Program of Works, Cost Summary
and Detailed BreakdownPROGRAM OF WORKSRepublic ofthe Bhilippines
DEPARTMENT OF TRANSPORTATION
CIVIL AVIATION AUTHORITY OF THE PHILIPPINES
(ld MIA Road, Pasay City
INDIVIDUAL PROJECT PROGRAM OF WORK.
DOTr DOWNLOADED PROJECT
4) Date May 11,2022
2) Agency AAP
3) Region REGION-X1
4) City Municipality Davao city
3) Name / Location of Project (@) sued obligated Je) Funding
Expansion of Davao Internationa Airport Passenger Terminal | (7) Source of Fund Authority Warrant
Building Dorr Downloaded Project
Davao City ‘GAA 20_
8 Plan SetNo.
410) Project Description (1) Number of Calendar Days to Complete
Construction of New Passenger Terminal Building ‘Sic Hundred Thity (630) Calendar Days
Davao city inclusive of Sity (60) rainylunworkable days
12) Technical Personnel Required (43) Minimum Equipment to be Used
Project Manager 4.49 2 | congo Tuck, 11-12 tonner, 280 hp, US. & other makes
ProjectEngineer 9g 2 | HydrauiicExcavator/Backhoe, W.M. 0.92 cum, 130 hp.
Material Engineer 4.09 2 |enerator Set, 251-300 kw, 314-375 va, Models
transit Mixer, 8.0- 10.0 cu,yd, 290 hp, apan & other
Electical Engineer 4.99 a ee
Mechanical Engineer 4.09 8 [oump Truck, 9-11.99 eu, 275 hp All Models
ater Truck w/ water pump, 16,000 liters, 3
canna ee 1 | Marte water resem ars ate an
1. | Pneumatic Rl (eitPropalied,aStonnes, 260 hp, 23-
‘ecttect 1.00 WHL-750x15, 42R
Sanitary Engineer 1.00 2 |Wheet Loader, 2.29 cum, 150.0hp. Komatsu
[Truck Mounted crane, Hydoulic Telescopic Boom, 21-
‘Surveyor 1.00 25, all Models
Satety Officer 1.00 1 [Pumperete, 60 cu.yd. (45.87m", 180hp, Putmetster
Nurse 1.00 1 [Trailer with Tractor, Low Bed, 30T cap
+4) Estimated Gost by tem of Work
(Material, Equipment and Labor)
(ay az | 08a] (aay (1450) (18.50)
‘Scope of Work to be Done ‘wot | Unit | quantity} Total Amount Unit
Tem Total Price
Mobilization/Demobilization osx] rot 1.00 3,601, 191.88 3,601, 194.86
General Requirements and Civil Works 434%] tot 1.00] 25,003,385.76 25,003,355.76
‘Structural Works 34.90%] ot 1.00) 200.987.4322 200 937 432.28]
‘Architectural Works. 16.03%] ot 100] 92,260,616.14 82,260,616.14
Mechanical and Fire Protection sar bot 100) 77.531,844.96 77.831,844.96
‘Sanitary Works, 141%] bt 1.00 8,138,060.08 8,138,060.
Electrical Works o2tm) lot 100} 58,039,528.31 83,039,528.31
TTelocommunication 556%] bot 00] 31,982,02965 31,982,028.65
Special Equipment 14.45%) tot 1.00) 83,177,788.78 83,177.788.78
nothing follows ***
sae 100.00%| 575,671,847.83BREAKDOWN OF ESTIMATED EXPENDITURES ‘AMOUNT % OF TOTAL
ESTIMATED DIRECT COST 975,671,867.83
DIRECT COST
1, MATERIALS. 478,326 682.10 68.38%|
1.4 COST AT SOURCE
1.2 TRANSPORT EXPENSES
1.3 STORAGE COST
2. LABOR 54,480,950.01 7.78%|
241 DIRECT LABOR
3. EQUIPMENT EXPENSES (Including FOL) 30,283,023.87 5.62%4|
3.1 RENTALS:
4, MOBILIZATION / DEMOBILIZATION 3,601,191.88 0.1%
B. INDIRECT cost . 123,877,476.33)
10cm 44,895,70287 642%|
4.4 OVERHEAD
4.2 CONTINGENCIES
2. CONTRACTOR'S PROFIT 4571127088 sae
3, VAT. & CONTRACTOR'S TAX 33,279,502.58 4.76%|
SUBTOTAL (690, 549,324.15| 10.00% |
Il ESTIMATED GOVERNMENT EXPENSES
1, ROW//SITE ACQUISITION
2, SOIL EXPLORATION Pp
3, PROJECT MANAGEMENT
4, MATERIALS TO BE FURNISHED BY THE GOVERNMENT
UB TOTAL
IL CONTINGENCY RESERVES
1. PHYSICAL
2, PRICE ESCALATION
UBTOTAL
‘OTAL PROJECT ESTIMATED COST (P6590 549,324.15 10.00%)
‘ARNEL F/BORLADO
Department Manager il, AED - ADMS
commend Approval: Funds Avaliable:
Leow INO A DIGNELA PAF(rel) ia
sistant Director General, ADMS Departmght Manage Il, FD
MELO
‘Assistant Secretary for Avian and AsportsCOST SUMMARYPROPOSED EXPANSION OF DAVAO INTERNATIONAL AIRPORT PASSENGER TERMINAL BUILDING
avaociTy
Cost SUMMARY
secnon/ ‘AMOUNT
DESCRIPTION unt
SERIES No. DIRECT COST INDIRECT COST
‘GENERAL REQUIREMENTS AND CIVIL WORKS
[rployers and engineer Facies 23932886 a5 57007 Te ES
[Envionmantat Management and Marita 3.831870. 422,381.40 3.254, 251.40
[contractor Submision 25,694.00 3979.00 3367300
Prec Equipment apes 977.28 358,12055, 55409819
Earthworks 5524,762.29| 726,202.54 eas0.98482
Pavement Work 3.128 094.08 215,924.50, 337401854
Drainage Works 901,345.78 195449.78 1,097595.56
viscalleneous Wore 555,891.67 32350.38 2047806.
structural Concrete and rebars 5735 571.8 7263.434.67, 7059,0085,
‘STRUCTURAL
Sroeoral Concrete Works for Buling aneense7ae R067 seasaazeat
seveturl Steel Works 715.016.936.68 253293.692.19, Tn 309.625.02
Block works 3238.96852 706,090.78 3.945,030.29
‘ARCHITECTURAL
[ermite Conta
Water Proofing Wor
Roofing, lang and Facade Wor
[Dsors na Windows
[Metal works
[woos Works and Porons
nines
visclienous/ ngs /Furaures
signages
Tass Tae Tapa aT
72.583.697.85 2743.28.69, Ts.325546.54
751,065.61 11646,127.94 9197.173.55
30,270,169.20 4418.96.88 89 065.08
1586325.52, 351,799.18 248,125.71
Br 58.85 335957. 759,516.06
85 783.70, a9. 960.85 Bases. 7005
4579.76357 538,26045, 557743682
2,582412.52 552,966.02 345,378.95
B/E S/S |S S/S |S 15
MECHANICAL AND FIRE PROTECTION
[Vetlston and Air Conditioning system Eos ERITH 313 19838
Fre Protection Sytem 7,791,986 7.698.544.86 990.593.77,
‘SANITARY,
Water Supp tne wa7as694 aes, 37383370
sentary and Plumbing Sytem 6710873.14 462,970.34 3.173.33.49
ELECTRICAL WORKS.
Power Supp system iso ae7o Saaz mas oase
Power Feeder system 3,348 360.18 3999,07052 77 343,430.70
[Gehting and wing Device Sato 2.793951.82, 09 08.41 3003.03.55,
TTELECOMMUNICATION
elegans and Dsta System TAOT BOG aT 705000,
[cable TV sytem 7997.77.70 T7313 9743,265.52
Public Adress Sytem 16.082, 693.10 3319487.10, 737210020,
[Master Gock system 3.521 404.65 35156522 3,853,07050
i ccrv system 16.583,753.80 85 25833, 019.0123,
Fie alam Detedion Ste 3.962.684 1853 865.18 4828 59.08
Fgh information soy System 4.56151. 573,502.05 5427.93.48
‘SPECIAL EQUIPMENT
[erator Esaator sano Taso a SaaaSS
Boeasge Waning ster 20.634.918.82 3398.41230, 29493.351.12
ipo Securty and Safety Stem 73 1.8/0.502.35 30783 397.05
Department Manager, AED - ADMS ‘Aesstant Director General, ADSDETAILED BREAKDOWN‘DAVAO cry
m @ @ [« 5 [8 a | th = sy a =,
‘ase zi aaa] aman) ae 5 =| meena] means) apenas
= ia | amas Taam wx] memlem| mimo] aon] saoam| _aearam| aan
ae Paar] ousieae|enamse| aan z aes wisn] ssave) comer] saan
SECTION 1907 SAFETY, HEATH ENVIRON RETA WANAEMENT AND WONITORNG
aoa iearaee| _awaewm| toma] aaa) maw iam) maze) aime | aan
‘STON 365 CONTRACTOR SUBRASSION
aI 5 Err) ane FE TT) ama] ia
SECTION 1210 ;PRONET EQUINE
ao re ed = ums] oaaar| wanes) acumen]
[sco s4o : ARTIWORES FoR STE DEVELOPNENT AND BURDWG WOR
Tati [eer cr: oan Brees [am Tsst| esis] rasa esse [ear] ase Po a Ts
[ene ebuer| Fe a A seu] naa Sa