Ht of reclamation (HR) 1.5 m Density of embarment material (GAM3) 2 gm/cc Depth of embarment(HE) 3.5 m Density of clay layer (GAM2) 1.8 gm/cc Depth of clay layer (HC) 4m Ht of sand drain (HSD) 3.99 m CVZ of clay 0.001183 sq cm/sec CVR of clay 0 sq cm/sec (Note: if CVR is not known put value as zero)
Pattern of sand drain Triangular
Dia of sand drain 30 cm Spacing of sand drain 2500 cm
Relation betn CVZ and CVR CVR=CVZ
input for top layer Type of Drainage Double
input for bottom layer
Type of Drainage Double ht of bottom clay layer (HCC) 0.01 m CV of bottom clay layer 0.001183 sq cm/sec DR. A.R.Katti
Settlement of top clay layer 70.22 cm
Settlement of bottom clay layer 0.14 cm Total Settlement of clay layer 70.35 cm
Value of CVZ 0.001183 sq cm/sec
Value of CVR 0.001183 sq cm/sec Drainage condition Double Pattern of sand drain Triangular