You are on page 1of 7

OUTPUT ILLUSTRATION

Area 0.41 m2
Volume 1.17 m3

MATERIALS
Cement 10.54 bags
Gravel 1.17 m3
Sand 0.59 m3

12mm dia rebar 47.32 kgs


12mm dia rebar 44.04 kgs
12mm dia rebar 11.75 kgs
12mm dia rebar kgs

#16 GI Wire 2.06 kgs

Excavation 2.93 m3
INPUT VALUES
MANHOLE
L (Length) 1.5 m
H (Height) 1.3 m Slab Area 2.25
W (Width) 1.5 m Area 1 0.24
Thk (Thickness) 0.1 m Volume 0.849
No. of Manhole 1 pcs
X Spacing 0.25 m Length 53.3
Y Spacing 0.25 m Length 49.6
X steel dia 12 mm
Y steel dia 12 mm

COVER
No. of Cover 3 pcs
L (Length) 1.4 m
W (Width) 0.5 m Area 0.7
Thk (Thickness) 0.1 m
Volume 0.07
L Spacing 0.275 m
W Spacing 0.125 m length 13.23636
L steel dia 12 mm
W steel dia 12 mm

LEAN CONCRETE
Thickness 0.05 m
OUTPUT ILLUSTRATION

Area 0.20 m2
Volume - m3
W
MATERIALS
Cement - bags
Gravel - m3 H
Sand - m3

12mm dia rebar 1.78 kgs


12mm dia rebar - kgs Y
#16 GI Wire 0.04 kgs X

Excavation 0 m3
INPUT VALUES

Total Length m
H (Height) 0.6 m
W (Width) 0.8 m
Thk (Thickness) 0.1 m

X Spacing 0.25 m
Y Spacing 0.25 m
X steel dia 12 mm
Y steel dia 12 mm
OUTPUT ILLUSTRATION

Area 0.09 m2
Volume - m3
W
MATERIALS
Cement - bags
Gravel - m3 H
Sand - m3

Excavation 0 m3
INPUT VALUES

Total Length m
H (Height) 0.6 m
W (Width) 0.8 m
Thk (Thickness) 0.1 m
Total Length m
Diameter m