Professional Documents
Culture Documents
lúc
Tình trạng Đã hoàn thành
Hoàn thành vào Thứ năm, 2 Tháng hai 2023, 8:17 PM
lúc
Thời gian thực 4 phút 22 giây
hiện
Điểm 9,00 của 10,00 (90%)
Câu hỏi 1
Hoàn thành
Chọn một:
a. All of the other answers.
b. Software Requirement Specification - SRS
c. Software Testing Document - STD
d. Software Detail Design - SDD
Câu hỏi 2
Hoàn thành
Chọn một:
a. In the waterfall model, we can not go back to the previous stage (only to the first stage if there is any problem in the latter stages).
b. In the waterfall model, there are alway 4 stages.
c. In the development step of incremental development, there is no more requirement analysis.
d. None of the other answers is correct.
Câu hỏi 3
Hoàn thành
Chọn một:
a. The waterfall model is currently used in small companies when it is traditional.
b. The incremental process can only be applied when the development time is very long.
c. The reuse-oriented model can only be used together with the waterfall model.
d. None of the other answers is correct.
Câu hỏi 4
Hoàn thành
Chọn một:
a. A program that has user interface and may have some basic functions.
b. A program that has at least more features than the requirements from the customer.
c. A program that has user interface and workable functions.
d. A complete design that can be implement immediately.
Câu hỏi 5
Hoàn thành
Chọn một:
a. In the incremental process, the goal for each iteration (repeat) may not be depended on the previous iterations.
b. In the waterfall model, the previous phase should be done before starting the next phase.
c. In the incremental process, only the final product could be delivered to the customer.
d. The incremental process allows fundamental software engineering activities such as specification, development and validation to be
performed repeatedly.
Câu hỏi 6
Hoàn thành
Chọn một:
a. Software process model is another name for software process.
b. All software processes consist of fundamental activities: specification, development, validation and evolution.
c. Software process is a set of techniques in software development.
d. All the other answers are correct.
Câu hỏi 7
Hoàn thành
Chọn một:
a. All of the other answers are correct.
b. Is a fundamental activity in Software engineering.
c. Can includes: requirement elicitation and analysis, requirement specification and requirement validation.
d. Is a process of establishing the software requirements.
Câu hỏi 8
Hoàn thành
Suppose that, some one states that: (1) Software specification is a process of specifying functionalities and constraints in development and
operation software; (2) Software development is a process of transferring specification into executable system; (3) Software testing is part of
software validation. Giving 1 point for each correct statement and -1 point for each incorrect statement. How many point do we have?
Chọn một:
a. -1
b. 1
c. 3
d. -3
Câu hỏi 9
Hoàn thành
Chọn một:
a. Is a process of converting specification into executable systems.
b. Design step and then implementation step as in water fall.
c. All of the other answers are correct.
d. Includes: design and implementation and testing
Câu hỏi 10
Hoàn thành
In which CMM (Capability Maturity Model) level, the company guarantees about the continuously improvement in software process?
Chọn một:
a. 6
b. 4
c. 3
d. 5
WEBSITE
HCMUT
MyBK
BKSI
LIÊN HỆ
elearning@hcmut.edu.vn
Copyright 2007-2022 BKEL - Phát triển dựa trên Moodle