1. Which of the following is responsible for sprint meeting?

Chọn một:
a. Scrum master
b. None of the above
c. Product Owner
d. Scrum team
2. Which of the following is the requirements development sequence?
Chọn một:
a. Elicitation, Validation, Specification and Analysis;
b. Elicitation, Analysis, Specification and Validation;
c. Validation, Specification, Analysis and Elicitation;
d. Specification, Elicitation, Validation and Analysis;
3. Software engineering principles:
Chọn một:
a. Require the use of software tools;
b. Set goals and objectives for managers.
c. Commit to quality and continuous improvement;
d. Focus on activities to construct software;

4. An information system is represented graphically using….


Chọn một:
a. Data flow diagram
b. Flow chart
c. Pictogram
d. Histogram

5. Software reviews and inspections can help improving


Chọn một:
a. Performance of software system
b. Software technology
c. Quality of software process
d. Quality of software products

6. A software process model is chosen based on the….


Chọn một:
a. The controls and deliverables that are required
b. The methods and tools to be used
c. Nature of the project and application
d. All of the above
7. During requirements phase, Software Engineer needs to:
Chọn một:
a. Ask for outcomes;
b. Ask for solutions;
c. Collect all data to prepare for testing;
d. Gather all customer’s wishes;

8. Defective requirements can cause:


Chọn một:
a. All of the above;
b. Late delivery
c. Project failure;
d. Expensive rework

9. A decent specification should be?


Chọn một:
a. Functional
b. Unambiguous Model
c. All of the Above
d. Distinctly Specific

10.What does an Agile approach value?


Chọn một:
a. Process over people
b. Plans over people
c. Plans over process
d. People over process

11.The most important goal of software engineering is:


Chọn một:
a. Software Costs;
b. Software management;
c. Software Quality
d. Software technology

12.What is the disadvantage of Agile Methodology?


Chọn một:
a. In agile methodology, documentation and designing take a back seat
b. It facilitates close interaction between business people and developers.
c. Speedy and continuous delivery of the software ensures customer satisfaction
d. All of the above

13.Before design, requirements must be:


Chọn một:
a. All of the above;
b. Documented
c. Prioritized;
d. Analyzed;

14.Maximum percentage of errors belongs to the which phase of SDLC?


Chọn một:
a. Specifications
b. Installation and maintenance
c. Coding
d. Design

15.Software testing happens mostly:


Chọn một:
a. During requirements phase
b. All of the above;
c. Before designing phase;
d. After construction phase;
Đáp án đúng là: After construction phase;
16.Software problems happen mostly on
Chọn một:
a. Midsize project;
b. Small project,
c. Large project;
d. Web project
Đáp án đúng là: Large project;
17.……modifies source code and/or data in an effort to make it amenable to future
changes.
Chọn một:
a. Software restructuring
b. Reverse engineering
c. Forward engineering
d. Software maintenance
Đáp án đúng là: Software restructuring
18.Requirements development is:
Chọn một:
a. A technique of gathering what the customer needs;
b. All of the above.
c. A method of obtaining requirements;
d. A process of analyzing requirements.
Đáp án đúng là: All of the above.
19.A best model to manage software risks is:
Chọn một:
a. The Spiral model;
b. The incremental model
c. The Waterfall model;
d. The Prototype mode;
Đáp án đúng là: The Spiral model;
20.Which of the following is the working culture of an Agile team?
Chọn một:
a. Connective
b. Connective
c. Collaborative
d. Contemplative
Đáp án đúng là: Collaborative
21.A Moderator must be:
Chọn một:
a. Well trained and respected
b. An executive;
c. An high level person;
d. A software engineer;
Đáp án đúng là: Well trained and respected

22.“It is a test model. It can serve as ‘the first system’. Users get a feel for the actual
system”. ‘It refers to…
Chọn một:
a. RAD model
b. Waterfall model
c. Prototyping Model
d. Incremental model
Đáp án đúng là: Prototyping Model
23.To be fully institutionalized a software process must be;
Chọn một:
a. Defined, Documented, Trained, Used, Measured, Verified, and Improved;
b. Required, Designed, Programmed, Tested, Released and Maintained
c. Designed, Constructed, Trained, Verified and Measured;
d. Documented, Trained, Designed, Measured and Implemented;
Đáp án đúng là: Defined, Documented, Trained, Used, Measured, Verified, and Improved;

24.Which of the following is done in order a data in phase 1 of the system


development life cycle ?
Chọn một:
a. Using questionnaires to contact surveys
b. All of the above
c. Conducting Interviews
d. Reviewing policies and procedures
Đáp án đúng là: All of the above

25.Incremental model is a:
Chọn một:
a. Risking model.
b. Staging model;
c. Continuous model;
d. Phasing model;
Đáp án đúng là: Staging model;
26.Project manager must balance requirements with:
Chọn một:
a. A programming languages
b. Hardware;
c. Project costs and quality;
d. Programmers’ skills and knowledge.
Đáp án đúng là: Project costs and quality;

27.A typical programmer may not know:


Chọn một:
a. Software maintenance;
b. Programming languages;
c. Software Engineering disciplines;
d. Testing techniques.
Đáp án đúng là: Software Engineering disciplines;

28.Is there any difference between incremental and iterative development?


Chọn một:

a. Yes
b. No
Đáp án đúng là: Yes

29.In theory, most requirements:


Chọn một:
a. Never change.
b. Clearly describe testing procedures and data;
c. Focus on what the customer think;
d. Are related to business outcomes;
Đáp án đúng là: Never change.
30.Software reviews and inspections can help:
Chọn một:
a. Improve complexity of software products;
b. Manager to know more about software engineer’s skills.
c. Support system to inspect its data;
d. Reduce reworks in software projects;
Đáp án đúng là: Reduce reworks in software projects;

31.Which of the following option is used to measure the size of a user story for an
Agile
Chọn một:

a. Work breakdown points


b. Story points
c. Velocity points
d. project?
e. Function points
Đáp án đúng là: Story points

32.Software reviews happens mostly:


Chọn một:
a. Before designing phase;
b. After construction phase;
c. During requirements phase
d. All of the above;
Đáp án đúng là: All of the above;

33.Which of the following is a task region of the spiral model?


Chọn một:
a. All of above
b. Engineering
c. Planning
d. Risk analysis
Đáp án đúng là: All of above

34.A software engineer can:


Select one or more:
a. Modify a software defined process;
b. Tailor a software defined process;
c. Change the software defined process;
d. Align a software defined process to hardware;
35.Software problems are mostly created by:
Chọn một:
a. Techniques;
b. People;
c. Hardware;
d. Tools;
Đáp án đúng là: People;

36.Which of the following framework activities are found in the Extreme


Programming(XP)?
Chọn một:
a. Planning, Design, Coding, Testing
b. None of the above
c. Planning, Analysis, Design, Coding
d. Analysis, Design, Coding, Testing
Đáp án đúng là: Planning, Design, Coding, Testing

37.In most formal inspections, project manager is


Chọn một:
a. Required to attend;
b. Not allowed to attend;
c. Could attend, if wanted;
d. Asked to attend;
Đáp án đúng là: Not allowed to attend;

38.The interface design describes……


Chọn một:
a. How structural elements of the program architecture transforms into a procedural
description.
b. How software communicates with itself, to the system interoperate with it, and with
humans who use it.
c. Relationship among major structural elements of the program.
d. The information domain model created during analysis transforms in to the data
structures.
Đáp án đúng là: How software communicates with itself, to the system interoperate with it,
and with humans who use it.

39.Which of the following is not an Agile methodology?


Chọn một:
a. PMBOK®3
b. Kanban
c. Scrum
d. Extreme programming (XP)
Đáp án đúng là: PMBOK®3

40....design use information flow characteristics to derive program structure.


Chọn một:
a. Procedural
b. Both A and B
c. None of the above
d. Architectural
Đáp án đúng là: Architectural