CONCRETING WORKS
FOOTING COLUMN 1 VOLUME: L*W*T
Length L 1
WIDTH W 1
THICK T 0.3
# OF FOOTING: 8
VOLUME TOTAL: 2.4
40kg/bag
CLASS B
CEMENT BAG 7.5
SAND (cu.m) 0.5
GRAVEL (cu.m) 1
CONCRETE PROPORTION
m CEMENT CEMENT SAND GRAVEL
m CLASS MIXTURE 40kg/bag 50kg/bag cu.m cu.m
m AA 12 9.5 0.5 1
units A 9 7 0.5 1
cu.m B 7.5 6 0.5 1
C 6 5 0.5 1
QUANTITY
18
1.2
2.4
m
m CONCRETE PROPORTION
m CEMENT CEMENT SAND GRAVEL
units CLASS MIXTURE 40kg/bag 50kg/bag cu.m cu.m
cu.m AA 12 9.5 0.5 1
A 9 7 0.5 1
QUANTITY B 7.5 6 0.5 1
13 C 6 5 0.5 1
0.864
1.728
CONCRETE PROPORTION
m CEMENT CEMENT SAND GRAVEL
m CLASS MIXTURE 40kg/bag 50kg/bag cu.m cu.m
m AA 12 9.5 0.5 1
units A 9 7 0.5 1
cu.m B 7.5 6 0.5 1
C 6 5 0.5 1
QUANTITY
4
0.25
0.5
CONCRETE PROPORTION
m CEMENT CEMENT SAND GRAVEL
m CLASS MIXTURE 40kg/bag 50kg/bag cu.m cu.m
m AA 12 9.5 0.5 1
units A 9 7 0.5 1
cu.m B 7.5 6 0.5 1
C 6 5 0.5 1
QUANTITY
4
0.216
0.432
CONCRETE PROPORTION
m CEMENT CEMENT SAND GRAVEL
m CLASS MIXTURE 40kg/bag 50kg/bag cu.m cu.m
m AA 12 9.5 0.5 1
units A 9 7 0.5 1
cu.m B 7.5 6 0.5 1
C 6 5 0.5 1
QUANTITY
3
0.183
0.365
CONCRETE PROPORTION
m CEMENT CEMENT SAND GRAVEL
m CLASS MIXTURE 40kg/bag 50kg/bag cu.m cu.m
m AA 12 9.5 0.5 1
units A 9 7 0.5 1
cu.m B 7.5 6 0.5 1
C 6 5 0.5 1
QUANTITY
15
1.185
2.369
MASONRY WORKS
Quantitty of cement and sand for CHB Mortar per
Description Area Total sq.m Cement(kg) 40kg Class B
Front Elv. 47.04 Size of CHB in cm # of CHB
Right side Elv. 37.87 10x20x40 12.5 0.525
Rear side Elv. 46.19 15x20x40 12.5 1.013
Left side Elv. 40.25 20x20x40 12.5 1.5
Net Area 171.35
SUMMARY OF THE MATERIALS
Material Total Area Total CHB Material
CHB 171.35 2142 Cement Bag
40kg Class D Cement Sand Sand (cu.m)
Material Size cement Sand Bags cu.m CHB
Size of CHB in cm 10x20x40 0.328 0.0438 57.00 7.51
sand for CHB Mortar per square meter wall
40kg Class C 40kg Class D 50kg Class B 50kg Class C 50kg Class D Sand
F THE MATERIALS
Net total
57.00
7.51
2142.00
REINFORCEMENT
FOOTING COLUMN 1 UNIT
NET LENGTH m
CUT BARS IN ONE FOOTING PCS
# OF FOOTING
TOTAL # CUT BARSFOR FOOTING PCS
TOTAL LENGTH CUT BARS m
COMMERCIAL LENGTH m
STEEL BARS PCS
QUANTITY
1.2
16
4
64
76.8
6
∅
13 @ 8-16mm
QUANTITY
0.9
16
10
250
5
8
40
1
6
6
46
QUANTITY
1.2
16
10
250
6
4
24
1
6
6
30
QUANTITY
19
1.42
26
2.83
10
450
6
1
76
STRUCTURAL
STRUCTURAL
MATERIALS TOTAL LENGTH (m) COMMERCIAL LENGTH (m
2"x2"x1/4 ANGLE BAR BOTTOM & TOP CHORD 15.2 6
1 (1/2)"X1(1/2)"X1/4" ANGLE BAR WEB MEMBER 11.76 6
SUMMARY
MATERIALS QUANTITY (PCS)
2"x2"x1/4 ANGLE BAR BOTTOM & TOP CHORD 13
1 (1/2)"X1(1/2)"X1/4" ANGLE BAR WEB MEMBER 8
TOTAL 21
ALLOWANCE 5
GRAND TOTAL 26
MATERIALS TOTAL LENGTH (m) COMMERCIAL LENGTH (m
2"x2"x1/4 ANGLE BAR BOTTOM & TOP CHORD 8.32 6
2 (1/2)"X1(1/2)"X1/4" ANGLE BAR WEB MEMBER 4.88 6
SUMMARY
MATERIALS QUANTITY (PCS)
2"x2"x1/4 ANGLE BAR BOTTOM & TOP CHORD 4
2 (1/2)"X1(1/2)"X1/4" ANGLE BAR WEB MEMBER -1
TOTAL 3
ALLOWANCE 6
GRAND TOTAL 9
COMMERCIAL LENGTH (m) # OF HALF TRUSS A QUANTITY (pcs)
6 1 3
6 1 2
SUBTOTAL 5
ALLOWANCE 1
TOTAL 6
QUANTITY (PCS)
13
8
21
5
26
COMMERCIAL LENGTH (m) # OF HALF TRUSS A QUANTITY (pcs)
6 1 2
6 1 1
SUBTOTAL 3
ALLOWANCE 2
TOTAL 5
QUANTITY (PCS)
4
-1
3
6
9