You are on page 1of 1

597X¹

Mass Spectrometer

Preventive Maintenance Checklist

Propósito del procedimiento Mechanical vacuum pumps • Verify previous


El mantenimiento preventivo (PM) ‰ Check for evidence of oil tune files
es un procedimiento recomendado leakage performance
por la fábrica diseñado para • Check pump gasket for ‰ Autotune Performed
reducir la probabilidad de fallas leakage • For EI use
electromecánicas. No realizar el ‰ Drain and replace ATUNE.U
mantenimiento preventivo puede Mechanical pump oil • For CI use
• PCICH4.U
reducir la fiabilidad a largo plazo Discuss with customer
de ciertos instrumentos y sistemas. the need for more
frequent oil changes if Service Review
the oil is dirty. ‰ Record in the instrument
Responsabilidades del cliente
• Inform customer that, logbook that a PM was
Los clientes deben asegurarse de
for CI systems, pump performed.
que todos los suministros will have to be in the ‰ Attach Autotune to
operativos necesarios, ballast mode for at least Logbook
consumibles y artículos 15 minutes every week. ‰ Affix the PM Sticker to
dependientes del uso, como papel, • Demonstrate ballast, if the MS or Instrument
bolígrafos, solventes y gases, estén requested.
Logbook as specified by
disponibles, y que se proporcione
the Customer
un medio de eliminación de Diffusion pumps
‰ Record Model Number
material de desecho (aceite). Un ‰ Drain and replace
_______________________
representante del cliente (por diffusion pump oil
ejemplo, el operador del
‰ Record Serial Number
instrumento) debe estar presente Cleaning system
_______________________
en todo momento durante la ‰ Fans
ejecución del procedimiento de • Vacuum/remove dust
‰ Support Provider
mantenimiento preventivo. El from fans and vent
Signature
cliente debe completar lo siguiente covers
antes del Soporte • Fans are functional
• Area is cleared around _______________________
‰ Type of column installed fans
‰ Customers Signature
________________
Source Cleaning
‰ Remove and clean _______________________
‰ Carrier Gas Flow rate
ml/min: _________ source
‰ Re-install source and ‰ Date completed
close analyzer _______________________
‰ Type of Source Installed
System post-check² ¹ 597X represents the 5971,
‰ Autotune Performed 5972, 5973 and 5975 MS
‰ Pump system back
down. systems only
‰ Vent MSD
‰ Verify systems vacuum ²if the PM is being performed
Preventative Maintenance reading via the gauge in advance of an OQPV, use
Checklist controller (if applicable) the protocol as guide for
‰ Perform general
‰ Leak Check Checkout and Setup.
inspection of system for • Verify system in
manual tune
cleanliness.

Issued: December, 2005 Revision A.01.00 Copyright © 2005 Agilent Technologies CSS Product Support Page 1 of 1

You might also like