1.1 Welder Test 86,350,000: Package

The document provides a cost breakdown for a gas pipeline project from MRS to the tie-in point of PT. CLARIANT in Manyar, Gresik, East Java. It lists the various preparation, construction, and installation activities required and provides unit costs and total costs for each item. Preparation activities include welder testing, temporary facilities, and mobilization/demobilization of manpower and equipment. Construction includes activities like cutting and beveling pipe, welding pipe, and welding fittings and flanges. The total estimated cost is Rp 1,333,900,998.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
540 views2 pages

1.1 Welder Test 86,350,000: Package

The document provides a cost breakdown for a gas pipeline project from MRS to the tie-in point of PT. CLARIANT in Manyar, Gresik, East Java. It lists the various preparation, construction, and installation activities required and provides unit costs and total costs for each item. Preparation activities include welder testing, temporary facilities, and mobilization/demobilization of manpower and equipment. Construction includes activities like cutting and beveling pipe, welding pipe, and welding fittings and flanges. The total estimated cost is Rp 1,333,900,998.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

RINCIAN BIAYA PEKERJAAN

Project : PEKERJAAN JARINGAN PIPA GAS JIIPE MANYAR - GRESIK Date: February 6, 2017
Package : Pengelasan Jalur Pipa Gas diameter 6" & 16" dari MRS ke Tie-in Point Area PT. CLARIANT Quotation # QV-AM.008.0802.17
Location : MANYAR - GRESIK JAWA TIMUR Customer ID: AM
Maincon : AGHATON MANDIRI Quotation valid until: March 8, 2017
Subcon : PT. VERTICAL Ref No: 0

SIZE MAT'L UNIT PRICE TOTAL PRICE


No. DESCRIPTIONS VOLUME
1 2 3 Class (Rp) (Rp)
1 PREPARATION 559,900,000
1.1 WELDER TEST 86,350,000
1.1.1 Pengadaan Matl, Cut & Bevel Pipe Spool 2" - 10", dan Penyediaan Tools & Equipment 1.00 Lots 31,350,000 31,350,000
1.1.2 Transportasi & Akamomodasi Team & Welder 1.00 Lots 24,750,000 24,750,000
1.1.4 Welder test 1.00 Lots 30,250,000 30,250,000
1.2 TEMPORARY FACILITY (Site Office & Facility Manpower (Camp)) 200,750,000
1.2.2 Site Office 1.00 Lots 77,000,000 77,000,000
1.2.3 Facility Manpower (Camp) 1.00 Lots 123,750,000 123,750,000
1.3 MOB - DEMOB Manpower & Equipment) 272,800,000
1.3.2 Mob -Demob Manpower 1.00 Lots 107,800,000 107,800,000
1.3.3 Mob -Demob Equipment & Tools 1.00 Lots 165,000,000 165,000,000
2 CONTRUCTRIONS 773,000,998
2.1 Cut & Bevel 164,716,076
2.1.1 PIPE 16" SCH 80 ERW, BE, API 5L GR.B ASME B36.10 16" 0 0 0 7.00 Jts 805,598 5,639,183
2.1.2 PIPE 16" SCH 40 ERW, BE, API 5L GR.B ASME B36.10 16" 0 0 0 148.00 Jts 671,331 99,357,040
2.1.3 PIPE 10" SCH 40 ERW, BE, API 5L GR.B ASME B36.10 10" 0 0 0 1.00 Jts 599,221 599,221
2.1.4 PIPE 6" SCH 40 ERW, BE, API 5L GR.B ASME B36.10 6" 0 0 0 141.00 Jts 359,533 50,694,088
2.1.5 PIPE 4" SCH 80 ERW, BE, API 5L GR.B ASME B36.10 4" 0 0 0 12.00 Jts 224,708 2,696,494
2.1.6 PIPE 2" SCH.80 SMLS ASTM A106 GR.B OR API 5L GRB.BE 2" 0 0 0 21.00 Jts 149,805 3,145,910
2.1.7 PIPE 1 1/2" SCH.80 SMLS ASTM A106 GR.B OR API 5L GRB.BE 1." 0 0 0 9.00 Jts 112,354 1,011,185
2.1.8 PIPE 3/4" SCH.80 SMLS ASTM A106 GR.B OR API 5L GRB.BE 3/4" 0 0 0 21.00 Jts 74,903 1,572,955
2.2 Welding Pipe 507,929,615
2.2.1 PIPE 16" SCH 80 ERW, BE, API 5L GR.B ASME B36.10 16" 0 0 0 5.00 Jts 3,016,606 15,083,028
2.2.2 PIPE 16" SCH 40 ERW, BE, API 5L GR.B ASME B36.10 16" 0 0 0 137.00 Jts 2,513,838 344,395,817
2.2.3 PIPE 10" SCH 40 ERW, BE, API 5L GR.B ASME B36.10 10" 0 0 0 1.00 Jts 1,508,416 1,508,416
2.2.4 PIPE 6" SCH 40 ERW, BE, API 5L GR.B ASME B36.10 6" 0 0 0 133.00 Jts 975,624 129,757,992
2.2.5 PIPE 4" SCH 80 ERW, BE, API 5L GR.B ASME B36.10 4" 0 0 0 11.00 Jts 670,020 7,370,220
2.2.6 PIPE 2" SCH.80 SMLS ASTM A106 GR.B OR API 5L GRB.BE 2" 0 0 0 18.00 Jts 360,152 6,482,736
2.2.7 PIPE 1 1/2" SCH.80 SMLS ASTM A106 GR.B OR API 5L GRB.BE 1." 0 0 0 7.00 Jts 270,114 1,890,798
2.2.8 PIPE 3/4" SCH.80 SMLS ASTM A106 GR.B OR API 5L GRB.BE 3/4" 0 0 0 16.00 Jts 90,038 1,440,608
2.3 Welding Fittings & Flange 100,355,306
2.3.1 HOT BEND 16" - 45 DEG, BW, SCH 40. API, 5L. GR.B 16" 0 0 0 14.00 ea 2,513,838 35,193,733
2.3.2 HOT BEND 16" - 90 DEG, BW, SCH 40. API, 5L. GR.B 16" 0 0 0 2.00 ea 2,513,838 5,027,676
2.3.3 HOT BEND 16" - 48 DEG, BW, SCH 40. API, 5L. GR.B 16" 0 0 0 1.00 ea 2,513,838 2,513,838
2.3.4 HOT BEND 16" - 12 DEG, BW, SCH 40. API, 5L. GR.B 16" 0 0 0 1.00 ea 2,513,838 2,513,838
2.3.5 HOT BEND 6" - 45 DEG, BW, SCH 40. API, 5L. GR.B 6" 0 0 0 7.00 ea 975,624 6,829,368
2.3.6 HOT BEND 6" - 27 DEG, BW, SCH 40. API, 5L. GR.B 6" 0 0 0 1.00 ea 975,624 975,624
2.3.7 ELBOW 6"-90 DEG. BW SCH. STD A234 GR. WPB 6" 0 0 0 10.00 ea 975,624 9,756,240
2.3.8 ELBOW 4"-90 DEG. BW SCH. STD A234 GR. WPB 4" 0 0 0 4.00 ea 670,020 2,680,080
2.3.9 CONC. RED 16"x10" SCH.STDxSCH.STD BW A234 WPB. ASME B16.9 16" 10" 0 0 1.00 ea 4,022,254 4,022,254
2.3.10 REDUCER ECCENTRIK 6"X4" BW SCH STD, A234 GR.WPB ASME B16.9 6" 4" 0 0 1.00 ea 1,645,644 1,645,644
2.3.11 REDUCE BUSING 3/4" X 1/2" " 1/2" 0 0 8.00 ea 180,076 1,440,608
2.3.12 BARRED TEE 16"X16", BW, SCH STD, A234, GR.WPB ASME B16.9 16" 16" 0 0 1.00 ea 5,027,676 5,027,676
2.3.13 BARRED TEE 6"X6", BW, SCH STD, A234, GR.WPB ASME B16.9 6" 6" 0 0 1.00 ea 1,658,561 1,658,561
2.3.14 TEE EQUAL 6" SCH.STD x SCH.STD BW ASTM A234 GR.WPB B16.9 6" 6" 6" 0 2.00 ea 1,951,248 3,902,496
2.3.15 WELDOLET 16" x 2" CS A105, CL 3000, MSS SP-97 16" 2" 0 0 3.00 ea 504,213 1,512,638
2.3.16 WELDOLET 6" x 2" SCH.40 x SCH.40 CL 3000, MSS SP-97 6" 2" 0 0 5.00 ea 504,213 2,521,064
2.3.17 WELDOLET 4" x 2" SCH.80 x SCH.80 CL 3000, MSS SP-97 4" 2" 0 0 2.00 ea 504,213 1,008,426
2.3.18 SOCKOLET 16" x 3/4" -3000# SW ASTM A105 16" " 0 3000# 2.00 ea 90,038 180,076
2.3.19 SOCKOLET 6" x 1 1/2" -3000# SW ASTM A105 6" 1." 0 3000# 1.00 ea 90,038 90,038
2.3.20 SOCKOLET 6" x 3/4" 3000# SW ASTM A105 6" 3/4" 0 3000# 4.00 ea 90,038 360,152
2.3.21 SOCKOLET 4" x 3/4" 3000# SW ASTM A105 4" 3/4" 0 3000# 2.00 ea 90,038 180,076
2.3.22 FLANGE 6" -300# R.F. W.N. SCH.STD CS A105, ASME B16.5 6" 0 0 300# 2.00 ea 975,624 1,951,248
2.3.23 FLANGE 2" -300# CS, A105, RF, 125-250 RMS 2" 0 0 300# 10.00 ea 360,152 3,601,520
2.3.24 FLANGE 1 1/2" -300# R.F. SCH.80 A105, 125-250 RMS 1." 0 0 300# 1.00 ea 270,114 270,114
2.3.25 FLANGE 3/4" -300# R.F. SCH.160 BORE ASTM A105 125-250 RMS 3/4" 0 0 300# 8.00 ea 90,038 720,304
2.3.26 FLANGE 3/4" -150# THREADED CS, A105, RF, 125-250 RMS 3/4" 0 0 150# 8.00 ea 90,038 720,304
2.3.27 PIPE NIPPLE POE X TOE 2" SCH.80 A106 GR. B 2" 0 0 0 9.00 ea 360,152 3,241,368
Page 1 of 2
SIZE MAT'L UNIT PRICE TOTAL PRICE
No. DESCRIPTIONS VOLUME
1 2 3 Class (Rp) (Rp)
2.3.28 PIPE NIPPLE POE 1 1/2" SCH.80 SMLS ASTM A106 GR. B 1." 0 0 0 1.00 ea 270,114 270,114
2.3.29 PIPE NIPPLE POE X TOE 3/4" SCH.80 ASTM A106 GR. B 3/4" 0 0 0 6.00 ea 90,038 540,228
3 COATING / WRAPPING PIPE -
3.1 Primer Coat - Mtr - -
3.2 Inner Wrapping - Mtr - -
3.3 Outer Wrapping - Mtr - -
4 DIGGING, BACKFILL & COMPACTED - -
4.1 Digging (1,5 mtr) - Mtr - -
4.2 Backfill & Comfacted - Mtr - -
5 RIVER CROSSING -
5.1 Lots -
5.2 Lots -
5.3 Lots -
6 TEST PACKAGE & HYDROTEST 335,500,000
6.1 TEST PACKAGE 1.00 Lots 60,500,000 60,500,000
6.2 HYDROTEST (MIGAS STANDARD) 1.00 Lots 275,000,000 275,000,000
7 TIE-IN, PURGING NETROGENT & GAS-IN 72,600,000
7.1 TIE-IN 1.00 lots - -
7.2 PURGING NETROGENT & GAS-IN 1.00 Lots 72,600,000 72,600,000
8 AS BUILT DRAWING -
8.1 As Built Drawing 1.00 lots - -
TOTAL (1+2+3+4++5+6+7+8) 1,741,000,998
NOTE: ROUNDED 1,741,000,000
yours faithfully
PT. VERTICAL

BADARUDIN

Page 2 of 2

Page 1 of 2
Project
:
Date:
Package
: Pengelasan Jalur Pipa Gas diameter 6" & 16" dari MRS ke Tie-in Point Area PT. CLARIANT
Page 2 of 2
MAT'L
1
2
3
Class
No.
 TOTAL PRICE 
(Rp) 
DESCRIPTIONS
SIZE
VOLUME
 UNIT PRICE 
(Rp) 
2.3.28
PIPE NIPPLE POE 1 1/