This document provides a bar bending schedule and concrete quantity estimate for a 50 KL underground sump project. It details the rebar requirements and concrete needs for elements like the top circular slab, ring beam, cylindrical wall, columns, foundation, and pump house slab. The total rebar estimated is 1561 kg and the total concrete volume is 19.17 cubic meters. Cement, sand and aggregate quantities are also provided for each element and in total. The note indicates that quantities should be verified before work execution.
This document provides a bar bending schedule and concrete quantity estimate for a 50 KL underground sump project. It details the rebar requirements and concrete needs for elements like the top circular slab, ring beam, cylindrical wall, columns, foundation, and pump house slab. The total rebar estimated is 1561 kg and the total concrete volume is 19.17 cubic meters. Cement, sand and aggregate quantities are also provided for each element and in total. The note indicates that quantities should be verified before work execution.
This document provides a bar bending schedule and concrete quantity estimate for a 50 KL underground sump project. It details the rebar requirements and concrete needs for elements like the top circular slab, ring beam, cylindrical wall, columns, foundation, and pump house slab. The total rebar estimated is 1561 kg and the total concrete volume is 19.17 cubic meters. Cement, sand and aggregate quantities are also provided for each element and in total. The note indicates that quantities should be verified before work execution.
TYPE OF WORK :- BAR BENDING SCHEDULE WITH CONCRETE QUANTITY
OVER ALL SUMMARY Sr.No. DESCRIPTION Dia. 8mm 10mm 12mm 16mm 20mm TOTAL (Kg.) 1 Top Circular Slab 189.91 0 0 0 0 189.91 2 Ring beam (Top) 51.68 35.04 75.47 0 0 162.19 3 Cydrincal wall 543.62 0 0 0 0 543.62 4 Columns 11.42 0 58.38 0 0 69.8 5 Foundation 402.08 0 0 0 402.08 6 Pump House Slab 147.51 0 0 0 147.51 TOTAL STEEL (Kg.) 1346.2 35.04 133.85 0 0 1515.11 TOTAL STEEL (Kg.) (INCLUDING 3% OF WASTAGE) 1560.5633 ESTIMATE OF CONCRETE VOLUME S.NO DETAILS OF WORK Volume UNIT 1 Top Circular Slab 2.39 CUM A QUANTITY OF CEMENT 17.925 NOS. B QUANTITY OF SAND 0.94 CUM 33.2 CUFT C QUANTITY OF AGGREGATE 1.88 CUM 66.4 CUFT 2 Ring beam (Top) 10.274 CUM A QUANTITY OF CEMENT 77.055 NOS. B QUANTITY OF SAND 4.05 CUM 142.9 CUFT C QUANTITY OF AGGREGATE 8.1 CUM 285.8 CUFT 3 Cydrincal wall 10.274 CUM A QUANTITY OF CEMENT 77.055 NOS. B QUANTITY OF SAND 4.05 CUM 142.9 CUFT C QUANTITY OF AGGREGATE 8.1 CUM 285.8 CUFT 4 Columns 0.58 CUM A QUANTITY OF CEMENT 4.35 NOS. B QUANTITY OF SAND 0.23 CUM 8.1 CUFT C QUANTITY OF AGGREGATE 0.46 CUM 16.2 CUFT 5 Foundation 3.78 CUM A QUANTITY OF CEMENT 28.35 NOS. B QUANTITY OF SAND 1.49 CUM 52.6 CUFT C QUANTITY OF AGGREGATE 2.98 CUM 105.2 CUFT 6 Pump House Slab 1.02 CUM A QUANTITY OF CEMENT 7.65 NOS. B QUANTITY OF SAND 0.4 CUM 14.1 CUFT C QUANTITY OF AGGREGATE 0.8 CUM 28.2 CUFT OVER ALL SUMMARY TOTAL 19.17 CUM 1 QUANTITY OF CEMENT 143.775 NOS. 2 QUANTITY OF SAND 7.55 CUM 266.4 CUFT 3 QUANTITY OF AGGREGATE 15.1 CUM 532.8 CUFT 4 QUANTITY OF REINFORCEMENT 1561 KG NOTE:- QUANTITY SHOULD BE VERIFY BEFORE EXECUTION OF THE WORK
1 2 13.67 10 NA 11 301 0.62 186.46 2 2 1.72 10 NA 69 237 0.62 147.16 333.62 Bar Bending Schedule of Kerb For 6 M Culvert Bar Bending Schedule of Kerb For 3 M Culvert