DAFTAR HARGA SATUAN BAHAN & UPAH KERJA

SMPN 1 KOKOP KEC. KOKOP KABUPATEN BANGKALAN

NO. NAMA BARANG SDAT HARGA SATUAN KETERANGAN

I BAHAN PASIR
1 Pedel putih M³ 120,000.00
1 Pasir Lokal M³ 160,000.00
2 Pasir Pasang ( Jawa ) M³ 260,000.00
3 Pasir Cor ( Jawa ) M³ 320,000.00

II BAHAN BATU
1 Batu Gunung 15/20 ( Lokal ) M³ 160,000.00
1 Batu Gunung Pecah 2/3 ( Lokal ) M³ 320,000.00

III BAHAN BATU BATA


1 Batu Putih ( Lokal ) Bh 700.00

IV PORTLAN CEMENT ( PC )
1 Semen Gresik 40 Kg Zak 60,000.00
2 Semen warna putih ( Gresik ) 40 Kg Zak 9,500.00
3 Semen warna Kg 10,000.00

V BAHAN BESI
1 Besi Beton Polos Kg 9,000.00
2 Kawat Beton / Kawat Bendrat Kg 20,000.00
2 Besi strip Kg 22,000.00

VII BAHAN KAYU


1 Kayu Kamper Balok 8/12, 6/12 Klas I M³ 11,500,000.00
3 Kayu Kamper Papan 2/20, 3/20 x 4,00 m' M³ 12,350,000.00
1 Kayu Meranti Balok 8/12, 6/12 Klas I M³ 7,475,000.00
2 Kayu Meranti Usuk 5/7 M³ 7,475,000.00
2 Kayu Meranti Reng 3/5 M³ 7,475,000.00
3 Kayu Meranti Papan 2/20, 3/20 x 4,00 m' M³ 8,050,000.00
4 Kayu Papan Begesting 2/20 x 4,00 m' M³ 2,500,000.00
5 Kayu Kempas Balok 8/12, 6/12, 8/15 M³ 7,475,000.00
6 Kayu Kempas Papan 3/30, 4/25, 4/12 M³ 8,050,000.00
7 Kayu Blangiran Balok 8/12, 6/12, 8/15 M³ 7,475,000.00
8 Kayu Blangiran Papan 3/30, 4/25, 4/12 M³ 8,050,000.00
9 Kayu Dolken Btg 30,000.00

VIII BAHAN PENUTUP ATAP + RANGKA


1 Rangka Atap Baja Ringan (Bentang 7m) M² 185,000.00
1 Rangka Atap Baja Ringan (Bentang 9m) M² 210,000.00
2 Genteng Kodok Model Ex. Karang Penang Bh 2,500.00
3 Genteng Bubungan Ex. Karang Penang Bh 5,500.00

IX BAHAN PAPAN / BOARD SEMEN + RANGKA


1 Metal Hollow Uk. 4.4, P = 4m' Ljr 45,000.00
2 Metal Hollow Uk. 2.4, P = 4m' Ljr 32,500.00
3 Kawat BWG Ljr 13,000.00
4 U Climb Ljr 500.00
5 Wall angle, P = 3m' Ljr 9,500.00
6 Papan Kalsiboar 8 mm, P= 4m', L= 30cm Lbr 65,000.00
7 Calsiboard 1,22 x 2,44 m Tebal 4 mm+rangka kayu M² 85,000.00
7 Calsi 1 x 1 m Tebal 4 mm+rangka kayu M² 85,000.00
9 Kawat BWG Kg 17,500.00
10 U Climb bh 500.00
11 Kasa + Compund M' 3,000.00
12 List Gypsum 8cm M' 12,000.00

X BAHAN CAT & MINYAK


1 Plamur Tembok Kg 25,000.00
2 Plamur Kayu Ex Pedang Kg 30,000.00
3 Cat Kayu/ Besi setara EMCO Kg 60,000.00
4 Cat Tembok setara Decolith ( 5 Kg ) Kg 24,000.00
5 Dempul Kayu / Besi Kg 37,000.00
6 Minyak Cat /Tinner A Ltr 30,000.00
7 Minyak Cat /Tinner B Ltr 20,000.00
8 Cat Meni ( Kayu ) Kg 30,000.00
9 Cat Meni ( Besi ) Kg 30,000.00
10 Cat Dasar Kg 60,000.00
11 Cat Dasar ( Dinding ) Kg 24,000.00
12 Lem Kayu Kg 22,500.00
13 Amplas Lbr 4,500.00
14 Minyak Begesting Ltr 6,000.00

XI HANA KACA
1 Kaca Polos 5 mm M² 97,500.00

XII BAHAN TRIPLEK / KAYU LAPIS


1 Multiplek 1,22 x 2,44 x 9 mm Lbr 130,000.00
2 Multiplek 1,22 x 2,44 x 12 mm Lbr 160,000.00

XIII BAHAN PENGGANTUNG / KUNCI


1 Kunci Pintu 2x Putar setara ex. Union Bh 95,000.00
2 Engsel Pintu setara ex. Arch Bh 9,000.00
3 Engsel Jendela setara ex. Arch Bh 4,500.00
4 Grendel ( Pintu ) Bh 45,000.00
5 Grendel Kecil ( Jendela ) Bh 5,000.00
6 Hak Angin Bh 8,000.00

XIV BAHAN PAKU


1 Paku Reng Kg 20,000.00
2 Paku Usuk Kg 19,000.00
3 Paku Triplek Kg 20,000.00
4 Paku Seng Kg 23,000.00
5 Paku Skrup Bh 500.00
6 Paku Rifet Kg 25,000.00
7 Paku Kayu / Dudor Kg 19,000.00
8 Fasting Nails ( Scrup ) Bh 200.00

XV BAHAN KERAMIK
1 Keramik 40 x 40 M² 51,000.00
2 Keramik 30 x 30 M² 46,000.00
3 Keramik 20 x 20 M² 48,000.00
4 Keramik 20 x 25 M² 55,000.00
4 Keramik 25 x 40 (Motif) M² 75,000.00
5 Keramik 20 x 40 (Motif batu) M² 85,000.00

XVIII UPAH KERJA


1 Mandor Hari 125,000.00
2 Kepala Tukang Batu Hari 115,000.00
3 Kepala Tukang Kayu Hari 115,000.00
4 Kepala Tukang Besi Hari 115,000.00
5 Kepala Tukang Cat Hari 115,000.00
6 Tukang Batu Hari 90,000.00
7 Tukang Kayu Hari 90,000.00
8 Tukang Besi Hari 90,000.00
9 Tukang Cat Hari 90,000.00
10 Pekerja Hari 75,000.00
DAFTAR ANALISA HARGA SATUAN
KEGIATAN : REHABILITASI SEDANG / BERAT BANGUNAN SEKOLAH
PEKERJAAN : REHABILITASI SMPN 2 KOKOP
LOKASI : SMPN 2 KOKOP KEC. KOKOP KAB. BANGKALAN

1 1,00 M2 Pekerjaan Pembongkaran Atap + Rangka


Upah :
0.075 Oh Pekerja @ Rp. 75,000.00 Rp. 5,625.00
0.075 Oh Tukang Kayu @ Rp. 90,000.00 Rp. 6,750.00
Jumlah = Rp. 12,375.00
2 1,00 M2 Pekerjaan Pembongkaran Dinding
Upah :
0.300 Oh Pekerja @ Rp. 75,000.00 Rp. 22,500.00
0.100 Oh Tukang Kayu @ Rp. 90,000.00 Rp. 9,000.00
Jumlah = Rp. 31,500.00
3 1,00 M2 Pasangan Bata Putih (Tembok) Tebal 1/2 Bata Camp. 1 Pc : 5 Ps
Bahan :
45.000 Bh Bata Putih ( Lokal ) @ Rp. 700.00 Rp. 31,500.00
9.980 Kg Semen ( Pc ) @ Rp. 1,500.00 Rp. 14,970.00
0.041 M3 Pasir Pasang ( Jawa ) @ Rp. 260,000.00 Rp. 10,616.67
Upah :
0.300 Oh Pekerja @ Rp. 75,000.00 Rp. 22,500.00
0.100 Oh Tukang Batu @ Rp. 90,000.00 Rp. 9,000.00
Rp. 57,086.67 + Rp. 31,500.00
Jumlah = Rp. 88,586.67
4 1,00 M2 Plesteran Tembok Camp. 1 Pc : 5 Ps Tebal 15 Mm
Bahan :
5.299 Kg Semen ( Pc ) @ Rp. 1,500.00 Rp. 7,948.80
0.023 M3 Pasir Pasang ( Jawa ) @ Rp. 260,000.00 Rp. 5,850.00
Upah :
0.200 Oh Pekerja @ Rp. 75,000.00 Rp. 15,000.00
0.150 Oh Tukang Batu @ Rp. 90,000.00 Rp. 13,500.00
Rp. 13,798.80 + Rp. 28,500.00
Jumlah = Rp. 42,298.80
5 1,00 M' Plesteran Skoning / Benangan 1 Pc : 2 Ps
Bahan :
0.500 Kg Semen ( Pc ) @ Rp. 1,500.00 Rp. 750.00
0.013 M3 Pasir Pasang ( Jawa ) @ Rp. 260,000.00 Rp. 3,380.00
Upah :
0.057 Oh Pekerja @ Rp. 75,000.00 Rp. 4,275.00
0.038 Oh Tukang Batu @ Rp. 90,000.00 Rp. 3,420.00
Rp. 4,130.00 + Rp. 7,695.00
Jumlah = Rp. 11,825.00
6 1,00 M' Pasang Lisplank Woodplank 8mm 30 cm
Bahan :
0.2750 Ljr Papan Woodplank 8 mm @ Rp. 65,000.00 Rp. 17,875.00
0.2500 Ljr Metal Hollow 2.4 @ Rp. 32,500.00 Rp. 8,125.00
4.000 bh Fasting Nails @ Rp. 200.00 Rp. 800.00
Upah :
0.125 Oh Pekerja @ Rp. 75,000.00 Rp. 9,375.00
0.200 Oh Tukang Kayu @ Rp. 90,000.00 Rp. 18,000.00
Rp. 26,800.00 + Rp. 27,375.00
Jumlah = Rp. 54,175.00

7 1,00 M3 Pekerjaan Beton Bertulang Camp. 1Pc : 2Ps : 3 Krl ( Kolom 15/20 ) Lembar. 2
Bahan :
336.000 Kg Semen ( Pc ) @ Rp. 1,500.00 Rp. 504,000.00
0.540 M3 Pasir Beton ( Jawa ) @ Rp. 320,000.00 Rp. 172,800.00
0.810 M3 Batu Pecah 2/3 ( Lokal ) @ Rp. 320,000.00 Rp. 259,200.00
Upah :
2.000 Oh Pekerja @ Rp. 75,000.00 Rp. 150,000.00
0.350 Oh Tukang Batu @ Rp. 90,000.00 Rp. 31,500.00
Rp. 936,000.00 + Rp. 181,500.00
Jumlah = Rp. 1,117,500.00
Pekerjaan Pembesian :
Bahan :
175.000 Kg Besi Beton Polos @ Rp. 9,000.00 Rp. 1,575,000.00
2.400 Kg Kawat Baja @ Rp. 20,000.00 Rp. 48,000.00
Jumlah 1,623,000.00
Upah :
0.770 Oh Pekerja @ Rp. 75,000.00 Rp. 57,750.00
0.770 Oh Tukang Besi @ Rp. 90,000.00 Rp. 69,300.00
Jumlah Rp. 127,050.00
Pek. Pembesian = 1,623,000.00 + 127,050.00 = Rp. 1,750,050.00
Pekerjaan Begesting ( 2 kali Pakai ) :
Bahan :
2.250 Kg Paku @ Rp. 20,000.00 Rp. 45,000.00
0.160 M3 Kayu Begisting @ Rp. 2,500,000.00 Rp. 400,000.00
Upah :
2.000 Oh Pekerja @ Rp. 75,000.00 Rp. 150,000.00
5.000 Oh Tukang Kayu @ Rp. 90,000.00 Rp. 450,000.00
Rp. 445,000.00 + Rp. 600,000.00
Jumlah = Rp. 1,045,000.00
Jadi untuk 1,00 M3 Pekerjaan Beton Bertulang : Rp. 1,117,500.00
Rp. 1,750,050.00
Rp. 1,045,000.00
Rp. 3,912,550.00

8 1,00 M3 Pekerjaan Beton Bertulang Camp. 1Pc : 2Ps : 3 Krl ( Kolom Praktis + Rink balk )
Bahan :
336.000 Kg Semen ( Pc ) @ Rp. 1,500.00 Rp. 504,000.00
0.540 M3 Pasir Beton ( Jawa ) @ Rp. 320,000.00 Rp. 172,800.00
0.810 M3 Batu Pecah 2/3 ( Lokal ) @ Rp. 320,000.00 Rp. 259,200.00
Upah :
2.000 Oh Pekerja @ Rp. 75,000.00 Rp. 150,000.00
0.350 Oh Tukang Batu @ Rp. 90,000.00 Rp. 31,500.00
Rp. 936,000.00 + Rp. 181,500.00
Jumlah = Rp. 1,117,500.00
Pekerjaan Pembesian :
Bahan :
195.000 Kg Besi Beton Polos @ Rp. 9,000.00 Rp. 1,755,000.00
2.400 Kg Kawat Baja @ Rp. 20,000.00 Rp. 48,000.00
Jumlah 1,803,000.00
Upah :
0.770 Oh Pekerja @ Rp. 75,000.00 Rp. 57,750.00
0.770 Oh Tukang Besi @ Rp. 90,000.00 Rp. 69,300.00
Jumlah Rp. 127,050.00
Pek. Pembesian = 1,803,000.00 + 127,050.00 = Rp. 1,930,050.00

Pekerjaan Begesting ( 2 kali Pakai ) : Lembar. 3


Bahan :
2.000 Kg Paku @ Rp. 20,000.00 Rp. 40,000.00
0.110 M3 Kayu Begisting @ Rp. 2,500,000.00 Rp. 275,000.00
Upah :
2.000 Oh Pekerja @ Rp. 75,000.00 Rp. 150,000.00
5.000 Oh Tukang Kayu @ Rp. 90,000.00 Rp. 450,000.00
Rp. 315,000.00 + Rp. 600,000.00
Jumlah = Rp. 915,000.00
Jadi untuk 1,00 M3 Pekerjaan Beton Bertulang : Rp. 1,117,500.00
Rp. 1,930,050.00
Rp. 915,000.00
Rp. 3,962,550.00
9 1,00 M2 Pasang Genteng Kodok Ex Karang Penang
Bahan :
25.000 Bh Genteng Kodok ex. Karang Penang @ Rp. 2,500.00 Rp. 62,500.00
Upah :
0.150 Oh Pekerja @ Rp. 75,000.00 Rp. 11,250.00
0.075 Oh Tukang Batu @ Rp. 90,000.00 Rp. 6,750.00
Rp. 62,500.00 + Rp. 18,000.00
Jumlah = Rp. 80,500.00
10 1,00 M' Pasang Genteng Wuwung
Bahan :
5.000 Bh Genteng Wuwung ex. Karang Penang @ Rp. 5,500.00 Rp. 27,500.00
8.000 Kg Semen ( Pc ) @ Rp. 1,500.00 Rp. 12,000.00
0.032 M3 Pasir Pasang ( Jawa ) @ Rp. 260,000.00 Rp. 8,320.00
Upah :
0.400 Oh Pekerja @ Rp. 75,000.00 Rp. 30,000.00
0.200 Oh Tukang Batu @ Rp. 90,000.00 Rp. 18,000.00
Rp. 47,820.00 + Rp. 48,000.00
Jumlah = Rp. 95,820.00

9 1,00 M2 Pasang Genteng Kodok Ex Karang Pilang


Bahan :
23.000 Bh Genteng Kodok ex. Karang Pilang @ Rp. 5,500.00 Rp. 126,500.00
Upah :
0.150 Oh Pekerja @ Rp. 75,000.00 Rp. 11,250.00
0.075 Oh Tukang Batu @ Rp. 90,000.00 Rp. 6,750.00
Rp. 126,500.00 + Rp. 18,000.00
Jumlah = Rp. 144,500.00

10 1,00 M' Pasang Genteng Wuwung


Bahan :
5.000 Bh Genteng Wuwung ex. Karang Penang @ Rp. 10,000.00 Rp. 50,000.00
8.000 Kg Semen ( Pc ) @ Rp. 1,500.00 Rp. 12,000.00
0.032 M3 Pasir Pasang ( Jawa ) @ Rp. 90,000.00 Rp. 2,880.00
Upah :
0.400 Oh Pekerja @ Rp. 75,000.00 Rp. 30,000.00
0.200 Oh Tukang Batu @ Rp. 90,000.00 Rp. 18,000.00
Rp. 64,880.00 + Rp. 48,000.00
Jumlah = Rp. 112,880.00

11 1,00 M2 Plafond Calsiboard 4mm rangka Metal Hollow


Bahan : `
0.380 Lbr Calsiboard 1.22 x 2.44, t = 4mm @ Rp. 85,000.00 Rp. 32,300.00
0.275 Ljr Metal hollow 4.4 @ Rp. 45,000.00 Rp. 12,375.00
0.540 Ljr Metal hollow 2.4 @ Rp. 32,500.00 Rp. 17,550.00
2.000 Ljr Kasa + Compund @ Rp. 3,000.00 Rp. 6,000.00
12.000 bh Scrup @ Rp. 200.00 Rp. 2,400.00
Upah :
0.125 Oh Pekerja @ Rp. 75,000.00 Rp. 9,375.00
0.225 Oh Tukang Kayu @ Rp. 90,000.00 Rp. 20,250.00
Rp. 70,625.00 + Rp. 29,625.00
Jumlah = Rp. 100,250.00
12 1,00 M3 Pekerjaan Kusen Pintu / Jendela Kayu Blangiran
Bahan :
1.200 M3 Kayu Blangiran Balok @ Rp. 7,475,000.00 Rp. 8,970,000.00
1.250 Kg Paku 10 cm @ Rp. 19,000.00 Rp. 23,750.00
1.000 Kg Lem Kayu @ Rp. 22,500.00 Rp. 22,500.00
Upah :
7.000 Oh Pekerja @ Rp. 75,000.00 Rp. 525,000.00
21.000 Oh Tukang Kayu @ Rp. 90,000.00 Rp. 1,890,000.00
Rp. 9,016,250.00 + Rp. 2,415,000.00
Jumlah = Rp. 11,431,250.00
13 1,00 M2 Pek. Daun Pintu Panil Kayu Blangiran + Isian Multiplek 12mm Lembar. 4
Bahan :
0.016 M3 Kayu Papan Blangiran @ Rp. 8,050,000.00 Rp. 128,800.00
0.340 Lbr Multiplek 9mm @ Rp. 130,000.00 Rp. 44,200.00
Upah :
1.000 Oh Pekerja @ Rp. 75,000.00 Rp. 75,000.00
3.000 Oh Tukang Kayu @ Rp. 90,000.00 Rp. 270,000.00
Rp. 173,000.00 + Rp. 345,000.00
Jumlah = Rp. 518,000.00
13 1,00 M2 Pek. Daun Pintu Panil Kayu Blangiran + Isian papan 3/20 Lembar. 4
Bahan :
0.040 M3 Kayu Papan Blangiran @ Rp. 8,050,000.00 Rp. 322,000.00
0.500 Kg Lem kayu @ Rp. 22,500.00 Rp. 11,250.00
Upah :
1.000 Oh Pekerja @ Rp. 60,000.00 Rp. 60,000.00
3.000 Oh Tukang Kayu @ Rp. 75,000.00 Rp. 225,000.00
Rp. 333,250.00 + Rp. 285,000.00
Jumlah = Rp. 618,250.00

14 1,00 M2 Pek. Daun Jendela Kaca Kayu Blangiran


Bahan :
0.012 M3 Kayu Papan Blangiran @ Rp. 8,050,000.00 Rp. 96,600.00
0.740 M2 Kaca Bening 5 mm @ Rp. 112,125.00 Rp. 82,972.50
Upah :
0.800 Oh Pekerja @ Rp. 75,000.00 Rp. 60,000.00
2.000 Oh Tukang Kayu @ Rp. 90,000.00 Rp. 180,000.00
Rp. 179,572.50 + Rp. 240,000.00
Jumlah = Rp. 419,572.50
15 1,00 M2 Pek. Jalusi Kayu Blangiran 3/5 & 2/15
Bahan :
0.025 M' Kayu Papan Blangiran @ Rp. 8,050,000.00 Rp. 197,225.00
0.150 Kg Paku reng @ Rp. 20,000.00 Rp. 3,000.00
Upah :
0.670 Oh Pekerja @ Rp. 75,000.00 Rp. 50,250.00
2.000 Oh Tukang Kayu @ Rp. 90,000.00 Rp. 180,000.00
Rp. 200,225.00 + Rp. 230,250.00
Jumlah = Rp. 430,475.00
16 1,00 Buah Pasang Kunci Pintu
Bahan :
1.000 Bh Kunci Pintu Biasa @ Rp. 95,000.00 Rp. 95,000.00
Upah :
0.010 Oh Pekerja @ Rp. 75,000.00 Rp. 750.00
0.500 Oh Tukang Kayu @ Rp. 90,000.00 Rp. 45,000.00
Rp. 95,000.00 + Rp. 45,750.00
Jumlah = Rp. 140,750.00
17 1,00 Buah Pasang Engsel Pintu
Bahan :
1.000 Bh Engsel Pintu @ Rp. 9,000.00 Rp. 9,000.00
Upah :
0.015 Oh Pekerja @ Rp. 75,000.00 Rp. 1,125.00
0.150 Oh Tukang Kayu @ Rp. 90,000.00 Rp. 13,500.00
Rp. 9,000.00 + Rp. 14,625.00
Jumlah = Rp. 23,625.00
18 1,00 Buah Pasang Engsel Jendela
Bahan :
1.000 Bh Engsel Jendela @ Rp. 4,500.00 Rp. 4,500.00
Upah :
0.013 Oh Pekerja @ Rp. 75,000.00 Rp. 937.50
0.125 Oh Tukang Kayu @ Rp. 90,000.00 Rp. 11,250.00
Rp. 4,500.00 + Rp. 12,187.50
Jumlah = Rp. 16,687.50
19 1,00 Buah Pasang Grendel Jendela Lembar. 5
Bahan :
1.000 Bh Grendel Jendela @ Rp. 5,000.00 Rp. 5,000.00
Upah :
0.010 Oh Pekerja @ Rp. 75,000.00 Rp. 750.00
0.100 Oh Tukang Kayu @ Rp. 90,000.00 Rp. 9,000.00
Rp. 5,000.00 + Rp. 9,750.00
Jumlah = Rp. 14,750.00
20 1,00 Buah Pasang Hag/Kait Angin
Bahan :
1.000 Bh Hag Angin @ Rp. 8,000.00 Rp. 8,000.00
Upah :
0.010 Oh Pekerja @ Rp. 75,000.00 Rp. 750.00
0.100 Oh Tukang Kayu @ Rp. 90,000.00 Rp. 9,000.00
Rp. 8,000.00 + Rp. 9,750.00
Jumlah = Rp. 17,750.00
21 1,00 Buah Pasang Grendel Pintu
Bahan :
1.000 Bh Grendel pintu @ Rp. 45,000.00 Rp. 45,000.00
Upah :
0.030 Oh Pekerja @ Rp. 75,000.00 Rp. 2,250.00
0.300 Oh Tukang Kayu @ Rp. 90,000.00 Rp. 27,000.00
Rp. 45,000.00 + Rp. 29,250.00
Jumlah = Rp. 74,250.00
22 1,00 M2 Pasang Kaca t = 5 mm
Bahan :
1.000 M2 Kaca polos 5 mm @ Rp. 97,500.00 Rp. 97,500.00
Upah :
0.015 Oh Pekerja @ Rp. 75,000.00 Rp. 1,125.00
0.150 Oh Tukang Kayu @ Rp. 90,000.00 Rp. 13,500.00
Rp. 97,500.00 + Rp. 14,625.00
Jumlah = Rp. 112,125.00
23 1,00 M2 Pekerjaan Cat Kayu 2 Lapis Cat Penutup ( Baru )
Bahan :
0.170 Kg Cat Dasar @ Rp. 60,000.00 Rp. 10,200.00
0.260 Kg Cat kayu @ Rp. 60,000.00 Rp. 15,600.00
0.150 Kg Plamir @ Rp. 30,000.00 Rp. 4,500.00
0.200 Kg Cat meni @ Rp. 30,000.00 Rp. 6,000.00
Upah :
0.070 Oh Pekerja @ Rp. 75,000.00 Rp. 5,250.00
0.010 Oh Tukang Cat @ Rp. 90,000.00 Rp. 900.00
Rp. 36,300.00 + Rp. 6,150.00
Jumlah = Rp. 42,450.00
24 1,00 M2 Pekerjaan Cat Dinding dan Plafond 2 Lapis Penutup ( Baru )
Bahan :
0.100 Kg Plamur @ Rp. 25,000.00 Rp. 2,500.00
0.260 Kg Cat tembok @ Rp. 24,000.00 Rp. 6,240.00
0.100 Kg Cat Dasar @ Rp. 24,000.00 Rp. 2,400.00
0.500 Lbr Kertas Gosok @ Rp. 4,500.00 Rp. 2,250.00
Upah :
0.020 Oh Pekerja @ Rp. 75,000.00 Rp. 1,500.00
0.065 Oh Tukang Cat @ Rp. 90,000.00 Rp. 5,850.00
Rp. 13,390.00 + Rp. 7,350.00
Jumlah = Rp. 20,740.00
24 1,00 M2 Pekerjaan Plamiran Dinding dan Plafond
Bahan :
0.100 Kg Plamur @ Rp. 25,000.00 Rp. 2,500.00
0.260 Kg Cat tembok @ Rp. - Rp. -
0.100 Kg Cat Dasar @ Rp. - Rp. -
0.500 Lbr Kertas Gosok @ Rp. - Rp. -
Upah :
0.020 Oh Pekerja @ Rp. 75,000.00 Rp. 1,500.00
0.063 Oh Tukang Cat @ Rp. 90,000.00 Rp. 5,670.00
Rp. 2,500.00 + Rp. 7,170.00
Jumlah = Rp. 9,670.00

1 1,00 M2 Lantai Keramik 30 x 30 cm


Bahan :
1.050 M2 Keramik Polos 30 x 30 @ Rp. 46,000.00 Rp. 48,300.00
7.50 Kg Semen ( Pc ) @ Rp. 1,500.00 Rp. 11,250.00
0.045 M3 Pasir Pasang ( Jawa ) @ Rp. 260,000.00 Rp. 11,700.00
0.250 Kg Semen Warna @ Rp. 10,000.00 Rp. 2,500.00
Upah :
0.150 Oh Pekerja @ Rp. 75,000.00 Rp. 11,250.00
0.225 Oh Tukang Batu @ Rp. 90,000.00 Rp. 20,250.00
Rp. 73,750.00 + Rp. 31,500.00
Jumlah = Rp. 105,250.00
1 1,00 M2 Lantai Keramik 40 x 40 cm
Bahan :
1.050 M2 Keramik Motif 40 x 40 @ Rp. 51,000.00 Rp. 53,550.00
8.50 Kg Semen ( Pc ) @ Rp. 1,500.00 Rp. 12,750.00
0.045 M3 Pasir Pasang ( Jawa ) @ Rp. 260,000.00 Rp. 11,700.00
0.250 Kg Semen Warna @ Rp. 10,000.00 Rp. 2,500.00
Upah :
0.150 Oh Pekerja @ Rp. 75,000.00 Rp. 11,250.00
0.225 Oh Tukang Batu @ Rp. 90,000.00 Rp. 20,250.00
Rp. 80,500.00 + Rp. 31,500.00
Jumlah = Rp. 112,000.00
2 1,00 M2 Lantai Keramik 20 x 20 cm
Bahan :
1.050 M2 Keramik @ Rp. 48,000.00 Rp. 50,400.00
7.50 Kg Semen ( Pc ) @ Rp. 1,500.00 Rp. 11,250.00
REKAPITULASI
RENCANA ANGGARAN BIAYA

KEGIATAN : PENGADAAN SARANA PRASARANA


PEKERJAAN : PERENCANAAN SMP KABUPATEN BANGKALAN
LINGKUP PEKERJAAN : REHABILITASI 2 RUANG BELAJAR SMPN 3 SATAP KOKOP
LOKASI : SMPN 3 SATAP KOKOP KEC. KOKOP KAB. BANGKALAN

NO. URAIAN PEKERJAAN JUMLAH HARGA

I PEKERJAAN PERSIAPAN Rp 5,252,500.00


II PEKERJAAN TANAH Rp 154,911.96
III PEKERJAAN PASANGAN/PLESTERAN Rp 17,946,864.80
IV PEKERJAAN BETON Rp 15,083,172.41
V PEKERJAAN RANGKA ATAP Rp 51,669,687.50
VI PEKERJAAN ATAP Rp 19,762,211.10
VII PEKERJAAN KUSEN PINTU DAN JENDELA Rp 23,012,400.00
VIII PEKERJAAN PLAFOND Rp 17,105,400.00
IX PEKERJAAN PENGECATAN/PLAMIRAN Rp 7,227,587.80
X PEKERJAAN LANTAI Rp 18,906,020.00
XI PEKERJAAN KUNCI + PENGGANTUNG Rp 1,500,500.00
XII PEKERJAAN INSTALASI LISTRIK Rp 3,060,000.00
XIII PEKERJAAN KACA Rp 2,318,745.00

JUMLAH Rp 183,000,000.56
DIBULATKAN Rp 183,000,000.00

TERBILANG : ( SERATUS DELAPAN PULUH TIGA JUTA RUPIAH )

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 3 Satap Kokop
Kec. Kokop Kab. Bangkalan

IHSANUDIN, S.Pd
NIP. 19700109 199104 1 001
Lembar. 2
NO JENIS PEKRJAAN VOLUME HARGA SATUAN JUMLAH HARGA
1 2 3 4 5
I. PEKERJAAN PERSIAPAN
1 Pembongkaran atap + rangka 260.00 m² Rp 12,375.00 Rp 3,217,500.00
2 Pembongkaran kosen 12.00 bh Rp 50,000.00 Rp 600,000.00
3 Pembongkaran dinding 61.75 m² Rp 20,000.00 Rp 1,235,000.00
4 Pembersihan akhir pekerjaan 1.00 ls Rp 200,000.00 Rp 200,000.00
Rp 5,252,500.00
II. PEKERJAAN TANAH
1 Galian tanah 1.51 m³ Rp 58,500.00 Rp 88,452.00
2 Urugan pasir bawah pondasi t=10cm 0.25 m³ Rp 215,400.00 Rp 54,280.80
4 Urugan tanah kembali 0.76 m³ Rp 16,110.00 Rp 12,179.16
Rp 154,911.96
III. PEKERJAAN PASANGAN/PLESTERAN 4,131.73
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 916.33 91.82 m² Rp 88,586.67 Rp 8,133,700.58
2 Plesteran 1Pc : 5Ps 973.07 183.63 m² Rp 42,298.80 Rp 7,767,439.21
3 Benangan 86.50 173.00 m' Rp 11,825.00 Rp 2,045,725.00
Rp 17,946,864.80
IV. PEKERJAAN BETON
1 Lantai kerja bawah pondasi 1:3:5 t=5cm 0.31 m³ Rp 897,800.00 Rp 274,726.80
2 Pondasi beton stempat 60 x 60 x 15cm 0.38 m³ Rp 3,962,550.00 Rp 1,497,843.90
3 Kolom teras 15/15 0.47 m³ Rp 3,962,550.00 Rp 1,872,304.88
4 Balok beton 15/20 1.07 m³ Rp 3,962,550.00 Rp 4,220,115.75
5 Kolom struktur 15/25 1.26 m³ Rp 3,962,550.00 Rp 4,992,813.00
6 Ring balk 15/15 0.56 m³ Rp 3,962,550.00 Rp 2,225,368.08
1,358.48 4.04 Rp 15,083,172.41
V. PEKERJAAN RANGKA ATAP
1 Kuda-kuda baja ringan (galvalum 75mm) 256.39 m² Rp 185,000.00 Rp 47,431,687.50
2 Lisplank kalsiplank 8mm / 30 cm 65.20 m¹ Rp 65,000.00 Rp 4,238,000.00
Rp 51,669,687.50
VI. PEKERJAAN ATAP 4,765.50
1 Atap genteng Karang Penang (baru bg depan) 190.62 m² Rp 80,500.00 Rp 15,344,910.00
2 Atap genteng (lama bg belakang) 111.26 m² Rp 18,000.00 Rp 2,002,725.00
3 Genteng bubungan Karang penang 154.80 19.35 m' Rp 95,820.00 Rp 1,854,117.00
4 Plesteran kompres L = 10 cm (Akhiran gent 13.25 26.50 m' Rp 21,149.40 Rp 560,459.10
Rp 19,762,211.10
VII. PEKERJAAN KUSEN PINTU DAN JENDELA
1 Kusen kayu aluminium 4" 95.76 m' Rp 115,000.00 Rp 11,012,400.00
2 Daun Pintu kaca aluminium 4.00 bh Rp 2,000,000.00 Rp 8,000,000.00
3 Daun Jendela kaca aluminium 8.00 bh Rp 500,000.00 Rp 4,000,000.00
Rp 23,012,400.00
VIII. PEKERJAAN PLAFOND
1 Plafond calsiboard 4mm + rangka hollow 201.24 m² Rp 85,000.00 Rp 17,105,400.00
Rp 17,105,400.00
IX. PEKERJAAN PENGECATAN/PLAMIRAN
1 Pengecatan dinding depan 54.00 m² Rp 20,740.00 Rp 1,119,960.00
2 Pelamiran dinding 344.50 m² Rp 9,670.00 Rp 3,331,315.00
3 Plamiran plafond 201.24 m² Rp 9,670.00 Rp 1,945,990.80
4 Pengecatan kayu 19.56 m² Rp 42,450.00 Rp 830,322.00
Rp 7,227,587.80
X. PEKERJAAN LANTAI
1 Keramik lantai 40 x 40 162.00 m² Rp 112,000.00 Rp 18,144,000.00
2 Keramik kolom 20 x 40 (motif) 5.60 m² Rp 136,075.00 Rp 762,020.00
1,257.00 167.60 Rp 18,906,020.00
XI. PEKERJAAN KUNCI + PENGGANTUNG4759.4276
1 Kunci pintu 2 x putar 118.98569 2.00 bh Rp 140,750.00 Rp 281,500.00
2 Engsel Pintu 12.00 bh Rp 23,625.00 Rp 283,500.00
3 Engsel Jendela 16.00 bh Rp 16,687.50 Rp 267,000.00
4 Grendel tanam 2.00 bh Rp 74,250.00 Rp 148,500.00
5 Grendel Jendela 16.00 bh Rp 14,750.00 Rp 236,000.00
6 Hag Angin 16.00 bh Rp 17,750.00 Rp 284,000.00
Rp 1,500,500.00
XII PEKERJAAN INSTALASI LISTRIK
1 Lampu SL 14 watt 8.00 bh Rp 55,000.00 Rp 440,000.00
2 Lampu SL 8watt (teras) 2.00 bh Rp 50,000.00 Rp 100,000.00
3 Saklar ganda 2.00 bh Rp 20,000.00 Rp 40,000.00
4 Saklar tunggal 2.00 bh Rp 15,000.00 Rp 30,000.00
5 Stop kontak + instalasi 2.00 bh Rp 225,000.00 Rp 450,000.00
6 Instalasi titik lampu 10.00 ttk Rp 200,000.00 Rp 2,000,000.00
Rp 3,060,000.00
XIII. PEKERJAAN KACA
1 Kaca mati t=5 mm 20.68 m² Rp 112,125.00 Rp 2,318,745.00
Rp 2,318,745.00
REKAPITULASI
RENCANA ANGGARAN BIAYA

KEGIATAN : REHABILITASI RUANG BELAJAR,


PEKERJAAN : PEMBANGUNAN GEDUNG SEKOLAH
REHABILITASI RUANG BELAJAR, DAN PENINGKATAN MUTU SMP
(NEGERI/SWASTA), KABUPATEN BANGKALAN
PEKERJAAN : REHABILITASI 3 RUANG BELAJAR SMP AINUL YAQIN KLAMPIS
LOKASI : SMP AINUL YAQIN KEC. KLAMPIS KAB. BANGKALAN

NO. URAIAN KEGIATAN JUMLAH HARGA

I PEKERJAAN PASANGAN / PLESTERAN Rp 40,842,337.42


II PEKERJAAN BETON Rp 90,154,527.05
III PEKERJAAN KUSEN PINTU DAN JENDELA Rp 23,504,445.90
IV PEKERJAAN RANGKA ATAP Rp 34,912,750.00
V PEKERJAAN PENUTUP ATAP Rp 14,903,633.30
VI PEKERJAAN PLAFOND Rp 9,677,250.00
VII PEKERJAAN CAT/PELAMIRAN Rp 16,118,747.23
VIII PEKERJAAN INSTALASI LISTRIK Rp 3,060,000.00
IX PEKERJAAN LANTAI Rp 16,671,600.00
X PEKERJAAN KUNCI + PENGGANTUNG Rp 2,469,625.00
XI PEKERJAAN KACA Rp 2,628,210.00
XII PEKERJAAN RAILLING Rp 6,550,000.00

JUMLAH Rp 261,493,125.90
DIBULATKAN Rp 261,493,000.00

TERBILANG : ( DUA RATUS LIMA PULUH DELAPAN JUTA RUPIAH )

Sidoarjo, 2017
Kepala SMP AINUL YAQIN KLAMPIS Dibuat oleh
KEC. KLAMPIS Konsultan Perencana
Selaku Penanggung Jawab PT. INDRAKILA

RUSTAM EFFENDY, SP SUMARTONO, SE


Direktur

Mengetahui, Menyetujui,
Kepala Bidang Pedidikan SMP Kepala Seksi Bidang Pendidikan SMP
Dinas Pendidikan Kab. Bangkalan Selaku Pejabat Pelaksana Teknik Kegiatan
Selaku Pejabat Pembuat Komitmen

Drs. ACHMAD MUSTAQIM, MM ZAKARIA AL HUDA, SE


NIP. 19671029 199303 1 005 NIP. 19721212 199203 1 004
Lembar. 2
NO JENIS PEKRJAAN VOLUME HARGA SATUAN JUMLAH HARGA
1 2 3 4 5

I. PEKERJAAN PASANGAN / PLESTERAN 9,114.98


1 Pasangan dinding 1Pc : 5Ps 202.56 m² Rp 88,586.67 Rp 17,943,672.27
2 Plesteran 1Pc : 5Ps 405.11 m² Rp 42,298.80 Rp 17,135,666.87
3 Benangan 461.99 m' Rp 11,825.00 Rp 5,462,998.29
4 Pasang roster 10.00 bh Rp 30,000.00 Rp 300,000.00
Rp 40,842,337.42
II. PEKERJAAN BETON
1 Sloop 20/30 3.19 m³ Rp 3,877,780.00 Rp 12,377,873.76
2 Sloop 15/20 0.27 m³ Rp 3,877,780.00 Rp 1,047,000.60
3 Kolom Struktur 25/25 3.75 m³ Rp 3,997,580.00 Rp 14,990,925.00
4 Kolom teras 20/20 1.04 m³ Rp 3,997,580.00 Rp 4,157,483.20
5 Balok beton 25/50 4.40 m³ Rp 4,180,580.00 Rp 18,394,552.00
6 Balok beton 20/30 1.62 m³ Rp 4,180,580.00 Rp 6,772,539.60
7 Balok beton 15/20 0.27 m³ Rp 4,180,580.00 Rp 1,128,756.60
8 Plat beton t=12cm 6.96 m³ Rp 3,391,665.00 Rp 23,593,100.07
9 Lisplank beton 10/60 0.77 m³ Rp 3,391,665.00 Rp 2,604,798.72
10 Beton tangga 1.50 m³ Rp 3,391,665.00 Rp 5,087,497.50
Rp 90,154,527.05
III. PEKERJAAN KUSEN PINTU DAN JENDELA
1 Kusen 6/15 kayu kempas/mahoni 1.39 m³ Rp 11,431,250.00 Rp 15,900,868.75
2 Daun Pintu panil papan kayu kempas/mahoni 4/10&2/20 5.96 m² Rp 618,250.00 Rp 3,684,770.00
3 Daun Jendela kaca kempas/mahoni 3/8 9.34 m² Rp 419,572.50 Rp 3,918,807.15
Rp 23,504,445.90
IV. PEKERJAAN RANGKA ATAP
1 Rangka atap baja ringan (Galvalum) 139.73 m² Rp 210,000.00 Rp 29,342,250.00
2 Listplank kalsiplank 8mm / 30 cm 47.70 m¹ Rp 65,000.00 Rp 3,100,500.00
3 Usuk 4/6 dan reng 2/3 kayu kempas/mahoni 26.00 m² Rp 95,000.00 Rp 2,470,000.00
Rp 34,912,750.00
V. PEKERJAAN PENUTUP ATAP
1 Pasang genteng kodok ex Karang Penang 165.73 m² Rp 80,500.00 Rp 13,340,862.50
2 Pasang bubungan genteng kodok ex. Karang Penang 10.35 m¹ Rp 95,820.00 Rp 991,737.00
3 Plesteran kompres L=10 cm (akhiran genting) 27.00 m¹ Rp 21,149.40 Rp 571,033.80
Rp 14,903,633.30
VI. PEKERJAAN PLAFOND
1 Plafond calsiboard 4mm + rangka hollow 113.85 m² Rp 85,000.00 Rp 9,677,250.00
Rp 9,677,250.00
VII. PEKERJAAN CAT/PELAMIRAN
1 Pelamiran dinding 405.11 m² Rp 20,740.00 Rp 8,401,981.40
2 Pelamiran di bawah dek 81.00 m² Rp 9,670.00 Rp 783,270.00
3 Pelamiran plafond 113.85 m² Rp 9,670.00 Rp 1,100,929.50
4 Cat kayu 137.40 m² Rp 42,450.00 Rp 5,832,566.33
Rp 16,118,747.23
VIII. PEKERJAAN INSTALASI LISTRIK
1 Lampu PL 14 watt 8.00 bh Rp 55,000.00 Rp 440,000.00
2 Lampu PL 8 watt 2.00 bh Rp 50,000.00 Rp 100,000.00
3 Pasang Saklar ganda 2.00 bh Rp 20,000.00 Rp 40,000.00
4 Pasang Saklar tunggal 2.00 bh Rp 15,000.00 Rp 30,000.00
5 Pasang stop kontak 450 VA + instalasi 2.00 ttk Rp 225,000.00 Rp 450,000.00
6 Titik lampu + Instalasi 10.00 ttk Rp 200,000.00 Rp 2,000,000.00
Rp 3,060,000.00
IX. PEKERJAAN LANTAI
1 Pasang keramik lantai 30 x 30 cm 158.40 m² Rp 105,250.00 Rp 16,671,600.00
Rp 16,671,600.00
X. PEKERJAAN KUNCI + PENGGANTUNG
1 Kunci pintu 2 x putar 2.00 bh Rp 140,750.00 Rp 281,500.00
2 Engsel Pintu 12.00 bh Rp 23,625.00 Rp 283,500.00
3 Engsel Jendela 42.00 bh Rp 16,687.50 Rp 700,875.00
4 Grendel tanam 2.00 bh Rp 74,250.00 Rp 148,500.00
5 Grendel Jendela 21.00 bh Rp 14,750.00 Rp 309,750.00
6 Hag Angin 42.00 bh Rp 17,750.00 Rp 745,500.00
Rp 2,469,625.00
XI. PEKERJAAN KACA
1 Kaca mati 5 mm 23.44 m² Rp 112,125.00 Rp 2,628,210.00
Rp 2,628,210.00
XII. PEKERJAAN RAILLING
1 Railling tangga minimalis pipa 40 x 40 dan 20 x 40 7.00 m' Rp 550,000.00 Rp 3,850,000.00
2 Railling pagar BRC 90 12.00 m' Rp 225,000.00 Rp 2,700,000.00
Rp 6,550,000.00
REKAPITULASI
RENCANA ANGGARAN BIAYA

KEGIATAN : PEMBANGUNAN GEDUNG SEKOLAH


PEKERJAAN : REHABILITASI RUANG KELAS, PEMBANGUNAN RKB, PERPUSTAKAAN, LAB.
DAN PENINGKATAN MUTU SD, SMP, SMA DAN SMK (NEGERI/SWASTA)
KABUPATEN BANGKALAN
LINGKUP PEKERJAAN : REHABILITASI 2 RUANG KELAS SMPN 1 MODUNG
LOKASI : SMPN 1 MODUNG KEC. MODUNG KAB. BANGKALAN

NO. URAIAN PEKERJAAN JUMLAH HARGA

I PEKERJAAN PERSIAPAN Rp 4,226,206.25


II PEKERJAAN PASANGAN/PLESTERAN Rp 14,506,256.09
III PEKERJAAN BETON Rp 11,671,204.89
IV PEKERJAAN KUSEN, PINTU, JENDELA Rp 10,421,558.60
V PEKERJAAN RANGKA ATAP Rp 60,946,750.00
VI PEKERJAAN ATAP Rp 10,046,129.55
VII PEKERJAAN KUNCI + PENGGANTUNG #REF!
VIII PEKERJAAN PLAFOND Rp 21,304,400.00
IX PEKERJAAN PENGECATAN / PLAMIRAN Rp 20,816,189.85
X PEKERJAAN INSTALASI LISTRIK Rp 2,220,000.00
XI PEKERJAAN KACA Rp 976,015.91

JUMLAH #REF!
DIBULATKAN #REF!

TERBILANG : ( SERATUS TIGA PULUH LIMA JUTA RUPIAH )

Sidoarjo, Agustus 2014


Kepala SMPN 1 MODUNG Dibuat oleh
KEC. MODUNG Konsultan Perencana
Selaku Penanggung Jawab PT. INDRAKILA

RAHMAWATI, M.Pd SUMARTONO, SE


NIP. 19700703 199802 2 003 Direktur

Mengetahui, Menyetujui,
Kepala Bidang Sarana Prasarana Kepala Seksi Sarana & Prasarana
Dinas Pendidikan Kab. Bangkalan Selaku Pejabat Pelaksana Teknik Kegiatan
Selaku Pejabat Pembuat Komitmen

Drs. ACHMAD MUSTAQIM, MM FARIS SANTOSO, SE


NIP. 19671029 199303 1 005 NIP. 19830403 200903 1 001
Lembar. 2
NO JENIS PEKRJAAN VOLUME HARGA SATUAN JUMLAH HARGA
1 2 3 4 5
I. PEKERJAAN PERSIAPAN
1 Pembongkaran atap + rangka 325.35 M² Rp 12,375.00 Rp 4,026,206.25
2 Pembersihan akhir pekerjaan 1.00 Ls Rp 200,000.00 Rp 200,000.00
Rp 4,226,206.25
II. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 83.76 m² Rp 88,586.67 Rp 7,420,194.10
2 Plesteran 1Pc : 5Ps 167.52 m² Rp 42,298.80 Rp 7,086,062.00
Rp 14,506,256.09
III. PEKERJAAN BETON
1 Kolom Struktur 15/20 0.19 m³ Rp 3,912,550.00 Rp 751,209.60
2 Kolom Praktis 15/15 0.22 m³ Rp 3,962,550.00 Rp 855,910.80
3 Ring Balk 15/15 1.35 m³ Rp 3,962,550.00 Rp 5,356,575.09
4 Ring gewel 15/15 dan konsol beton 15/15 1.19 m³ Rp 3,962,550.00 Rp 4,707,509.40
Rp 11,671,204.89
IV. PEKERJAAN KUSEN, PINTU, JENDELA
1 Kusen 6/15 kayu Blangiran 0.53 m³ Rp 11,431,250.00 Rp 6,024,726.00
2 Jalusi kayu 2/15 & 3/5 3.98 m² Rp 430,475.00 Rp 1,711,568.60
3 Daun Jendela kaca 6.40 m² Rp 419,572.50 Rp 2,685,264.00
Rp 10,421,558.60
V. PEKERJAAN RANGKA ATAP
1 Kuda-kuda baja ringan (galvalum) 325.35 m² Rp 175,000.00 Rp 56,936,250.00
2 Listplank kalsiplank 8mm / 30 cm 61.70 m¹ Rp 65,000.00 Rp 4,010,500.00
Rp 60,946,750.00
VI. PEKERJAAN ATAP
1 Atap genteng (lama) 325.35 m² Rp 18,000.00 Rp 5,856,300.00
2 Atap genteng (baru 5%) 16.27 m² Rp 80,500.00 Rp 1,309,533.75
2 Genteng bubungan ex Karang penang 24.10 m' Rp 95,820.00 Rp 2,309,262.00
3 Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' Rp 21,149.40 Rp 571,033.80
Rp 10,046,129.55
VII. PEKERJAAN KUNCI + PENGGANTUNG
1 Kunci pintu 2 x putar 3.00 bh #REF! #REF!
2 Engsel Jendela 16.00 bh Rp 16,687.50 Rp 267,000.00
3 Grendel Jendela 8.00 bh Rp 14,750.00 Rp 118,000.00
4 Hag Angin 16.00 bh Rp 17,750.00 Rp 284,000.00
#REF!
VIII. PEKERJAAN PLAFOND
1 Plafond calsiboard 4mm + rangka metal hollow 250.64 m² Rp 85,000.00 Rp 21,304,400.00
Rp 21,304,400.00
IX. PEKERJAAN PENGECATAN / PLAMIRAN
1 Plamiran dinding 279.70 m² Rp 20,740.00 Rp 5,801,022.25
2 Plamiran plafond 250.64 m² Rp 20,740.00 Rp 5,198,273.60
3 Pengecatan kayu 72.30 m² Rp 42,450.00 Rp 3,069,135.00
4 Pengecatan genteng 325.35 m² Rp 20,740.00 Rp 6,747,759.00
Rp 20,816,189.85
X PEKERJAAN INSTALASI LISTRIK
1 Lampu SL 14 watt 12.00 Bh Rp 49,500.00 Rp 594,000.00
2 Saklar ganda broco 6.00 Bh Rp 16,000.00 Rp 96,000.00
3 Stop kontak + instalasi 3.00 Bh Rp 110,000.00 Rp 330,000.00
4 Instalasi titik lampu 12.00 Ttk Rp 100,000.00 Rp 1,200,000.00
Rp 2,220,000.00
XI. PEKERJAAN KACA
1 Kaca mati 5 mm 8.70 m² Rp 112,125.00 Rp 976,015.91
Rp 976,015.91
YANG DIPAKAI
TH. 2018
1 SMPN 2 SEPULU 2 KELAS ### SINERGI 1 SMPN 2 SEPULU
2 SMPN 1 KLAMPIS 3 KELAS ### SINERGI 2 SMPN 1 KLAMP
3 SMPN 2 KOKOP 2 KELAS ### SINERGI 3 SMPN 2 KOKOP
4 SMPN 3 SATAP KOKOP 2 KELAS ### SINERGI 4 SMPN 3 SATAP K
5 SMPN 1 TRAGAH 3 KELAS ### INDRAKILA 5 SMPN 1 TRAGA
6 SMPN 2 MODUNG 2 KELAS ### INDRAKILA 6 SMPN 2 MODUN
7 SMPN 2 LABANG 3 KELAS ### INDRAKILA 7 SMPN 2 LABAN
8 SMPN 2 KWANYAR 2 KELAS ### INDRAKILA 8 SMPN 2 KWANY
9 SMPN TAHAL AMIN H. ABDULLAH, S.Pd 9 SMPN TAHAL
10 SMPN 1 MODU
11 SMPN 1 GALIS
12 SMPN 1 KOKO
REKAPITULASI 1 13 SMPN 2 KONANG
RENCANA ANGGARAN BIAYA OK 14 SMPN TAHAL
OK
KEGIATAN : PENGADAAN SARANA PRASARANA
PEKERJAAN : PERENCANAAN SMP KABUPATEN BANGKALAN SMPN 1 KWANYA
LINGKUP PEKERJAAN : REHABILITASI 2 RUANG BELAJAR SMPN 2 SEPULU SMPN 1 TANJUNG
LOKASI : SMPN 2 SEPULU KEC. SEPULU KAB. BANGKALAN SMPN 1 BLEGA
SMPN 1 LABANG
NO. URAIAN PEKERJAAN JUMLAH HARGA

SMPN 1 KWANYA
I PEKERJAAN PERSIAPAN ### SMPN 1 TANJUNG
II PEKERJAAN PASANGAN/PLESTERAN ### SMPN 1 BLEGA K
III PEKERJAAN BETON ### SMPN 2 TANAH M
IV PEKERJAAN RANGKA ATAP ### SMPN TAHAL
V PEKERJAAN ATAP ### SMPN 1 GEGER
VI PEKERJAAN PLAFOND ### SMPN 1 GALIS
VII PEKERJAAN PENGECATAN ### SMPN 1 TANAH
VIII PEKERJAAN LANTAI ### SMPN 2 GEGER
IX PEKERJAAN INSTALASI LISTRIK ### SMPN 4 SATAP T
X PEKERJAAN KACA ### SMPN 1 KONAN

JUMLAH ###
DIBULATK ### ###
###

TERBILANG : ( SERATUS DELAPAN PULUH TIGA JUTA RUPIAH )

28.5
Bangkalan, 2018 23.5
Menyetujui : Dibuat oleh 7.833333
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

ANWAR NURIS, S.Pd.I H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Sepulu
Kec. Sepulu Kab. Bangkalan

DR. AHMAD SABARUDIN, S.Pd, M.MPd


NIP. 19680503 199103 1 013
LAPORAN MINGGUAN
Minggu ke : 1 ( Satu )
Pekerjaan : REHABILITASI 2 RUANG KELAS SMPN 2 SEPULU Tanggal : 5 Oktob. s/d 10 Oktober 2015
Nama Sekolah : SMPN 2 SEPULU Bulan : Oktober 2015
Lokasi : Kec. Kedamean Kab. Gresik Dana diterima tangal : 29 Oktober 2015
Besar Dana : Rp. 212.320.000.00
Bobot Prestasi Pekerjaan Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%) Komulatif (%)
% Prestasi Rerata Prestasi Rerata Prestasi Rerata
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11)
(6)/100x(5) (8)/100x(5) (6)+(8) (7)+(9)
I. PEKERJAAN PERSIAPAN
1 Pembongkaran atap + rangka atap 143.00 m² 0.97 - - 100 0.97 100.00 0.97
2 Pembongkaran atap 234.90 m² 0.97 - - 100 0.97 100.00 0.97
3 Penetelan plesteran 92.16 m² 1.01 - - 100 1.01 100.00 1.01
4 Pembersihan akhir pekerjaan 1.00 ls 0.11 - - - - - -

II. PEKERJAAN PASANGAN/PLESTERAN


1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 18.50 m² 0.90 - - - - - -
2 Plesteran 1Pc : 5Ps 37.00 m² 0.86 - - - - - -
3 Benangan 48.00 m' - - - - - - -

III. PEKERJAAN BETON


1 Kolom Struktur 15/25 0.06 m³ 0.13 - - - - - -
2 Kolom Praktis 15/15 0.03 m³ 0.06 - - - - - -
3 Ring Balk 15/15 0.26 m³ 0.56 - - - - - -
4 Ring gewel 15/15 dan konsol beton 15/15 0.32 m³ 0.69 - - - - - -

IV. PEKERJAAN RANGKA ATAP


1 Kuda-kuda baja ringan (galvalum bentang 7m) 139.73 m² 14.17 - - - - - -
2 Kuda-kuda baja ringan (galvalum 50%) 118.54 m² 12.02 - - - - - -
2 Listplank kalsiplank 8mm / 30 cm 47.70 m¹ 1.70 - - - - - -

V. PEKERJAAN ATAP
1 Atap genteng beton (lama) 139.73 m² 1.38 - - - - - -
2 Atap genteng beton warna 237.08 m² 14.29 - - - - - -
3 Genteng bubungan beton warna 26.70 m' 1.40 - - - - - -
4 Plesteran kompres L = 10 cm (Akhiran genting) 56.00 m' 0.65 - - - - - -

VI. PEKERJAAN PLAFOND


1 Plafond calsiboard 4mm + rangka metal hollow 261.00 m² 12.16 - - - - - -

VII. PEKERJAAN PENGECATAN


1 Pengecatan dinding 521.00 m² 5.92 - - - - - -
2 Pengecetan plafond 261.00 m² 2.97 - - - - - -
3 Pengecatan kayu 111.96 m² 2.61 - - - - - -

VIII. PEKERJAAN LANTAI


1 Keramik lantai 30 x 30 ( tambal sulam 1kelas) 31.50 m² 1.82 - - - - - -
2 Keramik lantai 40 x 40 150.00 m² 9.21 - - - - - -
3 Keramik dinding R.Lab 25 x 40 92.16 m² 6.87 - - - - - -
4 List keramik 76.80 m' 3.58 - - - - - -

IX. PEKERJAAN INSTALASI LISTRIK


1 Lampu SL 14 watt 12.00 bh 0.36 - - - - - -
2 Lampu SL 8 watt (teras) 3.00 bh 0.08 - - - - - -
3 Saklar ganda 4.00 bh 0.04 - - - - - -
4 Saklar tunggal 5.00 bh 0.04 - - - - - -
5 Stop kontak + instalasi 5.00 bh 0.62 - - - - - -
6 Instalasi titik lampu 15.00 ttk 1.64

X. PEKERJAAN KACA
1 Kaca mati t=5 mm (yg pecah) 3.36 m² 0.21 - - - - - -

JUMLAH 100.00 - 2.95 2.95


Jumlah dana yang digunakan sampai dengan minggu ini ( minggu ke 1 ) Rp 20,300,000.00 2.95 %
REKAPITULASI 2
RENCANA ANGGARAN BIAYA OK

KEGIATAN : PENGADAAN SARANA PRASARANA


PEKERJAAN : PERENCANAAN SMP KABUPATEN BANGKALAN
LINGKUP PEKERJAAN : REHABILITASI 3 RUANG BELAJAR SMPN 1 KLAMPIS
LOKASI : SMPN 1 KLAMPIS KEC. KLAMPIS KAB. BANGKALAN

NO. URAIAN PEKERJAAN JUMLAH HARGA

I (2) ###
II PEKERJAAN TANAH ###
III PEKERJAAN PASANGAN/PLESTERAN ###
IV PEKERJAAN BETON ###
V PEKERJAAN RANGKA ATAP ###
VI PEKERJAAN ATAP ###
VII PEKERJAAN KUSEN PINTU DAN JENDELA ###
VIII PEKERJAAN PLAFOND ###
IX PEKERJAAN PENGECATAN/PLAMIRAN ###
X PEKERJAAN LANTAI ###
XI PEKERJAAN KUNCI + PENGGANTUNG ###
XII PEKERJAAN INSTALASI LISTRIK ### ###
XIII PEKERJAAN KACA ###

JUMLAH ### ###


DIBULATK ### ###

TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

HANAF I H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 1 Kelampis
Kec. Kelampis Kab. Bangkalan

IMAM SYAFII, S.Pd, MPd


NIP. 19680228 199401 1 003

LAPORAN MINGGUAN
Minggu ke : 1 ( Satu )
Pekerjaan : REHABILITASI 2 RUANG KELAS SMPN 1 KLAMPIS Tanggal : 5 Oktob. s/d 10 Oktober 2015
Nama Sekolah : SMPN 1 KLAMPIS Bulan : Oktober 2015
Lokasi : Kec. Kedamean Kab. Gresik Dana diterima tangal : 29 Oktober 2015
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%) Komulatif (%)
% Prestasi Rerata Prestasi Rerata Prestasi Rerata
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11)
I. PEKERJAAN PERSIAPAN (6)/100x(5) (8)/100x(5) (6)+(8) (7)+(9)
1 Pembongkaran kosen 12.00 bh 0.20 - - 100 0.20 100.00 0.20
2 Penetelan plesteran 12.00 m² 0.08 - - 100 0.08 100.00 0.08
3 Pembersihan akhir pekerjaan 1.00 ls 0.07 - - - - - -

II. PEKERJAAN TANAH


1 Galian tanah 2.16 m³ 0.04 - - - - - -
2 Urugan pasir bawah pondasi t=10cm 0.36 m³ 0.03 - - - - - -
4 Urugan tanah kembali 1.08 m³ 0.01 - - - - - -

III. PEKERJAAN PASANGAN/PLESTERAN


1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 42.79 m² 1.24 - - - - - -
2 Plesteran 1Pc : 5Ps 85.57 m² 1.19 - - - - - -
3 Benangan 308.80 m' 1.20 - - - - - -

IV. PEKERJAAN BETON


1 Lantai kerja bawah pondasi 1:3:5 t=5cm 0.18 m³ 0.05 - - - - - -
2 Pondasi beton stempat 60 x 60 x 15cm 0.54 m³ 0.70 - - - - - -
3 Kolom teras 15/15 0.79 m³ 1.02 - - - - - -
4 Balok beton 15/20 1.50 m³ 1.95 - - - - - -
5 Kolom beon 15/20 2.40 m³ 3.12 - - - - - -
6 Kolom praktis 15/15 0.24 m³ 0.31 - - - - - -
5.65
V. PEKERJAAN RANGKA ATAP
1 Kuda-kuda baja ringan (galvalum 75mm) (betang 370.11 m² 25.51 - - - - - -
2 Lisplank kalsiplank 8mm / 30 cm 77.90 m¹ 1.66 - - - - - -

VI. PEKERJAAN ATAP


1 Atap genteng Karang Penang (baru bg. depan) 202.80 m² 5.36 - - - - - -
2 Atap genteng (lama bg. belakang) 167.31 m² 0.99 - - - - - -
3 Genteng bubungan Karang penang 25.35 m' 0.80 - - - - - -
4 Plesteran kompres L = 10 cm (Akhiran genting) 29.20 m' 0.20 - - - - - -

VII. PEKERJAAN KUSEN PINTU DAN JENDELA


1 Kusen kayu kempas/mahoni 6/15 1.28 m³ 4.81 - - - - - -
2 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 8.69 m² 1.76 - - - - - -
3 Jalusi kayu kempas/mahoni 3/5 16.61 m² 2.35 - - - - - -
4 Daun Jendela kaca kayu kempas/mahoni 3/10 11.52 m² 1.59 - - - - - -

VIII. PEKERJAAN PLAFOND


1 Plafond calsiboard 4mm + rangka kayu 4/6 304.20 m² 8.49 - - - - - -

IX. PEKERJAAN PENGECATAN/PLAMIRAN


1 Pengecatan dinding 598.50 m² 4.07 - - - - - -
2 Pengecatan plafond 304.20 m² 2.07 - - - - - -
3 Pengecatan kayu 206.70 m² 2.88 - - - - - -

X. PEKERJAAN LANTAI
1 Keramik lantai 40 x 40 240.00 m² 8.82 - - - - - -
2 Keramik dinding 25 x 40 129.80 m² 5.80 - - - - - -
3 Keramik kolom 25 x 40 6.40 m² 0.29 - - - - - -
4 List keramik 119.00 m' 3.32 - - - - - -

XI. PEKERJAAN KUNCI + PENGGANTUNG


1 Kunci pintu 2 x putar 3.00 bh 0.14 - - - - - -
2 Engsel Pintu 18.00 bh 0.14 - - - - - -
3 Engsel Jendela 16.00 bh 0.09 - - - - - -
4 Grendel tanam 3.00 bh 0.07 - - - - - -
5 Grendel Jendela 16.00 bh 0.08 - - - - - -
6 Hag Angin 16.00 bh 0.09 - - - - - -

XII. PEKERJAAN INSTALASI LISTRIK


1
Lampu SL 14 watt 12.00 bh 0.22 - - - - - -
2
Lampu SL 8watt (teras) 3.00 bh 0.05 - - - - - -
3
Saklar ganda 3.00 bh 0.02 - - - - - -
4
Saklar tunggal 3.00 bh 0.01 - - - - - -
5 Stop kontak + instalasi 3.00 bh 0.22 - - - - - -
6 Instalasi titik lampu 15.00 ttk 0.98 - - - - - -

XIII. PEKERJAAN KACA


1 Kaca bening t=5 mm 27.10 m² 1.00 - - - - - -

JUMLAH 95.07 - 0.28 -


Jumlah dana yang digunakan sampai dengan minggu ini ( minggu ke 1 ) Rp 20,300,000.00 - %
3
REKAPITULASI OK
ENCANA ANGGARAN BIAYA OK
: PENGADAAN SARANA PRASARANA
KEGIATAN : PERENCANAAN SMP KABUPATEN BANGKALAN
PEKERJAAN : REHABILITASI 2 RUANG BELAJAR SMPN 3 SATAP KOKOP
LINGKUP PEKERJAAN : SMPN 3 SATAP KOKOP KEC. KOKOP KAB. BANGKALAN
LOKASI
URAIAN PEKERJAAN JUMLAH HARGA
NO.

PEKERJAAN PERSIAPAN ###


I PEKERJAAN TANAH ###
II PEKERJAAN PASANGAN/PLESTERAN ###
III PEKERJAAN BETON ###
IV PEKERJAAN RANGKA ATAP ###
V PEKERJAAN ATAP ###
VI PEKERJAAN KUSEN PINTU DAN JENDELA ###
VII PEKERJAAN PLAFOND ###
VIII PEKERJAAN PENGECATAN/PLAMIRAN ###
IX PEKERJAAN LANTAI ###
X PEKERJAAN KUNCI + PENGGANTUNG ###
XI PEKERJAAN INSTALASI LISTRIK ###
XII PEKERJAAN KACA ###
XIII

JUMLAH ### ###


DIBULATK ### ###

TERBILANG : ( SERATUS DELAPAN PULUH TIGA JUTA RUPIAH )

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 3 Satap Kokop
Kec. Kokop Kab. Bangkalan

IHSANUDIN, S.Pd
NIP. 19700109 199104 1 001
LAPORAN MINGGUAN
Minggu ke : 1 ( Satu )
Pekerjaan : REHABILITASI 2 RUANG BELAJAR SMPN 3 SATAP KOKOP Tanggal : 5 Oktob. s/d 10 Oktober 2015
Nama Sekolah : SMPN 3 SATAP KOKOP KEC. KOKOP KAB. BANGKALAN Bulan : Oktober 2015
Lokasi : KEC. KOKOP KAB. BANGKALAN Dana diterima tangal : 29 Oktober 2015
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%) Komulatif (%)
% Prestasi Rerata Prestasi Rerata Prestasi Rerata
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11)
(6)/100x(5) (8)/100x(5) (6)+(8) (7)+(9)

I. PEKERJAAN PERSIAPAN
1 Pembongkaran atap + rangka 260.00 m² 1.70 - 100 1.70 100.00 1.70
2 Pembongkaran kosen 12.00 bh 0.32 - 100 0.32 100.00 0.32
3 Pembongkaran dinding 61.75 m² 0.65 - 100 0.65 100.00 0.65
4 Pembersihan akhir pekerjaan 1.00 ls 0.11 - - - - -

II. PEKERJAAN TANAH


1 Galian tanah 1.51 m³ 0.05 - 100 0.05 100.00 0.05
2 Urugan pasir bawah pondasi t=10cm 0.25 m³ 0.03 - 100 0.03 100.00 0.03
4 Urugan tanah kembali 0.76 m³ 0.01 - 50 0.00 50.00 0.00

III. PEKERJAAN PASANGAN/PLESTERAN


1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 91.82 m² 4.29 - - - - -
2 Plesteran 1Pc : 5Ps 183.63 m² 4.10 - - - - -
3 Benangan 173.00 m' 1.08 - - - - -

IV. PEKERJAAN BETON `


1 Lantai kerja bawah pondasi 1:3:5 t=5cm 0.31 m³ 0.15 - - - - -
2 Pondasi beton stempat 60 x 60 x 15cm 0.38 m³ 0.79 - - - - -
3 Kolom teras 15/15 0.47 m³ 0.99 - - - - -
4 Balok beton 15/20 1.07 m³ 2.23 - - - - -
5 Kolom struktur 15/25 1.26 m³ 2.64 - - - - -
6 Ring balk 15/15 0.56 m³ 1.17 - - - - -

V. PEKERJAAN RANGKA ATAP


1 Kuda-kuda baja ringan (galvalum 75mm) 256.39 m² 28.43 - - - - -
2 Lisplank kalsiplank 8mm / 30 cm 65.20 m¹ 2.24 - - - - -

VI. PEKERJAAN ATAP


1 Atap genteng Karang Penang (baru bg depan) 190.62 m² 8.10 - - - - -
2 Atap genteng (lama bg belakang) 111.26 m² 1.06 - - - - -
3 Genteng bubungan Karang penang 19.35 m' 0.98 - - - - -
4 Plesteran kompres L = 10 cm (Akhiran genting) 26.50 m' 0.30 - - - - -

VII. PEKERJAAN KUSEN PINTU DAN JENDELA


1 Kusen kayu aluminium 4" 95.76 m' 5.81 - - - - -
2 Daun Pintu kaca aluminium 4.00 bh 4.22 - - - - -
3 Daun Jendela kaca aluminium 8.00 bh 2.11 - - - - -

VIII. PEKERJAAN PLAFOND


1 Plafond calsiboard 4mm + rangka hollow 201.24 m² 9.03 - - - - -

IX. PEKERJAAN PENGECATAN/PLAMIRAN


1 Pengecatan dinding depan 54.00 m² 0.59 - - - - -
2 Pelamiran dinding 344.50 m² 1.76 - - - - -
3 Plamiran plafond 201.24 m² 1.03 - - - - -
4 Pengecatan kayu 19.56 m² 0.44 - - - - -

X. PEKERJAAN LANTAI
1 Keramik lantai 40 x 40 162.00 m² 9.58 - - - - -
2 Keramik kolom 20 x 40 (motif) 5.60 m² 0.40 - - - - -

XI. PEKERJAAN KUNCI + PENGGANTUNG


1 Kunci pintu 2 x putar 2.00 bh 0.15 - - - - -
2 Engsel Pintu 12.00 bh 0.15 - - - - -
3 Engsel Jendela 16.00 bh 0.14 - - - - -
4 Grendel tanam 2.00 bh 0.08 - - - - -
5 Grendel Jendela 16.00 bh 0.12 - - - - -
6 Hag Angin 16.00 bh 0.15 - - - - -

XII PEKERJAAN INSTALASI LISTRIK


1 Lampu SL 14 watt 8.00 bh 0.23 - - - - -
2 Lampu SL 8watt (teras) 2.00 bh 0.05 - - - - -
3 Saklar ganda 2.00 bh 0.02 - - - - -
4 Saklar tunggal 2.00 bh 0.02 - - - - -
5 Stop kontak + instalasi 2.00 bh 0.24 - - - - -
6 Instalasi titik lampu 10.00 ttk 1.06 - - - - -

XIII. PEKERJAAN KACA


1 Kaca mati t=5 mm 20.68 m² 1.22 - - - - -

JUMLAH 100.00 - 2.75 2.75


Jumlah dana yang digunakan sampai dengan minggu ini ( minggu ke 1 ) Rp 5,201,000.00 2.75 %

Mengetahui Menyetujui Bangkalan, 2018


SMPN 3 Satap Kokop Panitia Pembangunan Sekolah Dibuat oleh
Kec. Kokop Kab. Bangkalan Fasilitator / Perencana
Selaku Penanggung Jawab

IHSANUDIN, S.Pd SUHAERI H. SUBADRIH, ST, MT


NIP. 19700109 199104 1 001

REKAPITULASI
ENCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI

NO.

I
II
III
IV
V
VI
VII
VIII
IX
X 4
XI OK
XII LAMA
XIII : PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 1 TRAGAH
: SMPN 1 TRAGAH KEC. TRAGAH KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA

TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )
PEKERJAAN PERSIAPAN ###
PEKERJAAN TANAH ###
PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA #DIV/0!
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###

JUMLAH #DIV/0! ###


DIBULATK #DIV/0! #DIV/0!

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

YUNIZAR AN NATSIRUL YUSUF H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 1 Tragah
Kec. Tragah Kab. Bangkalan
Drs. AMIRULLAH, MM
NIP. 19581217 198603 1 011

NO
1
I.
1
2
3
4

II.
1
2
4

III.
1
2
3

IV.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran atap + rangka 377.00 m² ### ###
V. Pembongkaran kusen 4.00 bh ### ###
1 Penetelan plesteran 159.60 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VI. PEKERJAAN TANAH ###
1 Galian tanah 2.16 m³ ### ###
2 Urugan pasir bawah pondasi t=10cm 0.36 m³ ### ### #DIV/0!
3 Urugan tanah kembali 1.08 m³ ### ###
4 ###
PEKERJAAN PASANGAN/PLESTERAN
VII. Pasangan 1/2 bata camp. 1 Pc : 5 Ps 7.20 m² ### ### ###
1 Plesteran 1Pc : 5Ps 14.40 m² ### ###
2 Benangan 24.00 m' ### ###
3 ###
PEKERJAAN BETON
VIII. Lantai kerja bawah pondasi 1:3:5 t=5cm 0.18 m³ ### ###
1 Pondasi beton stempat 60 x 60 x 15cm 0.54 m³ ### ###
Kolom teras 15/15 0.79 m³ ### ###
IX. Balok beton 15/20 1.71 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ ### ###
X. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Penang (baru) 382.73 m² ### ###
3 Atap genteng (lama bg. belakang) 170.10 m² ### ###
4 Genteng bubungan Karang penang 28.35 m' ### ###
Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' ### ###
XI. ###
1 PEKERJAAN KUSEN PINTU DAN JENDELA
2 Kusen kayu kempas/mahoni 6/15 #DIV/0! m³ Rp - #DIV/0!
3 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 8.61 m² Rp - Rp - #DIV/0!
4 Daun Jendela kaca kayu kempas/mahoni 3/10 8.40 m² Rp - Rp - ###
5 #DIV/0!
6 PEKERJAAN PLAFOND
Plafond calsiboard 4mm + rangka kayu 4/6 294.84 m² ### ###
XII ###
1 PEKERJAAN PENGECATAN
2 Pengecatan dinding (3 Ruang kelas) 598.50 m² ### ###
3 Pengecatan plafond 294.84 m² ### ###
4 Pengecatan kayu 206.70 m² ### ###
5 ###
6 PEKERJAAN LANTAI #DIV/0!
Keramik lantai 40 x 40 245.70 m² ### ###
XIII. Keramik dinding 25 x 40 ( 3 R.kelas + teras ) 159.60 m² ### ###
1 List keramik dinding 7cm 110.40 m² ### ###
Keramik kolom 25 x 40 12.00 m² ### ###
### 140
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Engsel Pintu 18.00 bh ### ###
Engsel Jendela 16.00 bh ### ###
Grendel pintu 3.00 bh ### ###
Grendel Jendela 16.00 bh ### ###
Hag Angin 16.00 bh ### ###
###
REKAPITULASI
PEKERJAAN INSTALASI LISTRIK
ENCANA ANGGARAN
Lampu BIAYA
SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
KEGI Saklar ganda 3.00 bh ### ###
PEKE Saklar tunggal 3.00 bh ### ###
LING Stop kontak + instalasi 3.00 bh ### ###
LOKA Instalasi titik lampu 15.00 ttk ### ###
###
NO. PEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 11.14 m² ### ###
###
I
II
III
IV
V
VI
VII
VIII
IX
X 4
XI OK
XII BARU
XIII : PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 1 TRAGAH
: SMPN 1 TRAGAH KEC. TRAGAH KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA

TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )
PEKERJAAN PERSIAPAN ###
PEKERJAAN TANAH ###
PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA Rp -
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###

JUMLAH ### ###


DIBULATK ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

YUNIZAR AN NATSIRUL YUSUF H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 1 Tragah
Kec. Tragah Kab. Bangkalan

Drs. AMIRULLAH, MM
NIP. 19581217 198603 1 011

NO
1
I.
1
2
3
4

II.
1
2
4

III.
1
2
3

IV.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran atap + rangka 377.00 m² ### ###
V. Pembongkaran kusen 8.00 bh ### ###
1 Penetelan plesteran 249.00 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VI. PEKERJAAN TANAH ###
1 Galian tanah 2.16 m³ ### ###
2 Urugan pasir bawah pondasi t=10cm 0.36 m³ ### ### ###
3 Urugan tanah kembali 1.08 m³ ### ###
###
VII. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 24.02 m² ### ### ###
2 Plesteran 1Pc : 5Ps 48.03 m² ### ###
3 Benangan 168.00 m' ### ###
4 ###
PEKERJAAN BETON
VIII. Lantai kerja bawah pondasi 1:3:5 t=5cm 0.18 m³ ### ###
1 Pondasi beton stempat 60 x 60 x 15cm 0.54 m³ ### ###
Kolom teras 15/15 0.79 m³ ### ###
IX. Balok beton 15/20 1.56 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ ### ###
X. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Penang (baru) 382.73 m² ### ###
3 Genteng bubungan Karang penang 28.35 m' ### ###
4 Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' ### ###
5 ###
PEKERJAAN KUSEN PINTU DAN JENDELA
XI. Kusen kayu kempas/mahoni 6/15 1.09 m³ Rp - Rp -
1 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 8.61 m² Rp - Rp - ###
2 Jalusi kayu kempas/mahoni 3/12 7.20 m² Rp - Rp -
3 Daun Jendela kaca kayu kempas/mahoni 3/10 6.72 m² Rp - Rp - ###
4 Rp -
5 PEKERJAAN PLAFOND
6 Plafond calsiboard 4mm + rangka kayu 4/6 294.84 m² ### ###
###
XII PEKERJAAN PENGECATAN
1 Pengecatan dinding (3 Ruang kelas) 598.50 m² ### ###
2 Pengecatan plafond 294.84 m² ### ###
3 Pengecatan kayu 206.70 m² ### ###
4 ###
5 PEKERJAAN LANTAI ###
6 Keramik lantai 40 x 40 245.70 m² ### ###
Keramik dinding 25 x 40 ( 3 R.kelas + teras ) 173.40 m² ### ###
XIII. List keramik dinding 7cm 132.90 m² ### ###
1 Keramik kolom 25 x 40 12.00 m² ### ###
Keramik dinding 25 x 40 ( 3 R.kelas teras saja ) 75.60 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Engsel Pintu 18.00 bh ### ###
Engsel Jendela 16.00 bh ### ###
Grendel pintu 3.00 bh ### ###
Grendel Jendela 16.00 bh ### ###
Hag Angin 16.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
REKAPITULASI
Lampu SL 8watt (teras) 3.00 bh ### ###
ENCANA ANGGARAN BIAYA
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
KEGI Stop kontak + instalasi 3.00 bh ### ###
PEKE Instalasi titik lampu 15.00 ttk ### ###
LINGKUP PEKERJAAN ###
LOKAPEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 11.14 m² ### ###
NO. ###

I
II
III
IV
V
VI
VII
VIII
IX
X 5
XI OK
XII LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 MODUNG
: SMPN 2 MODUNG KEC. MODUNG KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA


TERBILANG : ( DUA RATUS LIMA JUTA ENAM RATUS RIBU RUPIAH )

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA Rp -
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN/PLAMIRAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ### ###
PEKERJAAN KACA ###

JUMLAH ### ###


DIBULAT ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

M. MAHRI, S.Ag H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Modung
Kec. Modung Kab. Bangkalan

A S U R, M.Pd
NIP. 19610117 198403 1 008

NO
1
I.
1
2

II.
1
2
3

III.
1
2
3

IV.
1
2
Lembar. 2
V. JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
1 2 3 4 5
2 PEKERJAAN PERSIAPAN
3 Pembongkaran atap + rangka 406.00 m² ### ###
4 Pembersihan akhir pekerjaan 1.00 ls ### ### ###
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 98.93 m² ### ###
2 Plesteran 1Pc : 5Ps 197.87 m² ### ###
3 Benangan 166.56 m' ### ###
###
VII. PEKERJAAN BETON
1 Kolom teras 15/15 0.41 m³ ### ###
Balok teras 15/20 1.24 m³ ### ###
VIII. Ring balk gewel 15/15 0.98 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 396.90 m² ### ###
4 Lisplank kalsiplank 8mm / 30 cm 85.70 m¹ ### ###
5 ###
PEKERJAAN ATAP
IX. Pasang atap genteng karang p enang (baru 5%) 19.85 m² ### ###
1 Pasang atap genteng (lama) 377.06 m² ### ###
Genteng bubungan karang penang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 29.00 m' ### ###
1 ###
2 PEKERJAAN KUSEN PINTU DAN JENDELA
3 Kusen kayu kempas/mahoni 6/12 0.46 m³ Rp - Rp -
4 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 6.72 m² Rp - Rp -
5 Daun Jendela kaca kayu kempas/mahoni 3/10 5.04 m² Rp - Rp -
6 Rp -
PEKERJAAN PLAFOND ###
XI. Plafond calsiboard 4mm + rangka hollow 340.20 m² ### ###
1 ###
2 PEKERJAAN PENGECATAN/PLAMIRAN
3 Pengecatan dinding (depan) 66.85 m² ### ###
4 Pelamiran dinding 430.33 m² ### ###
5 Pelamiran plafond 340.20 m² ### ### ###
6 Pengecatan kayu 206.70 m² ### ###
Cat genteng 396.90 m² ### ###
XII. ###
1 PEKERJAAN LANTAI
Lantai rabat 216.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 4.00 bh ### ###
Engsel Pintu 21.00 bh ### ###
Engsel Jendela 24.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Grendel Jendela 12.00 bh ### ### ###
Hag Angin 24.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 14.00 bh ### ###
Lampu SL 8watt (teras) 4.00 bh ### ###
Saklar ganda 7.00 bh ### ###
REKAPITULASI
Saklar tunggal 3.00 bh ### ###
ENCANA ANGGARAN BIAYA
Stop kontak + instalasi 4.00 bh ### ###
Instalasi titik lampu 18.00 bh ### ###
KEGIATAN ###
PEKE PEKERJAAN KACA
LING Kaca mati t=5 mm 14.49 m² ### ###
LOKASI ###

NO.

I
II
III
IV
V
VI
VII
VIII
IX
X 5
XI OK
XII BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 MODUNG
: SMPN 2 MODUNG KEC. MODUNG KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA


TERBILANG : ( DUA RATUS LIMA JUTA ENAM RATUS RIBU RUPIAH )

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA Rp -
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN/PLAMIRAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ### -
PEKERJAAN KACA ###

JUMLAH ### ###


DIBULAT ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

M. MAHRI, S.Ag H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Modung
Kec. Modung Kab. Bangkalan

A S U R, M.Pd
NIP. 19610117 198403 1 008

NO
1
I.
1
2

II.
1
2
3

III.
1
2
3

IV.
1
2
Lembar. 2
V. JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
1 2 3 4 5
2 PEKERJAAN PERSIAPAN
3 Pembongkaran atap + rangka 406.00 m² ### ###
4 Pembersihan akhir pekerjaan 1.00 ls ### ### ###
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 98.93 m² ### ###
2 Plesteran 1Pc : 5Ps 197.87 m² ### ###
3 Benangan 166.56 m' ### ###
###
VII. PEKERJAAN BETON
1 Kolom teras 15/15 0.41 m³ ### ###
Balok teras 15/20 1.24 m³ ### ###
VIII. Ring balk gewel 15/15 0.98 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 396.90 m² ### ###
4 Lisplank kalsiplank 8mm / 30 cm 85.70 m¹ ### ###
5 ###
PEKERJAAN ATAP
IX. Pasang atap genteng karang p enang (baru 5%) 19.85 m² ### ###
1 Pasang atap genteng (lama) 377.06 m² ### ###
Genteng bubungan karang penang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 29.00 m' ### ###
1 ###
2 PEKERJAAN KUSEN PINTU DAN JENDELA
3 Kusen kayu kempas/mahoni 6/12 0.46 m³ Rp - Rp -
4 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 6.72 m² Rp - Rp -
5 Daun Jendela kaca kayu kempas/mahoni 3/10 5.04 m² Rp - Rp -
6 Rp -
PEKERJAAN PLAFOND ###
XI. Plafond calsiboard 4mm + rangka kayu 4/6 340.20 m² ### ###
1 ###
2 PEKERJAAN PENGECATAN/PLAMIRAN
3 Pengecatan dinding (depan) 66.85 m² ### ###
4 Pelamiran dinding 430.33 m² ### ###
5 Pelamiran plafond 340.20 m² ### ### ###
6 Pengecatan kayu 206.70 m² ### ###
Cat genteng 396.90 m² ### ###
XII. ###
1 PEKERJAAN LANTAI
Lantai rabat 216.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 4.00 bh ### ###
Engsel Pintu 21.00 bh ### ###
Engsel Jendela 24.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Grendel Jendela 12.00 bh ### ### ###
Hag Angin 24.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 14.00 bh ### ###
Lampu SL 8watt (teras) 4.00 bh ### ###
Saklar ganda 7.00 bh ### ###
REKAPITULASI
Saklar tunggal 3.00 bh ### ###
ENCANA ANGGARAN BIAYA
Stop kontak + instalasi 4.00 bh ### ###
Instalasi titik lampu 18.00 bh ### ###
KEGIATAN ###
PEKE PEKERJAAN KACA
LING Kaca mati t=5 mm 14.49 m² ### ###
LOKASI ###

NO.

I
II
III
IV
V
VI
VII
VIII
IX
X 6
XI OK
LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 2 LABANG
: SMPN 2 LABANG KEC. LABANG KAB. BANGKALAN

TERBILANG : ( DUA RATUS SEMBILAN


URAIAN
PULUHPEKERJAAN
EN JUMLAH HARGA

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN Rp -
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
PEKERJAAN TANGGA DEPAN PINTU ###

JUMLAH ### ###


DIBULATK ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
ACHMAD TAUFIK HEYKAL, A.Sg H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Labang
Kec. Labang Kab. Bangkalan

Drs. HARTONO, M.Pd


NIP. 19690126 199802 1 003

NO
1
I.
1
2
3
4
5

II.
1

III.
1
2

IV.
1
2
3 Lembar. 2
JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
V. 2 3 4 5
1 PEKERJAAN PERSIAPAN ###
Pembongkaran atap + rangka 377.00 m² Rp - Rp -
VI. Pembongkaran kosen 1.00 bh ### ###
1 Pembongkaran dinding 6.00 m² ### ###
2 Penetelan plesteran 139.74 m² ### ###
3 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VII. PEKERJAAN PASANGAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps (nyepit kuda2) 30.91 m² Rp - Rp -
2 Rp -
3 PEKERJAAN RANGKA ATAP ###
4 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ Rp - Rp -
VIII. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Pilang (baru) 382.73 m² ### ###
Genteng bubungan Karang pilang 28.35 m' ### ###
IX. Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' Rp - Rp -
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsiboard 4mm + rangka hollow 354.38 m² Rp - Rp -
4 Rp -
5 PEKERJAAN PENGECATAN
6 Pengecatan dinding 598.50 m² Rp - Rp - ###
Pengecatan plafond 354.38 m² Rp - Rp -
X. Pengecatan kayu 274.60 m² Rp - Rp -
1 Rp -
PEKERJAAN LANTAI
XI. Keramik lantai 40 x 40 243.00 m² ### ###
1 Keramik dinding 25 x 40 139.74 m² ### ###
2 List keramik 102.00 m' ### ###
3 Keramik kolom 20 x 40 10.80 m² ### ###
4 ###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA ###
Kaca mati t=5 mm (yg pecah) 4.22 m² ### ###
###
PEKERJAAN TANGGA DEPAN PINTU
Pasangan batu gunung 2.88 m³ ### ###
Plesterran trasram 7.68 m² ### ###
Keramik kasar 40 x 40 7.04 m² ### ###
Urugan pasir 4.96 m³ ### ###
REKAPITULASI ###
ENCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI

NO.

I
II
III
IV
V
VI
VII
VIII
IX
X 6
XI OK
XII BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 2 LABANG
: SMPN 2 LABANG KEC. LABANG KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA


TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
PEKERJAAN TANGGA DEPAN PINTU ###

JUMLAH ### ###


DIBULATK ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

ACHMAD TAUFIK HEYKAL, A.Sg H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Labang
Kec. Labang Kab. Bangkalan

Drs. HARTONO, M.Pd


NIP. 19690126 199802 1 003

NO
1
I.
1
2
3
4
5

II.
1
2
3

III.
1

IV.
1
2 Lembar. 2
JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
V. 2 3 4 5
1 PEKERJAAN PERSIAPAN ###
2 Pembongkaran atap + rangka 377.00 m² Rp - Rp -
3 Pembongkaran kosen 1.00 bh ### ###
Pembongkaran dinding 6.00 m² ### ###
VI. Penetelan plesteran 127.50 m² ### ###
1 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VII. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps (nyepit kuda2) 22.43 m² Rp - Rp - -
2 Plesteran 1Pc : 5Ps 16.20 m² ### ###
3 Benangan 32.00 m' ### ###
###
VIII. PEKERJAAN BETON
1 Ring balk gewel 15/15 0.40 m³ ### ###
2 ###
3 PEKERJAAN RANGKA ATAP ###
4 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ Rp - Rp -
IX. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Pilang (baru) 382.73 m² ### ###
Genteng bubungan Karang pilang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' Rp - Rp -
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsiboard 4mm + rangka hollow 354.38 m² Rp - Rp -
4 Rp -
5 PEKERJAAN PENGECATAN
6 Pengecatan dinding 598.50 m² Rp - Rp - ###
Pengecatan plafond 354.38 m² Rp - Rp -
XI. Pengecatan kayu 274.60 m² Rp - Rp -
1 Rp -
PEKERJAAN LANTAI
XII. Keramik lantai 40 x 40 243.00 m² ### ###
1 Keramik dinding 25 x 40 127.50 m² ### ###
2 List keramik 102.00 m' ### ###
3 Keramik kolom 20 x 40 10.80 m² ### ###
4 ###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Pintu harmonika 15.00 m² ### ### ###
### ###
PEKERJAAN INSTALASI LISTRIK ###
Lampu SL 14 watt 12.00 bh ### ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA ###
Kaca mati t=5 mm (yg pecah) 4.22 m² ### ###
###
PEKERJAAN TANGGA DEPAN PINTU 3.46
Pasangan batu gunung 2.88 m³ ### ###
Plesterran trasram 7.68 m² ### ###
Keramik kasar 40 x 40 7.04 m² ### ###
Urugan pasir 4.96 m³ ### ###
###
REKAPITULASI
ENCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI

NO.

I
II
III
IV
V
VI
VII
VIII
IX
X 7
OK
LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 KWANYAR
: SMPN 2 KWANYAR KEC. KWANYAR KAB. BANGKALAN
TERBILANG : ( SERATUS SEMBILAN PULUH TUJUH JUTA DELAPAN RATUS RIBU RUPIAH )
URAIAN PEKERJAAN JUMLAH HARGA

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN/PLESTERAN Rp -
PEKERJAAN KAYU ###
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
PEKERJAAN TEMPAT DUDUK ###

JUMLAH ### ###


DIBULAT ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

MOHAMMAD MUSTOFA ZAHRON, S.Pd H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Kwanyar
Kec. Kwanyar Kab. Bangkalan

RAHMAWATI, M.Pd
NIP. 19700703 199802 2 003

NO
1
I.
1
2
3
4

II.
1
2

III.
1

IV.
1

V.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran kusen 1.00 bh ### ###
VI. Pembongkaran dinding 15.00 m² ### ###
1 Penetelan plesteran 428.64 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 Ls ### ###
3 ###
4 PEKERJAAN PASANGAN/PLESTERAN ###
5 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 0.91 22.20 m² Rp - Rp -
6 Plesteran 1Pc : 5Ps 1.07 44.40 m² Rp - Rp -
Rp -
VII. PEKERJAAN KAYU
1 Lisplank kayu 3/30 cm 4.00 m¹ ### ###
2 ###
3 PEKERJAAN PLAFOND
4 Plafond calsi 1 x 1 + rangka kayu 12.00 m² Rp - Rp -
Rp -
VIII. PEKERJAAN PENGECATAN
1 Pengecatan dinding (3 kelas) 455.30 m² Rp - Rp -
2 Pengecatan plafond 319.00 m² Rp - Rp -
3 Pengecatan kayu 206.70 m² Rp - Rp - ###
4 Pengecatan kayu (Kantor) 214.39 m² Rp - Rp -
5 Rp -
6 PEKERJAAN LANTAI 162.00 ###
Keramik lantai 40 x 40 ( 2 R Kelas ) 5.67 126.00 m² ### ###
IX. Keramik lantai 40 x 40 ( Teras ) 1.62 36.00 m² ### ###
1 Keramik dinding 25 x 40 (dalam kelas + teras) 5.78 128.40 m² ### ###
Keramik kolom teras 25 x 40 1.01 22.40 m² ### ###
X. List keramik 1.64 327.80 m' ### ###
1 Keramik dinding 25 x 40 (dalam kantor+R.guru+ t 13.51 300.24 m² ### ###
2 451.04 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 3.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Hag Angin 60.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
REKAPITULASI
PEKERJAAN KACA
ENCANA ANGGARAN BIAYA
Kaca mati t=5 mm (yg pecah) 1.68 m² ### ###
###
KEGI PEKERJAAN TEMPAT DUDUK
PEKE Pasangan trasram 0.68 17.00 m² Rp - Rp -
LING Plat beton tempat duduk t=10 cm 0.53 1.02 m³ ### ###
LOKA Keramik tempat duduk 30 x 30 0.46 10.20 m² ### ###
Keramik dinding tempat duduk 25 x 40 1.84 40.80 m² ### ###
NO. 34.71 ###
0.86768 40.80

I
II
III
IV
V
VI
VII
VIII
IX
X 7
OK
BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 KWANYAR
: SMPN 2 KWANYAR KEC. KWANYAR KAB. BANGKALAN
TERBILANG : ( SERATUS SEMBILAN PULUH TUJUH JUTA DELAPAN RATUS RIBU RUPIAH )
URAIAN PEKERJAAN JUMLAH HARGA

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN/PLESTERAN Rp -
PEKERJAAN KAYU ###
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
PEKERJAAN TEMPAT DUDUK ###
JUMLAH ### ###
DIBULAT ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

MOHAMMAD MUSTOFA ZAHRON, S.Pd H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Kwanyar
Kec. Kwanyar Kab. Bangkalan

RAHMAWATI, M.Pd
NIP. 19700703 199802 2 003

NO
1
I.
1
2
3
4

II.
1
2

III.
1
2

IV.
1

V. Lembar. 2
1 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
2 2 3 4 5
3 PEKERJAAN PERSIAPAN
4 Pembongkaran kusen 1.00 bh ### ###
5 Pembongkaran dinding 15.00 m² ### ###
Penetelan plesteran 428.64 m² ### ###
VI. Pembersihan akhir pekerjaan 1.00 Ls ### ###
1 ###
2 PEKERJAAN PASANGAN/PLESTERAN ###
3 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 22.20 m² Rp - Rp -
4 Plesteran 1Pc : 5Ps 44.40 m² Rp - Rp -
5 Rp -
6 PEKERJAAN KAYU
Perbaikan daun pintu panil 4.00 bh ### ###
VII. Lisplank kayu 3/30 cm 4.00 m¹ ### ###
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsi 1 x 1 + rangka kayu 12.00 m² Rp - Rp -
4 Rp -
PEKERJAAN PENGECATAN
VIII. Pengecatan dinding (3 kelas) 439.90 m² Rp - Rp -
1 Pengecatan dinding (Kantor) 373.40 m² Rp - Rp -
2 Pengecatan plafond 319.00 m² Rp - Rp -
3 Pengecatan kayu 169.45 m² Rp - Rp - ###
4 Pengecatan kayu (Kantor) 197.69 m² Rp - Rp -
5 Rp -
6 PEKERJAAN LANTAI ###
Keramik lantai 40 x 40 ( 2 R Kelas ) 126.00 m² ### ###
IX. Keramik lantai 40 x 40 ( Teras ) 36.00 m² ### ###
1 Keramik dinding 25 x 40 (dalam kelas + teras) 128.40 m² ### ###
Keramik kolom teras 25 x 40 22.40 m² ### ###
X. List keramik 327.80 m' ### ###
1 Keramik dinding 25 x 40 (dalam kantor+R.guru+ teras) 300.24 m² ### ###
2 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 3.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Hag Angin 60.00 bh ### ###
Pintu harmonika 11.30 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK ###
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA
REKAPITULASI
Kaca mati t=5 mm (yg pecah) 1.68 m² ### ###
ENCANA ANGGARAN BIAYA ###
PEKERJAAN TEMPAT DUDUK
KEGI Pasangan trasram 17.00 m² Rp - Rp -
PEKE Plat beton tempat duduk t=10 cm 1.02 m³ ### ###
LING Keramik tempat duduk 30 x 30 10.20 m² ### ###
LOKA Keramik dinding tempat duduk 25 x 40 40.80 m² ### ###
###
NO.

I
II
III
IV
V
VI
VII
VIII
IX
8
OK

: PENGADAAN SARANA PRASARANA


: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 KOKOP
TERBILANG : ( SERATU : SMPN 2 KOKOP KEC. KOKOP KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN/PLESTERAN Rp -
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ### ###
PEKERJAAN KACA ###
PEKERJAAN TEMPAT DUDUK ###

JUMLAH ### ###


DIBULATK ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

BOSTOMI, S.Pd H. SUBADRIH, ST, MT


Mengetahui :
Kepala Sekolah
SMPN 2 Kokop
Kec. Kokop Kab. Bangkalan

MOHAMMAD TAUFIK, SPd


NIP. 19760326 200604 1 010
NO
1
I.
1
2

II.
1
2
3

III.
1

IV.
1
2
3

V. Lembar. 2
1 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
2 2 3 4 5
3 PEKERJAAN PERSIAPAN
4 Penetelan plesteran 317.46 m² ### ###
5 Pembersihan akhir pekerjaan 1.00 Ls Rp - Rp - #REF!
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 12.25 m² Rp - Rp -
5 Plesteran 1Pc : 5Ps 80.58 m² Rp - Rp -
6 Benangan 55.00 m' Rp - Rp -
7 Rp -
PEKERJAAN PLAFOND
VII. Plafond calsiboard 4mm + rangka kayu 15.00 m² Rp - Rp -
1 Rp -
2 PEKERJAAN PENGECATAN -
3 Pengecatan dinding 506.50 m² Rp - Rp -
4 Pengecatan plafond 352.00 m² Rp - Rp - #DIV/0!
5 Pengecatan kayu 275.60 m² Rp - Rp -
6 Rp -
PEKERJAAN LANTAI ###
VIII. Keramik lantai 40 x 40 243.00 m² ### ### 147.47
1 Keramik dinding 25 x 40 ( 3 R. Kelas + teras) 132.96 m² ### ###
List keramik 288.20 m' ### ###
IX. Keramik kolom 25 x 40 16.00 m² ### ### keramik tambal sulam
1 Keramik dinding 25 x 40 ( 5 R. Kelas bg. dalam) 184.50 m² ### ###
2 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 5.00 bh ### ###
Grendel Jendela 50.00 bh ### ###
Hag Angin 100.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 20.00 bh ### ###
Lampu SL 8watt (teras) 5.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 5.00 bh ### ###
Stop kontak + instalasi 5.00 bh ### ###
Instalasi titik lampu 25.00 ttk ### ###
###
PEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 2.53 m² ### ###
###
PEKERJAAN TEMPAT DUDUK
Pasangan trasram 14.70 m² Rp - Rp -
Plat beton tempat duduk t=10 cm 0.74 m³ ### ###
Keramik tempat duduk 30 x 30 7.35 m² ### ###
Keramik dinding tempat duduk 25 x 40 29.40 m² ### ###
###

BATAS
SMPN 2 SEPULU DR. AHMAD SABARUDIN, S.Pd, M.MPd
SMPN 1 KLAMPIS IMAM SYAFII, S.Pd, MPd
SMPN 2 KOKOP MOHAMMAD TAUFIK, SPd
SMPN 3 SATAP KOKOP IHSANUDIN, S.Pd
SMPN 1 TRAGAH Drs. AMIRULLAH, MM
SMPN 2 MODUNG A S U R, M.Pd
SMPN 2 LABANG Drs. HARTONO, M.Pd
SMPN 2 KWANYAR RAHMAWATI, M.Pd
SMPN TAHAL AMIN H. ABDULLAH, S.Pd
SMPN 1 MODUNG Drs. ALI MUSTOFA, M.Pd
SMPN 1 GALIS Drs. TAUFIKUR RAHMAN
SMPN 1 KOKOP BUDIONO, S.Pd, M.Pd
SMPN 2 KONANG ABDUL RASID, S.Ag, M.PdI
SMPN TAHAL AMIN H. ABDULLAH, S.Pd

SMPN 1 KWANYAR MOHAMMAD SADALI, S.Pd


SMPN 1 TANJUNG BUMI Drs. M. AGUS SUBAGIO, M.Pd
SMPN 1 BLEGA SRI ASTUTIK HANDAYANI, M.Pd
SMPN 1 LABANG SUPRIYO, S.Pd, SE, M.PdI

SMPN 1 KWANYAR KEC. KWANYAR KAB. BANGKALAN MOHAMMAD SADALI, S.Pd


SMPN 1 TANJUNG BUMI KEC. TANJUNG BUMI KAB. BANDrs. M. AGUS SUBAGIO, M.Pd
SMPN 1 BLEGA KEC. BLEGA KAB. BANGKALAN SRI ASTUTIK HANDAYANI, M.Pd
SMPN 2 TANAH MERAH KEC. T KOMARIYAH, S.Pd, M.MPd
SMPN TAHAL AMIN H. ABDULLAH, S.Pd
SMPN 1 GEGER Hj. SRI MULYATI, S.Pd, M.MPd
SMPN 1 GALIS
SMPN 1 TANAH MERAH DYAH CHANDRAWATI, S.Pd
SMPN 2 GEGER SITI YAUMAH, S.Pd
SMPN 4 SATAP TANAH MERAHMOH. YUSUF, S.Pd
SMPN 1 KONANG Drs. ANANG ISKANDAR, MM
1 2 3

Rp 12,375.00 Rp 1,769,625.00 0.97 100 0.97 100 0.97 100


Rp 7,500.00 Rp 1,761,750.00 0.97 100 0.97 100 0.97 100
Rp 20,000.00 Rp 1,843,200.00 1.01 100 1.01 100 1.01 100
Rp 200,000.00 Rp 200,000.00 0.11 - - - - -
Rp 5,574,575.00

Rp 88,586.67 Rp 1,638,853.33 0.90 - - 100 0.90 100


Rp 42,298.80 Rp 1,565,055.60 0.86 - - - - 100
Rp - Rp - - - - - - 100
Rp 3,203,908.93

Rp 3,912,550.00 Rp 234,753.00 0.13 - - - - -


Rp 3,962,550.00 Rp 114,121.44 0.06 - - - - -
Rp 3,962,550.00 Rp 1,027,092.96 0.56 - - - - -
Rp 3,962,550.00 Rp 1,255,335.84 0.69 - - - - -
Rp 2,631,303.24

Rp 185,000.00 Rp 25,849,125.00 14.17 - - - - -


Rp 185,000.00 Rp 21,929,437.50 12.02 - - - - -
Rp 65,000.00 Rp 3,100,500.00 1.70 - - - - -
Rp 50,879,062.50

Rp 18,000.00 Rp 2,515,050.00 1.38 - - - - -


Rp 110,000.00 Rp 26,078,250.00 14.29 - - - - -
Rp 95,820.00 Rp 2,558,394.00 1.40 - - - - -
Rp 21,149.40 Rp 1,184,366.40 0.65 - - - - -
Rp 32,336,060.40

Rp 85,000.00 Rp 22,185,000.00 12.16 - - - - -


Rp 22,185,000.00

Rp 20,740.00 Rp 10,805,637.48 5.92 - - - - -


Rp 20,740.00 Rp 5,413,140.00 2.97 - - - - -
Rp 42,450.00 Rp 4,752,702.00 2.61 - - - - -
Rp 20,971,479.48

Rp 105,250.00 Rp 3,315,375.00 1.82 - - - - -


Rp 112,000.00 Rp 16,800,000.00 9.21 - - - - -
Rp 136,075.00 Rp 12,540,672.00 6.87 - - - - -
Rp 85,000.00 Rp 6,528,000.00 3.58 - - - - -
Rp 39,184,047.00

Rp 55,000.00 Rp 660,000.00 0.36 - - - - -


Rp 50,000.00 Rp 150,000.00 0.08 - - - - -
Rp 20,000.00 Rp 80,000.00 0.04 - - - - -
Rp 15,000.00 Rp 75,000.00 0.04 - - - - -
Rp 225,000.00 Rp 1,125,000.00 0.62 - - - - -
Rp 200,000.00 Rp 3,000,000.00 1.64 - - - - -
Rp 5,090,000.00

Rp 112,125.00 Rp 376,964.25 0.21 - - - - -


Rp 376,964.25
1 2 3

Rp 50,000.00 Rp 600,000.00 0.20 100 0.20 100 0.20 100


Rp 20,000.00 Rp 240,000.00 0.08 100 0.08 100 0.08 100
Rp 200,000.00 Rp 200,000.00 0.07 - - - - -
Rp 1,040,000.00

Rp 58,500.00 Rp 126,360.00 0.04 - - 100 0.04 100


Rp 215,400.00 Rp 77,544.00 0.03 - - - - 100
Rp 16,110.00 Rp 17,398.80 0.01 - - - - 100
Rp 221,302.80

Rp 88,586.67 Rp 3,790,281.61 1.24 - - - - -


Rp 42,298.80 Rp 3,619,604.84 1.19 - - - - -
Rp 11,825.00 Rp 3,651,560.00 1.20 - - - - -
Rp 11,061,446.45

Rp 897,800.00 Rp 161,604.00 0.05 - - - - -


Rp 3,962,550.00 Rp 2,139,777.00 0.70 - - - - -
Rp 3,962,550.00 Rp 3,120,508.13 1.02 - - - - -
Rp 3,962,550.00 Rp 5,943,825.00 1.95 - - - - -
Rp 3,962,550.00 Rp 9,510,120.00 3.12 - - - - -
Rp 3,962,550.00 Rp 941,501.88 0.31 - - - - -
Rp 21,817,336.01

Rp 210,000.00 Rp 77,723,100.00 25.51 - - - - -


Rp 65,000.00 Rp 5,063,500.00 1.66 - - - - -
Rp 82,786,600.00

Rp 80,500.00 Rp 16,325,400.00 5.36 - - - - -


Rp 18,000.00 Rp 3,011,580.00 0.99 - - - - -
Rp 95,820.00 Rp 2,429,037.00 0.80 - - - - -
Rp 21,149.40 Rp 617,562.48 0.20 - - - - -
Rp 22,383,579.48

Rp 11,431,250.00 Rp 14,644,117.13 4.81 - - - - -


Rp 618,250.00 Rp 5,375,065.50 1.76 - - - - -
Rp 430,475.00 Rp 7,148,037.38 2.35 - - - - -
Rp 419,572.50 Rp 4,833,475.20 1.59 - - - - -
Rp 32,000,695.20

Rp 85,000.00 Rp 25,857,000.00 8.49 - - - - -


Rp 25,857,000.00

Rp 20,740.00 Rp 12,412,890.00 4.07 - - - - -


Rp 20,740.00 Rp 6,309,108.00 2.07 - - - - -
Rp 42,450.00 Rp 8,774,415.00 2.88 - - - - -
Rp 27,496,413.00

Rp 112,000.00 Rp 26,880,000.00 8.82 - - - - -


Rp 136,075.00 Rp 17,662,535.00 5.80 - - - - -
Rp 136,075.00 Rp 870,880.00 0.29 - - - - -
Rp 85,000.00 Rp 10,115,000.00 3.32 - - - - -
Rp 55,528,415.00

Rp 140,750.00 Rp 422,250.00 0.14 - - - - -


Rp 23,625.00 Rp 425,250.00 0.14 - - - - -
Rp 16,687.50 Rp 267,000.00 0.09 - - - - -
Rp 74,250.00 Rp 222,750.00 0.07 - - - - -
Rp 14,750.00 Rp 236,000.00 0.08 - - - - -
Rp 17,750.00 Rp 284,000.00 0.09 - - - - -
Rp 1,857,250.00

Rp 55,000.00 Rp 660,000.00 0.22 - - - - -


Rp 50,000.00 Rp 150,000.00 0.05 - - - - -
Rp 20,000.00 Rp 60,000.00 0.02 - - - - -
Rp 15,000.00 Rp 45,000.00 0.01 - - - - -
Rp 225,000.00 Rp 675,000.00 0.22 - - - - -
Rp 200,000.00 Rp 3,000,000.00 0.98 - - - - -
Rp 4,590,000.00

Rp 112,125.00 Rp 3,038,587.50 1.00 - - - - -


Rp 3,038,587.50
Lembar. 2
HARGA SATUAN JUMLAH HARGA
4 5
1 2 3

Rp 12,375.00 Rp 3,217,500.00 1.70 100 1.70 100 1.70 100


Rp 50,000.00 Rp 600,000.00 0.32 100 0.32 100 0.32 100
Rp 20,000.00 Rp 1,235,000.00 0.65 100 0.65 100 0.65 100
Rp 200,000.00 Rp 200,000.00 0.11 - - - - -
Rp 5,252,500.00

Rp 58,500.00 Rp 88,452.00 0.05 100 0.05 100 0.05 100


Rp 215,400.00 Rp 54,280.80 0.03 100 0.03 100 0.03 100
Rp 16,110.00 Rp 12,179.16 0.01 50 0.00 100 0.01 100
Rp 154,911.96

Rp 88,586.67 Rp 8,133,700.58 4.29 - - 100 4.29 100


Rp 42,298.80 Rp 7,767,439.21 4.10 - - 100 4.10 100
Rp 11,825.00 Rp 2,045,725.00 1.08 - - 15 0.16 100
Rp 17,946,864.80

Rp 897,800.00 Rp 274,726.80 0.15 - - - - 75


Rp 3,962,550.00 Rp 1,497,843.90 0.79 - - - - -
Rp 3,962,550.00 Rp 1,872,304.88 0.99 - - - - -
Rp 3,962,550.00 Rp 4,220,115.75 2.23 - - - - -
Rp 3,962,550.00 Rp 4,992,813.00 2.64 - - - - -
Rp 3,962,550.00 Rp 2,225,368.08 1.17 - - - - -
Rp 15,083,172.41

Rp 210,000.00 Rp 53,841,375.00 28.43 - - - - -


Rp 65,000.00 Rp 4,238,000.00 2.24 - - - - -
Rp 58,079,375.00

Rp 80,500.00 Rp 15,344,910.00 8.10 - - - - -


Rp 18,000.00 Rp 2,002,725.00 1.06 - - - - -
Rp 95,820.00 Rp 1,854,117.00 0.98 - - - - -
Rp 21,149.40 Rp 560,459.10 0.30 - - - - -
Rp 19,762,211.10

Rp 115,000.00 Rp 11,012,400.00 5.81 - - - - 75


Rp 2,000,000.00 Rp 8,000,000.00 4.22 - - - - 15
Rp 500,000.00 Rp 4,000,000.00 2.11 - - - - -
Rp 23,012,400.00

Rp 85,000.00 Rp 17,105,400.00 9.03 - - - - -


Rp 17,105,400.00

Rp 20,740.00 Rp 1,119,960.00 0.59 - - - - -


Rp 9,670.00 Rp 3,331,315.00 1.76 - - - - -
Rp 9,670.00 Rp 1,945,990.80 1.03 - - - - -
Rp 42,450.00 Rp 830,322.00 0.44 - - - - -
Rp 7,227,587.80

Rp 112,000.00 Rp 18,144,000.00 9.58 - - - - -


Rp 136,075.00 Rp 762,020.00 0.40 - - - - -
Rp 18,906,020.00

Rp 140,750.00 Rp 281,500.00 0.15 - - - - -


Rp 23,625.00 Rp 283,500.00 0.15 - - - - -
Rp 16,687.50 Rp 267,000.00 0.14 - - - - -
Rp 74,250.00 Rp 148,500.00 0.08 - - - - -
Rp 14,750.00 Rp 236,000.00 0.12 - - - - -
Rp 17,750.00 Rp 284,000.00 0.15 - - - - -
Rp 1,500,500.00

Rp 55,000.00 Rp 440,000.00 0.23 - - - - -


Rp 50,000.00 Rp 100,000.00 0.05 - - - - -
Rp 20,000.00 Rp 40,000.00 0.02 - - - - -
Rp 15,000.00 Rp 30,000.00 0.02 - - - - -
Rp 225,000.00 Rp 450,000.00 0.24 - - - - -
Rp 200,000.00 Rp 2,000,000.00 1.06 - - - - -
Rp 3,060,000.00

Rp 112,125.00 Rp 2,318,745.00 1.22 - - - - -


Rp 2,318,745.00
Rp 189,409,688.06
5201322.38
Rp 5,201,000.00
4 5 6 7 8 9

0.97 100 0.97 100 0.97 100 0.97 100 0.97 100 0.97 100 0.97
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100 0.97 100 0.97
1.01 100 1.01 100 1.01 100 1.01 100 1.01 100 1.01 100 1.01
- - - - - - - - - - - 100 0.11

0.90 100 0.90 100 0.90 100 0.90 100 0.90 100 0.90 100 0.90
0.86 100 0.86 100 0.86 100 0.86 100 0.86 100 0.86 100 0.86
- 100 - 100 - 100 - 100 - 100 - 100 -

- 50 0.06 100 0.13 100 0.13 100 0.13 100 0.13 100 0.13
- - - 100 0.06 100 0.06 100 0.06 100 0.06 100 0.06
- - - 100 0.56 100 0.56 100 0.56 100 0.56 100 0.56
- - - 50 0.34 100 0.69 100 0.69 100 0.69 100 0.69

- - - - - 100 14.17 100 14.17 100 14.17 100 14.17


- - - - - 100 12.02 100 12.02 100 12.02 100 12.02
- - - - - 25 0.42 100 1.70 100 1.70 100 1.70

- - - - - - - - - 100 1.38 100 1.38


- - - - - - - - - 100 14.29 100 14.29
- - - - - - - - - 100 1.40 100 1.40
- - - - - - - - - 100 0.65 100 0.65

- - - - - - - - - - - 100 12.16

- - - - - - - - - 50 2.96 100 5.92


- - - - - - - - - - - 100 2.97
- - - - - - - - - - - 100 2.61

- - - - - - - - - 50 0.91 100 1.82


- - - - - - - - - 100 9.21 100 9.21
- - - - - - - - - - - 100 6.87
- - - - - - - - - - - - -

- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -

- - - - - - - - - - - - -
4 5 6 7 8 9

0.20 100 0.20 100 0.20 100 0.20 100 0.20 100 0.20 100 0.20
0.08 100 0.08 100 0.08 100 0.08 100 0.08 100 0.08 100 0.08
- - - - - - - - - - - - -

0.04 100 0.04 100 0.04 100 0.04 100 0.04 100 0.04 100 0.04
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100 0.03 100 0.03
0.01 100 0.01 100 0.01 100 0.01 100 0.01 100 0.01 100 0.01

- 50 0.62 100 1.24 100 1.24 100 1.24 100 1.24 100 1.24
- - - 100 1.19 100 1.19 100 1.19 100 1.19 100 1.19
- - - 100 1.20 100 1.20 100 1.20 100 1.20 100 1.20

- 25 0.01 50 0.03 100 0.05 100 0.05 100 0.05 100 0.05
- - - 50 0.35 100 0.70 100 0.70 100 0.70 100 0.70
- - - - - 50 0.51 100 1.02 100 1.02 100 1.02
- - - - - 50 0.98 100 1.95 100 1.95 100 1.95
- - - 50 1.56 75 2.34 100 3.12 100 3.12 100 3.12
- - - 75 0.23 100 0.31 100 0.31 100 0.31 100 0.31

- - - - - - - 100 25.51 100 25.51 100 25.51


- - - - - - - - - 100 1.66 100 1.66

- - - - - - - - - 50 2.68 100 5.36


- - - - - - - - - 50 0.49 100 0.99
- - - - - - - - - - - 100 0.80
- - - - - - - - - - - 100 0.20

- - - 50 2.40 100 4.81 100 4.81 100 4.81 100 4.81


- - - - - - - - - - - 100 1.76
- - - - - - - - - - - 100 2.35
- - - - - - - - - 50 0.79 100 1.59

- - - - - - - - - - - 50 4.24

- - - - - - - 50 2.04 100 4.07 100 4.07


- - - - - - - - - - - 50 1.04
- - - - - - - - - 50 1.44 100 2.88

- - - - - - - - - - - 75 6.62
- - - - - - - - - - - 50 2.90
- - - - - - - - - - - 50 0.14
- - - - - - - - - - - - -

- - - - - - - - - - - 100 0.14
- - - - - - - - - - - 100 0.14
- - - - - - - - - - - 100 0.09
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -

- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -

- - - - - - - - - - - 100 1.00
4 5 6 7 8 9

1.70 100 1.70 100 1.70 100 1.70 100 1.70 100 1.70 100 1.70
0.32 100 0.32 100 0.32 100 0.32 100 0.32 100 0.32 100 0.32
0.65 100 0.65 100 0.65 100 0.65 100 0.65 100 0.65 100 0.65
- - - - - - - - - - - - -

0.05 100 0.05 100 0.05 100 0.05 100 0.05 100 0.05 100 0.05
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100 0.03 100 0.03
0.01 100 0.01 100 0.01 100 0.01 100 0.01 100 0.01 100 0.01

4.29 100 4.29 100 4.29 100 4.29 100 4.29 100 4.29 100 4.29
4.10 100 4.10 100 4.10 100 4.10 100 4.10 100 4.10 100 4.10
1.08 100 1.08 100 1.08 100 1.08 100 1.08 100 1.08 100 1.08

0.11 100 0.15 100 0.15 100 0.15 100 0.15 100 0.15 100 0.15
- 50 0.40 100 0.79 100 0.79 100 0.79 100 0.79 100 0.79
- 10 0.10 75 0.74 100 0.99 100 0.99 100 0.99 100 0.99
- - - - - 100 2.23 100 2.23 100 2.23 100 2.23
- - - - - 100 2.64 100 2.64 100 2.64 100 2.64
- - - - - 100 1.17 100 1.17 100 1.17 100 1.17

- - - - - 25 7.11 100 28.43 100 28.43 100 28.43


- - - - - - - 100 2.24 100 2.24 100 2.24

- - - - - - - 85 6.89 100 8.10 100 8.10


- - - - - - - - - 100 1.06 100 1.06
- - - - - - - - - 100 0.98 100 0.98
- - - - - - - - - 100 0.30 100 0.30

4.36 100 5.81 100 5.81 100 5.81 100 5.81 100 5.81 100 5.81
0.63 55 2.32 100 4.22 100 4.22 100 4.22 100 4.22 100 4.22
- - - 100 2.11 100 2.11 100 2.11 100 2.11 100 2.11

- - - - - - - - - 85 7.68 100 9.03

- - - - - 50 0.30 100 0.59 100 0.59 100 0.59


- - - - - 50 0.88 100 1.76 100 1.76 100 1.76
- - - 75 0.77 100 1.03 100 1.03 100 1.03 100 1.03
- - - - - - - - - 85 0.37 100 0.44

- - - - - - - 25 2.39 100 9.58 100 9.58


- - - - - - - - - 100 0.40 100 0.40

- - - - - 100 0.15 100 0.15 100 0.15 100 0.15


- - - - - 100 0.15 100 0.15 100 0.15 100 0.15
- - - - - 100 0.14 100 0.14 100 0.14 100 0.14
- - - - - 100 0.08 100 0.08 100 0.08 100 0.08
- - - - - 100 0.12 100 0.12 100 0.12 100 0.12
- - - - - 100 0.15 100 0.15 100 0.15 100 0.15

- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -

- - - - - - - - - - - - -
10

100 0.97
100 0.97
100 1.01
100 0.11

100 0.90
100 0.86
100 -

100 0.13
100 0.06
100 0.56
100 0.69

100 14.17
100 12.02
100 1.70

100 1.38
100 14.29
100 1.40
100 0.65

100 12.16

100 5.92
100 2.97
100 2.61

100 1.82
100 9.21
100 6.87
100 3.58

100 0.36
100 0.08
100 0.04
100 0.04
100 0.62
100 1.64

100 0.21
10

100 0.20
100 0.08
100 0.07

100 0.04
100 0.03
100 0.01

100 1.24
100 1.19
100 1.20

100 0.05
100 0.70
100 1.02
100 1.95
100 3.12
100 0.31

100 25.51
100 1.66

100 5.36
100 0.99
100 0.80
100 0.20

100 4.81
100 1.76
100 2.35
100 1.59

100 8.49

100 4.07
100 2.07
100 2.88

100 8.82
100 5.80
100 0.29
100 3.32

100 0.14
100 0.14
100 0.09
100 0.07
100 0.08
100 0.09

100 0.22
100 0.05
100 0.02
100 0.01
100 0.22
100 0.98

100 1.00
10

100 1.70
100 0.32
100 0.65
100 0.11

100 0.05
100 0.03
100 0.01

100 4.29
100 4.10
100 1.08

100 0.15
100 0.79
100 0.99
100 2.23
100 2.64
100 1.17

100 28.43
100 2.24

100 8.10
100 1.06
100 0.98
100 0.30

100 5.81
100 4.22
100 2.11

100 9.03

100 0.59
100 1.76
100 1.03
100 0.44

100 9.58
100 0.40

100 0.15
100 0.15
100 0.14
100 0.08
100 0.12
100 0.15

100 0.23
100 0.05
100 0.02
100 0.02
100 0.24
100 1.06

100 1.22
YANG DIPAKAI
TH. 2018
1 SMPN 2 SEPULU 2 KELAS ### SINERGI
2 SMPN 1 KLAMPIS 3 KELAS ### SINERGI
3 SMPN 2 KOKOP 2 KELAS ### SINERGI
4 SMPN 3 SATAP KOKOP 2 KELAS ### SINERGI
5 SMPN 1 TRAGAH 3 KELAS ### INDRAKILA
6 SMPN 2 MODUNG 2 KELAS ### INDRAKILA
7 SMPN 2 LABANG 3 KELAS ### INDRAKILA
8 SMPN 2 KWANYAR 2 KELAS ### INDRAKILA
9 SMPN TAHAL AMIN H. ABDULLAH, S.Pd

REKAPITULASI 1
RENCANA ANGGARAN BIAYA OK
OK
KEGIATAN : PENGADAAN SARANA PRASARANA
PEKERJAAN : PERENCANAAN SMP KABUPATEN BANGKALAN
LINGKUP PEKERJAAN : REHABILITASI 2 RUANG BELAJAR SMPN 2 SEPULU
LOKASI : SMPN 2 SEPULU KEC. SEPULU KAB. BANGKALAN

NO. URAIAN PEKERJAAN JUMLAH HARGA

I PEKERJAAN PERSIAPAN ###


II PEKERJAAN PASANGAN/PLESTERAN ###
III PEKERJAAN BETON ###
IV PEKERJAAN RANGKA ATAP ###
V PEKERJAAN ATAP ###
VI PEKERJAAN PLAFOND ###
VII PEKERJAAN PENGECATAN ###
VIII PEKERJAAN LANTAI ###
IX PEKERJAAN INSTALASI LISTRIK ###
X PEKERJAAN KACA ###

JUMLAH ###
DIBULATK ### ###
###

TERBILANG : ( SERATUS DELAPAN PULUH TIGA JUTA RUPIAH )

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

ANWAR NURIS, S.Pd.I H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Sepulu
Kec. Sepulu Kab. Bangkalan

DR. AHMAD SABARUDIN, S.Pd, M.MPd


NIP. 19680503 199103 1 013

LAPORAN MINGGUAN
Minggu ke :
Pekerjaan : REHABILITASI 2 RUANG KELAS SMPN 2 SEPULU Tanggal :
Nama Sekolah : SMPN 2 SEPULU Bulan :
Lokasi : Kec. Kedamean Kab. Gresik Dana diterima tangal :
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%)
% Prestasi Rerata Prestasi
(1) (2) (3) (4) (5) (6) (7) (8)
(6)/100x(5)
I. PEKERJAAN PERSIAPAN
1 Pembongkaran atap + rangka atap 143.00 m² 0.97 - - 100
2 Pembongkaran atap 234.90 m² 0.97 - - 100
3 Penetelan plesteran 92.16 m² 1.01 - - 100
4 Pembersihan akhir pekerjaan 1.00 ls 0.11 - - -
II. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 18.50 m² 0.90 - - -
2 Plesteran 1Pc : 5Ps 37.00 m² 0.86 - - -
3 Benangan 48.00 m' - - - -

III. PEKERJAAN BETON


1 Kolom Struktur 15/25 0.06 m³ 0.13 - - -
2 Kolom Praktis 15/15 0.03 m³ 0.06 - - -
3 Ring Balk 15/15 0.26 m³ 0.56 - - -
4 Ring gewel 15/15 dan konsol beton 15/15 0.32 m³ 0.69 - - -

IV. PEKERJAAN RANGKA ATAP


1 Kuda-kuda baja ringan (galvalum bentang 7m) 139.73 m² 14.17 - - -
2 Kuda-kuda baja ringan (galvalum 50%) 118.54 m² 12.02 - - -
2 Listplank kalsiplank 8mm / 30 cm 47.70 m¹ 1.70 - - -

V. PEKERJAAN ATAP
1 Atap genteng beton (lama) 139.73 m² 1.38 - - -
2 Atap genteng beton warna 237.08 m² 14.29 - - -
3 Genteng bubungan beton warna 26.70 m' 1.40 - - -
4 Plesteran kompres L = 10 cm (Akhiran genting) 56.00 m' 0.65 - - -

VI. PEKERJAAN PLAFOND


1 Plafond calsiboard 4mm + rangka metal hollow 261.00 m² 12.16 - - -

VII. PEKERJAAN PENGECATAN


1 Pengecatan dinding 521.00 m² 5.92 - - -
2 Pengecetan plafond 261.00 m² 2.97 - - -
3 Pengecatan kayu 111.96 m² 2.61 - - -

VIII. PEKERJAAN LANTAI


1 Keramik lantai 30 x 30 ( tambal sulam 1kelas) 31.50 m² 1.82 - - -
2 Keramik lantai 40 x 40 150.00 m² 9.21 - - -
3 Keramik dinding R.Lab 25 x 40 92.16 m² 6.87 - - -
4 List keramik 76.80 m' 3.58 - - -

IX. PEKERJAAN INSTALASI LISTRIK


1 Lampu SL 14 watt 12.00 bh 0.36 - - -
2 Lampu SL 8 watt (teras) 3.00 bh 0.08 - - -
3 Saklar ganda 4.00 bh 0.04 - - -
4 Saklar tunggal 5.00 bh 0.04 - - -
5 Stop kontak + instalasi 5.00 bh 0.62 - - -
6 Instalasi titik lampu 15.00 ttk 1.64
X. PEKERJAAN KACA
1 Kaca mati t=5 mm (yg pecah) 3.36 m² 0.21 - - -

JUMLAH 100.00 -
Jumlah dana yang digunakan sampai dengan minggu ini ( minggu ke 1 ) Rp 20,300,000.00

REKAPITULASI 2
RENCANA ANGGARAN BIAYA OK

KEGIATAN : PENGADAAN SARANA PRASARANA


PEKERJAAN : PERENCANAAN SMP KABUPATEN BANGKALAN
LINGKUP PEKERJAAN : REHABILITASI 3 RUANG BELAJAR SMPN 1 KLAMPIS
LOKASI : SMPN 1 KLAMPIS KEC. KLAMPIS KAB. BANGKALAN

NO. URAIAN PEKERJAAN JUMLAH HARGA

I (2) ###
II PEKERJAAN TANAH ###
III PEKERJAAN PASANGAN/PLESTERAN ###
IV PEKERJAAN BETON ###
V PEKERJAAN RANGKA ATAP ###
VI PEKERJAAN ATAP ###
VII PEKERJAAN KUSEN PINTU DAN JENDELA ###
VIII PEKERJAAN PLAFOND ###
IX PEKERJAAN PENGECATAN/PLAMIRAN ###
X PEKERJAAN LANTAI ###
XI PEKERJAAN KUNCI + PENGGANTUNG ###
XII PEKERJAAN INSTALASI LISTRIK ### ###
XIII PEKERJAAN KACA ###

JUMLAH ### ###


DIBULATK ### ###
TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

HANAF I H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 1 Kelampis
Kec. Kelampis Kab. Bangkalan

IMAM SYAFII, S.Pd, MPd


NIP. 19680228 199401 1 003

LAPORAN MINGGUAN
Minggu ke :
Pekerjaan : REHABILITASI 2 RUANG KELAS SMPN 1 KLAMPIS Tanggal :
Nama Sekolah : SMPN 1 KLAMPIS Bulan :
Lokasi : Kec. Kedamean Kab. Gresik Dana diterima tangal :
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%)
% Prestasi Rerata Prestasi
(1) (2) (3) (4) (5) (6) (7) (8)
I. PEKERJAAN PERSIAPAN (6)/100x(5)
1 Pembongkaran kosen 12.00 bh 0.20 - - 100
2 Penetelan plesteran 12.00 m² 0.08 - - 100
3 Pembersihan akhir pekerjaan 1.00 ls 0.07 - - -

II. PEKERJAAN TANAH


1 Galian tanah 2.16 m³ 0.04 - - -
2 Urugan pasir bawah pondasi t=10cm 0.36 m³ 0.03 - - -
4 Urugan tanah kembali 1.08 m³ 0.01 - - -

III. PEKERJAAN PASANGAN/PLESTERAN


1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 42.79 m² 1.24 - - -
2 Plesteran 1Pc : 5Ps 85.57 m² 1.19 - - -
3 Benangan 308.80 m' 1.20 - - -

IV. PEKERJAAN BETON


1 Lantai kerja bawah pondasi 1:3:5 t=5cm 0.18 m³ 0.05 - - -
2 Pondasi beton stempat 60 x 60 x 15cm 0.54 m³ 0.70 - - -
3 Kolom teras 15/15 0.79 m³ 1.02 - - -
4 Balok beton 15/20 1.50 m³ 1.95 - - -
5 Kolom beon 15/20 2.40 m³ 3.12 - - -
6 Kolom praktis 15/15 0.24 m³ 0.31 - - -
5.65
V. PEKERJAAN RANGKA ATAP
1 Kuda-kuda baja ringan (galvalum 75mm) (betang. 370.11 m² 25.51 - - -
2 Lisplank kalsiplank 8mm / 30 cm 77.90 m¹ 1.66 - - -

VI. PEKERJAAN ATAP


1 Atap genteng Karang Penang (baru bg. depan) 202.80 m² 5.36 - - -
2 Atap genteng (lama bg. belakang) 167.31 m² 0.99 - - -
3 Genteng bubungan Karang penang 25.35 m' 0.80 - - -
4 Plesteran kompres L = 10 cm (Akhiran genting) 29.20 m' 0.20 - - -

VII. PEKERJAAN KUSEN PINTU DAN JENDELA


1 Kusen kayu kempas/mahoni 6/15 1.28 m³ 4.81 - - -
2 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 8.69 m² 1.76 - - -
3 Jalusi kayu kempas/mahoni 3/5 16.61 m² 2.35 - - -
4 Daun Jendela kaca kayu kempas/mahoni 3/10 11.52 m² 1.59 - - -

VIII. PEKERJAAN PLAFOND


1 Plafond calsiboard 4mm + rangka kayu 4/6 304.20 m² 8.49 - - -

IX. PEKERJAAN PENGECATAN/PLAMIRAN


1 Pengecatan dinding 598.50 m² 4.07 - - -
2 Pengecatan plafond 304.20 m² 2.07 - - -
3 Pengecatan kayu 206.70 m² 2.88 - - -

X. PEKERJAAN LANTAI
1 Keramik lantai 40 x 40 240.00 m² 8.82 - - -
2 Keramik dinding 25 x 40 129.80 m² 5.80 - - -
3 Keramik kolom 25 x 40 6.40 m² 0.29 - - -
4 List keramik 119.00 m' 3.32 - - -

XI. PEKERJAAN KUNCI + PENGGANTUNG


1 Kunci pintu 2 x putar 3.00 bh 0.14 - - -
2 Engsel Pintu 18.00 bh 0.14 - - -
3 Engsel Jendela 16.00 bh 0.09 - - -
4 Grendel tanam 3.00 bh 0.07 - - -
5 Grendel Jendela 16.00 bh 0.08 - - -
6 Hag Angin 16.00 bh 0.09 - - -

XII. PEKERJAAN INSTALASI LISTRIK


1
Lampu SL 14 watt 12.00 bh 0.22 - - -
2
Lampu SL 8watt (teras) 3.00 bh 0.05 - - -
3
Saklar ganda 3.00 bh 0.02 - - -
4
Saklar tunggal 3.00 bh 0.01 - - -
5 Stop kontak + instalasi 3.00 bh 0.22 - - -
6 Instalasi titik lampu 15.00 ttk 0.98 - - -

XIII. PEKERJAAN KACA


1 Kaca bening t=5 mm 27.10 m² 1.00 - - -

JUMLAH 95.07 -
Jumlah dana yang digunakan sampai dengan minggu ini ( minggu ke 1 ) Rp 20,300,000.00

3
REKAPITULASI OK
NCANA ANGGARAN BIAYA OK
: PENGADAAN SARANA PRASARANA
KEGIATAN : PERENCANAAN SMP KABUPATEN BANGKALAN
PEKERJAAN : REHABILITASI 2 RUANG BELAJAR SMPN 3 SATAP KOKOP
LINGKUP PEKERJAAN : SMPN 3 SATAP KOKOP KEC. KOKOP KAB. BANGKALAN
LOKASI
URAIAN PEKERJAAN JUMLAH HARGA
NO.

PEKERJAAN PERSIAPAN ###


I PEKERJAAN TANAH ###
II PEKERJAAN PASANGAN/PLESTERAN ###
III PEKERJAAN BETON ###
IV PEKERJAAN RANGKA ATAP ###
V PEKERJAAN ATAP ###
VI PEKERJAAN KUSEN PINTU DAN JENDELA ###
VII PEKERJAAN PLAFOND ###
VIII PEKERJAAN PENGECATAN/PLAMIRAN ###
IX PEKERJAAN LANTAI ###
X PEKERJAAN KUNCI + PENGGANTUNG ###
XI PEKERJAAN INSTALASI LISTRIK ###
XII PEKERJAAN KACA ###
XIII

JUMLAH ### ###


DIBULATK ### ###

TERBILANG : ( SERATUS DELAPAN PULUH TIGA JUTA RUPIAH )

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 3 Satap Kokop
Kec. Kokop Kab. Bangkalan

IHSANUDIN, S.Pd
NIP. 19700109 199104 1 001
LAPORAN MINGGUAN
Minggu ke :
Pekerjaan : REHABILITASI 2 RUANG BELAJAR SMPN 3 SATAP KOKOP Tanggal :
Nama Sekolah : SMPN 3 SATAP KOKOP KEC. KOKOP KAB. BANGKALAN Bulan :
Lokasi : KEC. KOKOP KAB. BANGKALAN Dana diterima tangal :
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%)
% Prestasi Rerata Prestasi
(1) (2) (3) (4) (5) (6) (7) (8)
(6)/100x(5)

I. PEKERJAAN PERSIAPAN
1 Pembongkaran atap + rangka 260.00 m² 1.70 100 1.70 -
2 Pembongkaran kosen 12.00 bh 0.32 100 0.32 -
3 Pembongkaran dinding 61.75 m² 0.65 100 0.65 -
4 Pembersihan akhir pekerjaan 1.00 ls 0.11 - - -

II. PEKERJAAN TANAH


1 Galian tanah 1.51 m³ 0.05 100 0.05 -
2 Urugan pasir bawah pondasi t=10cm 0.25 m³ 0.03 100 0.03 -
4 Urugan tanah kembali 0.76 m³ 0.01 50 0.00 50

III. PEKERJAAN PASANGAN/PLESTERAN


1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 91.82 m² 4.29 - - 100
2 Plesteran 1Pc : 5Ps 183.63 m² 4.10 - - 100
3 Benangan 173.00 m' 1.08 - - 15

IV. PEKERJAAN BETON `


1 Lantai kerja bawah pondasi 1:3:5 t=5cm 0.31 m³ 0.15 - - -
2 Pondasi beton stempat 60 x 60 x 15cm 0.38 m³ 0.79 - - -
3 Kolom teras 15/15 0.47 m³ 0.99 - - -
4 Balok beton 15/20 1.07 m³ 2.23 - - -
5 Kolom struktur 15/25 1.26 m³ 2.64 - - -
6 Ring balk 15/15 0.56 m³ 1.17 - - -
V. PEKERJAAN RANGKA ATAP
1 Kuda-kuda baja ringan (galvalum 75mm) 256.39 m² 28.43 - - -
2 Lisplank kalsiplank 8mm / 30 cm 65.20 m¹ 2.24 - - -

VI. PEKERJAAN ATAP


1 Atap genteng Karang Penang (baru bg depan) 190.62 m² 8.10 - - -
2 Atap genteng (lama bg belakang) 111.26 m² 1.06 - - -
3 Genteng bubungan Karang penang 19.35 m' 0.98 - - -
4 Plesteran kompres L = 10 cm (Akhiran genting) 26.50 m' 0.30 - - -

VII. PEKERJAAN KUSEN PINTU DAN JENDELA


1 Kusen kayu aluminium 4" 95.76 m' 5.81 - - -
2 Daun Pintu kaca aluminium 4.00 bh 4.22 - - -
3 Daun Jendela kaca aluminium 8.00 bh 2.11 - - -

VIII. PEKERJAAN PLAFOND


1 Plafond calsiboard 4mm + rangka hollow 201.24 m² 9.03 - - -

IX. PEKERJAAN PENGECATAN/PLAMIRAN


1 Pengecatan dinding depan 54.00 m² 0.59 - - -
2 Pelamiran dinding 344.50 m² 1.76 - - -
3 Plamiran plafond 201.24 m² 1.03 - - -
4 Pengecatan kayu 19.56 m² 0.44 - - -

X. PEKERJAAN LANTAI
1 Keramik lantai 40 x 40 162.00 m² 9.58 - - -
2 Keramik kolom 20 x 40 (motif) 5.60 m² 0.40 - - -

XI. PEKERJAAN KUNCI + PENGGANTUNG


1 Kunci pintu 2 x putar 2.00 bh 0.15 - - -
2 Engsel Pintu 12.00 bh 0.15 - - -
3 Engsel Jendela 16.00 bh 0.14 - - -
4 Grendel tanam 2.00 bh 0.08 - - -
5 Grendel Jendela 16.00 bh 0.12 - - -
6 Hag Angin 16.00 bh 0.15 - - -

XII PEKERJAAN INSTALASI LISTRIK


1 Lampu SL 14 watt 8.00 bh 0.23 - - -
2 Lampu SL 8watt (teras) 2.00 bh 0.05 - - -
3 Saklar ganda 2.00 bh 0.02 - - -
4 Saklar tunggal 2.00 bh 0.02 - - -
5 Stop kontak + instalasi 2.00 bh 0.24 - - -
6 Instalasi titik lampu 10.00 ttk 1.06 - - -

XIII. PEKERJAAN KACA


1 Kaca mati t=5 mm 20.68 m² 1.22 - - -

JUMLAH 100.00 2.75


Jumlah dana yang digunakan sampai dengan minggu ini ( minggu ke 1 ) Rp 21,415,000.00

Mengetahui Menyetujui
SMPN 3 Satap Kokop Panitia Pembangunan Sekolah
Kec. Kokop Kab. Bangkalan
Selaku Penanggung Jawab
IHSANUDIN, S.Pd SUHAERI
NIP. 19700109 199104 1 001

REKAPITULASI
NCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI

NO.

I
II
III
IV
V
VI
VII
VIII
IX
X 4
XI OK
XII LAMA
XIII : PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 1 TRAGAH
: SMPN 1 TRAGAH KEC. TRAGAH KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA

TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )
PEKERJAAN PERSIAPAN ###
PEKERJAAN TANAH ###
PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA #DIV/0!
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###

JUMLAH #DIV/0! ###


DIBULATK #DIV/0! #DIV/0!

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

YUNIZAR AN NATSIRUL YUSUF H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 1 Tragah
Kec. Tragah Kab. Bangkalan

Drs. AMIRULLAH, MM
NIP. 19581217 198603 1 011

NO
1
I.
1
2
3
4

II.
1
2
4

III.
1
2
3

IV.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran atap + rangka 377.00 m² ### ###
V. Pembongkaran kusen 4.00 bh ### ###
1 Penetelan plesteran 159.60 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VI. PEKERJAAN TANAH ###
1 Galian tanah 2.16 m³ ### ###
2 Urugan pasir bawah pondasi t=10cm 0.36 m³ ### ### #DIV/0!
3 Urugan tanah kembali 1.08 m³ ### ###
4 ###
PEKERJAAN PASANGAN/PLESTERAN
VII. Pasangan 1/2 bata camp. 1 Pc : 5 Ps 7.20 m² ### ### ###
1 Plesteran 1Pc : 5Ps 14.40 m² ### ###
2 Benangan 24.00 m' ### ###
3 ###
PEKERJAAN BETON
VIII. Lantai kerja bawah pondasi 1:3:5 t=5cm 0.18 m³ ### ###
1 Pondasi beton stempat 60 x 60 x 15cm 0.54 m³ ### ###
Kolom teras 15/15 0.79 m³ ### ###
IX. Balok beton 15/20 1.71 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ ### ###
X. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Penang (baru) 382.73 m² ### ###
3 Atap genteng (lama bg. belakang) 170.10 m² ### ###
4 Genteng bubungan Karang penang 28.35 m' ### ###
Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' ### ###
XI. ###
1 PEKERJAAN KUSEN PINTU DAN JENDELA
2 Kusen kayu kempas/mahoni 6/15 #DIV/0! m³ Rp - #DIV/0!
3 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 8.61 m² Rp - Rp - #DIV/0!
4 Daun Jendela kaca kayu kempas/mahoni 3/10 8.40 m² Rp - Rp - ###
5 #DIV/0!
6 PEKERJAAN PLAFOND
Plafond calsiboard 4mm + rangka kayu 4/6 294.84 m² ### ###
XII ###
1 PEKERJAAN PENGECATAN
2 Pengecatan dinding (3 Ruang kelas) 598.50 m² ### ###
3 Pengecatan plafond 294.84 m² ### ###
4 Pengecatan kayu 206.70 m² ### ###
5 ###
6 PEKERJAAN LANTAI #DIV/0!
Keramik lantai 40 x 40 245.70 m² ### ###
XIII. Keramik dinding 25 x 40 ( 3 R.kelas + teras ) 159.60 m² ### ###
1 List keramik dinding 7cm 110.40 m² ### ###
Keramik kolom 25 x 40 12.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Engsel Pintu 18.00 bh ### ###
Engsel Jendela 16.00 bh ### ###
Grendel pintu 3.00 bh ### ###
Grendel Jendela 16.00 bh ### ###
Hag Angin 16.00 bh ### ###
###
REKAPITULASI
PEKERJAAN INSTALASI LISTRIK
NCANA ANGGARAN
Lampu BIAYA
SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
KEGI Saklar ganda 3.00 bh ### ###
PEKE Saklar tunggal 3.00 bh ### ###
LING Stop kontak + instalasi 3.00 bh ### ###
LOKA Instalasi titik lampu 15.00 ttk ### ###
###
NO. PEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 11.14 m² ### ###
###
I
II
III
IV
V
VI
VII
VIII
IX
X 4
XI OK
XII BARU
XIII : PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 1 TRAGAH
: SMPN 1 TRAGAH KEC. TRAGAH KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA

TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )
PEKERJAAN PERSIAPAN ###
PEKERJAAN TANAH ###
PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA Rp -
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###

JUMLAH ### ###


DIBULATK ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

YUNIZAR AN NATSIRUL YUSUF H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 1 Tragah
Kec. Tragah Kab. Bangkalan

Drs. AMIRULLAH, MM
NIP. 19581217 198603 1 011

NO
1
I.
1
2
3
4

II.
1
2
4

III.
1
2
3
IV.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran atap + rangka 377.00 m² ### ###
V. Pembongkaran kusen 8.00 bh ### ###
1 Penetelan plesteran 249.00 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VI. PEKERJAAN TANAH ###
1 Galian tanah 2.16 m³ ### ###
2 Urugan pasir bawah pondasi t=10cm 0.36 m³ ### ### ###
3 Urugan tanah kembali 1.08 m³ ### ###
###
VII. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 24.02 m² ### ### ###
2 Plesteran 1Pc : 5Ps 48.03 m² ### ###
3 Benangan 168.00 m' ### ###
4 ###
PEKERJAAN BETON
VIII. Lantai kerja bawah pondasi 1:3:5 t=5cm 0.18 m³ ### ###
1 Pondasi beton stempat 60 x 60 x 15cm 0.54 m³ ### ###
Kolom teras 15/15 0.79 m³ ### ###
IX. Balok beton 15/20 1.56 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ ### ###
X. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Penang (baru) 382.73 m² ### ###
3 Genteng bubungan Karang penang 28.35 m' ### ###
4 Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' ### ###
5 ###
PEKERJAAN KUSEN PINTU DAN JENDELA
XI. Kusen kayu kempas/mahoni 6/15 1.09 m³ Rp - Rp -
1 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 8.61 m² Rp - Rp - ###
2 Jalusi kayu kempas/mahoni 3/12 7.20 m² Rp - Rp -
3 Daun Jendela kaca kayu kempas/mahoni 3/10 6.72 m² Rp - Rp - ###
4 Rp -
5 PEKERJAAN PLAFOND
6 Plafond calsiboard 4mm + rangka kayu 4/6 294.84 m² ### ###
###
XII PEKERJAAN PENGECATAN
1 Pengecatan dinding (3 Ruang kelas) 598.50 m² ### ###
2 Pengecatan plafond 294.84 m² ### ###
3 Pengecatan kayu 206.70 m² ### ###
4 ###
5 PEKERJAAN LANTAI ###
6 Keramik lantai 40 x 40 245.70 m² ### ###
Keramik dinding 25 x 40 ( 3 R.kelas + teras ) 173.40 m² ### ###
XIII. List keramik dinding 7cm 132.90 m² ### ###
1 Keramik kolom 25 x 40 12.00 m² ### ###
Keramik dinding 25 x 40 ( 3 R.kelas teras saja ) 75.60 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Engsel Pintu 18.00 bh ### ###
Engsel Jendela 16.00 bh ### ###
Grendel pintu 3.00 bh ### ###
Grendel Jendela 16.00 bh ### ###
Hag Angin 16.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
REKAPITULASI
Lampu SL 8watt (teras) 3.00 bh ### ###
NCANA ANGGARAN BIAYA
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
KEGI Stop kontak + instalasi 3.00 bh ### ###
PEKE Instalasi titik lampu 15.00 ttk ### ###
LINGKUP PEKERJAAN ###
LOKAPEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 11.14 m² ### ###
NO. ###

I
II
III
IV
V
VI
VII
VIII
IX
X 5
XI OK
XII LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 MODUNG
: SMPN 2 MODUNG KEC. MODUNG KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA


TERBILANG : ( DUA RATUS LIMA JUTA ENAM RATUS RIBU RUPIAH )

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA Rp -
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN/PLAMIRAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ### ###
PEKERJAAN KACA ###

JUMLAH ### ###


DIBULAT ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

M. MAHRI, S.Ag H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Modung
Kec. Modung Kab. Bangkalan

A S U R, M.Pd
NIP. 19610117 198403 1 008

NO
1
I.
1
2

II.
1
2
3

III.
1
2
3

IV.
1
2
Lembar. 2
V. JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
1 2 3 4 5
2 PEKERJAAN PERSIAPAN
3 Pembongkaran atap + rangka 406.00 m² ### ###
4 Pembersihan akhir pekerjaan 1.00 ls ### ### ###
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 98.93 m² ### ###
2 Plesteran 1Pc : 5Ps 197.87 m² ### ###
3 Benangan 166.56 m' ### ###
###
VII. PEKERJAAN BETON
1 Kolom teras 15/15 0.41 m³ ### ###
Balok teras 15/20 1.24 m³ ### ###
VIII. Ring balk gewel 15/15 0.98 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 396.90 m² ### ###
4 Lisplank kalsiplank 8mm / 30 cm 85.70 m¹ ### ###
5 ###
PEKERJAAN ATAP
IX. Pasang atap genteng karang p enang (baru 5%) 19.85 m² ### ###
1 Pasang atap genteng (lama) 377.06 m² ### ###
Genteng bubungan karang penang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 29.00 m' ### ###
1 ###
2 PEKERJAAN KUSEN PINTU DAN JENDELA
3 Kusen kayu kempas/mahoni 6/12 0.46 m³ Rp - Rp -
4 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 6.72 m² Rp - Rp -
5 Daun Jendela kaca kayu kempas/mahoni 3/10 5.04 m² Rp - Rp -
6 Rp -
PEKERJAAN PLAFOND ###
XI. Plafond calsiboard 4mm + rangka hollow 340.20 m² ### ###
1 ###
2 PEKERJAAN PENGECATAN/PLAMIRAN
3 Pengecatan dinding (depan) 66.85 m² ### ###
4 Pelamiran dinding 430.33 m² ### ###
5 Pelamiran plafond 340.20 m² ### ### ###
6 Pengecatan kayu 206.70 m² ### ###
Cat genteng 396.90 m² ### ###
XII. ###
1 PEKERJAAN LANTAI
Lantai rabat 216.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 4.00 bh ### ###
Engsel Pintu 21.00 bh ### ###
Engsel Jendela 24.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Grendel Jendela 12.00 bh ### ### ###
Hag Angin 24.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 14.00 bh ### ###
Lampu SL 8watt (teras) 4.00 bh ### ###
Saklar ganda 7.00 bh ### ###
REKAPITULASI
Saklar tunggal 3.00 bh ### ###
NCANA ANGGARAN BIAYA
Stop kontak + instalasi 4.00 bh ### ###
Instalasi titik lampu 18.00 bh ### ###
KEGIATAN ###
PEKE PEKERJAAN KACA
LING Kaca mati t=5 mm 14.49 m² ### ###
LOKASI ###

NO.

I
II
III
IV
V
VI
VII
VIII
IX
X 5
XI OK
XII BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 MODUNG
: SMPN 2 MODUNG KEC. MODUNG KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA


TERBILANG : ( DUA RATUS LIMA JUTA ENAM RATUS RIBU RUPIAH )

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA Rp -
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN/PLAMIRAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ### -
PEKERJAAN KACA ###

JUMLAH ### ###


DIBULAT ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

M. MAHRI, S.Ag H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Modung
Kec. Modung Kab. Bangkalan

A S U R, M.Pd
NIP. 19610117 198403 1 008

NO
1
I.
1
2

II.
1
2
3

III.
1
2
3

IV.
1
2
Lembar. 2
V. JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
1 2 3 4 5
2 PEKERJAAN PERSIAPAN
3 Pembongkaran atap + rangka 406.00 m² ### ###
4 Pembersihan akhir pekerjaan 1.00 ls ### ### ###
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 98.93 m² ### ###
2 Plesteran 1Pc : 5Ps 197.87 m² ### ###
3 Benangan 166.56 m' ### ###
###
VII. PEKERJAAN BETON
1 Kolom teras 15/15 0.41 m³ ### ###
Balok teras 15/20 1.24 m³ ### ###
VIII. Ring balk gewel 15/15 0.98 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 396.90 m² ### ###
4 Lisplank kalsiplank 8mm / 30 cm 85.70 m¹ ### ###
5 ###
PEKERJAAN ATAP
IX. Pasang atap genteng karang p enang (baru 5%) 19.85 m² ### ###
1 Pasang atap genteng (lama) 377.06 m² ### ###
Genteng bubungan karang penang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 29.00 m' ### ###
1 ###
2 PEKERJAAN KUSEN PINTU DAN JENDELA
3 Kusen kayu kempas/mahoni 6/12 0.46 m³ Rp - Rp -
4 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 6.72 m² Rp - Rp -
5 Daun Jendela kaca kayu kempas/mahoni 3/10 5.04 m² Rp - Rp -
6 Rp -
PEKERJAAN PLAFOND ###
XI. Plafond calsiboard 4mm + rangka kayu 4/6 340.20 m² ### ###
1 ###
2 PEKERJAAN PENGECATAN/PLAMIRAN
3 Pengecatan dinding (depan) 66.85 m² ### ###
4 Pelamiran dinding 430.33 m² ### ###
5 Pelamiran plafond 340.20 m² ### ### ###
6 Pengecatan kayu 206.70 m² ### ###
Cat genteng 396.90 m² ### ###
XII. ###
1 PEKERJAAN LANTAI
Lantai rabat 216.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 4.00 bh ### ###
Engsel Pintu 21.00 bh ### ###
Engsel Jendela 24.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Grendel Jendela 12.00 bh ### ### ###
Hag Angin 24.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 14.00 bh ### ###
Lampu SL 8watt (teras) 4.00 bh ### ###
Saklar ganda 7.00 bh ### ###
REKAPITULASI
Saklar tunggal 3.00 bh ### ###
NCANA ANGGARAN BIAYA
Stop kontak + instalasi 4.00 bh ### ###
Instalasi titik lampu 18.00 bh ### ###
KEGIATAN ###
PEKE PEKERJAAN KACA
LING Kaca mati t=5 mm 14.49 m² ### ###
LOKASI ###

NO.

I
II
III
IV
V
VI
VII
VIII
IX
X 6
XI OK
LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 2 LABANG
: SMPN 2 LABANG KEC. LABANG KAB. BANGKALAN

TERBILANG : ( DUA RATUS SEMBILAN


URAIAN
PULUHPEKERJAAN
EN JUMLAH HARGA

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN Rp -
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
PEKERJAAN TANGGA DEPAN PINTU ###

JUMLAH ### ###


DIBULATK ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
ACHMAD TAUFIK HEYKAL, A.Sg H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Labang
Kec. Labang Kab. Bangkalan

Drs. HARTONO, M.Pd


NIP. 19690126 199802 1 003

NO
1
I.
1
2
3
4
5

II.
1

III.
1
2

IV.
1
2
3 Lembar. 2
JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
V. 2 3 4 5
1 PEKERJAAN PERSIAPAN ###
Pembongkaran atap + rangka 377.00 m² Rp - Rp -
VI. Pembongkaran kosen 1.00 bh ### ###
1 Pembongkaran dinding 6.00 m² ### ###
2 Penetelan plesteran 139.74 m² ### ###
3 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VII. PEKERJAAN PASANGAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps (nyepit kuda2) 30.91 m² Rp - Rp -
2 Rp -
3 PEKERJAAN RANGKA ATAP ###
4 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ Rp - Rp -
VIII. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Pilang (baru) 382.73 m² ### ###
Genteng bubungan Karang pilang 28.35 m' ### ###
IX. Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' Rp - Rp -
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsiboard 4mm + rangka hollow 354.38 m² Rp - Rp -
4 Rp -
5 PEKERJAAN PENGECATAN
6 Pengecatan dinding 598.50 m² Rp - Rp - ###
Pengecatan plafond 354.38 m² Rp - Rp -
X. Pengecatan kayu 274.60 m² Rp - Rp -
1 Rp -
PEKERJAAN LANTAI
XI. Keramik lantai 40 x 40 243.00 m² ### ###
1 Keramik dinding 25 x 40 139.74 m² ### ###
2 List keramik 102.00 m' ### ###
3 Keramik kolom 20 x 40 10.80 m² ### ###
4 ###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA ###
Kaca mati t=5 mm (yg pecah) 4.22 m² ### ###
###
PEKERJAAN TANGGA DEPAN PINTU
Pasangan batu gunung 2.88 m³ ### ###
Plesterran trasram 7.68 m² ### ###
Keramik kasar 40 x 40 7.04 m² ### ###
Urugan pasir 4.96 m³ ### ###
REKAPITULASI ###
NCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI

NO.

I
II
III
IV
V
VI
VII
VIII
IX
X 6
XI OK
XII BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 2 LABANG
: SMPN 2 LABANG KEC. LABANG KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA


TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
PEKERJAAN TANGGA DEPAN PINTU ###

JUMLAH ### ###


DIBULATK ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

ACHMAD TAUFIK HEYKAL, A.Sg H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Labang
Kec. Labang Kab. Bangkalan
Drs. HARTONO, M.Pd
NIP. 19690126 199802 1 003

NO
1
I.
1
2
3
4
5

II.
1
2
3

III.
1

IV.
1
2 Lembar. 2
JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
V. 2 3 4 5
1 PEKERJAAN PERSIAPAN ###
2 Pembongkaran atap + rangka 377.00 m² Rp - Rp -
3 Pembongkaran kosen 1.00 bh ### ###
Pembongkaran dinding 6.00 m² ### ###
VI. Penetelan plesteran 127.50 m² ### ###
1 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VII. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps (nyepit kuda2) 22.43 m² Rp - Rp - -
2 Plesteran 1Pc : 5Ps 16.20 m² ### ###
3 Benangan 32.00 m' ### ###
###
VIII. PEKERJAAN BETON
1 Ring balk gewel 15/15 0.40 m³ ### ###
2 ###
3 PEKERJAAN RANGKA ATAP ###
4 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ Rp - Rp -
IX. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Pilang (baru) 382.73 m² ### ###
Genteng bubungan Karang pilang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' Rp - Rp -
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsiboard 4mm + rangka hollow 354.38 m² Rp - Rp -
4 Rp -
5 PEKERJAAN PENGECATAN
6 Pengecatan dinding 598.50 m² Rp - Rp - ###
Pengecatan plafond 354.38 m² Rp - Rp -
XI. Pengecatan kayu 274.60 m² Rp - Rp -
1 Rp -
PEKERJAAN LANTAI
XII. Keramik lantai 40 x 40 243.00 m² ### ###
1 Keramik dinding 25 x 40 127.50 m² ### ###
2 List keramik 102.00 m' ### ###
3 Keramik kolom 20 x 40 10.80 m² ### ###
4 ###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Pintu harmonika 15.00 m² ### ### ###
### ###
PEKERJAAN INSTALASI LISTRIK ###
Lampu SL 14 watt 12.00 bh ### ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA ###
Kaca mati t=5 mm (yg pecah) 4.22 m² ### ###
###
PEKERJAAN TANGGA DEPAN PINTU 3.46
Pasangan batu gunung 2.88 m³ ### ###
Plesterran trasram 7.68 m² ### ###
Keramik kasar 40 x 40 7.04 m² ### ###
Urugan pasir 4.96 m³ ### ###
###
REKAPITULASI
NCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI

NO.

I
II
III
IV
V
VI
VII
VIII
IX
X 7
OK
LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 KWANYAR
: SMPN 2 KWANYAR KEC. KWANYAR KAB. BANGKALAN
TERBILANG : ( SERATUS SEMBILAN PULUH TUJUH JUTA DELAPAN RATUS RIBU RUPIAH )
URAIAN PEKERJAAN JUMLAH HARGA

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN/PLESTERAN Rp -
PEKERJAAN KAYU ###
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
PEKERJAAN TEMPAT DUDUK ###

JUMLAH ### ###


DIBULAT ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

MOHAMMAD MUSTOFA ZAHRON, S.Pd H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Kwanyar
Kec. Kwanyar Kab. Bangkalan

RAHMAWATI, M.Pd
NIP. 19700703 199802 2 003

NO
1
I.
1
2
3
4

II.
1
2

III.
1

IV.
1

V.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran kusen 1.00 bh ### ###
VI. Pembongkaran dinding 15.00 m² ### ###
1 Penetelan plesteran 428.64 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 Ls ### ###
3 ###
4 PEKERJAAN PASANGAN/PLESTERAN ###
5 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 0.91 22.20 m² Rp - Rp -
6 Plesteran 1Pc : 5Ps 1.07 44.40 m² Rp - Rp -
Rp -
VII. PEKERJAAN KAYU
1 Lisplank kayu 3/30 cm 4.00 m¹ ### ###
2 ###
3 PEKERJAAN PLAFOND
4 Plafond calsi 1 x 1 + rangka kayu 12.00 m² Rp - Rp -
Rp -
VIII. PEKERJAAN PENGECATAN
1 Pengecatan dinding (3 kelas) 455.30 m² Rp - Rp -
2 Pengecatan plafond 319.00 m² Rp - Rp -
3 Pengecatan kayu 206.70 m² Rp - Rp - ###
4 Pengecatan kayu (Kantor) 214.39 m² Rp - Rp -
5 Rp -
6PEKERJAAN LANTAI 162.00 ###
Keramik lantai 40 x 40 ( 2 R Kelas ) 5.67 126.00 m² ### ###
IX. Keramik lantai 40 x 40 ( Teras ) 1.62 36.00 m² ### ###
1 Keramik dinding 25 x 40 (dalam kelas + teras) 5.78 128.40 m² ### ###
Keramik kolom teras 25 x 40 1.01 22.40 m² ### ###
X. List keramik 1.64 327.80 m' ### ###
1 Keramik dinding 25 x 40 (dalam kantor+R.guru+ t 13.51 300.24 m² ### ###
2 451.04 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 3.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Hag Angin 60.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
REKAPITULASI
PEKERJAAN KACA
NCANA ANGGARAN BIAYA
Kaca mati t=5 mm (yg pecah) 1.68 m² ### ###
###
KEGI PEKERJAAN TEMPAT DUDUK
PEKE Pasangan trasram 0.68 17.00 m² Rp - Rp -
LING Plat beton tempat duduk t=10 cm 0.53 1.02 m³ ### ###
LOKA Keramik tempat duduk 30 x 30 0.46 10.20 m² ### ###
Keramik dinding tempat duduk 25 x 40 1.84 40.80 m² ### ###
NO. 34.71 ###
0.86768 40.80

I
II
III
IV
V
VI
VII
VIII
IX
X 7
OK
BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 KWANYAR
: SMPN 2 KWANYAR KEC. KWANYAR KAB. BANGKALAN
TERBILANG : ( SERATUS SEMBILAN PULUH TUJUH JUTA DELAPAN RATUS RIBU RUPIAH )
URAIAN PEKERJAAN JUMLAH HARGA
PEKERJAAN PERSIAPAN ###
PEKERJAAN PASANGAN/PLESTERAN Rp -
PEKERJAAN KAYU ###
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
PEKERJAAN TEMPAT DUDUK ###

JUMLAH ### ###


DIBULAT ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

MOHAMMAD MUSTOFA ZAHRON, S.Pd H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Kwanyar
Kec. Kwanyar Kab. Bangkalan

RAHMAWATI, M.Pd
NIP. 19700703 199802 2 003

NO
1
I.
1
2
3
4

II.
1
2

III.
1
2

IV.
1

V. Lembar. 2
1 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
2 2 3 4 5
3 PEKERJAAN PERSIAPAN
4 Pembongkaran kusen 1.00 bh ### ###
5 Pembongkaran dinding 15.00 m² ### ###
Penetelan plesteran 428.64 m² ### ###
VI. Pembersihan akhir pekerjaan 1.00 Ls ### ###
1 ###
2 PEKERJAAN PASANGAN/PLESTERAN ###
3 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 22.20 m² Rp - Rp -
4 Plesteran 1Pc : 5Ps 44.40 m² Rp - Rp -
5 Rp -
6 PEKERJAAN KAYU
Perbaikan daun pintu panil 4.00 bh ### ###
VII. Lisplank kayu 3/30 cm 4.00 m¹ ### ###
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsi 1 x 1 + rangka kayu 12.00 m² Rp - Rp -
4 Rp -
PEKERJAAN PENGECATAN
VIII. Pengecatan dinding (3 kelas) 439.90 m² Rp - Rp -
1 Pengecatan dinding (Kantor) 373.40 m² Rp - Rp -
2 Pengecatan plafond 319.00 m² Rp - Rp -
3 Pengecatan kayu 169.45 m² Rp - Rp - ###
4 Pengecatan kayu (Kantor) 197.69 m² Rp - Rp -
5 Rp -
6 PEKERJAAN LANTAI ###
Keramik lantai 40 x 40 ( 2 R Kelas ) 126.00 m² ### ###
IX. Keramik lantai 40 x 40 ( Teras ) 36.00 m² ### ###
1 Keramik dinding 25 x 40 (dalam kelas + teras) 128.40 m² ### ###
Keramik kolom teras 25 x 40 22.40 m² ### ###
X. List keramik 327.80 m' ### ###
1 Keramik dinding 25 x 40 (dalam kantor+R.guru+ teras) 300.24 m² ### ###
2 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 3.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Hag Angin 60.00 bh ### ###
Pintu harmonika 11.30 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK ###
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA
REKAPITULASI
Kaca mati t=5 mm (yg pecah) 1.68 m² ### ###
NCANA ANGGARAN BIAYA ###
PEKERJAAN TEMPAT DUDUK
KEGI Pasangan trasram 17.00 m² Rp - Rp -
PEKE Plat beton tempat duduk t=10 cm 1.02 m³ ### ###
LING Keramik tempat duduk 30 x 30 10.20 m² ### ###
LOKA Keramik dinding tempat duduk 25 x 40 40.80 m² ### ###
###
NO.

I
II
III
IV
V
VI
VII
VIII
IX
8
OK

: PENGADAAN SARANA PRASARANA


: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 KOKOP
TERBILANG : ( SERATU : SMPN 2 KOKOP KEC. KOKOP KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN/PLESTERAN Rp -
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ### ###
PEKERJAAN KACA ###
PEKERJAAN TEMPAT DUDUK ###

JUMLAH ### ###


DIBULATK ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

BOSTOMI, S.Pd H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Kokop
Kec. Kokop Kab. Bangkalan

MOHAMMAD TAUFIK, SPd


NIP. 19760326 200604 1 010
NO
1
I.
1
2

II.
1
2
3
III.
1

IV.
1
2
3

V. Lembar. 2
1 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
2 2 3 4 5
3 PEKERJAAN PERSIAPAN
4 Penetelan plesteran 317.46 m² ### ###
5 Pembersihan akhir pekerjaan 1.00 Ls Rp - Rp - #REF!
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 12.25 m² Rp - Rp -
5 Plesteran 1Pc : 5Ps 80.58 m² Rp - Rp -
6 Benangan 55.00 m' Rp - Rp -
7 Rp -
PEKERJAAN PLAFOND
VII. Plafond calsiboard 4mm + rangka kayu 15.00 m² Rp - Rp -
1 Rp -
2 PEKERJAAN PENGECATAN -
3 Pengecatan dinding 506.50 m² Rp - Rp -
4 Pengecatan plafond 352.00 m² Rp - Rp - #DIV/0!
5 Pengecatan kayu 275.60 m² Rp - Rp -
6 Rp -
PEKERJAAN LANTAI ###
VIII. Keramik lantai 40 x 40 243.00 m² ### ### 147.47
1 Keramik dinding 25 x 40 ( 3 R. Kelas + teras) 132.96 m² ### ###
List keramik 288.20 m' ### ###
IX. Keramik kolom 25 x 40 16.00 m² ### ###
1 Keramik dinding 25 x 40 ( 5 R. Kelas bg. dalam) 184.50 m² ### ###
2 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 5.00 bh ### ###
Grendel Jendela 50.00 bh ### ###
Hag Angin 100.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 20.00 bh ### ###
Lampu SL 8watt (teras) 5.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 5.00 bh ### ###
Stop kontak + instalasi 5.00 bh ### ###
Instalasi titik lampu 25.00 ttk ### ###
###
PEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 2.53 m² ### ###
###
PEKERJAAN TEMPAT DUDUK
Pasangan trasram 14.70 m² Rp - Rp -
Plat beton tempat duduk t=10 cm 0.74 m³ ### ###
Keramik tempat duduk 30 x 30 7.35 m² ### ###
Keramik dinding tempat duduk 25 x 40 29.40 m² ### ###
###

BATAS
SINERGI 1 SMPN 2 SEPULU DR. AHMAD SABARUDIN, S.Pd, M.MPd
SINERGI 2 SMPN 1 KLAMPIS IMAM SYAFII, S.Pd, MPd
SINERGI 3 SMPN 2 KOKOP MOHAMMAD TAUFIK, SPd
SINERGI 4 SMPN 3 SATAP KOKOP IHSANUDIN, S.Pd
INDRAKILA 5 SMPN 1 TRAGAH Drs. AMIRULLAH, MM
INDRAKILA 6 SMPN 2 MODUNG A S U R, M.Pd
INDRAKILA 7 SMPN 2 LABANG Drs. HARTONO, M.Pd
INDRAKILA 8 SMPN 2 KWANYAR RAHMAWATI, M.Pd
9 SMPN TAHAL AMIN H. ABDULLAH, S.Pd
10 SMPN 1 MODUNG Drs. ALI MUSTOFA, M.Pd
11 SMPN 1 GALIS Drs. TAUFIKUR RAHMAN
12 SMPN 1 KOKOP BUDIONO, S.Pd, M.Pd

13 SMPN 2 KONANG ABDUL RASID, S.Ag, M.PdI


14 SMPN TAHAL AMIN H. ABDULLAH, S.Pd

SMPN 1 KWANYAR MOHAMMAD SADALI, S.Pd


SMPN 1 TANJUNG BUMI Drs. M. AGUS SUBAGIO, M.Pd
SMPN 1 BLEGA SRI ASTUTIK HANDAYANI, M.Pd
SMPN 1 LABANG SUPRIYO, S.Pd, SE, M.PdI

SMPN 1 KWANYAR KEC. KWANYAR KAB. BANGKALAN MOHAMMAD SADALI, S.Pd


SMPN 1 TANJUNG BUMI KEC. TANJUNG BUMI KAB. BAN Drs. M. AGUS SUBAGIO, M.Pd
SMPN 1 BLEGA KEC. BLEGA KAB. BANGKALAN SRI ASTUTIK HANDAYANI, M.Pd
SMPN 2 TANAH MERAH KEC. T KOMARIYAH, S.Pd, M.MPd
SMPN TAHAL AMIN H. ABDULLAH, S.Pd
SMPN 1 GEGER Hj. SRI MULYATI, S.Pd, M.MPd
SMPN 1 GALIS
SMPN 1 TANAH MERAH DYAH CHANDRAWATI, S.Pd
SMPN 2 GEGER SITI YAUMAH, S.Pd
SMPN 4 SATAP TANAH MERA MOH. YUSUF, S.Pd
SMPN 1 KONANG Drs. ANANG ISKANDAR, MM

28.5
23.5
7.833333

1 ( Satu )
5 Oktob. s/d 10 Oktober 2015
Oktober 2015
29 Oktober 2015
Rp. 212.320.000.00
Prestasi Pekerjaan Prestasi Pekerjaan
Minggu Ini (%) Komulatif (%)
Rerata Prestasi Rerata
(9) (10) (11)
(8)/100x(5) (6)+(8) (7)+(9)

0.97 100.00 0.97 Rp 12,375.00 Rp 1,769,625.00


0.97 100.00 0.97 Rp 7,500.00 Rp 1,761,750.00
1.01 100.00 1.01 Rp 20,000.00 Rp 1,843,200.00
- - - Rp 200,000.00 Rp 200,000.00
Rp 5,574,575.00

- - - Rp 88,586.67 Rp 1,638,853.33
- - - Rp 42,298.80 Rp 1,565,055.60
- - - Rp - Rp -
Rp 3,203,908.93

- - - Rp 3,912,550.00 Rp 234,753.00
- - - Rp 3,962,550.00 Rp 114,121.44
- - - Rp 3,962,550.00 Rp 1,027,092.96
- - - Rp 3,962,550.00 Rp 1,255,335.84
Rp 2,631,303.24

- - - Rp 185,000.00 Rp 25,849,125.00
- - - Rp 185,000.00 Rp 21,929,437.50
- - - Rp 65,000.00 Rp 3,100,500.00
Rp 50,879,062.50

- - - Rp 18,000.00 Rp 2,515,050.00
- - - Rp 110,000.00 Rp 26,078,250.00
- - - Rp 95,820.00 Rp 2,558,394.00
- - - Rp 21,149.40 Rp 1,184,366.40
Rp 32,336,060.40

- - - Rp 85,000.00 Rp 22,185,000.00
Rp 22,185,000.00

- - - Rp 20,740.00 Rp 10,805,637.48
- - - Rp 20,740.00 Rp 5,413,140.00
- - - Rp 42,450.00 Rp 4,752,702.00
Rp 20,971,479.48

- - - Rp 105,250.00 Rp 3,315,375.00
- - - Rp 112,000.00 Rp 16,800,000.00
- - - Rp 136,075.00 Rp 12,540,672.00
- - - Rp 85,000.00 Rp 6,528,000.00
Rp 39,184,047.00

- - - Rp 55,000.00 Rp 660,000.00
- - - Rp 50,000.00 Rp 150,000.00
- - - Rp 20,000.00 Rp 80,000.00
- - - Rp 15,000.00 Rp 75,000.00
- - - Rp 225,000.00 Rp 1,125,000.00
Rp 200,000.00 Rp 3,000,000.00
Rp 5,090,000.00
- - - Rp 112,125.00 Rp 376,964.25
Rp 376,964.25

2.95 2.95

Rp 20,300,000.00 2.95 %
1 ( Satu )
5 Oktob. s/d 10 Oktober 2015
Oktober 2015
29 Oktober 2015

Prestasi Pekerjaan Prestasi Pekerjaan


Minggu Ini (%) Komulatif (%)
Rerata Prestasi Rerata
(9) (10) (11)
(8)/100x(5) (6)+(8) (7)+(9)
0.20 100.00 0.20 Rp 50,000.00 Rp 600,000.00
0.08 100.00 0.08 Rp 20,000.00 Rp 240,000.00
- - - Rp 200,000.00 Rp 200,000.00
Rp 1,040,000.00

- - - Rp 58,500.00 Rp 126,360.00
- - - Rp 215,400.00 Rp 77,544.00
- - - Rp 16,110.00 Rp 17,398.80
Rp 221,302.80

- - - Rp 88,586.67 Rp 3,790,281.61
- - - Rp 42,298.80 Rp 3,619,604.84
- - - Rp 11,825.00 Rp 3,651,560.00
Rp 11,061,446.45

- - - Rp 897,800.00 Rp 161,604.00
- - - Rp 3,962,550.00 Rp 2,139,777.00
- - - Rp 3,962,550.00 Rp 3,120,508.13
- - - Rp 3,962,550.00 Rp 5,943,825.00
- - - Rp 3,962,550.00 Rp 9,510,120.00
- - - Rp 3,962,550.00 Rp 941,501.88
Rp 21,817,336.01

- - - Rp 210,000.00 Rp 77,723,100.00
- - - Rp 65,000.00 Rp 5,063,500.00
Rp 82,786,600.00

- - - Rp 80,500.00 Rp 16,325,400.00
- - - Rp 18,000.00 Rp 3,011,580.00
- - - Rp 95,820.00 Rp 2,429,037.00
- - - Rp 21,149.40 Rp 617,562.48
Rp 22,383,579.48

- - - Rp 11,431,250.00 Rp 14,644,117.13
- - - Rp 618,250.00 Rp 5,375,065.50
- - - Rp 430,475.00 Rp 7,148,037.38
- - - Rp 419,572.50 Rp 4,833,475.20
Rp 32,000,695.20

- - - Rp 85,000.00 Rp 25,857,000.00
Rp 25,857,000.00

- - - Rp 20,740.00 Rp 12,412,890.00
- - - Rp 20,740.00 Rp 6,309,108.00
- - - Rp 42,450.00 Rp 8,774,415.00
Rp 27,496,413.00

- - - Rp 112,000.00 Rp 26,880,000.00
- - - Rp 136,075.00 Rp 17,662,535.00
- - - Rp 136,075.00 Rp 870,880.00
- - - Rp 85,000.00 Rp 10,115,000.00
Rp 55,528,415.00

- - - Rp 140,750.00 Rp 422,250.00
- - - Rp 23,625.00 Rp 425,250.00
- - - Rp 16,687.50 Rp 267,000.00
- - - Rp 74,250.00 Rp 222,750.00
- - - Rp 14,750.00 Rp 236,000.00
- - - Rp 17,750.00 Rp 284,000.00
Rp 1,857,250.00

- - - Rp 55,000.00 Rp 660,000.00
- - - Rp 50,000.00 Rp 150,000.00
- - - Rp 20,000.00 Rp 60,000.00
- - - Rp 15,000.00 Rp 45,000.00
- - - Rp 225,000.00 Rp 675,000.00
- - - Rp 200,000.00 Rp 3,000,000.00
Rp 4,590,000.00

- - - Rp 112,125.00 Rp 3,038,587.50
Rp 3,038,587.50

0.28 -
Rp 20,300,000.00 - %
1 ( Satu )
5 Oktob. s/d 10 Oktober 2015
Oktober 2015
29 Oktober 2015

Prestasi Pekerjaan Prestasi Pekerjaan


Minggu Ini (%) Komulatif (%)
Rerata Prestasi Rerata Lembar. 2
(9) (10) (11) HARGA SATUAN JUMLAH HARGA
(8)/100x(5) (6)+(8) (7)+(9) 4 5

- 100.00 1.70 Rp 12,375.00 Rp 3,217,500.00


- 100.00 0.32 Rp 50,000.00 Rp 600,000.00
- 100.00 0.65 Rp 20,000.00 Rp 1,235,000.00
- - - Rp 200,000.00 Rp 200,000.00
Rp 5,252,500.00

- 100.00 0.05 Rp 58,500.00 Rp 88,452.00


- 100.00 0.03 Rp 215,400.00 Rp 54,280.80
0.00 100.00 0.01 Rp 16,110.00 Rp 12,179.16
Rp 154,911.96

4.29 100.00 4.29 Rp 88,586.67 Rp 8,133,700.58


4.10 100.00 4.10 Rp 42,298.80 Rp 7,767,439.21
0.16 15.00 0.16 Rp 11,825.00 Rp 2,045,725.00
Rp 17,946,864.80

- - - Rp 897,800.00 Rp 274,726.80
- - - Rp 3,962,550.00 Rp 1,497,843.90
- - - Rp 3,962,550.00 Rp 1,872,304.88
- - - Rp 3,962,550.00 Rp 4,220,115.75
- - - Rp 3,962,550.00 Rp 4,992,813.00
- - - Rp 3,962,550.00 Rp 2,225,368.08
Rp 15,083,172.41

- - - Rp 210,000.00 Rp 53,841,375.00
- - - Rp 65,000.00 Rp 4,238,000.00
Rp 58,079,375.00

- - - Rp 80,500.00 Rp 15,344,910.00
- - - Rp 18,000.00 Rp 2,002,725.00
- - - Rp 95,820.00 Rp 1,854,117.00
- - - Rp 21,149.40 Rp 560,459.10
Rp 19,762,211.10

- - - Rp 115,000.00 Rp 11,012,400.00
- - - Rp 2,000,000.00 Rp 8,000,000.00
- - - Rp 500,000.00 Rp 4,000,000.00
Rp 23,012,400.00

- - - Rp 85,000.00 Rp 17,105,400.00
Rp 17,105,400.00

- - - Rp 20,740.00 Rp 1,119,960.00
- - - Rp 9,670.00 Rp 3,331,315.00
- - - Rp 9,670.00 Rp 1,945,990.80
- - - Rp 42,450.00 Rp 830,322.00
Rp 7,227,587.80

- - - Rp 112,000.00 Rp 18,144,000.00
- - - Rp 136,075.00 Rp 762,020.00
Rp 18,906,020.00

- - - Rp 140,750.00 Rp 281,500.00
- - - Rp 23,625.00 Rp 283,500.00
- - - Rp 16,687.50 Rp 267,000.00
- - - Rp 74,250.00 Rp 148,500.00
- - - Rp 14,750.00 Rp 236,000.00
- - - Rp 17,750.00 Rp 284,000.00
Rp 1,500,500.00

- - - Rp 55,000.00 Rp 440,000.00
- - - Rp 50,000.00 Rp 100,000.00
- - - Rp 20,000.00 Rp 40,000.00
- - - Rp 15,000.00 Rp 30,000.00
- - - Rp 225,000.00 Rp 450,000.00
- - - Rp 200,000.00 Rp 2,000,000.00
Rp 3,060,000.00

- - - Rp 112,125.00 Rp 2,318,745.00
Rp 2,318,745.00
8.56 11.31
Rp 21,415,000.00 11.31 %

Bangkalan, 2018 Rp 189,409,688.06


Dibuat oleh 21415410.5058365
Fasilitator / Perencana Rp 21,415,000.00
H. SUBADRIH, ST, MT

LAMA
140

BARU
LAMA
BARU
LAMA
BARU
LAMA
BARU
keramik tambal sulam
SADALI, S.Pd
UBAGIO, M.Pd
NDAYANI, M.Pd
1 2 3 4 5

0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
1.01 100 1.01 100 1.01 100 1.01 100 1.01 100
0.11 - - - - - - - - -
0.90 - - 100 0.90 100 0.90 100 0.90 100
0.86 - - - - 100 0.86 100 0.86 100
- - - - - 100 - 100 - 100

0.13 - - - - - - 50 0.06 100


0.06 - - - - - - - - 100
0.56 - - - - - - - - 100
0.69 - - - - - - - - 50

14.17 - - - - - - - - -
12.02 - - - - - - - - -
1.70 - - - - - - - - -

1.38 - - - - - - - - -
14.29 - - - - - - - - -
1.40 - - - - - - - - -
0.65 - - - - - - - - -

12.16 - - - - - - - - -

5.92 - - - - - - - - -
2.97 - - - - - - - - -
2.61 - - - - - - - - -

1.82 - - - - - - - - -
9.21 - - - - - - - - -
6.87 - - - - - - - - -
3.58 - - - - - - - - -

0.36 - - - - - - - - -
0.08 - - - - - - - - -
0.04 - - - - - - - - -
0.04 - - - - - - - - -
0.62 - - - - - - - - -
1.64 - - - - - - - - -
0.21 - - - - - - - - -
1 2 3 4 5
0.20 100 0.20 100 0.20 100 0.20 100 0.20 100
0.08 100 0.08 100 0.08 100 0.08 100 0.08 100
0.07 - - - - - - - - -

0.04 - - 100 0.04 100 0.04 100 0.04 100


0.03 - - - - 100 0.03 100 0.03 100
0.01 - - - - 100 0.01 100 0.01 100

1.24 - - - - - - 50 0.62 100


1.19 - - - - - - - - 100
1.20 - - - - - - - - 100

0.05 - - - - - - 25 0.01 50
0.70 - - - - - - - - 50
1.02 - - - - - - - - -
1.95 - - - - - - - - -
3.12 - - - - - - - - 50
0.31 - - - - - - - - 75

25.51 - - - - - - - - -
1.66 - - - - - - - - -

5.36 - - - - - - - - -
0.99 - - - - - - - - -
0.80 - - - - - - - - -
0.20 - - - - - - - - -

4.81 - - - - - - - - 50
1.76 - - - - - - - - -
2.35 - - - - - - - - -
1.59 - - - - - - - - -

8.49 - - - - - - - - -

4.07 - - - - - - - - -
2.07 - - - - - - - - -
2.88 - - - - - - - - -

8.82 - - - - - - - - -
5.80 - - - - - - - - -
0.29 - - - - - - - - -
3.32 - - - - - - - - -

0.14 - - - - - - - - -
0.14 - - - - - - - - -
0.09 - - - - - - - - -
0.07 - - - - - - - - -
0.08 - - - - - - - - -
0.09 - - - - - - - - -

0.22 - - - - - - - - -
0.05 - - - - - - - - -
0.02 - - - - - - - - -
0.01 - - - - - - - - -
0.22 - - - - - - - - -
0.98 - - - - - - - - -

1.00 - - - - - - - - -
1 2 3 4 5

1.70 100 1.70 100 1.70 100 1.70 100 1.70 100
0.32 100 0.32 100 0.32 100 0.32 100 0.32 100
0.65 100 0.65 100 0.65 100 0.65 100 0.65 100
0.11 - - - - - - - - -

0.05 100 0.05 100 0.05 100 0.05 100 0.05 100
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100
0.01 50 0.00 100 0.01 100 0.01 100 0.01 100

4.29 - - 100 4.29 100 4.29 100 4.29 100


4.10 - - 100 4.10 100 4.10 100 4.10 100
1.08 - - 15 0.16 100 1.08 100 1.08 100

0.15 - - - - 75 0.11 100 0.15 100


0.79 - - - - - - 50 0.40 100
0.99 - - - - - - 10 0.10 75
2.23 - - - - - - - - -
2.64 - - - - - - - - -
1.17 - - - - - - - - -
28.43 - - - - - - - - -
2.24 - - - - - - - - -

8.10 - - - - - - - - -
1.06 - - - - - - - - -
0.98 - - - - - - - - -
0.30 - - - - - - - - -

5.81 - - - - 75 4.36 100 5.81 100


4.22 - - - - 15 0.63 55 2.32 100
2.11 - - - - - - - - 100

9.03 - - - - - - - - -

0.59 - - - - - - - - -
1.76 - - - - - - - - -
1.03 - - - - - - - - 75
0.44 - - - - - - - - -

9.58 - - - - - - - - -
0.40 - - - - - - - - -

0.15 - - - - - - - - -
0.15 - - - - - - - - -
0.14 - - - - - - - - -
0.08 - - - - - - - - -
0.12 - - - - - - - - -
0.15 - - - - - - - - -

0.23 - - - - - - - - -
0.05 - - - - - - - - -
0.02 - - - - - - - - -
0.02 - - - - - - - - -
0.24 - - - - - - - - -
1.06 - - - - - - - - -

1.22 - - - - - - - - -
6 7 8 9 10

0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
1.01 100 1.01 100 1.01 100 1.01 100 1.01 100
- - - - - - - 100 0.11 100
0.90 100 0.90 100 0.90 100 0.90 100 0.90 100
0.86 100 0.86 100 0.86 100 0.86 100 0.86 100
- 100 - 100 - 100 - 100 - 100

0.13 100 0.13 100 0.13 100 0.13 100 0.13 100
0.06 100 0.06 100 0.06 100 0.06 100 0.06 100
0.56 100 0.56 100 0.56 100 0.56 100 0.56 100
0.34 100 0.69 100 0.69 100 0.69 100 0.69 100

- 100 14.17 100 14.17 100 14.17 100 14.17 100


- 100 12.02 100 12.02 100 12.02 100 12.02 100
- 25 0.42 100 1.70 100 1.70 100 1.70 100

- - - - - 100 1.38 100 1.38 100


- - - - - 100 14.29 100 14.29 100
- - - - - 100 1.40 100 1.40 100
- - - - - 100 0.65 100 0.65 100

- - - - - - - 100 12.16 100

- - - - - 50 2.96 100 5.92 100


- - - - - - - 100 2.97 100
- - - - - - - 100 2.61 100

- - - - - 50 0.91 100 1.82 100


- - - - - 100 9.21 100 9.21 100
- - - - - - - 100 6.87 100
- - - - - - - - - 100

- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
6 7 8 9 10
0.20 100 0.20 100 0.20 100 0.20 100 0.20 100
0.08 100 0.08 100 0.08 100 0.08 100 0.08 100
- - - - - - - - - 100

0.04 100 0.04 100 0.04 100 0.04 100 0.04 100
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100
0.01 100 0.01 100 0.01 100 0.01 100 0.01 100

1.24 100 1.24 100 1.24 100 1.24 100 1.24 100
1.19 100 1.19 100 1.19 100 1.19 100 1.19 100
1.20 100 1.20 100 1.20 100 1.20 100 1.20 100

0.03 100 0.05 100 0.05 100 0.05 100 0.05 100
0.35 100 0.70 100 0.70 100 0.70 100 0.70 100
- 50 0.51 100 1.02 100 1.02 100 1.02 100
- 50 0.98 100 1.95 100 1.95 100 1.95 100
1.56 75 2.34 100 3.12 100 3.12 100 3.12 100
0.23 100 0.31 100 0.31 100 0.31 100 0.31 100

- - - 100 25.51 100 25.51 100 25.51 100


- - - - - 100 1.66 100 1.66 100

- - - - - 50 2.68 100 5.36 100


- - - - - 50 0.49 100 0.99 100
- - - - - - - 100 0.80 100
- - - - - - - 100 0.20 100

2.40 100 4.81 100 4.81 100 4.81 100 4.81 100
- - - - - - - 100 1.76 100
- - - - - - - 100 2.35 100
- - - - - 50 0.79 100 1.59 100

- - - - - - - 50 4.24 100

- - - 50 2.04 100 4.07 100 4.07 100


- - - - - - - 50 1.04 100
- - - - - 50 1.44 100 2.88 100

- - - - - - - 75 6.62 100
- - - - - - - 50 2.90 100
- - - - - - - 50 0.14 100
- - - - - - - - - 100

- - - - - - - 100 0.14 100


- - - - - - - 100 0.14 100
- - - - - - - 100 0.09 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100

- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100

- - - - - - - 100 1.00 100


6 7 8 9 10

1.70 100 1.70 100 1.70 100 1.70 100 1.70 100
0.32 100 0.32 100 0.32 100 0.32 100 0.32 100
0.65 100 0.65 100 0.65 100 0.65 100 0.65 100
- - - - - - - - - 100

0.05 100 0.05 100 0.05 100 0.05 100 0.05 100
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100
0.01 100 0.01 100 0.01 100 0.01 100 0.01 100

4.29 100 4.29 100 4.29 100 4.29 100 4.29 100
4.10 100 4.10 100 4.10 100 4.10 100 4.10 100
1.08 100 1.08 100 1.08 100 1.08 100 1.08 100

0.15 100 0.15 100 0.15 100 0.15 100 0.15 100
0.79 100 0.79 100 0.79 100 0.79 100 0.79 100
0.74 100 0.99 100 0.99 100 0.99 100 0.99 100
- 100 2.23 100 2.23 100 2.23 100 2.23 100
- 100 2.64 100 2.64 100 2.64 100 2.64 100
- 100 1.17 100 1.17 100 1.17 100 1.17 100
- 25 7.11 100 28.43 100 28.43 100 28.43 100
- - - 100 2.24 100 2.24 100 2.24 100

- - - 85 6.89 100 8.10 100 8.10 100


- - - - - 100 1.06 100 1.06 100
- - - - - 100 0.98 100 0.98 100
- - - - - 100 0.30 100 0.30 100

5.81 100 5.81 100 5.81 100 5.81 100 5.81 100
4.22 100 4.22 100 4.22 100 4.22 100 4.22 100
2.11 100 2.11 100 2.11 100 2.11 100 2.11 100

- - - - - 85 7.68 100 9.03 100

- 50 0.30 100 0.59 100 0.59 100 0.59 100


- 50 0.88 100 1.76 100 1.76 100 1.76 100
0.77 100 1.03 100 1.03 100 1.03 100 1.03 100
- - - - - 100 0.44 100 0.44 100

- - - 25 2.39 100 9.58 100 9.58 100


- - - - - 85 0.34 100 0.40 100

- 100 0.15 100 0.15 100 0.15 100 0.15 100


- 100 0.15 100 0.15 100 0.15 100 0.15 100
- 100 0.14 100 0.14 100 0.14 100 0.14 100
- 100 0.08 100 0.08 100 0.08 100 0.08 100
- 100 0.12 100 0.12 100 0.12 100 0.12 100
- 100 0.15 100 0.15 100 0.15 100 0.15 100

- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100

- - - - - - - - - 100
0.97
0.97
1.01
0.11
0.90
0.86
-

0.13
0.06
0.56
0.69

14.17
12.02
1.70

1.38
14.29
1.40
0.65

12.16

5.92
2.97
2.61

1.82
9.21
6.87
3.58

0.36
0.08
0.04
0.04
0.62
1.64
0.21
0.20
0.08
0.07

0.04
0.03
0.01

1.24
1.19
1.20

0.05
0.70
1.02
1.95
3.12
0.31

25.51
1.66

5.36
0.99
0.80
0.20

4.81
1.76
2.35
1.59

8.49

4.07
2.07
2.88

8.82
5.80
0.29
3.32

0.14
0.14
0.09
0.07
0.08
0.09

0.22
0.05
0.02
0.01
0.22
0.98

1.00
1.70
0.32
0.65
0.11

0.05
0.03
0.01

4.29
4.10
1.08

0.15
0.79
0.99
2.23
2.64
1.17
28.43
2.24

8.10
1.06
0.98
0.30

5.81
4.22
2.11

9.03

0.59
1.76
1.03
0.44

9.58
0.40

0.15
0.15
0.14
0.08
0.12
0.15

0.23
0.05
0.02
0.02
0.24
1.06

1.22
YANG DIPAKAI
TH. 2018
1 SMPN 2 SEPULU 2 KELAS ### SINERGI
2 SMPN 1 KLAMPIS 3 KELAS ### SINERGI
3 SMPN 2 KOKOP 2 KELAS ### SINERGI
4 SMPN 3 SATAP KOKOP 2 KELAS ### SINERGI
5 SMPN 1 TRAGAH 3 KELAS ### INDRAKILA
6 SMPN 2 MODUNG 2 KELAS ### INDRAKILA
7 SMPN 2 LABANG 3 KELAS ### INDRAKILA
8 SMPN 2 KWANYAR 2 KELAS ### INDRAKILA
9 SMPN TAHAL AMIN H. ABDULLAH, S.Pd

REKAPITULASI 1
RENCANA ANGGARAN BIAYA OK
OK
KEGIATAN : PENGADAAN SARANA PRASARANA
PEKERJAAN : PERENCANAAN SMP KABUPATEN BANGKALAN
LINGKUP PEKERJAAN : REHABILITASI 2 RUANG BELAJAR SMPN 2 SEPULU
LOKASI : SMPN 2 SEPULU KEC. SEPULU KAB. BANGKALAN

NO. URAIAN PEKERJAAN JUMLAH HARGA

I PEKERJAAN PERSIAPAN ###


II PEKERJAAN PASANGAN/PLESTERAN ###
III PEKERJAAN BETON ###
IV PEKERJAAN RANGKA ATAP ###
V PEKERJAAN ATAP ###
VI PEKERJAAN PLAFOND ###
VII PEKERJAAN PENGECATAN ###
VIII PEKERJAAN LANTAI ###
IX PEKERJAAN INSTALASI LISTRIK ###
X PEKERJAAN KACA ###

JUMLAH ###
DIBULATK ### ###
###

TERBILANG : ( SERATUS DELAPAN PULUH TIGA JUTA RUPIAH )

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

ANWAR NURIS, S.Pd.I H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Sepulu
Kec. Sepulu Kab. Bangkalan

DR. AHMAD SABARUDIN, S.Pd, M.MPd


NIP. 19680503 199103 1 013

LAPORAN MINGGUAN
Minggu ke :
Pekerjaan : REHABILITASI 2 RUANG KELAS SMPN 2 SEPULU Tanggal :
Nama Sekolah : SMPN 2 SEPULU Bulan :
Lokasi : Kec. Kedamean Kab. Gresik Dana diterima tangal :
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%)
% Prestasi Rerata Prestasi
(1) (2) (3) (4) (5) (6) (7) (8)
(6)/100x(5)
I. PEKERJAAN PERSIAPAN
1 Pembongkaran atap + rangka atap 143.00 m² 0.97 - - 100
2 Pembongkaran atap 234.90 m² 0.97 - - 100
3 Penetelan plesteran 92.16 m² 1.01 - - 100
4 Pembersihan akhir pekerjaan 1.00 ls 0.11 - - -
II. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 18.50 m² 0.90 - - -
2 Plesteran 1Pc : 5Ps 37.00 m² 0.86 - - -
3 Benangan 48.00 m' - - - -

III. PEKERJAAN BETON


1 Kolom Struktur 15/25 0.06 m³ 0.13 - - -
2 Kolom Praktis 15/15 0.03 m³ 0.06 - - -
3 Ring Balk 15/15 0.26 m³ 0.56 - - -
4 Ring gewel 15/15 dan konsol beton 15/15 0.32 m³ 0.69 - - -

IV. PEKERJAAN RANGKA ATAP


1 Kuda-kuda baja ringan (galvalum bentang 7m) 139.73 m² 14.17 - - -
2 Kuda-kuda baja ringan (galvalum 50%) 118.54 m² 12.02 - - -
2 Listplank kalsiplank 8mm / 30 cm 47.70 m¹ 1.70 - - -

V. PEKERJAAN ATAP
1 Atap genteng beton (lama) 139.73 m² 1.38 - - -
2 Atap genteng beton warna 237.08 m² 14.29 - - -
3 Genteng bubungan beton warna 26.70 m' 1.40 - - -
4 Plesteran kompres L = 10 cm (Akhiran genting) 56.00 m' 0.65 - - -

VI. PEKERJAAN PLAFOND


1 Plafond calsiboard 4mm + rangka metal hollow 261.00 m² 12.16 - - -

VII. PEKERJAAN PENGECATAN


1 Pengecatan dinding 521.00 m² 5.92 - - -
2 Pengecetan plafond 261.00 m² 2.97 - - -
3 Pengecatan kayu 111.96 m² 2.61 - - -

VIII. PEKERJAAN LANTAI


1 Keramik lantai 30 x 30 ( tambal sulam 1kelas) 31.50 m² 1.82 - - -
2 Keramik lantai 40 x 40 150.00 m² 9.21 - - -
3 Keramik dinding R.Lab 25 x 40 92.16 m² 6.87 - - -
4 List keramik 76.80 m' 3.58 - - -

IX. PEKERJAAN INSTALASI LISTRIK


1 Lampu SL 14 watt 12.00 bh 0.36 - - -
2 Lampu SL 8 watt (teras) 3.00 bh 0.08 - - -
3 Saklar ganda 4.00 bh 0.04 - - -
4 Saklar tunggal 5.00 bh 0.04 - - -
5 Stop kontak + instalasi 5.00 bh 0.62 - - -
6 Instalasi titik lampu 15.00 ttk 1.64
X. PEKERJAAN KACA
1 Kaca mati t=5 mm (yg pecah) 3.36 m² 0.21 - - -

JUMLAH 100.00 -
Jumlah dana yang digunakan sampai dengan minggu ini ( minggu ke 1 ) Rp 20,300,000.00

REKAPITULASI 2
RENCANA ANGGARAN BIAYA OK

KEGIATAN : PENGADAAN SARANA PRASARANA


PEKERJAAN : PERENCANAAN SMP KABUPATEN BANGKALAN
LINGKUP PEKERJAAN : REHABILITASI 3 RUANG BELAJAR SMPN 1 KLAMPIS
LOKASI : SMPN 1 KLAMPIS KEC. KLAMPIS KAB. BANGKALAN

NO. URAIAN PEKERJAAN JUMLAH HARGA

I (2) ###
II PEKERJAAN TANAH ###
III PEKERJAAN PASANGAN/PLESTERAN ###
IV PEKERJAAN BETON ###
V PEKERJAAN RANGKA ATAP ###
VI PEKERJAAN ATAP ###
VII PEKERJAAN KUSEN PINTU DAN JENDELA ###
VIII PEKERJAAN PLAFOND ###
IX PEKERJAAN PENGECATAN/PLAMIRAN ###
X PEKERJAAN LANTAI ###
XI PEKERJAAN KUNCI + PENGGANTUNG ###
XII PEKERJAAN INSTALASI LISTRIK ### ###
XIII PEKERJAAN KACA ###

JUMLAH ### ###


DIBULATK ### ###
TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

HANAF I H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 1 Kelampis
Kec. Kelampis Kab. Bangkalan

IMAM SYAFII, S.Pd, MPd


NIP. 19680228 199401 1 003

LAPORAN MINGGUAN
Minggu ke :
Pekerjaan : REHABILITASI 2 RUANG KELAS SMPN 1 KLAMPIS Tanggal :
Nama Sekolah : SMPN 1 KLAMPIS Bulan :
Lokasi : Kec. Kedamean Kab. Gresik Dana diterima tangal :
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%)
% Prestasi Rerata Prestasi
(1) (2) (3) (4) (5) (6) (7) (8)
I. PEKERJAAN PERSIAPAN (6)/100x(5)
1 Pembongkaran kosen 12.00 bh 0.20 - - 100
2 Penetelan plesteran 12.00 m² 0.08 - - 100
3 Pembersihan akhir pekerjaan 1.00 ls 0.07 - - -

II. PEKERJAAN TANAH


1 Galian tanah 2.16 m³ 0.04 - - -
2 Urugan pasir bawah pondasi t=10cm 0.36 m³ 0.03 - - -
4 Urugan tanah kembali 1.08 m³ 0.01 - - -

III. PEKERJAAN PASANGAN/PLESTERAN


1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 42.79 m² 1.24 - - -
2 Plesteran 1Pc : 5Ps 85.57 m² 1.19 - - -
3 Benangan 308.80 m' 1.20 - - -

IV. PEKERJAAN BETON


1 Lantai kerja bawah pondasi 1:3:5 t=5cm 0.18 m³ 0.05 - - -
2 Pondasi beton stempat 60 x 60 x 15cm 0.54 m³ 0.70 - - -
3 Kolom teras 15/15 0.79 m³ 1.02 - - -
4 Balok beton 15/20 1.50 m³ 1.95 - - -
5 Kolom beon 15/20 2.40 m³ 3.12 - - -
6 Kolom praktis 15/15 0.24 m³ 0.31 - - -
5.65
V. PEKERJAAN RANGKA ATAP
1 Kuda-kuda baja ringan (galvalum 75mm) (betang. 370.11 m² 25.51 - - -
2 Lisplank kalsiplank 8mm / 30 cm 77.90 m¹ 1.66 - - -

VI. PEKERJAAN ATAP


1 Atap genteng Karang Penang (baru bg. depan) 202.80 m² 5.36 - - -
2 Atap genteng (lama bg. belakang) 167.31 m² 0.99 - - -
3 Genteng bubungan Karang penang 25.35 m' 0.80 - - -
4 Plesteran kompres L = 10 cm (Akhiran genting) 29.20 m' 0.20 - - -

VII. PEKERJAAN KUSEN PINTU DAN JENDELA


1 Kusen kayu kempas/mahoni 6/15 1.28 m³ 4.81 - - -
2 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 8.69 m² 1.76 - - -
3 Jalusi kayu kempas/mahoni 3/5 16.61 m² 2.35 - - -
4 Daun Jendela kaca kayu kempas/mahoni 3/10 11.52 m² 1.59 - - -

VIII. PEKERJAAN PLAFOND


1 Plafond calsiboard 4mm + rangka kayu 4/6 304.20 m² 8.49 - - -

IX. PEKERJAAN PENGECATAN/PLAMIRAN


1 Pengecatan dinding 598.50 m² 4.07 - - -
2 Pengecatan plafond 304.20 m² 2.07 - - -
3 Pengecatan kayu 206.70 m² 2.88 - - -

X. PEKERJAAN LANTAI
1 Keramik lantai 40 x 40 240.00 m² 8.82 - - -
2 Keramik dinding 25 x 40 129.80 m² 5.80 - - -
3 Keramik kolom 25 x 40 6.40 m² 0.29 - - -
4 List keramik 119.00 m' 3.32 - - -

XI. PEKERJAAN KUNCI + PENGGANTUNG


1 Kunci pintu 2 x putar 3.00 bh 0.14 - - -
2 Engsel Pintu 18.00 bh 0.14 - - -
3 Engsel Jendela 16.00 bh 0.09 - - -
4 Grendel tanam 3.00 bh 0.07 - - -
5 Grendel Jendela 16.00 bh 0.08 - - -
6 Hag Angin 16.00 bh 0.09 - - -

XII. PEKERJAAN INSTALASI LISTRIK


1
Lampu SL 14 watt 12.00 bh 0.22 - - -
2
Lampu SL 8watt (teras) 3.00 bh 0.05 - - -
3
Saklar ganda 3.00 bh 0.02 - - -
4
Saklar tunggal 3.00 bh 0.01 - - -
5 Stop kontak + instalasi 3.00 bh 0.22 - - -
6 Instalasi titik lampu 15.00 ttk 0.98 - - -

XIII. PEKERJAAN KACA


1 Kaca bening t=5 mm 27.10 m² 1.00 - - -

JUMLAH 95.07 -
Jumlah dana yang digunakan sampai dengan minggu ini ( minggu ke 1 ) Rp 20,300,000.00

3
REKAPITULASI OK
NCANA ANGGARAN BIAYA OK
: PENGADAAN SARANA PRASARANA
KEGIATAN : PERENCANAAN SMP KABUPATEN BANGKALAN
PEKERJAAN : REHABILITASI 2 RUANG BELAJAR SMPN 3 SATAP KOKOP
LINGKUP PEKERJAAN : SMPN 3 SATAP KOKOP KEC. KOKOP KAB. BANGKALAN
LOKASI
URAIAN PEKERJAAN JUMLAH HARGA
NO.

PEKERJAAN PERSIAPAN ###


I PEKERJAAN TANAH ###
II PEKERJAAN PASANGAN/PLESTERAN ###
III PEKERJAAN BETON ###
IV PEKERJAAN RANGKA ATAP ###
V PEKERJAAN ATAP ###
VI PEKERJAAN KUSEN PINTU DAN JENDELA ###
VII PEKERJAAN PLAFOND ###
VIII PEKERJAAN PENGECATAN/PLAMIRAN ###
IX PEKERJAAN LANTAI ###
X PEKERJAAN KUNCI + PENGGANTUNG ###
XI PEKERJAAN INSTALASI LISTRIK ###
XII PEKERJAAN KACA ###
XIII

JUMLAH ### ###


DIBULATK ### ###

TERBILANG : ( SERATUS DELAPAN PULUH TIGA JUTA RUPIAH )

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 3 Satap Kokop
Kec. Kokop Kab. Bangkalan

IHSANUDIN, S.Pd
NIP. 19700109 199104 1 001
LAPORAN MINGGUAN
Minggu ke :
Pekerjaan : REHABILITASI 2 RUANG BELAJAR SMPN 3 SATAP KOKOP Tanggal :
Nama Sekolah : SMPN 3 SATAP KOKOP KEC. KOKOP KAB. BANGKALAN Bulan :
Lokasi : KEC. KOKOP KAB. BANGKALAN Dana diterima tangal :
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%)
% Prestasi Rerata Prestasi
(1) (2) (3) (4) (5) (6) (7) (8)
(6)/100x(5)

I. PEKERJAAN PERSIAPAN
1 Pembongkaran atap + rangka 260.00 m² 1.70 100 1.70 -
2 Pembongkaran kosen 12.00 bh 0.32 100 0.32 -
3 Pembongkaran dinding 61.75 m² 0.65 100 0.65 -
4 Pembersihan akhir pekerjaan 1.00 ls 0.11 - - -

II. PEKERJAAN TANAH


1 Galian tanah 1.51 m³ 0.05 100 0.05 -
2 Urugan pasir bawah pondasi t=10cm 0.25 m³ 0.03 100 0.03 -
4 Urugan tanah kembali 0.76 m³ 0.01 100 0.01 -

III. PEKERJAAN PASANGAN/PLESTERAN


1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 91.82 m² 4.29 100 4.29 -
2 Plesteran 1Pc : 5Ps 183.63 m² 4.10 100 4.10 -
3 Benangan 173.00 m' 1.08 15 0.16 85

IV. PEKERJAAN BETON `


1 Lantai kerja bawah pondasi 1:3:5 t=5cm 0.31 m³ 0.15 - - 75
2 Pondasi beton stempat 60 x 60 x 15cm 0.38 m³ 0.79 - - -
3 Kolom teras 15/15 0.47 m³ 0.99 - - -
4 Balok beton 15/20 1.07 m³ 2.23 - - -
5 Kolom struktur 15/25 1.26 m³ 2.64 - - -
6 Ring balk 15/15 0.56 m³ 1.17 - - -
V. PEKERJAAN RANGKA ATAP
1 Kuda-kuda baja ringan (galvalum 75mm) 256.39 m² 28.43 - - -
2 Lisplank kalsiplank 8mm / 30 cm 65.20 m¹ 2.24 - - -

VI. PEKERJAAN ATAP


1 Atap genteng Karang Penang (baru bg depan) 190.62 m² 8.10 - - -
2 Atap genteng (lama bg belakang) 111.26 m² 1.06 - - -
3 Genteng bubungan Karang penang 19.35 m' 0.98 - - -
4 Plesteran kompres L = 10 cm (Akhiran genting) 26.50 m' 0.30 - - -

VII. PEKERJAAN KUSEN PINTU DAN JENDELA


1 Kusen kayu aluminium 4" 95.76 m' 5.81 - - 75
2 Daun Pintu kaca aluminium 4.00 bh 4.22 - - 15
3 Daun Jendela kaca aluminium 8.00 bh 2.11 - - -

VIII. PEKERJAAN PLAFOND


1 Plafond calsiboard 4mm + rangka hollow 201.24 m² 9.03 - - -

IX. PEKERJAAN PENGECATAN/PLAMIRAN


1 Pengecatan dinding depan 54.00 m² 0.59 - - -
2 Pelamiran dinding 344.50 m² 1.76 - - -
3 Plamiran plafond 201.24 m² 1.03 - - -
4 Pengecatan kayu 19.56 m² 0.44 - - -

X. PEKERJAAN LANTAI
1 Keramik lantai 40 x 40 162.00 m² 9.58 - - -
2 Keramik kolom 20 x 40 (motif) 5.60 m² 0.40 - - -

XI. PEKERJAAN KUNCI + PENGGANTUNG


1 Kunci pintu 2 x putar 2.00 bh 0.15 - - -
2 Engsel Pintu 12.00 bh 0.15 - - -
3 Engsel Jendela 16.00 bh 0.14 - - -
4 Grendel tanam 2.00 bh 0.08 - - -
5 Grendel Jendela 16.00 bh 0.12 - - -
6 Hag Angin 16.00 bh 0.15 - - -

XII PEKERJAAN INSTALASI LISTRIK


1 Lampu SL 14 watt 8.00 bh 0.23 - - -
2 Lampu SL 8watt (teras) 2.00 bh 0.05 - - -
3 Saklar ganda 2.00 bh 0.02 - - -
4 Saklar tunggal 2.00 bh 0.02 - - -
5 Stop kontak + instalasi 2.00 bh 0.24 - - -
6 Instalasi titik lampu 10.00 ttk 1.06 - - -

XIII. PEKERJAAN KACA


1 Kaca mati t=5 mm 20.68 m² 1.22 - - -

JUMLAH 100.00 11.31


Jumlah dana yang digunakan sampai dengan minggu ini ( minggu ke 1 ) Rp 32,819,000.00

Mengetahui Menyetujui
SMPN 3 Satap Kokop Panitia Pembangunan Sekolah
Kec. Kokop Kab. Bangkalan
Selaku Penanggung Jawab
IHSANUDIN, S.Pd SUHAERI
NIP. 19700109 199104 1 001

REKAPITULASI
NCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI

NO.

I
II
III
IV
V
VI
VII
VIII
IX
X 4
XI OK
XII LAMA
XIII : PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 1 TRAGAH
: SMPN 1 TRAGAH KEC. TRAGAH KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA

TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )
PEKERJAAN PERSIAPAN ###
PEKERJAAN TANAH ###
PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA #DIV/0!
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###

JUMLAH #DIV/0! ###


DIBULATK #DIV/0! #DIV/0!

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

YUNIZAR AN NATSIRUL YUSUF H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 1 Tragah
Kec. Tragah Kab. Bangkalan

Drs. AMIRULLAH, MM
NIP. 19581217 198603 1 011

NO
1
I.
1
2
3
4

II.
1
2
4

III.
1
2
3

IV.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran atap + rangka 377.00 m² ### ###
V. Pembongkaran kusen 4.00 bh ### ###
1 Penetelan plesteran 159.60 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VI. PEKERJAAN TANAH ###
1 Galian tanah 2.16 m³ ### ###
2 Urugan pasir bawah pondasi t=10cm 0.36 m³ ### ### #DIV/0!
3 Urugan tanah kembali 1.08 m³ ### ###
4 ###
PEKERJAAN PASANGAN/PLESTERAN
VII. Pasangan 1/2 bata camp. 1 Pc : 5 Ps 7.20 m² ### ### ###
1 Plesteran 1Pc : 5Ps 14.40 m² ### ###
2 Benangan 24.00 m' ### ###
3 ###
PEKERJAAN BETON
VIII. Lantai kerja bawah pondasi 1:3:5 t=5cm 0.18 m³ ### ###
1 Pondasi beton stempat 60 x 60 x 15cm 0.54 m³ ### ###
Kolom teras 15/15 0.79 m³ ### ###
IX. Balok beton 15/20 1.71 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ ### ###
X. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Penang (baru) 382.73 m² ### ###
3 Atap genteng (lama bg. belakang) 170.10 m² ### ###
4 Genteng bubungan Karang penang 28.35 m' ### ###
Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' ### ###
XI. ###
1 PEKERJAAN KUSEN PINTU DAN JENDELA
2 Kusen kayu kempas/mahoni 6/15 #DIV/0! m³ Rp - #DIV/0!
3 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 8.61 m² Rp - Rp - #DIV/0!
4 Daun Jendela kaca kayu kempas/mahoni 3/10 8.40 m² Rp - Rp - ###
5 #DIV/0!
6 PEKERJAAN PLAFOND
Plafond calsiboard 4mm + rangka kayu 4/6 294.84 m² ### ###
XII ###
1 PEKERJAAN PENGECATAN
2 Pengecatan dinding (3 Ruang kelas) 598.50 m² ### ###
3 Pengecatan plafond 294.84 m² ### ###
4 Pengecatan kayu 206.70 m² ### ###
5 ###
6 PEKERJAAN LANTAI #DIV/0!
Keramik lantai 40 x 40 245.70 m² ### ###
XIII. Keramik dinding 25 x 40 ( 3 R.kelas + teras ) 159.60 m² ### ###
1 List keramik dinding 7cm 110.40 m² ### ###
Keramik kolom 25 x 40 12.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Engsel Pintu 18.00 bh ### ###
Engsel Jendela 16.00 bh ### ###
Grendel pintu 3.00 bh ### ###
Grendel Jendela 16.00 bh ### ###
Hag Angin 16.00 bh ### ###
###
REKAPITULASI
PEKERJAAN INSTALASI LISTRIK
NCANA ANGGARAN
Lampu BIAYA
SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
KEGI Saklar ganda 3.00 bh ### ###
PEKE Saklar tunggal 3.00 bh ### ###
LING Stop kontak + instalasi 3.00 bh ### ###
LOKA Instalasi titik lampu 15.00 ttk ### ###
###
NO. PEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 11.14 m² ### ###
###
I
II
III
IV
V
VI
VII
VIII
IX
X 4
XI OK
XII BARU
XIII : PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 1 TRAGAH
: SMPN 1 TRAGAH KEC. TRAGAH KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA

TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )
PEKERJAAN PERSIAPAN ###
PEKERJAAN TANAH ###
PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA Rp -
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###

JUMLAH ### ###


DIBULATK ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

YUNIZAR AN NATSIRUL YUSUF H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 1 Tragah
Kec. Tragah Kab. Bangkalan

Drs. AMIRULLAH, MM
NIP. 19581217 198603 1 011

NO
1
I.
1
2
3
4

II.
1
2
4

III.
1
2
3
IV.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran atap + rangka 377.00 m² ### ###
V. Pembongkaran kusen 8.00 bh ### ###
1 Penetelan plesteran 249.00 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VI. PEKERJAAN TANAH ###
1 Galian tanah 2.16 m³ ### ###
2 Urugan pasir bawah pondasi t=10cm 0.36 m³ ### ### ###
3 Urugan tanah kembali 1.08 m³ ### ###
###
VII. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 24.02 m² ### ### ###
2 Plesteran 1Pc : 5Ps 48.03 m² ### ###
3 Benangan 168.00 m' ### ###
4 ###
PEKERJAAN BETON
VIII. Lantai kerja bawah pondasi 1:3:5 t=5cm 0.18 m³ ### ###
1 Pondasi beton stempat 60 x 60 x 15cm 0.54 m³ ### ###
Kolom teras 15/15 0.79 m³ ### ###
IX. Balok beton 15/20 1.56 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ ### ###
X. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Penang (baru) 382.73 m² ### ###
3 Genteng bubungan Karang penang 28.35 m' ### ###
4 Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' ### ###
5 ###
PEKERJAAN KUSEN PINTU DAN JENDELA
XI. Kusen kayu kempas/mahoni 6/15 1.09 m³ Rp - Rp -
1 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 8.61 m² Rp - Rp - ###
2 Jalusi kayu kempas/mahoni 3/12 7.20 m² Rp - Rp -
3 Daun Jendela kaca kayu kempas/mahoni 3/10 6.72 m² Rp - Rp - ###
4 Rp -
5 PEKERJAAN PLAFOND
6 Plafond calsiboard 4mm + rangka kayu 4/6 294.84 m² ### ###
###
XII PEKERJAAN PENGECATAN
1 Pengecatan dinding (3 Ruang kelas) 598.50 m² ### ###
2 Pengecatan plafond 294.84 m² ### ###
3 Pengecatan kayu 206.70 m² ### ###
4 ###
5 PEKERJAAN LANTAI ###
6 Keramik lantai 40 x 40 245.70 m² ### ###
Keramik dinding 25 x 40 ( 3 R.kelas + teras ) 173.40 m² ### ###
XIII. List keramik dinding 7cm 132.90 m² ### ###
1 Keramik kolom 25 x 40 12.00 m² ### ###
Keramik dinding 25 x 40 ( 3 R.kelas teras saja ) 75.60 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Engsel Pintu 18.00 bh ### ###
Engsel Jendela 16.00 bh ### ###
Grendel pintu 3.00 bh ### ###
Grendel Jendela 16.00 bh ### ###
Hag Angin 16.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
REKAPITULASI
Lampu SL 8watt (teras) 3.00 bh ### ###
NCANA ANGGARAN BIAYA
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
KEGI Stop kontak + instalasi 3.00 bh ### ###
PEKE Instalasi titik lampu 15.00 ttk ### ###
LINGKUP PEKERJAAN ###
LOKAPEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 11.14 m² ### ###
NO. ###

I
II
III
IV
V
VI
VII
VIII
IX
X 5
XI OK
XII LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 MODUNG
: SMPN 2 MODUNG KEC. MODUNG KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA


TERBILANG : ( DUA RATUS LIMA JUTA ENAM RATUS RIBU RUPIAH )

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA Rp -
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN/PLAMIRAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ### ###
PEKERJAAN KACA ###

JUMLAH ### ###


DIBULAT ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

M. MAHRI, S.Ag H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Modung
Kec. Modung Kab. Bangkalan

A S U R, M.Pd
NIP. 19610117 198403 1 008

NO
1
I.
1
2

II.
1
2
3

III.
1
2
3

IV.
1
2
Lembar. 2
V. JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
1 2 3 4 5
2 PEKERJAAN PERSIAPAN
3 Pembongkaran atap + rangka 406.00 m² ### ###
4 Pembersihan akhir pekerjaan 1.00 ls ### ### ###
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 98.93 m² ### ###
2 Plesteran 1Pc : 5Ps 197.87 m² ### ###
3 Benangan 166.56 m' ### ###
###
VII. PEKERJAAN BETON
1 Kolom teras 15/15 0.41 m³ ### ###
Balok teras 15/20 1.24 m³ ### ###
VIII. Ring balk gewel 15/15 0.98 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 396.90 m² ### ###
4 Lisplank kalsiplank 8mm / 30 cm 85.70 m¹ ### ###
5 ###
PEKERJAAN ATAP
IX. Pasang atap genteng karang p enang (baru 5%) 19.85 m² ### ###
1 Pasang atap genteng (lama) 377.06 m² ### ###
Genteng bubungan karang penang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 29.00 m' ### ###
1 ###
2 PEKERJAAN KUSEN PINTU DAN JENDELA
3 Kusen kayu kempas/mahoni 6/12 0.46 m³ Rp - Rp -
4 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 6.72 m² Rp - Rp -
5 Daun Jendela kaca kayu kempas/mahoni 3/10 5.04 m² Rp - Rp -
6 Rp -
PEKERJAAN PLAFOND ###
XI. Plafond calsiboard 4mm + rangka hollow 340.20 m² ### ###
1 ###
2 PEKERJAAN PENGECATAN/PLAMIRAN
3 Pengecatan dinding (depan) 66.85 m² ### ###
4 Pelamiran dinding 430.33 m² ### ###
5 Pelamiran plafond 340.20 m² ### ### ###
6 Pengecatan kayu 206.70 m² ### ###
Cat genteng 396.90 m² ### ###
XII. ###
1 PEKERJAAN LANTAI
Lantai rabat 216.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 4.00 bh ### ###
Engsel Pintu 21.00 bh ### ###
Engsel Jendela 24.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Grendel Jendela 12.00 bh ### ### ###
Hag Angin 24.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 14.00 bh ### ###
Lampu SL 8watt (teras) 4.00 bh ### ###
Saklar ganda 7.00 bh ### ###
REKAPITULASI
Saklar tunggal 3.00 bh ### ###
NCANA ANGGARAN BIAYA
Stop kontak + instalasi 4.00 bh ### ###
Instalasi titik lampu 18.00 bh ### ###
KEGIATAN ###
PEKE PEKERJAAN KACA
LING Kaca mati t=5 mm 14.49 m² ### ###
LOKASI ###

NO.

I
II
III
IV
V
VI
VII
VIII
IX
X 5
XI OK
XII BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 MODUNG
: SMPN 2 MODUNG KEC. MODUNG KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA


TERBILANG : ( DUA RATUS LIMA JUTA ENAM RATUS RIBU RUPIAH )

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA Rp -
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN/PLAMIRAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ### -
PEKERJAAN KACA ###

JUMLAH ### ###


DIBULAT ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

M. MAHRI, S.Ag H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Modung
Kec. Modung Kab. Bangkalan

A S U R, M.Pd
NIP. 19610117 198403 1 008

NO
1
I.
1
2

II.
1
2
3

III.
1
2
3

IV.
1
2
Lembar. 2
V. JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
1 2 3 4 5
2 PEKERJAAN PERSIAPAN
3 Pembongkaran atap + rangka 406.00 m² ### ###
4 Pembersihan akhir pekerjaan 1.00 ls ### ### ###
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 98.93 m² ### ###
2 Plesteran 1Pc : 5Ps 197.87 m² ### ###
3 Benangan 166.56 m' ### ###
###
VII. PEKERJAAN BETON
1 Kolom teras 15/15 0.41 m³ ### ###
Balok teras 15/20 1.24 m³ ### ###
VIII. Ring balk gewel 15/15 0.98 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 396.90 m² ### ###
4 Lisplank kalsiplank 8mm / 30 cm 85.70 m¹ ### ###
5 ###
PEKERJAAN ATAP
IX. Pasang atap genteng karang p enang (baru 5%) 19.85 m² ### ###
1 Pasang atap genteng (lama) 377.06 m² ### ###
Genteng bubungan karang penang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 29.00 m' ### ###
1 ###
2 PEKERJAAN KUSEN PINTU DAN JENDELA
3 Kusen kayu kempas/mahoni 6/12 0.46 m³ Rp - Rp -
4 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 6.72 m² Rp - Rp -
5 Daun Jendela kaca kayu kempas/mahoni 3/10 5.04 m² Rp - Rp -
6 Rp -
PEKERJAAN PLAFOND ###
XI. Plafond calsiboard 4mm + rangka kayu 4/6 340.20 m² ### ###
1 ###
2 PEKERJAAN PENGECATAN/PLAMIRAN
3 Pengecatan dinding (depan) 66.85 m² ### ###
4 Pelamiran dinding 430.33 m² ### ###
5 Pelamiran plafond 340.20 m² ### ### ###
6 Pengecatan kayu 206.70 m² ### ###
Cat genteng 396.90 m² ### ###
XII. ###
1 PEKERJAAN LANTAI
Lantai rabat 216.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 4.00 bh ### ###
Engsel Pintu 21.00 bh ### ###
Engsel Jendela 24.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Grendel Jendela 12.00 bh ### ### ###
Hag Angin 24.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 14.00 bh ### ###
Lampu SL 8watt (teras) 4.00 bh ### ###
Saklar ganda 7.00 bh ### ###
REKAPITULASI
Saklar tunggal 3.00 bh ### ###
NCANA ANGGARAN BIAYA
Stop kontak + instalasi 4.00 bh ### ###
Instalasi titik lampu 18.00 bh ### ###
KEGIATAN ###
PEKE PEKERJAAN KACA
LING Kaca mati t=5 mm 14.49 m² ### ###
LOKASI ###

NO.

I
II
III
IV
V
VI
VII
VIII
IX
X 6
XI OK
LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 2 LABANG
: SMPN 2 LABANG KEC. LABANG KAB. BANGKALAN

TERBILANG : ( DUA RATUS SEMBILAN


URAIAN
PULUHPEKERJAAN
EN JUMLAH HARGA

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN Rp -
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
PEKERJAAN TANGGA DEPAN PINTU ###

JUMLAH ### ###


DIBULATK ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
ACHMAD TAUFIK HEYKAL, A.Sg H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Labang
Kec. Labang Kab. Bangkalan

Drs. HARTONO, M.Pd


NIP. 19690126 199802 1 003

NO
1
I.
1
2
3
4
5

II.
1

III.
1
2

IV.
1
2
3 Lembar. 2
JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
V. 2 3 4 5
1 PEKERJAAN PERSIAPAN ###
Pembongkaran atap + rangka 377.00 m² Rp - Rp -
VI. Pembongkaran kosen 1.00 bh ### ###
1 Pembongkaran dinding 6.00 m² ### ###
2 Penetelan plesteran 139.74 m² ### ###
3 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VII. PEKERJAAN PASANGAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps (nyepit kuda2) 30.91 m² Rp - Rp -
2 Rp -
3 PEKERJAAN RANGKA ATAP ###
4 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ Rp - Rp -
VIII. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Pilang (baru) 382.73 m² ### ###
Genteng bubungan Karang pilang 28.35 m' ### ###
IX. Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' Rp - Rp -
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsiboard 4mm + rangka hollow 354.38 m² Rp - Rp -
4 Rp -
5 PEKERJAAN PENGECATAN
6 Pengecatan dinding 598.50 m² Rp - Rp - ###
Pengecatan plafond 354.38 m² Rp - Rp -
X. Pengecatan kayu 274.60 m² Rp - Rp -
1 Rp -
PEKERJAAN LANTAI
XI. Keramik lantai 40 x 40 243.00 m² ### ###
1 Keramik dinding 25 x 40 139.74 m² ### ###
2 List keramik 102.00 m' ### ###
3 Keramik kolom 20 x 40 10.80 m² ### ###
4 ###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA ###
Kaca mati t=5 mm (yg pecah) 4.22 m² ### ###
###
PEKERJAAN TANGGA DEPAN PINTU
Pasangan batu gunung 2.88 m³ ### ###
Plesterran trasram 7.68 m² ### ###
Keramik kasar 40 x 40 7.04 m² ### ###
Urugan pasir 4.96 m³ ### ###
REKAPITULASI ###
NCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI

NO.

I
II
III
IV
V
VI
VII
VIII
IX
X 6
XI OK
XII BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 2 LABANG
: SMPN 2 LABANG KEC. LABANG KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA


TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
PEKERJAAN TANGGA DEPAN PINTU ###

JUMLAH ### ###


DIBULATK ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

ACHMAD TAUFIK HEYKAL, A.Sg H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Labang
Kec. Labang Kab. Bangkalan
Drs. HARTONO, M.Pd
NIP. 19690126 199802 1 003

NO
1
I.
1
2
3
4
5

II.
1
2
3

III.
1

IV.
1
2 Lembar. 2
JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
V. 2 3 4 5
1 PEKERJAAN PERSIAPAN ###
2 Pembongkaran atap + rangka 377.00 m² Rp - Rp -
3 Pembongkaran kosen 1.00 bh ### ###
Pembongkaran dinding 6.00 m² ### ###
VI. Penetelan plesteran 127.50 m² ### ###
1 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VII. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps (nyepit kuda2) 22.43 m² Rp - Rp - -
2 Plesteran 1Pc : 5Ps 16.20 m² ### ###
3 Benangan 32.00 m' ### ###
###
VIII. PEKERJAAN BETON
1 Ring balk gewel 15/15 0.40 m³ ### ###
2 ###
3 PEKERJAAN RANGKA ATAP ###
4 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ Rp - Rp -
IX. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Pilang (baru) 382.73 m² ### ###
Genteng bubungan Karang pilang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' Rp - Rp -
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsiboard 4mm + rangka hollow 354.38 m² Rp - Rp -
4 Rp -
5 PEKERJAAN PENGECATAN
6 Pengecatan dinding 598.50 m² Rp - Rp - ###
Pengecatan plafond 354.38 m² Rp - Rp -
XI. Pengecatan kayu 274.60 m² Rp - Rp -
1 Rp -
PEKERJAAN LANTAI
XII. Keramik lantai 40 x 40 243.00 m² ### ###
1 Keramik dinding 25 x 40 127.50 m² ### ###
2 List keramik 102.00 m' ### ###
3 Keramik kolom 20 x 40 10.80 m² ### ###
4 ###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Pintu harmonika 15.00 m² ### ### ###
### ###
PEKERJAAN INSTALASI LISTRIK ###
Lampu SL 14 watt 12.00 bh ### ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA ###
Kaca mati t=5 mm (yg pecah) 4.22 m² ### ###
###
PEKERJAAN TANGGA DEPAN PINTU 3.46
Pasangan batu gunung 2.88 m³ ### ###
Plesterran trasram 7.68 m² ### ###
Keramik kasar 40 x 40 7.04 m² ### ###
Urugan pasir 4.96 m³ ### ###
###
REKAPITULASI
NCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI

NO.

I
II
III
IV
V
VI
VII
VIII
IX
X 7
OK
LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 KWANYAR
: SMPN 2 KWANYAR KEC. KWANYAR KAB. BANGKALAN
TERBILANG : ( SERATUS SEMBILAN PULUH TUJUH JUTA DELAPAN RATUS RIBU RUPIAH )
URAIAN PEKERJAAN JUMLAH HARGA

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN/PLESTERAN Rp -
PEKERJAAN KAYU ###
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
PEKERJAAN TEMPAT DUDUK ###

JUMLAH ### ###


DIBULAT ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

MOHAMMAD MUSTOFA ZAHRON, S.Pd H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Kwanyar
Kec. Kwanyar Kab. Bangkalan

RAHMAWATI, M.Pd
NIP. 19700703 199802 2 003

NO
1
I.
1
2
3
4

II.
1
2

III.
1

IV.
1

V.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran kusen 1.00 bh ### ###
VI. Pembongkaran dinding 15.00 m² ### ###
1 Penetelan plesteran 428.64 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 Ls ### ###
3 ###
4 PEKERJAAN PASANGAN/PLESTERAN ###
5 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 0.91 22.20 m² Rp - Rp -
6 Plesteran 1Pc : 5Ps 1.07 44.40 m² Rp - Rp -
Rp -
VII. PEKERJAAN KAYU
1 Lisplank kayu 3/30 cm 4.00 m¹ ### ###
2 ###
3 PEKERJAAN PLAFOND
4 Plafond calsi 1 x 1 + rangka kayu 12.00 m² Rp - Rp -
Rp -
VIII. PEKERJAAN PENGECATAN
1 Pengecatan dinding (3 kelas) 455.30 m² Rp - Rp -
2 Pengecatan plafond 319.00 m² Rp - Rp -
3 Pengecatan kayu 206.70 m² Rp - Rp - ###
4 Pengecatan kayu (Kantor) 214.39 m² Rp - Rp -
5 Rp -
6PEKERJAAN LANTAI 162.00 ###
Keramik lantai 40 x 40 ( 2 R Kelas ) 5.67 126.00 m² ### ###
IX. Keramik lantai 40 x 40 ( Teras ) 1.62 36.00 m² ### ###
1 Keramik dinding 25 x 40 (dalam kelas + teras) 5.78 128.40 m² ### ###
Keramik kolom teras 25 x 40 1.01 22.40 m² ### ###
X. List keramik 1.64 327.80 m' ### ###
1 Keramik dinding 25 x 40 (dalam kantor+R.guru+ t 13.51 300.24 m² ### ###
2 451.04 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 3.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Hag Angin 60.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
REKAPITULASI
PEKERJAAN KACA
NCANA ANGGARAN BIAYA
Kaca mati t=5 mm (yg pecah) 1.68 m² ### ###
###
KEGI PEKERJAAN TEMPAT DUDUK
PEKE Pasangan trasram 0.68 17.00 m² Rp - Rp -
LING Plat beton tempat duduk t=10 cm 0.53 1.02 m³ ### ###
LOKA Keramik tempat duduk 30 x 30 0.46 10.20 m² ### ###
Keramik dinding tempat duduk 25 x 40 1.84 40.80 m² ### ###
NO. 34.71 ###
0.86768 40.80

I
II
III
IV
V
VI
VII
VIII
IX
X 7
OK
BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 KWANYAR
: SMPN 2 KWANYAR KEC. KWANYAR KAB. BANGKALAN
TERBILANG : ( SERATUS SEMBILAN PULUH TUJUH JUTA DELAPAN RATUS RIBU RUPIAH )
URAIAN PEKERJAAN JUMLAH HARGA
PEKERJAAN PERSIAPAN ###
PEKERJAAN PASANGAN/PLESTERAN Rp -
PEKERJAAN KAYU ###
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
PEKERJAAN TEMPAT DUDUK ###

JUMLAH ### ###


DIBULAT ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

MOHAMMAD MUSTOFA ZAHRON, S.Pd H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Kwanyar
Kec. Kwanyar Kab. Bangkalan

RAHMAWATI, M.Pd
NIP. 19700703 199802 2 003

NO
1
I.
1
2
3
4

II.
1
2

III.
1
2

IV.
1

V. Lembar. 2
1 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
2 2 3 4 5
3 PEKERJAAN PERSIAPAN
4 Pembongkaran kusen 1.00 bh ### ###
5 Pembongkaran dinding 15.00 m² ### ###
Penetelan plesteran 428.64 m² ### ###
VI. Pembersihan akhir pekerjaan 1.00 Ls ### ###
1 ###
2 PEKERJAAN PASANGAN/PLESTERAN ###
3 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 22.20 m² Rp - Rp -
4 Plesteran 1Pc : 5Ps 44.40 m² Rp - Rp -
5 Rp -
6 PEKERJAAN KAYU
Perbaikan daun pintu panil 4.00 bh ### ###
VII. Lisplank kayu 3/30 cm 4.00 m¹ ### ###
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsi 1 x 1 + rangka kayu 12.00 m² Rp - Rp -
4 Rp -
PEKERJAAN PENGECATAN
VIII. Pengecatan dinding (3 kelas) 439.90 m² Rp - Rp -
1 Pengecatan dinding (Kantor) 373.40 m² Rp - Rp -
2 Pengecatan plafond 319.00 m² Rp - Rp -
3 Pengecatan kayu 169.45 m² Rp - Rp - ###
4 Pengecatan kayu (Kantor) 197.69 m² Rp - Rp -
5 Rp -
6 PEKERJAAN LANTAI ###
Keramik lantai 40 x 40 ( 2 R Kelas ) 126.00 m² ### ###
IX. Keramik lantai 40 x 40 ( Teras ) 36.00 m² ### ###
1 Keramik dinding 25 x 40 (dalam kelas + teras) 128.40 m² ### ###
Keramik kolom teras 25 x 40 22.40 m² ### ###
X. List keramik 327.80 m' ### ###
1 Keramik dinding 25 x 40 (dalam kantor+R.guru+ teras) 300.24 m² ### ###
2 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 3.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Hag Angin 60.00 bh ### ###
Pintu harmonika 11.30 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK ###
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA
REKAPITULASI
Kaca mati t=5 mm (yg pecah) 1.68 m² ### ###
NCANA ANGGARAN BIAYA ###
PEKERJAAN TEMPAT DUDUK
KEGI Pasangan trasram 17.00 m² Rp - Rp -
PEKE Plat beton tempat duduk t=10 cm 1.02 m³ ### ###
LING Keramik tempat duduk 30 x 30 10.20 m² ### ###
LOKA Keramik dinding tempat duduk 25 x 40 40.80 m² ### ###
###
NO.

I
II
III
IV
V
VI
VII
VIII
IX
8
OK

: PENGADAAN SARANA PRASARANA


: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 KOKOP
TERBILANG : ( SERATU : SMPN 2 KOKOP KEC. KOKOP KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN/PLESTERAN Rp -
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ### ###
PEKERJAAN KACA ###
PEKERJAAN TEMPAT DUDUK ###

JUMLAH ### ###


DIBULATK ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

BOSTOMI, S.Pd H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Kokop
Kec. Kokop Kab. Bangkalan

MOHAMMAD TAUFIK, SPd


NIP. 19760326 200604 1 010
NO
1
I.
1
2

II.
1
2
3
III.
1

IV.
1
2
3

V. Lembar. 2
1 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
2 2 3 4 5
3 PEKERJAAN PERSIAPAN
4 Penetelan plesteran 317.46 m² ### ###
5 Pembersihan akhir pekerjaan 1.00 Ls Rp - Rp - #REF!
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 12.25 m² Rp - Rp -
5 Plesteran 1Pc : 5Ps 80.58 m² Rp - Rp -
6 Benangan 55.00 m' Rp - Rp -
7 Rp -
PEKERJAAN PLAFOND
VII. Plafond calsiboard 4mm + rangka kayu 15.00 m² Rp - Rp -
1 Rp -
2 PEKERJAAN PENGECATAN -
3 Pengecatan dinding 506.50 m² Rp - Rp -
4 Pengecatan plafond 352.00 m² Rp - Rp - #DIV/0!
5 Pengecatan kayu 275.60 m² Rp - Rp -
6 Rp -
PEKERJAAN LANTAI ###
VIII. Keramik lantai 40 x 40 243.00 m² ### ### 147.47
1 Keramik dinding 25 x 40 ( 3 R. Kelas + teras) 132.96 m² ### ###
List keramik 288.20 m' ### ###
IX. Keramik kolom 25 x 40 16.00 m² ### ###
1 Keramik dinding 25 x 40 ( 5 R. Kelas bg. dalam) 184.50 m² ### ###
2 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 5.00 bh ### ###
Grendel Jendela 50.00 bh ### ###
Hag Angin 100.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 20.00 bh ### ###
Lampu SL 8watt (teras) 5.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 5.00 bh ### ###
Stop kontak + instalasi 5.00 bh ### ###
Instalasi titik lampu 25.00 ttk ### ###
###
PEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 2.53 m² ### ###
###
PEKERJAAN TEMPAT DUDUK
Pasangan trasram 14.70 m² Rp - Rp -
Plat beton tempat duduk t=10 cm 0.74 m³ ### ###
Keramik tempat duduk 30 x 30 7.35 m² ### ###
Keramik dinding tempat duduk 25 x 40 29.40 m² ### ###
###

BATAS
SINERGI 1 SMPN 2 SEPULU DR. AHMAD SABARUDIN, S.Pd, M.MPd
SINERGI 2 SMPN 1 KLAMPIS IMAM SYAFII, S.Pd, MPd
SINERGI 3 SMPN 2 KOKOP MOHAMMAD TAUFIK, SPd
SINERGI 4 SMPN 3 SATAP KOKOP IHSANUDIN, S.Pd
INDRAKILA 5 SMPN 1 TRAGAH Drs. AMIRULLAH, MM
INDRAKILA 6 SMPN 2 MODUNG A S U R, M.Pd
INDRAKILA 7 SMPN 2 LABANG Drs. HARTONO, M.Pd
INDRAKILA 8 SMPN 2 KWANYAR RAHMAWATI, M.Pd
9 SMPN TAHAL AMIN H. ABDULLAH, S.Pd
10 SMPN 1 MODUNG Drs. ALI MUSTOFA, M.Pd
11 SMPN 1 GALIS Drs. TAUFIKUR RAHMAN
12 SMPN 1 KOKOP BUDIONO, S.Pd, M.Pd

13 SMPN 2 KONANG ABDUL RASID, S.Ag, M.PdI


14 SMPN TAHAL AMIN H. ABDULLAH, S.Pd

SMPN 1 KWANYAR MOHAMMAD SADALI, S.Pd


SMPN 1 TANJUNG BUMI Drs. M. AGUS SUBAGIO, M.Pd
SMPN 1 BLEGA SRI ASTUTIK HANDAYANI, M.Pd
SMPN 1 LABANG SUPRIYO, S.Pd, SE, M.PdI

SMPN 1 KWANYAR KEC. KWANYAR KAB. BANGKALAN MOHAMMAD SADALI, S.Pd


SMPN 1 TANJUNG BUMI KEC. TANJUNG BUMI KAB. BAN Drs. M. AGUS SUBAGIO, M.Pd
SMPN 1 BLEGA KEC. BLEGA KAB. BANGKALAN SRI ASTUTIK HANDAYANI, M.Pd
SMPN 2 TANAH MERAH KEC. T KOMARIYAH, S.Pd, M.MPd
SMPN TAHAL AMIN H. ABDULLAH, S.Pd
SMPN 1 GEGER Hj. SRI MULYATI, S.Pd, M.MPd
SMPN 1 GALIS
SMPN 1 TANAH MERAH DYAH CHANDRAWATI, S.Pd
SMPN 2 GEGER SITI YAUMAH, S.Pd
SMPN 4 SATAP TANAH MERA MOH. YUSUF, S.Pd
SMPN 1 KONANG Drs. ANANG ISKANDAR, MM

28.5
23.5
7.833333

1 ( Satu )
5 Oktob. s/d 10 Oktober 2015
Oktober 2015
29 Oktober 2015
Rp. 212.320.000.00
Prestasi Pekerjaan Prestasi Pekerjaan
Minggu Ini (%) Komulatif (%)
Rerata Prestasi Rerata
(9) (10) (11)
(8)/100x(5) (6)+(8) (7)+(9)

0.97 100.00 0.97 Rp 12,375.00 Rp 1,769,625.00


0.97 100.00 0.97 Rp 7,500.00 Rp 1,761,750.00
1.01 100.00 1.01 Rp 20,000.00 Rp 1,843,200.00
- - - Rp 200,000.00 Rp 200,000.00
Rp 5,574,575.00

- - - Rp 88,586.67 Rp 1,638,853.33
- - - Rp 42,298.80 Rp 1,565,055.60
- - - Rp - Rp -
Rp 3,203,908.93

- - - Rp 3,912,550.00 Rp 234,753.00
- - - Rp 3,962,550.00 Rp 114,121.44
- - - Rp 3,962,550.00 Rp 1,027,092.96
- - - Rp 3,962,550.00 Rp 1,255,335.84
Rp 2,631,303.24

- - - Rp 185,000.00 Rp 25,849,125.00
- - - Rp 185,000.00 Rp 21,929,437.50
- - - Rp 65,000.00 Rp 3,100,500.00
Rp 50,879,062.50

- - - Rp 18,000.00 Rp 2,515,050.00
- - - Rp 110,000.00 Rp 26,078,250.00
- - - Rp 95,820.00 Rp 2,558,394.00
- - - Rp 21,149.40 Rp 1,184,366.40
Rp 32,336,060.40

- - - Rp 85,000.00 Rp 22,185,000.00
Rp 22,185,000.00

- - - Rp 20,740.00 Rp 10,805,637.48
- - - Rp 20,740.00 Rp 5,413,140.00
- - - Rp 42,450.00 Rp 4,752,702.00
Rp 20,971,479.48

- - - Rp 105,250.00 Rp 3,315,375.00
- - - Rp 112,000.00 Rp 16,800,000.00
- - - Rp 136,075.00 Rp 12,540,672.00
- - - Rp 85,000.00 Rp 6,528,000.00
Rp 39,184,047.00

- - - Rp 55,000.00 Rp 660,000.00
- - - Rp 50,000.00 Rp 150,000.00
- - - Rp 20,000.00 Rp 80,000.00
- - - Rp 15,000.00 Rp 75,000.00
- - - Rp 225,000.00 Rp 1,125,000.00
Rp 200,000.00 Rp 3,000,000.00
Rp 5,090,000.00
- - - Rp 112,125.00 Rp 376,964.25
Rp 376,964.25

2.95 2.95

Rp 20,300,000.00 2.95 %
1 ( Satu )
5 Oktob. s/d 10 Oktober 2015
Oktober 2015
29 Oktober 2015

Prestasi Pekerjaan Prestasi Pekerjaan


Minggu Ini (%) Komulatif (%)
Rerata Prestasi Rerata
(9) (10) (11)
(8)/100x(5) (6)+(8) (7)+(9)
0.20 100.00 0.20 Rp 50,000.00 Rp 600,000.00
0.08 100.00 0.08 Rp 20,000.00 Rp 240,000.00
- - - Rp 200,000.00 Rp 200,000.00
Rp 1,040,000.00

- - - Rp 58,500.00 Rp 126,360.00
- - - Rp 215,400.00 Rp 77,544.00
- - - Rp 16,110.00 Rp 17,398.80
Rp 221,302.80

- - - Rp 88,586.67 Rp 3,790,281.61
- - - Rp 42,298.80 Rp 3,619,604.84
- - - Rp 11,825.00 Rp 3,651,560.00
Rp 11,061,446.45

- - - Rp 897,800.00 Rp 161,604.00
- - - Rp 3,962,550.00 Rp 2,139,777.00
- - - Rp 3,962,550.00 Rp 3,120,508.13
- - - Rp 3,962,550.00 Rp 5,943,825.00
- - - Rp 3,962,550.00 Rp 9,510,120.00
- - - Rp 3,962,550.00 Rp 941,501.88
Rp 21,817,336.01

- - - Rp 210,000.00 Rp 77,723,100.00
- - - Rp 65,000.00 Rp 5,063,500.00
Rp 82,786,600.00

- - - Rp 80,500.00 Rp 16,325,400.00
- - - Rp 18,000.00 Rp 3,011,580.00
- - - Rp 95,820.00 Rp 2,429,037.00
- - - Rp 21,149.40 Rp 617,562.48
Rp 22,383,579.48

- - - Rp 11,431,250.00 Rp 14,644,117.13
- - - Rp 618,250.00 Rp 5,375,065.50
- - - Rp 430,475.00 Rp 7,148,037.38
- - - Rp 419,572.50 Rp 4,833,475.20
Rp 32,000,695.20

- - - Rp 85,000.00 Rp 25,857,000.00
Rp 25,857,000.00

- - - Rp 20,740.00 Rp 12,412,890.00
- - - Rp 20,740.00 Rp 6,309,108.00
- - - Rp 42,450.00 Rp 8,774,415.00
Rp 27,496,413.00

- - - Rp 112,000.00 Rp 26,880,000.00
- - - Rp 136,075.00 Rp 17,662,535.00
- - - Rp 136,075.00 Rp 870,880.00
- - - Rp 85,000.00 Rp 10,115,000.00
Rp 55,528,415.00

- - - Rp 140,750.00 Rp 422,250.00
- - - Rp 23,625.00 Rp 425,250.00
- - - Rp 16,687.50 Rp 267,000.00
- - - Rp 74,250.00 Rp 222,750.00
- - - Rp 14,750.00 Rp 236,000.00
- - - Rp 17,750.00 Rp 284,000.00
Rp 1,857,250.00

- - - Rp 55,000.00 Rp 660,000.00
- - - Rp 50,000.00 Rp 150,000.00
- - - Rp 20,000.00 Rp 60,000.00
- - - Rp 15,000.00 Rp 45,000.00
- - - Rp 225,000.00 Rp 675,000.00
- - - Rp 200,000.00 Rp 3,000,000.00
Rp 4,590,000.00

- - - Rp 112,125.00 Rp 3,038,587.50
Rp 3,038,587.50

0.28 -
Rp 20,300,000.00 - %
1 ( Satu )
5 Oktob. s/d 10 Oktober 2015
Oktober 2015
29 Oktober 2015

Prestasi Pekerjaan Prestasi Pekerjaan


Minggu Ini (%) Komulatif (%)
Rerata Prestasi Rerata Lembar. 2
(9) (10) (11) HARGA SATUAN JUMLAH HARGA
(8)/100x(5) (6)+(8) (7)+(9) 4 5

- 100.00 1.70 Rp 12,375.00 Rp 3,217,500.00


- 100.00 0.32 Rp 50,000.00 Rp 600,000.00
- 100.00 0.65 Rp 20,000.00 Rp 1,235,000.00
- - - Rp 200,000.00 Rp 200,000.00
Rp 5,252,500.00

- 100.00 0.05 Rp 58,500.00 Rp 88,452.00


- 100.00 0.03 Rp 215,400.00 Rp 54,280.80
- 100.00 0.01 Rp 16,110.00 Rp 12,179.16
Rp 154,911.96

- 100.00 4.29 Rp 88,586.67 Rp 8,133,700.58


- 100.00 4.10 Rp 42,298.80 Rp 7,767,439.21
0.92 100.00 1.08 Rp 11,825.00 Rp 2,045,725.00
Rp 17,946,864.80

0.11 75.00 0.11 Rp 897,800.00 Rp 274,726.80


- - - Rp 3,962,550.00 Rp 1,497,843.90
- - - Rp 3,962,550.00 Rp 1,872,304.88
- - - Rp 3,962,550.00 Rp 4,220,115.75
- - - Rp 3,962,550.00 Rp 4,992,813.00
- - - Rp 3,962,550.00 Rp 2,225,368.08
Rp 15,083,172.41

- - - Rp 210,000.00 Rp 53,841,375.00
- - - Rp 65,000.00 Rp 4,238,000.00
Rp 58,079,375.00

- - - Rp 80,500.00 Rp 15,344,910.00
- - - Rp 18,000.00 Rp 2,002,725.00
- - - Rp 95,820.00 Rp 1,854,117.00
- - - Rp 21,149.40 Rp 560,459.10
Rp 19,762,211.10

4.36 75.00 4.36 Rp 115,000.00 Rp 11,012,400.00


0.63 15.00 0.63 Rp 2,000,000.00 Rp 8,000,000.00
- - - Rp 500,000.00 Rp 4,000,000.00
Rp 23,012,400.00

- - - Rp 85,000.00 Rp 17,105,400.00
Rp 17,105,400.00

- - - Rp 20,740.00 Rp 1,119,960.00
- - - Rp 9,670.00 Rp 3,331,315.00
- - - Rp 9,670.00 Rp 1,945,990.80
- - - Rp 42,450.00 Rp 830,322.00
Rp 7,227,587.80

- - - Rp 112,000.00 Rp 18,144,000.00
- - - Rp 136,075.00 Rp 762,020.00
Rp 18,906,020.00

- - - Rp 140,750.00 Rp 281,500.00
- - - Rp 23,625.00 Rp 283,500.00
- - - Rp 16,687.50 Rp 267,000.00
- - - Rp 74,250.00 Rp 148,500.00
- - - Rp 14,750.00 Rp 236,000.00
- - - Rp 17,750.00 Rp 284,000.00
Rp 1,500,500.00

- - - Rp 55,000.00 Rp 440,000.00
- - - Rp 50,000.00 Rp 100,000.00
- - - Rp 20,000.00 Rp 40,000.00
- - - Rp 15,000.00 Rp 30,000.00
- - - Rp 225,000.00 Rp 450,000.00
- - - Rp 200,000.00 Rp 2,000,000.00
Rp 3,060,000.00

- - - Rp 112,125.00 Rp 2,318,745.00
Rp 2,318,745.00
6.02 17.33
Rp 32,819,000.00 17.33 %

Bangkalan, 2018 Rp 189,409,688.06


Dibuat oleh 32819621.8558365
Fasilitator / Perencana Rp 32,819,000.00
H. SUBADRIH, ST, MT

LAMA
140

BARU
LAMA
BARU
LAMA
BARU
LAMA
BARU
keramik tambal sulam
SADALI, S.Pd
UBAGIO, M.Pd
NDAYANI, M.Pd
1 2 3 4 5

0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
1.01 100 1.01 100 1.01 100 1.01 100 1.01 100
0.11 - - - - - - - - -
0.90 - - 100 0.90 100 0.90 100 0.90 100
0.86 - - - - 100 0.86 100 0.86 100
- - - - - 100 - 100 - 100

0.13 - - - - - - 50 0.06 100


0.06 - - - - - - - - 100
0.56 - - - - - - - - 100
0.69 - - - - - - - - 50

14.17 - - - - - - - - -
12.02 - - - - - - - - -
1.70 - - - - - - - - -

1.38 - - - - - - - - -
14.29 - - - - - - - - -
1.40 - - - - - - - - -
0.65 - - - - - - - - -

12.16 - - - - - - - - -

5.92 - - - - - - - - -
2.97 - - - - - - - - -
2.61 - - - - - - - - -

1.82 - - - - - - - - -
9.21 - - - - - - - - -
6.87 - - - - - - - - -
3.58 - - - - - - - - -

0.36 - - - - - - - - -
0.08 - - - - - - - - -
0.04 - - - - - - - - -
0.04 - - - - - - - - -
0.62 - - - - - - - - -
1.64 - - - - - - - - -
0.21 - - - - - - - - -
1 2 3 4 5
0.20 100 0.20 100 0.20 100 0.20 100 0.20 100
0.08 100 0.08 100 0.08 100 0.08 100 0.08 100
0.07 - - - - - - - - -

0.04 - - 100 0.04 100 0.04 100 0.04 100


0.03 - - - - 100 0.03 100 0.03 100
0.01 - - - - 100 0.01 100 0.01 100

1.24 - - - - - - 50 0.62 100


1.19 - - - - - - - - 100
1.20 - - - - - - - - 100

0.05 - - - - - - 25 0.01 50
0.70 - - - - - - - - 50
1.02 - - - - - - - - -
1.95 - - - - - - - - -
3.12 - - - - - - - - 50
0.31 - - - - - - - - 75

25.51 - - - - - - - - -
1.66 - - - - - - - - -

5.36 - - - - - - - - -
0.99 - - - - - - - - -
0.80 - - - - - - - - -
0.20 - - - - - - - - -

4.81 - - - - - - - - 50
1.76 - - - - - - - - -
2.35 - - - - - - - - -
1.59 - - - - - - - - -

8.49 - - - - - - - - -

4.07 - - - - - - - - -
2.07 - - - - - - - - -
2.88 - - - - - - - - -

8.82 - - - - - - - - -
5.80 - - - - - - - - -
0.29 - - - - - - - - -
3.32 - - - - - - - - -

0.14 - - - - - - - - -
0.14 - - - - - - - - -
0.09 - - - - - - - - -
0.07 - - - - - - - - -
0.08 - - - - - - - - -
0.09 - - - - - - - - -

0.22 - - - - - - - - -
0.05 - - - - - - - - -
0.02 - - - - - - - - -
0.01 - - - - - - - - -
0.22 - - - - - - - - -
0.98 - - - - - - - - -

1.00 - - - - - - - - -
1 2 3 4 5

1.70 100 1.70 100 1.70 100 1.70 100 1.70 100
0.32 100 0.32 100 0.32 100 0.32 100 0.32 100
0.65 100 0.65 100 0.65 100 0.65 100 0.65 100
0.11 - - - - - - - - -

0.05 100 0.05 100 0.05 100 0.05 100 0.05 100
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100
0.01 50 0.00 100 0.01 100 0.01 100 0.01 100

4.29 - - 100 4.29 100 4.29 100 4.29 100


4.10 - - 100 4.10 100 4.10 100 4.10 100
1.08 - - 15 0.16 100 1.08 100 1.08 100

0.15 - - - - 75 0.11 100 0.15 100


0.79 - - - - - - 50 0.40 100
0.99 - - - - - - 10 0.10 75
2.23 - - - - - - - - -
2.64 - - - - - - - - -
1.17 - - - - - - - - -
28.43 - - - - - - - - -
2.24 - - - - - - - - -

8.10 - - - - - - - - -
1.06 - - - - - - - - -
0.98 - - - - - - - - -
0.30 - - - - - - - - -

5.81 - - - - 75 4.36 100 5.81 100


4.22 - - - - 15 0.63 55 2.32 100
2.11 - - - - - - - - 100

9.03 - - - - - - - - -

0.59 - - - - - - - - -
1.76 - - - - - - - - -
1.03 - - - - - - - - 75
0.44 - - - - - - - - -

9.58 - - - - - - - - -
0.40 - - - - - - - - -

0.15 - - - - - - - - -
0.15 - - - - - - - - -
0.14 - - - - - - - - -
0.08 - - - - - - - - -
0.12 - - - - - - - - -
0.15 - - - - - - - - -

0.23 - - - - - - - - -
0.05 - - - - - - - - -
0.02 - - - - - - - - -
0.02 - - - - - - - - -
0.24 - - - - - - - - -
1.06 - - - - - - - - -

1.22 - - - - - - - - -
6 7 8 9 10

0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
1.01 100 1.01 100 1.01 100 1.01 100 1.01 100
- - - - - - - 100 0.11 100
0.90 100 0.90 100 0.90 100 0.90 100 0.90 100
0.86 100 0.86 100 0.86 100 0.86 100 0.86 100
- 100 - 100 - 100 - 100 - 100

0.13 100 0.13 100 0.13 100 0.13 100 0.13 100
0.06 100 0.06 100 0.06 100 0.06 100 0.06 100
0.56 100 0.56 100 0.56 100 0.56 100 0.56 100
0.34 100 0.69 100 0.69 100 0.69 100 0.69 100

- 100 14.17 100 14.17 100 14.17 100 14.17 100


- 100 12.02 100 12.02 100 12.02 100 12.02 100
- 25 0.42 100 1.70 100 1.70 100 1.70 100

- - - - - 100 1.38 100 1.38 100


- - - - - 100 14.29 100 14.29 100
- - - - - 100 1.40 100 1.40 100
- - - - - 100 0.65 100 0.65 100

- - - - - - - 100 12.16 100

- - - - - 50 2.96 100 5.92 100


- - - - - - - 100 2.97 100
- - - - - - - 100 2.61 100

- - - - - 50 0.91 100 1.82 100


- - - - - 100 9.21 100 9.21 100
- - - - - - - 100 6.87 100
- - - - - - - - - 100

- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
6 7 8 9 10
0.20 100 0.20 100 0.20 100 0.20 100 0.20 100
0.08 100 0.08 100 0.08 100 0.08 100 0.08 100
- - - - - - - - - 100

0.04 100 0.04 100 0.04 100 0.04 100 0.04 100
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100
0.01 100 0.01 100 0.01 100 0.01 100 0.01 100

1.24 100 1.24 100 1.24 100 1.24 100 1.24 100
1.19 100 1.19 100 1.19 100 1.19 100 1.19 100
1.20 100 1.20 100 1.20 100 1.20 100 1.20 100

0.03 100 0.05 100 0.05 100 0.05 100 0.05 100
0.35 100 0.70 100 0.70 100 0.70 100 0.70 100
- 50 0.51 100 1.02 100 1.02 100 1.02 100
- 50 0.98 100 1.95 100 1.95 100 1.95 100
1.56 75 2.34 100 3.12 100 3.12 100 3.12 100
0.23 100 0.31 100 0.31 100 0.31 100 0.31 100

- - - 100 25.51 100 25.51 100 25.51 100


- - - - - 100 1.66 100 1.66 100

- - - - - 50 2.68 100 5.36 100


- - - - - 50 0.49 100 0.99 100
- - - - - - - 100 0.80 100
- - - - - - - 100 0.20 100

2.40 100 4.81 100 4.81 100 4.81 100 4.81 100
- - - - - - - 100 1.76 100
- - - - - - - 100 2.35 100
- - - - - 50 0.79 100 1.59 100

- - - - - - - 50 4.24 100

- - - 50 2.04 100 4.07 100 4.07 100


- - - - - - - 50 1.04 100
- - - - - 50 1.44 100 2.88 100

- - - - - - - 75 6.62 100
- - - - - - - 50 2.90 100
- - - - - - - 50 0.14 100
- - - - - - - - - 100

- - - - - - - 100 0.14 100


- - - - - - - 100 0.14 100
- - - - - - - 100 0.09 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100

- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100

- - - - - - - 100 1.00 100


6 7 8 9 10

1.70 100 1.70 100 1.70 100 1.70 100 1.70 100
0.32 100 0.32 100 0.32 100 0.32 100 0.32 100
0.65 100 0.65 100 0.65 100 0.65 100 0.65 100
- - - - - - - - - 100

0.05 100 0.05 100 0.05 100 0.05 100 0.05 100
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100
0.01 100 0.01 100 0.01 100 0.01 100 0.01 100

4.29 100 4.29 100 4.29 100 4.29 100 4.29 100
4.10 100 4.10 100 4.10 100 4.10 100 4.10 100
1.08 100 1.08 100 1.08 100 1.08 100 1.08 100

0.15 100 0.15 100 0.15 100 0.15 100 0.15 100
0.79 100 0.79 100 0.79 100 0.79 100 0.79 100
0.74 100 0.99 100 0.99 100 0.99 100 0.99 100
- 100 2.23 100 2.23 100 2.23 100 2.23 100
- 100 2.64 100 2.64 100 2.64 100 2.64 100
- 100 1.17 100 1.17 100 1.17 100 1.17 100
- 25 7.11 100 28.43 100 28.43 100 28.43 100
- - - 100 2.24 100 2.24 100 2.24 100

- - - 85 6.89 100 8.10 100 8.10 100


- - - - - 100 1.06 100 1.06 100
- - - - - 100 0.98 100 0.98 100
- - - - - 100 0.30 100 0.30 100

5.81 100 5.81 100 5.81 100 5.81 100 5.81 100
4.22 100 4.22 100 4.22 100 4.22 100 4.22 100
2.11 100 2.11 100 2.11 100 2.11 100 2.11 100

- - - - - 85 7.68 100 9.03 100

- 50 0.30 100 0.59 100 0.59 100 0.59 100


- 50 0.88 100 1.76 100 1.76 100 1.76 100
0.77 100 1.03 100 1.03 100 1.03 100 1.03 100
- - - - - 100 0.44 100 0.44 100

- - - 25 2.39 100 9.58 100 9.58 100


- - - - - 85 0.34 100 0.40 100

- 100 0.15 100 0.15 100 0.15 100 0.15 100


- 100 0.15 100 0.15 100 0.15 100 0.15 100
- 100 0.14 100 0.14 100 0.14 100 0.14 100
- 100 0.08 100 0.08 100 0.08 100 0.08 100
- 100 0.12 100 0.12 100 0.12 100 0.12 100
- 100 0.15 100 0.15 100 0.15 100 0.15 100

- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100

- - - - - - - - - 100
0.97
0.97
1.01
0.11
0.90
0.86
-

0.13
0.06
0.56
0.69

14.17
12.02
1.70

1.38
14.29
1.40
0.65

12.16

5.92
2.97
2.61

1.82
9.21
6.87
3.58

0.36
0.08
0.04
0.04
0.62
1.64
0.21
0.20
0.08
0.07

0.04
0.03
0.01

1.24
1.19
1.20

0.05
0.70
1.02
1.95
3.12
0.31

25.51
1.66

5.36
0.99
0.80
0.20

4.81
1.76
2.35
1.59

8.49

4.07
2.07
2.88

8.82
5.80
0.29
3.32

0.14
0.14
0.09
0.07
0.08
0.09

0.22
0.05
0.02
0.01
0.22
0.98

1.00
1.70
0.32
0.65
0.11

0.05
0.03
0.01

4.29
4.10
1.08

0.15
0.79
0.99
2.23
2.64
1.17
28.43
2.24

8.10
1.06
0.98
0.30

5.81
4.22
2.11

9.03

0.59
1.76
1.03
0.44

9.58
0.40

0.15
0.15
0.14
0.08
0.12
0.15

0.23
0.05
0.02
0.02
0.24
1.06

1.22
YANG DIPAKAI
TH. 2018
1 SMPN 2 SEPULU 2 KELAS ### SINERGI
2 SMPN 1 KLAMPIS 3 KELAS ### SINERGI
3 SMPN 2 KOKOP 2 KELAS ### SINERGI
4 SMPN 3 SATAP KOKOP 2 KELAS ### SINERGI
5 SMPN 1 TRAGAH 3 KELAS ### INDRAKILA
6 SMPN 2 MODUNG 2 KELAS ### INDRAKILA
7 SMPN 2 LABANG 3 KELAS ### INDRAKILA
8 SMPN 2 KWANYAR 2 KELAS ### INDRAKILA
9 SMPN TAHAL AMIN H. ABDULLAH, S.Pd

REKAPITULASI 1
RENCANA ANGGARAN BIAYA OK
OK
KEGIATAN : PENGADAAN SARANA PRASARANA
PEKERJAAN : PERENCANAAN SMP KABUPATEN BANGKALAN
LINGKUP PEKERJAAN : REHABILITASI 2 RUANG BELAJAR SMPN 2 SEPULU
LOKASI : SMPN 2 SEPULU KEC. SEPULU KAB. BANGKALAN

NO. URAIAN PEKERJAAN JUMLAH HARGA

I PEKERJAAN PERSIAPAN ###


II PEKERJAAN PASANGAN/PLESTERAN ###
III PEKERJAAN BETON ###
IV PEKERJAAN RANGKA ATAP ###
V PEKERJAAN ATAP ###
VI PEKERJAAN PLAFOND ###
VII PEKERJAAN PENGECATAN ###
VIII PEKERJAAN LANTAI ###
IX PEKERJAAN INSTALASI LISTRIK ###
X PEKERJAAN KACA ###

JUMLAH ###
DIBULATK ### ###
###

TERBILANG : ( SERATUS DELAPAN PULUH TIGA JUTA RUPIAH )

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

ANWAR NURIS, S.Pd.I H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Sepulu
Kec. Sepulu Kab. Bangkalan

DR. AHMAD SABARUDIN, S.Pd, M.MPd


NIP. 19680503 199103 1 013

LAPORAN MINGGUAN
Minggu ke :
Pekerjaan : REHABILITASI 2 RUANG KELAS SMPN 2 SEPULU Tanggal :
Nama Sekolah : SMPN 2 SEPULU Bulan :
Lokasi : Kec. Kedamean Kab. Gresik Dana diterima tangal :
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%)
% Prestasi Rerata Prestasi
(1) (2) (3) (4) (5) (6) (7) (8)
(6)/100x(5)
I. PEKERJAAN PERSIAPAN
1 Pembongkaran atap + rangka atap 143.00 m² 0.97 - - 100
2 Pembongkaran atap 234.90 m² 0.97 - - 100
3 Penetelan plesteran 92.16 m² 1.01 - - 100
4 Pembersihan akhir pekerjaan 1.00 ls 0.11 - - -
II. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 18.50 m² 0.90 - - -
2 Plesteran 1Pc : 5Ps 37.00 m² 0.86 - - -
3 Benangan 48.00 m' - - - -

III. PEKERJAAN BETON


1 Kolom Struktur 15/25 0.06 m³ 0.13 - - -
2 Kolom Praktis 15/15 0.03 m³ 0.06 - - -
3 Ring Balk 15/15 0.26 m³ 0.56 - - -
4 Ring gewel 15/15 dan konsol beton 15/15 0.32 m³ 0.69 - - -

IV. PEKERJAAN RANGKA ATAP


1 Kuda-kuda baja ringan (galvalum bentang 7m) 139.73 m² 14.17 - - -
2 Kuda-kuda baja ringan (galvalum 50%) 118.54 m² 12.02 - - -
2 Listplank kalsiplank 8mm / 30 cm 47.70 m¹ 1.70 - - -

V. PEKERJAAN ATAP
1 Atap genteng beton (lama) 139.73 m² 1.38 - - -
2 Atap genteng beton warna 237.08 m² 14.29 - - -
3 Genteng bubungan beton warna 26.70 m' 1.40 - - -
4 Plesteran kompres L = 10 cm (Akhiran genting) 56.00 m' 0.65 - - -

VI. PEKERJAAN PLAFOND


1 Plafond calsiboard 4mm + rangka metal hollow 261.00 m² 12.16 - - -

VII. PEKERJAAN PENGECATAN


1 Pengecatan dinding 521.00 m² 5.92 - - -
2 Pengecetan plafond 261.00 m² 2.97 - - -
3 Pengecatan kayu 111.96 m² 2.61 - - -

VIII. PEKERJAAN LANTAI


1 Keramik lantai 30 x 30 ( tambal sulam 1kelas) 31.50 m² 1.82 - - -
2 Keramik lantai 40 x 40 150.00 m² 9.21 - - -
3 Keramik dinding R.Lab 25 x 40 92.16 m² 6.87 - - -
4 List keramik 76.80 m' 3.58 - - -

IX. PEKERJAAN INSTALASI LISTRIK


1 Lampu SL 14 watt 12.00 bh 0.36 - - -
2 Lampu SL 8 watt (teras) 3.00 bh 0.08 - - -
3 Saklar ganda 4.00 bh 0.04 - - -
4 Saklar tunggal 5.00 bh 0.04 - - -
5 Stop kontak + instalasi 5.00 bh 0.62 - - -
6 Instalasi titik lampu 15.00 ttk 1.64
X. PEKERJAAN KACA
1 Kaca mati t=5 mm (yg pecah) 3.36 m² 0.21 - - -

JUMLAH 100.00 -
Jumlah dana yang digunakan sampai dengan minggu ini ( minggu ke 1 ) Rp 20,300,000.00

REKAPITULASI 2
RENCANA ANGGARAN BIAYA OK

KEGIATAN : PENGADAAN SARANA PRASARANA


PEKERJAAN : PERENCANAAN SMP KABUPATEN BANGKALAN
LINGKUP PEKERJAAN : REHABILITASI 3 RUANG BELAJAR SMPN 1 KLAMPIS
LOKASI : SMPN 1 KLAMPIS KEC. KLAMPIS KAB. BANGKALAN

NO. URAIAN PEKERJAAN JUMLAH HARGA

I (2) ###
II PEKERJAAN TANAH ###
III PEKERJAAN PASANGAN/PLESTERAN ###
IV PEKERJAAN BETON ###
V PEKERJAAN RANGKA ATAP ###
VI PEKERJAAN ATAP ###
VII PEKERJAAN KUSEN PINTU DAN JENDELA ###
VIII PEKERJAAN PLAFOND ###
IX PEKERJAAN PENGECATAN/PLAMIRAN ###
X PEKERJAAN LANTAI ###
XI PEKERJAAN KUNCI + PENGGANTUNG ###
XII PEKERJAAN INSTALASI LISTRIK ### ###
XIII PEKERJAAN KACA ###

JUMLAH ### ###


DIBULATK ### ###
TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

HANAF I H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 1 Kelampis
Kec. Kelampis Kab. Bangkalan

IMAM SYAFII, S.Pd, MPd


NIP. 19680228 199401 1 003

LAPORAN MINGGUAN
Minggu ke :
Pekerjaan : REHABILITASI 2 RUANG KELAS SMPN 1 KLAMPIS Tanggal :
Nama Sekolah : SMPN 1 KLAMPIS Bulan :
Lokasi : Kec. Kedamean Kab. Gresik Dana diterima tangal :
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%)
% Prestasi Rerata Prestasi
(1) (2) (3) (4) (5) (6) (7) (8)
I. PEKERJAAN PERSIAPAN (6)/100x(5)
1 Pembongkaran kosen 12.00 bh 0.20 - - 100
2 Penetelan plesteran 12.00 m² 0.08 - - 100
3 Pembersihan akhir pekerjaan 1.00 ls 0.07 - - -

II. PEKERJAAN TANAH


1 Galian tanah 2.16 m³ 0.04 - - -
2 Urugan pasir bawah pondasi t=10cm 0.36 m³ 0.03 - - -
4 Urugan tanah kembali 1.08 m³ 0.01 - - -

III. PEKERJAAN PASANGAN/PLESTERAN


1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 42.79 m² 1.24 - - -
2 Plesteran 1Pc : 5Ps 85.57 m² 1.19 - - -
3 Benangan 308.80 m' 1.20 - - -

IV. PEKERJAAN BETON


1 Lantai kerja bawah pondasi 1:3:5 t=5cm 0.18 m³ 0.05 - - -
2 Pondasi beton stempat 60 x 60 x 15cm 0.54 m³ 0.70 - - -
3 Kolom teras 15/15 0.79 m³ 1.02 - - -
4 Balok beton 15/20 1.50 m³ 1.95 - - -
5 Kolom beon 15/20 2.40 m³ 3.12 - - -
6 Kolom praktis 15/15 0.24 m³ 0.31 - - -
5.65
V. PEKERJAAN RANGKA ATAP
1 Kuda-kuda baja ringan (galvalum 75mm) (betang. 370.11 m² 25.51 - - -
2 Lisplank kalsiplank 8mm / 30 cm 77.90 m¹ 1.66 - - -

VI. PEKERJAAN ATAP


1 Atap genteng Karang Penang (baru bg. depan) 202.80 m² 5.36 - - -
2 Atap genteng (lama bg. belakang) 167.31 m² 0.99 - - -
3 Genteng bubungan Karang penang 25.35 m' 0.80 - - -
4 Plesteran kompres L = 10 cm (Akhiran genting) 29.20 m' 0.20 - - -

VII. PEKERJAAN KUSEN PINTU DAN JENDELA


1 Kusen kayu kempas/mahoni 6/15 1.28 m³ 4.81 - - -
2 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 8.69 m² 1.76 - - -
3 Jalusi kayu kempas/mahoni 3/5 16.61 m² 2.35 - - -
4 Daun Jendela kaca kayu kempas/mahoni 3/10 11.52 m² 1.59 - - -

VIII. PEKERJAAN PLAFOND


1 Plafond calsiboard 4mm + rangka kayu 4/6 304.20 m² 8.49 - - -

IX. PEKERJAAN PENGECATAN/PLAMIRAN


1 Pengecatan dinding 598.50 m² 4.07 - - -
2 Pengecatan plafond 304.20 m² 2.07 - - -
3 Pengecatan kayu 206.70 m² 2.88 - - -

X. PEKERJAAN LANTAI
1 Keramik lantai 40 x 40 240.00 m² 8.82 - - -
2 Keramik dinding 25 x 40 129.80 m² 5.80 - - -
3 Keramik kolom 25 x 40 6.40 m² 0.29 - - -
4 List keramik 119.00 m' 3.32 - - -

XI. PEKERJAAN KUNCI + PENGGANTUNG


1 Kunci pintu 2 x putar 3.00 bh 0.14 - - -
2 Engsel Pintu 18.00 bh 0.14 - - -
3 Engsel Jendela 16.00 bh 0.09 - - -
4 Grendel tanam 3.00 bh 0.07 - - -
5 Grendel Jendela 16.00 bh 0.08 - - -
6 Hag Angin 16.00 bh 0.09 - - -

XII. PEKERJAAN INSTALASI LISTRIK


1
Lampu SL 14 watt 12.00 bh 0.22 - - -
2
Lampu SL 8watt (teras) 3.00 bh 0.05 - - -
3
Saklar ganda 3.00 bh 0.02 - - -
4
Saklar tunggal 3.00 bh 0.01 - - -
5 Stop kontak + instalasi 3.00 bh 0.22 - - -
6 Instalasi titik lampu 15.00 ttk 0.98 - - -

XIII. PEKERJAAN KACA


1 Kaca bening t=5 mm 27.10 m² 1.00 - - -

JUMLAH 95.07 -
Jumlah dana yang digunakan sampai dengan minggu ini ( minggu ke 1 ) Rp 20,300,000.00

3
REKAPITULASI OK
NCANA ANGGARAN BIAYA OK
: PENGADAAN SARANA PRASARANA
KEGIATAN : PERENCANAAN SMP KABUPATEN BANGKALAN
PEKERJAAN : REHABILITASI 2 RUANG BELAJAR SMPN 3 SATAP KOKOP
LINGKUP PEKERJAAN : SMPN 3 SATAP KOKOP KEC. KOKOP KAB. BANGKALAN
LOKASI
URAIAN PEKERJAAN JUMLAH HARGA
NO.

PEKERJAAN PERSIAPAN ###


I PEKERJAAN TANAH ###
II PEKERJAAN PASANGAN/PLESTERAN ###
III PEKERJAAN BETON ###
IV PEKERJAAN RANGKA ATAP ###
V PEKERJAAN ATAP ###
VI PEKERJAAN KUSEN PINTU DAN JENDELA ###
VII PEKERJAAN PLAFOND ###
VIII PEKERJAAN PENGECATAN/PLAMIRAN ###
IX PEKERJAAN LANTAI ###
X PEKERJAAN KUNCI + PENGGANTUNG ###
XI PEKERJAAN INSTALASI LISTRIK ###
XII PEKERJAAN KACA ###
XIII

JUMLAH ### ###


DIBULATK ### ###

TERBILANG : ( SERATUS DELAPAN PULUH TIGA JUTA RUPIAH )

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 3 Satap Kokop
Kec. Kokop Kab. Bangkalan

IHSANUDIN, S.Pd
NIP. 19700109 199104 1 001
LAPORAN MINGGUAN
Minggu ke :
Pekerjaan : REHABILITASI 2 RUANG BELAJAR SMPN 3 SATAP KOKOP Tanggal :
Nama Sekolah : SMPN 3 SATAP KOKOP KEC. KOKOP KAB. BANGKALAN Bulan :
Lokasi : KEC. KOKOP KAB. BANGKALAN Dana diterima tangal :
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%)
% Prestasi Rerata Prestasi
(1) (2) (3) (4) (5) (6) (7) (8)
(6)/100x(5)

I. PEKERJAAN PERSIAPAN
1 Pembongkaran atap + rangka 260.00 m² 1.70 100 1.70 -
2 Pembongkaran kosen 12.00 bh 0.32 100 0.32 -
3 Pembongkaran dinding 61.75 m² 0.65 100 0.65 -
4 Pembersihan akhir pekerjaan 1.00 ls 0.11 - - -

II. PEKERJAAN TANAH


1 Galian tanah 1.51 m³ 0.05 100 0.05 -
2 Urugan pasir bawah pondasi t=10cm 0.25 m³ 0.03 100 0.03 -
4 Urugan tanah kembali 0.76 m³ 0.01 100 0.01 -

III. PEKERJAAN PASANGAN/PLESTERAN


1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 91.82 m² 4.29 100 4.29 -
2 Plesteran 1Pc : 5Ps 183.63 m² 4.10 100 4.10 -
3 Benangan 173.00 m' 1.08 100 1.08 -

IV. PEKERJAAN BETON `


1 Lantai kerja bawah pondasi 1:3:5 t=5cm 0.31 m³ 0.15 75 0.11 25
2 Pondasi beton stempat 60 x 60 x 15cm 0.38 m³ 0.79 - - 50
3 Kolom teras 15/15 0.47 m³ 0.99 - - 10
4 Balok beton 15/20 1.07 m³ 2.23 - - -
5 Kolom struktur 15/25 1.26 m³ 2.64 - - -
6 Ring balk 15/15 0.56 m³ 1.17 - - -
V. PEKERJAAN RANGKA ATAP
1 Kuda-kuda baja ringan (galvalum 75mm) 256.39 m² 28.43 - - -
2 Lisplank kalsiplank 8mm / 30 cm 65.20 m¹ 2.24 - - -

VI. PEKERJAAN ATAP


1 Atap genteng Karang Penang (baru bg depan) 190.62 m² 8.10 - - -
2 Atap genteng (lama bg belakang) 111.26 m² 1.06 - - -
3 Genteng bubungan Karang penang 19.35 m' 0.98 - - -
4 Plesteran kompres L = 10 cm (Akhiran genting) 26.50 m' 0.30 - - -

VII. PEKERJAAN KUSEN PINTU DAN JENDELA


1 Kusen kayu aluminium 4" 95.76 m' 5.81 75 4.36 25
2 Daun Pintu kaca aluminium 4.00 bh 4.22 15 0.63 40
3 Daun Jendela kaca aluminium 8.00 bh 2.11 - - -

VIII. PEKERJAAN PLAFOND


1 Plafond calsiboard 4mm + rangka hollow 201.24 m² 9.03 - - -

IX. PEKERJAAN PENGECATAN/PLAMIRAN


1 Pengecatan dinding depan 54.00 m² 0.59 - - -
2 Pelamiran dinding 344.50 m² 1.76 - - -
3 Plamiran plafond 201.24 m² 1.03 - - -
4 Pengecatan kayu 19.56 m² 0.44 - - -

X. PEKERJAAN LANTAI
1 Keramik lantai 40 x 40 162.00 m² 9.58 - - -
2 Keramik kolom 20 x 40 (motif) 5.60 m² 0.40 - - -

XI. PEKERJAAN KUNCI + PENGGANTUNG


1 Kunci pintu 2 x putar 2.00 bh 0.15 - - -
2 Engsel Pintu 12.00 bh 0.15 - - -
3 Engsel Jendela 16.00 bh 0.14 - - -
4 Grendel tanam 2.00 bh 0.08 - - -
5 Grendel Jendela 16.00 bh 0.12 - - -
6 Hag Angin 16.00 bh 0.15 - - -

XII PEKERJAAN INSTALASI LISTRIK


1 Lampu SL 14 watt 8.00 bh 0.23 - - -
2 Lampu SL 8watt (teras) 2.00 bh 0.05 - - -
3 Saklar ganda 2.00 bh 0.02 - - -
4 Saklar tunggal 2.00 bh 0.02 - - -
5 Stop kontak + instalasi 2.00 bh 0.24 - - -
6 Instalasi titik lampu 10.00 ttk 1.06 - - -

XIII. PEKERJAAN KACA


1 Kaca mati t=5 mm 20.68 m² 1.22 - - -

JUMLAH 100.00 17.33


Jumlah dana yang digunakan sampai dengan minggu ini ( minggu ke 1 ) Rp 39,777,000.00

Mengetahui Menyetujui
SMPN 3 Satap Kokop Panitia Pembangunan Sekolah
Kec. Kokop Kab. Bangkalan
Selaku Penanggung Jawab
IHSANUDIN, S.Pd SUHAERI
NIP. 19700109 199104 1 001

REKAPITULASI
NCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI

NO.

I
II
III
IV
V
VI
VII
VIII
IX
X 4
XI OK
XII LAMA
XIII : PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 1 TRAGAH
: SMPN 1 TRAGAH KEC. TRAGAH KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA

TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )
PEKERJAAN PERSIAPAN ###
PEKERJAAN TANAH ###
PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA #DIV/0!
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###

JUMLAH #DIV/0! ###


DIBULATK #DIV/0! #DIV/0!

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

YUNIZAR AN NATSIRUL YUSUF H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 1 Tragah
Kec. Tragah Kab. Bangkalan

Drs. AMIRULLAH, MM
NIP. 19581217 198603 1 011

NO
1
I.
1
2
3
4

II.
1
2
4

III.
1
2
3

IV.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran atap + rangka 377.00 m² ### ###
V. Pembongkaran kusen 4.00 bh ### ###
1 Penetelan plesteran 159.60 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VI. PEKERJAAN TANAH ###
1 Galian tanah 2.16 m³ ### ###
2 Urugan pasir bawah pondasi t=10cm 0.36 m³ ### ### #DIV/0!
3 Urugan tanah kembali 1.08 m³ ### ###
4 ###
PEKERJAAN PASANGAN/PLESTERAN
VII. Pasangan 1/2 bata camp. 1 Pc : 5 Ps 7.20 m² ### ### ###
1 Plesteran 1Pc : 5Ps 14.40 m² ### ###
2 Benangan 24.00 m' ### ###
3 ###
PEKERJAAN BETON
VIII. Lantai kerja bawah pondasi 1:3:5 t=5cm 0.18 m³ ### ###
1 Pondasi beton stempat 60 x 60 x 15cm 0.54 m³ ### ###
Kolom teras 15/15 0.79 m³ ### ###
IX. Balok beton 15/20 1.71 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ ### ###
X. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Penang (baru) 382.73 m² ### ###
3 Atap genteng (lama bg. belakang) 170.10 m² ### ###
4 Genteng bubungan Karang penang 28.35 m' ### ###
Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' ### ###
XI. ###
1 PEKERJAAN KUSEN PINTU DAN JENDELA
2 Kusen kayu kempas/mahoni 6/15 #DIV/0! m³ Rp - #DIV/0!
3 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 8.61 m² Rp - Rp - #DIV/0!
4 Daun Jendela kaca kayu kempas/mahoni 3/10 8.40 m² Rp - Rp - ###
5 #DIV/0!
6 PEKERJAAN PLAFOND
Plafond calsiboard 4mm + rangka kayu 4/6 294.84 m² ### ###
XII ###
1 PEKERJAAN PENGECATAN
2 Pengecatan dinding (3 Ruang kelas) 598.50 m² ### ###
3 Pengecatan plafond 294.84 m² ### ###
4 Pengecatan kayu 206.70 m² ### ###
5 ###
6 PEKERJAAN LANTAI #DIV/0!
Keramik lantai 40 x 40 245.70 m² ### ###
XIII. Keramik dinding 25 x 40 ( 3 R.kelas + teras ) 159.60 m² ### ###
1 List keramik dinding 7cm 110.40 m² ### ###
Keramik kolom 25 x 40 12.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Engsel Pintu 18.00 bh ### ###
Engsel Jendela 16.00 bh ### ###
Grendel pintu 3.00 bh ### ###
Grendel Jendela 16.00 bh ### ###
Hag Angin 16.00 bh ### ###
###
REKAPITULASI
PEKERJAAN INSTALASI LISTRIK
NCANA ANGGARAN
Lampu BIAYA
SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
KEGI Saklar ganda 3.00 bh ### ###
PEKE Saklar tunggal 3.00 bh ### ###
LING Stop kontak + instalasi 3.00 bh ### ###
LOKA Instalasi titik lampu 15.00 ttk ### ###
###
NO. PEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 11.14 m² ### ###
###
I
II
III
IV
V
VI
VII
VIII
IX
X 4
XI OK
XII BARU
XIII : PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 1 TRAGAH
: SMPN 1 TRAGAH KEC. TRAGAH KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA

TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )
PEKERJAAN PERSIAPAN ###
PEKERJAAN TANAH ###
PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA Rp -
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###

JUMLAH ### ###


DIBULATK ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

YUNIZAR AN NATSIRUL YUSUF H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 1 Tragah
Kec. Tragah Kab. Bangkalan

Drs. AMIRULLAH, MM
NIP. 19581217 198603 1 011

NO
1
I.
1
2
3
4

II.
1
2
4

III.
1
2
3
IV.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran atap + rangka 377.00 m² ### ###
V. Pembongkaran kusen 8.00 bh ### ###
1 Penetelan plesteran 249.00 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VI. PEKERJAAN TANAH ###
1 Galian tanah 2.16 m³ ### ###
2 Urugan pasir bawah pondasi t=10cm 0.36 m³ ### ### ###
3 Urugan tanah kembali 1.08 m³ ### ###
###
VII. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 24.02 m² ### ### ###
2 Plesteran 1Pc : 5Ps 48.03 m² ### ###
3 Benangan 168.00 m' ### ###
4 ###
PEKERJAAN BETON
VIII. Lantai kerja bawah pondasi 1:3:5 t=5cm 0.18 m³ ### ###
1 Pondasi beton stempat 60 x 60 x 15cm 0.54 m³ ### ###
Kolom teras 15/15 0.79 m³ ### ###
IX. Balok beton 15/20 1.56 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ ### ###
X. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Penang (baru) 382.73 m² ### ###
3 Genteng bubungan Karang penang 28.35 m' ### ###
4 Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' ### ###
5 ###
PEKERJAAN KUSEN PINTU DAN JENDELA
XI. Kusen kayu kempas/mahoni 6/15 1.09 m³ Rp - Rp -
1 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 8.61 m² Rp - Rp - ###
2 Jalusi kayu kempas/mahoni 3/12 7.20 m² Rp - Rp -
3 Daun Jendela kaca kayu kempas/mahoni 3/10 6.72 m² Rp - Rp - ###
4 Rp -
5 PEKERJAAN PLAFOND
6 Plafond calsiboard 4mm + rangka kayu 4/6 294.84 m² ### ###
###
XII PEKERJAAN PENGECATAN
1 Pengecatan dinding (3 Ruang kelas) 598.50 m² ### ###
2 Pengecatan plafond 294.84 m² ### ###
3 Pengecatan kayu 206.70 m² ### ###
4 ###
5 PEKERJAAN LANTAI ###
6 Keramik lantai 40 x 40 245.70 m² ### ###
Keramik dinding 25 x 40 ( 3 R.kelas + teras ) 173.40 m² ### ###
XIII. List keramik dinding 7cm 132.90 m² ### ###
1 Keramik kolom 25 x 40 12.00 m² ### ###
Keramik dinding 25 x 40 ( 3 R.kelas teras saja ) 75.60 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Engsel Pintu 18.00 bh ### ###
Engsel Jendela 16.00 bh ### ###
Grendel pintu 3.00 bh ### ###
Grendel Jendela 16.00 bh ### ###
Hag Angin 16.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
REKAPITULASI
Lampu SL 8watt (teras) 3.00 bh ### ###
NCANA ANGGARAN BIAYA
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
KEGI Stop kontak + instalasi 3.00 bh ### ###
PEKE Instalasi titik lampu 15.00 ttk ### ###
LINGKUP PEKERJAAN ###
LOKAPEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 11.14 m² ### ###
NO. ###

I
II
III
IV
V
VI
VII
VIII
IX
X 5
XI OK
XII LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 MODUNG
: SMPN 2 MODUNG KEC. MODUNG KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA


TERBILANG : ( DUA RATUS LIMA JUTA ENAM RATUS RIBU RUPIAH )

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA Rp -
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN/PLAMIRAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ### ###
PEKERJAAN KACA ###

JUMLAH ### ###


DIBULAT ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

M. MAHRI, S.Ag H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Modung
Kec. Modung Kab. Bangkalan

A S U R, M.Pd
NIP. 19610117 198403 1 008

NO
1
I.
1
2

II.
1
2
3

III.
1
2
3

IV.
1
2
Lembar. 2
V. JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
1 2 3 4 5
2 PEKERJAAN PERSIAPAN
3 Pembongkaran atap + rangka 406.00 m² ### ###
4 Pembersihan akhir pekerjaan 1.00 ls ### ### ###
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 98.93 m² ### ###
2 Plesteran 1Pc : 5Ps 197.87 m² ### ###
3 Benangan 166.56 m' ### ###
###
VII. PEKERJAAN BETON
1 Kolom teras 15/15 0.41 m³ ### ###
Balok teras 15/20 1.24 m³ ### ###
VIII. Ring balk gewel 15/15 0.98 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 396.90 m² ### ###
4 Lisplank kalsiplank 8mm / 30 cm 85.70 m¹ ### ###
5 ###
PEKERJAAN ATAP
IX. Pasang atap genteng karang p enang (baru 5%) 19.85 m² ### ###
1 Pasang atap genteng (lama) 377.06 m² ### ###
Genteng bubungan karang penang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 29.00 m' ### ###
1 ###
2 PEKERJAAN KUSEN PINTU DAN JENDELA
3 Kusen kayu kempas/mahoni 6/12 0.46 m³ Rp - Rp -
4 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 6.72 m² Rp - Rp -
5 Daun Jendela kaca kayu kempas/mahoni 3/10 5.04 m² Rp - Rp -
6 Rp -
PEKERJAAN PLAFOND ###
XI. Plafond calsiboard 4mm + rangka hollow 340.20 m² ### ###
1 ###
2 PEKERJAAN PENGECATAN/PLAMIRAN
3 Pengecatan dinding (depan) 66.85 m² ### ###
4 Pelamiran dinding 430.33 m² ### ###
5 Pelamiran plafond 340.20 m² ### ### ###
6 Pengecatan kayu 206.70 m² ### ###
Cat genteng 396.90 m² ### ###
XII. ###
1 PEKERJAAN LANTAI
Lantai rabat 216.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 4.00 bh ### ###
Engsel Pintu 21.00 bh ### ###
Engsel Jendela 24.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Grendel Jendela 12.00 bh ### ### ###
Hag Angin 24.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 14.00 bh ### ###
Lampu SL 8watt (teras) 4.00 bh ### ###
Saklar ganda 7.00 bh ### ###
REKAPITULASI
Saklar tunggal 3.00 bh ### ###
NCANA ANGGARAN BIAYA
Stop kontak + instalasi 4.00 bh ### ###
Instalasi titik lampu 18.00 bh ### ###
KEGIATAN ###
PEKE PEKERJAAN KACA
LING Kaca mati t=5 mm 14.49 m² ### ###
LOKASI ###

NO.

I
II
III
IV
V
VI
VII
VIII
IX
X 5
XI OK
XII BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 MODUNG
: SMPN 2 MODUNG KEC. MODUNG KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA


TERBILANG : ( DUA RATUS LIMA JUTA ENAM RATUS RIBU RUPIAH )

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA Rp -
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN/PLAMIRAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ### -
PEKERJAAN KACA ###

JUMLAH ### ###


DIBULAT ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

M. MAHRI, S.Ag H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Modung
Kec. Modung Kab. Bangkalan

A S U R, M.Pd
NIP. 19610117 198403 1 008

NO
1
I.
1
2

II.
1
2
3

III.
1
2
3

IV.
1
2
Lembar. 2
V. JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
1 2 3 4 5
2 PEKERJAAN PERSIAPAN
3 Pembongkaran atap + rangka 406.00 m² ### ###
4 Pembersihan akhir pekerjaan 1.00 ls ### ### ###
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 98.93 m² ### ###
2 Plesteran 1Pc : 5Ps 197.87 m² ### ###
3 Benangan 166.56 m' ### ###
###
VII. PEKERJAAN BETON
1 Kolom teras 15/15 0.41 m³ ### ###
Balok teras 15/20 1.24 m³ ### ###
VIII. Ring balk gewel 15/15 0.98 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 396.90 m² ### ###
4 Lisplank kalsiplank 8mm / 30 cm 85.70 m¹ ### ###
5 ###
PEKERJAAN ATAP
IX. Pasang atap genteng karang p enang (baru 5%) 19.85 m² ### ###
1 Pasang atap genteng (lama) 377.06 m² ### ###
Genteng bubungan karang penang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 29.00 m' ### ###
1 ###
2 PEKERJAAN KUSEN PINTU DAN JENDELA
3 Kusen kayu kempas/mahoni 6/12 0.46 m³ Rp - Rp -
4 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 6.72 m² Rp - Rp -
5 Daun Jendela kaca kayu kempas/mahoni 3/10 5.04 m² Rp - Rp -
6 Rp -
PEKERJAAN PLAFOND ###
XI. Plafond calsiboard 4mm + rangka kayu 4/6 340.20 m² ### ###
1 ###
2 PEKERJAAN PENGECATAN/PLAMIRAN
3 Pengecatan dinding (depan) 66.85 m² ### ###
4 Pelamiran dinding 430.33 m² ### ###
5 Pelamiran plafond 340.20 m² ### ### ###
6 Pengecatan kayu 206.70 m² ### ###
Cat genteng 396.90 m² ### ###
XII. ###
1 PEKERJAAN LANTAI
Lantai rabat 216.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 4.00 bh ### ###
Engsel Pintu 21.00 bh ### ###
Engsel Jendela 24.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Grendel Jendela 12.00 bh ### ### ###
Hag Angin 24.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 14.00 bh ### ###
Lampu SL 8watt (teras) 4.00 bh ### ###
Saklar ganda 7.00 bh ### ###
REKAPITULASI
Saklar tunggal 3.00 bh ### ###
NCANA ANGGARAN BIAYA
Stop kontak + instalasi 4.00 bh ### ###
Instalasi titik lampu 18.00 bh ### ###
KEGIATAN ###
PEKE PEKERJAAN KACA
LING Kaca mati t=5 mm 14.49 m² ### ###
LOKASI ###

NO.

I
II
III
IV
V
VI
VII
VIII
IX
X 6
XI OK
LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 2 LABANG
: SMPN 2 LABANG KEC. LABANG KAB. BANGKALAN

TERBILANG : ( DUA RATUS SEMBILAN


URAIAN
PULUHPEKERJAAN
EN JUMLAH HARGA

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN Rp -
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
PEKERJAAN TANGGA DEPAN PINTU ###

JUMLAH ### ###


DIBULATK ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
ACHMAD TAUFIK HEYKAL, A.Sg H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Labang
Kec. Labang Kab. Bangkalan

Drs. HARTONO, M.Pd


NIP. 19690126 199802 1 003

NO
1
I.
1
2
3
4
5

II.
1

III.
1
2

IV.
1
2
3 Lembar. 2
JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
V. 2 3 4 5
1 PEKERJAAN PERSIAPAN ###
Pembongkaran atap + rangka 377.00 m² Rp - Rp -
VI. Pembongkaran kosen 1.00 bh ### ###
1 Pembongkaran dinding 6.00 m² ### ###
2 Penetelan plesteran 139.74 m² ### ###
3 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VII. PEKERJAAN PASANGAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps (nyepit kuda2) 30.91 m² Rp - Rp -
2 Rp -
3 PEKERJAAN RANGKA ATAP ###
4 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ Rp - Rp -
VIII. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Pilang (baru) 382.73 m² ### ###
Genteng bubungan Karang pilang 28.35 m' ### ###
IX. Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' Rp - Rp -
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsiboard 4mm + rangka hollow 354.38 m² Rp - Rp -
4 Rp -
5 PEKERJAAN PENGECATAN
6 Pengecatan dinding 598.50 m² Rp - Rp - ###
Pengecatan plafond 354.38 m² Rp - Rp -
X. Pengecatan kayu 274.60 m² Rp - Rp -
1 Rp -
PEKERJAAN LANTAI
XI. Keramik lantai 40 x 40 243.00 m² ### ###
1 Keramik dinding 25 x 40 139.74 m² ### ###
2 List keramik 102.00 m' ### ###
3 Keramik kolom 20 x 40 10.80 m² ### ###
4 ###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA ###
Kaca mati t=5 mm (yg pecah) 4.22 m² ### ###
###
PEKERJAAN TANGGA DEPAN PINTU
Pasangan batu gunung 2.88 m³ ### ###
Plesterran trasram 7.68 m² ### ###
Keramik kasar 40 x 40 7.04 m² ### ###
Urugan pasir 4.96 m³ ### ###
REKAPITULASI ###
NCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI

NO.

I
II
III
IV
V
VI
VII
VIII
IX
X 6
XI OK
XII BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 2 LABANG
: SMPN 2 LABANG KEC. LABANG KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA


TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
PEKERJAAN TANGGA DEPAN PINTU ###

JUMLAH ### ###


DIBULATK ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

ACHMAD TAUFIK HEYKAL, A.Sg H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Labang
Kec. Labang Kab. Bangkalan
Drs. HARTONO, M.Pd
NIP. 19690126 199802 1 003

NO
1
I.
1
2
3
4
5

II.
1
2
3

III.
1

IV.
1
2 Lembar. 2
JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
V. 2 3 4 5
1 PEKERJAAN PERSIAPAN ###
2 Pembongkaran atap + rangka 377.00 m² Rp - Rp -
3 Pembongkaran kosen 1.00 bh ### ###
Pembongkaran dinding 6.00 m² ### ###
VI. Penetelan plesteran 127.50 m² ### ###
1 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VII. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps (nyepit kuda2) 22.43 m² Rp - Rp - -
2 Plesteran 1Pc : 5Ps 16.20 m² ### ###
3 Benangan 32.00 m' ### ###
###
VIII. PEKERJAAN BETON
1 Ring balk gewel 15/15 0.40 m³ ### ###
2 ###
3 PEKERJAAN RANGKA ATAP ###
4 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ Rp - Rp -
IX. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Pilang (baru) 382.73 m² ### ###
Genteng bubungan Karang pilang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' Rp - Rp -
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsiboard 4mm + rangka hollow 354.38 m² Rp - Rp -
4 Rp -
5 PEKERJAAN PENGECATAN
6 Pengecatan dinding 598.50 m² Rp - Rp - ###
Pengecatan plafond 354.38 m² Rp - Rp -
XI. Pengecatan kayu 274.60 m² Rp - Rp -
1 Rp -
PEKERJAAN LANTAI
XII. Keramik lantai 40 x 40 243.00 m² ### ###
1 Keramik dinding 25 x 40 127.50 m² ### ###
2 List keramik 102.00 m' ### ###
3 Keramik kolom 20 x 40 10.80 m² ### ###
4 ###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Pintu harmonika 15.00 m² ### ### ###
### ###
PEKERJAAN INSTALASI LISTRIK ###
Lampu SL 14 watt 12.00 bh ### ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA ###
Kaca mati t=5 mm (yg pecah) 4.22 m² ### ###
###
PEKERJAAN TANGGA DEPAN PINTU 3.46
Pasangan batu gunung 2.88 m³ ### ###
Plesterran trasram 7.68 m² ### ###
Keramik kasar 40 x 40 7.04 m² ### ###
Urugan pasir 4.96 m³ ### ###
###
REKAPITULASI
NCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI

NO.

I
II
III
IV
V
VI
VII
VIII
IX
X 7
OK
LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 KWANYAR
: SMPN 2 KWANYAR KEC. KWANYAR KAB. BANGKALAN
TERBILANG : ( SERATUS SEMBILAN PULUH TUJUH JUTA DELAPAN RATUS RIBU RUPIAH )
URAIAN PEKERJAAN JUMLAH HARGA

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN/PLESTERAN Rp -
PEKERJAAN KAYU ###
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
PEKERJAAN TEMPAT DUDUK ###

JUMLAH ### ###


DIBULAT ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

MOHAMMAD MUSTOFA ZAHRON, S.Pd H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Kwanyar
Kec. Kwanyar Kab. Bangkalan

RAHMAWATI, M.Pd
NIP. 19700703 199802 2 003

NO
1
I.
1
2
3
4

II.
1
2

III.
1

IV.
1

V.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran kusen 1.00 bh ### ###
VI. Pembongkaran dinding 15.00 m² ### ###
1 Penetelan plesteran 428.64 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 Ls ### ###
3 ###
4 PEKERJAAN PASANGAN/PLESTERAN ###
5 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 0.91 22.20 m² Rp - Rp -
6 Plesteran 1Pc : 5Ps 1.07 44.40 m² Rp - Rp -
Rp -
VII. PEKERJAAN KAYU
1 Lisplank kayu 3/30 cm 4.00 m¹ ### ###
2 ###
3 PEKERJAAN PLAFOND
4 Plafond calsi 1 x 1 + rangka kayu 12.00 m² Rp - Rp -
Rp -
VIII. PEKERJAAN PENGECATAN
1 Pengecatan dinding (3 kelas) 455.30 m² Rp - Rp -
2 Pengecatan plafond 319.00 m² Rp - Rp -
3 Pengecatan kayu 206.70 m² Rp - Rp - ###
4 Pengecatan kayu (Kantor) 214.39 m² Rp - Rp -
5 Rp -
6PEKERJAAN LANTAI 162.00 ###
Keramik lantai 40 x 40 ( 2 R Kelas ) 5.67 126.00 m² ### ###
IX. Keramik lantai 40 x 40 ( Teras ) 1.62 36.00 m² ### ###
1 Keramik dinding 25 x 40 (dalam kelas + teras) 5.78 128.40 m² ### ###
Keramik kolom teras 25 x 40 1.01 22.40 m² ### ###
X. List keramik 1.64 327.80 m' ### ###
1 Keramik dinding 25 x 40 (dalam kantor+R.guru+ t 13.51 300.24 m² ### ###
2 451.04 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 3.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Hag Angin 60.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
REKAPITULASI
PEKERJAAN KACA
NCANA ANGGARAN BIAYA
Kaca mati t=5 mm (yg pecah) 1.68 m² ### ###
###
KEGI PEKERJAAN TEMPAT DUDUK
PEKE Pasangan trasram 0.68 17.00 m² Rp - Rp -
LING Plat beton tempat duduk t=10 cm 0.53 1.02 m³ ### ###
LOKA Keramik tempat duduk 30 x 30 0.46 10.20 m² ### ###
Keramik dinding tempat duduk 25 x 40 1.84 40.80 m² ### ###
NO. 34.71 ###
0.86768 40.80

I
II
III
IV
V
VI
VII
VIII
IX
X 7
OK
BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 KWANYAR
: SMPN 2 KWANYAR KEC. KWANYAR KAB. BANGKALAN
TERBILANG : ( SERATUS SEMBILAN PULUH TUJUH JUTA DELAPAN RATUS RIBU RUPIAH )
URAIAN PEKERJAAN JUMLAH HARGA
PEKERJAAN PERSIAPAN ###
PEKERJAAN PASANGAN/PLESTERAN Rp -
PEKERJAAN KAYU ###
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
PEKERJAAN TEMPAT DUDUK ###

JUMLAH ### ###


DIBULAT ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

MOHAMMAD MUSTOFA ZAHRON, S.Pd H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Kwanyar
Kec. Kwanyar Kab. Bangkalan

RAHMAWATI, M.Pd
NIP. 19700703 199802 2 003

NO
1
I.
1
2
3
4

II.
1
2

III.
1
2

IV.
1

V. Lembar. 2
1 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
2 2 3 4 5
3 PEKERJAAN PERSIAPAN
4 Pembongkaran kusen 1.00 bh ### ###
5 Pembongkaran dinding 15.00 m² ### ###
Penetelan plesteran 428.64 m² ### ###
VI. Pembersihan akhir pekerjaan 1.00 Ls ### ###
1 ###
2 PEKERJAAN PASANGAN/PLESTERAN ###
3 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 22.20 m² Rp - Rp -
4 Plesteran 1Pc : 5Ps 44.40 m² Rp - Rp -
5 Rp -
6 PEKERJAAN KAYU
Perbaikan daun pintu panil 4.00 bh ### ###
VII. Lisplank kayu 3/30 cm 4.00 m¹ ### ###
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsi 1 x 1 + rangka kayu 12.00 m² Rp - Rp -
4 Rp -
PEKERJAAN PENGECATAN
VIII. Pengecatan dinding (3 kelas) 439.90 m² Rp - Rp -
1 Pengecatan dinding (Kantor) 373.40 m² Rp - Rp -
2 Pengecatan plafond 319.00 m² Rp - Rp -
3 Pengecatan kayu 169.45 m² Rp - Rp - ###
4 Pengecatan kayu (Kantor) 197.69 m² Rp - Rp -
5 Rp -
6 PEKERJAAN LANTAI ###
Keramik lantai 40 x 40 ( 2 R Kelas ) 126.00 m² ### ###
IX. Keramik lantai 40 x 40 ( Teras ) 36.00 m² ### ###
1 Keramik dinding 25 x 40 (dalam kelas + teras) 128.40 m² ### ###
Keramik kolom teras 25 x 40 22.40 m² ### ###
X. List keramik 327.80 m' ### ###
1 Keramik dinding 25 x 40 (dalam kantor+R.guru+ teras) 300.24 m² ### ###
2 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 3.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Hag Angin 60.00 bh ### ###
Pintu harmonika 11.30 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK ###
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA
REKAPITULASI
Kaca mati t=5 mm (yg pecah) 1.68 m² ### ###
NCANA ANGGARAN BIAYA ###
PEKERJAAN TEMPAT DUDUK
KEGI Pasangan trasram 17.00 m² Rp - Rp -
PEKE Plat beton tempat duduk t=10 cm 1.02 m³ ### ###
LING Keramik tempat duduk 30 x 30 10.20 m² ### ###
LOKA Keramik dinding tempat duduk 25 x 40 40.80 m² ### ###
###
NO.

I
II
III
IV
V
VI
VII
VIII
IX
8
OK

: PENGADAAN SARANA PRASARANA


: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 KOKOP
TERBILANG : ( SERATU : SMPN 2 KOKOP KEC. KOKOP KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN/PLESTERAN Rp -
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ### ###
PEKERJAAN KACA ###
PEKERJAAN TEMPAT DUDUK ###

JUMLAH ### ###


DIBULATK ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

BOSTOMI, S.Pd H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Kokop
Kec. Kokop Kab. Bangkalan

MOHAMMAD TAUFIK, SPd


NIP. 19760326 200604 1 010
NO
1
I.
1
2

II.
1
2
3
III.
1

IV.
1
2
3

V. Lembar. 2
1 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
2 2 3 4 5
3 PEKERJAAN PERSIAPAN
4 Penetelan plesteran 317.46 m² ### ###
5 Pembersihan akhir pekerjaan 1.00 Ls Rp - Rp - #REF!
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 12.25 m² Rp - Rp -
5 Plesteran 1Pc : 5Ps 80.58 m² Rp - Rp -
6 Benangan 55.00 m' Rp - Rp -
7 Rp -
PEKERJAAN PLAFOND
VII. Plafond calsiboard 4mm + rangka kayu 15.00 m² Rp - Rp -
1 Rp -
2 PEKERJAAN PENGECATAN -
3 Pengecatan dinding 506.50 m² Rp - Rp -
4 Pengecatan plafond 352.00 m² Rp - Rp - #DIV/0!
5 Pengecatan kayu 275.60 m² Rp - Rp -
6 Rp -
PEKERJAAN LANTAI ###
VIII. Keramik lantai 40 x 40 243.00 m² ### ### 147.47
1 Keramik dinding 25 x 40 ( 3 R. Kelas + teras) 132.96 m² ### ###
List keramik 288.20 m' ### ###
IX. Keramik kolom 25 x 40 16.00 m² ### ###
1 Keramik dinding 25 x 40 ( 5 R. Kelas bg. dalam) 184.50 m² ### ###
2 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 5.00 bh ### ###
Grendel Jendela 50.00 bh ### ###
Hag Angin 100.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 20.00 bh ### ###
Lampu SL 8watt (teras) 5.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 5.00 bh ### ###
Stop kontak + instalasi 5.00 bh ### ###
Instalasi titik lampu 25.00 ttk ### ###
###
PEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 2.53 m² ### ###
###
PEKERJAAN TEMPAT DUDUK
Pasangan trasram 14.70 m² Rp - Rp -
Plat beton tempat duduk t=10 cm 0.74 m³ ### ###
Keramik tempat duduk 30 x 30 7.35 m² ### ###
Keramik dinding tempat duduk 25 x 40 29.40 m² ### ###
###

BATAS
SINERGI 1 SMPN 2 SEPULU DR. AHMAD SABARUDIN, S.Pd, M.MPd
SINERGI 2 SMPN 1 KLAMPIS IMAM SYAFII, S.Pd, MPd
SINERGI 3 SMPN 2 KOKOP MOHAMMAD TAUFIK, SPd
SINERGI 4 SMPN 3 SATAP KOKOP IHSANUDIN, S.Pd
INDRAKILA 5 SMPN 1 TRAGAH Drs. AMIRULLAH, MM
INDRAKILA 6 SMPN 2 MODUNG A S U R, M.Pd
INDRAKILA 7 SMPN 2 LABANG Drs. HARTONO, M.Pd
INDRAKILA 8 SMPN 2 KWANYAR RAHMAWATI, M.Pd
9 SMPN TAHAL AMIN H. ABDULLAH, S.Pd
10 SMPN 1 MODUNG Drs. ALI MUSTOFA, M.Pd
11 SMPN 1 GALIS Drs. TAUFIKUR RAHMAN
12 SMPN 1 KOKOP BUDIONO, S.Pd, M.Pd

13 SMPN 2 KONANG ABDUL RASID, S.Ag, M.PdI


14 SMPN TAHAL AMIN H. ABDULLAH, S.Pd

SMPN 1 KWANYAR MOHAMMAD SADALI, S.Pd


SMPN 1 TANJUNG BUMI Drs. M. AGUS SUBAGIO, M.Pd
SMPN 1 BLEGA SRI ASTUTIK HANDAYANI, M.Pd
SMPN 1 LABANG SUPRIYO, S.Pd, SE, M.PdI

SMPN 1 KWANYAR KEC. KWANYAR KAB. BANGKALAN MOHAMMAD SADALI, S.Pd


SMPN 1 TANJUNG BUMI KEC. TANJUNG BUMI KAB. BAN Drs. M. AGUS SUBAGIO, M.Pd
SMPN 1 BLEGA KEC. BLEGA KAB. BANGKALAN SRI ASTUTIK HANDAYANI, M.Pd
SMPN 2 TANAH MERAH KEC. T KOMARIYAH, S.Pd, M.MPd
SMPN TAHAL AMIN H. ABDULLAH, S.Pd
SMPN 1 GEGER Hj. SRI MULYATI, S.Pd, M.MPd
SMPN 1 GALIS
SMPN 1 TANAH MERAH DYAH CHANDRAWATI, S.Pd
SMPN 2 GEGER SITI YAUMAH, S.Pd
SMPN 4 SATAP TANAH MERA MOH. YUSUF, S.Pd
SMPN 1 KONANG Drs. ANANG ISKANDAR, MM

28.5
23.5
7.833333

1 ( Satu )
5 Oktob. s/d 10 Oktober 2015
Oktober 2015
29 Oktober 2015
Rp. 212.320.000.00
Prestasi Pekerjaan Prestasi Pekerjaan
Minggu Ini (%) Komulatif (%)
Rerata Prestasi Rerata
(9) (10) (11)
(8)/100x(5) (6)+(8) (7)+(9)

0.97 100.00 0.97 Rp 12,375.00 Rp 1,769,625.00


0.97 100.00 0.97 Rp 7,500.00 Rp 1,761,750.00
1.01 100.00 1.01 Rp 20,000.00 Rp 1,843,200.00
- - - Rp 200,000.00 Rp 200,000.00
Rp 5,574,575.00

- - - Rp 88,586.67 Rp 1,638,853.33
- - - Rp 42,298.80 Rp 1,565,055.60
- - - Rp - Rp -
Rp 3,203,908.93

- - - Rp 3,912,550.00 Rp 234,753.00
- - - Rp 3,962,550.00 Rp 114,121.44
- - - Rp 3,962,550.00 Rp 1,027,092.96
- - - Rp 3,962,550.00 Rp 1,255,335.84
Rp 2,631,303.24

- - - Rp 185,000.00 Rp 25,849,125.00
- - - Rp 185,000.00 Rp 21,929,437.50
- - - Rp 65,000.00 Rp 3,100,500.00
Rp 50,879,062.50

- - - Rp 18,000.00 Rp 2,515,050.00
- - - Rp 110,000.00 Rp 26,078,250.00
- - - Rp 95,820.00 Rp 2,558,394.00
- - - Rp 21,149.40 Rp 1,184,366.40
Rp 32,336,060.40

- - - Rp 85,000.00 Rp 22,185,000.00
Rp 22,185,000.00

- - - Rp 20,740.00 Rp 10,805,637.48
- - - Rp 20,740.00 Rp 5,413,140.00
- - - Rp 42,450.00 Rp 4,752,702.00
Rp 20,971,479.48

- - - Rp 105,250.00 Rp 3,315,375.00
- - - Rp 112,000.00 Rp 16,800,000.00
- - - Rp 136,075.00 Rp 12,540,672.00
- - - Rp 85,000.00 Rp 6,528,000.00
Rp 39,184,047.00

- - - Rp 55,000.00 Rp 660,000.00
- - - Rp 50,000.00 Rp 150,000.00
- - - Rp 20,000.00 Rp 80,000.00
- - - Rp 15,000.00 Rp 75,000.00
- - - Rp 225,000.00 Rp 1,125,000.00
Rp 200,000.00 Rp 3,000,000.00
Rp 5,090,000.00
- - - Rp 112,125.00 Rp 376,964.25
Rp 376,964.25

2.95 2.95

Rp 20,300,000.00 2.95 %
1 ( Satu )
5 Oktob. s/d 10 Oktober 2015
Oktober 2015
29 Oktober 2015

Prestasi Pekerjaan Prestasi Pekerjaan


Minggu Ini (%) Komulatif (%)
Rerata Prestasi Rerata
(9) (10) (11)
(8)/100x(5) (6)+(8) (7)+(9)
0.20 100.00 0.20 Rp 50,000.00 Rp 600,000.00
0.08 100.00 0.08 Rp 20,000.00 Rp 240,000.00
- - - Rp 200,000.00 Rp 200,000.00
Rp 1,040,000.00

- - - Rp 58,500.00 Rp 126,360.00
- - - Rp 215,400.00 Rp 77,544.00
- - - Rp 16,110.00 Rp 17,398.80
Rp 221,302.80

- - - Rp 88,586.67 Rp 3,790,281.61
- - - Rp 42,298.80 Rp 3,619,604.84
- - - Rp 11,825.00 Rp 3,651,560.00
Rp 11,061,446.45

- - - Rp 897,800.00 Rp 161,604.00
- - - Rp 3,962,550.00 Rp 2,139,777.00
- - - Rp 3,962,550.00 Rp 3,120,508.13
- - - Rp 3,962,550.00 Rp 5,943,825.00
- - - Rp 3,962,550.00 Rp 9,510,120.00
- - - Rp 3,962,550.00 Rp 941,501.88
Rp 21,817,336.01

- - - Rp 210,000.00 Rp 77,723,100.00
- - - Rp 65,000.00 Rp 5,063,500.00
Rp 82,786,600.00

- - - Rp 80,500.00 Rp 16,325,400.00
- - - Rp 18,000.00 Rp 3,011,580.00
- - - Rp 95,820.00 Rp 2,429,037.00
- - - Rp 21,149.40 Rp 617,562.48
Rp 22,383,579.48

- - - Rp 11,431,250.00 Rp 14,644,117.13
- - - Rp 618,250.00 Rp 5,375,065.50
- - - Rp 430,475.00 Rp 7,148,037.38
- - - Rp 419,572.50 Rp 4,833,475.20
Rp 32,000,695.20

- - - Rp 85,000.00 Rp 25,857,000.00
Rp 25,857,000.00

- - - Rp 20,740.00 Rp 12,412,890.00
- - - Rp 20,740.00 Rp 6,309,108.00
- - - Rp 42,450.00 Rp 8,774,415.00
Rp 27,496,413.00

- - - Rp 112,000.00 Rp 26,880,000.00
- - - Rp 136,075.00 Rp 17,662,535.00
- - - Rp 136,075.00 Rp 870,880.00
- - - Rp 85,000.00 Rp 10,115,000.00
Rp 55,528,415.00

- - - Rp 140,750.00 Rp 422,250.00
- - - Rp 23,625.00 Rp 425,250.00
- - - Rp 16,687.50 Rp 267,000.00
- - - Rp 74,250.00 Rp 222,750.00
- - - Rp 14,750.00 Rp 236,000.00
- - - Rp 17,750.00 Rp 284,000.00
Rp 1,857,250.00

- - - Rp 55,000.00 Rp 660,000.00
- - - Rp 50,000.00 Rp 150,000.00
- - - Rp 20,000.00 Rp 60,000.00
- - - Rp 15,000.00 Rp 45,000.00
- - - Rp 225,000.00 Rp 675,000.00
- - - Rp 200,000.00 Rp 3,000,000.00
Rp 4,590,000.00

- - - Rp 112,125.00 Rp 3,038,587.50
Rp 3,038,587.50

0.28 -
Rp 20,300,000.00 - %
1 ( Satu )
5 Oktob. s/d 10 Oktober 2015
Oktober 2015
29 Oktober 2015

Prestasi Pekerjaan Prestasi Pekerjaan


Minggu Ini (%) Komulatif (%)
Rerata Prestasi Rerata Lembar. 2
(9) (10) (11) HARGA SATUAN JUMLAH HARGA
(8)/100x(5) (6)+(8) (7)+(9) 4 5

- 100.00 1.70 Rp 12,375.00 Rp 3,217,500.00


- 100.00 0.32 Rp 50,000.00 Rp 600,000.00
- 100.00 0.65 Rp 20,000.00 Rp 1,235,000.00
- - - Rp 200,000.00 Rp 200,000.00
Rp 5,252,500.00

- 100.00 0.05 Rp 58,500.00 Rp 88,452.00


- 100.00 0.03 Rp 215,400.00 Rp 54,280.80
- 100.00 0.01 Rp 16,110.00 Rp 12,179.16
Rp 154,911.96

- 100.00 4.29 Rp 88,586.67 Rp 8,133,700.58


- 100.00 4.10 Rp 42,298.80 Rp 7,767,439.21
- 100.00 1.08 Rp 11,825.00 Rp 2,045,725.00
Rp 17,946,864.80

0.04 100.00 0.15 Rp 897,800.00 Rp 274,726.80


0.40 50.00 0.40 Rp 3,962,550.00 Rp 1,497,843.90
0.10 10.00 0.10 Rp 3,962,550.00 Rp 1,872,304.88
- - - Rp 3,962,550.00 Rp 4,220,115.75
- - - Rp 3,962,550.00 Rp 4,992,813.00
- - - Rp 3,962,550.00 Rp 2,225,368.08
Rp 15,083,172.41

- - - Rp 210,000.00 Rp 53,841,375.00
- - - Rp 65,000.00 Rp 4,238,000.00
Rp 58,079,375.00

- - - Rp 80,500.00 Rp 15,344,910.00
- - - Rp 18,000.00 Rp 2,002,725.00
- - - Rp 95,820.00 Rp 1,854,117.00
- - - Rp 21,149.40 Rp 560,459.10
Rp 19,762,211.10

1.45 100.00 5.81 Rp 115,000.00 Rp 11,012,400.00


1.69 55.00 2.32 Rp 2,000,000.00 Rp 8,000,000.00
- - - Rp 500,000.00 Rp 4,000,000.00
Rp 23,012,400.00

- - - Rp 85,000.00 Rp 17,105,400.00
Rp 17,105,400.00

- - - Rp 20,740.00 Rp 1,119,960.00
- - - Rp 9,670.00 Rp 3,331,315.00
- - - Rp 9,670.00 Rp 1,945,990.80
- - - Rp 42,450.00 Rp 830,322.00
Rp 7,227,587.80

- - - Rp 112,000.00 Rp 18,144,000.00
- - - Rp 136,075.00 Rp 762,020.00
Rp 18,906,020.00

- - - Rp 140,750.00 Rp 281,500.00
- - - Rp 23,625.00 Rp 283,500.00
- - - Rp 16,687.50 Rp 267,000.00
- - - Rp 74,250.00 Rp 148,500.00
- - - Rp 14,750.00 Rp 236,000.00
- - - Rp 17,750.00 Rp 284,000.00
Rp 1,500,500.00

- - - Rp 55,000.00 Rp 440,000.00
- - - Rp 50,000.00 Rp 100,000.00
- - - Rp 20,000.00 Rp 40,000.00
- - - Rp 15,000.00 Rp 30,000.00
- - - Rp 225,000.00 Rp 450,000.00
- - - Rp 200,000.00 Rp 2,000,000.00
Rp 3,060,000.00

- - - Rp 112,125.00 Rp 2,318,745.00
Rp 2,318,745.00
3.67 21.00
Rp 39,777,000.00 21.00 %

Bangkalan, 2018 Rp 189,409,688.06


Dibuat oleh 39777555.9933365
Fasilitator / Perencana Rp 39,777,000.00
H. SUBADRIH, ST, MT

LAMA
140

BARU
LAMA
BARU
LAMA
BARU
LAMA
BARU
keramik tambal sulam
SADALI, S.Pd
UBAGIO, M.Pd
NDAYANI, M.Pd
1 2 3 4 5

0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
1.01 100 1.01 100 1.01 100 1.01 100 1.01 100
0.11 - - - - - - - - -
0.90 - - 100 0.90 100 0.90 100 0.90 100
0.86 - - - - 100 0.86 100 0.86 100
- - - - - 100 - 100 - 100

0.13 - - - - - - 50 0.06 100


0.06 - - - - - - - - 100
0.56 - - - - - - - - 100
0.69 - - - - - - - - 50

14.17 - - - - - - - - -
12.02 - - - - - - - - -
1.70 - - - - - - - - -

1.38 - - - - - - - - -
14.29 - - - - - - - - -
1.40 - - - - - - - - -
0.65 - - - - - - - - -

12.16 - - - - - - - - -

5.92 - - - - - - - - -
2.97 - - - - - - - - -
2.61 - - - - - - - - -

1.82 - - - - - - - - -
9.21 - - - - - - - - -
6.87 - - - - - - - - -
3.58 - - - - - - - - -

0.36 - - - - - - - - -
0.08 - - - - - - - - -
0.04 - - - - - - - - -
0.04 - - - - - - - - -
0.62 - - - - - - - - -
1.64 - - - - - - - - -
0.21 - - - - - - - - -
1 2 3 4 5
0.20 100 0.20 100 0.20 100 0.20 100 0.20 100
0.08 100 0.08 100 0.08 100 0.08 100 0.08 100
0.07 - - - - - - - - -

0.04 - - 100 0.04 100 0.04 100 0.04 100


0.03 - - - - 100 0.03 100 0.03 100
0.01 - - - - 100 0.01 100 0.01 100

1.24 - - - - - - 50 0.62 100


1.19 - - - - - - - - 100
1.20 - - - - - - - - 100

0.05 - - - - - - 25 0.01 50
0.70 - - - - - - - - 50
1.02 - - - - - - - - -
1.95 - - - - - - - - -
3.12 - - - - - - - - 50
0.31 - - - - - - - - 75

25.51 - - - - - - - - -
1.66 - - - - - - - - -

5.36 - - - - - - - - -
0.99 - - - - - - - - -
0.80 - - - - - - - - -
0.20 - - - - - - - - -

4.81 - - - - - - - - 50
1.76 - - - - - - - - -
2.35 - - - - - - - - -
1.59 - - - - - - - - -

8.49 - - - - - - - - -

4.07 - - - - - - - - -
2.07 - - - - - - - - -
2.88 - - - - - - - - -

8.82 - - - - - - - - -
5.80 - - - - - - - - -
0.29 - - - - - - - - -
3.32 - - - - - - - - -

0.14 - - - - - - - - -
0.14 - - - - - - - - -
0.09 - - - - - - - - -
0.07 - - - - - - - - -
0.08 - - - - - - - - -
0.09 - - - - - - - - -

0.22 - - - - - - - - -
0.05 - - - - - - - - -
0.02 - - - - - - - - -
0.01 - - - - - - - - -
0.22 - - - - - - - - -
0.98 - - - - - - - - -

1.00 - - - - - - - - -
1 2 3 4 5

1.70 100 1.70 100 1.70 100 1.70 100 1.70 100
0.32 100 0.32 100 0.32 100 0.32 100 0.32 100
0.65 100 0.65 100 0.65 100 0.65 100 0.65 100
0.11 - - - - - - - - -

0.05 100 0.05 100 0.05 100 0.05 100 0.05 100
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100
0.01 50 0.00 100 0.01 100 0.01 100 0.01 100

4.29 - - 100 4.29 100 4.29 100 4.29 100


4.10 - - 100 4.10 100 4.10 100 4.10 100
1.08 - - 15 0.16 100 1.08 100 1.08 100

0.15 - - - - 75 0.11 100 0.15 100


0.79 - - - - - - 50 0.40 100
0.99 - - - - - - 10 0.10 75
2.23 - - - - - - - - -
2.64 - - - - - - - - -
1.17 - - - - - - - - -
28.43 - - - - - - - - -
2.24 - - - - - - - - -

8.10 - - - - - - - - -
1.06 - - - - - - - - -
0.98 - - - - - - - - -
0.30 - - - - - - - - -

5.81 - - - - 75 4.36 100 5.81 100


4.22 - - - - 15 0.63 55 2.32 100
2.11 - - - - - - - - 100

9.03 - - - - - - - - -

0.59 - - - - - - - - -
1.76 - - - - - - - - -
1.03 - - - - - - - - 75
0.44 - - - - - - - - -

9.58 - - - - - - - - -
0.40 - - - - - - - - -

0.15 - - - - - - - - -
0.15 - - - - - - - - -
0.14 - - - - - - - - -
0.08 - - - - - - - - -
0.12 - - - - - - - - -
0.15 - - - - - - - - -

0.23 - - - - - - - - -
0.05 - - - - - - - - -
0.02 - - - - - - - - -
0.02 - - - - - - - - -
0.24 - - - - - - - - -
1.06 - - - - - - - - -

1.22 - - - - - - - - -
6 7 8 9 10

0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
1.01 100 1.01 100 1.01 100 1.01 100 1.01 100
- - - - - - - 100 0.11 100
0.90 100 0.90 100 0.90 100 0.90 100 0.90 100
0.86 100 0.86 100 0.86 100 0.86 100 0.86 100
- 100 - 100 - 100 - 100 - 100

0.13 100 0.13 100 0.13 100 0.13 100 0.13 100
0.06 100 0.06 100 0.06 100 0.06 100 0.06 100
0.56 100 0.56 100 0.56 100 0.56 100 0.56 100
0.34 100 0.69 100 0.69 100 0.69 100 0.69 100

- 100 14.17 100 14.17 100 14.17 100 14.17 100


- 100 12.02 100 12.02 100 12.02 100 12.02 100
- 25 0.42 100 1.70 100 1.70 100 1.70 100

- - - - - 100 1.38 100 1.38 100


- - - - - 100 14.29 100 14.29 100
- - - - - 100 1.40 100 1.40 100
- - - - - 100 0.65 100 0.65 100

- - - - - - - 100 12.16 100

- - - - - 50 2.96 100 5.92 100


- - - - - - - 100 2.97 100
- - - - - - - 100 2.61 100

- - - - - 50 0.91 100 1.82 100


- - - - - 100 9.21 100 9.21 100
- - - - - - - 100 6.87 100
- - - - - - - - - 100

- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
6 7 8 9 10
0.20 100 0.20 100 0.20 100 0.20 100 0.20 100
0.08 100 0.08 100 0.08 100 0.08 100 0.08 100
- - - - - - - - - 100

0.04 100 0.04 100 0.04 100 0.04 100 0.04 100
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100
0.01 100 0.01 100 0.01 100 0.01 100 0.01 100

1.24 100 1.24 100 1.24 100 1.24 100 1.24 100
1.19 100 1.19 100 1.19 100 1.19 100 1.19 100
1.20 100 1.20 100 1.20 100 1.20 100 1.20 100

0.03 100 0.05 100 0.05 100 0.05 100 0.05 100
0.35 100 0.70 100 0.70 100 0.70 100 0.70 100
- 50 0.51 100 1.02 100 1.02 100 1.02 100
- 50 0.98 100 1.95 100 1.95 100 1.95 100
1.56 75 2.34 100 3.12 100 3.12 100 3.12 100
0.23 100 0.31 100 0.31 100 0.31 100 0.31 100

- - - 100 25.51 100 25.51 100 25.51 100


- - - - - 100 1.66 100 1.66 100

- - - - - 50 2.68 100 5.36 100


- - - - - 50 0.49 100 0.99 100
- - - - - - - 100 0.80 100
- - - - - - - 100 0.20 100

2.40 100 4.81 100 4.81 100 4.81 100 4.81 100
- - - - - - - 100 1.76 100
- - - - - - - 100 2.35 100
- - - - - 50 0.79 100 1.59 100

- - - - - - - 50 4.24 100

- - - 50 2.04 100 4.07 100 4.07 100


- - - - - - - 50 1.04 100
- - - - - 50 1.44 100 2.88 100

- - - - - - - 75 6.62 100
- - - - - - - 50 2.90 100
- - - - - - - 50 0.14 100
- - - - - - - - - 100

- - - - - - - 100 0.14 100


- - - - - - - 100 0.14 100
- - - - - - - 100 0.09 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100

- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100

- - - - - - - 100 1.00 100


6 7 8 9 10

1.70 100 1.70 100 1.70 100 1.70 100 1.70 100
0.32 100 0.32 100 0.32 100 0.32 100 0.32 100
0.65 100 0.65 100 0.65 100 0.65 100 0.65 100
- - - - - - - - - 100

0.05 100 0.05 100 0.05 100 0.05 100 0.05 100
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100
0.01 100 0.01 100 0.01 100 0.01 100 0.01 100

4.29 100 4.29 100 4.29 100 4.29 100 4.29 100
4.10 100 4.10 100 4.10 100 4.10 100 4.10 100
1.08 100 1.08 100 1.08 100 1.08 100 1.08 100

0.15 100 0.15 100 0.15 100 0.15 100 0.15 100
0.79 100 0.79 100 0.79 100 0.79 100 0.79 100
0.74 100 0.99 100 0.99 100 0.99 100 0.99 100
- 100 2.23 100 2.23 100 2.23 100 2.23 100
- 100 2.64 100 2.64 100 2.64 100 2.64 100
- 100 1.17 100 1.17 100 1.17 100 1.17 100
- 25 7.11 100 28.43 100 28.43 100 28.43 100
- - - 100 2.24 100 2.24 100 2.24 100

- - - 85 6.89 100 8.10 100 8.10 100


- - - - - 100 1.06 100 1.06 100
- - - - - 100 0.98 100 0.98 100
- - - - - 100 0.30 100 0.30 100

5.81 100 5.81 100 5.81 100 5.81 100 5.81 100
4.22 100 4.22 100 4.22 100 4.22 100 4.22 100
2.11 100 2.11 100 2.11 100 2.11 100 2.11 100

- - - - - 85 7.68 100 9.03 100

- 50 0.30 100 0.59 100 0.59 100 0.59 100


- 50 0.88 100 1.76 100 1.76 100 1.76 100
0.77 100 1.03 100 1.03 100 1.03 100 1.03 100
- - - - - 100 0.44 100 0.44 100

- - - 25 2.39 100 9.58 100 9.58 100


- - - - - 85 0.34 100 0.40 100

- 100 0.15 100 0.15 100 0.15 100 0.15 100


- 100 0.15 100 0.15 100 0.15 100 0.15 100
- 100 0.14 100 0.14 100 0.14 100 0.14 100
- 100 0.08 100 0.08 100 0.08 100 0.08 100
- 100 0.12 100 0.12 100 0.12 100 0.12 100
- 100 0.15 100 0.15 100 0.15 100 0.15 100

- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100

- - - - - - - - - 100
0.97
0.97
1.01
0.11
0.90
0.86
-

0.13
0.06
0.56
0.69

14.17
12.02
1.70

1.38
14.29
1.40
0.65

12.16

5.92
2.97
2.61

1.82
9.21
6.87
3.58

0.36
0.08
0.04
0.04
0.62
1.64
0.21
0.20
0.08
0.07

0.04
0.03
0.01

1.24
1.19
1.20

0.05
0.70
1.02
1.95
3.12
0.31

25.51
1.66

5.36
0.99
0.80
0.20

4.81
1.76
2.35
1.59

8.49

4.07
2.07
2.88

8.82
5.80
0.29
3.32

0.14
0.14
0.09
0.07
0.08
0.09

0.22
0.05
0.02
0.01
0.22
0.98

1.00
1.70
0.32
0.65
0.11

0.05
0.03
0.01

4.29
4.10
1.08

0.15
0.79
0.99
2.23
2.64
1.17
28.43
2.24

8.10
1.06
0.98
0.30

5.81
4.22
2.11

9.03

0.59
1.76
1.03
0.44

9.58
0.40

0.15
0.15
0.14
0.08
0.12
0.15

0.23
0.05
0.02
0.02
0.24
1.06

1.22
YANG DIPAKAI
TH. 2018
1 SMPN 2 SEPULU 2 KELAS ### SINERGI
2 SMPN 1 KLAMPIS 3 KELAS ### SINERGI
3 SMPN 2 KOKOP 2 KELAS ### SINERGI
4 SMPN 3 SATAP KOKOP 2 KELAS ### SINERGI
5 SMPN 1 TRAGAH 3 KELAS ### INDRAKILA
6 SMPN 2 MODUNG 2 KELAS ### INDRAKILA
7 SMPN 2 LABANG 3 KELAS ### INDRAKILA
8 SMPN 2 KWANYAR 2 KELAS ### INDRAKILA
9 SMPN TAHAL AMIN H. ABDULLAH, S.Pd

REKAPITULASI 1
RENCANA ANGGARAN BIAYA OK
OK
KEGIATAN : PENGADAAN SARANA PRASARANA
PEKERJAAN : PERENCANAAN SMP KABUPATEN BANGKALAN
LINGKUP PEKERJAAN : REHABILITASI 2 RUANG BELAJAR SMPN 2 SEPULU
LOKASI : SMPN 2 SEPULU KEC. SEPULU KAB. BANGKALAN

NO. URAIAN PEKERJAAN JUMLAH HARGA

I PEKERJAAN PERSIAPAN ###


II PEKERJAAN PASANGAN/PLESTERAN ###
III PEKERJAAN BETON ###
IV PEKERJAAN RANGKA ATAP ###
V PEKERJAAN ATAP ###
VI PEKERJAAN PLAFOND ###
VII PEKERJAAN PENGECATAN ###
VIII PEKERJAAN LANTAI ###
IX PEKERJAAN INSTALASI LISTRIK ###
X PEKERJAAN KACA ###

JUMLAH ###
DIBULATK ### ###
###

TERBILANG : ( SERATUS DELAPAN PULUH TIGA JUTA RUPIAH )

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

ANWAR NURIS, S.Pd.I H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Sepulu
Kec. Sepulu Kab. Bangkalan

DR. AHMAD SABARUDIN, S.Pd, M.MPd


NIP. 19680503 199103 1 013

LAPORAN MINGGUAN
Minggu ke :
Pekerjaan : REHABILITASI 2 RUANG KELAS SMPN 2 SEPULU Tanggal :
Nama Sekolah : SMPN 2 SEPULU Bulan :
Lokasi : Kec. Kedamean Kab. Gresik Dana diterima tangal :
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%)
% Prestasi Rerata Prestasi
(1) (2) (3) (4) (5) (6) (7) (8)
(6)/100x(5)
I. PEKERJAAN PERSIAPAN
1 Pembongkaran atap + rangka atap 143.00 m² 0.97 - - 100
2 Pembongkaran atap 234.90 m² 0.97 - - 100
3 Penetelan plesteran 92.16 m² 1.01 - - 100
4 Pembersihan akhir pekerjaan 1.00 ls 0.11 - - -
II. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 18.50 m² 0.90 - - -
2 Plesteran 1Pc : 5Ps 37.00 m² 0.86 - - -
3 Benangan 48.00 m' - - - -

III. PEKERJAAN BETON


1 Kolom Struktur 15/25 0.06 m³ 0.13 - - -
2 Kolom Praktis 15/15 0.03 m³ 0.06 - - -
3 Ring Balk 15/15 0.26 m³ 0.56 - - -
4 Ring gewel 15/15 dan konsol beton 15/15 0.32 m³ 0.69 - - -

IV. PEKERJAAN RANGKA ATAP


1 Kuda-kuda baja ringan (galvalum bentang 7m) 139.73 m² 14.17 - - -
2 Kuda-kuda baja ringan (galvalum 50%) 118.54 m² 12.02 - - -
2 Listplank kalsiplank 8mm / 30 cm 47.70 m¹ 1.70 - - -

V. PEKERJAAN ATAP
1 Atap genteng beton (lama) 139.73 m² 1.38 - - -
2 Atap genteng beton warna 237.08 m² 14.29 - - -
3 Genteng bubungan beton warna 26.70 m' 1.40 - - -
4 Plesteran kompres L = 10 cm (Akhiran genting) 56.00 m' 0.65 - - -

VI. PEKERJAAN PLAFOND


1 Plafond calsiboard 4mm + rangka metal hollow 261.00 m² 12.16 - - -

VII. PEKERJAAN PENGECATAN


1 Pengecatan dinding 521.00 m² 5.92 - - -
2 Pengecetan plafond 261.00 m² 2.97 - - -
3 Pengecatan kayu 111.96 m² 2.61 - - -

VIII. PEKERJAAN LANTAI


1 Keramik lantai 30 x 30 ( tambal sulam 1kelas) 31.50 m² 1.82 - - -
2 Keramik lantai 40 x 40 150.00 m² 9.21 - - -
3 Keramik dinding R.Lab 25 x 40 92.16 m² 6.87 - - -
4 List keramik 76.80 m' 3.58 - - -

IX. PEKERJAAN INSTALASI LISTRIK


1 Lampu SL 14 watt 12.00 bh 0.36 - - -
2 Lampu SL 8 watt (teras) 3.00 bh 0.08 - - -
3 Saklar ganda 4.00 bh 0.04 - - -
4 Saklar tunggal 5.00 bh 0.04 - - -
5 Stop kontak + instalasi 5.00 bh 0.62 - - -
6 Instalasi titik lampu 15.00 ttk 1.64
X. PEKERJAAN KACA
1 Kaca mati t=5 mm (yg pecah) 3.36 m² 0.21 - - -

JUMLAH 100.00 -
Jumlah dana yang digunakan sampai dengan minggu ini ( minggu ke 1 ) Rp 20,300,000.00

REKAPITULASI 2
RENCANA ANGGARAN BIAYA OK

KEGIATAN : PENGADAAN SARANA PRASARANA


PEKERJAAN : PERENCANAAN SMP KABUPATEN BANGKALAN
LINGKUP PEKERJAAN : REHABILITASI 3 RUANG BELAJAR SMPN 1 KLAMPIS
LOKASI : SMPN 1 KLAMPIS KEC. KLAMPIS KAB. BANGKALAN

NO. URAIAN PEKERJAAN JUMLAH HARGA

I (2) ###
II PEKERJAAN TANAH ###
III PEKERJAAN PASANGAN/PLESTERAN ###
IV PEKERJAAN BETON ###
V PEKERJAAN RANGKA ATAP ###
VI PEKERJAAN ATAP ###
VII PEKERJAAN KUSEN PINTU DAN JENDELA ###
VIII PEKERJAAN PLAFOND ###
IX PEKERJAAN PENGECATAN/PLAMIRAN ###
X PEKERJAAN LANTAI ###
XI PEKERJAAN KUNCI + PENGGANTUNG ###
XII PEKERJAAN INSTALASI LISTRIK ### ###
XIII PEKERJAAN KACA ###

JUMLAH ### ###


DIBULATK ### ###
TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

HANAF I H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 1 Kelampis
Kec. Kelampis Kab. Bangkalan

IMAM SYAFII, S.Pd, MPd


NIP. 19680228 199401 1 003

LAPORAN MINGGUAN
Minggu ke :
Pekerjaan : REHABILITASI 2 RUANG KELAS SMPN 1 KLAMPIS Tanggal :
Nama Sekolah : SMPN 1 KLAMPIS Bulan :
Lokasi : Kec. Kedamean Kab. Gresik Dana diterima tangal :
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%)
% Prestasi Rerata Prestasi
(1) (2) (3) (4) (5) (6) (7) (8)
I. PEKERJAAN PERSIAPAN (6)/100x(5)
1 Pembongkaran kosen 12.00 bh 0.20 - - 100
2 Penetelan plesteran 12.00 m² 0.08 - - 100
3 Pembersihan akhir pekerjaan 1.00 ls 0.07 - - -

II. PEKERJAAN TANAH


1 Galian tanah 2.16 m³ 0.04 - - -
2 Urugan pasir bawah pondasi t=10cm 0.36 m³ 0.03 - - -
4 Urugan tanah kembali 1.08 m³ 0.01 - - -

III. PEKERJAAN PASANGAN/PLESTERAN


1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 42.79 m² 1.24 - - -
2 Plesteran 1Pc : 5Ps 85.57 m² 1.19 - - -
3 Benangan 308.80 m' 1.20 - - -

IV. PEKERJAAN BETON


1 Lantai kerja bawah pondasi 1:3:5 t=5cm 0.18 m³ 0.05 - - -
2 Pondasi beton stempat 60 x 60 x 15cm 0.54 m³ 0.70 - - -
3 Kolom teras 15/15 0.79 m³ 1.02 - - -
4 Balok beton 15/20 1.50 m³ 1.95 - - -
5 Kolom beon 15/20 2.40 m³ 3.12 - - -
6 Kolom praktis 15/15 0.24 m³ 0.31 - - -
5.65
V. PEKERJAAN RANGKA ATAP
1 Kuda-kuda baja ringan (galvalum 75mm) (betang. 370.11 m² 25.51 - - -
2 Lisplank kalsiplank 8mm / 30 cm 77.90 m¹ 1.66 - - -

VI. PEKERJAAN ATAP


1 Atap genteng Karang Penang (baru bg. depan) 202.80 m² 5.36 - - -
2 Atap genteng (lama bg. belakang) 167.31 m² 0.99 - - -
3 Genteng bubungan Karang penang 25.35 m' 0.80 - - -
4 Plesteran kompres L = 10 cm (Akhiran genting) 29.20 m' 0.20 - - -

VII. PEKERJAAN KUSEN PINTU DAN JENDELA


1 Kusen kayu kempas/mahoni 6/15 1.28 m³ 4.81 - - -
2 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 8.69 m² 1.76 - - -
3 Jalusi kayu kempas/mahoni 3/5 16.61 m² 2.35 - - -
4 Daun Jendela kaca kayu kempas/mahoni 3/10 11.52 m² 1.59 - - -

VIII. PEKERJAAN PLAFOND


1 Plafond calsiboard 4mm + rangka kayu 4/6 304.20 m² 8.49 - - -

IX. PEKERJAAN PENGECATAN/PLAMIRAN


1 Pengecatan dinding 598.50 m² 4.07 - - -
2 Pengecatan plafond 304.20 m² 2.07 - - -
3 Pengecatan kayu 206.70 m² 2.88 - - -

X. PEKERJAAN LANTAI
1 Keramik lantai 40 x 40 240.00 m² 8.82 - - -
2 Keramik dinding 25 x 40 129.80 m² 5.80 - - -
3 Keramik kolom 25 x 40 6.40 m² 0.29 - - -
4 List keramik 119.00 m' 3.32 - - -

XI. PEKERJAAN KUNCI + PENGGANTUNG


1 Kunci pintu 2 x putar 3.00 bh 0.14 - - -
2 Engsel Pintu 18.00 bh 0.14 - - -
3 Engsel Jendela 16.00 bh 0.09 - - -
4 Grendel tanam 3.00 bh 0.07 - - -
5 Grendel Jendela 16.00 bh 0.08 - - -
6 Hag Angin 16.00 bh 0.09 - - -

XII. PEKERJAAN INSTALASI LISTRIK


1
Lampu SL 14 watt 12.00 bh 0.22 - - -
2
Lampu SL 8watt (teras) 3.00 bh 0.05 - - -
3
Saklar ganda 3.00 bh 0.02 - - -
4
Saklar tunggal 3.00 bh 0.01 - - -
5 Stop kontak + instalasi 3.00 bh 0.22 - - -
6 Instalasi titik lampu 15.00 ttk 0.98 - - -

XIII. PEKERJAAN KACA


1 Kaca bening t=5 mm 27.10 m² 1.00 - - -

JUMLAH 95.07 -
Jumlah dana yang digunakan sampai dengan minggu ini ( minggu ke 1 ) Rp 20,300,000.00

3
REKAPITULASI OK
NCANA ANGGARAN BIAYA OK
: PENGADAAN SARANA PRASARANA
KEGIATAN : PERENCANAAN SMP KABUPATEN BANGKALAN
PEKERJAAN : REHABILITASI 2 RUANG BELAJAR SMPN 3 SATAP KOKOP
LINGKUP PEKERJAAN : SMPN 3 SATAP KOKOP KEC. KOKOP KAB. BANGKALAN
LOKASI
URAIAN PEKERJAAN JUMLAH HARGA
NO.

PEKERJAAN PERSIAPAN ###


I PEKERJAAN TANAH ###
II PEKERJAAN PASANGAN/PLESTERAN ###
III PEKERJAAN BETON ###
IV PEKERJAAN RANGKA ATAP ###
V PEKERJAAN ATAP ###
VI PEKERJAAN KUSEN PINTU DAN JENDELA ###
VII PEKERJAAN PLAFOND ###
VIII PEKERJAAN PENGECATAN/PLAMIRAN ###
IX PEKERJAAN LANTAI ###
X PEKERJAAN KUNCI + PENGGANTUNG ###
XI PEKERJAAN INSTALASI LISTRIK ###
XII PEKERJAAN KACA ###
XIII

JUMLAH ### ###


DIBULATK ### ###

TERBILANG : ( SERATUS DELAPAN PULUH TIGA JUTA RUPIAH )

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 3 Satap Kokop
Kec. Kokop Kab. Bangkalan

IHSANUDIN, S.Pd
NIP. 19700109 199104 1 001
LAPORAN MINGGUAN
Minggu ke :
Pekerjaan : REHABILITASI 2 RUANG BELAJAR SMPN 3 SATAP KOKOP Tanggal :
Nama Sekolah : SMPN 3 SATAP KOKOP KEC. KOKOP KAB. BANGKALAN Bulan :
Lokasi : KEC. KOKOP KAB. BANGKALAN Dana diterima tangal :
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%)
% Prestasi Rerata Prestasi
(1) (2) (3) (4) (5) (6) (7) (8)
(6)/100x(5)

I. PEKERJAAN PERSIAPAN
1 Pembongkaran atap + rangka 260.00 m² 1.70 100 1.70 -
2 Pembongkaran kosen 12.00 bh 0.32 100 0.32 -
3 Pembongkaran dinding 61.75 m² 0.65 100 0.65 -
4 Pembersihan akhir pekerjaan 1.00 ls 0.11 - - -

II. PEKERJAAN TANAH


1 Galian tanah 1.51 m³ 0.05 100 0.05 -
2 Urugan pasir bawah pondasi t=10cm 0.25 m³ 0.03 100 0.03 -
4 Urugan tanah kembali 0.76 m³ 0.01 100 0.01 -

III. PEKERJAAN PASANGAN/PLESTERAN


1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 91.82 m² 4.29 100 4.29 -
2 Plesteran 1Pc : 5Ps 183.63 m² 4.10 100 4.10 -
3 Benangan 173.00 m' 1.08 100 1.08 -

IV. PEKERJAAN BETON `


1 Lantai kerja bawah pondasi 1:3:5 t=5cm 0.31 m³ 0.15 100 0.15 -
2 Pondasi beton stempat 60 x 60 x 15cm 0.38 m³ 0.79 50 0.40 50
3 Kolom teras 15/15 0.47 m³ 0.99 10 0.10 65
4 Balok beton 15/20 1.07 m³ 2.23 - - -
5 Kolom struktur 15/25 1.26 m³ 2.64 - - -
6 Ring balk 15/15 0.56 m³ 1.17 - - -
V. PEKERJAAN RANGKA ATAP
1 Kuda-kuda baja ringan (galvalum 75mm) 256.39 m² 28.43 - - -
2 Lisplank kalsiplank 8mm / 30 cm 65.20 m¹ 2.24 - - -

VI. PEKERJAAN ATAP


1 Atap genteng Karang Penang (baru bg depan) 190.62 m² 8.10 - - -
2 Atap genteng (lama bg belakang) 111.26 m² 1.06 - - -
3 Genteng bubungan Karang penang 19.35 m' 0.98 - - -
4 Plesteran kompres L = 10 cm (Akhiran genting) 26.50 m' 0.30 - - -

VII. PEKERJAAN KUSEN PINTU DAN JENDELA


1 Kusen kayu aluminium 4" 95.76 m' 5.81 100 5.81 -
2 Daun Pintu kaca aluminium 4.00 bh 4.22 55 2.32 45
3 Daun Jendela kaca aluminium 8.00 bh 2.11 - - 100

VIII. PEKERJAAN PLAFOND


1 Plafond calsiboard 4mm + rangka hollow 201.24 m² 9.03 - - -

IX. PEKERJAAN PENGECATAN/PLAMIRAN


1 Pengecatan dinding depan 54.00 m² 0.59 - - -
2 Pelamiran dinding 344.50 m² 1.76 - - -
3 Plamiran plafond 201.24 m² 1.03 - - 75
4 Pengecatan kayu 19.56 m² 0.44 - - -

X. PEKERJAAN LANTAI
1 Keramik lantai 40 x 40 162.00 m² 9.58 - - -
2 Keramik kolom 20 x 40 (motif) 5.60 m² 0.40 - - -

XI. PEKERJAAN KUNCI + PENGGANTUNG


1 Kunci pintu 2 x putar 2.00 bh 0.15 - - -
2 Engsel Pintu 12.00 bh 0.15 - - -
3 Engsel Jendela 16.00 bh 0.14 - - -
4 Grendel tanam 2.00 bh 0.08 - - -
5 Grendel Jendela 16.00 bh 0.12 - - -
6 Hag Angin 16.00 bh 0.15 - - -

XII PEKERJAAN INSTALASI LISTRIK


1 Lampu SL 14 watt 8.00 bh 0.23 - - -
2 Lampu SL 8watt (teras) 2.00 bh 0.05 - - -
3 Saklar ganda 2.00 bh 0.02 - - -
4 Saklar tunggal 2.00 bh 0.02 - - -
5 Stop kontak + instalasi 2.00 bh 0.24 - - -
6 Instalasi titik lampu 10.00 ttk 1.06 - - -

XIII. PEKERJAAN KACA


1 Kaca mati t=5 mm 20.68 m² 1.22 - - -

JUMLAH 100.00 21.00


Jumlah dana yang digunakan sampai dengan minggu ini ( minggu ke 1 ) Rp 50,802,000.00

Mengetahui Menyetujui
SMPN 3 Satap Kokop Panitia Pembangunan Sekolah
Kec. Kokop Kab. Bangkalan
Selaku Penanggung Jawab
IHSANUDIN, S.Pd SUHAERI
NIP. 19700109 199104 1 001

REKAPITULASI
NCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI

NO.

I
II
III
IV
V
VI
VII
VIII
IX
X 4
XI OK
XII LAMA
XIII : PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 1 TRAGAH
: SMPN 1 TRAGAH KEC. TRAGAH KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA

TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )
PEKERJAAN PERSIAPAN ###
PEKERJAAN TANAH ###
PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA #DIV/0!
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###

JUMLAH #DIV/0! ###


DIBULATK #DIV/0! #DIV/0!

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

YUNIZAR AN NATSIRUL YUSUF H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 1 Tragah
Kec. Tragah Kab. Bangkalan

Drs. AMIRULLAH, MM
NIP. 19581217 198603 1 011

NO
1
I.
1
2
3
4

II.
1
2
4

III.
1
2
3

IV.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran atap + rangka 377.00 m² ### ###
V. Pembongkaran kusen 4.00 bh ### ###
1 Penetelan plesteran 159.60 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VI. PEKERJAAN TANAH ###
1 Galian tanah 2.16 m³ ### ###
2 Urugan pasir bawah pondasi t=10cm 0.36 m³ ### ### #DIV/0!
3 Urugan tanah kembali 1.08 m³ ### ###
4 ###
PEKERJAAN PASANGAN/PLESTERAN
VII. Pasangan 1/2 bata camp. 1 Pc : 5 Ps 7.20 m² ### ### ###
1 Plesteran 1Pc : 5Ps 14.40 m² ### ###
2 Benangan 24.00 m' ### ###
3 ###
PEKERJAAN BETON
VIII. Lantai kerja bawah pondasi 1:3:5 t=5cm 0.18 m³ ### ###
1 Pondasi beton stempat 60 x 60 x 15cm 0.54 m³ ### ###
Kolom teras 15/15 0.79 m³ ### ###
IX. Balok beton 15/20 1.71 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ ### ###
X. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Penang (baru) 382.73 m² ### ###
3 Atap genteng (lama bg. belakang) 170.10 m² ### ###
4 Genteng bubungan Karang penang 28.35 m' ### ###
Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' ### ###
XI. ###
1 PEKERJAAN KUSEN PINTU DAN JENDELA
2 Kusen kayu kempas/mahoni 6/15 #DIV/0! m³ Rp - #DIV/0!
3 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 8.61 m² Rp - Rp - #DIV/0!
4 Daun Jendela kaca kayu kempas/mahoni 3/10 8.40 m² Rp - Rp - ###
5 #DIV/0!
6 PEKERJAAN PLAFOND
Plafond calsiboard 4mm + rangka kayu 4/6 294.84 m² ### ###
XII ###
1 PEKERJAAN PENGECATAN
2 Pengecatan dinding (3 Ruang kelas) 598.50 m² ### ###
3 Pengecatan plafond 294.84 m² ### ###
4 Pengecatan kayu 206.70 m² ### ###
5 ###
6 PEKERJAAN LANTAI #DIV/0!
Keramik lantai 40 x 40 245.70 m² ### ###
XIII. Keramik dinding 25 x 40 ( 3 R.kelas + teras ) 159.60 m² ### ###
1 List keramik dinding 7cm 110.40 m² ### ###
Keramik kolom 25 x 40 12.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Engsel Pintu 18.00 bh ### ###
Engsel Jendela 16.00 bh ### ###
Grendel pintu 3.00 bh ### ###
Grendel Jendela 16.00 bh ### ###
Hag Angin 16.00 bh ### ###
###
REKAPITULASI
PEKERJAAN INSTALASI LISTRIK
NCANA ANGGARAN
Lampu BIAYA
SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
KEGI Saklar ganda 3.00 bh ### ###
PEKE Saklar tunggal 3.00 bh ### ###
LING Stop kontak + instalasi 3.00 bh ### ###
LOKA Instalasi titik lampu 15.00 ttk ### ###
###
NO. PEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 11.14 m² ### ###
###
I
II
III
IV
V
VI
VII
VIII
IX
X 4
XI OK
XII BARU
XIII : PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 1 TRAGAH
: SMPN 1 TRAGAH KEC. TRAGAH KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA

TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )
PEKERJAAN PERSIAPAN ###
PEKERJAAN TANAH ###
PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA Rp -
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###

JUMLAH ### ###


DIBULATK ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

YUNIZAR AN NATSIRUL YUSUF H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 1 Tragah
Kec. Tragah Kab. Bangkalan

Drs. AMIRULLAH, MM
NIP. 19581217 198603 1 011

NO
1
I.
1
2
3
4

II.
1
2
4

III.
1
2
3
IV.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran atap + rangka 377.00 m² ### ###
V. Pembongkaran kusen 8.00 bh ### ###
1 Penetelan plesteran 249.00 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VI. PEKERJAAN TANAH ###
1 Galian tanah 2.16 m³ ### ###
2 Urugan pasir bawah pondasi t=10cm 0.36 m³ ### ### ###
3 Urugan tanah kembali 1.08 m³ ### ###
###
VII. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 24.02 m² ### ### ###
2 Plesteran 1Pc : 5Ps 48.03 m² ### ###
3 Benangan 168.00 m' ### ###
4 ###
PEKERJAAN BETON
VIII. Lantai kerja bawah pondasi 1:3:5 t=5cm 0.18 m³ ### ###
1 Pondasi beton stempat 60 x 60 x 15cm 0.54 m³ ### ###
Kolom teras 15/15 0.79 m³ ### ###
IX. Balok beton 15/20 1.56 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ ### ###
X. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Penang (baru) 382.73 m² ### ###
3 Genteng bubungan Karang penang 28.35 m' ### ###
4 Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' ### ###
5 ###
PEKERJAAN KUSEN PINTU DAN JENDELA
XI. Kusen kayu kempas/mahoni 6/15 1.09 m³ Rp - Rp -
1 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 8.61 m² Rp - Rp - ###
2 Jalusi kayu kempas/mahoni 3/12 7.20 m² Rp - Rp -
3 Daun Jendela kaca kayu kempas/mahoni 3/10 6.72 m² Rp - Rp - ###
4 Rp -
5 PEKERJAAN PLAFOND
6 Plafond calsiboard 4mm + rangka kayu 4/6 294.84 m² ### ###
###
XII PEKERJAAN PENGECATAN
1 Pengecatan dinding (3 Ruang kelas) 598.50 m² ### ###
2 Pengecatan plafond 294.84 m² ### ###
3 Pengecatan kayu 206.70 m² ### ###
4 ###
5 PEKERJAAN LANTAI ###
6 Keramik lantai 40 x 40 245.70 m² ### ###
Keramik dinding 25 x 40 ( 3 R.kelas + teras ) 173.40 m² ### ###
XIII. List keramik dinding 7cm 132.90 m² ### ###
1 Keramik kolom 25 x 40 12.00 m² ### ###
Keramik dinding 25 x 40 ( 3 R.kelas teras saja ) 75.60 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Engsel Pintu 18.00 bh ### ###
Engsel Jendela 16.00 bh ### ###
Grendel pintu 3.00 bh ### ###
Grendel Jendela 16.00 bh ### ###
Hag Angin 16.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
REKAPITULASI
Lampu SL 8watt (teras) 3.00 bh ### ###
NCANA ANGGARAN BIAYA
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
KEGI Stop kontak + instalasi 3.00 bh ### ###
PEKE Instalasi titik lampu 15.00 ttk ### ###
LINGKUP PEKERJAAN ###
LOKAPEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 11.14 m² ### ###
NO. ###

I
II
III
IV
V
VI
VII
VIII
IX
X 5
XI OK
XII LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 MODUNG
: SMPN 2 MODUNG KEC. MODUNG KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA


TERBILANG : ( DUA RATUS LIMA JUTA ENAM RATUS RIBU RUPIAH )

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA Rp -
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN/PLAMIRAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ### ###
PEKERJAAN KACA ###

JUMLAH ### ###


DIBULAT ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

M. MAHRI, S.Ag H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Modung
Kec. Modung Kab. Bangkalan

A S U R, M.Pd
NIP. 19610117 198403 1 008

NO
1
I.
1
2

II.
1
2
3

III.
1
2
3

IV.
1
2
Lembar. 2
V. JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
1 2 3 4 5
2 PEKERJAAN PERSIAPAN
3 Pembongkaran atap + rangka 406.00 m² ### ###
4 Pembersihan akhir pekerjaan 1.00 ls ### ### ###
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 98.93 m² ### ###
2 Plesteran 1Pc : 5Ps 197.87 m² ### ###
3 Benangan 166.56 m' ### ###
###
VII. PEKERJAAN BETON
1 Kolom teras 15/15 0.41 m³ ### ###
Balok teras 15/20 1.24 m³ ### ###
VIII. Ring balk gewel 15/15 0.98 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 396.90 m² ### ###
4 Lisplank kalsiplank 8mm / 30 cm 85.70 m¹ ### ###
5 ###
PEKERJAAN ATAP
IX. Pasang atap genteng karang p enang (baru 5%) 19.85 m² ### ###
1 Pasang atap genteng (lama) 377.06 m² ### ###
Genteng bubungan karang penang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 29.00 m' ### ###
1 ###
2 PEKERJAAN KUSEN PINTU DAN JENDELA
3 Kusen kayu kempas/mahoni 6/12 0.46 m³ Rp - Rp -
4 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 6.72 m² Rp - Rp -
5 Daun Jendela kaca kayu kempas/mahoni 3/10 5.04 m² Rp - Rp -
6 Rp -
PEKERJAAN PLAFOND ###
XI. Plafond calsiboard 4mm + rangka hollow 340.20 m² ### ###
1 ###
2 PEKERJAAN PENGECATAN/PLAMIRAN
3 Pengecatan dinding (depan) 66.85 m² ### ###
4 Pelamiran dinding 430.33 m² ### ###
5 Pelamiran plafond 340.20 m² ### ### ###
6 Pengecatan kayu 206.70 m² ### ###
Cat genteng 396.90 m² ### ###
XII. ###
1 PEKERJAAN LANTAI
Lantai rabat 216.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 4.00 bh ### ###
Engsel Pintu 21.00 bh ### ###
Engsel Jendela 24.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Grendel Jendela 12.00 bh ### ### ###
Hag Angin 24.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 14.00 bh ### ###
Lampu SL 8watt (teras) 4.00 bh ### ###
Saklar ganda 7.00 bh ### ###
REKAPITULASI
Saklar tunggal 3.00 bh ### ###
NCANA ANGGARAN BIAYA
Stop kontak + instalasi 4.00 bh ### ###
Instalasi titik lampu 18.00 bh ### ###
KEGIATAN ###
PEKE PEKERJAAN KACA
LING Kaca mati t=5 mm 14.49 m² ### ###
LOKASI ###

NO.

I
II
III
IV
V
VI
VII
VIII
IX
X 5
XI OK
XII BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 MODUNG
: SMPN 2 MODUNG KEC. MODUNG KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA


TERBILANG : ( DUA RATUS LIMA JUTA ENAM RATUS RIBU RUPIAH )

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA Rp -
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN/PLAMIRAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ### -
PEKERJAAN KACA ###

JUMLAH ### ###


DIBULAT ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

M. MAHRI, S.Ag H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Modung
Kec. Modung Kab. Bangkalan

A S U R, M.Pd
NIP. 19610117 198403 1 008

NO
1
I.
1
2

II.
1
2
3

III.
1
2
3

IV.
1
2
Lembar. 2
V. JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
1 2 3 4 5
2 PEKERJAAN PERSIAPAN
3 Pembongkaran atap + rangka 406.00 m² ### ###
4 Pembersihan akhir pekerjaan 1.00 ls ### ### ###
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 98.93 m² ### ###
2 Plesteran 1Pc : 5Ps 197.87 m² ### ###
3 Benangan 166.56 m' ### ###
###
VII. PEKERJAAN BETON
1 Kolom teras 15/15 0.41 m³ ### ###
Balok teras 15/20 1.24 m³ ### ###
VIII. Ring balk gewel 15/15 0.98 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 396.90 m² ### ###
4 Lisplank kalsiplank 8mm / 30 cm 85.70 m¹ ### ###
5 ###
PEKERJAAN ATAP
IX. Pasang atap genteng karang p enang (baru 5%) 19.85 m² ### ###
1 Pasang atap genteng (lama) 377.06 m² ### ###
Genteng bubungan karang penang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 29.00 m' ### ###
1 ###
2 PEKERJAAN KUSEN PINTU DAN JENDELA
3 Kusen kayu kempas/mahoni 6/12 0.46 m³ Rp - Rp -
4 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 6.72 m² Rp - Rp -
5 Daun Jendela kaca kayu kempas/mahoni 3/10 5.04 m² Rp - Rp -
6 Rp -
PEKERJAAN PLAFOND ###
XI. Plafond calsiboard 4mm + rangka kayu 4/6 340.20 m² ### ###
1 ###
2 PEKERJAAN PENGECATAN/PLAMIRAN
3 Pengecatan dinding (depan) 66.85 m² ### ###
4 Pelamiran dinding 430.33 m² ### ###
5 Pelamiran plafond 340.20 m² ### ### ###
6 Pengecatan kayu 206.70 m² ### ###
Cat genteng 396.90 m² ### ###
XII. ###
1 PEKERJAAN LANTAI
Lantai rabat 216.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 4.00 bh ### ###
Engsel Pintu 21.00 bh ### ###
Engsel Jendela 24.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Grendel Jendela 12.00 bh ### ### ###
Hag Angin 24.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 14.00 bh ### ###
Lampu SL 8watt (teras) 4.00 bh ### ###
Saklar ganda 7.00 bh ### ###
REKAPITULASI
Saklar tunggal 3.00 bh ### ###
NCANA ANGGARAN BIAYA
Stop kontak + instalasi 4.00 bh ### ###
Instalasi titik lampu 18.00 bh ### ###
KEGIATAN ###
PEKE PEKERJAAN KACA
LING Kaca mati t=5 mm 14.49 m² ### ###
LOKASI ###

NO.

I
II
III
IV
V
VI
VII
VIII
IX
X 6
XI OK
LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 2 LABANG
: SMPN 2 LABANG KEC. LABANG KAB. BANGKALAN

TERBILANG : ( DUA RATUS SEMBILAN


URAIAN
PULUHPEKERJAAN
EN JUMLAH HARGA

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN Rp -
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
PEKERJAAN TANGGA DEPAN PINTU ###

JUMLAH ### ###


DIBULATK ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
ACHMAD TAUFIK HEYKAL, A.Sg H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Labang
Kec. Labang Kab. Bangkalan

Drs. HARTONO, M.Pd


NIP. 19690126 199802 1 003

NO
1
I.
1
2
3
4
5

II.
1

III.
1
2

IV.
1
2
3 Lembar. 2
JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
V. 2 3 4 5
1 PEKERJAAN PERSIAPAN ###
Pembongkaran atap + rangka 377.00 m² Rp - Rp -
VI. Pembongkaran kosen 1.00 bh ### ###
1 Pembongkaran dinding 6.00 m² ### ###
2 Penetelan plesteran 139.74 m² ### ###
3 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VII. PEKERJAAN PASANGAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps (nyepit kuda2) 30.91 m² Rp - Rp -
2 Rp -
3 PEKERJAAN RANGKA ATAP ###
4 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ Rp - Rp -
VIII. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Pilang (baru) 382.73 m² ### ###
Genteng bubungan Karang pilang 28.35 m' ### ###
IX. Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' Rp - Rp -
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsiboard 4mm + rangka hollow 354.38 m² Rp - Rp -
4 Rp -
5 PEKERJAAN PENGECATAN
6 Pengecatan dinding 598.50 m² Rp - Rp - ###
Pengecatan plafond 354.38 m² Rp - Rp -
X. Pengecatan kayu 274.60 m² Rp - Rp -
1 Rp -
PEKERJAAN LANTAI
XI. Keramik lantai 40 x 40 243.00 m² ### ###
1 Keramik dinding 25 x 40 139.74 m² ### ###
2 List keramik 102.00 m' ### ###
3 Keramik kolom 20 x 40 10.80 m² ### ###
4 ###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA ###
Kaca mati t=5 mm (yg pecah) 4.22 m² ### ###
###
PEKERJAAN TANGGA DEPAN PINTU
Pasangan batu gunung 2.88 m³ ### ###
Plesterran trasram 7.68 m² ### ###
Keramik kasar 40 x 40 7.04 m² ### ###
Urugan pasir 4.96 m³ ### ###
REKAPITULASI ###
NCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI

NO.

I
II
III
IV
V
VI
VII
VIII
IX
X 6
XI OK
XII BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 2 LABANG
: SMPN 2 LABANG KEC. LABANG KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA


TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
PEKERJAAN TANGGA DEPAN PINTU ###

JUMLAH ### ###


DIBULATK ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

ACHMAD TAUFIK HEYKAL, A.Sg H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Labang
Kec. Labang Kab. Bangkalan
Drs. HARTONO, M.Pd
NIP. 19690126 199802 1 003

NO
1
I.
1
2
3
4
5

II.
1
2
3

III.
1

IV.
1
2 Lembar. 2
JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
V. 2 3 4 5
1 PEKERJAAN PERSIAPAN ###
2 Pembongkaran atap + rangka 377.00 m² Rp - Rp -
3 Pembongkaran kosen 1.00 bh ### ###
Pembongkaran dinding 6.00 m² ### ###
VI. Penetelan plesteran 127.50 m² ### ###
1 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VII. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps (nyepit kuda2) 22.43 m² Rp - Rp - -
2 Plesteran 1Pc : 5Ps 16.20 m² ### ###
3 Benangan 32.00 m' ### ###
###
VIII. PEKERJAAN BETON
1 Ring balk gewel 15/15 0.40 m³ ### ###
2 ###
3 PEKERJAAN RANGKA ATAP ###
4 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ Rp - Rp -
IX. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Pilang (baru) 382.73 m² ### ###
Genteng bubungan Karang pilang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' Rp - Rp -
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsiboard 4mm + rangka hollow 354.38 m² Rp - Rp -
4 Rp -
5 PEKERJAAN PENGECATAN
6 Pengecatan dinding 598.50 m² Rp - Rp - ###
Pengecatan plafond 354.38 m² Rp - Rp -
XI. Pengecatan kayu 274.60 m² Rp - Rp -
1 Rp -
PEKERJAAN LANTAI
XII. Keramik lantai 40 x 40 243.00 m² ### ###
1 Keramik dinding 25 x 40 127.50 m² ### ###
2 List keramik 102.00 m' ### ###
3 Keramik kolom 20 x 40 10.80 m² ### ###
4 ###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Pintu harmonika 15.00 m² ### ### ###
### ###
PEKERJAAN INSTALASI LISTRIK ###
Lampu SL 14 watt 12.00 bh ### ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA ###
Kaca mati t=5 mm (yg pecah) 4.22 m² ### ###
###
PEKERJAAN TANGGA DEPAN PINTU 3.46
Pasangan batu gunung 2.88 m³ ### ###
Plesterran trasram 7.68 m² ### ###
Keramik kasar 40 x 40 7.04 m² ### ###
Urugan pasir 4.96 m³ ### ###
###
REKAPITULASI
NCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI

NO.

I
II
III
IV
V
VI
VII
VIII
IX
X 7
OK
LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 KWANYAR
: SMPN 2 KWANYAR KEC. KWANYAR KAB. BANGKALAN
TERBILANG : ( SERATUS SEMBILAN PULUH TUJUH JUTA DELAPAN RATUS RIBU RUPIAH )
URAIAN PEKERJAAN JUMLAH HARGA

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN/PLESTERAN Rp -
PEKERJAAN KAYU ###
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
PEKERJAAN TEMPAT DUDUK ###

JUMLAH ### ###


DIBULAT ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

MOHAMMAD MUSTOFA ZAHRON, S.Pd H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Kwanyar
Kec. Kwanyar Kab. Bangkalan

RAHMAWATI, M.Pd
NIP. 19700703 199802 2 003

NO
1
I.
1
2
3
4

II.
1
2

III.
1

IV.
1

V.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran kusen 1.00 bh ### ###
VI. Pembongkaran dinding 15.00 m² ### ###
1 Penetelan plesteran 428.64 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 Ls ### ###
3 ###
4 PEKERJAAN PASANGAN/PLESTERAN ###
5 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 0.91 22.20 m² Rp - Rp -
6 Plesteran 1Pc : 5Ps 1.07 44.40 m² Rp - Rp -
Rp -
VII. PEKERJAAN KAYU
1 Lisplank kayu 3/30 cm 4.00 m¹ ### ###
2 ###
3 PEKERJAAN PLAFOND
4 Plafond calsi 1 x 1 + rangka kayu 12.00 m² Rp - Rp -
Rp -
VIII. PEKERJAAN PENGECATAN
1 Pengecatan dinding (3 kelas) 455.30 m² Rp - Rp -
2 Pengecatan plafond 319.00 m² Rp - Rp -
3 Pengecatan kayu 206.70 m² Rp - Rp - ###
4 Pengecatan kayu (Kantor) 214.39 m² Rp - Rp -
5 Rp -
6PEKERJAAN LANTAI 162.00 ###
Keramik lantai 40 x 40 ( 2 R Kelas ) 5.67 126.00 m² ### ###
IX. Keramik lantai 40 x 40 ( Teras ) 1.62 36.00 m² ### ###
1 Keramik dinding 25 x 40 (dalam kelas + teras) 5.78 128.40 m² ### ###
Keramik kolom teras 25 x 40 1.01 22.40 m² ### ###
X. List keramik 1.64 327.80 m' ### ###
1 Keramik dinding 25 x 40 (dalam kantor+R.guru+ t 13.51 300.24 m² ### ###
2 451.04 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 3.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Hag Angin 60.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
REKAPITULASI
PEKERJAAN KACA
NCANA ANGGARAN BIAYA
Kaca mati t=5 mm (yg pecah) 1.68 m² ### ###
###
KEGI PEKERJAAN TEMPAT DUDUK
PEKE Pasangan trasram 0.68 17.00 m² Rp - Rp -
LING Plat beton tempat duduk t=10 cm 0.53 1.02 m³ ### ###
LOKA Keramik tempat duduk 30 x 30 0.46 10.20 m² ### ###
Keramik dinding tempat duduk 25 x 40 1.84 40.80 m² ### ###
NO. 34.71 ###
0.86768 40.80

I
II
III
IV
V
VI
VII
VIII
IX
X 7
OK
BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 KWANYAR
: SMPN 2 KWANYAR KEC. KWANYAR KAB. BANGKALAN
TERBILANG : ( SERATUS SEMBILAN PULUH TUJUH JUTA DELAPAN RATUS RIBU RUPIAH )
URAIAN PEKERJAAN JUMLAH HARGA
PEKERJAAN PERSIAPAN ###
PEKERJAAN PASANGAN/PLESTERAN Rp -
PEKERJAAN KAYU ###
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
PEKERJAAN TEMPAT DUDUK ###

JUMLAH ### ###


DIBULAT ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

MOHAMMAD MUSTOFA ZAHRON, S.Pd H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Kwanyar
Kec. Kwanyar Kab. Bangkalan

RAHMAWATI, M.Pd
NIP. 19700703 199802 2 003

NO
1
I.
1
2
3
4

II.
1
2

III.
1
2

IV.
1

V. Lembar. 2
1 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
2 2 3 4 5
3 PEKERJAAN PERSIAPAN
4 Pembongkaran kusen 1.00 bh ### ###
5 Pembongkaran dinding 15.00 m² ### ###
Penetelan plesteran 428.64 m² ### ###
VI. Pembersihan akhir pekerjaan 1.00 Ls ### ###
1 ###
2 PEKERJAAN PASANGAN/PLESTERAN ###
3 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 22.20 m² Rp - Rp -
4 Plesteran 1Pc : 5Ps 44.40 m² Rp - Rp -
5 Rp -
6 PEKERJAAN KAYU
Perbaikan daun pintu panil 4.00 bh ### ###
VII. Lisplank kayu 3/30 cm 4.00 m¹ ### ###
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsi 1 x 1 + rangka kayu 12.00 m² Rp - Rp -
4 Rp -
PEKERJAAN PENGECATAN
VIII. Pengecatan dinding (3 kelas) 439.90 m² Rp - Rp -
1 Pengecatan dinding (Kantor) 373.40 m² Rp - Rp -
2 Pengecatan plafond 319.00 m² Rp - Rp -
3 Pengecatan kayu 169.45 m² Rp - Rp - ###
4 Pengecatan kayu (Kantor) 197.69 m² Rp - Rp -
5 Rp -
6 PEKERJAAN LANTAI ###
Keramik lantai 40 x 40 ( 2 R Kelas ) 126.00 m² ### ###
IX. Keramik lantai 40 x 40 ( Teras ) 36.00 m² ### ###
1 Keramik dinding 25 x 40 (dalam kelas + teras) 128.40 m² ### ###
Keramik kolom teras 25 x 40 22.40 m² ### ###
X. List keramik 327.80 m' ### ###
1 Keramik dinding 25 x 40 (dalam kantor+R.guru+ teras) 300.24 m² ### ###
2 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 3.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Hag Angin 60.00 bh ### ###
Pintu harmonika 11.30 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK ###
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA
REKAPITULASI
Kaca mati t=5 mm (yg pecah) 1.68 m² ### ###
NCANA ANGGARAN BIAYA ###
PEKERJAAN TEMPAT DUDUK
KEGI Pasangan trasram 17.00 m² Rp - Rp -
PEKE Plat beton tempat duduk t=10 cm 1.02 m³ ### ###
LING Keramik tempat duduk 30 x 30 10.20 m² ### ###
LOKA Keramik dinding tempat duduk 25 x 40 40.80 m² ### ###
###
NO.

I
II
III
IV
V
VI
VII
VIII
IX
8
OK

: PENGADAAN SARANA PRASARANA


: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 KOKOP
TERBILANG : ( SERATU : SMPN 2 KOKOP KEC. KOKOP KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN/PLESTERAN Rp -
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ### ###
PEKERJAAN KACA ###
PEKERJAAN TEMPAT DUDUK ###

JUMLAH ### ###


DIBULATK ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

BOSTOMI, S.Pd H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Kokop
Kec. Kokop Kab. Bangkalan

MOHAMMAD TAUFIK, SPd


NIP. 19760326 200604 1 010
NO
1
I.
1
2

II.
1
2
3
III.
1

IV.
1
2
3

V. Lembar. 2
1 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
2 2 3 4 5
3 PEKERJAAN PERSIAPAN
4 Penetelan plesteran 317.46 m² ### ###
5 Pembersihan akhir pekerjaan 1.00 Ls Rp - Rp - #REF!
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 12.25 m² Rp - Rp -
5 Plesteran 1Pc : 5Ps 80.58 m² Rp - Rp -
6 Benangan 55.00 m' Rp - Rp -
7 Rp -
PEKERJAAN PLAFOND
VII. Plafond calsiboard 4mm + rangka kayu 15.00 m² Rp - Rp -
1 Rp -
2 PEKERJAAN PENGECATAN -
3 Pengecatan dinding 506.50 m² Rp - Rp -
4 Pengecatan plafond 352.00 m² Rp - Rp - #DIV/0!
5 Pengecatan kayu 275.60 m² Rp - Rp -
6 Rp -
PEKERJAAN LANTAI ###
VIII. Keramik lantai 40 x 40 243.00 m² ### ### 147.47
1 Keramik dinding 25 x 40 ( 3 R. Kelas + teras) 132.96 m² ### ###
List keramik 288.20 m' ### ###
IX. Keramik kolom 25 x 40 16.00 m² ### ###
1 Keramik dinding 25 x 40 ( 5 R. Kelas bg. dalam) 184.50 m² ### ###
2 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 5.00 bh ### ###
Grendel Jendela 50.00 bh ### ###
Hag Angin 100.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 20.00 bh ### ###
Lampu SL 8watt (teras) 5.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 5.00 bh ### ###
Stop kontak + instalasi 5.00 bh ### ###
Instalasi titik lampu 25.00 ttk ### ###
###
PEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 2.53 m² ### ###
###
PEKERJAAN TEMPAT DUDUK
Pasangan trasram 14.70 m² Rp - Rp -
Plat beton tempat duduk t=10 cm 0.74 m³ ### ###
Keramik tempat duduk 30 x 30 7.35 m² ### ###
Keramik dinding tempat duduk 25 x 40 29.40 m² ### ###
###

BATAS
SINERGI 1 SMPN 2 SEPULU DR. AHMAD SABARUDIN, S.Pd, M.MPd
SINERGI 2 SMPN 1 KLAMPIS IMAM SYAFII, S.Pd, MPd
SINERGI 3 SMPN 2 KOKOP MOHAMMAD TAUFIK, SPd
SINERGI 4 SMPN 3 SATAP KOKOP IHSANUDIN, S.Pd
INDRAKILA 5 SMPN 1 TRAGAH Drs. AMIRULLAH, MM
INDRAKILA 6 SMPN 2 MODUNG A S U R, M.Pd
INDRAKILA 7 SMPN 2 LABANG Drs. HARTONO, M.Pd
INDRAKILA 8 SMPN 2 KWANYAR RAHMAWATI, M.Pd
9 SMPN TAHAL AMIN H. ABDULLAH, S.Pd
10 SMPN 1 MODUNG Drs. ALI MUSTOFA, M.Pd
11 SMPN 1 GALIS Drs. TAUFIKUR RAHMAN
12 SMPN 1 KOKOP BUDIONO, S.Pd, M.Pd

13 SMPN 2 KONANG ABDUL RASID, S.Ag, M.PdI


14 SMPN TAHAL AMIN H. ABDULLAH, S.Pd

SMPN 1 KWANYAR MOHAMMAD SADALI, S.Pd


SMPN 1 TANJUNG BUMI Drs. M. AGUS SUBAGIO, M.Pd
SMPN 1 BLEGA SRI ASTUTIK HANDAYANI, M.Pd
SMPN 1 LABANG SUPRIYO, S.Pd, SE, M.PdI

SMPN 1 KWANYAR KEC. KWANYAR KAB. BANGKALAN MOHAMMAD SADALI, S.Pd


SMPN 1 TANJUNG BUMI KEC. TANJUNG BUMI KAB. BAN Drs. M. AGUS SUBAGIO, M.Pd
SMPN 1 BLEGA KEC. BLEGA KAB. BANGKALAN SRI ASTUTIK HANDAYANI, M.Pd
SMPN 2 TANAH MERAH KEC. T KOMARIYAH, S.Pd, M.MPd
SMPN TAHAL AMIN H. ABDULLAH, S.Pd
SMPN 1 GEGER Hj. SRI MULYATI, S.Pd, M.MPd
SMPN 1 GALIS
SMPN 1 TANAH MERAH DYAH CHANDRAWATI, S.Pd
SMPN 2 GEGER SITI YAUMAH, S.Pd
SMPN 4 SATAP TANAH MERA MOH. YUSUF, S.Pd
SMPN 1 KONANG Drs. ANANG ISKANDAR, MM

28.5
23.5
7.833333

1 ( Satu )
5 Oktob. s/d 10 Oktober 2015
Oktober 2015
29 Oktober 2015
Rp. 212.320.000.00
Prestasi Pekerjaan Prestasi Pekerjaan
Minggu Ini (%) Komulatif (%)
Rerata Prestasi Rerata
(9) (10) (11)
(8)/100x(5) (6)+(8) (7)+(9)

0.97 100.00 0.97 Rp 12,375.00 Rp 1,769,625.00


0.97 100.00 0.97 Rp 7,500.00 Rp 1,761,750.00
1.01 100.00 1.01 Rp 20,000.00 Rp 1,843,200.00
- - - Rp 200,000.00 Rp 200,000.00
Rp 5,574,575.00

- - - Rp 88,586.67 Rp 1,638,853.33
- - - Rp 42,298.80 Rp 1,565,055.60
- - - Rp - Rp -
Rp 3,203,908.93

- - - Rp 3,912,550.00 Rp 234,753.00
- - - Rp 3,962,550.00 Rp 114,121.44
- - - Rp 3,962,550.00 Rp 1,027,092.96
- - - Rp 3,962,550.00 Rp 1,255,335.84
Rp 2,631,303.24

- - - Rp 185,000.00 Rp 25,849,125.00
- - - Rp 185,000.00 Rp 21,929,437.50
- - - Rp 65,000.00 Rp 3,100,500.00
Rp 50,879,062.50

- - - Rp 18,000.00 Rp 2,515,050.00
- - - Rp 110,000.00 Rp 26,078,250.00
- - - Rp 95,820.00 Rp 2,558,394.00
- - - Rp 21,149.40 Rp 1,184,366.40
Rp 32,336,060.40

- - - Rp 85,000.00 Rp 22,185,000.00
Rp 22,185,000.00

- - - Rp 20,740.00 Rp 10,805,637.48
- - - Rp 20,740.00 Rp 5,413,140.00
- - - Rp 42,450.00 Rp 4,752,702.00
Rp 20,971,479.48

- - - Rp 105,250.00 Rp 3,315,375.00
- - - Rp 112,000.00 Rp 16,800,000.00
- - - Rp 136,075.00 Rp 12,540,672.00
- - - Rp 85,000.00 Rp 6,528,000.00
Rp 39,184,047.00

- - - Rp 55,000.00 Rp 660,000.00
- - - Rp 50,000.00 Rp 150,000.00
- - - Rp 20,000.00 Rp 80,000.00
- - - Rp 15,000.00 Rp 75,000.00
- - - Rp 225,000.00 Rp 1,125,000.00
Rp 200,000.00 Rp 3,000,000.00
Rp 5,090,000.00
- - - Rp 112,125.00 Rp 376,964.25
Rp 376,964.25

2.95 2.95

Rp 20,300,000.00 2.95 %
1 ( Satu )
5 Oktob. s/d 10 Oktober 2015
Oktober 2015
29 Oktober 2015

Prestasi Pekerjaan Prestasi Pekerjaan


Minggu Ini (%) Komulatif (%)
Rerata Prestasi Rerata
(9) (10) (11)
(8)/100x(5) (6)+(8) (7)+(9)
0.20 100.00 0.20 Rp 50,000.00 Rp 600,000.00
0.08 100.00 0.08 Rp 20,000.00 Rp 240,000.00
- - - Rp 200,000.00 Rp 200,000.00
Rp 1,040,000.00

- - - Rp 58,500.00 Rp 126,360.00
- - - Rp 215,400.00 Rp 77,544.00
- - - Rp 16,110.00 Rp 17,398.80
Rp 221,302.80

- - - Rp 88,586.67 Rp 3,790,281.61
- - - Rp 42,298.80 Rp 3,619,604.84
- - - Rp 11,825.00 Rp 3,651,560.00
Rp 11,061,446.45

- - - Rp 897,800.00 Rp 161,604.00
- - - Rp 3,962,550.00 Rp 2,139,777.00
- - - Rp 3,962,550.00 Rp 3,120,508.13
- - - Rp 3,962,550.00 Rp 5,943,825.00
- - - Rp 3,962,550.00 Rp 9,510,120.00
- - - Rp 3,962,550.00 Rp 941,501.88
Rp 21,817,336.01

- - - Rp 210,000.00 Rp 77,723,100.00
- - - Rp 65,000.00 Rp 5,063,500.00
Rp 82,786,600.00

- - - Rp 80,500.00 Rp 16,325,400.00
- - - Rp 18,000.00 Rp 3,011,580.00
- - - Rp 95,820.00 Rp 2,429,037.00
- - - Rp 21,149.40 Rp 617,562.48
Rp 22,383,579.48

- - - Rp 11,431,250.00 Rp 14,644,117.13
- - - Rp 618,250.00 Rp 5,375,065.50
- - - Rp 430,475.00 Rp 7,148,037.38
- - - Rp 419,572.50 Rp 4,833,475.20
Rp 32,000,695.20

- - - Rp 85,000.00 Rp 25,857,000.00
Rp 25,857,000.00

- - - Rp 20,740.00 Rp 12,412,890.00
- - - Rp 20,740.00 Rp 6,309,108.00
- - - Rp 42,450.00 Rp 8,774,415.00
Rp 27,496,413.00

- - - Rp 112,000.00 Rp 26,880,000.00
- - - Rp 136,075.00 Rp 17,662,535.00
- - - Rp 136,075.00 Rp 870,880.00
- - - Rp 85,000.00 Rp 10,115,000.00
Rp 55,528,415.00

- - - Rp 140,750.00 Rp 422,250.00
- - - Rp 23,625.00 Rp 425,250.00
- - - Rp 16,687.50 Rp 267,000.00
- - - Rp 74,250.00 Rp 222,750.00
- - - Rp 14,750.00 Rp 236,000.00
- - - Rp 17,750.00 Rp 284,000.00
Rp 1,857,250.00

- - - Rp 55,000.00 Rp 660,000.00
- - - Rp 50,000.00 Rp 150,000.00
- - - Rp 20,000.00 Rp 60,000.00
- - - Rp 15,000.00 Rp 45,000.00
- - - Rp 225,000.00 Rp 675,000.00
- - - Rp 200,000.00 Rp 3,000,000.00
Rp 4,590,000.00

- - - Rp 112,125.00 Rp 3,038,587.50
Rp 3,038,587.50

0.28 -
Rp 20,300,000.00 - %
1 ( Satu )
5 Oktob. s/d 10 Oktober 2015
Oktober 2015
29 Oktober 2015

Prestasi Pekerjaan Prestasi Pekerjaan


Minggu Ini (%) Komulatif (%)
Rerata Prestasi Rerata Lembar. 2
(9) (10) (11) HARGA SATUAN JUMLAH HARGA
(8)/100x(5) (6)+(8) (7)+(9) 4 5

- 100.00 1.70 Rp 12,375.00 Rp 3,217,500.00


- 100.00 0.32 Rp 50,000.00 Rp 600,000.00
- 100.00 0.65 Rp 20,000.00 Rp 1,235,000.00
- - - Rp 200,000.00 Rp 200,000.00
Rp 5,252,500.00

- 100.00 0.05 Rp 58,500.00 Rp 88,452.00


- 100.00 0.03 Rp 215,400.00 Rp 54,280.80
- 100.00 0.01 Rp 16,110.00 Rp 12,179.16
Rp 154,911.96

- 100.00 4.29 Rp 88,586.67 Rp 8,133,700.58


- 100.00 4.10 Rp 42,298.80 Rp 7,767,439.21
- 100.00 1.08 Rp 11,825.00 Rp 2,045,725.00
Rp 17,946,864.80

- 100.00 0.15 Rp 897,800.00 Rp 274,726.80


0.40 100.00 0.79 Rp 3,962,550.00 Rp 1,497,843.90
0.64 75.00 0.74 Rp 3,962,550.00 Rp 1,872,304.88
- - - Rp 3,962,550.00 Rp 4,220,115.75
- - - Rp 3,962,550.00 Rp 4,992,813.00
- - - Rp 3,962,550.00 Rp 2,225,368.08
Rp 15,083,172.41

- - - Rp 210,000.00 Rp 53,841,375.00
- - - Rp 65,000.00 Rp 4,238,000.00
Rp 58,079,375.00

- - - Rp 80,500.00 Rp 15,344,910.00
- - - Rp 18,000.00 Rp 2,002,725.00
- - - Rp 95,820.00 Rp 1,854,117.00
- - - Rp 21,149.40 Rp 560,459.10
Rp 19,762,211.10

- 100.00 5.81 Rp 115,000.00 Rp 11,012,400.00


1.90 100.00 4.22 Rp 2,000,000.00 Rp 8,000,000.00
2.11 100.00 2.11 Rp 500,000.00 Rp 4,000,000.00
Rp 23,012,400.00

- - - Rp 85,000.00 Rp 17,105,400.00
Rp 17,105,400.00

- - - Rp 20,740.00 Rp 1,119,960.00
- - - Rp 9,670.00 Rp 3,331,315.00
0.77 75.00 0.77 Rp 9,670.00 Rp 1,945,990.80
- - - Rp 42,450.00 Rp 830,322.00
Rp 7,227,587.80

- - - Rp 112,000.00 Rp 18,144,000.00
- - - Rp 136,075.00 Rp 762,020.00
Rp 18,906,020.00

- - - Rp 140,750.00 Rp 281,500.00
- - - Rp 23,625.00 Rp 283,500.00
- - - Rp 16,687.50 Rp 267,000.00
- - - Rp 74,250.00 Rp 148,500.00
- - - Rp 14,750.00 Rp 236,000.00
- - - Rp 17,750.00 Rp 284,000.00
Rp 1,500,500.00

- - - Rp 55,000.00 Rp 440,000.00
- - - Rp 50,000.00 Rp 100,000.00
- - - Rp 20,000.00 Rp 40,000.00
- - - Rp 15,000.00 Rp 30,000.00
- - - Rp 225,000.00 Rp 450,000.00
- - - Rp 200,000.00 Rp 2,000,000.00
Rp 3,060,000.00

- - - Rp 112,125.00 Rp 2,318,745.00
Rp 2,318,745.00
5.82 26.82
Rp 50,802,000.00 26.82 %

Bangkalan, 2018 Rp 189,409,688.06


Dibuat oleh 50802969.2120865
Fasilitator / Perencana Rp 50,802,000.00
H. SUBADRIH, ST, MT

LAMA
140

BARU
LAMA
BARU
LAMA
BARU
LAMA
BARU
keramik tambal sulam
SADALI, S.Pd
UBAGIO, M.Pd
NDAYANI, M.Pd
1 2 3 4 5

0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
1.01 100 1.01 100 1.01 100 1.01 100 1.01 100
0.11 - - - - - - - - -
0.90 - - 100 0.90 100 0.90 100 0.90 100
0.86 - - - - 100 0.86 100 0.86 100
- - - - - 100 - 100 - 100

0.13 - - - - - - 50 0.06 100


0.06 - - - - - - - - 100
0.56 - - - - - - - - 100
0.69 - - - - - - - - 50

14.17 - - - - - - - - -
12.02 - - - - - - - - -
1.70 - - - - - - - - -

1.38 - - - - - - - - -
14.29 - - - - - - - - -
1.40 - - - - - - - - -
0.65 - - - - - - - - -

12.16 - - - - - - - - -

5.92 - - - - - - - - -
2.97 - - - - - - - - -
2.61 - - - - - - - - -

1.82 - - - - - - - - -
9.21 - - - - - - - - -
6.87 - - - - - - - - -
3.58 - - - - - - - - -

0.36 - - - - - - - - -
0.08 - - - - - - - - -
0.04 - - - - - - - - -
0.04 - - - - - - - - -
0.62 - - - - - - - - -
1.64 - - - - - - - - -
0.21 - - - - - - - - -
1 2 3 4 5
0.20 100 0.20 100 0.20 100 0.20 100 0.20 100
0.08 100 0.08 100 0.08 100 0.08 100 0.08 100
0.07 - - - - - - - - -

0.04 - - 100 0.04 100 0.04 100 0.04 100


0.03 - - - - 100 0.03 100 0.03 100
0.01 - - - - 100 0.01 100 0.01 100

1.24 - - - - - - 50 0.62 100


1.19 - - - - - - - - 100
1.20 - - - - - - - - 100

0.05 - - - - - - 25 0.01 50
0.70 - - - - - - - - 50
1.02 - - - - - - - - -
1.95 - - - - - - - - -
3.12 - - - - - - - - 50
0.31 - - - - - - - - 75

25.51 - - - - - - - - -
1.66 - - - - - - - - -

5.36 - - - - - - - - -
0.99 - - - - - - - - -
0.80 - - - - - - - - -
0.20 - - - - - - - - -

4.81 - - - - - - - - 50
1.76 - - - - - - - - -
2.35 - - - - - - - - -
1.59 - - - - - - - - -

8.49 - - - - - - - - -

4.07 - - - - - - - - -
2.07 - - - - - - - - -
2.88 - - - - - - - - -

8.82 - - - - - - - - -
5.80 - - - - - - - - -
0.29 - - - - - - - - -
3.32 - - - - - - - - -

0.14 - - - - - - - - -
0.14 - - - - - - - - -
0.09 - - - - - - - - -
0.07 - - - - - - - - -
0.08 - - - - - - - - -
0.09 - - - - - - - - -

0.22 - - - - - - - - -
0.05 - - - - - - - - -
0.02 - - - - - - - - -
0.01 - - - - - - - - -
0.22 - - - - - - - - -
0.98 - - - - - - - - -

1.00 - - - - - - - - -
1 2 3 4 5

1.70 100 1.70 100 1.70 100 1.70 100 1.70 100
0.32 100 0.32 100 0.32 100 0.32 100 0.32 100
0.65 100 0.65 100 0.65 100 0.65 100 0.65 100
0.11 - - - - - - - - -

0.05 100 0.05 100 0.05 100 0.05 100 0.05 100
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100
0.01 50 0.00 100 0.01 100 0.01 100 0.01 100

4.29 - - 100 4.29 100 4.29 100 4.29 100


4.10 - - 100 4.10 100 4.10 100 4.10 100
1.08 - - 15 0.16 100 1.08 100 1.08 100

0.15 - - - - 75 0.11 100 0.15 100


0.79 - - - - - - 50 0.40 100
0.99 - - - - - - 10 0.10 75
2.23 - - - - - - - - -
2.64 - - - - - - - - -
1.17 - - - - - - - - -
28.43 - - - - - - - - -
2.24 - - - - - - - - -

8.10 - - - - - - - - -
1.06 - - - - - - - - -
0.98 - - - - - - - - -
0.30 - - - - - - - - -

5.81 - - - - 75 4.36 100 5.81 100


4.22 - - - - 15 0.63 55 2.32 100
2.11 - - - - - - - - 100

9.03 - - - - - - - - -

0.59 - - - - - - - - -
1.76 - - - - - - - - -
1.03 - - - - - - - - 75
0.44 - - - - - - - - -

9.58 - - - - - - - - -
0.40 - - - - - - - - -

0.15 - - - - - - - - -
0.15 - - - - - - - - -
0.14 - - - - - - - - -
0.08 - - - - - - - - -
0.12 - - - - - - - - -
0.15 - - - - - - - - -

0.23 - - - - - - - - -
0.05 - - - - - - - - -
0.02 - - - - - - - - -
0.02 - - - - - - - - -
0.24 - - - - - - - - -
1.06 - - - - - - - - -

1.22 - - - - - - - - -
6 7 8 9 10

0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
1.01 100 1.01 100 1.01 100 1.01 100 1.01 100
- - - - - - - 100 0.11 100
0.90 100 0.90 100 0.90 100 0.90 100 0.90 100
0.86 100 0.86 100 0.86 100 0.86 100 0.86 100
- 100 - 100 - 100 - 100 - 100

0.13 100 0.13 100 0.13 100 0.13 100 0.13 100
0.06 100 0.06 100 0.06 100 0.06 100 0.06 100
0.56 100 0.56 100 0.56 100 0.56 100 0.56 100
0.34 100 0.69 100 0.69 100 0.69 100 0.69 100

- 100 14.17 100 14.17 100 14.17 100 14.17 100


- 100 12.02 100 12.02 100 12.02 100 12.02 100
- 25 0.42 100 1.70 100 1.70 100 1.70 100

- - - - - 100 1.38 100 1.38 100


- - - - - 100 14.29 100 14.29 100
- - - - - 100 1.40 100 1.40 100
- - - - - 100 0.65 100 0.65 100

- - - - - - - 100 12.16 100

- - - - - 50 2.96 100 5.92 100


- - - - - - - 100 2.97 100
- - - - - - - 100 2.61 100

- - - - - 50 0.91 100 1.82 100


- - - - - 100 9.21 100 9.21 100
- - - - - - - 100 6.87 100
- - - - - - - - - 100

- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
6 7 8 9 10
0.20 100 0.20 100 0.20 100 0.20 100 0.20 100
0.08 100 0.08 100 0.08 100 0.08 100 0.08 100
- - - - - - - - - 100

0.04 100 0.04 100 0.04 100 0.04 100 0.04 100
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100
0.01 100 0.01 100 0.01 100 0.01 100 0.01 100

1.24 100 1.24 100 1.24 100 1.24 100 1.24 100
1.19 100 1.19 100 1.19 100 1.19 100 1.19 100
1.20 100 1.20 100 1.20 100 1.20 100 1.20 100

0.03 100 0.05 100 0.05 100 0.05 100 0.05 100
0.35 100 0.70 100 0.70 100 0.70 100 0.70 100
- 50 0.51 100 1.02 100 1.02 100 1.02 100
- 50 0.98 100 1.95 100 1.95 100 1.95 100
1.56 75 2.34 100 3.12 100 3.12 100 3.12 100
0.23 100 0.31 100 0.31 100 0.31 100 0.31 100

- - - 100 25.51 100 25.51 100 25.51 100


- - - - - 100 1.66 100 1.66 100

- - - - - 50 2.68 100 5.36 100


- - - - - 50 0.49 100 0.99 100
- - - - - - - 100 0.80 100
- - - - - - - 100 0.20 100

2.40 100 4.81 100 4.81 100 4.81 100 4.81 100
- - - - - - - 100 1.76 100
- - - - - - - 100 2.35 100
- - - - - 50 0.79 100 1.59 100

- - - - - - - 50 4.24 100

- - - 50 2.04 100 4.07 100 4.07 100


- - - - - - - 50 1.04 100
- - - - - 50 1.44 100 2.88 100

- - - - - - - 75 6.62 100
- - - - - - - 50 2.90 100
- - - - - - - 50 0.14 100
- - - - - - - - - 100

- - - - - - - 100 0.14 100


- - - - - - - 100 0.14 100
- - - - - - - 100 0.09 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100

- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100

- - - - - - - 100 1.00 100


6 7 8 9 10

1.70 100 1.70 100 1.70 100 1.70 100 1.70 100
0.32 100 0.32 100 0.32 100 0.32 100 0.32 100
0.65 100 0.65 100 0.65 100 0.65 100 0.65 100
- - - - - - - - - 100

0.05 100 0.05 100 0.05 100 0.05 100 0.05 100
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100
0.01 100 0.01 100 0.01 100 0.01 100 0.01 100

4.29 100 4.29 100 4.29 100 4.29 100 4.29 100
4.10 100 4.10 100 4.10 100 4.10 100 4.10 100
1.08 100 1.08 100 1.08 100 1.08 100 1.08 100

0.15 100 0.15 100 0.15 100 0.15 100 0.15 100
0.79 100 0.79 100 0.79 100 0.79 100 0.79 100
0.74 100 0.99 100 0.99 100 0.99 100 0.99 100
- 100 2.23 100 2.23 100 2.23 100 2.23 100
- 100 2.64 100 2.64 100 2.64 100 2.64 100
- 100 1.17 100 1.17 100 1.17 100 1.17 100
- 25 7.11 100 28.43 100 28.43 100 28.43 100
- - - 100 2.24 100 2.24 100 2.24 100

- - - 85 6.89 100 8.10 100 8.10 100


- - - - - 100 1.06 100 1.06 100
- - - - - 100 0.98 100 0.98 100
- - - - - 100 0.30 100 0.30 100

5.81 100 5.81 100 5.81 100 5.81 100 5.81 100
4.22 100 4.22 100 4.22 100 4.22 100 4.22 100
2.11 100 2.11 100 2.11 100 2.11 100 2.11 100

- - - - - 85 7.68 100 9.03 100

- 50 0.30 100 0.59 100 0.59 100 0.59 100


- 50 0.88 100 1.76 100 1.76 100 1.76 100
0.77 100 1.03 100 1.03 100 1.03 100 1.03 100
- - - - - 100 0.44 100 0.44 100

- - - 25 2.39 100 9.58 100 9.58 100


- - - - - 85 0.34 100 0.40 100

- 100 0.15 100 0.15 100 0.15 100 0.15 100


- 100 0.15 100 0.15 100 0.15 100 0.15 100
- 100 0.14 100 0.14 100 0.14 100 0.14 100
- 100 0.08 100 0.08 100 0.08 100 0.08 100
- 100 0.12 100 0.12 100 0.12 100 0.12 100
- 100 0.15 100 0.15 100 0.15 100 0.15 100

- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100

- - - - - - - - - 100
0.97
0.97
1.01
0.11
0.90
0.86
-

0.13
0.06
0.56
0.69

14.17
12.02
1.70

1.38
14.29
1.40
0.65

12.16

5.92
2.97
2.61

1.82
9.21
6.87
3.58

0.36
0.08
0.04
0.04
0.62
1.64
0.21
0.20
0.08
0.07

0.04
0.03
0.01

1.24
1.19
1.20

0.05
0.70
1.02
1.95
3.12
0.31

25.51
1.66

5.36
0.99
0.80
0.20

4.81
1.76
2.35
1.59

8.49

4.07
2.07
2.88

8.82
5.80
0.29
3.32

0.14
0.14
0.09
0.07
0.08
0.09

0.22
0.05
0.02
0.01
0.22
0.98

1.00
1.70
0.32
0.65
0.11

0.05
0.03
0.01

4.29
4.10
1.08

0.15
0.79
0.99
2.23
2.64
1.17
28.43
2.24

8.10
1.06
0.98
0.30

5.81
4.22
2.11

9.03

0.59
1.76
1.03
0.44

9.58
0.40

0.15
0.15
0.14
0.08
0.12
0.15

0.23
0.05
0.02
0.02
0.24
1.06

1.22
YANG DIPAKAI
TH. 2018
1 SMPN 2 SEPULU 2 KELAS ### SINERGI
2 SMPN 1 KLAMPIS 3 KELAS ### SINERGI
3 SMPN 2 KOKOP 2 KELAS ### SINERGI
4 SMPN 3 SATAP KOKOP 2 KELAS ### SINERGI
5 SMPN 1 TRAGAH 3 KELAS ### INDRAKILA
6 SMPN 2 MODUNG 2 KELAS ### INDRAKILA
7 SMPN 2 LABANG 3 KELAS ### INDRAKILA
8 SMPN 2 KWANYAR 2 KELAS ### INDRAKILA
9 SMPN TAHAL AMIN H. ABDULLAH, S.Pd

REKAPITULASI 1
RENCANA ANGGARAN BIAYA OK
OK
KEGIATAN : PENGADAAN SARANA PRASARANA
PEKERJAAN : PERENCANAAN SMP KABUPATEN BANGKALAN
LINGKUP PEKERJAAN : REHABILITASI 2 RUANG BELAJAR SMPN 2 SEPULU
LOKASI : SMPN 2 SEPULU KEC. SEPULU KAB. BANGKALAN

NO. URAIAN PEKERJAAN JUMLAH HARGA

I PEKERJAAN PERSIAPAN ###


II PEKERJAAN PASANGAN/PLESTERAN ###
III PEKERJAAN BETON ###
IV PEKERJAAN RANGKA ATAP ###
V PEKERJAAN ATAP ###
VI PEKERJAAN PLAFOND ###
VII PEKERJAAN PENGECATAN ###
VIII PEKERJAAN LANTAI ###
IX PEKERJAAN INSTALASI LISTRIK ###
X PEKERJAAN KACA ###

JUMLAH ###
DIBULATK ### ###
###

TERBILANG : ( SERATUS DELAPAN PULUH TIGA JUTA RUPIAH )

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

ANWAR NURIS, S.Pd.I H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Sepulu
Kec. Sepulu Kab. Bangkalan

DR. AHMAD SABARUDIN, S.Pd, M.MPd


NIP. 19680503 199103 1 013

LAPORAN MINGGUAN
Minggu ke :
Pekerjaan : REHABILITASI 2 RUANG KELAS SMPN 2 SEPULU Tanggal :
Nama Sekolah : SMPN 2 SEPULU Bulan :
Lokasi : Kec. Kedamean Kab. Gresik Dana diterima tangal :
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%)
% Prestasi Rerata Prestasi
(1) (2) (3) (4) (5) (6) (7) (8)
(6)/100x(5)
I. PEKERJAAN PERSIAPAN
1 Pembongkaran atap + rangka atap 143.00 m² 0.97 - - 100
2 Pembongkaran atap 234.90 m² 0.97 - - 100
3 Penetelan plesteran 92.16 m² 1.01 - - 100
4 Pembersihan akhir pekerjaan 1.00 ls 0.11 - - -
II. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 18.50 m² 0.90 - - -
2 Plesteran 1Pc : 5Ps 37.00 m² 0.86 - - -
3 Benangan 48.00 m' - - - -

III. PEKERJAAN BETON


1 Kolom Struktur 15/25 0.06 m³ 0.13 - - -
2 Kolom Praktis 15/15 0.03 m³ 0.06 - - -
3 Ring Balk 15/15 0.26 m³ 0.56 - - -
4 Ring gewel 15/15 dan konsol beton 15/15 0.32 m³ 0.69 - - -

IV. PEKERJAAN RANGKA ATAP


1 Kuda-kuda baja ringan (galvalum bentang 7m) 139.73 m² 14.17 - - -
2 Kuda-kuda baja ringan (galvalum 50%) 118.54 m² 12.02 - - -
2 Listplank kalsiplank 8mm / 30 cm 47.70 m¹ 1.70 - - -

V. PEKERJAAN ATAP
1 Atap genteng beton (lama) 139.73 m² 1.38 - - -
2 Atap genteng beton warna 237.08 m² 14.29 - - -
3 Genteng bubungan beton warna 26.70 m' 1.40 - - -
4 Plesteran kompres L = 10 cm (Akhiran genting) 56.00 m' 0.65 - - -

VI. PEKERJAAN PLAFOND


1 Plafond calsiboard 4mm + rangka metal hollow 261.00 m² 12.16 - - -

VII. PEKERJAAN PENGECATAN


1 Pengecatan dinding 521.00 m² 5.92 - - -
2 Pengecetan plafond 261.00 m² 2.97 - - -
3 Pengecatan kayu 111.96 m² 2.61 - - -

VIII. PEKERJAAN LANTAI


1 Keramik lantai 30 x 30 ( tambal sulam 1kelas) 31.50 m² 1.82 - - -
2 Keramik lantai 40 x 40 150.00 m² 9.21 - - -
3 Keramik dinding R.Lab 25 x 40 92.16 m² 6.87 - - -
4 List keramik 76.80 m' 3.58 - - -

IX. PEKERJAAN INSTALASI LISTRIK


1 Lampu SL 14 watt 12.00 bh 0.36 - - -
2 Lampu SL 8 watt (teras) 3.00 bh 0.08 - - -
3 Saklar ganda 4.00 bh 0.04 - - -
4 Saklar tunggal 5.00 bh 0.04 - - -
5 Stop kontak + instalasi 5.00 bh 0.62 - - -
6 Instalasi titik lampu 15.00 ttk 1.64
X. PEKERJAAN KACA
1 Kaca mati t=5 mm (yg pecah) 3.36 m² 0.21 - - -

JUMLAH 100.00 -
Jumlah dana yang digunakan sampai dengan minggu ini ( minggu ke 1 ) Rp 20,300,000.00

REKAPITULASI 2
RENCANA ANGGARAN BIAYA OK

KEGIATAN : PENGADAAN SARANA PRASARANA


PEKERJAAN : PERENCANAAN SMP KABUPATEN BANGKALAN
LINGKUP PEKERJAAN : REHABILITASI 3 RUANG BELAJAR SMPN 1 KLAMPIS
LOKASI : SMPN 1 KLAMPIS KEC. KLAMPIS KAB. BANGKALAN

NO. URAIAN PEKERJAAN JUMLAH HARGA

I (2) ###
II PEKERJAAN TANAH ###
III PEKERJAAN PASANGAN/PLESTERAN ###
IV PEKERJAAN BETON ###
V PEKERJAAN RANGKA ATAP ###
VI PEKERJAAN ATAP ###
VII PEKERJAAN KUSEN PINTU DAN JENDELA ###
VIII PEKERJAAN PLAFOND ###
IX PEKERJAAN PENGECATAN/PLAMIRAN ###
X PEKERJAAN LANTAI ###
XI PEKERJAAN KUNCI + PENGGANTUNG ###
XII PEKERJAAN INSTALASI LISTRIK ### ###
XIII PEKERJAAN KACA ###

JUMLAH ### ###


DIBULATK ### ###
TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

HANAF I H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 1 Kelampis
Kec. Kelampis Kab. Bangkalan

IMAM SYAFII, S.Pd, MPd


NIP. 19680228 199401 1 003

LAPORAN MINGGUAN
Minggu ke :
Pekerjaan : REHABILITASI 2 RUANG KELAS SMPN 1 KLAMPIS Tanggal :
Nama Sekolah : SMPN 1 KLAMPIS Bulan :
Lokasi : Kec. Kedamean Kab. Gresik Dana diterima tangal :
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%)
% Prestasi Rerata Prestasi
(1) (2) (3) (4) (5) (6) (7) (8)
I. PEKERJAAN PERSIAPAN (6)/100x(5)
1 Pembongkaran kosen 12.00 bh 0.20 - - 100
2 Penetelan plesteran 12.00 m² 0.08 - - 100
3 Pembersihan akhir pekerjaan 1.00 ls 0.07 - - -

II. PEKERJAAN TANAH


1 Galian tanah 2.16 m³ 0.04 - - -
2 Urugan pasir bawah pondasi t=10cm 0.36 m³ 0.03 - - -
4 Urugan tanah kembali 1.08 m³ 0.01 - - -

III. PEKERJAAN PASANGAN/PLESTERAN


1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 42.79 m² 1.24 - - -
2 Plesteran 1Pc : 5Ps 85.57 m² 1.19 - - -
3 Benangan 308.80 m' 1.20 - - -

IV. PEKERJAAN BETON


1 Lantai kerja bawah pondasi 1:3:5 t=5cm 0.18 m³ 0.05 - - -
2 Pondasi beton stempat 60 x 60 x 15cm 0.54 m³ 0.70 - - -
3 Kolom teras 15/15 0.79 m³ 1.02 - - -
4 Balok beton 15/20 1.50 m³ 1.95 - - -
5 Kolom beon 15/20 2.40 m³ 3.12 - - -
6 Kolom praktis 15/15 0.24 m³ 0.31 - - -
5.65
V. PEKERJAAN RANGKA ATAP
1 Kuda-kuda baja ringan (galvalum 75mm) (betang. 370.11 m² 25.51 - - -
2 Lisplank kalsiplank 8mm / 30 cm 77.90 m¹ 1.66 - - -

VI. PEKERJAAN ATAP


1 Atap genteng Karang Penang (baru bg. depan) 202.80 m² 5.36 - - -
2 Atap genteng (lama bg. belakang) 167.31 m² 0.99 - - -
3 Genteng bubungan Karang penang 25.35 m' 0.80 - - -
4 Plesteran kompres L = 10 cm (Akhiran genting) 29.20 m' 0.20 - - -

VII. PEKERJAAN KUSEN PINTU DAN JENDELA


1 Kusen kayu kempas/mahoni 6/15 1.28 m³ 4.81 - - -
2 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 8.69 m² 1.76 - - -
3 Jalusi kayu kempas/mahoni 3/5 16.61 m² 2.35 - - -
4 Daun Jendela kaca kayu kempas/mahoni 3/10 11.52 m² 1.59 - - -

VIII. PEKERJAAN PLAFOND


1 Plafond calsiboard 4mm + rangka kayu 4/6 304.20 m² 8.49 - - -

IX. PEKERJAAN PENGECATAN/PLAMIRAN


1 Pengecatan dinding 598.50 m² 4.07 - - -
2 Pengecatan plafond 304.20 m² 2.07 - - -
3 Pengecatan kayu 206.70 m² 2.88 - - -

X. PEKERJAAN LANTAI
1 Keramik lantai 40 x 40 240.00 m² 8.82 - - -
2 Keramik dinding 25 x 40 129.80 m² 5.80 - - -
3 Keramik kolom 25 x 40 6.40 m² 0.29 - - -
4 List keramik 119.00 m' 3.32 - - -

XI. PEKERJAAN KUNCI + PENGGANTUNG


1 Kunci pintu 2 x putar 3.00 bh 0.14 - - -
2 Engsel Pintu 18.00 bh 0.14 - - -
3 Engsel Jendela 16.00 bh 0.09 - - -
4 Grendel tanam 3.00 bh 0.07 - - -
5 Grendel Jendela 16.00 bh 0.08 - - -
6 Hag Angin 16.00 bh 0.09 - - -

XII. PEKERJAAN INSTALASI LISTRIK


1
Lampu SL 14 watt 12.00 bh 0.22 - - -
2
Lampu SL 8watt (teras) 3.00 bh 0.05 - - -
3
Saklar ganda 3.00 bh 0.02 - - -
4
Saklar tunggal 3.00 bh 0.01 - - -
5 Stop kontak + instalasi 3.00 bh 0.22 - - -
6 Instalasi titik lampu 15.00 ttk 0.98 - - -

XIII. PEKERJAAN KACA


1 Kaca bening t=5 mm 27.10 m² 1.00 - - -

JUMLAH 95.07 -
Jumlah dana yang digunakan sampai dengan minggu ini ( minggu ke 1 ) Rp 20,300,000.00

3
REKAPITULASI OK
NCANA ANGGARAN BIAYA OK
: PENGADAAN SARANA PRASARANA
KEGIATAN : PERENCANAAN SMP KABUPATEN BANGKALAN
PEKERJAAN : REHABILITASI 2 RUANG BELAJAR SMPN 3 SATAP KOKOP
LINGKUP PEKERJAAN : SMPN 3 SATAP KOKOP KEC. KOKOP KAB. BANGKALAN
LOKASI
URAIAN PEKERJAAN JUMLAH HARGA
NO.

PEKERJAAN PERSIAPAN ###


I PEKERJAAN TANAH ###
II PEKERJAAN PASANGAN/PLESTERAN ###
III PEKERJAAN BETON ###
IV PEKERJAAN RANGKA ATAP ###
V PEKERJAAN ATAP ###
VI PEKERJAAN KUSEN PINTU DAN JENDELA ###
VII PEKERJAAN PLAFOND ###
VIII PEKERJAAN PENGECATAN/PLAMIRAN ###
IX PEKERJAAN LANTAI ###
X PEKERJAAN KUNCI + PENGGANTUNG ###
XI PEKERJAAN INSTALASI LISTRIK ###
XII PEKERJAAN KACA ###
XIII

JUMLAH ### ###


DIBULATK ### ###

TERBILANG : ( SERATUS DELAPAN PULUH TIGA JUTA RUPIAH )

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 3 Satap Kokop
Kec. Kokop Kab. Bangkalan

IHSANUDIN, S.Pd
NIP. 19700109 199104 1 001
LAPORAN MINGGUAN
Minggu ke :
Pekerjaan : REHABILITASI 2 RUANG BELAJAR SMPN 3 SATAP KOKOP Tanggal :
Nama Sekolah : SMPN 3 SATAP KOKOP KEC. KOKOP KAB. BANGKALAN Bulan :
Lokasi : KEC. KOKOP KAB. BANGKALAN Dana diterima tangal :
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%)
% Prestasi Rerata Prestasi
(1) (2) (3) (4) (5) (6) (7) (8)
(6)/100x(5)

I. PEKERJAAN PERSIAPAN
1 Pembongkaran atap + rangka 260.00 m² 1.70 100 1.70 -
2 Pembongkaran kosen 12.00 bh 0.32 100 0.32 -
3 Pembongkaran dinding 61.75 m² 0.65 100 0.65 -
4 Pembersihan akhir pekerjaan 1.00 ls 0.11 - - -

II. PEKERJAAN TANAH


1 Galian tanah 1.51 m³ 0.05 100 0.05 -
2 Urugan pasir bawah pondasi t=10cm 0.25 m³ 0.03 100 0.03 -
4 Urugan tanah kembali 0.76 m³ 0.01 100 0.01 -

III. PEKERJAAN PASANGAN/PLESTERAN


1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 91.82 m² 4.29 100 4.29 -
2 Plesteran 1Pc : 5Ps 183.63 m² 4.10 100 4.10 -
3 Benangan 173.00 m' 1.08 100 1.08 -

IV. PEKERJAAN BETON `


1 Lantai kerja bawah pondasi 1:3:5 t=5cm 0.31 m³ 0.15 100 0.15 -
2 Pondasi beton stempat 60 x 60 x 15cm 0.38 m³ 0.79 100 0.79 -
3 Kolom teras 15/15 0.47 m³ 0.99 75 0.74 25
4 Balok beton 15/20 1.07 m³ 2.23 - - 100
5 Kolom struktur 15/25 1.26 m³ 2.64 - - 100
6 Ring balk 15/15 0.56 m³ 1.17 - - 100
V. PEKERJAAN RANGKA ATAP
1 Kuda-kuda baja ringan (galvalum 75mm) 256.39 m² 28.43 - - 25
2 Lisplank kalsiplank 8mm / 30 cm 65.20 m¹ 2.24 - - -

VI. PEKERJAAN ATAP


1 Atap genteng Karang Penang (baru bg depan) 190.62 m² 8.10 - - -
2 Atap genteng (lama bg belakang) 111.26 m² 1.06 - - -
3 Genteng bubungan Karang penang 19.35 m' 0.98 - - -
4 Plesteran kompres L = 10 cm (Akhiran genting) 26.50 m' 0.30 - - -

VII. PEKERJAAN KUSEN PINTU DAN JENDELA


1 Kusen kayu aluminium 4" 95.76 m' 5.81 100 5.81 -
2 Daun Pintu kaca aluminium 4.00 bh 4.22 100 4.22 -
3 Daun Jendela kaca aluminium 8.00 bh 2.11 100 2.11 -

VIII. PEKERJAAN PLAFOND


1 Plafond calsiboard 4mm + rangka hollow 201.24 m² 9.03 - - -

IX. PEKERJAAN PENGECATAN/PLAMIRAN


1 Pengecatan dinding depan 54.00 m² 0.59 - - 50
2 Pelamiran dinding 344.50 m² 1.76 - - 50
3 Plamiran plafond 201.24 m² 1.03 75 0.77 25
4 Pengecatan kayu 19.56 m² 0.44 - - -

X. PEKERJAAN LANTAI
1 Keramik lantai 40 x 40 162.00 m² 9.58 - - -
2 Keramik kolom 20 x 40 (motif) 5.60 m² 0.40 - - -

XI. PEKERJAAN KUNCI + PENGGANTUNG


1 Kunci pintu 2 x putar 2.00 bh 0.15 - - 100
2 Engsel Pintu 12.00 bh 0.15 - - 100
3 Engsel Jendela 16.00 bh 0.14 - - 100
4 Grendel tanam 2.00 bh 0.08 - - 100
5 Grendel Jendela 16.00 bh 0.12 - - 100
6 Hag Angin 16.00 bh 0.15 - - 100

XII PEKERJAAN INSTALASI LISTRIK


1 Lampu SL 14 watt 8.00 bh 0.23 - - -
2 Lampu SL 8watt (teras) 2.00 bh 0.05 - - -
3 Saklar ganda 2.00 bh 0.02 - - -
4 Saklar tunggal 2.00 bh 0.02 - - -
5 Stop kontak + instalasi 2.00 bh 0.24 - - -
6 Instalasi titik lampu 10.00 ttk 1.06 - - -

XIII. PEKERJAAN KACA


1 Kaca mati t=5 mm 20.68 m² 1.22 - - -

JUMLAH 100.00 26.82


Jumlah dana yang digunakan sampai dengan minggu ini ( minggu ke 1 ) Rp 80,382,000.00

Mengetahui Menyetujui
SMPN 3 Satap Kokop Panitia Pembangunan Sekolah
Kec. Kokop Kab. Bangkalan
Selaku Penanggung Jawab
IHSANUDIN, S.Pd SUHAERI
NIP. 19700109 199104 1 001

REKAPITULASI
NCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI

NO.

I
II
III
IV
V
VI
VII
VIII
IX
X 4
XI OK
XII LAMA
XIII : PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 1 TRAGAH
: SMPN 1 TRAGAH KEC. TRAGAH KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA

TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )
PEKERJAAN PERSIAPAN ###
PEKERJAAN TANAH ###
PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA #DIV/0!
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###

JUMLAH #DIV/0! ###


DIBULATK #DIV/0! #DIV/0!

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

YUNIZAR AN NATSIRUL YUSUF H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 1 Tragah
Kec. Tragah Kab. Bangkalan

Drs. AMIRULLAH, MM
NIP. 19581217 198603 1 011

NO
1
I.
1
2
3
4

II.
1
2
4

III.
1
2
3

IV.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran atap + rangka 377.00 m² ### ###
V. Pembongkaran kusen 4.00 bh ### ###
1 Penetelan plesteran 159.60 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VI. PEKERJAAN TANAH ###
1 Galian tanah 2.16 m³ ### ###
2 Urugan pasir bawah pondasi t=10cm 0.36 m³ ### ### #DIV/0!
3 Urugan tanah kembali 1.08 m³ ### ###
4 ###
PEKERJAAN PASANGAN/PLESTERAN
VII. Pasangan 1/2 bata camp. 1 Pc : 5 Ps 7.20 m² ### ### ###
1 Plesteran 1Pc : 5Ps 14.40 m² ### ###
2 Benangan 24.00 m' ### ###
3 ###
PEKERJAAN BETON
VIII. Lantai kerja bawah pondasi 1:3:5 t=5cm 0.18 m³ ### ###
1 Pondasi beton stempat 60 x 60 x 15cm 0.54 m³ ### ###
Kolom teras 15/15 0.79 m³ ### ###
IX. Balok beton 15/20 1.71 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ ### ###
X. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Penang (baru) 382.73 m² ### ###
3 Atap genteng (lama bg. belakang) 170.10 m² ### ###
4 Genteng bubungan Karang penang 28.35 m' ### ###
Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' ### ###
XI. ###
1 PEKERJAAN KUSEN PINTU DAN JENDELA
2 Kusen kayu kempas/mahoni 6/15 #DIV/0! m³ Rp - #DIV/0!
3 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 8.61 m² Rp - Rp - #DIV/0!
4 Daun Jendela kaca kayu kempas/mahoni 3/10 8.40 m² Rp - Rp - ###
5 #DIV/0!
6 PEKERJAAN PLAFOND
Plafond calsiboard 4mm + rangka kayu 4/6 294.84 m² ### ###
XII ###
1 PEKERJAAN PENGECATAN
2 Pengecatan dinding (3 Ruang kelas) 598.50 m² ### ###
3 Pengecatan plafond 294.84 m² ### ###
4 Pengecatan kayu 206.70 m² ### ###
5 ###
6 PEKERJAAN LANTAI #DIV/0!
Keramik lantai 40 x 40 245.70 m² ### ###
XIII. Keramik dinding 25 x 40 ( 3 R.kelas + teras ) 159.60 m² ### ###
1 List keramik dinding 7cm 110.40 m² ### ###
Keramik kolom 25 x 40 12.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Engsel Pintu 18.00 bh ### ###
Engsel Jendela 16.00 bh ### ###
Grendel pintu 3.00 bh ### ###
Grendel Jendela 16.00 bh ### ###
Hag Angin 16.00 bh ### ###
###
REKAPITULASI
PEKERJAAN INSTALASI LISTRIK
NCANA ANGGARAN
Lampu BIAYA
SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
KEGI Saklar ganda 3.00 bh ### ###
PEKE Saklar tunggal 3.00 bh ### ###
LING Stop kontak + instalasi 3.00 bh ### ###
LOKA Instalasi titik lampu 15.00 ttk ### ###
###
NO. PEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 11.14 m² ### ###
###
I
II
III
IV
V
VI
VII
VIII
IX
X 4
XI OK
XII BARU
XIII : PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 1 TRAGAH
: SMPN 1 TRAGAH KEC. TRAGAH KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA

TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )
PEKERJAAN PERSIAPAN ###
PEKERJAAN TANAH ###
PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA Rp -
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###

JUMLAH ### ###


DIBULATK ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

YUNIZAR AN NATSIRUL YUSUF H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 1 Tragah
Kec. Tragah Kab. Bangkalan

Drs. AMIRULLAH, MM
NIP. 19581217 198603 1 011

NO
1
I.
1
2
3
4

II.
1
2
4

III.
1
2
3
IV.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran atap + rangka 377.00 m² ### ###
V. Pembongkaran kusen 8.00 bh ### ###
1 Penetelan plesteran 249.00 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VI. PEKERJAAN TANAH ###
1 Galian tanah 2.16 m³ ### ###
2 Urugan pasir bawah pondasi t=10cm 0.36 m³ ### ### ###
3 Urugan tanah kembali 1.08 m³ ### ###
###
VII. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 24.02 m² ### ### ###
2 Plesteran 1Pc : 5Ps 48.03 m² ### ###
3 Benangan 168.00 m' ### ###
4 ###
PEKERJAAN BETON
VIII. Lantai kerja bawah pondasi 1:3:5 t=5cm 0.18 m³ ### ###
1 Pondasi beton stempat 60 x 60 x 15cm 0.54 m³ ### ###
Kolom teras 15/15 0.79 m³ ### ###
IX. Balok beton 15/20 1.56 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ ### ###
X. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Penang (baru) 382.73 m² ### ###
3 Genteng bubungan Karang penang 28.35 m' ### ###
4 Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' ### ###
5 ###
PEKERJAAN KUSEN PINTU DAN JENDELA
XI. Kusen kayu kempas/mahoni 6/15 1.09 m³ Rp - Rp -
1 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 8.61 m² Rp - Rp - ###
2 Jalusi kayu kempas/mahoni 3/12 7.20 m² Rp - Rp -
3 Daun Jendela kaca kayu kempas/mahoni 3/10 6.72 m² Rp - Rp - ###
4 Rp -
5 PEKERJAAN PLAFOND
6 Plafond calsiboard 4mm + rangka kayu 4/6 294.84 m² ### ###
###
XII PEKERJAAN PENGECATAN
1 Pengecatan dinding (3 Ruang kelas) 598.50 m² ### ###
2 Pengecatan plafond 294.84 m² ### ###
3 Pengecatan kayu 206.70 m² ### ###
4 ###
5 PEKERJAAN LANTAI ###
6 Keramik lantai 40 x 40 245.70 m² ### ###
Keramik dinding 25 x 40 ( 3 R.kelas + teras ) 173.40 m² ### ###
XIII. List keramik dinding 7cm 132.90 m² ### ###
1 Keramik kolom 25 x 40 12.00 m² ### ###
Keramik dinding 25 x 40 ( 3 R.kelas teras saja ) 75.60 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Engsel Pintu 18.00 bh ### ###
Engsel Jendela 16.00 bh ### ###
Grendel pintu 3.00 bh ### ###
Grendel Jendela 16.00 bh ### ###
Hag Angin 16.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
REKAPITULASI
Lampu SL 8watt (teras) 3.00 bh ### ###
NCANA ANGGARAN BIAYA
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
KEGI Stop kontak + instalasi 3.00 bh ### ###
PEKE Instalasi titik lampu 15.00 ttk ### ###
LINGKUP PEKERJAAN ###
LOKAPEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 11.14 m² ### ###
NO. ###

I
II
III
IV
V
VI
VII
VIII
IX
X 5
XI OK
XII LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 MODUNG
: SMPN 2 MODUNG KEC. MODUNG KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA


TERBILANG : ( DUA RATUS LIMA JUTA ENAM RATUS RIBU RUPIAH )

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA Rp -
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN/PLAMIRAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ### ###
PEKERJAAN KACA ###

JUMLAH ### ###


DIBULAT ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

M. MAHRI, S.Ag H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Modung
Kec. Modung Kab. Bangkalan

A S U R, M.Pd
NIP. 19610117 198403 1 008

NO
1
I.
1
2

II.
1
2
3

III.
1
2
3

IV.
1
2
Lembar. 2
V. JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
1 2 3 4 5
2 PEKERJAAN PERSIAPAN
3 Pembongkaran atap + rangka 406.00 m² ### ###
4 Pembersihan akhir pekerjaan 1.00 ls ### ### ###
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 98.93 m² ### ###
2 Plesteran 1Pc : 5Ps 197.87 m² ### ###
3 Benangan 166.56 m' ### ###
###
VII. PEKERJAAN BETON
1 Kolom teras 15/15 0.41 m³ ### ###
Balok teras 15/20 1.24 m³ ### ###
VIII. Ring balk gewel 15/15 0.98 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 396.90 m² ### ###
4 Lisplank kalsiplank 8mm / 30 cm 85.70 m¹ ### ###
5 ###
PEKERJAAN ATAP
IX. Pasang atap genteng karang p enang (baru 5%) 19.85 m² ### ###
1 Pasang atap genteng (lama) 377.06 m² ### ###
Genteng bubungan karang penang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 29.00 m' ### ###
1 ###
2 PEKERJAAN KUSEN PINTU DAN JENDELA
3 Kusen kayu kempas/mahoni 6/12 0.46 m³ Rp - Rp -
4 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 6.72 m² Rp - Rp -
5 Daun Jendela kaca kayu kempas/mahoni 3/10 5.04 m² Rp - Rp -
6 Rp -
PEKERJAAN PLAFOND ###
XI. Plafond calsiboard 4mm + rangka hollow 340.20 m² ### ###
1 ###
2 PEKERJAAN PENGECATAN/PLAMIRAN
3 Pengecatan dinding (depan) 66.85 m² ### ###
4 Pelamiran dinding 430.33 m² ### ###
5 Pelamiran plafond 340.20 m² ### ### ###
6 Pengecatan kayu 206.70 m² ### ###
Cat genteng 396.90 m² ### ###
XII. ###
1 PEKERJAAN LANTAI
Lantai rabat 216.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 4.00 bh ### ###
Engsel Pintu 21.00 bh ### ###
Engsel Jendela 24.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Grendel Jendela 12.00 bh ### ### ###
Hag Angin 24.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 14.00 bh ### ###
Lampu SL 8watt (teras) 4.00 bh ### ###
Saklar ganda 7.00 bh ### ###
REKAPITULASI
Saklar tunggal 3.00 bh ### ###
NCANA ANGGARAN BIAYA
Stop kontak + instalasi 4.00 bh ### ###
Instalasi titik lampu 18.00 bh ### ###
KEGIATAN ###
PEKE PEKERJAAN KACA
LING Kaca mati t=5 mm 14.49 m² ### ###
LOKASI ###

NO.

I
II
III
IV
V
VI
VII
VIII
IX
X 5
XI OK
XII BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 MODUNG
: SMPN 2 MODUNG KEC. MODUNG KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA


TERBILANG : ( DUA RATUS LIMA JUTA ENAM RATUS RIBU RUPIAH )

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA Rp -
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN/PLAMIRAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ### -
PEKERJAAN KACA ###

JUMLAH ### ###


DIBULAT ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

M. MAHRI, S.Ag H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Modung
Kec. Modung Kab. Bangkalan

A S U R, M.Pd
NIP. 19610117 198403 1 008

NO
1
I.
1
2

II.
1
2
3

III.
1
2
3

IV.
1
2
Lembar. 2
V. JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
1 2 3 4 5
2 PEKERJAAN PERSIAPAN
3 Pembongkaran atap + rangka 406.00 m² ### ###
4 Pembersihan akhir pekerjaan 1.00 ls ### ### ###
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 98.93 m² ### ###
2 Plesteran 1Pc : 5Ps 197.87 m² ### ###
3 Benangan 166.56 m' ### ###
###
VII. PEKERJAAN BETON
1 Kolom teras 15/15 0.41 m³ ### ###
Balok teras 15/20 1.24 m³ ### ###
VIII. Ring balk gewel 15/15 0.98 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 396.90 m² ### ###
4 Lisplank kalsiplank 8mm / 30 cm 85.70 m¹ ### ###
5 ###
PEKERJAAN ATAP
IX. Pasang atap genteng karang p enang (baru 5%) 19.85 m² ### ###
1 Pasang atap genteng (lama) 377.06 m² ### ###
Genteng bubungan karang penang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 29.00 m' ### ###
1 ###
2 PEKERJAAN KUSEN PINTU DAN JENDELA
3 Kusen kayu kempas/mahoni 6/12 0.46 m³ Rp - Rp -
4 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 6.72 m² Rp - Rp -
5 Daun Jendela kaca kayu kempas/mahoni 3/10 5.04 m² Rp - Rp -
6 Rp -
PEKERJAAN PLAFOND ###
XI. Plafond calsiboard 4mm + rangka kayu 4/6 340.20 m² ### ###
1 ###
2 PEKERJAAN PENGECATAN/PLAMIRAN
3 Pengecatan dinding (depan) 66.85 m² ### ###
4 Pelamiran dinding 430.33 m² ### ###
5 Pelamiran plafond 340.20 m² ### ### ###
6 Pengecatan kayu 206.70 m² ### ###
Cat genteng 396.90 m² ### ###
XII. ###
1 PEKERJAAN LANTAI
Lantai rabat 216.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 4.00 bh ### ###
Engsel Pintu 21.00 bh ### ###
Engsel Jendela 24.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Grendel Jendela 12.00 bh ### ### ###
Hag Angin 24.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 14.00 bh ### ###
Lampu SL 8watt (teras) 4.00 bh ### ###
Saklar ganda 7.00 bh ### ###
REKAPITULASI
Saklar tunggal 3.00 bh ### ###
NCANA ANGGARAN BIAYA
Stop kontak + instalasi 4.00 bh ### ###
Instalasi titik lampu 18.00 bh ### ###
KEGIATAN ###
PEKE PEKERJAAN KACA
LING Kaca mati t=5 mm 14.49 m² ### ###
LOKASI ###

NO.

I
II
III
IV
V
VI
VII
VIII
IX
X 6
XI OK
LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 2 LABANG
: SMPN 2 LABANG KEC. LABANG KAB. BANGKALAN

TERBILANG : ( DUA RATUS SEMBILAN


URAIAN
PULUHPEKERJAAN
EN JUMLAH HARGA

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN Rp -
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
PEKERJAAN TANGGA DEPAN PINTU ###

JUMLAH ### ###


DIBULATK ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
ACHMAD TAUFIK HEYKAL, A.Sg H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Labang
Kec. Labang Kab. Bangkalan

Drs. HARTONO, M.Pd


NIP. 19690126 199802 1 003

NO
1
I.
1
2
3
4
5

II.
1

III.
1
2

IV.
1
2
3 Lembar. 2
JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
V. 2 3 4 5
1 PEKERJAAN PERSIAPAN ###
Pembongkaran atap + rangka 377.00 m² Rp - Rp -
VI. Pembongkaran kosen 1.00 bh ### ###
1 Pembongkaran dinding 6.00 m² ### ###
2 Penetelan plesteran 139.74 m² ### ###
3 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VII. PEKERJAAN PASANGAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps (nyepit kuda2) 30.91 m² Rp - Rp -
2 Rp -
3 PEKERJAAN RANGKA ATAP ###
4 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ Rp - Rp -
VIII. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Pilang (baru) 382.73 m² ### ###
Genteng bubungan Karang pilang 28.35 m' ### ###
IX. Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' Rp - Rp -
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsiboard 4mm + rangka hollow 354.38 m² Rp - Rp -
4 Rp -
5 PEKERJAAN PENGECATAN
6 Pengecatan dinding 598.50 m² Rp - Rp - ###
Pengecatan plafond 354.38 m² Rp - Rp -
X. Pengecatan kayu 274.60 m² Rp - Rp -
1 Rp -
PEKERJAAN LANTAI
XI. Keramik lantai 40 x 40 243.00 m² ### ###
1 Keramik dinding 25 x 40 139.74 m² ### ###
2 List keramik 102.00 m' ### ###
3 Keramik kolom 20 x 40 10.80 m² ### ###
4 ###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA ###
Kaca mati t=5 mm (yg pecah) 4.22 m² ### ###
###
PEKERJAAN TANGGA DEPAN PINTU
Pasangan batu gunung 2.88 m³ ### ###
Plesterran trasram 7.68 m² ### ###
Keramik kasar 40 x 40 7.04 m² ### ###
Urugan pasir 4.96 m³ ### ###
REKAPITULASI ###
NCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI

NO.

I
II
III
IV
V
VI
VII
VIII
IX
X 6
XI OK
XII BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 2 LABANG
: SMPN 2 LABANG KEC. LABANG KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA


TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
PEKERJAAN TANGGA DEPAN PINTU ###

JUMLAH ### ###


DIBULATK ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

ACHMAD TAUFIK HEYKAL, A.Sg H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Labang
Kec. Labang Kab. Bangkalan
Drs. HARTONO, M.Pd
NIP. 19690126 199802 1 003

NO
1
I.
1
2
3
4
5

II.
1
2
3

III.
1

IV.
1
2 Lembar. 2
JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
V. 2 3 4 5
1 PEKERJAAN PERSIAPAN ###
2 Pembongkaran atap + rangka 377.00 m² Rp - Rp -
3 Pembongkaran kosen 1.00 bh ### ###
Pembongkaran dinding 6.00 m² ### ###
VI. Penetelan plesteran 127.50 m² ### ###
1 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VII. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps (nyepit kuda2) 22.43 m² Rp - Rp - -
2 Plesteran 1Pc : 5Ps 16.20 m² ### ###
3 Benangan 32.00 m' ### ###
###
VIII. PEKERJAAN BETON
1 Ring balk gewel 15/15 0.40 m³ ### ###
2 ###
3 PEKERJAAN RANGKA ATAP ###
4 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ Rp - Rp -
IX. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Pilang (baru) 382.73 m² ### ###
Genteng bubungan Karang pilang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' Rp - Rp -
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsiboard 4mm + rangka hollow 354.38 m² Rp - Rp -
4 Rp -
5 PEKERJAAN PENGECATAN
6 Pengecatan dinding 598.50 m² Rp - Rp - ###
Pengecatan plafond 354.38 m² Rp - Rp -
XI. Pengecatan kayu 274.60 m² Rp - Rp -
1 Rp -
PEKERJAAN LANTAI
XII. Keramik lantai 40 x 40 243.00 m² ### ###
1 Keramik dinding 25 x 40 127.50 m² ### ###
2 List keramik 102.00 m' ### ###
3 Keramik kolom 20 x 40 10.80 m² ### ###
4 ###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Pintu harmonika 15.00 m² ### ### ###
### ###
PEKERJAAN INSTALASI LISTRIK ###
Lampu SL 14 watt 12.00 bh ### ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA ###
Kaca mati t=5 mm (yg pecah) 4.22 m² ### ###
###
PEKERJAAN TANGGA DEPAN PINTU 3.46
Pasangan batu gunung 2.88 m³ ### ###
Plesterran trasram 7.68 m² ### ###
Keramik kasar 40 x 40 7.04 m² ### ###
Urugan pasir 4.96 m³ ### ###
###
REKAPITULASI
NCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI

NO.

I
II
III
IV
V
VI
VII
VIII
IX
X 7
OK
LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 KWANYAR
: SMPN 2 KWANYAR KEC. KWANYAR KAB. BANGKALAN
TERBILANG : ( SERATUS SEMBILAN PULUH TUJUH JUTA DELAPAN RATUS RIBU RUPIAH )
URAIAN PEKERJAAN JUMLAH HARGA

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN/PLESTERAN Rp -
PEKERJAAN KAYU ###
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
PEKERJAAN TEMPAT DUDUK ###

JUMLAH ### ###


DIBULAT ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

MOHAMMAD MUSTOFA ZAHRON, S.Pd H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Kwanyar
Kec. Kwanyar Kab. Bangkalan

RAHMAWATI, M.Pd
NIP. 19700703 199802 2 003

NO
1
I.
1
2
3
4

II.
1
2

III.
1

IV.
1

V.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran kusen 1.00 bh ### ###
VI. Pembongkaran dinding 15.00 m² ### ###
1 Penetelan plesteran 428.64 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 Ls ### ###
3 ###
4 PEKERJAAN PASANGAN/PLESTERAN ###
5 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 0.91 22.20 m² Rp - Rp -
6 Plesteran 1Pc : 5Ps 1.07 44.40 m² Rp - Rp -
Rp -
VII. PEKERJAAN KAYU
1 Lisplank kayu 3/30 cm 4.00 m¹ ### ###
2 ###
3 PEKERJAAN PLAFOND
4 Plafond calsi 1 x 1 + rangka kayu 12.00 m² Rp - Rp -
Rp -
VIII. PEKERJAAN PENGECATAN
1 Pengecatan dinding (3 kelas) 455.30 m² Rp - Rp -
2 Pengecatan plafond 319.00 m² Rp - Rp -
3 Pengecatan kayu 206.70 m² Rp - Rp - ###
4 Pengecatan kayu (Kantor) 214.39 m² Rp - Rp -
5 Rp -
6PEKERJAAN LANTAI 162.00 ###
Keramik lantai 40 x 40 ( 2 R Kelas ) 5.67 126.00 m² ### ###
IX. Keramik lantai 40 x 40 ( Teras ) 1.62 36.00 m² ### ###
1 Keramik dinding 25 x 40 (dalam kelas + teras) 5.78 128.40 m² ### ###
Keramik kolom teras 25 x 40 1.01 22.40 m² ### ###
X. List keramik 1.64 327.80 m' ### ###
1 Keramik dinding 25 x 40 (dalam kantor+R.guru+ t 13.51 300.24 m² ### ###
2 451.04 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 3.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Hag Angin 60.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
REKAPITULASI
PEKERJAAN KACA
NCANA ANGGARAN BIAYA
Kaca mati t=5 mm (yg pecah) 1.68 m² ### ###
###
KEGI PEKERJAAN TEMPAT DUDUK
PEKE Pasangan trasram 0.68 17.00 m² Rp - Rp -
LING Plat beton tempat duduk t=10 cm 0.53 1.02 m³ ### ###
LOKA Keramik tempat duduk 30 x 30 0.46 10.20 m² ### ###
Keramik dinding tempat duduk 25 x 40 1.84 40.80 m² ### ###
NO. 34.71 ###
0.86768 40.80

I
II
III
IV
V
VI
VII
VIII
IX
X 7
OK
BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 KWANYAR
: SMPN 2 KWANYAR KEC. KWANYAR KAB. BANGKALAN
TERBILANG : ( SERATUS SEMBILAN PULUH TUJUH JUTA DELAPAN RATUS RIBU RUPIAH )
URAIAN PEKERJAAN JUMLAH HARGA
PEKERJAAN PERSIAPAN ###
PEKERJAAN PASANGAN/PLESTERAN Rp -
PEKERJAAN KAYU ###
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
PEKERJAAN TEMPAT DUDUK ###

JUMLAH ### ###


DIBULAT ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

MOHAMMAD MUSTOFA ZAHRON, S.Pd H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Kwanyar
Kec. Kwanyar Kab. Bangkalan

RAHMAWATI, M.Pd
NIP. 19700703 199802 2 003

NO
1
I.
1
2
3
4

II.
1
2

III.
1
2

IV.
1

V. Lembar. 2
1 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
2 2 3 4 5
3 PEKERJAAN PERSIAPAN
4 Pembongkaran kusen 1.00 bh ### ###
5 Pembongkaran dinding 15.00 m² ### ###
Penetelan plesteran 428.64 m² ### ###
VI. Pembersihan akhir pekerjaan 1.00 Ls ### ###
1 ###
2 PEKERJAAN PASANGAN/PLESTERAN ###
3 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 22.20 m² Rp - Rp -
4 Plesteran 1Pc : 5Ps 44.40 m² Rp - Rp -
5 Rp -
6 PEKERJAAN KAYU
Perbaikan daun pintu panil 4.00 bh ### ###
VII. Lisplank kayu 3/30 cm 4.00 m¹ ### ###
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsi 1 x 1 + rangka kayu 12.00 m² Rp - Rp -
4 Rp -
PEKERJAAN PENGECATAN
VIII. Pengecatan dinding (3 kelas) 439.90 m² Rp - Rp -
1 Pengecatan dinding (Kantor) 373.40 m² Rp - Rp -
2 Pengecatan plafond 319.00 m² Rp - Rp -
3 Pengecatan kayu 169.45 m² Rp - Rp - ###
4 Pengecatan kayu (Kantor) 197.69 m² Rp - Rp -
5 Rp -
6 PEKERJAAN LANTAI ###
Keramik lantai 40 x 40 ( 2 R Kelas ) 126.00 m² ### ###
IX. Keramik lantai 40 x 40 ( Teras ) 36.00 m² ### ###
1 Keramik dinding 25 x 40 (dalam kelas + teras) 128.40 m² ### ###
Keramik kolom teras 25 x 40 22.40 m² ### ###
X. List keramik 327.80 m' ### ###
1 Keramik dinding 25 x 40 (dalam kantor+R.guru+ teras) 300.24 m² ### ###
2 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 3.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Hag Angin 60.00 bh ### ###
Pintu harmonika 11.30 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK ###
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA
REKAPITULASI
Kaca mati t=5 mm (yg pecah) 1.68 m² ### ###
NCANA ANGGARAN BIAYA ###
PEKERJAAN TEMPAT DUDUK
KEGI Pasangan trasram 17.00 m² Rp - Rp -
PEKE Plat beton tempat duduk t=10 cm 1.02 m³ ### ###
LING Keramik tempat duduk 30 x 30 10.20 m² ### ###
LOKA Keramik dinding tempat duduk 25 x 40 40.80 m² ### ###
###
NO.

I
II
III
IV
V
VI
VII
VIII
IX
8
OK

: PENGADAAN SARANA PRASARANA


: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 KOKOP
TERBILANG : ( SERATU : SMPN 2 KOKOP KEC. KOKOP KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN/PLESTERAN Rp -
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ### ###
PEKERJAAN KACA ###
PEKERJAAN TEMPAT DUDUK ###

JUMLAH ### ###


DIBULATK ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

BOSTOMI, S.Pd H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Kokop
Kec. Kokop Kab. Bangkalan

MOHAMMAD TAUFIK, SPd


NIP. 19760326 200604 1 010
NO
1
I.
1
2

II.
1
2
3
III.
1

IV.
1
2
3

V. Lembar. 2
1 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
2 2 3 4 5
3 PEKERJAAN PERSIAPAN
4 Penetelan plesteran 317.46 m² ### ###
5 Pembersihan akhir pekerjaan 1.00 Ls Rp - Rp - #REF!
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 12.25 m² Rp - Rp -
5 Plesteran 1Pc : 5Ps 80.58 m² Rp - Rp -
6 Benangan 55.00 m' Rp - Rp -
7 Rp -
PEKERJAAN PLAFOND
VII. Plafond calsiboard 4mm + rangka kayu 15.00 m² Rp - Rp -
1 Rp -
2 PEKERJAAN PENGECATAN -
3 Pengecatan dinding 506.50 m² Rp - Rp -
4 Pengecatan plafond 352.00 m² Rp - Rp - #DIV/0!
5 Pengecatan kayu 275.60 m² Rp - Rp -
6 Rp -
PEKERJAAN LANTAI ###
VIII. Keramik lantai 40 x 40 243.00 m² ### ### 147.47
1 Keramik dinding 25 x 40 ( 3 R. Kelas + teras) 132.96 m² ### ###
List keramik 288.20 m' ### ###
IX. Keramik kolom 25 x 40 16.00 m² ### ###
1 Keramik dinding 25 x 40 ( 5 R. Kelas bg. dalam) 184.50 m² ### ###
2 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 5.00 bh ### ###
Grendel Jendela 50.00 bh ### ###
Hag Angin 100.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 20.00 bh ### ###
Lampu SL 8watt (teras) 5.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 5.00 bh ### ###
Stop kontak + instalasi 5.00 bh ### ###
Instalasi titik lampu 25.00 ttk ### ###
###
PEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 2.53 m² ### ###
###
PEKERJAAN TEMPAT DUDUK
Pasangan trasram 14.70 m² Rp - Rp -
Plat beton tempat duduk t=10 cm 0.74 m³ ### ###
Keramik tempat duduk 30 x 30 7.35 m² ### ###
Keramik dinding tempat duduk 25 x 40 29.40 m² ### ###
###

BATAS
SINERGI 1 SMPN 2 SEPULU DR. AHMAD SABARUDIN, S.Pd, M.MPd
SINERGI 2 SMPN 1 KLAMPIS IMAM SYAFII, S.Pd, MPd
SINERGI 3 SMPN 2 KOKOP MOHAMMAD TAUFIK, SPd
SINERGI 4 SMPN 3 SATAP KOKOP IHSANUDIN, S.Pd
INDRAKILA 5 SMPN 1 TRAGAH Drs. AMIRULLAH, MM
INDRAKILA 6 SMPN 2 MODUNG A S U R, M.Pd
INDRAKILA 7 SMPN 2 LABANG Drs. HARTONO, M.Pd
INDRAKILA 8 SMPN 2 KWANYAR RAHMAWATI, M.Pd
9 SMPN TAHAL AMIN H. ABDULLAH, S.Pd
10 SMPN 1 MODUNG Drs. ALI MUSTOFA, M.Pd
11 SMPN 1 GALIS Drs. TAUFIKUR RAHMAN
12 SMPN 1 KOKOP BUDIONO, S.Pd, M.Pd

13 SMPN 2 KONANG ABDUL RASID, S.Ag, M.PdI


14 SMPN TAHAL AMIN H. ABDULLAH, S.Pd

SMPN 1 KWANYAR MOHAMMAD SADALI, S.Pd


SMPN 1 TANJUNG BUMI Drs. M. AGUS SUBAGIO, M.Pd
SMPN 1 BLEGA SRI ASTUTIK HANDAYANI, M.Pd
SMPN 1 LABANG SUPRIYO, S.Pd, SE, M.PdI

SMPN 1 KWANYAR KEC. KWANYAR KAB. BANGKALAN MOHAMMAD SADALI, S.Pd


SMPN 1 TANJUNG BUMI KEC. TANJUNG BUMI KAB. BAN Drs. M. AGUS SUBAGIO, M.Pd
SMPN 1 BLEGA KEC. BLEGA KAB. BANGKALAN SRI ASTUTIK HANDAYANI, M.Pd
SMPN 2 TANAH MERAH KEC. T KOMARIYAH, S.Pd, M.MPd
SMPN TAHAL AMIN H. ABDULLAH, S.Pd
SMPN 1 GEGER Hj. SRI MULYATI, S.Pd, M.MPd
SMPN 1 GALIS
SMPN 1 TANAH MERAH DYAH CHANDRAWATI, S.Pd
SMPN 2 GEGER SITI YAUMAH, S.Pd
SMPN 4 SATAP TANAH MERA MOH. YUSUF, S.Pd
SMPN 1 KONANG Drs. ANANG ISKANDAR, MM

28.5
23.5
7.833333

1 ( Satu )
5 Oktob. s/d 10 Oktober 2015
Oktober 2015
29 Oktober 2015
Rp. 212.320.000.00
Prestasi Pekerjaan Prestasi Pekerjaan
Minggu Ini (%) Komulatif (%)
Rerata Prestasi Rerata
(9) (10) (11)
(8)/100x(5) (6)+(8) (7)+(9)

0.97 100.00 0.97 Rp 12,375.00 Rp 1,769,625.00


0.97 100.00 0.97 Rp 7,500.00 Rp 1,761,750.00
1.01 100.00 1.01 Rp 20,000.00 Rp 1,843,200.00
- - - Rp 200,000.00 Rp 200,000.00
Rp 5,574,575.00

- - - Rp 88,586.67 Rp 1,638,853.33
- - - Rp 42,298.80 Rp 1,565,055.60
- - - Rp - Rp -
Rp 3,203,908.93

- - - Rp 3,912,550.00 Rp 234,753.00
- - - Rp 3,962,550.00 Rp 114,121.44
- - - Rp 3,962,550.00 Rp 1,027,092.96
- - - Rp 3,962,550.00 Rp 1,255,335.84
Rp 2,631,303.24

- - - Rp 185,000.00 Rp 25,849,125.00
- - - Rp 185,000.00 Rp 21,929,437.50
- - - Rp 65,000.00 Rp 3,100,500.00
Rp 50,879,062.50

- - - Rp 18,000.00 Rp 2,515,050.00
- - - Rp 110,000.00 Rp 26,078,250.00
- - - Rp 95,820.00 Rp 2,558,394.00
- - - Rp 21,149.40 Rp 1,184,366.40
Rp 32,336,060.40

- - - Rp 85,000.00 Rp 22,185,000.00
Rp 22,185,000.00

- - - Rp 20,740.00 Rp 10,805,637.48
- - - Rp 20,740.00 Rp 5,413,140.00
- - - Rp 42,450.00 Rp 4,752,702.00
Rp 20,971,479.48

- - - Rp 105,250.00 Rp 3,315,375.00
- - - Rp 112,000.00 Rp 16,800,000.00
- - - Rp 136,075.00 Rp 12,540,672.00
- - - Rp 85,000.00 Rp 6,528,000.00
Rp 39,184,047.00

- - - Rp 55,000.00 Rp 660,000.00
- - - Rp 50,000.00 Rp 150,000.00
- - - Rp 20,000.00 Rp 80,000.00
- - - Rp 15,000.00 Rp 75,000.00
- - - Rp 225,000.00 Rp 1,125,000.00
Rp 200,000.00 Rp 3,000,000.00
Rp 5,090,000.00
- - - Rp 112,125.00 Rp 376,964.25
Rp 376,964.25

2.95 2.95

Rp 20,300,000.00 2.95 %
1 ( Satu )
5 Oktob. s/d 10 Oktober 2015
Oktober 2015
29 Oktober 2015

Prestasi Pekerjaan Prestasi Pekerjaan


Minggu Ini (%) Komulatif (%)
Rerata Prestasi Rerata
(9) (10) (11)
(8)/100x(5) (6)+(8) (7)+(9)
0.20 100.00 0.20 Rp 50,000.00 Rp 600,000.00
0.08 100.00 0.08 Rp 20,000.00 Rp 240,000.00
- - - Rp 200,000.00 Rp 200,000.00
Rp 1,040,000.00

- - - Rp 58,500.00 Rp 126,360.00
- - - Rp 215,400.00 Rp 77,544.00
- - - Rp 16,110.00 Rp 17,398.80
Rp 221,302.80

- - - Rp 88,586.67 Rp 3,790,281.61
- - - Rp 42,298.80 Rp 3,619,604.84
- - - Rp 11,825.00 Rp 3,651,560.00
Rp 11,061,446.45

- - - Rp 897,800.00 Rp 161,604.00
- - - Rp 3,962,550.00 Rp 2,139,777.00
- - - Rp 3,962,550.00 Rp 3,120,508.13
- - - Rp 3,962,550.00 Rp 5,943,825.00
- - - Rp 3,962,550.00 Rp 9,510,120.00
- - - Rp 3,962,550.00 Rp 941,501.88
Rp 21,817,336.01

- - - Rp 210,000.00 Rp 77,723,100.00
- - - Rp 65,000.00 Rp 5,063,500.00
Rp 82,786,600.00

- - - Rp 80,500.00 Rp 16,325,400.00
- - - Rp 18,000.00 Rp 3,011,580.00
- - - Rp 95,820.00 Rp 2,429,037.00
- - - Rp 21,149.40 Rp 617,562.48
Rp 22,383,579.48

- - - Rp 11,431,250.00 Rp 14,644,117.13
- - - Rp 618,250.00 Rp 5,375,065.50
- - - Rp 430,475.00 Rp 7,148,037.38
- - - Rp 419,572.50 Rp 4,833,475.20
Rp 32,000,695.20

- - - Rp 85,000.00 Rp 25,857,000.00
Rp 25,857,000.00

- - - Rp 20,740.00 Rp 12,412,890.00
- - - Rp 20,740.00 Rp 6,309,108.00
- - - Rp 42,450.00 Rp 8,774,415.00
Rp 27,496,413.00

- - - Rp 112,000.00 Rp 26,880,000.00
- - - Rp 136,075.00 Rp 17,662,535.00
- - - Rp 136,075.00 Rp 870,880.00
- - - Rp 85,000.00 Rp 10,115,000.00
Rp 55,528,415.00

- - - Rp 140,750.00 Rp 422,250.00
- - - Rp 23,625.00 Rp 425,250.00
- - - Rp 16,687.50 Rp 267,000.00
- - - Rp 74,250.00 Rp 222,750.00
- - - Rp 14,750.00 Rp 236,000.00
- - - Rp 17,750.00 Rp 284,000.00
Rp 1,857,250.00

- - - Rp 55,000.00 Rp 660,000.00
- - - Rp 50,000.00 Rp 150,000.00
- - - Rp 20,000.00 Rp 60,000.00
- - - Rp 15,000.00 Rp 45,000.00
- - - Rp 225,000.00 Rp 675,000.00
- - - Rp 200,000.00 Rp 3,000,000.00
Rp 4,590,000.00

- - - Rp 112,125.00 Rp 3,038,587.50
Rp 3,038,587.50

0.28 -
Rp 20,300,000.00 - %
1 ( Satu )
5 Oktob. s/d 10 Oktober 2015
Oktober 2015
29 Oktober 2015

Prestasi Pekerjaan Prestasi Pekerjaan


Minggu Ini (%) Komulatif (%)
Rerata Prestasi Rerata Lembar. 2
(9) (10) (11) HARGA SATUAN JUMLAH HARGA
(8)/100x(5) (6)+(8) (7)+(9) 4 5

- 100.00 1.70 Rp 12,375.00 Rp 3,217,500.00


- 100.00 0.32 Rp 50,000.00 Rp 600,000.00
- 100.00 0.65 Rp 20,000.00 Rp 1,235,000.00
- - - Rp 200,000.00 Rp 200,000.00
Rp 5,252,500.00

- 100.00 0.05 Rp 58,500.00 Rp 88,452.00


- 100.00 0.03 Rp 215,400.00 Rp 54,280.80
- 100.00 0.01 Rp 16,110.00 Rp 12,179.16
Rp 154,911.96

- 100.00 4.29 Rp 88,586.67 Rp 8,133,700.58


- 100.00 4.10 Rp 42,298.80 Rp 7,767,439.21
- 100.00 1.08 Rp 11,825.00 Rp 2,045,725.00
Rp 17,946,864.80

- 100.00 0.15 Rp 897,800.00 Rp 274,726.80


- 100.00 0.79 Rp 3,962,550.00 Rp 1,497,843.90
0.25 100.00 0.99 Rp 3,962,550.00 Rp 1,872,304.88
2.23 100.00 2.23 Rp 3,962,550.00 Rp 4,220,115.75
2.64 100.00 2.64 Rp 3,962,550.00 Rp 4,992,813.00
1.17 100.00 1.17 Rp 3,962,550.00 Rp 2,225,368.08
Rp 15,083,172.41

7.11 25.00 7.11 Rp 210,000.00 Rp 53,841,375.00


- - - Rp 65,000.00 Rp 4,238,000.00
Rp 58,079,375.00

- - - Rp 80,500.00 Rp 15,344,910.00
- - - Rp 18,000.00 Rp 2,002,725.00
- - - Rp 95,820.00 Rp 1,854,117.00
- - - Rp 21,149.40 Rp 560,459.10
Rp 19,762,211.10

- 100.00 5.81 Rp 115,000.00 Rp 11,012,400.00


- 100.00 4.22 Rp 2,000,000.00 Rp 8,000,000.00
- 100.00 2.11 Rp 500,000.00 Rp 4,000,000.00
Rp 23,012,400.00

- - - Rp 85,000.00 Rp 17,105,400.00
Rp 17,105,400.00

0.30 50.00 0.30 Rp 20,740.00 Rp 1,119,960.00


0.88 50.00 0.88 Rp 9,670.00 Rp 3,331,315.00
0.26 100.00 1.03 Rp 9,670.00 Rp 1,945,990.80
- - - Rp 42,450.00 Rp 830,322.00
Rp 7,227,587.80

- - - Rp 112,000.00 Rp 18,144,000.00
- - - Rp 136,075.00 Rp 762,020.00
Rp 18,906,020.00

0.15 100.00 0.15 Rp 140,750.00 Rp 281,500.00


0.15 100.00 0.15 Rp 23,625.00 Rp 283,500.00
0.14 100.00 0.14 Rp 16,687.50 Rp 267,000.00
0.08 100.00 0.08 Rp 74,250.00 Rp 148,500.00
0.12 100.00 0.12 Rp 14,750.00 Rp 236,000.00
0.15 100.00 0.15 Rp 17,750.00 Rp 284,000.00
Rp 1,500,500.00

- - - Rp 55,000.00 Rp 440,000.00
- - - Rp 50,000.00 Rp 100,000.00
- - - Rp 20,000.00 Rp 40,000.00
- - - Rp 15,000.00 Rp 30,000.00
- - - Rp 225,000.00 Rp 450,000.00
- - - Rp 200,000.00 Rp 2,000,000.00
Rp 3,060,000.00

- - - Rp 112,125.00 Rp 2,318,745.00
Rp 2,318,745.00
15.62 42.44
Rp 80,382,000.00 42.44 %

Bangkalan, 2018 Rp 189,409,688.06


Dibuat oleh 80382321.2108365
Fasilitator / Perencana Rp 80,382,000.00
H. SUBADRIH, ST, MT

LAMA
140

BARU
LAMA
BARU
LAMA
BARU
LAMA
BARU
keramik tambal sulam
SADALI, S.Pd
UBAGIO, M.Pd
NDAYANI, M.Pd
1 2 3 4 5

0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
1.01 100 1.01 100 1.01 100 1.01 100 1.01 100
0.11 - - - - - - - - -
0.90 - - 100 0.90 100 0.90 100 0.90 100
0.86 - - - - 100 0.86 100 0.86 100
- - - - - 100 - 100 - 100

0.13 - - - - - - 50 0.06 100


0.06 - - - - - - - - 100
0.56 - - - - - - - - 100
0.69 - - - - - - - - 50

14.17 - - - - - - - - -
12.02 - - - - - - - - -
1.70 - - - - - - - - -

1.38 - - - - - - - - -
14.29 - - - - - - - - -
1.40 - - - - - - - - -
0.65 - - - - - - - - -

12.16 - - - - - - - - -

5.92 - - - - - - - - -
2.97 - - - - - - - - -
2.61 - - - - - - - - -

1.82 - - - - - - - - -
9.21 - - - - - - - - -
6.87 - - - - - - - - -
3.58 - - - - - - - - -

0.36 - - - - - - - - -
0.08 - - - - - - - - -
0.04 - - - - - - - - -
0.04 - - - - - - - - -
0.62 - - - - - - - - -
1.64 - - - - - - - - -
0.21 - - - - - - - - -
1 2 3 4 5
0.20 100 0.20 100 0.20 100 0.20 100 0.20 100
0.08 100 0.08 100 0.08 100 0.08 100 0.08 100
0.07 - - - - - - - - -

0.04 - - 100 0.04 100 0.04 100 0.04 100


0.03 - - - - 100 0.03 100 0.03 100
0.01 - - - - 100 0.01 100 0.01 100

1.24 - - - - - - 50 0.62 100


1.19 - - - - - - - - 100
1.20 - - - - - - - - 100

0.05 - - - - - - 25 0.01 50
0.70 - - - - - - - - 50
1.02 - - - - - - - - -
1.95 - - - - - - - - -
3.12 - - - - - - - - 50
0.31 - - - - - - - - 75

25.51 - - - - - - - - -
1.66 - - - - - - - - -

5.36 - - - - - - - - -
0.99 - - - - - - - - -
0.80 - - - - - - - - -
0.20 - - - - - - - - -

4.81 - - - - - - - - 50
1.76 - - - - - - - - -
2.35 - - - - - - - - -
1.59 - - - - - - - - -

8.49 - - - - - - - - -

4.07 - - - - - - - - -
2.07 - - - - - - - - -
2.88 - - - - - - - - -

8.82 - - - - - - - - -
5.80 - - - - - - - - -
0.29 - - - - - - - - -
3.32 - - - - - - - - -

0.14 - - - - - - - - -
0.14 - - - - - - - - -
0.09 - - - - - - - - -
0.07 - - - - - - - - -
0.08 - - - - - - - - -
0.09 - - - - - - - - -

0.22 - - - - - - - - -
0.05 - - - - - - - - -
0.02 - - - - - - - - -
0.01 - - - - - - - - -
0.22 - - - - - - - - -
0.98 - - - - - - - - -

1.00 - - - - - - - - -
1 2 3 4 5

1.70 100 1.70 100 1.70 100 1.70 100 1.70 100
0.32 100 0.32 100 0.32 100 0.32 100 0.32 100
0.65 100 0.65 100 0.65 100 0.65 100 0.65 100
0.11 - - - - - - - - -

0.05 100 0.05 100 0.05 100 0.05 100 0.05 100
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100
0.01 50 0.00 100 0.01 100 0.01 100 0.01 100

4.29 - - 100 4.29 100 4.29 100 4.29 100


4.10 - - 100 4.10 100 4.10 100 4.10 100
1.08 - - 15 0.16 100 1.08 100 1.08 100

0.15 - - - - 75 0.11 100 0.15 100


0.79 - - - - - - 50 0.40 100
0.99 - - - - - - 10 0.10 75
2.23 - - - - - - - - -
2.64 - - - - - - - - -
1.17 - - - - - - - - -
28.43 - - - - - - - - -
2.24 - - - - - - - - -

8.10 - - - - - - - - -
1.06 - - - - - - - - -
0.98 - - - - - - - - -
0.30 - - - - - - - - -

5.81 - - - - 75 4.36 100 5.81 100


4.22 - - - - 15 0.63 55 2.32 100
2.11 - - - - - - - - 100

9.03 - - - - - - - - -

0.59 - - - - - - - - -
1.76 - - - - - - - - -
1.03 - - - - - - - - 75
0.44 - - - - - - - - -

9.58 - - - - - - - - -
0.40 - - - - - - - - -

0.15 - - - - - - - - -
0.15 - - - - - - - - -
0.14 - - - - - - - - -
0.08 - - - - - - - - -
0.12 - - - - - - - - -
0.15 - - - - - - - - -

0.23 - - - - - - - - -
0.05 - - - - - - - - -
0.02 - - - - - - - - -
0.02 - - - - - - - - -
0.24 - - - - - - - - -
1.06 - - - - - - - - -

1.22 - - - - - - - - -
6 7 8 9 10

0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
1.01 100 1.01 100 1.01 100 1.01 100 1.01 100
- - - - - - - 100 0.11 100
0.90 100 0.90 100 0.90 100 0.90 100 0.90 100
0.86 100 0.86 100 0.86 100 0.86 100 0.86 100
- 100 - 100 - 100 - 100 - 100

0.13 100 0.13 100 0.13 100 0.13 100 0.13 100
0.06 100 0.06 100 0.06 100 0.06 100 0.06 100
0.56 100 0.56 100 0.56 100 0.56 100 0.56 100
0.34 100 0.69 100 0.69 100 0.69 100 0.69 100

- 100 14.17 100 14.17 100 14.17 100 14.17 100


- 100 12.02 100 12.02 100 12.02 100 12.02 100
- 25 0.42 100 1.70 100 1.70 100 1.70 100

- - - - - 100 1.38 100 1.38 100


- - - - - 100 14.29 100 14.29 100
- - - - - 100 1.40 100 1.40 100
- - - - - 100 0.65 100 0.65 100

- - - - - - - 100 12.16 100

- - - - - 50 2.96 100 5.92 100


- - - - - - - 100 2.97 100
- - - - - - - 100 2.61 100

- - - - - 50 0.91 100 1.82 100


- - - - - 100 9.21 100 9.21 100
- - - - - - - 100 6.87 100
- - - - - - - - - 100

- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
6 7 8 9 10
0.20 100 0.20 100 0.20 100 0.20 100 0.20 100
0.08 100 0.08 100 0.08 100 0.08 100 0.08 100
- - - - - - - - - 100

0.04 100 0.04 100 0.04 100 0.04 100 0.04 100
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100
0.01 100 0.01 100 0.01 100 0.01 100 0.01 100

1.24 100 1.24 100 1.24 100 1.24 100 1.24 100
1.19 100 1.19 100 1.19 100 1.19 100 1.19 100
1.20 100 1.20 100 1.20 100 1.20 100 1.20 100

0.03 100 0.05 100 0.05 100 0.05 100 0.05 100
0.35 100 0.70 100 0.70 100 0.70 100 0.70 100
- 50 0.51 100 1.02 100 1.02 100 1.02 100
- 50 0.98 100 1.95 100 1.95 100 1.95 100
1.56 75 2.34 100 3.12 100 3.12 100 3.12 100
0.23 100 0.31 100 0.31 100 0.31 100 0.31 100

- - - 100 25.51 100 25.51 100 25.51 100


- - - - - 100 1.66 100 1.66 100

- - - - - 50 2.68 100 5.36 100


- - - - - 50 0.49 100 0.99 100
- - - - - - - 100 0.80 100
- - - - - - - 100 0.20 100

2.40 100 4.81 100 4.81 100 4.81 100 4.81 100
- - - - - - - 100 1.76 100
- - - - - - - 100 2.35 100
- - - - - 50 0.79 100 1.59 100

- - - - - - - 50 4.24 100

- - - 50 2.04 100 4.07 100 4.07 100


- - - - - - - 50 1.04 100
- - - - - 50 1.44 100 2.88 100

- - - - - - - 75 6.62 100
- - - - - - - 50 2.90 100
- - - - - - - 50 0.14 100
- - - - - - - - - 100

- - - - - - - 100 0.14 100


- - - - - - - 100 0.14 100
- - - - - - - 100 0.09 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100

- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100

- - - - - - - 100 1.00 100


6 7 8 9 10

1.70 100 1.70 100 1.70 100 1.70 100 1.70 100
0.32 100 0.32 100 0.32 100 0.32 100 0.32 100
0.65 100 0.65 100 0.65 100 0.65 100 0.65 100
- - - - - - - - - 100

0.05 100 0.05 100 0.05 100 0.05 100 0.05 100
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100
0.01 100 0.01 100 0.01 100 0.01 100 0.01 100

4.29 100 4.29 100 4.29 100 4.29 100 4.29 100
4.10 100 4.10 100 4.10 100 4.10 100 4.10 100
1.08 100 1.08 100 1.08 100 1.08 100 1.08 100

0.15 100 0.15 100 0.15 100 0.15 100 0.15 100
0.79 100 0.79 100 0.79 100 0.79 100 0.79 100
0.74 100 0.99 100 0.99 100 0.99 100 0.99 100
- 100 2.23 100 2.23 100 2.23 100 2.23 100
- 100 2.64 100 2.64 100 2.64 100 2.64 100
- 100 1.17 100 1.17 100 1.17 100 1.17 100
- 25 7.11 100 28.43 100 28.43 100 28.43 100
- - - 100 2.24 100 2.24 100 2.24 100

- - - 85 6.89 100 8.10 100 8.10 100


- - - - - 100 1.06 100 1.06 100
- - - - - 100 0.98 100 0.98 100
- - - - - 100 0.30 100 0.30 100

5.81 100 5.81 100 5.81 100 5.81 100 5.81 100
4.22 100 4.22 100 4.22 100 4.22 100 4.22 100
2.11 100 2.11 100 2.11 100 2.11 100 2.11 100

- - - - - 100 9.03 100 9.03 100

- 50 0.30 100 0.59 100 0.59 100 0.59 100


- 50 0.88 100 1.76 100 1.76 100 1.76 100
0.77 100 1.03 100 1.03 100 1.03 100 1.03 100
- - - - - 85 0.37 100 0.44 100

- - - 25 2.39 100 9.58 100 9.58 100


- - - - - 85 0.34 100 0.40 100

- 100 0.15 100 0.15 100 0.15 100 0.15 100


- 100 0.15 100 0.15 100 0.15 100 0.15 100
- 100 0.14 100 0.14 100 0.14 100 0.14 100
- 100 0.08 100 0.08 100 0.08 100 0.08 100
- 100 0.12 100 0.12 100 0.12 100 0.12 100
- 100 0.15 100 0.15 100 0.15 100 0.15 100

- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100

- - - - - - - - - 100
0.97
0.97
1.01
0.11
0.90
0.86
-

0.13
0.06
0.56
0.69

14.17
12.02
1.70

1.38
14.29
1.40
0.65

12.16

5.92
2.97
2.61

1.82
9.21
6.87
3.58

0.36
0.08
0.04
0.04
0.62
1.64
0.21
0.20
0.08
0.07

0.04
0.03
0.01

1.24
1.19
1.20

0.05
0.70
1.02
1.95
3.12
0.31

25.51
1.66

5.36
0.99
0.80
0.20

4.81
1.76
2.35
1.59

8.49

4.07
2.07
2.88

8.82
5.80
0.29
3.32

0.14
0.14
0.09
0.07
0.08
0.09

0.22
0.05
0.02
0.01
0.22
0.98

1.00
1.70
0.32
0.65
0.11

0.05
0.03
0.01

4.29
4.10
1.08

0.15
0.79
0.99
2.23
2.64
1.17
28.43
2.24

8.10
1.06
0.98
0.30

5.81
4.22
2.11

9.03

0.59
1.76
1.03
0.44

9.58
0.40

0.15
0.15
0.14
0.08
0.12
0.15

0.23
0.05
0.02
0.02
0.24
1.06

1.22
YANG DIPAKAI
TH. 2018
1 SMPN 2 SEPULU 2 KELAS ### SINERGI
2 SMPN 1 KLAMPIS 3 KELAS ### SINERGI
3 SMPN 2 KOKOP 2 KELAS ### SINERGI
4 SMPN 3 SATAP KOKOP 2 KELAS ### SINERGI
5 SMPN 1 TRAGAH 3 KELAS ### INDRAKILA
6 SMPN 2 MODUNG 2 KELAS ### INDRAKILA
7 SMPN 2 LABANG 3 KELAS ### INDRAKILA
8 SMPN 2 KWANYAR 2 KELAS ### INDRAKILA
9 SMPN TAHAL AMIN H. ABDULLAH, S.Pd

REKAPITULASI 1
RENCANA ANGGARAN BIAYA OK
OK
KEGIATAN : PENGADAAN SARANA PRASARANA
PEKERJAAN : PERENCANAAN SMP KABUPATEN BANGKALAN
LINGKUP PEKERJAAN : REHABILITASI 2 RUANG BELAJAR SMPN 2 SEPULU
LOKASI : SMPN 2 SEPULU KEC. SEPULU KAB. BANGKALAN

NO. URAIAN PEKERJAAN JUMLAH HARGA

I PEKERJAAN PERSIAPAN ###


II PEKERJAAN PASANGAN/PLESTERAN ###
III PEKERJAAN BETON ###
IV PEKERJAAN RANGKA ATAP ###
V PEKERJAAN ATAP ###
VI PEKERJAAN PLAFOND ###
VII PEKERJAAN PENGECATAN ###
VIII PEKERJAAN LANTAI ###
IX PEKERJAAN INSTALASI LISTRIK ###
X PEKERJAAN KACA ###

JUMLAH ###
DIBULATK ### ###
###

TERBILANG : ( SERATUS DELAPAN PULUH TIGA JUTA RUPIAH )

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

ANWAR NURIS, S.Pd.I H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Sepulu
Kec. Sepulu Kab. Bangkalan

DR. AHMAD SABARUDIN, S.Pd, M.MPd


NIP. 19680503 199103 1 013

LAPORAN MINGGUAN
Minggu ke :
Pekerjaan : REHABILITASI 2 RUANG KELAS SMPN 2 SEPULU Tanggal :
Nama Sekolah : SMPN 2 SEPULU Bulan :
Lokasi : Kec. Kedamean Kab. Gresik Dana diterima tangal :
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%)
% Prestasi Rerata Prestasi
(1) (2) (3) (4) (5) (6) (7) (8)
(6)/100x(5)
I. PEKERJAAN PERSIAPAN
1 Pembongkaran atap + rangka atap 143.00 m² 0.97 - - 100
2 Pembongkaran atap 234.90 m² 0.97 - - 100
3 Penetelan plesteran 92.16 m² 1.01 - - 100
4 Pembersihan akhir pekerjaan 1.00 ls 0.11 - - -
II. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 18.50 m² 0.90 - - -
2 Plesteran 1Pc : 5Ps 37.00 m² 0.86 - - -
3 Benangan 48.00 m' - - - -

III. PEKERJAAN BETON


1 Kolom Struktur 15/25 0.06 m³ 0.13 - - -
2 Kolom Praktis 15/15 0.03 m³ 0.06 - - -
3 Ring Balk 15/15 0.26 m³ 0.56 - - -
4 Ring gewel 15/15 dan konsol beton 15/15 0.32 m³ 0.69 - - -

IV. PEKERJAAN RANGKA ATAP


1 Kuda-kuda baja ringan (galvalum bentang 7m) 139.73 m² 14.17 - - -
2 Kuda-kuda baja ringan (galvalum 50%) 118.54 m² 12.02 - - -
2 Listplank kalsiplank 8mm / 30 cm 47.70 m¹ 1.70 - - -

V. PEKERJAAN ATAP
1 Atap genteng beton (lama) 139.73 m² 1.38 - - -
2 Atap genteng beton warna 237.08 m² 14.29 - - -
3 Genteng bubungan beton warna 26.70 m' 1.40 - - -
4 Plesteran kompres L = 10 cm (Akhiran genting) 56.00 m' 0.65 - - -

VI. PEKERJAAN PLAFOND


1 Plafond calsiboard 4mm + rangka metal hollow 261.00 m² 12.16 - - -

VII. PEKERJAAN PENGECATAN


1 Pengecatan dinding 521.00 m² 5.92 - - -
2 Pengecetan plafond 261.00 m² 2.97 - - -
3 Pengecatan kayu 111.96 m² 2.61 - - -

VIII. PEKERJAAN LANTAI


1 Keramik lantai 30 x 30 ( tambal sulam 1kelas) 31.50 m² 1.82 - - -
2 Keramik lantai 40 x 40 150.00 m² 9.21 - - -
3 Keramik dinding R.Lab 25 x 40 92.16 m² 6.87 - - -
4 List keramik 76.80 m' 3.58 - - -

IX. PEKERJAAN INSTALASI LISTRIK


1 Lampu SL 14 watt 12.00 bh 0.36 - - -
2 Lampu SL 8 watt (teras) 3.00 bh 0.08 - - -
3 Saklar ganda 4.00 bh 0.04 - - -
4 Saklar tunggal 5.00 bh 0.04 - - -
5 Stop kontak + instalasi 5.00 bh 0.62 - - -
6 Instalasi titik lampu 15.00 ttk 1.64
X. PEKERJAAN KACA
1 Kaca mati t=5 mm (yg pecah) 3.36 m² 0.21 - - -

JUMLAH 100.00 -
Jumlah dana yang digunakan sampai dengan minggu ini ( minggu ke 1 ) Rp 20,300,000.00

REKAPITULASI 2
RENCANA ANGGARAN BIAYA OK

KEGIATAN : PENGADAAN SARANA PRASARANA


PEKERJAAN : PERENCANAAN SMP KABUPATEN BANGKALAN
LINGKUP PEKERJAAN : REHABILITASI 3 RUANG BELAJAR SMPN 1 KLAMPIS
LOKASI : SMPN 1 KLAMPIS KEC. KLAMPIS KAB. BANGKALAN

NO. URAIAN PEKERJAAN JUMLAH HARGA

I (2) ###
II PEKERJAAN TANAH ###
III PEKERJAAN PASANGAN/PLESTERAN ###
IV PEKERJAAN BETON ###
V PEKERJAAN RANGKA ATAP ###
VI PEKERJAAN ATAP ###
VII PEKERJAAN KUSEN PINTU DAN JENDELA ###
VIII PEKERJAAN PLAFOND ###
IX PEKERJAAN PENGECATAN/PLAMIRAN ###
X PEKERJAAN LANTAI ###
XI PEKERJAAN KUNCI + PENGGANTUNG ###
XII PEKERJAAN INSTALASI LISTRIK ### ###
XIII PEKERJAAN KACA ###

JUMLAH ### ###


DIBULATK ### ###
TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

HANAF I H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 1 Kelampis
Kec. Kelampis Kab. Bangkalan

IMAM SYAFII, S.Pd, MPd


NIP. 19680228 199401 1 003

LAPORAN MINGGUAN
Minggu ke :
Pekerjaan : REHABILITASI 2 RUANG KELAS SMPN 1 KLAMPIS Tanggal :
Nama Sekolah : SMPN 1 KLAMPIS Bulan :
Lokasi : Kec. Kedamean Kab. Gresik Dana diterima tangal :
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%)
% Prestasi Rerata Prestasi
(1) (2) (3) (4) (5) (6) (7) (8)
I. PEKERJAAN PERSIAPAN (6)/100x(5)
1 Pembongkaran kosen 12.00 bh 0.20 - - 100
2 Penetelan plesteran 12.00 m² 0.08 - - 100
3 Pembersihan akhir pekerjaan 1.00 ls 0.07 - - -

II. PEKERJAAN TANAH


1 Galian tanah 2.16 m³ 0.04 - - -
2 Urugan pasir bawah pondasi t=10cm 0.36 m³ 0.03 - - -
4 Urugan tanah kembali 1.08 m³ 0.01 - - -

III. PEKERJAAN PASANGAN/PLESTERAN


1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 42.79 m² 1.24 - - -
2 Plesteran 1Pc : 5Ps 85.57 m² 1.19 - - -
3 Benangan 308.80 m' 1.20 - - -

IV. PEKERJAAN BETON


1 Lantai kerja bawah pondasi 1:3:5 t=5cm 0.18 m³ 0.05 - - -
2 Pondasi beton stempat 60 x 60 x 15cm 0.54 m³ 0.70 - - -
3 Kolom teras 15/15 0.79 m³ 1.02 - - -
4 Balok beton 15/20 1.50 m³ 1.95 - - -
5 Kolom beon 15/20 2.40 m³ 3.12 - - -
6 Kolom praktis 15/15 0.24 m³ 0.31 - - -
5.65
V. PEKERJAAN RANGKA ATAP
1 Kuda-kuda baja ringan (galvalum 75mm) (betang. 370.11 m² 25.51 - - -
2 Lisplank kalsiplank 8mm / 30 cm 77.90 m¹ 1.66 - - -

VI. PEKERJAAN ATAP


1 Atap genteng Karang Penang (baru bg. depan) 202.80 m² 5.36 - - -
2 Atap genteng (lama bg. belakang) 167.31 m² 0.99 - - -
3 Genteng bubungan Karang penang 25.35 m' 0.80 - - -
4 Plesteran kompres L = 10 cm (Akhiran genting) 29.20 m' 0.20 - - -

VII. PEKERJAAN KUSEN PINTU DAN JENDELA


1 Kusen kayu kempas/mahoni 6/15 1.28 m³ 4.81 - - -
2 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 8.69 m² 1.76 - - -
3 Jalusi kayu kempas/mahoni 3/5 16.61 m² 2.35 - - -
4 Daun Jendela kaca kayu kempas/mahoni 3/10 11.52 m² 1.59 - - -

VIII. PEKERJAAN PLAFOND


1 Plafond calsiboard 4mm + rangka kayu 4/6 304.20 m² 8.49 - - -

IX. PEKERJAAN PENGECATAN/PLAMIRAN


1 Pengecatan dinding 598.50 m² 4.07 - - -
2 Pengecatan plafond 304.20 m² 2.07 - - -
3 Pengecatan kayu 206.70 m² 2.88 - - -

X. PEKERJAAN LANTAI
1 Keramik lantai 40 x 40 240.00 m² 8.82 - - -
2 Keramik dinding 25 x 40 129.80 m² 5.80 - - -
3 Keramik kolom 25 x 40 6.40 m² 0.29 - - -
4 List keramik 119.00 m' 3.32 - - -

XI. PEKERJAAN KUNCI + PENGGANTUNG


1 Kunci pintu 2 x putar 3.00 bh 0.14 - - -
2 Engsel Pintu 18.00 bh 0.14 - - -
3 Engsel Jendela 16.00 bh 0.09 - - -
4 Grendel tanam 3.00 bh 0.07 - - -
5 Grendel Jendela 16.00 bh 0.08 - - -
6 Hag Angin 16.00 bh 0.09 - - -

XII. PEKERJAAN INSTALASI LISTRIK


1
Lampu SL 14 watt 12.00 bh 0.22 - - -
2
Lampu SL 8watt (teras) 3.00 bh 0.05 - - -
3
Saklar ganda 3.00 bh 0.02 - - -
4
Saklar tunggal 3.00 bh 0.01 - - -
5 Stop kontak + instalasi 3.00 bh 0.22 - - -
6 Instalasi titik lampu 15.00 ttk 0.98 - - -

XIII. PEKERJAAN KACA


1 Kaca bening t=5 mm 27.10 m² 1.00 - - -

JUMLAH 95.07 -
Jumlah dana yang digunakan sampai dengan minggu ini ( minggu ke 1 ) Rp 20,300,000.00

3
REKAPITULASI OK
NCANA ANGGARAN BIAYA OK
: PENGADAAN SARANA PRASARANA
KEGIATAN : PERENCANAAN SMP KABUPATEN BANGKALAN
PEKERJAAN : REHABILITASI 2 RUANG BELAJAR SMPN 3 SATAP KOKOP
LINGKUP PEKERJAAN : SMPN 3 SATAP KOKOP KEC. KOKOP KAB. BANGKALAN
LOKASI
URAIAN PEKERJAAN JUMLAH HARGA
NO.

PEKERJAAN PERSIAPAN ###


I PEKERJAAN TANAH ###
II PEKERJAAN PASANGAN/PLESTERAN ###
III PEKERJAAN BETON ###
IV PEKERJAAN RANGKA ATAP ###
V PEKERJAAN ATAP ###
VI PEKERJAAN KUSEN PINTU DAN JENDELA ###
VII PEKERJAAN PLAFOND ###
VIII PEKERJAAN PENGECATAN/PLAMIRAN ###
IX PEKERJAAN LANTAI ###
X PEKERJAAN KUNCI + PENGGANTUNG ###
XI PEKERJAAN INSTALASI LISTRIK ###
XII PEKERJAAN KACA ###
XIII

JUMLAH ### ###


DIBULATK ### ###

TERBILANG : ( SERATUS DELAPAN PULUH TIGA JUTA RUPIAH )

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 3 Satap Kokop
Kec. Kokop Kab. Bangkalan

IHSANUDIN, S.Pd
NIP. 19700109 199104 1 001
LAPORAN MINGGUAN
Minggu ke :
Pekerjaan : REHABILITASI 2 RUANG BELAJAR SMPN 3 SATAP KOKOP Tanggal :
Nama Sekolah : SMPN 3 SATAP KOKOP KEC. KOKOP KAB. BANGKALAN Bulan :
Lokasi : KEC. KOKOP KAB. BANGKALAN Dana diterima tangal :
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%)
% Prestasi Rerata Prestasi
(1) (2) (3) (4) (5) (6) (7) (8)
(6)/100x(5)

I. PEKERJAAN PERSIAPAN
1 Pembongkaran atap + rangka 260.00 m² 1.70 100 1.70 -
2 Pembongkaran kosen 12.00 bh 0.32 100 0.32 -
3 Pembongkaran dinding 61.75 m² 0.65 100 0.65 -
4 Pembersihan akhir pekerjaan 1.00 ls 0.11 - - -

II. PEKERJAAN TANAH


1 Galian tanah 1.51 m³ 0.05 100 0.05 -
2 Urugan pasir bawah pondasi t=10cm 0.25 m³ 0.03 100 0.03 -
4 Urugan tanah kembali 0.76 m³ 0.01 100 0.01 -

III. PEKERJAAN PASANGAN/PLESTERAN


1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 91.82 m² 4.29 100 4.29 -
2 Plesteran 1Pc : 5Ps 183.63 m² 4.10 100 4.10 -
3 Benangan 173.00 m' 1.08 100 1.08 -

IV. PEKERJAAN BETON `


1 Lantai kerja bawah pondasi 1:3:5 t=5cm 0.31 m³ 0.15 100 0.15 -
2 Pondasi beton stempat 60 x 60 x 15cm 0.38 m³ 0.79 100 0.79 -
3 Kolom teras 15/15 0.47 m³ 0.99 100 0.99 -
4 Balok beton 15/20 1.07 m³ 2.23 100 2.23 -
5 Kolom struktur 15/25 1.26 m³ 2.64 100 2.64 -
6 Ring balk 15/15 0.56 m³ 1.17 100 1.17 -
V. PEKERJAAN RANGKA ATAP
1 Kuda-kuda baja ringan (galvalum 75mm) 256.39 m² 28.43 25 7.11 75
2 Lisplank kalsiplank 8mm / 30 cm 65.20 m¹ 2.24 - - 100

VI. PEKERJAAN ATAP


1 Atap genteng Karang Penang (baru bg depan) 190.62 m² 8.10 - - 85
2 Atap genteng (lama bg belakang) 111.26 m² 1.06 - - -
3 Genteng bubungan Karang penang 19.35 m' 0.98 - - -
4 Plesteran kompres L = 10 cm (Akhiran genting) 26.50 m' 0.30 - - -

VII. PEKERJAAN KUSEN PINTU DAN JENDELA


1 Kusen kayu aluminium 4" 95.76 m' 5.81 100 5.81 -
2 Daun Pintu kaca aluminium 4.00 bh 4.22 100 4.22 -
3 Daun Jendela kaca aluminium 8.00 bh 2.11 100 2.11 -

VIII. PEKERJAAN PLAFOND


1 Plafond calsiboard 4mm + rangka hollow 201.24 m² 9.03 - - -

IX. PEKERJAAN PENGECATAN/PLAMIRAN


1 Pengecatan dinding depan 54.00 m² 0.59 50 0.30 50
2 Pelamiran dinding 344.50 m² 1.76 50 0.88 50
3 Plamiran plafond 201.24 m² 1.03 100 1.03 -
4 Pengecatan kayu 19.56 m² 0.44 - - -

X. PEKERJAAN LANTAI
1 Keramik lantai 40 x 40 162.00 m² 9.58 - - 25
2 Keramik kolom 20 x 40 (motif) 5.60 m² 0.40 - - -

XI. PEKERJAAN KUNCI + PENGGANTUNG


1 Kunci pintu 2 x putar 2.00 bh 0.15 100 0.15 -
2 Engsel Pintu 12.00 bh 0.15 100 0.15 -
3 Engsel Jendela 16.00 bh 0.14 100 0.14 -
4 Grendel tanam 2.00 bh 0.08 100 0.08 -
5 Grendel Jendela 16.00 bh 0.12 100 0.12 -
6 Hag Angin 16.00 bh 0.15 100 0.15 -

XII PEKERJAAN INSTALASI LISTRIK


1 Lampu SL 14 watt 8.00 bh 0.23 - - -
2 Lampu SL 8watt (teras) 2.00 bh 0.05 - - -
3 Saklar ganda 2.00 bh 0.02 - - -
4 Saklar tunggal 2.00 bh 0.02 - - -
5 Stop kontak + instalasi 2.00 bh 0.24 - - -
6 Instalasi titik lampu 10.00 ttk 1.06 - - -

XIII. PEKERJAAN KACA


1 Kaca mati t=5 mm 20.68 m² 1.22 - - -

JUMLAH 100.00 42.44


Jumlah dana yang digunakan sampai dengan minggu ini ( minggu ke 1 ) Rp 144,806,000.00

Mengetahui Menyetujui
SMPN 3 Satap Kokop Panitia Pembangunan Sekolah
Kec. Kokop Kab. Bangkalan
Selaku Penanggung Jawab
IHSANUDIN, S.Pd SUHAERI
NIP. 19700109 199104 1 001

REKAPITULASI
NCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI

NO.

I
II
III
IV
V
VI
VII
VIII
IX
X 4
XI OK
XII LAMA
XIII : PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 1 TRAGAH
: SMPN 1 TRAGAH KEC. TRAGAH KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA

TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )
PEKERJAAN PERSIAPAN ###
PEKERJAAN TANAH ###
PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA #DIV/0!
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###

JUMLAH #DIV/0! ###


DIBULATK #DIV/0! #DIV/0!

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

YUNIZAR AN NATSIRUL YUSUF H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 1 Tragah
Kec. Tragah Kab. Bangkalan

Drs. AMIRULLAH, MM
NIP. 19581217 198603 1 011

NO
1
I.
1
2
3
4

II.
1
2
4

III.
1
2
3

IV.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran atap + rangka 377.00 m² ### ###
V. Pembongkaran kusen 4.00 bh ### ###
1 Penetelan plesteran 159.60 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VI. PEKERJAAN TANAH ###
1 Galian tanah 2.16 m³ ### ###
2 Urugan pasir bawah pondasi t=10cm 0.36 m³ ### ### #DIV/0!
3 Urugan tanah kembali 1.08 m³ ### ###
4 ###
PEKERJAAN PASANGAN/PLESTERAN
VII. Pasangan 1/2 bata camp. 1 Pc : 5 Ps 7.20 m² ### ### ###
1 Plesteran 1Pc : 5Ps 14.40 m² ### ###
2 Benangan 24.00 m' ### ###
3 ###
PEKERJAAN BETON
VIII. Lantai kerja bawah pondasi 1:3:5 t=5cm 0.18 m³ ### ###
1 Pondasi beton stempat 60 x 60 x 15cm 0.54 m³ ### ###
Kolom teras 15/15 0.79 m³ ### ###
IX. Balok beton 15/20 1.71 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ ### ###
X. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Penang (baru) 382.73 m² ### ###
3 Atap genteng (lama bg. belakang) 170.10 m² ### ###
4 Genteng bubungan Karang penang 28.35 m' ### ###
Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' ### ###
XI. ###
1 PEKERJAAN KUSEN PINTU DAN JENDELA
2 Kusen kayu kempas/mahoni 6/15 #DIV/0! m³ Rp - #DIV/0!
3 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 8.61 m² Rp - Rp - #DIV/0!
4 Daun Jendela kaca kayu kempas/mahoni 3/10 8.40 m² Rp - Rp - ###
5 #DIV/0!
6 PEKERJAAN PLAFOND
Plafond calsiboard 4mm + rangka kayu 4/6 294.84 m² ### ###
XII ###
1 PEKERJAAN PENGECATAN
2 Pengecatan dinding (3 Ruang kelas) 598.50 m² ### ###
3 Pengecatan plafond 294.84 m² ### ###
4 Pengecatan kayu 206.70 m² ### ###
5 ###
6 PEKERJAAN LANTAI #DIV/0!
Keramik lantai 40 x 40 245.70 m² ### ###
XIII. Keramik dinding 25 x 40 ( 3 R.kelas + teras ) 159.60 m² ### ###
1 List keramik dinding 7cm 110.40 m² ### ###
Keramik kolom 25 x 40 12.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Engsel Pintu 18.00 bh ### ###
Engsel Jendela 16.00 bh ### ###
Grendel pintu 3.00 bh ### ###
Grendel Jendela 16.00 bh ### ###
Hag Angin 16.00 bh ### ###
###
REKAPITULASI
PEKERJAAN INSTALASI LISTRIK
NCANA ANGGARAN
Lampu BIAYA
SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
KEGI Saklar ganda 3.00 bh ### ###
PEKE Saklar tunggal 3.00 bh ### ###
LING Stop kontak + instalasi 3.00 bh ### ###
LOKA Instalasi titik lampu 15.00 ttk ### ###
###
NO. PEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 11.14 m² ### ###
###
I
II
III
IV
V
VI
VII
VIII
IX
X 4
XI OK
XII BARU
XIII : PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 1 TRAGAH
: SMPN 1 TRAGAH KEC. TRAGAH KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA

TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )
PEKERJAAN PERSIAPAN ###
PEKERJAAN TANAH ###
PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA Rp -
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###

JUMLAH ### ###


DIBULATK ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

YUNIZAR AN NATSIRUL YUSUF H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 1 Tragah
Kec. Tragah Kab. Bangkalan

Drs. AMIRULLAH, MM
NIP. 19581217 198603 1 011

NO
1
I.
1
2
3
4

II.
1
2
4

III.
1
2
3
IV.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran atap + rangka 377.00 m² ### ###
V. Pembongkaran kusen 8.00 bh ### ###
1 Penetelan plesteran 249.00 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VI. PEKERJAAN TANAH ###
1 Galian tanah 2.16 m³ ### ###
2 Urugan pasir bawah pondasi t=10cm 0.36 m³ ### ### ###
3 Urugan tanah kembali 1.08 m³ ### ###
###
VII. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 24.02 m² ### ### ###
2 Plesteran 1Pc : 5Ps 48.03 m² ### ###
3 Benangan 168.00 m' ### ###
4 ###
PEKERJAAN BETON
VIII. Lantai kerja bawah pondasi 1:3:5 t=5cm 0.18 m³ ### ###
1 Pondasi beton stempat 60 x 60 x 15cm 0.54 m³ ### ###
Kolom teras 15/15 0.79 m³ ### ###
IX. Balok beton 15/20 1.56 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ ### ###
X. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Penang (baru) 382.73 m² ### ###
3 Genteng bubungan Karang penang 28.35 m' ### ###
4 Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' ### ###
5 ###
PEKERJAAN KUSEN PINTU DAN JENDELA
XI. Kusen kayu kempas/mahoni 6/15 1.09 m³ Rp - Rp -
1 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 8.61 m² Rp - Rp - ###
2 Jalusi kayu kempas/mahoni 3/12 7.20 m² Rp - Rp -
3 Daun Jendela kaca kayu kempas/mahoni 3/10 6.72 m² Rp - Rp - ###
4 Rp -
5 PEKERJAAN PLAFOND
6 Plafond calsiboard 4mm + rangka kayu 4/6 294.84 m² ### ###
###
XII PEKERJAAN PENGECATAN
1 Pengecatan dinding (3 Ruang kelas) 598.50 m² ### ###
2 Pengecatan plafond 294.84 m² ### ###
3 Pengecatan kayu 206.70 m² ### ###
4 ###
5 PEKERJAAN LANTAI ###
6 Keramik lantai 40 x 40 245.70 m² ### ###
Keramik dinding 25 x 40 ( 3 R.kelas + teras ) 173.40 m² ### ###
XIII. List keramik dinding 7cm 132.90 m² ### ###
1 Keramik kolom 25 x 40 12.00 m² ### ###
Keramik dinding 25 x 40 ( 3 R.kelas teras saja ) 75.60 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Engsel Pintu 18.00 bh ### ###
Engsel Jendela 16.00 bh ### ###
Grendel pintu 3.00 bh ### ###
Grendel Jendela 16.00 bh ### ###
Hag Angin 16.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
REKAPITULASI
Lampu SL 8watt (teras) 3.00 bh ### ###
NCANA ANGGARAN BIAYA
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
KEGI Stop kontak + instalasi 3.00 bh ### ###
PEKE Instalasi titik lampu 15.00 ttk ### ###
LINGKUP PEKERJAAN ###
LOKAPEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 11.14 m² ### ###
NO. ###

I
II
III
IV
V
VI
VII
VIII
IX
X 5
XI OK
XII LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 MODUNG
: SMPN 2 MODUNG KEC. MODUNG KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA


TERBILANG : ( DUA RATUS LIMA JUTA ENAM RATUS RIBU RUPIAH )

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA Rp -
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN/PLAMIRAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ### ###
PEKERJAAN KACA ###

JUMLAH ### ###


DIBULAT ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

M. MAHRI, S.Ag H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Modung
Kec. Modung Kab. Bangkalan

A S U R, M.Pd
NIP. 19610117 198403 1 008

NO
1
I.
1
2

II.
1
2
3

III.
1
2
3

IV.
1
2
Lembar. 2
V. JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
1 2 3 4 5
2 PEKERJAAN PERSIAPAN
3 Pembongkaran atap + rangka 406.00 m² ### ###
4 Pembersihan akhir pekerjaan 1.00 ls ### ### ###
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 98.93 m² ### ###
2 Plesteran 1Pc : 5Ps 197.87 m² ### ###
3 Benangan 166.56 m' ### ###
###
VII. PEKERJAAN BETON
1 Kolom teras 15/15 0.41 m³ ### ###
Balok teras 15/20 1.24 m³ ### ###
VIII. Ring balk gewel 15/15 0.98 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 396.90 m² ### ###
4 Lisplank kalsiplank 8mm / 30 cm 85.70 m¹ ### ###
5 ###
PEKERJAAN ATAP
IX. Pasang atap genteng karang p enang (baru 5%) 19.85 m² ### ###
1 Pasang atap genteng (lama) 377.06 m² ### ###
Genteng bubungan karang penang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 29.00 m' ### ###
1 ###
2 PEKERJAAN KUSEN PINTU DAN JENDELA
3 Kusen kayu kempas/mahoni 6/12 0.46 m³ Rp - Rp -
4 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 6.72 m² Rp - Rp -
5 Daun Jendela kaca kayu kempas/mahoni 3/10 5.04 m² Rp - Rp -
6 Rp -
PEKERJAAN PLAFOND ###
XI. Plafond calsiboard 4mm + rangka hollow 340.20 m² ### ###
1 ###
2 PEKERJAAN PENGECATAN/PLAMIRAN
3 Pengecatan dinding (depan) 66.85 m² ### ###
4 Pelamiran dinding 430.33 m² ### ###
5 Pelamiran plafond 340.20 m² ### ### ###
6 Pengecatan kayu 206.70 m² ### ###
Cat genteng 396.90 m² ### ###
XII. ###
1 PEKERJAAN LANTAI
Lantai rabat 216.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 4.00 bh ### ###
Engsel Pintu 21.00 bh ### ###
Engsel Jendela 24.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Grendel Jendela 12.00 bh ### ### ###
Hag Angin 24.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 14.00 bh ### ###
Lampu SL 8watt (teras) 4.00 bh ### ###
Saklar ganda 7.00 bh ### ###
REKAPITULASI
Saklar tunggal 3.00 bh ### ###
NCANA ANGGARAN BIAYA
Stop kontak + instalasi 4.00 bh ### ###
Instalasi titik lampu 18.00 bh ### ###
KEGIATAN ###
PEKE PEKERJAAN KACA
LING Kaca mati t=5 mm 14.49 m² ### ###
LOKASI ###

NO.

I
II
III
IV
V
VI
VII
VIII
IX
X 5
XI OK
XII BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 MODUNG
: SMPN 2 MODUNG KEC. MODUNG KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA


TERBILANG : ( DUA RATUS LIMA JUTA ENAM RATUS RIBU RUPIAH )

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA Rp -
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN/PLAMIRAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ### -
PEKERJAAN KACA ###

JUMLAH ### ###


DIBULAT ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

M. MAHRI, S.Ag H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Modung
Kec. Modung Kab. Bangkalan

A S U R, M.Pd
NIP. 19610117 198403 1 008

NO
1
I.
1
2

II.
1
2
3

III.
1
2
3

IV.
1
2
Lembar. 2
V. JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
1 2 3 4 5
2 PEKERJAAN PERSIAPAN
3 Pembongkaran atap + rangka 406.00 m² ### ###
4 Pembersihan akhir pekerjaan 1.00 ls ### ### ###
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 98.93 m² ### ###
2 Plesteran 1Pc : 5Ps 197.87 m² ### ###
3 Benangan 166.56 m' ### ###
###
VII. PEKERJAAN BETON
1 Kolom teras 15/15 0.41 m³ ### ###
Balok teras 15/20 1.24 m³ ### ###
VIII. Ring balk gewel 15/15 0.98 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 396.90 m² ### ###
4 Lisplank kalsiplank 8mm / 30 cm 85.70 m¹ ### ###
5 ###
PEKERJAAN ATAP
IX. Pasang atap genteng karang p enang (baru 5%) 19.85 m² ### ###
1 Pasang atap genteng (lama) 377.06 m² ### ###
Genteng bubungan karang penang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 29.00 m' ### ###
1 ###
2 PEKERJAAN KUSEN PINTU DAN JENDELA
3 Kusen kayu kempas/mahoni 6/12 0.46 m³ Rp - Rp -
4 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 6.72 m² Rp - Rp -
5 Daun Jendela kaca kayu kempas/mahoni 3/10 5.04 m² Rp - Rp -
6 Rp -
PEKERJAAN PLAFOND ###
XI. Plafond calsiboard 4mm + rangka kayu 4/6 340.20 m² ### ###
1 ###
2 PEKERJAAN PENGECATAN/PLAMIRAN
3 Pengecatan dinding (depan) 66.85 m² ### ###
4 Pelamiran dinding 430.33 m² ### ###
5 Pelamiran plafond 340.20 m² ### ### ###
6 Pengecatan kayu 206.70 m² ### ###
Cat genteng 396.90 m² ### ###
XII. ###
1 PEKERJAAN LANTAI
Lantai rabat 216.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 4.00 bh ### ###
Engsel Pintu 21.00 bh ### ###
Engsel Jendela 24.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Grendel Jendela 12.00 bh ### ### ###
Hag Angin 24.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 14.00 bh ### ###
Lampu SL 8watt (teras) 4.00 bh ### ###
Saklar ganda 7.00 bh ### ###
REKAPITULASI
Saklar tunggal 3.00 bh ### ###
NCANA ANGGARAN BIAYA
Stop kontak + instalasi 4.00 bh ### ###
Instalasi titik lampu 18.00 bh ### ###
KEGIATAN ###
PEKE PEKERJAAN KACA
LING Kaca mati t=5 mm 14.49 m² ### ###
LOKASI ###

NO.

I
II
III
IV
V
VI
VII
VIII
IX
X 6
XI OK
LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 2 LABANG
: SMPN 2 LABANG KEC. LABANG KAB. BANGKALAN

TERBILANG : ( DUA RATUS SEMBILAN


URAIAN
PULUHPEKERJAAN
EN JUMLAH HARGA

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN Rp -
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
PEKERJAAN TANGGA DEPAN PINTU ###

JUMLAH ### ###


DIBULATK ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
ACHMAD TAUFIK HEYKAL, A.Sg H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Labang
Kec. Labang Kab. Bangkalan

Drs. HARTONO, M.Pd


NIP. 19690126 199802 1 003

NO
1
I.
1
2
3
4
5

II.
1

III.
1
2

IV.
1
2
3 Lembar. 2
JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
V. 2 3 4 5
1 PEKERJAAN PERSIAPAN ###
Pembongkaran atap + rangka 377.00 m² Rp - Rp -
VI. Pembongkaran kosen 1.00 bh ### ###
1 Pembongkaran dinding 6.00 m² ### ###
2 Penetelan plesteran 139.74 m² ### ###
3 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VII. PEKERJAAN PASANGAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps (nyepit kuda2) 30.91 m² Rp - Rp -
2 Rp -
3 PEKERJAAN RANGKA ATAP ###
4 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ Rp - Rp -
VIII. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Pilang (baru) 382.73 m² ### ###
Genteng bubungan Karang pilang 28.35 m' ### ###
IX. Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' Rp - Rp -
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsiboard 4mm + rangka hollow 354.38 m² Rp - Rp -
4 Rp -
5 PEKERJAAN PENGECATAN
6 Pengecatan dinding 598.50 m² Rp - Rp - ###
Pengecatan plafond 354.38 m² Rp - Rp -
X. Pengecatan kayu 274.60 m² Rp - Rp -
1 Rp -
PEKERJAAN LANTAI
XI. Keramik lantai 40 x 40 243.00 m² ### ###
1 Keramik dinding 25 x 40 139.74 m² ### ###
2 List keramik 102.00 m' ### ###
3 Keramik kolom 20 x 40 10.80 m² ### ###
4 ###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA ###
Kaca mati t=5 mm (yg pecah) 4.22 m² ### ###
###
PEKERJAAN TANGGA DEPAN PINTU
Pasangan batu gunung 2.88 m³ ### ###
Plesterran trasram 7.68 m² ### ###
Keramik kasar 40 x 40 7.04 m² ### ###
Urugan pasir 4.96 m³ ### ###
REKAPITULASI ###
NCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI

NO.

I
II
III
IV
V
VI
VII
VIII
IX
X 6
XI OK
XII BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 2 LABANG
: SMPN 2 LABANG KEC. LABANG KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA


TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
PEKERJAAN TANGGA DEPAN PINTU ###

JUMLAH ### ###


DIBULATK ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

ACHMAD TAUFIK HEYKAL, A.Sg H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Labang
Kec. Labang Kab. Bangkalan
Drs. HARTONO, M.Pd
NIP. 19690126 199802 1 003

NO
1
I.
1
2
3
4
5

II.
1
2
3

III.
1

IV.
1
2 Lembar. 2
JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
V. 2 3 4 5
1 PEKERJAAN PERSIAPAN ###
2 Pembongkaran atap + rangka 377.00 m² Rp - Rp -
3 Pembongkaran kosen 1.00 bh ### ###
Pembongkaran dinding 6.00 m² ### ###
VI. Penetelan plesteran 127.50 m² ### ###
1 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VII. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps (nyepit kuda2) 22.43 m² Rp - Rp - -
2 Plesteran 1Pc : 5Ps 16.20 m² ### ###
3 Benangan 32.00 m' ### ###
###
VIII. PEKERJAAN BETON
1 Ring balk gewel 15/15 0.40 m³ ### ###
2 ###
3 PEKERJAAN RANGKA ATAP ###
4 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ Rp - Rp -
IX. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Pilang (baru) 382.73 m² ### ###
Genteng bubungan Karang pilang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' Rp - Rp -
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsiboard 4mm + rangka hollow 354.38 m² Rp - Rp -
4 Rp -
5 PEKERJAAN PENGECATAN
6 Pengecatan dinding 598.50 m² Rp - Rp - ###
Pengecatan plafond 354.38 m² Rp - Rp -
XI. Pengecatan kayu 274.60 m² Rp - Rp -
1 Rp -
PEKERJAAN LANTAI
XII. Keramik lantai 40 x 40 243.00 m² ### ###
1 Keramik dinding 25 x 40 127.50 m² ### ###
2 List keramik 102.00 m' ### ###
3 Keramik kolom 20 x 40 10.80 m² ### ###
4 ###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Pintu harmonika 15.00 m² ### ### ###
### ###
PEKERJAAN INSTALASI LISTRIK ###
Lampu SL 14 watt 12.00 bh ### ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA ###
Kaca mati t=5 mm (yg pecah) 4.22 m² ### ###
###
PEKERJAAN TANGGA DEPAN PINTU 3.46
Pasangan batu gunung 2.88 m³ ### ###
Plesterran trasram 7.68 m² ### ###
Keramik kasar 40 x 40 7.04 m² ### ###
Urugan pasir 4.96 m³ ### ###
###
REKAPITULASI
NCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI

NO.

I
II
III
IV
V
VI
VII
VIII
IX
X 7
OK
LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 KWANYAR
: SMPN 2 KWANYAR KEC. KWANYAR KAB. BANGKALAN
TERBILANG : ( SERATUS SEMBILAN PULUH TUJUH JUTA DELAPAN RATUS RIBU RUPIAH )
URAIAN PEKERJAAN JUMLAH HARGA

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN/PLESTERAN Rp -
PEKERJAAN KAYU ###
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
PEKERJAAN TEMPAT DUDUK ###

JUMLAH ### ###


DIBULAT ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

MOHAMMAD MUSTOFA ZAHRON, S.Pd H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Kwanyar
Kec. Kwanyar Kab. Bangkalan

RAHMAWATI, M.Pd
NIP. 19700703 199802 2 003

NO
1
I.
1
2
3
4

II.
1
2

III.
1

IV.
1

V.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran kusen 1.00 bh ### ###
VI. Pembongkaran dinding 15.00 m² ### ###
1 Penetelan plesteran 428.64 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 Ls ### ###
3 ###
4 PEKERJAAN PASANGAN/PLESTERAN ###
5 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 0.91 22.20 m² Rp - Rp -
6 Plesteran 1Pc : 5Ps 1.07 44.40 m² Rp - Rp -
Rp -
VII. PEKERJAAN KAYU
1 Lisplank kayu 3/30 cm 4.00 m¹ ### ###
2 ###
3 PEKERJAAN PLAFOND
4 Plafond calsi 1 x 1 + rangka kayu 12.00 m² Rp - Rp -
Rp -
VIII. PEKERJAAN PENGECATAN
1 Pengecatan dinding (3 kelas) 455.30 m² Rp - Rp -
2 Pengecatan plafond 319.00 m² Rp - Rp -
3 Pengecatan kayu 206.70 m² Rp - Rp - ###
4 Pengecatan kayu (Kantor) 214.39 m² Rp - Rp -
5 Rp -
6PEKERJAAN LANTAI 162.00 ###
Keramik lantai 40 x 40 ( 2 R Kelas ) 5.67 126.00 m² ### ###
IX. Keramik lantai 40 x 40 ( Teras ) 1.62 36.00 m² ### ###
1 Keramik dinding 25 x 40 (dalam kelas + teras) 5.78 128.40 m² ### ###
Keramik kolom teras 25 x 40 1.01 22.40 m² ### ###
X. List keramik 1.64 327.80 m' ### ###
1 Keramik dinding 25 x 40 (dalam kantor+R.guru+ t 13.51 300.24 m² ### ###
2 451.04 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 3.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Hag Angin 60.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
REKAPITULASI
PEKERJAAN KACA
NCANA ANGGARAN BIAYA
Kaca mati t=5 mm (yg pecah) 1.68 m² ### ###
###
KEGI PEKERJAAN TEMPAT DUDUK
PEKE Pasangan trasram 0.68 17.00 m² Rp - Rp -
LING Plat beton tempat duduk t=10 cm 0.53 1.02 m³ ### ###
LOKA Keramik tempat duduk 30 x 30 0.46 10.20 m² ### ###
Keramik dinding tempat duduk 25 x 40 1.84 40.80 m² ### ###
NO. 34.71 ###
0.86768 40.80

I
II
III
IV
V
VI
VII
VIII
IX
X 7
OK
BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 KWANYAR
: SMPN 2 KWANYAR KEC. KWANYAR KAB. BANGKALAN
TERBILANG : ( SERATUS SEMBILAN PULUH TUJUH JUTA DELAPAN RATUS RIBU RUPIAH )
URAIAN PEKERJAAN JUMLAH HARGA
PEKERJAAN PERSIAPAN ###
PEKERJAAN PASANGAN/PLESTERAN Rp -
PEKERJAAN KAYU ###
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
PEKERJAAN TEMPAT DUDUK ###

JUMLAH ### ###


DIBULAT ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

MOHAMMAD MUSTOFA ZAHRON, S.Pd H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Kwanyar
Kec. Kwanyar Kab. Bangkalan

RAHMAWATI, M.Pd
NIP. 19700703 199802 2 003

NO
1
I.
1
2
3
4

II.
1
2

III.
1
2

IV.
1

V. Lembar. 2
1 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
2 2 3 4 5
3 PEKERJAAN PERSIAPAN
4 Pembongkaran kusen 1.00 bh ### ###
5 Pembongkaran dinding 15.00 m² ### ###
Penetelan plesteran 428.64 m² ### ###
VI. Pembersihan akhir pekerjaan 1.00 Ls ### ###
1 ###
2 PEKERJAAN PASANGAN/PLESTERAN ###
3 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 22.20 m² Rp - Rp -
4 Plesteran 1Pc : 5Ps 44.40 m² Rp - Rp -
5 Rp -
6 PEKERJAAN KAYU
Perbaikan daun pintu panil 4.00 bh ### ###
VII. Lisplank kayu 3/30 cm 4.00 m¹ ### ###
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsi 1 x 1 + rangka kayu 12.00 m² Rp - Rp -
4 Rp -
PEKERJAAN PENGECATAN
VIII. Pengecatan dinding (3 kelas) 439.90 m² Rp - Rp -
1 Pengecatan dinding (Kantor) 373.40 m² Rp - Rp -
2 Pengecatan plafond 319.00 m² Rp - Rp -
3 Pengecatan kayu 169.45 m² Rp - Rp - ###
4 Pengecatan kayu (Kantor) 197.69 m² Rp - Rp -
5 Rp -
6 PEKERJAAN LANTAI ###
Keramik lantai 40 x 40 ( 2 R Kelas ) 126.00 m² ### ###
IX. Keramik lantai 40 x 40 ( Teras ) 36.00 m² ### ###
1 Keramik dinding 25 x 40 (dalam kelas + teras) 128.40 m² ### ###
Keramik kolom teras 25 x 40 22.40 m² ### ###
X. List keramik 327.80 m' ### ###
1 Keramik dinding 25 x 40 (dalam kantor+R.guru+ teras) 300.24 m² ### ###
2 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 3.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Hag Angin 60.00 bh ### ###
Pintu harmonika 11.30 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK ###
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA
REKAPITULASI
Kaca mati t=5 mm (yg pecah) 1.68 m² ### ###
NCANA ANGGARAN BIAYA ###
PEKERJAAN TEMPAT DUDUK
KEGI Pasangan trasram 17.00 m² Rp - Rp -
PEKE Plat beton tempat duduk t=10 cm 1.02 m³ ### ###
LING Keramik tempat duduk 30 x 30 10.20 m² ### ###
LOKA Keramik dinding tempat duduk 25 x 40 40.80 m² ### ###
###
NO.

I
II
III
IV
V
VI
VII
VIII
IX
8
OK

: PENGADAAN SARANA PRASARANA


: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 KOKOP
TERBILANG : ( SERATU : SMPN 2 KOKOP KEC. KOKOP KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN/PLESTERAN Rp -
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ### ###
PEKERJAAN KACA ###
PEKERJAAN TEMPAT DUDUK ###

JUMLAH ### ###


DIBULATK ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

BOSTOMI, S.Pd H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Kokop
Kec. Kokop Kab. Bangkalan

MOHAMMAD TAUFIK, SPd


NIP. 19760326 200604 1 010
NO
1
I.
1
2

II.
1
2
3
III.
1

IV.
1
2
3

V. Lembar. 2
1 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
2 2 3 4 5
3 PEKERJAAN PERSIAPAN
4 Penetelan plesteran 317.46 m² ### ###
5 Pembersihan akhir pekerjaan 1.00 Ls Rp - Rp - #REF!
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 12.25 m² Rp - Rp -
5 Plesteran 1Pc : 5Ps 80.58 m² Rp - Rp -
6 Benangan 55.00 m' Rp - Rp -
7 Rp -
PEKERJAAN PLAFOND
VII. Plafond calsiboard 4mm + rangka kayu 15.00 m² Rp - Rp -
1 Rp -
2 PEKERJAAN PENGECATAN -
3 Pengecatan dinding 506.50 m² Rp - Rp -
4 Pengecatan plafond 352.00 m² Rp - Rp - #DIV/0!
5 Pengecatan kayu 275.60 m² Rp - Rp -
6 Rp -
PEKERJAAN LANTAI ###
VIII. Keramik lantai 40 x 40 243.00 m² ### ### 147.47
1 Keramik dinding 25 x 40 ( 3 R. Kelas + teras) 132.96 m² ### ###
List keramik 288.20 m' ### ###
IX. Keramik kolom 25 x 40 16.00 m² ### ###
1 Keramik dinding 25 x 40 ( 5 R. Kelas bg. dalam) 184.50 m² ### ###
2 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 5.00 bh ### ###
Grendel Jendela 50.00 bh ### ###
Hag Angin 100.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 20.00 bh ### ###
Lampu SL 8watt (teras) 5.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 5.00 bh ### ###
Stop kontak + instalasi 5.00 bh ### ###
Instalasi titik lampu 25.00 ttk ### ###
###
PEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 2.53 m² ### ###
###
PEKERJAAN TEMPAT DUDUK
Pasangan trasram 14.70 m² Rp - Rp -
Plat beton tempat duduk t=10 cm 0.74 m³ ### ###
Keramik tempat duduk 30 x 30 7.35 m² ### ###
Keramik dinding tempat duduk 25 x 40 29.40 m² ### ###
###

BATAS
SINERGI 1 SMPN 2 SEPULU DR. AHMAD SABARUDIN, S.Pd, M.MPd
SINERGI 2 SMPN 1 KLAMPIS IMAM SYAFII, S.Pd, MPd
SINERGI 3 SMPN 2 KOKOP MOHAMMAD TAUFIK, SPd
SINERGI 4 SMPN 3 SATAP KOKOP IHSANUDIN, S.Pd
INDRAKILA 5 SMPN 1 TRAGAH Drs. AMIRULLAH, MM
INDRAKILA 6 SMPN 2 MODUNG A S U R, M.Pd
INDRAKILA 7 SMPN 2 LABANG Drs. HARTONO, M.Pd
INDRAKILA 8 SMPN 2 KWANYAR RAHMAWATI, M.Pd
9 SMPN TAHAL AMIN H. ABDULLAH, S.Pd
10 SMPN 1 MODUNG Drs. ALI MUSTOFA, M.Pd
11 SMPN 1 GALIS Drs. TAUFIKUR RAHMAN
12 SMPN 1 KOKOP BUDIONO, S.Pd, M.Pd

13 SMPN 2 KONANG ABDUL RASID, S.Ag, M.PdI


14 SMPN TAHAL AMIN H. ABDULLAH, S.Pd

SMPN 1 KWANYAR MOHAMMAD SADALI, S.Pd


SMPN 1 TANJUNG BUMI Drs. M. AGUS SUBAGIO, M.Pd
SMPN 1 BLEGA SRI ASTUTIK HANDAYANI, M.Pd
SMPN 1 LABANG SUPRIYO, S.Pd, SE, M.PdI

SMPN 1 KWANYAR KEC. KWANYAR KAB. BANGKALAN MOHAMMAD SADALI, S.Pd


SMPN 1 TANJUNG BUMI KEC. TANJUNG BUMI KAB. BAN Drs. M. AGUS SUBAGIO, M.Pd
SMPN 1 BLEGA KEC. BLEGA KAB. BANGKALAN SRI ASTUTIK HANDAYANI, M.Pd
SMPN 2 TANAH MERAH KEC. T KOMARIYAH, S.Pd, M.MPd
SMPN TAHAL AMIN H. ABDULLAH, S.Pd
SMPN 1 GEGER Hj. SRI MULYATI, S.Pd, M.MPd
SMPN 1 GALIS
SMPN 1 TANAH MERAH DYAH CHANDRAWATI, S.Pd
SMPN 2 GEGER SITI YAUMAH, S.Pd
SMPN 4 SATAP TANAH MERA MOH. YUSUF, S.Pd
SMPN 1 KONANG Drs. ANANG ISKANDAR, MM

28.5
23.5
7.833333

1 ( Satu )
5 Oktob. s/d 10 Oktober 2015
Oktober 2015
29 Oktober 2015
Rp. 212.320.000.00
Prestasi Pekerjaan Prestasi Pekerjaan
Minggu Ini (%) Komulatif (%)
Rerata Prestasi Rerata
(9) (10) (11)
(8)/100x(5) (6)+(8) (7)+(9)

0.97 100.00 0.97 Rp 12,375.00 Rp 1,769,625.00


0.97 100.00 0.97 Rp 7,500.00 Rp 1,761,750.00
1.01 100.00 1.01 Rp 20,000.00 Rp 1,843,200.00
- - - Rp 200,000.00 Rp 200,000.00
Rp 5,574,575.00

- - - Rp 88,586.67 Rp 1,638,853.33
- - - Rp 42,298.80 Rp 1,565,055.60
- - - Rp - Rp -
Rp 3,203,908.93

- - - Rp 3,912,550.00 Rp 234,753.00
- - - Rp 3,962,550.00 Rp 114,121.44
- - - Rp 3,962,550.00 Rp 1,027,092.96
- - - Rp 3,962,550.00 Rp 1,255,335.84
Rp 2,631,303.24

- - - Rp 185,000.00 Rp 25,849,125.00
- - - Rp 185,000.00 Rp 21,929,437.50
- - - Rp 65,000.00 Rp 3,100,500.00
Rp 50,879,062.50

- - - Rp 18,000.00 Rp 2,515,050.00
- - - Rp 110,000.00 Rp 26,078,250.00
- - - Rp 95,820.00 Rp 2,558,394.00
- - - Rp 21,149.40 Rp 1,184,366.40
Rp 32,336,060.40

- - - Rp 85,000.00 Rp 22,185,000.00
Rp 22,185,000.00

- - - Rp 20,740.00 Rp 10,805,637.48
- - - Rp 20,740.00 Rp 5,413,140.00
- - - Rp 42,450.00 Rp 4,752,702.00
Rp 20,971,479.48

- - - Rp 105,250.00 Rp 3,315,375.00
- - - Rp 112,000.00 Rp 16,800,000.00
- - - Rp 136,075.00 Rp 12,540,672.00
- - - Rp 85,000.00 Rp 6,528,000.00
Rp 39,184,047.00

- - - Rp 55,000.00 Rp 660,000.00
- - - Rp 50,000.00 Rp 150,000.00
- - - Rp 20,000.00 Rp 80,000.00
- - - Rp 15,000.00 Rp 75,000.00
- - - Rp 225,000.00 Rp 1,125,000.00
Rp 200,000.00 Rp 3,000,000.00
Rp 5,090,000.00
- - - Rp 112,125.00 Rp 376,964.25
Rp 376,964.25

2.95 2.95

Rp 20,300,000.00 2.95 %
1 ( Satu )
5 Oktob. s/d 10 Oktober 2015
Oktober 2015
29 Oktober 2015

Prestasi Pekerjaan Prestasi Pekerjaan


Minggu Ini (%) Komulatif (%)
Rerata Prestasi Rerata
(9) (10) (11)
(8)/100x(5) (6)+(8) (7)+(9)
0.20 100.00 0.20 Rp 50,000.00 Rp 600,000.00
0.08 100.00 0.08 Rp 20,000.00 Rp 240,000.00
- - - Rp 200,000.00 Rp 200,000.00
Rp 1,040,000.00

- - - Rp 58,500.00 Rp 126,360.00
- - - Rp 215,400.00 Rp 77,544.00
- - - Rp 16,110.00 Rp 17,398.80
Rp 221,302.80

- - - Rp 88,586.67 Rp 3,790,281.61
- - - Rp 42,298.80 Rp 3,619,604.84
- - - Rp 11,825.00 Rp 3,651,560.00
Rp 11,061,446.45

- - - Rp 897,800.00 Rp 161,604.00
- - - Rp 3,962,550.00 Rp 2,139,777.00
- - - Rp 3,962,550.00 Rp 3,120,508.13
- - - Rp 3,962,550.00 Rp 5,943,825.00
- - - Rp 3,962,550.00 Rp 9,510,120.00
- - - Rp 3,962,550.00 Rp 941,501.88
Rp 21,817,336.01

- - - Rp 210,000.00 Rp 77,723,100.00
- - - Rp 65,000.00 Rp 5,063,500.00
Rp 82,786,600.00

- - - Rp 80,500.00 Rp 16,325,400.00
- - - Rp 18,000.00 Rp 3,011,580.00
- - - Rp 95,820.00 Rp 2,429,037.00
- - - Rp 21,149.40 Rp 617,562.48
Rp 22,383,579.48

- - - Rp 11,431,250.00 Rp 14,644,117.13
- - - Rp 618,250.00 Rp 5,375,065.50
- - - Rp 430,475.00 Rp 7,148,037.38
- - - Rp 419,572.50 Rp 4,833,475.20
Rp 32,000,695.20

- - - Rp 85,000.00 Rp 25,857,000.00
Rp 25,857,000.00

- - - Rp 20,740.00 Rp 12,412,890.00
- - - Rp 20,740.00 Rp 6,309,108.00
- - - Rp 42,450.00 Rp 8,774,415.00
Rp 27,496,413.00

- - - Rp 112,000.00 Rp 26,880,000.00
- - - Rp 136,075.00 Rp 17,662,535.00
- - - Rp 136,075.00 Rp 870,880.00
- - - Rp 85,000.00 Rp 10,115,000.00
Rp 55,528,415.00

- - - Rp 140,750.00 Rp 422,250.00
- - - Rp 23,625.00 Rp 425,250.00
- - - Rp 16,687.50 Rp 267,000.00
- - - Rp 74,250.00 Rp 222,750.00
- - - Rp 14,750.00 Rp 236,000.00
- - - Rp 17,750.00 Rp 284,000.00
Rp 1,857,250.00

- - - Rp 55,000.00 Rp 660,000.00
- - - Rp 50,000.00 Rp 150,000.00
- - - Rp 20,000.00 Rp 60,000.00
- - - Rp 15,000.00 Rp 45,000.00
- - - Rp 225,000.00 Rp 675,000.00
- - - Rp 200,000.00 Rp 3,000,000.00
Rp 4,590,000.00

- - - Rp 112,125.00 Rp 3,038,587.50
Rp 3,038,587.50

0.28 -
Rp 20,300,000.00 - %
1 ( Satu )
5 Oktob. s/d 10 Oktober 2015
Oktober 2015
29 Oktober 2015

Prestasi Pekerjaan Prestasi Pekerjaan


Minggu Ini (%) Komulatif (%)
Rerata Prestasi Rerata Lembar. 2
(9) (10) (11) HARGA SATUAN JUMLAH HARGA
(8)/100x(5) (6)+(8) (7)+(9) 4 5

- 100.00 1.70 Rp 12,375.00 Rp 3,217,500.00


- 100.00 0.32 Rp 50,000.00 Rp 600,000.00
- 100.00 0.65 Rp 20,000.00 Rp 1,235,000.00
- - - Rp 200,000.00 Rp 200,000.00
Rp 5,252,500.00

- 100.00 0.05 Rp 58,500.00 Rp 88,452.00


- 100.00 0.03 Rp 215,400.00 Rp 54,280.80
- 100.00 0.01 Rp 16,110.00 Rp 12,179.16
Rp 154,911.96

- 100.00 4.29 Rp 88,586.67 Rp 8,133,700.58


- 100.00 4.10 Rp 42,298.80 Rp 7,767,439.21
- 100.00 1.08 Rp 11,825.00 Rp 2,045,725.00
Rp 17,946,864.80

- 100.00 0.15 Rp 897,800.00 Rp 274,726.80


- 100.00 0.79 Rp 3,962,550.00 Rp 1,497,843.90
- 100.00 0.99 Rp 3,962,550.00 Rp 1,872,304.88
- 100.00 2.23 Rp 3,962,550.00 Rp 4,220,115.75
- 100.00 2.64 Rp 3,962,550.00 Rp 4,992,813.00
- 100.00 1.17 Rp 3,962,550.00 Rp 2,225,368.08
Rp 15,083,172.41

21.32 100.00 28.43 Rp 210,000.00 Rp 53,841,375.00


2.24 100.00 2.24 Rp 65,000.00 Rp 4,238,000.00
Rp 58,079,375.00

6.89 85.00 6.89 Rp 80,500.00 Rp 15,344,910.00


- - - Rp 18,000.00 Rp 2,002,725.00
- - - Rp 95,820.00 Rp 1,854,117.00
- - - Rp 21,149.40 Rp 560,459.10
Rp 19,762,211.10

- 100.00 5.81 Rp 115,000.00 Rp 11,012,400.00


- 100.00 4.22 Rp 2,000,000.00 Rp 8,000,000.00
- 100.00 2.11 Rp 500,000.00 Rp 4,000,000.00
Rp 23,012,400.00

- - - Rp 85,000.00 Rp 17,105,400.00
Rp 17,105,400.00

0.30 100.00 0.59 Rp 20,740.00 Rp 1,119,960.00


0.88 100.00 1.76 Rp 9,670.00 Rp 3,331,315.00
- 100.00 1.03 Rp 9,670.00 Rp 1,945,990.80
- - - Rp 42,450.00 Rp 830,322.00
Rp 7,227,587.80

2.39 25.00 2.39 Rp 112,000.00 Rp 18,144,000.00


- - - Rp 136,075.00 Rp 762,020.00
Rp 18,906,020.00

- 100.00 0.15 Rp 140,750.00 Rp 281,500.00


- 100.00 0.15 Rp 23,625.00 Rp 283,500.00
- 100.00 0.14 Rp 16,687.50 Rp 267,000.00
- 100.00 0.08 Rp 74,250.00 Rp 148,500.00
- 100.00 0.12 Rp 14,750.00 Rp 236,000.00
- 100.00 0.15 Rp 17,750.00 Rp 284,000.00
Rp 1,500,500.00

- - - Rp 55,000.00 Rp 440,000.00
- - - Rp 50,000.00 Rp 100,000.00
- - - Rp 20,000.00 Rp 40,000.00
- - - Rp 15,000.00 Rp 30,000.00
- - - Rp 225,000.00 Rp 450,000.00
- - - Rp 200,000.00 Rp 2,000,000.00
Rp 3,060,000.00

- - - Rp 112,125.00 Rp 2,318,745.00
Rp 2,318,745.00
34.01 76.45
Rp 144,806,000.00 76.45 %

Bangkalan, 2018 Rp 189,409,688.06


Dibuat oleh 144806163.460837
Fasilitator / Perencana Rp 144,806,000.00
H. SUBADRIH, ST, MT

LAMA
140

BARU
LAMA
BARU
LAMA
BARU
LAMA
BARU
keramik tambal sulam
SADALI, S.Pd
UBAGIO, M.Pd
NDAYANI, M.Pd
1 2 3 4 5

0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
1.01 100 1.01 100 1.01 100 1.01 100 1.01 100
0.11 - - - - - - - - -
0.90 - - 100 0.90 100 0.90 100 0.90 100
0.86 - - - - 100 0.86 100 0.86 100
- - - - - 100 - 100 - 100

0.13 - - - - - - 50 0.06 100


0.06 - - - - - - - - 100
0.56 - - - - - - - - 100
0.69 - - - - - - - - 50

14.17 - - - - - - - - -
12.02 - - - - - - - - -
1.70 - - - - - - - - -

1.38 - - - - - - - - -
14.29 - - - - - - - - -
1.40 - - - - - - - - -
0.65 - - - - - - - - -

12.16 - - - - - - - - -

5.92 - - - - - - - - -
2.97 - - - - - - - - -
2.61 - - - - - - - - -

1.82 - - - - - - - - -
9.21 - - - - - - - - -
6.87 - - - - - - - - -
3.58 - - - - - - - - -

0.36 - - - - - - - - -
0.08 - - - - - - - - -
0.04 - - - - - - - - -
0.04 - - - - - - - - -
0.62 - - - - - - - - -
1.64 - - - - - - - - -
0.21 - - - - - - - - -
1 2 3 4 5
0.20 100 0.20 100 0.20 100 0.20 100 0.20 100
0.08 100 0.08 100 0.08 100 0.08 100 0.08 100
0.07 - - - - - - - - -

0.04 - - 100 0.04 100 0.04 100 0.04 100


0.03 - - - - 100 0.03 100 0.03 100
0.01 - - - - 100 0.01 100 0.01 100

1.24 - - - - - - 50 0.62 100


1.19 - - - - - - - - 100
1.20 - - - - - - - - 100

0.05 - - - - - - 25 0.01 50
0.70 - - - - - - - - 50
1.02 - - - - - - - - -
1.95 - - - - - - - - -
3.12 - - - - - - - - 50
0.31 - - - - - - - - 75

25.51 - - - - - - - - -
1.66 - - - - - - - - -

5.36 - - - - - - - - -
0.99 - - - - - - - - -
0.80 - - - - - - - - -
0.20 - - - - - - - - -

4.81 - - - - - - - - 50
1.76 - - - - - - - - -
2.35 - - - - - - - - -
1.59 - - - - - - - - -

8.49 - - - - - - - - -

4.07 - - - - - - - - -
2.07 - - - - - - - - -
2.88 - - - - - - - - -

8.82 - - - - - - - - -
5.80 - - - - - - - - -
0.29 - - - - - - - - -
3.32 - - - - - - - - -

0.14 - - - - - - - - -
0.14 - - - - - - - - -
0.09 - - - - - - - - -
0.07 - - - - - - - - -
0.08 - - - - - - - - -
0.09 - - - - - - - - -

0.22 - - - - - - - - -
0.05 - - - - - - - - -
0.02 - - - - - - - - -
0.01 - - - - - - - - -
0.22 - - - - - - - - -
0.98 - - - - - - - - -

1.00 - - - - - - - - -
1 2 3 4 5

1.70 100 1.70 100 1.70 100 1.70 100 1.70 100
0.32 100 0.32 100 0.32 100 0.32 100 0.32 100
0.65 100 0.65 100 0.65 100 0.65 100 0.65 100
0.11 - - - - - - - - -

0.05 100 0.05 100 0.05 100 0.05 100 0.05 100
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100
0.01 50 0.00 100 0.01 100 0.01 100 0.01 100

4.29 - - 100 4.29 100 4.29 100 4.29 100


4.10 - - 100 4.10 100 4.10 100 4.10 100
1.08 - - 15 0.16 100 1.08 100 1.08 100

0.15 - - - - 75 0.11 100 0.15 100


0.79 - - - - - - 50 0.40 100
0.99 - - - - - - 10 0.10 75
2.23 - - - - - - - - -
2.64 - - - - - - - - -
1.17 - - - - - - - - -
28.43 - - - - - - - - -
2.24 - - - - - - - - -

8.10 - - - - - - - - -
1.06 - - - - - - - - -
0.98 - - - - - - - - -
0.30 - - - - - - - - -

5.81 - - - - 75 4.36 100 5.81 100


4.22 - - - - 15 0.63 55 2.32 100
2.11 - - - - - - - - 100

9.03 - - - - - - - - -

0.59 - - - - - - - - -
1.76 - - - - - - - - -
1.03 - - - - - - - - 75
0.44 - - - - - - - - -

9.58 - - - - - - - - -
0.40 - - - - - - - - -

0.15 - - - - - - - - -
0.15 - - - - - - - - -
0.14 - - - - - - - - -
0.08 - - - - - - - - -
0.12 - - - - - - - - -
0.15 - - - - - - - - -

0.23 - - - - - - - - -
0.05 - - - - - - - - -
0.02 - - - - - - - - -
0.02 - - - - - - - - -
0.24 - - - - - - - - -
1.06 - - - - - - - - -

1.22 - - - - - - - - -
6 7 8 9 10

0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
1.01 100 1.01 100 1.01 100 1.01 100 1.01 100
- - - - - - - 100 0.11 100
0.90 100 0.90 100 0.90 100 0.90 100 0.90 100
0.86 100 0.86 100 0.86 100 0.86 100 0.86 100
- 100 - 100 - 100 - 100 - 100

0.13 100 0.13 100 0.13 100 0.13 100 0.13 100
0.06 100 0.06 100 0.06 100 0.06 100 0.06 100
0.56 100 0.56 100 0.56 100 0.56 100 0.56 100
0.34 100 0.69 100 0.69 100 0.69 100 0.69 100

- 100 14.17 100 14.17 100 14.17 100 14.17 100


- 100 12.02 100 12.02 100 12.02 100 12.02 100
- 25 0.42 100 1.70 100 1.70 100 1.70 100

- - - - - 100 1.38 100 1.38 100


- - - - - 100 14.29 100 14.29 100
- - - - - 100 1.40 100 1.40 100
- - - - - 100 0.65 100 0.65 100

- - - - - - - 100 12.16 100

- - - - - 50 2.96 100 5.92 100


- - - - - - - 100 2.97 100
- - - - - - - 100 2.61 100

- - - - - 50 0.91 100 1.82 100


- - - - - 100 9.21 100 9.21 100
- - - - - - - 100 6.87 100
- - - - - - - - - 100

- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
6 7 8 9 10
0.20 100 0.20 100 0.20 100 0.20 100 0.20 100
0.08 100 0.08 100 0.08 100 0.08 100 0.08 100
- - - - - - - - - 100

0.04 100 0.04 100 0.04 100 0.04 100 0.04 100
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100
0.01 100 0.01 100 0.01 100 0.01 100 0.01 100

1.24 100 1.24 100 1.24 100 1.24 100 1.24 100
1.19 100 1.19 100 1.19 100 1.19 100 1.19 100
1.20 100 1.20 100 1.20 100 1.20 100 1.20 100

0.03 100 0.05 100 0.05 100 0.05 100 0.05 100
0.35 100 0.70 100 0.70 100 0.70 100 0.70 100
- 50 0.51 100 1.02 100 1.02 100 1.02 100
- 50 0.98 100 1.95 100 1.95 100 1.95 100
1.56 75 2.34 100 3.12 100 3.12 100 3.12 100
0.23 100 0.31 100 0.31 100 0.31 100 0.31 100

- - - 100 25.51 100 25.51 100 25.51 100


- - - - - 100 1.66 100 1.66 100

- - - - - 50 2.68 100 5.36 100


- - - - - 50 0.49 100 0.99 100
- - - - - - - 100 0.80 100
- - - - - - - 100 0.20 100

2.40 100 4.81 100 4.81 100 4.81 100 4.81 100
- - - - - - - 100 1.76 100
- - - - - - - 100 2.35 100
- - - - - 50 0.79 100 1.59 100

- - - - - - - 50 4.24 100

- - - 50 2.04 100 4.07 100 4.07 100


- - - - - - - 50 1.04 100
- - - - - 50 1.44 100 2.88 100

- - - - - - - 75 6.62 100
- - - - - - - 50 2.90 100
- - - - - - - 50 0.14 100
- - - - - - - - - 100

- - - - - - - 100 0.14 100


- - - - - - - 100 0.14 100
- - - - - - - 100 0.09 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100

- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100

- - - - - - - 100 1.00 100


6 7 8 9 10

1.70 100 1.70 100 1.70 100 1.70 100 1.70 100
0.32 100 0.32 100 0.32 100 0.32 100 0.32 100
0.65 100 0.65 100 0.65 100 0.65 100 0.65 100
- - - - - - - - - 100

0.05 100 0.05 100 0.05 100 0.05 100 0.05 100
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100
0.01 100 0.01 100 0.01 100 0.01 100 0.01 100

4.29 100 4.29 100 4.29 100 4.29 100 4.29 100
4.10 100 4.10 100 4.10 100 4.10 100 4.10 100
1.08 100 1.08 100 1.08 100 1.08 100 1.08 100

0.15 100 0.15 100 0.15 100 0.15 100 0.15 100
0.79 100 0.79 100 0.79 100 0.79 100 0.79 100
0.74 100 0.99 100 0.99 100 0.99 100 0.99 100
- 100 2.23 100 2.23 100 2.23 100 2.23 100
- 100 2.64 100 2.64 100 2.64 100 2.64 100
- 100 1.17 100 1.17 100 1.17 100 1.17 100
- 25 7.11 100 28.43 100 28.43 100 28.43 100
- - - 100 2.24 100 2.24 100 2.24 100

- - - 85 6.89 100 8.10 100 8.10 100


- - - - - 100 1.06 100 1.06 100
- - - - - 100 0.98 100 0.98 100
- - - - - 100 0.30 100 0.30 100

5.81 100 5.81 100 5.81 100 5.81 100 5.81 100
4.22 100 4.22 100 4.22 100 4.22 100 4.22 100
2.11 100 2.11 100 2.11 100 2.11 100 2.11 100

- - - - - 100 9.03 100 9.03 100

- 50 0.30 100 0.59 100 0.59 100 0.59 100


- 50 0.88 100 1.76 100 1.76 100 1.76 100
0.77 100 1.03 100 1.03 100 1.03 100 1.03 100
- - - - - 100 0.44 100 0.44 100

- - - 25 2.39 100 9.58 100 9.58 100


- - - - - 85 0.34 100 0.40 100

- 100 0.15 100 0.15 100 0.15 100 0.15 100


- 100 0.15 100 0.15 100 0.15 100 0.15 100
- 100 0.14 100 0.14 100 0.14 100 0.14 100
- 100 0.08 100 0.08 100 0.08 100 0.08 100
- 100 0.12 100 0.12 100 0.12 100 0.12 100
- 100 0.15 100 0.15 100 0.15 100 0.15 100

- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100

- - - - - - - - - 100
0.97
0.97
1.01
0.11
0.90
0.86
-

0.13
0.06
0.56
0.69

14.17
12.02
1.70

1.38
14.29
1.40
0.65

12.16

5.92
2.97
2.61

1.82
9.21
6.87
3.58

0.36
0.08
0.04
0.04
0.62
1.64
0.21
0.20
0.08
0.07

0.04
0.03
0.01

1.24
1.19
1.20

0.05
0.70
1.02
1.95
3.12
0.31

25.51
1.66

5.36
0.99
0.80
0.20

4.81
1.76
2.35
1.59

8.49

4.07
2.07
2.88

8.82
5.80
0.29
3.32

0.14
0.14
0.09
0.07
0.08
0.09

0.22
0.05
0.02
0.01
0.22
0.98

1.00
1.70
0.32
0.65
0.11

0.05
0.03
0.01

4.29
4.10
1.08

0.15
0.79
0.99
2.23
2.64
1.17
28.43
2.24

8.10
1.06
0.98
0.30

5.81
4.22
2.11

9.03

0.59
1.76
1.03
0.44

9.58
0.40

0.15
0.15
0.14
0.08
0.12
0.15

0.23
0.05
0.02
0.02
0.24
1.06

1.22
YANG DIPAKAI
TH. 2018
1 SMPN 2 SEPULU 2 KELAS ### SINERGI
2 SMPN 1 KLAMPIS 3 KELAS ### SINERGI
3 SMPN 2 KOKOP 2 KELAS ### SINERGI
4 SMPN 3 SATAP KOKOP 2 KELAS ### SINERGI
5 SMPN 1 TRAGAH 3 KELAS ### INDRAKILA
6 SMPN 2 MODUNG 2 KELAS ### INDRAKILA
7 SMPN 2 LABANG 3 KELAS ### INDRAKILA
8 SMPN 2 KWANYAR 2 KELAS ### INDRAKILA
9 SMPN TAHAL AMIN H. ABDULLAH, S.Pd

REKAPITULASI 1
RENCANA ANGGARAN BIAYA OK
OK
KEGIATAN : PENGADAAN SARANA PRASARANA
PEKERJAAN : PERENCANAAN SMP KABUPATEN BANGKALAN
LINGKUP PEKERJAAN : REHABILITASI 2 RUANG BELAJAR SMPN 2 SEPULU
LOKASI : SMPN 2 SEPULU KEC. SEPULU KAB. BANGKALAN

NO. URAIAN PEKERJAAN JUMLAH HARGA

I PEKERJAAN PERSIAPAN ###


II PEKERJAAN PASANGAN/PLESTERAN ###
III PEKERJAAN BETON ###
IV PEKERJAAN RANGKA ATAP ###
V PEKERJAAN ATAP ###
VI PEKERJAAN PLAFOND ###
VII PEKERJAAN PENGECATAN ###
VIII PEKERJAAN LANTAI ###
IX PEKERJAAN INSTALASI LISTRIK ###
X PEKERJAAN KACA ###

JUMLAH ###
DIBULATK ### ###
###

TERBILANG : ( SERATUS DELAPAN PULUH TIGA JUTA RUPIAH )

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

ANWAR NURIS, S.Pd.I H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Sepulu
Kec. Sepulu Kab. Bangkalan

DR. AHMAD SABARUDIN, S.Pd, M.MPd


NIP. 19680503 199103 1 013

LAPORAN MINGGUAN
Minggu ke :
Pekerjaan : REHABILITASI 2 RUANG KELAS SMPN 2 SEPULU Tanggal :
Nama Sekolah : SMPN 2 SEPULU Bulan :
Lokasi : Kec. Kedamean Kab. Gresik Dana diterima tangal :
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%)
% Prestasi Rerata Prestasi
(1) (2) (3) (4) (5) (6) (7) (8)
(6)/100x(5)
I. PEKERJAAN PERSIAPAN
1 Pembongkaran atap + rangka atap 143.00 m² 0.97 - - 100
2 Pembongkaran atap 234.90 m² 0.97 - - 100
3 Penetelan plesteran 92.16 m² 1.01 - - 100
4 Pembersihan akhir pekerjaan 1.00 ls 0.11 - - -
II. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 18.50 m² 0.90 - - -
2 Plesteran 1Pc : 5Ps 37.00 m² 0.86 - - -
3 Benangan 48.00 m' - - - -

III. PEKERJAAN BETON


1 Kolom Struktur 15/25 0.06 m³ 0.13 - - -
2 Kolom Praktis 15/15 0.03 m³ 0.06 - - -
3 Ring Balk 15/15 0.26 m³ 0.56 - - -
4 Ring gewel 15/15 dan konsol beton 15/15 0.32 m³ 0.69 - - -

IV. PEKERJAAN RANGKA ATAP


1 Kuda-kuda baja ringan (galvalum bentang 7m) 139.73 m² 14.17 - - -
2 Kuda-kuda baja ringan (galvalum 50%) 118.54 m² 12.02 - - -
2 Listplank kalsiplank 8mm / 30 cm 47.70 m¹ 1.70 - - -

V. PEKERJAAN ATAP
1 Atap genteng beton (lama) 139.73 m² 1.38 - - -
2 Atap genteng beton warna 237.08 m² 14.29 - - -
3 Genteng bubungan beton warna 26.70 m' 1.40 - - -
4 Plesteran kompres L = 10 cm (Akhiran genting) 56.00 m' 0.65 - - -

VI. PEKERJAAN PLAFOND


1 Plafond calsiboard 4mm + rangka metal hollow 261.00 m² 12.16 - - -

VII. PEKERJAAN PENGECATAN


1 Pengecatan dinding 521.00 m² 5.92 - - -
2 Pengecetan plafond 261.00 m² 2.97 - - -
3 Pengecatan kayu 111.96 m² 2.61 - - -

VIII. PEKERJAAN LANTAI


1 Keramik lantai 30 x 30 ( tambal sulam 1kelas) 31.50 m² 1.82 - - -
2 Keramik lantai 40 x 40 150.00 m² 9.21 - - -
3 Keramik dinding R.Lab 25 x 40 92.16 m² 6.87 - - -
4 List keramik 76.80 m' 3.58 - - -

IX. PEKERJAAN INSTALASI LISTRIK


1 Lampu SL 14 watt 12.00 bh 0.36 - - -
2 Lampu SL 8 watt (teras) 3.00 bh 0.08 - - -
3 Saklar ganda 4.00 bh 0.04 - - -
4 Saklar tunggal 5.00 bh 0.04 - - -
5 Stop kontak + instalasi 5.00 bh 0.62 - - -
6 Instalasi titik lampu 15.00 ttk 1.64
X. PEKERJAAN KACA
1 Kaca mati t=5 mm (yg pecah) 3.36 m² 0.21 - - -

JUMLAH 100.00 -
Jumlah dana yang digunakan sampai dengan minggu ini ( minggu ke 1 ) Rp 20,300,000.00

REKAPITULASI 2
RENCANA ANGGARAN BIAYA OK

KEGIATAN : PENGADAAN SARANA PRASARANA


PEKERJAAN : PERENCANAAN SMP KABUPATEN BANGKALAN
LINGKUP PEKERJAAN : REHABILITASI 3 RUANG BELAJAR SMPN 1 KLAMPIS
LOKASI : SMPN 1 KLAMPIS KEC. KLAMPIS KAB. BANGKALAN

NO. URAIAN PEKERJAAN JUMLAH HARGA

I (2) ###
II PEKERJAAN TANAH ###
III PEKERJAAN PASANGAN/PLESTERAN ###
IV PEKERJAAN BETON ###
V PEKERJAAN RANGKA ATAP ###
VI PEKERJAAN ATAP ###
VII PEKERJAAN KUSEN PINTU DAN JENDELA ###
VIII PEKERJAAN PLAFOND ###
IX PEKERJAAN PENGECATAN/PLAMIRAN ###
X PEKERJAAN LANTAI ###
XI PEKERJAAN KUNCI + PENGGANTUNG ###
XII PEKERJAAN INSTALASI LISTRIK ### ###
XIII PEKERJAAN KACA ###

JUMLAH ### ###


DIBULATK ### ###
TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

HANAF I H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 1 Kelampis
Kec. Kelampis Kab. Bangkalan

IMAM SYAFII, S.Pd, MPd


NIP. 19680228 199401 1 003

LAPORAN MINGGUAN
Minggu ke :
Pekerjaan : REHABILITASI 2 RUANG KELAS SMPN 1 KLAMPIS Tanggal :
Nama Sekolah : SMPN 1 KLAMPIS Bulan :
Lokasi : Kec. Kedamean Kab. Gresik Dana diterima tangal :
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%)
% Prestasi Rerata Prestasi
(1) (2) (3) (4) (5) (6) (7) (8)
I. PEKERJAAN PERSIAPAN (6)/100x(5)
1 Pembongkaran kosen 12.00 bh 0.20 - - 100
2 Penetelan plesteran 12.00 m² 0.08 - - 100
3 Pembersihan akhir pekerjaan 1.00 ls 0.07 - - -

II. PEKERJAAN TANAH


1 Galian tanah 2.16 m³ 0.04 - - -
2 Urugan pasir bawah pondasi t=10cm 0.36 m³ 0.03 - - -
4 Urugan tanah kembali 1.08 m³ 0.01 - - -

III. PEKERJAAN PASANGAN/PLESTERAN


1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 42.79 m² 1.24 - - -
2 Plesteran 1Pc : 5Ps 85.57 m² 1.19 - - -
3 Benangan 308.80 m' 1.20 - - -

IV. PEKERJAAN BETON


1 Lantai kerja bawah pondasi 1:3:5 t=5cm 0.18 m³ 0.05 - - -
2 Pondasi beton stempat 60 x 60 x 15cm 0.54 m³ 0.70 - - -
3 Kolom teras 15/15 0.79 m³ 1.02 - - -
4 Balok beton 15/20 1.50 m³ 1.95 - - -
5 Kolom beon 15/20 2.40 m³ 3.12 - - -
6 Kolom praktis 15/15 0.24 m³ 0.31 - - -
5.65
V. PEKERJAAN RANGKA ATAP
1 Kuda-kuda baja ringan (galvalum 75mm) (betang. 370.11 m² 25.51 - - -
2 Lisplank kalsiplank 8mm / 30 cm 77.90 m¹ 1.66 - - -

VI. PEKERJAAN ATAP


1 Atap genteng Karang Penang (baru bg. depan) 202.80 m² 5.36 - - -
2 Atap genteng (lama bg. belakang) 167.31 m² 0.99 - - -
3 Genteng bubungan Karang penang 25.35 m' 0.80 - - -
4 Plesteran kompres L = 10 cm (Akhiran genting) 29.20 m' 0.20 - - -

VII. PEKERJAAN KUSEN PINTU DAN JENDELA


1 Kusen kayu kempas/mahoni 6/15 1.28 m³ 4.81 - - -
2 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 8.69 m² 1.76 - - -
3 Jalusi kayu kempas/mahoni 3/5 16.61 m² 2.35 - - -
4 Daun Jendela kaca kayu kempas/mahoni 3/10 11.52 m² 1.59 - - -

VIII. PEKERJAAN PLAFOND


1 Plafond calsiboard 4mm + rangka kayu 4/6 304.20 m² 8.49 - - -

IX. PEKERJAAN PENGECATAN/PLAMIRAN


1 Pengecatan dinding 598.50 m² 4.07 - - -
2 Pengecatan plafond 304.20 m² 2.07 - - -
3 Pengecatan kayu 206.70 m² 2.88 - - -

X. PEKERJAAN LANTAI
1 Keramik lantai 40 x 40 240.00 m² 8.82 - - -
2 Keramik dinding 25 x 40 129.80 m² 5.80 - - -
3 Keramik kolom 25 x 40 6.40 m² 0.29 - - -
4 List keramik 119.00 m' 3.32 - - -

XI. PEKERJAAN KUNCI + PENGGANTUNG


1 Kunci pintu 2 x putar 3.00 bh 0.14 - - -
2 Engsel Pintu 18.00 bh 0.14 - - -
3 Engsel Jendela 16.00 bh 0.09 - - -
4 Grendel tanam 3.00 bh 0.07 - - -
5 Grendel Jendela 16.00 bh 0.08 - - -
6 Hag Angin 16.00 bh 0.09 - - -

XII. PEKERJAAN INSTALASI LISTRIK


1
Lampu SL 14 watt 12.00 bh 0.22 - - -
2
Lampu SL 8watt (teras) 3.00 bh 0.05 - - -
3
Saklar ganda 3.00 bh 0.02 - - -
4
Saklar tunggal 3.00 bh 0.01 - - -
5 Stop kontak + instalasi 3.00 bh 0.22 - - -
6 Instalasi titik lampu 15.00 ttk 0.98 - - -

XIII. PEKERJAAN KACA


1 Kaca bening t=5 mm 27.10 m² 1.00 - - -

JUMLAH 95.07 -
Jumlah dana yang digunakan sampai dengan minggu ini ( minggu ke 1 ) Rp 20,300,000.00

3
REKAPITULASI OK
NCANA ANGGARAN BIAYA OK
: PENGADAAN SARANA PRASARANA
KEGIATAN : PERENCANAAN SMP KABUPATEN BANGKALAN
PEKERJAAN : REHABILITASI 2 RUANG BELAJAR SMPN 3 SATAP KOKOP
LINGKUP PEKERJAAN : SMPN 3 SATAP KOKOP KEC. KOKOP KAB. BANGKALAN
LOKASI
URAIAN PEKERJAAN JUMLAH HARGA
NO.

PEKERJAAN PERSIAPAN ###


I PEKERJAAN TANAH ###
II PEKERJAAN PASANGAN/PLESTERAN ###
III PEKERJAAN BETON ###
IV PEKERJAAN RANGKA ATAP ###
V PEKERJAAN ATAP ###
VI PEKERJAAN KUSEN PINTU DAN JENDELA ###
VII PEKERJAAN PLAFOND ###
VIII PEKERJAAN PENGECATAN/PLAMIRAN ###
IX PEKERJAAN LANTAI ###
X PEKERJAAN KUNCI + PENGGANTUNG ###
XI PEKERJAAN INSTALASI LISTRIK ###
XII PEKERJAAN KACA ###
XIII

JUMLAH ### ###


DIBULATK ### ###

TERBILANG : ( SERATUS DELAPAN PULUH TIGA JUTA RUPIAH )

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 3 Satap Kokop
Kec. Kokop Kab. Bangkalan

IHSANUDIN, S.Pd
NIP. 19700109 199104 1 001
LAPORAN MINGGUAN
Minggu ke :
Pekerjaan : REHABILITASI 2 RUANG BELAJAR SMPN 3 SATAP KOKOP Tanggal :
Nama Sekolah : SMPN 3 SATAP KOKOP KEC. KOKOP KAB. BANGKALAN Bulan :
Lokasi : KEC. KOKOP KAB. BANGKALAN Dana diterima tangal :
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%)
% Prestasi Rerata Prestasi
(1) (2) (3) (4) (5) (6) (7) (8)
(6)/100x(5)

I. PEKERJAAN PERSIAPAN
1 Pembongkaran atap + rangka 260.00 m² 1.70 100 1.70 -
2 Pembongkaran kosen 12.00 bh 0.32 100 0.32 -
3 Pembongkaran dinding 61.75 m² 0.65 100 0.65 -
4 Pembersihan akhir pekerjaan 1.00 ls 0.11 - - -

II. PEKERJAAN TANAH


1 Galian tanah 1.51 m³ 0.05 100 0.05 -
2 Urugan pasir bawah pondasi t=10cm 0.25 m³ 0.03 100 0.03 -
4 Urugan tanah kembali 0.76 m³ 0.01 100 0.01 -

III. PEKERJAAN PASANGAN/PLESTERAN


1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 91.82 m² 4.29 100 4.29 -
2 Plesteran 1Pc : 5Ps 183.63 m² 4.10 100 4.10 -
3 Benangan 173.00 m' 1.08 100 1.08 -

IV. PEKERJAAN BETON `


1 Lantai kerja bawah pondasi 1:3:5 t=5cm 0.31 m³ 0.15 100 0.15 -
2 Pondasi beton stempat 60 x 60 x 15cm 0.38 m³ 0.79 100 0.79 -
3 Kolom teras 15/15 0.47 m³ 0.99 100 0.99 -
4 Balok beton 15/20 1.07 m³ 2.23 100 2.23 -
5 Kolom struktur 15/25 1.26 m³ 2.64 100 2.64 -
6 Ring balk 15/15 0.56 m³ 1.17 100 1.17 -
V. PEKERJAAN RANGKA ATAP
1 Kuda-kuda baja ringan (galvalum 75mm) 256.39 m² 28.43 100 28.43 -
2 Lisplank kalsiplank 8mm / 30 cm 65.20 m¹ 2.24 100 2.24 -

VI. PEKERJAAN ATAP


1 Atap genteng Karang Penang (baru bg depan) 190.62 m² 8.10 85 6.89 15
2 Atap genteng (lama bg belakang) 111.26 m² 1.06 - - 100
3 Genteng bubungan Karang penang 19.35 m' 0.98 - - 100
4 Plesteran kompres L = 10 cm (Akhiran genting) 26.50 m' 0.30 - - 100

VII. PEKERJAAN KUSEN PINTU DAN JENDELA


1 Kusen kayu aluminium 4" 95.76 m' 5.81 100 5.81 -
2 Daun Pintu kaca aluminium 4.00 bh 4.22 100 4.22 -
3 Daun Jendela kaca aluminium 8.00 bh 2.11 100 2.11 -

VIII. PEKERJAAN PLAFOND


1 Plafond calsiboard 4mm + rangka hollow 201.24 m² 9.03 - - 100

IX. PEKERJAAN PENGECATAN/PLAMIRAN


1 Pengecatan dinding depan 54.00 m² 0.59 100 0.59 -
2 Pelamiran dinding 344.50 m² 1.76 100 1.76 -
3 Plamiran plafond 201.24 m² 1.03 100 1.03 -
4 Pengecatan kayu 19.56 m² 0.44 - - 100

X. PEKERJAAN LANTAI
1 Keramik lantai 40 x 40 162.00 m² 9.58 25 2.39 75
2 Keramik kolom 20 x 40 (motif) 5.60 m² 0.40 - - 85

XI. PEKERJAAN KUNCI + PENGGANTUNG


1 Kunci pintu 2 x putar 2.00 bh 0.15 100 0.15 -
2 Engsel Pintu 12.00 bh 0.15 100 0.15 -
3 Engsel Jendela 16.00 bh 0.14 100 0.14 -
4 Grendel tanam 2.00 bh 0.08 100 0.08 -
5 Grendel Jendela 16.00 bh 0.12 100 0.12 -
6 Hag Angin 16.00 bh 0.15 100 0.15 -

XII PEKERJAAN INSTALASI LISTRIK


1 Lampu SL 14 watt 8.00 bh 0.23 - - -
2 Lampu SL 8watt (teras) 2.00 bh 0.05 - - -
3 Saklar ganda 2.00 bh 0.02 - - -
4 Saklar tunggal 2.00 bh 0.02 - - -
5 Stop kontak + instalasi 2.00 bh 0.24 - - -
6 Instalasi titik lampu 10.00 ttk 1.06 - - -

XIII. PEKERJAAN KACA


1 Kaca mati t=5 mm 20.68 m² 1.22 - - -

JUMLAH 100.00 76.45


Jumlah dana yang digunakan sampai dengan minggu ini ( minggu ke 1 ) Rp 183,716,000.00

Mengetahui Menyetujui
SMPN 3 Satap Kokop Panitia Pembangunan Sekolah
Kec. Kokop Kab. Bangkalan
Selaku Penanggung Jawab
IHSANUDIN, S.Pd SUHAERI
NIP. 19700109 199104 1 001

REKAPITULASI
NCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI

NO.

I
II
III
IV
V
VI
VII
VIII
IX
X 4
XI OK
XII LAMA
XIII : PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 1 TRAGAH
: SMPN 1 TRAGAH KEC. TRAGAH KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA

TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )
PEKERJAAN PERSIAPAN ###
PEKERJAAN TANAH ###
PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA #DIV/0!
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###

JUMLAH #DIV/0! ###


DIBULATK #DIV/0! #DIV/0!

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

YUNIZAR AN NATSIRUL YUSUF H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 1 Tragah
Kec. Tragah Kab. Bangkalan

Drs. AMIRULLAH, MM
NIP. 19581217 198603 1 011

NO
1
I.
1
2
3
4

II.
1
2
4

III.
1
2
3

IV.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran atap + rangka 377.00 m² ### ###
V. Pembongkaran kusen 4.00 bh ### ###
1 Penetelan plesteran 159.60 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VI. PEKERJAAN TANAH ###
1 Galian tanah 2.16 m³ ### ###
2 Urugan pasir bawah pondasi t=10cm 0.36 m³ ### ### #DIV/0!
3 Urugan tanah kembali 1.08 m³ ### ###
4 ###
PEKERJAAN PASANGAN/PLESTERAN
VII. Pasangan 1/2 bata camp. 1 Pc : 5 Ps 7.20 m² ### ### ###
1 Plesteran 1Pc : 5Ps 14.40 m² ### ###
2 Benangan 24.00 m' ### ###
3 ###
PEKERJAAN BETON
VIII. Lantai kerja bawah pondasi 1:3:5 t=5cm 0.18 m³ ### ###
1 Pondasi beton stempat 60 x 60 x 15cm 0.54 m³ ### ###
Kolom teras 15/15 0.79 m³ ### ###
IX. Balok beton 15/20 1.71 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ ### ###
X. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Penang (baru) 382.73 m² ### ###
3 Atap genteng (lama bg. belakang) 170.10 m² ### ###
4 Genteng bubungan Karang penang 28.35 m' ### ###
Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' ### ###
XI. ###
1 PEKERJAAN KUSEN PINTU DAN JENDELA
2 Kusen kayu kempas/mahoni 6/15 #DIV/0! m³ Rp - #DIV/0!
3 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 8.61 m² Rp - Rp - #DIV/0!
4 Daun Jendela kaca kayu kempas/mahoni 3/10 8.40 m² Rp - Rp - ###
5 #DIV/0!
6 PEKERJAAN PLAFOND
Plafond calsiboard 4mm + rangka kayu 4/6 294.84 m² ### ###
XII ###
1 PEKERJAAN PENGECATAN
2 Pengecatan dinding (3 Ruang kelas) 598.50 m² ### ###
3 Pengecatan plafond 294.84 m² ### ###
4 Pengecatan kayu 206.70 m² ### ###
5 ###
6 PEKERJAAN LANTAI #DIV/0!
Keramik lantai 40 x 40 245.70 m² ### ###
XIII. Keramik dinding 25 x 40 ( 3 R.kelas + teras ) 159.60 m² ### ###
1 List keramik dinding 7cm 110.40 m² ### ###
Keramik kolom 25 x 40 12.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Engsel Pintu 18.00 bh ### ###
Engsel Jendela 16.00 bh ### ###
Grendel pintu 3.00 bh ### ###
Grendel Jendela 16.00 bh ### ###
Hag Angin 16.00 bh ### ###
###
REKAPITULASI
PEKERJAAN INSTALASI LISTRIK
NCANA ANGGARAN
Lampu BIAYA
SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
KEGI Saklar ganda 3.00 bh ### ###
PEKE Saklar tunggal 3.00 bh ### ###
LING Stop kontak + instalasi 3.00 bh ### ###
LOKA Instalasi titik lampu 15.00 ttk ### ###
###
NO. PEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 11.14 m² ### ###
###
I
II
III
IV
V
VI
VII
VIII
IX
X 4
XI OK
XII BARU
XIII : PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 1 TRAGAH
: SMPN 1 TRAGAH KEC. TRAGAH KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA

TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )
PEKERJAAN PERSIAPAN ###
PEKERJAAN TANAH ###
PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA Rp -
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###

JUMLAH ### ###


DIBULATK ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

YUNIZAR AN NATSIRUL YUSUF H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 1 Tragah
Kec. Tragah Kab. Bangkalan

Drs. AMIRULLAH, MM
NIP. 19581217 198603 1 011

NO
1
I.
1
2
3
4

II.
1
2
4

III.
1
2
3
IV.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran atap + rangka 377.00 m² ### ###
V. Pembongkaran kusen 8.00 bh ### ###
1 Penetelan plesteran 249.00 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VI. PEKERJAAN TANAH ###
1 Galian tanah 2.16 m³ ### ###
2 Urugan pasir bawah pondasi t=10cm 0.36 m³ ### ### ###
3 Urugan tanah kembali 1.08 m³ ### ###
###
VII. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 24.02 m² ### ### ###
2 Plesteran 1Pc : 5Ps 48.03 m² ### ###
3 Benangan 168.00 m' ### ###
4 ###
PEKERJAAN BETON
VIII. Lantai kerja bawah pondasi 1:3:5 t=5cm 0.18 m³ ### ###
1 Pondasi beton stempat 60 x 60 x 15cm 0.54 m³ ### ###
Kolom teras 15/15 0.79 m³ ### ###
IX. Balok beton 15/20 1.56 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ ### ###
X. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Penang (baru) 382.73 m² ### ###
3 Genteng bubungan Karang penang 28.35 m' ### ###
4 Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' ### ###
5 ###
PEKERJAAN KUSEN PINTU DAN JENDELA
XI. Kusen kayu kempas/mahoni 6/15 1.09 m³ Rp - Rp -
1 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 8.61 m² Rp - Rp - ###
2 Jalusi kayu kempas/mahoni 3/12 7.20 m² Rp - Rp -
3 Daun Jendela kaca kayu kempas/mahoni 3/10 6.72 m² Rp - Rp - ###
4 Rp -
5 PEKERJAAN PLAFOND
6 Plafond calsiboard 4mm + rangka kayu 4/6 294.84 m² ### ###
###
XII PEKERJAAN PENGECATAN
1 Pengecatan dinding (3 Ruang kelas) 598.50 m² ### ###
2 Pengecatan plafond 294.84 m² ### ###
3 Pengecatan kayu 206.70 m² ### ###
4 ###
5 PEKERJAAN LANTAI ###
6 Keramik lantai 40 x 40 245.70 m² ### ###
Keramik dinding 25 x 40 ( 3 R.kelas + teras ) 173.40 m² ### ###
XIII. List keramik dinding 7cm 132.90 m² ### ###
1 Keramik kolom 25 x 40 12.00 m² ### ###
Keramik dinding 25 x 40 ( 3 R.kelas teras saja ) 75.60 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Engsel Pintu 18.00 bh ### ###
Engsel Jendela 16.00 bh ### ###
Grendel pintu 3.00 bh ### ###
Grendel Jendela 16.00 bh ### ###
Hag Angin 16.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
REKAPITULASI
Lampu SL 8watt (teras) 3.00 bh ### ###
NCANA ANGGARAN BIAYA
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
KEGI Stop kontak + instalasi 3.00 bh ### ###
PEKE Instalasi titik lampu 15.00 ttk ### ###
LINGKUP PEKERJAAN ###
LOKAPEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 11.14 m² ### ###
NO. ###

I
II
III
IV
V
VI
VII
VIII
IX
X 5
XI OK
XII LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 MODUNG
: SMPN 2 MODUNG KEC. MODUNG KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA


TERBILANG : ( DUA RATUS LIMA JUTA ENAM RATUS RIBU RUPIAH )

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA Rp -
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN/PLAMIRAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ### ###
PEKERJAAN KACA ###

JUMLAH ### ###


DIBULAT ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

M. MAHRI, S.Ag H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Modung
Kec. Modung Kab. Bangkalan

A S U R, M.Pd
NIP. 19610117 198403 1 008

NO
1
I.
1
2

II.
1
2
3

III.
1
2
3

IV.
1
2
Lembar. 2
V. JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
1 2 3 4 5
2 PEKERJAAN PERSIAPAN
3 Pembongkaran atap + rangka 406.00 m² ### ###
4 Pembersihan akhir pekerjaan 1.00 ls ### ### ###
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 98.93 m² ### ###
2 Plesteran 1Pc : 5Ps 197.87 m² ### ###
3 Benangan 166.56 m' ### ###
###
VII. PEKERJAAN BETON
1 Kolom teras 15/15 0.41 m³ ### ###
Balok teras 15/20 1.24 m³ ### ###
VIII. Ring balk gewel 15/15 0.98 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 396.90 m² ### ###
4 Lisplank kalsiplank 8mm / 30 cm 85.70 m¹ ### ###
5 ###
PEKERJAAN ATAP
IX. Pasang atap genteng karang p enang (baru 5%) 19.85 m² ### ###
1 Pasang atap genteng (lama) 377.06 m² ### ###
Genteng bubungan karang penang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 29.00 m' ### ###
1 ###
2 PEKERJAAN KUSEN PINTU DAN JENDELA
3 Kusen kayu kempas/mahoni 6/12 0.46 m³ Rp - Rp -
4 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 6.72 m² Rp - Rp -
5 Daun Jendela kaca kayu kempas/mahoni 3/10 5.04 m² Rp - Rp -
6 Rp -
PEKERJAAN PLAFOND ###
XI. Plafond calsiboard 4mm + rangka hollow 340.20 m² ### ###
1 ###
2 PEKERJAAN PENGECATAN/PLAMIRAN
3 Pengecatan dinding (depan) 66.85 m² ### ###
4 Pelamiran dinding 430.33 m² ### ###
5 Pelamiran plafond 340.20 m² ### ### ###
6 Pengecatan kayu 206.70 m² ### ###
Cat genteng 396.90 m² ### ###
XII. ###
1 PEKERJAAN LANTAI
Lantai rabat 216.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 4.00 bh ### ###
Engsel Pintu 21.00 bh ### ###
Engsel Jendela 24.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Grendel Jendela 12.00 bh ### ### ###
Hag Angin 24.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 14.00 bh ### ###
Lampu SL 8watt (teras) 4.00 bh ### ###
Saklar ganda 7.00 bh ### ###
REKAPITULASI
Saklar tunggal 3.00 bh ### ###
NCANA ANGGARAN BIAYA
Stop kontak + instalasi 4.00 bh ### ###
Instalasi titik lampu 18.00 bh ### ###
KEGIATAN ###
PEKE PEKERJAAN KACA
LING Kaca mati t=5 mm 14.49 m² ### ###
LOKASI ###

NO.

I
II
III
IV
V
VI
VII
VIII
IX
X 5
XI OK
XII BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 MODUNG
: SMPN 2 MODUNG KEC. MODUNG KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA


TERBILANG : ( DUA RATUS LIMA JUTA ENAM RATUS RIBU RUPIAH )

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA Rp -
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN/PLAMIRAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ### -
PEKERJAAN KACA ###

JUMLAH ### ###


DIBULAT ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

M. MAHRI, S.Ag H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Modung
Kec. Modung Kab. Bangkalan

A S U R, M.Pd
NIP. 19610117 198403 1 008

NO
1
I.
1
2

II.
1
2
3

III.
1
2
3

IV.
1
2
Lembar. 2
V. JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
1 2 3 4 5
2 PEKERJAAN PERSIAPAN
3 Pembongkaran atap + rangka 406.00 m² ### ###
4 Pembersihan akhir pekerjaan 1.00 ls ### ### ###
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 98.93 m² ### ###
2 Plesteran 1Pc : 5Ps 197.87 m² ### ###
3 Benangan 166.56 m' ### ###
###
VII. PEKERJAAN BETON
1 Kolom teras 15/15 0.41 m³ ### ###
Balok teras 15/20 1.24 m³ ### ###
VIII. Ring balk gewel 15/15 0.98 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 396.90 m² ### ###
4 Lisplank kalsiplank 8mm / 30 cm 85.70 m¹ ### ###
5 ###
PEKERJAAN ATAP
IX. Pasang atap genteng karang p enang (baru 5%) 19.85 m² ### ###
1 Pasang atap genteng (lama) 377.06 m² ### ###
Genteng bubungan karang penang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 29.00 m' ### ###
1 ###
2 PEKERJAAN KUSEN PINTU DAN JENDELA
3 Kusen kayu kempas/mahoni 6/12 0.46 m³ Rp - Rp -
4 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 6.72 m² Rp - Rp -
5 Daun Jendela kaca kayu kempas/mahoni 3/10 5.04 m² Rp - Rp -
6 Rp -
PEKERJAAN PLAFOND ###
XI. Plafond calsiboard 4mm + rangka kayu 4/6 340.20 m² ### ###
1 ###
2 PEKERJAAN PENGECATAN/PLAMIRAN
3 Pengecatan dinding (depan) 66.85 m² ### ###
4 Pelamiran dinding 430.33 m² ### ###
5 Pelamiran plafond 340.20 m² ### ### ###
6 Pengecatan kayu 206.70 m² ### ###
Cat genteng 396.90 m² ### ###
XII. ###
1 PEKERJAAN LANTAI
Lantai rabat 216.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 4.00 bh ### ###
Engsel Pintu 21.00 bh ### ###
Engsel Jendela 24.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Grendel Jendela 12.00 bh ### ### ###
Hag Angin 24.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 14.00 bh ### ###
Lampu SL 8watt (teras) 4.00 bh ### ###
Saklar ganda 7.00 bh ### ###
REKAPITULASI
Saklar tunggal 3.00 bh ### ###
NCANA ANGGARAN BIAYA
Stop kontak + instalasi 4.00 bh ### ###
Instalasi titik lampu 18.00 bh ### ###
KEGIATAN ###
PEKE PEKERJAAN KACA
LING Kaca mati t=5 mm 14.49 m² ### ###
LOKASI ###

NO.

I
II
III
IV
V
VI
VII
VIII
IX
X 6
XI OK
LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 2 LABANG
: SMPN 2 LABANG KEC. LABANG KAB. BANGKALAN

TERBILANG : ( DUA RATUS SEMBILAN


URAIAN
PULUHPEKERJAAN
EN JUMLAH HARGA

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN Rp -
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
PEKERJAAN TANGGA DEPAN PINTU ###

JUMLAH ### ###


DIBULATK ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
ACHMAD TAUFIK HEYKAL, A.Sg H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Labang
Kec. Labang Kab. Bangkalan

Drs. HARTONO, M.Pd


NIP. 19690126 199802 1 003

NO
1
I.
1
2
3
4
5

II.
1

III.
1
2

IV.
1
2
3 Lembar. 2
JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
V. 2 3 4 5
1 PEKERJAAN PERSIAPAN ###
Pembongkaran atap + rangka 377.00 m² Rp - Rp -
VI. Pembongkaran kosen 1.00 bh ### ###
1 Pembongkaran dinding 6.00 m² ### ###
2 Penetelan plesteran 139.74 m² ### ###
3 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VII. PEKERJAAN PASANGAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps (nyepit kuda2) 30.91 m² Rp - Rp -
2 Rp -
3 PEKERJAAN RANGKA ATAP ###
4 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ Rp - Rp -
VIII. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Pilang (baru) 382.73 m² ### ###
Genteng bubungan Karang pilang 28.35 m' ### ###
IX. Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' Rp - Rp -
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsiboard 4mm + rangka hollow 354.38 m² Rp - Rp -
4 Rp -
5 PEKERJAAN PENGECATAN
6 Pengecatan dinding 598.50 m² Rp - Rp - ###
Pengecatan plafond 354.38 m² Rp - Rp -
X. Pengecatan kayu 274.60 m² Rp - Rp -
1 Rp -
PEKERJAAN LANTAI
XI. Keramik lantai 40 x 40 243.00 m² ### ###
1 Keramik dinding 25 x 40 139.74 m² ### ###
2 List keramik 102.00 m' ### ###
3 Keramik kolom 20 x 40 10.80 m² ### ###
4 ###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA ###
Kaca mati t=5 mm (yg pecah) 4.22 m² ### ###
###
PEKERJAAN TANGGA DEPAN PINTU
Pasangan batu gunung 2.88 m³ ### ###
Plesterran trasram 7.68 m² ### ###
Keramik kasar 40 x 40 7.04 m² ### ###
Urugan pasir 4.96 m³ ### ###
REKAPITULASI ###
NCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI

NO.

I
II
III
IV
V
VI
VII
VIII
IX
X 6
XI OK
XII BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 2 LABANG
: SMPN 2 LABANG KEC. LABANG KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA


TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
PEKERJAAN TANGGA DEPAN PINTU ###

JUMLAH ### ###


DIBULATK ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

ACHMAD TAUFIK HEYKAL, A.Sg H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Labang
Kec. Labang Kab. Bangkalan
Drs. HARTONO, M.Pd
NIP. 19690126 199802 1 003

NO
1
I.
1
2
3
4
5

II.
1
2
3

III.
1

IV.
1
2 Lembar. 2
JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
V. 2 3 4 5
1 PEKERJAAN PERSIAPAN ###
2 Pembongkaran atap + rangka 377.00 m² Rp - Rp -
3 Pembongkaran kosen 1.00 bh ### ###
Pembongkaran dinding 6.00 m² ### ###
VI. Penetelan plesteran 127.50 m² ### ###
1 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VII. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps (nyepit kuda2) 22.43 m² Rp - Rp - -
2 Plesteran 1Pc : 5Ps 16.20 m² ### ###
3 Benangan 32.00 m' ### ###
###
VIII. PEKERJAAN BETON
1 Ring balk gewel 15/15 0.40 m³ ### ###
2 ###
3 PEKERJAAN RANGKA ATAP ###
4 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ Rp - Rp -
IX. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Pilang (baru) 382.73 m² ### ###
Genteng bubungan Karang pilang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' Rp - Rp -
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsiboard 4mm + rangka hollow 354.38 m² Rp - Rp -
4 Rp -
5 PEKERJAAN PENGECATAN
6 Pengecatan dinding 598.50 m² Rp - Rp - ###
Pengecatan plafond 354.38 m² Rp - Rp -
XI. Pengecatan kayu 274.60 m² Rp - Rp -
1 Rp -
PEKERJAAN LANTAI
XII. Keramik lantai 40 x 40 243.00 m² ### ###
1 Keramik dinding 25 x 40 127.50 m² ### ###
2 List keramik 102.00 m' ### ###
3 Keramik kolom 20 x 40 10.80 m² ### ###
4 ###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Pintu harmonika 15.00 m² ### ### ###
### ###
PEKERJAAN INSTALASI LISTRIK ###
Lampu SL 14 watt 12.00 bh ### ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA ###
Kaca mati t=5 mm (yg pecah) 4.22 m² ### ###
###
PEKERJAAN TANGGA DEPAN PINTU 3.46
Pasangan batu gunung 2.88 m³ ### ###
Plesterran trasram 7.68 m² ### ###
Keramik kasar 40 x 40 7.04 m² ### ###
Urugan pasir 4.96 m³ ### ###
###
REKAPITULASI
NCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI

NO.

I
II
III
IV
V
VI
VII
VIII
IX
X 7
OK
LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 KWANYAR
: SMPN 2 KWANYAR KEC. KWANYAR KAB. BANGKALAN
TERBILANG : ( SERATUS SEMBILAN PULUH TUJUH JUTA DELAPAN RATUS RIBU RUPIAH )
URAIAN PEKERJAAN JUMLAH HARGA

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN/PLESTERAN Rp -
PEKERJAAN KAYU ###
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
PEKERJAAN TEMPAT DUDUK ###

JUMLAH ### ###


DIBULAT ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

MOHAMMAD MUSTOFA ZAHRON, S.Pd H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Kwanyar
Kec. Kwanyar Kab. Bangkalan

RAHMAWATI, M.Pd
NIP. 19700703 199802 2 003

NO
1
I.
1
2
3
4

II.
1
2

III.
1

IV.
1

V.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran kusen 1.00 bh ### ###
VI. Pembongkaran dinding 15.00 m² ### ###
1 Penetelan plesteran 428.64 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 Ls ### ###
3 ###
4 PEKERJAAN PASANGAN/PLESTERAN ###
5 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 0.91 22.20 m² Rp - Rp -
6 Plesteran 1Pc : 5Ps 1.07 44.40 m² Rp - Rp -
Rp -
VII. PEKERJAAN KAYU
1 Lisplank kayu 3/30 cm 4.00 m¹ ### ###
2 ###
3 PEKERJAAN PLAFOND
4 Plafond calsi 1 x 1 + rangka kayu 12.00 m² Rp - Rp -
Rp -
VIII. PEKERJAAN PENGECATAN
1 Pengecatan dinding (3 kelas) 455.30 m² Rp - Rp -
2 Pengecatan plafond 319.00 m² Rp - Rp -
3 Pengecatan kayu 206.70 m² Rp - Rp - ###
4 Pengecatan kayu (Kantor) 214.39 m² Rp - Rp -
5 Rp -
6PEKERJAAN LANTAI 162.00 ###
Keramik lantai 40 x 40 ( 2 R Kelas ) 5.67 126.00 m² ### ###
IX. Keramik lantai 40 x 40 ( Teras ) 1.62 36.00 m² ### ###
1 Keramik dinding 25 x 40 (dalam kelas + teras) 5.78 128.40 m² ### ###
Keramik kolom teras 25 x 40 1.01 22.40 m² ### ###
X. List keramik 1.64 327.80 m' ### ###
1 Keramik dinding 25 x 40 (dalam kantor+R.guru+ t 13.51 300.24 m² ### ###
2 451.04 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 3.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Hag Angin 60.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
REKAPITULASI
PEKERJAAN KACA
NCANA ANGGARAN BIAYA
Kaca mati t=5 mm (yg pecah) 1.68 m² ### ###
###
KEGI PEKERJAAN TEMPAT DUDUK
PEKE Pasangan trasram 0.68 17.00 m² Rp - Rp -
LING Plat beton tempat duduk t=10 cm 0.53 1.02 m³ ### ###
LOKA Keramik tempat duduk 30 x 30 0.46 10.20 m² ### ###
Keramik dinding tempat duduk 25 x 40 1.84 40.80 m² ### ###
NO. 34.71 ###
0.86768 40.80

I
II
III
IV
V
VI
VII
VIII
IX
X 7
OK
BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 KWANYAR
: SMPN 2 KWANYAR KEC. KWANYAR KAB. BANGKALAN
TERBILANG : ( SERATUS SEMBILAN PULUH TUJUH JUTA DELAPAN RATUS RIBU RUPIAH )
URAIAN PEKERJAAN JUMLAH HARGA
PEKERJAAN PERSIAPAN ###
PEKERJAAN PASANGAN/PLESTERAN Rp -
PEKERJAAN KAYU ###
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
PEKERJAAN TEMPAT DUDUK ###

JUMLAH ### ###


DIBULAT ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

MOHAMMAD MUSTOFA ZAHRON, S.Pd H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Kwanyar
Kec. Kwanyar Kab. Bangkalan

RAHMAWATI, M.Pd
NIP. 19700703 199802 2 003

NO
1
I.
1
2
3
4

II.
1
2

III.
1
2

IV.
1

V. Lembar. 2
1 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
2 2 3 4 5
3 PEKERJAAN PERSIAPAN
4 Pembongkaran kusen 1.00 bh ### ###
5 Pembongkaran dinding 15.00 m² ### ###
Penetelan plesteran 428.64 m² ### ###
VI. Pembersihan akhir pekerjaan 1.00 Ls ### ###
1 ###
2 PEKERJAAN PASANGAN/PLESTERAN ###
3 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 22.20 m² Rp - Rp -
4 Plesteran 1Pc : 5Ps 44.40 m² Rp - Rp -
5 Rp -
6 PEKERJAAN KAYU
Perbaikan daun pintu panil 4.00 bh ### ###
VII. Lisplank kayu 3/30 cm 4.00 m¹ ### ###
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsi 1 x 1 + rangka kayu 12.00 m² Rp - Rp -
4 Rp -
PEKERJAAN PENGECATAN
VIII. Pengecatan dinding (3 kelas) 439.90 m² Rp - Rp -
1 Pengecatan dinding (Kantor) 373.40 m² Rp - Rp -
2 Pengecatan plafond 319.00 m² Rp - Rp -
3 Pengecatan kayu 169.45 m² Rp - Rp - ###
4 Pengecatan kayu (Kantor) 197.69 m² Rp - Rp -
5 Rp -
6 PEKERJAAN LANTAI ###
Keramik lantai 40 x 40 ( 2 R Kelas ) 126.00 m² ### ###
IX. Keramik lantai 40 x 40 ( Teras ) 36.00 m² ### ###
1 Keramik dinding 25 x 40 (dalam kelas + teras) 128.40 m² ### ###
Keramik kolom teras 25 x 40 22.40 m² ### ###
X. List keramik 327.80 m' ### ###
1 Keramik dinding 25 x 40 (dalam kantor+R.guru+ teras) 300.24 m² ### ###
2 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 3.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Hag Angin 60.00 bh ### ###
Pintu harmonika 11.30 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK ###
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA
REKAPITULASI
Kaca mati t=5 mm (yg pecah) 1.68 m² ### ###
NCANA ANGGARAN BIAYA ###
PEKERJAAN TEMPAT DUDUK
KEGI Pasangan trasram 17.00 m² Rp - Rp -
PEKE Plat beton tempat duduk t=10 cm 1.02 m³ ### ###
LING Keramik tempat duduk 30 x 30 10.20 m² ### ###
LOKA Keramik dinding tempat duduk 25 x 40 40.80 m² ### ###
###
NO.

I
II
III
IV
V
VI
VII
VIII
IX
8
OK

: PENGADAAN SARANA PRASARANA


: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 KOKOP
TERBILANG : ( SERATU : SMPN 2 KOKOP KEC. KOKOP KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN/PLESTERAN Rp -
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ### ###
PEKERJAAN KACA ###
PEKERJAAN TEMPAT DUDUK ###

JUMLAH ### ###


DIBULATK ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

BOSTOMI, S.Pd H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Kokop
Kec. Kokop Kab. Bangkalan

MOHAMMAD TAUFIK, SPd


NIP. 19760326 200604 1 010
NO
1
I.
1
2

II.
1
2
3
III.
1

IV.
1
2
3

V. Lembar. 2
1 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
2 2 3 4 5
3 PEKERJAAN PERSIAPAN
4 Penetelan plesteran 317.46 m² ### ###
5 Pembersihan akhir pekerjaan 1.00 Ls Rp - Rp - #REF!
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 12.25 m² Rp - Rp -
5 Plesteran 1Pc : 5Ps 80.58 m² Rp - Rp -
6 Benangan 55.00 m' Rp - Rp -
7 Rp -
PEKERJAAN PLAFOND
VII. Plafond calsiboard 4mm + rangka kayu 15.00 m² Rp - Rp -
1 Rp -
2 PEKERJAAN PENGECATAN -
3 Pengecatan dinding 506.50 m² Rp - Rp -
4 Pengecatan plafond 352.00 m² Rp - Rp - #DIV/0!
5 Pengecatan kayu 275.60 m² Rp - Rp -
6 Rp -
PEKERJAAN LANTAI ###
VIII. Keramik lantai 40 x 40 243.00 m² ### ### 147.47
1 Keramik dinding 25 x 40 ( 3 R. Kelas + teras) 132.96 m² ### ###
List keramik 288.20 m' ### ###
IX. Keramik kolom 25 x 40 16.00 m² ### ###
1 Keramik dinding 25 x 40 ( 5 R. Kelas bg. dalam) 184.50 m² ### ###
2 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 5.00 bh ### ###
Grendel Jendela 50.00 bh ### ###
Hag Angin 100.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 20.00 bh ### ###
Lampu SL 8watt (teras) 5.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 5.00 bh ### ###
Stop kontak + instalasi 5.00 bh ### ###
Instalasi titik lampu 25.00 ttk ### ###
###
PEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 2.53 m² ### ###
###
PEKERJAAN TEMPAT DUDUK
Pasangan trasram 14.70 m² Rp - Rp -
Plat beton tempat duduk t=10 cm 0.74 m³ ### ###
Keramik tempat duduk 30 x 30 7.35 m² ### ###
Keramik dinding tempat duduk 25 x 40 29.40 m² ### ###
###

BATAS
SINERGI 1 SMPN 2 SEPULU DR. AHMAD SABARUDIN, S.Pd, M.MPd
SINERGI 2 SMPN 1 KLAMPIS IMAM SYAFII, S.Pd, MPd
SINERGI 3 SMPN 2 KOKOP MOHAMMAD TAUFIK, SPd
SINERGI 4 SMPN 3 SATAP KOKOP IHSANUDIN, S.Pd
INDRAKILA 5 SMPN 1 TRAGAH Drs. AMIRULLAH, MM
INDRAKILA 6 SMPN 2 MODUNG A S U R, M.Pd
INDRAKILA 7 SMPN 2 LABANG Drs. HARTONO, M.Pd
INDRAKILA 8 SMPN 2 KWANYAR RAHMAWATI, M.Pd
9 SMPN TAHAL AMIN H. ABDULLAH, S.Pd
10 SMPN 1 MODUNG Drs. ALI MUSTOFA, M.Pd
11 SMPN 1 GALIS Drs. TAUFIKUR RAHMAN
12 SMPN 1 KOKOP BUDIONO, S.Pd, M.Pd

13 SMPN 2 KONANG ABDUL RASID, S.Ag, M.PdI


14 SMPN TAHAL AMIN H. ABDULLAH, S.Pd

SMPN 1 KWANYAR MOHAMMAD SADALI, S.Pd


SMPN 1 TANJUNG BUMI Drs. M. AGUS SUBAGIO, M.Pd
SMPN 1 BLEGA SRI ASTUTIK HANDAYANI, M.Pd
SMPN 1 LABANG SUPRIYO, S.Pd, SE, M.PdI

SMPN 1 KWANYAR KEC. KWANYAR KAB. BANGKALAN MOHAMMAD SADALI, S.Pd


SMPN 1 TANJUNG BUMI KEC. TANJUNG BUMI KAB. BAN Drs. M. AGUS SUBAGIO, M.Pd
SMPN 1 BLEGA KEC. BLEGA KAB. BANGKALAN SRI ASTUTIK HANDAYANI, M.Pd
SMPN 2 TANAH MERAH KEC. T KOMARIYAH, S.Pd, M.MPd
SMPN TAHAL AMIN H. ABDULLAH, S.Pd
SMPN 1 GEGER Hj. SRI MULYATI, S.Pd, M.MPd
SMPN 1 GALIS
SMPN 1 TANAH MERAH DYAH CHANDRAWATI, S.Pd
SMPN 2 GEGER SITI YAUMAH, S.Pd
SMPN 4 SATAP TANAH MERA MOH. YUSUF, S.Pd
SMPN 1 KONANG Drs. ANANG ISKANDAR, MM

28.5
23.5
7.833333

1 ( Satu )
5 Oktob. s/d 10 Oktober 2015
Oktober 2015
29 Oktober 2015
Rp. 212.320.000.00
Prestasi Pekerjaan Prestasi Pekerjaan
Minggu Ini (%) Komulatif (%)
Rerata Prestasi Rerata
(9) (10) (11)
(8)/100x(5) (6)+(8) (7)+(9)

0.97 100.00 0.97 Rp 12,375.00 Rp 1,769,625.00


0.97 100.00 0.97 Rp 7,500.00 Rp 1,761,750.00
1.01 100.00 1.01 Rp 20,000.00 Rp 1,843,200.00
- - - Rp 200,000.00 Rp 200,000.00
Rp 5,574,575.00

- - - Rp 88,586.67 Rp 1,638,853.33
- - - Rp 42,298.80 Rp 1,565,055.60
- - - Rp - Rp -
Rp 3,203,908.93

- - - Rp 3,912,550.00 Rp 234,753.00
- - - Rp 3,962,550.00 Rp 114,121.44
- - - Rp 3,962,550.00 Rp 1,027,092.96
- - - Rp 3,962,550.00 Rp 1,255,335.84
Rp 2,631,303.24

- - - Rp 185,000.00 Rp 25,849,125.00
- - - Rp 185,000.00 Rp 21,929,437.50
- - - Rp 65,000.00 Rp 3,100,500.00
Rp 50,879,062.50

- - - Rp 18,000.00 Rp 2,515,050.00
- - - Rp 110,000.00 Rp 26,078,250.00
- - - Rp 95,820.00 Rp 2,558,394.00
- - - Rp 21,149.40 Rp 1,184,366.40
Rp 32,336,060.40

- - - Rp 85,000.00 Rp 22,185,000.00
Rp 22,185,000.00

- - - Rp 20,740.00 Rp 10,805,637.48
- - - Rp 20,740.00 Rp 5,413,140.00
- - - Rp 42,450.00 Rp 4,752,702.00
Rp 20,971,479.48

- - - Rp 105,250.00 Rp 3,315,375.00
- - - Rp 112,000.00 Rp 16,800,000.00
- - - Rp 136,075.00 Rp 12,540,672.00
- - - Rp 85,000.00 Rp 6,528,000.00
Rp 39,184,047.00

- - - Rp 55,000.00 Rp 660,000.00
- - - Rp 50,000.00 Rp 150,000.00
- - - Rp 20,000.00 Rp 80,000.00
- - - Rp 15,000.00 Rp 75,000.00
- - - Rp 225,000.00 Rp 1,125,000.00
Rp 200,000.00 Rp 3,000,000.00
Rp 5,090,000.00
- - - Rp 112,125.00 Rp 376,964.25
Rp 376,964.25

2.95 2.95

Rp 20,300,000.00 2.95 %
1 ( Satu )
5 Oktob. s/d 10 Oktober 2015
Oktober 2015
29 Oktober 2015

Prestasi Pekerjaan Prestasi Pekerjaan


Minggu Ini (%) Komulatif (%)
Rerata Prestasi Rerata
(9) (10) (11)
(8)/100x(5) (6)+(8) (7)+(9)
0.20 100.00 0.20 Rp 50,000.00 Rp 600,000.00
0.08 100.00 0.08 Rp 20,000.00 Rp 240,000.00
- - - Rp 200,000.00 Rp 200,000.00
Rp 1,040,000.00

- - - Rp 58,500.00 Rp 126,360.00
- - - Rp 215,400.00 Rp 77,544.00
- - - Rp 16,110.00 Rp 17,398.80
Rp 221,302.80

- - - Rp 88,586.67 Rp 3,790,281.61
- - - Rp 42,298.80 Rp 3,619,604.84
- - - Rp 11,825.00 Rp 3,651,560.00
Rp 11,061,446.45

- - - Rp 897,800.00 Rp 161,604.00
- - - Rp 3,962,550.00 Rp 2,139,777.00
- - - Rp 3,962,550.00 Rp 3,120,508.13
- - - Rp 3,962,550.00 Rp 5,943,825.00
- - - Rp 3,962,550.00 Rp 9,510,120.00
- - - Rp 3,962,550.00 Rp 941,501.88
Rp 21,817,336.01

- - - Rp 210,000.00 Rp 77,723,100.00
- - - Rp 65,000.00 Rp 5,063,500.00
Rp 82,786,600.00

- - - Rp 80,500.00 Rp 16,325,400.00
- - - Rp 18,000.00 Rp 3,011,580.00
- - - Rp 95,820.00 Rp 2,429,037.00
- - - Rp 21,149.40 Rp 617,562.48
Rp 22,383,579.48

- - - Rp 11,431,250.00 Rp 14,644,117.13
- - - Rp 618,250.00 Rp 5,375,065.50
- - - Rp 430,475.00 Rp 7,148,037.38
- - - Rp 419,572.50 Rp 4,833,475.20
Rp 32,000,695.20

- - - Rp 85,000.00 Rp 25,857,000.00
Rp 25,857,000.00

- - - Rp 20,740.00 Rp 12,412,890.00
- - - Rp 20,740.00 Rp 6,309,108.00
- - - Rp 42,450.00 Rp 8,774,415.00
Rp 27,496,413.00

- - - Rp 112,000.00 Rp 26,880,000.00
- - - Rp 136,075.00 Rp 17,662,535.00
- - - Rp 136,075.00 Rp 870,880.00
- - - Rp 85,000.00 Rp 10,115,000.00
Rp 55,528,415.00

- - - Rp 140,750.00 Rp 422,250.00
- - - Rp 23,625.00 Rp 425,250.00
- - - Rp 16,687.50 Rp 267,000.00
- - - Rp 74,250.00 Rp 222,750.00
- - - Rp 14,750.00 Rp 236,000.00
- - - Rp 17,750.00 Rp 284,000.00
Rp 1,857,250.00

- - - Rp 55,000.00 Rp 660,000.00
- - - Rp 50,000.00 Rp 150,000.00
- - - Rp 20,000.00 Rp 60,000.00
- - - Rp 15,000.00 Rp 45,000.00
- - - Rp 225,000.00 Rp 675,000.00
- - - Rp 200,000.00 Rp 3,000,000.00
Rp 4,590,000.00

- - - Rp 112,125.00 Rp 3,038,587.50
Rp 3,038,587.50

0.28 -
Rp 20,300,000.00 - %
1 ( Satu )
5 Oktob. s/d 10 Oktober 2015
Oktober 2015
29 Oktober 2015

Prestasi Pekerjaan Prestasi Pekerjaan


Minggu Ini (%) Komulatif (%)
Rerata Prestasi Rerata Lembar. 2
(9) (10) (11) HARGA SATUAN JUMLAH HARGA
(8)/100x(5) (6)+(8) (7)+(9) 4 5

- 100.00 1.70 Rp 12,375.00 Rp 3,217,500.00


- 100.00 0.32 Rp 50,000.00 Rp 600,000.00
- 100.00 0.65 Rp 20,000.00 Rp 1,235,000.00
- - - Rp 200,000.00 Rp 200,000.00
Rp 5,252,500.00

- 100.00 0.05 Rp 58,500.00 Rp 88,452.00


- 100.00 0.03 Rp 215,400.00 Rp 54,280.80
- 100.00 0.01 Rp 16,110.00 Rp 12,179.16
Rp 154,911.96

- 100.00 4.29 Rp 88,586.67 Rp 8,133,700.58


- 100.00 4.10 Rp 42,298.80 Rp 7,767,439.21
- 100.00 1.08 Rp 11,825.00 Rp 2,045,725.00
Rp 17,946,864.80

- 100.00 0.15 Rp 897,800.00 Rp 274,726.80


- 100.00 0.79 Rp 3,962,550.00 Rp 1,497,843.90
- 100.00 0.99 Rp 3,962,550.00 Rp 1,872,304.88
- 100.00 2.23 Rp 3,962,550.00 Rp 4,220,115.75
- 100.00 2.64 Rp 3,962,550.00 Rp 4,992,813.00
- 100.00 1.17 Rp 3,962,550.00 Rp 2,225,368.08
Rp 15,083,172.41

- 100.00 28.43 Rp 210,000.00 Rp 53,841,375.00


- 100.00 2.24 Rp 65,000.00 Rp 4,238,000.00
Rp 58,079,375.00

1.22 100.00 8.10 Rp 80,500.00 Rp 15,344,910.00


1.06 100.00 1.06 Rp 18,000.00 Rp 2,002,725.00
0.98 100.00 0.98 Rp 95,820.00 Rp 1,854,117.00
0.30 100.00 0.30 Rp 21,149.40 Rp 560,459.10
Rp 19,762,211.10

- 100.00 5.81 Rp 115,000.00 Rp 11,012,400.00


- 100.00 4.22 Rp 2,000,000.00 Rp 8,000,000.00
- 100.00 2.11 Rp 500,000.00 Rp 4,000,000.00
Rp 23,012,400.00

9.03 100.00 9.03 Rp 85,000.00 Rp 17,105,400.00


Rp 17,105,400.00

- 100.00 0.59 Rp 20,740.00 Rp 1,119,960.00


- 100.00 1.76 Rp 9,670.00 Rp 3,331,315.00
- 100.00 1.03 Rp 9,670.00 Rp 1,945,990.80
0.44 100.00 0.44 Rp 42,450.00 Rp 830,322.00
Rp 7,227,587.80

7.18 100.00 9.58 Rp 112,000.00 Rp 18,144,000.00


0.34 85.00 0.34 Rp 136,075.00 Rp 762,020.00
Rp 18,906,020.00

- 100.00 0.15 Rp 140,750.00 Rp 281,500.00


- 100.00 0.15 Rp 23,625.00 Rp 283,500.00
- 100.00 0.14 Rp 16,687.50 Rp 267,000.00
- 100.00 0.08 Rp 74,250.00 Rp 148,500.00
- 100.00 0.12 Rp 14,750.00 Rp 236,000.00
- 100.00 0.15 Rp 17,750.00 Rp 284,000.00
Rp 1,500,500.00

- - - Rp 55,000.00 Rp 440,000.00
- - - Rp 50,000.00 Rp 100,000.00
- - - Rp 20,000.00 Rp 40,000.00
- - - Rp 15,000.00 Rp 30,000.00
- - - Rp 225,000.00 Rp 450,000.00
- - - Rp 200,000.00 Rp 2,000,000.00
Rp 3,060,000.00

- - - Rp 112,125.00 Rp 2,318,745.00
Rp 2,318,745.00
20.54 96.99
Rp 183,716,000.00 96.99 %

Bangkalan, 2018 Rp 189,409,688.06


Dibuat oleh 183716640.060837
Fasilitator / Perencana Rp 183,716,000.00
H. SUBADRIH, ST, MT

LAMA
140

BARU
LAMA
BARU
LAMA
BARU
LAMA
BARU
keramik tambal sulam
SADALI, S.Pd
UBAGIO, M.Pd
NDAYANI, M.Pd
1 2 3 4 5

0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
1.01 100 1.01 100 1.01 100 1.01 100 1.01 100
0.11 - - - - - - - - -
0.90 - - 100 0.90 100 0.90 100 0.90 100
0.86 - - - - 100 0.86 100 0.86 100
- - - - - 100 - 100 - 100

0.13 - - - - - - 50 0.06 100


0.06 - - - - - - - - 100
0.56 - - - - - - - - 100
0.69 - - - - - - - - 50

14.17 - - - - - - - - -
12.02 - - - - - - - - -
1.70 - - - - - - - - -

1.38 - - - - - - - - -
14.29 - - - - - - - - -
1.40 - - - - - - - - -
0.65 - - - - - - - - -

12.16 - - - - - - - - -

5.92 - - - - - - - - -
2.97 - - - - - - - - -
2.61 - - - - - - - - -

1.82 - - - - - - - - -
9.21 - - - - - - - - -
6.87 - - - - - - - - -
3.58 - - - - - - - - -

0.36 - - - - - - - - -
0.08 - - - - - - - - -
0.04 - - - - - - - - -
0.04 - - - - - - - - -
0.62 - - - - - - - - -
1.64 - - - - - - - - -
0.21 - - - - - - - - -
1 2 3 4 5
0.20 100 0.20 100 0.20 100 0.20 100 0.20 100
0.08 100 0.08 100 0.08 100 0.08 100 0.08 100
0.07 - - - - - - - - -

0.04 - - 100 0.04 100 0.04 100 0.04 100


0.03 - - - - 100 0.03 100 0.03 100
0.01 - - - - 100 0.01 100 0.01 100

1.24 - - - - - - 50 0.62 100


1.19 - - - - - - - - 100
1.20 - - - - - - - - 100

0.05 - - - - - - 25 0.01 50
0.70 - - - - - - - - 50
1.02 - - - - - - - - -
1.95 - - - - - - - - -
3.12 - - - - - - - - 50
0.31 - - - - - - - - 75

25.51 - - - - - - - - -
1.66 - - - - - - - - -

5.36 - - - - - - - - -
0.99 - - - - - - - - -
0.80 - - - - - - - - -
0.20 - - - - - - - - -

4.81 - - - - - - - - 50
1.76 - - - - - - - - -
2.35 - - - - - - - - -
1.59 - - - - - - - - -

8.49 - - - - - - - - -

4.07 - - - - - - - - -
2.07 - - - - - - - - -
2.88 - - - - - - - - -

8.82 - - - - - - - - -
5.80 - - - - - - - - -
0.29 - - - - - - - - -
3.32 - - - - - - - - -

0.14 - - - - - - - - -
0.14 - - - - - - - - -
0.09 - - - - - - - - -
0.07 - - - - - - - - -
0.08 - - - - - - - - -
0.09 - - - - - - - - -

0.22 - - - - - - - - -
0.05 - - - - - - - - -
0.02 - - - - - - - - -
0.01 - - - - - - - - -
0.22 - - - - - - - - -
0.98 - - - - - - - - -

1.00 - - - - - - - - -
1 2 3 4 5

1.70 100 1.70 100 1.70 100 1.70 100 1.70 100
0.32 100 0.32 100 0.32 100 0.32 100 0.32 100
0.65 100 0.65 100 0.65 100 0.65 100 0.65 100
0.11 - - - - - - - - -

0.05 100 0.05 100 0.05 100 0.05 100 0.05 100
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100
0.01 50 0.00 100 0.01 100 0.01 100 0.01 100

4.29 - - 100 4.29 100 4.29 100 4.29 100


4.10 - - 100 4.10 100 4.10 100 4.10 100
1.08 - - 15 0.16 100 1.08 100 1.08 100

0.15 - - - - 75 0.11 100 0.15 100


0.79 - - - - - - 50 0.40 100
0.99 - - - - - - 10 0.10 75
2.23 - - - - - - - - -
2.64 - - - - - - - - -
1.17 - - - - - - - - -
28.43 - - - - - - - - -
2.24 - - - - - - - - -

8.10 - - - - - - - - -
1.06 - - - - - - - - -
0.98 - - - - - - - - -
0.30 - - - - - - - - -

5.81 - - - - 75 4.36 100 5.81 100


4.22 - - - - 15 0.63 55 2.32 100
2.11 - - - - - - - - 100

9.03 - - - - - - - - -

0.59 - - - - - - - - -
1.76 - - - - - - - - -
1.03 - - - - - - - - 75
0.44 - - - - - - - - -

9.58 - - - - - - - - -
0.40 - - - - - - - - -

0.15 - - - - - - - - -
0.15 - - - - - - - - -
0.14 - - - - - - - - -
0.08 - - - - - - - - -
0.12 - - - - - - - - -
0.15 - - - - - - - - -

0.23 - - - - - - - - -
0.05 - - - - - - - - -
0.02 - - - - - - - - -
0.02 - - - - - - - - -
0.24 - - - - - - - - -
1.06 - - - - - - - - -

1.22 - - - - - - - - -
6 7 8 9 10

0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
1.01 100 1.01 100 1.01 100 1.01 100 1.01 100
- - - - - - - 100 0.11 100
0.90 100 0.90 100 0.90 100 0.90 100 0.90 100
0.86 100 0.86 100 0.86 100 0.86 100 0.86 100
- 100 - 100 - 100 - 100 - 100

0.13 100 0.13 100 0.13 100 0.13 100 0.13 100
0.06 100 0.06 100 0.06 100 0.06 100 0.06 100
0.56 100 0.56 100 0.56 100 0.56 100 0.56 100
0.34 100 0.69 100 0.69 100 0.69 100 0.69 100

- 100 14.17 100 14.17 100 14.17 100 14.17 100


- 100 12.02 100 12.02 100 12.02 100 12.02 100
- 25 0.42 100 1.70 100 1.70 100 1.70 100

- - - - - 100 1.38 100 1.38 100


- - - - - 100 14.29 100 14.29 100
- - - - - 100 1.40 100 1.40 100
- - - - - 100 0.65 100 0.65 100

- - - - - - - 100 12.16 100

- - - - - 50 2.96 100 5.92 100


- - - - - - - 100 2.97 100
- - - - - - - 100 2.61 100

- - - - - 50 0.91 100 1.82 100


- - - - - 100 9.21 100 9.21 100
- - - - - - - 100 6.87 100
- - - - - - - - - 100

- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
6 7 8 9 10
0.20 100 0.20 100 0.20 100 0.20 100 0.20 100
0.08 100 0.08 100 0.08 100 0.08 100 0.08 100
- - - - - - - - - 100

0.04 100 0.04 100 0.04 100 0.04 100 0.04 100
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100
0.01 100 0.01 100 0.01 100 0.01 100 0.01 100

1.24 100 1.24 100 1.24 100 1.24 100 1.24 100
1.19 100 1.19 100 1.19 100 1.19 100 1.19 100
1.20 100 1.20 100 1.20 100 1.20 100 1.20 100

0.03 100 0.05 100 0.05 100 0.05 100 0.05 100
0.35 100 0.70 100 0.70 100 0.70 100 0.70 100
- 50 0.51 100 1.02 100 1.02 100 1.02 100
- 50 0.98 100 1.95 100 1.95 100 1.95 100
1.56 75 2.34 100 3.12 100 3.12 100 3.12 100
0.23 100 0.31 100 0.31 100 0.31 100 0.31 100

- - - 100 25.51 100 25.51 100 25.51 100


- - - - - 100 1.66 100 1.66 100

- - - - - 50 2.68 100 5.36 100


- - - - - 50 0.49 100 0.99 100
- - - - - - - 100 0.80 100
- - - - - - - 100 0.20 100

2.40 100 4.81 100 4.81 100 4.81 100 4.81 100
- - - - - - - 100 1.76 100
- - - - - - - 100 2.35 100
- - - - - 50 0.79 100 1.59 100

- - - - - - - 50 4.24 100

- - - 50 2.04 100 4.07 100 4.07 100


- - - - - - - 50 1.04 100
- - - - - 50 1.44 100 2.88 100

- - - - - - - 75 6.62 100
- - - - - - - 50 2.90 100
- - - - - - - 50 0.14 100
- - - - - - - - - 100

- - - - - - - 100 0.14 100


- - - - - - - 100 0.14 100
- - - - - - - 100 0.09 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100

- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100

- - - - - - - 100 1.00 100


6 7 8 9 10

1.70 100 1.70 100 1.70 100 1.70 100 1.70 100
0.32 100 0.32 100 0.32 100 0.32 100 0.32 100
0.65 100 0.65 100 0.65 100 0.65 100 0.65 100
- - - - - - - - - 100

0.05 100 0.05 100 0.05 100 0.05 100 0.05 100
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100
0.01 100 0.01 100 0.01 100 0.01 100 0.01 100

4.29 100 4.29 100 4.29 100 4.29 100 4.29 100
4.10 100 4.10 100 4.10 100 4.10 100 4.10 100
1.08 100 1.08 100 1.08 100 1.08 100 1.08 100

0.15 100 0.15 100 0.15 100 0.15 100 0.15 100
0.79 100 0.79 100 0.79 100 0.79 100 0.79 100
0.74 100 0.99 100 0.99 100 0.99 100 0.99 100
- 100 2.23 100 2.23 100 2.23 100 2.23 100
- 100 2.64 100 2.64 100 2.64 100 2.64 100
- 100 1.17 100 1.17 100 1.17 100 1.17 100
- 25 7.11 100 28.43 100 28.43 100 28.43 100
- - - 100 2.24 100 2.24 100 2.24 100

- - - 85 6.89 100 8.10 100 8.10 100


- - - - - 100 1.06 100 1.06 100
- - - - - 100 0.98 100 0.98 100
- - - - - 100 0.30 100 0.30 100

5.81 100 5.81 100 5.81 100 5.81 100 5.81 100
4.22 100 4.22 100 4.22 100 4.22 100 4.22 100
2.11 100 2.11 100 2.11 100 2.11 100 2.11 100

- - - - - 100 9.03 100 9.03 100

- 50 0.30 100 0.59 100 0.59 100 0.59 100


- 50 0.88 100 1.76 100 1.76 100 1.76 100
0.77 100 1.03 100 1.03 100 1.03 100 1.03 100
- - - - - 100 0.44 100 0.44 100

- - - 25 2.39 100 9.58 100 9.58 100


- - - - - 85 0.34 100 0.40 100

- 100 0.15 100 0.15 100 0.15 100 0.15 100


- 100 0.15 100 0.15 100 0.15 100 0.15 100
- 100 0.14 100 0.14 100 0.14 100 0.14 100
- 100 0.08 100 0.08 100 0.08 100 0.08 100
- 100 0.12 100 0.12 100 0.12 100 0.12 100
- 100 0.15 100 0.15 100 0.15 100 0.15 100

- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100

- - - - - - - - - 100
0.97
0.97
1.01
0.11
0.90
0.86
-

0.13
0.06
0.56
0.69

14.17
12.02
1.70

1.38
14.29
1.40
0.65

12.16

5.92
2.97
2.61

1.82
9.21
6.87
3.58

0.36
0.08
0.04
0.04
0.62
1.64
0.21
0.20
0.08
0.07

0.04
0.03
0.01

1.24
1.19
1.20

0.05
0.70
1.02
1.95
3.12
0.31

25.51
1.66

5.36
0.99
0.80
0.20

4.81
1.76
2.35
1.59

8.49

4.07
2.07
2.88

8.82
5.80
0.29
3.32

0.14
0.14
0.09
0.07
0.08
0.09

0.22
0.05
0.02
0.01
0.22
0.98

1.00
1.70
0.32
0.65
0.11

0.05
0.03
0.01

4.29
4.10
1.08

0.15
0.79
0.99
2.23
2.64
1.17
28.43
2.24

8.10
1.06
0.98
0.30

5.81
4.22
2.11

9.03

0.59
1.76
1.03
0.44

9.58
0.40

0.15
0.15
0.14
0.08
0.12
0.15

0.23
0.05
0.02
0.02
0.24
1.06

1.22
YANG DIPAKAI
TH. 2018
1 SMPN 2 SEPULU 2 KELAS ### SINERGI
2 SMPN 1 KLAMPIS 3 KELAS ### SINERGI
3 SMPN 2 KOKOP 2 KELAS ### SINERGI
4 SMPN 3 SATAP KOKOP 2 KELAS ### SINERGI
5 SMPN 1 TRAGAH 3 KELAS ### INDRAKILA
6 SMPN 2 MODUNG 2 KELAS ### INDRAKILA
7 SMPN 2 LABANG 3 KELAS ### INDRAKILA
8 SMPN 2 KWANYAR 2 KELAS ### INDRAKILA
9 SMPN TAHAL AMIN H. ABDULLAH, S.Pd

REKAPITULASI 1
RENCANA ANGGARAN BIAYA OK
OK
KEGIATAN : PENGADAAN SARANA PRASARANA
PEKERJAAN : PERENCANAAN SMP KABUPATEN BANGKALAN
LINGKUP PEKERJAAN : REHABILITASI 2 RUANG BELAJAR SMPN 2 SEPULU
LOKASI : SMPN 2 SEPULU KEC. SEPULU KAB. BANGKALAN

NO. URAIAN PEKERJAAN JUMLAH HARGA

I PEKERJAAN PERSIAPAN ###


II PEKERJAAN PASANGAN/PLESTERAN ###
III PEKERJAAN BETON ###
IV PEKERJAAN RANGKA ATAP ###
V PEKERJAAN ATAP ###
VI PEKERJAAN PLAFOND ###
VII PEKERJAAN PENGECATAN ###
VIII PEKERJAAN LANTAI ###
IX PEKERJAAN INSTALASI LISTRIK ###
X PEKERJAAN KACA ###

JUMLAH ###
DIBULATK ### ###
###

TERBILANG : ( SERATUS DELAPAN PULUH TIGA JUTA RUPIAH )

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

ANWAR NURIS, S.Pd.I H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Sepulu
Kec. Sepulu Kab. Bangkalan

DR. AHMAD SABARUDIN, S.Pd, M.MPd


NIP. 19680503 199103 1 013

LAPORAN MINGGUAN
Minggu ke :
Pekerjaan : REHABILITASI 2 RUANG KELAS SMPN 2 SEPULU Tanggal :
Nama Sekolah : SMPN 2 SEPULU Bulan :
Lokasi : Kec. Kedamean Kab. Gresik Dana diterima tangal :
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%)
% Prestasi Rerata Prestasi
(1) (2) (3) (4) (5) (6) (7) (8)
(6)/100x(5)
I. PEKERJAAN PERSIAPAN
1 Pembongkaran atap + rangka atap 143.00 m² 0.97 - - 100
2 Pembongkaran atap 234.90 m² 0.97 - - 100
3 Penetelan plesteran 92.16 m² 1.01 - - 100
4 Pembersihan akhir pekerjaan 1.00 ls 0.11 - - -
II. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 18.50 m² 0.90 - - -
2 Plesteran 1Pc : 5Ps 37.00 m² 0.86 - - -
3 Benangan 48.00 m' - - - -

III. PEKERJAAN BETON


1 Kolom Struktur 15/25 0.06 m³ 0.13 - - -
2 Kolom Praktis 15/15 0.03 m³ 0.06 - - -
3 Ring Balk 15/15 0.26 m³ 0.56 - - -
4 Ring gewel 15/15 dan konsol beton 15/15 0.32 m³ 0.69 - - -

IV. PEKERJAAN RANGKA ATAP


1 Kuda-kuda baja ringan (galvalum bentang 7m) 139.73 m² 14.17 - - -
2 Kuda-kuda baja ringan (galvalum 50%) 118.54 m² 12.02 - - -
2 Listplank kalsiplank 8mm / 30 cm 47.70 m¹ 1.70 - - -

V. PEKERJAAN ATAP
1 Atap genteng beton (lama) 139.73 m² 1.38 - - -
2 Atap genteng beton warna 237.08 m² 14.29 - - -
3 Genteng bubungan beton warna 26.70 m' 1.40 - - -
4 Plesteran kompres L = 10 cm (Akhiran genting) 56.00 m' 0.65 - - -

VI. PEKERJAAN PLAFOND


1 Plafond calsiboard 4mm + rangka metal hollow 261.00 m² 12.16 - - -

VII. PEKERJAAN PENGECATAN


1 Pengecatan dinding 521.00 m² 5.92 - - -
2 Pengecetan plafond 261.00 m² 2.97 - - -
3 Pengecatan kayu 111.96 m² 2.61 - - -

VIII. PEKERJAAN LANTAI


1 Keramik lantai 30 x 30 ( tambal sulam 1kelas) 31.50 m² 1.82 - - -
2 Keramik lantai 40 x 40 150.00 m² 9.21 - - -
3 Keramik dinding R.Lab 25 x 40 92.16 m² 6.87 - - -
4 List keramik 76.80 m' 3.58 - - -

IX. PEKERJAAN INSTALASI LISTRIK


1 Lampu SL 14 watt 12.00 bh 0.36 - - -
2 Lampu SL 8 watt (teras) 3.00 bh 0.08 - - -
3 Saklar ganda 4.00 bh 0.04 - - -
4 Saklar tunggal 5.00 bh 0.04 - - -
5 Stop kontak + instalasi 5.00 bh 0.62 - - -
6 Instalasi titik lampu 15.00 ttk 1.64
X. PEKERJAAN KACA
1 Kaca mati t=5 mm (yg pecah) 3.36 m² 0.21 - - -

JUMLAH 100.00 -
Jumlah dana yang digunakan sampai dengan minggu ini ( minggu ke 1 ) Rp 20,300,000.00

REKAPITULASI 2
RENCANA ANGGARAN BIAYA OK

KEGIATAN : PENGADAAN SARANA PRASARANA


PEKERJAAN : PERENCANAAN SMP KABUPATEN BANGKALAN
LINGKUP PEKERJAAN : REHABILITASI 3 RUANG BELAJAR SMPN 1 KLAMPIS
LOKASI : SMPN 1 KLAMPIS KEC. KLAMPIS KAB. BANGKALAN

NO. URAIAN PEKERJAAN JUMLAH HARGA

I (2) ###
II PEKERJAAN TANAH ###
III PEKERJAAN PASANGAN/PLESTERAN ###
IV PEKERJAAN BETON ###
V PEKERJAAN RANGKA ATAP ###
VI PEKERJAAN ATAP ###
VII PEKERJAAN KUSEN PINTU DAN JENDELA ###
VIII PEKERJAAN PLAFOND ###
IX PEKERJAAN PENGECATAN/PLAMIRAN ###
X PEKERJAAN LANTAI ###
XI PEKERJAAN KUNCI + PENGGANTUNG ###
XII PEKERJAAN INSTALASI LISTRIK ### ###
XIII PEKERJAAN KACA ###

JUMLAH ### ###


DIBULATK ### ###
TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

HANAF I H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 1 Kelampis
Kec. Kelampis Kab. Bangkalan

IMAM SYAFII, S.Pd, MPd


NIP. 19680228 199401 1 003

LAPORAN MINGGUAN
Minggu ke :
Pekerjaan : REHABILITASI 2 RUANG KELAS SMPN 1 KLAMPIS Tanggal :
Nama Sekolah : SMPN 1 KLAMPIS Bulan :
Lokasi : Kec. Kedamean Kab. Gresik Dana diterima tangal :
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%)
% Prestasi Rerata Prestasi
(1) (2) (3) (4) (5) (6) (7) (8)
I. PEKERJAAN PERSIAPAN (6)/100x(5)
1 Pembongkaran kosen 12.00 bh 0.20 - - 100
2 Penetelan plesteran 12.00 m² 0.08 - - 100
3 Pembersihan akhir pekerjaan 1.00 ls 0.07 - - -

II. PEKERJAAN TANAH


1 Galian tanah 2.16 m³ 0.04 - - -
2 Urugan pasir bawah pondasi t=10cm 0.36 m³ 0.03 - - -
4 Urugan tanah kembali 1.08 m³ 0.01 - - -

III. PEKERJAAN PASANGAN/PLESTERAN


1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 42.79 m² 1.24 - - -
2 Plesteran 1Pc : 5Ps 85.57 m² 1.19 - - -
3 Benangan 308.80 m' 1.20 - - -

IV. PEKERJAAN BETON


1 Lantai kerja bawah pondasi 1:3:5 t=5cm 0.18 m³ 0.05 - - -
2 Pondasi beton stempat 60 x 60 x 15cm 0.54 m³ 0.70 - - -
3 Kolom teras 15/15 0.79 m³ 1.02 - - -
4 Balok beton 15/20 1.50 m³ 1.95 - - -
5 Kolom beon 15/20 2.40 m³ 3.12 - - -
6 Kolom praktis 15/15 0.24 m³ 0.31 - - -
5.65
V. PEKERJAAN RANGKA ATAP
1 Kuda-kuda baja ringan (galvalum 75mm) (betang. 370.11 m² 25.51 - - -
2 Lisplank kalsiplank 8mm / 30 cm 77.90 m¹ 1.66 - - -

VI. PEKERJAAN ATAP


1 Atap genteng Karang Penang (baru bg. depan) 202.80 m² 5.36 - - -
2 Atap genteng (lama bg. belakang) 167.31 m² 0.99 - - -
3 Genteng bubungan Karang penang 25.35 m' 0.80 - - -
4 Plesteran kompres L = 10 cm (Akhiran genting) 29.20 m' 0.20 - - -

VII. PEKERJAAN KUSEN PINTU DAN JENDELA


1 Kusen kayu kempas/mahoni 6/15 1.28 m³ 4.81 - - -
2 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 8.69 m² 1.76 - - -
3 Jalusi kayu kempas/mahoni 3/5 16.61 m² 2.35 - - -
4 Daun Jendela kaca kayu kempas/mahoni 3/10 11.52 m² 1.59 - - -

VIII. PEKERJAAN PLAFOND


1 Plafond calsiboard 4mm + rangka kayu 4/6 304.20 m² 8.49 - - -

IX. PEKERJAAN PENGECATAN/PLAMIRAN


1 Pengecatan dinding 598.50 m² 4.07 - - -
2 Pengecatan plafond 304.20 m² 2.07 - - -
3 Pengecatan kayu 206.70 m² 2.88 - - -

X. PEKERJAAN LANTAI
1 Keramik lantai 40 x 40 240.00 m² 8.82 - - -
2 Keramik dinding 25 x 40 129.80 m² 5.80 - - -
3 Keramik kolom 25 x 40 6.40 m² 0.29 - - -
4 List keramik 119.00 m' 3.32 - - -

XI. PEKERJAAN KUNCI + PENGGANTUNG


1 Kunci pintu 2 x putar 3.00 bh 0.14 - - -
2 Engsel Pintu 18.00 bh 0.14 - - -
3 Engsel Jendela 16.00 bh 0.09 - - -
4 Grendel tanam 3.00 bh 0.07 - - -
5 Grendel Jendela 16.00 bh 0.08 - - -
6 Hag Angin 16.00 bh 0.09 - - -

XII. PEKERJAAN INSTALASI LISTRIK


1
Lampu SL 14 watt 12.00 bh 0.22 - - -
2
Lampu SL 8watt (teras) 3.00 bh 0.05 - - -
3
Saklar ganda 3.00 bh 0.02 - - -
4
Saklar tunggal 3.00 bh 0.01 - - -
5 Stop kontak + instalasi 3.00 bh 0.22 - - -
6 Instalasi titik lampu 15.00 ttk 0.98 - - -

XIII. PEKERJAAN KACA


1 Kaca bening t=5 mm 27.10 m² 1.00 - - -

JUMLAH 95.07 -
Jumlah dana yang digunakan sampai dengan minggu ini ( minggu ke 1 ) Rp 20,300,000.00

3
REKAPITULASI OK
NCANA ANGGARAN BIAYA OK
: PENGADAAN SARANA PRASARANA
KEGIATAN : PERENCANAAN SMP KABUPATEN BANGKALAN
PEKERJAAN : REHABILITASI 2 RUANG BELAJAR SMPN 3 SATAP KOKOP
LINGKUP PEKERJAAN : SMPN 3 SATAP KOKOP KEC. KOKOP KAB. BANGKALAN
LOKASI
URAIAN PEKERJAAN JUMLAH HARGA
NO.

PEKERJAAN PERSIAPAN ###


I PEKERJAAN TANAH ###
II PEKERJAAN PASANGAN/PLESTERAN ###
III PEKERJAAN BETON ###
IV PEKERJAAN RANGKA ATAP ###
V PEKERJAAN ATAP ###
VI PEKERJAAN KUSEN PINTU DAN JENDELA ###
VII PEKERJAAN PLAFOND ###
VIII PEKERJAAN PENGECATAN/PLAMIRAN ###
IX PEKERJAAN LANTAI ###
X PEKERJAAN KUNCI + PENGGANTUNG ###
XI PEKERJAAN INSTALASI LISTRIK ###
XII PEKERJAAN KACA ###
XIII

JUMLAH ### ###


DIBULATK ### ###

TERBILANG : ( SERATUS DELAPAN PULUH TIGA JUTA RUPIAH )

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 3 Satap Kokop
Kec. Kokop Kab. Bangkalan

IHSANUDIN, S.Pd
NIP. 19700109 199104 1 001
LAPORAN MINGGUAN
Minggu ke :
Pekerjaan : REHABILITASI 2 RUANG BELAJAR SMPN 3 SATAP KOKOP Tanggal :
Nama Sekolah : SMPN 3 SATAP KOKOP KEC. KOKOP KAB. BANGKALAN Bulan :
Lokasi : KEC. KOKOP KAB. BANGKALAN Dana diterima tangal :
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%)
% Prestasi Rerata Prestasi
(1) (2) (3) (4) (5) (6) (7) (8)
(6)/100x(5)

I. PEKERJAAN PERSIAPAN
1 Pembongkaran atap + rangka 260.00 m² 1.70 100 1.70 -
2 Pembongkaran kosen 12.00 bh 0.32 100 0.32 -
3 Pembongkaran dinding 61.75 m² 0.65 100 0.65 -
4 Pembersihan akhir pekerjaan 1.00 ls 0.11 - - -

II. PEKERJAAN TANAH


1 Galian tanah 1.51 m³ 0.05 100 0.05 -
2 Urugan pasir bawah pondasi t=10cm 0.25 m³ 0.03 100 0.03 -
4 Urugan tanah kembali 0.76 m³ 0.01 100 0.01 -

III. PEKERJAAN PASANGAN/PLESTERAN


1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 91.82 m² 4.29 100 4.29 -
2 Plesteran 1Pc : 5Ps 183.63 m² 4.10 100 4.10 -
3 Benangan 173.00 m' 1.08 100 1.08 -

IV. PEKERJAAN BETON `


1 Lantai kerja bawah pondasi 1:3:5 t=5cm 0.31 m³ 0.15 100 0.15 -
2 Pondasi beton stempat 60 x 60 x 15cm 0.38 m³ 0.79 100 0.79 -
3 Kolom teras 15/15 0.47 m³ 0.99 100 0.99 -
4 Balok beton 15/20 1.07 m³ 2.23 100 2.23 -
5 Kolom struktur 15/25 1.26 m³ 2.64 100 2.64 -
6 Ring balk 15/15 0.56 m³ 1.17 100 1.17 -
V. PEKERJAAN RANGKA ATAP
1 Kuda-kuda baja ringan (galvalum 75mm) 256.39 m² 28.43 100 28.43 -
2 Lisplank kalsiplank 8mm / 30 cm 65.20 m¹ 2.24 100 2.24 -

VI. PEKERJAAN ATAP


1 Atap genteng Karang Penang (baru bg depan) 190.62 m² 8.10 100 8.10 -
2 Atap genteng (lama bg belakang) 111.26 m² 1.06 100 1.06 -
3 Genteng bubungan Karang penang 19.35 m' 0.98 100 0.98 -
4 Plesteran kompres L = 10 cm (Akhiran genting) 26.50 m' 0.30 100 0.30 -

VII. PEKERJAAN KUSEN PINTU DAN JENDELA


1 Kusen kayu aluminium 4" 95.76 m' 5.81 100 5.81 -
2 Daun Pintu kaca aluminium 4.00 bh 4.22 100 4.22 -
3 Daun Jendela kaca aluminium 8.00 bh 2.11 100 2.11 -

VIII. PEKERJAAN PLAFOND


1 Plafond calsiboard 4mm + rangka hollow 201.24 m² 9.03 100 9.03 -

IX. PEKERJAAN PENGECATAN/PLAMIRAN


1 Pengecatan dinding depan 54.00 m² 0.59 100 0.59 -
2 Pelamiran dinding 344.50 m² 1.76 100 1.76 -
3 Plamiran plafond 201.24 m² 1.03 100 1.03 -
4 Pengecatan kayu 19.56 m² 0.44 100 0.44 -

X. PEKERJAAN LANTAI
1 Keramik lantai 40 x 40 162.00 m² 9.58 100 9.58 -
2 Keramik kolom 20 x 40 (motif) 5.60 m² 0.40 85 0.34 15

XI. PEKERJAAN KUNCI + PENGGANTUNG


1 Kunci pintu 2 x putar 2.00 bh 0.15 100 0.15 -
2 Engsel Pintu 12.00 bh 0.15 100 0.15 -
3 Engsel Jendela 16.00 bh 0.14 100 0.14 -
4 Grendel tanam 2.00 bh 0.08 100 0.08 -
5 Grendel Jendela 16.00 bh 0.12 100 0.12 -
6 Hag Angin 16.00 bh 0.15 100 0.15 -

XII PEKERJAAN INSTALASI LISTRIK


1 Lampu SL 14 watt 8.00 bh 0.23 - - -
2 Lampu SL 8watt (teras) 2.00 bh 0.05 - - -
3 Saklar ganda 2.00 bh 0.02 - - -
4 Saklar tunggal 2.00 bh 0.02 - - -
5 Stop kontak + instalasi 2.00 bh 0.24 - - -
6 Instalasi titik lampu 10.00 ttk 1.06 - - -

XIII. PEKERJAAN KACA


1 Kaca mati t=5 mm 20.68 m² 1.22 - - -

JUMLAH 100.00 96.99


Jumlah dana yang digunakan sampai dengan minggu ini ( minggu ke 1 ) Rp 183,830,000.00

Mengetahui Menyetujui
SMPN 3 Satap Kokop Panitia Pembangunan Sekolah
Kec. Kokop Kab. Bangkalan
Selaku Penanggung Jawab
IHSANUDIN, S.Pd SUHAERI
NIP. 19700109 199104 1 001

REKAPITULASI
NCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI

NO.

I
II
III
IV
V
VI
VII
VIII
IX
X 4
XI OK
XII LAMA
XIII : PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 1 TRAGAH
: SMPN 1 TRAGAH KEC. TRAGAH KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA

TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )
PEKERJAAN PERSIAPAN ###
PEKERJAAN TANAH ###
PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA #DIV/0!
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###

JUMLAH #DIV/0! ###


DIBULATK #DIV/0! #DIV/0!

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

YUNIZAR AN NATSIRUL YUSUF H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 1 Tragah
Kec. Tragah Kab. Bangkalan

Drs. AMIRULLAH, MM
NIP. 19581217 198603 1 011

NO
1
I.
1
2
3
4

II.
1
2
4

III.
1
2
3

IV.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran atap + rangka 377.00 m² ### ###
V. Pembongkaran kusen 4.00 bh ### ###
1 Penetelan plesteran 159.60 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VI. PEKERJAAN TANAH ###
1 Galian tanah 2.16 m³ ### ###
2 Urugan pasir bawah pondasi t=10cm 0.36 m³ ### ### #DIV/0!
3 Urugan tanah kembali 1.08 m³ ### ###
4 ###
PEKERJAAN PASANGAN/PLESTERAN
VII. Pasangan 1/2 bata camp. 1 Pc : 5 Ps 7.20 m² ### ### ###
1 Plesteran 1Pc : 5Ps 14.40 m² ### ###
2 Benangan 24.00 m' ### ###
3 ###
PEKERJAAN BETON
VIII. Lantai kerja bawah pondasi 1:3:5 t=5cm 0.18 m³ ### ###
1 Pondasi beton stempat 60 x 60 x 15cm 0.54 m³ ### ###
Kolom teras 15/15 0.79 m³ ### ###
IX. Balok beton 15/20 1.71 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ ### ###
X. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Penang (baru) 382.73 m² ### ###
3 Atap genteng (lama bg. belakang) 170.10 m² ### ###
4 Genteng bubungan Karang penang 28.35 m' ### ###
Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' ### ###
XI. ###
1 PEKERJAAN KUSEN PINTU DAN JENDELA
2 Kusen kayu kempas/mahoni 6/15 #DIV/0! m³ Rp - #DIV/0!
3 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 8.61 m² Rp - Rp - #DIV/0!
4 Daun Jendela kaca kayu kempas/mahoni 3/10 8.40 m² Rp - Rp - ###
5 #DIV/0!
6 PEKERJAAN PLAFOND
Plafond calsiboard 4mm + rangka kayu 4/6 294.84 m² ### ###
XII ###
1 PEKERJAAN PENGECATAN
2 Pengecatan dinding (3 Ruang kelas) 598.50 m² ### ###
3 Pengecatan plafond 294.84 m² ### ###
4 Pengecatan kayu 206.70 m² ### ###
5 ###
6 PEKERJAAN LANTAI #DIV/0!
Keramik lantai 40 x 40 245.70 m² ### ###
XIII. Keramik dinding 25 x 40 ( 3 R.kelas + teras ) 159.60 m² ### ###
1 List keramik dinding 7cm 110.40 m² ### ###
Keramik kolom 25 x 40 12.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Engsel Pintu 18.00 bh ### ###
Engsel Jendela 16.00 bh ### ###
Grendel pintu 3.00 bh ### ###
Grendel Jendela 16.00 bh ### ###
Hag Angin 16.00 bh ### ###
###
REKAPITULASI
PEKERJAAN INSTALASI LISTRIK
NCANA ANGGARAN
Lampu BIAYA
SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
KEGI Saklar ganda 3.00 bh ### ###
PEKE Saklar tunggal 3.00 bh ### ###
LING Stop kontak + instalasi 3.00 bh ### ###
LOKA Instalasi titik lampu 15.00 ttk ### ###
###
NO. PEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 11.14 m² ### ###
###
I
II
III
IV
V
VI
VII
VIII
IX
X 4
XI OK
XII BARU
XIII : PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 1 TRAGAH
: SMPN 1 TRAGAH KEC. TRAGAH KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA

TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )
PEKERJAAN PERSIAPAN ###
PEKERJAAN TANAH ###
PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA Rp -
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###

JUMLAH ### ###


DIBULATK ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

YUNIZAR AN NATSIRUL YUSUF H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 1 Tragah
Kec. Tragah Kab. Bangkalan

Drs. AMIRULLAH, MM
NIP. 19581217 198603 1 011

NO
1
I.
1
2
3
4

II.
1
2
4

III.
1
2
3
IV.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran atap + rangka 377.00 m² ### ###
V. Pembongkaran kusen 8.00 bh ### ###
1 Penetelan plesteran 249.00 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VI. PEKERJAAN TANAH ###
1 Galian tanah 2.16 m³ ### ###
2 Urugan pasir bawah pondasi t=10cm 0.36 m³ ### ### ###
3 Urugan tanah kembali 1.08 m³ ### ###
###
VII. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 24.02 m² ### ### ###
2 Plesteran 1Pc : 5Ps 48.03 m² ### ###
3 Benangan 168.00 m' ### ###
4 ###
PEKERJAAN BETON
VIII. Lantai kerja bawah pondasi 1:3:5 t=5cm 0.18 m³ ### ###
1 Pondasi beton stempat 60 x 60 x 15cm 0.54 m³ ### ###
Kolom teras 15/15 0.79 m³ ### ###
IX. Balok beton 15/20 1.56 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ ### ###
X. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Penang (baru) 382.73 m² ### ###
3 Genteng bubungan Karang penang 28.35 m' ### ###
4 Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' ### ###
5 ###
PEKERJAAN KUSEN PINTU DAN JENDELA
XI. Kusen kayu kempas/mahoni 6/15 1.09 m³ Rp - Rp -
1 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 8.61 m² Rp - Rp - ###
2 Jalusi kayu kempas/mahoni 3/12 7.20 m² Rp - Rp -
3 Daun Jendela kaca kayu kempas/mahoni 3/10 6.72 m² Rp - Rp - ###
4 Rp -
5 PEKERJAAN PLAFOND
6 Plafond calsiboard 4mm + rangka kayu 4/6 294.84 m² ### ###
###
XII PEKERJAAN PENGECATAN
1 Pengecatan dinding (3 Ruang kelas) 598.50 m² ### ###
2 Pengecatan plafond 294.84 m² ### ###
3 Pengecatan kayu 206.70 m² ### ###
4 ###
5 PEKERJAAN LANTAI ###
6 Keramik lantai 40 x 40 245.70 m² ### ###
Keramik dinding 25 x 40 ( 3 R.kelas + teras ) 173.40 m² ### ###
XIII. List keramik dinding 7cm 132.90 m² ### ###
1 Keramik kolom 25 x 40 12.00 m² ### ###
Keramik dinding 25 x 40 ( 3 R.kelas teras saja ) 75.60 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Engsel Pintu 18.00 bh ### ###
Engsel Jendela 16.00 bh ### ###
Grendel pintu 3.00 bh ### ###
Grendel Jendela 16.00 bh ### ###
Hag Angin 16.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
REKAPITULASI
Lampu SL 8watt (teras) 3.00 bh ### ###
NCANA ANGGARAN BIAYA
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
KEGI Stop kontak + instalasi 3.00 bh ### ###
PEKE Instalasi titik lampu 15.00 ttk ### ###
LINGKUP PEKERJAAN ###
LOKAPEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 11.14 m² ### ###
NO. ###

I
II
III
IV
V
VI
VII
VIII
IX
X 5
XI OK
XII LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 MODUNG
: SMPN 2 MODUNG KEC. MODUNG KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA


TERBILANG : ( DUA RATUS LIMA JUTA ENAM RATUS RIBU RUPIAH )

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA Rp -
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN/PLAMIRAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ### ###
PEKERJAAN KACA ###

JUMLAH ### ###


DIBULAT ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

M. MAHRI, S.Ag H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Modung
Kec. Modung Kab. Bangkalan

A S U R, M.Pd
NIP. 19610117 198403 1 008

NO
1
I.
1
2

II.
1
2
3

III.
1
2
3

IV.
1
2
Lembar. 2
V. JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
1 2 3 4 5
2 PEKERJAAN PERSIAPAN
3 Pembongkaran atap + rangka 406.00 m² ### ###
4 Pembersihan akhir pekerjaan 1.00 ls ### ### ###
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 98.93 m² ### ###
2 Plesteran 1Pc : 5Ps 197.87 m² ### ###
3 Benangan 166.56 m' ### ###
###
VII. PEKERJAAN BETON
1 Kolom teras 15/15 0.41 m³ ### ###
Balok teras 15/20 1.24 m³ ### ###
VIII. Ring balk gewel 15/15 0.98 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 396.90 m² ### ###
4 Lisplank kalsiplank 8mm / 30 cm 85.70 m¹ ### ###
5 ###
PEKERJAAN ATAP
IX. Pasang atap genteng karang p enang (baru 5%) 19.85 m² ### ###
1 Pasang atap genteng (lama) 377.06 m² ### ###
Genteng bubungan karang penang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 29.00 m' ### ###
1 ###
2 PEKERJAAN KUSEN PINTU DAN JENDELA
3 Kusen kayu kempas/mahoni 6/12 0.46 m³ Rp - Rp -
4 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 6.72 m² Rp - Rp -
5 Daun Jendela kaca kayu kempas/mahoni 3/10 5.04 m² Rp - Rp -
6 Rp -
PEKERJAAN PLAFOND ###
XI. Plafond calsiboard 4mm + rangka hollow 340.20 m² ### ###
1 ###
2 PEKERJAAN PENGECATAN/PLAMIRAN
3 Pengecatan dinding (depan) 66.85 m² ### ###
4 Pelamiran dinding 430.33 m² ### ###
5 Pelamiran plafond 340.20 m² ### ### ###
6 Pengecatan kayu 206.70 m² ### ###
Cat genteng 396.90 m² ### ###
XII. ###
1 PEKERJAAN LANTAI
Lantai rabat 216.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 4.00 bh ### ###
Engsel Pintu 21.00 bh ### ###
Engsel Jendela 24.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Grendel Jendela 12.00 bh ### ### ###
Hag Angin 24.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 14.00 bh ### ###
Lampu SL 8watt (teras) 4.00 bh ### ###
Saklar ganda 7.00 bh ### ###
REKAPITULASI
Saklar tunggal 3.00 bh ### ###
NCANA ANGGARAN BIAYA
Stop kontak + instalasi 4.00 bh ### ###
Instalasi titik lampu 18.00 bh ### ###
KEGIATAN ###
PEKE PEKERJAAN KACA
LING Kaca mati t=5 mm 14.49 m² ### ###
LOKASI ###

NO.

I
II
III
IV
V
VI
VII
VIII
IX
X 5
XI OK
XII BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 MODUNG
: SMPN 2 MODUNG KEC. MODUNG KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA


TERBILANG : ( DUA RATUS LIMA JUTA ENAM RATUS RIBU RUPIAH )

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA Rp -
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN/PLAMIRAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ### -
PEKERJAAN KACA ###

JUMLAH ### ###


DIBULAT ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

M. MAHRI, S.Ag H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Modung
Kec. Modung Kab. Bangkalan

A S U R, M.Pd
NIP. 19610117 198403 1 008

NO
1
I.
1
2

II.
1
2
3

III.
1
2
3

IV.
1
2
Lembar. 2
V. JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
1 2 3 4 5
2 PEKERJAAN PERSIAPAN
3 Pembongkaran atap + rangka 406.00 m² ### ###
4 Pembersihan akhir pekerjaan 1.00 ls ### ### ###
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 98.93 m² ### ###
2 Plesteran 1Pc : 5Ps 197.87 m² ### ###
3 Benangan 166.56 m' ### ###
###
VII. PEKERJAAN BETON
1 Kolom teras 15/15 0.41 m³ ### ###
Balok teras 15/20 1.24 m³ ### ###
VIII. Ring balk gewel 15/15 0.98 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 396.90 m² ### ###
4 Lisplank kalsiplank 8mm / 30 cm 85.70 m¹ ### ###
5 ###
PEKERJAAN ATAP
IX. Pasang atap genteng karang p enang (baru 5%) 19.85 m² ### ###
1 Pasang atap genteng (lama) 377.06 m² ### ###
Genteng bubungan karang penang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 29.00 m' ### ###
1 ###
2 PEKERJAAN KUSEN PINTU DAN JENDELA
3 Kusen kayu kempas/mahoni 6/12 0.46 m³ Rp - Rp -
4 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 6.72 m² Rp - Rp -
5 Daun Jendela kaca kayu kempas/mahoni 3/10 5.04 m² Rp - Rp -
6 Rp -
PEKERJAAN PLAFOND ###
XI. Plafond calsiboard 4mm + rangka kayu 4/6 340.20 m² ### ###
1 ###
2 PEKERJAAN PENGECATAN/PLAMIRAN
3 Pengecatan dinding (depan) 66.85 m² ### ###
4 Pelamiran dinding 430.33 m² ### ###
5 Pelamiran plafond 340.20 m² ### ### ###
6 Pengecatan kayu 206.70 m² ### ###
Cat genteng 396.90 m² ### ###
XII. ###
1 PEKERJAAN LANTAI
Lantai rabat 216.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 4.00 bh ### ###
Engsel Pintu 21.00 bh ### ###
Engsel Jendela 24.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Grendel Jendela 12.00 bh ### ### ###
Hag Angin 24.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 14.00 bh ### ###
Lampu SL 8watt (teras) 4.00 bh ### ###
Saklar ganda 7.00 bh ### ###
REKAPITULASI
Saklar tunggal 3.00 bh ### ###
NCANA ANGGARAN BIAYA
Stop kontak + instalasi 4.00 bh ### ###
Instalasi titik lampu 18.00 bh ### ###
KEGIATAN ###
PEKE PEKERJAAN KACA
LING Kaca mati t=5 mm 14.49 m² ### ###
LOKASI ###

NO.

I
II
III
IV
V
VI
VII
VIII
IX
X 6
XI OK
LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 2 LABANG
: SMPN 2 LABANG KEC. LABANG KAB. BANGKALAN

TERBILANG : ( DUA RATUS SEMBILAN


URAIAN
PULUHPEKERJAAN
EN JUMLAH HARGA

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN Rp -
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
PEKERJAAN TANGGA DEPAN PINTU ###

JUMLAH ### ###


DIBULATK ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
ACHMAD TAUFIK HEYKAL, A.Sg H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Labang
Kec. Labang Kab. Bangkalan

Drs. HARTONO, M.Pd


NIP. 19690126 199802 1 003

NO
1
I.
1
2
3
4
5

II.
1

III.
1
2

IV.
1
2
3 Lembar. 2
JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
V. 2 3 4 5
1 PEKERJAAN PERSIAPAN ###
Pembongkaran atap + rangka 377.00 m² Rp - Rp -
VI. Pembongkaran kosen 1.00 bh ### ###
1 Pembongkaran dinding 6.00 m² ### ###
2 Penetelan plesteran 139.74 m² ### ###
3 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VII. PEKERJAAN PASANGAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps (nyepit kuda2) 30.91 m² Rp - Rp -
2 Rp -
3 PEKERJAAN RANGKA ATAP ###
4 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ Rp - Rp -
VIII. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Pilang (baru) 382.73 m² ### ###
Genteng bubungan Karang pilang 28.35 m' ### ###
IX. Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' Rp - Rp -
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsiboard 4mm + rangka hollow 354.38 m² Rp - Rp -
4 Rp -
5 PEKERJAAN PENGECATAN
6 Pengecatan dinding 598.50 m² Rp - Rp - ###
Pengecatan plafond 354.38 m² Rp - Rp -
X. Pengecatan kayu 274.60 m² Rp - Rp -
1 Rp -
PEKERJAAN LANTAI
XI. Keramik lantai 40 x 40 243.00 m² ### ###
1 Keramik dinding 25 x 40 139.74 m² ### ###
2 List keramik 102.00 m' ### ###
3 Keramik kolom 20 x 40 10.80 m² ### ###
4 ###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA ###
Kaca mati t=5 mm (yg pecah) 4.22 m² ### ###
###
PEKERJAAN TANGGA DEPAN PINTU
Pasangan batu gunung 2.88 m³ ### ###
Plesterran trasram 7.68 m² ### ###
Keramik kasar 40 x 40 7.04 m² ### ###
Urugan pasir 4.96 m³ ### ###
REKAPITULASI ###
NCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI

NO.

I
II
III
IV
V
VI
VII
VIII
IX
X 6
XI OK
XII BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 2 LABANG
: SMPN 2 LABANG KEC. LABANG KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA


TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
PEKERJAAN TANGGA DEPAN PINTU ###

JUMLAH ### ###


DIBULATK ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

ACHMAD TAUFIK HEYKAL, A.Sg H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Labang
Kec. Labang Kab. Bangkalan
Drs. HARTONO, M.Pd
NIP. 19690126 199802 1 003

NO
1
I.
1
2
3
4
5

II.
1
2
3

III.
1

IV.
1
2 Lembar. 2
JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
V. 2 3 4 5
1 PEKERJAAN PERSIAPAN ###
2 Pembongkaran atap + rangka 377.00 m² Rp - Rp -
3 Pembongkaran kosen 1.00 bh ### ###
Pembongkaran dinding 6.00 m² ### ###
VI. Penetelan plesteran 127.50 m² ### ###
1 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VII. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps (nyepit kuda2) 22.43 m² Rp - Rp - -
2 Plesteran 1Pc : 5Ps 16.20 m² ### ###
3 Benangan 32.00 m' ### ###
###
VIII. PEKERJAAN BETON
1 Ring balk gewel 15/15 0.40 m³ ### ###
2 ###
3 PEKERJAAN RANGKA ATAP ###
4 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ Rp - Rp -
IX. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Pilang (baru) 382.73 m² ### ###
Genteng bubungan Karang pilang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' Rp - Rp -
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsiboard 4mm + rangka hollow 354.38 m² Rp - Rp -
4 Rp -
5 PEKERJAAN PENGECATAN
6 Pengecatan dinding 598.50 m² Rp - Rp - ###
Pengecatan plafond 354.38 m² Rp - Rp -
XI. Pengecatan kayu 274.60 m² Rp - Rp -
1 Rp -
PEKERJAAN LANTAI
XII. Keramik lantai 40 x 40 243.00 m² ### ###
1 Keramik dinding 25 x 40 127.50 m² ### ###
2 List keramik 102.00 m' ### ###
3 Keramik kolom 20 x 40 10.80 m² ### ###
4 ###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Pintu harmonika 15.00 m² ### ### ###
### ###
PEKERJAAN INSTALASI LISTRIK ###
Lampu SL 14 watt 12.00 bh ### ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA ###
Kaca mati t=5 mm (yg pecah) 4.22 m² ### ###
###
PEKERJAAN TANGGA DEPAN PINTU 3.46
Pasangan batu gunung 2.88 m³ ### ###
Plesterran trasram 7.68 m² ### ###
Keramik kasar 40 x 40 7.04 m² ### ###
Urugan pasir 4.96 m³ ### ###
###
REKAPITULASI
NCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI

NO.

I
II
III
IV
V
VI
VII
VIII
IX
X 7
OK
LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 KWANYAR
: SMPN 2 KWANYAR KEC. KWANYAR KAB. BANGKALAN
TERBILANG : ( SERATUS SEMBILAN PULUH TUJUH JUTA DELAPAN RATUS RIBU RUPIAH )
URAIAN PEKERJAAN JUMLAH HARGA

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN/PLESTERAN Rp -
PEKERJAAN KAYU ###
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
PEKERJAAN TEMPAT DUDUK ###

JUMLAH ### ###


DIBULAT ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

MOHAMMAD MUSTOFA ZAHRON, S.Pd H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Kwanyar
Kec. Kwanyar Kab. Bangkalan

RAHMAWATI, M.Pd
NIP. 19700703 199802 2 003

NO
1
I.
1
2
3
4

II.
1
2

III.
1

IV.
1

V.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran kusen 1.00 bh ### ###
VI. Pembongkaran dinding 15.00 m² ### ###
1 Penetelan plesteran 428.64 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 Ls ### ###
3 ###
4 PEKERJAAN PASANGAN/PLESTERAN ###
5 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 0.91 22.20 m² Rp - Rp -
6 Plesteran 1Pc : 5Ps 1.07 44.40 m² Rp - Rp -
Rp -
VII. PEKERJAAN KAYU
1 Lisplank kayu 3/30 cm 4.00 m¹ ### ###
2 ###
3 PEKERJAAN PLAFOND
4 Plafond calsi 1 x 1 + rangka kayu 12.00 m² Rp - Rp -
Rp -
VIII. PEKERJAAN PENGECATAN
1 Pengecatan dinding (3 kelas) 455.30 m² Rp - Rp -
2 Pengecatan plafond 319.00 m² Rp - Rp -
3 Pengecatan kayu 206.70 m² Rp - Rp - ###
4 Pengecatan kayu (Kantor) 214.39 m² Rp - Rp -
5 Rp -
6PEKERJAAN LANTAI 162.00 ###
Keramik lantai 40 x 40 ( 2 R Kelas ) 5.67 126.00 m² ### ###
IX. Keramik lantai 40 x 40 ( Teras ) 1.62 36.00 m² ### ###
1 Keramik dinding 25 x 40 (dalam kelas + teras) 5.78 128.40 m² ### ###
Keramik kolom teras 25 x 40 1.01 22.40 m² ### ###
X. List keramik 1.64 327.80 m' ### ###
1 Keramik dinding 25 x 40 (dalam kantor+R.guru+ t 13.51 300.24 m² ### ###
2 451.04 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 3.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Hag Angin 60.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
REKAPITULASI
PEKERJAAN KACA
NCANA ANGGARAN BIAYA
Kaca mati t=5 mm (yg pecah) 1.68 m² ### ###
###
KEGI PEKERJAAN TEMPAT DUDUK
PEKE Pasangan trasram 0.68 17.00 m² Rp - Rp -
LING Plat beton tempat duduk t=10 cm 0.53 1.02 m³ ### ###
LOKA Keramik tempat duduk 30 x 30 0.46 10.20 m² ### ###
Keramik dinding tempat duduk 25 x 40 1.84 40.80 m² ### ###
NO. 34.71 ###
0.86768 40.80

I
II
III
IV
V
VI
VII
VIII
IX
X 7
OK
BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 KWANYAR
: SMPN 2 KWANYAR KEC. KWANYAR KAB. BANGKALAN
TERBILANG : ( SERATUS SEMBILAN PULUH TUJUH JUTA DELAPAN RATUS RIBU RUPIAH )
URAIAN PEKERJAAN JUMLAH HARGA
PEKERJAAN PERSIAPAN ###
PEKERJAAN PASANGAN/PLESTERAN Rp -
PEKERJAAN KAYU ###
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
PEKERJAAN TEMPAT DUDUK ###

JUMLAH ### ###


DIBULAT ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

MOHAMMAD MUSTOFA ZAHRON, S.Pd H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Kwanyar
Kec. Kwanyar Kab. Bangkalan

RAHMAWATI, M.Pd
NIP. 19700703 199802 2 003

NO
1
I.
1
2
3
4

II.
1
2

III.
1
2

IV.
1

V. Lembar. 2
1 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
2 2 3 4 5
3 PEKERJAAN PERSIAPAN
4 Pembongkaran kusen 1.00 bh ### ###
5 Pembongkaran dinding 15.00 m² ### ###
Penetelan plesteran 428.64 m² ### ###
VI. Pembersihan akhir pekerjaan 1.00 Ls ### ###
1 ###
2 PEKERJAAN PASANGAN/PLESTERAN ###
3 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 22.20 m² Rp - Rp -
4 Plesteran 1Pc : 5Ps 44.40 m² Rp - Rp -
5 Rp -
6 PEKERJAAN KAYU
Perbaikan daun pintu panil 4.00 bh ### ###
VII. Lisplank kayu 3/30 cm 4.00 m¹ ### ###
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsi 1 x 1 + rangka kayu 12.00 m² Rp - Rp -
4 Rp -
PEKERJAAN PENGECATAN
VIII. Pengecatan dinding (3 kelas) 439.90 m² Rp - Rp -
1 Pengecatan dinding (Kantor) 373.40 m² Rp - Rp -
2 Pengecatan plafond 319.00 m² Rp - Rp -
3 Pengecatan kayu 169.45 m² Rp - Rp - ###
4 Pengecatan kayu (Kantor) 197.69 m² Rp - Rp -
5 Rp -
6 PEKERJAAN LANTAI ###
Keramik lantai 40 x 40 ( 2 R Kelas ) 126.00 m² ### ###
IX. Keramik lantai 40 x 40 ( Teras ) 36.00 m² ### ###
1 Keramik dinding 25 x 40 (dalam kelas + teras) 128.40 m² ### ###
Keramik kolom teras 25 x 40 22.40 m² ### ###
X. List keramik 327.80 m' ### ###
1 Keramik dinding 25 x 40 (dalam kantor+R.guru+ teras) 300.24 m² ### ###
2 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 3.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Hag Angin 60.00 bh ### ###
Pintu harmonika 11.30 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK ###
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA
REKAPITULASI
Kaca mati t=5 mm (yg pecah) 1.68 m² ### ###
NCANA ANGGARAN BIAYA ###
PEKERJAAN TEMPAT DUDUK
KEGI Pasangan trasram 17.00 m² Rp - Rp -
PEKE Plat beton tempat duduk t=10 cm 1.02 m³ ### ###
LING Keramik tempat duduk 30 x 30 10.20 m² ### ###
LOKA Keramik dinding tempat duduk 25 x 40 40.80 m² ### ###
###
NO.

I
II
III
IV
V
VI
VII
VIII
IX
8
OK

: PENGADAAN SARANA PRASARANA


: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 KOKOP
TERBILANG : ( SERATU : SMPN 2 KOKOP KEC. KOKOP KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN/PLESTERAN Rp -
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ### ###
PEKERJAAN KACA ###
PEKERJAAN TEMPAT DUDUK ###

JUMLAH ### ###


DIBULATK ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

BOSTOMI, S.Pd H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Kokop
Kec. Kokop Kab. Bangkalan

MOHAMMAD TAUFIK, SPd


NIP. 19760326 200604 1 010
NO
1
I.
1
2

II.
1
2
3
III.
1

IV.
1
2
3

V. Lembar. 2
1 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
2 2 3 4 5
3 PEKERJAAN PERSIAPAN
4 Penetelan plesteran 317.46 m² ### ###
5 Pembersihan akhir pekerjaan 1.00 Ls Rp - Rp - #REF!
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 12.25 m² Rp - Rp -
5 Plesteran 1Pc : 5Ps 80.58 m² Rp - Rp -
6 Benangan 55.00 m' Rp - Rp -
7 Rp -
PEKERJAAN PLAFOND
VII. Plafond calsiboard 4mm + rangka kayu 15.00 m² Rp - Rp -
1 Rp -
2 PEKERJAAN PENGECATAN -
3 Pengecatan dinding 506.50 m² Rp - Rp -
4 Pengecatan plafond 352.00 m² Rp - Rp - #DIV/0!
5 Pengecatan kayu 275.60 m² Rp - Rp -
6 Rp -
PEKERJAAN LANTAI ###
VIII. Keramik lantai 40 x 40 243.00 m² ### ### 147.47
1 Keramik dinding 25 x 40 ( 3 R. Kelas + teras) 132.96 m² ### ###
List keramik 288.20 m' ### ###
IX. Keramik kolom 25 x 40 16.00 m² ### ###
1 Keramik dinding 25 x 40 ( 5 R. Kelas bg. dalam) 184.50 m² ### ###
2 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 5.00 bh ### ###
Grendel Jendela 50.00 bh ### ###
Hag Angin 100.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 20.00 bh ### ###
Lampu SL 8watt (teras) 5.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 5.00 bh ### ###
Stop kontak + instalasi 5.00 bh ### ###
Instalasi titik lampu 25.00 ttk ### ###
###
PEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 2.53 m² ### ###
###
PEKERJAAN TEMPAT DUDUK
Pasangan trasram 14.70 m² Rp - Rp -
Plat beton tempat duduk t=10 cm 0.74 m³ ### ###
Keramik tempat duduk 30 x 30 7.35 m² ### ###
Keramik dinding tempat duduk 25 x 40 29.40 m² ### ###
###

BATAS
SINERGI 1 SMPN 2 SEPULU DR. AHMAD SABARUDIN, S.Pd, M.MPd
SINERGI 2 SMPN 1 KLAMPIS IMAM SYAFII, S.Pd, MPd
SINERGI 3 SMPN 2 KOKOP MOHAMMAD TAUFIK, SPd
SINERGI 4 SMPN 3 SATAP KOKOP IHSANUDIN, S.Pd
INDRAKILA 5 SMPN 1 TRAGAH Drs. AMIRULLAH, MM
INDRAKILA 6 SMPN 2 MODUNG A S U R, M.Pd
INDRAKILA 7 SMPN 2 LABANG Drs. HARTONO, M.Pd
INDRAKILA 8 SMPN 2 KWANYAR RAHMAWATI, M.Pd
9 SMPN TAHAL AMIN H. ABDULLAH, S.Pd
10 SMPN 1 MODUNG Drs. ALI MUSTOFA, M.Pd
11 SMPN 1 GALIS Drs. TAUFIKUR RAHMAN
12 SMPN 1 KOKOP BUDIONO, S.Pd, M.Pd

13 SMPN 2 KONANG ABDUL RASID, S.Ag, M.PdI


14 SMPN TAHAL AMIN H. ABDULLAH, S.Pd

SMPN 1 KWANYAR MOHAMMAD SADALI, S.Pd


SMPN 1 TANJUNG BUMI Drs. M. AGUS SUBAGIO, M.Pd
SMPN 1 BLEGA SRI ASTUTIK HANDAYANI, M.Pd
SMPN 1 LABANG SUPRIYO, S.Pd, SE, M.PdI

SMPN 1 KWANYAR KEC. KWANYAR KAB. BANGKALAN MOHAMMAD SADALI, S.Pd


SMPN 1 TANJUNG BUMI KEC. TANJUNG BUMI KAB. BAN Drs. M. AGUS SUBAGIO, M.Pd
SMPN 1 BLEGA KEC. BLEGA KAB. BANGKALAN SRI ASTUTIK HANDAYANI, M.Pd
SMPN 2 TANAH MERAH KEC. T KOMARIYAH, S.Pd, M.MPd
SMPN TAHAL AMIN H. ABDULLAH, S.Pd
SMPN 1 GEGER Hj. SRI MULYATI, S.Pd, M.MPd
SMPN 1 GALIS
SMPN 1 TANAH MERAH DYAH CHANDRAWATI, S.Pd
SMPN 2 GEGER SITI YAUMAH, S.Pd
SMPN 4 SATAP TANAH MERA MOH. YUSUF, S.Pd
SMPN 1 KONANG Drs. ANANG ISKANDAR, MM

28.5
23.5
7.833333

1 ( Satu )
5 Oktob. s/d 10 Oktober 2015
Oktober 2015
29 Oktober 2015
Rp. 212.320.000.00
Prestasi Pekerjaan Prestasi Pekerjaan
Minggu Ini (%) Komulatif (%)
Rerata Prestasi Rerata
(9) (10) (11)
(8)/100x(5) (6)+(8) (7)+(9)

0.97 100.00 0.97 Rp 12,375.00 Rp 1,769,625.00


0.97 100.00 0.97 Rp 7,500.00 Rp 1,761,750.00
1.01 100.00 1.01 Rp 20,000.00 Rp 1,843,200.00
- - - Rp 200,000.00 Rp 200,000.00
Rp 5,574,575.00

- - - Rp 88,586.67 Rp 1,638,853.33
- - - Rp 42,298.80 Rp 1,565,055.60
- - - Rp - Rp -
Rp 3,203,908.93

- - - Rp 3,912,550.00 Rp 234,753.00
- - - Rp 3,962,550.00 Rp 114,121.44
- - - Rp 3,962,550.00 Rp 1,027,092.96
- - - Rp 3,962,550.00 Rp 1,255,335.84
Rp 2,631,303.24

- - - Rp 185,000.00 Rp 25,849,125.00
- - - Rp 185,000.00 Rp 21,929,437.50
- - - Rp 65,000.00 Rp 3,100,500.00
Rp 50,879,062.50

- - - Rp 18,000.00 Rp 2,515,050.00
- - - Rp 110,000.00 Rp 26,078,250.00
- - - Rp 95,820.00 Rp 2,558,394.00
- - - Rp 21,149.40 Rp 1,184,366.40
Rp 32,336,060.40

- - - Rp 85,000.00 Rp 22,185,000.00
Rp 22,185,000.00

- - - Rp 20,740.00 Rp 10,805,637.48
- - - Rp 20,740.00 Rp 5,413,140.00
- - - Rp 42,450.00 Rp 4,752,702.00
Rp 20,971,479.48

- - - Rp 105,250.00 Rp 3,315,375.00
- - - Rp 112,000.00 Rp 16,800,000.00
- - - Rp 136,075.00 Rp 12,540,672.00
- - - Rp 85,000.00 Rp 6,528,000.00
Rp 39,184,047.00

- - - Rp 55,000.00 Rp 660,000.00
- - - Rp 50,000.00 Rp 150,000.00
- - - Rp 20,000.00 Rp 80,000.00
- - - Rp 15,000.00 Rp 75,000.00
- - - Rp 225,000.00 Rp 1,125,000.00
Rp 200,000.00 Rp 3,000,000.00
Rp 5,090,000.00
- - - Rp 112,125.00 Rp 376,964.25
Rp 376,964.25

2.95 2.95

Rp 20,300,000.00 2.95 %
1 ( Satu )
5 Oktob. s/d 10 Oktober 2015
Oktober 2015
29 Oktober 2015

Prestasi Pekerjaan Prestasi Pekerjaan


Minggu Ini (%) Komulatif (%)
Rerata Prestasi Rerata
(9) (10) (11)
(8)/100x(5) (6)+(8) (7)+(9)
0.20 100.00 0.20 Rp 50,000.00 Rp 600,000.00
0.08 100.00 0.08 Rp 20,000.00 Rp 240,000.00
- - - Rp 200,000.00 Rp 200,000.00
Rp 1,040,000.00

- - - Rp 58,500.00 Rp 126,360.00
- - - Rp 215,400.00 Rp 77,544.00
- - - Rp 16,110.00 Rp 17,398.80
Rp 221,302.80

- - - Rp 88,586.67 Rp 3,790,281.61
- - - Rp 42,298.80 Rp 3,619,604.84
- - - Rp 11,825.00 Rp 3,651,560.00
Rp 11,061,446.45

- - - Rp 897,800.00 Rp 161,604.00
- - - Rp 3,962,550.00 Rp 2,139,777.00
- - - Rp 3,962,550.00 Rp 3,120,508.13
- - - Rp 3,962,550.00 Rp 5,943,825.00
- - - Rp 3,962,550.00 Rp 9,510,120.00
- - - Rp 3,962,550.00 Rp 941,501.88
Rp 21,817,336.01

- - - Rp 210,000.00 Rp 77,723,100.00
- - - Rp 65,000.00 Rp 5,063,500.00
Rp 82,786,600.00

- - - Rp 80,500.00 Rp 16,325,400.00
- - - Rp 18,000.00 Rp 3,011,580.00
- - - Rp 95,820.00 Rp 2,429,037.00
- - - Rp 21,149.40 Rp 617,562.48
Rp 22,383,579.48

- - - Rp 11,431,250.00 Rp 14,644,117.13
- - - Rp 618,250.00 Rp 5,375,065.50
- - - Rp 430,475.00 Rp 7,148,037.38
- - - Rp 419,572.50 Rp 4,833,475.20
Rp 32,000,695.20

- - - Rp 85,000.00 Rp 25,857,000.00
Rp 25,857,000.00

- - - Rp 20,740.00 Rp 12,412,890.00
- - - Rp 20,740.00 Rp 6,309,108.00
- - - Rp 42,450.00 Rp 8,774,415.00
Rp 27,496,413.00

- - - Rp 112,000.00 Rp 26,880,000.00
- - - Rp 136,075.00 Rp 17,662,535.00
- - - Rp 136,075.00 Rp 870,880.00
- - - Rp 85,000.00 Rp 10,115,000.00
Rp 55,528,415.00

- - - Rp 140,750.00 Rp 422,250.00
- - - Rp 23,625.00 Rp 425,250.00
- - - Rp 16,687.50 Rp 267,000.00
- - - Rp 74,250.00 Rp 222,750.00
- - - Rp 14,750.00 Rp 236,000.00
- - - Rp 17,750.00 Rp 284,000.00
Rp 1,857,250.00

- - - Rp 55,000.00 Rp 660,000.00
- - - Rp 50,000.00 Rp 150,000.00
- - - Rp 20,000.00 Rp 60,000.00
- - - Rp 15,000.00 Rp 45,000.00
- - - Rp 225,000.00 Rp 675,000.00
- - - Rp 200,000.00 Rp 3,000,000.00
Rp 4,590,000.00

- - - Rp 112,125.00 Rp 3,038,587.50
Rp 3,038,587.50

0.28 -
Rp 20,300,000.00 - %
1 ( Satu )
5 Oktob. s/d 10 Oktober 2015
Oktober 2015
29 Oktober 2015

Prestasi Pekerjaan Prestasi Pekerjaan


Minggu Ini (%) Komulatif (%)
Rerata Prestasi Rerata Lembar. 2
(9) (10) (11) HARGA SATUAN JUMLAH HARGA
(8)/100x(5) (6)+(8) (7)+(9) 4 5

- 100.00 1.70 Rp 12,375.00 Rp 3,217,500.00


- 100.00 0.32 Rp 50,000.00 Rp 600,000.00
- 100.00 0.65 Rp 20,000.00 Rp 1,235,000.00
- - - Rp 200,000.00 Rp 200,000.00
Rp 5,252,500.00

- 100.00 0.05 Rp 58,500.00 Rp 88,452.00


- 100.00 0.03 Rp 215,400.00 Rp 54,280.80
- 100.00 0.01 Rp 16,110.00 Rp 12,179.16
Rp 154,911.96

- 100.00 4.29 Rp 88,586.67 Rp 8,133,700.58


- 100.00 4.10 Rp 42,298.80 Rp 7,767,439.21
- 100.00 1.08 Rp 11,825.00 Rp 2,045,725.00
Rp 17,946,864.80

- 100.00 0.15 Rp 897,800.00 Rp 274,726.80


- 100.00 0.79 Rp 3,962,550.00 Rp 1,497,843.90
- 100.00 0.99 Rp 3,962,550.00 Rp 1,872,304.88
- 100.00 2.23 Rp 3,962,550.00 Rp 4,220,115.75
- 100.00 2.64 Rp 3,962,550.00 Rp 4,992,813.00
- 100.00 1.17 Rp 3,962,550.00 Rp 2,225,368.08
Rp 15,083,172.41

- 100.00 28.43 Rp 210,000.00 Rp 53,841,375.00


- 100.00 2.24 Rp 65,000.00 Rp 4,238,000.00
Rp 58,079,375.00

- 100.00 8.10 Rp 80,500.00 Rp 15,344,910.00


- 100.00 1.06 Rp 18,000.00 Rp 2,002,725.00
- 100.00 0.98 Rp 95,820.00 Rp 1,854,117.00
- 100.00 0.30 Rp 21,149.40 Rp 560,459.10
Rp 19,762,211.10

- 100.00 5.81 Rp 115,000.00 Rp 11,012,400.00


- 100.00 4.22 Rp 2,000,000.00 Rp 8,000,000.00
- 100.00 2.11 Rp 500,000.00 Rp 4,000,000.00
Rp 23,012,400.00

- 100.00 9.03 Rp 85,000.00 Rp 17,105,400.00


Rp 17,105,400.00

- 100.00 0.59 Rp 20,740.00 Rp 1,119,960.00


- 100.00 1.76 Rp 9,670.00 Rp 3,331,315.00
- 100.00 1.03 Rp 9,670.00 Rp 1,945,990.80
- 100.00 0.44 Rp 42,450.00 Rp 830,322.00
Rp 7,227,587.80

- 100.00 9.58 Rp 112,000.00 Rp 18,144,000.00


0.06 100.00 0.40 Rp 136,075.00 Rp 762,020.00
Rp 18,906,020.00

- 100.00 0.15 Rp 140,750.00 Rp 281,500.00


- 100.00 0.15 Rp 23,625.00 Rp 283,500.00
- 100.00 0.14 Rp 16,687.50 Rp 267,000.00
- 100.00 0.08 Rp 74,250.00 Rp 148,500.00
- 100.00 0.12 Rp 14,750.00 Rp 236,000.00
- 100.00 0.15 Rp 17,750.00 Rp 284,000.00
Rp 1,500,500.00

- - - Rp 55,000.00 Rp 440,000.00
- - - Rp 50,000.00 Rp 100,000.00
- - - Rp 20,000.00 Rp 40,000.00
- - - Rp 15,000.00 Rp 30,000.00
- - - Rp 225,000.00 Rp 450,000.00
- - - Rp 200,000.00 Rp 2,000,000.00
Rp 3,060,000.00

- - - Rp 112,125.00 Rp 2,318,745.00
Rp 2,318,745.00
0.06 97.05
Rp 183,830,000.00 97.05 %

Bangkalan, 2018 Rp 189,409,688.06


Dibuat oleh 183830943.060837
Fasilitator / Perencana Rp 183,830,000.00
H. SUBADRIH, ST, MT

LAMA
140

BARU
LAMA
BARU
LAMA
BARU
LAMA
BARU
keramik tambal sulam
SADALI, S.Pd
UBAGIO, M.Pd
NDAYANI, M.Pd
1 2 3 4 5

0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
1.01 100 1.01 100 1.01 100 1.01 100 1.01 100
0.11 - - - - - - - - -
0.90 - - 100 0.90 100 0.90 100 0.90 100
0.86 - - - - 100 0.86 100 0.86 100
- - - - - 100 - 100 - 100

0.13 - - - - - - 50 0.06 100


0.06 - - - - - - - - 100
0.56 - - - - - - - - 100
0.69 - - - - - - - - 50

14.17 - - - - - - - - -
12.02 - - - - - - - - -
1.70 - - - - - - - - -

1.38 - - - - - - - - -
14.29 - - - - - - - - -
1.40 - - - - - - - - -
0.65 - - - - - - - - -

12.16 - - - - - - - - -

5.92 - - - - - - - - -
2.97 - - - - - - - - -
2.61 - - - - - - - - -

1.82 - - - - - - - - -
9.21 - - - - - - - - -
6.87 - - - - - - - - -
3.58 - - - - - - - - -

0.36 - - - - - - - - -
0.08 - - - - - - - - -
0.04 - - - - - - - - -
0.04 - - - - - - - - -
0.62 - - - - - - - - -
1.64 - - - - - - - - -
0.21 - - - - - - - - -
1 2 3 4 5
0.20 100 0.20 100 0.20 100 0.20 100 0.20 100
0.08 100 0.08 100 0.08 100 0.08 100 0.08 100
0.07 - - - - - - - - -

0.04 - - 100 0.04 100 0.04 100 0.04 100


0.03 - - - - 100 0.03 100 0.03 100
0.01 - - - - 100 0.01 100 0.01 100

1.24 - - - - - - 50 0.62 100


1.19 - - - - - - - - 100
1.20 - - - - - - - - 100

0.05 - - - - - - 25 0.01 50
0.70 - - - - - - - - 50
1.02 - - - - - - - - -
1.95 - - - - - - - - -
3.12 - - - - - - - - 50
0.31 - - - - - - - - 75

25.51 - - - - - - - - -
1.66 - - - - - - - - -

5.36 - - - - - - - - -
0.99 - - - - - - - - -
0.80 - - - - - - - - -
0.20 - - - - - - - - -

4.81 - - - - - - - - 50
1.76 - - - - - - - - -
2.35 - - - - - - - - -
1.59 - - - - - - - - -

8.49 - - - - - - - - -

4.07 - - - - - - - - -
2.07 - - - - - - - - -
2.88 - - - - - - - - -

8.82 - - - - - - - - -
5.80 - - - - - - - - -
0.29 - - - - - - - - -
3.32 - - - - - - - - -

0.14 - - - - - - - - -
0.14 - - - - - - - - -
0.09 - - - - - - - - -
0.07 - - - - - - - - -
0.08 - - - - - - - - -
0.09 - - - - - - - - -

0.22 - - - - - - - - -
0.05 - - - - - - - - -
0.02 - - - - - - - - -
0.01 - - - - - - - - -
0.22 - - - - - - - - -
0.98 - - - - - - - - -

1.00 - - - - - - - - -
1 2 3 4 5

1.70 100 1.70 100 1.70 100 1.70 100 1.70 100
0.32 100 0.32 100 0.32 100 0.32 100 0.32 100
0.65 100 0.65 100 0.65 100 0.65 100 0.65 100
0.11 - - - - - - - - -

0.05 100 0.05 100 0.05 100 0.05 100 0.05 100
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100
0.01 50 0.00 100 0.01 100 0.01 100 0.01 100

4.29 - - 100 4.29 100 4.29 100 4.29 100


4.10 - - 100 4.10 100 4.10 100 4.10 100
1.08 - - 15 0.16 100 1.08 100 1.08 100

0.15 - - - - 75 0.11 100 0.15 100


0.79 - - - - - - 50 0.40 100
0.99 - - - - - - 10 0.10 75
2.23 - - - - - - - - -
2.64 - - - - - - - - -
1.17 - - - - - - - - -
28.43 - - - - - - - - -
2.24 - - - - - - - - -

8.10 - - - - - - - - -
1.06 - - - - - - - - -
0.98 - - - - - - - - -
0.30 - - - - - - - - -

5.81 - - - - 75 4.36 100 5.81 100


4.22 - - - - 15 0.63 55 2.32 100
2.11 - - - - - - - - 100

9.03 - - - - - - - - -

0.59 - - - - - - - - -
1.76 - - - - - - - - -
1.03 - - - - - - - - 75
0.44 - - - - - - - - -

9.58 - - - - - - - - -
0.40 - - - - - - - - -

0.15 - - - - - - - - -
0.15 - - - - - - - - -
0.14 - - - - - - - - -
0.08 - - - - - - - - -
0.12 - - - - - - - - -
0.15 - - - - - - - - -

0.23 - - - - - - - - -
0.05 - - - - - - - - -
0.02 - - - - - - - - -
0.02 - - - - - - - - -
0.24 - - - - - - - - -
1.06 - - - - - - - - -

1.22 - - - - - - - - -
6 7 8 9 10

0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
1.01 100 1.01 100 1.01 100 1.01 100 1.01 100
- - - - - - - 100 0.11 100
0.90 100 0.90 100 0.90 100 0.90 100 0.90 100
0.86 100 0.86 100 0.86 100 0.86 100 0.86 100
- 100 - 100 - 100 - 100 - 100

0.13 100 0.13 100 0.13 100 0.13 100 0.13 100
0.06 100 0.06 100 0.06 100 0.06 100 0.06 100
0.56 100 0.56 100 0.56 100 0.56 100 0.56 100
0.34 100 0.69 100 0.69 100 0.69 100 0.69 100

- 100 14.17 100 14.17 100 14.17 100 14.17 100


- 100 12.02 100 12.02 100 12.02 100 12.02 100
- 25 0.42 100 1.70 100 1.70 100 1.70 100

- - - - - 100 1.38 100 1.38 100


- - - - - 100 14.29 100 14.29 100
- - - - - 100 1.40 100 1.40 100
- - - - - 100 0.65 100 0.65 100

- - - - - - - 100 12.16 100

- - - - - 50 2.96 100 5.92 100


- - - - - - - 100 2.97 100
- - - - - - - 100 2.61 100

- - - - - 50 0.91 100 1.82 100


- - - - - 100 9.21 100 9.21 100
- - - - - - - 100 6.87 100
- - - - - - - - - 100

- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
6 7 8 9 10
0.20 100 0.20 100 0.20 100 0.20 100 0.20 100
0.08 100 0.08 100 0.08 100 0.08 100 0.08 100
- - - - - - - - - 100

0.04 100 0.04 100 0.04 100 0.04 100 0.04 100
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100
0.01 100 0.01 100 0.01 100 0.01 100 0.01 100

1.24 100 1.24 100 1.24 100 1.24 100 1.24 100
1.19 100 1.19 100 1.19 100 1.19 100 1.19 100
1.20 100 1.20 100 1.20 100 1.20 100 1.20 100

0.03 100 0.05 100 0.05 100 0.05 100 0.05 100
0.35 100 0.70 100 0.70 100 0.70 100 0.70 100
- 50 0.51 100 1.02 100 1.02 100 1.02 100
- 50 0.98 100 1.95 100 1.95 100 1.95 100
1.56 75 2.34 100 3.12 100 3.12 100 3.12 100
0.23 100 0.31 100 0.31 100 0.31 100 0.31 100

- - - 100 25.51 100 25.51 100 25.51 100


- - - - - 100 1.66 100 1.66 100

- - - - - 50 2.68 100 5.36 100


- - - - - 50 0.49 100 0.99 100
- - - - - - - 100 0.80 100
- - - - - - - 100 0.20 100

2.40 100 4.81 100 4.81 100 4.81 100 4.81 100
- - - - - - - 100 1.76 100
- - - - - - - 100 2.35 100
- - - - - 50 0.79 100 1.59 100

- - - - - - - 50 4.24 100

- - - 50 2.04 100 4.07 100 4.07 100


- - - - - - - 50 1.04 100
- - - - - 50 1.44 100 2.88 100

- - - - - - - 75 6.62 100
- - - - - - - 50 2.90 100
- - - - - - - 50 0.14 100
- - - - - - - - - 100

- - - - - - - 100 0.14 100


- - - - - - - 100 0.14 100
- - - - - - - 100 0.09 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100

- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100

- - - - - - - 100 1.00 100


6 7 8 9 10

1.70 100 1.70 100 1.70 100 1.70 100 1.70 100
0.32 100 0.32 100 0.32 100 0.32 100 0.32 100
0.65 100 0.65 100 0.65 100 0.65 100 0.65 100
- - - - - - - - - 100

0.05 100 0.05 100 0.05 100 0.05 100 0.05 100
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100
0.01 100 0.01 100 0.01 100 0.01 100 0.01 100

4.29 100 4.29 100 4.29 100 4.29 100 4.29 100
4.10 100 4.10 100 4.10 100 4.10 100 4.10 100
1.08 100 1.08 100 1.08 100 1.08 100 1.08 100

0.15 100 0.15 100 0.15 100 0.15 100 0.15 100
0.79 100 0.79 100 0.79 100 0.79 100 0.79 100
0.74 100 0.99 100 0.99 100 0.99 100 0.99 100
- 100 2.23 100 2.23 100 2.23 100 2.23 100
- 100 2.64 100 2.64 100 2.64 100 2.64 100
- 100 1.17 100 1.17 100 1.17 100 1.17 100
- 25 7.11 100 28.43 100 28.43 100 28.43 100
- - - 100 2.24 100 2.24 100 2.24 100

- - - 85 6.89 100 8.10 100 8.10 100


- - - - - 100 1.06 100 1.06 100
- - - - - 100 0.98 100 0.98 100
- - - - - 100 0.30 100 0.30 100

5.81 100 5.81 100 5.81 100 5.81 100 5.81 100
4.22 100 4.22 100 4.22 100 4.22 100 4.22 100
2.11 100 2.11 100 2.11 100 2.11 100 2.11 100

- - - - - 100 9.03 100 9.03 100

- 50 0.30 100 0.59 100 0.59 100 0.59 100


- 50 0.88 100 1.76 100 1.76 100 1.76 100
0.77 100 1.03 100 1.03 100 1.03 100 1.03 100
- - - - - 100 0.44 100 0.44 100

- - - 25 2.39 100 9.58 100 9.58 100


- - - - - 85 0.34 100 0.40 100

- 100 0.15 100 0.15 100 0.15 100 0.15 100


- 100 0.15 100 0.15 100 0.15 100 0.15 100
- 100 0.14 100 0.14 100 0.14 100 0.14 100
- 100 0.08 100 0.08 100 0.08 100 0.08 100
- 100 0.12 100 0.12 100 0.12 100 0.12 100
- 100 0.15 100 0.15 100 0.15 100 0.15 100

- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100

- - - - - - - - - 100
0.97
0.97
1.01
0.11
0.90
0.86
-

0.13
0.06
0.56
0.69

14.17
12.02
1.70

1.38
14.29
1.40
0.65

12.16

5.92
2.97
2.61

1.82
9.21
6.87
3.58

0.36
0.08
0.04
0.04
0.62
1.64
0.21
0.20
0.08
0.07

0.04
0.03
0.01

1.24
1.19
1.20

0.05
0.70
1.02
1.95
3.12
0.31

25.51
1.66

5.36
0.99
0.80
0.20

4.81
1.76
2.35
1.59

8.49

4.07
2.07
2.88

8.82
5.80
0.29
3.32

0.14
0.14
0.09
0.07
0.08
0.09

0.22
0.05
0.02
0.01
0.22
0.98

1.00
1.70
0.32
0.65
0.11

0.05
0.03
0.01

4.29
4.10
1.08

0.15
0.79
0.99
2.23
2.64
1.17
28.43
2.24

8.10
1.06
0.98
0.30

5.81
4.22
2.11

9.03

0.59
1.76
1.03
0.44

9.58
0.40

0.15
0.15
0.14
0.08
0.12
0.15

0.23
0.05
0.02
0.02
0.24
1.06

1.22
YANG DIPAKAI
TH. 2018
1 SMPN 2 SEPULU 2 KELAS ### SINERGI
2 SMPN 1 KLAMPIS 3 KELAS ### SINERGI
3 SMPN 2 KOKOP 2 KELAS ### SINERGI
4 SMPN 3 SATAP KOKOP 2 KELAS ### SINERGI
5 SMPN 1 TRAGAH 3 KELAS ### INDRAKILA
6 SMPN 2 MODUNG 2 KELAS ### INDRAKILA
7 SMPN 2 LABANG 3 KELAS ### INDRAKILA
8 SMPN 2 KWANYAR 2 KELAS ### INDRAKILA
9 SMPN TAHAL AMIN H. ABDULLAH, S.Pd

REKAPITULASI 1
RENCANA ANGGARAN BIAYA OK
OK
KEGIATAN : PENGADAAN SARANA PRASARANA
PEKERJAAN : PERENCANAAN SMP KABUPATEN BANGKALAN
LINGKUP PEKERJAAN : REHABILITASI 2 RUANG BELAJAR SMPN 2 SEPULU
LOKASI : SMPN 2 SEPULU KEC. SEPULU KAB. BANGKALAN

NO. URAIAN PEKERJAAN JUMLAH HARGA

I PEKERJAAN PERSIAPAN ###


II PEKERJAAN PASANGAN/PLESTERAN ###
III PEKERJAAN BETON ###
IV PEKERJAAN RANGKA ATAP ###
V PEKERJAAN ATAP ###
VI PEKERJAAN PLAFOND ###
VII PEKERJAAN PENGECATAN ###
VIII PEKERJAAN LANTAI ###
IX PEKERJAAN INSTALASI LISTRIK ###
X PEKERJAAN KACA ###

JUMLAH ###
DIBULATK ### ###
###

TERBILANG : ( SERATUS DELAPAN PULUH TIGA JUTA RUPIAH )

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

ANWAR NURIS, S.Pd.I H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Sepulu
Kec. Sepulu Kab. Bangkalan

DR. AHMAD SABARUDIN, S.Pd, M.MPd


NIP. 19680503 199103 1 013

LAPORAN MINGGUAN
Minggu ke :
Pekerjaan : REHABILITASI 2 RUANG KELAS SMPN 2 SEPULU Tanggal :
Nama Sekolah : SMPN 2 SEPULU Bulan :
Lokasi : Kec. Kedamean Kab. Gresik Dana diterima tangal :
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%)
% Prestasi Rerata Prestasi
(1) (2) (3) (4) (5) (6) (7) (8)
(6)/100x(5)
I. PEKERJAAN PERSIAPAN
1 Pembongkaran atap + rangka atap 143.00 m² 0.97 - - 100
2 Pembongkaran atap 234.90 m² 0.97 - - 100
3 Penetelan plesteran 92.16 m² 1.01 - - 100
4 Pembersihan akhir pekerjaan 1.00 ls 0.11 - - -
II. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 18.50 m² 0.90 - - -
2 Plesteran 1Pc : 5Ps 37.00 m² 0.86 - - -
3 Benangan 48.00 m' - - - -

III. PEKERJAAN BETON


1 Kolom Struktur 15/25 0.06 m³ 0.13 - - -
2 Kolom Praktis 15/15 0.03 m³ 0.06 - - -
3 Ring Balk 15/15 0.26 m³ 0.56 - - -
4 Ring gewel 15/15 dan konsol beton 15/15 0.32 m³ 0.69 - - -

IV. PEKERJAAN RANGKA ATAP


1 Kuda-kuda baja ringan (galvalum bentang 7m) 139.73 m² 14.17 - - -
2 Kuda-kuda baja ringan (galvalum 50%) 118.54 m² 12.02 - - -
2 Listplank kalsiplank 8mm / 30 cm 47.70 m¹ 1.70 - - -

V. PEKERJAAN ATAP
1 Atap genteng beton (lama) 139.73 m² 1.38 - - -
2 Atap genteng beton warna 237.08 m² 14.29 - - -
3 Genteng bubungan beton warna 26.70 m' 1.40 - - -
4 Plesteran kompres L = 10 cm (Akhiran genting) 56.00 m' 0.65 - - -

VI. PEKERJAAN PLAFOND


1 Plafond calsiboard 4mm + rangka metal hollow 261.00 m² 12.16 - - -

VII. PEKERJAAN PENGECATAN


1 Pengecatan dinding 521.00 m² 5.92 - - -
2 Pengecetan plafond 261.00 m² 2.97 - - -
3 Pengecatan kayu 111.96 m² 2.61 - - -

VIII. PEKERJAAN LANTAI


1 Keramik lantai 30 x 30 ( tambal sulam 1kelas) 31.50 m² 1.82 - - -
2 Keramik lantai 40 x 40 150.00 m² 9.21 - - -
3 Keramik dinding R.Lab 25 x 40 92.16 m² 6.87 - - -
4 List keramik 76.80 m' 3.58 - - -

IX. PEKERJAAN INSTALASI LISTRIK


1 Lampu SL 14 watt 12.00 bh 0.36 - - -
2 Lampu SL 8 watt (teras) 3.00 bh 0.08 - - -
3 Saklar ganda 4.00 bh 0.04 - - -
4 Saklar tunggal 5.00 bh 0.04 - - -
5 Stop kontak + instalasi 5.00 bh 0.62 - - -
6 Instalasi titik lampu 15.00 ttk 1.64
X. PEKERJAAN KACA
1 Kaca mati t=5 mm (yg pecah) 3.36 m² 0.21 - - -

JUMLAH 100.00 -
Jumlah dana yang digunakan sampai dengan minggu ini ( minggu ke 1 ) Rp 20,300,000.00

REKAPITULASI 2
RENCANA ANGGARAN BIAYA OK

KEGIATAN : PENGADAAN SARANA PRASARANA


PEKERJAAN : PERENCANAAN SMP KABUPATEN BANGKALAN
LINGKUP PEKERJAAN : REHABILITASI 3 RUANG BELAJAR SMPN 1 KLAMPIS
LOKASI : SMPN 1 KLAMPIS KEC. KLAMPIS KAB. BANGKALAN

NO. URAIAN PEKERJAAN JUMLAH HARGA

I (2) ###
II PEKERJAAN TANAH ###
III PEKERJAAN PASANGAN/PLESTERAN ###
IV PEKERJAAN BETON ###
V PEKERJAAN RANGKA ATAP ###
VI PEKERJAAN ATAP ###
VII PEKERJAAN KUSEN PINTU DAN JENDELA ###
VIII PEKERJAAN PLAFOND ###
IX PEKERJAAN PENGECATAN/PLAMIRAN ###
X PEKERJAAN LANTAI ###
XI PEKERJAAN KUNCI + PENGGANTUNG ###
XII PEKERJAAN INSTALASI LISTRIK ### ###
XIII PEKERJAAN KACA ###

JUMLAH ### ###


DIBULATK ### ###
TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

HANAF I H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 1 Kelampis
Kec. Kelampis Kab. Bangkalan

IMAM SYAFII, S.Pd, MPd


NIP. 19680228 199401 1 003

LAPORAN MINGGUAN
Minggu ke :
Pekerjaan : REHABILITASI 2 RUANG KELAS SMPN 1 KLAMPIS Tanggal :
Nama Sekolah : SMPN 1 KLAMPIS Bulan :
Lokasi : Kec. Kedamean Kab. Gresik Dana diterima tangal :
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%)
% Prestasi Rerata Prestasi
(1) (2) (3) (4) (5) (6) (7) (8)
I. PEKERJAAN PERSIAPAN (6)/100x(5)
1 Pembongkaran kosen 12.00 bh 0.20 - - 100
2 Penetelan plesteran 12.00 m² 0.08 - - 100
3 Pembersihan akhir pekerjaan 1.00 ls 0.07 - - -

II. PEKERJAAN TANAH


1 Galian tanah 2.16 m³ 0.04 - - -
2 Urugan pasir bawah pondasi t=10cm 0.36 m³ 0.03 - - -
4 Urugan tanah kembali 1.08 m³ 0.01 - - -

III. PEKERJAAN PASANGAN/PLESTERAN


1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 42.79 m² 1.24 - - -
2 Plesteran 1Pc : 5Ps 85.57 m² 1.19 - - -
3 Benangan 308.80 m' 1.20 - - -

IV. PEKERJAAN BETON


1 Lantai kerja bawah pondasi 1:3:5 t=5cm 0.18 m³ 0.05 - - -
2 Pondasi beton stempat 60 x 60 x 15cm 0.54 m³ 0.70 - - -
3 Kolom teras 15/15 0.79 m³ 1.02 - - -
4 Balok beton 15/20 1.50 m³ 1.95 - - -
5 Kolom beon 15/20 2.40 m³ 3.12 - - -
6 Kolom praktis 15/15 0.24 m³ 0.31 - - -
5.65
V. PEKERJAAN RANGKA ATAP
1 Kuda-kuda baja ringan (galvalum 75mm) (betang. 370.11 m² 25.51 - - -
2 Lisplank kalsiplank 8mm / 30 cm 77.90 m¹ 1.66 - - -

VI. PEKERJAAN ATAP


1 Atap genteng Karang Penang (baru bg. depan) 202.80 m² 5.36 - - -
2 Atap genteng (lama bg. belakang) 167.31 m² 0.99 - - -
3 Genteng bubungan Karang penang 25.35 m' 0.80 - - -
4 Plesteran kompres L = 10 cm (Akhiran genting) 29.20 m' 0.20 - - -

VII. PEKERJAAN KUSEN PINTU DAN JENDELA


1 Kusen kayu kempas/mahoni 6/15 1.28 m³ 4.81 - - -
2 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 8.69 m² 1.76 - - -
3 Jalusi kayu kempas/mahoni 3/5 16.61 m² 2.35 - - -
4 Daun Jendela kaca kayu kempas/mahoni 3/10 11.52 m² 1.59 - - -

VIII. PEKERJAAN PLAFOND


1 Plafond calsiboard 4mm + rangka kayu 4/6 304.20 m² 8.49 - - -

IX. PEKERJAAN PENGECATAN/PLAMIRAN


1 Pengecatan dinding 598.50 m² 4.07 - - -
2 Pengecatan plafond 304.20 m² 2.07 - - -
3 Pengecatan kayu 206.70 m² 2.88 - - -

X. PEKERJAAN LANTAI
1 Keramik lantai 40 x 40 240.00 m² 8.82 - - -
2 Keramik dinding 25 x 40 129.80 m² 5.80 - - -
3 Keramik kolom 25 x 40 6.40 m² 0.29 - - -
4 List keramik 119.00 m' 3.32 - - -

XI. PEKERJAAN KUNCI + PENGGANTUNG


1 Kunci pintu 2 x putar 3.00 bh 0.14 - - -
2 Engsel Pintu 18.00 bh 0.14 - - -
3 Engsel Jendela 16.00 bh 0.09 - - -
4 Grendel tanam 3.00 bh 0.07 - - -
5 Grendel Jendela 16.00 bh 0.08 - - -
6 Hag Angin 16.00 bh 0.09 - - -

XII. PEKERJAAN INSTALASI LISTRIK


1
Lampu SL 14 watt 12.00 bh 0.22 - - -
2
Lampu SL 8watt (teras) 3.00 bh 0.05 - - -
3
Saklar ganda 3.00 bh 0.02 - - -
4
Saklar tunggal 3.00 bh 0.01 - - -
5 Stop kontak + instalasi 3.00 bh 0.22 - - -
6 Instalasi titik lampu 15.00 ttk 0.98 - - -

XIII. PEKERJAAN KACA


1 Kaca bening t=5 mm 27.10 m² 1.00 - - -

JUMLAH 95.07 -
Jumlah dana yang digunakan sampai dengan minggu ini ( minggu ke 1 ) Rp 20,300,000.00

3
REKAPITULASI OK
NCANA ANGGARAN BIAYA OK
: PENGADAAN SARANA PRASARANA
KEGIATAN : PERENCANAAN SMP KABUPATEN BANGKALAN
PEKERJAAN : REHABILITASI 2 RUANG BELAJAR SMPN 3 SATAP KOKOP
LINGKUP PEKERJAAN : SMPN 3 SATAP KOKOP KEC. KOKOP KAB. BANGKALAN
LOKASI
URAIAN PEKERJAAN JUMLAH HARGA
NO.

PEKERJAAN PERSIAPAN ###


I PEKERJAAN TANAH ###
II PEKERJAAN PASANGAN/PLESTERAN ###
III PEKERJAAN BETON ###
IV PEKERJAAN RANGKA ATAP ###
V PEKERJAAN ATAP ###
VI PEKERJAAN KUSEN PINTU DAN JENDELA ###
VII PEKERJAAN PLAFOND ###
VIII PEKERJAAN PENGECATAN/PLAMIRAN ###
IX PEKERJAAN LANTAI ###
X PEKERJAAN KUNCI + PENGGANTUNG ###
XI PEKERJAAN INSTALASI LISTRIK ###
XII PEKERJAAN KACA ###
XIII

JUMLAH ### ###


DIBULATK ### ###

TERBILANG : ( SERATUS DELAPAN PULUH TIGA JUTA RUPIAH )

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 3 Satap Kokop
Kec. Kokop Kab. Bangkalan

IHSANUDIN, S.Pd
NIP. 19700109 199104 1 001
LAPORAN MINGGUAN
Minggu ke :
Pekerjaan : REHABILITASI 2 RUANG BELAJAR SMPN 3 SATAP KOKOP Tanggal :
Nama Sekolah : SMPN 3 SATAP KOKOP KEC. KOKOP KAB. BANGKALAN Bulan :
Lokasi : KEC. KOKOP KAB. BANGKALAN Dana diterima tangal :
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%)
% Prestasi Rerata Prestasi
(1) (2) (3) (4) (5) (6) (7) (8)
(6)/100x(5)

I. PEKERJAAN PERSIAPAN
1 Pembongkaran atap + rangka 260.00 m² 1.70 100 1.70 -
2 Pembongkaran kosen 12.00 bh 0.32 100 0.32 -
3 Pembongkaran dinding 61.75 m² 0.65 100 0.65 -
4 Pembersihan akhir pekerjaan 1.00 ls 0.11 - - 100

II. PEKERJAAN TANAH


1 Galian tanah 1.51 m³ 0.05 100 0.05 -
2 Urugan pasir bawah pondasi t=10cm 0.25 m³ 0.03 100 0.03 -
4 Urugan tanah kembali 0.76 m³ 0.01 100 0.01 -

III. PEKERJAAN PASANGAN/PLESTERAN


1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 91.82 m² 4.29 100 4.29 -
2 Plesteran 1Pc : 5Ps 183.63 m² 4.10 100 4.10 -
3 Benangan 173.00 m' 1.08 100 1.08 -

IV. PEKERJAAN BETON `


1 Lantai kerja bawah pondasi 1:3:5 t=5cm 0.31 m³ 0.15 100 0.15 -
2 Pondasi beton stempat 60 x 60 x 15cm 0.38 m³ 0.79 100 0.79 -
3 Kolom teras 15/15 0.47 m³ 0.99 100 0.99 -
4 Balok beton 15/20 1.07 m³ 2.23 100 2.23 -
5 Kolom struktur 15/25 1.26 m³ 2.64 100 2.64 -
6 Ring balk 15/15 0.56 m³ 1.17 100 1.17 -
V. PEKERJAAN RANGKA ATAP
1 Kuda-kuda baja ringan (galvalum 75mm) 256.39 m² 28.43 100 28.43 -
2 Lisplank kalsiplank 8mm / 30 cm 65.20 m¹ 2.24 100 2.24 -

VI. PEKERJAAN ATAP


1 Atap genteng Karang Penang (baru bg depan) 190.62 m² 8.10 100 8.10 -
2 Atap genteng (lama bg belakang) 111.26 m² 1.06 100 1.06 -
3 Genteng bubungan Karang penang 19.35 m' 0.98 100 0.98 -
4 Plesteran kompres L = 10 cm (Akhiran genting) 26.50 m' 0.30 100 0.30 -

VII. PEKERJAAN KUSEN PINTU DAN JENDELA


1 Kusen kayu aluminium 4" 95.76 m' 5.81 100 5.81 -
2 Daun Pintu kaca aluminium 4.00 bh 4.22 100 4.22 -
3 Daun Jendela kaca aluminium 8.00 bh 2.11 100 2.11 -

VIII. PEKERJAAN PLAFOND


1 Plafond calsiboard 4mm + rangka hollow 201.24 m² 9.03 100 9.03 -

IX. PEKERJAAN PENGECATAN/PLAMIRAN


1 Pengecatan dinding depan 54.00 m² 0.59 100 0.59 -
2 Pelamiran dinding 344.50 m² 1.76 100 1.76 -
3 Plamiran plafond 201.24 m² 1.03 100 1.03 -
4 Pengecatan kayu 19.56 m² 0.44 100 0.44 -

X. PEKERJAAN LANTAI
1 Keramik lantai 40 x 40 162.00 m² 9.58 100 9.58 -
2 Keramik kolom 20 x 40 (motif) 5.60 m² 0.40 100 0.40 -

XI. PEKERJAAN KUNCI + PENGGANTUNG


1 Kunci pintu 2 x putar 2.00 bh 0.15 100 0.15 -
2 Engsel Pintu 12.00 bh 0.15 100 0.15 -
3 Engsel Jendela 16.00 bh 0.14 100 0.14 -
4 Grendel tanam 2.00 bh 0.08 100 0.08 -
5 Grendel Jendela 16.00 bh 0.12 100 0.12 -
6 Hag Angin 16.00 bh 0.15 100 0.15 -

XII PEKERJAAN INSTALASI LISTRIK


1 Lampu SL 14 watt 8.00 bh 0.23 - - 100
2 Lampu SL 8watt (teras) 2.00 bh 0.05 - - 100
3 Saklar ganda 2.00 bh 0.02 - - 100
4 Saklar tunggal 2.00 bh 0.02 - - 100
5 Stop kontak + instalasi 2.00 bh 0.24 - - 100
6 Instalasi titik lampu 10.00 ttk 1.06 - - 100

XIII. PEKERJAAN KACA


1 Kaca mati t=5 mm 20.68 m² 1.22 - - 100

JUMLAH 100.00 97.05


Jumlah dana yang digunakan sampai dengan minggu ini ( minggu ke 1 ) Rp 189,409,000.00

Mengetahui Menyetujui
SMPN 3 Satap Kokop Panitia Pembangunan Sekolah
Kec. Kokop Kab. Bangkalan
Selaku Penanggung Jawab
IHSANUDIN, S.Pd SUHAERI
NIP. 19700109 199104 1 001

REKAPITULASI
NCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI

NO.

I
II
III
IV
V
VI
VII
VIII
IX
X 4
XI OK
XII LAMA
XIII : PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 1 TRAGAH
: SMPN 1 TRAGAH KEC. TRAGAH KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA

TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )
PEKERJAAN PERSIAPAN ###
PEKERJAAN TANAH ###
PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA #DIV/0!
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###

JUMLAH #DIV/0! ###


DIBULATK #DIV/0! #DIV/0!

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

YUNIZAR AN NATSIRUL YUSUF H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 1 Tragah
Kec. Tragah Kab. Bangkalan

Drs. AMIRULLAH, MM
NIP. 19581217 198603 1 011

NO
1
I.
1
2
3
4

II.
1
2
4

III.
1
2
3

IV.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran atap + rangka 377.00 m² ### ###
V. Pembongkaran kusen 4.00 bh ### ###
1 Penetelan plesteran 159.60 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VI. PEKERJAAN TANAH ###
1 Galian tanah 2.16 m³ ### ###
2 Urugan pasir bawah pondasi t=10cm 0.36 m³ ### ### #DIV/0!
3 Urugan tanah kembali 1.08 m³ ### ###
4 ###
PEKERJAAN PASANGAN/PLESTERAN
VII. Pasangan 1/2 bata camp. 1 Pc : 5 Ps 7.20 m² ### ### ###
1 Plesteran 1Pc : 5Ps 14.40 m² ### ###
2 Benangan 24.00 m' ### ###
3 ###
PEKERJAAN BETON
VIII. Lantai kerja bawah pondasi 1:3:5 t=5cm 0.18 m³ ### ###
1 Pondasi beton stempat 60 x 60 x 15cm 0.54 m³ ### ###
Kolom teras 15/15 0.79 m³ ### ###
IX. Balok beton 15/20 1.71 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ ### ###
X. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Penang (baru) 382.73 m² ### ###
3 Atap genteng (lama bg. belakang) 170.10 m² ### ###
4 Genteng bubungan Karang penang 28.35 m' ### ###
Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' ### ###
XI. ###
1 PEKERJAAN KUSEN PINTU DAN JENDELA
2 Kusen kayu kempas/mahoni 6/15 #DIV/0! m³ Rp - #DIV/0!
3 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 8.61 m² Rp - Rp - #DIV/0!
4 Daun Jendela kaca kayu kempas/mahoni 3/10 8.40 m² Rp - Rp - ###
5 #DIV/0!
6 PEKERJAAN PLAFOND
Plafond calsiboard 4mm + rangka kayu 4/6 294.84 m² ### ###
XII ###
1 PEKERJAAN PENGECATAN
2 Pengecatan dinding (3 Ruang kelas) 598.50 m² ### ###
3 Pengecatan plafond 294.84 m² ### ###
4 Pengecatan kayu 206.70 m² ### ###
5 ###
6 PEKERJAAN LANTAI #DIV/0!
Keramik lantai 40 x 40 245.70 m² ### ###
XIII. Keramik dinding 25 x 40 ( 3 R.kelas + teras ) 159.60 m² ### ###
1 List keramik dinding 7cm 110.40 m² ### ###
Keramik kolom 25 x 40 12.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Engsel Pintu 18.00 bh ### ###
Engsel Jendela 16.00 bh ### ###
Grendel pintu 3.00 bh ### ###
Grendel Jendela 16.00 bh ### ###
Hag Angin 16.00 bh ### ###
###
REKAPITULASI
PEKERJAAN INSTALASI LISTRIK
NCANA ANGGARAN
Lampu BIAYA
SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
KEGI Saklar ganda 3.00 bh ### ###
PEKE Saklar tunggal 3.00 bh ### ###
LING Stop kontak + instalasi 3.00 bh ### ###
LOKA Instalasi titik lampu 15.00 ttk ### ###
###
NO. PEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 11.14 m² ### ###
###
I
II
III
IV
V
VI
VII
VIII
IX
X 4
XI OK
XII BARU
XIII : PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 1 TRAGAH
: SMPN 1 TRAGAH KEC. TRAGAH KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA

TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )
PEKERJAAN PERSIAPAN ###
PEKERJAAN TANAH ###
PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA Rp -
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###

JUMLAH ### ###


DIBULATK ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

YUNIZAR AN NATSIRUL YUSUF H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 1 Tragah
Kec. Tragah Kab. Bangkalan

Drs. AMIRULLAH, MM
NIP. 19581217 198603 1 011

NO
1
I.
1
2
3
4

II.
1
2
4

III.
1
2
3
IV.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran atap + rangka 377.00 m² ### ###
V. Pembongkaran kusen 8.00 bh ### ###
1 Penetelan plesteran 249.00 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VI. PEKERJAAN TANAH ###
1 Galian tanah 2.16 m³ ### ###
2 Urugan pasir bawah pondasi t=10cm 0.36 m³ ### ### ###
3 Urugan tanah kembali 1.08 m³ ### ###
###
VII. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 24.02 m² ### ### ###
2 Plesteran 1Pc : 5Ps 48.03 m² ### ###
3 Benangan 168.00 m' ### ###
4 ###
PEKERJAAN BETON
VIII. Lantai kerja bawah pondasi 1:3:5 t=5cm 0.18 m³ ### ###
1 Pondasi beton stempat 60 x 60 x 15cm 0.54 m³ ### ###
Kolom teras 15/15 0.79 m³ ### ###
IX. Balok beton 15/20 1.56 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ ### ###
X. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Penang (baru) 382.73 m² ### ###
3 Genteng bubungan Karang penang 28.35 m' ### ###
4 Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' ### ###
5 ###
PEKERJAAN KUSEN PINTU DAN JENDELA
XI. Kusen kayu kempas/mahoni 6/15 1.09 m³ Rp - Rp -
1 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 8.61 m² Rp - Rp - ###
2 Jalusi kayu kempas/mahoni 3/12 7.20 m² Rp - Rp -
3 Daun Jendela kaca kayu kempas/mahoni 3/10 6.72 m² Rp - Rp - ###
4 Rp -
5 PEKERJAAN PLAFOND
6 Plafond calsiboard 4mm + rangka kayu 4/6 294.84 m² ### ###
###
XII PEKERJAAN PENGECATAN
1 Pengecatan dinding (3 Ruang kelas) 598.50 m² ### ###
2 Pengecatan plafond 294.84 m² ### ###
3 Pengecatan kayu 206.70 m² ### ###
4 ###
5 PEKERJAAN LANTAI ###
6 Keramik lantai 40 x 40 245.70 m² ### ###
Keramik dinding 25 x 40 ( 3 R.kelas + teras ) 173.40 m² ### ###
XIII. List keramik dinding 7cm 132.90 m² ### ###
1 Keramik kolom 25 x 40 12.00 m² ### ###
Keramik dinding 25 x 40 ( 3 R.kelas teras saja ) 75.60 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Engsel Pintu 18.00 bh ### ###
Engsel Jendela 16.00 bh ### ###
Grendel pintu 3.00 bh ### ###
Grendel Jendela 16.00 bh ### ###
Hag Angin 16.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
REKAPITULASI
Lampu SL 8watt (teras) 3.00 bh ### ###
NCANA ANGGARAN BIAYA
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
KEGI Stop kontak + instalasi 3.00 bh ### ###
PEKE Instalasi titik lampu 15.00 ttk ### ###
LINGKUP PEKERJAAN ###
LOKAPEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 11.14 m² ### ###
NO. ###

I
II
III
IV
V
VI
VII
VIII
IX
X 5
XI OK
XII LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 MODUNG
: SMPN 2 MODUNG KEC. MODUNG KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA


TERBILANG : ( DUA RATUS LIMA JUTA ENAM RATUS RIBU RUPIAH )

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA Rp -
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN/PLAMIRAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ### ###
PEKERJAAN KACA ###

JUMLAH ### ###


DIBULAT ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

M. MAHRI, S.Ag H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Modung
Kec. Modung Kab. Bangkalan

A S U R, M.Pd
NIP. 19610117 198403 1 008

NO
1
I.
1
2

II.
1
2
3

III.
1
2
3

IV.
1
2
Lembar. 2
V. JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
1 2 3 4 5
2 PEKERJAAN PERSIAPAN
3 Pembongkaran atap + rangka 406.00 m² ### ###
4 Pembersihan akhir pekerjaan 1.00 ls ### ### ###
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 98.93 m² ### ###
2 Plesteran 1Pc : 5Ps 197.87 m² ### ###
3 Benangan 166.56 m' ### ###
###
VII. PEKERJAAN BETON
1 Kolom teras 15/15 0.41 m³ ### ###
Balok teras 15/20 1.24 m³ ### ###
VIII. Ring balk gewel 15/15 0.98 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 396.90 m² ### ###
4 Lisplank kalsiplank 8mm / 30 cm 85.70 m¹ ### ###
5 ###
PEKERJAAN ATAP
IX. Pasang atap genteng karang p enang (baru 5%) 19.85 m² ### ###
1 Pasang atap genteng (lama) 377.06 m² ### ###
Genteng bubungan karang penang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 29.00 m' ### ###
1 ###
2 PEKERJAAN KUSEN PINTU DAN JENDELA
3 Kusen kayu kempas/mahoni 6/12 0.46 m³ Rp - Rp -
4 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 6.72 m² Rp - Rp -
5 Daun Jendela kaca kayu kempas/mahoni 3/10 5.04 m² Rp - Rp -
6 Rp -
PEKERJAAN PLAFOND ###
XI. Plafond calsiboard 4mm + rangka hollow 340.20 m² ### ###
1 ###
2 PEKERJAAN PENGECATAN/PLAMIRAN
3 Pengecatan dinding (depan) 66.85 m² ### ###
4 Pelamiran dinding 430.33 m² ### ###
5 Pelamiran plafond 340.20 m² ### ### ###
6 Pengecatan kayu 206.70 m² ### ###
Cat genteng 396.90 m² ### ###
XII. ###
1 PEKERJAAN LANTAI
Lantai rabat 216.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 4.00 bh ### ###
Engsel Pintu 21.00 bh ### ###
Engsel Jendela 24.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Grendel Jendela 12.00 bh ### ### ###
Hag Angin 24.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 14.00 bh ### ###
Lampu SL 8watt (teras) 4.00 bh ### ###
Saklar ganda 7.00 bh ### ###
REKAPITULASI
Saklar tunggal 3.00 bh ### ###
NCANA ANGGARAN BIAYA
Stop kontak + instalasi 4.00 bh ### ###
Instalasi titik lampu 18.00 bh ### ###
KEGIATAN ###
PEKE PEKERJAAN KACA
LING Kaca mati t=5 mm 14.49 m² ### ###
LOKASI ###

NO.

I
II
III
IV
V
VI
VII
VIII
IX
X 5
XI OK
XII BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 MODUNG
: SMPN 2 MODUNG KEC. MODUNG KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA


TERBILANG : ( DUA RATUS LIMA JUTA ENAM RATUS RIBU RUPIAH )

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA Rp -
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN/PLAMIRAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ### -
PEKERJAAN KACA ###

JUMLAH ### ###


DIBULAT ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

M. MAHRI, S.Ag H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Modung
Kec. Modung Kab. Bangkalan

A S U R, M.Pd
NIP. 19610117 198403 1 008

NO
1
I.
1
2

II.
1
2
3

III.
1
2
3

IV.
1
2
Lembar. 2
V. JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
1 2 3 4 5
2 PEKERJAAN PERSIAPAN
3 Pembongkaran atap + rangka 406.00 m² ### ###
4 Pembersihan akhir pekerjaan 1.00 ls ### ### ###
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 98.93 m² ### ###
2 Plesteran 1Pc : 5Ps 197.87 m² ### ###
3 Benangan 166.56 m' ### ###
###
VII. PEKERJAAN BETON
1 Kolom teras 15/15 0.41 m³ ### ###
Balok teras 15/20 1.24 m³ ### ###
VIII. Ring balk gewel 15/15 0.98 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 396.90 m² ### ###
4 Lisplank kalsiplank 8mm / 30 cm 85.70 m¹ ### ###
5 ###
PEKERJAAN ATAP
IX. Pasang atap genteng karang p enang (baru 5%) 19.85 m² ### ###
1 Pasang atap genteng (lama) 377.06 m² ### ###
Genteng bubungan karang penang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 29.00 m' ### ###
1 ###
2 PEKERJAAN KUSEN PINTU DAN JENDELA
3 Kusen kayu kempas/mahoni 6/12 0.46 m³ Rp - Rp -
4 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 6.72 m² Rp - Rp -
5 Daun Jendela kaca kayu kempas/mahoni 3/10 5.04 m² Rp - Rp -
6 Rp -
PEKERJAAN PLAFOND ###
XI. Plafond calsiboard 4mm + rangka kayu 4/6 340.20 m² ### ###
1 ###
2 PEKERJAAN PENGECATAN/PLAMIRAN
3 Pengecatan dinding (depan) 66.85 m² ### ###
4 Pelamiran dinding 430.33 m² ### ###
5 Pelamiran plafond 340.20 m² ### ### ###
6 Pengecatan kayu 206.70 m² ### ###
Cat genteng 396.90 m² ### ###
XII. ###
1 PEKERJAAN LANTAI
Lantai rabat 216.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 4.00 bh ### ###
Engsel Pintu 21.00 bh ### ###
Engsel Jendela 24.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Grendel Jendela 12.00 bh ### ### ###
Hag Angin 24.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 14.00 bh ### ###
Lampu SL 8watt (teras) 4.00 bh ### ###
Saklar ganda 7.00 bh ### ###
REKAPITULASI
Saklar tunggal 3.00 bh ### ###
NCANA ANGGARAN BIAYA
Stop kontak + instalasi 4.00 bh ### ###
Instalasi titik lampu 18.00 bh ### ###
KEGIATAN ###
PEKE PEKERJAAN KACA
LING Kaca mati t=5 mm 14.49 m² ### ###
LOKASI ###

NO.

I
II
III
IV
V
VI
VII
VIII
IX
X 6
XI OK
LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 2 LABANG
: SMPN 2 LABANG KEC. LABANG KAB. BANGKALAN

TERBILANG : ( DUA RATUS SEMBILAN


URAIAN
PULUHPEKERJAAN
EN JUMLAH HARGA

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN Rp -
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
PEKERJAAN TANGGA DEPAN PINTU ###

JUMLAH ### ###


DIBULATK ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
ACHMAD TAUFIK HEYKAL, A.Sg H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Labang
Kec. Labang Kab. Bangkalan

Drs. HARTONO, M.Pd


NIP. 19690126 199802 1 003

NO
1
I.
1
2
3
4
5

II.
1

III.
1
2

IV.
1
2
3 Lembar. 2
JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
V. 2 3 4 5
1 PEKERJAAN PERSIAPAN ###
Pembongkaran atap + rangka 377.00 m² Rp - Rp -
VI. Pembongkaran kosen 1.00 bh ### ###
1 Pembongkaran dinding 6.00 m² ### ###
2 Penetelan plesteran 139.74 m² ### ###
3 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VII. PEKERJAAN PASANGAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps (nyepit kuda2) 30.91 m² Rp - Rp -
2 Rp -
3 PEKERJAAN RANGKA ATAP ###
4 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ Rp - Rp -
VIII. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Pilang (baru) 382.73 m² ### ###
Genteng bubungan Karang pilang 28.35 m' ### ###
IX. Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' Rp - Rp -
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsiboard 4mm + rangka hollow 354.38 m² Rp - Rp -
4 Rp -
5 PEKERJAAN PENGECATAN
6 Pengecatan dinding 598.50 m² Rp - Rp - ###
Pengecatan plafond 354.38 m² Rp - Rp -
X. Pengecatan kayu 274.60 m² Rp - Rp -
1 Rp -
PEKERJAAN LANTAI
XI. Keramik lantai 40 x 40 243.00 m² ### ###
1 Keramik dinding 25 x 40 139.74 m² ### ###
2 List keramik 102.00 m' ### ###
3 Keramik kolom 20 x 40 10.80 m² ### ###
4 ###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA ###
Kaca mati t=5 mm (yg pecah) 4.22 m² ### ###
###
PEKERJAAN TANGGA DEPAN PINTU
Pasangan batu gunung 2.88 m³ ### ###
Plesterran trasram 7.68 m² ### ###
Keramik kasar 40 x 40 7.04 m² ### ###
Urugan pasir 4.96 m³ ### ###
REKAPITULASI ###
NCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI

NO.

I
II
III
IV
V
VI
VII
VIII
IX
X 6
XI OK
XII BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 2 LABANG
: SMPN 2 LABANG KEC. LABANG KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA


TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
PEKERJAAN TANGGA DEPAN PINTU ###

JUMLAH ### ###


DIBULATK ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

ACHMAD TAUFIK HEYKAL, A.Sg H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Labang
Kec. Labang Kab. Bangkalan
Drs. HARTONO, M.Pd
NIP. 19690126 199802 1 003

NO
1
I.
1
2
3
4
5

II.
1
2
3

III.
1

IV.
1
2 Lembar. 2
JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
V. 2 3 4 5
1 PEKERJAAN PERSIAPAN ###
2 Pembongkaran atap + rangka 377.00 m² Rp - Rp -
3 Pembongkaran kosen 1.00 bh ### ###
Pembongkaran dinding 6.00 m² ### ###
VI. Penetelan plesteran 127.50 m² ### ###
1 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VII. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps (nyepit kuda2) 22.43 m² Rp - Rp - -
2 Plesteran 1Pc : 5Ps 16.20 m² ### ###
3 Benangan 32.00 m' ### ###
###
VIII. PEKERJAAN BETON
1 Ring balk gewel 15/15 0.40 m³ ### ###
2 ###
3 PEKERJAAN RANGKA ATAP ###
4 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ Rp - Rp -
IX. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Pilang (baru) 382.73 m² ### ###
Genteng bubungan Karang pilang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' Rp - Rp -
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsiboard 4mm + rangka hollow 354.38 m² Rp - Rp -
4 Rp -
5 PEKERJAAN PENGECATAN
6 Pengecatan dinding 598.50 m² Rp - Rp - ###
Pengecatan plafond 354.38 m² Rp - Rp -
XI. Pengecatan kayu 274.60 m² Rp - Rp -
1 Rp -
PEKERJAAN LANTAI
XII. Keramik lantai 40 x 40 243.00 m² ### ###
1 Keramik dinding 25 x 40 127.50 m² ### ###
2 List keramik 102.00 m' ### ###
3 Keramik kolom 20 x 40 10.80 m² ### ###
4 ###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Pintu harmonika 15.00 m² ### ### ###
### ###
PEKERJAAN INSTALASI LISTRIK ###
Lampu SL 14 watt 12.00 bh ### ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA ###
Kaca mati t=5 mm (yg pecah) 4.22 m² ### ###
###
PEKERJAAN TANGGA DEPAN PINTU 3.46
Pasangan batu gunung 2.88 m³ ### ###
Plesterran trasram 7.68 m² ### ###
Keramik kasar 40 x 40 7.04 m² ### ###
Urugan pasir 4.96 m³ ### ###
###
REKAPITULASI
NCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI

NO.

I
II
III
IV
V
VI
VII
VIII
IX
X 7
OK
LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 KWANYAR
: SMPN 2 KWANYAR KEC. KWANYAR KAB. BANGKALAN
TERBILANG : ( SERATUS SEMBILAN PULUH TUJUH JUTA DELAPAN RATUS RIBU RUPIAH )
URAIAN PEKERJAAN JUMLAH HARGA

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN/PLESTERAN Rp -
PEKERJAAN KAYU ###
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
PEKERJAAN TEMPAT DUDUK ###

JUMLAH ### ###


DIBULAT ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

MOHAMMAD MUSTOFA ZAHRON, S.Pd H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Kwanyar
Kec. Kwanyar Kab. Bangkalan

RAHMAWATI, M.Pd
NIP. 19700703 199802 2 003

NO
1
I.
1
2
3
4

II.
1
2

III.
1

IV.
1

V.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran kusen 1.00 bh ### ###
VI. Pembongkaran dinding 15.00 m² ### ###
1 Penetelan plesteran 428.64 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 Ls ### ###
3 ###
4 PEKERJAAN PASANGAN/PLESTERAN ###
5 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 0.91 22.20 m² Rp - Rp -
6 Plesteran 1Pc : 5Ps 1.07 44.40 m² Rp - Rp -
Rp -
VII. PEKERJAAN KAYU
1 Lisplank kayu 3/30 cm 4.00 m¹ ### ###
2 ###
3 PEKERJAAN PLAFOND
4 Plafond calsi 1 x 1 + rangka kayu 12.00 m² Rp - Rp -
Rp -
VIII. PEKERJAAN PENGECATAN
1 Pengecatan dinding (3 kelas) 455.30 m² Rp - Rp -
2 Pengecatan plafond 319.00 m² Rp - Rp -
3 Pengecatan kayu 206.70 m² Rp - Rp - ###
4 Pengecatan kayu (Kantor) 214.39 m² Rp - Rp -
5 Rp -
6PEKERJAAN LANTAI 162.00 ###
Keramik lantai 40 x 40 ( 2 R Kelas ) 5.67 126.00 m² ### ###
IX. Keramik lantai 40 x 40 ( Teras ) 1.62 36.00 m² ### ###
1 Keramik dinding 25 x 40 (dalam kelas + teras) 5.78 128.40 m² ### ###
Keramik kolom teras 25 x 40 1.01 22.40 m² ### ###
X. List keramik 1.64 327.80 m' ### ###
1 Keramik dinding 25 x 40 (dalam kantor+R.guru+ t 13.51 300.24 m² ### ###
2 451.04 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 3.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Hag Angin 60.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
REKAPITULASI
PEKERJAAN KACA
NCANA ANGGARAN BIAYA
Kaca mati t=5 mm (yg pecah) 1.68 m² ### ###
###
KEGI PEKERJAAN TEMPAT DUDUK
PEKE Pasangan trasram 0.68 17.00 m² Rp - Rp -
LING Plat beton tempat duduk t=10 cm 0.53 1.02 m³ ### ###
LOKA Keramik tempat duduk 30 x 30 0.46 10.20 m² ### ###
Keramik dinding tempat duduk 25 x 40 1.84 40.80 m² ### ###
NO. 34.71 ###
0.86768 40.80

I
II
III
IV
V
VI
VII
VIII
IX
X 7
OK
BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 KWANYAR
: SMPN 2 KWANYAR KEC. KWANYAR KAB. BANGKALAN
TERBILANG : ( SERATUS SEMBILAN PULUH TUJUH JUTA DELAPAN RATUS RIBU RUPIAH )
URAIAN PEKERJAAN JUMLAH HARGA
PEKERJAAN PERSIAPAN ###
PEKERJAAN PASANGAN/PLESTERAN Rp -
PEKERJAAN KAYU ###
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
PEKERJAAN TEMPAT DUDUK ###

JUMLAH ### ###


DIBULAT ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

MOHAMMAD MUSTOFA ZAHRON, S.Pd H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Kwanyar
Kec. Kwanyar Kab. Bangkalan

RAHMAWATI, M.Pd
NIP. 19700703 199802 2 003

NO
1
I.
1
2
3
4

II.
1
2

III.
1
2

IV.
1

V. Lembar. 2
1 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
2 2 3 4 5
3 PEKERJAAN PERSIAPAN
4 Pembongkaran kusen 1.00 bh ### ###
5 Pembongkaran dinding 15.00 m² ### ###
Penetelan plesteran 428.64 m² ### ###
VI. Pembersihan akhir pekerjaan 1.00 Ls ### ###
1 ###
2 PEKERJAAN PASANGAN/PLESTERAN ###
3 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 22.20 m² Rp - Rp -
4 Plesteran 1Pc : 5Ps 44.40 m² Rp - Rp -
5 Rp -
6 PEKERJAAN KAYU
Perbaikan daun pintu panil 4.00 bh ### ###
VII. Lisplank kayu 3/30 cm 4.00 m¹ ### ###
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsi 1 x 1 + rangka kayu 12.00 m² Rp - Rp -
4 Rp -
PEKERJAAN PENGECATAN
VIII. Pengecatan dinding (3 kelas) 439.90 m² Rp - Rp -
1 Pengecatan dinding (Kantor) 373.40 m² Rp - Rp -
2 Pengecatan plafond 319.00 m² Rp - Rp -
3 Pengecatan kayu 169.45 m² Rp - Rp - ###
4 Pengecatan kayu (Kantor) 197.69 m² Rp - Rp -
5 Rp -
6 PEKERJAAN LANTAI ###
Keramik lantai 40 x 40 ( 2 R Kelas ) 126.00 m² ### ###
IX. Keramik lantai 40 x 40 ( Teras ) 36.00 m² ### ###
1 Keramik dinding 25 x 40 (dalam kelas + teras) 128.40 m² ### ###
Keramik kolom teras 25 x 40 22.40 m² ### ###
X. List keramik 327.80 m' ### ###
1 Keramik dinding 25 x 40 (dalam kantor+R.guru+ teras) 300.24 m² ### ###
2 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 3.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Hag Angin 60.00 bh ### ###
Pintu harmonika 11.30 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK ###
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA
REKAPITULASI
Kaca mati t=5 mm (yg pecah) 1.68 m² ### ###
NCANA ANGGARAN BIAYA ###
PEKERJAAN TEMPAT DUDUK
KEGI Pasangan trasram 17.00 m² Rp - Rp -
PEKE Plat beton tempat duduk t=10 cm 1.02 m³ ### ###
LING Keramik tempat duduk 30 x 30 10.20 m² ### ###
LOKA Keramik dinding tempat duduk 25 x 40 40.80 m² ### ###
###
NO.

I
II
III
IV
V
VI
VII
VIII
IX
8
OK

: PENGADAAN SARANA PRASARANA


: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 KOKOP
TERBILANG : ( SERATU : SMPN 2 KOKOP KEC. KOKOP KAB. BANGKALAN

URAIAN PEKERJAAN JUMLAH HARGA

PEKERJAAN PERSIAPAN ###


PEKERJAAN PASANGAN/PLESTERAN Rp -
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ### ###
PEKERJAAN KACA ###
PEKERJAAN TEMPAT DUDUK ###

JUMLAH ### ###


DIBULATK ### ###

Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)

BOSTOMI, S.Pd H. SUBADRIH, ST, MT

Mengetahui :
Kepala Sekolah
SMPN 2 Kokop
Kec. Kokop Kab. Bangkalan

MOHAMMAD TAUFIK, SPd


NIP. 19760326 200604 1 010
NO
1
I.
1
2

II.
1
2
3
III.
1

IV.
1
2
3

V. Lembar. 2
1 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
2 2 3 4 5
3 PEKERJAAN PERSIAPAN
4 Penetelan plesteran 317.46 m² ### ###
5 Pembersihan akhir pekerjaan 1.00 Ls Rp - Rp - #REF!
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 12.25 m² Rp - Rp -
5 Plesteran 1Pc : 5Ps 80.58 m² Rp - Rp -
6 Benangan 55.00 m' Rp - Rp -
7 Rp -
PEKERJAAN PLAFOND
VII. Plafond calsiboard 4mm + rangka kayu 15.00 m² Rp - Rp -
1 Rp -
2 PEKERJAAN PENGECATAN -
3 Pengecatan dinding 506.50 m² Rp - Rp -
4 Pengecatan plafond 352.00 m² Rp - Rp - #DIV/0!
5 Pengecatan kayu 275.60 m² Rp - Rp -
6 Rp -
PEKERJAAN LANTAI ###
VIII. Keramik lantai 40 x 40 243.00 m² ### ### 147.47
1 Keramik dinding 25 x 40 ( 3 R. Kelas + teras) 132.96 m² ### ###
List keramik 288.20 m' ### ###
IX. Keramik kolom 25 x 40 16.00 m² ### ###
1 Keramik dinding 25 x 40 ( 5 R. Kelas bg. dalam) 184.50 m² ### ###
2 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 5.00 bh ### ###
Grendel Jendela 50.00 bh ### ###
Hag Angin 100.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 20.00 bh ### ###
Lampu SL 8watt (teras) 5.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 5.00 bh ### ###
Stop kontak + instalasi 5.00 bh ### ###
Instalasi titik lampu 25.00 ttk ### ###
###
PEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 2.53 m² ### ###
###
PEKERJAAN TEMPAT DUDUK
Pasangan trasram 14.70 m² Rp - Rp -
Plat beton tempat duduk t=10 cm 0.74 m³ ### ###
Keramik tempat duduk 30 x 30 7.35 m² ### ###
Keramik dinding tempat duduk 25 x 40 29.40 m² ### ###
###

BATAS
SINERGI 1 SMPN 2 SEPULU DR. AHMAD SABARUDIN, S.Pd, M.MPd
SINERGI 2 SMPN 1 KLAMPIS IMAM SYAFII, S.Pd, MPd
SINERGI 3 SMPN 2 KOKOP MOHAMMAD TAUFIK, SPd
SINERGI 4 SMPN 3 SATAP KOKOP IHSANUDIN, S.Pd
INDRAKILA 5 SMPN 1 TRAGAH Drs. AMIRULLAH, MM
INDRAKILA 6 SMPN 2 MODUNG A S U R, M.Pd
INDRAKILA 7 SMPN 2 LABANG Drs. HARTONO, M.Pd
INDRAKILA 8 SMPN 2 KWANYAR RAHMAWATI, M.Pd
9 SMPN TAHAL AMIN H. ABDULLAH, S.Pd
10 SMPN 1 MODUNG Drs. ALI MUSTOFA, M.Pd
11 SMPN 1 GALIS Drs. TAUFIKUR RAHMAN
12 SMPN 1 KOKOP BUDIONO, S.Pd, M.Pd

13 SMPN 2 KONANG ABDUL RASID, S.Ag, M.PdI


14 SMPN TAHAL AMIN H. ABDULLAH, S.Pd

SMPN 1 KWANYAR MOHAMMAD SADALI, S.Pd


SMPN 1 TANJUNG BUMI Drs. M. AGUS SUBAGIO, M.Pd
SMPN 1 BLEGA SRI ASTUTIK HANDAYANI, M.Pd
SMPN 1 LABANG SUPRIYO, S.Pd, SE, M.PdI

SMPN 1 KWANYAR KEC. KWANYAR KAB. BANGKALAN MOHAMMAD SADALI, S.Pd


SMPN 1 TANJUNG BUMI KEC. TANJUNG BUMI KAB. BAN Drs. M. AGUS SUBAGIO, M.Pd
SMPN 1 BLEGA KEC. BLEGA KAB. BANGKALAN SRI ASTUTIK HANDAYANI, M.Pd
SMPN 2 TANAH MERAH KEC. T KOMARIYAH, S.Pd, M.MPd
SMPN TAHAL AMIN H. ABDULLAH, S.Pd
SMPN 1 GEGER Hj. SRI MULYATI, S.Pd, M.MPd
SMPN 1 GALIS
SMPN 1 TANAH MERAH DYAH CHANDRAWATI, S.Pd
SMPN 2 GEGER SITI YAUMAH, S.Pd
SMPN 4 SATAP TANAH MERA MOH. YUSUF, S.Pd
SMPN 1 KONANG Drs. ANANG ISKANDAR, MM

28.5
23.5
7.833333

1 ( Satu )
5 Oktob. s/d 10 Oktober 2015
Oktober 2015
29 Oktober 2015
Rp. 212.320.000.00
Prestasi Pekerjaan Prestasi Pekerjaan
Minggu Ini (%) Komulatif (%)
Rerata Prestasi Rerata
(9) (10) (11)
(8)/100x(5) (6)+(8) (7)+(9)

0.97 100.00 0.97 Rp 12,375.00 Rp 1,769,625.00


0.97 100.00 0.97 Rp 7,500.00 Rp 1,761,750.00
1.01 100.00 1.01 Rp 20,000.00 Rp 1,843,200.00
- - - Rp 200,000.00 Rp 200,000.00
Rp 5,574,575.00

- - - Rp 88,586.67 Rp 1,638,853.33
- - - Rp 42,298.80 Rp 1,565,055.60
- - - Rp - Rp -
Rp 3,203,908.93

- - - Rp 3,912,550.00 Rp 234,753.00
- - - Rp 3,962,550.00 Rp 114,121.44
- - - Rp 3,962,550.00 Rp 1,027,092.96
- - - Rp 3,962,550.00 Rp 1,255,335.84
Rp 2,631,303.24

- - - Rp 185,000.00 Rp 25,849,125.00
- - - Rp 185,000.00 Rp 21,929,437.50
- - - Rp 65,000.00 Rp 3,100,500.00
Rp 50,879,062.50

- - - Rp 18,000.00 Rp 2,515,050.00
- - - Rp 110,000.00 Rp 26,078,250.00
- - - Rp 95,820.00 Rp 2,558,394.00
- - - Rp 21,149.40 Rp 1,184,366.40
Rp 32,336,060.40

- - - Rp 85,000.00 Rp 22,185,000.00
Rp 22,185,000.00

- - - Rp 20,740.00 Rp 10,805,637.48
- - - Rp 20,740.00 Rp 5,413,140.00
- - - Rp 42,450.00 Rp 4,752,702.00
Rp 20,971,479.48

- - - Rp 105,250.00 Rp 3,315,375.00
- - - Rp 112,000.00 Rp 16,800,000.00
- - - Rp 136,075.00 Rp 12,540,672.00
- - - Rp 85,000.00 Rp 6,528,000.00
Rp 39,184,047.00

- - - Rp 55,000.00 Rp 660,000.00
- - - Rp 50,000.00 Rp 150,000.00
- - - Rp 20,000.00 Rp 80,000.00
- - - Rp 15,000.00 Rp 75,000.00
- - - Rp 225,000.00 Rp 1,125,000.00
Rp 200,000.00 Rp 3,000,000.00
Rp 5,090,000.00
- - - Rp 112,125.00 Rp 376,964.25
Rp 376,964.25

2.95 2.95

Rp 20,300,000.00 2.95 %
1 ( Satu )
5 Oktob. s/d 10 Oktober 2015
Oktober 2015
29 Oktober 2015

Prestasi Pekerjaan Prestasi Pekerjaan


Minggu Ini (%) Komulatif (%)
Rerata Prestasi Rerata
(9) (10) (11)
(8)/100x(5) (6)+(8) (7)+(9)
0.20 100.00 0.20 Rp 50,000.00 Rp 600,000.00
0.08 100.00 0.08 Rp 20,000.00 Rp 240,000.00
- - - Rp 200,000.00 Rp 200,000.00
Rp 1,040,000.00

- - - Rp 58,500.00 Rp 126,360.00
- - - Rp 215,400.00 Rp 77,544.00
- - - Rp 16,110.00 Rp 17,398.80
Rp 221,302.80

- - - Rp 88,586.67 Rp 3,790,281.61
- - - Rp 42,298.80 Rp 3,619,604.84
- - - Rp 11,825.00 Rp 3,651,560.00
Rp 11,061,446.45

- - - Rp 897,800.00 Rp 161,604.00
- - - Rp 3,962,550.00 Rp 2,139,777.00
- - - Rp 3,962,550.00 Rp 3,120,508.13
- - - Rp 3,962,550.00 Rp 5,943,825.00
- - - Rp 3,962,550.00 Rp 9,510,120.00
- - - Rp 3,962,550.00 Rp 941,501.88
Rp 21,817,336.01

- - - Rp 210,000.00 Rp 77,723,100.00
- - - Rp 65,000.00 Rp 5,063,500.00
Rp 82,786,600.00

- - - Rp 80,500.00 Rp 16,325,400.00
- - - Rp 18,000.00 Rp 3,011,580.00
- - - Rp 95,820.00 Rp 2,429,037.00
- - - Rp 21,149.40 Rp 617,562.48
Rp 22,383,579.48

- - - Rp 11,431,250.00 Rp 14,644,117.13
- - - Rp 618,250.00 Rp 5,375,065.50
- - - Rp 430,475.00 Rp 7,148,037.38
- - - Rp 419,572.50 Rp 4,833,475.20
Rp 32,000,695.20

- - - Rp 85,000.00 Rp 25,857,000.00
Rp 25,857,000.00

- - - Rp 20,740.00 Rp 12,412,890.00
- - - Rp 20,740.00 Rp 6,309,108.00
- - - Rp 42,450.00 Rp 8,774,415.00
Rp 27,496,413.00

- - - Rp 112,000.00 Rp 26,880,000.00
- - - Rp 136,075.00 Rp 17,662,535.00
- - - Rp 136,075.00 Rp 870,880.00
- - - Rp 85,000.00 Rp 10,115,000.00
Rp 55,528,415.00

- - - Rp 140,750.00 Rp 422,250.00
- - - Rp 23,625.00 Rp 425,250.00
- - - Rp 16,687.50 Rp 267,000.00
- - - Rp 74,250.00 Rp 222,750.00
- - - Rp 14,750.00 Rp 236,000.00
- - - Rp 17,750.00 Rp 284,000.00
Rp 1,857,250.00

- - - Rp 55,000.00 Rp 660,000.00
- - - Rp 50,000.00 Rp 150,000.00
- - - Rp 20,000.00 Rp 60,000.00
- - - Rp 15,000.00 Rp 45,000.00
- - - Rp 225,000.00 Rp 675,000.00
- - - Rp 200,000.00 Rp 3,000,000.00
Rp 4,590,000.00

- - - Rp 112,125.00 Rp 3,038,587.50
Rp 3,038,587.50

0.28 -
Rp 20,300,000.00 - %
1 ( Satu )
5 Oktob. s/d 10 Oktober 2015
Oktober 2015
29 Oktober 2015

Prestasi Pekerjaan Prestasi Pekerjaan


Minggu Ini (%) Komulatif (%)
Rerata Prestasi Rerata Lembar. 2
(9) (10) (11) HARGA SATUAN JUMLAH HARGA
(8)/100x(5) (6)+(8) (7)+(9) 4 5

- 100.00 1.70 Rp 12,375.00 Rp 3,217,500.00


- 100.00 0.32 Rp 50,000.00 Rp 600,000.00
- 100.00 0.65 Rp 20,000.00 Rp 1,235,000.00
0.11 100.00 0.11 Rp 200,000.00 Rp 200,000.00
Rp 5,252,500.00

- 100.00 0.05 Rp 58,500.00 Rp 88,452.00


- 100.00 0.03 Rp 215,400.00 Rp 54,280.80
- 100.00 0.01 Rp 16,110.00 Rp 12,179.16
Rp 154,911.96

- 100.00 4.29 Rp 88,586.67 Rp 8,133,700.58


- 100.00 4.10 Rp 42,298.80 Rp 7,767,439.21
- 100.00 1.08 Rp 11,825.00 Rp 2,045,725.00
Rp 17,946,864.80

- 100.00 0.15 Rp 897,800.00 Rp 274,726.80


- 100.00 0.79 Rp 3,962,550.00 Rp 1,497,843.90
- 100.00 0.99 Rp 3,962,550.00 Rp 1,872,304.88
- 100.00 2.23 Rp 3,962,550.00 Rp 4,220,115.75
- 100.00 2.64 Rp 3,962,550.00 Rp 4,992,813.00
- 100.00 1.17 Rp 3,962,550.00 Rp 2,225,368.08
Rp 15,083,172.41

- 100.00 28.43 Rp 210,000.00 Rp 53,841,375.00


- 100.00 2.24 Rp 65,000.00 Rp 4,238,000.00
Rp 58,079,375.00

- 100.00 8.10 Rp 80,500.00 Rp 15,344,910.00


- 100.00 1.06 Rp 18,000.00 Rp 2,002,725.00
- 100.00 0.98 Rp 95,820.00 Rp 1,854,117.00
- 100.00 0.30 Rp 21,149.40 Rp 560,459.10
Rp 19,762,211.10

- 100.00 5.81 Rp 115,000.00 Rp 11,012,400.00


- 100.00 4.22 Rp 2,000,000.00 Rp 8,000,000.00
- 100.00 2.11 Rp 500,000.00 Rp 4,000,000.00
Rp 23,012,400.00

- 100.00 9.03 Rp 85,000.00 Rp 17,105,400.00


Rp 17,105,400.00

- 100.00 0.59 Rp 20,740.00 Rp 1,119,960.00


- 100.00 1.76 Rp 9,670.00 Rp 3,331,315.00
- 100.00 1.03 Rp 9,670.00 Rp 1,945,990.80
- 100.00 0.44 Rp 42,450.00 Rp 830,322.00
Rp 7,227,587.80

- 100.00 9.58 Rp 112,000.00 Rp 18,144,000.00


- 100.00 0.40 Rp 136,075.00 Rp 762,020.00
Rp 18,906,020.00

- 100.00 0.15 Rp 140,750.00 Rp 281,500.00


- 100.00 0.15 Rp 23,625.00 Rp 283,500.00
- 100.00 0.14 Rp 16,687.50 Rp 267,000.00
- 100.00 0.08 Rp 74,250.00 Rp 148,500.00
- 100.00 0.12 Rp 14,750.00 Rp 236,000.00
- 100.00 0.15 Rp 17,750.00 Rp 284,000.00
Rp 1,500,500.00

0.23 100.00 0.23 Rp 55,000.00 Rp 440,000.00


0.05 100.00 0.05 Rp 50,000.00 Rp 100,000.00
0.02 100.00 0.02 Rp 20,000.00 Rp 40,000.00
0.02 100.00 0.02 Rp 15,000.00 Rp 30,000.00
0.24 100.00 0.24 Rp 225,000.00 Rp 450,000.00
1.06 100.00 1.06 Rp 200,000.00 Rp 2,000,000.00
Rp 3,060,000.00

1.22 100.00 1.22 Rp 112,125.00 Rp 2,318,745.00


Rp 2,318,745.00
1.72 100.00
Rp 189,409,000.00 100.00 %

Bangkalan, 2018 Rp 189,409,688.06


Dibuat oleh 189409688.060837
Fasilitator / Perencana Rp 189,409,000.00
H. SUBADRIH, ST, MT

LAMA
140

BARU
LAMA
BARU
LAMA
BARU
LAMA
BARU
keramik tambal sulam
SADALI, S.Pd
UBAGIO, M.Pd
NDAYANI, M.Pd
1 2 3 4 5

0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
1.01 100 1.01 100 1.01 100 1.01 100 1.01 100
0.11 - - - - - - - - -
0.90 - - 100 0.90 100 0.90 100 0.90 100
0.86 - - - - 100 0.86 100 0.86 100
- - - - - 100 - 100 - 100

0.13 - - - - - - 50 0.06 100


0.06 - - - - - - - - 100
0.56 - - - - - - - - 100
0.69 - - - - - - - - 50

14.17 - - - - - - - - -
12.02 - - - - - - - - -
1.70 - - - - - - - - -

1.38 - - - - - - - - -
14.29 - - - - - - - - -
1.40 - - - - - - - - -
0.65 - - - - - - - - -

12.16 - - - - - - - - -

5.92 - - - - - - - - -
2.97 - - - - - - - - -
2.61 - - - - - - - - -

1.82 - - - - - - - - -
9.21 - - - - - - - - -
6.87 - - - - - - - - -
3.58 - - - - - - - - -

0.36 - - - - - - - - -
0.08 - - - - - - - - -
0.04 - - - - - - - - -
0.04 - - - - - - - - -
0.62 - - - - - - - - -
1.64 - - - - - - - - -
0.21 - - - - - - - - -
1 2 3 4 5
0.20 100 0.20 100 0.20 100 0.20 100 0.20 100
0.08 100 0.08 100 0.08 100 0.08 100 0.08 100
0.07 - - - - - - - - -

0.04 - - 100 0.04 100 0.04 100 0.04 100


0.03 - - - - 100 0.03 100 0.03 100
0.01 - - - - 100 0.01 100 0.01 100

1.24 - - - - - - 50 0.62 100


1.19 - - - - - - - - 100
1.20 - - - - - - - - 100

0.05 - - - - - - 25 0.01 50
0.70 - - - - - - - - 50
1.02 - - - - - - - - -
1.95 - - - - - - - - -
3.12 - - - - - - - - 50
0.31 - - - - - - - - 75

25.51 - - - - - - - - -
1.66 - - - - - - - - -

5.36 - - - - - - - - -
0.99 - - - - - - - - -
0.80 - - - - - - - - -
0.20 - - - - - - - - -

4.81 - - - - - - - - 50
1.76 - - - - - - - - -
2.35 - - - - - - - - -
1.59 - - - - - - - - -

8.49 - - - - - - - - -

4.07 - - - - - - - - -
2.07 - - - - - - - - -
2.88 - - - - - - - - -

8.82 - - - - - - - - -
5.80 - - - - - - - - -
0.29 - - - - - - - - -
3.32 - - - - - - - - -

0.14 - - - - - - - - -
0.14 - - - - - - - - -
0.09 - - - - - - - - -
0.07 - - - - - - - - -
0.08 - - - - - - - - -
0.09 - - - - - - - - -

0.22 - - - - - - - - -
0.05 - - - - - - - - -
0.02 - - - - - - - - -
0.01 - - - - - - - - -
0.22 - - - - - - - - -
0.98 - - - - - - - - -

1.00 - - - - - - - - -
1 2 3 4 5

1.70 100 1.70 100 1.70 100 1.70 100 1.70 100
0.32 100 0.32 100 0.32 100 0.32 100 0.32 100
0.65 100 0.65 100 0.65 100 0.65 100 0.65 100
0.11 - - - - - - - - -

0.05 100 0.05 100 0.05 100 0.05 100 0.05 100
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100
0.01 50 0.00 100 0.01 100 0.01 100 0.01 100

4.29 - - 100 4.29 100 4.29 100 4.29 100


4.10 - - 100 4.10 100 4.10 100 4.10 100
1.08 - - 15 0.16 100 1.08 100 1.08 100

0.15 - - - - 75 0.11 100 0.15 100


0.79 - - - - - - 50 0.40 100
0.99 - - - - - - 10 0.10 75
2.23 - - - - - - - - -
2.64 - - - - - - - - -
1.17 - - - - - - - - -
28.43 - - - - - - - - -
2.24 - - - - - - - - -

8.10 - - - - - - - - -
1.06 - - - - - - - - -
0.98 - - - - - - - - -
0.30 - - - - - - - - -

5.81 - - - - 75 4.36 100 5.81 100


4.22 - - - - 15 0.63 55 2.32 100
2.11 - - - - - - - - 100

9.03 - - - - - - - - -

0.59 - - - - - - - - -
1.76 - - - - - - - - -
1.03 - - - - - - - - 75
0.44 - - - - - - - - -

9.58 - - - - - - - - -
0.40 - - - - - - - - -

0.15 - - - - - - - - -
0.15 - - - - - - - - -
0.14 - - - - - - - - -
0.08 - - - - - - - - -
0.12 - - - - - - - - -
0.15 - - - - - - - - -

0.23 - - - - - - - - -
0.05 - - - - - - - - -
0.02 - - - - - - - - -
0.02 - - - - - - - - -
0.24 - - - - - - - - -
1.06 - - - - - - - - -

1.22 - - - - - - - - -
6 7 8 9 10

0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
1.01 100 1.01 100 1.01 100 1.01 100 1.01 100
- - - - - - - 100 0.11 100
0.90 100 0.90 100 0.90 100 0.90 100 0.90 100
0.86 100 0.86 100 0.86 100 0.86 100 0.86 100
- 100 - 100 - 100 - 100 - 100

0.13 100 0.13 100 0.13 100 0.13 100 0.13 100
0.06 100 0.06 100 0.06 100 0.06 100 0.06 100
0.56 100 0.56 100 0.56 100 0.56 100 0.56 100
0.34 100 0.69 100 0.69 100 0.69 100 0.69 100

- 100 14.17 100 14.17 100 14.17 100 14.17 100


- 100 12.02 100 12.02 100 12.02 100 12.02 100
- 25 0.42 100 1.70 100 1.70 100 1.70 100

- - - - - 100 1.38 100 1.38 100


- - - - - 100 14.29 100 14.29 100
- - - - - 100 1.40 100 1.40 100
- - - - - 100 0.65 100 0.65 100

- - - - - - - 100 12.16 100

- - - - - 50 2.96 100 5.92 100


- - - - - - - 100 2.97 100
- - - - - - - 100 2.61 100

- - - - - 50 0.91 100 1.82 100


- - - - - 100 9.21 100 9.21 100
- - - - - - - 100 6.87 100
- - - - - - - - - 100

- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
6 7 8 9 10
0.20 100 0.20 100 0.20 100 0.20 100 0.20 100
0.08 100 0.08 100 0.08 100 0.08 100 0.08 100
- - - - - - - - - 100

0.04 100 0.04 100 0.04 100 0.04 100 0.04 100
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100
0.01 100 0.01 100 0.01 100 0.01 100 0.01 100

1.24 100 1.24 100 1.24 100 1.24 100 1.24 100
1.19 100 1.19 100 1.19 100 1.19 100 1.19 100
1.20 100 1.20 100 1.20 100 1.20 100 1.20 100

0.03 100 0.05 100 0.05 100 0.05 100 0.05 100
0.35 100 0.70 100 0.70 100 0.70 100 0.70 100
- 50 0.51 100 1.02 100 1.02 100 1.02 100
- 50 0.98 100 1.95 100 1.95 100 1.95 100
1.56 75 2.34 100 3.12 100 3.12 100 3.12 100
0.23 100 0.31 100 0.31 100 0.31 100 0.31 100

- - - 100 25.51 100 25.51 100 25.51 100


- - - - - 100 1.66 100 1.66 100

- - - - - 50 2.68 100 5.36 100


- - - - - 50 0.49 100 0.99 100
- - - - - - - 100 0.80 100
- - - - - - - 100 0.20 100

2.40 100 4.81 100 4.81 100 4.81 100 4.81 100
- - - - - - - 100 1.76 100
- - - - - - - 100 2.35 100
- - - - - 50 0.79 100 1.59 100

- - - - - - - 50 4.24 100

- - - 50 2.04 100 4.07 100 4.07 100


- - - - - - - 50 1.04 100
- - - - - 50 1.44 100 2.88 100

- - - - - - - 75 6.62 100
- - - - - - - 50 2.90 100
- - - - - - - 50 0.14 100
- - - - - - - - - 100

- - - - - - - 100 0.14 100


- - - - - - - 100 0.14 100
- - - - - - - 100 0.09 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100

- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100

- - - - - - - 100 1.00 100


6 7 8 9 10

1.70 100 1.70 100 1.70 100 1.70 100 1.70 100
0.32 100 0.32 100 0.32 100 0.32 100 0.32 100
0.65 100 0.65 100 0.65 100 0.65 100 0.65 100
- - - - - - - - - 100

0.05 100 0.05 100 0.05 100 0.05 100 0.05 100
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100
0.01 100 0.01 100 0.01 100 0.01 100 0.01 100

4.29 100 4.29 100 4.29 100 4.29 100 4.29 100
4.10 100 4.10 100 4.10 100 4.10 100 4.10 100
1.08 100 1.08 100 1.08 100 1.08 100 1.08 100

0.15 100 0.15 100 0.15 100 0.15 100 0.15 100
0.79 100 0.79 100 0.79 100 0.79 100 0.79 100
0.74 100 0.99 100 0.99 100 0.99 100 0.99 100
- 100 2.23 100 2.23 100 2.23 100 2.23 100
- 100 2.64 100 2.64 100 2.64 100 2.64 100
- 100 1.17 100 1.17 100 1.17 100 1.17 100
- 25 7.11 100 28.43 100 28.43 100 28.43 100
- - - 100 2.24 100 2.24 100 2.24 100

- - - 85 6.89 100 8.10 100 8.10 100


- - - - - 100 1.06 100 1.06 100
- - - - - 100 0.98 100 0.98 100
- - - - - 100 0.30 100 0.30 100

5.81 100 5.81 100 5.81 100 5.81 100 5.81 100
4.22 100 4.22 100 4.22 100 4.22 100 4.22 100
2.11 100 2.11 100 2.11 100 2.11 100 2.11 100

- - - - - 100 9.03 100 9.03 100

- 50 0.30 100 0.59 100 0.59 100 0.59 100


- 50 0.88 100 1.76 100 1.76 100 1.76 100
0.77 100 1.03 100 1.03 100 1.03 100 1.03 100
- - - - - 100 0.44 100 0.44 100

- - - 25 2.39 100 9.58 100 9.58 100


- - - - - 85 0.34 100 0.40 100

- 100 0.15 100 0.15 100 0.15 100 0.15 100


- 100 0.15 100 0.15 100 0.15 100 0.15 100
- 100 0.14 100 0.14 100 0.14 100 0.14 100
- 100 0.08 100 0.08 100 0.08 100 0.08 100
- 100 0.12 100 0.12 100 0.12 100 0.12 100
- 100 0.15 100 0.15 100 0.15 100 0.15 100

- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100

- - - - - - - - - 100
0.97
0.97
1.01
0.11
0.90
0.86
-

0.13
0.06
0.56
0.69

14.17
12.02
1.70

1.38
14.29
1.40
0.65

12.16

5.92
2.97
2.61

1.82
9.21
6.87
3.58

0.36
0.08
0.04
0.04
0.62
1.64
0.21
0.20
0.08
0.07

0.04
0.03
0.01

1.24
1.19
1.20

0.05
0.70
1.02
1.95
3.12
0.31

25.51
1.66

5.36
0.99
0.80
0.20

4.81
1.76
2.35
1.59

8.49

4.07
2.07
2.88

8.82
5.80
0.29
3.32

0.14
0.14
0.09
0.07
0.08
0.09

0.22
0.05
0.02
0.01
0.22
0.98

1.00
1.70
0.32
0.65
0.11

0.05
0.03
0.01

4.29
4.10
1.08

0.15
0.79
0.99
2.23
2.64
1.17
28.43
2.24

8.10
1.06
0.98
0.30

5.81
4.22
2.11

9.03

0.59
1.76
1.03
0.44

9.58
0.40

0.15
0.15
0.14
0.08
0.12
0.15

0.23
0.05
0.02
0.02
0.24
1.06

1.22

You might also like