Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE X
Engineer's Hill, Bulua, Cagayan de Oro City
BACK-UP COMPUTATION
COMPLETION OF CAMP EVANGELISTA STATION HOSPITAL FACILITIES
Name of Projects:
AT H4ID, CAMP EVANGELISTA PATAG, CAGAYAN DE ORO CITY, MISAMIS
CAMP EVANGELISTA PATAG,
Location: Prepared: CJR
CAGAYAN DE ORO CITY
Length: 1 Project Checked: RACB
1040 Metal lath and Accessories
Total Area
DESCRIPTION Length (m) Width (m) Quantity Remarks
(sq.m.)
Steel Facade (Material Recovery Facility)
Panel A (front side)
0.40 1.02 14.00 5.71
0.20 1.02 17.00 3.47
3/16 Wire Strand Galvanized Iron 0.40 1.00 14.00 5.60
Diamond Pattern Expanded Wire
Mesh 0.20 1.00 18.00 3.60
0.40 1.05 15.00 6.30
0.20 1.05 15.00 3.15
Sub-total = 27.83 sq.m.
Panel B (front side)
0.40 1.02 3.00 1.22
0.20 1.02 3.00 0.61
3/16 Wire Strand Galvanized Iron 0.40 1.00 3.00 1.20
Diamond Pattern Expanded Wire
Mesh 0.20 1.00 3.00 0.60
0.40 1.05 3.00 1.26
0.20 1.05 3.00 0.63
Sub-total = 5.53 sq.m.
Framing
Unit
No. of Length Total Length Total Weight
DESCRIPTION Weight Remarks
Pcs. (m) (m) (kg)
(kg/m)
25mmx50mmx1.5mm Thk.
Rectangular Tube (Vertical and 1.00 51.90 51.90 1.70 88.23
Horizontal Main Framing)
43.00 3.07 132.01 1.93 254.78
14.00 1.00 14.00 1.93 27.02
50mmx 4.75mm Thk. Flat Bar
12.00 1.02 12.24 1.93 23.62
12.00 1.05 12.60 1.93 24.32
Sub-total = 417.97 kgs.
Rectangular Steel post
ITEM 1040
Page 1 of 3
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE X
Engineer's Hill, Bulua, Cagayan de Oro City
BACK-UP COMPUTATION
COMPLETION OF CAMP EVANGELISTA STATION HOSPITAL FACILITIES
Name of Projects:
AT H4ID, CAMP EVANGELISTA PATAG, CAGAYAN DE ORO CITY, MISAMIS
CAMP EVANGELISTA PATAG,
Location: Prepared: CJR
CAGAYAN DE ORO CITY
Length: 1 Project Checked: RACB
Unit
No. of Length Total Length Total Weight
DESCRIPTION Weight Remarks
Pcs. (m) (m) (kg)
(kg/m)
100mmx100mmx2.30mm Thk.
1.00 12.00 12.00 6.95 83.40
Square Tube
Sub-total = 549.31 kgs.
Total 1,075.00
Total Area
DESCRIPTION Length (m) Width (m) Quantity Remarks
(sq.m.)
Steel Matting Partition and Framing (Material Recovery Facility)
Panel
0.54 0.78 18.00 7.58
50mm x 50mm x 6mm wire 1.22 0.78 12.00 11.42
diameter G.I. Steel Matting 1.60 2.90 5.00 23.20
1.60 2.50 6.00 24.00
Sub-total = 66.20 sq.m.
Framing
Unit
No. of Length Total Length Total Weight
DESCRIPTION Weight Remarks
Pcs. (m) (m) (kg)
(kg/m)
6.00 5.00 30.00 5.43 162.90
6.00 3.40 20.40 5.43 110.77
6.00 1.50 9.00 5.43 48.87
50 mm diameter G.I. Pipe
6.00 5.00 30.00 5.43 162.90
schedule 40
6.00 1.70 10.20 5.43 55.39
5.00 6.00 30.00 5.43 162.90
5.00 1.70 8.50 5.43 46.16
6.00 7.20 43.20 1.21 52.27
1 1/4 inches x 3/16inches thick 6.00 7.20 43.20 1.21 52.27
Flat Bar 6.00 10.80 64.80 1.21 78.41
5.00 12.00 60.00 1.21 72.60
Sub-total = 1,005.44 kgs.
Tubular Steel post
Unit
No. of Length Total Length Total Weight
DESCRIPTION Weight Remarks
Pcs. (m) (m) (kg)
(kg/m)
ITEM 1040
Page 2 of 3
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE X
Engineer's Hill, Bulua, Cagayan de Oro City
BACK-UP COMPUTATION
COMPLETION OF CAMP EVANGELISTA STATION HOSPITAL FACILITIES
Name of Projects:
AT H4ID, CAMP EVANGELISTA PATAG, CAGAYAN DE ORO CITY, MISAMIS
CAMP EVANGELISTA PATAG,
Location: Prepared: CJR
CAGAYAN DE ORO CITY
Length: 1 Project Checked: RACB
7.00 1.85 12.95 16.06 207.98
100mm diameter G.I. Pipe
7.00 1.75 12.25 16.06 196.74
Sub-total = 404.71 kgs.
Total Area of Metal lath = 71.73 kgs.
Total kg. of Framing and Post = 2,044.44 kgs.
Grand Total = 1.00 1.00 Lumpsum
ITEM 1040
Page 3 of 3