156.8 m3 Isolated Footing F1 to the depth of 2.5m
and with working space of 0.25m
18 2.2
2.6
2.5
257.4 m3 Ditto but for F2
6 1.9
2
2.5
57 m3 Ditto but for F3
314.40 m3 Total volume of pit excavation
1 0.9
1.45 1.4 Trench excavation
30.7
16 3.3 L=(2.6-0.4-1.1)+2.2=3.3
0.4
1.5
31.68 m3 volume of masonary both on Y1 and Y2 And X1- X9
16 0.35
0.25
1.5
2.1 m3 deduction of column in pit volume on Y1 and Y2/X2-X9
29.58 m3 volume of masonary over lap on pit volume on
Y1 and Y2 /X2_X9 axis
2 1.95 L=1.15+0.8= 1.95
0.4
1.5
2.34 m3 volume of masonary on Y3 / X1 and X10
2 0.35
0.25
1.5
0.26 m3 deduction of column in pit volume on Y3/XI and X10
3
2.08 m volume of masonary on Y3 / X1 and X10
2 2
0.4
1.5
2.4 m3 volume of masonary on Y2' and Y1' / X1 and X10
2 0.25
0.3
1.5
0.23 m3 deduction of column in pit volume on Y2'&Y1'/X1&X10
3
2.18 m volume of masonary on Y2' and Y1' / X1 and X10
2 2.75
0.4
1.5
3.3 m3 volume of masonary on Y2' and Y1' / X1 and X10
2 0.35
0.25
1.5
0.26 m3 deduction of column in pit volume on Y2'&Y1'/X1&X10
3.04 m3 volume of masonary on Y2' and Y1' / X1 and X10
2 2.4
0.4
1.5
2.88 m3 Volume of masonary on Y1 / X1and X10
2 0.35
0.25
1.5
0.26 m3 deduction of column in pit volume on Y 1 /X1&X10
2.62 m3 volume of masonary on Y1 / X1and X10
3
63.37 m Total volume of masonary in footing
1 30.7 d. Volume of foundation walls
0.4
1.5 Back fill around wall X1- X10 on axis Y1
18.42 m3
1 26.2
0.4
1.5 Ditto but on axis Y2
3
15.72 m
1 31
0.4
1.5 Ditto but for axis Y3
3
18.6 m
8 5.6
0.4
1.5 Y1 - Y3 on axis X2-X9
26.88 m3
2 5.15
0.4
1.5 Y1 -Y3 ON axis X1 - X10
3
6.18 m
85.8 m3 total volum
volume of foundation wall
0.4
30.4 m2 leanconcrete for grade beam from y1 -y3 on x2-x9
1 18.4
0.4
7.36 m2 ditto fromy1-y2 on x1& x10
90.1 m2 total area covered by lean concrete under massonery
252.60 m2 Total area under footing grade beam &under massonary
2.2 Reinforced concrete with concrete C25 260kg/m3
fill in to formwork &vibrated around rainforced steel in m3
A. For issolated footing pad
8 2.3
2.3
0.55
23.28 m3 for F1
18 1.7
2.1
0.4
25.70 m3 ditto for F2
6 1.5
1.4
0.3
3.78 m3 ditto for F3
3
52.76 m Total RCC for footing pad
B. For foundation column
8 0.3
0.3
1.95
1.40 m3 reinforced concrete for F1& C1
18 0.35
0.25
2.1
3.31 m3 Ditto but for f2 & c2
6 0.3
0.25
2.2
0.99 m3 ditto but for f3 & c3
5.70 m3 total reinforced concrete for foundation column
58.46 m3 Total reinforced concrete for for footing pad & founda
tion column
C.Concrete for grade beam in m3
3 46.8
0.5
0.25
17.55 m3 grade beam on axis y1,y2 & y3 of x1 -x10
10 9.85
0.5
0.25
12.3125 m3 ditto but for X1 -X10 on y1,y2 &y3 axis
3
29.86 m Total concrete for grade beam
8 0.3 D. Concrete for Column in m3
0.3
2.7
1.94 m3 RC for C3
18 0.35
0.25
2.7
4.25 m3 ditto but for C2
6 0.3
0.25
2.7
1.22 m3 ditto but for C1
3
7.41 m total volume of RC concrete for basement column
1 46.3 E. Concrete for basement floor in m3
10.3
0.15
71.53 m3 volume of concrete for basement floor with grade beam
2 43.35
0.25
0.15
3.25 m3 from axis y1&y3 /x1-x10
1 43.05
0.25
0.15
1.61 m3 ditto on axis y2/y1-x10
16 4.75
0.25
0.15
2.85 m3 ditto but on axis x2-x9/y1-y2
1 18.4
0.25
0.15
0.69 m3 ditto but onaxis x1-x10/y1-y2
3
8.41 m total volume of grade beam deduction
2 10.85
0.12
2.60 m2 ditto but on axis X1 & X10 from Y1 -Y3
9.62 m2 Total form work for basement slab
d) Form work for basement column
8 2.6
2.7
56.16 m2 form work for C3
18 2.5
2.7
121.5 m2 ditto but for C2
6 2.2
2.7
35.64 M2 Ditto but for C1
2
213.3 m Total forwork required for basement column
e) Form work for shearwall
2 46.35
2.7
250.29 m2 form work on Y3 axis
2 0.2
2.7
1.08 m2 ditto but on X1 and X10 axis
2
251.37 m Total forwork required for shearwall
2.3 Expansion joint
0.4
4 43.75
0.15
26.25 m2 Area of expansion joint on axis Y1-Y3/X1-X10
18 9.8 2.70
0.15
26.46 m2 Area of expansion joint on axis X1-X10/ Y1-Y3
52.71 m2 Total Area of expansion joint 1.00
2 43.75 3. Masonary Work
0.4
1.5 massonery work on axis x1-x2/y1&y3
3
52.5 m
43.35
1 0.4
1.5 ditto but on axis x1-x10/ y2
26.01 m3
8 9.5
0.5
1.5 ditt but on axis y1-y2
3
38 m
2 9.25
0.4
1.5 ditto but on axis y1-y2/x1&x2
11.1 m3
127.61 m3 Total volume stone massonery for trench wall
0.17
11.305 m2 Riser formwork
4 3.5
1.8
25.2 m2 soffit form work of stair
Stair case B.
4 3.5
0.2
2.8 m2 flight form work
4 1.75
0.15
1.05 m2 landing form work axis
20 1.75
0.17
5.95 m2 Riser formwork
4 1.75
1.8
12.6 m2 soffit form work of stair
4 1.2
0.15
0.72 m2
65.725 m2
617.646 Total form work
3) Block works
2 46.3
3
277.8 m2 20cm thick HCB for ground floor wall in m2 with opening
2 10.3 and columns in front and rear
3
61.8 m2 Ditto but sides wall
1 5.11
3
15.33 Ditto but internal wall
2 2.15
3
12.9 Ditto but sides wall
2 46.3
3.15
291.69 m2 20cm thick HCB for first floor wall in front and rear
2 10.3
3.15
6.19
0.9
4 0.87
46.8
3.13 both left and right windows(W9)
D. Ground floor front french doors and windows
4.41 1.25
2 1.91
16.85 m2 window (W1) 2.76
4.2
4 2.64 6.19
2
44.35 m french doors (FD1)
4.35
2 2.64
22.97 m2 french doors (FD2)
2.71 doors and windows
E. First floor Front french
4.41
2 1.91 2.96 5.92
16.85 m2 window (W1)
4.2
4 2.64
44.35 m2 french doors (FD1)
4.35
2 2.64
22.97 french doors (FD2)
2
220.267 m total opening area
17 0.3
11.2
3
15.3 m2 ground column area
17 0.3
3.15
16.065 m2 first floor column area
31.37 m 2
total area of column 11.2
1 52.92
3
158.76 m2 2.81
1 90.88
3.15
` 286.27 m2
445.032 m2 Total 15cm thick HCB for ground & first floor wall in m 2
482.57 m2
0.5(b1+b2)*h=0.5*(31.17+46.8)*6.19=241.29
2 1.38
1.25
3.45 m2 deduct
479.12 m2
2 5.6
7.82
87.58 m2
11.2
2 2.96 a=0.5*11.2*7.82=43.79
2.71
16.04 m2
1 2.96
2.75
8.14 m2
590.89 m2 total area of roof cover
1 64.83 couping with harvey title sheet
64.83 for the main house
1 13.1
13.1 m2 Ditto but for veredah cover
2
77.93 m Total length of or dimenssion of coupping
with harvey title sheet
5) Carpentary work in ml
14 26.39
369.46 ml dia. 8 eucalyptus
42 46.8
1965.6 ml 50*40zigba
1 purlin for main house
560.79 ml 50*70 zigba rafter
27 23.58
636.66
2 43.56
87.12 ml 50*40zigba
purlin for veredah
6 12.37
74.22 ml dia. 8 eucalyptus
for veredah
2 20.96
41.92 ml dia. 8 eucalyptus
2 46.72
93.44 ml dia.12 eucalyptus
2 43.26
86.52 ml dia. 8 eucalyptus
2 27.78
55.56 ml dia.12 eucalyptus
2 28.68
57.36 ml dia.8 eucalyptus
2 13.44
26.88 ml dia.12 eucalyptus
2 6.78
13.56 ml dia. 12 eucalyptus
1 2
2 pcs W6 size 1.20*0.8m 4mm clear glass
1 1
1 pcs W7 size 1.4*0.7m
1 1
1 pcs W8 size1.5*0.4m
a.skerting for basement
1 10.48 m spesfic room for water closet ff ceramic tile
10.48
1 5.3
5.3 ml room ocoridor ff ceramic
1 5.2
5.2 ml room ocoridor ff ceramic
1 14.3
14.3 ml room of coridor ff ceramic tiles
1 13
13 ml for office room ff pvc tiles
1 27.8
27.8 ml for bank store ff terazzo tiles
1 37.6
37.6 ml for store room ff terazzo tiles
1 18.5
18.5 ml for store room ff terazzo tiles
1 15.2
15.2 ml for store room ff terazzo tiles
1 5.3
5.3 ml for water closet ff ceramic tiles
1 13.5
13.5 ml for ladies locker ff ceramic tiles
1 14.5
14.5 for gents locker ff ceramic tiles
1 9.4
9.4 for cold room ff ceramic tiles
77.98 ml ceramic tiles for basement
13 ml pvc tiles for basement
99.1 ml terazzo tile for basement
b.skerting for ground floor
1 47 47 ml room for bank inshurance ff PVC tiles
1 15.42 15.42 ml for office
1 4.3 4.3 ml for coridor
1 6.1 6.1 ml for water closet ff ceramic tiles
1 8.5 8.5 ml for stor ff terazzo piles
1 17.9 17.9 ml for shop ff PVC
1 47.1 47.1 ml coridor ff marble
1 25.3 25.3 ml for supper mart room ff pvc tiles
1 29.2
29.2 m2for dairy section ff terazzo tiles
426.32
c. finishing work for first floor
1 24
24 m2 for store ff terazzo tiles
4 2.4
9.6 m2 for coridor ff marble
1 42.3
42.3 m2 for water closet ff ceramic
1 117.1
117.1 m2 for shope ff pvc tiles
1 118.85
118.85 m2 for corridor ff marble
1 117.95
117.95 m2 for resturant ff pvc tiles
24 generally adding ff terazzo
128.45 m2 ffor all adding marble
42.3 m2 for all adding ceramic
235.05 m2 for all adding pvc tiles
429.8 m2 all area of finishing work for first floor
plastering for ground&first ground floor
445.03 m2 total area plaster of 15cm HCB wall
502.42 m2total areaplaster of 20 cmHCB wall
142 m2 total area plaster of beam
31.37 m2total area plaster of column
gypsum plastering
445.03 m2 total area plaster of 15cm HCB wall
gypsum plastering
502.42 m2 total areaplaster of 20 cmHCB wall
gypsum plastering
142 m2 total area plaster of beam gypsum plastering
31.37 m2 total area plaster of column gypsum plastering
3.22 m2 total gypsum plastering forstair case A landing
2.76 m2 total gypsum plastering forstair case A soffit slab
stair case plastering
2 0.262
2
2.5 m2plastering forstair case A landing
2 0.54
2
2.16 m2 plastering soffit slab for stair case A
2 0.18
2
0.72 m2 plastering stair case B landing
2 0.15
2
0.6 m2 plastering of stair case B soffit slab
painting work
a) toexternall wall surface &
exposed columns &
beams of ground floor.
1 551.12
551.12 m²
b) to internal wall surface &
exposed columns &
beams of first floor.
1 1175.8
1175.8 m²
c) to soffit surface of first
floor slab
1
421.49
421.49 m²
d) to stair case soffit
1 28.2
28.2 m²
for stair case
3.22 m2 total area of painting stair landing
2.76 m2total area of painting soffit slab for stair
connector of pipe in pc
40 for 110 diameter pipe
10 for 65 diameter pipe
8 for 50 diamter pipe
fixture in pcs
14 hand wash basin fixtures
2 shower fixtures
14 low flush water closet fixtures
2 kitchen sink fixtures
ELECTRICAL INSTALLATION
FOR BASEMENT
Distribution pannel boards
A) Floor stand distribution pannel board with
lockable door and other accesseries for
basement in pc
1 32 Amper MLPP main switch 3 phasefor f
basementlight
1 20 amper SLPP_BF/BK ACB 3 phase
1 32 AmperLPP_BF/GSS ACB 3phaase
lighting lamp in pc for basement
11 wall light point
8 ceiling light point
31 2*36 w florecent lamp
33 1*36w florecent lamp
10 single switch
6 two way switch
15 double switch
wire for basement floor lightining
245.1 ML wire with 2*2.5 size for basement lighting
socket system of basement flooor in pc
32 socket outlet
2 twin socket outlet
2 water heater
5.32 ML wire with3*2.5 size for water heater
110.56 ML wire with 3*2.5 size for socket outlet
9.58 ML wire for telephone line
10.64 ML wire for tele data
FOR GROUND FLOOR
lighting lamp in pcfor groundfloor
12 wall light point
4 ceiling light point
47 2*36 w florecent lamp
17 1*36w florecent lamp
7 single switch
2 two way switch
9 double switch
6 spot light incandescent 50 wat
wire in ml for ground foor
277.84 ML wire with 2*2.25 size for lightining system
144.53 ML wire with 3*2.5 size for socket outlet
54.22 ML wire for telephone line
76.63 ML wire for tele data
socket system for ground floor in pc
27 socket outlet
17 twin socket outlet
a. diam. 15 mm ml 63 -
b. diam. 20 mm ml 35 -
c. diam. 25 mm ml 4 -
12.01 single gate valve.
a) diam.15mm No 20
b) diam. 20mm No 10
c) diam. 32mm No 1
double gate valve
a) diam. 15 mm No 5 -
one way valve
a) diam 15 No 3
T joint No 28
12.02 SANITARY FIXTURES
Supply and install hand wash basin with stand
pedestal , Italy, made of white vitreous china
including cold and hot water mixer tap, plug, chain,
trap, and all required accessories of approved &
best quality.
Size: 500x405 mm No 14 -
Supply and install low flush water closet, Italy
made of white glazed vitreous china including low
flush cistern complete with universal mechanism &
float ball valve, including plastic seat with hard
cover,flexible pipe and all required accessories of
approved & best quality.
No 14 -
Supply and install shower units made of enameled
cast iron plate with slip resistant base including
chrome plated shower head, mixing valves, waste
water trap and all reqired accessories.
Size: 800x800 mm No 2 -
Supply and install kitchen sink in stainless steel
with chrome plated mixed valve, chain,plug, trap
and complete with all required accessories.
a. diam. 50 mm ml 23 -
b. diam. 80 mm ml 12 -
c. diam. 110 mm ml 53 -
12.05 elbo for waste water pipe
a. diam. 50mm ml 24 -
b. diam. 65 mm ml 4 -
c) diam 110mm ml 25 -
12.06 connector for waste water pipe
a) diam 50mm No 8
b) diam 65mm No 10
c) diam 110mm No 40
Total Carried to Summarry 0.00
0 0p
0 0 0
1.13
1.14
1.15
1.16
SUMMARY OF BILL OF QUANTITIES
FOR
2. Concrete Wor
3. Masonary Work
A. SUPER STRUCTURE
1. Concrete Work
2. Block Work
3. Carpentary Joinery
5. Glazing 0.00
6. Flooring 0.00
7. Finishing
8. Painting 0.00