Propósito del procedimiento Mechanical vacuum pumps • Verify previous
El mantenimiento preventivo (PM) Check for evidence of oil tune files es un procedimiento recomendado leakage performance por la fábrica diseñado para • Check pump gasket for Autotune Performed reducir la probabilidad de fallas leakage • For EI use electromecánicas. No realizar el Drain and replace ATUNE.U mantenimiento preventivo puede Mechanical pump oil • For CI use • PCICH4.U reducir la fiabilidad a largo plazo Discuss with customer de ciertos instrumentos y sistemas. the need for more frequent oil changes if Service Review the oil is dirty. Record in the instrument Responsabilidades del cliente • Inform customer that, logbook that a PM was Los clientes deben asegurarse de for CI systems, pump performed. que todos los suministros will have to be in the Attach Autotune to operativos necesarios, ballast mode for at least Logbook consumibles y artículos 15 minutes every week. Affix the PM Sticker to dependientes del uso, como papel, • Demonstrate ballast, if the MS or Instrument bolígrafos, solventes y gases, estén requested. Logbook as specified by disponibles, y que se proporcione the Customer un medio de eliminación de Diffusion pumps Record Model Number material de desecho (aceite). Un Drain and replace _______________________ representante del cliente (por diffusion pump oil ejemplo, el operador del Record Serial Number instrumento) debe estar presente Cleaning system _______________________ en todo momento durante la Fans ejecución del procedimiento de • Vacuum/remove dust Support Provider mantenimiento preventivo. El from fans and vent Signature cliente debe completar lo siguiente covers antes del Soporte • Fans are functional • Area is cleared around _______________________ Type of column installed fans Customers Signature ________________ Source Cleaning Remove and clean _______________________ Carrier Gas Flow rate ml/min: _________ source Re-install source and Date completed close analyzer _______________________ Type of Source Installed System post-check² ¹ 597X represents the 5971, Autotune Performed 5972, 5973 and 5975 MS Pump system back down. systems only Vent MSD Verify systems vacuum ²if the PM is being performed Preventative Maintenance reading via the gauge in advance of an OQPV, use Checklist controller (if applicable) the protocol as guide for Perform general Leak Check Checkout and Setup. inspection of system for • Verify system in manual tune cleanliness.