CONTINGENCY INPUT 10% 1.

Item Description L/H (m) W (m) T (m) Vol. (m3)

Footings
1 Footing 0.5 0.5 0.25 0.063
Subt
Concrete ColFooting Unit
Cement 4 bags
Gravel 1 cu.m
Sand 1 cu.m

Columns
1 Columns 12.00 0.25 0.5 1.5
Subt
Concrete Unit
Cement 90.00 bags
Gravel 10.00 cu.m
Sand 5.00 cu.m

Beams
1 Top Ring Beam 5.00 0.2 0.2 0.200
2 Bottom Beam 24.54 0.5 0.25 3.068
Subt
Concrete Unit
Cement 33.00 bags
Gravel 4.00 cu.m
Sand 2.00 cu.m
Rebar length Total Required +
Total Vol. + 10% Rebar length LONG/
Qty TRANS/ Top&bot Rebar Size(Ø) 10%
Contingency Top&bot (m)
(m) contingency (m)

6 0.41 1 4.9 12Ø 38.94


Subtotal 0.41

Main Bars

Reqd length + 10% Equiv. nos of 6- Bar length each


Size
contingency meter length tie loop

6 9.90 487.08 8 - 12Ø 82 1.28


Subtotal 9.90

No of top bars No of bot. bars #REF! Rebar Size

1 0.220 2 2 22 12Ø
1 3.374 2 2 113.3748 12Ø
Subtotal 3.594
Equivalent no. of
6-meter bars

Tie Bars
Equiv. nos of 6-
No. of
Size meter length (w/
loops/length
10% contingency)
66 12Ø 93

Stirrups
Equiv. nos
Total No.
Eq. nos of 6-meter length of of 6-
Size No. of beams of stirrup #REF!
length bar/loop meter
loops
length
4 10Ø 3 42 0.58 26.796 5
19 10Ø 4 145 1.28 204.16 35
CONTINGENCY
INPUT 10% 1.1
Excavation Volumes
Volume
Total Volume
L (m) W (m) D (m) excavated Qty
(m3)
(m3)
Footing F1 0.5 0.5 3.00 0.75 6 4.5
Total excavation 4.5
Filling Materials
Total
Area (sq.m) +
Depth of Volume
10%
fill (m) of fill
contingency
(cu.m)
Gravel fill G1 124 0.05 6.19
Soil fill 124 0.15 18.6
Subtotal Area

1.50