SETTLEMENT ANALYSIS

PROJECT : SOIL INVESTIGATION IKK RIVER DIVERSION PHASE 2 - PINDO DELI 4


LOCATION : KARAWANG TIMUR
SCOPE OF WORK : SHALLOW FOOTING SETTLEMENT
BORE HOLE NO. : BH-1A

DATA INPUT
SOIL DATA LOADING DATA
2
Thickness Number Soil Parameter Surcharge (t/m )
Soil Type Layer No. 3 GWL (m) Df (m)
(m) of step g (t/m ) eo Cc Cr Fill Height (m)
Stiff clay 1 3 2 1.617 1.268 0.422 0 Load (ton) 10
Hard silt 2 3 1 2.2 0,8 0.1 0 Length (m) 2
2.1 1.5 Width (m) 2
2
Initial Area (m ) 4
3
g Fill (t/m )

SETTLEMENT (m) = 0.0406


PT. SANP
SETTLEMENT ANALYSIS
PROJECT : SOIL INVESTIGATION IKK RIVER DIVERSION PHASE 2 - PINDO DELI 4
LOCATION : KARAWANG TIMUR
SCOPE OF WORK : SHALLOW FOOTING SETTLEMENT
JOB NO. : BH-1A
DATA INPUT

SOIL DATA LOADING DATA


2
Thickness Number of Soil Parameter Surcharge (t/m ) 0
Soil Type Layer No. 3 GWL (m) Df (m)
(m) step g (t/m ) eo Cc Cr Fill Height (m) 0
Stiff clay 1 3.00 2 1.617 1.268 0.422 0.000 Load (ton) 10
Hard silt 2 3.00 1 2.200 0,8 0.100 0.000 Length (m) 2
0.00 0 0.000 0.000 0.000 0.000 2.1 1.5 Width (m) 2
2
0.00 0 0.000 0.000 0.000 0.000 Initial Area (m ) 4
0.00 0 0.000 0.000 0.000 0.000 у Fill (t/m 3) 0

CALCULATION TABLE TOTAL SETTLEMENT (m) = 0.041


geff Load Data (t/m2) Settlement (m)
Step No. Layar No. Depth (m) Z (m) eo Cc Cr A (m2) H (m)
3
(t/m ) Po Dp S Scum
1 1 1.50 1.50 1.617 1.268 0.422 0.000 4.00 0.00 2.426 2.500 0.000 0.000
2 1 3.00 2.25 0.617 1.268 0.422 0.000 7.56 0.75 1.388 1.322 0.041 0.041
3 2 6.00 4.50 1.200 0,8 0.100 0.000 25.00 2.25 5.400 0.400 0.000 0.041