FLOOR SLAB
- GROUND 57 bags 3.796 Cu. M 7.592 Cu. M
FLOOR 111 bags 7.407 Cu. M 14.814 Cu. M
- 2ND FLOOR
TOTAL
433 bags 26.36 Cu. M 52.462 Cu. M
SUMMARY OF MATERIALS FOR MASONRY WORKS
EXTERIOR WALL:
258.952 sqm
CLASS B CHB
INTERIOR WALL:
144.97sqm
CLASS B CHB
MORTAR
277 bags 22.953 Cu. M
EXTERIOR: 15 x 20 x 40
258.952 sqm
79 bags 6.626 Cu. M
INTERIOR: 10 x 20 x 40
144.97sqm TOTAL= 356 bags TOTAL= 29.579 Cu. M
TOTAL
518 bags 43.139 Cu. M
SUMMARY OF MATERIALS FOR STEELWORKS
CHB
REINFORCEMENT 187 9.69
BARS
FOOTING
REINFORCEMENT
31 152.4 2.875
COLUMN 140
BILL OF QUANTITY
SITE WORKS
P228,673.8
MASONRY WORKS
P287,635.3
TOTAL
P669,331.2