Professional Documents
Culture Documents
This survey aims to determine the knowledge gained by the participant from the Basic PCO
Training.
Before the Training After the Training,
PERMITS / can you secure COMMITMENT DATE
CLEARANCES the required and TIME to secure the
(Kindly check permits? permit/clearance, not
which permit is YES later than 3 months from
(Kindly
applicable.) indicate the NO N/A YES NO N/A the date of training
permit
reference no.)
Environmental RO7- YES ALREADY SECURED
Compliance 0901-
Certificate 0030-
(Under PD 1586) 116A
Certificate of Non- N/A N/A N/A
Coverage
(Under PD 1586)
Discharge Permit CHECK YES 3 MONTHS AFTER PCO
(Under RA 9275) ACCREDITATION
Permit to Operate CHECK YES 3 MONTHS AFTER PCO
(under RA 8749) ACCREDITATION
Compliance Certificate
(under RA 6969):
Hazardous Waste CHECK YES 3 MONTHS AFTER PCO
Generator’s ID ACCREDITATION
a) PMPIN N/.A N/A N/A
b) SQI N/A N/A N/A
c) PCL N/A N/A N/A
Chemical Control Order
(under RA 6969):
a) Mercury N/A N/A N/A
b) Cyanide N/A N/A N/A
c) Asbestos N/A N/A N/A
d) ODS N/A N/A N/A
e) PCB N/A N/A N/A
f) Lead & Lead N/A N/A N/A
Compounds
For LGUs, N/A N/A N/A
approved 10-Year
Solid Waste
Management Plan
TOTAL PERCENTAGE
COMPLIANCE TO THE
ALL PERMIT WILL BE
REQUIRED PERMITS / TARGET = 4/4 = SECURED 3 MONTHS
CLEARANCES 3/4 = 75%
100% AFTER PCO
ACCREDITATION
After the completion of the training, are you still unable to secure the above stated
permits/clearances? If yes, please select from the reasons stated below:
☐ Failure to obtain PCO accreditation due to unrelated field of study and lacking requirements.
Kindly specify what type of requirements/qualifications.
____________________________________________________________________________
__________________________________________________________________________
☐ Unfamiliar on navigating the Online Permitting and Monitoring System (OPMS) due to lack of
computer skills
☐ Unfamiliar on navigating the Online Permitting and Monitoring System (OPMS) due to
inadequate training given