PROJECT NAME
HIA MACO
No. DESCRIPTION SUB PROJECT
1 APD
- Full Body Harnes Camp Ex. LSS
- Helm Safety Camp Ex. LSS
- Safety Shoes Camp Ex. LSS
- Gloves Camp Ex. LSS
- Vest Camp Ex. LSS
- Googles Camp Ex. LSS
2 Sarana
- Kendaraan Tambang (Double Gardan) Camp Ex. LSS
- Aksesoris Mobil Tambang Camp Ex. LSS
3 Perancah
- Schaffolding Camp Ex. LSS
- Join pin Camp Ex. LSS
- Cross brace Camp Ex. LSS
- Jack Base Camp Ex. LSS
- Cat Walk Camp Ex. LSS
PROJECT NAME
HIA MACO
SCOPE OF WORK QTY UNIT DUE DATE
1 Putih, 10 Kuning
68.86
1122.57
RAP MATERIAL PROGRESS SD 50%
c. Bekisting 8.8 m2
2 Sloof 20 x 40 cm
a. Beton K250 4.296 m3
PC 41.2416 Zak
PB 2.123451 m3
Split 2.479747 m3
D Washing Bays
1 Perbaikan Main Bays
a. Beton K250 14 m3
PC 134.4 Zak
PB 6.92 m3
Split 8.081111 m3
c. Bekisting 15.84 m2
2 Sloof 20 x 40 cm
a. Beton K250 6.84 m3
PC 65.664 Zak
PB 3.380914 m3
Split 3.9482 m3
c. Bekisting 24 m2
Sloof 20 x 40 cm
a. Beton K250 11.52 m3
PC 110.592 Zak
PB 5.694171 m3
Split 6.6496 m3
d. Bekisting 126.72 m2
P T Tipikal Jumlah
H 5 0.2 24 24
5 0.4 6 12 Batako
V 10 0.2 6 12 Semen
10 0.4 6 24 Pasir
PIT STOP
Site Mix K.125 (JMD)
Material Berat Koef Volume
PC 276 40 6.9 Zak
PB 828 1400 0.591429 m3
Split 1012 1800 0.562222 m3
Site Mix K.250 (JMD)
Material Berat Koef Volume
PC 384 40 9.6 Zak
PB 692 1400 0.494286 m3
Split 1039 1800 0.577222 m3
Koef 1.041885
Koef 0.0143
Koef 1.57824
Koef 0.0143
Koef 0.6165
Koef 0.0143
Total
28.8 m2
360 Bh
6.9696 Zak
1.296 m3
Koef 1.041885
Koef 0.0143
Koef 1.57824
Koef 0.0143
Koef 0.6165
Koef 0.0143
Total
34 m2
425 Bh
8.228 Zak
1.53 m3
Koef 0.88776
Koef 0.0143
Koef 1.041885
Koef 0.0143
Koef 1.041885
Koef 0.0143
Koef 0.6165
Koef 0.0143
Total
72 m2
900 Bh
17.424 Zak
3.24 m3
BESTAT SLOOF
C WORKSHOP TYRE
1 SLOOF (20x40) 12m
12 x 3
a. c 11.92
a
b. 0.35 0.15 0.35 0.15
a. c 9.92
a
b. 0.35 0.15 0.35 0.15
D WASHING BAYS
1 SLOOF (30x40) 12m
12 x 2
a. c 11.92
a
b. 0.35 0.25 0.35 0.25
2 SLOOF (30x40) 8m
8 x 3
a. c 7.92
a
b. 0.35 0.25 0.35 0.25
a. c 9.92
a
b. 0.35 0.15 0.35 0.15
2 SLOOF (20x40) 5m
5 x 15
a. c 4.92
a
b. 0.35 0.15 0.35 0.15
BALANCING
Begel Sloof
Potongan
Hak ᴓ Bentang Panjang Jarak ∑ ∑Roundup ∑ ∑ / Tipikal
( m' ) ( m' ) ( bh ) ( bh ) Sambungan
0.04 16 11.92 12 8
0.04 16 9.92 10 8
0.04 16 11.92 12 12
0.04 16 9.92 10 6
0.04 16 4.92 5 6
JUMLAH (Btg)
BERAT (Kg) 0 0 0
BALANCING
16
0
36
36
45
0
BESTAT PLAT LANTAI
C WORKSHOP TYRE
1 PLAT LANTAI t:20cm (12x8)
a. 7.92 0.04 13
0.2
b. 11.92 0.04 13
0.2
12
D WASHING BAYS
1 PLAT LANTAI t:15cm (12x8)
a. 7.92 0.04 13
0.15
b. 11.92 0.04 13
0.15
12
a. 4.92 0.04 13
0.2
b. 9.92 0.04 13
0.2
10
Potongan Per 12 m
Bentang Panjang Jarak ∑ ∑Roundup ∑ / Tipikal Tipikal ∑ total 12
( m' ) ( m' ) ( bh ) ( bh ) Axial x,y ( bh ) ( bh ) (Ptg)
8 12 0.2 40 40 2 1 80 1.00
8 12 0.1 80 80 1 1 80 1.00
1 0.00 80 0.00 0
1 0.00 80 0.00 0
D WASHING BAYS
1 Bidang 8m
Subtitusi Pot. C1 (2x @4m)
2 Bidang 12m
Jumlah 144
Berat 1065
Berat Total
JUMLAH LONJOR /12m POTONGAN SISA SISA SUBTITUSI
13 16 22 PAKAI POT (m') JUMLAH POT (m') JUMLAH
24 D16 - 12m
ø10 - 1m
16 D16 - 10m 2.00 16 2.00 16
ø10 - 1m
24 D16 - 12m
ø10 - 1.2m
36 D16 - 8m 4.00 36
ø10 - 1.2m
-12 D16 - 4m
725 169
9064 3201
13330 Kg