I BAHAN PASIR
1 Pedel putih M³ 120,000.00
1 Pasir Lokal M³ 160,000.00
2 Pasir Pasang ( Jawa ) M³ 260,000.00
3 Pasir Cor ( Jawa ) M³ 320,000.00
II BAHAN BATU
1 Batu Gunung 15/20 ( Lokal ) M³ 160,000.00
1 Batu Gunung Pecah 2/3 ( Lokal ) M³ 320,000.00
IV PORTLAN CEMENT ( PC )
1 Semen Gresik 40 Kg Zak 60,000.00
2 Semen warna putih ( Gresik ) 40 Kg Zak 9,500.00
3 Semen warna Kg 10,000.00
V BAHAN BESI
1 Besi Beton Polos Kg 9,000.00
2 Kawat Beton / Kawat Bendrat Kg 20,000.00
2 Besi strip Kg 22,000.00
XI HANA KACA
1 Kaca Polos 5 mm M² 97,500.00
XV BAHAN KERAMIK
1 Keramik 40 x 40 M² 51,000.00
2 Keramik 30 x 30 M² 46,000.00
3 Keramik 20 x 20 M² 48,000.00
4 Keramik 20 x 25 M² 55,000.00
4 Keramik 25 x 40 (Motif) M² 75,000.00
5 Keramik 20 x 40 (Motif batu) M² 85,000.00
7 1,00 M3 Pekerjaan Beton Bertulang Camp. 1Pc : 2Ps : 3 Krl ( Kolom 15/20 ) Lembar. 2
Bahan :
336.000 Kg Semen ( Pc ) @ Rp. 1,500.00 Rp. 504,000.00
0.540 M3 Pasir Beton ( Jawa ) @ Rp. 320,000.00 Rp. 172,800.00
0.810 M3 Batu Pecah 2/3 ( Lokal ) @ Rp. 320,000.00 Rp. 259,200.00
Upah :
2.000 Oh Pekerja @ Rp. 75,000.00 Rp. 150,000.00
0.350 Oh Tukang Batu @ Rp. 90,000.00 Rp. 31,500.00
Rp. 936,000.00 + Rp. 181,500.00
Jumlah = Rp. 1,117,500.00
Pekerjaan Pembesian :
Bahan :
175.000 Kg Besi Beton Polos @ Rp. 9,000.00 Rp. 1,575,000.00
2.400 Kg Kawat Baja @ Rp. 20,000.00 Rp. 48,000.00
Jumlah 1,623,000.00
Upah :
0.770 Oh Pekerja @ Rp. 75,000.00 Rp. 57,750.00
0.770 Oh Tukang Besi @ Rp. 90,000.00 Rp. 69,300.00
Jumlah Rp. 127,050.00
Pek. Pembesian = 1,623,000.00 + 127,050.00 = Rp. 1,750,050.00
Pekerjaan Begesting ( 2 kali Pakai ) :
Bahan :
2.250 Kg Paku @ Rp. 20,000.00 Rp. 45,000.00
0.160 M3 Kayu Begisting @ Rp. 2,500,000.00 Rp. 400,000.00
Upah :
2.000 Oh Pekerja @ Rp. 75,000.00 Rp. 150,000.00
5.000 Oh Tukang Kayu @ Rp. 90,000.00 Rp. 450,000.00
Rp. 445,000.00 + Rp. 600,000.00
Jumlah = Rp. 1,045,000.00
Jadi untuk 1,00 M3 Pekerjaan Beton Bertulang : Rp. 1,117,500.00
Rp. 1,750,050.00
Rp. 1,045,000.00
Rp. 3,912,550.00
8 1,00 M3 Pekerjaan Beton Bertulang Camp. 1Pc : 2Ps : 3 Krl ( Kolom Praktis + Rink balk )
Bahan :
336.000 Kg Semen ( Pc ) @ Rp. 1,500.00 Rp. 504,000.00
0.540 M3 Pasir Beton ( Jawa ) @ Rp. 320,000.00 Rp. 172,800.00
0.810 M3 Batu Pecah 2/3 ( Lokal ) @ Rp. 320,000.00 Rp. 259,200.00
Upah :
2.000 Oh Pekerja @ Rp. 75,000.00 Rp. 150,000.00
0.350 Oh Tukang Batu @ Rp. 90,000.00 Rp. 31,500.00
Rp. 936,000.00 + Rp. 181,500.00
Jumlah = Rp. 1,117,500.00
Pekerjaan Pembesian :
Bahan :
195.000 Kg Besi Beton Polos @ Rp. 9,000.00 Rp. 1,755,000.00
2.400 Kg Kawat Baja @ Rp. 20,000.00 Rp. 48,000.00
Jumlah 1,803,000.00
Upah :
0.770 Oh Pekerja @ Rp. 75,000.00 Rp. 57,750.00
0.770 Oh Tukang Besi @ Rp. 90,000.00 Rp. 69,300.00
Jumlah Rp. 127,050.00
Pek. Pembesian = 1,803,000.00 + 127,050.00 = Rp. 1,930,050.00
JUMLAH Rp 183,000,000.56
DIBULATKAN Rp 183,000,000.00
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
H. SUBADRIH, ST, MT
Mengetahui :
Kepala Sekolah
SMPN 3 Satap Kokop
Kec. Kokop Kab. Bangkalan
IHSANUDIN, S.Pd
NIP. 19700109 199104 1 001
Lembar. 2
NO JENIS PEKRJAAN VOLUME HARGA SATUAN JUMLAH HARGA
1 2 3 4 5
I. PEKERJAAN PERSIAPAN
1 Pembongkaran atap + rangka 260.00 m² Rp 12,375.00 Rp 3,217,500.00
2 Pembongkaran kosen 12.00 bh Rp 50,000.00 Rp 600,000.00
3 Pembongkaran dinding 61.75 m² Rp 20,000.00 Rp 1,235,000.00
4 Pembersihan akhir pekerjaan 1.00 ls Rp 200,000.00 Rp 200,000.00
Rp 5,252,500.00
II. PEKERJAAN TANAH
1 Galian tanah 1.51 m³ Rp 58,500.00 Rp 88,452.00
2 Urugan pasir bawah pondasi t=10cm 0.25 m³ Rp 215,400.00 Rp 54,280.80
4 Urugan tanah kembali 0.76 m³ Rp 16,110.00 Rp 12,179.16
Rp 154,911.96
III. PEKERJAAN PASANGAN/PLESTERAN 4,131.73
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 916.33 91.82 m² Rp 88,586.67 Rp 8,133,700.58
2 Plesteran 1Pc : 5Ps 973.07 183.63 m² Rp 42,298.80 Rp 7,767,439.21
3 Benangan 86.50 173.00 m' Rp 11,825.00 Rp 2,045,725.00
Rp 17,946,864.80
IV. PEKERJAAN BETON
1 Lantai kerja bawah pondasi 1:3:5 t=5cm 0.31 m³ Rp 897,800.00 Rp 274,726.80
2 Pondasi beton stempat 60 x 60 x 15cm 0.38 m³ Rp 3,962,550.00 Rp 1,497,843.90
3 Kolom teras 15/15 0.47 m³ Rp 3,962,550.00 Rp 1,872,304.88
4 Balok beton 15/20 1.07 m³ Rp 3,962,550.00 Rp 4,220,115.75
5 Kolom struktur 15/25 1.26 m³ Rp 3,962,550.00 Rp 4,992,813.00
6 Ring balk 15/15 0.56 m³ Rp 3,962,550.00 Rp 2,225,368.08
1,358.48 4.04 Rp 15,083,172.41
V. PEKERJAAN RANGKA ATAP
1 Kuda-kuda baja ringan (galvalum 75mm) 256.39 m² Rp 185,000.00 Rp 47,431,687.50
2 Lisplank kalsiplank 8mm / 30 cm 65.20 m¹ Rp 65,000.00 Rp 4,238,000.00
Rp 51,669,687.50
VI. PEKERJAAN ATAP 4,765.50
1 Atap genteng Karang Penang (baru bg depan) 190.62 m² Rp 80,500.00 Rp 15,344,910.00
2 Atap genteng (lama bg belakang) 111.26 m² Rp 18,000.00 Rp 2,002,725.00
3 Genteng bubungan Karang penang 154.80 19.35 m' Rp 95,820.00 Rp 1,854,117.00
4 Plesteran kompres L = 10 cm (Akhiran gent 13.25 26.50 m' Rp 21,149.40 Rp 560,459.10
Rp 19,762,211.10
VII. PEKERJAAN KUSEN PINTU DAN JENDELA
1 Kusen kayu aluminium 4" 95.76 m' Rp 115,000.00 Rp 11,012,400.00
2 Daun Pintu kaca aluminium 4.00 bh Rp 2,000,000.00 Rp 8,000,000.00
3 Daun Jendela kaca aluminium 8.00 bh Rp 500,000.00 Rp 4,000,000.00
Rp 23,012,400.00
VIII. PEKERJAAN PLAFOND
1 Plafond calsiboard 4mm + rangka hollow 201.24 m² Rp 85,000.00 Rp 17,105,400.00
Rp 17,105,400.00
IX. PEKERJAAN PENGECATAN/PLAMIRAN
1 Pengecatan dinding depan 54.00 m² Rp 20,740.00 Rp 1,119,960.00
2 Pelamiran dinding 344.50 m² Rp 9,670.00 Rp 3,331,315.00
3 Plamiran plafond 201.24 m² Rp 9,670.00 Rp 1,945,990.80
4 Pengecatan kayu 19.56 m² Rp 42,450.00 Rp 830,322.00
Rp 7,227,587.80
X. PEKERJAAN LANTAI
1 Keramik lantai 40 x 40 162.00 m² Rp 112,000.00 Rp 18,144,000.00
2 Keramik kolom 20 x 40 (motif) 5.60 m² Rp 136,075.00 Rp 762,020.00
1,257.00 167.60 Rp 18,906,020.00
XI. PEKERJAAN KUNCI + PENGGANTUNG4759.4276
1 Kunci pintu 2 x putar 118.98569 2.00 bh Rp 140,750.00 Rp 281,500.00
2 Engsel Pintu 12.00 bh Rp 23,625.00 Rp 283,500.00
3 Engsel Jendela 16.00 bh Rp 16,687.50 Rp 267,000.00
4 Grendel tanam 2.00 bh Rp 74,250.00 Rp 148,500.00
5 Grendel Jendela 16.00 bh Rp 14,750.00 Rp 236,000.00
6 Hag Angin 16.00 bh Rp 17,750.00 Rp 284,000.00
Rp 1,500,500.00
XII PEKERJAAN INSTALASI LISTRIK
1 Lampu SL 14 watt 8.00 bh Rp 55,000.00 Rp 440,000.00
2 Lampu SL 8watt (teras) 2.00 bh Rp 50,000.00 Rp 100,000.00
3 Saklar ganda 2.00 bh Rp 20,000.00 Rp 40,000.00
4 Saklar tunggal 2.00 bh Rp 15,000.00 Rp 30,000.00
5 Stop kontak + instalasi 2.00 bh Rp 225,000.00 Rp 450,000.00
6 Instalasi titik lampu 10.00 ttk Rp 200,000.00 Rp 2,000,000.00
Rp 3,060,000.00
XIII. PEKERJAAN KACA
1 Kaca mati t=5 mm 20.68 m² Rp 112,125.00 Rp 2,318,745.00
Rp 2,318,745.00
REKAPITULASI
RENCANA ANGGARAN BIAYA
JUMLAH Rp 261,493,125.90
DIBULATKAN Rp 261,493,000.00
Sidoarjo, 2017
Kepala SMP AINUL YAQIN KLAMPIS Dibuat oleh
KEC. KLAMPIS Konsultan Perencana
Selaku Penanggung Jawab PT. INDRAKILA
Mengetahui, Menyetujui,
Kepala Bidang Pedidikan SMP Kepala Seksi Bidang Pendidikan SMP
Dinas Pendidikan Kab. Bangkalan Selaku Pejabat Pelaksana Teknik Kegiatan
Selaku Pejabat Pembuat Komitmen
JUMLAH #REF!
DIBULATKAN #REF!
Mengetahui, Menyetujui,
Kepala Bidang Sarana Prasarana Kepala Seksi Sarana & Prasarana
Dinas Pendidikan Kab. Bangkalan Selaku Pejabat Pelaksana Teknik Kegiatan
Selaku Pejabat Pembuat Komitmen
SMPN 1 KWANYA
I PEKERJAAN PERSIAPAN ### SMPN 1 TANJUNG
II PEKERJAAN PASANGAN/PLESTERAN ### SMPN 1 BLEGA K
III PEKERJAAN BETON ### SMPN 2 TANAH M
IV PEKERJAAN RANGKA ATAP ### SMPN TAHAL
V PEKERJAAN ATAP ### SMPN 1 GEGER
VI PEKERJAAN PLAFOND ### SMPN 1 GALIS
VII PEKERJAAN PENGECATAN ### SMPN 1 TANAH
VIII PEKERJAAN LANTAI ### SMPN 2 GEGER
IX PEKERJAAN INSTALASI LISTRIK ### SMPN 4 SATAP T
X PEKERJAAN KACA ### SMPN 1 KONAN
JUMLAH ###
DIBULATK ### ###
###
28.5
Bangkalan, 2018 23.5
Menyetujui : Dibuat oleh 7.833333
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Sepulu
Kec. Sepulu Kab. Bangkalan
V. PEKERJAAN ATAP
1 Atap genteng beton (lama) 139.73 m² 1.38 - - - - - -
2 Atap genteng beton warna 237.08 m² 14.29 - - - - - -
3 Genteng bubungan beton warna 26.70 m' 1.40 - - - - - -
4 Plesteran kompres L = 10 cm (Akhiran genting) 56.00 m' 0.65 - - - - - -
X. PEKERJAAN KACA
1 Kaca mati t=5 mm (yg pecah) 3.36 m² 0.21 - - - - - -
I (2) ###
II PEKERJAAN TANAH ###
III PEKERJAAN PASANGAN/PLESTERAN ###
IV PEKERJAAN BETON ###
V PEKERJAAN RANGKA ATAP ###
VI PEKERJAAN ATAP ###
VII PEKERJAAN KUSEN PINTU DAN JENDELA ###
VIII PEKERJAAN PLAFOND ###
IX PEKERJAAN PENGECATAN/PLAMIRAN ###
X PEKERJAAN LANTAI ###
XI PEKERJAAN KUNCI + PENGGANTUNG ###
XII PEKERJAAN INSTALASI LISTRIK ### ###
XIII PEKERJAAN KACA ###
TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 1 Kelampis
Kec. Kelampis Kab. Bangkalan
LAPORAN MINGGUAN
Minggu ke : 1 ( Satu )
Pekerjaan : REHABILITASI 2 RUANG KELAS SMPN 1 KLAMPIS Tanggal : 5 Oktob. s/d 10 Oktober 2015
Nama Sekolah : SMPN 1 KLAMPIS Bulan : Oktober 2015
Lokasi : Kec. Kedamean Kab. Gresik Dana diterima tangal : 29 Oktober 2015
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%) Komulatif (%)
% Prestasi Rerata Prestasi Rerata Prestasi Rerata
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11)
I. PEKERJAAN PERSIAPAN (6)/100x(5) (8)/100x(5) (6)+(8) (7)+(9)
1 Pembongkaran kosen 12.00 bh 0.20 - - 100 0.20 100.00 0.20
2 Penetelan plesteran 12.00 m² 0.08 - - 100 0.08 100.00 0.08
3 Pembersihan akhir pekerjaan 1.00 ls 0.07 - - - - - -
X. PEKERJAAN LANTAI
1 Keramik lantai 40 x 40 240.00 m² 8.82 - - - - - -
2 Keramik dinding 25 x 40 129.80 m² 5.80 - - - - - -
3 Keramik kolom 25 x 40 6.40 m² 0.29 - - - - - -
4 List keramik 119.00 m' 3.32 - - - - - -
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
H. SUBADRIH, ST, MT
Mengetahui :
Kepala Sekolah
SMPN 3 Satap Kokop
Kec. Kokop Kab. Bangkalan
IHSANUDIN, S.Pd
NIP. 19700109 199104 1 001
LAPORAN MINGGUAN
Minggu ke : 1 ( Satu )
Pekerjaan : REHABILITASI 2 RUANG BELAJAR SMPN 3 SATAP KOKOP Tanggal : 5 Oktob. s/d 10 Oktober 2015
Nama Sekolah : SMPN 3 SATAP KOKOP KEC. KOKOP KAB. BANGKALAN Bulan : Oktober 2015
Lokasi : KEC. KOKOP KAB. BANGKALAN Dana diterima tangal : 29 Oktober 2015
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%) Komulatif (%)
% Prestasi Rerata Prestasi Rerata Prestasi Rerata
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11)
(6)/100x(5) (8)/100x(5) (6)+(8) (7)+(9)
I. PEKERJAAN PERSIAPAN
1 Pembongkaran atap + rangka 260.00 m² 1.70 - 100 1.70 100.00 1.70
2 Pembongkaran kosen 12.00 bh 0.32 - 100 0.32 100.00 0.32
3 Pembongkaran dinding 61.75 m² 0.65 - 100 0.65 100.00 0.65
4 Pembersihan akhir pekerjaan 1.00 ls 0.11 - - - - -
X. PEKERJAAN LANTAI
1 Keramik lantai 40 x 40 162.00 m² 9.58 - - - - -
2 Keramik kolom 20 x 40 (motif) 5.60 m² 0.40 - - - - -
REKAPITULASI
ENCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI
NO.
I
II
III
IV
V
VI
VII
VIII
IX
X 4
XI OK
XII LAMA
XIII : PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 1 TRAGAH
: SMPN 1 TRAGAH KEC. TRAGAH KAB. BANGKALAN
TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )
PEKERJAAN PERSIAPAN ###
PEKERJAAN TANAH ###
PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA #DIV/0!
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 1 Tragah
Kec. Tragah Kab. Bangkalan
Drs. AMIRULLAH, MM
NIP. 19581217 198603 1 011
NO
1
I.
1
2
3
4
II.
1
2
4
III.
1
2
3
IV.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran atap + rangka 377.00 m² ### ###
V. Pembongkaran kusen 4.00 bh ### ###
1 Penetelan plesteran 159.60 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VI. PEKERJAAN TANAH ###
1 Galian tanah 2.16 m³ ### ###
2 Urugan pasir bawah pondasi t=10cm 0.36 m³ ### ### #DIV/0!
3 Urugan tanah kembali 1.08 m³ ### ###
4 ###
PEKERJAAN PASANGAN/PLESTERAN
VII. Pasangan 1/2 bata camp. 1 Pc : 5 Ps 7.20 m² ### ### ###
1 Plesteran 1Pc : 5Ps 14.40 m² ### ###
2 Benangan 24.00 m' ### ###
3 ###
PEKERJAAN BETON
VIII. Lantai kerja bawah pondasi 1:3:5 t=5cm 0.18 m³ ### ###
1 Pondasi beton stempat 60 x 60 x 15cm 0.54 m³ ### ###
Kolom teras 15/15 0.79 m³ ### ###
IX. Balok beton 15/20 1.71 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ ### ###
X. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Penang (baru) 382.73 m² ### ###
3 Atap genteng (lama bg. belakang) 170.10 m² ### ###
4 Genteng bubungan Karang penang 28.35 m' ### ###
Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' ### ###
XI. ###
1 PEKERJAAN KUSEN PINTU DAN JENDELA
2 Kusen kayu kempas/mahoni 6/15 #DIV/0! m³ Rp - #DIV/0!
3 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 8.61 m² Rp - Rp - #DIV/0!
4 Daun Jendela kaca kayu kempas/mahoni 3/10 8.40 m² Rp - Rp - ###
5 #DIV/0!
6 PEKERJAAN PLAFOND
Plafond calsiboard 4mm + rangka kayu 4/6 294.84 m² ### ###
XII ###
1 PEKERJAAN PENGECATAN
2 Pengecatan dinding (3 Ruang kelas) 598.50 m² ### ###
3 Pengecatan plafond 294.84 m² ### ###
4 Pengecatan kayu 206.70 m² ### ###
5 ###
6 PEKERJAAN LANTAI #DIV/0!
Keramik lantai 40 x 40 245.70 m² ### ###
XIII. Keramik dinding 25 x 40 ( 3 R.kelas + teras ) 159.60 m² ### ###
1 List keramik dinding 7cm 110.40 m² ### ###
Keramik kolom 25 x 40 12.00 m² ### ###
### 140
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Engsel Pintu 18.00 bh ### ###
Engsel Jendela 16.00 bh ### ###
Grendel pintu 3.00 bh ### ###
Grendel Jendela 16.00 bh ### ###
Hag Angin 16.00 bh ### ###
###
REKAPITULASI
PEKERJAAN INSTALASI LISTRIK
ENCANA ANGGARAN
Lampu BIAYA
SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
KEGI Saklar ganda 3.00 bh ### ###
PEKE Saklar tunggal 3.00 bh ### ###
LING Stop kontak + instalasi 3.00 bh ### ###
LOKA Instalasi titik lampu 15.00 ttk ### ###
###
NO. PEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 11.14 m² ### ###
###
I
II
III
IV
V
VI
VII
VIII
IX
X 4
XI OK
XII BARU
XIII : PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 1 TRAGAH
: SMPN 1 TRAGAH KEC. TRAGAH KAB. BANGKALAN
TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )
PEKERJAAN PERSIAPAN ###
PEKERJAAN TANAH ###
PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA Rp -
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 1 Tragah
Kec. Tragah Kab. Bangkalan
Drs. AMIRULLAH, MM
NIP. 19581217 198603 1 011
NO
1
I.
1
2
3
4
II.
1
2
4
III.
1
2
3
IV.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran atap + rangka 377.00 m² ### ###
V. Pembongkaran kusen 8.00 bh ### ###
1 Penetelan plesteran 249.00 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VI. PEKERJAAN TANAH ###
1 Galian tanah 2.16 m³ ### ###
2 Urugan pasir bawah pondasi t=10cm 0.36 m³ ### ### ###
3 Urugan tanah kembali 1.08 m³ ### ###
###
VII. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 24.02 m² ### ### ###
2 Plesteran 1Pc : 5Ps 48.03 m² ### ###
3 Benangan 168.00 m' ### ###
4 ###
PEKERJAAN BETON
VIII. Lantai kerja bawah pondasi 1:3:5 t=5cm 0.18 m³ ### ###
1 Pondasi beton stempat 60 x 60 x 15cm 0.54 m³ ### ###
Kolom teras 15/15 0.79 m³ ### ###
IX. Balok beton 15/20 1.56 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ ### ###
X. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Penang (baru) 382.73 m² ### ###
3 Genteng bubungan Karang penang 28.35 m' ### ###
4 Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' ### ###
5 ###
PEKERJAAN KUSEN PINTU DAN JENDELA
XI. Kusen kayu kempas/mahoni 6/15 1.09 m³ Rp - Rp -
1 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 8.61 m² Rp - Rp - ###
2 Jalusi kayu kempas/mahoni 3/12 7.20 m² Rp - Rp -
3 Daun Jendela kaca kayu kempas/mahoni 3/10 6.72 m² Rp - Rp - ###
4 Rp -
5 PEKERJAAN PLAFOND
6 Plafond calsiboard 4mm + rangka kayu 4/6 294.84 m² ### ###
###
XII PEKERJAAN PENGECATAN
1 Pengecatan dinding (3 Ruang kelas) 598.50 m² ### ###
2 Pengecatan plafond 294.84 m² ### ###
3 Pengecatan kayu 206.70 m² ### ###
4 ###
5 PEKERJAAN LANTAI ###
6 Keramik lantai 40 x 40 245.70 m² ### ###
Keramik dinding 25 x 40 ( 3 R.kelas + teras ) 173.40 m² ### ###
XIII. List keramik dinding 7cm 132.90 m² ### ###
1 Keramik kolom 25 x 40 12.00 m² ### ###
Keramik dinding 25 x 40 ( 3 R.kelas teras saja ) 75.60 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Engsel Pintu 18.00 bh ### ###
Engsel Jendela 16.00 bh ### ###
Grendel pintu 3.00 bh ### ###
Grendel Jendela 16.00 bh ### ###
Hag Angin 16.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
REKAPITULASI
Lampu SL 8watt (teras) 3.00 bh ### ###
ENCANA ANGGARAN BIAYA
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
KEGI Stop kontak + instalasi 3.00 bh ### ###
PEKE Instalasi titik lampu 15.00 ttk ### ###
LINGKUP PEKERJAAN ###
LOKAPEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 11.14 m² ### ###
NO. ###
I
II
III
IV
V
VI
VII
VIII
IX
X 5
XI OK
XII LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 MODUNG
: SMPN 2 MODUNG KEC. MODUNG KAB. BANGKALAN
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Modung
Kec. Modung Kab. Bangkalan
A S U R, M.Pd
NIP. 19610117 198403 1 008
NO
1
I.
1
2
II.
1
2
3
III.
1
2
3
IV.
1
2
Lembar. 2
V. JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
1 2 3 4 5
2 PEKERJAAN PERSIAPAN
3 Pembongkaran atap + rangka 406.00 m² ### ###
4 Pembersihan akhir pekerjaan 1.00 ls ### ### ###
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 98.93 m² ### ###
2 Plesteran 1Pc : 5Ps 197.87 m² ### ###
3 Benangan 166.56 m' ### ###
###
VII. PEKERJAAN BETON
1 Kolom teras 15/15 0.41 m³ ### ###
Balok teras 15/20 1.24 m³ ### ###
VIII. Ring balk gewel 15/15 0.98 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 396.90 m² ### ###
4 Lisplank kalsiplank 8mm / 30 cm 85.70 m¹ ### ###
5 ###
PEKERJAAN ATAP
IX. Pasang atap genteng karang p enang (baru 5%) 19.85 m² ### ###
1 Pasang atap genteng (lama) 377.06 m² ### ###
Genteng bubungan karang penang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 29.00 m' ### ###
1 ###
2 PEKERJAAN KUSEN PINTU DAN JENDELA
3 Kusen kayu kempas/mahoni 6/12 0.46 m³ Rp - Rp -
4 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 6.72 m² Rp - Rp -
5 Daun Jendela kaca kayu kempas/mahoni 3/10 5.04 m² Rp - Rp -
6 Rp -
PEKERJAAN PLAFOND ###
XI. Plafond calsiboard 4mm + rangka hollow 340.20 m² ### ###
1 ###
2 PEKERJAAN PENGECATAN/PLAMIRAN
3 Pengecatan dinding (depan) 66.85 m² ### ###
4 Pelamiran dinding 430.33 m² ### ###
5 Pelamiran plafond 340.20 m² ### ### ###
6 Pengecatan kayu 206.70 m² ### ###
Cat genteng 396.90 m² ### ###
XII. ###
1 PEKERJAAN LANTAI
Lantai rabat 216.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 4.00 bh ### ###
Engsel Pintu 21.00 bh ### ###
Engsel Jendela 24.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Grendel Jendela 12.00 bh ### ### ###
Hag Angin 24.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 14.00 bh ### ###
Lampu SL 8watt (teras) 4.00 bh ### ###
Saklar ganda 7.00 bh ### ###
REKAPITULASI
Saklar tunggal 3.00 bh ### ###
ENCANA ANGGARAN BIAYA
Stop kontak + instalasi 4.00 bh ### ###
Instalasi titik lampu 18.00 bh ### ###
KEGIATAN ###
PEKE PEKERJAAN KACA
LING Kaca mati t=5 mm 14.49 m² ### ###
LOKASI ###
NO.
I
II
III
IV
V
VI
VII
VIII
IX
X 5
XI OK
XII BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 MODUNG
: SMPN 2 MODUNG KEC. MODUNG KAB. BANGKALAN
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Modung
Kec. Modung Kab. Bangkalan
A S U R, M.Pd
NIP. 19610117 198403 1 008
NO
1
I.
1
2
II.
1
2
3
III.
1
2
3
IV.
1
2
Lembar. 2
V. JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
1 2 3 4 5
2 PEKERJAAN PERSIAPAN
3 Pembongkaran atap + rangka 406.00 m² ### ###
4 Pembersihan akhir pekerjaan 1.00 ls ### ### ###
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 98.93 m² ### ###
2 Plesteran 1Pc : 5Ps 197.87 m² ### ###
3 Benangan 166.56 m' ### ###
###
VII. PEKERJAAN BETON
1 Kolom teras 15/15 0.41 m³ ### ###
Balok teras 15/20 1.24 m³ ### ###
VIII. Ring balk gewel 15/15 0.98 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 396.90 m² ### ###
4 Lisplank kalsiplank 8mm / 30 cm 85.70 m¹ ### ###
5 ###
PEKERJAAN ATAP
IX. Pasang atap genteng karang p enang (baru 5%) 19.85 m² ### ###
1 Pasang atap genteng (lama) 377.06 m² ### ###
Genteng bubungan karang penang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 29.00 m' ### ###
1 ###
2 PEKERJAAN KUSEN PINTU DAN JENDELA
3 Kusen kayu kempas/mahoni 6/12 0.46 m³ Rp - Rp -
4 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 6.72 m² Rp - Rp -
5 Daun Jendela kaca kayu kempas/mahoni 3/10 5.04 m² Rp - Rp -
6 Rp -
PEKERJAAN PLAFOND ###
XI. Plafond calsiboard 4mm + rangka kayu 4/6 340.20 m² ### ###
1 ###
2 PEKERJAAN PENGECATAN/PLAMIRAN
3 Pengecatan dinding (depan) 66.85 m² ### ###
4 Pelamiran dinding 430.33 m² ### ###
5 Pelamiran plafond 340.20 m² ### ### ###
6 Pengecatan kayu 206.70 m² ### ###
Cat genteng 396.90 m² ### ###
XII. ###
1 PEKERJAAN LANTAI
Lantai rabat 216.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 4.00 bh ### ###
Engsel Pintu 21.00 bh ### ###
Engsel Jendela 24.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Grendel Jendela 12.00 bh ### ### ###
Hag Angin 24.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 14.00 bh ### ###
Lampu SL 8watt (teras) 4.00 bh ### ###
Saklar ganda 7.00 bh ### ###
REKAPITULASI
Saklar tunggal 3.00 bh ### ###
ENCANA ANGGARAN BIAYA
Stop kontak + instalasi 4.00 bh ### ###
Instalasi titik lampu 18.00 bh ### ###
KEGIATAN ###
PEKE PEKERJAAN KACA
LING Kaca mati t=5 mm 14.49 m² ### ###
LOKASI ###
NO.
I
II
III
IV
V
VI
VII
VIII
IX
X 6
XI OK
LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 2 LABANG
: SMPN 2 LABANG KEC. LABANG KAB. BANGKALAN
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
ACHMAD TAUFIK HEYKAL, A.Sg H. SUBADRIH, ST, MT
Mengetahui :
Kepala Sekolah
SMPN 2 Labang
Kec. Labang Kab. Bangkalan
NO
1
I.
1
2
3
4
5
II.
1
III.
1
2
IV.
1
2
3 Lembar. 2
JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
V. 2 3 4 5
1 PEKERJAAN PERSIAPAN ###
Pembongkaran atap + rangka 377.00 m² Rp - Rp -
VI. Pembongkaran kosen 1.00 bh ### ###
1 Pembongkaran dinding 6.00 m² ### ###
2 Penetelan plesteran 139.74 m² ### ###
3 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VII. PEKERJAAN PASANGAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps (nyepit kuda2) 30.91 m² Rp - Rp -
2 Rp -
3 PEKERJAAN RANGKA ATAP ###
4 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ Rp - Rp -
VIII. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Pilang (baru) 382.73 m² ### ###
Genteng bubungan Karang pilang 28.35 m' ### ###
IX. Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' Rp - Rp -
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsiboard 4mm + rangka hollow 354.38 m² Rp - Rp -
4 Rp -
5 PEKERJAAN PENGECATAN
6 Pengecatan dinding 598.50 m² Rp - Rp - ###
Pengecatan plafond 354.38 m² Rp - Rp -
X. Pengecatan kayu 274.60 m² Rp - Rp -
1 Rp -
PEKERJAAN LANTAI
XI. Keramik lantai 40 x 40 243.00 m² ### ###
1 Keramik dinding 25 x 40 139.74 m² ### ###
2 List keramik 102.00 m' ### ###
3 Keramik kolom 20 x 40 10.80 m² ### ###
4 ###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA ###
Kaca mati t=5 mm (yg pecah) 4.22 m² ### ###
###
PEKERJAAN TANGGA DEPAN PINTU
Pasangan batu gunung 2.88 m³ ### ###
Plesterran trasram 7.68 m² ### ###
Keramik kasar 40 x 40 7.04 m² ### ###
Urugan pasir 4.96 m³ ### ###
REKAPITULASI ###
ENCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI
NO.
I
II
III
IV
V
VI
VII
VIII
IX
X 6
XI OK
XII BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 2 LABANG
: SMPN 2 LABANG KEC. LABANG KAB. BANGKALAN
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Labang
Kec. Labang Kab. Bangkalan
NO
1
I.
1
2
3
4
5
II.
1
2
3
III.
1
IV.
1
2 Lembar. 2
JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
V. 2 3 4 5
1 PEKERJAAN PERSIAPAN ###
2 Pembongkaran atap + rangka 377.00 m² Rp - Rp -
3 Pembongkaran kosen 1.00 bh ### ###
Pembongkaran dinding 6.00 m² ### ###
VI. Penetelan plesteran 127.50 m² ### ###
1 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VII. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps (nyepit kuda2) 22.43 m² Rp - Rp - -
2 Plesteran 1Pc : 5Ps 16.20 m² ### ###
3 Benangan 32.00 m' ### ###
###
VIII. PEKERJAAN BETON
1 Ring balk gewel 15/15 0.40 m³ ### ###
2 ###
3 PEKERJAAN RANGKA ATAP ###
4 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ Rp - Rp -
IX. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Pilang (baru) 382.73 m² ### ###
Genteng bubungan Karang pilang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' Rp - Rp -
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsiboard 4mm + rangka hollow 354.38 m² Rp - Rp -
4 Rp -
5 PEKERJAAN PENGECATAN
6 Pengecatan dinding 598.50 m² Rp - Rp - ###
Pengecatan plafond 354.38 m² Rp - Rp -
XI. Pengecatan kayu 274.60 m² Rp - Rp -
1 Rp -
PEKERJAAN LANTAI
XII. Keramik lantai 40 x 40 243.00 m² ### ###
1 Keramik dinding 25 x 40 127.50 m² ### ###
2 List keramik 102.00 m' ### ###
3 Keramik kolom 20 x 40 10.80 m² ### ###
4 ###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Pintu harmonika 15.00 m² ### ### ###
### ###
PEKERJAAN INSTALASI LISTRIK ###
Lampu SL 14 watt 12.00 bh ### ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA ###
Kaca mati t=5 mm (yg pecah) 4.22 m² ### ###
###
PEKERJAAN TANGGA DEPAN PINTU 3.46
Pasangan batu gunung 2.88 m³ ### ###
Plesterran trasram 7.68 m² ### ###
Keramik kasar 40 x 40 7.04 m² ### ###
Urugan pasir 4.96 m³ ### ###
###
REKAPITULASI
ENCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI
NO.
I
II
III
IV
V
VI
VII
VIII
IX
X 7
OK
LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 KWANYAR
: SMPN 2 KWANYAR KEC. KWANYAR KAB. BANGKALAN
TERBILANG : ( SERATUS SEMBILAN PULUH TUJUH JUTA DELAPAN RATUS RIBU RUPIAH )
URAIAN PEKERJAAN JUMLAH HARGA
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Kwanyar
Kec. Kwanyar Kab. Bangkalan
RAHMAWATI, M.Pd
NIP. 19700703 199802 2 003
NO
1
I.
1
2
3
4
II.
1
2
III.
1
IV.
1
V.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran kusen 1.00 bh ### ###
VI. Pembongkaran dinding 15.00 m² ### ###
1 Penetelan plesteran 428.64 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 Ls ### ###
3 ###
4 PEKERJAAN PASANGAN/PLESTERAN ###
5 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 0.91 22.20 m² Rp - Rp -
6 Plesteran 1Pc : 5Ps 1.07 44.40 m² Rp - Rp -
Rp -
VII. PEKERJAAN KAYU
1 Lisplank kayu 3/30 cm 4.00 m¹ ### ###
2 ###
3 PEKERJAAN PLAFOND
4 Plafond calsi 1 x 1 + rangka kayu 12.00 m² Rp - Rp -
Rp -
VIII. PEKERJAAN PENGECATAN
1 Pengecatan dinding (3 kelas) 455.30 m² Rp - Rp -
2 Pengecatan plafond 319.00 m² Rp - Rp -
3 Pengecatan kayu 206.70 m² Rp - Rp - ###
4 Pengecatan kayu (Kantor) 214.39 m² Rp - Rp -
5 Rp -
6 PEKERJAAN LANTAI 162.00 ###
Keramik lantai 40 x 40 ( 2 R Kelas ) 5.67 126.00 m² ### ###
IX. Keramik lantai 40 x 40 ( Teras ) 1.62 36.00 m² ### ###
1 Keramik dinding 25 x 40 (dalam kelas + teras) 5.78 128.40 m² ### ###
Keramik kolom teras 25 x 40 1.01 22.40 m² ### ###
X. List keramik 1.64 327.80 m' ### ###
1 Keramik dinding 25 x 40 (dalam kantor+R.guru+ t 13.51 300.24 m² ### ###
2 451.04 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 3.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Hag Angin 60.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
REKAPITULASI
PEKERJAAN KACA
ENCANA ANGGARAN BIAYA
Kaca mati t=5 mm (yg pecah) 1.68 m² ### ###
###
KEGI PEKERJAAN TEMPAT DUDUK
PEKE Pasangan trasram 0.68 17.00 m² Rp - Rp -
LING Plat beton tempat duduk t=10 cm 0.53 1.02 m³ ### ###
LOKA Keramik tempat duduk 30 x 30 0.46 10.20 m² ### ###
Keramik dinding tempat duduk 25 x 40 1.84 40.80 m² ### ###
NO. 34.71 ###
0.86768 40.80
I
II
III
IV
V
VI
VII
VIII
IX
X 7
OK
BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 KWANYAR
: SMPN 2 KWANYAR KEC. KWANYAR KAB. BANGKALAN
TERBILANG : ( SERATUS SEMBILAN PULUH TUJUH JUTA DELAPAN RATUS RIBU RUPIAH )
URAIAN PEKERJAAN JUMLAH HARGA
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Kwanyar
Kec. Kwanyar Kab. Bangkalan
RAHMAWATI, M.Pd
NIP. 19700703 199802 2 003
NO
1
I.
1
2
3
4
II.
1
2
III.
1
2
IV.
1
V. Lembar. 2
1 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
2 2 3 4 5
3 PEKERJAAN PERSIAPAN
4 Pembongkaran kusen 1.00 bh ### ###
5 Pembongkaran dinding 15.00 m² ### ###
Penetelan plesteran 428.64 m² ### ###
VI. Pembersihan akhir pekerjaan 1.00 Ls ### ###
1 ###
2 PEKERJAAN PASANGAN/PLESTERAN ###
3 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 22.20 m² Rp - Rp -
4 Plesteran 1Pc : 5Ps 44.40 m² Rp - Rp -
5 Rp -
6 PEKERJAAN KAYU
Perbaikan daun pintu panil 4.00 bh ### ###
VII. Lisplank kayu 3/30 cm 4.00 m¹ ### ###
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsi 1 x 1 + rangka kayu 12.00 m² Rp - Rp -
4 Rp -
PEKERJAAN PENGECATAN
VIII. Pengecatan dinding (3 kelas) 439.90 m² Rp - Rp -
1 Pengecatan dinding (Kantor) 373.40 m² Rp - Rp -
2 Pengecatan plafond 319.00 m² Rp - Rp -
3 Pengecatan kayu 169.45 m² Rp - Rp - ###
4 Pengecatan kayu (Kantor) 197.69 m² Rp - Rp -
5 Rp -
6 PEKERJAAN LANTAI ###
Keramik lantai 40 x 40 ( 2 R Kelas ) 126.00 m² ### ###
IX. Keramik lantai 40 x 40 ( Teras ) 36.00 m² ### ###
1 Keramik dinding 25 x 40 (dalam kelas + teras) 128.40 m² ### ###
Keramik kolom teras 25 x 40 22.40 m² ### ###
X. List keramik 327.80 m' ### ###
1 Keramik dinding 25 x 40 (dalam kantor+R.guru+ teras) 300.24 m² ### ###
2 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 3.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Hag Angin 60.00 bh ### ###
Pintu harmonika 11.30 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK ###
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA
REKAPITULASI
Kaca mati t=5 mm (yg pecah) 1.68 m² ### ###
ENCANA ANGGARAN BIAYA ###
PEKERJAAN TEMPAT DUDUK
KEGI Pasangan trasram 17.00 m² Rp - Rp -
PEKE Plat beton tempat duduk t=10 cm 1.02 m³ ### ###
LING Keramik tempat duduk 30 x 30 10.20 m² ### ###
LOKA Keramik dinding tempat duduk 25 x 40 40.80 m² ### ###
###
NO.
I
II
III
IV
V
VI
VII
VIII
IX
8
OK
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
II.
1
2
3
III.
1
IV.
1
2
3
V. Lembar. 2
1 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
2 2 3 4 5
3 PEKERJAAN PERSIAPAN
4 Penetelan plesteran 317.46 m² ### ###
5 Pembersihan akhir pekerjaan 1.00 Ls Rp - Rp - #REF!
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 12.25 m² Rp - Rp -
5 Plesteran 1Pc : 5Ps 80.58 m² Rp - Rp -
6 Benangan 55.00 m' Rp - Rp -
7 Rp -
PEKERJAAN PLAFOND
VII. Plafond calsiboard 4mm + rangka kayu 15.00 m² Rp - Rp -
1 Rp -
2 PEKERJAAN PENGECATAN -
3 Pengecatan dinding 506.50 m² Rp - Rp -
4 Pengecatan plafond 352.00 m² Rp - Rp - #DIV/0!
5 Pengecatan kayu 275.60 m² Rp - Rp -
6 Rp -
PEKERJAAN LANTAI ###
VIII. Keramik lantai 40 x 40 243.00 m² ### ### 147.47
1 Keramik dinding 25 x 40 ( 3 R. Kelas + teras) 132.96 m² ### ###
List keramik 288.20 m' ### ###
IX. Keramik kolom 25 x 40 16.00 m² ### ### keramik tambal sulam
1 Keramik dinding 25 x 40 ( 5 R. Kelas bg. dalam) 184.50 m² ### ###
2 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 5.00 bh ### ###
Grendel Jendela 50.00 bh ### ###
Hag Angin 100.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 20.00 bh ### ###
Lampu SL 8watt (teras) 5.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 5.00 bh ### ###
Stop kontak + instalasi 5.00 bh ### ###
Instalasi titik lampu 25.00 ttk ### ###
###
PEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 2.53 m² ### ###
###
PEKERJAAN TEMPAT DUDUK
Pasangan trasram 14.70 m² Rp - Rp -
Plat beton tempat duduk t=10 cm 0.74 m³ ### ###
Keramik tempat duduk 30 x 30 7.35 m² ### ###
Keramik dinding tempat duduk 25 x 40 29.40 m² ### ###
###
BATAS
SMPN 2 SEPULU DR. AHMAD SABARUDIN, S.Pd, M.MPd
SMPN 1 KLAMPIS IMAM SYAFII, S.Pd, MPd
SMPN 2 KOKOP MOHAMMAD TAUFIK, SPd
SMPN 3 SATAP KOKOP IHSANUDIN, S.Pd
SMPN 1 TRAGAH Drs. AMIRULLAH, MM
SMPN 2 MODUNG A S U R, M.Pd
SMPN 2 LABANG Drs. HARTONO, M.Pd
SMPN 2 KWANYAR RAHMAWATI, M.Pd
SMPN TAHAL AMIN H. ABDULLAH, S.Pd
SMPN 1 MODUNG Drs. ALI MUSTOFA, M.Pd
SMPN 1 GALIS Drs. TAUFIKUR RAHMAN
SMPN 1 KOKOP BUDIONO, S.Pd, M.Pd
SMPN 2 KONANG ABDUL RASID, S.Ag, M.PdI
SMPN TAHAL AMIN H. ABDULLAH, S.Pd
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100 0.97 100 0.97
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100 0.97 100 0.97
1.01 100 1.01 100 1.01 100 1.01 100 1.01 100 1.01 100 1.01
- - - - - - - - - - - 100 0.11
0.90 100 0.90 100 0.90 100 0.90 100 0.90 100 0.90 100 0.90
0.86 100 0.86 100 0.86 100 0.86 100 0.86 100 0.86 100 0.86
- 100 - 100 - 100 - 100 - 100 - 100 -
- 50 0.06 100 0.13 100 0.13 100 0.13 100 0.13 100 0.13
- - - 100 0.06 100 0.06 100 0.06 100 0.06 100 0.06
- - - 100 0.56 100 0.56 100 0.56 100 0.56 100 0.56
- - - 50 0.34 100 0.69 100 0.69 100 0.69 100 0.69
- - - - - - - - - - - 100 12.16
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
4 5 6 7 8 9
0.20 100 0.20 100 0.20 100 0.20 100 0.20 100 0.20 100 0.20
0.08 100 0.08 100 0.08 100 0.08 100 0.08 100 0.08 100 0.08
- - - - - - - - - - - - -
0.04 100 0.04 100 0.04 100 0.04 100 0.04 100 0.04 100 0.04
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100 0.03 100 0.03
0.01 100 0.01 100 0.01 100 0.01 100 0.01 100 0.01 100 0.01
- 50 0.62 100 1.24 100 1.24 100 1.24 100 1.24 100 1.24
- - - 100 1.19 100 1.19 100 1.19 100 1.19 100 1.19
- - - 100 1.20 100 1.20 100 1.20 100 1.20 100 1.20
- 25 0.01 50 0.03 100 0.05 100 0.05 100 0.05 100 0.05
- - - 50 0.35 100 0.70 100 0.70 100 0.70 100 0.70
- - - - - 50 0.51 100 1.02 100 1.02 100 1.02
- - - - - 50 0.98 100 1.95 100 1.95 100 1.95
- - - 50 1.56 75 2.34 100 3.12 100 3.12 100 3.12
- - - 75 0.23 100 0.31 100 0.31 100 0.31 100 0.31
- - - - - - - - - - - 50 4.24
- - - - - - - - - - - 75 6.62
- - - - - - - - - - - 50 2.90
- - - - - - - - - - - 50 0.14
- - - - - - - - - - - - -
- - - - - - - - - - - 100 0.14
- - - - - - - - - - - 100 0.14
- - - - - - - - - - - 100 0.09
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - 100 1.00
4 5 6 7 8 9
1.70 100 1.70 100 1.70 100 1.70 100 1.70 100 1.70 100 1.70
0.32 100 0.32 100 0.32 100 0.32 100 0.32 100 0.32 100 0.32
0.65 100 0.65 100 0.65 100 0.65 100 0.65 100 0.65 100 0.65
- - - - - - - - - - - - -
0.05 100 0.05 100 0.05 100 0.05 100 0.05 100 0.05 100 0.05
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100 0.03 100 0.03
0.01 100 0.01 100 0.01 100 0.01 100 0.01 100 0.01 100 0.01
4.29 100 4.29 100 4.29 100 4.29 100 4.29 100 4.29 100 4.29
4.10 100 4.10 100 4.10 100 4.10 100 4.10 100 4.10 100 4.10
1.08 100 1.08 100 1.08 100 1.08 100 1.08 100 1.08 100 1.08
0.11 100 0.15 100 0.15 100 0.15 100 0.15 100 0.15 100 0.15
- 50 0.40 100 0.79 100 0.79 100 0.79 100 0.79 100 0.79
- 10 0.10 75 0.74 100 0.99 100 0.99 100 0.99 100 0.99
- - - - - 100 2.23 100 2.23 100 2.23 100 2.23
- - - - - 100 2.64 100 2.64 100 2.64 100 2.64
- - - - - 100 1.17 100 1.17 100 1.17 100 1.17
4.36 100 5.81 100 5.81 100 5.81 100 5.81 100 5.81 100 5.81
0.63 55 2.32 100 4.22 100 4.22 100 4.22 100 4.22 100 4.22
- - - 100 2.11 100 2.11 100 2.11 100 2.11 100 2.11
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
10
100 0.97
100 0.97
100 1.01
100 0.11
100 0.90
100 0.86
100 -
100 0.13
100 0.06
100 0.56
100 0.69
100 14.17
100 12.02
100 1.70
100 1.38
100 14.29
100 1.40
100 0.65
100 12.16
100 5.92
100 2.97
100 2.61
100 1.82
100 9.21
100 6.87
100 3.58
100 0.36
100 0.08
100 0.04
100 0.04
100 0.62
100 1.64
100 0.21
10
100 0.20
100 0.08
100 0.07
100 0.04
100 0.03
100 0.01
100 1.24
100 1.19
100 1.20
100 0.05
100 0.70
100 1.02
100 1.95
100 3.12
100 0.31
100 25.51
100 1.66
100 5.36
100 0.99
100 0.80
100 0.20
100 4.81
100 1.76
100 2.35
100 1.59
100 8.49
100 4.07
100 2.07
100 2.88
100 8.82
100 5.80
100 0.29
100 3.32
100 0.14
100 0.14
100 0.09
100 0.07
100 0.08
100 0.09
100 0.22
100 0.05
100 0.02
100 0.01
100 0.22
100 0.98
100 1.00
10
100 1.70
100 0.32
100 0.65
100 0.11
100 0.05
100 0.03
100 0.01
100 4.29
100 4.10
100 1.08
100 0.15
100 0.79
100 0.99
100 2.23
100 2.64
100 1.17
100 28.43
100 2.24
100 8.10
100 1.06
100 0.98
100 0.30
100 5.81
100 4.22
100 2.11
100 9.03
100 0.59
100 1.76
100 1.03
100 0.44
100 9.58
100 0.40
100 0.15
100 0.15
100 0.14
100 0.08
100 0.12
100 0.15
100 0.23
100 0.05
100 0.02
100 0.02
100 0.24
100 1.06
100 1.22
YANG DIPAKAI
TH. 2018
1 SMPN 2 SEPULU 2 KELAS ### SINERGI
2 SMPN 1 KLAMPIS 3 KELAS ### SINERGI
3 SMPN 2 KOKOP 2 KELAS ### SINERGI
4 SMPN 3 SATAP KOKOP 2 KELAS ### SINERGI
5 SMPN 1 TRAGAH 3 KELAS ### INDRAKILA
6 SMPN 2 MODUNG 2 KELAS ### INDRAKILA
7 SMPN 2 LABANG 3 KELAS ### INDRAKILA
8 SMPN 2 KWANYAR 2 KELAS ### INDRAKILA
9 SMPN TAHAL AMIN H. ABDULLAH, S.Pd
REKAPITULASI 1
RENCANA ANGGARAN BIAYA OK
OK
KEGIATAN : PENGADAAN SARANA PRASARANA
PEKERJAAN : PERENCANAAN SMP KABUPATEN BANGKALAN
LINGKUP PEKERJAAN : REHABILITASI 2 RUANG BELAJAR SMPN 2 SEPULU
LOKASI : SMPN 2 SEPULU KEC. SEPULU KAB. BANGKALAN
JUMLAH ###
DIBULATK ### ###
###
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Sepulu
Kec. Sepulu Kab. Bangkalan
LAPORAN MINGGUAN
Minggu ke :
Pekerjaan : REHABILITASI 2 RUANG KELAS SMPN 2 SEPULU Tanggal :
Nama Sekolah : SMPN 2 SEPULU Bulan :
Lokasi : Kec. Kedamean Kab. Gresik Dana diterima tangal :
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%)
% Prestasi Rerata Prestasi
(1) (2) (3) (4) (5) (6) (7) (8)
(6)/100x(5)
I. PEKERJAAN PERSIAPAN
1 Pembongkaran atap + rangka atap 143.00 m² 0.97 - - 100
2 Pembongkaran atap 234.90 m² 0.97 - - 100
3 Penetelan plesteran 92.16 m² 1.01 - - 100
4 Pembersihan akhir pekerjaan 1.00 ls 0.11 - - -
II. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 18.50 m² 0.90 - - -
2 Plesteran 1Pc : 5Ps 37.00 m² 0.86 - - -
3 Benangan 48.00 m' - - - -
V. PEKERJAAN ATAP
1 Atap genteng beton (lama) 139.73 m² 1.38 - - -
2 Atap genteng beton warna 237.08 m² 14.29 - - -
3 Genteng bubungan beton warna 26.70 m' 1.40 - - -
4 Plesteran kompres L = 10 cm (Akhiran genting) 56.00 m' 0.65 - - -
JUMLAH 100.00 -
Jumlah dana yang digunakan sampai dengan minggu ini ( minggu ke 1 ) Rp 20,300,000.00
REKAPITULASI 2
RENCANA ANGGARAN BIAYA OK
I (2) ###
II PEKERJAAN TANAH ###
III PEKERJAAN PASANGAN/PLESTERAN ###
IV PEKERJAAN BETON ###
V PEKERJAAN RANGKA ATAP ###
VI PEKERJAAN ATAP ###
VII PEKERJAAN KUSEN PINTU DAN JENDELA ###
VIII PEKERJAAN PLAFOND ###
IX PEKERJAAN PENGECATAN/PLAMIRAN ###
X PEKERJAAN LANTAI ###
XI PEKERJAAN KUNCI + PENGGANTUNG ###
XII PEKERJAAN INSTALASI LISTRIK ### ###
XIII PEKERJAAN KACA ###
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 1 Kelampis
Kec. Kelampis Kab. Bangkalan
LAPORAN MINGGUAN
Minggu ke :
Pekerjaan : REHABILITASI 2 RUANG KELAS SMPN 1 KLAMPIS Tanggal :
Nama Sekolah : SMPN 1 KLAMPIS Bulan :
Lokasi : Kec. Kedamean Kab. Gresik Dana diterima tangal :
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%)
% Prestasi Rerata Prestasi
(1) (2) (3) (4) (5) (6) (7) (8)
I. PEKERJAAN PERSIAPAN (6)/100x(5)
1 Pembongkaran kosen 12.00 bh 0.20 - - 100
2 Penetelan plesteran 12.00 m² 0.08 - - 100
3 Pembersihan akhir pekerjaan 1.00 ls 0.07 - - -
X. PEKERJAAN LANTAI
1 Keramik lantai 40 x 40 240.00 m² 8.82 - - -
2 Keramik dinding 25 x 40 129.80 m² 5.80 - - -
3 Keramik kolom 25 x 40 6.40 m² 0.29 - - -
4 List keramik 119.00 m' 3.32 - - -
JUMLAH 95.07 -
Jumlah dana yang digunakan sampai dengan minggu ini ( minggu ke 1 ) Rp 20,300,000.00
3
REKAPITULASI OK
NCANA ANGGARAN BIAYA OK
: PENGADAAN SARANA PRASARANA
KEGIATAN : PERENCANAAN SMP KABUPATEN BANGKALAN
PEKERJAAN : REHABILITASI 2 RUANG BELAJAR SMPN 3 SATAP KOKOP
LINGKUP PEKERJAAN : SMPN 3 SATAP KOKOP KEC. KOKOP KAB. BANGKALAN
LOKASI
URAIAN PEKERJAAN JUMLAH HARGA
NO.
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
H. SUBADRIH, ST, MT
Mengetahui :
Kepala Sekolah
SMPN 3 Satap Kokop
Kec. Kokop Kab. Bangkalan
IHSANUDIN, S.Pd
NIP. 19700109 199104 1 001
LAPORAN MINGGUAN
Minggu ke :
Pekerjaan : REHABILITASI 2 RUANG BELAJAR SMPN 3 SATAP KOKOP Tanggal :
Nama Sekolah : SMPN 3 SATAP KOKOP KEC. KOKOP KAB. BANGKALAN Bulan :
Lokasi : KEC. KOKOP KAB. BANGKALAN Dana diterima tangal :
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%)
% Prestasi Rerata Prestasi
(1) (2) (3) (4) (5) (6) (7) (8)
(6)/100x(5)
I. PEKERJAAN PERSIAPAN
1 Pembongkaran atap + rangka 260.00 m² 1.70 100 1.70 -
2 Pembongkaran kosen 12.00 bh 0.32 100 0.32 -
3 Pembongkaran dinding 61.75 m² 0.65 100 0.65 -
4 Pembersihan akhir pekerjaan 1.00 ls 0.11 - - -
X. PEKERJAAN LANTAI
1 Keramik lantai 40 x 40 162.00 m² 9.58 - - -
2 Keramik kolom 20 x 40 (motif) 5.60 m² 0.40 - - -
Mengetahui Menyetujui
SMPN 3 Satap Kokop Panitia Pembangunan Sekolah
Kec. Kokop Kab. Bangkalan
Selaku Penanggung Jawab
IHSANUDIN, S.Pd SUHAERI
NIP. 19700109 199104 1 001
REKAPITULASI
NCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI
NO.
I
II
III
IV
V
VI
VII
VIII
IX
X 4
XI OK
XII LAMA
XIII : PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 1 TRAGAH
: SMPN 1 TRAGAH KEC. TRAGAH KAB. BANGKALAN
TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )
PEKERJAAN PERSIAPAN ###
PEKERJAAN TANAH ###
PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA #DIV/0!
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 1 Tragah
Kec. Tragah Kab. Bangkalan
Drs. AMIRULLAH, MM
NIP. 19581217 198603 1 011
NO
1
I.
1
2
3
4
II.
1
2
4
III.
1
2
3
IV.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran atap + rangka 377.00 m² ### ###
V. Pembongkaran kusen 4.00 bh ### ###
1 Penetelan plesteran 159.60 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VI. PEKERJAAN TANAH ###
1 Galian tanah 2.16 m³ ### ###
2 Urugan pasir bawah pondasi t=10cm 0.36 m³ ### ### #DIV/0!
3 Urugan tanah kembali 1.08 m³ ### ###
4 ###
PEKERJAAN PASANGAN/PLESTERAN
VII. Pasangan 1/2 bata camp. 1 Pc : 5 Ps 7.20 m² ### ### ###
1 Plesteran 1Pc : 5Ps 14.40 m² ### ###
2 Benangan 24.00 m' ### ###
3 ###
PEKERJAAN BETON
VIII. Lantai kerja bawah pondasi 1:3:5 t=5cm 0.18 m³ ### ###
1 Pondasi beton stempat 60 x 60 x 15cm 0.54 m³ ### ###
Kolom teras 15/15 0.79 m³ ### ###
IX. Balok beton 15/20 1.71 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ ### ###
X. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Penang (baru) 382.73 m² ### ###
3 Atap genteng (lama bg. belakang) 170.10 m² ### ###
4 Genteng bubungan Karang penang 28.35 m' ### ###
Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' ### ###
XI. ###
1 PEKERJAAN KUSEN PINTU DAN JENDELA
2 Kusen kayu kempas/mahoni 6/15 #DIV/0! m³ Rp - #DIV/0!
3 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 8.61 m² Rp - Rp - #DIV/0!
4 Daun Jendela kaca kayu kempas/mahoni 3/10 8.40 m² Rp - Rp - ###
5 #DIV/0!
6 PEKERJAAN PLAFOND
Plafond calsiboard 4mm + rangka kayu 4/6 294.84 m² ### ###
XII ###
1 PEKERJAAN PENGECATAN
2 Pengecatan dinding (3 Ruang kelas) 598.50 m² ### ###
3 Pengecatan plafond 294.84 m² ### ###
4 Pengecatan kayu 206.70 m² ### ###
5 ###
6 PEKERJAAN LANTAI #DIV/0!
Keramik lantai 40 x 40 245.70 m² ### ###
XIII. Keramik dinding 25 x 40 ( 3 R.kelas + teras ) 159.60 m² ### ###
1 List keramik dinding 7cm 110.40 m² ### ###
Keramik kolom 25 x 40 12.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Engsel Pintu 18.00 bh ### ###
Engsel Jendela 16.00 bh ### ###
Grendel pintu 3.00 bh ### ###
Grendel Jendela 16.00 bh ### ###
Hag Angin 16.00 bh ### ###
###
REKAPITULASI
PEKERJAAN INSTALASI LISTRIK
NCANA ANGGARAN
Lampu BIAYA
SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
KEGI Saklar ganda 3.00 bh ### ###
PEKE Saklar tunggal 3.00 bh ### ###
LING Stop kontak + instalasi 3.00 bh ### ###
LOKA Instalasi titik lampu 15.00 ttk ### ###
###
NO. PEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 11.14 m² ### ###
###
I
II
III
IV
V
VI
VII
VIII
IX
X 4
XI OK
XII BARU
XIII : PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 1 TRAGAH
: SMPN 1 TRAGAH KEC. TRAGAH KAB. BANGKALAN
TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )
PEKERJAAN PERSIAPAN ###
PEKERJAAN TANAH ###
PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA Rp -
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 1 Tragah
Kec. Tragah Kab. Bangkalan
Drs. AMIRULLAH, MM
NIP. 19581217 198603 1 011
NO
1
I.
1
2
3
4
II.
1
2
4
III.
1
2
3
IV.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran atap + rangka 377.00 m² ### ###
V. Pembongkaran kusen 8.00 bh ### ###
1 Penetelan plesteran 249.00 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VI. PEKERJAAN TANAH ###
1 Galian tanah 2.16 m³ ### ###
2 Urugan pasir bawah pondasi t=10cm 0.36 m³ ### ### ###
3 Urugan tanah kembali 1.08 m³ ### ###
###
VII. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 24.02 m² ### ### ###
2 Plesteran 1Pc : 5Ps 48.03 m² ### ###
3 Benangan 168.00 m' ### ###
4 ###
PEKERJAAN BETON
VIII. Lantai kerja bawah pondasi 1:3:5 t=5cm 0.18 m³ ### ###
1 Pondasi beton stempat 60 x 60 x 15cm 0.54 m³ ### ###
Kolom teras 15/15 0.79 m³ ### ###
IX. Balok beton 15/20 1.56 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ ### ###
X. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Penang (baru) 382.73 m² ### ###
3 Genteng bubungan Karang penang 28.35 m' ### ###
4 Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' ### ###
5 ###
PEKERJAAN KUSEN PINTU DAN JENDELA
XI. Kusen kayu kempas/mahoni 6/15 1.09 m³ Rp - Rp -
1 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 8.61 m² Rp - Rp - ###
2 Jalusi kayu kempas/mahoni 3/12 7.20 m² Rp - Rp -
3 Daun Jendela kaca kayu kempas/mahoni 3/10 6.72 m² Rp - Rp - ###
4 Rp -
5 PEKERJAAN PLAFOND
6 Plafond calsiboard 4mm + rangka kayu 4/6 294.84 m² ### ###
###
XII PEKERJAAN PENGECATAN
1 Pengecatan dinding (3 Ruang kelas) 598.50 m² ### ###
2 Pengecatan plafond 294.84 m² ### ###
3 Pengecatan kayu 206.70 m² ### ###
4 ###
5 PEKERJAAN LANTAI ###
6 Keramik lantai 40 x 40 245.70 m² ### ###
Keramik dinding 25 x 40 ( 3 R.kelas + teras ) 173.40 m² ### ###
XIII. List keramik dinding 7cm 132.90 m² ### ###
1 Keramik kolom 25 x 40 12.00 m² ### ###
Keramik dinding 25 x 40 ( 3 R.kelas teras saja ) 75.60 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Engsel Pintu 18.00 bh ### ###
Engsel Jendela 16.00 bh ### ###
Grendel pintu 3.00 bh ### ###
Grendel Jendela 16.00 bh ### ###
Hag Angin 16.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
REKAPITULASI
Lampu SL 8watt (teras) 3.00 bh ### ###
NCANA ANGGARAN BIAYA
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
KEGI Stop kontak + instalasi 3.00 bh ### ###
PEKE Instalasi titik lampu 15.00 ttk ### ###
LINGKUP PEKERJAAN ###
LOKAPEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 11.14 m² ### ###
NO. ###
I
II
III
IV
V
VI
VII
VIII
IX
X 5
XI OK
XII LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 MODUNG
: SMPN 2 MODUNG KEC. MODUNG KAB. BANGKALAN
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Modung
Kec. Modung Kab. Bangkalan
A S U R, M.Pd
NIP. 19610117 198403 1 008
NO
1
I.
1
2
II.
1
2
3
III.
1
2
3
IV.
1
2
Lembar. 2
V. JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
1 2 3 4 5
2 PEKERJAAN PERSIAPAN
3 Pembongkaran atap + rangka 406.00 m² ### ###
4 Pembersihan akhir pekerjaan 1.00 ls ### ### ###
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 98.93 m² ### ###
2 Plesteran 1Pc : 5Ps 197.87 m² ### ###
3 Benangan 166.56 m' ### ###
###
VII. PEKERJAAN BETON
1 Kolom teras 15/15 0.41 m³ ### ###
Balok teras 15/20 1.24 m³ ### ###
VIII. Ring balk gewel 15/15 0.98 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 396.90 m² ### ###
4 Lisplank kalsiplank 8mm / 30 cm 85.70 m¹ ### ###
5 ###
PEKERJAAN ATAP
IX. Pasang atap genteng karang p enang (baru 5%) 19.85 m² ### ###
1 Pasang atap genteng (lama) 377.06 m² ### ###
Genteng bubungan karang penang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 29.00 m' ### ###
1 ###
2 PEKERJAAN KUSEN PINTU DAN JENDELA
3 Kusen kayu kempas/mahoni 6/12 0.46 m³ Rp - Rp -
4 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 6.72 m² Rp - Rp -
5 Daun Jendela kaca kayu kempas/mahoni 3/10 5.04 m² Rp - Rp -
6 Rp -
PEKERJAAN PLAFOND ###
XI. Plafond calsiboard 4mm + rangka hollow 340.20 m² ### ###
1 ###
2 PEKERJAAN PENGECATAN/PLAMIRAN
3 Pengecatan dinding (depan) 66.85 m² ### ###
4 Pelamiran dinding 430.33 m² ### ###
5 Pelamiran plafond 340.20 m² ### ### ###
6 Pengecatan kayu 206.70 m² ### ###
Cat genteng 396.90 m² ### ###
XII. ###
1 PEKERJAAN LANTAI
Lantai rabat 216.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 4.00 bh ### ###
Engsel Pintu 21.00 bh ### ###
Engsel Jendela 24.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Grendel Jendela 12.00 bh ### ### ###
Hag Angin 24.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 14.00 bh ### ###
Lampu SL 8watt (teras) 4.00 bh ### ###
Saklar ganda 7.00 bh ### ###
REKAPITULASI
Saklar tunggal 3.00 bh ### ###
NCANA ANGGARAN BIAYA
Stop kontak + instalasi 4.00 bh ### ###
Instalasi titik lampu 18.00 bh ### ###
KEGIATAN ###
PEKE PEKERJAAN KACA
LING Kaca mati t=5 mm 14.49 m² ### ###
LOKASI ###
NO.
I
II
III
IV
V
VI
VII
VIII
IX
X 5
XI OK
XII BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 MODUNG
: SMPN 2 MODUNG KEC. MODUNG KAB. BANGKALAN
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Modung
Kec. Modung Kab. Bangkalan
A S U R, M.Pd
NIP. 19610117 198403 1 008
NO
1
I.
1
2
II.
1
2
3
III.
1
2
3
IV.
1
2
Lembar. 2
V. JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
1 2 3 4 5
2 PEKERJAAN PERSIAPAN
3 Pembongkaran atap + rangka 406.00 m² ### ###
4 Pembersihan akhir pekerjaan 1.00 ls ### ### ###
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 98.93 m² ### ###
2 Plesteran 1Pc : 5Ps 197.87 m² ### ###
3 Benangan 166.56 m' ### ###
###
VII. PEKERJAAN BETON
1 Kolom teras 15/15 0.41 m³ ### ###
Balok teras 15/20 1.24 m³ ### ###
VIII. Ring balk gewel 15/15 0.98 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 396.90 m² ### ###
4 Lisplank kalsiplank 8mm / 30 cm 85.70 m¹ ### ###
5 ###
PEKERJAAN ATAP
IX. Pasang atap genteng karang p enang (baru 5%) 19.85 m² ### ###
1 Pasang atap genteng (lama) 377.06 m² ### ###
Genteng bubungan karang penang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 29.00 m' ### ###
1 ###
2 PEKERJAAN KUSEN PINTU DAN JENDELA
3 Kusen kayu kempas/mahoni 6/12 0.46 m³ Rp - Rp -
4 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 6.72 m² Rp - Rp -
5 Daun Jendela kaca kayu kempas/mahoni 3/10 5.04 m² Rp - Rp -
6 Rp -
PEKERJAAN PLAFOND ###
XI. Plafond calsiboard 4mm + rangka kayu 4/6 340.20 m² ### ###
1 ###
2 PEKERJAAN PENGECATAN/PLAMIRAN
3 Pengecatan dinding (depan) 66.85 m² ### ###
4 Pelamiran dinding 430.33 m² ### ###
5 Pelamiran plafond 340.20 m² ### ### ###
6 Pengecatan kayu 206.70 m² ### ###
Cat genteng 396.90 m² ### ###
XII. ###
1 PEKERJAAN LANTAI
Lantai rabat 216.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 4.00 bh ### ###
Engsel Pintu 21.00 bh ### ###
Engsel Jendela 24.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Grendel Jendela 12.00 bh ### ### ###
Hag Angin 24.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 14.00 bh ### ###
Lampu SL 8watt (teras) 4.00 bh ### ###
Saklar ganda 7.00 bh ### ###
REKAPITULASI
Saklar tunggal 3.00 bh ### ###
NCANA ANGGARAN BIAYA
Stop kontak + instalasi 4.00 bh ### ###
Instalasi titik lampu 18.00 bh ### ###
KEGIATAN ###
PEKE PEKERJAAN KACA
LING Kaca mati t=5 mm 14.49 m² ### ###
LOKASI ###
NO.
I
II
III
IV
V
VI
VII
VIII
IX
X 6
XI OK
LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 2 LABANG
: SMPN 2 LABANG KEC. LABANG KAB. BANGKALAN
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
ACHMAD TAUFIK HEYKAL, A.Sg H. SUBADRIH, ST, MT
Mengetahui :
Kepala Sekolah
SMPN 2 Labang
Kec. Labang Kab. Bangkalan
NO
1
I.
1
2
3
4
5
II.
1
III.
1
2
IV.
1
2
3 Lembar. 2
JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
V. 2 3 4 5
1 PEKERJAAN PERSIAPAN ###
Pembongkaran atap + rangka 377.00 m² Rp - Rp -
VI. Pembongkaran kosen 1.00 bh ### ###
1 Pembongkaran dinding 6.00 m² ### ###
2 Penetelan plesteran 139.74 m² ### ###
3 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VII. PEKERJAAN PASANGAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps (nyepit kuda2) 30.91 m² Rp - Rp -
2 Rp -
3 PEKERJAAN RANGKA ATAP ###
4 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ Rp - Rp -
VIII. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Pilang (baru) 382.73 m² ### ###
Genteng bubungan Karang pilang 28.35 m' ### ###
IX. Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' Rp - Rp -
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsiboard 4mm + rangka hollow 354.38 m² Rp - Rp -
4 Rp -
5 PEKERJAAN PENGECATAN
6 Pengecatan dinding 598.50 m² Rp - Rp - ###
Pengecatan plafond 354.38 m² Rp - Rp -
X. Pengecatan kayu 274.60 m² Rp - Rp -
1 Rp -
PEKERJAAN LANTAI
XI. Keramik lantai 40 x 40 243.00 m² ### ###
1 Keramik dinding 25 x 40 139.74 m² ### ###
2 List keramik 102.00 m' ### ###
3 Keramik kolom 20 x 40 10.80 m² ### ###
4 ###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA ###
Kaca mati t=5 mm (yg pecah) 4.22 m² ### ###
###
PEKERJAAN TANGGA DEPAN PINTU
Pasangan batu gunung 2.88 m³ ### ###
Plesterran trasram 7.68 m² ### ###
Keramik kasar 40 x 40 7.04 m² ### ###
Urugan pasir 4.96 m³ ### ###
REKAPITULASI ###
NCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI
NO.
I
II
III
IV
V
VI
VII
VIII
IX
X 6
XI OK
XII BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 2 LABANG
: SMPN 2 LABANG KEC. LABANG KAB. BANGKALAN
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Labang
Kec. Labang Kab. Bangkalan
Drs. HARTONO, M.Pd
NIP. 19690126 199802 1 003
NO
1
I.
1
2
3
4
5
II.
1
2
3
III.
1
IV.
1
2 Lembar. 2
JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
V. 2 3 4 5
1 PEKERJAAN PERSIAPAN ###
2 Pembongkaran atap + rangka 377.00 m² Rp - Rp -
3 Pembongkaran kosen 1.00 bh ### ###
Pembongkaran dinding 6.00 m² ### ###
VI. Penetelan plesteran 127.50 m² ### ###
1 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VII. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps (nyepit kuda2) 22.43 m² Rp - Rp - -
2 Plesteran 1Pc : 5Ps 16.20 m² ### ###
3 Benangan 32.00 m' ### ###
###
VIII. PEKERJAAN BETON
1 Ring balk gewel 15/15 0.40 m³ ### ###
2 ###
3 PEKERJAAN RANGKA ATAP ###
4 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ Rp - Rp -
IX. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Pilang (baru) 382.73 m² ### ###
Genteng bubungan Karang pilang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' Rp - Rp -
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsiboard 4mm + rangka hollow 354.38 m² Rp - Rp -
4 Rp -
5 PEKERJAAN PENGECATAN
6 Pengecatan dinding 598.50 m² Rp - Rp - ###
Pengecatan plafond 354.38 m² Rp - Rp -
XI. Pengecatan kayu 274.60 m² Rp - Rp -
1 Rp -
PEKERJAAN LANTAI
XII. Keramik lantai 40 x 40 243.00 m² ### ###
1 Keramik dinding 25 x 40 127.50 m² ### ###
2 List keramik 102.00 m' ### ###
3 Keramik kolom 20 x 40 10.80 m² ### ###
4 ###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Pintu harmonika 15.00 m² ### ### ###
### ###
PEKERJAAN INSTALASI LISTRIK ###
Lampu SL 14 watt 12.00 bh ### ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA ###
Kaca mati t=5 mm (yg pecah) 4.22 m² ### ###
###
PEKERJAAN TANGGA DEPAN PINTU 3.46
Pasangan batu gunung 2.88 m³ ### ###
Plesterran trasram 7.68 m² ### ###
Keramik kasar 40 x 40 7.04 m² ### ###
Urugan pasir 4.96 m³ ### ###
###
REKAPITULASI
NCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI
NO.
I
II
III
IV
V
VI
VII
VIII
IX
X 7
OK
LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 KWANYAR
: SMPN 2 KWANYAR KEC. KWANYAR KAB. BANGKALAN
TERBILANG : ( SERATUS SEMBILAN PULUH TUJUH JUTA DELAPAN RATUS RIBU RUPIAH )
URAIAN PEKERJAAN JUMLAH HARGA
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Kwanyar
Kec. Kwanyar Kab. Bangkalan
RAHMAWATI, M.Pd
NIP. 19700703 199802 2 003
NO
1
I.
1
2
3
4
II.
1
2
III.
1
IV.
1
V.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran kusen 1.00 bh ### ###
VI. Pembongkaran dinding 15.00 m² ### ###
1 Penetelan plesteran 428.64 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 Ls ### ###
3 ###
4 PEKERJAAN PASANGAN/PLESTERAN ###
5 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 0.91 22.20 m² Rp - Rp -
6 Plesteran 1Pc : 5Ps 1.07 44.40 m² Rp - Rp -
Rp -
VII. PEKERJAAN KAYU
1 Lisplank kayu 3/30 cm 4.00 m¹ ### ###
2 ###
3 PEKERJAAN PLAFOND
4 Plafond calsi 1 x 1 + rangka kayu 12.00 m² Rp - Rp -
Rp -
VIII. PEKERJAAN PENGECATAN
1 Pengecatan dinding (3 kelas) 455.30 m² Rp - Rp -
2 Pengecatan plafond 319.00 m² Rp - Rp -
3 Pengecatan kayu 206.70 m² Rp - Rp - ###
4 Pengecatan kayu (Kantor) 214.39 m² Rp - Rp -
5 Rp -
6PEKERJAAN LANTAI 162.00 ###
Keramik lantai 40 x 40 ( 2 R Kelas ) 5.67 126.00 m² ### ###
IX. Keramik lantai 40 x 40 ( Teras ) 1.62 36.00 m² ### ###
1 Keramik dinding 25 x 40 (dalam kelas + teras) 5.78 128.40 m² ### ###
Keramik kolom teras 25 x 40 1.01 22.40 m² ### ###
X. List keramik 1.64 327.80 m' ### ###
1 Keramik dinding 25 x 40 (dalam kantor+R.guru+ t 13.51 300.24 m² ### ###
2 451.04 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 3.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Hag Angin 60.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
REKAPITULASI
PEKERJAAN KACA
NCANA ANGGARAN BIAYA
Kaca mati t=5 mm (yg pecah) 1.68 m² ### ###
###
KEGI PEKERJAAN TEMPAT DUDUK
PEKE Pasangan trasram 0.68 17.00 m² Rp - Rp -
LING Plat beton tempat duduk t=10 cm 0.53 1.02 m³ ### ###
LOKA Keramik tempat duduk 30 x 30 0.46 10.20 m² ### ###
Keramik dinding tempat duduk 25 x 40 1.84 40.80 m² ### ###
NO. 34.71 ###
0.86768 40.80
I
II
III
IV
V
VI
VII
VIII
IX
X 7
OK
BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 KWANYAR
: SMPN 2 KWANYAR KEC. KWANYAR KAB. BANGKALAN
TERBILANG : ( SERATUS SEMBILAN PULUH TUJUH JUTA DELAPAN RATUS RIBU RUPIAH )
URAIAN PEKERJAAN JUMLAH HARGA
PEKERJAAN PERSIAPAN ###
PEKERJAAN PASANGAN/PLESTERAN Rp -
PEKERJAAN KAYU ###
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
PEKERJAAN TEMPAT DUDUK ###
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Kwanyar
Kec. Kwanyar Kab. Bangkalan
RAHMAWATI, M.Pd
NIP. 19700703 199802 2 003
NO
1
I.
1
2
3
4
II.
1
2
III.
1
2
IV.
1
V. Lembar. 2
1 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
2 2 3 4 5
3 PEKERJAAN PERSIAPAN
4 Pembongkaran kusen 1.00 bh ### ###
5 Pembongkaran dinding 15.00 m² ### ###
Penetelan plesteran 428.64 m² ### ###
VI. Pembersihan akhir pekerjaan 1.00 Ls ### ###
1 ###
2 PEKERJAAN PASANGAN/PLESTERAN ###
3 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 22.20 m² Rp - Rp -
4 Plesteran 1Pc : 5Ps 44.40 m² Rp - Rp -
5 Rp -
6 PEKERJAAN KAYU
Perbaikan daun pintu panil 4.00 bh ### ###
VII. Lisplank kayu 3/30 cm 4.00 m¹ ### ###
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsi 1 x 1 + rangka kayu 12.00 m² Rp - Rp -
4 Rp -
PEKERJAAN PENGECATAN
VIII. Pengecatan dinding (3 kelas) 439.90 m² Rp - Rp -
1 Pengecatan dinding (Kantor) 373.40 m² Rp - Rp -
2 Pengecatan plafond 319.00 m² Rp - Rp -
3 Pengecatan kayu 169.45 m² Rp - Rp - ###
4 Pengecatan kayu (Kantor) 197.69 m² Rp - Rp -
5 Rp -
6 PEKERJAAN LANTAI ###
Keramik lantai 40 x 40 ( 2 R Kelas ) 126.00 m² ### ###
IX. Keramik lantai 40 x 40 ( Teras ) 36.00 m² ### ###
1 Keramik dinding 25 x 40 (dalam kelas + teras) 128.40 m² ### ###
Keramik kolom teras 25 x 40 22.40 m² ### ###
X. List keramik 327.80 m' ### ###
1 Keramik dinding 25 x 40 (dalam kantor+R.guru+ teras) 300.24 m² ### ###
2 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 3.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Hag Angin 60.00 bh ### ###
Pintu harmonika 11.30 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK ###
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA
REKAPITULASI
Kaca mati t=5 mm (yg pecah) 1.68 m² ### ###
NCANA ANGGARAN BIAYA ###
PEKERJAAN TEMPAT DUDUK
KEGI Pasangan trasram 17.00 m² Rp - Rp -
PEKE Plat beton tempat duduk t=10 cm 1.02 m³ ### ###
LING Keramik tempat duduk 30 x 30 10.20 m² ### ###
LOKA Keramik dinding tempat duduk 25 x 40 40.80 m² ### ###
###
NO.
I
II
III
IV
V
VI
VII
VIII
IX
8
OK
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Kokop
Kec. Kokop Kab. Bangkalan
II.
1
2
3
III.
1
IV.
1
2
3
V. Lembar. 2
1 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
2 2 3 4 5
3 PEKERJAAN PERSIAPAN
4 Penetelan plesteran 317.46 m² ### ###
5 Pembersihan akhir pekerjaan 1.00 Ls Rp - Rp - #REF!
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 12.25 m² Rp - Rp -
5 Plesteran 1Pc : 5Ps 80.58 m² Rp - Rp -
6 Benangan 55.00 m' Rp - Rp -
7 Rp -
PEKERJAAN PLAFOND
VII. Plafond calsiboard 4mm + rangka kayu 15.00 m² Rp - Rp -
1 Rp -
2 PEKERJAAN PENGECATAN -
3 Pengecatan dinding 506.50 m² Rp - Rp -
4 Pengecatan plafond 352.00 m² Rp - Rp - #DIV/0!
5 Pengecatan kayu 275.60 m² Rp - Rp -
6 Rp -
PEKERJAAN LANTAI ###
VIII. Keramik lantai 40 x 40 243.00 m² ### ### 147.47
1 Keramik dinding 25 x 40 ( 3 R. Kelas + teras) 132.96 m² ### ###
List keramik 288.20 m' ### ###
IX. Keramik kolom 25 x 40 16.00 m² ### ###
1 Keramik dinding 25 x 40 ( 5 R. Kelas bg. dalam) 184.50 m² ### ###
2 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 5.00 bh ### ###
Grendel Jendela 50.00 bh ### ###
Hag Angin 100.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 20.00 bh ### ###
Lampu SL 8watt (teras) 5.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 5.00 bh ### ###
Stop kontak + instalasi 5.00 bh ### ###
Instalasi titik lampu 25.00 ttk ### ###
###
PEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 2.53 m² ### ###
###
PEKERJAAN TEMPAT DUDUK
Pasangan trasram 14.70 m² Rp - Rp -
Plat beton tempat duduk t=10 cm 0.74 m³ ### ###
Keramik tempat duduk 30 x 30 7.35 m² ### ###
Keramik dinding tempat duduk 25 x 40 29.40 m² ### ###
###
BATAS
SINERGI 1 SMPN 2 SEPULU DR. AHMAD SABARUDIN, S.Pd, M.MPd
SINERGI 2 SMPN 1 KLAMPIS IMAM SYAFII, S.Pd, MPd
SINERGI 3 SMPN 2 KOKOP MOHAMMAD TAUFIK, SPd
SINERGI 4 SMPN 3 SATAP KOKOP IHSANUDIN, S.Pd
INDRAKILA 5 SMPN 1 TRAGAH Drs. AMIRULLAH, MM
INDRAKILA 6 SMPN 2 MODUNG A S U R, M.Pd
INDRAKILA 7 SMPN 2 LABANG Drs. HARTONO, M.Pd
INDRAKILA 8 SMPN 2 KWANYAR RAHMAWATI, M.Pd
9 SMPN TAHAL AMIN H. ABDULLAH, S.Pd
10 SMPN 1 MODUNG Drs. ALI MUSTOFA, M.Pd
11 SMPN 1 GALIS Drs. TAUFIKUR RAHMAN
12 SMPN 1 KOKOP BUDIONO, S.Pd, M.Pd
28.5
23.5
7.833333
1 ( Satu )
5 Oktob. s/d 10 Oktober 2015
Oktober 2015
29 Oktober 2015
Rp. 212.320.000.00
Prestasi Pekerjaan Prestasi Pekerjaan
Minggu Ini (%) Komulatif (%)
Rerata Prestasi Rerata
(9) (10) (11)
(8)/100x(5) (6)+(8) (7)+(9)
- - - Rp 88,586.67 Rp 1,638,853.33
- - - Rp 42,298.80 Rp 1,565,055.60
- - - Rp - Rp -
Rp 3,203,908.93
- - - Rp 3,912,550.00 Rp 234,753.00
- - - Rp 3,962,550.00 Rp 114,121.44
- - - Rp 3,962,550.00 Rp 1,027,092.96
- - - Rp 3,962,550.00 Rp 1,255,335.84
Rp 2,631,303.24
- - - Rp 185,000.00 Rp 25,849,125.00
- - - Rp 185,000.00 Rp 21,929,437.50
- - - Rp 65,000.00 Rp 3,100,500.00
Rp 50,879,062.50
- - - Rp 18,000.00 Rp 2,515,050.00
- - - Rp 110,000.00 Rp 26,078,250.00
- - - Rp 95,820.00 Rp 2,558,394.00
- - - Rp 21,149.40 Rp 1,184,366.40
Rp 32,336,060.40
- - - Rp 85,000.00 Rp 22,185,000.00
Rp 22,185,000.00
- - - Rp 20,740.00 Rp 10,805,637.48
- - - Rp 20,740.00 Rp 5,413,140.00
- - - Rp 42,450.00 Rp 4,752,702.00
Rp 20,971,479.48
- - - Rp 105,250.00 Rp 3,315,375.00
- - - Rp 112,000.00 Rp 16,800,000.00
- - - Rp 136,075.00 Rp 12,540,672.00
- - - Rp 85,000.00 Rp 6,528,000.00
Rp 39,184,047.00
- - - Rp 55,000.00 Rp 660,000.00
- - - Rp 50,000.00 Rp 150,000.00
- - - Rp 20,000.00 Rp 80,000.00
- - - Rp 15,000.00 Rp 75,000.00
- - - Rp 225,000.00 Rp 1,125,000.00
Rp 200,000.00 Rp 3,000,000.00
Rp 5,090,000.00
- - - Rp 112,125.00 Rp 376,964.25
Rp 376,964.25
2.95 2.95
Rp 20,300,000.00 2.95 %
1 ( Satu )
5 Oktob. s/d 10 Oktober 2015
Oktober 2015
29 Oktober 2015
- - - Rp 58,500.00 Rp 126,360.00
- - - Rp 215,400.00 Rp 77,544.00
- - - Rp 16,110.00 Rp 17,398.80
Rp 221,302.80
- - - Rp 88,586.67 Rp 3,790,281.61
- - - Rp 42,298.80 Rp 3,619,604.84
- - - Rp 11,825.00 Rp 3,651,560.00
Rp 11,061,446.45
- - - Rp 897,800.00 Rp 161,604.00
- - - Rp 3,962,550.00 Rp 2,139,777.00
- - - Rp 3,962,550.00 Rp 3,120,508.13
- - - Rp 3,962,550.00 Rp 5,943,825.00
- - - Rp 3,962,550.00 Rp 9,510,120.00
- - - Rp 3,962,550.00 Rp 941,501.88
Rp 21,817,336.01
- - - Rp 210,000.00 Rp 77,723,100.00
- - - Rp 65,000.00 Rp 5,063,500.00
Rp 82,786,600.00
- - - Rp 80,500.00 Rp 16,325,400.00
- - - Rp 18,000.00 Rp 3,011,580.00
- - - Rp 95,820.00 Rp 2,429,037.00
- - - Rp 21,149.40 Rp 617,562.48
Rp 22,383,579.48
- - - Rp 11,431,250.00 Rp 14,644,117.13
- - - Rp 618,250.00 Rp 5,375,065.50
- - - Rp 430,475.00 Rp 7,148,037.38
- - - Rp 419,572.50 Rp 4,833,475.20
Rp 32,000,695.20
- - - Rp 85,000.00 Rp 25,857,000.00
Rp 25,857,000.00
- - - Rp 20,740.00 Rp 12,412,890.00
- - - Rp 20,740.00 Rp 6,309,108.00
- - - Rp 42,450.00 Rp 8,774,415.00
Rp 27,496,413.00
- - - Rp 112,000.00 Rp 26,880,000.00
- - - Rp 136,075.00 Rp 17,662,535.00
- - - Rp 136,075.00 Rp 870,880.00
- - - Rp 85,000.00 Rp 10,115,000.00
Rp 55,528,415.00
- - - Rp 140,750.00 Rp 422,250.00
- - - Rp 23,625.00 Rp 425,250.00
- - - Rp 16,687.50 Rp 267,000.00
- - - Rp 74,250.00 Rp 222,750.00
- - - Rp 14,750.00 Rp 236,000.00
- - - Rp 17,750.00 Rp 284,000.00
Rp 1,857,250.00
- - - Rp 55,000.00 Rp 660,000.00
- - - Rp 50,000.00 Rp 150,000.00
- - - Rp 20,000.00 Rp 60,000.00
- - - Rp 15,000.00 Rp 45,000.00
- - - Rp 225,000.00 Rp 675,000.00
- - - Rp 200,000.00 Rp 3,000,000.00
Rp 4,590,000.00
- - - Rp 112,125.00 Rp 3,038,587.50
Rp 3,038,587.50
0.28 -
Rp 20,300,000.00 - %
1 ( Satu )
5 Oktob. s/d 10 Oktober 2015
Oktober 2015
29 Oktober 2015
- - - Rp 897,800.00 Rp 274,726.80
- - - Rp 3,962,550.00 Rp 1,497,843.90
- - - Rp 3,962,550.00 Rp 1,872,304.88
- - - Rp 3,962,550.00 Rp 4,220,115.75
- - - Rp 3,962,550.00 Rp 4,992,813.00
- - - Rp 3,962,550.00 Rp 2,225,368.08
Rp 15,083,172.41
- - - Rp 210,000.00 Rp 53,841,375.00
- - - Rp 65,000.00 Rp 4,238,000.00
Rp 58,079,375.00
- - - Rp 80,500.00 Rp 15,344,910.00
- - - Rp 18,000.00 Rp 2,002,725.00
- - - Rp 95,820.00 Rp 1,854,117.00
- - - Rp 21,149.40 Rp 560,459.10
Rp 19,762,211.10
- - - Rp 115,000.00 Rp 11,012,400.00
- - - Rp 2,000,000.00 Rp 8,000,000.00
- - - Rp 500,000.00 Rp 4,000,000.00
Rp 23,012,400.00
- - - Rp 85,000.00 Rp 17,105,400.00
Rp 17,105,400.00
- - - Rp 20,740.00 Rp 1,119,960.00
- - - Rp 9,670.00 Rp 3,331,315.00
- - - Rp 9,670.00 Rp 1,945,990.80
- - - Rp 42,450.00 Rp 830,322.00
Rp 7,227,587.80
- - - Rp 112,000.00 Rp 18,144,000.00
- - - Rp 136,075.00 Rp 762,020.00
Rp 18,906,020.00
- - - Rp 140,750.00 Rp 281,500.00
- - - Rp 23,625.00 Rp 283,500.00
- - - Rp 16,687.50 Rp 267,000.00
- - - Rp 74,250.00 Rp 148,500.00
- - - Rp 14,750.00 Rp 236,000.00
- - - Rp 17,750.00 Rp 284,000.00
Rp 1,500,500.00
- - - Rp 55,000.00 Rp 440,000.00
- - - Rp 50,000.00 Rp 100,000.00
- - - Rp 20,000.00 Rp 40,000.00
- - - Rp 15,000.00 Rp 30,000.00
- - - Rp 225,000.00 Rp 450,000.00
- - - Rp 200,000.00 Rp 2,000,000.00
Rp 3,060,000.00
- - - Rp 112,125.00 Rp 2,318,745.00
Rp 2,318,745.00
8.56 11.31
Rp 21,415,000.00 11.31 %
LAMA
140
BARU
LAMA
BARU
LAMA
BARU
LAMA
BARU
keramik tambal sulam
SADALI, S.Pd
UBAGIO, M.Pd
NDAYANI, M.Pd
1 2 3 4 5
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
1.01 100 1.01 100 1.01 100 1.01 100 1.01 100
0.11 - - - - - - - - -
0.90 - - 100 0.90 100 0.90 100 0.90 100
0.86 - - - - 100 0.86 100 0.86 100
- - - - - 100 - 100 - 100
14.17 - - - - - - - - -
12.02 - - - - - - - - -
1.70 - - - - - - - - -
1.38 - - - - - - - - -
14.29 - - - - - - - - -
1.40 - - - - - - - - -
0.65 - - - - - - - - -
12.16 - - - - - - - - -
5.92 - - - - - - - - -
2.97 - - - - - - - - -
2.61 - - - - - - - - -
1.82 - - - - - - - - -
9.21 - - - - - - - - -
6.87 - - - - - - - - -
3.58 - - - - - - - - -
0.36 - - - - - - - - -
0.08 - - - - - - - - -
0.04 - - - - - - - - -
0.04 - - - - - - - - -
0.62 - - - - - - - - -
1.64 - - - - - - - - -
0.21 - - - - - - - - -
1 2 3 4 5
0.20 100 0.20 100 0.20 100 0.20 100 0.20 100
0.08 100 0.08 100 0.08 100 0.08 100 0.08 100
0.07 - - - - - - - - -
0.05 - - - - - - 25 0.01 50
0.70 - - - - - - - - 50
1.02 - - - - - - - - -
1.95 - - - - - - - - -
3.12 - - - - - - - - 50
0.31 - - - - - - - - 75
25.51 - - - - - - - - -
1.66 - - - - - - - - -
5.36 - - - - - - - - -
0.99 - - - - - - - - -
0.80 - - - - - - - - -
0.20 - - - - - - - - -
4.81 - - - - - - - - 50
1.76 - - - - - - - - -
2.35 - - - - - - - - -
1.59 - - - - - - - - -
8.49 - - - - - - - - -
4.07 - - - - - - - - -
2.07 - - - - - - - - -
2.88 - - - - - - - - -
8.82 - - - - - - - - -
5.80 - - - - - - - - -
0.29 - - - - - - - - -
3.32 - - - - - - - - -
0.14 - - - - - - - - -
0.14 - - - - - - - - -
0.09 - - - - - - - - -
0.07 - - - - - - - - -
0.08 - - - - - - - - -
0.09 - - - - - - - - -
0.22 - - - - - - - - -
0.05 - - - - - - - - -
0.02 - - - - - - - - -
0.01 - - - - - - - - -
0.22 - - - - - - - - -
0.98 - - - - - - - - -
1.00 - - - - - - - - -
1 2 3 4 5
1.70 100 1.70 100 1.70 100 1.70 100 1.70 100
0.32 100 0.32 100 0.32 100 0.32 100 0.32 100
0.65 100 0.65 100 0.65 100 0.65 100 0.65 100
0.11 - - - - - - - - -
0.05 100 0.05 100 0.05 100 0.05 100 0.05 100
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100
0.01 50 0.00 100 0.01 100 0.01 100 0.01 100
8.10 - - - - - - - - -
1.06 - - - - - - - - -
0.98 - - - - - - - - -
0.30 - - - - - - - - -
9.03 - - - - - - - - -
0.59 - - - - - - - - -
1.76 - - - - - - - - -
1.03 - - - - - - - - 75
0.44 - - - - - - - - -
9.58 - - - - - - - - -
0.40 - - - - - - - - -
0.15 - - - - - - - - -
0.15 - - - - - - - - -
0.14 - - - - - - - - -
0.08 - - - - - - - - -
0.12 - - - - - - - - -
0.15 - - - - - - - - -
0.23 - - - - - - - - -
0.05 - - - - - - - - -
0.02 - - - - - - - - -
0.02 - - - - - - - - -
0.24 - - - - - - - - -
1.06 - - - - - - - - -
1.22 - - - - - - - - -
6 7 8 9 10
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
1.01 100 1.01 100 1.01 100 1.01 100 1.01 100
- - - - - - - 100 0.11 100
0.90 100 0.90 100 0.90 100 0.90 100 0.90 100
0.86 100 0.86 100 0.86 100 0.86 100 0.86 100
- 100 - 100 - 100 - 100 - 100
0.13 100 0.13 100 0.13 100 0.13 100 0.13 100
0.06 100 0.06 100 0.06 100 0.06 100 0.06 100
0.56 100 0.56 100 0.56 100 0.56 100 0.56 100
0.34 100 0.69 100 0.69 100 0.69 100 0.69 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
6 7 8 9 10
0.20 100 0.20 100 0.20 100 0.20 100 0.20 100
0.08 100 0.08 100 0.08 100 0.08 100 0.08 100
- - - - - - - - - 100
0.04 100 0.04 100 0.04 100 0.04 100 0.04 100
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100
0.01 100 0.01 100 0.01 100 0.01 100 0.01 100
1.24 100 1.24 100 1.24 100 1.24 100 1.24 100
1.19 100 1.19 100 1.19 100 1.19 100 1.19 100
1.20 100 1.20 100 1.20 100 1.20 100 1.20 100
0.03 100 0.05 100 0.05 100 0.05 100 0.05 100
0.35 100 0.70 100 0.70 100 0.70 100 0.70 100
- 50 0.51 100 1.02 100 1.02 100 1.02 100
- 50 0.98 100 1.95 100 1.95 100 1.95 100
1.56 75 2.34 100 3.12 100 3.12 100 3.12 100
0.23 100 0.31 100 0.31 100 0.31 100 0.31 100
2.40 100 4.81 100 4.81 100 4.81 100 4.81 100
- - - - - - - 100 1.76 100
- - - - - - - 100 2.35 100
- - - - - 50 0.79 100 1.59 100
- - - - - - - 50 4.24 100
- - - - - - - 75 6.62 100
- - - - - - - 50 2.90 100
- - - - - - - 50 0.14 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
1.70 100 1.70 100 1.70 100 1.70 100 1.70 100
0.32 100 0.32 100 0.32 100 0.32 100 0.32 100
0.65 100 0.65 100 0.65 100 0.65 100 0.65 100
- - - - - - - - - 100
0.05 100 0.05 100 0.05 100 0.05 100 0.05 100
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100
0.01 100 0.01 100 0.01 100 0.01 100 0.01 100
4.29 100 4.29 100 4.29 100 4.29 100 4.29 100
4.10 100 4.10 100 4.10 100 4.10 100 4.10 100
1.08 100 1.08 100 1.08 100 1.08 100 1.08 100
0.15 100 0.15 100 0.15 100 0.15 100 0.15 100
0.79 100 0.79 100 0.79 100 0.79 100 0.79 100
0.74 100 0.99 100 0.99 100 0.99 100 0.99 100
- 100 2.23 100 2.23 100 2.23 100 2.23 100
- 100 2.64 100 2.64 100 2.64 100 2.64 100
- 100 1.17 100 1.17 100 1.17 100 1.17 100
- 25 7.11 100 28.43 100 28.43 100 28.43 100
- - - 100 2.24 100 2.24 100 2.24 100
5.81 100 5.81 100 5.81 100 5.81 100 5.81 100
4.22 100 4.22 100 4.22 100 4.22 100 4.22 100
2.11 100 2.11 100 2.11 100 2.11 100 2.11 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
0.97
0.97
1.01
0.11
0.90
0.86
-
0.13
0.06
0.56
0.69
14.17
12.02
1.70
1.38
14.29
1.40
0.65
12.16
5.92
2.97
2.61
1.82
9.21
6.87
3.58
0.36
0.08
0.04
0.04
0.62
1.64
0.21
0.20
0.08
0.07
0.04
0.03
0.01
1.24
1.19
1.20
0.05
0.70
1.02
1.95
3.12
0.31
25.51
1.66
5.36
0.99
0.80
0.20
4.81
1.76
2.35
1.59
8.49
4.07
2.07
2.88
8.82
5.80
0.29
3.32
0.14
0.14
0.09
0.07
0.08
0.09
0.22
0.05
0.02
0.01
0.22
0.98
1.00
1.70
0.32
0.65
0.11
0.05
0.03
0.01
4.29
4.10
1.08
0.15
0.79
0.99
2.23
2.64
1.17
28.43
2.24
8.10
1.06
0.98
0.30
5.81
4.22
2.11
9.03
0.59
1.76
1.03
0.44
9.58
0.40
0.15
0.15
0.14
0.08
0.12
0.15
0.23
0.05
0.02
0.02
0.24
1.06
1.22
YANG DIPAKAI
TH. 2018
1 SMPN 2 SEPULU 2 KELAS ### SINERGI
2 SMPN 1 KLAMPIS 3 KELAS ### SINERGI
3 SMPN 2 KOKOP 2 KELAS ### SINERGI
4 SMPN 3 SATAP KOKOP 2 KELAS ### SINERGI
5 SMPN 1 TRAGAH 3 KELAS ### INDRAKILA
6 SMPN 2 MODUNG 2 KELAS ### INDRAKILA
7 SMPN 2 LABANG 3 KELAS ### INDRAKILA
8 SMPN 2 KWANYAR 2 KELAS ### INDRAKILA
9 SMPN TAHAL AMIN H. ABDULLAH, S.Pd
REKAPITULASI 1
RENCANA ANGGARAN BIAYA OK
OK
KEGIATAN : PENGADAAN SARANA PRASARANA
PEKERJAAN : PERENCANAAN SMP KABUPATEN BANGKALAN
LINGKUP PEKERJAAN : REHABILITASI 2 RUANG BELAJAR SMPN 2 SEPULU
LOKASI : SMPN 2 SEPULU KEC. SEPULU KAB. BANGKALAN
JUMLAH ###
DIBULATK ### ###
###
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Sepulu
Kec. Sepulu Kab. Bangkalan
LAPORAN MINGGUAN
Minggu ke :
Pekerjaan : REHABILITASI 2 RUANG KELAS SMPN 2 SEPULU Tanggal :
Nama Sekolah : SMPN 2 SEPULU Bulan :
Lokasi : Kec. Kedamean Kab. Gresik Dana diterima tangal :
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%)
% Prestasi Rerata Prestasi
(1) (2) (3) (4) (5) (6) (7) (8)
(6)/100x(5)
I. PEKERJAAN PERSIAPAN
1 Pembongkaran atap + rangka atap 143.00 m² 0.97 - - 100
2 Pembongkaran atap 234.90 m² 0.97 - - 100
3 Penetelan plesteran 92.16 m² 1.01 - - 100
4 Pembersihan akhir pekerjaan 1.00 ls 0.11 - - -
II. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 18.50 m² 0.90 - - -
2 Plesteran 1Pc : 5Ps 37.00 m² 0.86 - - -
3 Benangan 48.00 m' - - - -
V. PEKERJAAN ATAP
1 Atap genteng beton (lama) 139.73 m² 1.38 - - -
2 Atap genteng beton warna 237.08 m² 14.29 - - -
3 Genteng bubungan beton warna 26.70 m' 1.40 - - -
4 Plesteran kompres L = 10 cm (Akhiran genting) 56.00 m' 0.65 - - -
JUMLAH 100.00 -
Jumlah dana yang digunakan sampai dengan minggu ini ( minggu ke 1 ) Rp 20,300,000.00
REKAPITULASI 2
RENCANA ANGGARAN BIAYA OK
I (2) ###
II PEKERJAAN TANAH ###
III PEKERJAAN PASANGAN/PLESTERAN ###
IV PEKERJAAN BETON ###
V PEKERJAAN RANGKA ATAP ###
VI PEKERJAAN ATAP ###
VII PEKERJAAN KUSEN PINTU DAN JENDELA ###
VIII PEKERJAAN PLAFOND ###
IX PEKERJAAN PENGECATAN/PLAMIRAN ###
X PEKERJAAN LANTAI ###
XI PEKERJAAN KUNCI + PENGGANTUNG ###
XII PEKERJAAN INSTALASI LISTRIK ### ###
XIII PEKERJAAN KACA ###
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 1 Kelampis
Kec. Kelampis Kab. Bangkalan
LAPORAN MINGGUAN
Minggu ke :
Pekerjaan : REHABILITASI 2 RUANG KELAS SMPN 1 KLAMPIS Tanggal :
Nama Sekolah : SMPN 1 KLAMPIS Bulan :
Lokasi : Kec. Kedamean Kab. Gresik Dana diterima tangal :
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%)
% Prestasi Rerata Prestasi
(1) (2) (3) (4) (5) (6) (7) (8)
I. PEKERJAAN PERSIAPAN (6)/100x(5)
1 Pembongkaran kosen 12.00 bh 0.20 - - 100
2 Penetelan plesteran 12.00 m² 0.08 - - 100
3 Pembersihan akhir pekerjaan 1.00 ls 0.07 - - -
X. PEKERJAAN LANTAI
1 Keramik lantai 40 x 40 240.00 m² 8.82 - - -
2 Keramik dinding 25 x 40 129.80 m² 5.80 - - -
3 Keramik kolom 25 x 40 6.40 m² 0.29 - - -
4 List keramik 119.00 m' 3.32 - - -
JUMLAH 95.07 -
Jumlah dana yang digunakan sampai dengan minggu ini ( minggu ke 1 ) Rp 20,300,000.00
3
REKAPITULASI OK
NCANA ANGGARAN BIAYA OK
: PENGADAAN SARANA PRASARANA
KEGIATAN : PERENCANAAN SMP KABUPATEN BANGKALAN
PEKERJAAN : REHABILITASI 2 RUANG BELAJAR SMPN 3 SATAP KOKOP
LINGKUP PEKERJAAN : SMPN 3 SATAP KOKOP KEC. KOKOP KAB. BANGKALAN
LOKASI
URAIAN PEKERJAAN JUMLAH HARGA
NO.
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
H. SUBADRIH, ST, MT
Mengetahui :
Kepala Sekolah
SMPN 3 Satap Kokop
Kec. Kokop Kab. Bangkalan
IHSANUDIN, S.Pd
NIP. 19700109 199104 1 001
LAPORAN MINGGUAN
Minggu ke :
Pekerjaan : REHABILITASI 2 RUANG BELAJAR SMPN 3 SATAP KOKOP Tanggal :
Nama Sekolah : SMPN 3 SATAP KOKOP KEC. KOKOP KAB. BANGKALAN Bulan :
Lokasi : KEC. KOKOP KAB. BANGKALAN Dana diterima tangal :
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%)
% Prestasi Rerata Prestasi
(1) (2) (3) (4) (5) (6) (7) (8)
(6)/100x(5)
I. PEKERJAAN PERSIAPAN
1 Pembongkaran atap + rangka 260.00 m² 1.70 100 1.70 -
2 Pembongkaran kosen 12.00 bh 0.32 100 0.32 -
3 Pembongkaran dinding 61.75 m² 0.65 100 0.65 -
4 Pembersihan akhir pekerjaan 1.00 ls 0.11 - - -
X. PEKERJAAN LANTAI
1 Keramik lantai 40 x 40 162.00 m² 9.58 - - -
2 Keramik kolom 20 x 40 (motif) 5.60 m² 0.40 - - -
Mengetahui Menyetujui
SMPN 3 Satap Kokop Panitia Pembangunan Sekolah
Kec. Kokop Kab. Bangkalan
Selaku Penanggung Jawab
IHSANUDIN, S.Pd SUHAERI
NIP. 19700109 199104 1 001
REKAPITULASI
NCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI
NO.
I
II
III
IV
V
VI
VII
VIII
IX
X 4
XI OK
XII LAMA
XIII : PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 1 TRAGAH
: SMPN 1 TRAGAH KEC. TRAGAH KAB. BANGKALAN
TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )
PEKERJAAN PERSIAPAN ###
PEKERJAAN TANAH ###
PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA #DIV/0!
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 1 Tragah
Kec. Tragah Kab. Bangkalan
Drs. AMIRULLAH, MM
NIP. 19581217 198603 1 011
NO
1
I.
1
2
3
4
II.
1
2
4
III.
1
2
3
IV.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran atap + rangka 377.00 m² ### ###
V. Pembongkaran kusen 4.00 bh ### ###
1 Penetelan plesteran 159.60 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VI. PEKERJAAN TANAH ###
1 Galian tanah 2.16 m³ ### ###
2 Urugan pasir bawah pondasi t=10cm 0.36 m³ ### ### #DIV/0!
3 Urugan tanah kembali 1.08 m³ ### ###
4 ###
PEKERJAAN PASANGAN/PLESTERAN
VII. Pasangan 1/2 bata camp. 1 Pc : 5 Ps 7.20 m² ### ### ###
1 Plesteran 1Pc : 5Ps 14.40 m² ### ###
2 Benangan 24.00 m' ### ###
3 ###
PEKERJAAN BETON
VIII. Lantai kerja bawah pondasi 1:3:5 t=5cm 0.18 m³ ### ###
1 Pondasi beton stempat 60 x 60 x 15cm 0.54 m³ ### ###
Kolom teras 15/15 0.79 m³ ### ###
IX. Balok beton 15/20 1.71 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ ### ###
X. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Penang (baru) 382.73 m² ### ###
3 Atap genteng (lama bg. belakang) 170.10 m² ### ###
4 Genteng bubungan Karang penang 28.35 m' ### ###
Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' ### ###
XI. ###
1 PEKERJAAN KUSEN PINTU DAN JENDELA
2 Kusen kayu kempas/mahoni 6/15 #DIV/0! m³ Rp - #DIV/0!
3 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 8.61 m² Rp - Rp - #DIV/0!
4 Daun Jendela kaca kayu kempas/mahoni 3/10 8.40 m² Rp - Rp - ###
5 #DIV/0!
6 PEKERJAAN PLAFOND
Plafond calsiboard 4mm + rangka kayu 4/6 294.84 m² ### ###
XII ###
1 PEKERJAAN PENGECATAN
2 Pengecatan dinding (3 Ruang kelas) 598.50 m² ### ###
3 Pengecatan plafond 294.84 m² ### ###
4 Pengecatan kayu 206.70 m² ### ###
5 ###
6 PEKERJAAN LANTAI #DIV/0!
Keramik lantai 40 x 40 245.70 m² ### ###
XIII. Keramik dinding 25 x 40 ( 3 R.kelas + teras ) 159.60 m² ### ###
1 List keramik dinding 7cm 110.40 m² ### ###
Keramik kolom 25 x 40 12.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Engsel Pintu 18.00 bh ### ###
Engsel Jendela 16.00 bh ### ###
Grendel pintu 3.00 bh ### ###
Grendel Jendela 16.00 bh ### ###
Hag Angin 16.00 bh ### ###
###
REKAPITULASI
PEKERJAAN INSTALASI LISTRIK
NCANA ANGGARAN
Lampu BIAYA
SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
KEGI Saklar ganda 3.00 bh ### ###
PEKE Saklar tunggal 3.00 bh ### ###
LING Stop kontak + instalasi 3.00 bh ### ###
LOKA Instalasi titik lampu 15.00 ttk ### ###
###
NO. PEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 11.14 m² ### ###
###
I
II
III
IV
V
VI
VII
VIII
IX
X 4
XI OK
XII BARU
XIII : PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 1 TRAGAH
: SMPN 1 TRAGAH KEC. TRAGAH KAB. BANGKALAN
TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )
PEKERJAAN PERSIAPAN ###
PEKERJAAN TANAH ###
PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA Rp -
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 1 Tragah
Kec. Tragah Kab. Bangkalan
Drs. AMIRULLAH, MM
NIP. 19581217 198603 1 011
NO
1
I.
1
2
3
4
II.
1
2
4
III.
1
2
3
IV.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran atap + rangka 377.00 m² ### ###
V. Pembongkaran kusen 8.00 bh ### ###
1 Penetelan plesteran 249.00 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VI. PEKERJAAN TANAH ###
1 Galian tanah 2.16 m³ ### ###
2 Urugan pasir bawah pondasi t=10cm 0.36 m³ ### ### ###
3 Urugan tanah kembali 1.08 m³ ### ###
###
VII. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 24.02 m² ### ### ###
2 Plesteran 1Pc : 5Ps 48.03 m² ### ###
3 Benangan 168.00 m' ### ###
4 ###
PEKERJAAN BETON
VIII. Lantai kerja bawah pondasi 1:3:5 t=5cm 0.18 m³ ### ###
1 Pondasi beton stempat 60 x 60 x 15cm 0.54 m³ ### ###
Kolom teras 15/15 0.79 m³ ### ###
IX. Balok beton 15/20 1.56 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ ### ###
X. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Penang (baru) 382.73 m² ### ###
3 Genteng bubungan Karang penang 28.35 m' ### ###
4 Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' ### ###
5 ###
PEKERJAAN KUSEN PINTU DAN JENDELA
XI. Kusen kayu kempas/mahoni 6/15 1.09 m³ Rp - Rp -
1 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 8.61 m² Rp - Rp - ###
2 Jalusi kayu kempas/mahoni 3/12 7.20 m² Rp - Rp -
3 Daun Jendela kaca kayu kempas/mahoni 3/10 6.72 m² Rp - Rp - ###
4 Rp -
5 PEKERJAAN PLAFOND
6 Plafond calsiboard 4mm + rangka kayu 4/6 294.84 m² ### ###
###
XII PEKERJAAN PENGECATAN
1 Pengecatan dinding (3 Ruang kelas) 598.50 m² ### ###
2 Pengecatan plafond 294.84 m² ### ###
3 Pengecatan kayu 206.70 m² ### ###
4 ###
5 PEKERJAAN LANTAI ###
6 Keramik lantai 40 x 40 245.70 m² ### ###
Keramik dinding 25 x 40 ( 3 R.kelas + teras ) 173.40 m² ### ###
XIII. List keramik dinding 7cm 132.90 m² ### ###
1 Keramik kolom 25 x 40 12.00 m² ### ###
Keramik dinding 25 x 40 ( 3 R.kelas teras saja ) 75.60 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Engsel Pintu 18.00 bh ### ###
Engsel Jendela 16.00 bh ### ###
Grendel pintu 3.00 bh ### ###
Grendel Jendela 16.00 bh ### ###
Hag Angin 16.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
REKAPITULASI
Lampu SL 8watt (teras) 3.00 bh ### ###
NCANA ANGGARAN BIAYA
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
KEGI Stop kontak + instalasi 3.00 bh ### ###
PEKE Instalasi titik lampu 15.00 ttk ### ###
LINGKUP PEKERJAAN ###
LOKAPEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 11.14 m² ### ###
NO. ###
I
II
III
IV
V
VI
VII
VIII
IX
X 5
XI OK
XII LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 MODUNG
: SMPN 2 MODUNG KEC. MODUNG KAB. BANGKALAN
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Modung
Kec. Modung Kab. Bangkalan
A S U R, M.Pd
NIP. 19610117 198403 1 008
NO
1
I.
1
2
II.
1
2
3
III.
1
2
3
IV.
1
2
Lembar. 2
V. JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
1 2 3 4 5
2 PEKERJAAN PERSIAPAN
3 Pembongkaran atap + rangka 406.00 m² ### ###
4 Pembersihan akhir pekerjaan 1.00 ls ### ### ###
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 98.93 m² ### ###
2 Plesteran 1Pc : 5Ps 197.87 m² ### ###
3 Benangan 166.56 m' ### ###
###
VII. PEKERJAAN BETON
1 Kolom teras 15/15 0.41 m³ ### ###
Balok teras 15/20 1.24 m³ ### ###
VIII. Ring balk gewel 15/15 0.98 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 396.90 m² ### ###
4 Lisplank kalsiplank 8mm / 30 cm 85.70 m¹ ### ###
5 ###
PEKERJAAN ATAP
IX. Pasang atap genteng karang p enang (baru 5%) 19.85 m² ### ###
1 Pasang atap genteng (lama) 377.06 m² ### ###
Genteng bubungan karang penang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 29.00 m' ### ###
1 ###
2 PEKERJAAN KUSEN PINTU DAN JENDELA
3 Kusen kayu kempas/mahoni 6/12 0.46 m³ Rp - Rp -
4 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 6.72 m² Rp - Rp -
5 Daun Jendela kaca kayu kempas/mahoni 3/10 5.04 m² Rp - Rp -
6 Rp -
PEKERJAAN PLAFOND ###
XI. Plafond calsiboard 4mm + rangka hollow 340.20 m² ### ###
1 ###
2 PEKERJAAN PENGECATAN/PLAMIRAN
3 Pengecatan dinding (depan) 66.85 m² ### ###
4 Pelamiran dinding 430.33 m² ### ###
5 Pelamiran plafond 340.20 m² ### ### ###
6 Pengecatan kayu 206.70 m² ### ###
Cat genteng 396.90 m² ### ###
XII. ###
1 PEKERJAAN LANTAI
Lantai rabat 216.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 4.00 bh ### ###
Engsel Pintu 21.00 bh ### ###
Engsel Jendela 24.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Grendel Jendela 12.00 bh ### ### ###
Hag Angin 24.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 14.00 bh ### ###
Lampu SL 8watt (teras) 4.00 bh ### ###
Saklar ganda 7.00 bh ### ###
REKAPITULASI
Saklar tunggal 3.00 bh ### ###
NCANA ANGGARAN BIAYA
Stop kontak + instalasi 4.00 bh ### ###
Instalasi titik lampu 18.00 bh ### ###
KEGIATAN ###
PEKE PEKERJAAN KACA
LING Kaca mati t=5 mm 14.49 m² ### ###
LOKASI ###
NO.
I
II
III
IV
V
VI
VII
VIII
IX
X 5
XI OK
XII BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 MODUNG
: SMPN 2 MODUNG KEC. MODUNG KAB. BANGKALAN
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Modung
Kec. Modung Kab. Bangkalan
A S U R, M.Pd
NIP. 19610117 198403 1 008
NO
1
I.
1
2
II.
1
2
3
III.
1
2
3
IV.
1
2
Lembar. 2
V. JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
1 2 3 4 5
2 PEKERJAAN PERSIAPAN
3 Pembongkaran atap + rangka 406.00 m² ### ###
4 Pembersihan akhir pekerjaan 1.00 ls ### ### ###
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 98.93 m² ### ###
2 Plesteran 1Pc : 5Ps 197.87 m² ### ###
3 Benangan 166.56 m' ### ###
###
VII. PEKERJAAN BETON
1 Kolom teras 15/15 0.41 m³ ### ###
Balok teras 15/20 1.24 m³ ### ###
VIII. Ring balk gewel 15/15 0.98 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 396.90 m² ### ###
4 Lisplank kalsiplank 8mm / 30 cm 85.70 m¹ ### ###
5 ###
PEKERJAAN ATAP
IX. Pasang atap genteng karang p enang (baru 5%) 19.85 m² ### ###
1 Pasang atap genteng (lama) 377.06 m² ### ###
Genteng bubungan karang penang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 29.00 m' ### ###
1 ###
2 PEKERJAAN KUSEN PINTU DAN JENDELA
3 Kusen kayu kempas/mahoni 6/12 0.46 m³ Rp - Rp -
4 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 6.72 m² Rp - Rp -
5 Daun Jendela kaca kayu kempas/mahoni 3/10 5.04 m² Rp - Rp -
6 Rp -
PEKERJAAN PLAFOND ###
XI. Plafond calsiboard 4mm + rangka kayu 4/6 340.20 m² ### ###
1 ###
2 PEKERJAAN PENGECATAN/PLAMIRAN
3 Pengecatan dinding (depan) 66.85 m² ### ###
4 Pelamiran dinding 430.33 m² ### ###
5 Pelamiran plafond 340.20 m² ### ### ###
6 Pengecatan kayu 206.70 m² ### ###
Cat genteng 396.90 m² ### ###
XII. ###
1 PEKERJAAN LANTAI
Lantai rabat 216.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 4.00 bh ### ###
Engsel Pintu 21.00 bh ### ###
Engsel Jendela 24.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Grendel Jendela 12.00 bh ### ### ###
Hag Angin 24.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 14.00 bh ### ###
Lampu SL 8watt (teras) 4.00 bh ### ###
Saklar ganda 7.00 bh ### ###
REKAPITULASI
Saklar tunggal 3.00 bh ### ###
NCANA ANGGARAN BIAYA
Stop kontak + instalasi 4.00 bh ### ###
Instalasi titik lampu 18.00 bh ### ###
KEGIATAN ###
PEKE PEKERJAAN KACA
LING Kaca mati t=5 mm 14.49 m² ### ###
LOKASI ###
NO.
I
II
III
IV
V
VI
VII
VIII
IX
X 6
XI OK
LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 2 LABANG
: SMPN 2 LABANG KEC. LABANG KAB. BANGKALAN
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
ACHMAD TAUFIK HEYKAL, A.Sg H. SUBADRIH, ST, MT
Mengetahui :
Kepala Sekolah
SMPN 2 Labang
Kec. Labang Kab. Bangkalan
NO
1
I.
1
2
3
4
5
II.
1
III.
1
2
IV.
1
2
3 Lembar. 2
JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
V. 2 3 4 5
1 PEKERJAAN PERSIAPAN ###
Pembongkaran atap + rangka 377.00 m² Rp - Rp -
VI. Pembongkaran kosen 1.00 bh ### ###
1 Pembongkaran dinding 6.00 m² ### ###
2 Penetelan plesteran 139.74 m² ### ###
3 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VII. PEKERJAAN PASANGAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps (nyepit kuda2) 30.91 m² Rp - Rp -
2 Rp -
3 PEKERJAAN RANGKA ATAP ###
4 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ Rp - Rp -
VIII. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Pilang (baru) 382.73 m² ### ###
Genteng bubungan Karang pilang 28.35 m' ### ###
IX. Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' Rp - Rp -
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsiboard 4mm + rangka hollow 354.38 m² Rp - Rp -
4 Rp -
5 PEKERJAAN PENGECATAN
6 Pengecatan dinding 598.50 m² Rp - Rp - ###
Pengecatan plafond 354.38 m² Rp - Rp -
X. Pengecatan kayu 274.60 m² Rp - Rp -
1 Rp -
PEKERJAAN LANTAI
XI. Keramik lantai 40 x 40 243.00 m² ### ###
1 Keramik dinding 25 x 40 139.74 m² ### ###
2 List keramik 102.00 m' ### ###
3 Keramik kolom 20 x 40 10.80 m² ### ###
4 ###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA ###
Kaca mati t=5 mm (yg pecah) 4.22 m² ### ###
###
PEKERJAAN TANGGA DEPAN PINTU
Pasangan batu gunung 2.88 m³ ### ###
Plesterran trasram 7.68 m² ### ###
Keramik kasar 40 x 40 7.04 m² ### ###
Urugan pasir 4.96 m³ ### ###
REKAPITULASI ###
NCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI
NO.
I
II
III
IV
V
VI
VII
VIII
IX
X 6
XI OK
XII BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 2 LABANG
: SMPN 2 LABANG KEC. LABANG KAB. BANGKALAN
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Labang
Kec. Labang Kab. Bangkalan
Drs. HARTONO, M.Pd
NIP. 19690126 199802 1 003
NO
1
I.
1
2
3
4
5
II.
1
2
3
III.
1
IV.
1
2 Lembar. 2
JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
V. 2 3 4 5
1 PEKERJAAN PERSIAPAN ###
2 Pembongkaran atap + rangka 377.00 m² Rp - Rp -
3 Pembongkaran kosen 1.00 bh ### ###
Pembongkaran dinding 6.00 m² ### ###
VI. Penetelan plesteran 127.50 m² ### ###
1 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VII. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps (nyepit kuda2) 22.43 m² Rp - Rp - -
2 Plesteran 1Pc : 5Ps 16.20 m² ### ###
3 Benangan 32.00 m' ### ###
###
VIII. PEKERJAAN BETON
1 Ring balk gewel 15/15 0.40 m³ ### ###
2 ###
3 PEKERJAAN RANGKA ATAP ###
4 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ Rp - Rp -
IX. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Pilang (baru) 382.73 m² ### ###
Genteng bubungan Karang pilang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' Rp - Rp -
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsiboard 4mm + rangka hollow 354.38 m² Rp - Rp -
4 Rp -
5 PEKERJAAN PENGECATAN
6 Pengecatan dinding 598.50 m² Rp - Rp - ###
Pengecatan plafond 354.38 m² Rp - Rp -
XI. Pengecatan kayu 274.60 m² Rp - Rp -
1 Rp -
PEKERJAAN LANTAI
XII. Keramik lantai 40 x 40 243.00 m² ### ###
1 Keramik dinding 25 x 40 127.50 m² ### ###
2 List keramik 102.00 m' ### ###
3 Keramik kolom 20 x 40 10.80 m² ### ###
4 ###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Pintu harmonika 15.00 m² ### ### ###
### ###
PEKERJAAN INSTALASI LISTRIK ###
Lampu SL 14 watt 12.00 bh ### ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA ###
Kaca mati t=5 mm (yg pecah) 4.22 m² ### ###
###
PEKERJAAN TANGGA DEPAN PINTU 3.46
Pasangan batu gunung 2.88 m³ ### ###
Plesterran trasram 7.68 m² ### ###
Keramik kasar 40 x 40 7.04 m² ### ###
Urugan pasir 4.96 m³ ### ###
###
REKAPITULASI
NCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI
NO.
I
II
III
IV
V
VI
VII
VIII
IX
X 7
OK
LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 KWANYAR
: SMPN 2 KWANYAR KEC. KWANYAR KAB. BANGKALAN
TERBILANG : ( SERATUS SEMBILAN PULUH TUJUH JUTA DELAPAN RATUS RIBU RUPIAH )
URAIAN PEKERJAAN JUMLAH HARGA
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Kwanyar
Kec. Kwanyar Kab. Bangkalan
RAHMAWATI, M.Pd
NIP. 19700703 199802 2 003
NO
1
I.
1
2
3
4
II.
1
2
III.
1
IV.
1
V.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran kusen 1.00 bh ### ###
VI. Pembongkaran dinding 15.00 m² ### ###
1 Penetelan plesteran 428.64 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 Ls ### ###
3 ###
4 PEKERJAAN PASANGAN/PLESTERAN ###
5 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 0.91 22.20 m² Rp - Rp -
6 Plesteran 1Pc : 5Ps 1.07 44.40 m² Rp - Rp -
Rp -
VII. PEKERJAAN KAYU
1 Lisplank kayu 3/30 cm 4.00 m¹ ### ###
2 ###
3 PEKERJAAN PLAFOND
4 Plafond calsi 1 x 1 + rangka kayu 12.00 m² Rp - Rp -
Rp -
VIII. PEKERJAAN PENGECATAN
1 Pengecatan dinding (3 kelas) 455.30 m² Rp - Rp -
2 Pengecatan plafond 319.00 m² Rp - Rp -
3 Pengecatan kayu 206.70 m² Rp - Rp - ###
4 Pengecatan kayu (Kantor) 214.39 m² Rp - Rp -
5 Rp -
6PEKERJAAN LANTAI 162.00 ###
Keramik lantai 40 x 40 ( 2 R Kelas ) 5.67 126.00 m² ### ###
IX. Keramik lantai 40 x 40 ( Teras ) 1.62 36.00 m² ### ###
1 Keramik dinding 25 x 40 (dalam kelas + teras) 5.78 128.40 m² ### ###
Keramik kolom teras 25 x 40 1.01 22.40 m² ### ###
X. List keramik 1.64 327.80 m' ### ###
1 Keramik dinding 25 x 40 (dalam kantor+R.guru+ t 13.51 300.24 m² ### ###
2 451.04 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 3.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Hag Angin 60.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
REKAPITULASI
PEKERJAAN KACA
NCANA ANGGARAN BIAYA
Kaca mati t=5 mm (yg pecah) 1.68 m² ### ###
###
KEGI PEKERJAAN TEMPAT DUDUK
PEKE Pasangan trasram 0.68 17.00 m² Rp - Rp -
LING Plat beton tempat duduk t=10 cm 0.53 1.02 m³ ### ###
LOKA Keramik tempat duduk 30 x 30 0.46 10.20 m² ### ###
Keramik dinding tempat duduk 25 x 40 1.84 40.80 m² ### ###
NO. 34.71 ###
0.86768 40.80
I
II
III
IV
V
VI
VII
VIII
IX
X 7
OK
BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 KWANYAR
: SMPN 2 KWANYAR KEC. KWANYAR KAB. BANGKALAN
TERBILANG : ( SERATUS SEMBILAN PULUH TUJUH JUTA DELAPAN RATUS RIBU RUPIAH )
URAIAN PEKERJAAN JUMLAH HARGA
PEKERJAAN PERSIAPAN ###
PEKERJAAN PASANGAN/PLESTERAN Rp -
PEKERJAAN KAYU ###
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
PEKERJAAN TEMPAT DUDUK ###
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Kwanyar
Kec. Kwanyar Kab. Bangkalan
RAHMAWATI, M.Pd
NIP. 19700703 199802 2 003
NO
1
I.
1
2
3
4
II.
1
2
III.
1
2
IV.
1
V. Lembar. 2
1 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
2 2 3 4 5
3 PEKERJAAN PERSIAPAN
4 Pembongkaran kusen 1.00 bh ### ###
5 Pembongkaran dinding 15.00 m² ### ###
Penetelan plesteran 428.64 m² ### ###
VI. Pembersihan akhir pekerjaan 1.00 Ls ### ###
1 ###
2 PEKERJAAN PASANGAN/PLESTERAN ###
3 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 22.20 m² Rp - Rp -
4 Plesteran 1Pc : 5Ps 44.40 m² Rp - Rp -
5 Rp -
6 PEKERJAAN KAYU
Perbaikan daun pintu panil 4.00 bh ### ###
VII. Lisplank kayu 3/30 cm 4.00 m¹ ### ###
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsi 1 x 1 + rangka kayu 12.00 m² Rp - Rp -
4 Rp -
PEKERJAAN PENGECATAN
VIII. Pengecatan dinding (3 kelas) 439.90 m² Rp - Rp -
1 Pengecatan dinding (Kantor) 373.40 m² Rp - Rp -
2 Pengecatan plafond 319.00 m² Rp - Rp -
3 Pengecatan kayu 169.45 m² Rp - Rp - ###
4 Pengecatan kayu (Kantor) 197.69 m² Rp - Rp -
5 Rp -
6 PEKERJAAN LANTAI ###
Keramik lantai 40 x 40 ( 2 R Kelas ) 126.00 m² ### ###
IX. Keramik lantai 40 x 40 ( Teras ) 36.00 m² ### ###
1 Keramik dinding 25 x 40 (dalam kelas + teras) 128.40 m² ### ###
Keramik kolom teras 25 x 40 22.40 m² ### ###
X. List keramik 327.80 m' ### ###
1 Keramik dinding 25 x 40 (dalam kantor+R.guru+ teras) 300.24 m² ### ###
2 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 3.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Hag Angin 60.00 bh ### ###
Pintu harmonika 11.30 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK ###
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA
REKAPITULASI
Kaca mati t=5 mm (yg pecah) 1.68 m² ### ###
NCANA ANGGARAN BIAYA ###
PEKERJAAN TEMPAT DUDUK
KEGI Pasangan trasram 17.00 m² Rp - Rp -
PEKE Plat beton tempat duduk t=10 cm 1.02 m³ ### ###
LING Keramik tempat duduk 30 x 30 10.20 m² ### ###
LOKA Keramik dinding tempat duduk 25 x 40 40.80 m² ### ###
###
NO.
I
II
III
IV
V
VI
VII
VIII
IX
8
OK
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Kokop
Kec. Kokop Kab. Bangkalan
II.
1
2
3
III.
1
IV.
1
2
3
V. Lembar. 2
1 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
2 2 3 4 5
3 PEKERJAAN PERSIAPAN
4 Penetelan plesteran 317.46 m² ### ###
5 Pembersihan akhir pekerjaan 1.00 Ls Rp - Rp - #REF!
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 12.25 m² Rp - Rp -
5 Plesteran 1Pc : 5Ps 80.58 m² Rp - Rp -
6 Benangan 55.00 m' Rp - Rp -
7 Rp -
PEKERJAAN PLAFOND
VII. Plafond calsiboard 4mm + rangka kayu 15.00 m² Rp - Rp -
1 Rp -
2 PEKERJAAN PENGECATAN -
3 Pengecatan dinding 506.50 m² Rp - Rp -
4 Pengecatan plafond 352.00 m² Rp - Rp - #DIV/0!
5 Pengecatan kayu 275.60 m² Rp - Rp -
6 Rp -
PEKERJAAN LANTAI ###
VIII. Keramik lantai 40 x 40 243.00 m² ### ### 147.47
1 Keramik dinding 25 x 40 ( 3 R. Kelas + teras) 132.96 m² ### ###
List keramik 288.20 m' ### ###
IX. Keramik kolom 25 x 40 16.00 m² ### ###
1 Keramik dinding 25 x 40 ( 5 R. Kelas bg. dalam) 184.50 m² ### ###
2 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 5.00 bh ### ###
Grendel Jendela 50.00 bh ### ###
Hag Angin 100.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 20.00 bh ### ###
Lampu SL 8watt (teras) 5.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 5.00 bh ### ###
Stop kontak + instalasi 5.00 bh ### ###
Instalasi titik lampu 25.00 ttk ### ###
###
PEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 2.53 m² ### ###
###
PEKERJAAN TEMPAT DUDUK
Pasangan trasram 14.70 m² Rp - Rp -
Plat beton tempat duduk t=10 cm 0.74 m³ ### ###
Keramik tempat duduk 30 x 30 7.35 m² ### ###
Keramik dinding tempat duduk 25 x 40 29.40 m² ### ###
###
BATAS
SINERGI 1 SMPN 2 SEPULU DR. AHMAD SABARUDIN, S.Pd, M.MPd
SINERGI 2 SMPN 1 KLAMPIS IMAM SYAFII, S.Pd, MPd
SINERGI 3 SMPN 2 KOKOP MOHAMMAD TAUFIK, SPd
SINERGI 4 SMPN 3 SATAP KOKOP IHSANUDIN, S.Pd
INDRAKILA 5 SMPN 1 TRAGAH Drs. AMIRULLAH, MM
INDRAKILA 6 SMPN 2 MODUNG A S U R, M.Pd
INDRAKILA 7 SMPN 2 LABANG Drs. HARTONO, M.Pd
INDRAKILA 8 SMPN 2 KWANYAR RAHMAWATI, M.Pd
9 SMPN TAHAL AMIN H. ABDULLAH, S.Pd
10 SMPN 1 MODUNG Drs. ALI MUSTOFA, M.Pd
11 SMPN 1 GALIS Drs. TAUFIKUR RAHMAN
12 SMPN 1 KOKOP BUDIONO, S.Pd, M.Pd
28.5
23.5
7.833333
1 ( Satu )
5 Oktob. s/d 10 Oktober 2015
Oktober 2015
29 Oktober 2015
Rp. 212.320.000.00
Prestasi Pekerjaan Prestasi Pekerjaan
Minggu Ini (%) Komulatif (%)
Rerata Prestasi Rerata
(9) (10) (11)
(8)/100x(5) (6)+(8) (7)+(9)
- - - Rp 88,586.67 Rp 1,638,853.33
- - - Rp 42,298.80 Rp 1,565,055.60
- - - Rp - Rp -
Rp 3,203,908.93
- - - Rp 3,912,550.00 Rp 234,753.00
- - - Rp 3,962,550.00 Rp 114,121.44
- - - Rp 3,962,550.00 Rp 1,027,092.96
- - - Rp 3,962,550.00 Rp 1,255,335.84
Rp 2,631,303.24
- - - Rp 185,000.00 Rp 25,849,125.00
- - - Rp 185,000.00 Rp 21,929,437.50
- - - Rp 65,000.00 Rp 3,100,500.00
Rp 50,879,062.50
- - - Rp 18,000.00 Rp 2,515,050.00
- - - Rp 110,000.00 Rp 26,078,250.00
- - - Rp 95,820.00 Rp 2,558,394.00
- - - Rp 21,149.40 Rp 1,184,366.40
Rp 32,336,060.40
- - - Rp 85,000.00 Rp 22,185,000.00
Rp 22,185,000.00
- - - Rp 20,740.00 Rp 10,805,637.48
- - - Rp 20,740.00 Rp 5,413,140.00
- - - Rp 42,450.00 Rp 4,752,702.00
Rp 20,971,479.48
- - - Rp 105,250.00 Rp 3,315,375.00
- - - Rp 112,000.00 Rp 16,800,000.00
- - - Rp 136,075.00 Rp 12,540,672.00
- - - Rp 85,000.00 Rp 6,528,000.00
Rp 39,184,047.00
- - - Rp 55,000.00 Rp 660,000.00
- - - Rp 50,000.00 Rp 150,000.00
- - - Rp 20,000.00 Rp 80,000.00
- - - Rp 15,000.00 Rp 75,000.00
- - - Rp 225,000.00 Rp 1,125,000.00
Rp 200,000.00 Rp 3,000,000.00
Rp 5,090,000.00
- - - Rp 112,125.00 Rp 376,964.25
Rp 376,964.25
2.95 2.95
Rp 20,300,000.00 2.95 %
1 ( Satu )
5 Oktob. s/d 10 Oktober 2015
Oktober 2015
29 Oktober 2015
- - - Rp 58,500.00 Rp 126,360.00
- - - Rp 215,400.00 Rp 77,544.00
- - - Rp 16,110.00 Rp 17,398.80
Rp 221,302.80
- - - Rp 88,586.67 Rp 3,790,281.61
- - - Rp 42,298.80 Rp 3,619,604.84
- - - Rp 11,825.00 Rp 3,651,560.00
Rp 11,061,446.45
- - - Rp 897,800.00 Rp 161,604.00
- - - Rp 3,962,550.00 Rp 2,139,777.00
- - - Rp 3,962,550.00 Rp 3,120,508.13
- - - Rp 3,962,550.00 Rp 5,943,825.00
- - - Rp 3,962,550.00 Rp 9,510,120.00
- - - Rp 3,962,550.00 Rp 941,501.88
Rp 21,817,336.01
- - - Rp 210,000.00 Rp 77,723,100.00
- - - Rp 65,000.00 Rp 5,063,500.00
Rp 82,786,600.00
- - - Rp 80,500.00 Rp 16,325,400.00
- - - Rp 18,000.00 Rp 3,011,580.00
- - - Rp 95,820.00 Rp 2,429,037.00
- - - Rp 21,149.40 Rp 617,562.48
Rp 22,383,579.48
- - - Rp 11,431,250.00 Rp 14,644,117.13
- - - Rp 618,250.00 Rp 5,375,065.50
- - - Rp 430,475.00 Rp 7,148,037.38
- - - Rp 419,572.50 Rp 4,833,475.20
Rp 32,000,695.20
- - - Rp 85,000.00 Rp 25,857,000.00
Rp 25,857,000.00
- - - Rp 20,740.00 Rp 12,412,890.00
- - - Rp 20,740.00 Rp 6,309,108.00
- - - Rp 42,450.00 Rp 8,774,415.00
Rp 27,496,413.00
- - - Rp 112,000.00 Rp 26,880,000.00
- - - Rp 136,075.00 Rp 17,662,535.00
- - - Rp 136,075.00 Rp 870,880.00
- - - Rp 85,000.00 Rp 10,115,000.00
Rp 55,528,415.00
- - - Rp 140,750.00 Rp 422,250.00
- - - Rp 23,625.00 Rp 425,250.00
- - - Rp 16,687.50 Rp 267,000.00
- - - Rp 74,250.00 Rp 222,750.00
- - - Rp 14,750.00 Rp 236,000.00
- - - Rp 17,750.00 Rp 284,000.00
Rp 1,857,250.00
- - - Rp 55,000.00 Rp 660,000.00
- - - Rp 50,000.00 Rp 150,000.00
- - - Rp 20,000.00 Rp 60,000.00
- - - Rp 15,000.00 Rp 45,000.00
- - - Rp 225,000.00 Rp 675,000.00
- - - Rp 200,000.00 Rp 3,000,000.00
Rp 4,590,000.00
- - - Rp 112,125.00 Rp 3,038,587.50
Rp 3,038,587.50
0.28 -
Rp 20,300,000.00 - %
1 ( Satu )
5 Oktob. s/d 10 Oktober 2015
Oktober 2015
29 Oktober 2015
- - - Rp 210,000.00 Rp 53,841,375.00
- - - Rp 65,000.00 Rp 4,238,000.00
Rp 58,079,375.00
- - - Rp 80,500.00 Rp 15,344,910.00
- - - Rp 18,000.00 Rp 2,002,725.00
- - - Rp 95,820.00 Rp 1,854,117.00
- - - Rp 21,149.40 Rp 560,459.10
Rp 19,762,211.10
- - - Rp 85,000.00 Rp 17,105,400.00
Rp 17,105,400.00
- - - Rp 20,740.00 Rp 1,119,960.00
- - - Rp 9,670.00 Rp 3,331,315.00
- - - Rp 9,670.00 Rp 1,945,990.80
- - - Rp 42,450.00 Rp 830,322.00
Rp 7,227,587.80
- - - Rp 112,000.00 Rp 18,144,000.00
- - - Rp 136,075.00 Rp 762,020.00
Rp 18,906,020.00
- - - Rp 140,750.00 Rp 281,500.00
- - - Rp 23,625.00 Rp 283,500.00
- - - Rp 16,687.50 Rp 267,000.00
- - - Rp 74,250.00 Rp 148,500.00
- - - Rp 14,750.00 Rp 236,000.00
- - - Rp 17,750.00 Rp 284,000.00
Rp 1,500,500.00
- - - Rp 55,000.00 Rp 440,000.00
- - - Rp 50,000.00 Rp 100,000.00
- - - Rp 20,000.00 Rp 40,000.00
- - - Rp 15,000.00 Rp 30,000.00
- - - Rp 225,000.00 Rp 450,000.00
- - - Rp 200,000.00 Rp 2,000,000.00
Rp 3,060,000.00
- - - Rp 112,125.00 Rp 2,318,745.00
Rp 2,318,745.00
6.02 17.33
Rp 32,819,000.00 17.33 %
LAMA
140
BARU
LAMA
BARU
LAMA
BARU
LAMA
BARU
keramik tambal sulam
SADALI, S.Pd
UBAGIO, M.Pd
NDAYANI, M.Pd
1 2 3 4 5
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
1.01 100 1.01 100 1.01 100 1.01 100 1.01 100
0.11 - - - - - - - - -
0.90 - - 100 0.90 100 0.90 100 0.90 100
0.86 - - - - 100 0.86 100 0.86 100
- - - - - 100 - 100 - 100
14.17 - - - - - - - - -
12.02 - - - - - - - - -
1.70 - - - - - - - - -
1.38 - - - - - - - - -
14.29 - - - - - - - - -
1.40 - - - - - - - - -
0.65 - - - - - - - - -
12.16 - - - - - - - - -
5.92 - - - - - - - - -
2.97 - - - - - - - - -
2.61 - - - - - - - - -
1.82 - - - - - - - - -
9.21 - - - - - - - - -
6.87 - - - - - - - - -
3.58 - - - - - - - - -
0.36 - - - - - - - - -
0.08 - - - - - - - - -
0.04 - - - - - - - - -
0.04 - - - - - - - - -
0.62 - - - - - - - - -
1.64 - - - - - - - - -
0.21 - - - - - - - - -
1 2 3 4 5
0.20 100 0.20 100 0.20 100 0.20 100 0.20 100
0.08 100 0.08 100 0.08 100 0.08 100 0.08 100
0.07 - - - - - - - - -
0.05 - - - - - - 25 0.01 50
0.70 - - - - - - - - 50
1.02 - - - - - - - - -
1.95 - - - - - - - - -
3.12 - - - - - - - - 50
0.31 - - - - - - - - 75
25.51 - - - - - - - - -
1.66 - - - - - - - - -
5.36 - - - - - - - - -
0.99 - - - - - - - - -
0.80 - - - - - - - - -
0.20 - - - - - - - - -
4.81 - - - - - - - - 50
1.76 - - - - - - - - -
2.35 - - - - - - - - -
1.59 - - - - - - - - -
8.49 - - - - - - - - -
4.07 - - - - - - - - -
2.07 - - - - - - - - -
2.88 - - - - - - - - -
8.82 - - - - - - - - -
5.80 - - - - - - - - -
0.29 - - - - - - - - -
3.32 - - - - - - - - -
0.14 - - - - - - - - -
0.14 - - - - - - - - -
0.09 - - - - - - - - -
0.07 - - - - - - - - -
0.08 - - - - - - - - -
0.09 - - - - - - - - -
0.22 - - - - - - - - -
0.05 - - - - - - - - -
0.02 - - - - - - - - -
0.01 - - - - - - - - -
0.22 - - - - - - - - -
0.98 - - - - - - - - -
1.00 - - - - - - - - -
1 2 3 4 5
1.70 100 1.70 100 1.70 100 1.70 100 1.70 100
0.32 100 0.32 100 0.32 100 0.32 100 0.32 100
0.65 100 0.65 100 0.65 100 0.65 100 0.65 100
0.11 - - - - - - - - -
0.05 100 0.05 100 0.05 100 0.05 100 0.05 100
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100
0.01 50 0.00 100 0.01 100 0.01 100 0.01 100
8.10 - - - - - - - - -
1.06 - - - - - - - - -
0.98 - - - - - - - - -
0.30 - - - - - - - - -
9.03 - - - - - - - - -
0.59 - - - - - - - - -
1.76 - - - - - - - - -
1.03 - - - - - - - - 75
0.44 - - - - - - - - -
9.58 - - - - - - - - -
0.40 - - - - - - - - -
0.15 - - - - - - - - -
0.15 - - - - - - - - -
0.14 - - - - - - - - -
0.08 - - - - - - - - -
0.12 - - - - - - - - -
0.15 - - - - - - - - -
0.23 - - - - - - - - -
0.05 - - - - - - - - -
0.02 - - - - - - - - -
0.02 - - - - - - - - -
0.24 - - - - - - - - -
1.06 - - - - - - - - -
1.22 - - - - - - - - -
6 7 8 9 10
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
1.01 100 1.01 100 1.01 100 1.01 100 1.01 100
- - - - - - - 100 0.11 100
0.90 100 0.90 100 0.90 100 0.90 100 0.90 100
0.86 100 0.86 100 0.86 100 0.86 100 0.86 100
- 100 - 100 - 100 - 100 - 100
0.13 100 0.13 100 0.13 100 0.13 100 0.13 100
0.06 100 0.06 100 0.06 100 0.06 100 0.06 100
0.56 100 0.56 100 0.56 100 0.56 100 0.56 100
0.34 100 0.69 100 0.69 100 0.69 100 0.69 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
6 7 8 9 10
0.20 100 0.20 100 0.20 100 0.20 100 0.20 100
0.08 100 0.08 100 0.08 100 0.08 100 0.08 100
- - - - - - - - - 100
0.04 100 0.04 100 0.04 100 0.04 100 0.04 100
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100
0.01 100 0.01 100 0.01 100 0.01 100 0.01 100
1.24 100 1.24 100 1.24 100 1.24 100 1.24 100
1.19 100 1.19 100 1.19 100 1.19 100 1.19 100
1.20 100 1.20 100 1.20 100 1.20 100 1.20 100
0.03 100 0.05 100 0.05 100 0.05 100 0.05 100
0.35 100 0.70 100 0.70 100 0.70 100 0.70 100
- 50 0.51 100 1.02 100 1.02 100 1.02 100
- 50 0.98 100 1.95 100 1.95 100 1.95 100
1.56 75 2.34 100 3.12 100 3.12 100 3.12 100
0.23 100 0.31 100 0.31 100 0.31 100 0.31 100
2.40 100 4.81 100 4.81 100 4.81 100 4.81 100
- - - - - - - 100 1.76 100
- - - - - - - 100 2.35 100
- - - - - 50 0.79 100 1.59 100
- - - - - - - 50 4.24 100
- - - - - - - 75 6.62 100
- - - - - - - 50 2.90 100
- - - - - - - 50 0.14 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
1.70 100 1.70 100 1.70 100 1.70 100 1.70 100
0.32 100 0.32 100 0.32 100 0.32 100 0.32 100
0.65 100 0.65 100 0.65 100 0.65 100 0.65 100
- - - - - - - - - 100
0.05 100 0.05 100 0.05 100 0.05 100 0.05 100
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100
0.01 100 0.01 100 0.01 100 0.01 100 0.01 100
4.29 100 4.29 100 4.29 100 4.29 100 4.29 100
4.10 100 4.10 100 4.10 100 4.10 100 4.10 100
1.08 100 1.08 100 1.08 100 1.08 100 1.08 100
0.15 100 0.15 100 0.15 100 0.15 100 0.15 100
0.79 100 0.79 100 0.79 100 0.79 100 0.79 100
0.74 100 0.99 100 0.99 100 0.99 100 0.99 100
- 100 2.23 100 2.23 100 2.23 100 2.23 100
- 100 2.64 100 2.64 100 2.64 100 2.64 100
- 100 1.17 100 1.17 100 1.17 100 1.17 100
- 25 7.11 100 28.43 100 28.43 100 28.43 100
- - - 100 2.24 100 2.24 100 2.24 100
5.81 100 5.81 100 5.81 100 5.81 100 5.81 100
4.22 100 4.22 100 4.22 100 4.22 100 4.22 100
2.11 100 2.11 100 2.11 100 2.11 100 2.11 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
0.97
0.97
1.01
0.11
0.90
0.86
-
0.13
0.06
0.56
0.69
14.17
12.02
1.70
1.38
14.29
1.40
0.65
12.16
5.92
2.97
2.61
1.82
9.21
6.87
3.58
0.36
0.08
0.04
0.04
0.62
1.64
0.21
0.20
0.08
0.07
0.04
0.03
0.01
1.24
1.19
1.20
0.05
0.70
1.02
1.95
3.12
0.31
25.51
1.66
5.36
0.99
0.80
0.20
4.81
1.76
2.35
1.59
8.49
4.07
2.07
2.88
8.82
5.80
0.29
3.32
0.14
0.14
0.09
0.07
0.08
0.09
0.22
0.05
0.02
0.01
0.22
0.98
1.00
1.70
0.32
0.65
0.11
0.05
0.03
0.01
4.29
4.10
1.08
0.15
0.79
0.99
2.23
2.64
1.17
28.43
2.24
8.10
1.06
0.98
0.30
5.81
4.22
2.11
9.03
0.59
1.76
1.03
0.44
9.58
0.40
0.15
0.15
0.14
0.08
0.12
0.15
0.23
0.05
0.02
0.02
0.24
1.06
1.22
YANG DIPAKAI
TH. 2018
1 SMPN 2 SEPULU 2 KELAS ### SINERGI
2 SMPN 1 KLAMPIS 3 KELAS ### SINERGI
3 SMPN 2 KOKOP 2 KELAS ### SINERGI
4 SMPN 3 SATAP KOKOP 2 KELAS ### SINERGI
5 SMPN 1 TRAGAH 3 KELAS ### INDRAKILA
6 SMPN 2 MODUNG 2 KELAS ### INDRAKILA
7 SMPN 2 LABANG 3 KELAS ### INDRAKILA
8 SMPN 2 KWANYAR 2 KELAS ### INDRAKILA
9 SMPN TAHAL AMIN H. ABDULLAH, S.Pd
REKAPITULASI 1
RENCANA ANGGARAN BIAYA OK
OK
KEGIATAN : PENGADAAN SARANA PRASARANA
PEKERJAAN : PERENCANAAN SMP KABUPATEN BANGKALAN
LINGKUP PEKERJAAN : REHABILITASI 2 RUANG BELAJAR SMPN 2 SEPULU
LOKASI : SMPN 2 SEPULU KEC. SEPULU KAB. BANGKALAN
JUMLAH ###
DIBULATK ### ###
###
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Sepulu
Kec. Sepulu Kab. Bangkalan
LAPORAN MINGGUAN
Minggu ke :
Pekerjaan : REHABILITASI 2 RUANG KELAS SMPN 2 SEPULU Tanggal :
Nama Sekolah : SMPN 2 SEPULU Bulan :
Lokasi : Kec. Kedamean Kab. Gresik Dana diterima tangal :
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%)
% Prestasi Rerata Prestasi
(1) (2) (3) (4) (5) (6) (7) (8)
(6)/100x(5)
I. PEKERJAAN PERSIAPAN
1 Pembongkaran atap + rangka atap 143.00 m² 0.97 - - 100
2 Pembongkaran atap 234.90 m² 0.97 - - 100
3 Penetelan plesteran 92.16 m² 1.01 - - 100
4 Pembersihan akhir pekerjaan 1.00 ls 0.11 - - -
II. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 18.50 m² 0.90 - - -
2 Plesteran 1Pc : 5Ps 37.00 m² 0.86 - - -
3 Benangan 48.00 m' - - - -
V. PEKERJAAN ATAP
1 Atap genteng beton (lama) 139.73 m² 1.38 - - -
2 Atap genteng beton warna 237.08 m² 14.29 - - -
3 Genteng bubungan beton warna 26.70 m' 1.40 - - -
4 Plesteran kompres L = 10 cm (Akhiran genting) 56.00 m' 0.65 - - -
JUMLAH 100.00 -
Jumlah dana yang digunakan sampai dengan minggu ini ( minggu ke 1 ) Rp 20,300,000.00
REKAPITULASI 2
RENCANA ANGGARAN BIAYA OK
I (2) ###
II PEKERJAAN TANAH ###
III PEKERJAAN PASANGAN/PLESTERAN ###
IV PEKERJAAN BETON ###
V PEKERJAAN RANGKA ATAP ###
VI PEKERJAAN ATAP ###
VII PEKERJAAN KUSEN PINTU DAN JENDELA ###
VIII PEKERJAAN PLAFOND ###
IX PEKERJAAN PENGECATAN/PLAMIRAN ###
X PEKERJAAN LANTAI ###
XI PEKERJAAN KUNCI + PENGGANTUNG ###
XII PEKERJAAN INSTALASI LISTRIK ### ###
XIII PEKERJAAN KACA ###
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 1 Kelampis
Kec. Kelampis Kab. Bangkalan
LAPORAN MINGGUAN
Minggu ke :
Pekerjaan : REHABILITASI 2 RUANG KELAS SMPN 1 KLAMPIS Tanggal :
Nama Sekolah : SMPN 1 KLAMPIS Bulan :
Lokasi : Kec. Kedamean Kab. Gresik Dana diterima tangal :
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%)
% Prestasi Rerata Prestasi
(1) (2) (3) (4) (5) (6) (7) (8)
I. PEKERJAAN PERSIAPAN (6)/100x(5)
1 Pembongkaran kosen 12.00 bh 0.20 - - 100
2 Penetelan plesteran 12.00 m² 0.08 - - 100
3 Pembersihan akhir pekerjaan 1.00 ls 0.07 - - -
X. PEKERJAAN LANTAI
1 Keramik lantai 40 x 40 240.00 m² 8.82 - - -
2 Keramik dinding 25 x 40 129.80 m² 5.80 - - -
3 Keramik kolom 25 x 40 6.40 m² 0.29 - - -
4 List keramik 119.00 m' 3.32 - - -
JUMLAH 95.07 -
Jumlah dana yang digunakan sampai dengan minggu ini ( minggu ke 1 ) Rp 20,300,000.00
3
REKAPITULASI OK
NCANA ANGGARAN BIAYA OK
: PENGADAAN SARANA PRASARANA
KEGIATAN : PERENCANAAN SMP KABUPATEN BANGKALAN
PEKERJAAN : REHABILITASI 2 RUANG BELAJAR SMPN 3 SATAP KOKOP
LINGKUP PEKERJAAN : SMPN 3 SATAP KOKOP KEC. KOKOP KAB. BANGKALAN
LOKASI
URAIAN PEKERJAAN JUMLAH HARGA
NO.
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
H. SUBADRIH, ST, MT
Mengetahui :
Kepala Sekolah
SMPN 3 Satap Kokop
Kec. Kokop Kab. Bangkalan
IHSANUDIN, S.Pd
NIP. 19700109 199104 1 001
LAPORAN MINGGUAN
Minggu ke :
Pekerjaan : REHABILITASI 2 RUANG BELAJAR SMPN 3 SATAP KOKOP Tanggal :
Nama Sekolah : SMPN 3 SATAP KOKOP KEC. KOKOP KAB. BANGKALAN Bulan :
Lokasi : KEC. KOKOP KAB. BANGKALAN Dana diterima tangal :
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%)
% Prestasi Rerata Prestasi
(1) (2) (3) (4) (5) (6) (7) (8)
(6)/100x(5)
I. PEKERJAAN PERSIAPAN
1 Pembongkaran atap + rangka 260.00 m² 1.70 100 1.70 -
2 Pembongkaran kosen 12.00 bh 0.32 100 0.32 -
3 Pembongkaran dinding 61.75 m² 0.65 100 0.65 -
4 Pembersihan akhir pekerjaan 1.00 ls 0.11 - - -
X. PEKERJAAN LANTAI
1 Keramik lantai 40 x 40 162.00 m² 9.58 - - -
2 Keramik kolom 20 x 40 (motif) 5.60 m² 0.40 - - -
Mengetahui Menyetujui
SMPN 3 Satap Kokop Panitia Pembangunan Sekolah
Kec. Kokop Kab. Bangkalan
Selaku Penanggung Jawab
IHSANUDIN, S.Pd SUHAERI
NIP. 19700109 199104 1 001
REKAPITULASI
NCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI
NO.
I
II
III
IV
V
VI
VII
VIII
IX
X 4
XI OK
XII LAMA
XIII : PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 1 TRAGAH
: SMPN 1 TRAGAH KEC. TRAGAH KAB. BANGKALAN
TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )
PEKERJAAN PERSIAPAN ###
PEKERJAAN TANAH ###
PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA #DIV/0!
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 1 Tragah
Kec. Tragah Kab. Bangkalan
Drs. AMIRULLAH, MM
NIP. 19581217 198603 1 011
NO
1
I.
1
2
3
4
II.
1
2
4
III.
1
2
3
IV.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran atap + rangka 377.00 m² ### ###
V. Pembongkaran kusen 4.00 bh ### ###
1 Penetelan plesteran 159.60 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VI. PEKERJAAN TANAH ###
1 Galian tanah 2.16 m³ ### ###
2 Urugan pasir bawah pondasi t=10cm 0.36 m³ ### ### #DIV/0!
3 Urugan tanah kembali 1.08 m³ ### ###
4 ###
PEKERJAAN PASANGAN/PLESTERAN
VII. Pasangan 1/2 bata camp. 1 Pc : 5 Ps 7.20 m² ### ### ###
1 Plesteran 1Pc : 5Ps 14.40 m² ### ###
2 Benangan 24.00 m' ### ###
3 ###
PEKERJAAN BETON
VIII. Lantai kerja bawah pondasi 1:3:5 t=5cm 0.18 m³ ### ###
1 Pondasi beton stempat 60 x 60 x 15cm 0.54 m³ ### ###
Kolom teras 15/15 0.79 m³ ### ###
IX. Balok beton 15/20 1.71 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ ### ###
X. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Penang (baru) 382.73 m² ### ###
3 Atap genteng (lama bg. belakang) 170.10 m² ### ###
4 Genteng bubungan Karang penang 28.35 m' ### ###
Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' ### ###
XI. ###
1 PEKERJAAN KUSEN PINTU DAN JENDELA
2 Kusen kayu kempas/mahoni 6/15 #DIV/0! m³ Rp - #DIV/0!
3 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 8.61 m² Rp - Rp - #DIV/0!
4 Daun Jendela kaca kayu kempas/mahoni 3/10 8.40 m² Rp - Rp - ###
5 #DIV/0!
6 PEKERJAAN PLAFOND
Plafond calsiboard 4mm + rangka kayu 4/6 294.84 m² ### ###
XII ###
1 PEKERJAAN PENGECATAN
2 Pengecatan dinding (3 Ruang kelas) 598.50 m² ### ###
3 Pengecatan plafond 294.84 m² ### ###
4 Pengecatan kayu 206.70 m² ### ###
5 ###
6 PEKERJAAN LANTAI #DIV/0!
Keramik lantai 40 x 40 245.70 m² ### ###
XIII. Keramik dinding 25 x 40 ( 3 R.kelas + teras ) 159.60 m² ### ###
1 List keramik dinding 7cm 110.40 m² ### ###
Keramik kolom 25 x 40 12.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Engsel Pintu 18.00 bh ### ###
Engsel Jendela 16.00 bh ### ###
Grendel pintu 3.00 bh ### ###
Grendel Jendela 16.00 bh ### ###
Hag Angin 16.00 bh ### ###
###
REKAPITULASI
PEKERJAAN INSTALASI LISTRIK
NCANA ANGGARAN
Lampu BIAYA
SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
KEGI Saklar ganda 3.00 bh ### ###
PEKE Saklar tunggal 3.00 bh ### ###
LING Stop kontak + instalasi 3.00 bh ### ###
LOKA Instalasi titik lampu 15.00 ttk ### ###
###
NO. PEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 11.14 m² ### ###
###
I
II
III
IV
V
VI
VII
VIII
IX
X 4
XI OK
XII BARU
XIII : PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 1 TRAGAH
: SMPN 1 TRAGAH KEC. TRAGAH KAB. BANGKALAN
TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )
PEKERJAAN PERSIAPAN ###
PEKERJAAN TANAH ###
PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA Rp -
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 1 Tragah
Kec. Tragah Kab. Bangkalan
Drs. AMIRULLAH, MM
NIP. 19581217 198603 1 011
NO
1
I.
1
2
3
4
II.
1
2
4
III.
1
2
3
IV.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran atap + rangka 377.00 m² ### ###
V. Pembongkaran kusen 8.00 bh ### ###
1 Penetelan plesteran 249.00 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VI. PEKERJAAN TANAH ###
1 Galian tanah 2.16 m³ ### ###
2 Urugan pasir bawah pondasi t=10cm 0.36 m³ ### ### ###
3 Urugan tanah kembali 1.08 m³ ### ###
###
VII. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 24.02 m² ### ### ###
2 Plesteran 1Pc : 5Ps 48.03 m² ### ###
3 Benangan 168.00 m' ### ###
4 ###
PEKERJAAN BETON
VIII. Lantai kerja bawah pondasi 1:3:5 t=5cm 0.18 m³ ### ###
1 Pondasi beton stempat 60 x 60 x 15cm 0.54 m³ ### ###
Kolom teras 15/15 0.79 m³ ### ###
IX. Balok beton 15/20 1.56 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ ### ###
X. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Penang (baru) 382.73 m² ### ###
3 Genteng bubungan Karang penang 28.35 m' ### ###
4 Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' ### ###
5 ###
PEKERJAAN KUSEN PINTU DAN JENDELA
XI. Kusen kayu kempas/mahoni 6/15 1.09 m³ Rp - Rp -
1 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 8.61 m² Rp - Rp - ###
2 Jalusi kayu kempas/mahoni 3/12 7.20 m² Rp - Rp -
3 Daun Jendela kaca kayu kempas/mahoni 3/10 6.72 m² Rp - Rp - ###
4 Rp -
5 PEKERJAAN PLAFOND
6 Plafond calsiboard 4mm + rangka kayu 4/6 294.84 m² ### ###
###
XII PEKERJAAN PENGECATAN
1 Pengecatan dinding (3 Ruang kelas) 598.50 m² ### ###
2 Pengecatan plafond 294.84 m² ### ###
3 Pengecatan kayu 206.70 m² ### ###
4 ###
5 PEKERJAAN LANTAI ###
6 Keramik lantai 40 x 40 245.70 m² ### ###
Keramik dinding 25 x 40 ( 3 R.kelas + teras ) 173.40 m² ### ###
XIII. List keramik dinding 7cm 132.90 m² ### ###
1 Keramik kolom 25 x 40 12.00 m² ### ###
Keramik dinding 25 x 40 ( 3 R.kelas teras saja ) 75.60 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Engsel Pintu 18.00 bh ### ###
Engsel Jendela 16.00 bh ### ###
Grendel pintu 3.00 bh ### ###
Grendel Jendela 16.00 bh ### ###
Hag Angin 16.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
REKAPITULASI
Lampu SL 8watt (teras) 3.00 bh ### ###
NCANA ANGGARAN BIAYA
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
KEGI Stop kontak + instalasi 3.00 bh ### ###
PEKE Instalasi titik lampu 15.00 ttk ### ###
LINGKUP PEKERJAAN ###
LOKAPEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 11.14 m² ### ###
NO. ###
I
II
III
IV
V
VI
VII
VIII
IX
X 5
XI OK
XII LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 MODUNG
: SMPN 2 MODUNG KEC. MODUNG KAB. BANGKALAN
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Modung
Kec. Modung Kab. Bangkalan
A S U R, M.Pd
NIP. 19610117 198403 1 008
NO
1
I.
1
2
II.
1
2
3
III.
1
2
3
IV.
1
2
Lembar. 2
V. JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
1 2 3 4 5
2 PEKERJAAN PERSIAPAN
3 Pembongkaran atap + rangka 406.00 m² ### ###
4 Pembersihan akhir pekerjaan 1.00 ls ### ### ###
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 98.93 m² ### ###
2 Plesteran 1Pc : 5Ps 197.87 m² ### ###
3 Benangan 166.56 m' ### ###
###
VII. PEKERJAAN BETON
1 Kolom teras 15/15 0.41 m³ ### ###
Balok teras 15/20 1.24 m³ ### ###
VIII. Ring balk gewel 15/15 0.98 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 396.90 m² ### ###
4 Lisplank kalsiplank 8mm / 30 cm 85.70 m¹ ### ###
5 ###
PEKERJAAN ATAP
IX. Pasang atap genteng karang p enang (baru 5%) 19.85 m² ### ###
1 Pasang atap genteng (lama) 377.06 m² ### ###
Genteng bubungan karang penang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 29.00 m' ### ###
1 ###
2 PEKERJAAN KUSEN PINTU DAN JENDELA
3 Kusen kayu kempas/mahoni 6/12 0.46 m³ Rp - Rp -
4 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 6.72 m² Rp - Rp -
5 Daun Jendela kaca kayu kempas/mahoni 3/10 5.04 m² Rp - Rp -
6 Rp -
PEKERJAAN PLAFOND ###
XI. Plafond calsiboard 4mm + rangka hollow 340.20 m² ### ###
1 ###
2 PEKERJAAN PENGECATAN/PLAMIRAN
3 Pengecatan dinding (depan) 66.85 m² ### ###
4 Pelamiran dinding 430.33 m² ### ###
5 Pelamiran plafond 340.20 m² ### ### ###
6 Pengecatan kayu 206.70 m² ### ###
Cat genteng 396.90 m² ### ###
XII. ###
1 PEKERJAAN LANTAI
Lantai rabat 216.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 4.00 bh ### ###
Engsel Pintu 21.00 bh ### ###
Engsel Jendela 24.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Grendel Jendela 12.00 bh ### ### ###
Hag Angin 24.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 14.00 bh ### ###
Lampu SL 8watt (teras) 4.00 bh ### ###
Saklar ganda 7.00 bh ### ###
REKAPITULASI
Saklar tunggal 3.00 bh ### ###
NCANA ANGGARAN BIAYA
Stop kontak + instalasi 4.00 bh ### ###
Instalasi titik lampu 18.00 bh ### ###
KEGIATAN ###
PEKE PEKERJAAN KACA
LING Kaca mati t=5 mm 14.49 m² ### ###
LOKASI ###
NO.
I
II
III
IV
V
VI
VII
VIII
IX
X 5
XI OK
XII BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 MODUNG
: SMPN 2 MODUNG KEC. MODUNG KAB. BANGKALAN
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Modung
Kec. Modung Kab. Bangkalan
A S U R, M.Pd
NIP. 19610117 198403 1 008
NO
1
I.
1
2
II.
1
2
3
III.
1
2
3
IV.
1
2
Lembar. 2
V. JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
1 2 3 4 5
2 PEKERJAAN PERSIAPAN
3 Pembongkaran atap + rangka 406.00 m² ### ###
4 Pembersihan akhir pekerjaan 1.00 ls ### ### ###
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 98.93 m² ### ###
2 Plesteran 1Pc : 5Ps 197.87 m² ### ###
3 Benangan 166.56 m' ### ###
###
VII. PEKERJAAN BETON
1 Kolom teras 15/15 0.41 m³ ### ###
Balok teras 15/20 1.24 m³ ### ###
VIII. Ring balk gewel 15/15 0.98 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 396.90 m² ### ###
4 Lisplank kalsiplank 8mm / 30 cm 85.70 m¹ ### ###
5 ###
PEKERJAAN ATAP
IX. Pasang atap genteng karang p enang (baru 5%) 19.85 m² ### ###
1 Pasang atap genteng (lama) 377.06 m² ### ###
Genteng bubungan karang penang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 29.00 m' ### ###
1 ###
2 PEKERJAAN KUSEN PINTU DAN JENDELA
3 Kusen kayu kempas/mahoni 6/12 0.46 m³ Rp - Rp -
4 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 6.72 m² Rp - Rp -
5 Daun Jendela kaca kayu kempas/mahoni 3/10 5.04 m² Rp - Rp -
6 Rp -
PEKERJAAN PLAFOND ###
XI. Plafond calsiboard 4mm + rangka kayu 4/6 340.20 m² ### ###
1 ###
2 PEKERJAAN PENGECATAN/PLAMIRAN
3 Pengecatan dinding (depan) 66.85 m² ### ###
4 Pelamiran dinding 430.33 m² ### ###
5 Pelamiran plafond 340.20 m² ### ### ###
6 Pengecatan kayu 206.70 m² ### ###
Cat genteng 396.90 m² ### ###
XII. ###
1 PEKERJAAN LANTAI
Lantai rabat 216.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 4.00 bh ### ###
Engsel Pintu 21.00 bh ### ###
Engsel Jendela 24.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Grendel Jendela 12.00 bh ### ### ###
Hag Angin 24.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 14.00 bh ### ###
Lampu SL 8watt (teras) 4.00 bh ### ###
Saklar ganda 7.00 bh ### ###
REKAPITULASI
Saklar tunggal 3.00 bh ### ###
NCANA ANGGARAN BIAYA
Stop kontak + instalasi 4.00 bh ### ###
Instalasi titik lampu 18.00 bh ### ###
KEGIATAN ###
PEKE PEKERJAAN KACA
LING Kaca mati t=5 mm 14.49 m² ### ###
LOKASI ###
NO.
I
II
III
IV
V
VI
VII
VIII
IX
X 6
XI OK
LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 2 LABANG
: SMPN 2 LABANG KEC. LABANG KAB. BANGKALAN
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
ACHMAD TAUFIK HEYKAL, A.Sg H. SUBADRIH, ST, MT
Mengetahui :
Kepala Sekolah
SMPN 2 Labang
Kec. Labang Kab. Bangkalan
NO
1
I.
1
2
3
4
5
II.
1
III.
1
2
IV.
1
2
3 Lembar. 2
JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
V. 2 3 4 5
1 PEKERJAAN PERSIAPAN ###
Pembongkaran atap + rangka 377.00 m² Rp - Rp -
VI. Pembongkaran kosen 1.00 bh ### ###
1 Pembongkaran dinding 6.00 m² ### ###
2 Penetelan plesteran 139.74 m² ### ###
3 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VII. PEKERJAAN PASANGAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps (nyepit kuda2) 30.91 m² Rp - Rp -
2 Rp -
3 PEKERJAAN RANGKA ATAP ###
4 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ Rp - Rp -
VIII. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Pilang (baru) 382.73 m² ### ###
Genteng bubungan Karang pilang 28.35 m' ### ###
IX. Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' Rp - Rp -
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsiboard 4mm + rangka hollow 354.38 m² Rp - Rp -
4 Rp -
5 PEKERJAAN PENGECATAN
6 Pengecatan dinding 598.50 m² Rp - Rp - ###
Pengecatan plafond 354.38 m² Rp - Rp -
X. Pengecatan kayu 274.60 m² Rp - Rp -
1 Rp -
PEKERJAAN LANTAI
XI. Keramik lantai 40 x 40 243.00 m² ### ###
1 Keramik dinding 25 x 40 139.74 m² ### ###
2 List keramik 102.00 m' ### ###
3 Keramik kolom 20 x 40 10.80 m² ### ###
4 ###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA ###
Kaca mati t=5 mm (yg pecah) 4.22 m² ### ###
###
PEKERJAAN TANGGA DEPAN PINTU
Pasangan batu gunung 2.88 m³ ### ###
Plesterran trasram 7.68 m² ### ###
Keramik kasar 40 x 40 7.04 m² ### ###
Urugan pasir 4.96 m³ ### ###
REKAPITULASI ###
NCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI
NO.
I
II
III
IV
V
VI
VII
VIII
IX
X 6
XI OK
XII BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 2 LABANG
: SMPN 2 LABANG KEC. LABANG KAB. BANGKALAN
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Labang
Kec. Labang Kab. Bangkalan
Drs. HARTONO, M.Pd
NIP. 19690126 199802 1 003
NO
1
I.
1
2
3
4
5
II.
1
2
3
III.
1
IV.
1
2 Lembar. 2
JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
V. 2 3 4 5
1 PEKERJAAN PERSIAPAN ###
2 Pembongkaran atap + rangka 377.00 m² Rp - Rp -
3 Pembongkaran kosen 1.00 bh ### ###
Pembongkaran dinding 6.00 m² ### ###
VI. Penetelan plesteran 127.50 m² ### ###
1 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VII. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps (nyepit kuda2) 22.43 m² Rp - Rp - -
2 Plesteran 1Pc : 5Ps 16.20 m² ### ###
3 Benangan 32.00 m' ### ###
###
VIII. PEKERJAAN BETON
1 Ring balk gewel 15/15 0.40 m³ ### ###
2 ###
3 PEKERJAAN RANGKA ATAP ###
4 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ Rp - Rp -
IX. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Pilang (baru) 382.73 m² ### ###
Genteng bubungan Karang pilang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' Rp - Rp -
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsiboard 4mm + rangka hollow 354.38 m² Rp - Rp -
4 Rp -
5 PEKERJAAN PENGECATAN
6 Pengecatan dinding 598.50 m² Rp - Rp - ###
Pengecatan plafond 354.38 m² Rp - Rp -
XI. Pengecatan kayu 274.60 m² Rp - Rp -
1 Rp -
PEKERJAAN LANTAI
XII. Keramik lantai 40 x 40 243.00 m² ### ###
1 Keramik dinding 25 x 40 127.50 m² ### ###
2 List keramik 102.00 m' ### ###
3 Keramik kolom 20 x 40 10.80 m² ### ###
4 ###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Pintu harmonika 15.00 m² ### ### ###
### ###
PEKERJAAN INSTALASI LISTRIK ###
Lampu SL 14 watt 12.00 bh ### ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA ###
Kaca mati t=5 mm (yg pecah) 4.22 m² ### ###
###
PEKERJAAN TANGGA DEPAN PINTU 3.46
Pasangan batu gunung 2.88 m³ ### ###
Plesterran trasram 7.68 m² ### ###
Keramik kasar 40 x 40 7.04 m² ### ###
Urugan pasir 4.96 m³ ### ###
###
REKAPITULASI
NCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI
NO.
I
II
III
IV
V
VI
VII
VIII
IX
X 7
OK
LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 KWANYAR
: SMPN 2 KWANYAR KEC. KWANYAR KAB. BANGKALAN
TERBILANG : ( SERATUS SEMBILAN PULUH TUJUH JUTA DELAPAN RATUS RIBU RUPIAH )
URAIAN PEKERJAAN JUMLAH HARGA
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Kwanyar
Kec. Kwanyar Kab. Bangkalan
RAHMAWATI, M.Pd
NIP. 19700703 199802 2 003
NO
1
I.
1
2
3
4
II.
1
2
III.
1
IV.
1
V.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran kusen 1.00 bh ### ###
VI. Pembongkaran dinding 15.00 m² ### ###
1 Penetelan plesteran 428.64 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 Ls ### ###
3 ###
4 PEKERJAAN PASANGAN/PLESTERAN ###
5 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 0.91 22.20 m² Rp - Rp -
6 Plesteran 1Pc : 5Ps 1.07 44.40 m² Rp - Rp -
Rp -
VII. PEKERJAAN KAYU
1 Lisplank kayu 3/30 cm 4.00 m¹ ### ###
2 ###
3 PEKERJAAN PLAFOND
4 Plafond calsi 1 x 1 + rangka kayu 12.00 m² Rp - Rp -
Rp -
VIII. PEKERJAAN PENGECATAN
1 Pengecatan dinding (3 kelas) 455.30 m² Rp - Rp -
2 Pengecatan plafond 319.00 m² Rp - Rp -
3 Pengecatan kayu 206.70 m² Rp - Rp - ###
4 Pengecatan kayu (Kantor) 214.39 m² Rp - Rp -
5 Rp -
6PEKERJAAN LANTAI 162.00 ###
Keramik lantai 40 x 40 ( 2 R Kelas ) 5.67 126.00 m² ### ###
IX. Keramik lantai 40 x 40 ( Teras ) 1.62 36.00 m² ### ###
1 Keramik dinding 25 x 40 (dalam kelas + teras) 5.78 128.40 m² ### ###
Keramik kolom teras 25 x 40 1.01 22.40 m² ### ###
X. List keramik 1.64 327.80 m' ### ###
1 Keramik dinding 25 x 40 (dalam kantor+R.guru+ t 13.51 300.24 m² ### ###
2 451.04 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 3.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Hag Angin 60.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
REKAPITULASI
PEKERJAAN KACA
NCANA ANGGARAN BIAYA
Kaca mati t=5 mm (yg pecah) 1.68 m² ### ###
###
KEGI PEKERJAAN TEMPAT DUDUK
PEKE Pasangan trasram 0.68 17.00 m² Rp - Rp -
LING Plat beton tempat duduk t=10 cm 0.53 1.02 m³ ### ###
LOKA Keramik tempat duduk 30 x 30 0.46 10.20 m² ### ###
Keramik dinding tempat duduk 25 x 40 1.84 40.80 m² ### ###
NO. 34.71 ###
0.86768 40.80
I
II
III
IV
V
VI
VII
VIII
IX
X 7
OK
BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 KWANYAR
: SMPN 2 KWANYAR KEC. KWANYAR KAB. BANGKALAN
TERBILANG : ( SERATUS SEMBILAN PULUH TUJUH JUTA DELAPAN RATUS RIBU RUPIAH )
URAIAN PEKERJAAN JUMLAH HARGA
PEKERJAAN PERSIAPAN ###
PEKERJAAN PASANGAN/PLESTERAN Rp -
PEKERJAAN KAYU ###
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
PEKERJAAN TEMPAT DUDUK ###
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Kwanyar
Kec. Kwanyar Kab. Bangkalan
RAHMAWATI, M.Pd
NIP. 19700703 199802 2 003
NO
1
I.
1
2
3
4
II.
1
2
III.
1
2
IV.
1
V. Lembar. 2
1 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
2 2 3 4 5
3 PEKERJAAN PERSIAPAN
4 Pembongkaran kusen 1.00 bh ### ###
5 Pembongkaran dinding 15.00 m² ### ###
Penetelan plesteran 428.64 m² ### ###
VI. Pembersihan akhir pekerjaan 1.00 Ls ### ###
1 ###
2 PEKERJAAN PASANGAN/PLESTERAN ###
3 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 22.20 m² Rp - Rp -
4 Plesteran 1Pc : 5Ps 44.40 m² Rp - Rp -
5 Rp -
6 PEKERJAAN KAYU
Perbaikan daun pintu panil 4.00 bh ### ###
VII. Lisplank kayu 3/30 cm 4.00 m¹ ### ###
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsi 1 x 1 + rangka kayu 12.00 m² Rp - Rp -
4 Rp -
PEKERJAAN PENGECATAN
VIII. Pengecatan dinding (3 kelas) 439.90 m² Rp - Rp -
1 Pengecatan dinding (Kantor) 373.40 m² Rp - Rp -
2 Pengecatan plafond 319.00 m² Rp - Rp -
3 Pengecatan kayu 169.45 m² Rp - Rp - ###
4 Pengecatan kayu (Kantor) 197.69 m² Rp - Rp -
5 Rp -
6 PEKERJAAN LANTAI ###
Keramik lantai 40 x 40 ( 2 R Kelas ) 126.00 m² ### ###
IX. Keramik lantai 40 x 40 ( Teras ) 36.00 m² ### ###
1 Keramik dinding 25 x 40 (dalam kelas + teras) 128.40 m² ### ###
Keramik kolom teras 25 x 40 22.40 m² ### ###
X. List keramik 327.80 m' ### ###
1 Keramik dinding 25 x 40 (dalam kantor+R.guru+ teras) 300.24 m² ### ###
2 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 3.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Hag Angin 60.00 bh ### ###
Pintu harmonika 11.30 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK ###
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA
REKAPITULASI
Kaca mati t=5 mm (yg pecah) 1.68 m² ### ###
NCANA ANGGARAN BIAYA ###
PEKERJAAN TEMPAT DUDUK
KEGI Pasangan trasram 17.00 m² Rp - Rp -
PEKE Plat beton tempat duduk t=10 cm 1.02 m³ ### ###
LING Keramik tempat duduk 30 x 30 10.20 m² ### ###
LOKA Keramik dinding tempat duduk 25 x 40 40.80 m² ### ###
###
NO.
I
II
III
IV
V
VI
VII
VIII
IX
8
OK
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Kokop
Kec. Kokop Kab. Bangkalan
II.
1
2
3
III.
1
IV.
1
2
3
V. Lembar. 2
1 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
2 2 3 4 5
3 PEKERJAAN PERSIAPAN
4 Penetelan plesteran 317.46 m² ### ###
5 Pembersihan akhir pekerjaan 1.00 Ls Rp - Rp - #REF!
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 12.25 m² Rp - Rp -
5 Plesteran 1Pc : 5Ps 80.58 m² Rp - Rp -
6 Benangan 55.00 m' Rp - Rp -
7 Rp -
PEKERJAAN PLAFOND
VII. Plafond calsiboard 4mm + rangka kayu 15.00 m² Rp - Rp -
1 Rp -
2 PEKERJAAN PENGECATAN -
3 Pengecatan dinding 506.50 m² Rp - Rp -
4 Pengecatan plafond 352.00 m² Rp - Rp - #DIV/0!
5 Pengecatan kayu 275.60 m² Rp - Rp -
6 Rp -
PEKERJAAN LANTAI ###
VIII. Keramik lantai 40 x 40 243.00 m² ### ### 147.47
1 Keramik dinding 25 x 40 ( 3 R. Kelas + teras) 132.96 m² ### ###
List keramik 288.20 m' ### ###
IX. Keramik kolom 25 x 40 16.00 m² ### ###
1 Keramik dinding 25 x 40 ( 5 R. Kelas bg. dalam) 184.50 m² ### ###
2 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 5.00 bh ### ###
Grendel Jendela 50.00 bh ### ###
Hag Angin 100.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 20.00 bh ### ###
Lampu SL 8watt (teras) 5.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 5.00 bh ### ###
Stop kontak + instalasi 5.00 bh ### ###
Instalasi titik lampu 25.00 ttk ### ###
###
PEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 2.53 m² ### ###
###
PEKERJAAN TEMPAT DUDUK
Pasangan trasram 14.70 m² Rp - Rp -
Plat beton tempat duduk t=10 cm 0.74 m³ ### ###
Keramik tempat duduk 30 x 30 7.35 m² ### ###
Keramik dinding tempat duduk 25 x 40 29.40 m² ### ###
###
BATAS
SINERGI 1 SMPN 2 SEPULU DR. AHMAD SABARUDIN, S.Pd, M.MPd
SINERGI 2 SMPN 1 KLAMPIS IMAM SYAFII, S.Pd, MPd
SINERGI 3 SMPN 2 KOKOP MOHAMMAD TAUFIK, SPd
SINERGI 4 SMPN 3 SATAP KOKOP IHSANUDIN, S.Pd
INDRAKILA 5 SMPN 1 TRAGAH Drs. AMIRULLAH, MM
INDRAKILA 6 SMPN 2 MODUNG A S U R, M.Pd
INDRAKILA 7 SMPN 2 LABANG Drs. HARTONO, M.Pd
INDRAKILA 8 SMPN 2 KWANYAR RAHMAWATI, M.Pd
9 SMPN TAHAL AMIN H. ABDULLAH, S.Pd
10 SMPN 1 MODUNG Drs. ALI MUSTOFA, M.Pd
11 SMPN 1 GALIS Drs. TAUFIKUR RAHMAN
12 SMPN 1 KOKOP BUDIONO, S.Pd, M.Pd
28.5
23.5
7.833333
1 ( Satu )
5 Oktob. s/d 10 Oktober 2015
Oktober 2015
29 Oktober 2015
Rp. 212.320.000.00
Prestasi Pekerjaan Prestasi Pekerjaan
Minggu Ini (%) Komulatif (%)
Rerata Prestasi Rerata
(9) (10) (11)
(8)/100x(5) (6)+(8) (7)+(9)
- - - Rp 88,586.67 Rp 1,638,853.33
- - - Rp 42,298.80 Rp 1,565,055.60
- - - Rp - Rp -
Rp 3,203,908.93
- - - Rp 3,912,550.00 Rp 234,753.00
- - - Rp 3,962,550.00 Rp 114,121.44
- - - Rp 3,962,550.00 Rp 1,027,092.96
- - - Rp 3,962,550.00 Rp 1,255,335.84
Rp 2,631,303.24
- - - Rp 185,000.00 Rp 25,849,125.00
- - - Rp 185,000.00 Rp 21,929,437.50
- - - Rp 65,000.00 Rp 3,100,500.00
Rp 50,879,062.50
- - - Rp 18,000.00 Rp 2,515,050.00
- - - Rp 110,000.00 Rp 26,078,250.00
- - - Rp 95,820.00 Rp 2,558,394.00
- - - Rp 21,149.40 Rp 1,184,366.40
Rp 32,336,060.40
- - - Rp 85,000.00 Rp 22,185,000.00
Rp 22,185,000.00
- - - Rp 20,740.00 Rp 10,805,637.48
- - - Rp 20,740.00 Rp 5,413,140.00
- - - Rp 42,450.00 Rp 4,752,702.00
Rp 20,971,479.48
- - - Rp 105,250.00 Rp 3,315,375.00
- - - Rp 112,000.00 Rp 16,800,000.00
- - - Rp 136,075.00 Rp 12,540,672.00
- - - Rp 85,000.00 Rp 6,528,000.00
Rp 39,184,047.00
- - - Rp 55,000.00 Rp 660,000.00
- - - Rp 50,000.00 Rp 150,000.00
- - - Rp 20,000.00 Rp 80,000.00
- - - Rp 15,000.00 Rp 75,000.00
- - - Rp 225,000.00 Rp 1,125,000.00
Rp 200,000.00 Rp 3,000,000.00
Rp 5,090,000.00
- - - Rp 112,125.00 Rp 376,964.25
Rp 376,964.25
2.95 2.95
Rp 20,300,000.00 2.95 %
1 ( Satu )
5 Oktob. s/d 10 Oktober 2015
Oktober 2015
29 Oktober 2015
- - - Rp 58,500.00 Rp 126,360.00
- - - Rp 215,400.00 Rp 77,544.00
- - - Rp 16,110.00 Rp 17,398.80
Rp 221,302.80
- - - Rp 88,586.67 Rp 3,790,281.61
- - - Rp 42,298.80 Rp 3,619,604.84
- - - Rp 11,825.00 Rp 3,651,560.00
Rp 11,061,446.45
- - - Rp 897,800.00 Rp 161,604.00
- - - Rp 3,962,550.00 Rp 2,139,777.00
- - - Rp 3,962,550.00 Rp 3,120,508.13
- - - Rp 3,962,550.00 Rp 5,943,825.00
- - - Rp 3,962,550.00 Rp 9,510,120.00
- - - Rp 3,962,550.00 Rp 941,501.88
Rp 21,817,336.01
- - - Rp 210,000.00 Rp 77,723,100.00
- - - Rp 65,000.00 Rp 5,063,500.00
Rp 82,786,600.00
- - - Rp 80,500.00 Rp 16,325,400.00
- - - Rp 18,000.00 Rp 3,011,580.00
- - - Rp 95,820.00 Rp 2,429,037.00
- - - Rp 21,149.40 Rp 617,562.48
Rp 22,383,579.48
- - - Rp 11,431,250.00 Rp 14,644,117.13
- - - Rp 618,250.00 Rp 5,375,065.50
- - - Rp 430,475.00 Rp 7,148,037.38
- - - Rp 419,572.50 Rp 4,833,475.20
Rp 32,000,695.20
- - - Rp 85,000.00 Rp 25,857,000.00
Rp 25,857,000.00
- - - Rp 20,740.00 Rp 12,412,890.00
- - - Rp 20,740.00 Rp 6,309,108.00
- - - Rp 42,450.00 Rp 8,774,415.00
Rp 27,496,413.00
- - - Rp 112,000.00 Rp 26,880,000.00
- - - Rp 136,075.00 Rp 17,662,535.00
- - - Rp 136,075.00 Rp 870,880.00
- - - Rp 85,000.00 Rp 10,115,000.00
Rp 55,528,415.00
- - - Rp 140,750.00 Rp 422,250.00
- - - Rp 23,625.00 Rp 425,250.00
- - - Rp 16,687.50 Rp 267,000.00
- - - Rp 74,250.00 Rp 222,750.00
- - - Rp 14,750.00 Rp 236,000.00
- - - Rp 17,750.00 Rp 284,000.00
Rp 1,857,250.00
- - - Rp 55,000.00 Rp 660,000.00
- - - Rp 50,000.00 Rp 150,000.00
- - - Rp 20,000.00 Rp 60,000.00
- - - Rp 15,000.00 Rp 45,000.00
- - - Rp 225,000.00 Rp 675,000.00
- - - Rp 200,000.00 Rp 3,000,000.00
Rp 4,590,000.00
- - - Rp 112,125.00 Rp 3,038,587.50
Rp 3,038,587.50
0.28 -
Rp 20,300,000.00 - %
1 ( Satu )
5 Oktob. s/d 10 Oktober 2015
Oktober 2015
29 Oktober 2015
- - - Rp 210,000.00 Rp 53,841,375.00
- - - Rp 65,000.00 Rp 4,238,000.00
Rp 58,079,375.00
- - - Rp 80,500.00 Rp 15,344,910.00
- - - Rp 18,000.00 Rp 2,002,725.00
- - - Rp 95,820.00 Rp 1,854,117.00
- - - Rp 21,149.40 Rp 560,459.10
Rp 19,762,211.10
- - - Rp 85,000.00 Rp 17,105,400.00
Rp 17,105,400.00
- - - Rp 20,740.00 Rp 1,119,960.00
- - - Rp 9,670.00 Rp 3,331,315.00
- - - Rp 9,670.00 Rp 1,945,990.80
- - - Rp 42,450.00 Rp 830,322.00
Rp 7,227,587.80
- - - Rp 112,000.00 Rp 18,144,000.00
- - - Rp 136,075.00 Rp 762,020.00
Rp 18,906,020.00
- - - Rp 140,750.00 Rp 281,500.00
- - - Rp 23,625.00 Rp 283,500.00
- - - Rp 16,687.50 Rp 267,000.00
- - - Rp 74,250.00 Rp 148,500.00
- - - Rp 14,750.00 Rp 236,000.00
- - - Rp 17,750.00 Rp 284,000.00
Rp 1,500,500.00
- - - Rp 55,000.00 Rp 440,000.00
- - - Rp 50,000.00 Rp 100,000.00
- - - Rp 20,000.00 Rp 40,000.00
- - - Rp 15,000.00 Rp 30,000.00
- - - Rp 225,000.00 Rp 450,000.00
- - - Rp 200,000.00 Rp 2,000,000.00
Rp 3,060,000.00
- - - Rp 112,125.00 Rp 2,318,745.00
Rp 2,318,745.00
3.67 21.00
Rp 39,777,000.00 21.00 %
LAMA
140
BARU
LAMA
BARU
LAMA
BARU
LAMA
BARU
keramik tambal sulam
SADALI, S.Pd
UBAGIO, M.Pd
NDAYANI, M.Pd
1 2 3 4 5
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
1.01 100 1.01 100 1.01 100 1.01 100 1.01 100
0.11 - - - - - - - - -
0.90 - - 100 0.90 100 0.90 100 0.90 100
0.86 - - - - 100 0.86 100 0.86 100
- - - - - 100 - 100 - 100
14.17 - - - - - - - - -
12.02 - - - - - - - - -
1.70 - - - - - - - - -
1.38 - - - - - - - - -
14.29 - - - - - - - - -
1.40 - - - - - - - - -
0.65 - - - - - - - - -
12.16 - - - - - - - - -
5.92 - - - - - - - - -
2.97 - - - - - - - - -
2.61 - - - - - - - - -
1.82 - - - - - - - - -
9.21 - - - - - - - - -
6.87 - - - - - - - - -
3.58 - - - - - - - - -
0.36 - - - - - - - - -
0.08 - - - - - - - - -
0.04 - - - - - - - - -
0.04 - - - - - - - - -
0.62 - - - - - - - - -
1.64 - - - - - - - - -
0.21 - - - - - - - - -
1 2 3 4 5
0.20 100 0.20 100 0.20 100 0.20 100 0.20 100
0.08 100 0.08 100 0.08 100 0.08 100 0.08 100
0.07 - - - - - - - - -
0.05 - - - - - - 25 0.01 50
0.70 - - - - - - - - 50
1.02 - - - - - - - - -
1.95 - - - - - - - - -
3.12 - - - - - - - - 50
0.31 - - - - - - - - 75
25.51 - - - - - - - - -
1.66 - - - - - - - - -
5.36 - - - - - - - - -
0.99 - - - - - - - - -
0.80 - - - - - - - - -
0.20 - - - - - - - - -
4.81 - - - - - - - - 50
1.76 - - - - - - - - -
2.35 - - - - - - - - -
1.59 - - - - - - - - -
8.49 - - - - - - - - -
4.07 - - - - - - - - -
2.07 - - - - - - - - -
2.88 - - - - - - - - -
8.82 - - - - - - - - -
5.80 - - - - - - - - -
0.29 - - - - - - - - -
3.32 - - - - - - - - -
0.14 - - - - - - - - -
0.14 - - - - - - - - -
0.09 - - - - - - - - -
0.07 - - - - - - - - -
0.08 - - - - - - - - -
0.09 - - - - - - - - -
0.22 - - - - - - - - -
0.05 - - - - - - - - -
0.02 - - - - - - - - -
0.01 - - - - - - - - -
0.22 - - - - - - - - -
0.98 - - - - - - - - -
1.00 - - - - - - - - -
1 2 3 4 5
1.70 100 1.70 100 1.70 100 1.70 100 1.70 100
0.32 100 0.32 100 0.32 100 0.32 100 0.32 100
0.65 100 0.65 100 0.65 100 0.65 100 0.65 100
0.11 - - - - - - - - -
0.05 100 0.05 100 0.05 100 0.05 100 0.05 100
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100
0.01 50 0.00 100 0.01 100 0.01 100 0.01 100
8.10 - - - - - - - - -
1.06 - - - - - - - - -
0.98 - - - - - - - - -
0.30 - - - - - - - - -
9.03 - - - - - - - - -
0.59 - - - - - - - - -
1.76 - - - - - - - - -
1.03 - - - - - - - - 75
0.44 - - - - - - - - -
9.58 - - - - - - - - -
0.40 - - - - - - - - -
0.15 - - - - - - - - -
0.15 - - - - - - - - -
0.14 - - - - - - - - -
0.08 - - - - - - - - -
0.12 - - - - - - - - -
0.15 - - - - - - - - -
0.23 - - - - - - - - -
0.05 - - - - - - - - -
0.02 - - - - - - - - -
0.02 - - - - - - - - -
0.24 - - - - - - - - -
1.06 - - - - - - - - -
1.22 - - - - - - - - -
6 7 8 9 10
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
1.01 100 1.01 100 1.01 100 1.01 100 1.01 100
- - - - - - - 100 0.11 100
0.90 100 0.90 100 0.90 100 0.90 100 0.90 100
0.86 100 0.86 100 0.86 100 0.86 100 0.86 100
- 100 - 100 - 100 - 100 - 100
0.13 100 0.13 100 0.13 100 0.13 100 0.13 100
0.06 100 0.06 100 0.06 100 0.06 100 0.06 100
0.56 100 0.56 100 0.56 100 0.56 100 0.56 100
0.34 100 0.69 100 0.69 100 0.69 100 0.69 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
6 7 8 9 10
0.20 100 0.20 100 0.20 100 0.20 100 0.20 100
0.08 100 0.08 100 0.08 100 0.08 100 0.08 100
- - - - - - - - - 100
0.04 100 0.04 100 0.04 100 0.04 100 0.04 100
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100
0.01 100 0.01 100 0.01 100 0.01 100 0.01 100
1.24 100 1.24 100 1.24 100 1.24 100 1.24 100
1.19 100 1.19 100 1.19 100 1.19 100 1.19 100
1.20 100 1.20 100 1.20 100 1.20 100 1.20 100
0.03 100 0.05 100 0.05 100 0.05 100 0.05 100
0.35 100 0.70 100 0.70 100 0.70 100 0.70 100
- 50 0.51 100 1.02 100 1.02 100 1.02 100
- 50 0.98 100 1.95 100 1.95 100 1.95 100
1.56 75 2.34 100 3.12 100 3.12 100 3.12 100
0.23 100 0.31 100 0.31 100 0.31 100 0.31 100
2.40 100 4.81 100 4.81 100 4.81 100 4.81 100
- - - - - - - 100 1.76 100
- - - - - - - 100 2.35 100
- - - - - 50 0.79 100 1.59 100
- - - - - - - 50 4.24 100
- - - - - - - 75 6.62 100
- - - - - - - 50 2.90 100
- - - - - - - 50 0.14 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
1.70 100 1.70 100 1.70 100 1.70 100 1.70 100
0.32 100 0.32 100 0.32 100 0.32 100 0.32 100
0.65 100 0.65 100 0.65 100 0.65 100 0.65 100
- - - - - - - - - 100
0.05 100 0.05 100 0.05 100 0.05 100 0.05 100
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100
0.01 100 0.01 100 0.01 100 0.01 100 0.01 100
4.29 100 4.29 100 4.29 100 4.29 100 4.29 100
4.10 100 4.10 100 4.10 100 4.10 100 4.10 100
1.08 100 1.08 100 1.08 100 1.08 100 1.08 100
0.15 100 0.15 100 0.15 100 0.15 100 0.15 100
0.79 100 0.79 100 0.79 100 0.79 100 0.79 100
0.74 100 0.99 100 0.99 100 0.99 100 0.99 100
- 100 2.23 100 2.23 100 2.23 100 2.23 100
- 100 2.64 100 2.64 100 2.64 100 2.64 100
- 100 1.17 100 1.17 100 1.17 100 1.17 100
- 25 7.11 100 28.43 100 28.43 100 28.43 100
- - - 100 2.24 100 2.24 100 2.24 100
5.81 100 5.81 100 5.81 100 5.81 100 5.81 100
4.22 100 4.22 100 4.22 100 4.22 100 4.22 100
2.11 100 2.11 100 2.11 100 2.11 100 2.11 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
0.97
0.97
1.01
0.11
0.90
0.86
-
0.13
0.06
0.56
0.69
14.17
12.02
1.70
1.38
14.29
1.40
0.65
12.16
5.92
2.97
2.61
1.82
9.21
6.87
3.58
0.36
0.08
0.04
0.04
0.62
1.64
0.21
0.20
0.08
0.07
0.04
0.03
0.01
1.24
1.19
1.20
0.05
0.70
1.02
1.95
3.12
0.31
25.51
1.66
5.36
0.99
0.80
0.20
4.81
1.76
2.35
1.59
8.49
4.07
2.07
2.88
8.82
5.80
0.29
3.32
0.14
0.14
0.09
0.07
0.08
0.09
0.22
0.05
0.02
0.01
0.22
0.98
1.00
1.70
0.32
0.65
0.11
0.05
0.03
0.01
4.29
4.10
1.08
0.15
0.79
0.99
2.23
2.64
1.17
28.43
2.24
8.10
1.06
0.98
0.30
5.81
4.22
2.11
9.03
0.59
1.76
1.03
0.44
9.58
0.40
0.15
0.15
0.14
0.08
0.12
0.15
0.23
0.05
0.02
0.02
0.24
1.06
1.22
YANG DIPAKAI
TH. 2018
1 SMPN 2 SEPULU 2 KELAS ### SINERGI
2 SMPN 1 KLAMPIS 3 KELAS ### SINERGI
3 SMPN 2 KOKOP 2 KELAS ### SINERGI
4 SMPN 3 SATAP KOKOP 2 KELAS ### SINERGI
5 SMPN 1 TRAGAH 3 KELAS ### INDRAKILA
6 SMPN 2 MODUNG 2 KELAS ### INDRAKILA
7 SMPN 2 LABANG 3 KELAS ### INDRAKILA
8 SMPN 2 KWANYAR 2 KELAS ### INDRAKILA
9 SMPN TAHAL AMIN H. ABDULLAH, S.Pd
REKAPITULASI 1
RENCANA ANGGARAN BIAYA OK
OK
KEGIATAN : PENGADAAN SARANA PRASARANA
PEKERJAAN : PERENCANAAN SMP KABUPATEN BANGKALAN
LINGKUP PEKERJAAN : REHABILITASI 2 RUANG BELAJAR SMPN 2 SEPULU
LOKASI : SMPN 2 SEPULU KEC. SEPULU KAB. BANGKALAN
JUMLAH ###
DIBULATK ### ###
###
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Sepulu
Kec. Sepulu Kab. Bangkalan
LAPORAN MINGGUAN
Minggu ke :
Pekerjaan : REHABILITASI 2 RUANG KELAS SMPN 2 SEPULU Tanggal :
Nama Sekolah : SMPN 2 SEPULU Bulan :
Lokasi : Kec. Kedamean Kab. Gresik Dana diterima tangal :
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%)
% Prestasi Rerata Prestasi
(1) (2) (3) (4) (5) (6) (7) (8)
(6)/100x(5)
I. PEKERJAAN PERSIAPAN
1 Pembongkaran atap + rangka atap 143.00 m² 0.97 - - 100
2 Pembongkaran atap 234.90 m² 0.97 - - 100
3 Penetelan plesteran 92.16 m² 1.01 - - 100
4 Pembersihan akhir pekerjaan 1.00 ls 0.11 - - -
II. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 18.50 m² 0.90 - - -
2 Plesteran 1Pc : 5Ps 37.00 m² 0.86 - - -
3 Benangan 48.00 m' - - - -
V. PEKERJAAN ATAP
1 Atap genteng beton (lama) 139.73 m² 1.38 - - -
2 Atap genteng beton warna 237.08 m² 14.29 - - -
3 Genteng bubungan beton warna 26.70 m' 1.40 - - -
4 Plesteran kompres L = 10 cm (Akhiran genting) 56.00 m' 0.65 - - -
JUMLAH 100.00 -
Jumlah dana yang digunakan sampai dengan minggu ini ( minggu ke 1 ) Rp 20,300,000.00
REKAPITULASI 2
RENCANA ANGGARAN BIAYA OK
I (2) ###
II PEKERJAAN TANAH ###
III PEKERJAAN PASANGAN/PLESTERAN ###
IV PEKERJAAN BETON ###
V PEKERJAAN RANGKA ATAP ###
VI PEKERJAAN ATAP ###
VII PEKERJAAN KUSEN PINTU DAN JENDELA ###
VIII PEKERJAAN PLAFOND ###
IX PEKERJAAN PENGECATAN/PLAMIRAN ###
X PEKERJAAN LANTAI ###
XI PEKERJAAN KUNCI + PENGGANTUNG ###
XII PEKERJAAN INSTALASI LISTRIK ### ###
XIII PEKERJAAN KACA ###
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 1 Kelampis
Kec. Kelampis Kab. Bangkalan
LAPORAN MINGGUAN
Minggu ke :
Pekerjaan : REHABILITASI 2 RUANG KELAS SMPN 1 KLAMPIS Tanggal :
Nama Sekolah : SMPN 1 KLAMPIS Bulan :
Lokasi : Kec. Kedamean Kab. Gresik Dana diterima tangal :
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%)
% Prestasi Rerata Prestasi
(1) (2) (3) (4) (5) (6) (7) (8)
I. PEKERJAAN PERSIAPAN (6)/100x(5)
1 Pembongkaran kosen 12.00 bh 0.20 - - 100
2 Penetelan plesteran 12.00 m² 0.08 - - 100
3 Pembersihan akhir pekerjaan 1.00 ls 0.07 - - -
X. PEKERJAAN LANTAI
1 Keramik lantai 40 x 40 240.00 m² 8.82 - - -
2 Keramik dinding 25 x 40 129.80 m² 5.80 - - -
3 Keramik kolom 25 x 40 6.40 m² 0.29 - - -
4 List keramik 119.00 m' 3.32 - - -
JUMLAH 95.07 -
Jumlah dana yang digunakan sampai dengan minggu ini ( minggu ke 1 ) Rp 20,300,000.00
3
REKAPITULASI OK
NCANA ANGGARAN BIAYA OK
: PENGADAAN SARANA PRASARANA
KEGIATAN : PERENCANAAN SMP KABUPATEN BANGKALAN
PEKERJAAN : REHABILITASI 2 RUANG BELAJAR SMPN 3 SATAP KOKOP
LINGKUP PEKERJAAN : SMPN 3 SATAP KOKOP KEC. KOKOP KAB. BANGKALAN
LOKASI
URAIAN PEKERJAAN JUMLAH HARGA
NO.
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
H. SUBADRIH, ST, MT
Mengetahui :
Kepala Sekolah
SMPN 3 Satap Kokop
Kec. Kokop Kab. Bangkalan
IHSANUDIN, S.Pd
NIP. 19700109 199104 1 001
LAPORAN MINGGUAN
Minggu ke :
Pekerjaan : REHABILITASI 2 RUANG BELAJAR SMPN 3 SATAP KOKOP Tanggal :
Nama Sekolah : SMPN 3 SATAP KOKOP KEC. KOKOP KAB. BANGKALAN Bulan :
Lokasi : KEC. KOKOP KAB. BANGKALAN Dana diterima tangal :
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%)
% Prestasi Rerata Prestasi
(1) (2) (3) (4) (5) (6) (7) (8)
(6)/100x(5)
I. PEKERJAAN PERSIAPAN
1 Pembongkaran atap + rangka 260.00 m² 1.70 100 1.70 -
2 Pembongkaran kosen 12.00 bh 0.32 100 0.32 -
3 Pembongkaran dinding 61.75 m² 0.65 100 0.65 -
4 Pembersihan akhir pekerjaan 1.00 ls 0.11 - - -
X. PEKERJAAN LANTAI
1 Keramik lantai 40 x 40 162.00 m² 9.58 - - -
2 Keramik kolom 20 x 40 (motif) 5.60 m² 0.40 - - -
Mengetahui Menyetujui
SMPN 3 Satap Kokop Panitia Pembangunan Sekolah
Kec. Kokop Kab. Bangkalan
Selaku Penanggung Jawab
IHSANUDIN, S.Pd SUHAERI
NIP. 19700109 199104 1 001
REKAPITULASI
NCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI
NO.
I
II
III
IV
V
VI
VII
VIII
IX
X 4
XI OK
XII LAMA
XIII : PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 1 TRAGAH
: SMPN 1 TRAGAH KEC. TRAGAH KAB. BANGKALAN
TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )
PEKERJAAN PERSIAPAN ###
PEKERJAAN TANAH ###
PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA #DIV/0!
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 1 Tragah
Kec. Tragah Kab. Bangkalan
Drs. AMIRULLAH, MM
NIP. 19581217 198603 1 011
NO
1
I.
1
2
3
4
II.
1
2
4
III.
1
2
3
IV.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran atap + rangka 377.00 m² ### ###
V. Pembongkaran kusen 4.00 bh ### ###
1 Penetelan plesteran 159.60 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VI. PEKERJAAN TANAH ###
1 Galian tanah 2.16 m³ ### ###
2 Urugan pasir bawah pondasi t=10cm 0.36 m³ ### ### #DIV/0!
3 Urugan tanah kembali 1.08 m³ ### ###
4 ###
PEKERJAAN PASANGAN/PLESTERAN
VII. Pasangan 1/2 bata camp. 1 Pc : 5 Ps 7.20 m² ### ### ###
1 Plesteran 1Pc : 5Ps 14.40 m² ### ###
2 Benangan 24.00 m' ### ###
3 ###
PEKERJAAN BETON
VIII. Lantai kerja bawah pondasi 1:3:5 t=5cm 0.18 m³ ### ###
1 Pondasi beton stempat 60 x 60 x 15cm 0.54 m³ ### ###
Kolom teras 15/15 0.79 m³ ### ###
IX. Balok beton 15/20 1.71 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ ### ###
X. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Penang (baru) 382.73 m² ### ###
3 Atap genteng (lama bg. belakang) 170.10 m² ### ###
4 Genteng bubungan Karang penang 28.35 m' ### ###
Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' ### ###
XI. ###
1 PEKERJAAN KUSEN PINTU DAN JENDELA
2 Kusen kayu kempas/mahoni 6/15 #DIV/0! m³ Rp - #DIV/0!
3 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 8.61 m² Rp - Rp - #DIV/0!
4 Daun Jendela kaca kayu kempas/mahoni 3/10 8.40 m² Rp - Rp - ###
5 #DIV/0!
6 PEKERJAAN PLAFOND
Plafond calsiboard 4mm + rangka kayu 4/6 294.84 m² ### ###
XII ###
1 PEKERJAAN PENGECATAN
2 Pengecatan dinding (3 Ruang kelas) 598.50 m² ### ###
3 Pengecatan plafond 294.84 m² ### ###
4 Pengecatan kayu 206.70 m² ### ###
5 ###
6 PEKERJAAN LANTAI #DIV/0!
Keramik lantai 40 x 40 245.70 m² ### ###
XIII. Keramik dinding 25 x 40 ( 3 R.kelas + teras ) 159.60 m² ### ###
1 List keramik dinding 7cm 110.40 m² ### ###
Keramik kolom 25 x 40 12.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Engsel Pintu 18.00 bh ### ###
Engsel Jendela 16.00 bh ### ###
Grendel pintu 3.00 bh ### ###
Grendel Jendela 16.00 bh ### ###
Hag Angin 16.00 bh ### ###
###
REKAPITULASI
PEKERJAAN INSTALASI LISTRIK
NCANA ANGGARAN
Lampu BIAYA
SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
KEGI Saklar ganda 3.00 bh ### ###
PEKE Saklar tunggal 3.00 bh ### ###
LING Stop kontak + instalasi 3.00 bh ### ###
LOKA Instalasi titik lampu 15.00 ttk ### ###
###
NO. PEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 11.14 m² ### ###
###
I
II
III
IV
V
VI
VII
VIII
IX
X 4
XI OK
XII BARU
XIII : PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 1 TRAGAH
: SMPN 1 TRAGAH KEC. TRAGAH KAB. BANGKALAN
TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )
PEKERJAAN PERSIAPAN ###
PEKERJAAN TANAH ###
PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA Rp -
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 1 Tragah
Kec. Tragah Kab. Bangkalan
Drs. AMIRULLAH, MM
NIP. 19581217 198603 1 011
NO
1
I.
1
2
3
4
II.
1
2
4
III.
1
2
3
IV.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran atap + rangka 377.00 m² ### ###
V. Pembongkaran kusen 8.00 bh ### ###
1 Penetelan plesteran 249.00 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VI. PEKERJAAN TANAH ###
1 Galian tanah 2.16 m³ ### ###
2 Urugan pasir bawah pondasi t=10cm 0.36 m³ ### ### ###
3 Urugan tanah kembali 1.08 m³ ### ###
###
VII. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 24.02 m² ### ### ###
2 Plesteran 1Pc : 5Ps 48.03 m² ### ###
3 Benangan 168.00 m' ### ###
4 ###
PEKERJAAN BETON
VIII. Lantai kerja bawah pondasi 1:3:5 t=5cm 0.18 m³ ### ###
1 Pondasi beton stempat 60 x 60 x 15cm 0.54 m³ ### ###
Kolom teras 15/15 0.79 m³ ### ###
IX. Balok beton 15/20 1.56 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ ### ###
X. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Penang (baru) 382.73 m² ### ###
3 Genteng bubungan Karang penang 28.35 m' ### ###
4 Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' ### ###
5 ###
PEKERJAAN KUSEN PINTU DAN JENDELA
XI. Kusen kayu kempas/mahoni 6/15 1.09 m³ Rp - Rp -
1 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 8.61 m² Rp - Rp - ###
2 Jalusi kayu kempas/mahoni 3/12 7.20 m² Rp - Rp -
3 Daun Jendela kaca kayu kempas/mahoni 3/10 6.72 m² Rp - Rp - ###
4 Rp -
5 PEKERJAAN PLAFOND
6 Plafond calsiboard 4mm + rangka kayu 4/6 294.84 m² ### ###
###
XII PEKERJAAN PENGECATAN
1 Pengecatan dinding (3 Ruang kelas) 598.50 m² ### ###
2 Pengecatan plafond 294.84 m² ### ###
3 Pengecatan kayu 206.70 m² ### ###
4 ###
5 PEKERJAAN LANTAI ###
6 Keramik lantai 40 x 40 245.70 m² ### ###
Keramik dinding 25 x 40 ( 3 R.kelas + teras ) 173.40 m² ### ###
XIII. List keramik dinding 7cm 132.90 m² ### ###
1 Keramik kolom 25 x 40 12.00 m² ### ###
Keramik dinding 25 x 40 ( 3 R.kelas teras saja ) 75.60 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Engsel Pintu 18.00 bh ### ###
Engsel Jendela 16.00 bh ### ###
Grendel pintu 3.00 bh ### ###
Grendel Jendela 16.00 bh ### ###
Hag Angin 16.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
REKAPITULASI
Lampu SL 8watt (teras) 3.00 bh ### ###
NCANA ANGGARAN BIAYA
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
KEGI Stop kontak + instalasi 3.00 bh ### ###
PEKE Instalasi titik lampu 15.00 ttk ### ###
LINGKUP PEKERJAAN ###
LOKAPEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 11.14 m² ### ###
NO. ###
I
II
III
IV
V
VI
VII
VIII
IX
X 5
XI OK
XII LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 MODUNG
: SMPN 2 MODUNG KEC. MODUNG KAB. BANGKALAN
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Modung
Kec. Modung Kab. Bangkalan
A S U R, M.Pd
NIP. 19610117 198403 1 008
NO
1
I.
1
2
II.
1
2
3
III.
1
2
3
IV.
1
2
Lembar. 2
V. JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
1 2 3 4 5
2 PEKERJAAN PERSIAPAN
3 Pembongkaran atap + rangka 406.00 m² ### ###
4 Pembersihan akhir pekerjaan 1.00 ls ### ### ###
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 98.93 m² ### ###
2 Plesteran 1Pc : 5Ps 197.87 m² ### ###
3 Benangan 166.56 m' ### ###
###
VII. PEKERJAAN BETON
1 Kolom teras 15/15 0.41 m³ ### ###
Balok teras 15/20 1.24 m³ ### ###
VIII. Ring balk gewel 15/15 0.98 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 396.90 m² ### ###
4 Lisplank kalsiplank 8mm / 30 cm 85.70 m¹ ### ###
5 ###
PEKERJAAN ATAP
IX. Pasang atap genteng karang p enang (baru 5%) 19.85 m² ### ###
1 Pasang atap genteng (lama) 377.06 m² ### ###
Genteng bubungan karang penang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 29.00 m' ### ###
1 ###
2 PEKERJAAN KUSEN PINTU DAN JENDELA
3 Kusen kayu kempas/mahoni 6/12 0.46 m³ Rp - Rp -
4 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 6.72 m² Rp - Rp -
5 Daun Jendela kaca kayu kempas/mahoni 3/10 5.04 m² Rp - Rp -
6 Rp -
PEKERJAAN PLAFOND ###
XI. Plafond calsiboard 4mm + rangka hollow 340.20 m² ### ###
1 ###
2 PEKERJAAN PENGECATAN/PLAMIRAN
3 Pengecatan dinding (depan) 66.85 m² ### ###
4 Pelamiran dinding 430.33 m² ### ###
5 Pelamiran plafond 340.20 m² ### ### ###
6 Pengecatan kayu 206.70 m² ### ###
Cat genteng 396.90 m² ### ###
XII. ###
1 PEKERJAAN LANTAI
Lantai rabat 216.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 4.00 bh ### ###
Engsel Pintu 21.00 bh ### ###
Engsel Jendela 24.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Grendel Jendela 12.00 bh ### ### ###
Hag Angin 24.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 14.00 bh ### ###
Lampu SL 8watt (teras) 4.00 bh ### ###
Saklar ganda 7.00 bh ### ###
REKAPITULASI
Saklar tunggal 3.00 bh ### ###
NCANA ANGGARAN BIAYA
Stop kontak + instalasi 4.00 bh ### ###
Instalasi titik lampu 18.00 bh ### ###
KEGIATAN ###
PEKE PEKERJAAN KACA
LING Kaca mati t=5 mm 14.49 m² ### ###
LOKASI ###
NO.
I
II
III
IV
V
VI
VII
VIII
IX
X 5
XI OK
XII BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 MODUNG
: SMPN 2 MODUNG KEC. MODUNG KAB. BANGKALAN
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Modung
Kec. Modung Kab. Bangkalan
A S U R, M.Pd
NIP. 19610117 198403 1 008
NO
1
I.
1
2
II.
1
2
3
III.
1
2
3
IV.
1
2
Lembar. 2
V. JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
1 2 3 4 5
2 PEKERJAAN PERSIAPAN
3 Pembongkaran atap + rangka 406.00 m² ### ###
4 Pembersihan akhir pekerjaan 1.00 ls ### ### ###
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 98.93 m² ### ###
2 Plesteran 1Pc : 5Ps 197.87 m² ### ###
3 Benangan 166.56 m' ### ###
###
VII. PEKERJAAN BETON
1 Kolom teras 15/15 0.41 m³ ### ###
Balok teras 15/20 1.24 m³ ### ###
VIII. Ring balk gewel 15/15 0.98 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 396.90 m² ### ###
4 Lisplank kalsiplank 8mm / 30 cm 85.70 m¹ ### ###
5 ###
PEKERJAAN ATAP
IX. Pasang atap genteng karang p enang (baru 5%) 19.85 m² ### ###
1 Pasang atap genteng (lama) 377.06 m² ### ###
Genteng bubungan karang penang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 29.00 m' ### ###
1 ###
2 PEKERJAAN KUSEN PINTU DAN JENDELA
3 Kusen kayu kempas/mahoni 6/12 0.46 m³ Rp - Rp -
4 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 6.72 m² Rp - Rp -
5 Daun Jendela kaca kayu kempas/mahoni 3/10 5.04 m² Rp - Rp -
6 Rp -
PEKERJAAN PLAFOND ###
XI. Plafond calsiboard 4mm + rangka kayu 4/6 340.20 m² ### ###
1 ###
2 PEKERJAAN PENGECATAN/PLAMIRAN
3 Pengecatan dinding (depan) 66.85 m² ### ###
4 Pelamiran dinding 430.33 m² ### ###
5 Pelamiran plafond 340.20 m² ### ### ###
6 Pengecatan kayu 206.70 m² ### ###
Cat genteng 396.90 m² ### ###
XII. ###
1 PEKERJAAN LANTAI
Lantai rabat 216.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 4.00 bh ### ###
Engsel Pintu 21.00 bh ### ###
Engsel Jendela 24.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Grendel Jendela 12.00 bh ### ### ###
Hag Angin 24.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 14.00 bh ### ###
Lampu SL 8watt (teras) 4.00 bh ### ###
Saklar ganda 7.00 bh ### ###
REKAPITULASI
Saklar tunggal 3.00 bh ### ###
NCANA ANGGARAN BIAYA
Stop kontak + instalasi 4.00 bh ### ###
Instalasi titik lampu 18.00 bh ### ###
KEGIATAN ###
PEKE PEKERJAAN KACA
LING Kaca mati t=5 mm 14.49 m² ### ###
LOKASI ###
NO.
I
II
III
IV
V
VI
VII
VIII
IX
X 6
XI OK
LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 2 LABANG
: SMPN 2 LABANG KEC. LABANG KAB. BANGKALAN
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
ACHMAD TAUFIK HEYKAL, A.Sg H. SUBADRIH, ST, MT
Mengetahui :
Kepala Sekolah
SMPN 2 Labang
Kec. Labang Kab. Bangkalan
NO
1
I.
1
2
3
4
5
II.
1
III.
1
2
IV.
1
2
3 Lembar. 2
JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
V. 2 3 4 5
1 PEKERJAAN PERSIAPAN ###
Pembongkaran atap + rangka 377.00 m² Rp - Rp -
VI. Pembongkaran kosen 1.00 bh ### ###
1 Pembongkaran dinding 6.00 m² ### ###
2 Penetelan plesteran 139.74 m² ### ###
3 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VII. PEKERJAAN PASANGAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps (nyepit kuda2) 30.91 m² Rp - Rp -
2 Rp -
3 PEKERJAAN RANGKA ATAP ###
4 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ Rp - Rp -
VIII. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Pilang (baru) 382.73 m² ### ###
Genteng bubungan Karang pilang 28.35 m' ### ###
IX. Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' Rp - Rp -
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsiboard 4mm + rangka hollow 354.38 m² Rp - Rp -
4 Rp -
5 PEKERJAAN PENGECATAN
6 Pengecatan dinding 598.50 m² Rp - Rp - ###
Pengecatan plafond 354.38 m² Rp - Rp -
X. Pengecatan kayu 274.60 m² Rp - Rp -
1 Rp -
PEKERJAAN LANTAI
XI. Keramik lantai 40 x 40 243.00 m² ### ###
1 Keramik dinding 25 x 40 139.74 m² ### ###
2 List keramik 102.00 m' ### ###
3 Keramik kolom 20 x 40 10.80 m² ### ###
4 ###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA ###
Kaca mati t=5 mm (yg pecah) 4.22 m² ### ###
###
PEKERJAAN TANGGA DEPAN PINTU
Pasangan batu gunung 2.88 m³ ### ###
Plesterran trasram 7.68 m² ### ###
Keramik kasar 40 x 40 7.04 m² ### ###
Urugan pasir 4.96 m³ ### ###
REKAPITULASI ###
NCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI
NO.
I
II
III
IV
V
VI
VII
VIII
IX
X 6
XI OK
XII BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 2 LABANG
: SMPN 2 LABANG KEC. LABANG KAB. BANGKALAN
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Labang
Kec. Labang Kab. Bangkalan
Drs. HARTONO, M.Pd
NIP. 19690126 199802 1 003
NO
1
I.
1
2
3
4
5
II.
1
2
3
III.
1
IV.
1
2 Lembar. 2
JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
V. 2 3 4 5
1 PEKERJAAN PERSIAPAN ###
2 Pembongkaran atap + rangka 377.00 m² Rp - Rp -
3 Pembongkaran kosen 1.00 bh ### ###
Pembongkaran dinding 6.00 m² ### ###
VI. Penetelan plesteran 127.50 m² ### ###
1 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VII. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps (nyepit kuda2) 22.43 m² Rp - Rp - -
2 Plesteran 1Pc : 5Ps 16.20 m² ### ###
3 Benangan 32.00 m' ### ###
###
VIII. PEKERJAAN BETON
1 Ring balk gewel 15/15 0.40 m³ ### ###
2 ###
3 PEKERJAAN RANGKA ATAP ###
4 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ Rp - Rp -
IX. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Pilang (baru) 382.73 m² ### ###
Genteng bubungan Karang pilang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' Rp - Rp -
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsiboard 4mm + rangka hollow 354.38 m² Rp - Rp -
4 Rp -
5 PEKERJAAN PENGECATAN
6 Pengecatan dinding 598.50 m² Rp - Rp - ###
Pengecatan plafond 354.38 m² Rp - Rp -
XI. Pengecatan kayu 274.60 m² Rp - Rp -
1 Rp -
PEKERJAAN LANTAI
XII. Keramik lantai 40 x 40 243.00 m² ### ###
1 Keramik dinding 25 x 40 127.50 m² ### ###
2 List keramik 102.00 m' ### ###
3 Keramik kolom 20 x 40 10.80 m² ### ###
4 ###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Pintu harmonika 15.00 m² ### ### ###
### ###
PEKERJAAN INSTALASI LISTRIK ###
Lampu SL 14 watt 12.00 bh ### ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA ###
Kaca mati t=5 mm (yg pecah) 4.22 m² ### ###
###
PEKERJAAN TANGGA DEPAN PINTU 3.46
Pasangan batu gunung 2.88 m³ ### ###
Plesterran trasram 7.68 m² ### ###
Keramik kasar 40 x 40 7.04 m² ### ###
Urugan pasir 4.96 m³ ### ###
###
REKAPITULASI
NCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI
NO.
I
II
III
IV
V
VI
VII
VIII
IX
X 7
OK
LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 KWANYAR
: SMPN 2 KWANYAR KEC. KWANYAR KAB. BANGKALAN
TERBILANG : ( SERATUS SEMBILAN PULUH TUJUH JUTA DELAPAN RATUS RIBU RUPIAH )
URAIAN PEKERJAAN JUMLAH HARGA
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Kwanyar
Kec. Kwanyar Kab. Bangkalan
RAHMAWATI, M.Pd
NIP. 19700703 199802 2 003
NO
1
I.
1
2
3
4
II.
1
2
III.
1
IV.
1
V.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran kusen 1.00 bh ### ###
VI. Pembongkaran dinding 15.00 m² ### ###
1 Penetelan plesteran 428.64 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 Ls ### ###
3 ###
4 PEKERJAAN PASANGAN/PLESTERAN ###
5 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 0.91 22.20 m² Rp - Rp -
6 Plesteran 1Pc : 5Ps 1.07 44.40 m² Rp - Rp -
Rp -
VII. PEKERJAAN KAYU
1 Lisplank kayu 3/30 cm 4.00 m¹ ### ###
2 ###
3 PEKERJAAN PLAFOND
4 Plafond calsi 1 x 1 + rangka kayu 12.00 m² Rp - Rp -
Rp -
VIII. PEKERJAAN PENGECATAN
1 Pengecatan dinding (3 kelas) 455.30 m² Rp - Rp -
2 Pengecatan plafond 319.00 m² Rp - Rp -
3 Pengecatan kayu 206.70 m² Rp - Rp - ###
4 Pengecatan kayu (Kantor) 214.39 m² Rp - Rp -
5 Rp -
6PEKERJAAN LANTAI 162.00 ###
Keramik lantai 40 x 40 ( 2 R Kelas ) 5.67 126.00 m² ### ###
IX. Keramik lantai 40 x 40 ( Teras ) 1.62 36.00 m² ### ###
1 Keramik dinding 25 x 40 (dalam kelas + teras) 5.78 128.40 m² ### ###
Keramik kolom teras 25 x 40 1.01 22.40 m² ### ###
X. List keramik 1.64 327.80 m' ### ###
1 Keramik dinding 25 x 40 (dalam kantor+R.guru+ t 13.51 300.24 m² ### ###
2 451.04 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 3.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Hag Angin 60.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
REKAPITULASI
PEKERJAAN KACA
NCANA ANGGARAN BIAYA
Kaca mati t=5 mm (yg pecah) 1.68 m² ### ###
###
KEGI PEKERJAAN TEMPAT DUDUK
PEKE Pasangan trasram 0.68 17.00 m² Rp - Rp -
LING Plat beton tempat duduk t=10 cm 0.53 1.02 m³ ### ###
LOKA Keramik tempat duduk 30 x 30 0.46 10.20 m² ### ###
Keramik dinding tempat duduk 25 x 40 1.84 40.80 m² ### ###
NO. 34.71 ###
0.86768 40.80
I
II
III
IV
V
VI
VII
VIII
IX
X 7
OK
BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 KWANYAR
: SMPN 2 KWANYAR KEC. KWANYAR KAB. BANGKALAN
TERBILANG : ( SERATUS SEMBILAN PULUH TUJUH JUTA DELAPAN RATUS RIBU RUPIAH )
URAIAN PEKERJAAN JUMLAH HARGA
PEKERJAAN PERSIAPAN ###
PEKERJAAN PASANGAN/PLESTERAN Rp -
PEKERJAAN KAYU ###
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
PEKERJAAN TEMPAT DUDUK ###
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Kwanyar
Kec. Kwanyar Kab. Bangkalan
RAHMAWATI, M.Pd
NIP. 19700703 199802 2 003
NO
1
I.
1
2
3
4
II.
1
2
III.
1
2
IV.
1
V. Lembar. 2
1 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
2 2 3 4 5
3 PEKERJAAN PERSIAPAN
4 Pembongkaran kusen 1.00 bh ### ###
5 Pembongkaran dinding 15.00 m² ### ###
Penetelan plesteran 428.64 m² ### ###
VI. Pembersihan akhir pekerjaan 1.00 Ls ### ###
1 ###
2 PEKERJAAN PASANGAN/PLESTERAN ###
3 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 22.20 m² Rp - Rp -
4 Plesteran 1Pc : 5Ps 44.40 m² Rp - Rp -
5 Rp -
6 PEKERJAAN KAYU
Perbaikan daun pintu panil 4.00 bh ### ###
VII. Lisplank kayu 3/30 cm 4.00 m¹ ### ###
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsi 1 x 1 + rangka kayu 12.00 m² Rp - Rp -
4 Rp -
PEKERJAAN PENGECATAN
VIII. Pengecatan dinding (3 kelas) 439.90 m² Rp - Rp -
1 Pengecatan dinding (Kantor) 373.40 m² Rp - Rp -
2 Pengecatan plafond 319.00 m² Rp - Rp -
3 Pengecatan kayu 169.45 m² Rp - Rp - ###
4 Pengecatan kayu (Kantor) 197.69 m² Rp - Rp -
5 Rp -
6 PEKERJAAN LANTAI ###
Keramik lantai 40 x 40 ( 2 R Kelas ) 126.00 m² ### ###
IX. Keramik lantai 40 x 40 ( Teras ) 36.00 m² ### ###
1 Keramik dinding 25 x 40 (dalam kelas + teras) 128.40 m² ### ###
Keramik kolom teras 25 x 40 22.40 m² ### ###
X. List keramik 327.80 m' ### ###
1 Keramik dinding 25 x 40 (dalam kantor+R.guru+ teras) 300.24 m² ### ###
2 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 3.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Hag Angin 60.00 bh ### ###
Pintu harmonika 11.30 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK ###
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA
REKAPITULASI
Kaca mati t=5 mm (yg pecah) 1.68 m² ### ###
NCANA ANGGARAN BIAYA ###
PEKERJAAN TEMPAT DUDUK
KEGI Pasangan trasram 17.00 m² Rp - Rp -
PEKE Plat beton tempat duduk t=10 cm 1.02 m³ ### ###
LING Keramik tempat duduk 30 x 30 10.20 m² ### ###
LOKA Keramik dinding tempat duduk 25 x 40 40.80 m² ### ###
###
NO.
I
II
III
IV
V
VI
VII
VIII
IX
8
OK
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Kokop
Kec. Kokop Kab. Bangkalan
II.
1
2
3
III.
1
IV.
1
2
3
V. Lembar. 2
1 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
2 2 3 4 5
3 PEKERJAAN PERSIAPAN
4 Penetelan plesteran 317.46 m² ### ###
5 Pembersihan akhir pekerjaan 1.00 Ls Rp - Rp - #REF!
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 12.25 m² Rp - Rp -
5 Plesteran 1Pc : 5Ps 80.58 m² Rp - Rp -
6 Benangan 55.00 m' Rp - Rp -
7 Rp -
PEKERJAAN PLAFOND
VII. Plafond calsiboard 4mm + rangka kayu 15.00 m² Rp - Rp -
1 Rp -
2 PEKERJAAN PENGECATAN -
3 Pengecatan dinding 506.50 m² Rp - Rp -
4 Pengecatan plafond 352.00 m² Rp - Rp - #DIV/0!
5 Pengecatan kayu 275.60 m² Rp - Rp -
6 Rp -
PEKERJAAN LANTAI ###
VIII. Keramik lantai 40 x 40 243.00 m² ### ### 147.47
1 Keramik dinding 25 x 40 ( 3 R. Kelas + teras) 132.96 m² ### ###
List keramik 288.20 m' ### ###
IX. Keramik kolom 25 x 40 16.00 m² ### ###
1 Keramik dinding 25 x 40 ( 5 R. Kelas bg. dalam) 184.50 m² ### ###
2 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 5.00 bh ### ###
Grendel Jendela 50.00 bh ### ###
Hag Angin 100.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 20.00 bh ### ###
Lampu SL 8watt (teras) 5.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 5.00 bh ### ###
Stop kontak + instalasi 5.00 bh ### ###
Instalasi titik lampu 25.00 ttk ### ###
###
PEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 2.53 m² ### ###
###
PEKERJAAN TEMPAT DUDUK
Pasangan trasram 14.70 m² Rp - Rp -
Plat beton tempat duduk t=10 cm 0.74 m³ ### ###
Keramik tempat duduk 30 x 30 7.35 m² ### ###
Keramik dinding tempat duduk 25 x 40 29.40 m² ### ###
###
BATAS
SINERGI 1 SMPN 2 SEPULU DR. AHMAD SABARUDIN, S.Pd, M.MPd
SINERGI 2 SMPN 1 KLAMPIS IMAM SYAFII, S.Pd, MPd
SINERGI 3 SMPN 2 KOKOP MOHAMMAD TAUFIK, SPd
SINERGI 4 SMPN 3 SATAP KOKOP IHSANUDIN, S.Pd
INDRAKILA 5 SMPN 1 TRAGAH Drs. AMIRULLAH, MM
INDRAKILA 6 SMPN 2 MODUNG A S U R, M.Pd
INDRAKILA 7 SMPN 2 LABANG Drs. HARTONO, M.Pd
INDRAKILA 8 SMPN 2 KWANYAR RAHMAWATI, M.Pd
9 SMPN TAHAL AMIN H. ABDULLAH, S.Pd
10 SMPN 1 MODUNG Drs. ALI MUSTOFA, M.Pd
11 SMPN 1 GALIS Drs. TAUFIKUR RAHMAN
12 SMPN 1 KOKOP BUDIONO, S.Pd, M.Pd
28.5
23.5
7.833333
1 ( Satu )
5 Oktob. s/d 10 Oktober 2015
Oktober 2015
29 Oktober 2015
Rp. 212.320.000.00
Prestasi Pekerjaan Prestasi Pekerjaan
Minggu Ini (%) Komulatif (%)
Rerata Prestasi Rerata
(9) (10) (11)
(8)/100x(5) (6)+(8) (7)+(9)
- - - Rp 88,586.67 Rp 1,638,853.33
- - - Rp 42,298.80 Rp 1,565,055.60
- - - Rp - Rp -
Rp 3,203,908.93
- - - Rp 3,912,550.00 Rp 234,753.00
- - - Rp 3,962,550.00 Rp 114,121.44
- - - Rp 3,962,550.00 Rp 1,027,092.96
- - - Rp 3,962,550.00 Rp 1,255,335.84
Rp 2,631,303.24
- - - Rp 185,000.00 Rp 25,849,125.00
- - - Rp 185,000.00 Rp 21,929,437.50
- - - Rp 65,000.00 Rp 3,100,500.00
Rp 50,879,062.50
- - - Rp 18,000.00 Rp 2,515,050.00
- - - Rp 110,000.00 Rp 26,078,250.00
- - - Rp 95,820.00 Rp 2,558,394.00
- - - Rp 21,149.40 Rp 1,184,366.40
Rp 32,336,060.40
- - - Rp 85,000.00 Rp 22,185,000.00
Rp 22,185,000.00
- - - Rp 20,740.00 Rp 10,805,637.48
- - - Rp 20,740.00 Rp 5,413,140.00
- - - Rp 42,450.00 Rp 4,752,702.00
Rp 20,971,479.48
- - - Rp 105,250.00 Rp 3,315,375.00
- - - Rp 112,000.00 Rp 16,800,000.00
- - - Rp 136,075.00 Rp 12,540,672.00
- - - Rp 85,000.00 Rp 6,528,000.00
Rp 39,184,047.00
- - - Rp 55,000.00 Rp 660,000.00
- - - Rp 50,000.00 Rp 150,000.00
- - - Rp 20,000.00 Rp 80,000.00
- - - Rp 15,000.00 Rp 75,000.00
- - - Rp 225,000.00 Rp 1,125,000.00
Rp 200,000.00 Rp 3,000,000.00
Rp 5,090,000.00
- - - Rp 112,125.00 Rp 376,964.25
Rp 376,964.25
2.95 2.95
Rp 20,300,000.00 2.95 %
1 ( Satu )
5 Oktob. s/d 10 Oktober 2015
Oktober 2015
29 Oktober 2015
- - - Rp 58,500.00 Rp 126,360.00
- - - Rp 215,400.00 Rp 77,544.00
- - - Rp 16,110.00 Rp 17,398.80
Rp 221,302.80
- - - Rp 88,586.67 Rp 3,790,281.61
- - - Rp 42,298.80 Rp 3,619,604.84
- - - Rp 11,825.00 Rp 3,651,560.00
Rp 11,061,446.45
- - - Rp 897,800.00 Rp 161,604.00
- - - Rp 3,962,550.00 Rp 2,139,777.00
- - - Rp 3,962,550.00 Rp 3,120,508.13
- - - Rp 3,962,550.00 Rp 5,943,825.00
- - - Rp 3,962,550.00 Rp 9,510,120.00
- - - Rp 3,962,550.00 Rp 941,501.88
Rp 21,817,336.01
- - - Rp 210,000.00 Rp 77,723,100.00
- - - Rp 65,000.00 Rp 5,063,500.00
Rp 82,786,600.00
- - - Rp 80,500.00 Rp 16,325,400.00
- - - Rp 18,000.00 Rp 3,011,580.00
- - - Rp 95,820.00 Rp 2,429,037.00
- - - Rp 21,149.40 Rp 617,562.48
Rp 22,383,579.48
- - - Rp 11,431,250.00 Rp 14,644,117.13
- - - Rp 618,250.00 Rp 5,375,065.50
- - - Rp 430,475.00 Rp 7,148,037.38
- - - Rp 419,572.50 Rp 4,833,475.20
Rp 32,000,695.20
- - - Rp 85,000.00 Rp 25,857,000.00
Rp 25,857,000.00
- - - Rp 20,740.00 Rp 12,412,890.00
- - - Rp 20,740.00 Rp 6,309,108.00
- - - Rp 42,450.00 Rp 8,774,415.00
Rp 27,496,413.00
- - - Rp 112,000.00 Rp 26,880,000.00
- - - Rp 136,075.00 Rp 17,662,535.00
- - - Rp 136,075.00 Rp 870,880.00
- - - Rp 85,000.00 Rp 10,115,000.00
Rp 55,528,415.00
- - - Rp 140,750.00 Rp 422,250.00
- - - Rp 23,625.00 Rp 425,250.00
- - - Rp 16,687.50 Rp 267,000.00
- - - Rp 74,250.00 Rp 222,750.00
- - - Rp 14,750.00 Rp 236,000.00
- - - Rp 17,750.00 Rp 284,000.00
Rp 1,857,250.00
- - - Rp 55,000.00 Rp 660,000.00
- - - Rp 50,000.00 Rp 150,000.00
- - - Rp 20,000.00 Rp 60,000.00
- - - Rp 15,000.00 Rp 45,000.00
- - - Rp 225,000.00 Rp 675,000.00
- - - Rp 200,000.00 Rp 3,000,000.00
Rp 4,590,000.00
- - - Rp 112,125.00 Rp 3,038,587.50
Rp 3,038,587.50
0.28 -
Rp 20,300,000.00 - %
1 ( Satu )
5 Oktob. s/d 10 Oktober 2015
Oktober 2015
29 Oktober 2015
- - - Rp 210,000.00 Rp 53,841,375.00
- - - Rp 65,000.00 Rp 4,238,000.00
Rp 58,079,375.00
- - - Rp 80,500.00 Rp 15,344,910.00
- - - Rp 18,000.00 Rp 2,002,725.00
- - - Rp 95,820.00 Rp 1,854,117.00
- - - Rp 21,149.40 Rp 560,459.10
Rp 19,762,211.10
- - - Rp 85,000.00 Rp 17,105,400.00
Rp 17,105,400.00
- - - Rp 20,740.00 Rp 1,119,960.00
- - - Rp 9,670.00 Rp 3,331,315.00
0.77 75.00 0.77 Rp 9,670.00 Rp 1,945,990.80
- - - Rp 42,450.00 Rp 830,322.00
Rp 7,227,587.80
- - - Rp 112,000.00 Rp 18,144,000.00
- - - Rp 136,075.00 Rp 762,020.00
Rp 18,906,020.00
- - - Rp 140,750.00 Rp 281,500.00
- - - Rp 23,625.00 Rp 283,500.00
- - - Rp 16,687.50 Rp 267,000.00
- - - Rp 74,250.00 Rp 148,500.00
- - - Rp 14,750.00 Rp 236,000.00
- - - Rp 17,750.00 Rp 284,000.00
Rp 1,500,500.00
- - - Rp 55,000.00 Rp 440,000.00
- - - Rp 50,000.00 Rp 100,000.00
- - - Rp 20,000.00 Rp 40,000.00
- - - Rp 15,000.00 Rp 30,000.00
- - - Rp 225,000.00 Rp 450,000.00
- - - Rp 200,000.00 Rp 2,000,000.00
Rp 3,060,000.00
- - - Rp 112,125.00 Rp 2,318,745.00
Rp 2,318,745.00
5.82 26.82
Rp 50,802,000.00 26.82 %
LAMA
140
BARU
LAMA
BARU
LAMA
BARU
LAMA
BARU
keramik tambal sulam
SADALI, S.Pd
UBAGIO, M.Pd
NDAYANI, M.Pd
1 2 3 4 5
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
1.01 100 1.01 100 1.01 100 1.01 100 1.01 100
0.11 - - - - - - - - -
0.90 - - 100 0.90 100 0.90 100 0.90 100
0.86 - - - - 100 0.86 100 0.86 100
- - - - - 100 - 100 - 100
14.17 - - - - - - - - -
12.02 - - - - - - - - -
1.70 - - - - - - - - -
1.38 - - - - - - - - -
14.29 - - - - - - - - -
1.40 - - - - - - - - -
0.65 - - - - - - - - -
12.16 - - - - - - - - -
5.92 - - - - - - - - -
2.97 - - - - - - - - -
2.61 - - - - - - - - -
1.82 - - - - - - - - -
9.21 - - - - - - - - -
6.87 - - - - - - - - -
3.58 - - - - - - - - -
0.36 - - - - - - - - -
0.08 - - - - - - - - -
0.04 - - - - - - - - -
0.04 - - - - - - - - -
0.62 - - - - - - - - -
1.64 - - - - - - - - -
0.21 - - - - - - - - -
1 2 3 4 5
0.20 100 0.20 100 0.20 100 0.20 100 0.20 100
0.08 100 0.08 100 0.08 100 0.08 100 0.08 100
0.07 - - - - - - - - -
0.05 - - - - - - 25 0.01 50
0.70 - - - - - - - - 50
1.02 - - - - - - - - -
1.95 - - - - - - - - -
3.12 - - - - - - - - 50
0.31 - - - - - - - - 75
25.51 - - - - - - - - -
1.66 - - - - - - - - -
5.36 - - - - - - - - -
0.99 - - - - - - - - -
0.80 - - - - - - - - -
0.20 - - - - - - - - -
4.81 - - - - - - - - 50
1.76 - - - - - - - - -
2.35 - - - - - - - - -
1.59 - - - - - - - - -
8.49 - - - - - - - - -
4.07 - - - - - - - - -
2.07 - - - - - - - - -
2.88 - - - - - - - - -
8.82 - - - - - - - - -
5.80 - - - - - - - - -
0.29 - - - - - - - - -
3.32 - - - - - - - - -
0.14 - - - - - - - - -
0.14 - - - - - - - - -
0.09 - - - - - - - - -
0.07 - - - - - - - - -
0.08 - - - - - - - - -
0.09 - - - - - - - - -
0.22 - - - - - - - - -
0.05 - - - - - - - - -
0.02 - - - - - - - - -
0.01 - - - - - - - - -
0.22 - - - - - - - - -
0.98 - - - - - - - - -
1.00 - - - - - - - - -
1 2 3 4 5
1.70 100 1.70 100 1.70 100 1.70 100 1.70 100
0.32 100 0.32 100 0.32 100 0.32 100 0.32 100
0.65 100 0.65 100 0.65 100 0.65 100 0.65 100
0.11 - - - - - - - - -
0.05 100 0.05 100 0.05 100 0.05 100 0.05 100
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100
0.01 50 0.00 100 0.01 100 0.01 100 0.01 100
8.10 - - - - - - - - -
1.06 - - - - - - - - -
0.98 - - - - - - - - -
0.30 - - - - - - - - -
9.03 - - - - - - - - -
0.59 - - - - - - - - -
1.76 - - - - - - - - -
1.03 - - - - - - - - 75
0.44 - - - - - - - - -
9.58 - - - - - - - - -
0.40 - - - - - - - - -
0.15 - - - - - - - - -
0.15 - - - - - - - - -
0.14 - - - - - - - - -
0.08 - - - - - - - - -
0.12 - - - - - - - - -
0.15 - - - - - - - - -
0.23 - - - - - - - - -
0.05 - - - - - - - - -
0.02 - - - - - - - - -
0.02 - - - - - - - - -
0.24 - - - - - - - - -
1.06 - - - - - - - - -
1.22 - - - - - - - - -
6 7 8 9 10
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
1.01 100 1.01 100 1.01 100 1.01 100 1.01 100
- - - - - - - 100 0.11 100
0.90 100 0.90 100 0.90 100 0.90 100 0.90 100
0.86 100 0.86 100 0.86 100 0.86 100 0.86 100
- 100 - 100 - 100 - 100 - 100
0.13 100 0.13 100 0.13 100 0.13 100 0.13 100
0.06 100 0.06 100 0.06 100 0.06 100 0.06 100
0.56 100 0.56 100 0.56 100 0.56 100 0.56 100
0.34 100 0.69 100 0.69 100 0.69 100 0.69 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
6 7 8 9 10
0.20 100 0.20 100 0.20 100 0.20 100 0.20 100
0.08 100 0.08 100 0.08 100 0.08 100 0.08 100
- - - - - - - - - 100
0.04 100 0.04 100 0.04 100 0.04 100 0.04 100
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100
0.01 100 0.01 100 0.01 100 0.01 100 0.01 100
1.24 100 1.24 100 1.24 100 1.24 100 1.24 100
1.19 100 1.19 100 1.19 100 1.19 100 1.19 100
1.20 100 1.20 100 1.20 100 1.20 100 1.20 100
0.03 100 0.05 100 0.05 100 0.05 100 0.05 100
0.35 100 0.70 100 0.70 100 0.70 100 0.70 100
- 50 0.51 100 1.02 100 1.02 100 1.02 100
- 50 0.98 100 1.95 100 1.95 100 1.95 100
1.56 75 2.34 100 3.12 100 3.12 100 3.12 100
0.23 100 0.31 100 0.31 100 0.31 100 0.31 100
2.40 100 4.81 100 4.81 100 4.81 100 4.81 100
- - - - - - - 100 1.76 100
- - - - - - - 100 2.35 100
- - - - - 50 0.79 100 1.59 100
- - - - - - - 50 4.24 100
- - - - - - - 75 6.62 100
- - - - - - - 50 2.90 100
- - - - - - - 50 0.14 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
1.70 100 1.70 100 1.70 100 1.70 100 1.70 100
0.32 100 0.32 100 0.32 100 0.32 100 0.32 100
0.65 100 0.65 100 0.65 100 0.65 100 0.65 100
- - - - - - - - - 100
0.05 100 0.05 100 0.05 100 0.05 100 0.05 100
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100
0.01 100 0.01 100 0.01 100 0.01 100 0.01 100
4.29 100 4.29 100 4.29 100 4.29 100 4.29 100
4.10 100 4.10 100 4.10 100 4.10 100 4.10 100
1.08 100 1.08 100 1.08 100 1.08 100 1.08 100
0.15 100 0.15 100 0.15 100 0.15 100 0.15 100
0.79 100 0.79 100 0.79 100 0.79 100 0.79 100
0.74 100 0.99 100 0.99 100 0.99 100 0.99 100
- 100 2.23 100 2.23 100 2.23 100 2.23 100
- 100 2.64 100 2.64 100 2.64 100 2.64 100
- 100 1.17 100 1.17 100 1.17 100 1.17 100
- 25 7.11 100 28.43 100 28.43 100 28.43 100
- - - 100 2.24 100 2.24 100 2.24 100
5.81 100 5.81 100 5.81 100 5.81 100 5.81 100
4.22 100 4.22 100 4.22 100 4.22 100 4.22 100
2.11 100 2.11 100 2.11 100 2.11 100 2.11 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
0.97
0.97
1.01
0.11
0.90
0.86
-
0.13
0.06
0.56
0.69
14.17
12.02
1.70
1.38
14.29
1.40
0.65
12.16
5.92
2.97
2.61
1.82
9.21
6.87
3.58
0.36
0.08
0.04
0.04
0.62
1.64
0.21
0.20
0.08
0.07
0.04
0.03
0.01
1.24
1.19
1.20
0.05
0.70
1.02
1.95
3.12
0.31
25.51
1.66
5.36
0.99
0.80
0.20
4.81
1.76
2.35
1.59
8.49
4.07
2.07
2.88
8.82
5.80
0.29
3.32
0.14
0.14
0.09
0.07
0.08
0.09
0.22
0.05
0.02
0.01
0.22
0.98
1.00
1.70
0.32
0.65
0.11
0.05
0.03
0.01
4.29
4.10
1.08
0.15
0.79
0.99
2.23
2.64
1.17
28.43
2.24
8.10
1.06
0.98
0.30
5.81
4.22
2.11
9.03
0.59
1.76
1.03
0.44
9.58
0.40
0.15
0.15
0.14
0.08
0.12
0.15
0.23
0.05
0.02
0.02
0.24
1.06
1.22
YANG DIPAKAI
TH. 2018
1 SMPN 2 SEPULU 2 KELAS ### SINERGI
2 SMPN 1 KLAMPIS 3 KELAS ### SINERGI
3 SMPN 2 KOKOP 2 KELAS ### SINERGI
4 SMPN 3 SATAP KOKOP 2 KELAS ### SINERGI
5 SMPN 1 TRAGAH 3 KELAS ### INDRAKILA
6 SMPN 2 MODUNG 2 KELAS ### INDRAKILA
7 SMPN 2 LABANG 3 KELAS ### INDRAKILA
8 SMPN 2 KWANYAR 2 KELAS ### INDRAKILA
9 SMPN TAHAL AMIN H. ABDULLAH, S.Pd
REKAPITULASI 1
RENCANA ANGGARAN BIAYA OK
OK
KEGIATAN : PENGADAAN SARANA PRASARANA
PEKERJAAN : PERENCANAAN SMP KABUPATEN BANGKALAN
LINGKUP PEKERJAAN : REHABILITASI 2 RUANG BELAJAR SMPN 2 SEPULU
LOKASI : SMPN 2 SEPULU KEC. SEPULU KAB. BANGKALAN
JUMLAH ###
DIBULATK ### ###
###
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Sepulu
Kec. Sepulu Kab. Bangkalan
LAPORAN MINGGUAN
Minggu ke :
Pekerjaan : REHABILITASI 2 RUANG KELAS SMPN 2 SEPULU Tanggal :
Nama Sekolah : SMPN 2 SEPULU Bulan :
Lokasi : Kec. Kedamean Kab. Gresik Dana diterima tangal :
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%)
% Prestasi Rerata Prestasi
(1) (2) (3) (4) (5) (6) (7) (8)
(6)/100x(5)
I. PEKERJAAN PERSIAPAN
1 Pembongkaran atap + rangka atap 143.00 m² 0.97 - - 100
2 Pembongkaran atap 234.90 m² 0.97 - - 100
3 Penetelan plesteran 92.16 m² 1.01 - - 100
4 Pembersihan akhir pekerjaan 1.00 ls 0.11 - - -
II. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 18.50 m² 0.90 - - -
2 Plesteran 1Pc : 5Ps 37.00 m² 0.86 - - -
3 Benangan 48.00 m' - - - -
V. PEKERJAAN ATAP
1 Atap genteng beton (lama) 139.73 m² 1.38 - - -
2 Atap genteng beton warna 237.08 m² 14.29 - - -
3 Genteng bubungan beton warna 26.70 m' 1.40 - - -
4 Plesteran kompres L = 10 cm (Akhiran genting) 56.00 m' 0.65 - - -
JUMLAH 100.00 -
Jumlah dana yang digunakan sampai dengan minggu ini ( minggu ke 1 ) Rp 20,300,000.00
REKAPITULASI 2
RENCANA ANGGARAN BIAYA OK
I (2) ###
II PEKERJAAN TANAH ###
III PEKERJAAN PASANGAN/PLESTERAN ###
IV PEKERJAAN BETON ###
V PEKERJAAN RANGKA ATAP ###
VI PEKERJAAN ATAP ###
VII PEKERJAAN KUSEN PINTU DAN JENDELA ###
VIII PEKERJAAN PLAFOND ###
IX PEKERJAAN PENGECATAN/PLAMIRAN ###
X PEKERJAAN LANTAI ###
XI PEKERJAAN KUNCI + PENGGANTUNG ###
XII PEKERJAAN INSTALASI LISTRIK ### ###
XIII PEKERJAAN KACA ###
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 1 Kelampis
Kec. Kelampis Kab. Bangkalan
LAPORAN MINGGUAN
Minggu ke :
Pekerjaan : REHABILITASI 2 RUANG KELAS SMPN 1 KLAMPIS Tanggal :
Nama Sekolah : SMPN 1 KLAMPIS Bulan :
Lokasi : Kec. Kedamean Kab. Gresik Dana diterima tangal :
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%)
% Prestasi Rerata Prestasi
(1) (2) (3) (4) (5) (6) (7) (8)
I. PEKERJAAN PERSIAPAN (6)/100x(5)
1 Pembongkaran kosen 12.00 bh 0.20 - - 100
2 Penetelan plesteran 12.00 m² 0.08 - - 100
3 Pembersihan akhir pekerjaan 1.00 ls 0.07 - - -
X. PEKERJAAN LANTAI
1 Keramik lantai 40 x 40 240.00 m² 8.82 - - -
2 Keramik dinding 25 x 40 129.80 m² 5.80 - - -
3 Keramik kolom 25 x 40 6.40 m² 0.29 - - -
4 List keramik 119.00 m' 3.32 - - -
JUMLAH 95.07 -
Jumlah dana yang digunakan sampai dengan minggu ini ( minggu ke 1 ) Rp 20,300,000.00
3
REKAPITULASI OK
NCANA ANGGARAN BIAYA OK
: PENGADAAN SARANA PRASARANA
KEGIATAN : PERENCANAAN SMP KABUPATEN BANGKALAN
PEKERJAAN : REHABILITASI 2 RUANG BELAJAR SMPN 3 SATAP KOKOP
LINGKUP PEKERJAAN : SMPN 3 SATAP KOKOP KEC. KOKOP KAB. BANGKALAN
LOKASI
URAIAN PEKERJAAN JUMLAH HARGA
NO.
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
H. SUBADRIH, ST, MT
Mengetahui :
Kepala Sekolah
SMPN 3 Satap Kokop
Kec. Kokop Kab. Bangkalan
IHSANUDIN, S.Pd
NIP. 19700109 199104 1 001
LAPORAN MINGGUAN
Minggu ke :
Pekerjaan : REHABILITASI 2 RUANG BELAJAR SMPN 3 SATAP KOKOP Tanggal :
Nama Sekolah : SMPN 3 SATAP KOKOP KEC. KOKOP KAB. BANGKALAN Bulan :
Lokasi : KEC. KOKOP KAB. BANGKALAN Dana diterima tangal :
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%)
% Prestasi Rerata Prestasi
(1) (2) (3) (4) (5) (6) (7) (8)
(6)/100x(5)
I. PEKERJAAN PERSIAPAN
1 Pembongkaran atap + rangka 260.00 m² 1.70 100 1.70 -
2 Pembongkaran kosen 12.00 bh 0.32 100 0.32 -
3 Pembongkaran dinding 61.75 m² 0.65 100 0.65 -
4 Pembersihan akhir pekerjaan 1.00 ls 0.11 - - -
X. PEKERJAAN LANTAI
1 Keramik lantai 40 x 40 162.00 m² 9.58 - - -
2 Keramik kolom 20 x 40 (motif) 5.60 m² 0.40 - - -
Mengetahui Menyetujui
SMPN 3 Satap Kokop Panitia Pembangunan Sekolah
Kec. Kokop Kab. Bangkalan
Selaku Penanggung Jawab
IHSANUDIN, S.Pd SUHAERI
NIP. 19700109 199104 1 001
REKAPITULASI
NCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI
NO.
I
II
III
IV
V
VI
VII
VIII
IX
X 4
XI OK
XII LAMA
XIII : PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 1 TRAGAH
: SMPN 1 TRAGAH KEC. TRAGAH KAB. BANGKALAN
TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )
PEKERJAAN PERSIAPAN ###
PEKERJAAN TANAH ###
PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA #DIV/0!
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 1 Tragah
Kec. Tragah Kab. Bangkalan
Drs. AMIRULLAH, MM
NIP. 19581217 198603 1 011
NO
1
I.
1
2
3
4
II.
1
2
4
III.
1
2
3
IV.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran atap + rangka 377.00 m² ### ###
V. Pembongkaran kusen 4.00 bh ### ###
1 Penetelan plesteran 159.60 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VI. PEKERJAAN TANAH ###
1 Galian tanah 2.16 m³ ### ###
2 Urugan pasir bawah pondasi t=10cm 0.36 m³ ### ### #DIV/0!
3 Urugan tanah kembali 1.08 m³ ### ###
4 ###
PEKERJAAN PASANGAN/PLESTERAN
VII. Pasangan 1/2 bata camp. 1 Pc : 5 Ps 7.20 m² ### ### ###
1 Plesteran 1Pc : 5Ps 14.40 m² ### ###
2 Benangan 24.00 m' ### ###
3 ###
PEKERJAAN BETON
VIII. Lantai kerja bawah pondasi 1:3:5 t=5cm 0.18 m³ ### ###
1 Pondasi beton stempat 60 x 60 x 15cm 0.54 m³ ### ###
Kolom teras 15/15 0.79 m³ ### ###
IX. Balok beton 15/20 1.71 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ ### ###
X. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Penang (baru) 382.73 m² ### ###
3 Atap genteng (lama bg. belakang) 170.10 m² ### ###
4 Genteng bubungan Karang penang 28.35 m' ### ###
Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' ### ###
XI. ###
1 PEKERJAAN KUSEN PINTU DAN JENDELA
2 Kusen kayu kempas/mahoni 6/15 #DIV/0! m³ Rp - #DIV/0!
3 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 8.61 m² Rp - Rp - #DIV/0!
4 Daun Jendela kaca kayu kempas/mahoni 3/10 8.40 m² Rp - Rp - ###
5 #DIV/0!
6 PEKERJAAN PLAFOND
Plafond calsiboard 4mm + rangka kayu 4/6 294.84 m² ### ###
XII ###
1 PEKERJAAN PENGECATAN
2 Pengecatan dinding (3 Ruang kelas) 598.50 m² ### ###
3 Pengecatan plafond 294.84 m² ### ###
4 Pengecatan kayu 206.70 m² ### ###
5 ###
6 PEKERJAAN LANTAI #DIV/0!
Keramik lantai 40 x 40 245.70 m² ### ###
XIII. Keramik dinding 25 x 40 ( 3 R.kelas + teras ) 159.60 m² ### ###
1 List keramik dinding 7cm 110.40 m² ### ###
Keramik kolom 25 x 40 12.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Engsel Pintu 18.00 bh ### ###
Engsel Jendela 16.00 bh ### ###
Grendel pintu 3.00 bh ### ###
Grendel Jendela 16.00 bh ### ###
Hag Angin 16.00 bh ### ###
###
REKAPITULASI
PEKERJAAN INSTALASI LISTRIK
NCANA ANGGARAN
Lampu BIAYA
SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
KEGI Saklar ganda 3.00 bh ### ###
PEKE Saklar tunggal 3.00 bh ### ###
LING Stop kontak + instalasi 3.00 bh ### ###
LOKA Instalasi titik lampu 15.00 ttk ### ###
###
NO. PEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 11.14 m² ### ###
###
I
II
III
IV
V
VI
VII
VIII
IX
X 4
XI OK
XII BARU
XIII : PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 1 TRAGAH
: SMPN 1 TRAGAH KEC. TRAGAH KAB. BANGKALAN
TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )
PEKERJAAN PERSIAPAN ###
PEKERJAAN TANAH ###
PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA Rp -
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 1 Tragah
Kec. Tragah Kab. Bangkalan
Drs. AMIRULLAH, MM
NIP. 19581217 198603 1 011
NO
1
I.
1
2
3
4
II.
1
2
4
III.
1
2
3
IV.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran atap + rangka 377.00 m² ### ###
V. Pembongkaran kusen 8.00 bh ### ###
1 Penetelan plesteran 249.00 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VI. PEKERJAAN TANAH ###
1 Galian tanah 2.16 m³ ### ###
2 Urugan pasir bawah pondasi t=10cm 0.36 m³ ### ### ###
3 Urugan tanah kembali 1.08 m³ ### ###
###
VII. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 24.02 m² ### ### ###
2 Plesteran 1Pc : 5Ps 48.03 m² ### ###
3 Benangan 168.00 m' ### ###
4 ###
PEKERJAAN BETON
VIII. Lantai kerja bawah pondasi 1:3:5 t=5cm 0.18 m³ ### ###
1 Pondasi beton stempat 60 x 60 x 15cm 0.54 m³ ### ###
Kolom teras 15/15 0.79 m³ ### ###
IX. Balok beton 15/20 1.56 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ ### ###
X. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Penang (baru) 382.73 m² ### ###
3 Genteng bubungan Karang penang 28.35 m' ### ###
4 Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' ### ###
5 ###
PEKERJAAN KUSEN PINTU DAN JENDELA
XI. Kusen kayu kempas/mahoni 6/15 1.09 m³ Rp - Rp -
1 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 8.61 m² Rp - Rp - ###
2 Jalusi kayu kempas/mahoni 3/12 7.20 m² Rp - Rp -
3 Daun Jendela kaca kayu kempas/mahoni 3/10 6.72 m² Rp - Rp - ###
4 Rp -
5 PEKERJAAN PLAFOND
6 Plafond calsiboard 4mm + rangka kayu 4/6 294.84 m² ### ###
###
XII PEKERJAAN PENGECATAN
1 Pengecatan dinding (3 Ruang kelas) 598.50 m² ### ###
2 Pengecatan plafond 294.84 m² ### ###
3 Pengecatan kayu 206.70 m² ### ###
4 ###
5 PEKERJAAN LANTAI ###
6 Keramik lantai 40 x 40 245.70 m² ### ###
Keramik dinding 25 x 40 ( 3 R.kelas + teras ) 173.40 m² ### ###
XIII. List keramik dinding 7cm 132.90 m² ### ###
1 Keramik kolom 25 x 40 12.00 m² ### ###
Keramik dinding 25 x 40 ( 3 R.kelas teras saja ) 75.60 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Engsel Pintu 18.00 bh ### ###
Engsel Jendela 16.00 bh ### ###
Grendel pintu 3.00 bh ### ###
Grendel Jendela 16.00 bh ### ###
Hag Angin 16.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
REKAPITULASI
Lampu SL 8watt (teras) 3.00 bh ### ###
NCANA ANGGARAN BIAYA
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
KEGI Stop kontak + instalasi 3.00 bh ### ###
PEKE Instalasi titik lampu 15.00 ttk ### ###
LINGKUP PEKERJAAN ###
LOKAPEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 11.14 m² ### ###
NO. ###
I
II
III
IV
V
VI
VII
VIII
IX
X 5
XI OK
XII LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 MODUNG
: SMPN 2 MODUNG KEC. MODUNG KAB. BANGKALAN
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Modung
Kec. Modung Kab. Bangkalan
A S U R, M.Pd
NIP. 19610117 198403 1 008
NO
1
I.
1
2
II.
1
2
3
III.
1
2
3
IV.
1
2
Lembar. 2
V. JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
1 2 3 4 5
2 PEKERJAAN PERSIAPAN
3 Pembongkaran atap + rangka 406.00 m² ### ###
4 Pembersihan akhir pekerjaan 1.00 ls ### ### ###
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 98.93 m² ### ###
2 Plesteran 1Pc : 5Ps 197.87 m² ### ###
3 Benangan 166.56 m' ### ###
###
VII. PEKERJAAN BETON
1 Kolom teras 15/15 0.41 m³ ### ###
Balok teras 15/20 1.24 m³ ### ###
VIII. Ring balk gewel 15/15 0.98 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 396.90 m² ### ###
4 Lisplank kalsiplank 8mm / 30 cm 85.70 m¹ ### ###
5 ###
PEKERJAAN ATAP
IX. Pasang atap genteng karang p enang (baru 5%) 19.85 m² ### ###
1 Pasang atap genteng (lama) 377.06 m² ### ###
Genteng bubungan karang penang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 29.00 m' ### ###
1 ###
2 PEKERJAAN KUSEN PINTU DAN JENDELA
3 Kusen kayu kempas/mahoni 6/12 0.46 m³ Rp - Rp -
4 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 6.72 m² Rp - Rp -
5 Daun Jendela kaca kayu kempas/mahoni 3/10 5.04 m² Rp - Rp -
6 Rp -
PEKERJAAN PLAFOND ###
XI. Plafond calsiboard 4mm + rangka hollow 340.20 m² ### ###
1 ###
2 PEKERJAAN PENGECATAN/PLAMIRAN
3 Pengecatan dinding (depan) 66.85 m² ### ###
4 Pelamiran dinding 430.33 m² ### ###
5 Pelamiran plafond 340.20 m² ### ### ###
6 Pengecatan kayu 206.70 m² ### ###
Cat genteng 396.90 m² ### ###
XII. ###
1 PEKERJAAN LANTAI
Lantai rabat 216.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 4.00 bh ### ###
Engsel Pintu 21.00 bh ### ###
Engsel Jendela 24.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Grendel Jendela 12.00 bh ### ### ###
Hag Angin 24.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 14.00 bh ### ###
Lampu SL 8watt (teras) 4.00 bh ### ###
Saklar ganda 7.00 bh ### ###
REKAPITULASI
Saklar tunggal 3.00 bh ### ###
NCANA ANGGARAN BIAYA
Stop kontak + instalasi 4.00 bh ### ###
Instalasi titik lampu 18.00 bh ### ###
KEGIATAN ###
PEKE PEKERJAAN KACA
LING Kaca mati t=5 mm 14.49 m² ### ###
LOKASI ###
NO.
I
II
III
IV
V
VI
VII
VIII
IX
X 5
XI OK
XII BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 MODUNG
: SMPN 2 MODUNG KEC. MODUNG KAB. BANGKALAN
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Modung
Kec. Modung Kab. Bangkalan
A S U R, M.Pd
NIP. 19610117 198403 1 008
NO
1
I.
1
2
II.
1
2
3
III.
1
2
3
IV.
1
2
Lembar. 2
V. JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
1 2 3 4 5
2 PEKERJAAN PERSIAPAN
3 Pembongkaran atap + rangka 406.00 m² ### ###
4 Pembersihan akhir pekerjaan 1.00 ls ### ### ###
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 98.93 m² ### ###
2 Plesteran 1Pc : 5Ps 197.87 m² ### ###
3 Benangan 166.56 m' ### ###
###
VII. PEKERJAAN BETON
1 Kolom teras 15/15 0.41 m³ ### ###
Balok teras 15/20 1.24 m³ ### ###
VIII. Ring balk gewel 15/15 0.98 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 396.90 m² ### ###
4 Lisplank kalsiplank 8mm / 30 cm 85.70 m¹ ### ###
5 ###
PEKERJAAN ATAP
IX. Pasang atap genteng karang p enang (baru 5%) 19.85 m² ### ###
1 Pasang atap genteng (lama) 377.06 m² ### ###
Genteng bubungan karang penang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 29.00 m' ### ###
1 ###
2 PEKERJAAN KUSEN PINTU DAN JENDELA
3 Kusen kayu kempas/mahoni 6/12 0.46 m³ Rp - Rp -
4 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 6.72 m² Rp - Rp -
5 Daun Jendela kaca kayu kempas/mahoni 3/10 5.04 m² Rp - Rp -
6 Rp -
PEKERJAAN PLAFOND ###
XI. Plafond calsiboard 4mm + rangka kayu 4/6 340.20 m² ### ###
1 ###
2 PEKERJAAN PENGECATAN/PLAMIRAN
3 Pengecatan dinding (depan) 66.85 m² ### ###
4 Pelamiran dinding 430.33 m² ### ###
5 Pelamiran plafond 340.20 m² ### ### ###
6 Pengecatan kayu 206.70 m² ### ###
Cat genteng 396.90 m² ### ###
XII. ###
1 PEKERJAAN LANTAI
Lantai rabat 216.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 4.00 bh ### ###
Engsel Pintu 21.00 bh ### ###
Engsel Jendela 24.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Grendel Jendela 12.00 bh ### ### ###
Hag Angin 24.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 14.00 bh ### ###
Lampu SL 8watt (teras) 4.00 bh ### ###
Saklar ganda 7.00 bh ### ###
REKAPITULASI
Saklar tunggal 3.00 bh ### ###
NCANA ANGGARAN BIAYA
Stop kontak + instalasi 4.00 bh ### ###
Instalasi titik lampu 18.00 bh ### ###
KEGIATAN ###
PEKE PEKERJAAN KACA
LING Kaca mati t=5 mm 14.49 m² ### ###
LOKASI ###
NO.
I
II
III
IV
V
VI
VII
VIII
IX
X 6
XI OK
LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 2 LABANG
: SMPN 2 LABANG KEC. LABANG KAB. BANGKALAN
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
ACHMAD TAUFIK HEYKAL, A.Sg H. SUBADRIH, ST, MT
Mengetahui :
Kepala Sekolah
SMPN 2 Labang
Kec. Labang Kab. Bangkalan
NO
1
I.
1
2
3
4
5
II.
1
III.
1
2
IV.
1
2
3 Lembar. 2
JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
V. 2 3 4 5
1 PEKERJAAN PERSIAPAN ###
Pembongkaran atap + rangka 377.00 m² Rp - Rp -
VI. Pembongkaran kosen 1.00 bh ### ###
1 Pembongkaran dinding 6.00 m² ### ###
2 Penetelan plesteran 139.74 m² ### ###
3 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VII. PEKERJAAN PASANGAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps (nyepit kuda2) 30.91 m² Rp - Rp -
2 Rp -
3 PEKERJAAN RANGKA ATAP ###
4 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ Rp - Rp -
VIII. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Pilang (baru) 382.73 m² ### ###
Genteng bubungan Karang pilang 28.35 m' ### ###
IX. Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' Rp - Rp -
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsiboard 4mm + rangka hollow 354.38 m² Rp - Rp -
4 Rp -
5 PEKERJAAN PENGECATAN
6 Pengecatan dinding 598.50 m² Rp - Rp - ###
Pengecatan plafond 354.38 m² Rp - Rp -
X. Pengecatan kayu 274.60 m² Rp - Rp -
1 Rp -
PEKERJAAN LANTAI
XI. Keramik lantai 40 x 40 243.00 m² ### ###
1 Keramik dinding 25 x 40 139.74 m² ### ###
2 List keramik 102.00 m' ### ###
3 Keramik kolom 20 x 40 10.80 m² ### ###
4 ###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA ###
Kaca mati t=5 mm (yg pecah) 4.22 m² ### ###
###
PEKERJAAN TANGGA DEPAN PINTU
Pasangan batu gunung 2.88 m³ ### ###
Plesterran trasram 7.68 m² ### ###
Keramik kasar 40 x 40 7.04 m² ### ###
Urugan pasir 4.96 m³ ### ###
REKAPITULASI ###
NCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI
NO.
I
II
III
IV
V
VI
VII
VIII
IX
X 6
XI OK
XII BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 2 LABANG
: SMPN 2 LABANG KEC. LABANG KAB. BANGKALAN
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Labang
Kec. Labang Kab. Bangkalan
Drs. HARTONO, M.Pd
NIP. 19690126 199802 1 003
NO
1
I.
1
2
3
4
5
II.
1
2
3
III.
1
IV.
1
2 Lembar. 2
JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
V. 2 3 4 5
1 PEKERJAAN PERSIAPAN ###
2 Pembongkaran atap + rangka 377.00 m² Rp - Rp -
3 Pembongkaran kosen 1.00 bh ### ###
Pembongkaran dinding 6.00 m² ### ###
VI. Penetelan plesteran 127.50 m² ### ###
1 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VII. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps (nyepit kuda2) 22.43 m² Rp - Rp - -
2 Plesteran 1Pc : 5Ps 16.20 m² ### ###
3 Benangan 32.00 m' ### ###
###
VIII. PEKERJAAN BETON
1 Ring balk gewel 15/15 0.40 m³ ### ###
2 ###
3 PEKERJAAN RANGKA ATAP ###
4 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ Rp - Rp -
IX. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Pilang (baru) 382.73 m² ### ###
Genteng bubungan Karang pilang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' Rp - Rp -
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsiboard 4mm + rangka hollow 354.38 m² Rp - Rp -
4 Rp -
5 PEKERJAAN PENGECATAN
6 Pengecatan dinding 598.50 m² Rp - Rp - ###
Pengecatan plafond 354.38 m² Rp - Rp -
XI. Pengecatan kayu 274.60 m² Rp - Rp -
1 Rp -
PEKERJAAN LANTAI
XII. Keramik lantai 40 x 40 243.00 m² ### ###
1 Keramik dinding 25 x 40 127.50 m² ### ###
2 List keramik 102.00 m' ### ###
3 Keramik kolom 20 x 40 10.80 m² ### ###
4 ###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Pintu harmonika 15.00 m² ### ### ###
### ###
PEKERJAAN INSTALASI LISTRIK ###
Lampu SL 14 watt 12.00 bh ### ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA ###
Kaca mati t=5 mm (yg pecah) 4.22 m² ### ###
###
PEKERJAAN TANGGA DEPAN PINTU 3.46
Pasangan batu gunung 2.88 m³ ### ###
Plesterran trasram 7.68 m² ### ###
Keramik kasar 40 x 40 7.04 m² ### ###
Urugan pasir 4.96 m³ ### ###
###
REKAPITULASI
NCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI
NO.
I
II
III
IV
V
VI
VII
VIII
IX
X 7
OK
LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 KWANYAR
: SMPN 2 KWANYAR KEC. KWANYAR KAB. BANGKALAN
TERBILANG : ( SERATUS SEMBILAN PULUH TUJUH JUTA DELAPAN RATUS RIBU RUPIAH )
URAIAN PEKERJAAN JUMLAH HARGA
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Kwanyar
Kec. Kwanyar Kab. Bangkalan
RAHMAWATI, M.Pd
NIP. 19700703 199802 2 003
NO
1
I.
1
2
3
4
II.
1
2
III.
1
IV.
1
V.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran kusen 1.00 bh ### ###
VI. Pembongkaran dinding 15.00 m² ### ###
1 Penetelan plesteran 428.64 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 Ls ### ###
3 ###
4 PEKERJAAN PASANGAN/PLESTERAN ###
5 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 0.91 22.20 m² Rp - Rp -
6 Plesteran 1Pc : 5Ps 1.07 44.40 m² Rp - Rp -
Rp -
VII. PEKERJAAN KAYU
1 Lisplank kayu 3/30 cm 4.00 m¹ ### ###
2 ###
3 PEKERJAAN PLAFOND
4 Plafond calsi 1 x 1 + rangka kayu 12.00 m² Rp - Rp -
Rp -
VIII. PEKERJAAN PENGECATAN
1 Pengecatan dinding (3 kelas) 455.30 m² Rp - Rp -
2 Pengecatan plafond 319.00 m² Rp - Rp -
3 Pengecatan kayu 206.70 m² Rp - Rp - ###
4 Pengecatan kayu (Kantor) 214.39 m² Rp - Rp -
5 Rp -
6PEKERJAAN LANTAI 162.00 ###
Keramik lantai 40 x 40 ( 2 R Kelas ) 5.67 126.00 m² ### ###
IX. Keramik lantai 40 x 40 ( Teras ) 1.62 36.00 m² ### ###
1 Keramik dinding 25 x 40 (dalam kelas + teras) 5.78 128.40 m² ### ###
Keramik kolom teras 25 x 40 1.01 22.40 m² ### ###
X. List keramik 1.64 327.80 m' ### ###
1 Keramik dinding 25 x 40 (dalam kantor+R.guru+ t 13.51 300.24 m² ### ###
2 451.04 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 3.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Hag Angin 60.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
REKAPITULASI
PEKERJAAN KACA
NCANA ANGGARAN BIAYA
Kaca mati t=5 mm (yg pecah) 1.68 m² ### ###
###
KEGI PEKERJAAN TEMPAT DUDUK
PEKE Pasangan trasram 0.68 17.00 m² Rp - Rp -
LING Plat beton tempat duduk t=10 cm 0.53 1.02 m³ ### ###
LOKA Keramik tempat duduk 30 x 30 0.46 10.20 m² ### ###
Keramik dinding tempat duduk 25 x 40 1.84 40.80 m² ### ###
NO. 34.71 ###
0.86768 40.80
I
II
III
IV
V
VI
VII
VIII
IX
X 7
OK
BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 KWANYAR
: SMPN 2 KWANYAR KEC. KWANYAR KAB. BANGKALAN
TERBILANG : ( SERATUS SEMBILAN PULUH TUJUH JUTA DELAPAN RATUS RIBU RUPIAH )
URAIAN PEKERJAAN JUMLAH HARGA
PEKERJAAN PERSIAPAN ###
PEKERJAAN PASANGAN/PLESTERAN Rp -
PEKERJAAN KAYU ###
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
PEKERJAAN TEMPAT DUDUK ###
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Kwanyar
Kec. Kwanyar Kab. Bangkalan
RAHMAWATI, M.Pd
NIP. 19700703 199802 2 003
NO
1
I.
1
2
3
4
II.
1
2
III.
1
2
IV.
1
V. Lembar. 2
1 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
2 2 3 4 5
3 PEKERJAAN PERSIAPAN
4 Pembongkaran kusen 1.00 bh ### ###
5 Pembongkaran dinding 15.00 m² ### ###
Penetelan plesteran 428.64 m² ### ###
VI. Pembersihan akhir pekerjaan 1.00 Ls ### ###
1 ###
2 PEKERJAAN PASANGAN/PLESTERAN ###
3 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 22.20 m² Rp - Rp -
4 Plesteran 1Pc : 5Ps 44.40 m² Rp - Rp -
5 Rp -
6 PEKERJAAN KAYU
Perbaikan daun pintu panil 4.00 bh ### ###
VII. Lisplank kayu 3/30 cm 4.00 m¹ ### ###
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsi 1 x 1 + rangka kayu 12.00 m² Rp - Rp -
4 Rp -
PEKERJAAN PENGECATAN
VIII. Pengecatan dinding (3 kelas) 439.90 m² Rp - Rp -
1 Pengecatan dinding (Kantor) 373.40 m² Rp - Rp -
2 Pengecatan plafond 319.00 m² Rp - Rp -
3 Pengecatan kayu 169.45 m² Rp - Rp - ###
4 Pengecatan kayu (Kantor) 197.69 m² Rp - Rp -
5 Rp -
6 PEKERJAAN LANTAI ###
Keramik lantai 40 x 40 ( 2 R Kelas ) 126.00 m² ### ###
IX. Keramik lantai 40 x 40 ( Teras ) 36.00 m² ### ###
1 Keramik dinding 25 x 40 (dalam kelas + teras) 128.40 m² ### ###
Keramik kolom teras 25 x 40 22.40 m² ### ###
X. List keramik 327.80 m' ### ###
1 Keramik dinding 25 x 40 (dalam kantor+R.guru+ teras) 300.24 m² ### ###
2 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 3.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Hag Angin 60.00 bh ### ###
Pintu harmonika 11.30 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK ###
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA
REKAPITULASI
Kaca mati t=5 mm (yg pecah) 1.68 m² ### ###
NCANA ANGGARAN BIAYA ###
PEKERJAAN TEMPAT DUDUK
KEGI Pasangan trasram 17.00 m² Rp - Rp -
PEKE Plat beton tempat duduk t=10 cm 1.02 m³ ### ###
LING Keramik tempat duduk 30 x 30 10.20 m² ### ###
LOKA Keramik dinding tempat duduk 25 x 40 40.80 m² ### ###
###
NO.
I
II
III
IV
V
VI
VII
VIII
IX
8
OK
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Kokop
Kec. Kokop Kab. Bangkalan
II.
1
2
3
III.
1
IV.
1
2
3
V. Lembar. 2
1 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
2 2 3 4 5
3 PEKERJAAN PERSIAPAN
4 Penetelan plesteran 317.46 m² ### ###
5 Pembersihan akhir pekerjaan 1.00 Ls Rp - Rp - #REF!
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 12.25 m² Rp - Rp -
5 Plesteran 1Pc : 5Ps 80.58 m² Rp - Rp -
6 Benangan 55.00 m' Rp - Rp -
7 Rp -
PEKERJAAN PLAFOND
VII. Plafond calsiboard 4mm + rangka kayu 15.00 m² Rp - Rp -
1 Rp -
2 PEKERJAAN PENGECATAN -
3 Pengecatan dinding 506.50 m² Rp - Rp -
4 Pengecatan plafond 352.00 m² Rp - Rp - #DIV/0!
5 Pengecatan kayu 275.60 m² Rp - Rp -
6 Rp -
PEKERJAAN LANTAI ###
VIII. Keramik lantai 40 x 40 243.00 m² ### ### 147.47
1 Keramik dinding 25 x 40 ( 3 R. Kelas + teras) 132.96 m² ### ###
List keramik 288.20 m' ### ###
IX. Keramik kolom 25 x 40 16.00 m² ### ###
1 Keramik dinding 25 x 40 ( 5 R. Kelas bg. dalam) 184.50 m² ### ###
2 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 5.00 bh ### ###
Grendel Jendela 50.00 bh ### ###
Hag Angin 100.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 20.00 bh ### ###
Lampu SL 8watt (teras) 5.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 5.00 bh ### ###
Stop kontak + instalasi 5.00 bh ### ###
Instalasi titik lampu 25.00 ttk ### ###
###
PEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 2.53 m² ### ###
###
PEKERJAAN TEMPAT DUDUK
Pasangan trasram 14.70 m² Rp - Rp -
Plat beton tempat duduk t=10 cm 0.74 m³ ### ###
Keramik tempat duduk 30 x 30 7.35 m² ### ###
Keramik dinding tempat duduk 25 x 40 29.40 m² ### ###
###
BATAS
SINERGI 1 SMPN 2 SEPULU DR. AHMAD SABARUDIN, S.Pd, M.MPd
SINERGI 2 SMPN 1 KLAMPIS IMAM SYAFII, S.Pd, MPd
SINERGI 3 SMPN 2 KOKOP MOHAMMAD TAUFIK, SPd
SINERGI 4 SMPN 3 SATAP KOKOP IHSANUDIN, S.Pd
INDRAKILA 5 SMPN 1 TRAGAH Drs. AMIRULLAH, MM
INDRAKILA 6 SMPN 2 MODUNG A S U R, M.Pd
INDRAKILA 7 SMPN 2 LABANG Drs. HARTONO, M.Pd
INDRAKILA 8 SMPN 2 KWANYAR RAHMAWATI, M.Pd
9 SMPN TAHAL AMIN H. ABDULLAH, S.Pd
10 SMPN 1 MODUNG Drs. ALI MUSTOFA, M.Pd
11 SMPN 1 GALIS Drs. TAUFIKUR RAHMAN
12 SMPN 1 KOKOP BUDIONO, S.Pd, M.Pd
28.5
23.5
7.833333
1 ( Satu )
5 Oktob. s/d 10 Oktober 2015
Oktober 2015
29 Oktober 2015
Rp. 212.320.000.00
Prestasi Pekerjaan Prestasi Pekerjaan
Minggu Ini (%) Komulatif (%)
Rerata Prestasi Rerata
(9) (10) (11)
(8)/100x(5) (6)+(8) (7)+(9)
- - - Rp 88,586.67 Rp 1,638,853.33
- - - Rp 42,298.80 Rp 1,565,055.60
- - - Rp - Rp -
Rp 3,203,908.93
- - - Rp 3,912,550.00 Rp 234,753.00
- - - Rp 3,962,550.00 Rp 114,121.44
- - - Rp 3,962,550.00 Rp 1,027,092.96
- - - Rp 3,962,550.00 Rp 1,255,335.84
Rp 2,631,303.24
- - - Rp 185,000.00 Rp 25,849,125.00
- - - Rp 185,000.00 Rp 21,929,437.50
- - - Rp 65,000.00 Rp 3,100,500.00
Rp 50,879,062.50
- - - Rp 18,000.00 Rp 2,515,050.00
- - - Rp 110,000.00 Rp 26,078,250.00
- - - Rp 95,820.00 Rp 2,558,394.00
- - - Rp 21,149.40 Rp 1,184,366.40
Rp 32,336,060.40
- - - Rp 85,000.00 Rp 22,185,000.00
Rp 22,185,000.00
- - - Rp 20,740.00 Rp 10,805,637.48
- - - Rp 20,740.00 Rp 5,413,140.00
- - - Rp 42,450.00 Rp 4,752,702.00
Rp 20,971,479.48
- - - Rp 105,250.00 Rp 3,315,375.00
- - - Rp 112,000.00 Rp 16,800,000.00
- - - Rp 136,075.00 Rp 12,540,672.00
- - - Rp 85,000.00 Rp 6,528,000.00
Rp 39,184,047.00
- - - Rp 55,000.00 Rp 660,000.00
- - - Rp 50,000.00 Rp 150,000.00
- - - Rp 20,000.00 Rp 80,000.00
- - - Rp 15,000.00 Rp 75,000.00
- - - Rp 225,000.00 Rp 1,125,000.00
Rp 200,000.00 Rp 3,000,000.00
Rp 5,090,000.00
- - - Rp 112,125.00 Rp 376,964.25
Rp 376,964.25
2.95 2.95
Rp 20,300,000.00 2.95 %
1 ( Satu )
5 Oktob. s/d 10 Oktober 2015
Oktober 2015
29 Oktober 2015
- - - Rp 58,500.00 Rp 126,360.00
- - - Rp 215,400.00 Rp 77,544.00
- - - Rp 16,110.00 Rp 17,398.80
Rp 221,302.80
- - - Rp 88,586.67 Rp 3,790,281.61
- - - Rp 42,298.80 Rp 3,619,604.84
- - - Rp 11,825.00 Rp 3,651,560.00
Rp 11,061,446.45
- - - Rp 897,800.00 Rp 161,604.00
- - - Rp 3,962,550.00 Rp 2,139,777.00
- - - Rp 3,962,550.00 Rp 3,120,508.13
- - - Rp 3,962,550.00 Rp 5,943,825.00
- - - Rp 3,962,550.00 Rp 9,510,120.00
- - - Rp 3,962,550.00 Rp 941,501.88
Rp 21,817,336.01
- - - Rp 210,000.00 Rp 77,723,100.00
- - - Rp 65,000.00 Rp 5,063,500.00
Rp 82,786,600.00
- - - Rp 80,500.00 Rp 16,325,400.00
- - - Rp 18,000.00 Rp 3,011,580.00
- - - Rp 95,820.00 Rp 2,429,037.00
- - - Rp 21,149.40 Rp 617,562.48
Rp 22,383,579.48
- - - Rp 11,431,250.00 Rp 14,644,117.13
- - - Rp 618,250.00 Rp 5,375,065.50
- - - Rp 430,475.00 Rp 7,148,037.38
- - - Rp 419,572.50 Rp 4,833,475.20
Rp 32,000,695.20
- - - Rp 85,000.00 Rp 25,857,000.00
Rp 25,857,000.00
- - - Rp 20,740.00 Rp 12,412,890.00
- - - Rp 20,740.00 Rp 6,309,108.00
- - - Rp 42,450.00 Rp 8,774,415.00
Rp 27,496,413.00
- - - Rp 112,000.00 Rp 26,880,000.00
- - - Rp 136,075.00 Rp 17,662,535.00
- - - Rp 136,075.00 Rp 870,880.00
- - - Rp 85,000.00 Rp 10,115,000.00
Rp 55,528,415.00
- - - Rp 140,750.00 Rp 422,250.00
- - - Rp 23,625.00 Rp 425,250.00
- - - Rp 16,687.50 Rp 267,000.00
- - - Rp 74,250.00 Rp 222,750.00
- - - Rp 14,750.00 Rp 236,000.00
- - - Rp 17,750.00 Rp 284,000.00
Rp 1,857,250.00
- - - Rp 55,000.00 Rp 660,000.00
- - - Rp 50,000.00 Rp 150,000.00
- - - Rp 20,000.00 Rp 60,000.00
- - - Rp 15,000.00 Rp 45,000.00
- - - Rp 225,000.00 Rp 675,000.00
- - - Rp 200,000.00 Rp 3,000,000.00
Rp 4,590,000.00
- - - Rp 112,125.00 Rp 3,038,587.50
Rp 3,038,587.50
0.28 -
Rp 20,300,000.00 - %
1 ( Satu )
5 Oktob. s/d 10 Oktober 2015
Oktober 2015
29 Oktober 2015
- - - Rp 80,500.00 Rp 15,344,910.00
- - - Rp 18,000.00 Rp 2,002,725.00
- - - Rp 95,820.00 Rp 1,854,117.00
- - - Rp 21,149.40 Rp 560,459.10
Rp 19,762,211.10
- - - Rp 85,000.00 Rp 17,105,400.00
Rp 17,105,400.00
- - - Rp 112,000.00 Rp 18,144,000.00
- - - Rp 136,075.00 Rp 762,020.00
Rp 18,906,020.00
- - - Rp 55,000.00 Rp 440,000.00
- - - Rp 50,000.00 Rp 100,000.00
- - - Rp 20,000.00 Rp 40,000.00
- - - Rp 15,000.00 Rp 30,000.00
- - - Rp 225,000.00 Rp 450,000.00
- - - Rp 200,000.00 Rp 2,000,000.00
Rp 3,060,000.00
- - - Rp 112,125.00 Rp 2,318,745.00
Rp 2,318,745.00
15.62 42.44
Rp 80,382,000.00 42.44 %
LAMA
140
BARU
LAMA
BARU
LAMA
BARU
LAMA
BARU
keramik tambal sulam
SADALI, S.Pd
UBAGIO, M.Pd
NDAYANI, M.Pd
1 2 3 4 5
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
1.01 100 1.01 100 1.01 100 1.01 100 1.01 100
0.11 - - - - - - - - -
0.90 - - 100 0.90 100 0.90 100 0.90 100
0.86 - - - - 100 0.86 100 0.86 100
- - - - - 100 - 100 - 100
14.17 - - - - - - - - -
12.02 - - - - - - - - -
1.70 - - - - - - - - -
1.38 - - - - - - - - -
14.29 - - - - - - - - -
1.40 - - - - - - - - -
0.65 - - - - - - - - -
12.16 - - - - - - - - -
5.92 - - - - - - - - -
2.97 - - - - - - - - -
2.61 - - - - - - - - -
1.82 - - - - - - - - -
9.21 - - - - - - - - -
6.87 - - - - - - - - -
3.58 - - - - - - - - -
0.36 - - - - - - - - -
0.08 - - - - - - - - -
0.04 - - - - - - - - -
0.04 - - - - - - - - -
0.62 - - - - - - - - -
1.64 - - - - - - - - -
0.21 - - - - - - - - -
1 2 3 4 5
0.20 100 0.20 100 0.20 100 0.20 100 0.20 100
0.08 100 0.08 100 0.08 100 0.08 100 0.08 100
0.07 - - - - - - - - -
0.05 - - - - - - 25 0.01 50
0.70 - - - - - - - - 50
1.02 - - - - - - - - -
1.95 - - - - - - - - -
3.12 - - - - - - - - 50
0.31 - - - - - - - - 75
25.51 - - - - - - - - -
1.66 - - - - - - - - -
5.36 - - - - - - - - -
0.99 - - - - - - - - -
0.80 - - - - - - - - -
0.20 - - - - - - - - -
4.81 - - - - - - - - 50
1.76 - - - - - - - - -
2.35 - - - - - - - - -
1.59 - - - - - - - - -
8.49 - - - - - - - - -
4.07 - - - - - - - - -
2.07 - - - - - - - - -
2.88 - - - - - - - - -
8.82 - - - - - - - - -
5.80 - - - - - - - - -
0.29 - - - - - - - - -
3.32 - - - - - - - - -
0.14 - - - - - - - - -
0.14 - - - - - - - - -
0.09 - - - - - - - - -
0.07 - - - - - - - - -
0.08 - - - - - - - - -
0.09 - - - - - - - - -
0.22 - - - - - - - - -
0.05 - - - - - - - - -
0.02 - - - - - - - - -
0.01 - - - - - - - - -
0.22 - - - - - - - - -
0.98 - - - - - - - - -
1.00 - - - - - - - - -
1 2 3 4 5
1.70 100 1.70 100 1.70 100 1.70 100 1.70 100
0.32 100 0.32 100 0.32 100 0.32 100 0.32 100
0.65 100 0.65 100 0.65 100 0.65 100 0.65 100
0.11 - - - - - - - - -
0.05 100 0.05 100 0.05 100 0.05 100 0.05 100
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100
0.01 50 0.00 100 0.01 100 0.01 100 0.01 100
8.10 - - - - - - - - -
1.06 - - - - - - - - -
0.98 - - - - - - - - -
0.30 - - - - - - - - -
9.03 - - - - - - - - -
0.59 - - - - - - - - -
1.76 - - - - - - - - -
1.03 - - - - - - - - 75
0.44 - - - - - - - - -
9.58 - - - - - - - - -
0.40 - - - - - - - - -
0.15 - - - - - - - - -
0.15 - - - - - - - - -
0.14 - - - - - - - - -
0.08 - - - - - - - - -
0.12 - - - - - - - - -
0.15 - - - - - - - - -
0.23 - - - - - - - - -
0.05 - - - - - - - - -
0.02 - - - - - - - - -
0.02 - - - - - - - - -
0.24 - - - - - - - - -
1.06 - - - - - - - - -
1.22 - - - - - - - - -
6 7 8 9 10
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
1.01 100 1.01 100 1.01 100 1.01 100 1.01 100
- - - - - - - 100 0.11 100
0.90 100 0.90 100 0.90 100 0.90 100 0.90 100
0.86 100 0.86 100 0.86 100 0.86 100 0.86 100
- 100 - 100 - 100 - 100 - 100
0.13 100 0.13 100 0.13 100 0.13 100 0.13 100
0.06 100 0.06 100 0.06 100 0.06 100 0.06 100
0.56 100 0.56 100 0.56 100 0.56 100 0.56 100
0.34 100 0.69 100 0.69 100 0.69 100 0.69 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
6 7 8 9 10
0.20 100 0.20 100 0.20 100 0.20 100 0.20 100
0.08 100 0.08 100 0.08 100 0.08 100 0.08 100
- - - - - - - - - 100
0.04 100 0.04 100 0.04 100 0.04 100 0.04 100
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100
0.01 100 0.01 100 0.01 100 0.01 100 0.01 100
1.24 100 1.24 100 1.24 100 1.24 100 1.24 100
1.19 100 1.19 100 1.19 100 1.19 100 1.19 100
1.20 100 1.20 100 1.20 100 1.20 100 1.20 100
0.03 100 0.05 100 0.05 100 0.05 100 0.05 100
0.35 100 0.70 100 0.70 100 0.70 100 0.70 100
- 50 0.51 100 1.02 100 1.02 100 1.02 100
- 50 0.98 100 1.95 100 1.95 100 1.95 100
1.56 75 2.34 100 3.12 100 3.12 100 3.12 100
0.23 100 0.31 100 0.31 100 0.31 100 0.31 100
2.40 100 4.81 100 4.81 100 4.81 100 4.81 100
- - - - - - - 100 1.76 100
- - - - - - - 100 2.35 100
- - - - - 50 0.79 100 1.59 100
- - - - - - - 50 4.24 100
- - - - - - - 75 6.62 100
- - - - - - - 50 2.90 100
- - - - - - - 50 0.14 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
1.70 100 1.70 100 1.70 100 1.70 100 1.70 100
0.32 100 0.32 100 0.32 100 0.32 100 0.32 100
0.65 100 0.65 100 0.65 100 0.65 100 0.65 100
- - - - - - - - - 100
0.05 100 0.05 100 0.05 100 0.05 100 0.05 100
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100
0.01 100 0.01 100 0.01 100 0.01 100 0.01 100
4.29 100 4.29 100 4.29 100 4.29 100 4.29 100
4.10 100 4.10 100 4.10 100 4.10 100 4.10 100
1.08 100 1.08 100 1.08 100 1.08 100 1.08 100
0.15 100 0.15 100 0.15 100 0.15 100 0.15 100
0.79 100 0.79 100 0.79 100 0.79 100 0.79 100
0.74 100 0.99 100 0.99 100 0.99 100 0.99 100
- 100 2.23 100 2.23 100 2.23 100 2.23 100
- 100 2.64 100 2.64 100 2.64 100 2.64 100
- 100 1.17 100 1.17 100 1.17 100 1.17 100
- 25 7.11 100 28.43 100 28.43 100 28.43 100
- - - 100 2.24 100 2.24 100 2.24 100
5.81 100 5.81 100 5.81 100 5.81 100 5.81 100
4.22 100 4.22 100 4.22 100 4.22 100 4.22 100
2.11 100 2.11 100 2.11 100 2.11 100 2.11 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
0.97
0.97
1.01
0.11
0.90
0.86
-
0.13
0.06
0.56
0.69
14.17
12.02
1.70
1.38
14.29
1.40
0.65
12.16
5.92
2.97
2.61
1.82
9.21
6.87
3.58
0.36
0.08
0.04
0.04
0.62
1.64
0.21
0.20
0.08
0.07
0.04
0.03
0.01
1.24
1.19
1.20
0.05
0.70
1.02
1.95
3.12
0.31
25.51
1.66
5.36
0.99
0.80
0.20
4.81
1.76
2.35
1.59
8.49
4.07
2.07
2.88
8.82
5.80
0.29
3.32
0.14
0.14
0.09
0.07
0.08
0.09
0.22
0.05
0.02
0.01
0.22
0.98
1.00
1.70
0.32
0.65
0.11
0.05
0.03
0.01
4.29
4.10
1.08
0.15
0.79
0.99
2.23
2.64
1.17
28.43
2.24
8.10
1.06
0.98
0.30
5.81
4.22
2.11
9.03
0.59
1.76
1.03
0.44
9.58
0.40
0.15
0.15
0.14
0.08
0.12
0.15
0.23
0.05
0.02
0.02
0.24
1.06
1.22
YANG DIPAKAI
TH. 2018
1 SMPN 2 SEPULU 2 KELAS ### SINERGI
2 SMPN 1 KLAMPIS 3 KELAS ### SINERGI
3 SMPN 2 KOKOP 2 KELAS ### SINERGI
4 SMPN 3 SATAP KOKOP 2 KELAS ### SINERGI
5 SMPN 1 TRAGAH 3 KELAS ### INDRAKILA
6 SMPN 2 MODUNG 2 KELAS ### INDRAKILA
7 SMPN 2 LABANG 3 KELAS ### INDRAKILA
8 SMPN 2 KWANYAR 2 KELAS ### INDRAKILA
9 SMPN TAHAL AMIN H. ABDULLAH, S.Pd
REKAPITULASI 1
RENCANA ANGGARAN BIAYA OK
OK
KEGIATAN : PENGADAAN SARANA PRASARANA
PEKERJAAN : PERENCANAAN SMP KABUPATEN BANGKALAN
LINGKUP PEKERJAAN : REHABILITASI 2 RUANG BELAJAR SMPN 2 SEPULU
LOKASI : SMPN 2 SEPULU KEC. SEPULU KAB. BANGKALAN
JUMLAH ###
DIBULATK ### ###
###
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Sepulu
Kec. Sepulu Kab. Bangkalan
LAPORAN MINGGUAN
Minggu ke :
Pekerjaan : REHABILITASI 2 RUANG KELAS SMPN 2 SEPULU Tanggal :
Nama Sekolah : SMPN 2 SEPULU Bulan :
Lokasi : Kec. Kedamean Kab. Gresik Dana diterima tangal :
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%)
% Prestasi Rerata Prestasi
(1) (2) (3) (4) (5) (6) (7) (8)
(6)/100x(5)
I. PEKERJAAN PERSIAPAN
1 Pembongkaran atap + rangka atap 143.00 m² 0.97 - - 100
2 Pembongkaran atap 234.90 m² 0.97 - - 100
3 Penetelan plesteran 92.16 m² 1.01 - - 100
4 Pembersihan akhir pekerjaan 1.00 ls 0.11 - - -
II. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 18.50 m² 0.90 - - -
2 Plesteran 1Pc : 5Ps 37.00 m² 0.86 - - -
3 Benangan 48.00 m' - - - -
V. PEKERJAAN ATAP
1 Atap genteng beton (lama) 139.73 m² 1.38 - - -
2 Atap genteng beton warna 237.08 m² 14.29 - - -
3 Genteng bubungan beton warna 26.70 m' 1.40 - - -
4 Plesteran kompres L = 10 cm (Akhiran genting) 56.00 m' 0.65 - - -
JUMLAH 100.00 -
Jumlah dana yang digunakan sampai dengan minggu ini ( minggu ke 1 ) Rp 20,300,000.00
REKAPITULASI 2
RENCANA ANGGARAN BIAYA OK
I (2) ###
II PEKERJAAN TANAH ###
III PEKERJAAN PASANGAN/PLESTERAN ###
IV PEKERJAAN BETON ###
V PEKERJAAN RANGKA ATAP ###
VI PEKERJAAN ATAP ###
VII PEKERJAAN KUSEN PINTU DAN JENDELA ###
VIII PEKERJAAN PLAFOND ###
IX PEKERJAAN PENGECATAN/PLAMIRAN ###
X PEKERJAAN LANTAI ###
XI PEKERJAAN KUNCI + PENGGANTUNG ###
XII PEKERJAAN INSTALASI LISTRIK ### ###
XIII PEKERJAAN KACA ###
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 1 Kelampis
Kec. Kelampis Kab. Bangkalan
LAPORAN MINGGUAN
Minggu ke :
Pekerjaan : REHABILITASI 2 RUANG KELAS SMPN 1 KLAMPIS Tanggal :
Nama Sekolah : SMPN 1 KLAMPIS Bulan :
Lokasi : Kec. Kedamean Kab. Gresik Dana diterima tangal :
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%)
% Prestasi Rerata Prestasi
(1) (2) (3) (4) (5) (6) (7) (8)
I. PEKERJAAN PERSIAPAN (6)/100x(5)
1 Pembongkaran kosen 12.00 bh 0.20 - - 100
2 Penetelan plesteran 12.00 m² 0.08 - - 100
3 Pembersihan akhir pekerjaan 1.00 ls 0.07 - - -
X. PEKERJAAN LANTAI
1 Keramik lantai 40 x 40 240.00 m² 8.82 - - -
2 Keramik dinding 25 x 40 129.80 m² 5.80 - - -
3 Keramik kolom 25 x 40 6.40 m² 0.29 - - -
4 List keramik 119.00 m' 3.32 - - -
JUMLAH 95.07 -
Jumlah dana yang digunakan sampai dengan minggu ini ( minggu ke 1 ) Rp 20,300,000.00
3
REKAPITULASI OK
NCANA ANGGARAN BIAYA OK
: PENGADAAN SARANA PRASARANA
KEGIATAN : PERENCANAAN SMP KABUPATEN BANGKALAN
PEKERJAAN : REHABILITASI 2 RUANG BELAJAR SMPN 3 SATAP KOKOP
LINGKUP PEKERJAAN : SMPN 3 SATAP KOKOP KEC. KOKOP KAB. BANGKALAN
LOKASI
URAIAN PEKERJAAN JUMLAH HARGA
NO.
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
H. SUBADRIH, ST, MT
Mengetahui :
Kepala Sekolah
SMPN 3 Satap Kokop
Kec. Kokop Kab. Bangkalan
IHSANUDIN, S.Pd
NIP. 19700109 199104 1 001
LAPORAN MINGGUAN
Minggu ke :
Pekerjaan : REHABILITASI 2 RUANG BELAJAR SMPN 3 SATAP KOKOP Tanggal :
Nama Sekolah : SMPN 3 SATAP KOKOP KEC. KOKOP KAB. BANGKALAN Bulan :
Lokasi : KEC. KOKOP KAB. BANGKALAN Dana diterima tangal :
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%)
% Prestasi Rerata Prestasi
(1) (2) (3) (4) (5) (6) (7) (8)
(6)/100x(5)
I. PEKERJAAN PERSIAPAN
1 Pembongkaran atap + rangka 260.00 m² 1.70 100 1.70 -
2 Pembongkaran kosen 12.00 bh 0.32 100 0.32 -
3 Pembongkaran dinding 61.75 m² 0.65 100 0.65 -
4 Pembersihan akhir pekerjaan 1.00 ls 0.11 - - -
X. PEKERJAAN LANTAI
1 Keramik lantai 40 x 40 162.00 m² 9.58 - - 25
2 Keramik kolom 20 x 40 (motif) 5.60 m² 0.40 - - -
Mengetahui Menyetujui
SMPN 3 Satap Kokop Panitia Pembangunan Sekolah
Kec. Kokop Kab. Bangkalan
Selaku Penanggung Jawab
IHSANUDIN, S.Pd SUHAERI
NIP. 19700109 199104 1 001
REKAPITULASI
NCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI
NO.
I
II
III
IV
V
VI
VII
VIII
IX
X 4
XI OK
XII LAMA
XIII : PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 1 TRAGAH
: SMPN 1 TRAGAH KEC. TRAGAH KAB. BANGKALAN
TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )
PEKERJAAN PERSIAPAN ###
PEKERJAAN TANAH ###
PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA #DIV/0!
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 1 Tragah
Kec. Tragah Kab. Bangkalan
Drs. AMIRULLAH, MM
NIP. 19581217 198603 1 011
NO
1
I.
1
2
3
4
II.
1
2
4
III.
1
2
3
IV.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran atap + rangka 377.00 m² ### ###
V. Pembongkaran kusen 4.00 bh ### ###
1 Penetelan plesteran 159.60 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VI. PEKERJAAN TANAH ###
1 Galian tanah 2.16 m³ ### ###
2 Urugan pasir bawah pondasi t=10cm 0.36 m³ ### ### #DIV/0!
3 Urugan tanah kembali 1.08 m³ ### ###
4 ###
PEKERJAAN PASANGAN/PLESTERAN
VII. Pasangan 1/2 bata camp. 1 Pc : 5 Ps 7.20 m² ### ### ###
1 Plesteran 1Pc : 5Ps 14.40 m² ### ###
2 Benangan 24.00 m' ### ###
3 ###
PEKERJAAN BETON
VIII. Lantai kerja bawah pondasi 1:3:5 t=5cm 0.18 m³ ### ###
1 Pondasi beton stempat 60 x 60 x 15cm 0.54 m³ ### ###
Kolom teras 15/15 0.79 m³ ### ###
IX. Balok beton 15/20 1.71 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ ### ###
X. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Penang (baru) 382.73 m² ### ###
3 Atap genteng (lama bg. belakang) 170.10 m² ### ###
4 Genteng bubungan Karang penang 28.35 m' ### ###
Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' ### ###
XI. ###
1 PEKERJAAN KUSEN PINTU DAN JENDELA
2 Kusen kayu kempas/mahoni 6/15 #DIV/0! m³ Rp - #DIV/0!
3 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 8.61 m² Rp - Rp - #DIV/0!
4 Daun Jendela kaca kayu kempas/mahoni 3/10 8.40 m² Rp - Rp - ###
5 #DIV/0!
6 PEKERJAAN PLAFOND
Plafond calsiboard 4mm + rangka kayu 4/6 294.84 m² ### ###
XII ###
1 PEKERJAAN PENGECATAN
2 Pengecatan dinding (3 Ruang kelas) 598.50 m² ### ###
3 Pengecatan plafond 294.84 m² ### ###
4 Pengecatan kayu 206.70 m² ### ###
5 ###
6 PEKERJAAN LANTAI #DIV/0!
Keramik lantai 40 x 40 245.70 m² ### ###
XIII. Keramik dinding 25 x 40 ( 3 R.kelas + teras ) 159.60 m² ### ###
1 List keramik dinding 7cm 110.40 m² ### ###
Keramik kolom 25 x 40 12.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Engsel Pintu 18.00 bh ### ###
Engsel Jendela 16.00 bh ### ###
Grendel pintu 3.00 bh ### ###
Grendel Jendela 16.00 bh ### ###
Hag Angin 16.00 bh ### ###
###
REKAPITULASI
PEKERJAAN INSTALASI LISTRIK
NCANA ANGGARAN
Lampu BIAYA
SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
KEGI Saklar ganda 3.00 bh ### ###
PEKE Saklar tunggal 3.00 bh ### ###
LING Stop kontak + instalasi 3.00 bh ### ###
LOKA Instalasi titik lampu 15.00 ttk ### ###
###
NO. PEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 11.14 m² ### ###
###
I
II
III
IV
V
VI
VII
VIII
IX
X 4
XI OK
XII BARU
XIII : PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 1 TRAGAH
: SMPN 1 TRAGAH KEC. TRAGAH KAB. BANGKALAN
TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )
PEKERJAAN PERSIAPAN ###
PEKERJAAN TANAH ###
PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA Rp -
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 1 Tragah
Kec. Tragah Kab. Bangkalan
Drs. AMIRULLAH, MM
NIP. 19581217 198603 1 011
NO
1
I.
1
2
3
4
II.
1
2
4
III.
1
2
3
IV.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran atap + rangka 377.00 m² ### ###
V. Pembongkaran kusen 8.00 bh ### ###
1 Penetelan plesteran 249.00 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VI. PEKERJAAN TANAH ###
1 Galian tanah 2.16 m³ ### ###
2 Urugan pasir bawah pondasi t=10cm 0.36 m³ ### ### ###
3 Urugan tanah kembali 1.08 m³ ### ###
###
VII. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 24.02 m² ### ### ###
2 Plesteran 1Pc : 5Ps 48.03 m² ### ###
3 Benangan 168.00 m' ### ###
4 ###
PEKERJAAN BETON
VIII. Lantai kerja bawah pondasi 1:3:5 t=5cm 0.18 m³ ### ###
1 Pondasi beton stempat 60 x 60 x 15cm 0.54 m³ ### ###
Kolom teras 15/15 0.79 m³ ### ###
IX. Balok beton 15/20 1.56 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ ### ###
X. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Penang (baru) 382.73 m² ### ###
3 Genteng bubungan Karang penang 28.35 m' ### ###
4 Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' ### ###
5 ###
PEKERJAAN KUSEN PINTU DAN JENDELA
XI. Kusen kayu kempas/mahoni 6/15 1.09 m³ Rp - Rp -
1 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 8.61 m² Rp - Rp - ###
2 Jalusi kayu kempas/mahoni 3/12 7.20 m² Rp - Rp -
3 Daun Jendela kaca kayu kempas/mahoni 3/10 6.72 m² Rp - Rp - ###
4 Rp -
5 PEKERJAAN PLAFOND
6 Plafond calsiboard 4mm + rangka kayu 4/6 294.84 m² ### ###
###
XII PEKERJAAN PENGECATAN
1 Pengecatan dinding (3 Ruang kelas) 598.50 m² ### ###
2 Pengecatan plafond 294.84 m² ### ###
3 Pengecatan kayu 206.70 m² ### ###
4 ###
5 PEKERJAAN LANTAI ###
6 Keramik lantai 40 x 40 245.70 m² ### ###
Keramik dinding 25 x 40 ( 3 R.kelas + teras ) 173.40 m² ### ###
XIII. List keramik dinding 7cm 132.90 m² ### ###
1 Keramik kolom 25 x 40 12.00 m² ### ###
Keramik dinding 25 x 40 ( 3 R.kelas teras saja ) 75.60 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Engsel Pintu 18.00 bh ### ###
Engsel Jendela 16.00 bh ### ###
Grendel pintu 3.00 bh ### ###
Grendel Jendela 16.00 bh ### ###
Hag Angin 16.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
REKAPITULASI
Lampu SL 8watt (teras) 3.00 bh ### ###
NCANA ANGGARAN BIAYA
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
KEGI Stop kontak + instalasi 3.00 bh ### ###
PEKE Instalasi titik lampu 15.00 ttk ### ###
LINGKUP PEKERJAAN ###
LOKAPEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 11.14 m² ### ###
NO. ###
I
II
III
IV
V
VI
VII
VIII
IX
X 5
XI OK
XII LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 MODUNG
: SMPN 2 MODUNG KEC. MODUNG KAB. BANGKALAN
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Modung
Kec. Modung Kab. Bangkalan
A S U R, M.Pd
NIP. 19610117 198403 1 008
NO
1
I.
1
2
II.
1
2
3
III.
1
2
3
IV.
1
2
Lembar. 2
V. JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
1 2 3 4 5
2 PEKERJAAN PERSIAPAN
3 Pembongkaran atap + rangka 406.00 m² ### ###
4 Pembersihan akhir pekerjaan 1.00 ls ### ### ###
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 98.93 m² ### ###
2 Plesteran 1Pc : 5Ps 197.87 m² ### ###
3 Benangan 166.56 m' ### ###
###
VII. PEKERJAAN BETON
1 Kolom teras 15/15 0.41 m³ ### ###
Balok teras 15/20 1.24 m³ ### ###
VIII. Ring balk gewel 15/15 0.98 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 396.90 m² ### ###
4 Lisplank kalsiplank 8mm / 30 cm 85.70 m¹ ### ###
5 ###
PEKERJAAN ATAP
IX. Pasang atap genteng karang p enang (baru 5%) 19.85 m² ### ###
1 Pasang atap genteng (lama) 377.06 m² ### ###
Genteng bubungan karang penang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 29.00 m' ### ###
1 ###
2 PEKERJAAN KUSEN PINTU DAN JENDELA
3 Kusen kayu kempas/mahoni 6/12 0.46 m³ Rp - Rp -
4 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 6.72 m² Rp - Rp -
5 Daun Jendela kaca kayu kempas/mahoni 3/10 5.04 m² Rp - Rp -
6 Rp -
PEKERJAAN PLAFOND ###
XI. Plafond calsiboard 4mm + rangka hollow 340.20 m² ### ###
1 ###
2 PEKERJAAN PENGECATAN/PLAMIRAN
3 Pengecatan dinding (depan) 66.85 m² ### ###
4 Pelamiran dinding 430.33 m² ### ###
5 Pelamiran plafond 340.20 m² ### ### ###
6 Pengecatan kayu 206.70 m² ### ###
Cat genteng 396.90 m² ### ###
XII. ###
1 PEKERJAAN LANTAI
Lantai rabat 216.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 4.00 bh ### ###
Engsel Pintu 21.00 bh ### ###
Engsel Jendela 24.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Grendel Jendela 12.00 bh ### ### ###
Hag Angin 24.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 14.00 bh ### ###
Lampu SL 8watt (teras) 4.00 bh ### ###
Saklar ganda 7.00 bh ### ###
REKAPITULASI
Saklar tunggal 3.00 bh ### ###
NCANA ANGGARAN BIAYA
Stop kontak + instalasi 4.00 bh ### ###
Instalasi titik lampu 18.00 bh ### ###
KEGIATAN ###
PEKE PEKERJAAN KACA
LING Kaca mati t=5 mm 14.49 m² ### ###
LOKASI ###
NO.
I
II
III
IV
V
VI
VII
VIII
IX
X 5
XI OK
XII BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 MODUNG
: SMPN 2 MODUNG KEC. MODUNG KAB. BANGKALAN
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Modung
Kec. Modung Kab. Bangkalan
A S U R, M.Pd
NIP. 19610117 198403 1 008
NO
1
I.
1
2
II.
1
2
3
III.
1
2
3
IV.
1
2
Lembar. 2
V. JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
1 2 3 4 5
2 PEKERJAAN PERSIAPAN
3 Pembongkaran atap + rangka 406.00 m² ### ###
4 Pembersihan akhir pekerjaan 1.00 ls ### ### ###
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 98.93 m² ### ###
2 Plesteran 1Pc : 5Ps 197.87 m² ### ###
3 Benangan 166.56 m' ### ###
###
VII. PEKERJAAN BETON
1 Kolom teras 15/15 0.41 m³ ### ###
Balok teras 15/20 1.24 m³ ### ###
VIII. Ring balk gewel 15/15 0.98 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 396.90 m² ### ###
4 Lisplank kalsiplank 8mm / 30 cm 85.70 m¹ ### ###
5 ###
PEKERJAAN ATAP
IX. Pasang atap genteng karang p enang (baru 5%) 19.85 m² ### ###
1 Pasang atap genteng (lama) 377.06 m² ### ###
Genteng bubungan karang penang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 29.00 m' ### ###
1 ###
2 PEKERJAAN KUSEN PINTU DAN JENDELA
3 Kusen kayu kempas/mahoni 6/12 0.46 m³ Rp - Rp -
4 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 6.72 m² Rp - Rp -
5 Daun Jendela kaca kayu kempas/mahoni 3/10 5.04 m² Rp - Rp -
6 Rp -
PEKERJAAN PLAFOND ###
XI. Plafond calsiboard 4mm + rangka kayu 4/6 340.20 m² ### ###
1 ###
2 PEKERJAAN PENGECATAN/PLAMIRAN
3 Pengecatan dinding (depan) 66.85 m² ### ###
4 Pelamiran dinding 430.33 m² ### ###
5 Pelamiran plafond 340.20 m² ### ### ###
6 Pengecatan kayu 206.70 m² ### ###
Cat genteng 396.90 m² ### ###
XII. ###
1 PEKERJAAN LANTAI
Lantai rabat 216.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 4.00 bh ### ###
Engsel Pintu 21.00 bh ### ###
Engsel Jendela 24.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Grendel Jendela 12.00 bh ### ### ###
Hag Angin 24.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 14.00 bh ### ###
Lampu SL 8watt (teras) 4.00 bh ### ###
Saklar ganda 7.00 bh ### ###
REKAPITULASI
Saklar tunggal 3.00 bh ### ###
NCANA ANGGARAN BIAYA
Stop kontak + instalasi 4.00 bh ### ###
Instalasi titik lampu 18.00 bh ### ###
KEGIATAN ###
PEKE PEKERJAAN KACA
LING Kaca mati t=5 mm 14.49 m² ### ###
LOKASI ###
NO.
I
II
III
IV
V
VI
VII
VIII
IX
X 6
XI OK
LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 2 LABANG
: SMPN 2 LABANG KEC. LABANG KAB. BANGKALAN
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
ACHMAD TAUFIK HEYKAL, A.Sg H. SUBADRIH, ST, MT
Mengetahui :
Kepala Sekolah
SMPN 2 Labang
Kec. Labang Kab. Bangkalan
NO
1
I.
1
2
3
4
5
II.
1
III.
1
2
IV.
1
2
3 Lembar. 2
JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
V. 2 3 4 5
1 PEKERJAAN PERSIAPAN ###
Pembongkaran atap + rangka 377.00 m² Rp - Rp -
VI. Pembongkaran kosen 1.00 bh ### ###
1 Pembongkaran dinding 6.00 m² ### ###
2 Penetelan plesteran 139.74 m² ### ###
3 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VII. PEKERJAAN PASANGAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps (nyepit kuda2) 30.91 m² Rp - Rp -
2 Rp -
3 PEKERJAAN RANGKA ATAP ###
4 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ Rp - Rp -
VIII. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Pilang (baru) 382.73 m² ### ###
Genteng bubungan Karang pilang 28.35 m' ### ###
IX. Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' Rp - Rp -
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsiboard 4mm + rangka hollow 354.38 m² Rp - Rp -
4 Rp -
5 PEKERJAAN PENGECATAN
6 Pengecatan dinding 598.50 m² Rp - Rp - ###
Pengecatan plafond 354.38 m² Rp - Rp -
X. Pengecatan kayu 274.60 m² Rp - Rp -
1 Rp -
PEKERJAAN LANTAI
XI. Keramik lantai 40 x 40 243.00 m² ### ###
1 Keramik dinding 25 x 40 139.74 m² ### ###
2 List keramik 102.00 m' ### ###
3 Keramik kolom 20 x 40 10.80 m² ### ###
4 ###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA ###
Kaca mati t=5 mm (yg pecah) 4.22 m² ### ###
###
PEKERJAAN TANGGA DEPAN PINTU
Pasangan batu gunung 2.88 m³ ### ###
Plesterran trasram 7.68 m² ### ###
Keramik kasar 40 x 40 7.04 m² ### ###
Urugan pasir 4.96 m³ ### ###
REKAPITULASI ###
NCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI
NO.
I
II
III
IV
V
VI
VII
VIII
IX
X 6
XI OK
XII BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 2 LABANG
: SMPN 2 LABANG KEC. LABANG KAB. BANGKALAN
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Labang
Kec. Labang Kab. Bangkalan
Drs. HARTONO, M.Pd
NIP. 19690126 199802 1 003
NO
1
I.
1
2
3
4
5
II.
1
2
3
III.
1
IV.
1
2 Lembar. 2
JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
V. 2 3 4 5
1 PEKERJAAN PERSIAPAN ###
2 Pembongkaran atap + rangka 377.00 m² Rp - Rp -
3 Pembongkaran kosen 1.00 bh ### ###
Pembongkaran dinding 6.00 m² ### ###
VI. Penetelan plesteran 127.50 m² ### ###
1 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VII. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps (nyepit kuda2) 22.43 m² Rp - Rp - -
2 Plesteran 1Pc : 5Ps 16.20 m² ### ###
3 Benangan 32.00 m' ### ###
###
VIII. PEKERJAAN BETON
1 Ring balk gewel 15/15 0.40 m³ ### ###
2 ###
3 PEKERJAAN RANGKA ATAP ###
4 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ Rp - Rp -
IX. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Pilang (baru) 382.73 m² ### ###
Genteng bubungan Karang pilang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' Rp - Rp -
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsiboard 4mm + rangka hollow 354.38 m² Rp - Rp -
4 Rp -
5 PEKERJAAN PENGECATAN
6 Pengecatan dinding 598.50 m² Rp - Rp - ###
Pengecatan plafond 354.38 m² Rp - Rp -
XI. Pengecatan kayu 274.60 m² Rp - Rp -
1 Rp -
PEKERJAAN LANTAI
XII. Keramik lantai 40 x 40 243.00 m² ### ###
1 Keramik dinding 25 x 40 127.50 m² ### ###
2 List keramik 102.00 m' ### ###
3 Keramik kolom 20 x 40 10.80 m² ### ###
4 ###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Pintu harmonika 15.00 m² ### ### ###
### ###
PEKERJAAN INSTALASI LISTRIK ###
Lampu SL 14 watt 12.00 bh ### ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA ###
Kaca mati t=5 mm (yg pecah) 4.22 m² ### ###
###
PEKERJAAN TANGGA DEPAN PINTU 3.46
Pasangan batu gunung 2.88 m³ ### ###
Plesterran trasram 7.68 m² ### ###
Keramik kasar 40 x 40 7.04 m² ### ###
Urugan pasir 4.96 m³ ### ###
###
REKAPITULASI
NCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI
NO.
I
II
III
IV
V
VI
VII
VIII
IX
X 7
OK
LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 KWANYAR
: SMPN 2 KWANYAR KEC. KWANYAR KAB. BANGKALAN
TERBILANG : ( SERATUS SEMBILAN PULUH TUJUH JUTA DELAPAN RATUS RIBU RUPIAH )
URAIAN PEKERJAAN JUMLAH HARGA
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Kwanyar
Kec. Kwanyar Kab. Bangkalan
RAHMAWATI, M.Pd
NIP. 19700703 199802 2 003
NO
1
I.
1
2
3
4
II.
1
2
III.
1
IV.
1
V.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran kusen 1.00 bh ### ###
VI. Pembongkaran dinding 15.00 m² ### ###
1 Penetelan plesteran 428.64 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 Ls ### ###
3 ###
4 PEKERJAAN PASANGAN/PLESTERAN ###
5 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 0.91 22.20 m² Rp - Rp -
6 Plesteran 1Pc : 5Ps 1.07 44.40 m² Rp - Rp -
Rp -
VII. PEKERJAAN KAYU
1 Lisplank kayu 3/30 cm 4.00 m¹ ### ###
2 ###
3 PEKERJAAN PLAFOND
4 Plafond calsi 1 x 1 + rangka kayu 12.00 m² Rp - Rp -
Rp -
VIII. PEKERJAAN PENGECATAN
1 Pengecatan dinding (3 kelas) 455.30 m² Rp - Rp -
2 Pengecatan plafond 319.00 m² Rp - Rp -
3 Pengecatan kayu 206.70 m² Rp - Rp - ###
4 Pengecatan kayu (Kantor) 214.39 m² Rp - Rp -
5 Rp -
6PEKERJAAN LANTAI 162.00 ###
Keramik lantai 40 x 40 ( 2 R Kelas ) 5.67 126.00 m² ### ###
IX. Keramik lantai 40 x 40 ( Teras ) 1.62 36.00 m² ### ###
1 Keramik dinding 25 x 40 (dalam kelas + teras) 5.78 128.40 m² ### ###
Keramik kolom teras 25 x 40 1.01 22.40 m² ### ###
X. List keramik 1.64 327.80 m' ### ###
1 Keramik dinding 25 x 40 (dalam kantor+R.guru+ t 13.51 300.24 m² ### ###
2 451.04 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 3.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Hag Angin 60.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
REKAPITULASI
PEKERJAAN KACA
NCANA ANGGARAN BIAYA
Kaca mati t=5 mm (yg pecah) 1.68 m² ### ###
###
KEGI PEKERJAAN TEMPAT DUDUK
PEKE Pasangan trasram 0.68 17.00 m² Rp - Rp -
LING Plat beton tempat duduk t=10 cm 0.53 1.02 m³ ### ###
LOKA Keramik tempat duduk 30 x 30 0.46 10.20 m² ### ###
Keramik dinding tempat duduk 25 x 40 1.84 40.80 m² ### ###
NO. 34.71 ###
0.86768 40.80
I
II
III
IV
V
VI
VII
VIII
IX
X 7
OK
BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 KWANYAR
: SMPN 2 KWANYAR KEC. KWANYAR KAB. BANGKALAN
TERBILANG : ( SERATUS SEMBILAN PULUH TUJUH JUTA DELAPAN RATUS RIBU RUPIAH )
URAIAN PEKERJAAN JUMLAH HARGA
PEKERJAAN PERSIAPAN ###
PEKERJAAN PASANGAN/PLESTERAN Rp -
PEKERJAAN KAYU ###
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
PEKERJAAN TEMPAT DUDUK ###
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Kwanyar
Kec. Kwanyar Kab. Bangkalan
RAHMAWATI, M.Pd
NIP. 19700703 199802 2 003
NO
1
I.
1
2
3
4
II.
1
2
III.
1
2
IV.
1
V. Lembar. 2
1 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
2 2 3 4 5
3 PEKERJAAN PERSIAPAN
4 Pembongkaran kusen 1.00 bh ### ###
5 Pembongkaran dinding 15.00 m² ### ###
Penetelan plesteran 428.64 m² ### ###
VI. Pembersihan akhir pekerjaan 1.00 Ls ### ###
1 ###
2 PEKERJAAN PASANGAN/PLESTERAN ###
3 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 22.20 m² Rp - Rp -
4 Plesteran 1Pc : 5Ps 44.40 m² Rp - Rp -
5 Rp -
6 PEKERJAAN KAYU
Perbaikan daun pintu panil 4.00 bh ### ###
VII. Lisplank kayu 3/30 cm 4.00 m¹ ### ###
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsi 1 x 1 + rangka kayu 12.00 m² Rp - Rp -
4 Rp -
PEKERJAAN PENGECATAN
VIII. Pengecatan dinding (3 kelas) 439.90 m² Rp - Rp -
1 Pengecatan dinding (Kantor) 373.40 m² Rp - Rp -
2 Pengecatan plafond 319.00 m² Rp - Rp -
3 Pengecatan kayu 169.45 m² Rp - Rp - ###
4 Pengecatan kayu (Kantor) 197.69 m² Rp - Rp -
5 Rp -
6 PEKERJAAN LANTAI ###
Keramik lantai 40 x 40 ( 2 R Kelas ) 126.00 m² ### ###
IX. Keramik lantai 40 x 40 ( Teras ) 36.00 m² ### ###
1 Keramik dinding 25 x 40 (dalam kelas + teras) 128.40 m² ### ###
Keramik kolom teras 25 x 40 22.40 m² ### ###
X. List keramik 327.80 m' ### ###
1 Keramik dinding 25 x 40 (dalam kantor+R.guru+ teras) 300.24 m² ### ###
2 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 3.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Hag Angin 60.00 bh ### ###
Pintu harmonika 11.30 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK ###
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA
REKAPITULASI
Kaca mati t=5 mm (yg pecah) 1.68 m² ### ###
NCANA ANGGARAN BIAYA ###
PEKERJAAN TEMPAT DUDUK
KEGI Pasangan trasram 17.00 m² Rp - Rp -
PEKE Plat beton tempat duduk t=10 cm 1.02 m³ ### ###
LING Keramik tempat duduk 30 x 30 10.20 m² ### ###
LOKA Keramik dinding tempat duduk 25 x 40 40.80 m² ### ###
###
NO.
I
II
III
IV
V
VI
VII
VIII
IX
8
OK
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Kokop
Kec. Kokop Kab. Bangkalan
II.
1
2
3
III.
1
IV.
1
2
3
V. Lembar. 2
1 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
2 2 3 4 5
3 PEKERJAAN PERSIAPAN
4 Penetelan plesteran 317.46 m² ### ###
5 Pembersihan akhir pekerjaan 1.00 Ls Rp - Rp - #REF!
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 12.25 m² Rp - Rp -
5 Plesteran 1Pc : 5Ps 80.58 m² Rp - Rp -
6 Benangan 55.00 m' Rp - Rp -
7 Rp -
PEKERJAAN PLAFOND
VII. Plafond calsiboard 4mm + rangka kayu 15.00 m² Rp - Rp -
1 Rp -
2 PEKERJAAN PENGECATAN -
3 Pengecatan dinding 506.50 m² Rp - Rp -
4 Pengecatan plafond 352.00 m² Rp - Rp - #DIV/0!
5 Pengecatan kayu 275.60 m² Rp - Rp -
6 Rp -
PEKERJAAN LANTAI ###
VIII. Keramik lantai 40 x 40 243.00 m² ### ### 147.47
1 Keramik dinding 25 x 40 ( 3 R. Kelas + teras) 132.96 m² ### ###
List keramik 288.20 m' ### ###
IX. Keramik kolom 25 x 40 16.00 m² ### ###
1 Keramik dinding 25 x 40 ( 5 R. Kelas bg. dalam) 184.50 m² ### ###
2 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 5.00 bh ### ###
Grendel Jendela 50.00 bh ### ###
Hag Angin 100.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 20.00 bh ### ###
Lampu SL 8watt (teras) 5.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 5.00 bh ### ###
Stop kontak + instalasi 5.00 bh ### ###
Instalasi titik lampu 25.00 ttk ### ###
###
PEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 2.53 m² ### ###
###
PEKERJAAN TEMPAT DUDUK
Pasangan trasram 14.70 m² Rp - Rp -
Plat beton tempat duduk t=10 cm 0.74 m³ ### ###
Keramik tempat duduk 30 x 30 7.35 m² ### ###
Keramik dinding tempat duduk 25 x 40 29.40 m² ### ###
###
BATAS
SINERGI 1 SMPN 2 SEPULU DR. AHMAD SABARUDIN, S.Pd, M.MPd
SINERGI 2 SMPN 1 KLAMPIS IMAM SYAFII, S.Pd, MPd
SINERGI 3 SMPN 2 KOKOP MOHAMMAD TAUFIK, SPd
SINERGI 4 SMPN 3 SATAP KOKOP IHSANUDIN, S.Pd
INDRAKILA 5 SMPN 1 TRAGAH Drs. AMIRULLAH, MM
INDRAKILA 6 SMPN 2 MODUNG A S U R, M.Pd
INDRAKILA 7 SMPN 2 LABANG Drs. HARTONO, M.Pd
INDRAKILA 8 SMPN 2 KWANYAR RAHMAWATI, M.Pd
9 SMPN TAHAL AMIN H. ABDULLAH, S.Pd
10 SMPN 1 MODUNG Drs. ALI MUSTOFA, M.Pd
11 SMPN 1 GALIS Drs. TAUFIKUR RAHMAN
12 SMPN 1 KOKOP BUDIONO, S.Pd, M.Pd
28.5
23.5
7.833333
1 ( Satu )
5 Oktob. s/d 10 Oktober 2015
Oktober 2015
29 Oktober 2015
Rp. 212.320.000.00
Prestasi Pekerjaan Prestasi Pekerjaan
Minggu Ini (%) Komulatif (%)
Rerata Prestasi Rerata
(9) (10) (11)
(8)/100x(5) (6)+(8) (7)+(9)
- - - Rp 88,586.67 Rp 1,638,853.33
- - - Rp 42,298.80 Rp 1,565,055.60
- - - Rp - Rp -
Rp 3,203,908.93
- - - Rp 3,912,550.00 Rp 234,753.00
- - - Rp 3,962,550.00 Rp 114,121.44
- - - Rp 3,962,550.00 Rp 1,027,092.96
- - - Rp 3,962,550.00 Rp 1,255,335.84
Rp 2,631,303.24
- - - Rp 185,000.00 Rp 25,849,125.00
- - - Rp 185,000.00 Rp 21,929,437.50
- - - Rp 65,000.00 Rp 3,100,500.00
Rp 50,879,062.50
- - - Rp 18,000.00 Rp 2,515,050.00
- - - Rp 110,000.00 Rp 26,078,250.00
- - - Rp 95,820.00 Rp 2,558,394.00
- - - Rp 21,149.40 Rp 1,184,366.40
Rp 32,336,060.40
- - - Rp 85,000.00 Rp 22,185,000.00
Rp 22,185,000.00
- - - Rp 20,740.00 Rp 10,805,637.48
- - - Rp 20,740.00 Rp 5,413,140.00
- - - Rp 42,450.00 Rp 4,752,702.00
Rp 20,971,479.48
- - - Rp 105,250.00 Rp 3,315,375.00
- - - Rp 112,000.00 Rp 16,800,000.00
- - - Rp 136,075.00 Rp 12,540,672.00
- - - Rp 85,000.00 Rp 6,528,000.00
Rp 39,184,047.00
- - - Rp 55,000.00 Rp 660,000.00
- - - Rp 50,000.00 Rp 150,000.00
- - - Rp 20,000.00 Rp 80,000.00
- - - Rp 15,000.00 Rp 75,000.00
- - - Rp 225,000.00 Rp 1,125,000.00
Rp 200,000.00 Rp 3,000,000.00
Rp 5,090,000.00
- - - Rp 112,125.00 Rp 376,964.25
Rp 376,964.25
2.95 2.95
Rp 20,300,000.00 2.95 %
1 ( Satu )
5 Oktob. s/d 10 Oktober 2015
Oktober 2015
29 Oktober 2015
- - - Rp 58,500.00 Rp 126,360.00
- - - Rp 215,400.00 Rp 77,544.00
- - - Rp 16,110.00 Rp 17,398.80
Rp 221,302.80
- - - Rp 88,586.67 Rp 3,790,281.61
- - - Rp 42,298.80 Rp 3,619,604.84
- - - Rp 11,825.00 Rp 3,651,560.00
Rp 11,061,446.45
- - - Rp 897,800.00 Rp 161,604.00
- - - Rp 3,962,550.00 Rp 2,139,777.00
- - - Rp 3,962,550.00 Rp 3,120,508.13
- - - Rp 3,962,550.00 Rp 5,943,825.00
- - - Rp 3,962,550.00 Rp 9,510,120.00
- - - Rp 3,962,550.00 Rp 941,501.88
Rp 21,817,336.01
- - - Rp 210,000.00 Rp 77,723,100.00
- - - Rp 65,000.00 Rp 5,063,500.00
Rp 82,786,600.00
- - - Rp 80,500.00 Rp 16,325,400.00
- - - Rp 18,000.00 Rp 3,011,580.00
- - - Rp 95,820.00 Rp 2,429,037.00
- - - Rp 21,149.40 Rp 617,562.48
Rp 22,383,579.48
- - - Rp 11,431,250.00 Rp 14,644,117.13
- - - Rp 618,250.00 Rp 5,375,065.50
- - - Rp 430,475.00 Rp 7,148,037.38
- - - Rp 419,572.50 Rp 4,833,475.20
Rp 32,000,695.20
- - - Rp 85,000.00 Rp 25,857,000.00
Rp 25,857,000.00
- - - Rp 20,740.00 Rp 12,412,890.00
- - - Rp 20,740.00 Rp 6,309,108.00
- - - Rp 42,450.00 Rp 8,774,415.00
Rp 27,496,413.00
- - - Rp 112,000.00 Rp 26,880,000.00
- - - Rp 136,075.00 Rp 17,662,535.00
- - - Rp 136,075.00 Rp 870,880.00
- - - Rp 85,000.00 Rp 10,115,000.00
Rp 55,528,415.00
- - - Rp 140,750.00 Rp 422,250.00
- - - Rp 23,625.00 Rp 425,250.00
- - - Rp 16,687.50 Rp 267,000.00
- - - Rp 74,250.00 Rp 222,750.00
- - - Rp 14,750.00 Rp 236,000.00
- - - Rp 17,750.00 Rp 284,000.00
Rp 1,857,250.00
- - - Rp 55,000.00 Rp 660,000.00
- - - Rp 50,000.00 Rp 150,000.00
- - - Rp 20,000.00 Rp 60,000.00
- - - Rp 15,000.00 Rp 45,000.00
- - - Rp 225,000.00 Rp 675,000.00
- - - Rp 200,000.00 Rp 3,000,000.00
Rp 4,590,000.00
- - - Rp 112,125.00 Rp 3,038,587.50
Rp 3,038,587.50
0.28 -
Rp 20,300,000.00 - %
1 ( Satu )
5 Oktob. s/d 10 Oktober 2015
Oktober 2015
29 Oktober 2015
- - - Rp 85,000.00 Rp 17,105,400.00
Rp 17,105,400.00
- - - Rp 55,000.00 Rp 440,000.00
- - - Rp 50,000.00 Rp 100,000.00
- - - Rp 20,000.00 Rp 40,000.00
- - - Rp 15,000.00 Rp 30,000.00
- - - Rp 225,000.00 Rp 450,000.00
- - - Rp 200,000.00 Rp 2,000,000.00
Rp 3,060,000.00
- - - Rp 112,125.00 Rp 2,318,745.00
Rp 2,318,745.00
34.01 76.45
Rp 144,806,000.00 76.45 %
LAMA
140
BARU
LAMA
BARU
LAMA
BARU
LAMA
BARU
keramik tambal sulam
SADALI, S.Pd
UBAGIO, M.Pd
NDAYANI, M.Pd
1 2 3 4 5
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
1.01 100 1.01 100 1.01 100 1.01 100 1.01 100
0.11 - - - - - - - - -
0.90 - - 100 0.90 100 0.90 100 0.90 100
0.86 - - - - 100 0.86 100 0.86 100
- - - - - 100 - 100 - 100
14.17 - - - - - - - - -
12.02 - - - - - - - - -
1.70 - - - - - - - - -
1.38 - - - - - - - - -
14.29 - - - - - - - - -
1.40 - - - - - - - - -
0.65 - - - - - - - - -
12.16 - - - - - - - - -
5.92 - - - - - - - - -
2.97 - - - - - - - - -
2.61 - - - - - - - - -
1.82 - - - - - - - - -
9.21 - - - - - - - - -
6.87 - - - - - - - - -
3.58 - - - - - - - - -
0.36 - - - - - - - - -
0.08 - - - - - - - - -
0.04 - - - - - - - - -
0.04 - - - - - - - - -
0.62 - - - - - - - - -
1.64 - - - - - - - - -
0.21 - - - - - - - - -
1 2 3 4 5
0.20 100 0.20 100 0.20 100 0.20 100 0.20 100
0.08 100 0.08 100 0.08 100 0.08 100 0.08 100
0.07 - - - - - - - - -
0.05 - - - - - - 25 0.01 50
0.70 - - - - - - - - 50
1.02 - - - - - - - - -
1.95 - - - - - - - - -
3.12 - - - - - - - - 50
0.31 - - - - - - - - 75
25.51 - - - - - - - - -
1.66 - - - - - - - - -
5.36 - - - - - - - - -
0.99 - - - - - - - - -
0.80 - - - - - - - - -
0.20 - - - - - - - - -
4.81 - - - - - - - - 50
1.76 - - - - - - - - -
2.35 - - - - - - - - -
1.59 - - - - - - - - -
8.49 - - - - - - - - -
4.07 - - - - - - - - -
2.07 - - - - - - - - -
2.88 - - - - - - - - -
8.82 - - - - - - - - -
5.80 - - - - - - - - -
0.29 - - - - - - - - -
3.32 - - - - - - - - -
0.14 - - - - - - - - -
0.14 - - - - - - - - -
0.09 - - - - - - - - -
0.07 - - - - - - - - -
0.08 - - - - - - - - -
0.09 - - - - - - - - -
0.22 - - - - - - - - -
0.05 - - - - - - - - -
0.02 - - - - - - - - -
0.01 - - - - - - - - -
0.22 - - - - - - - - -
0.98 - - - - - - - - -
1.00 - - - - - - - - -
1 2 3 4 5
1.70 100 1.70 100 1.70 100 1.70 100 1.70 100
0.32 100 0.32 100 0.32 100 0.32 100 0.32 100
0.65 100 0.65 100 0.65 100 0.65 100 0.65 100
0.11 - - - - - - - - -
0.05 100 0.05 100 0.05 100 0.05 100 0.05 100
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100
0.01 50 0.00 100 0.01 100 0.01 100 0.01 100
8.10 - - - - - - - - -
1.06 - - - - - - - - -
0.98 - - - - - - - - -
0.30 - - - - - - - - -
9.03 - - - - - - - - -
0.59 - - - - - - - - -
1.76 - - - - - - - - -
1.03 - - - - - - - - 75
0.44 - - - - - - - - -
9.58 - - - - - - - - -
0.40 - - - - - - - - -
0.15 - - - - - - - - -
0.15 - - - - - - - - -
0.14 - - - - - - - - -
0.08 - - - - - - - - -
0.12 - - - - - - - - -
0.15 - - - - - - - - -
0.23 - - - - - - - - -
0.05 - - - - - - - - -
0.02 - - - - - - - - -
0.02 - - - - - - - - -
0.24 - - - - - - - - -
1.06 - - - - - - - - -
1.22 - - - - - - - - -
6 7 8 9 10
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
1.01 100 1.01 100 1.01 100 1.01 100 1.01 100
- - - - - - - 100 0.11 100
0.90 100 0.90 100 0.90 100 0.90 100 0.90 100
0.86 100 0.86 100 0.86 100 0.86 100 0.86 100
- 100 - 100 - 100 - 100 - 100
0.13 100 0.13 100 0.13 100 0.13 100 0.13 100
0.06 100 0.06 100 0.06 100 0.06 100 0.06 100
0.56 100 0.56 100 0.56 100 0.56 100 0.56 100
0.34 100 0.69 100 0.69 100 0.69 100 0.69 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
6 7 8 9 10
0.20 100 0.20 100 0.20 100 0.20 100 0.20 100
0.08 100 0.08 100 0.08 100 0.08 100 0.08 100
- - - - - - - - - 100
0.04 100 0.04 100 0.04 100 0.04 100 0.04 100
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100
0.01 100 0.01 100 0.01 100 0.01 100 0.01 100
1.24 100 1.24 100 1.24 100 1.24 100 1.24 100
1.19 100 1.19 100 1.19 100 1.19 100 1.19 100
1.20 100 1.20 100 1.20 100 1.20 100 1.20 100
0.03 100 0.05 100 0.05 100 0.05 100 0.05 100
0.35 100 0.70 100 0.70 100 0.70 100 0.70 100
- 50 0.51 100 1.02 100 1.02 100 1.02 100
- 50 0.98 100 1.95 100 1.95 100 1.95 100
1.56 75 2.34 100 3.12 100 3.12 100 3.12 100
0.23 100 0.31 100 0.31 100 0.31 100 0.31 100
2.40 100 4.81 100 4.81 100 4.81 100 4.81 100
- - - - - - - 100 1.76 100
- - - - - - - 100 2.35 100
- - - - - 50 0.79 100 1.59 100
- - - - - - - 50 4.24 100
- - - - - - - 75 6.62 100
- - - - - - - 50 2.90 100
- - - - - - - 50 0.14 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
1.70 100 1.70 100 1.70 100 1.70 100 1.70 100
0.32 100 0.32 100 0.32 100 0.32 100 0.32 100
0.65 100 0.65 100 0.65 100 0.65 100 0.65 100
- - - - - - - - - 100
0.05 100 0.05 100 0.05 100 0.05 100 0.05 100
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100
0.01 100 0.01 100 0.01 100 0.01 100 0.01 100
4.29 100 4.29 100 4.29 100 4.29 100 4.29 100
4.10 100 4.10 100 4.10 100 4.10 100 4.10 100
1.08 100 1.08 100 1.08 100 1.08 100 1.08 100
0.15 100 0.15 100 0.15 100 0.15 100 0.15 100
0.79 100 0.79 100 0.79 100 0.79 100 0.79 100
0.74 100 0.99 100 0.99 100 0.99 100 0.99 100
- 100 2.23 100 2.23 100 2.23 100 2.23 100
- 100 2.64 100 2.64 100 2.64 100 2.64 100
- 100 1.17 100 1.17 100 1.17 100 1.17 100
- 25 7.11 100 28.43 100 28.43 100 28.43 100
- - - 100 2.24 100 2.24 100 2.24 100
5.81 100 5.81 100 5.81 100 5.81 100 5.81 100
4.22 100 4.22 100 4.22 100 4.22 100 4.22 100
2.11 100 2.11 100 2.11 100 2.11 100 2.11 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
0.97
0.97
1.01
0.11
0.90
0.86
-
0.13
0.06
0.56
0.69
14.17
12.02
1.70
1.38
14.29
1.40
0.65
12.16
5.92
2.97
2.61
1.82
9.21
6.87
3.58
0.36
0.08
0.04
0.04
0.62
1.64
0.21
0.20
0.08
0.07
0.04
0.03
0.01
1.24
1.19
1.20
0.05
0.70
1.02
1.95
3.12
0.31
25.51
1.66
5.36
0.99
0.80
0.20
4.81
1.76
2.35
1.59
8.49
4.07
2.07
2.88
8.82
5.80
0.29
3.32
0.14
0.14
0.09
0.07
0.08
0.09
0.22
0.05
0.02
0.01
0.22
0.98
1.00
1.70
0.32
0.65
0.11
0.05
0.03
0.01
4.29
4.10
1.08
0.15
0.79
0.99
2.23
2.64
1.17
28.43
2.24
8.10
1.06
0.98
0.30
5.81
4.22
2.11
9.03
0.59
1.76
1.03
0.44
9.58
0.40
0.15
0.15
0.14
0.08
0.12
0.15
0.23
0.05
0.02
0.02
0.24
1.06
1.22
YANG DIPAKAI
TH. 2018
1 SMPN 2 SEPULU 2 KELAS ### SINERGI
2 SMPN 1 KLAMPIS 3 KELAS ### SINERGI
3 SMPN 2 KOKOP 2 KELAS ### SINERGI
4 SMPN 3 SATAP KOKOP 2 KELAS ### SINERGI
5 SMPN 1 TRAGAH 3 KELAS ### INDRAKILA
6 SMPN 2 MODUNG 2 KELAS ### INDRAKILA
7 SMPN 2 LABANG 3 KELAS ### INDRAKILA
8 SMPN 2 KWANYAR 2 KELAS ### INDRAKILA
9 SMPN TAHAL AMIN H. ABDULLAH, S.Pd
REKAPITULASI 1
RENCANA ANGGARAN BIAYA OK
OK
KEGIATAN : PENGADAAN SARANA PRASARANA
PEKERJAAN : PERENCANAAN SMP KABUPATEN BANGKALAN
LINGKUP PEKERJAAN : REHABILITASI 2 RUANG BELAJAR SMPN 2 SEPULU
LOKASI : SMPN 2 SEPULU KEC. SEPULU KAB. BANGKALAN
JUMLAH ###
DIBULATK ### ###
###
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Sepulu
Kec. Sepulu Kab. Bangkalan
LAPORAN MINGGUAN
Minggu ke :
Pekerjaan : REHABILITASI 2 RUANG KELAS SMPN 2 SEPULU Tanggal :
Nama Sekolah : SMPN 2 SEPULU Bulan :
Lokasi : Kec. Kedamean Kab. Gresik Dana diterima tangal :
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%)
% Prestasi Rerata Prestasi
(1) (2) (3) (4) (5) (6) (7) (8)
(6)/100x(5)
I. PEKERJAAN PERSIAPAN
1 Pembongkaran atap + rangka atap 143.00 m² 0.97 - - 100
2 Pembongkaran atap 234.90 m² 0.97 - - 100
3 Penetelan plesteran 92.16 m² 1.01 - - 100
4 Pembersihan akhir pekerjaan 1.00 ls 0.11 - - -
II. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 18.50 m² 0.90 - - -
2 Plesteran 1Pc : 5Ps 37.00 m² 0.86 - - -
3 Benangan 48.00 m' - - - -
V. PEKERJAAN ATAP
1 Atap genteng beton (lama) 139.73 m² 1.38 - - -
2 Atap genteng beton warna 237.08 m² 14.29 - - -
3 Genteng bubungan beton warna 26.70 m' 1.40 - - -
4 Plesteran kompres L = 10 cm (Akhiran genting) 56.00 m' 0.65 - - -
JUMLAH 100.00 -
Jumlah dana yang digunakan sampai dengan minggu ini ( minggu ke 1 ) Rp 20,300,000.00
REKAPITULASI 2
RENCANA ANGGARAN BIAYA OK
I (2) ###
II PEKERJAAN TANAH ###
III PEKERJAAN PASANGAN/PLESTERAN ###
IV PEKERJAAN BETON ###
V PEKERJAAN RANGKA ATAP ###
VI PEKERJAAN ATAP ###
VII PEKERJAAN KUSEN PINTU DAN JENDELA ###
VIII PEKERJAAN PLAFOND ###
IX PEKERJAAN PENGECATAN/PLAMIRAN ###
X PEKERJAAN LANTAI ###
XI PEKERJAAN KUNCI + PENGGANTUNG ###
XII PEKERJAAN INSTALASI LISTRIK ### ###
XIII PEKERJAAN KACA ###
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 1 Kelampis
Kec. Kelampis Kab. Bangkalan
LAPORAN MINGGUAN
Minggu ke :
Pekerjaan : REHABILITASI 2 RUANG KELAS SMPN 1 KLAMPIS Tanggal :
Nama Sekolah : SMPN 1 KLAMPIS Bulan :
Lokasi : Kec. Kedamean Kab. Gresik Dana diterima tangal :
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%)
% Prestasi Rerata Prestasi
(1) (2) (3) (4) (5) (6) (7) (8)
I. PEKERJAAN PERSIAPAN (6)/100x(5)
1 Pembongkaran kosen 12.00 bh 0.20 - - 100
2 Penetelan plesteran 12.00 m² 0.08 - - 100
3 Pembersihan akhir pekerjaan 1.00 ls 0.07 - - -
X. PEKERJAAN LANTAI
1 Keramik lantai 40 x 40 240.00 m² 8.82 - - -
2 Keramik dinding 25 x 40 129.80 m² 5.80 - - -
3 Keramik kolom 25 x 40 6.40 m² 0.29 - - -
4 List keramik 119.00 m' 3.32 - - -
JUMLAH 95.07 -
Jumlah dana yang digunakan sampai dengan minggu ini ( minggu ke 1 ) Rp 20,300,000.00
3
REKAPITULASI OK
NCANA ANGGARAN BIAYA OK
: PENGADAAN SARANA PRASARANA
KEGIATAN : PERENCANAAN SMP KABUPATEN BANGKALAN
PEKERJAAN : REHABILITASI 2 RUANG BELAJAR SMPN 3 SATAP KOKOP
LINGKUP PEKERJAAN : SMPN 3 SATAP KOKOP KEC. KOKOP KAB. BANGKALAN
LOKASI
URAIAN PEKERJAAN JUMLAH HARGA
NO.
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
H. SUBADRIH, ST, MT
Mengetahui :
Kepala Sekolah
SMPN 3 Satap Kokop
Kec. Kokop Kab. Bangkalan
IHSANUDIN, S.Pd
NIP. 19700109 199104 1 001
LAPORAN MINGGUAN
Minggu ke :
Pekerjaan : REHABILITASI 2 RUANG BELAJAR SMPN 3 SATAP KOKOP Tanggal :
Nama Sekolah : SMPN 3 SATAP KOKOP KEC. KOKOP KAB. BANGKALAN Bulan :
Lokasi : KEC. KOKOP KAB. BANGKALAN Dana diterima tangal :
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%)
% Prestasi Rerata Prestasi
(1) (2) (3) (4) (5) (6) (7) (8)
(6)/100x(5)
I. PEKERJAAN PERSIAPAN
1 Pembongkaran atap + rangka 260.00 m² 1.70 100 1.70 -
2 Pembongkaran kosen 12.00 bh 0.32 100 0.32 -
3 Pembongkaran dinding 61.75 m² 0.65 100 0.65 -
4 Pembersihan akhir pekerjaan 1.00 ls 0.11 - - -
X. PEKERJAAN LANTAI
1 Keramik lantai 40 x 40 162.00 m² 9.58 25 2.39 75
2 Keramik kolom 20 x 40 (motif) 5.60 m² 0.40 - - 85
Mengetahui Menyetujui
SMPN 3 Satap Kokop Panitia Pembangunan Sekolah
Kec. Kokop Kab. Bangkalan
Selaku Penanggung Jawab
IHSANUDIN, S.Pd SUHAERI
NIP. 19700109 199104 1 001
REKAPITULASI
NCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI
NO.
I
II
III
IV
V
VI
VII
VIII
IX
X 4
XI OK
XII LAMA
XIII : PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 1 TRAGAH
: SMPN 1 TRAGAH KEC. TRAGAH KAB. BANGKALAN
TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )
PEKERJAAN PERSIAPAN ###
PEKERJAAN TANAH ###
PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA #DIV/0!
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 1 Tragah
Kec. Tragah Kab. Bangkalan
Drs. AMIRULLAH, MM
NIP. 19581217 198603 1 011
NO
1
I.
1
2
3
4
II.
1
2
4
III.
1
2
3
IV.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran atap + rangka 377.00 m² ### ###
V. Pembongkaran kusen 4.00 bh ### ###
1 Penetelan plesteran 159.60 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VI. PEKERJAAN TANAH ###
1 Galian tanah 2.16 m³ ### ###
2 Urugan pasir bawah pondasi t=10cm 0.36 m³ ### ### #DIV/0!
3 Urugan tanah kembali 1.08 m³ ### ###
4 ###
PEKERJAAN PASANGAN/PLESTERAN
VII. Pasangan 1/2 bata camp. 1 Pc : 5 Ps 7.20 m² ### ### ###
1 Plesteran 1Pc : 5Ps 14.40 m² ### ###
2 Benangan 24.00 m' ### ###
3 ###
PEKERJAAN BETON
VIII. Lantai kerja bawah pondasi 1:3:5 t=5cm 0.18 m³ ### ###
1 Pondasi beton stempat 60 x 60 x 15cm 0.54 m³ ### ###
Kolom teras 15/15 0.79 m³ ### ###
IX. Balok beton 15/20 1.71 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ ### ###
X. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Penang (baru) 382.73 m² ### ###
3 Atap genteng (lama bg. belakang) 170.10 m² ### ###
4 Genteng bubungan Karang penang 28.35 m' ### ###
Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' ### ###
XI. ###
1 PEKERJAAN KUSEN PINTU DAN JENDELA
2 Kusen kayu kempas/mahoni 6/15 #DIV/0! m³ Rp - #DIV/0!
3 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 8.61 m² Rp - Rp - #DIV/0!
4 Daun Jendela kaca kayu kempas/mahoni 3/10 8.40 m² Rp - Rp - ###
5 #DIV/0!
6 PEKERJAAN PLAFOND
Plafond calsiboard 4mm + rangka kayu 4/6 294.84 m² ### ###
XII ###
1 PEKERJAAN PENGECATAN
2 Pengecatan dinding (3 Ruang kelas) 598.50 m² ### ###
3 Pengecatan plafond 294.84 m² ### ###
4 Pengecatan kayu 206.70 m² ### ###
5 ###
6 PEKERJAAN LANTAI #DIV/0!
Keramik lantai 40 x 40 245.70 m² ### ###
XIII. Keramik dinding 25 x 40 ( 3 R.kelas + teras ) 159.60 m² ### ###
1 List keramik dinding 7cm 110.40 m² ### ###
Keramik kolom 25 x 40 12.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Engsel Pintu 18.00 bh ### ###
Engsel Jendela 16.00 bh ### ###
Grendel pintu 3.00 bh ### ###
Grendel Jendela 16.00 bh ### ###
Hag Angin 16.00 bh ### ###
###
REKAPITULASI
PEKERJAAN INSTALASI LISTRIK
NCANA ANGGARAN
Lampu BIAYA
SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
KEGI Saklar ganda 3.00 bh ### ###
PEKE Saklar tunggal 3.00 bh ### ###
LING Stop kontak + instalasi 3.00 bh ### ###
LOKA Instalasi titik lampu 15.00 ttk ### ###
###
NO. PEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 11.14 m² ### ###
###
I
II
III
IV
V
VI
VII
VIII
IX
X 4
XI OK
XII BARU
XIII : PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 1 TRAGAH
: SMPN 1 TRAGAH KEC. TRAGAH KAB. BANGKALAN
TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )
PEKERJAAN PERSIAPAN ###
PEKERJAAN TANAH ###
PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA Rp -
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 1 Tragah
Kec. Tragah Kab. Bangkalan
Drs. AMIRULLAH, MM
NIP. 19581217 198603 1 011
NO
1
I.
1
2
3
4
II.
1
2
4
III.
1
2
3
IV.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran atap + rangka 377.00 m² ### ###
V. Pembongkaran kusen 8.00 bh ### ###
1 Penetelan plesteran 249.00 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VI. PEKERJAAN TANAH ###
1 Galian tanah 2.16 m³ ### ###
2 Urugan pasir bawah pondasi t=10cm 0.36 m³ ### ### ###
3 Urugan tanah kembali 1.08 m³ ### ###
###
VII. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 24.02 m² ### ### ###
2 Plesteran 1Pc : 5Ps 48.03 m² ### ###
3 Benangan 168.00 m' ### ###
4 ###
PEKERJAAN BETON
VIII. Lantai kerja bawah pondasi 1:3:5 t=5cm 0.18 m³ ### ###
1 Pondasi beton stempat 60 x 60 x 15cm 0.54 m³ ### ###
Kolom teras 15/15 0.79 m³ ### ###
IX. Balok beton 15/20 1.56 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ ### ###
X. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Penang (baru) 382.73 m² ### ###
3 Genteng bubungan Karang penang 28.35 m' ### ###
4 Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' ### ###
5 ###
PEKERJAAN KUSEN PINTU DAN JENDELA
XI. Kusen kayu kempas/mahoni 6/15 1.09 m³ Rp - Rp -
1 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 8.61 m² Rp - Rp - ###
2 Jalusi kayu kempas/mahoni 3/12 7.20 m² Rp - Rp -
3 Daun Jendela kaca kayu kempas/mahoni 3/10 6.72 m² Rp - Rp - ###
4 Rp -
5 PEKERJAAN PLAFOND
6 Plafond calsiboard 4mm + rangka kayu 4/6 294.84 m² ### ###
###
XII PEKERJAAN PENGECATAN
1 Pengecatan dinding (3 Ruang kelas) 598.50 m² ### ###
2 Pengecatan plafond 294.84 m² ### ###
3 Pengecatan kayu 206.70 m² ### ###
4 ###
5 PEKERJAAN LANTAI ###
6 Keramik lantai 40 x 40 245.70 m² ### ###
Keramik dinding 25 x 40 ( 3 R.kelas + teras ) 173.40 m² ### ###
XIII. List keramik dinding 7cm 132.90 m² ### ###
1 Keramik kolom 25 x 40 12.00 m² ### ###
Keramik dinding 25 x 40 ( 3 R.kelas teras saja ) 75.60 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Engsel Pintu 18.00 bh ### ###
Engsel Jendela 16.00 bh ### ###
Grendel pintu 3.00 bh ### ###
Grendel Jendela 16.00 bh ### ###
Hag Angin 16.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
REKAPITULASI
Lampu SL 8watt (teras) 3.00 bh ### ###
NCANA ANGGARAN BIAYA
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
KEGI Stop kontak + instalasi 3.00 bh ### ###
PEKE Instalasi titik lampu 15.00 ttk ### ###
LINGKUP PEKERJAAN ###
LOKAPEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 11.14 m² ### ###
NO. ###
I
II
III
IV
V
VI
VII
VIII
IX
X 5
XI OK
XII LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 MODUNG
: SMPN 2 MODUNG KEC. MODUNG KAB. BANGKALAN
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Modung
Kec. Modung Kab. Bangkalan
A S U R, M.Pd
NIP. 19610117 198403 1 008
NO
1
I.
1
2
II.
1
2
3
III.
1
2
3
IV.
1
2
Lembar. 2
V. JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
1 2 3 4 5
2 PEKERJAAN PERSIAPAN
3 Pembongkaran atap + rangka 406.00 m² ### ###
4 Pembersihan akhir pekerjaan 1.00 ls ### ### ###
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 98.93 m² ### ###
2 Plesteran 1Pc : 5Ps 197.87 m² ### ###
3 Benangan 166.56 m' ### ###
###
VII. PEKERJAAN BETON
1 Kolom teras 15/15 0.41 m³ ### ###
Balok teras 15/20 1.24 m³ ### ###
VIII. Ring balk gewel 15/15 0.98 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 396.90 m² ### ###
4 Lisplank kalsiplank 8mm / 30 cm 85.70 m¹ ### ###
5 ###
PEKERJAAN ATAP
IX. Pasang atap genteng karang p enang (baru 5%) 19.85 m² ### ###
1 Pasang atap genteng (lama) 377.06 m² ### ###
Genteng bubungan karang penang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 29.00 m' ### ###
1 ###
2 PEKERJAAN KUSEN PINTU DAN JENDELA
3 Kusen kayu kempas/mahoni 6/12 0.46 m³ Rp - Rp -
4 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 6.72 m² Rp - Rp -
5 Daun Jendela kaca kayu kempas/mahoni 3/10 5.04 m² Rp - Rp -
6 Rp -
PEKERJAAN PLAFOND ###
XI. Plafond calsiboard 4mm + rangka hollow 340.20 m² ### ###
1 ###
2 PEKERJAAN PENGECATAN/PLAMIRAN
3 Pengecatan dinding (depan) 66.85 m² ### ###
4 Pelamiran dinding 430.33 m² ### ###
5 Pelamiran plafond 340.20 m² ### ### ###
6 Pengecatan kayu 206.70 m² ### ###
Cat genteng 396.90 m² ### ###
XII. ###
1 PEKERJAAN LANTAI
Lantai rabat 216.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 4.00 bh ### ###
Engsel Pintu 21.00 bh ### ###
Engsel Jendela 24.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Grendel Jendela 12.00 bh ### ### ###
Hag Angin 24.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 14.00 bh ### ###
Lampu SL 8watt (teras) 4.00 bh ### ###
Saklar ganda 7.00 bh ### ###
REKAPITULASI
Saklar tunggal 3.00 bh ### ###
NCANA ANGGARAN BIAYA
Stop kontak + instalasi 4.00 bh ### ###
Instalasi titik lampu 18.00 bh ### ###
KEGIATAN ###
PEKE PEKERJAAN KACA
LING Kaca mati t=5 mm 14.49 m² ### ###
LOKASI ###
NO.
I
II
III
IV
V
VI
VII
VIII
IX
X 5
XI OK
XII BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 MODUNG
: SMPN 2 MODUNG KEC. MODUNG KAB. BANGKALAN
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Modung
Kec. Modung Kab. Bangkalan
A S U R, M.Pd
NIP. 19610117 198403 1 008
NO
1
I.
1
2
II.
1
2
3
III.
1
2
3
IV.
1
2
Lembar. 2
V. JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
1 2 3 4 5
2 PEKERJAAN PERSIAPAN
3 Pembongkaran atap + rangka 406.00 m² ### ###
4 Pembersihan akhir pekerjaan 1.00 ls ### ### ###
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 98.93 m² ### ###
2 Plesteran 1Pc : 5Ps 197.87 m² ### ###
3 Benangan 166.56 m' ### ###
###
VII. PEKERJAAN BETON
1 Kolom teras 15/15 0.41 m³ ### ###
Balok teras 15/20 1.24 m³ ### ###
VIII. Ring balk gewel 15/15 0.98 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 396.90 m² ### ###
4 Lisplank kalsiplank 8mm / 30 cm 85.70 m¹ ### ###
5 ###
PEKERJAAN ATAP
IX. Pasang atap genteng karang p enang (baru 5%) 19.85 m² ### ###
1 Pasang atap genteng (lama) 377.06 m² ### ###
Genteng bubungan karang penang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 29.00 m' ### ###
1 ###
2 PEKERJAAN KUSEN PINTU DAN JENDELA
3 Kusen kayu kempas/mahoni 6/12 0.46 m³ Rp - Rp -
4 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 6.72 m² Rp - Rp -
5 Daun Jendela kaca kayu kempas/mahoni 3/10 5.04 m² Rp - Rp -
6 Rp -
PEKERJAAN PLAFOND ###
XI. Plafond calsiboard 4mm + rangka kayu 4/6 340.20 m² ### ###
1 ###
2 PEKERJAAN PENGECATAN/PLAMIRAN
3 Pengecatan dinding (depan) 66.85 m² ### ###
4 Pelamiran dinding 430.33 m² ### ###
5 Pelamiran plafond 340.20 m² ### ### ###
6 Pengecatan kayu 206.70 m² ### ###
Cat genteng 396.90 m² ### ###
XII. ###
1 PEKERJAAN LANTAI
Lantai rabat 216.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 4.00 bh ### ###
Engsel Pintu 21.00 bh ### ###
Engsel Jendela 24.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Grendel Jendela 12.00 bh ### ### ###
Hag Angin 24.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 14.00 bh ### ###
Lampu SL 8watt (teras) 4.00 bh ### ###
Saklar ganda 7.00 bh ### ###
REKAPITULASI
Saklar tunggal 3.00 bh ### ###
NCANA ANGGARAN BIAYA
Stop kontak + instalasi 4.00 bh ### ###
Instalasi titik lampu 18.00 bh ### ###
KEGIATAN ###
PEKE PEKERJAAN KACA
LING Kaca mati t=5 mm 14.49 m² ### ###
LOKASI ###
NO.
I
II
III
IV
V
VI
VII
VIII
IX
X 6
XI OK
LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 2 LABANG
: SMPN 2 LABANG KEC. LABANG KAB. BANGKALAN
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
ACHMAD TAUFIK HEYKAL, A.Sg H. SUBADRIH, ST, MT
Mengetahui :
Kepala Sekolah
SMPN 2 Labang
Kec. Labang Kab. Bangkalan
NO
1
I.
1
2
3
4
5
II.
1
III.
1
2
IV.
1
2
3 Lembar. 2
JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
V. 2 3 4 5
1 PEKERJAAN PERSIAPAN ###
Pembongkaran atap + rangka 377.00 m² Rp - Rp -
VI. Pembongkaran kosen 1.00 bh ### ###
1 Pembongkaran dinding 6.00 m² ### ###
2 Penetelan plesteran 139.74 m² ### ###
3 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VII. PEKERJAAN PASANGAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps (nyepit kuda2) 30.91 m² Rp - Rp -
2 Rp -
3 PEKERJAAN RANGKA ATAP ###
4 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ Rp - Rp -
VIII. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Pilang (baru) 382.73 m² ### ###
Genteng bubungan Karang pilang 28.35 m' ### ###
IX. Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' Rp - Rp -
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsiboard 4mm + rangka hollow 354.38 m² Rp - Rp -
4 Rp -
5 PEKERJAAN PENGECATAN
6 Pengecatan dinding 598.50 m² Rp - Rp - ###
Pengecatan plafond 354.38 m² Rp - Rp -
X. Pengecatan kayu 274.60 m² Rp - Rp -
1 Rp -
PEKERJAAN LANTAI
XI. Keramik lantai 40 x 40 243.00 m² ### ###
1 Keramik dinding 25 x 40 139.74 m² ### ###
2 List keramik 102.00 m' ### ###
3 Keramik kolom 20 x 40 10.80 m² ### ###
4 ###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA ###
Kaca mati t=5 mm (yg pecah) 4.22 m² ### ###
###
PEKERJAAN TANGGA DEPAN PINTU
Pasangan batu gunung 2.88 m³ ### ###
Plesterran trasram 7.68 m² ### ###
Keramik kasar 40 x 40 7.04 m² ### ###
Urugan pasir 4.96 m³ ### ###
REKAPITULASI ###
NCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI
NO.
I
II
III
IV
V
VI
VII
VIII
IX
X 6
XI OK
XII BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 2 LABANG
: SMPN 2 LABANG KEC. LABANG KAB. BANGKALAN
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Labang
Kec. Labang Kab. Bangkalan
Drs. HARTONO, M.Pd
NIP. 19690126 199802 1 003
NO
1
I.
1
2
3
4
5
II.
1
2
3
III.
1
IV.
1
2 Lembar. 2
JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
V. 2 3 4 5
1 PEKERJAAN PERSIAPAN ###
2 Pembongkaran atap + rangka 377.00 m² Rp - Rp -
3 Pembongkaran kosen 1.00 bh ### ###
Pembongkaran dinding 6.00 m² ### ###
VI. Penetelan plesteran 127.50 m² ### ###
1 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VII. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps (nyepit kuda2) 22.43 m² Rp - Rp - -
2 Plesteran 1Pc : 5Ps 16.20 m² ### ###
3 Benangan 32.00 m' ### ###
###
VIII. PEKERJAAN BETON
1 Ring balk gewel 15/15 0.40 m³ ### ###
2 ###
3 PEKERJAAN RANGKA ATAP ###
4 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ Rp - Rp -
IX. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Pilang (baru) 382.73 m² ### ###
Genteng bubungan Karang pilang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' Rp - Rp -
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsiboard 4mm + rangka hollow 354.38 m² Rp - Rp -
4 Rp -
5 PEKERJAAN PENGECATAN
6 Pengecatan dinding 598.50 m² Rp - Rp - ###
Pengecatan plafond 354.38 m² Rp - Rp -
XI. Pengecatan kayu 274.60 m² Rp - Rp -
1 Rp -
PEKERJAAN LANTAI
XII. Keramik lantai 40 x 40 243.00 m² ### ###
1 Keramik dinding 25 x 40 127.50 m² ### ###
2 List keramik 102.00 m' ### ###
3 Keramik kolom 20 x 40 10.80 m² ### ###
4 ###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Pintu harmonika 15.00 m² ### ### ###
### ###
PEKERJAAN INSTALASI LISTRIK ###
Lampu SL 14 watt 12.00 bh ### ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA ###
Kaca mati t=5 mm (yg pecah) 4.22 m² ### ###
###
PEKERJAAN TANGGA DEPAN PINTU 3.46
Pasangan batu gunung 2.88 m³ ### ###
Plesterran trasram 7.68 m² ### ###
Keramik kasar 40 x 40 7.04 m² ### ###
Urugan pasir 4.96 m³ ### ###
###
REKAPITULASI
NCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI
NO.
I
II
III
IV
V
VI
VII
VIII
IX
X 7
OK
LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 KWANYAR
: SMPN 2 KWANYAR KEC. KWANYAR KAB. BANGKALAN
TERBILANG : ( SERATUS SEMBILAN PULUH TUJUH JUTA DELAPAN RATUS RIBU RUPIAH )
URAIAN PEKERJAAN JUMLAH HARGA
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Kwanyar
Kec. Kwanyar Kab. Bangkalan
RAHMAWATI, M.Pd
NIP. 19700703 199802 2 003
NO
1
I.
1
2
3
4
II.
1
2
III.
1
IV.
1
V.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran kusen 1.00 bh ### ###
VI. Pembongkaran dinding 15.00 m² ### ###
1 Penetelan plesteran 428.64 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 Ls ### ###
3 ###
4 PEKERJAAN PASANGAN/PLESTERAN ###
5 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 0.91 22.20 m² Rp - Rp -
6 Plesteran 1Pc : 5Ps 1.07 44.40 m² Rp - Rp -
Rp -
VII. PEKERJAAN KAYU
1 Lisplank kayu 3/30 cm 4.00 m¹ ### ###
2 ###
3 PEKERJAAN PLAFOND
4 Plafond calsi 1 x 1 + rangka kayu 12.00 m² Rp - Rp -
Rp -
VIII. PEKERJAAN PENGECATAN
1 Pengecatan dinding (3 kelas) 455.30 m² Rp - Rp -
2 Pengecatan plafond 319.00 m² Rp - Rp -
3 Pengecatan kayu 206.70 m² Rp - Rp - ###
4 Pengecatan kayu (Kantor) 214.39 m² Rp - Rp -
5 Rp -
6PEKERJAAN LANTAI 162.00 ###
Keramik lantai 40 x 40 ( 2 R Kelas ) 5.67 126.00 m² ### ###
IX. Keramik lantai 40 x 40 ( Teras ) 1.62 36.00 m² ### ###
1 Keramik dinding 25 x 40 (dalam kelas + teras) 5.78 128.40 m² ### ###
Keramik kolom teras 25 x 40 1.01 22.40 m² ### ###
X. List keramik 1.64 327.80 m' ### ###
1 Keramik dinding 25 x 40 (dalam kantor+R.guru+ t 13.51 300.24 m² ### ###
2 451.04 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 3.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Hag Angin 60.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
REKAPITULASI
PEKERJAAN KACA
NCANA ANGGARAN BIAYA
Kaca mati t=5 mm (yg pecah) 1.68 m² ### ###
###
KEGI PEKERJAAN TEMPAT DUDUK
PEKE Pasangan trasram 0.68 17.00 m² Rp - Rp -
LING Plat beton tempat duduk t=10 cm 0.53 1.02 m³ ### ###
LOKA Keramik tempat duduk 30 x 30 0.46 10.20 m² ### ###
Keramik dinding tempat duduk 25 x 40 1.84 40.80 m² ### ###
NO. 34.71 ###
0.86768 40.80
I
II
III
IV
V
VI
VII
VIII
IX
X 7
OK
BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 KWANYAR
: SMPN 2 KWANYAR KEC. KWANYAR KAB. BANGKALAN
TERBILANG : ( SERATUS SEMBILAN PULUH TUJUH JUTA DELAPAN RATUS RIBU RUPIAH )
URAIAN PEKERJAAN JUMLAH HARGA
PEKERJAAN PERSIAPAN ###
PEKERJAAN PASANGAN/PLESTERAN Rp -
PEKERJAAN KAYU ###
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
PEKERJAAN TEMPAT DUDUK ###
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Kwanyar
Kec. Kwanyar Kab. Bangkalan
RAHMAWATI, M.Pd
NIP. 19700703 199802 2 003
NO
1
I.
1
2
3
4
II.
1
2
III.
1
2
IV.
1
V. Lembar. 2
1 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
2 2 3 4 5
3 PEKERJAAN PERSIAPAN
4 Pembongkaran kusen 1.00 bh ### ###
5 Pembongkaran dinding 15.00 m² ### ###
Penetelan plesteran 428.64 m² ### ###
VI. Pembersihan akhir pekerjaan 1.00 Ls ### ###
1 ###
2 PEKERJAAN PASANGAN/PLESTERAN ###
3 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 22.20 m² Rp - Rp -
4 Plesteran 1Pc : 5Ps 44.40 m² Rp - Rp -
5 Rp -
6 PEKERJAAN KAYU
Perbaikan daun pintu panil 4.00 bh ### ###
VII. Lisplank kayu 3/30 cm 4.00 m¹ ### ###
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsi 1 x 1 + rangka kayu 12.00 m² Rp - Rp -
4 Rp -
PEKERJAAN PENGECATAN
VIII. Pengecatan dinding (3 kelas) 439.90 m² Rp - Rp -
1 Pengecatan dinding (Kantor) 373.40 m² Rp - Rp -
2 Pengecatan plafond 319.00 m² Rp - Rp -
3 Pengecatan kayu 169.45 m² Rp - Rp - ###
4 Pengecatan kayu (Kantor) 197.69 m² Rp - Rp -
5 Rp -
6 PEKERJAAN LANTAI ###
Keramik lantai 40 x 40 ( 2 R Kelas ) 126.00 m² ### ###
IX. Keramik lantai 40 x 40 ( Teras ) 36.00 m² ### ###
1 Keramik dinding 25 x 40 (dalam kelas + teras) 128.40 m² ### ###
Keramik kolom teras 25 x 40 22.40 m² ### ###
X. List keramik 327.80 m' ### ###
1 Keramik dinding 25 x 40 (dalam kantor+R.guru+ teras) 300.24 m² ### ###
2 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 3.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Hag Angin 60.00 bh ### ###
Pintu harmonika 11.30 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK ###
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA
REKAPITULASI
Kaca mati t=5 mm (yg pecah) 1.68 m² ### ###
NCANA ANGGARAN BIAYA ###
PEKERJAAN TEMPAT DUDUK
KEGI Pasangan trasram 17.00 m² Rp - Rp -
PEKE Plat beton tempat duduk t=10 cm 1.02 m³ ### ###
LING Keramik tempat duduk 30 x 30 10.20 m² ### ###
LOKA Keramik dinding tempat duduk 25 x 40 40.80 m² ### ###
###
NO.
I
II
III
IV
V
VI
VII
VIII
IX
8
OK
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Kokop
Kec. Kokop Kab. Bangkalan
II.
1
2
3
III.
1
IV.
1
2
3
V. Lembar. 2
1 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
2 2 3 4 5
3 PEKERJAAN PERSIAPAN
4 Penetelan plesteran 317.46 m² ### ###
5 Pembersihan akhir pekerjaan 1.00 Ls Rp - Rp - #REF!
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 12.25 m² Rp - Rp -
5 Plesteran 1Pc : 5Ps 80.58 m² Rp - Rp -
6 Benangan 55.00 m' Rp - Rp -
7 Rp -
PEKERJAAN PLAFOND
VII. Plafond calsiboard 4mm + rangka kayu 15.00 m² Rp - Rp -
1 Rp -
2 PEKERJAAN PENGECATAN -
3 Pengecatan dinding 506.50 m² Rp - Rp -
4 Pengecatan plafond 352.00 m² Rp - Rp - #DIV/0!
5 Pengecatan kayu 275.60 m² Rp - Rp -
6 Rp -
PEKERJAAN LANTAI ###
VIII. Keramik lantai 40 x 40 243.00 m² ### ### 147.47
1 Keramik dinding 25 x 40 ( 3 R. Kelas + teras) 132.96 m² ### ###
List keramik 288.20 m' ### ###
IX. Keramik kolom 25 x 40 16.00 m² ### ###
1 Keramik dinding 25 x 40 ( 5 R. Kelas bg. dalam) 184.50 m² ### ###
2 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 5.00 bh ### ###
Grendel Jendela 50.00 bh ### ###
Hag Angin 100.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 20.00 bh ### ###
Lampu SL 8watt (teras) 5.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 5.00 bh ### ###
Stop kontak + instalasi 5.00 bh ### ###
Instalasi titik lampu 25.00 ttk ### ###
###
PEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 2.53 m² ### ###
###
PEKERJAAN TEMPAT DUDUK
Pasangan trasram 14.70 m² Rp - Rp -
Plat beton tempat duduk t=10 cm 0.74 m³ ### ###
Keramik tempat duduk 30 x 30 7.35 m² ### ###
Keramik dinding tempat duduk 25 x 40 29.40 m² ### ###
###
BATAS
SINERGI 1 SMPN 2 SEPULU DR. AHMAD SABARUDIN, S.Pd, M.MPd
SINERGI 2 SMPN 1 KLAMPIS IMAM SYAFII, S.Pd, MPd
SINERGI 3 SMPN 2 KOKOP MOHAMMAD TAUFIK, SPd
SINERGI 4 SMPN 3 SATAP KOKOP IHSANUDIN, S.Pd
INDRAKILA 5 SMPN 1 TRAGAH Drs. AMIRULLAH, MM
INDRAKILA 6 SMPN 2 MODUNG A S U R, M.Pd
INDRAKILA 7 SMPN 2 LABANG Drs. HARTONO, M.Pd
INDRAKILA 8 SMPN 2 KWANYAR RAHMAWATI, M.Pd
9 SMPN TAHAL AMIN H. ABDULLAH, S.Pd
10 SMPN 1 MODUNG Drs. ALI MUSTOFA, M.Pd
11 SMPN 1 GALIS Drs. TAUFIKUR RAHMAN
12 SMPN 1 KOKOP BUDIONO, S.Pd, M.Pd
28.5
23.5
7.833333
1 ( Satu )
5 Oktob. s/d 10 Oktober 2015
Oktober 2015
29 Oktober 2015
Rp. 212.320.000.00
Prestasi Pekerjaan Prestasi Pekerjaan
Minggu Ini (%) Komulatif (%)
Rerata Prestasi Rerata
(9) (10) (11)
(8)/100x(5) (6)+(8) (7)+(9)
- - - Rp 88,586.67 Rp 1,638,853.33
- - - Rp 42,298.80 Rp 1,565,055.60
- - - Rp - Rp -
Rp 3,203,908.93
- - - Rp 3,912,550.00 Rp 234,753.00
- - - Rp 3,962,550.00 Rp 114,121.44
- - - Rp 3,962,550.00 Rp 1,027,092.96
- - - Rp 3,962,550.00 Rp 1,255,335.84
Rp 2,631,303.24
- - - Rp 185,000.00 Rp 25,849,125.00
- - - Rp 185,000.00 Rp 21,929,437.50
- - - Rp 65,000.00 Rp 3,100,500.00
Rp 50,879,062.50
- - - Rp 18,000.00 Rp 2,515,050.00
- - - Rp 110,000.00 Rp 26,078,250.00
- - - Rp 95,820.00 Rp 2,558,394.00
- - - Rp 21,149.40 Rp 1,184,366.40
Rp 32,336,060.40
- - - Rp 85,000.00 Rp 22,185,000.00
Rp 22,185,000.00
- - - Rp 20,740.00 Rp 10,805,637.48
- - - Rp 20,740.00 Rp 5,413,140.00
- - - Rp 42,450.00 Rp 4,752,702.00
Rp 20,971,479.48
- - - Rp 105,250.00 Rp 3,315,375.00
- - - Rp 112,000.00 Rp 16,800,000.00
- - - Rp 136,075.00 Rp 12,540,672.00
- - - Rp 85,000.00 Rp 6,528,000.00
Rp 39,184,047.00
- - - Rp 55,000.00 Rp 660,000.00
- - - Rp 50,000.00 Rp 150,000.00
- - - Rp 20,000.00 Rp 80,000.00
- - - Rp 15,000.00 Rp 75,000.00
- - - Rp 225,000.00 Rp 1,125,000.00
Rp 200,000.00 Rp 3,000,000.00
Rp 5,090,000.00
- - - Rp 112,125.00 Rp 376,964.25
Rp 376,964.25
2.95 2.95
Rp 20,300,000.00 2.95 %
1 ( Satu )
5 Oktob. s/d 10 Oktober 2015
Oktober 2015
29 Oktober 2015
- - - Rp 58,500.00 Rp 126,360.00
- - - Rp 215,400.00 Rp 77,544.00
- - - Rp 16,110.00 Rp 17,398.80
Rp 221,302.80
- - - Rp 88,586.67 Rp 3,790,281.61
- - - Rp 42,298.80 Rp 3,619,604.84
- - - Rp 11,825.00 Rp 3,651,560.00
Rp 11,061,446.45
- - - Rp 897,800.00 Rp 161,604.00
- - - Rp 3,962,550.00 Rp 2,139,777.00
- - - Rp 3,962,550.00 Rp 3,120,508.13
- - - Rp 3,962,550.00 Rp 5,943,825.00
- - - Rp 3,962,550.00 Rp 9,510,120.00
- - - Rp 3,962,550.00 Rp 941,501.88
Rp 21,817,336.01
- - - Rp 210,000.00 Rp 77,723,100.00
- - - Rp 65,000.00 Rp 5,063,500.00
Rp 82,786,600.00
- - - Rp 80,500.00 Rp 16,325,400.00
- - - Rp 18,000.00 Rp 3,011,580.00
- - - Rp 95,820.00 Rp 2,429,037.00
- - - Rp 21,149.40 Rp 617,562.48
Rp 22,383,579.48
- - - Rp 11,431,250.00 Rp 14,644,117.13
- - - Rp 618,250.00 Rp 5,375,065.50
- - - Rp 430,475.00 Rp 7,148,037.38
- - - Rp 419,572.50 Rp 4,833,475.20
Rp 32,000,695.20
- - - Rp 85,000.00 Rp 25,857,000.00
Rp 25,857,000.00
- - - Rp 20,740.00 Rp 12,412,890.00
- - - Rp 20,740.00 Rp 6,309,108.00
- - - Rp 42,450.00 Rp 8,774,415.00
Rp 27,496,413.00
- - - Rp 112,000.00 Rp 26,880,000.00
- - - Rp 136,075.00 Rp 17,662,535.00
- - - Rp 136,075.00 Rp 870,880.00
- - - Rp 85,000.00 Rp 10,115,000.00
Rp 55,528,415.00
- - - Rp 140,750.00 Rp 422,250.00
- - - Rp 23,625.00 Rp 425,250.00
- - - Rp 16,687.50 Rp 267,000.00
- - - Rp 74,250.00 Rp 222,750.00
- - - Rp 14,750.00 Rp 236,000.00
- - - Rp 17,750.00 Rp 284,000.00
Rp 1,857,250.00
- - - Rp 55,000.00 Rp 660,000.00
- - - Rp 50,000.00 Rp 150,000.00
- - - Rp 20,000.00 Rp 60,000.00
- - - Rp 15,000.00 Rp 45,000.00
- - - Rp 225,000.00 Rp 675,000.00
- - - Rp 200,000.00 Rp 3,000,000.00
Rp 4,590,000.00
- - - Rp 112,125.00 Rp 3,038,587.50
Rp 3,038,587.50
0.28 -
Rp 20,300,000.00 - %
1 ( Satu )
5 Oktob. s/d 10 Oktober 2015
Oktober 2015
29 Oktober 2015
- - - Rp 55,000.00 Rp 440,000.00
- - - Rp 50,000.00 Rp 100,000.00
- - - Rp 20,000.00 Rp 40,000.00
- - - Rp 15,000.00 Rp 30,000.00
- - - Rp 225,000.00 Rp 450,000.00
- - - Rp 200,000.00 Rp 2,000,000.00
Rp 3,060,000.00
- - - Rp 112,125.00 Rp 2,318,745.00
Rp 2,318,745.00
20.54 96.99
Rp 183,716,000.00 96.99 %
LAMA
140
BARU
LAMA
BARU
LAMA
BARU
LAMA
BARU
keramik tambal sulam
SADALI, S.Pd
UBAGIO, M.Pd
NDAYANI, M.Pd
1 2 3 4 5
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
1.01 100 1.01 100 1.01 100 1.01 100 1.01 100
0.11 - - - - - - - - -
0.90 - - 100 0.90 100 0.90 100 0.90 100
0.86 - - - - 100 0.86 100 0.86 100
- - - - - 100 - 100 - 100
14.17 - - - - - - - - -
12.02 - - - - - - - - -
1.70 - - - - - - - - -
1.38 - - - - - - - - -
14.29 - - - - - - - - -
1.40 - - - - - - - - -
0.65 - - - - - - - - -
12.16 - - - - - - - - -
5.92 - - - - - - - - -
2.97 - - - - - - - - -
2.61 - - - - - - - - -
1.82 - - - - - - - - -
9.21 - - - - - - - - -
6.87 - - - - - - - - -
3.58 - - - - - - - - -
0.36 - - - - - - - - -
0.08 - - - - - - - - -
0.04 - - - - - - - - -
0.04 - - - - - - - - -
0.62 - - - - - - - - -
1.64 - - - - - - - - -
0.21 - - - - - - - - -
1 2 3 4 5
0.20 100 0.20 100 0.20 100 0.20 100 0.20 100
0.08 100 0.08 100 0.08 100 0.08 100 0.08 100
0.07 - - - - - - - - -
0.05 - - - - - - 25 0.01 50
0.70 - - - - - - - - 50
1.02 - - - - - - - - -
1.95 - - - - - - - - -
3.12 - - - - - - - - 50
0.31 - - - - - - - - 75
25.51 - - - - - - - - -
1.66 - - - - - - - - -
5.36 - - - - - - - - -
0.99 - - - - - - - - -
0.80 - - - - - - - - -
0.20 - - - - - - - - -
4.81 - - - - - - - - 50
1.76 - - - - - - - - -
2.35 - - - - - - - - -
1.59 - - - - - - - - -
8.49 - - - - - - - - -
4.07 - - - - - - - - -
2.07 - - - - - - - - -
2.88 - - - - - - - - -
8.82 - - - - - - - - -
5.80 - - - - - - - - -
0.29 - - - - - - - - -
3.32 - - - - - - - - -
0.14 - - - - - - - - -
0.14 - - - - - - - - -
0.09 - - - - - - - - -
0.07 - - - - - - - - -
0.08 - - - - - - - - -
0.09 - - - - - - - - -
0.22 - - - - - - - - -
0.05 - - - - - - - - -
0.02 - - - - - - - - -
0.01 - - - - - - - - -
0.22 - - - - - - - - -
0.98 - - - - - - - - -
1.00 - - - - - - - - -
1 2 3 4 5
1.70 100 1.70 100 1.70 100 1.70 100 1.70 100
0.32 100 0.32 100 0.32 100 0.32 100 0.32 100
0.65 100 0.65 100 0.65 100 0.65 100 0.65 100
0.11 - - - - - - - - -
0.05 100 0.05 100 0.05 100 0.05 100 0.05 100
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100
0.01 50 0.00 100 0.01 100 0.01 100 0.01 100
8.10 - - - - - - - - -
1.06 - - - - - - - - -
0.98 - - - - - - - - -
0.30 - - - - - - - - -
9.03 - - - - - - - - -
0.59 - - - - - - - - -
1.76 - - - - - - - - -
1.03 - - - - - - - - 75
0.44 - - - - - - - - -
9.58 - - - - - - - - -
0.40 - - - - - - - - -
0.15 - - - - - - - - -
0.15 - - - - - - - - -
0.14 - - - - - - - - -
0.08 - - - - - - - - -
0.12 - - - - - - - - -
0.15 - - - - - - - - -
0.23 - - - - - - - - -
0.05 - - - - - - - - -
0.02 - - - - - - - - -
0.02 - - - - - - - - -
0.24 - - - - - - - - -
1.06 - - - - - - - - -
1.22 - - - - - - - - -
6 7 8 9 10
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
1.01 100 1.01 100 1.01 100 1.01 100 1.01 100
- - - - - - - 100 0.11 100
0.90 100 0.90 100 0.90 100 0.90 100 0.90 100
0.86 100 0.86 100 0.86 100 0.86 100 0.86 100
- 100 - 100 - 100 - 100 - 100
0.13 100 0.13 100 0.13 100 0.13 100 0.13 100
0.06 100 0.06 100 0.06 100 0.06 100 0.06 100
0.56 100 0.56 100 0.56 100 0.56 100 0.56 100
0.34 100 0.69 100 0.69 100 0.69 100 0.69 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
6 7 8 9 10
0.20 100 0.20 100 0.20 100 0.20 100 0.20 100
0.08 100 0.08 100 0.08 100 0.08 100 0.08 100
- - - - - - - - - 100
0.04 100 0.04 100 0.04 100 0.04 100 0.04 100
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100
0.01 100 0.01 100 0.01 100 0.01 100 0.01 100
1.24 100 1.24 100 1.24 100 1.24 100 1.24 100
1.19 100 1.19 100 1.19 100 1.19 100 1.19 100
1.20 100 1.20 100 1.20 100 1.20 100 1.20 100
0.03 100 0.05 100 0.05 100 0.05 100 0.05 100
0.35 100 0.70 100 0.70 100 0.70 100 0.70 100
- 50 0.51 100 1.02 100 1.02 100 1.02 100
- 50 0.98 100 1.95 100 1.95 100 1.95 100
1.56 75 2.34 100 3.12 100 3.12 100 3.12 100
0.23 100 0.31 100 0.31 100 0.31 100 0.31 100
2.40 100 4.81 100 4.81 100 4.81 100 4.81 100
- - - - - - - 100 1.76 100
- - - - - - - 100 2.35 100
- - - - - 50 0.79 100 1.59 100
- - - - - - - 50 4.24 100
- - - - - - - 75 6.62 100
- - - - - - - 50 2.90 100
- - - - - - - 50 0.14 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
1.70 100 1.70 100 1.70 100 1.70 100 1.70 100
0.32 100 0.32 100 0.32 100 0.32 100 0.32 100
0.65 100 0.65 100 0.65 100 0.65 100 0.65 100
- - - - - - - - - 100
0.05 100 0.05 100 0.05 100 0.05 100 0.05 100
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100
0.01 100 0.01 100 0.01 100 0.01 100 0.01 100
4.29 100 4.29 100 4.29 100 4.29 100 4.29 100
4.10 100 4.10 100 4.10 100 4.10 100 4.10 100
1.08 100 1.08 100 1.08 100 1.08 100 1.08 100
0.15 100 0.15 100 0.15 100 0.15 100 0.15 100
0.79 100 0.79 100 0.79 100 0.79 100 0.79 100
0.74 100 0.99 100 0.99 100 0.99 100 0.99 100
- 100 2.23 100 2.23 100 2.23 100 2.23 100
- 100 2.64 100 2.64 100 2.64 100 2.64 100
- 100 1.17 100 1.17 100 1.17 100 1.17 100
- 25 7.11 100 28.43 100 28.43 100 28.43 100
- - - 100 2.24 100 2.24 100 2.24 100
5.81 100 5.81 100 5.81 100 5.81 100 5.81 100
4.22 100 4.22 100 4.22 100 4.22 100 4.22 100
2.11 100 2.11 100 2.11 100 2.11 100 2.11 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
0.97
0.97
1.01
0.11
0.90
0.86
-
0.13
0.06
0.56
0.69
14.17
12.02
1.70
1.38
14.29
1.40
0.65
12.16
5.92
2.97
2.61
1.82
9.21
6.87
3.58
0.36
0.08
0.04
0.04
0.62
1.64
0.21
0.20
0.08
0.07
0.04
0.03
0.01
1.24
1.19
1.20
0.05
0.70
1.02
1.95
3.12
0.31
25.51
1.66
5.36
0.99
0.80
0.20
4.81
1.76
2.35
1.59
8.49
4.07
2.07
2.88
8.82
5.80
0.29
3.32
0.14
0.14
0.09
0.07
0.08
0.09
0.22
0.05
0.02
0.01
0.22
0.98
1.00
1.70
0.32
0.65
0.11
0.05
0.03
0.01
4.29
4.10
1.08
0.15
0.79
0.99
2.23
2.64
1.17
28.43
2.24
8.10
1.06
0.98
0.30
5.81
4.22
2.11
9.03
0.59
1.76
1.03
0.44
9.58
0.40
0.15
0.15
0.14
0.08
0.12
0.15
0.23
0.05
0.02
0.02
0.24
1.06
1.22
YANG DIPAKAI
TH. 2018
1 SMPN 2 SEPULU 2 KELAS ### SINERGI
2 SMPN 1 KLAMPIS 3 KELAS ### SINERGI
3 SMPN 2 KOKOP 2 KELAS ### SINERGI
4 SMPN 3 SATAP KOKOP 2 KELAS ### SINERGI
5 SMPN 1 TRAGAH 3 KELAS ### INDRAKILA
6 SMPN 2 MODUNG 2 KELAS ### INDRAKILA
7 SMPN 2 LABANG 3 KELAS ### INDRAKILA
8 SMPN 2 KWANYAR 2 KELAS ### INDRAKILA
9 SMPN TAHAL AMIN H. ABDULLAH, S.Pd
REKAPITULASI 1
RENCANA ANGGARAN BIAYA OK
OK
KEGIATAN : PENGADAAN SARANA PRASARANA
PEKERJAAN : PERENCANAAN SMP KABUPATEN BANGKALAN
LINGKUP PEKERJAAN : REHABILITASI 2 RUANG BELAJAR SMPN 2 SEPULU
LOKASI : SMPN 2 SEPULU KEC. SEPULU KAB. BANGKALAN
JUMLAH ###
DIBULATK ### ###
###
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Sepulu
Kec. Sepulu Kab. Bangkalan
LAPORAN MINGGUAN
Minggu ke :
Pekerjaan : REHABILITASI 2 RUANG KELAS SMPN 2 SEPULU Tanggal :
Nama Sekolah : SMPN 2 SEPULU Bulan :
Lokasi : Kec. Kedamean Kab. Gresik Dana diterima tangal :
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%)
% Prestasi Rerata Prestasi
(1) (2) (3) (4) (5) (6) (7) (8)
(6)/100x(5)
I. PEKERJAAN PERSIAPAN
1 Pembongkaran atap + rangka atap 143.00 m² 0.97 - - 100
2 Pembongkaran atap 234.90 m² 0.97 - - 100
3 Penetelan plesteran 92.16 m² 1.01 - - 100
4 Pembersihan akhir pekerjaan 1.00 ls 0.11 - - -
II. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 18.50 m² 0.90 - - -
2 Plesteran 1Pc : 5Ps 37.00 m² 0.86 - - -
3 Benangan 48.00 m' - - - -
V. PEKERJAAN ATAP
1 Atap genteng beton (lama) 139.73 m² 1.38 - - -
2 Atap genteng beton warna 237.08 m² 14.29 - - -
3 Genteng bubungan beton warna 26.70 m' 1.40 - - -
4 Plesteran kompres L = 10 cm (Akhiran genting) 56.00 m' 0.65 - - -
JUMLAH 100.00 -
Jumlah dana yang digunakan sampai dengan minggu ini ( minggu ke 1 ) Rp 20,300,000.00
REKAPITULASI 2
RENCANA ANGGARAN BIAYA OK
I (2) ###
II PEKERJAAN TANAH ###
III PEKERJAAN PASANGAN/PLESTERAN ###
IV PEKERJAAN BETON ###
V PEKERJAAN RANGKA ATAP ###
VI PEKERJAAN ATAP ###
VII PEKERJAAN KUSEN PINTU DAN JENDELA ###
VIII PEKERJAAN PLAFOND ###
IX PEKERJAAN PENGECATAN/PLAMIRAN ###
X PEKERJAAN LANTAI ###
XI PEKERJAAN KUNCI + PENGGANTUNG ###
XII PEKERJAAN INSTALASI LISTRIK ### ###
XIII PEKERJAAN KACA ###
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 1 Kelampis
Kec. Kelampis Kab. Bangkalan
LAPORAN MINGGUAN
Minggu ke :
Pekerjaan : REHABILITASI 2 RUANG KELAS SMPN 1 KLAMPIS Tanggal :
Nama Sekolah : SMPN 1 KLAMPIS Bulan :
Lokasi : Kec. Kedamean Kab. Gresik Dana diterima tangal :
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%)
% Prestasi Rerata Prestasi
(1) (2) (3) (4) (5) (6) (7) (8)
I. PEKERJAAN PERSIAPAN (6)/100x(5)
1 Pembongkaran kosen 12.00 bh 0.20 - - 100
2 Penetelan plesteran 12.00 m² 0.08 - - 100
3 Pembersihan akhir pekerjaan 1.00 ls 0.07 - - -
X. PEKERJAAN LANTAI
1 Keramik lantai 40 x 40 240.00 m² 8.82 - - -
2 Keramik dinding 25 x 40 129.80 m² 5.80 - - -
3 Keramik kolom 25 x 40 6.40 m² 0.29 - - -
4 List keramik 119.00 m' 3.32 - - -
JUMLAH 95.07 -
Jumlah dana yang digunakan sampai dengan minggu ini ( minggu ke 1 ) Rp 20,300,000.00
3
REKAPITULASI OK
NCANA ANGGARAN BIAYA OK
: PENGADAAN SARANA PRASARANA
KEGIATAN : PERENCANAAN SMP KABUPATEN BANGKALAN
PEKERJAAN : REHABILITASI 2 RUANG BELAJAR SMPN 3 SATAP KOKOP
LINGKUP PEKERJAAN : SMPN 3 SATAP KOKOP KEC. KOKOP KAB. BANGKALAN
LOKASI
URAIAN PEKERJAAN JUMLAH HARGA
NO.
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
H. SUBADRIH, ST, MT
Mengetahui :
Kepala Sekolah
SMPN 3 Satap Kokop
Kec. Kokop Kab. Bangkalan
IHSANUDIN, S.Pd
NIP. 19700109 199104 1 001
LAPORAN MINGGUAN
Minggu ke :
Pekerjaan : REHABILITASI 2 RUANG BELAJAR SMPN 3 SATAP KOKOP Tanggal :
Nama Sekolah : SMPN 3 SATAP KOKOP KEC. KOKOP KAB. BANGKALAN Bulan :
Lokasi : KEC. KOKOP KAB. BANGKALAN Dana diterima tangal :
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%)
% Prestasi Rerata Prestasi
(1) (2) (3) (4) (5) (6) (7) (8)
(6)/100x(5)
I. PEKERJAAN PERSIAPAN
1 Pembongkaran atap + rangka 260.00 m² 1.70 100 1.70 -
2 Pembongkaran kosen 12.00 bh 0.32 100 0.32 -
3 Pembongkaran dinding 61.75 m² 0.65 100 0.65 -
4 Pembersihan akhir pekerjaan 1.00 ls 0.11 - - -
X. PEKERJAAN LANTAI
1 Keramik lantai 40 x 40 162.00 m² 9.58 100 9.58 -
2 Keramik kolom 20 x 40 (motif) 5.60 m² 0.40 85 0.34 15
Mengetahui Menyetujui
SMPN 3 Satap Kokop Panitia Pembangunan Sekolah
Kec. Kokop Kab. Bangkalan
Selaku Penanggung Jawab
IHSANUDIN, S.Pd SUHAERI
NIP. 19700109 199104 1 001
REKAPITULASI
NCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI
NO.
I
II
III
IV
V
VI
VII
VIII
IX
X 4
XI OK
XII LAMA
XIII : PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 1 TRAGAH
: SMPN 1 TRAGAH KEC. TRAGAH KAB. BANGKALAN
TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )
PEKERJAAN PERSIAPAN ###
PEKERJAAN TANAH ###
PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA #DIV/0!
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 1 Tragah
Kec. Tragah Kab. Bangkalan
Drs. AMIRULLAH, MM
NIP. 19581217 198603 1 011
NO
1
I.
1
2
3
4
II.
1
2
4
III.
1
2
3
IV.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran atap + rangka 377.00 m² ### ###
V. Pembongkaran kusen 4.00 bh ### ###
1 Penetelan plesteran 159.60 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VI. PEKERJAAN TANAH ###
1 Galian tanah 2.16 m³ ### ###
2 Urugan pasir bawah pondasi t=10cm 0.36 m³ ### ### #DIV/0!
3 Urugan tanah kembali 1.08 m³ ### ###
4 ###
PEKERJAAN PASANGAN/PLESTERAN
VII. Pasangan 1/2 bata camp. 1 Pc : 5 Ps 7.20 m² ### ### ###
1 Plesteran 1Pc : 5Ps 14.40 m² ### ###
2 Benangan 24.00 m' ### ###
3 ###
PEKERJAAN BETON
VIII. Lantai kerja bawah pondasi 1:3:5 t=5cm 0.18 m³ ### ###
1 Pondasi beton stempat 60 x 60 x 15cm 0.54 m³ ### ###
Kolom teras 15/15 0.79 m³ ### ###
IX. Balok beton 15/20 1.71 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ ### ###
X. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Penang (baru) 382.73 m² ### ###
3 Atap genteng (lama bg. belakang) 170.10 m² ### ###
4 Genteng bubungan Karang penang 28.35 m' ### ###
Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' ### ###
XI. ###
1 PEKERJAAN KUSEN PINTU DAN JENDELA
2 Kusen kayu kempas/mahoni 6/15 #DIV/0! m³ Rp - #DIV/0!
3 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 8.61 m² Rp - Rp - #DIV/0!
4 Daun Jendela kaca kayu kempas/mahoni 3/10 8.40 m² Rp - Rp - ###
5 #DIV/0!
6 PEKERJAAN PLAFOND
Plafond calsiboard 4mm + rangka kayu 4/6 294.84 m² ### ###
XII ###
1 PEKERJAAN PENGECATAN
2 Pengecatan dinding (3 Ruang kelas) 598.50 m² ### ###
3 Pengecatan plafond 294.84 m² ### ###
4 Pengecatan kayu 206.70 m² ### ###
5 ###
6 PEKERJAAN LANTAI #DIV/0!
Keramik lantai 40 x 40 245.70 m² ### ###
XIII. Keramik dinding 25 x 40 ( 3 R.kelas + teras ) 159.60 m² ### ###
1 List keramik dinding 7cm 110.40 m² ### ###
Keramik kolom 25 x 40 12.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Engsel Pintu 18.00 bh ### ###
Engsel Jendela 16.00 bh ### ###
Grendel pintu 3.00 bh ### ###
Grendel Jendela 16.00 bh ### ###
Hag Angin 16.00 bh ### ###
###
REKAPITULASI
PEKERJAAN INSTALASI LISTRIK
NCANA ANGGARAN
Lampu BIAYA
SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
KEGI Saklar ganda 3.00 bh ### ###
PEKE Saklar tunggal 3.00 bh ### ###
LING Stop kontak + instalasi 3.00 bh ### ###
LOKA Instalasi titik lampu 15.00 ttk ### ###
###
NO. PEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 11.14 m² ### ###
###
I
II
III
IV
V
VI
VII
VIII
IX
X 4
XI OK
XII BARU
XIII : PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 1 TRAGAH
: SMPN 1 TRAGAH KEC. TRAGAH KAB. BANGKALAN
TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )
PEKERJAAN PERSIAPAN ###
PEKERJAAN TANAH ###
PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA Rp -
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 1 Tragah
Kec. Tragah Kab. Bangkalan
Drs. AMIRULLAH, MM
NIP. 19581217 198603 1 011
NO
1
I.
1
2
3
4
II.
1
2
4
III.
1
2
3
IV.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran atap + rangka 377.00 m² ### ###
V. Pembongkaran kusen 8.00 bh ### ###
1 Penetelan plesteran 249.00 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VI. PEKERJAAN TANAH ###
1 Galian tanah 2.16 m³ ### ###
2 Urugan pasir bawah pondasi t=10cm 0.36 m³ ### ### ###
3 Urugan tanah kembali 1.08 m³ ### ###
###
VII. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 24.02 m² ### ### ###
2 Plesteran 1Pc : 5Ps 48.03 m² ### ###
3 Benangan 168.00 m' ### ###
4 ###
PEKERJAAN BETON
VIII. Lantai kerja bawah pondasi 1:3:5 t=5cm 0.18 m³ ### ###
1 Pondasi beton stempat 60 x 60 x 15cm 0.54 m³ ### ###
Kolom teras 15/15 0.79 m³ ### ###
IX. Balok beton 15/20 1.56 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ ### ###
X. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Penang (baru) 382.73 m² ### ###
3 Genteng bubungan Karang penang 28.35 m' ### ###
4 Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' ### ###
5 ###
PEKERJAAN KUSEN PINTU DAN JENDELA
XI. Kusen kayu kempas/mahoni 6/15 1.09 m³ Rp - Rp -
1 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 8.61 m² Rp - Rp - ###
2 Jalusi kayu kempas/mahoni 3/12 7.20 m² Rp - Rp -
3 Daun Jendela kaca kayu kempas/mahoni 3/10 6.72 m² Rp - Rp - ###
4 Rp -
5 PEKERJAAN PLAFOND
6 Plafond calsiboard 4mm + rangka kayu 4/6 294.84 m² ### ###
###
XII PEKERJAAN PENGECATAN
1 Pengecatan dinding (3 Ruang kelas) 598.50 m² ### ###
2 Pengecatan plafond 294.84 m² ### ###
3 Pengecatan kayu 206.70 m² ### ###
4 ###
5 PEKERJAAN LANTAI ###
6 Keramik lantai 40 x 40 245.70 m² ### ###
Keramik dinding 25 x 40 ( 3 R.kelas + teras ) 173.40 m² ### ###
XIII. List keramik dinding 7cm 132.90 m² ### ###
1 Keramik kolom 25 x 40 12.00 m² ### ###
Keramik dinding 25 x 40 ( 3 R.kelas teras saja ) 75.60 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Engsel Pintu 18.00 bh ### ###
Engsel Jendela 16.00 bh ### ###
Grendel pintu 3.00 bh ### ###
Grendel Jendela 16.00 bh ### ###
Hag Angin 16.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
REKAPITULASI
Lampu SL 8watt (teras) 3.00 bh ### ###
NCANA ANGGARAN BIAYA
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
KEGI Stop kontak + instalasi 3.00 bh ### ###
PEKE Instalasi titik lampu 15.00 ttk ### ###
LINGKUP PEKERJAAN ###
LOKAPEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 11.14 m² ### ###
NO. ###
I
II
III
IV
V
VI
VII
VIII
IX
X 5
XI OK
XII LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 MODUNG
: SMPN 2 MODUNG KEC. MODUNG KAB. BANGKALAN
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Modung
Kec. Modung Kab. Bangkalan
A S U R, M.Pd
NIP. 19610117 198403 1 008
NO
1
I.
1
2
II.
1
2
3
III.
1
2
3
IV.
1
2
Lembar. 2
V. JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
1 2 3 4 5
2 PEKERJAAN PERSIAPAN
3 Pembongkaran atap + rangka 406.00 m² ### ###
4 Pembersihan akhir pekerjaan 1.00 ls ### ### ###
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 98.93 m² ### ###
2 Plesteran 1Pc : 5Ps 197.87 m² ### ###
3 Benangan 166.56 m' ### ###
###
VII. PEKERJAAN BETON
1 Kolom teras 15/15 0.41 m³ ### ###
Balok teras 15/20 1.24 m³ ### ###
VIII. Ring balk gewel 15/15 0.98 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 396.90 m² ### ###
4 Lisplank kalsiplank 8mm / 30 cm 85.70 m¹ ### ###
5 ###
PEKERJAAN ATAP
IX. Pasang atap genteng karang p enang (baru 5%) 19.85 m² ### ###
1 Pasang atap genteng (lama) 377.06 m² ### ###
Genteng bubungan karang penang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 29.00 m' ### ###
1 ###
2 PEKERJAAN KUSEN PINTU DAN JENDELA
3 Kusen kayu kempas/mahoni 6/12 0.46 m³ Rp - Rp -
4 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 6.72 m² Rp - Rp -
5 Daun Jendela kaca kayu kempas/mahoni 3/10 5.04 m² Rp - Rp -
6 Rp -
PEKERJAAN PLAFOND ###
XI. Plafond calsiboard 4mm + rangka hollow 340.20 m² ### ###
1 ###
2 PEKERJAAN PENGECATAN/PLAMIRAN
3 Pengecatan dinding (depan) 66.85 m² ### ###
4 Pelamiran dinding 430.33 m² ### ###
5 Pelamiran plafond 340.20 m² ### ### ###
6 Pengecatan kayu 206.70 m² ### ###
Cat genteng 396.90 m² ### ###
XII. ###
1 PEKERJAAN LANTAI
Lantai rabat 216.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 4.00 bh ### ###
Engsel Pintu 21.00 bh ### ###
Engsel Jendela 24.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Grendel Jendela 12.00 bh ### ### ###
Hag Angin 24.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 14.00 bh ### ###
Lampu SL 8watt (teras) 4.00 bh ### ###
Saklar ganda 7.00 bh ### ###
REKAPITULASI
Saklar tunggal 3.00 bh ### ###
NCANA ANGGARAN BIAYA
Stop kontak + instalasi 4.00 bh ### ###
Instalasi titik lampu 18.00 bh ### ###
KEGIATAN ###
PEKE PEKERJAAN KACA
LING Kaca mati t=5 mm 14.49 m² ### ###
LOKASI ###
NO.
I
II
III
IV
V
VI
VII
VIII
IX
X 5
XI OK
XII BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 MODUNG
: SMPN 2 MODUNG KEC. MODUNG KAB. BANGKALAN
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Modung
Kec. Modung Kab. Bangkalan
A S U R, M.Pd
NIP. 19610117 198403 1 008
NO
1
I.
1
2
II.
1
2
3
III.
1
2
3
IV.
1
2
Lembar. 2
V. JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
1 2 3 4 5
2 PEKERJAAN PERSIAPAN
3 Pembongkaran atap + rangka 406.00 m² ### ###
4 Pembersihan akhir pekerjaan 1.00 ls ### ### ###
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 98.93 m² ### ###
2 Plesteran 1Pc : 5Ps 197.87 m² ### ###
3 Benangan 166.56 m' ### ###
###
VII. PEKERJAAN BETON
1 Kolom teras 15/15 0.41 m³ ### ###
Balok teras 15/20 1.24 m³ ### ###
VIII. Ring balk gewel 15/15 0.98 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 396.90 m² ### ###
4 Lisplank kalsiplank 8mm / 30 cm 85.70 m¹ ### ###
5 ###
PEKERJAAN ATAP
IX. Pasang atap genteng karang p enang (baru 5%) 19.85 m² ### ###
1 Pasang atap genteng (lama) 377.06 m² ### ###
Genteng bubungan karang penang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 29.00 m' ### ###
1 ###
2 PEKERJAAN KUSEN PINTU DAN JENDELA
3 Kusen kayu kempas/mahoni 6/12 0.46 m³ Rp - Rp -
4 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 6.72 m² Rp - Rp -
5 Daun Jendela kaca kayu kempas/mahoni 3/10 5.04 m² Rp - Rp -
6 Rp -
PEKERJAAN PLAFOND ###
XI. Plafond calsiboard 4mm + rangka kayu 4/6 340.20 m² ### ###
1 ###
2 PEKERJAAN PENGECATAN/PLAMIRAN
3 Pengecatan dinding (depan) 66.85 m² ### ###
4 Pelamiran dinding 430.33 m² ### ###
5 Pelamiran plafond 340.20 m² ### ### ###
6 Pengecatan kayu 206.70 m² ### ###
Cat genteng 396.90 m² ### ###
XII. ###
1 PEKERJAAN LANTAI
Lantai rabat 216.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 4.00 bh ### ###
Engsel Pintu 21.00 bh ### ###
Engsel Jendela 24.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Grendel Jendela 12.00 bh ### ### ###
Hag Angin 24.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 14.00 bh ### ###
Lampu SL 8watt (teras) 4.00 bh ### ###
Saklar ganda 7.00 bh ### ###
REKAPITULASI
Saklar tunggal 3.00 bh ### ###
NCANA ANGGARAN BIAYA
Stop kontak + instalasi 4.00 bh ### ###
Instalasi titik lampu 18.00 bh ### ###
KEGIATAN ###
PEKE PEKERJAAN KACA
LING Kaca mati t=5 mm 14.49 m² ### ###
LOKASI ###
NO.
I
II
III
IV
V
VI
VII
VIII
IX
X 6
XI OK
LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 2 LABANG
: SMPN 2 LABANG KEC. LABANG KAB. BANGKALAN
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
ACHMAD TAUFIK HEYKAL, A.Sg H. SUBADRIH, ST, MT
Mengetahui :
Kepala Sekolah
SMPN 2 Labang
Kec. Labang Kab. Bangkalan
NO
1
I.
1
2
3
4
5
II.
1
III.
1
2
IV.
1
2
3 Lembar. 2
JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
V. 2 3 4 5
1 PEKERJAAN PERSIAPAN ###
Pembongkaran atap + rangka 377.00 m² Rp - Rp -
VI. Pembongkaran kosen 1.00 bh ### ###
1 Pembongkaran dinding 6.00 m² ### ###
2 Penetelan plesteran 139.74 m² ### ###
3 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VII. PEKERJAAN PASANGAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps (nyepit kuda2) 30.91 m² Rp - Rp -
2 Rp -
3 PEKERJAAN RANGKA ATAP ###
4 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ Rp - Rp -
VIII. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Pilang (baru) 382.73 m² ### ###
Genteng bubungan Karang pilang 28.35 m' ### ###
IX. Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' Rp - Rp -
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsiboard 4mm + rangka hollow 354.38 m² Rp - Rp -
4 Rp -
5 PEKERJAAN PENGECATAN
6 Pengecatan dinding 598.50 m² Rp - Rp - ###
Pengecatan plafond 354.38 m² Rp - Rp -
X. Pengecatan kayu 274.60 m² Rp - Rp -
1 Rp -
PEKERJAAN LANTAI
XI. Keramik lantai 40 x 40 243.00 m² ### ###
1 Keramik dinding 25 x 40 139.74 m² ### ###
2 List keramik 102.00 m' ### ###
3 Keramik kolom 20 x 40 10.80 m² ### ###
4 ###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA ###
Kaca mati t=5 mm (yg pecah) 4.22 m² ### ###
###
PEKERJAAN TANGGA DEPAN PINTU
Pasangan batu gunung 2.88 m³ ### ###
Plesterran trasram 7.68 m² ### ###
Keramik kasar 40 x 40 7.04 m² ### ###
Urugan pasir 4.96 m³ ### ###
REKAPITULASI ###
NCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI
NO.
I
II
III
IV
V
VI
VII
VIII
IX
X 6
XI OK
XII BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 2 LABANG
: SMPN 2 LABANG KEC. LABANG KAB. BANGKALAN
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Labang
Kec. Labang Kab. Bangkalan
Drs. HARTONO, M.Pd
NIP. 19690126 199802 1 003
NO
1
I.
1
2
3
4
5
II.
1
2
3
III.
1
IV.
1
2 Lembar. 2
JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
V. 2 3 4 5
1 PEKERJAAN PERSIAPAN ###
2 Pembongkaran atap + rangka 377.00 m² Rp - Rp -
3 Pembongkaran kosen 1.00 bh ### ###
Pembongkaran dinding 6.00 m² ### ###
VI. Penetelan plesteran 127.50 m² ### ###
1 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VII. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps (nyepit kuda2) 22.43 m² Rp - Rp - -
2 Plesteran 1Pc : 5Ps 16.20 m² ### ###
3 Benangan 32.00 m' ### ###
###
VIII. PEKERJAAN BETON
1 Ring balk gewel 15/15 0.40 m³ ### ###
2 ###
3 PEKERJAAN RANGKA ATAP ###
4 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ Rp - Rp -
IX. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Pilang (baru) 382.73 m² ### ###
Genteng bubungan Karang pilang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' Rp - Rp -
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsiboard 4mm + rangka hollow 354.38 m² Rp - Rp -
4 Rp -
5 PEKERJAAN PENGECATAN
6 Pengecatan dinding 598.50 m² Rp - Rp - ###
Pengecatan plafond 354.38 m² Rp - Rp -
XI. Pengecatan kayu 274.60 m² Rp - Rp -
1 Rp -
PEKERJAAN LANTAI
XII. Keramik lantai 40 x 40 243.00 m² ### ###
1 Keramik dinding 25 x 40 127.50 m² ### ###
2 List keramik 102.00 m' ### ###
3 Keramik kolom 20 x 40 10.80 m² ### ###
4 ###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Pintu harmonika 15.00 m² ### ### ###
### ###
PEKERJAAN INSTALASI LISTRIK ###
Lampu SL 14 watt 12.00 bh ### ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA ###
Kaca mati t=5 mm (yg pecah) 4.22 m² ### ###
###
PEKERJAAN TANGGA DEPAN PINTU 3.46
Pasangan batu gunung 2.88 m³ ### ###
Plesterran trasram 7.68 m² ### ###
Keramik kasar 40 x 40 7.04 m² ### ###
Urugan pasir 4.96 m³ ### ###
###
REKAPITULASI
NCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI
NO.
I
II
III
IV
V
VI
VII
VIII
IX
X 7
OK
LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 KWANYAR
: SMPN 2 KWANYAR KEC. KWANYAR KAB. BANGKALAN
TERBILANG : ( SERATUS SEMBILAN PULUH TUJUH JUTA DELAPAN RATUS RIBU RUPIAH )
URAIAN PEKERJAAN JUMLAH HARGA
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Kwanyar
Kec. Kwanyar Kab. Bangkalan
RAHMAWATI, M.Pd
NIP. 19700703 199802 2 003
NO
1
I.
1
2
3
4
II.
1
2
III.
1
IV.
1
V.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran kusen 1.00 bh ### ###
VI. Pembongkaran dinding 15.00 m² ### ###
1 Penetelan plesteran 428.64 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 Ls ### ###
3 ###
4 PEKERJAAN PASANGAN/PLESTERAN ###
5 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 0.91 22.20 m² Rp - Rp -
6 Plesteran 1Pc : 5Ps 1.07 44.40 m² Rp - Rp -
Rp -
VII. PEKERJAAN KAYU
1 Lisplank kayu 3/30 cm 4.00 m¹ ### ###
2 ###
3 PEKERJAAN PLAFOND
4 Plafond calsi 1 x 1 + rangka kayu 12.00 m² Rp - Rp -
Rp -
VIII. PEKERJAAN PENGECATAN
1 Pengecatan dinding (3 kelas) 455.30 m² Rp - Rp -
2 Pengecatan plafond 319.00 m² Rp - Rp -
3 Pengecatan kayu 206.70 m² Rp - Rp - ###
4 Pengecatan kayu (Kantor) 214.39 m² Rp - Rp -
5 Rp -
6PEKERJAAN LANTAI 162.00 ###
Keramik lantai 40 x 40 ( 2 R Kelas ) 5.67 126.00 m² ### ###
IX. Keramik lantai 40 x 40 ( Teras ) 1.62 36.00 m² ### ###
1 Keramik dinding 25 x 40 (dalam kelas + teras) 5.78 128.40 m² ### ###
Keramik kolom teras 25 x 40 1.01 22.40 m² ### ###
X. List keramik 1.64 327.80 m' ### ###
1 Keramik dinding 25 x 40 (dalam kantor+R.guru+ t 13.51 300.24 m² ### ###
2 451.04 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 3.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Hag Angin 60.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
REKAPITULASI
PEKERJAAN KACA
NCANA ANGGARAN BIAYA
Kaca mati t=5 mm (yg pecah) 1.68 m² ### ###
###
KEGI PEKERJAAN TEMPAT DUDUK
PEKE Pasangan trasram 0.68 17.00 m² Rp - Rp -
LING Plat beton tempat duduk t=10 cm 0.53 1.02 m³ ### ###
LOKA Keramik tempat duduk 30 x 30 0.46 10.20 m² ### ###
Keramik dinding tempat duduk 25 x 40 1.84 40.80 m² ### ###
NO. 34.71 ###
0.86768 40.80
I
II
III
IV
V
VI
VII
VIII
IX
X 7
OK
BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 KWANYAR
: SMPN 2 KWANYAR KEC. KWANYAR KAB. BANGKALAN
TERBILANG : ( SERATUS SEMBILAN PULUH TUJUH JUTA DELAPAN RATUS RIBU RUPIAH )
URAIAN PEKERJAAN JUMLAH HARGA
PEKERJAAN PERSIAPAN ###
PEKERJAAN PASANGAN/PLESTERAN Rp -
PEKERJAAN KAYU ###
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
PEKERJAAN TEMPAT DUDUK ###
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Kwanyar
Kec. Kwanyar Kab. Bangkalan
RAHMAWATI, M.Pd
NIP. 19700703 199802 2 003
NO
1
I.
1
2
3
4
II.
1
2
III.
1
2
IV.
1
V. Lembar. 2
1 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
2 2 3 4 5
3 PEKERJAAN PERSIAPAN
4 Pembongkaran kusen 1.00 bh ### ###
5 Pembongkaran dinding 15.00 m² ### ###
Penetelan plesteran 428.64 m² ### ###
VI. Pembersihan akhir pekerjaan 1.00 Ls ### ###
1 ###
2 PEKERJAAN PASANGAN/PLESTERAN ###
3 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 22.20 m² Rp - Rp -
4 Plesteran 1Pc : 5Ps 44.40 m² Rp - Rp -
5 Rp -
6 PEKERJAAN KAYU
Perbaikan daun pintu panil 4.00 bh ### ###
VII. Lisplank kayu 3/30 cm 4.00 m¹ ### ###
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsi 1 x 1 + rangka kayu 12.00 m² Rp - Rp -
4 Rp -
PEKERJAAN PENGECATAN
VIII. Pengecatan dinding (3 kelas) 439.90 m² Rp - Rp -
1 Pengecatan dinding (Kantor) 373.40 m² Rp - Rp -
2 Pengecatan plafond 319.00 m² Rp - Rp -
3 Pengecatan kayu 169.45 m² Rp - Rp - ###
4 Pengecatan kayu (Kantor) 197.69 m² Rp - Rp -
5 Rp -
6 PEKERJAAN LANTAI ###
Keramik lantai 40 x 40 ( 2 R Kelas ) 126.00 m² ### ###
IX. Keramik lantai 40 x 40 ( Teras ) 36.00 m² ### ###
1 Keramik dinding 25 x 40 (dalam kelas + teras) 128.40 m² ### ###
Keramik kolom teras 25 x 40 22.40 m² ### ###
X. List keramik 327.80 m' ### ###
1 Keramik dinding 25 x 40 (dalam kantor+R.guru+ teras) 300.24 m² ### ###
2 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 3.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Hag Angin 60.00 bh ### ###
Pintu harmonika 11.30 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK ###
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA
REKAPITULASI
Kaca mati t=5 mm (yg pecah) 1.68 m² ### ###
NCANA ANGGARAN BIAYA ###
PEKERJAAN TEMPAT DUDUK
KEGI Pasangan trasram 17.00 m² Rp - Rp -
PEKE Plat beton tempat duduk t=10 cm 1.02 m³ ### ###
LING Keramik tempat duduk 30 x 30 10.20 m² ### ###
LOKA Keramik dinding tempat duduk 25 x 40 40.80 m² ### ###
###
NO.
I
II
III
IV
V
VI
VII
VIII
IX
8
OK
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Kokop
Kec. Kokop Kab. Bangkalan
II.
1
2
3
III.
1
IV.
1
2
3
V. Lembar. 2
1 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
2 2 3 4 5
3 PEKERJAAN PERSIAPAN
4 Penetelan plesteran 317.46 m² ### ###
5 Pembersihan akhir pekerjaan 1.00 Ls Rp - Rp - #REF!
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 12.25 m² Rp - Rp -
5 Plesteran 1Pc : 5Ps 80.58 m² Rp - Rp -
6 Benangan 55.00 m' Rp - Rp -
7 Rp -
PEKERJAAN PLAFOND
VII. Plafond calsiboard 4mm + rangka kayu 15.00 m² Rp - Rp -
1 Rp -
2 PEKERJAAN PENGECATAN -
3 Pengecatan dinding 506.50 m² Rp - Rp -
4 Pengecatan plafond 352.00 m² Rp - Rp - #DIV/0!
5 Pengecatan kayu 275.60 m² Rp - Rp -
6 Rp -
PEKERJAAN LANTAI ###
VIII. Keramik lantai 40 x 40 243.00 m² ### ### 147.47
1 Keramik dinding 25 x 40 ( 3 R. Kelas + teras) 132.96 m² ### ###
List keramik 288.20 m' ### ###
IX. Keramik kolom 25 x 40 16.00 m² ### ###
1 Keramik dinding 25 x 40 ( 5 R. Kelas bg. dalam) 184.50 m² ### ###
2 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 5.00 bh ### ###
Grendel Jendela 50.00 bh ### ###
Hag Angin 100.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 20.00 bh ### ###
Lampu SL 8watt (teras) 5.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 5.00 bh ### ###
Stop kontak + instalasi 5.00 bh ### ###
Instalasi titik lampu 25.00 ttk ### ###
###
PEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 2.53 m² ### ###
###
PEKERJAAN TEMPAT DUDUK
Pasangan trasram 14.70 m² Rp - Rp -
Plat beton tempat duduk t=10 cm 0.74 m³ ### ###
Keramik tempat duduk 30 x 30 7.35 m² ### ###
Keramik dinding tempat duduk 25 x 40 29.40 m² ### ###
###
BATAS
SINERGI 1 SMPN 2 SEPULU DR. AHMAD SABARUDIN, S.Pd, M.MPd
SINERGI 2 SMPN 1 KLAMPIS IMAM SYAFII, S.Pd, MPd
SINERGI 3 SMPN 2 KOKOP MOHAMMAD TAUFIK, SPd
SINERGI 4 SMPN 3 SATAP KOKOP IHSANUDIN, S.Pd
INDRAKILA 5 SMPN 1 TRAGAH Drs. AMIRULLAH, MM
INDRAKILA 6 SMPN 2 MODUNG A S U R, M.Pd
INDRAKILA 7 SMPN 2 LABANG Drs. HARTONO, M.Pd
INDRAKILA 8 SMPN 2 KWANYAR RAHMAWATI, M.Pd
9 SMPN TAHAL AMIN H. ABDULLAH, S.Pd
10 SMPN 1 MODUNG Drs. ALI MUSTOFA, M.Pd
11 SMPN 1 GALIS Drs. TAUFIKUR RAHMAN
12 SMPN 1 KOKOP BUDIONO, S.Pd, M.Pd
28.5
23.5
7.833333
1 ( Satu )
5 Oktob. s/d 10 Oktober 2015
Oktober 2015
29 Oktober 2015
Rp. 212.320.000.00
Prestasi Pekerjaan Prestasi Pekerjaan
Minggu Ini (%) Komulatif (%)
Rerata Prestasi Rerata
(9) (10) (11)
(8)/100x(5) (6)+(8) (7)+(9)
- - - Rp 88,586.67 Rp 1,638,853.33
- - - Rp 42,298.80 Rp 1,565,055.60
- - - Rp - Rp -
Rp 3,203,908.93
- - - Rp 3,912,550.00 Rp 234,753.00
- - - Rp 3,962,550.00 Rp 114,121.44
- - - Rp 3,962,550.00 Rp 1,027,092.96
- - - Rp 3,962,550.00 Rp 1,255,335.84
Rp 2,631,303.24
- - - Rp 185,000.00 Rp 25,849,125.00
- - - Rp 185,000.00 Rp 21,929,437.50
- - - Rp 65,000.00 Rp 3,100,500.00
Rp 50,879,062.50
- - - Rp 18,000.00 Rp 2,515,050.00
- - - Rp 110,000.00 Rp 26,078,250.00
- - - Rp 95,820.00 Rp 2,558,394.00
- - - Rp 21,149.40 Rp 1,184,366.40
Rp 32,336,060.40
- - - Rp 85,000.00 Rp 22,185,000.00
Rp 22,185,000.00
- - - Rp 20,740.00 Rp 10,805,637.48
- - - Rp 20,740.00 Rp 5,413,140.00
- - - Rp 42,450.00 Rp 4,752,702.00
Rp 20,971,479.48
- - - Rp 105,250.00 Rp 3,315,375.00
- - - Rp 112,000.00 Rp 16,800,000.00
- - - Rp 136,075.00 Rp 12,540,672.00
- - - Rp 85,000.00 Rp 6,528,000.00
Rp 39,184,047.00
- - - Rp 55,000.00 Rp 660,000.00
- - - Rp 50,000.00 Rp 150,000.00
- - - Rp 20,000.00 Rp 80,000.00
- - - Rp 15,000.00 Rp 75,000.00
- - - Rp 225,000.00 Rp 1,125,000.00
Rp 200,000.00 Rp 3,000,000.00
Rp 5,090,000.00
- - - Rp 112,125.00 Rp 376,964.25
Rp 376,964.25
2.95 2.95
Rp 20,300,000.00 2.95 %
1 ( Satu )
5 Oktob. s/d 10 Oktober 2015
Oktober 2015
29 Oktober 2015
- - - Rp 58,500.00 Rp 126,360.00
- - - Rp 215,400.00 Rp 77,544.00
- - - Rp 16,110.00 Rp 17,398.80
Rp 221,302.80
- - - Rp 88,586.67 Rp 3,790,281.61
- - - Rp 42,298.80 Rp 3,619,604.84
- - - Rp 11,825.00 Rp 3,651,560.00
Rp 11,061,446.45
- - - Rp 897,800.00 Rp 161,604.00
- - - Rp 3,962,550.00 Rp 2,139,777.00
- - - Rp 3,962,550.00 Rp 3,120,508.13
- - - Rp 3,962,550.00 Rp 5,943,825.00
- - - Rp 3,962,550.00 Rp 9,510,120.00
- - - Rp 3,962,550.00 Rp 941,501.88
Rp 21,817,336.01
- - - Rp 210,000.00 Rp 77,723,100.00
- - - Rp 65,000.00 Rp 5,063,500.00
Rp 82,786,600.00
- - - Rp 80,500.00 Rp 16,325,400.00
- - - Rp 18,000.00 Rp 3,011,580.00
- - - Rp 95,820.00 Rp 2,429,037.00
- - - Rp 21,149.40 Rp 617,562.48
Rp 22,383,579.48
- - - Rp 11,431,250.00 Rp 14,644,117.13
- - - Rp 618,250.00 Rp 5,375,065.50
- - - Rp 430,475.00 Rp 7,148,037.38
- - - Rp 419,572.50 Rp 4,833,475.20
Rp 32,000,695.20
- - - Rp 85,000.00 Rp 25,857,000.00
Rp 25,857,000.00
- - - Rp 20,740.00 Rp 12,412,890.00
- - - Rp 20,740.00 Rp 6,309,108.00
- - - Rp 42,450.00 Rp 8,774,415.00
Rp 27,496,413.00
- - - Rp 112,000.00 Rp 26,880,000.00
- - - Rp 136,075.00 Rp 17,662,535.00
- - - Rp 136,075.00 Rp 870,880.00
- - - Rp 85,000.00 Rp 10,115,000.00
Rp 55,528,415.00
- - - Rp 140,750.00 Rp 422,250.00
- - - Rp 23,625.00 Rp 425,250.00
- - - Rp 16,687.50 Rp 267,000.00
- - - Rp 74,250.00 Rp 222,750.00
- - - Rp 14,750.00 Rp 236,000.00
- - - Rp 17,750.00 Rp 284,000.00
Rp 1,857,250.00
- - - Rp 55,000.00 Rp 660,000.00
- - - Rp 50,000.00 Rp 150,000.00
- - - Rp 20,000.00 Rp 60,000.00
- - - Rp 15,000.00 Rp 45,000.00
- - - Rp 225,000.00 Rp 675,000.00
- - - Rp 200,000.00 Rp 3,000,000.00
Rp 4,590,000.00
- - - Rp 112,125.00 Rp 3,038,587.50
Rp 3,038,587.50
0.28 -
Rp 20,300,000.00 - %
1 ( Satu )
5 Oktob. s/d 10 Oktober 2015
Oktober 2015
29 Oktober 2015
- - - Rp 55,000.00 Rp 440,000.00
- - - Rp 50,000.00 Rp 100,000.00
- - - Rp 20,000.00 Rp 40,000.00
- - - Rp 15,000.00 Rp 30,000.00
- - - Rp 225,000.00 Rp 450,000.00
- - - Rp 200,000.00 Rp 2,000,000.00
Rp 3,060,000.00
- - - Rp 112,125.00 Rp 2,318,745.00
Rp 2,318,745.00
0.06 97.05
Rp 183,830,000.00 97.05 %
LAMA
140
BARU
LAMA
BARU
LAMA
BARU
LAMA
BARU
keramik tambal sulam
SADALI, S.Pd
UBAGIO, M.Pd
NDAYANI, M.Pd
1 2 3 4 5
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
1.01 100 1.01 100 1.01 100 1.01 100 1.01 100
0.11 - - - - - - - - -
0.90 - - 100 0.90 100 0.90 100 0.90 100
0.86 - - - - 100 0.86 100 0.86 100
- - - - - 100 - 100 - 100
14.17 - - - - - - - - -
12.02 - - - - - - - - -
1.70 - - - - - - - - -
1.38 - - - - - - - - -
14.29 - - - - - - - - -
1.40 - - - - - - - - -
0.65 - - - - - - - - -
12.16 - - - - - - - - -
5.92 - - - - - - - - -
2.97 - - - - - - - - -
2.61 - - - - - - - - -
1.82 - - - - - - - - -
9.21 - - - - - - - - -
6.87 - - - - - - - - -
3.58 - - - - - - - - -
0.36 - - - - - - - - -
0.08 - - - - - - - - -
0.04 - - - - - - - - -
0.04 - - - - - - - - -
0.62 - - - - - - - - -
1.64 - - - - - - - - -
0.21 - - - - - - - - -
1 2 3 4 5
0.20 100 0.20 100 0.20 100 0.20 100 0.20 100
0.08 100 0.08 100 0.08 100 0.08 100 0.08 100
0.07 - - - - - - - - -
0.05 - - - - - - 25 0.01 50
0.70 - - - - - - - - 50
1.02 - - - - - - - - -
1.95 - - - - - - - - -
3.12 - - - - - - - - 50
0.31 - - - - - - - - 75
25.51 - - - - - - - - -
1.66 - - - - - - - - -
5.36 - - - - - - - - -
0.99 - - - - - - - - -
0.80 - - - - - - - - -
0.20 - - - - - - - - -
4.81 - - - - - - - - 50
1.76 - - - - - - - - -
2.35 - - - - - - - - -
1.59 - - - - - - - - -
8.49 - - - - - - - - -
4.07 - - - - - - - - -
2.07 - - - - - - - - -
2.88 - - - - - - - - -
8.82 - - - - - - - - -
5.80 - - - - - - - - -
0.29 - - - - - - - - -
3.32 - - - - - - - - -
0.14 - - - - - - - - -
0.14 - - - - - - - - -
0.09 - - - - - - - - -
0.07 - - - - - - - - -
0.08 - - - - - - - - -
0.09 - - - - - - - - -
0.22 - - - - - - - - -
0.05 - - - - - - - - -
0.02 - - - - - - - - -
0.01 - - - - - - - - -
0.22 - - - - - - - - -
0.98 - - - - - - - - -
1.00 - - - - - - - - -
1 2 3 4 5
1.70 100 1.70 100 1.70 100 1.70 100 1.70 100
0.32 100 0.32 100 0.32 100 0.32 100 0.32 100
0.65 100 0.65 100 0.65 100 0.65 100 0.65 100
0.11 - - - - - - - - -
0.05 100 0.05 100 0.05 100 0.05 100 0.05 100
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100
0.01 50 0.00 100 0.01 100 0.01 100 0.01 100
8.10 - - - - - - - - -
1.06 - - - - - - - - -
0.98 - - - - - - - - -
0.30 - - - - - - - - -
9.03 - - - - - - - - -
0.59 - - - - - - - - -
1.76 - - - - - - - - -
1.03 - - - - - - - - 75
0.44 - - - - - - - - -
9.58 - - - - - - - - -
0.40 - - - - - - - - -
0.15 - - - - - - - - -
0.15 - - - - - - - - -
0.14 - - - - - - - - -
0.08 - - - - - - - - -
0.12 - - - - - - - - -
0.15 - - - - - - - - -
0.23 - - - - - - - - -
0.05 - - - - - - - - -
0.02 - - - - - - - - -
0.02 - - - - - - - - -
0.24 - - - - - - - - -
1.06 - - - - - - - - -
1.22 - - - - - - - - -
6 7 8 9 10
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
1.01 100 1.01 100 1.01 100 1.01 100 1.01 100
- - - - - - - 100 0.11 100
0.90 100 0.90 100 0.90 100 0.90 100 0.90 100
0.86 100 0.86 100 0.86 100 0.86 100 0.86 100
- 100 - 100 - 100 - 100 - 100
0.13 100 0.13 100 0.13 100 0.13 100 0.13 100
0.06 100 0.06 100 0.06 100 0.06 100 0.06 100
0.56 100 0.56 100 0.56 100 0.56 100 0.56 100
0.34 100 0.69 100 0.69 100 0.69 100 0.69 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
6 7 8 9 10
0.20 100 0.20 100 0.20 100 0.20 100 0.20 100
0.08 100 0.08 100 0.08 100 0.08 100 0.08 100
- - - - - - - - - 100
0.04 100 0.04 100 0.04 100 0.04 100 0.04 100
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100
0.01 100 0.01 100 0.01 100 0.01 100 0.01 100
1.24 100 1.24 100 1.24 100 1.24 100 1.24 100
1.19 100 1.19 100 1.19 100 1.19 100 1.19 100
1.20 100 1.20 100 1.20 100 1.20 100 1.20 100
0.03 100 0.05 100 0.05 100 0.05 100 0.05 100
0.35 100 0.70 100 0.70 100 0.70 100 0.70 100
- 50 0.51 100 1.02 100 1.02 100 1.02 100
- 50 0.98 100 1.95 100 1.95 100 1.95 100
1.56 75 2.34 100 3.12 100 3.12 100 3.12 100
0.23 100 0.31 100 0.31 100 0.31 100 0.31 100
2.40 100 4.81 100 4.81 100 4.81 100 4.81 100
- - - - - - - 100 1.76 100
- - - - - - - 100 2.35 100
- - - - - 50 0.79 100 1.59 100
- - - - - - - 50 4.24 100
- - - - - - - 75 6.62 100
- - - - - - - 50 2.90 100
- - - - - - - 50 0.14 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
1.70 100 1.70 100 1.70 100 1.70 100 1.70 100
0.32 100 0.32 100 0.32 100 0.32 100 0.32 100
0.65 100 0.65 100 0.65 100 0.65 100 0.65 100
- - - - - - - - - 100
0.05 100 0.05 100 0.05 100 0.05 100 0.05 100
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100
0.01 100 0.01 100 0.01 100 0.01 100 0.01 100
4.29 100 4.29 100 4.29 100 4.29 100 4.29 100
4.10 100 4.10 100 4.10 100 4.10 100 4.10 100
1.08 100 1.08 100 1.08 100 1.08 100 1.08 100
0.15 100 0.15 100 0.15 100 0.15 100 0.15 100
0.79 100 0.79 100 0.79 100 0.79 100 0.79 100
0.74 100 0.99 100 0.99 100 0.99 100 0.99 100
- 100 2.23 100 2.23 100 2.23 100 2.23 100
- 100 2.64 100 2.64 100 2.64 100 2.64 100
- 100 1.17 100 1.17 100 1.17 100 1.17 100
- 25 7.11 100 28.43 100 28.43 100 28.43 100
- - - 100 2.24 100 2.24 100 2.24 100
5.81 100 5.81 100 5.81 100 5.81 100 5.81 100
4.22 100 4.22 100 4.22 100 4.22 100 4.22 100
2.11 100 2.11 100 2.11 100 2.11 100 2.11 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
0.97
0.97
1.01
0.11
0.90
0.86
-
0.13
0.06
0.56
0.69
14.17
12.02
1.70
1.38
14.29
1.40
0.65
12.16
5.92
2.97
2.61
1.82
9.21
6.87
3.58
0.36
0.08
0.04
0.04
0.62
1.64
0.21
0.20
0.08
0.07
0.04
0.03
0.01
1.24
1.19
1.20
0.05
0.70
1.02
1.95
3.12
0.31
25.51
1.66
5.36
0.99
0.80
0.20
4.81
1.76
2.35
1.59
8.49
4.07
2.07
2.88
8.82
5.80
0.29
3.32
0.14
0.14
0.09
0.07
0.08
0.09
0.22
0.05
0.02
0.01
0.22
0.98
1.00
1.70
0.32
0.65
0.11
0.05
0.03
0.01
4.29
4.10
1.08
0.15
0.79
0.99
2.23
2.64
1.17
28.43
2.24
8.10
1.06
0.98
0.30
5.81
4.22
2.11
9.03
0.59
1.76
1.03
0.44
9.58
0.40
0.15
0.15
0.14
0.08
0.12
0.15
0.23
0.05
0.02
0.02
0.24
1.06
1.22
YANG DIPAKAI
TH. 2018
1 SMPN 2 SEPULU 2 KELAS ### SINERGI
2 SMPN 1 KLAMPIS 3 KELAS ### SINERGI
3 SMPN 2 KOKOP 2 KELAS ### SINERGI
4 SMPN 3 SATAP KOKOP 2 KELAS ### SINERGI
5 SMPN 1 TRAGAH 3 KELAS ### INDRAKILA
6 SMPN 2 MODUNG 2 KELAS ### INDRAKILA
7 SMPN 2 LABANG 3 KELAS ### INDRAKILA
8 SMPN 2 KWANYAR 2 KELAS ### INDRAKILA
9 SMPN TAHAL AMIN H. ABDULLAH, S.Pd
REKAPITULASI 1
RENCANA ANGGARAN BIAYA OK
OK
KEGIATAN : PENGADAAN SARANA PRASARANA
PEKERJAAN : PERENCANAAN SMP KABUPATEN BANGKALAN
LINGKUP PEKERJAAN : REHABILITASI 2 RUANG BELAJAR SMPN 2 SEPULU
LOKASI : SMPN 2 SEPULU KEC. SEPULU KAB. BANGKALAN
JUMLAH ###
DIBULATK ### ###
###
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Sepulu
Kec. Sepulu Kab. Bangkalan
LAPORAN MINGGUAN
Minggu ke :
Pekerjaan : REHABILITASI 2 RUANG KELAS SMPN 2 SEPULU Tanggal :
Nama Sekolah : SMPN 2 SEPULU Bulan :
Lokasi : Kec. Kedamean Kab. Gresik Dana diterima tangal :
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%)
% Prestasi Rerata Prestasi
(1) (2) (3) (4) (5) (6) (7) (8)
(6)/100x(5)
I. PEKERJAAN PERSIAPAN
1 Pembongkaran atap + rangka atap 143.00 m² 0.97 - - 100
2 Pembongkaran atap 234.90 m² 0.97 - - 100
3 Penetelan plesteran 92.16 m² 1.01 - - 100
4 Pembersihan akhir pekerjaan 1.00 ls 0.11 - - -
II. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 18.50 m² 0.90 - - -
2 Plesteran 1Pc : 5Ps 37.00 m² 0.86 - - -
3 Benangan 48.00 m' - - - -
V. PEKERJAAN ATAP
1 Atap genteng beton (lama) 139.73 m² 1.38 - - -
2 Atap genteng beton warna 237.08 m² 14.29 - - -
3 Genteng bubungan beton warna 26.70 m' 1.40 - - -
4 Plesteran kompres L = 10 cm (Akhiran genting) 56.00 m' 0.65 - - -
JUMLAH 100.00 -
Jumlah dana yang digunakan sampai dengan minggu ini ( minggu ke 1 ) Rp 20,300,000.00
REKAPITULASI 2
RENCANA ANGGARAN BIAYA OK
I (2) ###
II PEKERJAAN TANAH ###
III PEKERJAAN PASANGAN/PLESTERAN ###
IV PEKERJAAN BETON ###
V PEKERJAAN RANGKA ATAP ###
VI PEKERJAAN ATAP ###
VII PEKERJAAN KUSEN PINTU DAN JENDELA ###
VIII PEKERJAAN PLAFOND ###
IX PEKERJAAN PENGECATAN/PLAMIRAN ###
X PEKERJAAN LANTAI ###
XI PEKERJAAN KUNCI + PENGGANTUNG ###
XII PEKERJAAN INSTALASI LISTRIK ### ###
XIII PEKERJAAN KACA ###
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 1 Kelampis
Kec. Kelampis Kab. Bangkalan
LAPORAN MINGGUAN
Minggu ke :
Pekerjaan : REHABILITASI 2 RUANG KELAS SMPN 1 KLAMPIS Tanggal :
Nama Sekolah : SMPN 1 KLAMPIS Bulan :
Lokasi : Kec. Kedamean Kab. Gresik Dana diterima tangal :
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%)
% Prestasi Rerata Prestasi
(1) (2) (3) (4) (5) (6) (7) (8)
I. PEKERJAAN PERSIAPAN (6)/100x(5)
1 Pembongkaran kosen 12.00 bh 0.20 - - 100
2 Penetelan plesteran 12.00 m² 0.08 - - 100
3 Pembersihan akhir pekerjaan 1.00 ls 0.07 - - -
X. PEKERJAAN LANTAI
1 Keramik lantai 40 x 40 240.00 m² 8.82 - - -
2 Keramik dinding 25 x 40 129.80 m² 5.80 - - -
3 Keramik kolom 25 x 40 6.40 m² 0.29 - - -
4 List keramik 119.00 m' 3.32 - - -
JUMLAH 95.07 -
Jumlah dana yang digunakan sampai dengan minggu ini ( minggu ke 1 ) Rp 20,300,000.00
3
REKAPITULASI OK
NCANA ANGGARAN BIAYA OK
: PENGADAAN SARANA PRASARANA
KEGIATAN : PERENCANAAN SMP KABUPATEN BANGKALAN
PEKERJAAN : REHABILITASI 2 RUANG BELAJAR SMPN 3 SATAP KOKOP
LINGKUP PEKERJAAN : SMPN 3 SATAP KOKOP KEC. KOKOP KAB. BANGKALAN
LOKASI
URAIAN PEKERJAAN JUMLAH HARGA
NO.
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
H. SUBADRIH, ST, MT
Mengetahui :
Kepala Sekolah
SMPN 3 Satap Kokop
Kec. Kokop Kab. Bangkalan
IHSANUDIN, S.Pd
NIP. 19700109 199104 1 001
LAPORAN MINGGUAN
Minggu ke :
Pekerjaan : REHABILITASI 2 RUANG BELAJAR SMPN 3 SATAP KOKOP Tanggal :
Nama Sekolah : SMPN 3 SATAP KOKOP KEC. KOKOP KAB. BANGKALAN Bulan :
Lokasi : KEC. KOKOP KAB. BANGKALAN Dana diterima tangal :
Besar Dana :
Bobot Prestasi Pekerjaan Prestasi Pekerjaan
No. Jenis Pekerjaan Volume Satuan Pekerjaan Minggu Lalu (%) Minggu Ini (%)
% Prestasi Rerata Prestasi
(1) (2) (3) (4) (5) (6) (7) (8)
(6)/100x(5)
I. PEKERJAAN PERSIAPAN
1 Pembongkaran atap + rangka 260.00 m² 1.70 100 1.70 -
2 Pembongkaran kosen 12.00 bh 0.32 100 0.32 -
3 Pembongkaran dinding 61.75 m² 0.65 100 0.65 -
4 Pembersihan akhir pekerjaan 1.00 ls 0.11 - - 100
X. PEKERJAAN LANTAI
1 Keramik lantai 40 x 40 162.00 m² 9.58 100 9.58 -
2 Keramik kolom 20 x 40 (motif) 5.60 m² 0.40 100 0.40 -
Mengetahui Menyetujui
SMPN 3 Satap Kokop Panitia Pembangunan Sekolah
Kec. Kokop Kab. Bangkalan
Selaku Penanggung Jawab
IHSANUDIN, S.Pd SUHAERI
NIP. 19700109 199104 1 001
REKAPITULASI
NCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI
NO.
I
II
III
IV
V
VI
VII
VIII
IX
X 4
XI OK
XII LAMA
XIII : PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 1 TRAGAH
: SMPN 1 TRAGAH KEC. TRAGAH KAB. BANGKALAN
TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )
PEKERJAAN PERSIAPAN ###
PEKERJAAN TANAH ###
PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA #DIV/0!
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 1 Tragah
Kec. Tragah Kab. Bangkalan
Drs. AMIRULLAH, MM
NIP. 19581217 198603 1 011
NO
1
I.
1
2
3
4
II.
1
2
4
III.
1
2
3
IV.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran atap + rangka 377.00 m² ### ###
V. Pembongkaran kusen 4.00 bh ### ###
1 Penetelan plesteran 159.60 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VI. PEKERJAAN TANAH ###
1 Galian tanah 2.16 m³ ### ###
2 Urugan pasir bawah pondasi t=10cm 0.36 m³ ### ### #DIV/0!
3 Urugan tanah kembali 1.08 m³ ### ###
4 ###
PEKERJAAN PASANGAN/PLESTERAN
VII. Pasangan 1/2 bata camp. 1 Pc : 5 Ps 7.20 m² ### ### ###
1 Plesteran 1Pc : 5Ps 14.40 m² ### ###
2 Benangan 24.00 m' ### ###
3 ###
PEKERJAAN BETON
VIII. Lantai kerja bawah pondasi 1:3:5 t=5cm 0.18 m³ ### ###
1 Pondasi beton stempat 60 x 60 x 15cm 0.54 m³ ### ###
Kolom teras 15/15 0.79 m³ ### ###
IX. Balok beton 15/20 1.71 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ ### ###
X. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Penang (baru) 382.73 m² ### ###
3 Atap genteng (lama bg. belakang) 170.10 m² ### ###
4 Genteng bubungan Karang penang 28.35 m' ### ###
Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' ### ###
XI. ###
1 PEKERJAAN KUSEN PINTU DAN JENDELA
2 Kusen kayu kempas/mahoni 6/15 #DIV/0! m³ Rp - #DIV/0!
3 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 8.61 m² Rp - Rp - #DIV/0!
4 Daun Jendela kaca kayu kempas/mahoni 3/10 8.40 m² Rp - Rp - ###
5 #DIV/0!
6 PEKERJAAN PLAFOND
Plafond calsiboard 4mm + rangka kayu 4/6 294.84 m² ### ###
XII ###
1 PEKERJAAN PENGECATAN
2 Pengecatan dinding (3 Ruang kelas) 598.50 m² ### ###
3 Pengecatan plafond 294.84 m² ### ###
4 Pengecatan kayu 206.70 m² ### ###
5 ###
6 PEKERJAAN LANTAI #DIV/0!
Keramik lantai 40 x 40 245.70 m² ### ###
XIII. Keramik dinding 25 x 40 ( 3 R.kelas + teras ) 159.60 m² ### ###
1 List keramik dinding 7cm 110.40 m² ### ###
Keramik kolom 25 x 40 12.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Engsel Pintu 18.00 bh ### ###
Engsel Jendela 16.00 bh ### ###
Grendel pintu 3.00 bh ### ###
Grendel Jendela 16.00 bh ### ###
Hag Angin 16.00 bh ### ###
###
REKAPITULASI
PEKERJAAN INSTALASI LISTRIK
NCANA ANGGARAN
Lampu BIAYA
SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
KEGI Saklar ganda 3.00 bh ### ###
PEKE Saklar tunggal 3.00 bh ### ###
LING Stop kontak + instalasi 3.00 bh ### ###
LOKA Instalasi titik lampu 15.00 ttk ### ###
###
NO. PEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 11.14 m² ### ###
###
I
II
III
IV
V
VI
VII
VIII
IX
X 4
XI OK
XII BARU
XIII : PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 1 TRAGAH
: SMPN 1 TRAGAH KEC. TRAGAH KAB. BANGKALAN
TERBILANG : ( DUA RATUS SEMBILAN PULUH ENAM JUTA TUJUH RATUS RIBU RUPIAH )
PEKERJAAN PERSIAPAN ###
PEKERJAAN TANAH ###
PEKERJAAN PASANGAN/PLESTERAN ###
PEKERJAAN BETON ###
PEKERJAAN RANGKA ATAP ###
PEKERJAAN ATAP ###
PEKERJAAN KUSEN PINTU DAN JENDELA Rp -
PEKERJAAN PLAFOND ###
PEKERJAAN PENGECATAN ###
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 1 Tragah
Kec. Tragah Kab. Bangkalan
Drs. AMIRULLAH, MM
NIP. 19581217 198603 1 011
NO
1
I.
1
2
3
4
II.
1
2
4
III.
1
2
3
IV.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran atap + rangka 377.00 m² ### ###
V. Pembongkaran kusen 8.00 bh ### ###
1 Penetelan plesteran 249.00 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VI. PEKERJAAN TANAH ###
1 Galian tanah 2.16 m³ ### ###
2 Urugan pasir bawah pondasi t=10cm 0.36 m³ ### ### ###
3 Urugan tanah kembali 1.08 m³ ### ###
###
VII. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 24.02 m² ### ### ###
2 Plesteran 1Pc : 5Ps 48.03 m² ### ###
3 Benangan 168.00 m' ### ###
4 ###
PEKERJAAN BETON
VIII. Lantai kerja bawah pondasi 1:3:5 t=5cm 0.18 m³ ### ###
1 Pondasi beton stempat 60 x 60 x 15cm 0.54 m³ ### ###
Kolom teras 15/15 0.79 m³ ### ###
IX. Balok beton 15/20 1.56 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ ### ###
X. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Penang (baru) 382.73 m² ### ###
3 Genteng bubungan Karang penang 28.35 m' ### ###
4 Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' ### ###
5 ###
PEKERJAAN KUSEN PINTU DAN JENDELA
XI. Kusen kayu kempas/mahoni 6/15 1.09 m³ Rp - Rp -
1 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 8.61 m² Rp - Rp - ###
2 Jalusi kayu kempas/mahoni 3/12 7.20 m² Rp - Rp -
3 Daun Jendela kaca kayu kempas/mahoni 3/10 6.72 m² Rp - Rp - ###
4 Rp -
5 PEKERJAAN PLAFOND
6 Plafond calsiboard 4mm + rangka kayu 4/6 294.84 m² ### ###
###
XII PEKERJAAN PENGECATAN
1 Pengecatan dinding (3 Ruang kelas) 598.50 m² ### ###
2 Pengecatan plafond 294.84 m² ### ###
3 Pengecatan kayu 206.70 m² ### ###
4 ###
5 PEKERJAAN LANTAI ###
6 Keramik lantai 40 x 40 245.70 m² ### ###
Keramik dinding 25 x 40 ( 3 R.kelas + teras ) 173.40 m² ### ###
XIII. List keramik dinding 7cm 132.90 m² ### ###
1 Keramik kolom 25 x 40 12.00 m² ### ###
Keramik dinding 25 x 40 ( 3 R.kelas teras saja ) 75.60 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Engsel Pintu 18.00 bh ### ###
Engsel Jendela 16.00 bh ### ###
Grendel pintu 3.00 bh ### ###
Grendel Jendela 16.00 bh ### ###
Hag Angin 16.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
REKAPITULASI
Lampu SL 8watt (teras) 3.00 bh ### ###
NCANA ANGGARAN BIAYA
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
KEGI Stop kontak + instalasi 3.00 bh ### ###
PEKE Instalasi titik lampu 15.00 ttk ### ###
LINGKUP PEKERJAAN ###
LOKAPEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 11.14 m² ### ###
NO. ###
I
II
III
IV
V
VI
VII
VIII
IX
X 5
XI OK
XII LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 MODUNG
: SMPN 2 MODUNG KEC. MODUNG KAB. BANGKALAN
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Modung
Kec. Modung Kab. Bangkalan
A S U R, M.Pd
NIP. 19610117 198403 1 008
NO
1
I.
1
2
II.
1
2
3
III.
1
2
3
IV.
1
2
Lembar. 2
V. JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
1 2 3 4 5
2 PEKERJAAN PERSIAPAN
3 Pembongkaran atap + rangka 406.00 m² ### ###
4 Pembersihan akhir pekerjaan 1.00 ls ### ### ###
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 98.93 m² ### ###
2 Plesteran 1Pc : 5Ps 197.87 m² ### ###
3 Benangan 166.56 m' ### ###
###
VII. PEKERJAAN BETON
1 Kolom teras 15/15 0.41 m³ ### ###
Balok teras 15/20 1.24 m³ ### ###
VIII. Ring balk gewel 15/15 0.98 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 396.90 m² ### ###
4 Lisplank kalsiplank 8mm / 30 cm 85.70 m¹ ### ###
5 ###
PEKERJAAN ATAP
IX. Pasang atap genteng karang p enang (baru 5%) 19.85 m² ### ###
1 Pasang atap genteng (lama) 377.06 m² ### ###
Genteng bubungan karang penang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 29.00 m' ### ###
1 ###
2 PEKERJAAN KUSEN PINTU DAN JENDELA
3 Kusen kayu kempas/mahoni 6/12 0.46 m³ Rp - Rp -
4 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 6.72 m² Rp - Rp -
5 Daun Jendela kaca kayu kempas/mahoni 3/10 5.04 m² Rp - Rp -
6 Rp -
PEKERJAAN PLAFOND ###
XI. Plafond calsiboard 4mm + rangka hollow 340.20 m² ### ###
1 ###
2 PEKERJAAN PENGECATAN/PLAMIRAN
3 Pengecatan dinding (depan) 66.85 m² ### ###
4 Pelamiran dinding 430.33 m² ### ###
5 Pelamiran plafond 340.20 m² ### ### ###
6 Pengecatan kayu 206.70 m² ### ###
Cat genteng 396.90 m² ### ###
XII. ###
1 PEKERJAAN LANTAI
Lantai rabat 216.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 4.00 bh ### ###
Engsel Pintu 21.00 bh ### ###
Engsel Jendela 24.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Grendel Jendela 12.00 bh ### ### ###
Hag Angin 24.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 14.00 bh ### ###
Lampu SL 8watt (teras) 4.00 bh ### ###
Saklar ganda 7.00 bh ### ###
REKAPITULASI
Saklar tunggal 3.00 bh ### ###
NCANA ANGGARAN BIAYA
Stop kontak + instalasi 4.00 bh ### ###
Instalasi titik lampu 18.00 bh ### ###
KEGIATAN ###
PEKE PEKERJAAN KACA
LING Kaca mati t=5 mm 14.49 m² ### ###
LOKASI ###
NO.
I
II
III
IV
V
VI
VII
VIII
IX
X 5
XI OK
XII BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 MODUNG
: SMPN 2 MODUNG KEC. MODUNG KAB. BANGKALAN
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Modung
Kec. Modung Kab. Bangkalan
A S U R, M.Pd
NIP. 19610117 198403 1 008
NO
1
I.
1
2
II.
1
2
3
III.
1
2
3
IV.
1
2
Lembar. 2
V. JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
1 2 3 4 5
2 PEKERJAAN PERSIAPAN
3 Pembongkaran atap + rangka 406.00 m² ### ###
4 Pembersihan akhir pekerjaan 1.00 ls ### ### ###
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 98.93 m² ### ###
2 Plesteran 1Pc : 5Ps 197.87 m² ### ###
3 Benangan 166.56 m' ### ###
###
VII. PEKERJAAN BETON
1 Kolom teras 15/15 0.41 m³ ### ###
Balok teras 15/20 1.24 m³ ### ###
VIII. Ring balk gewel 15/15 0.98 m³ ### ###
1 ###
2 PEKERJAAN RANGKA ATAP
3 Kuda-kuda baja ringan (galvalum 75mm) 396.90 m² ### ###
4 Lisplank kalsiplank 8mm / 30 cm 85.70 m¹ ### ###
5 ###
PEKERJAAN ATAP
IX. Pasang atap genteng karang p enang (baru 5%) 19.85 m² ### ###
1 Pasang atap genteng (lama) 377.06 m² ### ###
Genteng bubungan karang penang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 29.00 m' ### ###
1 ###
2 PEKERJAAN KUSEN PINTU DAN JENDELA
3 Kusen kayu kempas/mahoni 6/12 0.46 m³ Rp - Rp -
4 Daun Pintu panil kayu kmpas/mahoni 4/10 & 3/20 6.72 m² Rp - Rp -
5 Daun Jendela kaca kayu kempas/mahoni 3/10 5.04 m² Rp - Rp -
6 Rp -
PEKERJAAN PLAFOND ###
XI. Plafond calsiboard 4mm + rangka kayu 4/6 340.20 m² ### ###
1 ###
2 PEKERJAAN PENGECATAN/PLAMIRAN
3 Pengecatan dinding (depan) 66.85 m² ### ###
4 Pelamiran dinding 430.33 m² ### ###
5 Pelamiran plafond 340.20 m² ### ### ###
6 Pengecatan kayu 206.70 m² ### ###
Cat genteng 396.90 m² ### ###
XII. ###
1 PEKERJAAN LANTAI
Lantai rabat 216.00 m² ### ###
###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 4.00 bh ### ###
Engsel Pintu 21.00 bh ### ###
Engsel Jendela 24.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Grendel Jendela 12.00 bh ### ### ###
Hag Angin 24.00 bh ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 14.00 bh ### ###
Lampu SL 8watt (teras) 4.00 bh ### ###
Saklar ganda 7.00 bh ### ###
REKAPITULASI
Saklar tunggal 3.00 bh ### ###
NCANA ANGGARAN BIAYA
Stop kontak + instalasi 4.00 bh ### ###
Instalasi titik lampu 18.00 bh ### ###
KEGIATAN ###
PEKE PEKERJAAN KACA
LING Kaca mati t=5 mm 14.49 m² ### ###
LOKASI ###
NO.
I
II
III
IV
V
VI
VII
VIII
IX
X 6
XI OK
LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 2 LABANG
: SMPN 2 LABANG KEC. LABANG KAB. BANGKALAN
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
ACHMAD TAUFIK HEYKAL, A.Sg H. SUBADRIH, ST, MT
Mengetahui :
Kepala Sekolah
SMPN 2 Labang
Kec. Labang Kab. Bangkalan
NO
1
I.
1
2
3
4
5
II.
1
III.
1
2
IV.
1
2
3 Lembar. 2
JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
V. 2 3 4 5
1 PEKERJAAN PERSIAPAN ###
Pembongkaran atap + rangka 377.00 m² Rp - Rp -
VI. Pembongkaran kosen 1.00 bh ### ###
1 Pembongkaran dinding 6.00 m² ### ###
2 Penetelan plesteran 139.74 m² ### ###
3 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VII. PEKERJAAN PASANGAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps (nyepit kuda2) 30.91 m² Rp - Rp -
2 Rp -
3 PEKERJAAN RANGKA ATAP ###
4 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ Rp - Rp -
VIII. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Pilang (baru) 382.73 m² ### ###
Genteng bubungan Karang pilang 28.35 m' ### ###
IX. Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' Rp - Rp -
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsiboard 4mm + rangka hollow 354.38 m² Rp - Rp -
4 Rp -
5 PEKERJAAN PENGECATAN
6 Pengecatan dinding 598.50 m² Rp - Rp - ###
Pengecatan plafond 354.38 m² Rp - Rp -
X. Pengecatan kayu 274.60 m² Rp - Rp -
1 Rp -
PEKERJAAN LANTAI
XI. Keramik lantai 40 x 40 243.00 m² ### ###
1 Keramik dinding 25 x 40 139.74 m² ### ###
2 List keramik 102.00 m' ### ###
3 Keramik kolom 20 x 40 10.80 m² ### ###
4 ###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA ###
Kaca mati t=5 mm (yg pecah) 4.22 m² ### ###
###
PEKERJAAN TANGGA DEPAN PINTU
Pasangan batu gunung 2.88 m³ ### ###
Plesterran trasram 7.68 m² ### ###
Keramik kasar 40 x 40 7.04 m² ### ###
Urugan pasir 4.96 m³ ### ###
REKAPITULASI ###
NCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI
NO.
I
II
III
IV
V
VI
VII
VIII
IX
X 6
XI OK
XII BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 3 RUANG BELAJAR SMPN 2 LABANG
: SMPN 2 LABANG KEC. LABANG KAB. BANGKALAN
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Labang
Kec. Labang Kab. Bangkalan
Drs. HARTONO, M.Pd
NIP. 19690126 199802 1 003
NO
1
I.
1
2
3
4
5
II.
1
2
3
III.
1
IV.
1
2 Lembar. 2
JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
V. 2 3 4 5
1 PEKERJAAN PERSIAPAN ###
2 Pembongkaran atap + rangka 377.00 m² Rp - Rp -
3 Pembongkaran kosen 1.00 bh ### ###
Pembongkaran dinding 6.00 m² ### ###
VI. Penetelan plesteran 127.50 m² ### ###
1 Pembersihan akhir pekerjaan 1.00 ls ### ###
###
VII. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps (nyepit kuda2) 22.43 m² Rp - Rp - -
2 Plesteran 1Pc : 5Ps 16.20 m² ### ###
3 Benangan 32.00 m' ### ###
###
VIII. PEKERJAAN BETON
1 Ring balk gewel 15/15 0.40 m³ ### ###
2 ###
3 PEKERJAAN RANGKA ATAP ###
4 Kuda-kuda baja ringan (galvalum 75mm) 382.73 m² ### ###
Lisplank kalsiplank 8mm / 30 cm 83.70 m¹ Rp - Rp -
IX. ###
1 PEKERJAAN ATAP
2 Atap genteng Karang Pilang (baru) 382.73 m² ### ###
Genteng bubungan Karang pilang 28.35 m' ### ###
X. Plesteran kompres L = 10 cm (Akhiran genting) 27.00 m' Rp - Rp -
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsiboard 4mm + rangka hollow 354.38 m² Rp - Rp -
4 Rp -
5 PEKERJAAN PENGECATAN
6 Pengecatan dinding 598.50 m² Rp - Rp - ###
Pengecatan plafond 354.38 m² Rp - Rp -
XI. Pengecatan kayu 274.60 m² Rp - Rp -
1 Rp -
PEKERJAAN LANTAI
XII. Keramik lantai 40 x 40 243.00 m² ### ###
1 Keramik dinding 25 x 40 127.50 m² ### ###
2 List keramik 102.00 m' ### ###
3 Keramik kolom 20 x 40 10.80 m² ### ###
4 ###
PEKERJAAN KUNCI + PENGGANTUNG
Kunci pintu 2 x putar 3.00 bh ### ###
Pintu harmonika 15.00 m² ### ### ###
### ###
PEKERJAAN INSTALASI LISTRIK ###
Lampu SL 14 watt 12.00 bh ### ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 3.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA ###
Kaca mati t=5 mm (yg pecah) 4.22 m² ### ###
###
PEKERJAAN TANGGA DEPAN PINTU 3.46
Pasangan batu gunung 2.88 m³ ### ###
Plesterran trasram 7.68 m² ### ###
Keramik kasar 40 x 40 7.04 m² ### ###
Urugan pasir 4.96 m³ ### ###
###
REKAPITULASI
NCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
LINGKUP PEKERJAAN
LOKASI
NO.
I
II
III
IV
V
VI
VII
VIII
IX
X 7
OK
LAMA
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 KWANYAR
: SMPN 2 KWANYAR KEC. KWANYAR KAB. BANGKALAN
TERBILANG : ( SERATUS SEMBILAN PULUH TUJUH JUTA DELAPAN RATUS RIBU RUPIAH )
URAIAN PEKERJAAN JUMLAH HARGA
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Kwanyar
Kec. Kwanyar Kab. Bangkalan
RAHMAWATI, M.Pd
NIP. 19700703 199802 2 003
NO
1
I.
1
2
3
4
II.
1
2
III.
1
IV.
1
V.
1 Lembar. 2
2 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
3 2 3 4 5
4 PEKERJAAN PERSIAPAN
Pembongkaran kusen 1.00 bh ### ###
VI. Pembongkaran dinding 15.00 m² ### ###
1 Penetelan plesteran 428.64 m² ### ###
2 Pembersihan akhir pekerjaan 1.00 Ls ### ###
3 ###
4 PEKERJAAN PASANGAN/PLESTERAN ###
5 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 0.91 22.20 m² Rp - Rp -
6 Plesteran 1Pc : 5Ps 1.07 44.40 m² Rp - Rp -
Rp -
VII. PEKERJAAN KAYU
1 Lisplank kayu 3/30 cm 4.00 m¹ ### ###
2 ###
3 PEKERJAAN PLAFOND
4 Plafond calsi 1 x 1 + rangka kayu 12.00 m² Rp - Rp -
Rp -
VIII. PEKERJAAN PENGECATAN
1 Pengecatan dinding (3 kelas) 455.30 m² Rp - Rp -
2 Pengecatan plafond 319.00 m² Rp - Rp -
3 Pengecatan kayu 206.70 m² Rp - Rp - ###
4 Pengecatan kayu (Kantor) 214.39 m² Rp - Rp -
5 Rp -
6PEKERJAAN LANTAI 162.00 ###
Keramik lantai 40 x 40 ( 2 R Kelas ) 5.67 126.00 m² ### ###
IX. Keramik lantai 40 x 40 ( Teras ) 1.62 36.00 m² ### ###
1 Keramik dinding 25 x 40 (dalam kelas + teras) 5.78 128.40 m² ### ###
Keramik kolom teras 25 x 40 1.01 22.40 m² ### ###
X. List keramik 1.64 327.80 m' ### ###
1 Keramik dinding 25 x 40 (dalam kantor+R.guru+ t 13.51 300.24 m² ### ###
2 451.04 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 3.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Hag Angin 60.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
REKAPITULASI
PEKERJAAN KACA
NCANA ANGGARAN BIAYA
Kaca mati t=5 mm (yg pecah) 1.68 m² ### ###
###
KEGI PEKERJAAN TEMPAT DUDUK
PEKE Pasangan trasram 0.68 17.00 m² Rp - Rp -
LING Plat beton tempat duduk t=10 cm 0.53 1.02 m³ ### ###
LOKA Keramik tempat duduk 30 x 30 0.46 10.20 m² ### ###
Keramik dinding tempat duduk 25 x 40 1.84 40.80 m² ### ###
NO. 34.71 ###
0.86768 40.80
I
II
III
IV
V
VI
VII
VIII
IX
X 7
OK
BARU
: PENGADAAN SARANA PRASARANA
: PERENCANAAN SMP KABUPATEN BANGKALAN
: REHABILITASI 2 RUANG BELAJAR SMPN 2 KWANYAR
: SMPN 2 KWANYAR KEC. KWANYAR KAB. BANGKALAN
TERBILANG : ( SERATUS SEMBILAN PULUH TUJUH JUTA DELAPAN RATUS RIBU RUPIAH )
URAIAN PEKERJAAN JUMLAH HARGA
PEKERJAAN PERSIAPAN ###
PEKERJAAN PASANGAN/PLESTERAN Rp -
PEKERJAAN KAYU ###
PEKERJAAN PLAFOND Rp -
PEKERJAAN PENGECATAN Rp -
PEKERJAAN LANTAI ###
PEKERJAAN KUNCI + PENGGANTUNG ###
PEKERJAAN INSTALASI LISTRIK ###
PEKERJAAN KACA ###
PEKERJAAN TEMPAT DUDUK ###
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Kwanyar
Kec. Kwanyar Kab. Bangkalan
RAHMAWATI, M.Pd
NIP. 19700703 199802 2 003
NO
1
I.
1
2
3
4
II.
1
2
III.
1
2
IV.
1
V. Lembar. 2
1 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
2 2 3 4 5
3 PEKERJAAN PERSIAPAN
4 Pembongkaran kusen 1.00 bh ### ###
5 Pembongkaran dinding 15.00 m² ### ###
Penetelan plesteran 428.64 m² ### ###
VI. Pembersihan akhir pekerjaan 1.00 Ls ### ###
1 ###
2 PEKERJAAN PASANGAN/PLESTERAN ###
3 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 22.20 m² Rp - Rp -
4 Plesteran 1Pc : 5Ps 44.40 m² Rp - Rp -
5 Rp -
6 PEKERJAAN KAYU
Perbaikan daun pintu panil 4.00 bh ### ###
VII. Lisplank kayu 3/30 cm 4.00 m¹ ### ###
1 ###
2 PEKERJAAN PLAFOND
3 Plafond calsi 1 x 1 + rangka kayu 12.00 m² Rp - Rp -
4 Rp -
PEKERJAAN PENGECATAN
VIII. Pengecatan dinding (3 kelas) 439.90 m² Rp - Rp -
1 Pengecatan dinding (Kantor) 373.40 m² Rp - Rp -
2 Pengecatan plafond 319.00 m² Rp - Rp -
3 Pengecatan kayu 169.45 m² Rp - Rp - ###
4 Pengecatan kayu (Kantor) 197.69 m² Rp - Rp -
5 Rp -
6 PEKERJAAN LANTAI ###
Keramik lantai 40 x 40 ( 2 R Kelas ) 126.00 m² ### ###
IX. Keramik lantai 40 x 40 ( Teras ) 36.00 m² ### ###
1 Keramik dinding 25 x 40 (dalam kelas + teras) 128.40 m² ### ###
Keramik kolom teras 25 x 40 22.40 m² ### ###
X. List keramik 327.80 m' ### ###
1 Keramik dinding 25 x 40 (dalam kantor+R.guru+ teras) 300.24 m² ### ###
2 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 3.00 bh ### ###
Grendel pintu 2.00 bh ### ###
Hag Angin 60.00 bh ### ###
Pintu harmonika 11.30 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK ###
Lampu SL 14 watt 12.00 bh ### ###
Lampu SL 8watt (teras) 3.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 3.00 bh ### ###
Stop kontak + instalasi 3.00 bh ### ###
Instalasi titik lampu 15.00 ttk ### ###
###
PEKERJAAN KACA
REKAPITULASI
Kaca mati t=5 mm (yg pecah) 1.68 m² ### ###
NCANA ANGGARAN BIAYA ###
PEKERJAAN TEMPAT DUDUK
KEGI Pasangan trasram 17.00 m² Rp - Rp -
PEKE Plat beton tempat duduk t=10 cm 1.02 m³ ### ###
LING Keramik tempat duduk 30 x 30 10.20 m² ### ###
LOKA Keramik dinding tempat duduk 25 x 40 40.80 m² ### ###
###
NO.
I
II
III
IV
V
VI
VII
VIII
IX
8
OK
Bangkalan, 2018
Menyetujui : Dibuat oleh
Panitia Pembangunan Sekolah Fasilitator / Perencana
(P2S)
Mengetahui :
Kepala Sekolah
SMPN 2 Kokop
Kec. Kokop Kab. Bangkalan
II.
1
2
3
III.
1
IV.
1
2
3
V. Lembar. 2
1 JENIS PEKRJAAN VOLUME HARGA
JUMLAH HARGA
2 2 3 4 5
3 PEKERJAAN PERSIAPAN
4 Penetelan plesteran 317.46 m² ### ###
5 Pembersihan akhir pekerjaan 1.00 Ls Rp - Rp - #REF!
###
VI. PEKERJAAN PASANGAN/PLESTERAN
1 Pasangan 1/2 bata camp. 1 Pc : 5 Ps 12.25 m² Rp - Rp -
5 Plesteran 1Pc : 5Ps 80.58 m² Rp - Rp -
6 Benangan 55.00 m' Rp - Rp -
7 Rp -
PEKERJAAN PLAFOND
VII. Plafond calsiboard 4mm + rangka kayu 15.00 m² Rp - Rp -
1 Rp -
2 PEKERJAAN PENGECATAN -
3 Pengecatan dinding 506.50 m² Rp - Rp -
4 Pengecatan plafond 352.00 m² Rp - Rp - #DIV/0!
5 Pengecatan kayu 275.60 m² Rp - Rp -
6 Rp -
PEKERJAAN LANTAI ###
VIII. Keramik lantai 40 x 40 243.00 m² ### ### 147.47
1 Keramik dinding 25 x 40 ( 3 R. Kelas + teras) 132.96 m² ### ###
List keramik 288.20 m' ### ###
IX. Keramik kolom 25 x 40 16.00 m² ### ###
1 Keramik dinding 25 x 40 ( 5 R. Kelas bg. dalam) 184.50 m² ### ###
2 ###
3 PEKERJAAN KUNCI + PENGGANTUNG
4 Kunci pintu 2 x putar 5.00 bh ### ###
Grendel Jendela 50.00 bh ### ###
Hag Angin 100.00 bh ### ###
Pintu harmonika 15.00 m² ### ###
###
PEKERJAAN INSTALASI LISTRIK
Lampu SL 14 watt 20.00 bh ### ###
Lampu SL 8watt (teras) 5.00 bh ### ###
Saklar ganda 5.00 bh ### ###
Saklar tunggal 5.00 bh ### ###
Stop kontak + instalasi 5.00 bh ### ###
Instalasi titik lampu 25.00 ttk ### ###
###
PEKERJAAN KACA
Kaca mati t=5 mm (yg pecah) 2.53 m² ### ###
###
PEKERJAAN TEMPAT DUDUK
Pasangan trasram 14.70 m² Rp - Rp -
Plat beton tempat duduk t=10 cm 0.74 m³ ### ###
Keramik tempat duduk 30 x 30 7.35 m² ### ###
Keramik dinding tempat duduk 25 x 40 29.40 m² ### ###
###
BATAS
SINERGI 1 SMPN 2 SEPULU DR. AHMAD SABARUDIN, S.Pd, M.MPd
SINERGI 2 SMPN 1 KLAMPIS IMAM SYAFII, S.Pd, MPd
SINERGI 3 SMPN 2 KOKOP MOHAMMAD TAUFIK, SPd
SINERGI 4 SMPN 3 SATAP KOKOP IHSANUDIN, S.Pd
INDRAKILA 5 SMPN 1 TRAGAH Drs. AMIRULLAH, MM
INDRAKILA 6 SMPN 2 MODUNG A S U R, M.Pd
INDRAKILA 7 SMPN 2 LABANG Drs. HARTONO, M.Pd
INDRAKILA 8 SMPN 2 KWANYAR RAHMAWATI, M.Pd
9 SMPN TAHAL AMIN H. ABDULLAH, S.Pd
10 SMPN 1 MODUNG Drs. ALI MUSTOFA, M.Pd
11 SMPN 1 GALIS Drs. TAUFIKUR RAHMAN
12 SMPN 1 KOKOP BUDIONO, S.Pd, M.Pd
28.5
23.5
7.833333
1 ( Satu )
5 Oktob. s/d 10 Oktober 2015
Oktober 2015
29 Oktober 2015
Rp. 212.320.000.00
Prestasi Pekerjaan Prestasi Pekerjaan
Minggu Ini (%) Komulatif (%)
Rerata Prestasi Rerata
(9) (10) (11)
(8)/100x(5) (6)+(8) (7)+(9)
- - - Rp 88,586.67 Rp 1,638,853.33
- - - Rp 42,298.80 Rp 1,565,055.60
- - - Rp - Rp -
Rp 3,203,908.93
- - - Rp 3,912,550.00 Rp 234,753.00
- - - Rp 3,962,550.00 Rp 114,121.44
- - - Rp 3,962,550.00 Rp 1,027,092.96
- - - Rp 3,962,550.00 Rp 1,255,335.84
Rp 2,631,303.24
- - - Rp 185,000.00 Rp 25,849,125.00
- - - Rp 185,000.00 Rp 21,929,437.50
- - - Rp 65,000.00 Rp 3,100,500.00
Rp 50,879,062.50
- - - Rp 18,000.00 Rp 2,515,050.00
- - - Rp 110,000.00 Rp 26,078,250.00
- - - Rp 95,820.00 Rp 2,558,394.00
- - - Rp 21,149.40 Rp 1,184,366.40
Rp 32,336,060.40
- - - Rp 85,000.00 Rp 22,185,000.00
Rp 22,185,000.00
- - - Rp 20,740.00 Rp 10,805,637.48
- - - Rp 20,740.00 Rp 5,413,140.00
- - - Rp 42,450.00 Rp 4,752,702.00
Rp 20,971,479.48
- - - Rp 105,250.00 Rp 3,315,375.00
- - - Rp 112,000.00 Rp 16,800,000.00
- - - Rp 136,075.00 Rp 12,540,672.00
- - - Rp 85,000.00 Rp 6,528,000.00
Rp 39,184,047.00
- - - Rp 55,000.00 Rp 660,000.00
- - - Rp 50,000.00 Rp 150,000.00
- - - Rp 20,000.00 Rp 80,000.00
- - - Rp 15,000.00 Rp 75,000.00
- - - Rp 225,000.00 Rp 1,125,000.00
Rp 200,000.00 Rp 3,000,000.00
Rp 5,090,000.00
- - - Rp 112,125.00 Rp 376,964.25
Rp 376,964.25
2.95 2.95
Rp 20,300,000.00 2.95 %
1 ( Satu )
5 Oktob. s/d 10 Oktober 2015
Oktober 2015
29 Oktober 2015
- - - Rp 58,500.00 Rp 126,360.00
- - - Rp 215,400.00 Rp 77,544.00
- - - Rp 16,110.00 Rp 17,398.80
Rp 221,302.80
- - - Rp 88,586.67 Rp 3,790,281.61
- - - Rp 42,298.80 Rp 3,619,604.84
- - - Rp 11,825.00 Rp 3,651,560.00
Rp 11,061,446.45
- - - Rp 897,800.00 Rp 161,604.00
- - - Rp 3,962,550.00 Rp 2,139,777.00
- - - Rp 3,962,550.00 Rp 3,120,508.13
- - - Rp 3,962,550.00 Rp 5,943,825.00
- - - Rp 3,962,550.00 Rp 9,510,120.00
- - - Rp 3,962,550.00 Rp 941,501.88
Rp 21,817,336.01
- - - Rp 210,000.00 Rp 77,723,100.00
- - - Rp 65,000.00 Rp 5,063,500.00
Rp 82,786,600.00
- - - Rp 80,500.00 Rp 16,325,400.00
- - - Rp 18,000.00 Rp 3,011,580.00
- - - Rp 95,820.00 Rp 2,429,037.00
- - - Rp 21,149.40 Rp 617,562.48
Rp 22,383,579.48
- - - Rp 11,431,250.00 Rp 14,644,117.13
- - - Rp 618,250.00 Rp 5,375,065.50
- - - Rp 430,475.00 Rp 7,148,037.38
- - - Rp 419,572.50 Rp 4,833,475.20
Rp 32,000,695.20
- - - Rp 85,000.00 Rp 25,857,000.00
Rp 25,857,000.00
- - - Rp 20,740.00 Rp 12,412,890.00
- - - Rp 20,740.00 Rp 6,309,108.00
- - - Rp 42,450.00 Rp 8,774,415.00
Rp 27,496,413.00
- - - Rp 112,000.00 Rp 26,880,000.00
- - - Rp 136,075.00 Rp 17,662,535.00
- - - Rp 136,075.00 Rp 870,880.00
- - - Rp 85,000.00 Rp 10,115,000.00
Rp 55,528,415.00
- - - Rp 140,750.00 Rp 422,250.00
- - - Rp 23,625.00 Rp 425,250.00
- - - Rp 16,687.50 Rp 267,000.00
- - - Rp 74,250.00 Rp 222,750.00
- - - Rp 14,750.00 Rp 236,000.00
- - - Rp 17,750.00 Rp 284,000.00
Rp 1,857,250.00
- - - Rp 55,000.00 Rp 660,000.00
- - - Rp 50,000.00 Rp 150,000.00
- - - Rp 20,000.00 Rp 60,000.00
- - - Rp 15,000.00 Rp 45,000.00
- - - Rp 225,000.00 Rp 675,000.00
- - - Rp 200,000.00 Rp 3,000,000.00
Rp 4,590,000.00
- - - Rp 112,125.00 Rp 3,038,587.50
Rp 3,038,587.50
0.28 -
Rp 20,300,000.00 - %
1 ( Satu )
5 Oktob. s/d 10 Oktober 2015
Oktober 2015
29 Oktober 2015
LAMA
140
BARU
LAMA
BARU
LAMA
BARU
LAMA
BARU
keramik tambal sulam
SADALI, S.Pd
UBAGIO, M.Pd
NDAYANI, M.Pd
1 2 3 4 5
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
1.01 100 1.01 100 1.01 100 1.01 100 1.01 100
0.11 - - - - - - - - -
0.90 - - 100 0.90 100 0.90 100 0.90 100
0.86 - - - - 100 0.86 100 0.86 100
- - - - - 100 - 100 - 100
14.17 - - - - - - - - -
12.02 - - - - - - - - -
1.70 - - - - - - - - -
1.38 - - - - - - - - -
14.29 - - - - - - - - -
1.40 - - - - - - - - -
0.65 - - - - - - - - -
12.16 - - - - - - - - -
5.92 - - - - - - - - -
2.97 - - - - - - - - -
2.61 - - - - - - - - -
1.82 - - - - - - - - -
9.21 - - - - - - - - -
6.87 - - - - - - - - -
3.58 - - - - - - - - -
0.36 - - - - - - - - -
0.08 - - - - - - - - -
0.04 - - - - - - - - -
0.04 - - - - - - - - -
0.62 - - - - - - - - -
1.64 - - - - - - - - -
0.21 - - - - - - - - -
1 2 3 4 5
0.20 100 0.20 100 0.20 100 0.20 100 0.20 100
0.08 100 0.08 100 0.08 100 0.08 100 0.08 100
0.07 - - - - - - - - -
0.05 - - - - - - 25 0.01 50
0.70 - - - - - - - - 50
1.02 - - - - - - - - -
1.95 - - - - - - - - -
3.12 - - - - - - - - 50
0.31 - - - - - - - - 75
25.51 - - - - - - - - -
1.66 - - - - - - - - -
5.36 - - - - - - - - -
0.99 - - - - - - - - -
0.80 - - - - - - - - -
0.20 - - - - - - - - -
4.81 - - - - - - - - 50
1.76 - - - - - - - - -
2.35 - - - - - - - - -
1.59 - - - - - - - - -
8.49 - - - - - - - - -
4.07 - - - - - - - - -
2.07 - - - - - - - - -
2.88 - - - - - - - - -
8.82 - - - - - - - - -
5.80 - - - - - - - - -
0.29 - - - - - - - - -
3.32 - - - - - - - - -
0.14 - - - - - - - - -
0.14 - - - - - - - - -
0.09 - - - - - - - - -
0.07 - - - - - - - - -
0.08 - - - - - - - - -
0.09 - - - - - - - - -
0.22 - - - - - - - - -
0.05 - - - - - - - - -
0.02 - - - - - - - - -
0.01 - - - - - - - - -
0.22 - - - - - - - - -
0.98 - - - - - - - - -
1.00 - - - - - - - - -
1 2 3 4 5
1.70 100 1.70 100 1.70 100 1.70 100 1.70 100
0.32 100 0.32 100 0.32 100 0.32 100 0.32 100
0.65 100 0.65 100 0.65 100 0.65 100 0.65 100
0.11 - - - - - - - - -
0.05 100 0.05 100 0.05 100 0.05 100 0.05 100
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100
0.01 50 0.00 100 0.01 100 0.01 100 0.01 100
8.10 - - - - - - - - -
1.06 - - - - - - - - -
0.98 - - - - - - - - -
0.30 - - - - - - - - -
9.03 - - - - - - - - -
0.59 - - - - - - - - -
1.76 - - - - - - - - -
1.03 - - - - - - - - 75
0.44 - - - - - - - - -
9.58 - - - - - - - - -
0.40 - - - - - - - - -
0.15 - - - - - - - - -
0.15 - - - - - - - - -
0.14 - - - - - - - - -
0.08 - - - - - - - - -
0.12 - - - - - - - - -
0.15 - - - - - - - - -
0.23 - - - - - - - - -
0.05 - - - - - - - - -
0.02 - - - - - - - - -
0.02 - - - - - - - - -
0.24 - - - - - - - - -
1.06 - - - - - - - - -
1.22 - - - - - - - - -
6 7 8 9 10
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
0.97 100 0.97 100 0.97 100 0.97 100 0.97 100
1.01 100 1.01 100 1.01 100 1.01 100 1.01 100
- - - - - - - 100 0.11 100
0.90 100 0.90 100 0.90 100 0.90 100 0.90 100
0.86 100 0.86 100 0.86 100 0.86 100 0.86 100
- 100 - 100 - 100 - 100 - 100
0.13 100 0.13 100 0.13 100 0.13 100 0.13 100
0.06 100 0.06 100 0.06 100 0.06 100 0.06 100
0.56 100 0.56 100 0.56 100 0.56 100 0.56 100
0.34 100 0.69 100 0.69 100 0.69 100 0.69 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
6 7 8 9 10
0.20 100 0.20 100 0.20 100 0.20 100 0.20 100
0.08 100 0.08 100 0.08 100 0.08 100 0.08 100
- - - - - - - - - 100
0.04 100 0.04 100 0.04 100 0.04 100 0.04 100
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100
0.01 100 0.01 100 0.01 100 0.01 100 0.01 100
1.24 100 1.24 100 1.24 100 1.24 100 1.24 100
1.19 100 1.19 100 1.19 100 1.19 100 1.19 100
1.20 100 1.20 100 1.20 100 1.20 100 1.20 100
0.03 100 0.05 100 0.05 100 0.05 100 0.05 100
0.35 100 0.70 100 0.70 100 0.70 100 0.70 100
- 50 0.51 100 1.02 100 1.02 100 1.02 100
- 50 0.98 100 1.95 100 1.95 100 1.95 100
1.56 75 2.34 100 3.12 100 3.12 100 3.12 100
0.23 100 0.31 100 0.31 100 0.31 100 0.31 100
2.40 100 4.81 100 4.81 100 4.81 100 4.81 100
- - - - - - - 100 1.76 100
- - - - - - - 100 2.35 100
- - - - - 50 0.79 100 1.59 100
- - - - - - - 50 4.24 100
- - - - - - - 75 6.62 100
- - - - - - - 50 2.90 100
- - - - - - - 50 0.14 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
1.70 100 1.70 100 1.70 100 1.70 100 1.70 100
0.32 100 0.32 100 0.32 100 0.32 100 0.32 100
0.65 100 0.65 100 0.65 100 0.65 100 0.65 100
- - - - - - - - - 100
0.05 100 0.05 100 0.05 100 0.05 100 0.05 100
0.03 100 0.03 100 0.03 100 0.03 100 0.03 100
0.01 100 0.01 100 0.01 100 0.01 100 0.01 100
4.29 100 4.29 100 4.29 100 4.29 100 4.29 100
4.10 100 4.10 100 4.10 100 4.10 100 4.10 100
1.08 100 1.08 100 1.08 100 1.08 100 1.08 100
0.15 100 0.15 100 0.15 100 0.15 100 0.15 100
0.79 100 0.79 100 0.79 100 0.79 100 0.79 100
0.74 100 0.99 100 0.99 100 0.99 100 0.99 100
- 100 2.23 100 2.23 100 2.23 100 2.23 100
- 100 2.64 100 2.64 100 2.64 100 2.64 100
- 100 1.17 100 1.17 100 1.17 100 1.17 100
- 25 7.11 100 28.43 100 28.43 100 28.43 100
- - - 100 2.24 100 2.24 100 2.24 100
5.81 100 5.81 100 5.81 100 5.81 100 5.81 100
4.22 100 4.22 100 4.22 100 4.22 100 4.22 100
2.11 100 2.11 100 2.11 100 2.11 100 2.11 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
- - - - - - - - - 100
0.97
0.97
1.01
0.11
0.90
0.86
-
0.13
0.06
0.56
0.69
14.17
12.02
1.70
1.38
14.29
1.40
0.65
12.16
5.92
2.97
2.61
1.82
9.21
6.87
3.58
0.36
0.08
0.04
0.04
0.62
1.64
0.21
0.20
0.08
0.07
0.04
0.03
0.01
1.24
1.19
1.20
0.05
0.70
1.02
1.95
3.12
0.31
25.51
1.66
5.36
0.99
0.80
0.20
4.81
1.76
2.35
1.59
8.49
4.07
2.07
2.88
8.82
5.80
0.29
3.32
0.14
0.14
0.09
0.07
0.08
0.09
0.22
0.05
0.02
0.01
0.22
0.98
1.00
1.70
0.32
0.65
0.11
0.05
0.03
0.01
4.29
4.10
1.08
0.15
0.79
0.99
2.23
2.64
1.17
28.43
2.24
8.10
1.06
0.98
0.30
5.81
4.22
2.11
9.03
0.59
1.76
1.03
0.44
9.58
0.40
0.15
0.15
0.14
0.08
0.12
0.15
0.23
0.05
0.02
0.02
0.24
1.06
1.22