SAN FRANCISCO, CA 94103
T-2 T-1
415.252.7063
LVP-1/1A
© ANKROM MOISAN ARCHITECTS, INC.
CT-2 RFP-1
5' - 4 1/2"
3' - 11 3/4"
A10.04
OFFICE 3
114
BUSINESS
2
N.I.C.
122
3' - 3" 12' - 4" A10.03
3' - 6"
5' - 2"
5 TYP
1
A11.13 REVISION DATE REASON FOR ISSUE
CT-1 T-1
2
1 RECEPTION LOUNGE
CT-2 RFP-1 101 1 A10.02 4 101B
A10.04
A10.03
OFFICE 2
113 1
RFP-1 T-1
3 2 T-1 CT-1 CT-1 T-1
TYP
A11.13 1
A11.13
EM-1 T-1
16' - 8"
A11.13
A10.03 4
CT-2 T-1
2 A10.03
SDCI APPROVAL STAMP
T-1 EM-1 VESTIBULE EM-1 T-1
101A
T-1 EM-1
MANAGER
112 111
3
T-1
LEASING 3 A10.02
A10.03
A10.04 OFFICE
110
3
2' - 0"
ENLARGED FINISH
PLAN - LEVEL 1
-WEST
BIM 360://Seattle II/210310-20-Seattle II.rvt
60% CD SET
1
DATE PROJECT NUMBER
LEVEL 1 - ENLARGED FINISH PLAN - WEST 11/18/2022 210310
1/4" = 1'-0"
SHEET NUMBER
A9.30
PROJECT
11/18/2022 10:38:10 AM
GENERAL NOTES - FINISH PLAN
1.
2.
REFER TO SCHEDULE ON SHEED A12.XX FOR FINISHES BY ROOM.
SEE INTERIOR ELEVATIONS (A10.00 SERIES) FOR EXTENT OF FINISHES, SPECIAL CONDITIONS, AND ADDITIONAL
NOT FOR
3.
INFORMATION.
REFER TO PROJECT MANUAL 09 06 02 FOR AMENITY MATERIALS AND FINISHES SPECIFICATIONS. CONSTRUCTION
4. REFER TO APPENDIX A FOR UNIT, CORRIDOR, AND BACK OF HOUSE MATERIALS AND FINISHES SPECIFICATIONS.
5. REFER TO SHEET SERIES AX.XX FOR FLOORING TRANSITION DETAILS.
6. REFER TO SHEET SERIES AX.XX FOR ADDITIONAL INFORMATION.
7. PROVIDE LEVEL 5 FINISH AT WALL TO RECEIVE WALLCOVERINGS
8
PACKAGE LEED
IDF 7 A10.06 9
HOLDING 109 SHOWER
5 108
ROOM 10
PARCEL 118
4 A10.05 6
T-3 RFP-1
106
T-3 T-4
T-3 RFP-1
7
TRANSFORMER
RFP-1 T-3
104
3
HVAC
A11.13 T-3 CONC-S 124 REVISION DATE REASON FOR ISSUE
8
MAILROOM A11.13
107
MECH
CORR. 2
104A RETAIL
1 A10.06 ELEVATOR T-3
LOBBY
120
T-3
1 A10.05 3
N.I.C
SDCI APPROVAL STAMP
FIRE
COMMAND
CENTER
103
CONC-S
T-1
ENLARGED FINISH
T-3
CONC-S T-1
8
BIM 360://Seattle II/210310-20-Seattle II.rvt
A9.31
PROJECT
11/18/2022 10:38:14 AM
GENERAL NOTES - FINISH PLAN
1.
2.
REFER TO SCHEDULE ON SHEED A12.XX FOR FINISHES BY ROOM.
SEE INTERIOR ELEVATIONS (A10.00 SERIES) FOR EXTENT OF FINISHES, SPECIAL CONDITIONS, AND ADDITIONAL
NOT FOR
3.
INFORMATION.
REFER TO PROJECT MANUAL 09 06 02 FOR AMENITY MATERIALS AND FINISHES SPECIFICATIONS. CONSTRUCTION
4. REFER TO APPENDIX A FOR UNIT, CORRIDOR, AND BACK OF HOUSE MATERIALS AND FINISHES SPECIFICATIONS.
5. REFER TO SHEET SERIES AX.XX FOR FLOORING TRANSITION DETAILS.
6. REFER TO SHEET SERIES AX.XX FOR ADDITIONAL INFORMATION.
7. PROVIDE LEVEL 5 FINISH AT WALL TO RECEIVE WALLCOVERINGS
RFP-2
RFP-2
RFP-2/3
T-2
SHAFT
3
STAIR 1
MECH. A11.13 S01
M107 EGRESS
STAIR 2 S01B
S02 ELEC.
CONC-S T-2 T-2 CONC-S 200A
BIKE
SHAFT
ROOM 54 BIKES (7 ARE
1 A10.07 202 ACCESSIBLE)
CONC-S RFP-2
TYP SHAFT 10 A10.07 11
7
M110
OPEN TO
BELOW
BUSINESS
N.I.C.
CONDENSER 122
FARM
201B
OPEN TO
BELOW
OPEN TO
BELOW
OPEN TO
BELOW
ENLARGED FINISH
PLAN - LEVEL 2 -
WEST
BIM 360://Seattle II/210310-20-Seattle II.rvt
60% CD SET
A9.32
PROJECT
11/18/2022 10:38:18 AM
GENERAL NOTES - FINISH PLAN
1.
2.
REFER TO SCHEDULE ON SHEED A12.XX FOR FINISHES BY ROOM.
SEE INTERIOR ELEVATIONS (A10.00 SERIES) FOR EXTENT OF FINISHES, SPECIAL CONDITIONS, AND ADDITIONAL
NOT FOR
3.
INFORMATION.
REFER TO PROJECT MANUAL 09 06 02 FOR AMENITY MATERIALS AND FINISHES SPECIFICATIONS. CONSTRUCTION
4. REFER TO APPENDIX A FOR UNIT, CORRIDOR, AND BACK OF HOUSE MATERIALS AND FINISHES SPECIFICATIONS.
5. REFER TO SHEET SERIES AX.XX FOR FLOORING TRANSITION DETAILS.
6. REFER TO SHEET SERIES AX.XX FOR ADDITIONAL INFORMATION.
7. PROVIDE LEVEL 5 FINISH AT WALL TO RECEIVE WALLCOVERINGS
59
__ ____ ____ ____ ____ ____ ____ ____ ____ ____ _____ ____ ___
A7.16
A7.43
3
STUDY
TRASH 2 A10.07 4 AREA
ROOM 206
5
204
6 A10.07 8
9
RFP-2 RFS-1
RFP-2 CT-3
T-4
RFP-2
5 3
RFP-2 A11.13 A11.13
ENLARGED FINISH
RFP-2
PLAN - LEVEL 2 -
RFP-2
EAST
BIM 360://Seattle II/210310-20-Seattle II.rvt
60% CD SET
A9.33
PROJECT
11/18/2022 10:38:23 AM
GENERAL NOTES - FINISH PLAN
1.
2.
REFER TO SCHEDULE ON SHEED A12.XX FOR FINISHES BY ROOM.
SEE INTERIOR ELEVATIONS (A10.00 SERIES) FOR EXTENT OF FINISHES, SPECIAL CONDITIONS, AND ADDITIONAL
NOT FOR
3.
INFORMATION.
REFER TO PROJECT MANUAL 09 06 02 FOR AMENITY MATERIALS AND FINISHES SPECIFICATIONS. CONSTRUCTION
4. REFER TO APPENDIX A FOR UNIT, CORRIDOR, AND BACK OF HOUSE MATERIALS AND FINISHES SPECIFICATIONS.
5. REFER TO SHEET SERIES AX.XX FOR FLOORING TRANSITION DETAILS.
6. REFER TO SHEET SERIES AX.XX FOR ADDITIONAL INFORMATION.
7. PROVIDE LEVEL 5 FINISH AT WALL TO RECEIVE WALLCOVERINGS
CT-4
CT-6 CT-4
A10.08 5
2' - 0"
RFP-2
6
STUDY
RFP-2 CT-6
A10.08
2' - 0"
RFS-1
316
TYP
4
T-2
9' - 6"
A11.13
CT-6 CT-4
A10.08 2
A10.08 3 RFP-2A RFP-2
DHW
STUDY PUMP RM
300A
STAIR 1
312B 8 S01
A11.13
ELEC.
CONC-S T-2 300B
1 REVISION DATE REASON FOR ISSUE
T-2 CONC-S
2' - 0"
A10.08
HVAC 1 A10.09 2
5
48 UNIT D3
CT-6 CT-4
STUDY CT-4 CONC-S 301
A11.13
314 6 ELEV.
RFP-2 CT-4
A11.13 LOBBY
T-2 T-2 T-2 T-2
300
A10.08 RR
315
7 4 ELEV 2 ELEV 1
STAIR 2 E02 E01
3 A10.09 5 RFP-2 RFP-2A S02 3 SDCI APPROVAL STAMP
A11.13
6
T-1/CT-1 T-2
T-4
RFP-2
RFP-2 CORRIDOR
300.1
3 RFP-2
UNIT C1
A11.13
TYPE A
T-1/CT-1
RFP-2
304
1 A10.02 4
60% CD SET
A9.34
PROJECT
11/18/2022 10:38:28 AM
GENERAL NOTES - FINISH PLAN
1.
2.
REFER TO SCHEDULE ON SHEED A12.XX FOR FINISHES BY ROOM.
SEE INTERIOR ELEVATIONS (A10.00 SERIES) FOR EXTENT OF FINISHES, SPECIAL CONDITIONS, AND ADDITIONAL
NOT FOR
3.
INFORMATION.
REFER TO PROJECT MANUAL 09 06 02 FOR AMENITY MATERIALS AND FINISHES SPECIFICATIONS. CONSTRUCTION
4. REFER TO APPENDIX A FOR UNIT, CORRIDOR, AND BACK OF HOUSE MATERIALS AND FINISHES SPECIFICATIONS.
5. REFER TO SHEET SERIES AX.XX FOR FLOORING TRANSITION DETAILS.
6. REFER TO SHEET SERIES AX.XX FOR ADDITIONAL INFORMATION.
7. PROVIDE LEVEL 5 FINISH AT WALL TO RECEIVE WALLCOVERINGS
TRASH
413
RFP-2
RFS-1
T-2
REVISION DATE REASON FOR ISSUE
DHW
RFP-2A RFP-2
PUMP RM
400A STAIR 1
S01
ELEC.
CONC-S T-2 T-2 CONC-S 400B
8
A11.13
2 A10.01 3
RFP-2
RFS-1 RFP-2
UNIT A2
ELEV.
TYPE A JAN. SDCI APPROVAL STAMP
406 408 LOBBY
T-2 T-2 T-2 T-2 RFP-2
400
ELEV 2 ELEV 1
RFS-1 RFP-2 STAIR 2 E02 E01
RFP-2 RFP-2A S02
3
RFP-2
STORAGE A11.13
RFP-2 T-2
409
RFP-2
CORRIDOR
ENLARGED
400.2
CORRIDOR FINISH
PLAN - LEVEL 4
RFP-2
RFP-2
BIM 360://Seattle II/210310-20-Seattle II.rvt
60% CD SET
A9.36
PROJECT
11/18/2022 10:38:32 AM
GENERAL NOTES - FINISH PLAN
1.
2.
REFER TO SCHEDULE ON SHEED A12.XX FOR FINISHES BY ROOM.
SEE INTERIOR ELEVATIONS (A10.00 SERIES) FOR EXTENT OF FINISHES, SPECIAL CONDITIONS, AND ADDITIONAL
NOT FOR
3.
INFORMATION.
REFER TO PROJECT MANUAL 09 06 02 FOR AMENITY MATERIALS AND FINISHES SPECIFICATIONS. CONSTRUCTION
4. REFER TO APPENDIX A FOR UNIT, CORRIDOR, AND BACK OF HOUSE MATERIALS AND FINISHES SPECIFICATIONS.
5. REFER TO SHEET SERIES AX.XX FOR FLOORING TRANSITION DETAILS.
6. REFER TO SHEET SERIES AX.XX FOR ADDITIONAL INFORMATION.
7. PROVIDE LEVEL 5 FINISH AT WALL TO RECEIVE WALLCOVERINGS
TRASH 501
513
RFP-2 RFP-2
RFP-2
RFS-1
T-2
REVISION DATE REASON FOR ISSUE
MECH. RFP-2A RFP-2
500A
STAIR 1
S01
RFP-2 ELEC.
CONC-S T-2 8 T-2 CONC-S
500B
A11.13
UNIT B4
506
ELEV.
LOBBY SDCI APPROVAL STAMP
T-2 T-2 500 T-2 T-2 RFP-2
ELEV 2 ELEV 1
E02 E01
STAIR 2
RFP-2 RFP-2A S02
3 RFP-2
A11.13
RFP-2 T-2
CORRIDOR ENLARGED
500.1
CORRIDOR FINISH
RFP-2
RFP-2
60% CD SET
A9.37
PROJECT
11/18/2022 10:38:37 AM
GENERAL NOTES - FINISH PLAN
1.
2.
REFER TO SCHEDULE ON SHEED A12.XX FOR FINISHES BY ROOM.
SEE INTERIOR ELEVATIONS (A10.00 SERIES) FOR EXTENT OF FINISHES, SPECIAL CONDITIONS, AND ADDITIONAL
NOT FOR
3.
INFORMATION.
REFER TO PROJECT MANUAL 09 06 02 FOR AMENITY MATERIALS AND FINISHES SPECIFICATIONS. CONSTRUCTION
4. REFER TO APPENDIX A FOR UNIT, CORRIDOR, AND BACK OF HOUSE MATERIALS AND FINISHES SPECIFICATIONS.
5. REFER TO SHEET SERIES AX.XX FOR FLOORING TRANSITION DETAILS.
6. REFER TO SHEET SERIES AX.XX FOR ADDITIONAL INFORMATION.
7. PROVIDE LEVEL 5 FINISH AT WALL TO RECEIVE WALLCOVERINGS
UNIT A1
2101
RFS-1
TRASH
2113
RFP-2
RFP-2 RFP-2
RFP-2
RFS-1
T-2
DHW
RFP-2A RFP-2 REVISION DATE REASON FOR ISSUE
PUMP RM
2100B
STAIR 1
8 S01
RFP-2
A11.13 ELEC.
T-2 CONC-S S2100A
CONC-S T-2
ELEV.
LOBBY
2100
UNIT B4
2106
T-2 T-2 T-2 T-2 RFP-2
ELEV 2 ELEV 1 SDCI APPROVAL STAMP
E02 E01
STAIR 2
RFP-2 RFP-2A S02
3 RFP-2
A11.13
RFP-2 T-2
CORRIDOR ENLARGED
2100.2
CORRIDOR FINISH
RFP-2
RFP-2
PLAN - LEVEL 21
BIM 360://Seattle II/210310-20-Seattle II.rvt
60% CD SET
A9.38
PROJECT
11/18/2022 10:38:41 AM
GENERAL NOTES - FINISH PLAN
1.
2.
REFER TO SCHEDULE ON SHEED A12.XX FOR FINISHES BY ROOM.
SEE INTERIOR ELEVATIONS (A10.00 SERIES) FOR EXTENT OF FINISHES, SPECIAL CONDITIONS, AND ADDITIONAL
NOT FOR
3.
INFORMATION.
REFER TO PROJECT MANUAL 09 06 02 FOR AMENITY MATERIALS AND FINISHES SPECIFICATIONS. CONSTRUCTION
4. REFER TO APPENDIX A FOR UNIT, CORRIDOR, AND BACK OF HOUSE MATERIALS AND FINISHES SPECIFICATIONS.
5. REFER TO SHEET SERIES AX.XX FOR FLOORING TRANSITION DETAILS.
6. REFER TO SHEET SERIES AX.XX FOR ADDITIONAL INFORMATION.
7. PROVIDE LEVEL 5 FINISH AT WALL TO RECEIVE WALLCOVERINGS
2208 A5.41
RFP-2 RFS-1
TRASH
2200.1
UNIT C3
RFP-2 RFP-2
2201
RFS-1
T-2
RFP-2
DWH REVISION DATE REASON FOR ISSUE
RFP-2A RFP-2
PUMP RM
2200B
ELEC. STAIR 1
8 2200A S01
RFP-2
A11.13 T-2 CONC-S
ELEV.
LOBBY
2200
T-2 T-2
T-2 T-2 SDCI APPROVAL STAMP
ELEV 2 ELEV 1
E02 E01
STAIR 2
S02
RFP-2 RFP-2A
3
A11.13
RFP-2 T-2
RFP-2
RFP-2
PLAN - LEVEL 22
BIM 360://Seattle II/210310-20-Seattle II.rvt
60% CD SET
A9.39
PROJECT
11/18/2022 1:15:08 PM
GENERAL NOTES - FINISH PLAN
1.
2.
REFER TO SCHEDULE ON SHEED A12.XX FOR FINISHES BY ROOM.
SEE INTERIOR ELEVATIONS (A10.00 SERIES) FOR EXTENT OF FINISHES, SPECIAL CONDITIONS, AND ADDITIONAL
NOT FOR
3.
INFORMATION.
REFER TO PROJECT MANUAL 09 06 02 FOR AMENITY MATERIALS AND FINISHES SPECIFICATIONS. CONSTRUCTION
4. REFER TO APPENDIX A FOR UNIT, CORRIDOR, AND BACK OF HOUSE MATERIALS AND FINISHES SPECIFICATIONS.
5. REFER TO SHEET SERIES AX.XX FOR FLOORING TRANSITION DETAILS.
6. REFER TO SHEET SERIES AX.XX FOR ADDITIONAL INFORMATION.
7. PROVIDE LEVEL 5 FINISH AT WALL TO RECEIVE WALLCOVERINGS
RFS-1
SEATTLE, WA 98101
206.576.1600
SHOWER RR
2305 2306
T-2
1014 HOWARD STREET
SAN FRANCISCO, CA 94103
CONDENSER
T-4 T-2 T-2 T-4 415.252.7063
FARM IDF CORRIDOR
2304B © ANKROM MOISAN ARCHITECTS, INC.
2308 2307
MECH ELEC.
STAIR 1 RFP-2A T-1
2300B 2300A
S01
8
A11.13 T-2 CONC-S
CONC-S T-2
1 A10.10 3
S02
ELEV 2 ELEV 1
E02 E01
RAF-1 RFP-2A
T-2
T-1
2' - 0"
9' - 0"
RAF-1 T-1 5
T-1
TYP A10.10
1
RAF-1
ALIGN
A11.13 REVISION DATE REASON FOR ISSUE
T-1
RAF-2
CT-6
ALIGN
ALIGN
T-1 CT-6
RAF-1 RAF-2
ALIGN
26' - 4 1/2"
41' - 3 1/4"
IDF
51
T-1
YOGA/STRETCHING
TERRACE
ENLARGED FINISH
2300F
PLAN - ROOF LEVEL
BIM 360://Seattle II/210310-20-Seattle II.rvt
60% CD SET