You are on page 1of 1

16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

L L

OLD LOCATION

NEW LOCATION X1 X2 X3 X4 X5 X6 X7 X8 X9 X10 X11 X12 X13 X14 X15 X16 X17 X18 X19 X20 X21 X22 X23 X24 X25 X26 X27 X28 X29 X30 X31 X32 X32' X33 X34 X35

Y13
Y12
Y11

K Y10
Y9
K
Y8
Y7
Y6
Y5
Y4
Y3
Y2
Y1

X1 X2 X3 X4 X5 X6 X7 X8 X9 X10 X11 X12 X13 X14 X15 X16 X17 X18 X19 X20 X21 X22 X23 X24 X25 X26 X27 X28 X29 X30 X31 X32 X32' X33 X34 X35
279,000 KEY PLAN
NOTE

7,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 4,000 8,000 16,000
4,000
J 8,000 8,000 J

I I
TOILET-3 EOT SHOWER & LOCKER ROOM EOT TOILET TOILET-4
EA0393 EC0341 EC0392 EA0394
FFL 3rd FFL±0 FFL 3rd FFL±0 FFL 3rd FFL±0 FFL 3rd FFL±0
SFL 3rd FFL-175 SFL 3rd FFL-175 SFL 3rd FFL-175 SFL 3rd FFL-175
CH 2900 CH 2900,3000 CH 2900 CH 2900
F3 W7 C6 MV F3,F2 W7,W1 C6,C2 AC F3 W7 C6 AC F3 W7 C6 MV

Y13
FAO FAO FAO FAO FAO FAO FAO FAO FAO FAO FAO FAO FAO FAO

Y13

2,000
Ø100 SLEEVE(PIPE)

Ø100 SLEEVE(PIPE)
CA DN20 F/A PS
FL+2,000

Y13'
A3-001 20Nm3/hr ELV

TOOL ROOM HARDWARE STORE CO-WORKING OFFICE SERVER ROOM SPV


8,000

CA DN15 F/A
FL+2,000
EA0385

6,000
A3-062 10Nm3/hr
FFL 3rd FFL±0 OPEN FFL 3rd FFL±0 FFL 3rd FFL±0 STAFF LOUNGE

(MODULAR SYSTEM)
ELV(IT)
SFL 3rd FFL-175 OPEN ELV(IT) SFL 3rd FFL-175 SFL 3rd FFL-175

NOVEC-1230
PS
CH NIL A3-063 SHIFTED PAD
F2A W1 C5 MV

FA
PAD SPK

O
ELV FIRE LIFT DN
PS PS PAD PAD PAD FREIGHT LIFT
CA MAIN DN80 T/B
Ø250 SLEEVE Ø250 SLEEVE

PAD 1225kg
STAIR 2

Y12 Y12
PS 2500kg
(1ST STORY) CA DN15 F/A 1.5m/s PAD
FFL FL+2,000
0.5m/s
FFL UP
FIRE CURTAIN DN FIRE LIFT A3-063 10Nm3/hr DN

GRAD 1:12
FIRE LIFT PAD
STAIR 11 STAIR 1 FFL
Ø250 SLEEVE

RAMP UP
SPK 1225kg PS SPK ELV ELV(IT) CA DN25 F/A
1.5m/s DN15 BALL VALVE
PAD UP UP
SEATING ROOM
8,000

8,000
FL+2,000

H H
A3-028 10Nm3/hr
UP
FFL 3rd FFL±0
X26 X28
FAO SFL 3rd FFL-100

00
FFL-3
A3-029 10Nm3/hr A3-032 50Nm3/hr

3rd
SFL=
DN 15 DN32 F/A VEHICLE INSPECTION LINE PIT-1
FL+2,500 FL+2,500 FAO
PIT-3F-08

Y11 Y11
SFL=3rd FFL-2,700
CA DN25 F/A
CA DN50 F/A DETAIL "A"
FL+2,000 CA DN25 F/A CA DN25 F/A
CA DN25 F/A C/W CA DN50 F/A CA DN25 F/A CA DN25 F/A CA DN25 F/A Ø150 SLEEVE(PIPE)
CA DN40 F/A Ø150 SLEEVE(PIPE)

A3-010 160Nm3/hr DN20 BALL VALVE DN15 BALL VALVE


DN15 BALL VALVE FL+2,000 FL+2,000 DN20 BALL VALVE DN15 BALL VALVE DN20 BALL VALVE A3-033 30Nm3/hr DN
A3-011 160Nm3/hr FL+2,000 FL+2,000 DN25 F/A
FL+2,000 FL+2,000
8,000

8,000
A3-015 15Nm3/hr A3-017 10Nm3/hr FL+2,000 STAIR 5 PAD
A3-009 10Nm3/hr A3-016 15Nm3/hr A3-052 20Nm3/hr FL+2,500 FE5 LINE PIT
FL+2,500
A3-051 10Nm3/hr A3-027 20Nm3/hr UP
PIT-3F-06 FAO
DN20 PAD
SFL=3rd FFL-2,700

PS ELV ELV(IT)
SSL

Y10 Y10
Ø250 SLEEVE
8,000

8,000
FAO A3-003 ADDED
A3-003 DN25 CA DN65 T/B A3-023 ADDED CA DN25 F/A C/W
A3-003 30Nm3/hr FE

FL+2,000 A3-022 SHIFTED A3-024 SHIFTED


DN20 BALL VALVE A3-025 SHIFTED
FL+2,000 A3-023 160Nm3/hr FL+2,000 PAD

00
FFL-3
Ø250 SLEEVE

A3-023 DN50 A3-024 20Nm3/hr EAD

3rd
PAD

SFL=
PS
DETAIL "A" DETAIL "A"

Y9 Y9
DETAIL "A" A3-004 SHIFTED DETAIL "A" DETAIL "A" CA DN25 F/A C/W
CA DN25 F/A CA DN25 F/A C/W DN15 BALL VALVE
CA DN25 F/A CA DN25 F/A A3-022 DN40
CA DN50 F/A DN20 BALL VALVE
CA DN25 F/A CA DN40 F/A CA DN25 F/A
DN15 BALL VALVE
DN15 BALL VALVE DN15 BALL VALVE
A3-022 125Nm3/hr CA DN65 F/A
FL+2,000 FIRE LIFT FFL DN

FL+2,000 FL+2,000
DN15 BALL VALVE
FL+2,000
A3-014 DN25
A3-014 40Nm3/hr
DN15 BALL VALVE
FL+2,000
FL+2,000
A3-019 10Nm3/hr
FL+2,000 FL+2,000 FL+2,000
A3-034 10Nm3/hr STAIR 3 SPK
A3-008 250Nm3/hr CA DN25 F/A FL+2,000 A3-018 10Nm3/hr A3-020 10Nm3/hr UP
A3-007 20Nm3/hr FL+2,000 A3-025 255Nm3/hr
8,000

8,000
A3-013 10Nm3/hr FL+2,000 A3-012 10Nm3/hr PAD
A3-004 30Nm3/hr

from 1st Storey

to 5th Storey
G G

SECURITY GATE
STAFF LOUNGE
LIFT LOBBY 1
FIRE CURTAIN
FAO

Y8 ASSEMBLY PROCESS
PASSENGER LIFT PASSENGER LIFT
PAD
PASSENGER LIFT
PS

DISPLAY GALLERY
Y8
8,000

PS

EA0302 ELV(IT) EC0302


FFL 3rd FFL±0 FFL 3rd FFL±0
SFL 3rd FFL-175 SFL 3rd FFL-100
CH NIL CA DN25 F/A CH NIL
96,000

96,000
16,000
FL+2,000 LIFT LOBBY 2
F2A W1 C4 AC A3-035 30Nm3/hr ID SHOW ID SHOW ID SHOW AC
A3-064 SHIFTED
PAD EC0301

Y7 Y7
DN
Ø250 SLEEVE
FIRE LIFT PS FFL 3rd FFL±0
STAIR 10 FFL
1225kg
1.5m/s
STAFF LOUNGE
SFL 3rd FFL-100 OPEN
PAD UP CA DN25 F/A CA DN25 F/A C/W CA DN25 F/A Ø150 SLEEVE(PIPE)

SPK
DN15 BALL VALVE DN 15 BALL VALVE DN15 BALL VALVE CH 3000
FL+2,000 FL+2,000 FL+2,000 TOILET-1 ID SOW ID SOW ID SOW AC
8,000

CA DN25 F/A A3-064 10Nm3/hr A3-065 10Nm3/hr A3-066 10Nm3/hr EA0391


CA DN32 F/A DN20 BALL VALVE
FL+2,000 FL+2,000 FFL 3rd FFL±0
A3-045 50Nm3/hr A3-044 20Nm3/hr SFL 3rd FFL-100
VEHICLE INSPECTION LINE PIT-2 PAD
CH 2900 DN PASSENGER LIFT
PIT-3F-08
SFL=3rd FFL-2,700
F3 W7 C6 MV ELV STAIR 12
EAD UP

Y6 STAFF LOUNGE

FAO
Y6
8,000

8,000
SHOP DRAWING

to 1st Storey
from 5th Storey
FAO
A3-047 ADDED
A3-048 ADDED

F A3-038 ADDED

DETAIL "A" DETAIL "A"


A3-049 SHIFTED

DETAIL "A"
VEHICLE INSPECTION LINE PIT-3

PIT-3F-08
F
DETAIL "A"

Y5 Y5
CA DN25 F/A C/W CA DN25 F/A SFL=3rd FFL-250
CA DN25 F/A CA DN25 F/A CA DN25 F/A CA DN25 F/A CA DN25 F/A CA DN25 F/A
DN20 BALL VALVE DN15 BALL VALVE FL+2,000 CA DN25 F/A FL+2,000 DN15 BALL VALVE DN15 BALL VALVE
DN20 BALL VALVE DN15 BALL VALVE
A3-042 30Nm3/hr FL+2,000 FL+2,000 FL+2,000
FL+2,000 FL+2,000
A3-038 10Nm3/hr
FL+2,000 FL+2,000
A3-040 10Nm3/hr A3-043 40Nm3/hr
A3-046 10Nm3/hr
A3-049 10Nm3/hr A3-050 10Nm3/hr
VISITOR TOILET
A3-039 10Nm3/hr A3-041 10Nm3/hr DN15
A3-047 10Nm3/hr EC0391
8,000

8,000
DN15 FFL 3rd FFL±0
A3-048 10Nm3/hr
DN15 SFL 3rd FFL-100
CH 2900
ID SOW ID SOW ID SOW MV

Y4 PS
ELV ELV(IT)

FIRE LIFT(HCP)
Ø250 SLEEVE

FFL
PAD

RECEPTION
Y4
8,000

8,000
KIDS
1225kg

KIDS
1.5m/s
PAD
FAO STAFF LOUNGE FFL 3rd FFL±0
STAFF LOUNGE
B REVISED AS PER NEW DESIGN 30 MAR GANESH 23 May 22
TOILET-2
DN
STAIR 6
SPK
SFL 3rd FFL-100 FAO
E
UP
EA0392

Y3 Y3
CA DN25 F/A CA DN50 F/A
CA DN40 F/A FFL 3rd FFL±0 DN15 BALL VALVE FL+2,000
CA DN25 F/A FL+2,000 FL+2,000
SFL 3rd FFL-175 A3-030 168Nm3/hr DETAIL "A"
DN20 BALL VALVE
FL+2,000
A3-021 100Nm3/hr
CH 2900
A3-063 10Nm3/hr CA DN25 F/A
DN15 BALL VALVE CA DN25 F/A C/W
DN15 BALL VALVE
A REVISED AS PER NEW DESIGN REV-2 GANESH 14 Dec 21
A3-054 20Nm3/hr F3 W7 C6 MV FL+2,000 STORE-1 FAO
8,000

8,000
A3-036 5Nm3/hr FL+2,000
A3-031 10Nm3/hr

OPEN
FFL 3rd FFL±0
SFL 3rd FFL-100
REV. DESCRIPTION DRAWN DATE

E PAD DN
PAD PS
OPEN OPEN
SPK
PAD
PAD TR ELV PAD DN
PAD
Ø250 SLEEVE
SPK CLIENT
STAIR 9 STAIRUP7

Y2 Y2
SPK FREIGHT LIFT
CA DN25 F/A
CA DN25 F/A UP FFL FIRE LIFT PS 2500kg
Ø250 SLEEVE

DN15 BALL VALVE


0.5m/s PS
FIRE LIFT UP CA DN25 F/A FFL
DN15 BALL VALVE 1225kg
FL+2,000 1.5m/s
CA DN25 F/A 1225kg FFL STAIR 8
FL+2,000 DN15 BALL VALVE FIRE LIFT

6,000
FL+2,000 A3-062 10Nm3/hr FL+2,000 1225kg

FAO
A3-061 10Nm3/hr 1.5m/s 1.0m/s
ELV(HV) ELV(LV) ELV(IT)
Ø250 SLEEVE

A3-053 30Nm3/hr DN A3-037 10Nm3/hr PS ELV ELV(IT) RESERVE


8,000

CAR LIFT

FAO
STAFF LOUNGE

STORE-2

Y1'

2,000
CLEAN-UP CAR
FFL 3rd FFL±0
SFL 3rd FFL-175

Ø100 SLEEVE(PIPE)

75
FFL-1
Y1

3rd
SFL=
ARCHITECT & ENGINEER (SOUTH KOREA)
Ø100 SLEEVE(PIPE)

Ø100 SLEEVE(PIPE)

Ø100 SLEEVE(PIPE)

Ø100 SLEEVE(PIPE)

Ø100 SLEEVE(PIPE)
GAS RISER

FAO FAO FAO FAO FAO FAO FAO FAO FAO FAO FAO FAO FAO FAO

Y1 D
ARCHITECT

D DP ARCHITECTS PTE LTD


6 RAFFLES BOULEVARD
#02-249 MARINA SQUARE
SINGAPORE 039594
TEL 63383988 FAX 63379989
ENGINEER

C
DP ENGINEERS PTE LTD
6 RAFFLES BOULEVARD
#02-249 MARINA SQUARE
SINGAPORE 039594
C TEL 63383988 FAX 63379989
SUB-CONTRACTOR
ASK M&E PTE LTD

PROJECT TITLE

HMGICS PROJECT
DRAWING TITLE
B COMPRESSED AIR SYSTEM B
A1 SIZE (841mm x 594mm)

3RD STOREY COMPRESSED AIR PIPING


LAYOUT PLAN (OVERALL)
SCALE ASK
3RD STOREY COMPRESSED AIR A1: 1/500
A3: 1/1000 DRAWN CHECKED APPROVED

PIPING LAYOUT PLAN GANESH SELVAM ASK


DATE
23 May 22
1 Scale 1/500
DRAWING NO. REV.

ASK/HMGICS/CA/03/005 B
A A
16 15 14 13 12 11 10 7 6 5 4 3 2 1

You might also like