HARI KE- 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56
SEPTEMBER 2017 OKTOBER 2017
No URAIAN PEKERJAAN VOLUME M5 M6 M7 M8
Total - 5 Total - 6 Total - 7 Total - 8
18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
M1 M2 M3 M4 M5 M6 M7 M8 TOTAL
No URAIAN PEKERJAAN VOLUME BOBOT
Vol. Bobot (%) Vol. Bobot (%) Vol. Bobot (%) Vol. Bobot (%) Vol. Bobot (%) Vol. Bobot (%) Vol. Bobot (%) Vol. Bobot (%) Volume Bobot (%)
1 Galian Tanah 9.56 m3 0.77% 4.78 50.0% 4.78 50.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 9.56 100.00%
2 Urugan Kembali Bekas Galian 6.00 m3 0.16% 1.56 26.0% 4.26 71.0% 0.18 3.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 6.00 100.00%
3 Urugan Pasir 0.86 m3 0.20% 0.34 39.2% 0.52 60.8% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.86 100.00%
4 Pasangan Pondasi Batu Kali 1PC : 4 PS 7.54 m3 6.05% 3.78 50.1% 3.76 49.9% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 7.54 100.00%
5 Pasangan Sloof Beton Bertulang 0.87 m3 4.44% 0.36 41.4% 0.51 58.6% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.87 100.00%
6 Pasangan Balok Beton Bertulang 0.87 m3 6.04% 0.00 0.0% 0.80 91.4% 0.08 8.6% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.87 100.00%
7 Pasangan Kolom Beton Bertulang 1.00 m3 8.92% 0.50 49.8% 0.50 50.2% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 1.00 100.00%
8 Pasangan Bata Merah tebal 1/2 Bata 1PC : 4PS 35.52 m2 4.57% 0.00 0.0% 30.90 87.0% 4.62 13.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 35.52 100.00%
9 Pasangan Plesteran 1PC : 2PS t= 15 mm 83.04 m2 6.07% 0.00 0.0% 40.95 49.3% 42.09 50.7% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 83.04 100.00%
10 Pas. Lt. Keramik uk. 30 x 30cm DN Putih Polos 27.42 m2 3.05% 0.00 0.0% 0.00 0.0% 27.42 100.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 27.42 100.00%
11 Pas. Lt. Keramik uk. 20 x 20cm Corak / Antislip 3.00 m2 0.44% 0.00 0.0% 0.00 0.0% 3.00 100.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 3.00 100.00%
12 Pasangan Keramik Dinding 20 x 25 cm 12.00 m2 2.97% 0.00 0.0% 0.00 0.0% 12.00 100.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 12.00 100.00%
13 Pasang Rangka Atap Baja Ringan 44.00 m2 10.07% 0.00 0.0% 0.00 0.0% 44.00 100.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 44.00 100.00%
14 Pasang Genteng Nok Empat (4) Arah 2.00 bh 0.42% 0.00 0.0% 0.00 0.0% 1.00 50.0% 1.00 50.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 2.00 100.00%
15 Pasang Genteng Nok Ujung 8.00 bh 1.66% 0.00 0.0% 0.00 0.0% 4.00 50.0% 4.00 50.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 8.00 100.00%
16 Pasang Genteng Keramik 52.40 m2 10.90% 0.00 0.0% 0.00 0.0% 26.20 50.0% 26.20 50.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 52.40 100.00%
17 Pasang Bubungan Genteng Keramik 30.72 m' 3.65% 0.00 0.0% 0.00 0.0% 15.36 50.0% 15.36 50.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 30.72 100.00%
18 Pasang Plafon Gypsum + Rangka 49.00 m2 9.05% 0.00 0.0% 0.00 0.0% 24.50 50.0% 24.50 50.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 49.00 100.00%
19 Pasang List Gypsum 60.20 m' 1.35% 0.00 0.0% 0.00 0.0% 30.10 50.0% 30.10 50.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 60.20 100.00%
20 Pasang Kusen Pintu / Jendela Aluminium 41.34 m' 2.27% 0.00 0.0% 0.00 0.0% 0.00 0.0% 41.34 100.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 41.34 100.00%
21 Pasang Daun Pintu Aluminium 3.00 bh 0.35% 0.00 0.0% 0.00 0.0% 0.00 0.0% 2.00 66.7% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 2.00 66.67%
22 Pemasangan Kaca Polos tebal 5 mm 13.20 m2 1.56% 0.00 0.0% 0.00 0.0% 0.00 0.0% 13.20 100.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 13.20 100.00%
23 Cat Dinding / Tembok (3x sapu) 91.04 m2 1.99% 0.00 0.0% 0.00 0.0% 48.00 52.7% 42.00 46.1% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 90.00 98.86%
24 Cat Plafon (3x sapu) 49.00 m2 1.25% 0.00 0.0% 0.00 0.0% 24.50 50.0% 24.50 50.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 48.99 99.98%
25 Instalasi Titik Lampu 8.00 titik 1.15% 0.00 0.0% 0.00 0.0% 4.00 50.0% 4.00 50.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 8.00 100.00%
26 Instalasi Titik Stop Kontak 4.00 titik 0.44% 0.00 0.0% 0.00 0.0% 2.00 50.0% 2.00 50.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 4.00 100.00%
27 Penyambungan Kabel Listrik 4.00 rol 1.60% 0.00 0.0% 0.00 0.0% 2.00 50.0% 1.50 37.5% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 3.50 87.50%
28 Pasang Closet Jongkok Warna Putih TOTO 1.00 bh 0.54% 0.00 0.0% 0.00 0.0% 1.00 100.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 1.00 100.00%
29 Pasang Kran Air ø 1/2" 1.00 bh 0.10% 0.00 0.0% 0.00 0.0% 1.00 100.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 1.00 100.00%
30 Pasang Floor Drain 1.00 bh 0.07% 0.00 0.0% 0.00 0.0% 1.00 100.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 1.00 100.00%
31 Pekerjaan Septictank 1,5x1x1,5 m + Rembesan 1.00 unit 3.45% 0.00 0.0% 0.00 0.0% 0.80 80.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.80 80.00%
32 Pemasangan Pompa & Instalasi Air Bersih 1.00 ls 1.52% 0.00 0.0% 0.00 0.0% 0.00 0.0% 1.00 100.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 1.00 100.00%
33 Sumur Bor 1.00 titik 1.60% 0.00 0.0% 0.00 0.0% 0.00 0.0% 1.00 100.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 1.00 100.00%
34 Dokumentasi 3 Rangkap 1.00 ls 1.32% 0.00 0.0% 0.00 0.0% 0.30 30.0% 0.60 60.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.90 90.00%
100.00%
TIME SCHEDULE
KURVA - S
BULAN
Jumlah Harga Bobot
No Uraian Pekerjaan Volume Sat M1 M2 M3 M4 Grafik Keterangan
( Rp ) (% ) 21-27 Aug 28-3 Sep 4-10 Sep 11-17 Sep
0.77% * Rencana
1 Galian Tanah 9.56 m3 963,887 0.77% 100
0.39% 0.39% 0.00% 0.00% * Realisasi
0.16%
2 Urugan Kembali Bekas Galian 6.00 m3 201,650 0.16%
0.04% 0.11% 0.00% 0.00%
0.20%
3 Urugan Pasir 0.86 m3 244,593 0.20%
0.08% 0.12% 0.00% 0.00%
3.03% 3.03%
4 Pasangan Pondasi Batu Kali 1PC : 4 PS 7.54 m3 7,547,434 6.05% 90
3.03% 3.02% 0.00% 0.00%
4.44%
5 Pasangan Sloof Beton Bertulang 0.87 m3 5,535,661 4.44%
1.84% 2.60% 0.00% 0.00%
6.04%
6 Pasangan Balok Beton Bertulang 0.87 m3 7,527,548 6.04%
0.00% 5.52% 0.52% 0.00%
8.92%
7 Pasangan Kolom Beton Bertulang 1.00 m3 11,126,229 8.92%
4.44% 4.48% 0.00% 0.00%
4.57% 80
8 Pasangan Bata Merah tebal 1/2 Bata 1PC : 4PS 35.52 m2 5,702,878 4.57%
0.00% 3.98% 0.59% 0.00%
3.04% 3.04%
9 Pasangan Plesteran 1PC : 2PS tebal 15 mm 83.04 m2 7,574,096 6.07%
0.00% 3.00% 3.08% 0.00%
1.52% 1.52%
10 Pasangan Lantai Keramik uk. 30 x 30 cm DN Putih Polos 27.42 m2 3,797,453 3.05%
0.00% 0.00% 3.05% 0.00%
0.44%
11 Pasangan Lantai Keramik uk. 20 x 20 cm Corak / Antislip 3.00 m2 553,973 0.44% 70
0.00% 0.00% 0.44% 0.00%
1.49% 1.49%
12 Pasangan Keramik Dinding 20 x 25 cm 12.00 m2 3,706,642 2.97%
0.00% 0.00% 2.97% 0.00%
10.07%
13 Pasang Rangka Atap Baja Ringan 44.00 m2 12,558,832 10.07%
0.00% 0.00% 10.07% 0.00%
0.42%
14 Pasang Genteng Nok Empat (4) Arah 2.00 bh 518,574 0.42%
0.00% 0.00% 0.21% 0.21%
60
1.66%
15 Pasang Genteng Nok Ujung 8.00 bh 2,074,296 1.66%
0.00% 0.00% 0.83% 0.83%
10.90%
16 Pasang Genteng Keramik 52.40 m2 13,586,639 10.90%
0.00% 0.00% 5.45% 5.45%
1.82% 1.82%
17 Pasang Bubungan Genteng Keramik 30.72 m' 4,550,830 3.65%
0.00% 0.00% 1.82% 1.82%
4.53% 4.53% 50
18 Pasang Plafon Gypsum + Rangka 49.00 m2 11,285,117 9.05%
0.00% 0.00% 4.52% 4.53%
1.35%
19 Pasang List Gypsum 60.20 m' 1,681,649 1.35%
0.00% 0.00% 0.67% 0.67%
2.27%
20 Pasang Kusen Pintu / Jendela Aluminium 41.34 m' 2,827,970 2.27%
0.00% 0.00% 0.00% 2.27%
0.35%
21 Pasang Daun Pintu Aluminium 3.00 bh 438,540 0.35% 40
0.00% 0.00% 0.00% 0.23%
1.56%
22 Pemasangan Kaca Polos tebal 5 mm 13.20 m2 1,940,973 1.56%
0.00% 0.00% 0.00% 1.56%
1.99%
23 Cat Dinding / Tembok (3x sapu) 91.04 m2 2,478,955 1.99%
0.00% 0.00% 1.05% 0.92%
1.25%
24 Cat Plafon (3x sapu) 49.00 m2 1,563,556 1.25%
0.00% 0.00% 0.63% 0.63%
30
1.15%
25 Instalasi Titik Lampu 8.00 titik 1,440,000 1.15%
0.00% 0.00% 0.58% 0.58%
0.44%
26 Instalasi Titik Stop Kontak 4.00 titik 545,788 0.44%
0.00% 0.00% 0.22% 0.22%
1.60%
27 Penyambungan Kabel Listrik 4.00 rol 2,000,000 1.60%
0.00% 0.00% 0.80% 0.60% 20
0.54%
28 Pasang Closet Jongkok Warna Putih TOTO 1.00 bh 676,902 0.54%
0.00% 0.00% 0.54% 0.00%
0.10%
29 Pasang Kran Air ø 1/2" 1.00 bh 118,669 0.10%
0.00% 0.00% 0.10% 0.00%
0.07%
30 Pasang Floor Drain 1.00 bh 83,195 0.07%
0.00% 0.00% 0.07% 0.00%
3.45% 10
31 Pekerjaan Septictank 1,5x1x1,5 m + Rembesan 1.00 unit 4,306,133 3.45%
0.00% 0.00% 2.76% 0.00%
1.52%
32 Pemasangan Pompa & Instalasi Air Bersih 1.00 ls 1,898,400 1.52%
0.00% 0.00% 0.00% 1.52%
1.60%
33 Sumur Bor 1.00 titik 1,993,000 1.60%
0.00% 0.00% 0.00% 1.60%
0.33% 0.33% 0.33% 0.33%
34 Dokumentasi 3 Rangkap 1.00 ls 1,644,000 1.32%
0.00% 0.00% 0.40% 0.79%
0