iHOGA software. Report.

Project: P1.kho. Generation # 1


DC Voltage: 48 V. AC: 400 V.

COMPONENTS:

PV gen. PV100, 1x100 kWp. P total = 100 kWp (100% PV#1)


Batt. Bat240kWh, 1x1x5 kAh. E total = 0,24 MWh (0,8 d.aut) POWER (kW)
Without Wind Turbines
Without Hydro Turbine 100
1 x AC Gen. Diesel50kW, 1x50 KVA 80
Fuel Cell FuelCell1kW, power 1 kW
Elyzer. Elyzer2kW, 2 kW. 60
Inverter Inv-Ch75kW, 75kW 40
20

PV GEN FC ELY INV


CONTROL STRATEGY:

IF THE POWER PRODUCED BY THE RENEWABLE SOURCES IS HIGHER THAN LOAD: CHARGE
If the spare power from renewable is lower than Plim_charge = 30 kW the Batteries are charged. Otherwise the
Electrolyzer generates H2

IF THE POWER PRODUCED BY THE RENEWABLE SOURCES IS LESS THAN LOAD: DISCHARGE
If the power not supplied to meet the load is lower than P1FC = 11,2 kW, it will be supplied by the Batteries. If the
Batteries cannot supply the whole and the rest is lower than P2 = 39,6 kW, the rest will be supplied by the Fuel Cell,
otherwise the rest will be supplied by the AC Generator.
If the power not supplied to meet the load is higher than P1FC = 11,2 kW, and lower than P2 = 39,6 kW, it will be
supplied by the Fuel Cell. If the FC cannot supply the whole and the rest is lower than P1gen = INF kW, the rest will be
supplied by the Batteries, otherwise the rest will be supplied by the AC Generator.
If the power not supplied to meet the load is higher than P2 = 39,6 kW, it will be supplied by the AC Generator. If the
AC Generator cannot supply the whole and the rest is lower than P1FC = 11,2 kW, the rest will be supplied by the
Batteries, otherwise the rest will be supplied by the Fuel Cell.

AC Generator Minimum Power : 15 kW


When power to be supplied by AC Gen. is < Pcritical_gen = 0 kW, AC gen. runs at full power (without excess),
charging the Batt. (this hour and the next hours) until 10 % SOC is reached and generating H2 in Elyzer until H2
Tank= 0 t
Fuel Cell Minimum Power : 0,1 kW
When power to be supplied by FC is < Pcritical_FC = 0 kW, the FC runs at full power (without excess), charging the
Batteries (this hour and the next hours) until 10 % of SOC is reached
LOAD FOLLOWING. SOC min. batteries = 10 %

COSTS:

Initial Investment: 221,25 k$. Loan: 100 %, int. 5% in 25 years, annual quota: 15,698 k$. Cost AC gen. fuel, 1st. year:
2,583 k$

NPC OF THE SYSTEM (25 years lifetime): (comparing to only AC grid, 86MWh/yr, NPC=324,87 k$)

Total System Costs (NPC): 174,395 k$. Levelized cost of energy: 0,18 $/kWh

Distribution of NPC:
PV Generator Costs (NPC): 111,103 k$
Battery bank Costs (NPC): 49,098 k$
AC Generator Costs (NPC): 16,54 k$
Fuel Cell Costs (NPC): 4 k$
Electrolyzer+H2Tank Costs (NPC): 19,134 k$
Inverter Costs (NPC): 19,227 k$
AC Generator Fuel Costs (NPC): 22,683 k$
Installation+financing (NPC): -67,39k$

1 of 3
NPC / NPV (k$)

PV

AC GEN. FUEL
BATTERIES

AC GENERATOR

INV.+AUX. FC ELYZER.+H2_TANK

ENERGY BALANCE DURING 1 YEAR (MWh/year):

Overall Load Energy: 88,377 MWh/yr. From Renewable: 95,65%


Unmet load: 0 MWh/yr (0 % load)
E. Purchased from AC grid: 0 MWh/yr
Export Energy: 7,99 MWh/yr
E. sold to AC grid: 0 MWh/yr
Energy delivered by PV generator: 112,997 MWh/yr
Energy delivered by Wind Turbines: 0 MWh/yr
Energy delivered by Hydro Turbine: 0 MWh/yr
Energy delivered by AC Generator: 3,84 MWh/yr
Energy delivered by Fuel Cell: 0 MWh/yr
Energy at Electrolyzer: 5,348 MWh/yr
Energy charged by Batteries: 81,366 MWh/yr
Energy discharged by Batteries: 75,038 MWh/yr

OTHER RESULTS:

Batteries Lifetime: 9,1 years


Hours eq. of AC Generator operation: 346,67 h/yr
Hours of Electrolyzer operation: 2049 h/yr
Hours of Fuel Cell operation: 0 h/yr
Total CO2 emissions: 10,24tCO2/yr; Emissions of AC generator (due to consumption of 1,987 litrex1E3/yr): 5,36 tCO2/yr
H2 sold in one year: 0 t H2/yr

ENERGY BALANCE DURING 1 YEAR (MWh/year)

100

80

60

40

20

LOAD Exp PV GEN ELYZ C.BAT D.BAT

2 of 3
NO MULTI-PERIOD SIMULATION -> ALL THE YEARS SAME ENERGY VALUES (MWh/yr).

TOTAL LOAD: PV GENERATOR:

100
50
50

0 0
12 34 567 89 11 13 15 17 19 21 23 25 1 2 3 4 5 6 7 8 9 11 13 15 17 19 21 23 25

WIND TURBINES: HYDRO TURBINE:

0 0

1 23 45 6 78 9 11 13 15 17 19 21 23 25 1 23 45 6 78 9 11 13 15 17 19 21 23 25

AC GENERATOR: EXPORT:
4 8
3 6
2 4
1 2
0 0
1 23 45 6 78 9 11 13 15 17 19 21 23 25 1 23 45 6 78 9 11 13 15 17 19 21 23 25

FUEL CELL: ELECTROLYZER:

4
0
2

0
1 23 45 6 78 9 11 13 15 17 19 21 23 25 1 23 45 6 78 9 11 13 15 17 19 21 23 25

BATTERY BANK CHARGE: BATTERY BANK DISCHARGE:

80
60 60
40 40
20 20
0 0
12 34 567 89 11 13 15 17 19 21 23 25 12 34 567 89 11 13 15 17 19 21 23 25

HYDROGEN TANK CAP. OR H2 SOLD (t): UNMET LOAD:

0,08
0,06
0,04 0
0,02
0
123456789 11 13 15 17 19 21 23 25 1 23 45 6 78 9 11 13 15 17 19 21 23 25

PURCHASED FROM AC GRID: SOLD TO AC GRID:

0 0

1 23 45 6 78 9 11 13 15 17 19 21 23 25 1 23 45 6 78 9 11 13 15 17 19 21 23 25

3 of 3

You might also like