Settlement of clay layer Subjected to sand drains

Density of reclamation (GAM1) 2 gm/cc


Ht of reclamation (HR) 1.5 m
Density of embarment material (GAM3) 2 gm/cc
Depth of embarment(HE) 3.5 m
Density of clay layer (GAM2) 1.8 gm/cc
Depth of clay layer (HC) 4m
Ht of sand drain (HSD) 3.99 m
CVZ of clay 0.001183 sq cm/sec
CVR of clay 0 sq cm/sec (Note: if CVR is not known
put value as zero)

Pattern of sand drain Triangular


Dia of sand drain 30 cm
Spacing of sand drain 2500 cm

Relation betn CVZ and CVR CVR=CVZ


input for top layer
Type of Drainage Double

input for bottom layer


Type of Drainage Double
ht of bottom clay layer (HCC) 0.01 m
CV of bottom clay layer 0.001183 sq cm/sec
DR. A.R.Katti

Settlement of top clay layer 70.22 cm


Settlement of bottom clay layer 0.14 cm
Total Settlement of clay layer 70.35 cm

Value of CVZ 0.001183 sq cm/sec


Value of CVR 0.001183 sq cm/sec
Drainage condition Double
Pattern of sand drain Triangular

Sand Drain Diameter 30


Spacing of Sand Drain 2500
∆σ 1 pressure void ratio ( e )
σ0 0.16 e0 2.58 0.02 2.8
total 1.1596 e1 1.95 0.04 2.77
0.05 2.75
setmt0 70.215084 0.08 2.68
0.1 2.65
σ01 0.3196 e2 2.39 0.2 2.6
σtotal 1.3196 e3 1.93 0.3 2.4
0.5 2.22
setmt1 0.135693 1 1.96
5 1.29
settmt_tot 70.350777 10 1
10.7 0.8

Depth of Drainage layer (HGT) 199.5


Radius of influence ( R ) 1312.5
Value of n(AN) 87.5
(XN) 86.750032653
Function of n (FN) 4.4723575539