GENERAL NOTES - FINISH PLAN


1.
2.
REFER TO SCHEDULE ON SHEED A12.XX FOR FINISHES BY ROOM.
SEE INTERIOR ELEVATIONS (A10.00 SERIES) FOR EXTENT OF FINISHES, SPECIAL CONDITIONS, AND ADDITIONAL
NOT FOR
3.
INFORMATION.
REFER TO PROJECT MANUAL 09 06 02 FOR AMENITY MATERIALS AND FINISHES SPECIFICATIONS. CONSTRUCTION
4. REFER TO APPENDIX A FOR UNIT, CORRIDOR, AND BACK OF HOUSE MATERIALS AND FINISHES SPECIFICATIONS.
5. REFER TO SHEET SERIES AX.XX FOR FLOORING TRANSITION DETAILS.
6. REFER TO SHEET SERIES AX.XX FOR ADDITIONAL INFORMATION.
7. PROVIDE LEVEL 5 FINISH AT WALL TO RECEIVE WALLCOVERINGS

38 NORTHWEST DAVIS, SUITE 300


PORTLAND, OR 97209
503.245.7100

1505 5TH AVE, SUITE 300


SEATTLE, WA 98101
206.576.1600

1014 HOWARD STREET

T-1
SAN FRANCISCO, CA 94103

T-2 T-1
415.252.7063

LVP-1/1A
© ANKROM MOISAN ARCHITECTS, INC.

MECHANICAL ELEC. STAIR 1 EGRESS


100A 100B
S01 S01A
CONC-S T-2 T-2 CONC-S
WORKROOM
117
6 T-4 N.I.C
DW RR 12
A10.04 4 5 A10.04 7 122C
11 A10.06 13
8
14
RR T-4 RFP-1
ELEV.
115 3
REF LOBBY T-2 T-2
A11.13

THE MARK AT SEATTLE


T-2 T-2
100

1200 45TH ST SEATTLE, WA 98105


4

3 A10.06 5 ELEV 2 ELEV 1


12
EGRESS E02
S02A E01 11 A10.06 13
6 STAIR 2
RR
LVP-1/1A

S02 T-4 N.I.C


122B 14

LCD ACQUISITIONS, LLC


T-1 T-2
DN

1' - 0"1' - 0"


T-1

CT-2 RFP-1

5' - 4 1/2"
3' - 11 3/4"
A10.04
OFFICE 3
114
BUSINESS
2
N.I.C.
122
3' - 3" 12' - 4" A10.03
3' - 6"

5' - 2"
5 TYP
1
A11.13 REVISION DATE REASON FOR ISSUE

CT-1 T-1
2
1 RECEPTION LOUNGE
CT-2 RFP-1 101 1 A10.02 4 101B
A10.04

A10.03
OFFICE 2
113 1

RFP-1 T-1
3 2 T-1 CT-1 CT-1 T-1
TYP
A11.13 1
A11.13
EM-1 T-1

16' - 8"

A11.13
A10.03 4
CT-2 T-1

2 A10.03
SDCI APPROVAL STAMP
T-1 EM-1 VESTIBULE EM-1 T-1
101A
T-1 EM-1

CT-2 RFP-1 9' - 9" 2' - 0"


5
A11.13 LEASING 2' - 0"
CT-1

MANAGER
112 111
3
T-1

LEASING 3 A10.02
A10.03
A10.04 OFFICE
110
3
2' - 0"

ENLARGED FINISH
PLAN - LEVEL 1
-WEST
BIM 360://Seattle II/210310-20-Seattle II.rvt

60% CD SET

1
DATE PROJECT NUMBER
LEVEL 1 - ENLARGED FINISH PLAN - WEST 11/18/2022 210310
1/4" = 1'-0"
SHEET NUMBER

A9.30
PROJECT
11/18/2022 10:38:10 AM
GENERAL NOTES - FINISH PLAN
1.
2.
REFER TO SCHEDULE ON SHEED A12.XX FOR FINISHES BY ROOM.
SEE INTERIOR ELEVATIONS (A10.00 SERIES) FOR EXTENT OF FINISHES, SPECIAL CONDITIONS, AND ADDITIONAL
NOT FOR
3.
INFORMATION.
REFER TO PROJECT MANUAL 09 06 02 FOR AMENITY MATERIALS AND FINISHES SPECIFICATIONS. CONSTRUCTION
4. REFER TO APPENDIX A FOR UNIT, CORRIDOR, AND BACK OF HOUSE MATERIALS AND FINISHES SPECIFICATIONS.
5. REFER TO SHEET SERIES AX.XX FOR FLOORING TRANSITION DETAILS.
6. REFER TO SHEET SERIES AX.XX FOR ADDITIONAL INFORMATION.
7. PROVIDE LEVEL 5 FINISH AT WALL TO RECEIVE WALLCOVERINGS

38 NORTHWEST DAVIS, SUITE 300


PORTLAND, OR 97209
503.245.7100

1505 5TH AVE, SUITE 300


SEATTLE, WA 98101
206.576.1600

1014 HOWARD STREET


SAN FRANCISCO, CA 94103
415.252.7063
© ANKROM MOISAN ARCHITECTS, INC.

THE MARK AT SEATTLE


1200 45TH ST SEATTLE, WA 98105

LCD ACQUISITIONS, LLC


SHAFT
418

8
PACKAGE LEED
IDF 7 A10.06 9
HOLDING 109 SHOWER
5 108
ROOM 10
PARCEL 118
4 A10.05 6

T-3 RFP-1
106

T-3 T-4
T-3 RFP-1
7

TRANSFORMER
RFP-1 T-3
104
3
HVAC
A11.13 T-3 CONC-S 124 REVISION DATE REASON FOR ISSUE
8
MAILROOM A11.13
107

MECH
CORR. 2
104A RETAIL
1 A10.06 ELEVATOR T-3

LOBBY
120

T-3
1 A10.05 3

N.I.C
SDCI APPROVAL STAMP

FIRE
COMMAND
CENTER
103
CONC-S
T-1

ENLARGED FINISH
T-3

PLAN - LEVEL 1 EAST


T-1

CONC-S T-1
8
BIM 360://Seattle II/210310-20-Seattle II.rvt

A11.13 60% CD SET


T-1
T-1

DATE PROJECT NUMBER


11/18/2022 210310

1 LEVEL 1 - ENLARGED FINISH PLAN - EAST


1/4" = 1'-0"
SHEET NUMBER

A9.31
PROJECT
11/18/2022 10:38:14 AM
GENERAL NOTES - FINISH PLAN
1.
2.
REFER TO SCHEDULE ON SHEED A12.XX FOR FINISHES BY ROOM.
SEE INTERIOR ELEVATIONS (A10.00 SERIES) FOR EXTENT OF FINISHES, SPECIAL CONDITIONS, AND ADDITIONAL
NOT FOR
3.
INFORMATION.
REFER TO PROJECT MANUAL 09 06 02 FOR AMENITY MATERIALS AND FINISHES SPECIFICATIONS. CONSTRUCTION
4. REFER TO APPENDIX A FOR UNIT, CORRIDOR, AND BACK OF HOUSE MATERIALS AND FINISHES SPECIFICATIONS.
5. REFER TO SHEET SERIES AX.XX FOR FLOORING TRANSITION DETAILS.
6. REFER TO SHEET SERIES AX.XX FOR ADDITIONAL INFORMATION.
7. PROVIDE LEVEL 5 FINISH AT WALL TO RECEIVE WALLCOVERINGS

38 NORTHWEST DAVIS, SUITE 300


PORTLAND, OR 97209
503.245.7100

1505 5TH AVE, SUITE 300


SEATTLE, WA 98101
206.576.1600

1014 HOWARD STREET


SAN FRANCISCO, CA 94103
415.252.7063
© ANKROM MOISAN ARCHITECTS, INC.

RFP-2
RFP-2

RFP-2/3
T-2
SHAFT
3
STAIR 1
MECH. A11.13 S01
M107 EGRESS
STAIR 2 S01B
S02 ELEC.
CONC-S T-2 T-2 CONC-S 200A
BIKE

SHAFT
ROOM 54 BIKES (7 ARE
1 A10.07 202 ACCESSIBLE)
CONC-S RFP-2
TYP SHAFT 10 A10.07 11
7
M110

THE MARK AT SEATTLE


A11.13

1200 45TH ST SEATTLE, WA 98105


T-2 T-2
ELEV. T-2 T-2
LOBBY
200

LCD ACQUISITIONS, LLC


ELEV 2 ELEV 1
STAIR 2
E02 E01
S02
RFP-2 RFP-2A
MAINT
CONC-S RFP-2 SHAFT
CORR
201A

REVISION DATE REASON FOR ISSUE

OPEN TO
BELOW

BUSINESS
N.I.C.
CONDENSER 122
FARM
201B

OPEN TO
BELOW

SDCI APPROVAL STAMP

OPEN TO
BELOW

OPEN TO
BELOW
ENLARGED FINISH
PLAN - LEVEL 2 -
WEST
BIM 360://Seattle II/210310-20-Seattle II.rvt

60% CD SET

1 LEVEL 2 - ENLARGED FINISH PLAN - WEST


1/4" = 1'-0"
DATE
11/18/2022
SHEET NUMBER
PROJECT NUMBER
210310

A9.32
PROJECT
11/18/2022 10:38:18 AM
GENERAL NOTES - FINISH PLAN
1.
2.
REFER TO SCHEDULE ON SHEED A12.XX FOR FINISHES BY ROOM.
SEE INTERIOR ELEVATIONS (A10.00 SERIES) FOR EXTENT OF FINISHES, SPECIAL CONDITIONS, AND ADDITIONAL
NOT FOR
3.
INFORMATION.
REFER TO PROJECT MANUAL 09 06 02 FOR AMENITY MATERIALS AND FINISHES SPECIFICATIONS. CONSTRUCTION
4. REFER TO APPENDIX A FOR UNIT, CORRIDOR, AND BACK OF HOUSE MATERIALS AND FINISHES SPECIFICATIONS.
5. REFER TO SHEET SERIES AX.XX FOR FLOORING TRANSITION DETAILS.
6. REFER TO SHEET SERIES AX.XX FOR ADDITIONAL INFORMATION.
7. PROVIDE LEVEL 5 FINISH AT WALL TO RECEIVE WALLCOVERINGS

38 NORTHWEST DAVIS, SUITE 300


PORTLAND, OR 97209
503.245.7100

1505 5TH AVE, SUITE 300


SEATTLE, WA 98101
206.576.1600

1014 HOWARD STREET


SAN FRANCISCO, CA 94103
415.252.7063
© ANKROM MOISAN ARCHITECTS, INC.

THE MARK AT SEATTLE


1200 45TH ST SEATTLE, WA 98105
_
3
A3.15

LCD ACQUISITIONS, LLC


4 A10.05 6
6'-11"
7

59
__ ____ ____ ____ ____ ____ ____ ____ ____ ____ _____ ____ ___

A7.16

ELEC. 8' - 0" 2


203A REVISION DATE REASON FOR ISSUE
2-
3' - 3 1/4" 11' - A10.06
4" 11' - 4" 3'189
- 4"
__ ____ ____ ____ ____ ____ ____ ____ ____ ____ _____ ____ ___

A7.43

3
STUDY
TRASH 2 A10.07 4 AREA
ROOM 206
5
204

SDCI APPROVAL STAMP

42' - 11 3/4" 14' - 3" 7 5' - 0 1/4" 33' - 0 1/8"

6 A10.07 8

9
RFP-2 RFS-1

RFP-2 CT-3

T-4
RFP-2

5 3
RFP-2 A11.13 A11.13

ENLARGED FINISH

RFP-2
PLAN - LEVEL 2 -
RFP-2

EAST
BIM 360://Seattle II/210310-20-Seattle II.rvt

60% CD SET

DATE PROJECT NUMBER

1 LEVEL 2 - ENLARGED FINISH PLAN - EAST


1/4" = 1'-0"
11/18/2022
SHEET NUMBER
210310

A9.33
PROJECT
11/18/2022 10:38:23 AM
GENERAL NOTES - FINISH PLAN
1.
2.
REFER TO SCHEDULE ON SHEED A12.XX FOR FINISHES BY ROOM.
SEE INTERIOR ELEVATIONS (A10.00 SERIES) FOR EXTENT OF FINISHES, SPECIAL CONDITIONS, AND ADDITIONAL
NOT FOR
3.
INFORMATION.
REFER TO PROJECT MANUAL 09 06 02 FOR AMENITY MATERIALS AND FINISHES SPECIFICATIONS. CONSTRUCTION
4. REFER TO APPENDIX A FOR UNIT, CORRIDOR, AND BACK OF HOUSE MATERIALS AND FINISHES SPECIFICATIONS.
5. REFER TO SHEET SERIES AX.XX FOR FLOORING TRANSITION DETAILS.
6. REFER TO SHEET SERIES AX.XX FOR ADDITIONAL INFORMATION.
7. PROVIDE LEVEL 5 FINISH AT WALL TO RECEIVE WALLCOVERINGS

38 NORTHWEST DAVIS, SUITE 300


PORTLAND, OR 97209
503.245.7100

1505 5TH AVE, SUITE 300


SEATTLE, WA 98101
206.576.1600

1014 HOWARD STREET


SAN FRANCISCO, CA 94103
415.252.7063
© ANKROM MOISAN ARCHITECTS, INC.

CT-4
CT-6 CT-4
A10.08 5
2' - 0"

RFP-2
6
STUDY

THE MARK AT SEATTLE


7 A10.08 9
OPEN COMPUTER 318

1200 45TH ST SEATTLE, WA 98105


STUDY LAB 6 A10.07 8
311 311A
9
A10.08

RFP-2 CT-6
A10.08

LCD ACQUISITIONS, LLC


8
4 TRASH
313 5
A11.13
IDF

2' - 0"

RFS-1
316
TYP
4

T-2
9' - 6"

A11.13
CT-6 CT-4
A10.08 2
A10.08 3 RFP-2A RFP-2
DHW
STUDY PUMP RM
300A
STAIR 1
312B 8 S01
A11.13
ELEC.
CONC-S T-2 300B
1 REVISION DATE REASON FOR ISSUE
T-2 CONC-S
2' - 0"
A10.08

4' - 6" 4' - 3"


8' - 1"

HVAC 1 A10.09 2
5
48 UNIT D3
CT-6 CT-4
STUDY CT-4 CONC-S 301
A11.13
314 6 ELEV.
RFP-2 CT-4

A11.13 LOBBY
T-2 T-2 T-2 T-2
300
A10.08 RR
315
7 4 ELEV 2 ELEV 1
STAIR 2 E02 E01
3 A10.09 5 RFP-2 RFP-2A S02 3 SDCI APPROVAL STAMP
A11.13
6

T-1/CT-1 T-2
T-4
RFP-2

RFP-2 CORRIDOR
300.1
3 RFP-2
UNIT C1
A11.13
TYPE A
T-1/CT-1

RFP-2
304

A10.03 ENLARGED FINISH


UNIT D2
303 5
PLAN - LEVEL 3
UNIT C2
2 302
BIM 360://Seattle II/210310-20-Seattle II.rvt

1 A10.02 4
60% CD SET

1 LEVEL 3 - ENLARGED FINISH PLAN


1/4" = 1'-0"
DATE
11/18/2022
SHEET NUMBER
PROJECT NUMBER
210310

A9.34
PROJECT
11/18/2022 10:38:28 AM
GENERAL NOTES - FINISH PLAN
1.
2.
REFER TO SCHEDULE ON SHEED A12.XX FOR FINISHES BY ROOM.
SEE INTERIOR ELEVATIONS (A10.00 SERIES) FOR EXTENT OF FINISHES, SPECIAL CONDITIONS, AND ADDITIONAL
NOT FOR
3.
INFORMATION.
REFER TO PROJECT MANUAL 09 06 02 FOR AMENITY MATERIALS AND FINISHES SPECIFICATIONS. CONSTRUCTION
4. REFER TO APPENDIX A FOR UNIT, CORRIDOR, AND BACK OF HOUSE MATERIALS AND FINISHES SPECIFICATIONS.
5. REFER TO SHEET SERIES AX.XX FOR FLOORING TRANSITION DETAILS.
6. REFER TO SHEET SERIES AX.XX FOR ADDITIONAL INFORMATION.
7. PROVIDE LEVEL 5 FINISH AT WALL TO RECEIVE WALLCOVERINGS

38 NORTHWEST DAVIS, SUITE 300


PORTLAND, OR 97209
503.245.7100

1505 5TH AVE, SUITE 300


SEATTLE, WA 98101
206.576.1600

1014 HOWARD STREET


SAN FRANCISCO, CA 94103
415.252.7063
© ANKROM MOISAN ARCHITECTS, INC.

THE MARK AT SEATTLE


1200 45TH ST SEATTLE, WA 98105
UNIT E5
407
UNIT A1

LCD ACQUISITIONS, LLC


401

TRASH
413

RFP-2
RFS-1
T-2
REVISION DATE REASON FOR ISSUE

DHW
RFP-2A RFP-2
PUMP RM
400A STAIR 1
S01
ELEC.
CONC-S T-2 T-2 CONC-S 400B
8
A11.13

2 A10.01 3
RFP-2

RFS-1 RFP-2
UNIT A2
ELEV.
TYPE A JAN. SDCI APPROVAL STAMP
406 408 LOBBY
T-2 T-2 T-2 T-2 RFP-2
400

ELEV 2 ELEV 1
RFS-1 RFP-2 STAIR 2 E02 E01
RFP-2 RFP-2A S02
3
RFP-2
STORAGE A11.13
RFP-2 T-2

409
RFP-2

CORRIDOR
ENLARGED
400.2
CORRIDOR FINISH
PLAN - LEVEL 4
RFP-2

RFP-2
BIM 360://Seattle II/210310-20-Seattle II.rvt

60% CD SET

DATE PROJECT NUMBER


11/18/2022 210310

1 LEVEL 4 - ENLARGED CORRIDOR FINISH PLAN


1/4" = 1'-0"
SHEET NUMBER

A9.36
PROJECT
11/18/2022 10:38:32 AM
GENERAL NOTES - FINISH PLAN
1.
2.
REFER TO SCHEDULE ON SHEED A12.XX FOR FINISHES BY ROOM.
SEE INTERIOR ELEVATIONS (A10.00 SERIES) FOR EXTENT OF FINISHES, SPECIAL CONDITIONS, AND ADDITIONAL
NOT FOR
3.
INFORMATION.
REFER TO PROJECT MANUAL 09 06 02 FOR AMENITY MATERIALS AND FINISHES SPECIFICATIONS. CONSTRUCTION
4. REFER TO APPENDIX A FOR UNIT, CORRIDOR, AND BACK OF HOUSE MATERIALS AND FINISHES SPECIFICATIONS.
5. REFER TO SHEET SERIES AX.XX FOR FLOORING TRANSITION DETAILS.
6. REFER TO SHEET SERIES AX.XX FOR ADDITIONAL INFORMATION.
7. PROVIDE LEVEL 5 FINISH AT WALL TO RECEIVE WALLCOVERINGS

38 NORTHWEST DAVIS, SUITE 300


PORTLAND, OR 97209
503.245.7100

1505 5TH AVE, SUITE 300


SEATTLE, WA 98101
206.576.1600

1014 HOWARD STREET


SAN FRANCISCO, CA 94103
415.252.7063
© ANKROM MOISAN ARCHITECTS, INC.

THE MARK AT SEATTLE


1200 45TH ST SEATTLE, WA 98105
UNIT B1
508

LCD ACQUISITIONS, LLC


UNIT A1
RFP-2 RFS-1

TRASH 501
513

RFP-2 RFP-2

RFP-2
RFS-1
T-2
REVISION DATE REASON FOR ISSUE
MECH. RFP-2A RFP-2
500A

STAIR 1
S01
RFP-2 ELEC.
CONC-S T-2 8 T-2 CONC-S
500B
A11.13
UNIT B4
506

ELEV.
LOBBY SDCI APPROVAL STAMP
T-2 T-2 500 T-2 T-2 RFP-2
ELEV 2 ELEV 1
E02 E01

STAIR 2
RFP-2 RFP-2A S02
3 RFP-2
A11.13
RFP-2 T-2

CORRIDOR ENLARGED
500.1
CORRIDOR FINISH
RFP-2

RFP-2

PLAN - LEVEL 5-20


BIM 360://Seattle II/210310-20-Seattle II.rvt

60% CD SET

DATE PROJECT NUMBER


11/18/2022 210310

1 LEVEL 5-20 - ENLARGED CORRIDOR FINISH PLAN


1/4" = 1'-0"
SHEET NUMBER

A9.37
PROJECT
11/18/2022 10:38:37 AM
GENERAL NOTES - FINISH PLAN
1.
2.
REFER TO SCHEDULE ON SHEED A12.XX FOR FINISHES BY ROOM.
SEE INTERIOR ELEVATIONS (A10.00 SERIES) FOR EXTENT OF FINISHES, SPECIAL CONDITIONS, AND ADDITIONAL
NOT FOR
3.
INFORMATION.
REFER TO PROJECT MANUAL 09 06 02 FOR AMENITY MATERIALS AND FINISHES SPECIFICATIONS. CONSTRUCTION
4. REFER TO APPENDIX A FOR UNIT, CORRIDOR, AND BACK OF HOUSE MATERIALS AND FINISHES SPECIFICATIONS.
5. REFER TO SHEET SERIES AX.XX FOR FLOORING TRANSITION DETAILS.
6. REFER TO SHEET SERIES AX.XX FOR ADDITIONAL INFORMATION.
7. PROVIDE LEVEL 5 FINISH AT WALL TO RECEIVE WALLCOVERINGS

38 NORTHWEST DAVIS, SUITE 300


PORTLAND, OR 97209
503.245.7100

1505 5TH AVE, SUITE 300


SEATTLE, WA 98101
206.576.1600

1014 HOWARD STREET


SAN FRANCISCO, CA 94103
415.252.7063
© ANKROM MOISAN ARCHITECTS, INC.

THE MARK AT SEATTLE


1200 45TH ST SEATTLE, WA 98105
UNIT B1
2108
UNIT B2

LCD ACQUISITIONS, LLC


2107

UNIT A1
2101
RFS-1

TRASH
2113
RFP-2

RFP-2 RFP-2

RFP-2
RFS-1
T-2
DHW
RFP-2A RFP-2 REVISION DATE REASON FOR ISSUE
PUMP RM
2100B
STAIR 1
8 S01
RFP-2
A11.13 ELEC.
T-2 CONC-S S2100A
CONC-S T-2

ELEV.
LOBBY
2100
UNIT B4
2106
T-2 T-2 T-2 T-2 RFP-2
ELEV 2 ELEV 1 SDCI APPROVAL STAMP
E02 E01

STAIR 2
RFP-2 RFP-2A S02
3 RFP-2
A11.13
RFP-2 T-2

CORRIDOR ENLARGED
2100.2
CORRIDOR FINISH
RFP-2
RFP-2

PLAN - LEVEL 21
BIM 360://Seattle II/210310-20-Seattle II.rvt

60% CD SET

DATE PROJECT NUMBER


11/18/2022 210310

1 LEVEL 21 - ENLARGED CORRIDOR FINISH PLAN


1/4" = 1'-0"
SHEET NUMBER

A9.38
PROJECT
11/18/2022 10:38:41 AM
GENERAL NOTES - FINISH PLAN
1.
2.
REFER TO SCHEDULE ON SHEED A12.XX FOR FINISHES BY ROOM.
SEE INTERIOR ELEVATIONS (A10.00 SERIES) FOR EXTENT OF FINISHES, SPECIAL CONDITIONS, AND ADDITIONAL
NOT FOR
3.
INFORMATION.
REFER TO PROJECT MANUAL 09 06 02 FOR AMENITY MATERIALS AND FINISHES SPECIFICATIONS. CONSTRUCTION
4. REFER TO APPENDIX A FOR UNIT, CORRIDOR, AND BACK OF HOUSE MATERIALS AND FINISHES SPECIFICATIONS.
5. REFER TO SHEET SERIES AX.XX FOR FLOORING TRANSITION DETAILS.
6. REFER TO SHEET SERIES AX.XX FOR ADDITIONAL INFORMATION.
7. PROVIDE LEVEL 5 FINISH AT WALL TO RECEIVE WALLCOVERINGS

38 NORTHWEST DAVIS, SUITE 300


PORTLAND, OR 97209
503.245.7100

1505 5TH AVE, SUITE 300


SEATTLE, WA 98101
206.576.1600

1014 HOWARD STREET


SAN FRANCISCO, CA 94103
415.252.7063
© ANKROM MOISAN ARCHITECTS, INC.

THE MARK AT SEATTLE


1200 45TH ST SEATTLE, WA 98105
UNIT B2
2207

LCD ACQUISITIONS, LLC


UNIT B1 12
__ ____ ____ ____ ____ ____ ____ ____ ____ ____ _____ ____ ___

2208 A5.41
RFP-2 RFS-1

TRASH
2200.1
UNIT C3
RFP-2 RFP-2
2201

RFS-1
T-2

RFP-2
DWH REVISION DATE REASON FOR ISSUE
RFP-2A RFP-2
PUMP RM
2200B
ELEC. STAIR 1
8 2200A S01
RFP-2
A11.13 T-2 CONC-S

UNIT B5 CONC-S T-2


TYPE A
2206

ELEV.
LOBBY
2200
T-2 T-2
T-2 T-2 SDCI APPROVAL STAMP
ELEV 2 ELEV 1
E02 E01

STAIR 2
S02
RFP-2 RFP-2A
3
A11.13
RFP-2 T-2

CORRIDOR RFP-2 ENLARGED


2200.2
CORRIDOR FINISH
RFP-2

RFP-2

RFP-2
PLAN - LEVEL 22
BIM 360://Seattle II/210310-20-Seattle II.rvt

60% CD SET

DATE PROJECT NUMBER


11/18/2022 210310

1 LEVEL 22 - ENLARGED CORRIDOR FINISH PLAN


1/4" = 1'-0"
SHEET NUMBER

A9.39
PROJECT
11/18/2022 1:15:08 PM
GENERAL NOTES - FINISH PLAN
1.
2.
REFER TO SCHEDULE ON SHEED A12.XX FOR FINISHES BY ROOM.
SEE INTERIOR ELEVATIONS (A10.00 SERIES) FOR EXTENT OF FINISHES, SPECIAL CONDITIONS, AND ADDITIONAL
NOT FOR
3.
INFORMATION.
REFER TO PROJECT MANUAL 09 06 02 FOR AMENITY MATERIALS AND FINISHES SPECIFICATIONS. CONSTRUCTION
4. REFER TO APPENDIX A FOR UNIT, CORRIDOR, AND BACK OF HOUSE MATERIALS AND FINISHES SPECIFICATIONS.
5. REFER TO SHEET SERIES AX.XX FOR FLOORING TRANSITION DETAILS.
6. REFER TO SHEET SERIES AX.XX FOR ADDITIONAL INFORMATION.
7. PROVIDE LEVEL 5 FINISH AT WALL TO RECEIVE WALLCOVERINGS

38 NORTHWEST DAVIS, SUITE 300


PORTLAND, OR 97209
MECHANICAL 503.245.7100
2304
1505 5TH AVE, SUITE 300

RFS-1
SEATTLE, WA 98101
206.576.1600
SHOWER RR
2305 2306

T-2
1014 HOWARD STREET
SAN FRANCISCO, CA 94103
CONDENSER
T-4 T-2 T-2 T-4 415.252.7063
FARM IDF CORRIDOR
2304B © ANKROM MOISAN ARCHITECTS, INC.
2308 2307

MECH ELEC.
STAIR 1 RFP-2A T-1
2300B 2300A
S01
8
A11.13 T-2 CONC-S
CONC-S T-2

1 A10.10 3

THE MARK AT SEATTLE


1200 45TH ST SEATTLE, WA 98105
ELEV.
T-2 T-2 LOBBY T-2 T-2
2300
STAIR 2

LCD ACQUISITIONS, LLC


RAF-1

S02
ELEV 2 ELEV 1
E02 E01
RAF-1 RFP-2A

T-2
T-1

2' - 0"
9' - 0"
RAF-1 T-1 5
T-1
TYP A10.10
1
RAF-1

ALIGN
A11.13 REVISION DATE REASON FOR ISSUE

T-1
RAF-2

CT-6
ALIGN

RAF-1 RAF-2 FITNESS A10.10 7 SKY CT-6 T-1


4 A10.10 A10.10 6
2303 LOUNGE
2301

ALIGN

T-1 CT-6
RAF-1 RAF-2

SDCI APPROVAL STAMP

ALIGN
26' - 4 1/2"
41' - 3 1/4"

IDF
51

T-1
YOGA/STRETCHING
TERRACE
ENLARGED FINISH
2300F
PLAN - ROOF LEVEL
BIM 360://Seattle II/210310-20-Seattle II.rvt

60% CD SET

DATE PROJECT NUMBER


11/18/2022 210310
SHEET NUMBER

1 LEVEL 23 - ENLARGED FINISH PLAN


1/4" = 1'-0"
PROJECT
A9.40

You might also like