Design of Sludge Drying Beds

Client :

Total Sludge Generated kg/d 12.38 sludge consistency 1.1%


Total Sludge Cum/d 1.13
Drying period d 10.00
Sludge cake thickness m 0.30
Sludge drying area requireSqm 37.67
No. of beds Required 4
Area of each bed m2 9.42
Size of bed provided
Length m 3.10 3.10 6 underdrain pipeline at bottom of tank
Width m 3.04 3.10 3 medium gravel
SWD m 0.90 0.90 2 coarse sand
Free board m 0.40 0.40 3 coarse gravel
3 medium gravel
Dimension 3.1M (L) X 3.1M (W) X 0.9 M SWD + 0.4M FB 3 fine gravel
Quantity 4 Nos. 3 coarse sand
6 fine sand
6 CI inler pipe at top
inch 23 Total media depth
cm 57.5 Total media depth
meter 0.6 Total media depth
meter 0.3 Depth of Sludge
meter 0.9 SWD
0.4 FB