You are on page 1of 4

MAIN STAIR

CONCRETE
CLASS AA (4000psi) - CONCRETE MIXTURE
FORMULA:
1ST-2ND 2ND-3RD MID-LANDING
WIDTH (m) 2.4 2.4 2.4
RISE (m) 0.2 0.2 0.2
THREAD (m) 0.3 0.3 1.2
NO. OF STEPS 18 15 1
VOLUME OF CONCRETE (cu.m) 2.592 2.16 0.576
TOTAL VOLUME OF CONCRETE (cu.m) 4.752
12 - NO. OF CEMENT (bags) 57.024
0.5 - VOL. OF SAND (cu.m) 2.376
1- VOL. OF GRAVEL (cu.m) 4.752
0.6 - VOL. OF WATER (cu.m) 2.8512

TOTAL GF SF
VOLUME OF CONCRETE (cu.m) 3.168 2.736
12 - NO. OF CEMENT (bags) 38.016 32.832
0.5 - VOL. OF SAND (cu.m) 1.584 1.368
1 - VOL. OF GRAVEL (cu.m) 3.168 2.736
0.6 - VOL. OF WATER (cu.m) 1.9008 1.6416

FIRE EXIT STAIR


CONCRETE
CLASS AA (4000psi) - CONCRETE MIXTURE
FORMULA:
1ST-2ND 2ND-3RD 3RD-4TH MID-LANDING
WIDTH (m) 1.5 1.5 1.5 3
RISE (m) 0.2 0.2 0.2 0.2
THREAD (m) 0.3 0.3 0.3 1.2
NO. OF STEPS 18 15 15 1
VOLUME OF CONCRETE (cu.m) 1.62 1.35 1.35 0.72
TOTAL VOLUME OF CONCRETE (cu.m) 5.04
12 - NO. OF CEMENT (bags) 60.48
0.5 - VOL. OF SAND (cu.m) 2.52
1- VOL. OF GRAVEL (cu.m) 5.04
0.6 - VOL. OF WATER (cu.m) 3.024

TOTAL GF SF TF
VOLUME OF CONCRETE (cu.m) 2.34 2.07 2.07
12 - NO. OF CEMENT (bags) 28.08 24.84 24.84
0.5 - VOL. OF SAND (cu.m) 1.17 1.035 1.035
1 - VOL. OF GRAVEL (cu.m) 2.34 2.07 2.07
0.6 - VOL. OF WATER (cu.m) 1.404 1.242 1.242

STAIRS (OUTSIDE)
CONCRETE
CLASS AA (4000psi) - CONCRETE MIXTURE
FORMULA:
LEFT RIGHT REAR MID-LANDING
WIDTH (m) 2 2 2 2
RISE (m) 0.1 0.1 0.1 0.1
THREAD (m) 0.3 0.3 0.3 0.5
NO. OF STEPS 2 2 2 1
VOLUME OF CONCRETE (cu.m) 0.12 0.12 0.12 0.1
TOTAL VOLUME OF CONCRETE (cu.m) 0.46
12 - NO. OF CEMENT (bags) 5.52
0.5 - VOL. OF SAND (cu.m) 0.23
1- VOL. OF GRAVEL (cu.m) 0.46
0.6 - VOL. OF WATER (cu.m) 0.276

TOTAL LEFT RIGHT REAR TOTAL


VOLUME OF CONCRETE (cu.m) 0.22 0.22 0.22 0.66
12 - NO. OF CEMENT (bags) 2.64 2.64 2.64 7.92
0.5 - VOL. OF SAND (cu.m) 0.11 0.11 0.11 0.33
1 - VOL. OF GRAVEL (cu.m) 0.22 0.22 0.22 0.66
0.6 - VOL. OF WATER (cu.m) 0.132 0.132 0.132 0.396
STAIRS (OUTSIDE)
CONCRETE
CLASS AA (4000psi) - CONCRETE MIXTURE
FORMULA:
FRONT MID-LANDING
WIDTH (m) 10 10
RISE (m) 0.1 0.1
THREAD (m) 1.2 1.2
NO. OF STEPS 2 1
VOLUME OF CONCRETE (cu.m) 2.4 1.2
TOTAL VOLUME OF CONCRETE (cu.m) 3.6
12 - NO. OF CEMENT (bags) 43.2
0.5 - VOL. OF SAND (cu.m) 1.8
1- VOL. OF GRAVEL (cu.m) 3.6
0.6 - VOL. OF WATER (cu.m) 2.16

TOTAL MAIN TOTAL FOR BOQ


VOLUME OF CONCRETE (cu.m) 3.6 4.26
12 - NO. OF CEMENT (bags) 43.2 51.12
0.5 - VOL. OF SAND (cu.m) 1.8 2.13
1 - VOL. OF GRAVEL (cu.m) 3.6 4.26
0.6 - VOL. OF WATER (cu.m) 2.16 2.556

RAMPS (OUTSIDE)
CONCRETE
CLASS AA (4000psi) - CONCRETE MIXTURE
FORMULA: LEFT RIGHT MID-LANDING
WIDTH (m) 3 3 3
RISE (m) 0.3 0.3 0.3
THREAD (m) 1.4 1.4 0.8
NO. OF STEPS 1 1 1
VOLUME OF CONCRETE (cu.m) 1.26 1.26 0.72
TOTAL VOLUME OF CONCRETE (cu.m) 2.52
12 - NO. OF CEMENT (bags) 30.24
0.5 - VOL. OF SAND (cu.m) 1.26
1- VOL. OF GRAVEL (cu.m) 2.52
0.6 - VOL. OF WATER (cu.m) 1.512

TOTAL LEFT RIGHT TOTAL


VOLUME OF CONCRETE (cu.m) 1.98 1.98 3.96
12 - NO. OF CEMENT (bags) 23.76 23.76 47.52
0.5 - VOL. OF SAND (cu.m) 0.99 0.99 1.98
1 - VOL. OF GRAVEL (cu.m) 1.98 1.98 3.96
0.6 - VOL. OF WATER (cu.m) 1.188 1.188 2.376

RAMPS (OUTSIDE)
CONCRETE
CLASS AA (4000psi) - CONCRETE MIXTURE
FORMULA:
REAR MID-LANDING
WIDTH (m) 2 2
RISE (m) 0.3 0.3
THREAD (m) 1.4 1.4
NO. OF STEPS 1 1
VOLUME OF CONCRETE (cu.m) 0.84 0.84
TOTAL VOLUME OF CONCRETE (cu.m) 1.68
12 - NO. OF CEMENT (bags) 20.16
0.5 - VOL. OF SAND (cu.m) 0.84
1- VOL. OF GRAVEL (cu.m) 1.68
0.6 - VOL. OF WATER (cu.m) 1.008

TOTAL MAIN TOTAL FOR BOQ


VOLUME OF CONCRETE (cu.m) 1.68 5.64
12 - NO. OF CEMENT (bags) 20.16 67.68
0.5 - VOL. OF SAND (cu.m) 0.84 2.82
1 - VOL. OF GRAVEL (cu.m) 1.68 5.64
0.6 - VOL. OF WATER (cu.m) 1.008 3.384
MAIN STAIR
GF-MID
HORIZONTAL/VERTICAL cc=15mm dleng=65mm Steps = 12
STAIRS W Spacing R T No. of Bars ø Bar Length R Length T Total Length R Total Length T Total Length RL Com. Length (m) Cuts of 6m Say No. of Steel Bars #16 G.I. wire (kg)
(TEMP TOP) 2.4 0.26 0.4 0.6 10.2308 0.01 0.38 0.58 0.4450 0.6450 1.0900 6 5.5046 5 1.8586 0.174
TOTAL 22.3031 3.1271
PARALLEL
STAIRS W Spacing L No. of Bars ø Bar Length R Length T Total Length R Total Length T Total Length RL Com. Length (m) Cuts of 6m Say No. of Steel Bars #16 G.I. wire (kg)
(TEMP BOT1) 2.4 0.26 6 24.0769 0.01 3.363 6 1.7841 1 13.4951 0.409
(TEMP BOT2) 2.4 0.26 4.8 19.4615 0.01 3.363 6 1.7841 1 10.9082 0.330
GF STEP 2.4 12 0.01 3.363 6 1.7841 1 6.7260 0.204
TOTAL 31.1293 0.943
DIAGONAL
STAIRS W Spacing L No. of Bars ø Bar Length R Length T Total Length R Total Length T Total Length RL Com. Length (m) Cuts of 6m Say No. of Steel Bars #16 G.I. wire (kg)
TOP 2.4 0.15 6.42 17.0000 0.012 6.42 6 1.1033 1 18.1900 0.289
BOT 2.4 0.15 5.5 17.0000 0.012 5.5 6 1.0909 1 15.5833 0.289
TOTAL 33.7733 0.577

SF-MID
HORIZONTAL/VERTICAL cc=15mm dleng=65mm Steps = 9
STAIRS W Spacing R T No. of Bars ø Bar Length R Length T Total Length R Total Length T Total Length RL Com. Length (m) Cuts of 6m Say No. of Steel Bars #16 G.I. wire (kg)
(TEMP TOP) 2.4 0.26 0.4 0.6 10.2308 0.01 0.38 0.58 0.4450 0.6450 1.0900 6 5.5046 5 1.8586 0.174
TOTAL 16.7273 3.1271
PARALLEL
STAIRS W Spacing L No. of Bars ø Bar Length R Length T Total Length R Total Length T Total Length RL Com. Length (m) Cuts of 6m Say No. of Steel Bars #16 G.I. wire (kg)
(TEMP BOT1) 2.4 0.26 5.6 22.5385 0.01 3.363 6 1.7841 1 12.6328 0.383
(TEMP BOT2) 2.4 0.26 4.7 19.0769 0.01 3.363 6 1.7841 1 10.6926 0.324
GF STEP 2.4 9 0.01 3.363 6 1.7841 1 5.0445 0.153
TOTAL 28.3699 0.860
DIAGONAL
STAIRS W Spacing L No. of Bars ø Bar Length R Length T Total Length R Total Length T Total Length RL Com. Length (m) Cuts of 6m Say No. of Steel Bars #16 G.I. wire (kg)
TOP 2.4 0.17 6.2 15.1176 0.012 6.2 6 1.0667 1 15.6216 0.257
BOT 2.4 0.17 5 15.1176 0.012 5 6 1.2000 1 12.5980 0.257
TOTAL 28.2196 0.513

MID-(SF&TF)
HORIZONTAL/VERTICAL cc=15mm dleng=65mm Steps = 8
STAIRS W Spacing R T No. of Bars ø Bar Length R Length T Total Length R Total Length T Total Length RL Com. Length (m) Cuts of 6m Say No. of Steel Bars #16 G.I. wire (kg)
(TEMP TOP) 2.4 0.26 0.4 0.6 10.2308 0.01 0.38 0.58 0.4450 0.6450 1.0900 6 5.5046 5 1.8586 0.174
TOTAL 14.8687 3.1271
PARALLEL
STAIRS W Spacing L No. of Bars ø Bar Length R Length T Total Length R Total Length T Total Length RL Com. Length (m) Cuts of 6m Say No. of Steel Bars #16 G.I. wire (kg)
(TEMP BOT1) 2.4 0.26 4 16.3846 0.01 3.363 6 1.7841 1 9.1836 0.278
(TEMP BOT2) 2.4 0.26 4.6 18.6923 0.01 3.363 6 1.7841 1 18.6923 0.317
GF STEP 2.4 8 0.01 3.363 6 1.7841 1 8.0000 0.136
TOTAL 35.8759 0.731
DIAGONAL
STAIRS W Spacing L No. of Bars ø Bar Length R Length T Total Length R Total Length T Total Length RL Com. Length (m) Cuts of 6m Say No. of Steel Bars #16 G.I. wire (kg)
TOP 2.4 0.17 6 15.1176 0.012 6 6 1.0333 1 15.1176 0.257
BOT 2.4 0.17 5.5 15.1176 0.012 5.5 6 1.0909 1 13.8578 0.257
TOTAL 28.9755 0.513
FIRE EXIT
GF-MID
HORIZONTAL/VERTICAL cc=15mm dleng=65mm Steps = 12
STAIRS W Spacing R T No. of Bars ø Bar Length R Length T Total Length R Total Length T Total Length RL Com. Length (m) Cuts of 6m Say No. of Steel Bars #16 G.I. wire (kg)
(TEMP TOP) 2.4 0.26 0.4 0.6 10.2308 0.01 0.38 0.58 0.4450 0.6450 1.0900 6 5.5046 5 1.8586 0.174
TOTAL 22.3031 3.1271
PARALLEL
STAIRS W Spacing L No. of Bars ø Bar Length R Length T Total Length R Total Length T Total Length RL Com. Length (m) Cuts of 6m Say No. of Steel Bars #16 G.I. wire (kg)
(TEMP BOT1) 2.4 0.26 5.5 22.1538 0.01 3.363 6 1.7841 1 12.4172 0.376
(TEMP BOT2) 2.4 0.26 4.8 19.4615 0.01 3.363 6 1.7841 1 10.9082 0.330
GF STEP 2.4 12 0.01 3.363 6 1.7841 1 6.7260 0.204
TOTAL 30.0514 0.910
DIAGONAL
STAIRS W Spacing L No. of Bars ø Bar Length R Length T Total Length R Total Length T Total Length RL Com. Length (m) Cuts of 6m Say No. of Steel Bars #16 G.I. wire (kg)
TOP 2.4 0.15 6.6 17.0000 0.012 6.6 6 1.1333 1 18.7000 0.289
BOT 2.4 0.15 5.5 17.0000 0.012 5.5 6 1.0909 1 15.5833 0.289
TOTAL 34.2833 0.577

(SF&TF)-MID
HORIZONTAL/VERTICAL cc=15mm dleng=65mm Steps = 9
STAIRS W Spacing R T No. of Bars ø Bar Length R Length T Total Length R Total Length T Total Length RL Com. Length (m) Cuts of 6m Say No. of Steel Bars #16 G.I. wire (kg)
(TEMP TOP) 2.4 0.26 0.4 0.6 10.2308 0.01 0.38 0.58 0.4450 0.6450 1.0900 6 5.5046 5 1.8586 0.174
TOTAL 16.7273 3.1271
PARALLEL
STAIRS W Spacing L No. of Bars ø Bar Length R Length T Total Length R Total Length T Total Length RL Com. Length (m) Cuts of 6m Say No. of Steel Bars #16 G.I. wire (kg)
(TEMP BOT1) 2.4 0.26 4.9 19.8462 0.01 3.363 6 1.7841 1 11.1238 0.337
(TEMP BOT2) 2.4 0.26 6.8 27.1538 0.01 3.363 6 1.7841 1 15.2197 0.461
GF STEP 2.4 9 0.01 3.363 6 1.7841 1 5.0445 0.153
TOTAL 31.3880 0.951
DIAGONAL
STAIRS W Spacing L No. of Bars ø Bar Length R Length T Total Length R Total Length T Total Length RL Com. Length (m) Cuts of 6m Say No. of Steel Bars #16 G.I. wire (kg)
TOP 2.4 0.17 5.5 15.1176 0.012 5.5 6 1.0909 1 13.8578 0.257
BOT 2.4 0.17 7.1 15.1176 0.012 7.1 6 0.8451 0 17.8892 0.257
TOTAL 31.7471 0.513

MID-(SF&TF&RD)
HORIZONTAL/VERTICAL cc=15mm dleng=65mm Steps = 8
STAIRS W Spacing R T No. of Bars ø Bar Length R Length T Total Length R Total Length T Total Length RL Com. Length (m) Cuts of 6m Say No. of Steel Bars #16 G.I. wire (kg)
(TEMP TOP) 2.4 0.26 0.4 0.6 10.2308 0.01 0.38 0.58 0.4450 0.6450 1.0900 6 5.5046 5 1.8586 0.174
TOTAL 14.8687 3.1271
PARALLEL
STAIRS W Spacing L No. of Bars ø Bar Length R Length T Total Length R Total Length T Total Length RL Com. Length (m) Cuts of 6m Say No. of Steel Bars #16 G.I. wire (kg)
(TEMP BOT1) 2.4 0.26 5.7 22.9231 0.01 3.363 6 1.7841 1 12.8484 0.389
(TEMP BOT2) 2.4 0.26 4.9 19.8462 0.01 3.363 6 1.7841 1 11.1238 0.337
GF STEP 2.4 8 0.01 3.363 6 1.7841 1 4.4840 0.136
TOTAL 28.4562 0.862
DIAGONAL
STAIRS W Spacing L No. of Bars ø Bar Length R Length T Total Length R Total Length T Total Length RL Com. Length (m) Cuts of 6m Say No. of Steel Bars #16 G.I. wire (kg)
TOP 2.4 0.17 6.3 15.1176 0.012 6.3 6 1.0833 1 15.8735 0.257
BOT 2.4 0.17 5.2 15.1176 0.012 5.2 6 1.1538 1 13.1020 0.257
TOTAL 28.9755 0.513

SUMMARY FOR TIE BARS TOTAL


MAIN STAIRS (GF) 9.020
MAIN STAIRS (SF) 8.872
FIRE EXIT STAIRS (GF) 9.118
FIRE EXIT STAIRS (SF) 9.094
FIRE EXIT STAIRS (3F) 9.094