The document provides specifications for the design of sludge drying beds to handle 12.38 kg/day of 1.1% consistency sludge over a 10 day drying period. It determines that 4 beds, each measuring 3.1m x 3.1m x 0.9m SWD + 0.4m FB, are required to dry the sludge in the allotted time based on the calculated sludge drying area of 37.67 sqm. The bed design includes multiple layers of gravel, sand and pipes.
The document provides specifications for the design of sludge drying beds to handle 12.38 kg/day of 1.1% consistency sludge over a 10 day drying period. It determines that 4 beds, each measuring 3.1m x 3.1m x 0.9m SWD + 0.4m FB, are required to dry the sludge in the allotted time based on the calculated sludge drying area of 37.67 sqm. The bed design includes multiple layers of gravel, sand and pipes.
The document provides specifications for the design of sludge drying beds to handle 12.38 kg/day of 1.1% consistency sludge over a 10 day drying period. It determines that 4 beds, each measuring 3.1m x 3.1m x 0.9m SWD + 0.4m FB, are required to dry the sludge in the allotted time based on the calculated sludge drying area of 37.67 sqm. The bed design includes multiple layers of gravel, sand and pipes.
Total Sludge Generated kg/d 12.38 sludge consistency 1.1%
Total Sludge Cum/d 1.13 Drying period d 10.00 Sludge cake thickness m 0.30 Sludge drying area requireSqm 37.67 No. of beds Required 4 Area of each bed m2 9.42 Size of bed provided Length m 3.10 3.10 6 underdrain pipeline at bottom of tank Width m 3.04 3.10 3 medium gravel SWD m 0.90 0.90 2 coarse sand Free board m 0.40 0.40 3 coarse gravel 3 medium gravel Dimension 3.1M (L) X 3.1M (W) X 0.9 M SWD + 0.4M FB 3 fine gravel Quantity 4 Nos. 3 coarse sand 6 fine sand 6 CI inler pipe at top inch 23 Total media depth cm 57.5 Total media depth meter 0.6 Total media depth meter 0.3 Depth of Sludge meter 0.9 SWD 0.4 FB