PROJECT :- secondary school class room

CLIENT :-
CONSULTANT:-
LOCATIO :- DEBRE MARKOS, ETHIOPIA
TIMISINGDIMENTION SQUARING DESCRIPTION
supper stracture
1. CONCRETE WORK
1.1 FOR ELEVATED COLUMNS OF G+1

22 0.3
0.3
2.96 5.8608 m3 For C1
6 0.3
0.3
2.96 1.5984 m3 For C2
4 0.3
0.3
2.96 1.0656 m3 For C3
8.5248 Total concrete for elevated columns G+1
1.4 CONCRETE WORK FOR BEAMS ON G+1
2 22.42
0.2
0.48 4.30464 m3 For FB 1 and 5
2 9.154
0.2
0.48 1.757568 m3 For FB 6
4 10.585
0.2
0.48 4.06464 m3 For FB 7 and 8
1 13.94
0.2
0.48 1.33824 m3 For FB 2
2 3.89
0.2
0.48 0.74688 m3 For FB 3 and 4
18 0.2
0.48
0.4 0.6912 m3 Deduct the beam cross section multiplied by column depth.
11.520768 m3 Total concrete work for 1st floor beam or G+1

1.5 CONCRETE WORK FOR BEAMS ON G+2


2 22.42
0.2
0.48 4.30464 m3 For FB 1 and 5
2 9.154
0.2
0.48 1.757568 m3 For FB 6
4 10.585
0.2
0.48 4.06464 m3 For FB 7 and 8
1 13.94
0.2
0.48 1.33824 m3 For FB 2
2 3.89
0.2
0.48 0.74688 m3 For FB 3 and 4
18 0.2
0.48
0.4 0.6912 m3 Deduct the beam cross section multiplied by column depth.
11.520768 m3 Total concrete work for 1st floor beam or G+2

1.6 CONCRETE WORK FOR TOP TILE BEAM


2 22.42
0.2
0.3 2.6904 m3 For TTB 4&5
2 9.154
0.2
0.3 1.09848 m3 For TTB 6
4 10.585
0.2
0.3 2.5404 m3 For TTB 7&8
2 3.815
0.2
0.3 0.4578 m3 For TTB 2&3
1 13.9
0.2
0.3 0.834 m3 For TTB 1
18 0.2
0.3
0.4 0.432 m3 Deduct beam crossection multi[lied by column depth
7.18908 m3 Total C25 concrete for TTB

1.7 CONCRETE WORK FOR STAIRCASE


2 4.09 1. For landing
1.578
0.2 2.581608 m3 Cocrete work for landig
2. For steps
32 1.4
0.3
0.16 2.1504 m3 Concrete work for steps
4.732008 m3 total concrete work for stair
1.8 RIPED SLAB(1'ST&2'NDFLOOR SLAB)
1.8.1CONCRETE WORKM FOR SOLID SLAB NEARER T
COLUMNS AND SOLID BEAMS ON RIPED SLAB
2 0.05
0.305 0.0305 m2 on axis 1 and 6
2 0.2
0.505 0.202 m2 Total with ribed slab depth on axis 1 and 6 on ''A''
8 0.05
0.053 0.0212 m2 Total with ribed slab depth on axis C and D
4 0.2
0.505 0.404 m2 Total with ribed slab depth
6 0.165
0.505 0.49995 m2 on axis 2 and 5
6 0.2
0.505 0.606 m2
24 0.025
0.053 0.0318 m2 Total with ribed slab thickness on axis A, B, &C
6 0.05
0.305 0.0915 m2 ON Axis 3 to left and 4 to right
6 0.175 Total concrete work with a ribed slab depth on
0.505 0.53025 m2 axis A,B, and C
24 0.04 Concrete work at edge of solid beam parallel to
0.505 0.4848 m2 solid beam and HCB length
24 0.05
0.505 0.606 m2 For panel 1,2,A,D&5,6 A,B
28 0.04 Total concrete work with a ribed slab depth for panel
0.505 0.5656 m2 2,3 A~ D & 4,5 A~,D
28 0.05
0.505 0.707 m2 Total concrete with ribeed slab depth
28 0.04
0.05 0.056 m2 Total with ribed slab thickness
4.8366
1.8.2CONCRETE WORK AT A JOINT B/N PRECAST BEA
AND SOLID BEAM
45 0.2
0.08 0.72 m2 End to end concrete work of precat beam on solid beam
30 0.16

0.08 0.384 m2 1 end concncrete of precast beam on solid beam


1.8.3CONCRETEWORK ON RIPED SLAB HCB(1'ST&2'ND
COCNCETE WORK FOR RIBED SLAB
(=total slab area-solid beam area-precast beam area)
179.2m2-10.086m2-3.456m2-2.88m2=162.778m2
1 162.77 162.77 With a depth of 0.094m
2 0.094 15.30038
21.24098 TOTAL CONCRETE WORK AT RIPED SLAB with.094

30 5.025
0.12 precast beam expresed in pcs
0.06 30 pcs Precast beam 1(WITH 5.025M LENGTH)
36 4.015
0.12
0.06 36 pcs Precast bam 2(WITH 4.025 M LENGYH)
PROPS FOR 1'ST FLOOR SLAB
2 13.94
0.535 14.9158 m2 b/n axis 2,5 and A~, A
8 22.02
0.535 94.2456 m2 B/n axis 1,6 A,B~ and 1, 6 B'' D
14 8.84
0.535 66.2116 m2 B/n axis 1, 3, B` B'' and 4,6 B` B''
173.373 total area of props for 1'st floor slab
PROPS FOR 1'ST FLOOR SLAB
2 13.94
0.535 14.9158 m2 b/n axis 2,5 and A~, A
8 22.02
0.535 94.2456 m2 B/n axis 1,6 A,B~ and 1, 6 B'' D
14 8.84
0.535 66.2116 m2 B/n axis 1, 3, B` B'' and 4,6 B` B''
173.373 total area of props for 2'nd floor slab
form work
for elevated column
perimeterxheight
G +0

36 3.744 P=2(0.25X2.88+0.4X2.88)=3.74
2.88
388.17792 TOTAL FORM WORK FOR G+0&G+1
4 4.03 p1 =2(.3x2.88+.4x2.88)=4.03m
2.88 P2=2(0.25X2.880+0.4X2.880=3.74
46.4256 FOR C2&C2'
14 3.74
2.88 150.7968 FOR C1,C3,C4.C5&C6
585.40032 FORM WORK FOR ELEVATED COLUMN

TOTAL FORM WORK FORCOLUMN

FORMWORK FOR G+0 BEAM


Beam overlapping must be deducted
formwork overlapping I,e 0.025 m must be added in to
8.453 opposite sides of sofit
4 0.48 For beam on axis 1 and 5
8.053 16.22976 m2 Exterior form work
4 0.48
8.453 15.46176 m2 Interior form work
2 0.25
14.34 4.2265 m2 Sofit
2 0.48 For beams on axis 10
13.54 13.7664 m2 Exterior form work
2 0.48
14.34 12.9984 m2 Interior form work
1 0.25
9.385 3.585 m2 Sofit
8 0.48 For beams on axis 2,3,4 and 5
9.185 36.0384 m2 Exterior form work
4 0.48
8.785 17.6352 m2 Interior form work for axis 2 and 5
4 0.48
9.385 16.8672 m2 Interior form work for axis 3 and 4
4 0.25
20.98 9.385 m2 Sofit
2 0.48 Beams on axis A
20.98 20.1408 m2 Exterior form work
2 0.48
20.98 20.1408 m2 Interior form work
1 0.25
22.02 5.245 m2 Sofit
2 0.48 For beams on axis D
21.22 21.1392 m2 Exterior form work
2 0.48
22.02 20.3712 m2 Interior form work
1 0.25
3.84 5.505 m2 Sofit
4 0.48 For beams on axis B~ and B~~
3.84 7.3728 m2 Exterior form work
4 0.48
3.84 7.3728 m2 inerior form work
2 0.25
1.92 m2 Sofit
M2

FORMWORK FOR G+1 BEAM


Beam overlapping must be deducted
formwork overlapping I,e 0.025 m must be added in to
8.453 opposite sides of sofit
4 0.48 For beam on axis 1 and 5
8.053 16.22976 m2 Exterior form work
4 0.48
8.453 15.46176 m2 Interior form work
2 0.25
14.34 4.2265 m2 Sofit
2 0.48 For beams on axis 10
13.54 13.7664 m2 Exterior form work
2 0.48
14.34 12.9984 m2 Interior form work
1 0.25
9.385 3.585 m2 Sofit
8 0.48 For beams on axis 2,3,4 and 5
9.185 36.0384 m2 Exterior form work
4 0.48
8.785 17.6352 m2 Interior form work for axis 2 and 5
4 0.48
9.385 16.8672 m2 Interior form work for axis 3 and 4
4 0.25
20.98 9.385 m2 Sofit
2 0.48 Beams on axis A
20.98 20.1408 m2 Exterior form work
2 0.48
20.98 20.1408 m2 Interior form work
1 0.25
22.02 5.245 m2 Sofit
2 0.48 For beams on axis D
21.22 21.1392 m2 Exterior form work
2 0.48
22.02 20.3712 m2 Interior form work
1 0.25
3.84 5.505 m2 Sofit
4 0.48 For beams on axis B~ and B~~
3.84 7.3728 m2 Exterior form work
4 0.48
3.84 7.3728 m2 inerior form work
2 0.25
1.92 m2 Sofit

FORMWORK FOR G+2 BEAM


Beam overlapping must be deducted
formwork overlapping I,e 0.025 m must be added in to
8.453 opposite sides of sofit
4 0.48 For beam on axis 1 and 5
8.053 16.22976 m2 Exterior form work
4 0.48
8.453 15.46176 m2 Interior form work
2 0.25
14.34 4.2265 m2 Sofit
2 0.48 For beams on axis 10
13.54 13.7664 m2 Exterior form work
2 0.48
14.34 12.9984 m2 Interior form work
1 0.25
9.385 3.585 m2 Sofit
8 0.48 For beams on axis 2,3,4 and 5
9.185 36.0384 m2 Exterior form work
4 0.48
8.785 17.6352 m2 Interior form work for axis 2 and 5
4 0.48
9.385 16.8672 m2 Interior form work for axis 3 and 4
4 0.25
20.98 9.385 m2 Sofit
2 0.48 Beams on axis A
20.98 20.1408 m2 Exterior form work
2 0.48
20.98 20.1408 m2 Interior form work
1 0.25
22.02 5.245 m2 Sofit
2 0.48 For beams on axis D
21.22 21.1392 m2 Exterior form work
2 0.48
22.02 20.3712 m2 Interior form work
1 0.25
3.84 5.505 m2 Sofit
4 0.48 For beams on axis B~ and B~~
3.84 7.3728 m2 Exterior form work
4 0.48
3.84 7.3728 m2 inerior form work
2 0.25
1.92 m2 Sofit

8.453 FORMWORK FOR TOP TILE BEAM


4 0.3
8.053 10.1436 m2 Exterior form work
4 0.3
8.453 9.6636 m2 interior form work
2 0.25
14.04 4.2265 m2 Sofit
2 0.3
13.54 8.424 m2 Exterior form work
2 0.3
14.34 8.124 m2 inerior form work
1 0.25
9.385 3.585 m2 Sofit
8 0.3
9.385 22.524 m2 Exterior form work
8 0.25
22.02 18.77 m2 Interior form work
4 0.3
22.02 26.424 m2 Sofit
2 0.3
21.22 13.212 m2 Exterior form work
2 0.3
22.02 12.732 m2 Interior form work
1 0.25
20.98 5.505 m2 Sofit
2 0.3
20.98 12.588 m2 Exterior form work
2 0.3
20.98 12.588 m2 Interior form work design
1 0.25
3.515 5.245 m2 Sofit
4 0.3
3.515 4.218 m2 Exterior form work
4 0.3
3.515 4.218 m2 Interior form work
2 0.25
1.7575 m2 Sofit

STAIRCASE
FORM WORK FOR STAIR
A) Form work for stair case
1. For landing
add 0.025 over loping at both sides
of widh and legth for sofit form
work
so, L= 4.09+2(0.025)
= 4.14 m
4.14 W = 1.578m + 2(0.025)
2 1.628 W = 1.628
4.09 13.47984 m2 Sofit for landing
2 0.2
1.578 1.636 m2 Infront face of the landing
2 0.2
0.6312 m2 In right and left side of the lading
2. For steps
Z2 = √(2.4)2 + √(1.44)2
Z = 2.8 m
Sofit form work for steps
L= 2.8m + 2(0.025)
W = 0.3m + 2(0.025)
L = 2.85 m
2.85 W = 0.35m
4 0.35
3.99 m2 Sofit form work for steps
ii) For raiser
1.4 L = 1.4m
32 0.16 W = 0.16 m
7.168 m2 Form work for raiser of stairs

2.8 iii) For stranger siides


8 0.2
4.48 m2 deduct it
0.3
32 0.16
1.536 m2
2.944 m2 Form work for straiger side
29.84904 total form work for stair

BLOCK WORK
HCB work
FOR G+0
A,External HCB 15 CM THICK
8.457 1,on axis 1&6
2 2.4
1.5 40.5936 m2 ddt
2 1.5 w1`
0.6 4.5 m2 ddt
2 0.7
0.84 m2 w4
35.2536 m2 Total HCB on axis 1&6
4.065 2,on axis A and below C parallel to A
2 2.4
1.2 19.512 m2 ddt
2 1.5 w2
3.6 m2
15.912 m2 total HCB on axis A and below C parallel to A
9.385 3,On axis 2&5
2 2.4
1 45.048 m2 ddt
2 2.4
4.8 m2
40.248 m2 Total HCB on axis 2&5
4.77 4,On axis 3&4
2 2.4
22.896 m2 Total HCB on axis 3&4
3.84 5,b/n axis 3&4 parallel to axis A
1 2.4
9.216 m2 Total HCB b/n 3&4 parallel to axis A
3.24 6,b/n axis 3&4 parallel to axis 3&4
1 2.4
7.776 m2 Total HCB b/n axis 3&4 parallel to axis 3&4
4.825 7,b/n axis 2&3 on axis C
1 2.4
0.6 11.58 m2 ddt
1 0.7
1.5 0.42 m2 w4
1 1.5
1 2.25 m2 w1`
1 2.4
2.4 m2 D1
6.51 m2 Total HCB b/n axis 2&3 on axis C
4.825 8, b/n axis 4&5 and on axis C
1 2.4
0.6 11.58 m2 ddt
1 0.7 w4
1.5 0.42 m2 ddt
1 1.5
1 2.25 m2 w1`
1 2.4
2.4 m2 D1
6.51 m2 Total HCB b/n axis 4&5 and axis C
13.941 9,axis parallel to axis A and above A
1 2.4
1 33.4584 m2 ddt
2 1.5
1.2 3 m2 w3
4 1.5
7.2 m2 w2
23.2584 m2 Total HCB on axis parallel to axis A and above A
3.74 10,On axis A and below axis C parallel to C
2 2.4
1.2 17.952 m2 ddt
2 1.5
3.6 m2 w2
14.352 m2 Total HCB On axis A and below axis C parallel to C
181.932 m2 Total HCB work for G+0
FOR G+1
8.457 1,on axis 1&6
2 2.4
1.5 40.5936 m2 ddt
2 1.5 w1`
0.6 4.5 m2 ddt
2 0.7
0.84 m2 w4
35.2536 m2 Total HCB on axis 1&6
4.065 2,on axis A and below C parallel to A
2 2.4
1.2 19.512 m2 ddt
2 1.5 w2
3.6 m2
15.912 m2 total HCB on axis A and below C parallel to A
9.385 3,On axis 2&5
2 2.4
1 45.048 m2 ddt
2 2.4
4.8 m2
40.248 m2 Total HCB on axis 2&5
4.77 4,On axis 3&4
2 2.4
22.896 m2 Total HCB on axis 3&4
3.84 5,b/n axis 3&4 parallel to axis A
1 2.4
9.216 m2 Total HCB b/n 3&4 parallel to axis A
3.24 6,b/n axis 3&4 parallel to axis 3&4
1 2.4
7.776 m2 Total HCB b/n axis 3&4 parallel to axis 3&4
4.825 7,b/n axis 2&3 on axis C
1 2.4
0.6 11.58 m2 ddt
1 0.7
1.5 0.42 m2 w4
1 1.5
1 2.25 m2 w1`
1 2.4
2.4 m2 D1
6.51 m2 Total HCB b/n axis 2&3 on axis C
4.825 8, b/n axis 4&5 and on axis C
1 2.4
0.6 11.58 m2 ddt
1 0.7 w4
1.5 0.42 m2 ddt
1 1.5
1 2.25 m2 w1`
1 2.4
2.4 m2 D1
6.51 m2 Total HCB b/n axis 4&5 and axis C
13.941 9,axis parallel to axis A and above A
1 2.4
1 33.4584 m2 ddt
2 1.5
1.2 3 m2 w3
4 1.5
7.2 m2 w2
23.2584 m2 Total HCB on axis parallel to axis A and above A
3.74 10,On axis A and below axis C parallel to C
2 2.4
1.2 17.952 m2 ddt
2 1.5
3.6 m2 w2
14.352 m2 Total HCB On axis A and below axis C parallel to C
13.89 11,On corrider
1 0.9
12.501 m2 Total HCB for corrider
194.433 m2 Total HCB work for G+1
FOR G+2
8.457 1,on axis 1&6
2 2.4
1.5 40.5936 m2 ddt
2 1.5 w1`
0.6 4.5 m2 ddt
2 0.7
0.84 m2 w4
35.2536 m2 Total HCB on axis 1&6
4.065 2,on axis A and below C parallel to A
2 2.4
1.2 19.512 m2 ddt
2 1.5 w2
3.6 m2
15.912 m2 total HCB on axis A and below C parallel to A
9.385 3,On axis 2&5
2 2.4
1 45.048 m2 ddt
2 2.4
4.8 m2
40.248 m2 Total HCB on axis 2&5
4.77 4,On axis 3&4
2 2.4
22.896 m2 Total HCB on axis 3&4
3.84 5,b/n axis 3&4 parallel to axis A
1 2.4
9.216 m2 Total HCB b/n 3&4 parallel to axis A
3.24 6,b/n axis 3&4 parallel to axis 3&4
1 2.4
7.776 m2 Total HCB b/n axis 3&4 parallel to axis 3&4
4.825 7,b/n axis 2&3 on axis C
1 2.4
0.6 11.58 m2 ddt
1 0.7
1.5 0.42 m2 w4
1 1.5
1 2.25 m2 w1`
1 2.4
2.4 m2 D1
6.51 m2 Total HCB b/n axis 2&3 on axis C
4.825 8, b/n axis 4&5 and on axis C
1 2.4
0.6 11.58 m2 ddt
1 0.7 w4
1.5 0.42 m2 ddt
1 1.5
1 2.25 m2 w1`
1 2.4
2.4 m2 D1
6.51 m2 Total HCB b/n axis 4&5 and axis C
13.941 9,axis parallel to axis A and above A
1 2.4
1 33.4584 m2 ddt
2 1.5
1.2 3 m2 w3
4 1.5
7.2 m2 w2
23.2584 m2 Total HCB on axis parallel to axis A and above A
3.74 10,On axis A and below axis C parallel to C
2 2.4
1.2 17.952 m2 ddt
2 1.5
3.6 m2 w2
14.352 m2 Total HCB On axis A and below axis C parallel to C
13.89 11,On corrider
1 0.9
12.501 m2 Total HCB for corrider
194.433 m2 Total HCB work for G+2
Internal Partition wall
10 CM THICK INTERNAL HCB
FOR G+0
1,b/n axis 1&2 bottom of B & b/n axis 5&6 bottom of B
1.8 1.1 For kitchen
2 2.4
8.64 m2 Total HCB for kitchen room
1.65 1.2 For toilet
2 2.4
0.7 7.92 m2 add
2 2.4
3.36 m2
11.28 m2 Total HCB for toilet room
1.65 1.3 Common wall for toilet &kitchen
1 2.4
3.96 m2 Total HCB for common rooms
2.95 2,b/n axis 2&3(toilet)
1 2.4
7.08 m2 Total HCB b/n axis 2&3
2.29 3,On axis 3&4 (toilet wall)
2 2.4
10.992 m2 Total HCB on axis 3&4 b/n kitchen and bed room
2.75 4,b/n axis 4&5
1 2.4
6.6 m2 Total HCB for wall b/n axis 4&5 (toilet)
52.1934 m2 Total HCB work for Internal partition wall
Agrostone interior wall
2.99 1.b/n axis 1,2,AB and 5,6,AB.
2 2.4
14.352 m2 Total agrostone b/n axis 1,2,AB and 5,6,AB(bed room)
0.95 2,b/n axis 1,2,BC and 5,6, BC
2 2.4
4.56 m2 Total agrostone b/n axis 1,2,BC and 5,6, BC
2.63 3,b/n axis 2&3 and 4&5
2 2.4
4.38 12.624 m2 For bed room1
2 2.4
21.024 m2 For bed room2
33.648 m2 Total for bed room(b/n axis 2,3 &4,5
0.2 4,On axis 2,3 and 3,4
1 2.4
0.48 m2 Total agrostone b/n 2,3 and 3,4
0.55 5,b/n axis 3&4
1 2.4
1.32 m2 Total HCB agrostone
0.21 6,b/n axis 4 ends on bottom for toilet room
1 2.4
0.504 m2 Total agrostone
54.864 m2 Total agrostone
FOR G+1
Internal Partition wall
1,b/n axis 1&2 bottom of B & b/n axis 5&6 bottom of B
1.8 1.1 For kitchen
2 2.4
8.64 m2 Total HCB for kitchen room
1.65 1.2 For toilet
2 2.4
0.7 7.92 m2 add
2 2.4
3.36 m2
11.28 m2 Total HCB for toilet room
1.65 1.3 Common wall for toilet &kitchen
1 2.4
3.96 m2 Total HCB for common rooms
2.95 2,b/n axis 2&3(toilet)
1 2.4
7.08 m2 Total HCB b/n axis 2&3
2.29 3,On axis 3&4 (toilet wall)
2 2.4
10.992 m2 Total HCB on axis 3&4 b/n kitchen and bed room
2.75 4,b/n axis 4&5
1 2.4
6.6 m2 Total HCB for wall b/n axis 4&5 (toilet)
52.194 m2 Total HCB work for Internal partition wall FOR G+1
Agrostone interior wall
2.99 1.b/n axis 1,2,AB and 5,6,AB.
2 2.4
14.352 m2 Total agrostone b/n axis 1,2,AB and 5,6,AB(bed room)
0.95 2,b/n axis 1,2,BC and 5,6, BC
2 2.4
4.56 m2 Total agrostone b/n axis 1,2,BC and 5,6, BC
2.63 3,b/n axis 2&3 and 4&5
2 2.4
4.38 12.624 m2 For bed room1
2 2.4
21.024 m2 For bed room2
33.648 m2 Total for bed room(b/n axis 2,3 &4,5
0.2 4,On axis 2,3 and 3,4
1 2.4
0.48 m2 Total agrostone b/n 2,3 and 3,4
0.55 5,b/n axis 3&4
1 2.4
1.32 m2 Total agrostone
0.21 6,b/n axis 4 ends on bottom for toilet room
1 2.4
0.504 m2 Total agrostone
54.864 m2 Total agrostone for G+1
FOR G+2
Internal Partition wall
1,b/n axis 1&2 bottom of B & b/n axis 5&6 bottom of B
1.8 1.1 For kitchen
2 2.58
9.288 m2 Total HCB for kitchen room
1.65 1.2 For toilet
2 2.58
0.7 8.514 m2 add
2 2.58
3.612 m2
12.126 m2 Total HCB for toilet room
1.65 1.3 Common wall for toilet &kitchen
1 2.58
4.257 m2 Total HCB for common rooms
2.95 2,b/n axis 2&3(toilet)
1 2.58
7.611 m2 Total HCB b/n axis 2&3
2.29 3,On axis 3&4 (toilet wall)
2 2.58
11.8164 m2 Total HCB on axis 3&4 b/n kitchen and bed room
2.75 4,b/n axis 4&5
1 2.58
7.095 m2 Total HCB for wall b/n axis 4&5 (toilet)
52.1934 m2 Total HCB work for Internal partition wall
Agrostone interior wall
2.99 1.b/n axis 1,2,AB and 5,6,AB.
2 2.58
15.4284 m2 Total agrostone b/n axis 1,2,AB and 5,6,AB(bed room)
0.95 2,b/n axis 1,2,BC and 5,6, BC
2 2.58
4.902 m2 Total agrostone b/n axis 1,2,BC and 5,6, BC
2.63 3,b/n axis 2&3 and 4&5
2 2.58
4.38 13.5708 m2 For bed room1
2 2.58
22.6008 m2 For bed room2
36.1716 m2 Total for bed room(b/n axis 2,3 &4,5
0.2 4,On axis 2,3 and 3,4
1 2.58
0.516 m2 Total agrostone b/n 2,3 and 3,4
0.55 5,b/n axis 3&4
1 2.58
1.419 m2 Total HCB agrostone
0.21 6,b/n axis 4 ends on bottom for toilet room
1 2.58
0.5418 m2 Total agrostone
54.864 m2 Total agrostone
15 RIBED SLAB HCB
2 19
17 558 pcs Deduduct 6 no of solid slab around the slab
2 24
10 804 pcs Deduduct 6 no of solid slab around the slab
1 19
186 pcs Deduduct 4 no of solid slab around the slab
1548 pcs Total HCB for ribed slab
14.34 ROOF COVER
1 12.09
173.3706 m2
m2 Total roof cover EGA 500 sheet

6.82 RIDGE
4
14.34 27.28 m
1
14.34 m
41.62 m Total ridge required
BATTEN
A) Zigba wood batten with c/c 50cm
B/N AXIS 2,5
ALONG LENGTH=14.14/0.5=28.28 WITH 10.986 LENGTH
ALONG WIDTH 10.986/0.5=22 WITH14.14 LENGTH
B/NAXSIS 1,2&5,6
ALONG LENGTH( 4.015/0.5=8)*2=16WITH9.35 LENGTH
28.28 ALONG WIDTH 9.35/0.5=18.7)=37.4 WITH4.003M LENGT
1 10.98

22 310.5144 M
1 14.14
311.08 M
8
2 9.35
149.6 M
18.7
2 4.003
149.7122 M
920.9066 M TOTAL BATTEN REQUIRED
CHEEP WOOD CEILING
DEDACT 0.6M AT ALL END CORNERS CEILING
B/N AXIS 2,5
ALONG LENGTH=14.14-0.6=13.54 M
ALONG WIDTH 10.986-0.6=10.38 M
B/NAXSIS 1,2&5,6
ALONG LENGTH( 4.015-0.6=3.42 M
13.54 ALONG WIDTH 9.35-0.6=8.75 M
1 10.38
3.42 140.5452 M2
2 8.75
59.85 M2
200.3952 M2 TOTAL CHEEP WOOD REQUIRED
DOWN PIPE
10.6 L=7.2M+(0.6*6M)=10.6M
8 84.8 M TOTAL LENGTH OF 80MM DIAPVCDOWN PIPEWITH D
SO ADD 60%ALLOWANCE
GUTTER
24.47 G-28 FLAT metal sheet guter with development length is 720m
2 11.325 48.94 m
2 22.65 m
71.59 m total gutter work
finishing work

floor finish
4.23 b/n a1,2&5,6
2 2.17 8.46 m2 for kitchen room
2 18.3 4.34 m2 for toilet room
2 9.55 36.6 m2 for living/dinning room
2 19.1 m2 for bed room

9.44 b/n axsis2,3&4,5


2 6.24 18.88 m2 for bed room1
2 23.9 12.48 m2 for bed room2
2 3.35 47.8 m2 for living/dinning room
2 6.7 m2 for toilet room

6.74 b/n axsis374


2 25.2 13.48 m2 for kitchen room
1 25.2 m2 forr corridor
167.84 total cement screed floor finish
25.2 total terazo tile floor finisn
FOR G+1
4.23 b/n a1,2&5,6
2 2.17 8.46 m2 for kitchen room
2 18.3 4.34 m2 for toilet room
2 9.55 36.6 m2 for living/dinning room
2 19.1 m2 for bed room

9.44 b/n axsis2,3&4,5


2 6.24 18.88 m2 for bed room1
2 23.9 12.48 m2 for bed room2
2 3.35 47.8 m2 for living/dinning room
2 6.7 m2 for toilet room

6.74 b/n axsis374


2 25.2 13.48 m2 for kitchen room
1 25.2 m2 forr corridor
167.84 total cement screed floor finish
25.2 total terazo tile floor finisn
FOR G+2
4.23 b/n a1,2&5,6
2 2.17 8.46 m2 for kitchen room
2 18.3 4.34 m2 for toilet room
2 9.55 36.6 m2 for living/dinning room
2 19.1 m2 for bed room

9.44 b/n axsis2,3&4,5


2 6.24 18.88 m2 for bed room1
2 23.9 12.48 m2 for bed room2
2 3.35 47.8 m2 for living/dinning room
2 6.7 m2 for toilet room

6.74 b/n axsis374


2 25.2 13.48 m2 for kitchen room
1 25.2 m2 forr corridor
167.84 total cement screed floor finish
25.2 total terazo tile floor finisn
503.52 toltal cement screed floor finish
75.6 total terazo tile floor finish

WALL FINISH
PLASTERING
WALLPLASTERING
A,External WALL PLASTERING
FOR G+0
EXTERIOR FACE
8.457 1,on axis 1&6
2 2.4
1.5 40.5936 m2 ddt
2 1.5 w1`
0.6 4.5 m2 ddt
2 0.7
0.84 m2 w4
35.2536 m2 Total HCB on axis 1&6
4.065 2,on axis A and below C parallel to A
2 2.4
1.2 19.512 m2 ddt
2 1.5 w2
3.6 m2
15.912 m2 total HCB on axis A and below C parallel to A
9.385 3,On axis 2&5
2 2.4
1 45.048 m2 ddt
2 2.4
4.8 m2
40.248 m2 Total HCB on axis 2&5
4.77 4,On axis 3&4
2 2.4
22.896 m2 Total HCB on axis 3&4
3.84 5,b/n axis 3&4 parallel to axis A
1 2.4
9.216 m2 Total HCB b/n 3&4 parallel to axis A
3.24 6,b/n axis 3&4 parallel to axis 3&4
1 2.4
7.776 m2 Total HCB b/n axis 3&4 parallel to axis 3&4
4.825 7,b/n axis 2&3 on axis C
1 2.4
0.6 11.58 m2 ddt
1 0.7
1.5 0.42 m2 w4
1 1.5
1 2.25 m2 w1`
1 2.4
2.4 m2 D1
6.51 m2 Total HCB b/n axis 2&3 on axis C
4.825 8, b/n axis 4&5 and on axis C
1 2.4
0.6 11.58 m2 ddt
1 0.7 w4
1.5 0.42 m2 ddt
1 1.5
1 2.25 m2 w1`
1 2.4
2.4 m2 D1
6.51 m2 Total HCB b/n axis 4&5 and axis C
13.941 9,axis parallel to axis A and above A
1 2.4
1 33.4584 m2 ddt
2 1.5
1.2 3 m2 w3
4 1.5
7.2 m2 w2
23.2584 m2 Total HCB on axis parallel to axis A and above A
3.74 10,On axis A and below axis C parallel to C
2 2.4
1.2 17.952 m2 ddt
2 1.5
3.6 m2 w2
14.352 m2 Total HCB On axis A and below axis C parallel to C
181.932
5.657 INTERIOR FACE
2 2.4
2.865 27.1536 m2 on axis 1 and 6
2 2.4
7.885 13.752 m2 on axis A and below axis C parallel to A
2 2.4
4.57 37.848 m2 On axis 2 and 5
2 2.4
3.64 21.936 m2 on axis 3 and 5
1 2.4
3.24 8.736 m2 b/n axis 3 and 4 parallel to axis A
1 2.4
1.625 7.776 m2 B/n axis 3 and 4 parallel to 3 and 4
1 2.4
1.625 3.9 m2 B/n 2 and 3 on axis C
1 2.4
7.141 3.9 m2 B/n axis 4 and 5 on axis C
1 2.4
2.865 17.1384 m2 axis parallel to axis A and above A
2 2.4
13.752 m2 on axis A and below axis C parallel to C
155.892
337.82 TOTAL EXTERIOR& INTERIOR

FOR G+1
EXTERIOR
8.457 1,on axis 1&6
2 2.4
1.5 40.5936 m2 ddt
2 1.5 w1`
0.6 4.5 m2 ddt
2 0.7
0.84 m2 w4
35.2536 m2 Total HCB on axis 1&6
4.065 2,on axis A and below C parallel to A
2 2.4
1.2 19.512 m2 ddt
2 1.5 w2
3.6 m2
15.912 m2 total HCB on axis A and below C parallel to A
9.385 3,On axis 2&5
2 2.4
1 45.048 m2 ddt
2 2.4
4.8 m2
40.248 m2 Total HCB on axis 2&5
4.77 4,On axis 3&4
2 2.4
22.896 m2 Total HCB on axis 3&4
3.84 5,b/n axis 3&4 parallel to axis A
1 2.4
9.216 m2 Total HCB b/n 3&4 parallel to axis A
3.24 6,b/n axis 3&4 parallel to axis 3&4
1 2.4
7.776 m2 Total HCB b/n axis 3&4 parallel to axis 3&4
4.825 7,b/n axis 2&3 on axis C
1 2.4
0.6 11.58 m2 ddt
1 0.7
1.5 0.42 m2 w4
1 1.5
1 2.25 m2 w1`
1 2.4
2.4 m2 D1
6.51 m2 Total HCB b/n axis 2&3 on axis C
4.825 8, b/n axis 4&5 and on axis C
1 2.4
0.6 11.58 m2 ddt
1 0.7 w4
1.5 0.42 m2 ddt
1 1.5
1 2.25 m2 w1`
1 2.4
2.4 m2 D1
6.51 m2 Total HCB b/n axis 4&5 and axis C
13.941 9,axis parallel to axis A and above A
1 2.4
1 33.4584 m2 ddt
2 1.5
1.2 3 m2 w3
4 1.5
7.2 m2 w2
23.2584 m2 Total HCB on axis parallel to axis A and above A
3.74 10,On axis A and below axis C parallel to C
2 2.4
1.2 17.952 m2 ddt
2 1.5
3.6 m2 w2
14.352 m2 Total HCB On axis A and below axis C parallel to C
13.89 11,On corrider
1 0.9
12.501 m2 Total HCB for corrider
194.433
5.657 INTERIOR
2 2.4
2.865 27.1536 m2 on axis 1 and 6
2 2.4
7.885 13.752 m2 on axis A and below axis C parallel to A
2 2.4
4.57 37.848 m2 On axis 2 and 5
2 2.4
3.64 21.936 m2 on axis 3 and 5
1 2.4
3.24 8.736 m2 b/n axis 3 and 4 parallel to axis A
1 2.4
1.625 7.776 m2 B/n axis 3 and 4 parallel to 3 and 4
1 2.4
1.625 3.9 m2 B/n 2 and 3 on axis C
1 2.4
7.141 3.9 m2 B/n axis 4 and 5 on axis C
1 2.4
2.865 17.1384 m2 axis parallel to axis A and above A
2 2.4
13.752 m2 on axis A and below axis C parallel to C
155.892
350.32 TOTAL INTERIOR&EXTERIOR

G+2
EXTERIOR
8.457 1,on axis 1&6
2 2.4
1.5 40.5936 m2 ddt
2 1.5 w1`
0.6 4.5 m2 ddt
2 0.7
0.84 m2 w4
35.2536 m2 Total HCB on axis 1&6
4.065 2,on axis A and below C parallel to A
2 2.4
1.2 19.512 m2 ddt
2 1.5 w2
3.6 m2
15.912 m2 total HCB on axis A and below C parallel to A
9.385 3,On axis 2&5
2 2.4
1 45.048 m2 ddt
2 2.4
4.8 m2
40.248 m2 Total HCB on axis 2&5
4.77 4,On axis 3&4
2 2.4
22.896 m2 Total HCB on axis 3&4
3.84 5,b/n axis 3&4 parallel to axis A
1 2.4
9.216 m2 Total HCB b/n 3&4 parallel to axis A
3.24 6,b/n axis 3&4 parallel to axis 3&4
1 2.4
7.776 m2 Total HCB b/n axis 3&4 parallel to axis 3&4
4.825 7,b/n axis 2&3 on axis C
1 2.4
0.6 11.58 m2 ddt
1 0.7
1.5 0.42 m2 w4
1 1.5
1 2.25 m2 w1`
1 2.4
2.4 m2 D1
6.51 m2 Total HCB b/n axis 2&3 on axis C
4.825 8, b/n axis 4&5 and on axis C
1 2.4
0.6 11.58 m2 ddt
1 0.7 w4
1.5 0.42 m2 ddt
1 1.5
1 2.25 m2 w1`
1 2.4
2.4 m2 D1
6.51 m2 Total HCB b/n axis 4&5 and axis C
13.941 9,axis parallel to axis A and above A
1 2.4
1 33.4584 m2 ddt
2 1.5
1.2 3 m2 w3
4 1.5
7.2 m2 w2
23.2584 m2 Total HCB on axis parallel to axis A and above A
3.74 10,On axis A and below axis C parallel to C
2 2.4
1.2 17.952 m2 ddt
2 1.5
3.6 m2 w2
14.352 m2 Total HCB On axis A and below axis C parallel to C
13.89 11,On corrider
1 0.9
12.501 m2 Total HCB for corrider
194.433
5.657 INTERIOR
2 2.4
2.865 27.1536 m2 on axis 1 and 6
2 2.4
7.885 13.752 m2 on axis A and below axis C parallel to A
2 2.4
4.57 37.848 m2 On axis 2 and 5
2 2.4
3.64 21.936 m2 on axis 3 and 5
1 2.4
3.24 8.736 m2 b/n axis 3 and 4 parallel to axis A
1 2.4
1.625 7.776 m2 B/n axis 3 and 4 parallel to 3 and 4
1 2.4
1.625 3.9 m2 B/n 2 and 3 on axis C
1 2.4
7.141 3.9 m2 B/n axis 4 and 5 on axis C
1 2.4
2.865 17.1384 m2 axis parallel to axis A and above A
2 2.4
13.752 m2 on axis A and below axis C parallel to C
155.892
350.32 TOTAL INTERIOR&EXTERIOR

1038.46 TOTAL 2 Coat plasterd pointed&painted EXTERNAL W


378.10456 total beam plastering &painting
124.416 total colum plastering & painting
1434.72 m2 total 2 coat plastered pointed&painted wall

B INTERNAL WALL PLASTERING pointed & painting


EXTERIOR & INTERIOR FACE

5.657 FOR G+0


2 2.4
2.865 27.1536 m2 on axis 1 and 6
2 2.4
7.885 13.752 m2 on axis A and below axis C parallel to A
2 2.4
4.57 37.848 m2 On axis 2 and 5
2 2.4
3.64 21.936 m2 on axis 3 and 5
1 2.4
3.24 8.736 m2 b/n axis 3 and 4 parallel to axis A
1 2.4
1.625 7.776 m2 B/n axis 3 and 4 parallel to 3 and 4
1 2.4
1.625 3.9 m2 B/n 2 and 3 on axis C
1 2.4
7.141 3.9 m2 B/n axis 4 and 5 on axis C
1 2.4
2.865 17.1384 m2 axis parallel to axis A and above A
2 2.4
155.892 13.752 m2 on axis A and below axis C parallel to C
2 311.784 Total area of plastering &painting internal face
BOTH INTERNAL AND EXTERNAL FACE

5.657 FOR G+1


2 2.4
2.865 27.1536 m2 on axis 1 and 6
2 2.4
7.885 13.752 m2 on axis A and below axis C parallel to A
2 2.4
4.57 37.848 m2 On axis 2 and 5
2 2.4
3.64 21.936 m2 on axis 3 and 5
1 2.4
3.24 8.736 m2 b/n axis 3 and 4 parallel to axis A
1 2.4
1.625 7.776 m2 B/n axis 3 and 4 parallel to 3 and 4
1 2.4
1.625 3.9 m2 B/n 2 and 3 on axis C
1 2.4
7.141 3.9 m2 B/n axis 4 and 5 on axis C
1 2.4
2.865 17.1384 m2 axis parallel to axis A and above A
2 2.4
155.892 13.752 m2 on axis A and below axis C parallel to C
2 311.784 Total area of plastering&painting internal WALL
BOTH INTERNAL AND EXTERNAL FACE

5.657 FOR G+2


2 2.4
2.865 27.1536 m2 on axis 1 and 6
2 2.4
7.885 13.752 m2 on axis A and below axis C parallel to A
2 2.4
4.57 37.848 m2 On axis 2 and 5
2 2.4
3.64 21.936 m2 on axis 3 and 5
1 2.4
3.24 8.736 m2 b/n axis 3 and 4 parallel to axis A
1 2.4
1.625 7.776 m2 B/n axis 3 and 4 parallel to 3 and 4
1 2.4
1.625 3.9 m2 B/n 2 and 3 on axis C
1 2.4
7.141 3.9 m2 B/n axis 4 and 5 on axis C
1 2.4
2.865 17.1384 m2 axis parallel to axis A and above A
2 2.4
155.892 13.752 m2 on axis A and below axis C parallel to C
2 311.784 Total area of plastering&painting internal WALL
311.784 BOTH INTERNAL AND EXTERNAL FACE
3 935.352 Total 3 COAT area OF pointed PAINTED& PLASTERD in

BEAM PLASTERING
GREAD BEAM PLASTERING

22.42
6 0.4
4.09 53.808 m2 For grade beam 1,2.6
4 0.4
9.04 6.544 m For grade beam 5 and landing beam
4 0.4
9.354 14.464 m2 For grade beam 3 and 4
4 0.4
10.785 14.9664 m2 For grade beam 7
8 0.4
14.14 34.512 m2 For grade beam 8 and 9
2 0.4
11.312 m2 For grade beam 10
135.6064 total GB plastering both two face
2.42 FOR G+1 AND G+2
8 0.48
9.154 9.2928 m2 For G+1 FB1 and 5
8 0.48
10.585 35.15136 m2 For FB 6
16 0.48
13.34 81.2928 m2 For FB 7 and 8
4 0.48
3.89 25.6128 m2 For FB 2
8 0.48
14.9376 m2 For Fb 3 and 4
166.28736 Total Floor beam plastering
22.42 TOP TILE BEAM PLASSTERIG
4 0.3
9.154 26.904 m2 For TTB 4 and 5
4 0.3
10.585 10.9848 m2 For TTB 6
8 0.3
3.815 25.404 m2 For TTB 7 and 8
4 0.3
13.9 4.578 m2 For TTB 2 and 3
2 0.3
8.34 m2 For TTB 1
76.2108 Total Top tile beam plastering
378.10456 total beam plastering &painting

COLUMN PLASTERING
24 FOR G+0,G+1&G+2 for two face
0.4
2.88 27.648 m3 For C1
12
0.4
2.88 13.824 m3 For C2
12
0.4
2.88 13.824 m3 For C2`
12
0.4
2.88 13.824 m3 For C3
12
0.4
2.88 13.824 m3 For C4
24
0.4
2.88 27.648 m3 For C5
12
0.4
2.88 13.824 m3 For C6
124.416 total colum plastering & painting
* 3.84 SLAB PLASTERING
3.552
4 4.85 54.55872 m2
3.552
4 4.85 68.9088 m2
3.902
4 3.84 59.93472 m2
3.903
6 3.84 89.92512 m2
1.4
4 4.85 21.504 m2
4 1.13
4.85 21.922 m2
4 1.4
3.84 27.16 m2
2 1.13
3.84 8.6784 m2
2 2.38
18.2782 m2

18.2784 m2
370.87016 TOTAL AREA OF PLASTERING & PAINTING FOR G+O
POINTING
BEAM POINTING
22.42
6 0.4
4.09 53.808 m2 For grade beam 1,2.6
4 0.4
9.04 6.544 m For grade beam 5 and landing beam
4 0.4
9.354 14.464 m2 For grade beam 3 and 4
4 0.4
10.785 14.9664 m2 For grade beam 7
8 0.4
14.14 34.512 m2 For grade beam 8 and 9
2 0.4
11.312 m2 For grade beam 10
135.6064 TOTAL POINTING
2.42 FOR G+1 AND G+2
4 0.48
9.154 4.6464 m2 For G+1 FB1 and 5
4 0.48
10.585 17.57568 m2 For FB 6
8 0.48
13.34 40.6464 m2 For FB 7 and 8
2 0.48
3.89 12.8064 m2 For FB 2
4 0.48
7.4688 m2 For Fb 3 and 4
83.14368 Total Floor beam pointing
22.42 TOP TILE BEAM pointing
4 0.3
9.154 26.904 m2 For TTB 4 and 5
4 0.3
10.585 10.9848 m2 For TTB 6
8 0.3
3.815 25.404 m2 For TTB 7 and 8
4 0.3
13.9 4.578 m2 For TTB 2 and 3
2 0.3
8.34 m2 For TTB 1
76.2108 Total Top tile beam pointing
294.96088 total beam pointing
column pointing
24 FOR G+0,G+1&G+2 for two face
0.4
2.88 27.648 m2 For C1
12
0.4 m2
2.88 13.824 m2 For C2
12
0.4 m2
2.88 13.824 m2 For C2`
12
0.4 m2
2.88 13.824 m2 For C3
12
0.4
2.88 13.824 m2 For C4
24
0.4
2.88 27.648 m2 S
12
0.4
2.88 13.824 m2 For C6
124.416 total colum pointing
419.37688 total pointing

agrostone wall G+0,G+1,G+2


2.99 1.b/n axis 1,2,AB and 5,6,AB.
12 2.4
86.112 m2 Total agrostone b/n axis 1,2,AB and 5,6,AB(bed room)
0.95 2,b/n axis 1,2,BC and 5,6, BC
12 2.4
27.36 m2 Total agrostone b/n axis 1,2,BC and 5,6, BC
2.63 3,b/n axis 2&3 and 4&5
12 2.4
4.38 75.744 m2 For bed room1
12 2.4
126.144 m2 For bed room2
201.888 m2 Total for bed room(b/n axis 2,3 &4,5
0.2 4,On axis 2,3 and 3,4
2.4
0 m2 Total agrostone b/n 2,3 and 3,4
0.55 5,b/n axis 3&4
6 2.4
7.92 m2 Total agrostone
0.21 6,b/n axis 4 ends on bottom for toilet room
6 2.4
3.024 m2 Total agrostone
326.304 Total PAINTED AGRO STONE WALL
1261.656 M2 TOTAL INTERIOR PAINTED WALL
cheep wood ceiling
200.39 total painted cheep wood ceiling
MS ON G+1

plied by column depth.

MS ON G+2
plied by column depth.

TILE BEAM

y column depth
LID SLAB NEARER TO
N RIPED SLAB

and 6 on ''A''

s A, B, &C

depth on

parallel to

depth for panel

NT B/N PRECAST BEAM

eam on solid beam


solid beam
SLAB HCB(1'ST&2'NDSLAB)

cast beam area)


162.778m2

PED SLAB with.094


ust be added in to
ust be added in to
ust be added in to
and above A

C parallel to C
and above A

C parallel to C
and above A

C parallel to C
5&6 bottom of B

nd bed room

,6,AB(bed room)
5&6 bottom of B

nd bed room

n wall FOR G+1

,6,AB(bed room)
5&6 bottom of B

nd bed room

,6,AB(bed room)
WITH 10.986 LENGTH
H14.14 LENGTH

6WITH9.35 LENGTH
4 WITH4.003M LENGTH
NERS CEILING

VCDOWN PIPEWITH DEVELOPING LENGTH OF6 M

velopment length is 720mm


and above A

C parallel to C
and above A

C parallel to C
and above A

C parallel to C
&painted EXTERNAL WALL

G pointed & painting


ernal face
ernal WALL

ernal WALL

NTED& PLASTERD internal WALLFOR G+0, G+1 G+2


PAINTING FOR G+O & G+1
,6,AB(bed room)

You might also like