SCOPE OF WORK

• The purpose of this work statement for


application of paint is to outline and describe in
detail the safe procedure of painting including
other related activities such as layout,
delivery/handling, process of application and
other related works to complete the scope.
ALL PLANT AND EQUIPMENT

Level Bar Steel Bar 3-Stepladder Working Platform


ALL PLANT AND EQUIPMENT

Paint Roller w/
Paint Roller Sandpaper Brush
Handle
**PRIOR TO START PAINTING ACTIVITY**

- All workers must undergo work activity training (WAT)


prior to mobilization Secure permits prior to painting works
- Secure material transmittal form per delivery
WORK (warehouseman)

EXECUTION - Check all materials if in good condition before application

- Ensure all workers must follow with the rules and


regulation against covid-19
- Secure permits prior to painting works
1. MATERIAL HANDLING, STORAGE
AND PROTECTION
WORK
EXECUTION a. Deliver materials to the project site in
untouched packaging or in container must
have the following information listed
below
• Product Name
• Product Description
• Manufacturers date & Expiration date (depends on
the item material)
1. MATERIAL HANDLING,
STORAGE AND PROTECTION

WORK b. Store materials that are not in use


EXECUTION in a tightly covered container and in
a well-ventilated areas
• Maintain containers in good condition
• Remove away any unnecessary items or
chemicals that could cause contamination
• Keep the storage area clean and dry
1. MATERIAL HANDLING,
STORAGE AND PROTECTION

c. Manual Handling Materials


WORK
• Ensure proper lighting inside and outside of the
EXECUTION storage area
• Remove objects that can cause slip, trip and
cuts to workers
• Use of rubber knitted gloves as hand
protection, safety shoes, hard hat during
hauling of materials
2. PRE-INSTALLATION /
APPLICATION
REQUIREMENTS

Test Area / Mock-up Preparation

• Prior to start of mass application of


WORK painting, mock-up will be done on site for
EXECUTION each type of paint system for consultant
approval
• All the paintwork will be done according to
Project Specification
• Approved mock-up shall be retained until
completion of works to serve as standard
for similar works through the building
3. WORK PROCEDURE

Preparation of Area

•Clean the area, remove all materials that


WORK
create hindrances.
EXECUTION •Prepare the area using chalk line (pitik)
or steel bar to locate concave walls, wavy
corners and bulging of walls
•Apply putty (skimcoat/boral) for surface
preparation and to cover hollow or
cracked areas and fix alignments
3. WORK PROCEDURE

STEPS TO APPLY PUTTY

•Scrap off old surfaces, if the wall is “basal”


WORK removed laitance or hardened cement on walls
•Putty mixing, can use tools such as electric
EXECUTION mixer, mix ratio is 2:1 (putty : water) , mixed
for at least 10-15 minutes until a uniform paste
is formed.
•Putty can also be mixed by manual handling
(depends on the painter desired mixture)
3. WORK PROCEDURE

STEPS TO APPLY PUTTY

•Apply first coat of putty. The right way to apply putty


is to spread it uniformly in an upward direction.
WORK •Once done applying the putty on the surface area it
EXECUTION will begin to dry. If multiple coats application, make
sure to adhere to the 2mm thickness restriction.
•Make sure that the first coat of putty has dried
completely before moving on to apply the next one.
•Sanding the loose particles. (use of sand paper #100 -
#180)
•And then, final coat of putty for preparation of primer
application
3. WORK PROCEDURE

Application of Primer
WORK • Apply primer to the surface area
EXECUTION • Inspect the area to check if there still issues
to fix on walls and ceiling (wavy surfaces or
misalignment on corners) if so, fix it by going
back to step 2,3, 4 & 5. Then apply primer
after fixing the specific area.
• Repeat steps until ready for application of 1st
coat mixed paint
3. WORK PROCEDURE

Application of 1st Coat Mixed Paint

• After completely drying the primer, apply 1st coat


WORK mixed paint (2 pail gloss & 1 pail flat latex with
EXECUTION acry-color) to match the color of final paint finish
(Virtouso)
• Inspect the area to check if there still issues to fix
on walls and ceiling (wavy surfaces or
misalignment on corners) if so, fix it by going back
to step 2,3, 4 & 5. Then apply thin primer after
fixing the specific area.
• Repeat steps until ready for application of 1st coat
topcoat or final coat.
3. WORK PROCEDURE

Application of Final Coating

WORK • After inspection or area checking, if the


EXECUTION area is acceptable for client, apply 1st coat
of topcoat or final coating, for a better
texture and glossy finish
• Inspect the area if all is done and ready
for final inspection, then apply the second
and third coat of topcoat or final coat for
finishing.
CLEANING
After completing paint
At the end of each work, remove application, clean spattered
rubbish, empty cans, rags and surfaces. Remove spattered
other discarded materials from paints by washing, scrapping, or
project site. Clean the area other methods. Do not scratch
before and after activity or damage adjacent finished
surfaces.

Protect other work of other


trades against damage from At a completion of
paint application. Correct construction activities of
damage work of other trades by
cleaning, repairing, and
other trades, touch up and
refinishing, as approved by restore damaged or defaced
Architect and leave in an painted surfaces,
undamaged condition.

Use of appropriate and complete


PPE during working hours and
while inside the site premises,
such as eye protection (goggles),
Clean the area before
hand protection (gloves), and after work activity
reflectorized vest and safety
shoes.
QUALITY ASSURANCE
AND CONTROL
TESTS Refer to Project-WP-ITP–Inspection and Test Plan/ Construction
Specifications INSPECTIONS Refer to ITP – Inspection Plans Refer to Forms –
Inspection Checklists and Forms

MEASURING AND TESTING EQUIPMENT TO BE CALIBRATED


Checking of
Surface Texture Approved Colon
corners

PARTIES AND PRODUCTS REQUIRING ACCREDITATION OR


CERTIFICATION

Skim Coat Boral Paint


THANK YOU

You might also like