ITEM DESCRIPCION UND Nº VECES LARGO

01 SOLADO DE CONCRETO C:H=1:12; E=0.75 m M2


6.00 1.00

Cemento (Bls) Hormigon (m3)


3.60 1.23
1.78 0.61

02 CIMIENTO
02.01 CONCRETO C:H=1:10 M3
6.00 1.00

Cemento (Bls) Hormigon (m3)


4.20 1.19
8.32 2.36

02.02 ENCOFRADO M2
6.00 4.00

03 ITO DE CONCRETO
03.01 CONCRETO f'c=175 Kg/cm2 M3
6.00 0.45

Cemento (Bls) Hormigon (m3)


5.00 1.13
6.01 1.36

03.02 ENCOFRADO M2
6.00 1.80

04 ACERO DE REFUERZO fy=4200Kg/cm2 VARILLAS


Ø 1/2" 11
Ø 3/8" 5

03 TARRAJEO C:AF=1=5, E=1.5 cm M2


Cimiento 6 4.00
6 3.20
Ito de Concreto 6 1.80
6 0.30

Cemento (Bls) Arena Fina (m3)


0.11 0.02
2.31 0.33

CEMENTO (BLS) ARENA GRUESA


(M3)
TOTAL 18.42 4.32
ANCHO ALTURA PARCIAL TOTAL
6.60
1.00 6.00

Agua (m3)
0.12
0.06

1.98
1.00 0.30 1.80

Agua (m3)
0.14
0.28

5.28
0.20 4.80

1.20
0.45 0.90 1.09

Agua (m3)
0.17
0.20

10.69
0.90 9.72

VARILLAS
VARILLAS

20.79
0.20 4.80
0.20 3.84
0.90 9.72
0.30 0.54

Agua (m3)
0.00
0.06

ARENA FINA AGUA (M3)


(M3
0.33 0.54
ITEM DESCRIPCION Ø Nº DE VECES Nº DE ESTRUCTURAS
4 ACERO DE REFUERZO fy=4200Kg/cm2
CIMIENTO 1/2" 10 6

ITO
Longitudinal 1/2" 4 6
Estribo 3/8" 6 6

TOTAL ADQUIRIR: 95.96


ADQUIRIR: 11
ADQUIRIR: 41.18
ADQUIRIR: 5
LONGITUD TOTAL

0.9 59.4

1.39 36.56
1.04 41.18

metros Ø 1/2"
VARILLAS Ø 1/2"
metros Ø 3/8"
VARILLAS Ø 3/8"