Professional Documents
Culture Documents
6 m
11.8 m
12.3 m
R. Wk. Gerbang
54 m Kuriku Depan
lum POS
24 m 30 m UKS Satpam
R.
R. Kelas R. Kelas R. Kelas R. Band R. Kelas R. Kelas R. Kelas 36.2 m
13.4 m
Operator 4m
9m
R. Gudang
R. Kelas R. Kelas R. S-2 R. Kelas R. Kelas R. Kelas
13 m
Kesiswaan Ruang
KKPI
R. Kepsek
9m
WC R. Seni
SMP Mesjid
WC
R. TU
Ruang
39.7 m Bendahara 9m
27.5 m
40 m
Bank
Lapang Upacara/Olah Raga R. Tamu
Mini
45 m
R. Guru
- Ruang Kelas = 25 (9.9 x 7)
= 1732.5 m2
- Bengkel = 28 x 12.5 Lab. Informatika
= 350 m2
30.5 m
38 m
= 52.32 m2
- Kelas Perb. = 8.1 x 5.6 Ruang Ruang Ruang
6.6 m Kelas Kelas Kelas
= 45.36 m2
12.5 m
- Ruang KKPI = 8.1 x 5.6
= 45.36 m2 28.5 m Lab. Perbankan
Bengkel Otomotif
- Lab. Akuntansi = 17.76 x 6.6
WC Perpusta Koperasi Lab. Perhotelan
= 116.82 m2 R. Kelas R. Kelas
8.8 m
WC kaan
- Lab. Perhotelan = 17.76 x 6.6 Gerbang WC
Belakang R. Kelas R. Kelas R. Guru 28 m
= 116.82 m2 WC
- Total = 2459.18 m2
Bengkel TBSM
23.5 m
Lab. Akuntansi
31.5 m