DESCRIPTION OF MATERIALS QUANTITY UNIT UNIT COST TOTAL COST
1.2”X3”X12’ COCO LUMBER 115 PCS PIECE
2.2”X3”X10’ COCO LUMBER 110 PCS PIECE 3.1/2 THK PHENOLIC BOARD 18BOARDS PIECE 930 16,740 4.2” ORDINARY NAIL 10 KLS 4” ORDINARY NAIL 25kls KILO 145/kl 5,075
5. 3’’ CONCRETE NAIL 10KLS KILO 165/kl 1,650
I- FORMS AND SCAFFOLDING
TOTAL PRICE: 23,465.00 php
DESCRIPTION OF MATERIALS QUANTITY UNIT UNIT COST TOTAL COST 1.WASHED SAND 15 CUBIC CUBIC 1,450 21,750 2.3/4 GRAVEL 30 CUBIC CUBIC 1,450 43,500 3.CEMENT (FORTUNE CEMENT) 180 BAGS BAGS 265 47,700 II-CONCRETE WORKS
TOTAL PRICE: 112,950.00 php
DESCRIPTION OF MATERIALS QUANTITY UNIT UNIT COST TOTAL COST 1.16MM Ø X 6M DEF.BAR 100 PCS PIECE 392 39,200 2.12MM Ø X 6M DEF.BAR 150 PCS PIECE 264 39,600 3. NO.16 TIE WIRE 3 BANDLE BANDLE 1,800 5,400 III-STEEL WORKS