Design Data:
Footing C2/F2 Tie Beam
Length : 1.2 m Total Length : 42.9562 m
Width : 1.2 m Width : 0.2 m
Thickness : 0.25 m Thickness : 0.3 m
No of Footing : 9m
Volume of Excavated Area
Footing = 3.24 cu.m
Tie Beam = 2.577372 cu.m
Total Excavation = 5.817372 cu.m
Design Data:
Footing C1/F1 Tie Beam
Length : 1.5 m Total Length : 34.8594 m
Width : 1.5 m Width : 0.2 m
Thickness : 0.3 m Thickness : 0.3 m
No of Footing : 9m
Volume of Excavated Area
Footing = 6.075 cu.m
Tie Beam = 2.091564 cu.m
Total Excavation = 8.166564 cu.m
Design Data:
Gross Area : 274.8
Opening Width Height Quantity Total Area Area for Opening :
Door - 1 0.9 2.15 1 1.935 24.7
Door - 2 0.9 2.15 1 1.935 Net Area :
Door - 3 0.8 2.15 2 3.44 250.1
Door - 4 0.6 2.15 3 3.87
Window -1 1.2 1.2 5 7.2 TOTAL NUMBER OF CHB
Window -2 0.8 1.2 4 3.84 = 3126.25
Window -3 0.8 1 1 0.8
Window -4 0.4 1.2 2 0.96
Window -5 0.6 0.6 2 0.72
Hook of Length :
Degree Length
90 deg 144
130 deg 256
must be divisible by 25, therefore use : 275 mm
0.275 m
Cutting List :
Net
LENGTH OF RSB FOR length of
Cutting Say Waste
16mm 1 RSB
6 3.157895 5 -3.5
7.5 3.947368 6 -3.9
9 1.9 4.736842 7 -4.3
10.5 5.526316 8 -4.7
12 6.315789 10 -7
Therefore use 6 m or 12m length of RSB for 16mm diameter bar
Column :
Design Data:
COLUMN 1 COLUMN 2
No. of Column : 9 units No. of Column : 9 units
Length : 150 mm Length : 120 units
Width : 150 mm Width : 120 units