Page No__________
Project:
Location:
Owner:
Contractor:
Consultant:
1 2 3 Description
A. SUBSTRUCTURT
1. Earth Work
7.7
8.7 1.1 Site Excavation
1.5
1.5 1.4 Back Fill
2
0.2
0.2
2 Ddt. Ditto. For the columns
0.08
4 Total volume of net soil to be back filled around footing
17.68 pad
1.5. Cart Away
51.1555
C.A=T.S - B.F
17.68
C.A= (S.E+D.E+BE)-BF
C.A=((66.99*0.25)+(20.70+12.96)+(14.96*0.05))-17.68
=33.48
2. Stone Work
3.4
2.2. Hard Core
4.4
Total area of 25cm thic hard core
14.96
3. Concrete Work
3.2. Footing
4 1.5
1.5
0.25
2.25 Volume of concrete for the footing pad
4 0.2
0.2
2
Ditto but for the footing column
0.32
2.57 Total volume of concrete for the footing