SCOPE OF WORK
• The purpose of this work statement for the
concrete topping is to outline and describe in
detail the safe procedure of concrete topping
which includes layout, delivery/handling,
application of grout mixture, mixed
concrete/mortar, and other related works to
complete the scope.
ALL PLANT AND EQUIPMENT
Vibro Sand
Cement
**PRIOR TO START CONCRETE TOPPING
ACTIVITY**
- All workers must undergo work activity training
(WAT) prior to mobilization
- Secure material transmittal form per delivery
WORK (warehouseman)
EXECUTION - Check all materials if in good condition before
application
- Secure Materials Inspection Request to QA for AQL
Preparation of Area
Preparation of Area
WORK
EXECUTION d) For mixed concrete topping,
prepare material of 1:5 mix ratio of
cement bag and vibro sand bag
e) For diluted mix grout, prepare
material of 1:1 mix ratio of cement
and adhesive or adhesive only.
2. WORK PROCEDURE
WORK FINISHING
EXECUTION
• Level the surface to the desired
finish
• For smooth finished concrete, wait
for the topping concrete to dry a
little then splatter pure cement. Use
steel trowel for finishing.
2. WORK
PROCEDURE
CURING