You are on page 1of 3

Grout volume Calculation for Micro piles

Wastage 0.045 570.12

Pile OD 0.25 m
Pile ID 0.2 m
Area 1 0.049 m2
Area 2 0.031 m2
Annular Space Area 0.018 m2

Pile Length 12 m
Volume of one pile Annular space 0.21 m3
Number of piles 154 Nos
Total volume of Grout 32.7 m3

WC Ratio 0.42
Total volume of Grout 32.7 m3
Volume of Water Reqd 13.72 m3 (WC*Grout Volume)
Cement Quantity 18.94 m3 (Grout Volume - Volume of Water)
Volume of cement per bag 0.03 m3/bag
Cement required 545.6 bags

Total No. of bags required


Grouted Nails Volume Calculation
1st Layer
Dia of Grouted Nail 0.125
Length of nail 12
Area 0.012
Volume of one grouted nail 0.15
No. of Grouted Nails 61.5
Total Volume of grout 9.1
2nd Layer
Dia of Grouted Nail 0.125
Length of nail 6
Area 0.012
Volume of one grouted nail 0.07
No. of Grouted Nails 61.5
Total Volume of grout 4.5
Combined volume of grout for layers 1 & 2 13.6

WC Ratio 0.42
Total Volume of grout 13.6
Volume of Water Reqd 5.71
Cement Quantity 7.88
Volume of cement per bag 0.0347
Cement required 227.0

772.5 bags
s Volume Calculation

m
m
m2
m3
Nos (assumed 120 m perimeter)
m3

m
m
m2
m3
Nos (assumed 120 m perimeter)
m3
m3

m3
m3 (WC*Grout Volume)
m3 (Grout Volume - Volume of Water)
m3/bag
bags