1:00 1.00 8:00 AM PADI, RICO 03 Agustus 2021 GD 01 8:00 SERVICE RFU 3-Aug-21 8:00 9:30 1:30 1.50 9:30 AM PADI, RICO 03 Agustus 2021 E 402 7:00 AC RFU 3-Aug-21 12:30 13:20 0:50 0.83 1:20 PM CAHYO,FAUZI 03 Agustus 2021 DT 234 12:00 AC PENDING 0:00 0.00 12:00 AM 03 Agustus 2021 E 301 7:00 IDLER RFU 3-Aug-21 14:20 16:05 1:45 1.75 4:05 PM PADI,FAUZI,CAHYO Wednesday, August 4, 2021 25 Juni 2021 DT 212 7:00 GS WAITING PART 0:00 0.00 12:00 AM 29 Juli 2021 DT 217 7:00 TRANSMISI PENDING 0:00 0.00 12:00 AM 31 Juli 2021 DT 209 7:00 AC WAITING PART 0:00 0.00 12:00 AM 02 Agustus 2021 DT 240 7:00 PUMP PTO RFU 4-Jul-21 7:20 15:00 7:40 7.67 3:00 PM PADI,YOTO 02 Agustus 2021 E 312 7:00 BLOWBAY PENDING 0:00 0.00 12:00 AM 03 Agustus 2021 DT 234 7:00 AC PENDING 0:00 0.00 12:00 AM 04 Agustus 2021 DT 233 7:00 PATAH PER RFU 4-Aug-21 7:00 14:00 7:00 7.00 2:00 PM YADI,YOTO 04 Agustus 2021 DT 222 9:00 BOOSTER KOPLING PROGRESS 4-Aug-21 9:00 15:00 15.00 12:00 AM YADI Thursday, August 5, 2021 25 Juni 2021 DT 212 7:00 GS WAITING PART 0:00 0.00 12:00 AM 29 Juli 2021 DT 217 7:00 TRANSMISI PENDING 0:00 0.00 12:00 AM 31 Juli 2021 DT 209 7:00 AC WAITING PART 0:00 0.00 12:00 AM 02 Agustus 2021 E 312 7:00 BLOWBAY PENDING 0:00 0.00 12:00 AM 03 Agustus 2021 DT 234 7:00 AC PENDING 0:00 0.00 12:00 AM 04 Agustus 2021 DT 222 7:00 BOOSTER KOPLING RFU 5-Aug-21 9:00 15:00 6:00 6.00 3:00 PM YADI 05 Agustus 2021 E 207 6:59 TRACK LEPAS PROGRESS 5-Aug-21 9:00 15:00 15.00 12:00 AM PADI 06 Agustus 2021 25 Juni 2021 DT 212 7:00 GS WAITING PART 0:00 0.00 12:00 AM 29 Juli 2021 DT 217 7:00 TRANSMISI PENDING 0:00 0.00 12:00 AM 31 Juli 2021 DT 209 7:00 AC WAITING PART 0:00 0.00 12:00 AM 02 Agustus 2021 E 312 7:00 BLOWBAY PENDING 0:00 0.00 12:00 AM 03 Agustus 2021 DT 234 7:00 AC PENDING 0:00 0.00 12:00 AM 05 Agustus 2021 E 207 6:59 TRACK LEPAS RFU 6-Aug-21 7:00 8:00 1:00 1.00 8:00 AM PADI 06 Agustus 2021 DT 210 6:59 NO START PENDING 0:00 0.00 12:00 AM 06 Agustus 2021 DT 240 6:59 KEBOCORAN OLI TRANSMISI PENDING 0:00 0.00 12:00 AM 06 Agustus 2021 E 301 6:59 AC PENDING 0:00 0.00 12:00 AM PENDING 0:00 0.00 12:00 AM PENDING 0:00 0.00 12:00 AM PENDING 0:00 0.00 12:00 AM PENDING 0:00 0.00 12:00 AM PENDING 0:00 0.00 12:00 AM PENDING 0:00 0.00 12:00 AM PENDING 0:00 0.00 12:00 AM PENDING 0:00 0.00 12:00 AM PENDING 0:00 0.00 12:00 AM PENDING 0:00 0.00 12:00 AM Thursday, 19 August 2021 DT 212 7:00 GS,GARDAN WAITING PART 0:00 0.00 12:00 AM DT 217 7:00 HIGH LOW,PTO PUMP WAITING PART 0:00 0.00 12:00 AM 02 Agustus 2021 E 312 7:00 BLOWBAY PENDING 0:00 0.00 12:00 AM DT 210 6:59 TRANSMISI PENDING 0:00 0.00 12:00 AM DT 240 6:59 GARDAN PENDING 0:00 0.00 12:00 AM E 301 6:59 ELECTRIC EROR PROGRESS 19-Aug-21 7:10 16:50 9:40 9.67 4:50 PM YADI,RICO,YORI DT 233 6:59 V-BELT WAITING PART 0:00 0.00 12:00 AM 19 Agustus 2021 GD 01 14:30 18536.3 BAN BOCOR PENDING 19-Aug-21 14:30 9:30 9.50 12:00 AM JOKO,ANDREAS Friday, 20 August 2021 DT 212 7:00 GS,GARDAN WAITING PART 0:00 0.00 12:00 AM DT 217 7:00 HIGH LOW,PTO PUMP WAITING PART 0:00 0.00 12:00 AM 02 Agustus 2021 E 312 7:00 BLOWBAY PENDING 0:00 0.00 12:00 AM DT 210 6:59 TRANSMISI PENDING 0:00 0.00 12:00 AM DT 240 6:59 GARDAN PENDING 0:00 0.00 12:00 AM E 301 6:59 ELECTRIC EROR PROGRESS 20-Aug-21 7:10 16:50 9:40 9.67 4:50 PM YADI,RICO,YORI DT 233 6:59 V-BELT WAITING PART 0:00 0.00 12:00 AM 19 Agustus 2021 GD 01 14:30 18536.3 BAN BOCOR RFU 20-Aug-21 7:20 10:40 3:20 3.33 10:40 AM JOKO,ANDREAS Saturday, 21 August 2021 DT 212 7:00 GS,GARDAN WAITING PART 0:00 0.00 12:00 AM DT 217 7:00 HIGH LOW,PTO PUMP WAITING PART 0:00 0.00 12:00 AM 02 Agustus 2021 E 312 7:00 BLOWBAY PENDING 0:00 0.00 12:00 AM DT 210 6:59 TRANSMISI PENDING 0:00 0.00 12:00 AM DT 240 6:59 GARDAN PENDING 0:00 0.00 12:00 AM E 301 6:59 ELECTRIC EROR PROGRESS 21-Aug-21 7:10 16:50 16.83 12:00 AM YADI,RICO,YORI DT 233 6:59 V-BELT WAITING PART 0:00 0.00 12:00 AM Sunday, 22 August 2021 DT 212 7:00 GS,GARDAN WAITING PART 0:00 0.00 12:00 AM DT 217 7:00 HIGH LOW,PTO PUMP WAITING PART 0:00 0.00 12:00 AM 02 Agustus 2021 E 312 7:00 BLOWBAY PENDING 0:00 0.00 12:00 AM DT 210 6:59 TRANSMISI PENDING 0:00 0.00 12:00 AM DT 240 6:59 GARDAN PROGRESS 22-Aug-21 7:10 16:50 16.83 12:00 AM YORI,RICO E 301 6:59 ELECTRIC EROR RFU 22-Aug-21 7:10 7:40 0:30 0.50 7:40 AM YADI DT 233 6:59 V-BELT PROGRESS 22-Aug-21 8:00 9:00 1:00 1.00 9:00 AM RICO,YORI Monday, 23 August 2021 DT 212 7:00 GS,GARDAN WAITING PART 0:00 0.00 12:00 AM DT 217 7:00 HIGH LOW,PTO PUMP WAITING PART 0:00 0.00 12:00 AM 02 Agustus 2021 E 312 7:00 BLOWBAY PENDING 0:00 0.00 12:00 AM DT 210 6:59 TRANSMISI PENDING 0:00 0.00 12:00 AM DT 240 6:59 GARDAN RFU 23-Aug-21 7:10 15:00 7:50 7.83 3:00 PM YADI,YORI,RICO 23 Agustus 2021 DT 240 15:00 BAN WAITING PART 0:00 0.00 23 Agustus 2021 DT 233 6:59 AC PENDING 0:00 0.00 12:00 AM 23 Agustus 2021 DT 207 6:59 LAS KNALPOT RFU 23-Aug-21 7:00 11:00 4:00 4.00 11:00 AM YOTO, JOKO Tuesday, 24 August 2021 DT 212 7:00 GS,GARDAN WAITING PART 0:00 0.00 12:00 AM DT 217 7:00 HIGH LOW,PTO PUMP WAITING PART 0:00 0.00 12:00 AM 02 Agustus 2021 E 312 7:00 BLOWBAY PENDING 0:00 0.00 12:00 AM DT 210 6:59 TRANSMISI PROGRESS 24-Aug-21 13:00 11:00 11.00 12:00 AM YUDI 23 Agustus 2021 DT 240 6:59 BAN WAITING PART 0:00 0.00 12:00 AM 23 Agustus 2021 DT 233 6:59 AC PENDING 0:00 0.00 12:00 AM 24 Agustus 2021 E 207 6:59 SERVICE HM 2000 RFU 24-Aug-21 7:10 14:00 6:50 6.83 2:00 PM YADI,FAISAL,HUSNI, DT 234 6:59 PROGRESS 24-Aug-21 8:00 16:00 16.00 12:00 AM FAUZI,YOTO,JOKO E 207 14:00 PROGRESS 24-Aug-21 14:00 10:00 10.00 12:00 AM YOTO, YADI,HUSNI Wednesday, 25 August 2021 DT 212 7:00 GS,GARDAN WAITING PART 0:00 0.00 12:00 AM DT 217 7:00 HIGH LOW,PTO PUMP WAITING PART 0:00 0.00 12:00 AM 02 Agustus 2021 E 312 7:00 BLOWBAY PENDING 0:00 0.00 12:00 AM DT 210 6:59 TRANSMISI PROGRESS 25-Aug-21 13:00 11:00 11.00 12:00 AM YUDI 23 Agustus 2021 DT 240 6:59 BAN PROGRESS 0:00 0.00 12:00 AM 23 Agustus 2021 DT 233 6:59 AC PENDING 0:00 0.00 12:00 AM 25 Agustus 2021 E 301 6:59 HOSE PECAH RFU 25-Aug-21 7:00 8:45 1:45 1.75 8:45 AM JOKO,HUSNI Thursday, 26 August 2021 DT 212 7:00 GS,GARDAN WAITING PART 0:00 0.00 12:00 AM DT 217 7:00 HIGH LOW,PTO PUMP WAITING PART 0:00 0.00 12:00 AM 02 Agustus 2021 E 312 7:00 BLOWBAY PROGRESS 26-Aug-21 7:00 17:00 17.00 12:00 AM PADI,HUSNI DT 210 6:59 TRANSMISI PROGRESS 26-Aug-21 13:00 11:00 11.00 12:00 AM YUDI,FAUZI,FAISAL 23 Agustus 2021 DT 240 6:59 TRANSMISI PROGRESS 0:00 0.00 12:00 AM 23 Agustus 2021 DT 233 6:59 AC WAITING PART 0:00 0.00 12:00 AM 26 Agustus 2021 DT 222 10:30 AMPER PANAS NAIK PENDING 0:00 0.00 12:00 AM 26 Agustus 2021 DT 234 9:00 TEKOR ANGIN RFU 26-Aug-21 9:10 9:45 0:35 0.58 9:45 AM JOKO,RICO 26 Agustus 2021 DT 233 13:00 BAN BOCOR PROGRESS 26-Aug-21 13:20 10:40 10.67 12:00 AM YOTO,FAUZI Friday, 27 August 2021 DT 212 7:00 GS,GARDAN WAITING PART 0:00 0.00 12:00 AM DT 217 7:00 HIGH LOW,PTO PUMP WAITING PART 0:00 0.00 12:00 AM 02 Agustus 2021 E 312 7:00 BLOWBAY PROGRESS 27-Aug-21 7:00 17:00 17.00 12:00 AM PADI,HUSNI DT 210 6:59 TRANSMISI PROGRESS 27-Aug-21 13:00 11:00 11.00 12:00 AM YUDI,FAUZI,FAISAL 23 Agustus 2021 DT 240 6:59 TRANSMISI PROGRESS 0:00 0.00 12:00 AM 23 Agustus 2021 DT 233 6:59 AC WAITING PART 0:00 0.00 12:00 AM 26 Agustus 2021 DT 222 10:30 BEARING RODA PROGRESS 0:00 0.00 12:00 AM 26 Agustus 2021 DT 233 13:00 BAN BOCOR PROGRESS 27-Aug-21 13:20 10:40 10.67 12:00 AM YOTO,FAUZI Saturday, 28 August 2021 DT 212 7:00 GS,GARDAN WAITING PART 0:00 0.00 12:00 AM DT 217 7:00 HIGH LOW,PTO PUMP WAITING PART 0:00 0.00 12:00 AM 02 Agustus 2021 E 312 7:00 BLOWBAY PROGRESS 28-Aug-21 7:00 17:00 17.00 12:00 AM PADI,HUSNI DT 210 6:59 TRANSMISI PROGRESS 28-Aug-21 13:00 11:00 11.00 12:00 AM YUDI,FAUZI,FAISAL 23 Agustus 2021 DT 240 6:59 TRANSMISI RFU 28-Aug-21 7:00 15:30 8:30 8.50 3:30 PM 23 Agustus 2021 DT 233 6:59 AC WAITING PART 0:00 0.00 12:00 AM 26 Agustus 2021 DT 222 6:59 BEARING RODA RFU 28-Aug-21 7:00 12:20 5:20 5.33 12:20 PM YOTO,JOKO,FAISAL 28 Agustus 2021 DT 250 7:00 TRANSMISI RFU 28-Aug-21 7:00 15:50 8:50 8.83 3:50 PM FAUZI,YADI 28 Agustus 2021 DT 247 7:00 BAN BOCOR RFU 28-Aug-21 7:00 12:00 5:00 5.00 12:00 PM YOTO,HUSNI Sunday, 29 August 2021 DT 212 7:00 GS,GARDAN WAITING PART 0:00 0.00 12:00 AM DT 217 7:00 HIGH LOW,PTO PUMP WAITING PART 0:00 0.00 12:00 AM 02 Agustus 2021 E 312 7:00 BLOWBAY PROGRESS 29-Aug-21 7:00 17:00 17.00 12:00 AM PADI,HUSNI DT 210 6:59 TRANSMISI PROGRESS 29-Aug-21 13:00 11:00 11.00 12:00 AM YUDI,FAUZI,FAISAL 23 Agustus 2021 DT 233 6:59 AC WAITING PART 0:00 0.00 12:00 AM 29 Agustus 2021 E 207 6:59 KUKU BUCKET RFU 29-Aug-21 7:00 8:20 1:20 1.33 8:20 AM YADI, FAISAL 29 Agustus 2021 E 301 6:59 PENDING 29-Aug-21 8:20 15:40 15.67 12:00 AM Monday, 30 August 2021 DT 212 7:00 GS,GARDAN WAITING PART 0:00 0.00 12:00 AM DT 217 7:00 HIGH LOW,PTO PUMP WAITING PART 0:00 0.00 12:00 AM 02 Agustus 2021 E 312 7:00 BLOWBAY PROGRESS 30-Aug-21 0:00 0.00 12:00 AM PADI,YADI,FAISAL DT 210 6:59 TRANSMISI WAITING PART 0:00 0.00 12:00 AM 23 Agustus 2021 DT 233 6:59 AC WAITING PART 0:00 0.00 12:00 AM 30 Agustus 2021 E 301 6:59 PECAH HOSE RFU 30-Aug-21 7:00 8:25 1:25 1.42 8:25 AM YADI,JOKO 30 Agustus 2021 DT 222 6:59 KENCANGI BAUT SASIS RFU 30-Aug-21 7:00 8:20 1:20 1.33 8:20 AM RICO,HUSNI Tuesday, 31 August 2021 DT 212 7:00 GS,GARDAN WAITING PART 0:00 0.00 12:00 AM DT 217 7:00 HIGH LOW,PTO PUMP WAITING PART 0:00 0.00 12:00 AM 02 Agustus 2021 E 312 7:00 BLOWBAY PROGRESS 30-Aug-21 0:00 0.00 12:00 AM PADI,YADI,FAISAL DT 210 6:59 TRANSMISI WAITING PART 0:00 0.00 12:00 AM 23 Agustus 2021 DT 233 6:59 AC WAITING PART 0:00 0.00 12:00 AM 31 Agustus 2021 GD 01 6:59 TUBE PROGRESS 31-Aug-21 7:00 17:00 17.00 12:00 AM PADI 31 Agustus 2021 E 402 6:59 SERVICE HM 250 PROGRESS 31-Aug-21 7:00 17:00 17.00 12:00 AM YADI,FAISAL 31 Agustus 2021 DT 222 6:59 PATAH PER PROGRESS 31-Aug-21 7:00 17:00 17.00 12:00 AM JOKO,HUSNI PENDING 0:00 0.00 12:00 AM PENDING 0:00 0.00 12:00 AM BREAKDOWN DATE UNIT HM WO TROUBLE JAM HM IN HM OUT WT 01 OVERHOUL TRANSMISI GS 01 ENGINE TL 05 OVH ENGINE DT 211 POWER STEERING PMP SCANIA OVER HAUL DT 208 AXLE MODULATOR DT 226 FINISHING GD 01 HIGH BLOWBY OH CRUSHER DINAMO GEAR BOX CONVEYOR TL 07 7:00 KEBAKARAN E 202 7:00 OVER HAUL DT 233 WATER PUMP DT 232 7:00 POMPA DUMP E 316 FINAL DRIVE GD 02 KING PIN 03.05.2021 DT 225 KABEL STIR 03.05.2021 DT 219 PECAH KARTER (INCIDENT) 03.05.2021 E 301 7:00 KUKU BUCKET 03.05.2021 DT 244 7:00 AC 04.05.2021 DT 206 7:00 HANGER 04.05.2021 DT 235 7:00 PATAH PER 04.05.2021 DT 229 7:00 SERVICE PS 4 TANGGAL : SHIFT :
05/11/20 Oil 40 Cat 648 648 TDTO 50 Cat 288 288 20/01/21 Oli HO 46 KGO/78 315 315 06/02/21 Oli 90 P 321 321 Oli 140 P 210 210 21/04/21 Oil TO 30 KGO 299 299 20/12/20 Oil TO 30 KGO/ PAIL 0 0 06/02/21 Oil 30 P 260 260 21/04/21 Oil 40 SCANIA 389 288 13/09/20 Water coolant KGO 135 135 2865 2764 BREAKDOWN READY FOR USE DATE UNIT HM WO TROUBLE JAM HM IN HM OUT RFU Tuesday, June 1, 2021 1-Jun-21 DT 207 7:00 CHASIS CRACK PENDING 1-Jun-21 E 402 7:00 SELENOID SUPPLY PUMP PROGRESS 1-Jun-21 DT 240 7:00 TIPPING VALVE RFU 1-Jun-21 DT 212 7:00 DINAMO CAS WAITING PART READY FOR USE ACTUAL HOURS LAMA BD JAM EMPLOYEE NAME DATE START FINISH WH ay, June 1, 2021 0:00 0.00 12:00 AM 1-Jun-21 13:20 16:45 0.14 3.42 12:00 AM BUDI, JOKO,YADI 1-Jun-21 7:20 11:00 3:40 3.67 12:00 AM BUDI, JOKO,YADI 0:00 0.00 12:00 AM BD STB ACC PA Maintenance PA Project