You are on page 1of 45

Building quantity and cost Estimation

UPTO PLINTH LEVEL

Sr. No. Item Description No.

1 Earthwork for Foundation:


Footing F1 16
Footing F2 8
Footing F3
Total
2 Footing PCC
Footing (1m x 1m) 24
Thickness = 0.075
D = 0.150 + 1.0 + 0.150
Total
3 Footing RCC
Footing F1 24
Footing F2
Footing F3
Total
4 Column up to Plinth Level RCC
Column C1 16
Column C2 8
Column C3
Column C4
Total
5 Back-filling
5.a Back-filling In Footing
Excavation Area 24
Deduction
5.a Tota
5.b Plinth Beam Back filling
Plinth area out to out 1

5.b Tota
6 Plinth Beam RCC

Beam B1 3
Beam B2 2
Beam B3 2
Beam B4 2
Beam B5 2

Total

7 Grae Slab RCC


Plinth area out to out 1
Deduction
Column 24
24
Total

8 Brickwork
Plinth running length 36.5
Height of Plinth Slab above ground 0.25
thickness of wall 9

amt of cement ba
amt of
TOTAL QUANTIT

TOTAL QUANTIT
TOTAL QUANT
TOTAL QUANTITY
TOTAL QUANT

TOTAL NUMB
stimation

Width/ Height/
Length Breadth Depth Quantity Unit
(m)
(m) (m)

2.000 2.000 2.000 128.00 cu m


2.000 2.000 2.000 64.00 cu m
0.00 cu m
Total Qty= 192.00 cu m

2.000 2.000 0.100 9.60 cu m

Total Qty= 9.60 cu m

1.800 1.800 0.250 19.44 cu m

Total Qty= 19.44 cu m

0.250 0.400 1.400 4.00 cu m


0.250 0.400 1.500 1.20

Total Qty= 5.20 cu m

2.000 2.000 2.000 192.00 cu m


34.24
5.a Total Qty= 157.76 cu m

0.000 0.000 0.300 0.00 cu m

5.b Total Qty= 0.00 cu m

9.800 0.250 0.100 0.74 cu m


12.950 0.250 0.100 0.65 cu m
11.800 0.250 0.100 0.59 cu m
11.600 0.250 0.100 0.58 cu m
11.600 0.250 0.100 0.58 cu m

Total Qty= 3.13 cu m


total back filling works 154.63 cu m

13.300 10450.000 0.800 111188.00 cu m

0.250 0.400 1.400 -3.36 cu m


0.250 0.400 1.500 -3.60 cu m
Total Qty= 111181.04 cu m

m
m
cm total brickworks 0.82125 cu m
quantity of mortar 0.19 cu m
uneven mortar joint wastage 0.22 cu m
for dry volume 0.27 cum
amt of cement bags for brick work 2 bags
amt of sand 327 kg
TOTAL QUANTITY OF CONCRETE 111218.41 cu m
WET VOLUME 169496.8607 cu m

upto plinth level

TOTAL QUANTITY OF CEMENT Err:507 bags


TOTAL QUANTITY OF SAND Err:507 kgs
TOTAL QUANTITY OF AGGREGATE Err:507 kgs
TOTAL QUANTITY OF STEEL 0.000 tonnage

TOTAL NUMBER OF BRICKS 411 bricks


Steel used/ footing (in Total steel in Sr. No.
kg) tonnage

0.000
0.000
0.000
Total Steel Qty= 0.000 3

0.000
0.000
0.000
0.000
Total Steel Qty= 0.000

0.000
0.000
0.000
0.000
0.000

Total Steel Qty= 0.000

concrete grade M-20

5
6
GROUND FLOOR
Width/
Item Description No. Length Breadth
(m)
(m)

Column Up to Slab Level RCC


Column C1 24 0.250 0.400
Column C2
Column C3
Total RCC Qty=
Slab Beam RCC

Beam B1 3 9.800 0.250


Beam B2 3 12.950 0.250
Beam B3 2 11.800 0.250
Beam B4 1 11.600 0.250
Beam B5 1 11.600 0.250
Beam B6
Total RCC Qty=
Brick Masonry  
Wall Brick Masonry thickness( in mm)= 200.000

Long Wall 4 12.950 0.200


Shot wall-1 3 9.800 0.200
Shot wall-1 2 8.880 0.200
Shot Wall-2 1 6.000 0.200
Now Deductions for opening(-)
Column 24 0.400
Window W 8 2.000 0.200
Window W1 10 1.500 0.200
Window W2 0 0 0
Window W3 0 0 0
Door o 6 1.200 0.200
Door D 2 1.500 0.200
Door D1 2 1.500 0.200
Door MS 1 7.100 0.620
Vent 4 0.900 0.200
Vent V1 0 0 0

Total Qty 200 mm Thick Wall=


Wall Brick Masonry thickness( in mm)= 115.000
Bath Room 1 1.500 0.115
Passage wall 1 2.315 0.115
Deduction
Door D2 2 0.750 0.115
Parapet Wall
Long Wall 2 0.000 0.115
Shot Wall 2 -0.230 0.115
Total Qty 115 mm Thick Wall=
total brick works

quantity of mortar
uneven mortar joint was
for dry volume
amt of cement bags for brick work
amt of sand
Cement Plaster Works

long wall
Short wall
Parapet wall
Tower
Now deducton for opening (-)
Doors total
Windows total
Vents total

Total plaster work area


Plaster thickness 20 mm total mortar required
Cement Mortar ratio 1 3 for joint and cover surfa
for dry volume
amt of cement bags for brick work
amt of sand

Roof Slab RCC

Slab Area 1 12.9 9.8


S1 2 8.1 0.23
S2 4 3 0.23
S3 3 4 0.23
S4 1 1.5 0.23
micclelaneous 1 2.315 0.23

Total RCC Slab Qty=


Staircase

inclined length
tread size
riser size

TOTAL QUANTITY OF CONCRETE

GROUND FLOOR

TOTAL QUANTITY OF CEMENT


TOTAL QUANTITY OF SAND
TOTAL QUANTITY OF AGGREGATE
TOTAL QUANTITY OF STEEL
TOTAL NUMBER OF BRICKS
Height/
Depth Quantity Unit Steel used/ footing
(in kg)
(m)

0.900 2.16 cu m

ty= 2.16 cu m Total steel

0.100 0.74 cu m
0.100 0.97 cu m
0.100 0.59 cu m
0.100 0.29 cu m
0.100 0.29 cu m

ty= 0.29 cu m Total steel

1.200 12.43 cu m
1.200 7.06 cu m
1.200 4.26 cu m
1.200 1.44 cu m

2.16 cu m
1.200 3.84 cu m
1.200 3.60 cu m
0 0 0
0 0 cu m
2.100 3.02 cu m
2.100 1.26 cu m
2.100 1.26 cu m
2.100 9.24 cu m
0.350 0.25 cu m
0 0 cu m

Thick Wall= 0.55 cu m


2.65 0.46 cu m
2.65 0.71 cu m

2.1 -0.36 cu m

1 0.00 cu m
1 -0.05 cu m
Thick Wall= 0.75 cu m
orks 1.30 cu m

quantity of mortar 0.30 cu m


uneven mortar joint wastage 0.34 cu m
for dry volume 0.43 cum
or brick work 2 bags
nd 516 kg

124.32 sq.m
127.584 sq.m
-0.92 sq.m
sq.m

147.882 sq.m
#DIV/0! sq.m
2.52 sq.m

rk area #DIV/0! sq.m


total mortar required #DIV/0! cu m
for joint and cover surfaces #DIV/0! cu m
for dry volume #DIV/0! cu m
or brick work #DIV/0! bags
nd #DIV/0! kg

0.1 12.64 cu m
0.1 0.37 cu m
0.1 0.28 cu m
0.1 0.28 cu m
0.1 0.03 cu m
0.1 0.05 cu m

Qty= 13.65 cu m Total steel


m
m
m

F CONCRETE 16.10 cu m
WET VOLUME 24.5430 cu m concrete grade

GROUND FLOOR

OF CEMENT Err:507 bags


OF SAND Err:507 kgs
AGGREGATE Err:507 kgs
OF STEEL 0.000 tonnage
OF BRICKS 648.84 bricks
Total steel in tonnage

0.000
0.000
0
0.000

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.000
20

Mix Design Cement


M-15 Err:507

Volume Dimension
Length

VOLUME OF CONCRETE

CEMENT
BAGS
Err:507

SAND
CUM
Err:507
Err:507
AGGREGATE
CUM
Err:507
Sr. No.

3
4

5
6

Sand Aggregate Sum of mix


Err:507 Err:507 Err:507

60 Width 1
Err:507 Err:507
7.5 11.55

CUM CUF KG
Err:507 Err:507 Err:507

CFT KG Err:507
Err:507 Err:507 Err:507
Err:507 Err:507 Err:507

CFT KG Err:507
Err:507 Err:507 Err:507
FIRST FLOOR
Width/
Item Description No. Length Breadth
(m)
(m)

Column Up to Slab Level RCC


Column C1 11 0.000 0.000
Column C2
Column C3
Total RCC Qty=
Slab Beam RCC

Beam B1 3 10.240 0.230


Beam B2 4 3.000 0.230
Beam B3 3 4.000 0.230
Beam B4 1 1.500 0.230
Beam B5 1 2.315 0.230
Beam B6
Total RCC Qty=
Brick Masonry  
Wall Brick Masonry thickness( in mm)= 230.000

Long Wall 3 10.240 0.230


Shot wall-1 3 3.000 0.230
Shot wall-1 1 3.000 0.230
Shot Wall-2 3 4.000 0.230
Now Deductions for opening(-)
Column 11 0.230
Window W 2 2.000 0.230
Window W1 2 1.500 0.230
Window W2 3 1.200 0.230
Window W3 1 1.200 0.230
Door o 2 1.200 0.230
Door D 1 1.200 0.230
Door D1 1 1.000 0.230
Door MS 1 2.000 0.230
Vent 1 0.900 0.230
Vent V1 1 0.600 0.230

Total Qty 230 mm Thick Wall=


Wall Brick Masonry thickness( in mm)= 115.000
Bath Room 1 1.500 0.115
Passage wall 1 2.315 0.115
Deduction
Door D2 2 0.750 0.115
Parapet Wall
Long Wall 2 0.000 0.115
Shot Wall 2 -0.230 0.115
Total Qty 115 mm Thick Wall=
total brick works

quantity of mortar
uneven mortar joint wastage
for dry volume
amt of cement bags for brick work
amt of sand
Cement Plaster Works

long wall
Short wall
Parapet wall
Tower
Now deducton for opening (-)
Doors total
Windows total
Vents total

Total plaster work area


Plaster thickness 20 mm total mortar required
Cement Mortar ratio 1 3 for joint and cover surfaces
for dry volume
amt of cement bags for brick work
amt of sand

Roof Slab RCC

Slab Area 1 10.24 7.69


S1 3 10.24 0.23
S2 4 3 0.23
S3 3 4 0.23
S4 1 1.5 0.23
micclelaneous 1 2.315 0.23

Total RCC Slab Qty=


Staircase

inclined length
tread size
riser size

TOTAL QUANTITY OF CONCRETE

FIRST FLOOR

TOTAL QUANTITY OF CEMENT


TOTAL QUANTITY OF SAND
TOTAL QUANTITY OF AGGREGATE
TOTAL QUANTITY OF STEEL
TOTAL NUMBER OF BRICKS

Height 0.125
Height/
Depth Quantity Unit Steel used/
footing (in kg)
(m)

2.650 0.00 cu m

Total RCC Qty= 0.00 cu m Total steel

0.600 4.24 cu m
0.600 1.66 cu m
0.600 1.66 cu m
0.600 0.21 cu m
0.600 0.32 cu m

Total RCC Qty= 0.32 cu m Total steel

2.650 18.72 cu m
2.650 5.49 cu m
1.200 0.83 cu m
2.650 7.31 cu m

0.00 cu m
1.200 1.10 cu m
1.200 0.83 cu m
1.200 0.99 cu m
1.500 0.41 cu m
2.100 1.16 cu m
2.100 0.58 cu m
2.100 0.48 cu m
1.200 0.55 cu m
0.600 0.12 cu m
0.600 0.08 cu m

tal Qty 230 mm Thick Wall= 26.03 cu m


2.65 0.46 cu m
2.65 0.71 cu m

2.1 -0.36 cu m

1 0.00 cu m
1 -0.05 cu m
tal Qty 115 mm Thick Wall= 0.75 cu m
total brick works 26.78 cu m

quantity of mortar 6.17 cu m


uneven mortar joint wastage 7.10 cu m
for dry volume 8.87 cum
of cement bags for brick work 51 bags
amt of sand 10647 kg

162.816 sq.m
118.5 sq.m
-0.92 sq.m
sq.m

24.12 sq.m
29.04 sq.m
1.8 sq.m

Total plaster work area 225.44 sq.m


total mortar required 4.50872 cu m
for joint and cover surfaces 5.861336 cu m
for dry volume 7.32667 cu m
of cement bags for brick work 52.3 bags
amt of sand 8517 kg

0.1 7.87 cu m
0.35 2.47 cu m
0.35 0.97 cu m
0.35 0.97 cu m
0.35 0.12 cu m
0.35 0.19 cu m

Total RCC Slab Qty= 12.59 cu m Total steel


m
m
m

TAL QUANTITY OF CONCRETE 12.91 cu m


WET VOLUME 19.6689 cu m concrete grade

FIRST FLOOR

TAL QUANTITY OF CEMENT Err:507 bags


OTAL QUANTITY OF SAND Err:507 kgs
AL QUANTITY OF AGGREGATE Err:507 kgs
OTAL QUANTITY OF STEEL 0.000 tonnage
OTAL NUMBER OF BRICKS 13389.21 bricks
Total steel in tonnage Sr. No.

1
0.000
0.000
0
0.000
2
0.000
0.000
0.000
0.000
0.000
0.000
0.000

3
4

0.000
0.000
0.000
0.000
0.000
0.000

0.000
6

25
SECOND FLOOR
Width/
Item Description No. Length Breadth
(m)
(m)

Column Up to Slab Level RCC


Column C1 11 0.000 0.000
Column C2
Column C3
Total RCC Qty=
Slab Beam RCC

Beam B1 3 10.240 0.230


Beam B2 4 3.000 0.230
Beam B3 3 4.000 0.230
Beam B4 1 1.500 0.230
Beam B5 1 2.315 0.230
Beam B6
Total RCC Qty=
Brick Masonry  
Wall Brick Masonry thickness( in mm)= 230.000

Long Wall 3 10.240 0.230


Shot wall-1 3 3.000 0.230
Shot wall-1 1 3.000 0.230
Shot Wall-2 3 4.000 0.230
Now Deductions for opening(-)
Column 11 0.230
Window W 2 2.000 0.230
Window W1 2 1.500 0.230
Window W2 3 1.200 0.230
Window W3 1 1.200 0.230
Door o 2 1.500 0.230
Door D 1 1.200 0.230
Door D1 1 1.500 0.230
Door MS 1 2.000 0.230
Vent 1 0.900 0.230
Vent V1 1 0.600 0.230

Total Qty 230 mm Thick Wall=


Wall Brick Masonry thickness( in mm)= 115.000
Bath Room 1 1.500 0.115
Passage wall 1 2.315 0.115
Deduction
Door D2 2 0.750 0.115
Parapet Wall
Long Wall 2 0.000 0.115
Shot Wall 2 -0.230 0.115
Total Qty 115 mm Thick Wall=
total brick works

quantity of mortar
uneven mortar joint wastage
for dry volume
amt of cement bags for brick work
amt of sand
Cement Plaster Works

long wall
Short wall
Parapet wall
Tower
Now deducton for opening (-)
Doors total
Windows total
Vents total

Total plaster work area


Plaster thickness 20 mm total mortar required
Cement Mortar ratio 1 3 for joint and cover surfaces
for dry volume
amt of cement bags for brick work
amt of sand

Roof Slab RCC

Slab Area 1 10.24 7.69


S1 3 10.24 0.23
S2 4 3 0.23
S3 3 4 0.23
S4 1 1.5 0.23
micclelaneous 1 2.315 0.23

Total RCC Slab Qty=


Staircase

inclined length
tread size
riser size

TOTAL QUANTITY OF CONCRETE

SECOND FLOOR

TOTAL QUANTITY OF CEMENT


TOTAL QUANTITY OF SAND
TOTAL QUANTITY OF AGGREGATE
TOTAL QUANTITY OF STEEL
TOTAL NUMBER OF BRICKS
Height/
Depth Quantity Unit Steel used/ footing
(in kg)
(m)

2.650 0.00 cu m

CC Qty= 0.00 cu m Total steel

0.600 4.24 cu m
0.600 1.66 cu m
0.600 1.66 cu m
0.600 0.21 cu m
0.600 0.32 cu m

CC Qty= 0.32 cu m Total steel

2.650 18.72 cu m
2.650 5.49 cu m
1.200 0.83 cu m
2.650 7.31 cu m

0.00 cu m
1.200 1.10 cu m
1.200 0.83 cu m
1.200 0.99 cu m
1.500 0.41 cu m
2.100 1.45 cu m
2.100 0.58 cu m
2.100 0.72 cu m
1.200 0.55 cu m
0.600 0.12 cu m
0.600 0.08 cu m

mm Thick Wall= 25.50 cu m


2.65 0.46 cu m
2.65 0.71 cu m

2.1 -0.36 cu m

1 0.00 cu m
1 -0.05 cu m
mm Thick Wall= 0.75 cu m
ck works 26.25 cu m

quantity of mortar 6.05 cu m


uneven mortar joint wastage 6.96 cu m
for dry volume 8.70 cum
ags for brick work 50 bags
f sand 10436 kg

162.816 sq.m
118.5 sq.m
-0.92 sq.m
sq.m

28.74 sq.m
29.04 sq.m
1.8 sq.m

r work area 220.82 sq.m


total mortar required 4.41632 cu m
for joint and cover surfaces 5.741216 cu m
for dry volume 7.17652 cu m
ags for brick work 51.3 bags
f sand 8343 kg

0.1 7.87 cu m
0.35 2.47 cu m
0.35 0.97 cu m
0.35 0.97 cu m
0.35 0.12 cu m
0.35 0.19 cu m

Slab Qty= 12.59 cu m Total steel


m
m
m

Y OF CONCRETE 12.91 cu m
WET VOLUME 19.6689 cu m concrete grade

SECOND FLOOR

TY OF CEMENT Err:507 bags


TITY OF SAND Err:507 kgs
Y OF AGGREGATE Err:507 kgs
TITY OF STEEL 0.000 tonnage
ER OF BRICKS 13123.56 bricks
Total steel in tonnage

0.000
0.000
0
0.000

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.000
20