Rebar Works:
c.1. Footing up to Ground Floor Level:
Isolated Footing 121,695.44 kgs.
Footing Tie Beam 384,717.69 kgs.
Column 79,319.09 kgs.
Grade Beam 99,874.78 kgs.
Slab on Fill 124,034.40 kgs.
G.I. Wire no. 16 8,096.41 kgs.
Stair case 613.20 kgs.
c.2. Ground Floor Level to Roof Deck Level
Column 105,758.79 kgs.
Girder & Beams 456,006.71 kgs.
Suspended Slab 43,243.20 kgs.
G.I. Wire no. 16 6,050.09 kgs.
Stair case 1,226.40 kgs.
c.3. Roof Deck Level to Upper Roof Deck Level
Column 13,824.71 kgs.
Girder & Beams 21,697.20 kgs.
Suspended Slab 4,737.60 kgs.
G.I. Wire no. 16 402.60 kgs.
sub-total:
STP
Excavation 266.81 cu.m
Installation of rebar 4,001.72 kgs.
Formworks and Shoring: 87.36 sq.m.
Concreting Works 74.09 cu.m.
Pump Room
a.1. CHB Laying 41.33 sq.m.
a.2. Structural Framing
Rebar Installation 810.82 kgs.
Formworks 50.06 sq.m.
Concreting works 12.38 cu.m.
a.3. Plastering works 82.66 sq.m.
RETAINING WALL
Excavation 787.50 cu.m
Installation of rebar 66,622.50 kgs.
Formworks and Shoring: 2,220.75 sq.m.
Concreting Works 616.88 cu.m.
TOTAL AMOUNT
Unit Cost Amount % Weight % Weight
941,642.10 2.088%
2,500,000.00 5.543%
45,103,633.49 100.000%