Professional Documents
Culture Documents
CLIENT :-
CONSULTANT:-
LOCATIO :- DEBRE MARKOS, ETHIOPIA
TIMISINGDIMENTION SQUARING DESCRIPTION
supper stracture
1. CONCRETE WORK
1.1 FOR ELEVATED COLUMNS OF G+1
22 0.3
0.3
2.96 5.8608 m3 For C1
6 0.3
0.3
2.96 1.5984 m3 For C2
4 0.3
0.3
2.96 1.0656 m3 For C3
8.5248 Total concrete for elevated columns G+1
1.4 CONCRETE WORK FOR BEAMS ON G+1
2 22.42
0.2
0.48 4.30464 m3 For FB 1 and 5
2 9.154
0.2
0.48 1.757568 m3 For FB 6
4 10.585
0.2
0.48 4.06464 m3 For FB 7 and 8
1 13.94
0.2
0.48 1.33824 m3 For FB 2
2 3.89
0.2
0.48 0.74688 m3 For FB 3 and 4
18 0.2
0.48
0.4 0.6912 m3 Deduct the beam cross section multiplied by column depth.
11.520768 m3 Total concrete work for 1st floor beam or G+1
30 5.025
0.12 precast beam expresed in pcs
0.06 30 pcs Precast beam 1(WITH 5.025M LENGTH)
36 4.015
0.12
0.06 36 pcs Precast bam 2(WITH 4.025 M LENGYH)
PROPS FOR 1'ST FLOOR SLAB
2 13.94
0.535 14.9158 m2 b/n axis 2,5 and A~, A
8 22.02
0.535 94.2456 m2 B/n axis 1,6 A,B~ and 1, 6 B'' D
14 8.84
0.535 66.2116 m2 B/n axis 1, 3, B` B'' and 4,6 B` B''
173.373 total area of props for 1'st floor slab
PROPS FOR 1'ST FLOOR SLAB
2 13.94
0.535 14.9158 m2 b/n axis 2,5 and A~, A
8 22.02
0.535 94.2456 m2 B/n axis 1,6 A,B~ and 1, 6 B'' D
14 8.84
0.535 66.2116 m2 B/n axis 1, 3, B` B'' and 4,6 B` B''
173.373 total area of props for 2'nd floor slab
form work
for elevated column
perimeterxheight
G +0
36 3.744 P=2(0.25X2.88+0.4X2.88)=3.74
2.88
388.17792 TOTAL FORM WORK FOR G+0&G+1
4 4.03 p1 =2(.3x2.88+.4x2.88)=4.03m
2.88 P2=2(0.25X2.880+0.4X2.880=3.74
46.4256 FOR C2&C2'
14 3.74
2.88 150.7968 FOR C1,C3,C4.C5&C6
585.40032 FORM WORK FOR ELEVATED COLUMN
STAIRCASE
FORM WORK FOR STAIR
A) Form work for stair case
1. For landing
add 0.025 over loping at both sides
of widh and legth for sofit form
work
so, L= 4.09+2(0.025)
= 4.14 m
4.14 W = 1.578m + 2(0.025)
2 1.628 W = 1.628
4.09 13.47984 m2 Sofit for landing
2 0.2
1.578 1.636 m2 Infront face of the landing
2 0.2
0.6312 m2 In right and left side of the lading
2. For steps
Z2 = √(2.4)2 + √(1.44)2
Z = 2.8 m
Sofit form work for steps
L= 2.8m + 2(0.025)
W = 0.3m + 2(0.025)
L = 2.85 m
2.85 W = 0.35m
4 0.35
3.99 m2 Sofit form work for steps
ii) For raiser
1.4 L = 1.4m
32 0.16 W = 0.16 m
7.168 m2 Form work for raiser of stairs
BLOCK WORK
HCB work
FOR G+0
A,External HCB 15 CM THICK
8.457 1,on axis 1&6
2 2.4
1.5 40.5936 m2 ddt
2 1.5 w1`
0.6 4.5 m2 ddt
2 0.7
0.84 m2 w4
35.2536 m2 Total HCB on axis 1&6
4.065 2,on axis A and below C parallel to A
2 2.4
1.2 19.512 m2 ddt
2 1.5 w2
3.6 m2
15.912 m2 total HCB on axis A and below C parallel to A
9.385 3,On axis 2&5
2 2.4
1 45.048 m2 ddt
2 2.4
4.8 m2
40.248 m2 Total HCB on axis 2&5
4.77 4,On axis 3&4
2 2.4
22.896 m2 Total HCB on axis 3&4
3.84 5,b/n axis 3&4 parallel to axis A
1 2.4
9.216 m2 Total HCB b/n 3&4 parallel to axis A
3.24 6,b/n axis 3&4 parallel to axis 3&4
1 2.4
7.776 m2 Total HCB b/n axis 3&4 parallel to axis 3&4
4.825 7,b/n axis 2&3 on axis C
1 2.4
0.6 11.58 m2 ddt
1 0.7
1.5 0.42 m2 w4
1 1.5
1 2.25 m2 w1`
1 2.4
2.4 m2 D1
6.51 m2 Total HCB b/n axis 2&3 on axis C
4.825 8, b/n axis 4&5 and on axis C
1 2.4
0.6 11.58 m2 ddt
1 0.7 w4
1.5 0.42 m2 ddt
1 1.5
1 2.25 m2 w1`
1 2.4
2.4 m2 D1
6.51 m2 Total HCB b/n axis 4&5 and axis C
13.941 9,axis parallel to axis A and above A
1 2.4
1 33.4584 m2 ddt
2 1.5
1.2 3 m2 w3
4 1.5
7.2 m2 w2
23.2584 m2 Total HCB on axis parallel to axis A and above A
3.74 10,On axis A and below axis C parallel to C
2 2.4
1.2 17.952 m2 ddt
2 1.5
3.6 m2 w2
14.352 m2 Total HCB On axis A and below axis C parallel to C
181.932 m2 Total HCB work for G+0
FOR G+1
8.457 1,on axis 1&6
2 2.4
1.5 40.5936 m2 ddt
2 1.5 w1`
0.6 4.5 m2 ddt
2 0.7
0.84 m2 w4
35.2536 m2 Total HCB on axis 1&6
4.065 2,on axis A and below C parallel to A
2 2.4
1.2 19.512 m2 ddt
2 1.5 w2
3.6 m2
15.912 m2 total HCB on axis A and below C parallel to A
9.385 3,On axis 2&5
2 2.4
1 45.048 m2 ddt
2 2.4
4.8 m2
40.248 m2 Total HCB on axis 2&5
4.77 4,On axis 3&4
2 2.4
22.896 m2 Total HCB on axis 3&4
3.84 5,b/n axis 3&4 parallel to axis A
1 2.4
9.216 m2 Total HCB b/n 3&4 parallel to axis A
3.24 6,b/n axis 3&4 parallel to axis 3&4
1 2.4
7.776 m2 Total HCB b/n axis 3&4 parallel to axis 3&4
4.825 7,b/n axis 2&3 on axis C
1 2.4
0.6 11.58 m2 ddt
1 0.7
1.5 0.42 m2 w4
1 1.5
1 2.25 m2 w1`
1 2.4
2.4 m2 D1
6.51 m2 Total HCB b/n axis 2&3 on axis C
4.825 8, b/n axis 4&5 and on axis C
1 2.4
0.6 11.58 m2 ddt
1 0.7 w4
1.5 0.42 m2 ddt
1 1.5
1 2.25 m2 w1`
1 2.4
2.4 m2 D1
6.51 m2 Total HCB b/n axis 4&5 and axis C
13.941 9,axis parallel to axis A and above A
1 2.4
1 33.4584 m2 ddt
2 1.5
1.2 3 m2 w3
4 1.5
7.2 m2 w2
23.2584 m2 Total HCB on axis parallel to axis A and above A
3.74 10,On axis A and below axis C parallel to C
2 2.4
1.2 17.952 m2 ddt
2 1.5
3.6 m2 w2
14.352 m2 Total HCB On axis A and below axis C parallel to C
13.89 11,On corrider
1 0.9
12.501 m2 Total HCB for corrider
194.433 m2 Total HCB work for G+1
FOR G+2
8.457 1,on axis 1&6
2 2.4
1.5 40.5936 m2 ddt
2 1.5 w1`
0.6 4.5 m2 ddt
2 0.7
0.84 m2 w4
35.2536 m2 Total HCB on axis 1&6
4.065 2,on axis A and below C parallel to A
2 2.4
1.2 19.512 m2 ddt
2 1.5 w2
3.6 m2
15.912 m2 total HCB on axis A and below C parallel to A
9.385 3,On axis 2&5
2 2.4
1 45.048 m2 ddt
2 2.4
4.8 m2
40.248 m2 Total HCB on axis 2&5
4.77 4,On axis 3&4
2 2.4
22.896 m2 Total HCB on axis 3&4
3.84 5,b/n axis 3&4 parallel to axis A
1 2.4
9.216 m2 Total HCB b/n 3&4 parallel to axis A
3.24 6,b/n axis 3&4 parallel to axis 3&4
1 2.4
7.776 m2 Total HCB b/n axis 3&4 parallel to axis 3&4
4.825 7,b/n axis 2&3 on axis C
1 2.4
0.6 11.58 m2 ddt
1 0.7
1.5 0.42 m2 w4
1 1.5
1 2.25 m2 w1`
1 2.4
2.4 m2 D1
6.51 m2 Total HCB b/n axis 2&3 on axis C
4.825 8, b/n axis 4&5 and on axis C
1 2.4
0.6 11.58 m2 ddt
1 0.7 w4
1.5 0.42 m2 ddt
1 1.5
1 2.25 m2 w1`
1 2.4
2.4 m2 D1
6.51 m2 Total HCB b/n axis 4&5 and axis C
13.941 9,axis parallel to axis A and above A
1 2.4
1 33.4584 m2 ddt
2 1.5
1.2 3 m2 w3
4 1.5
7.2 m2 w2
23.2584 m2 Total HCB on axis parallel to axis A and above A
3.74 10,On axis A and below axis C parallel to C
2 2.4
1.2 17.952 m2 ddt
2 1.5
3.6 m2 w2
14.352 m2 Total HCB On axis A and below axis C parallel to C
13.89 11,On corrider
1 0.9
12.501 m2 Total HCB for corrider
194.433 m2 Total HCB work for G+2
Internal Partition wall
10 CM THICK INTERNAL HCB
FOR G+0
1,b/n axis 1&2 bottom of B & b/n axis 5&6 bottom of B
1.8 1.1 For kitchen
2 2.4
8.64 m2 Total HCB for kitchen room
1.65 1.2 For toilet
2 2.4
0.7 7.92 m2 add
2 2.4
3.36 m2
11.28 m2 Total HCB for toilet room
1.65 1.3 Common wall for toilet &kitchen
1 2.4
3.96 m2 Total HCB for common rooms
2.95 2,b/n axis 2&3(toilet)
1 2.4
7.08 m2 Total HCB b/n axis 2&3
2.29 3,On axis 3&4 (toilet wall)
2 2.4
10.992 m2 Total HCB on axis 3&4 b/n kitchen and bed room
2.75 4,b/n axis 4&5
1 2.4
6.6 m2 Total HCB for wall b/n axis 4&5 (toilet)
52.1934 m2 Total HCB work for Internal partition wall
Agrostone interior wall
2.99 1.b/n axis 1,2,AB and 5,6,AB.
2 2.4
14.352 m2 Total agrostone b/n axis 1,2,AB and 5,6,AB(bed room)
0.95 2,b/n axis 1,2,BC and 5,6, BC
2 2.4
4.56 m2 Total agrostone b/n axis 1,2,BC and 5,6, BC
2.63 3,b/n axis 2&3 and 4&5
2 2.4
4.38 12.624 m2 For bed room1
2 2.4
21.024 m2 For bed room2
33.648 m2 Total for bed room(b/n axis 2,3 &4,5
0.2 4,On axis 2,3 and 3,4
1 2.4
0.48 m2 Total agrostone b/n 2,3 and 3,4
0.55 5,b/n axis 3&4
1 2.4
1.32 m2 Total HCB agrostone
0.21 6,b/n axis 4 ends on bottom for toilet room
1 2.4
0.504 m2 Total agrostone
54.864 m2 Total agrostone
FOR G+1
Internal Partition wall
1,b/n axis 1&2 bottom of B & b/n axis 5&6 bottom of B
1.8 1.1 For kitchen
2 2.4
8.64 m2 Total HCB for kitchen room
1.65 1.2 For toilet
2 2.4
0.7 7.92 m2 add
2 2.4
3.36 m2
11.28 m2 Total HCB for toilet room
1.65 1.3 Common wall for toilet &kitchen
1 2.4
3.96 m2 Total HCB for common rooms
2.95 2,b/n axis 2&3(toilet)
1 2.4
7.08 m2 Total HCB b/n axis 2&3
2.29 3,On axis 3&4 (toilet wall)
2 2.4
10.992 m2 Total HCB on axis 3&4 b/n kitchen and bed room
2.75 4,b/n axis 4&5
1 2.4
6.6 m2 Total HCB for wall b/n axis 4&5 (toilet)
52.194 m2 Total HCB work for Internal partition wall FOR G+1
Agrostone interior wall
2.99 1.b/n axis 1,2,AB and 5,6,AB.
2 2.4
14.352 m2 Total agrostone b/n axis 1,2,AB and 5,6,AB(bed room)
0.95 2,b/n axis 1,2,BC and 5,6, BC
2 2.4
4.56 m2 Total agrostone b/n axis 1,2,BC and 5,6, BC
2.63 3,b/n axis 2&3 and 4&5
2 2.4
4.38 12.624 m2 For bed room1
2 2.4
21.024 m2 For bed room2
33.648 m2 Total for bed room(b/n axis 2,3 &4,5
0.2 4,On axis 2,3 and 3,4
1 2.4
0.48 m2 Total agrostone b/n 2,3 and 3,4
0.55 5,b/n axis 3&4
1 2.4
1.32 m2 Total agrostone
0.21 6,b/n axis 4 ends on bottom for toilet room
1 2.4
0.504 m2 Total agrostone
54.864 m2 Total agrostone for G+1
FOR G+2
Internal Partition wall
1,b/n axis 1&2 bottom of B & b/n axis 5&6 bottom of B
1.8 1.1 For kitchen
2 2.58
9.288 m2 Total HCB for kitchen room
1.65 1.2 For toilet
2 2.58
0.7 8.514 m2 add
2 2.58
3.612 m2
12.126 m2 Total HCB for toilet room
1.65 1.3 Common wall for toilet &kitchen
1 2.58
4.257 m2 Total HCB for common rooms
2.95 2,b/n axis 2&3(toilet)
1 2.58
7.611 m2 Total HCB b/n axis 2&3
2.29 3,On axis 3&4 (toilet wall)
2 2.58
11.8164 m2 Total HCB on axis 3&4 b/n kitchen and bed room
2.75 4,b/n axis 4&5
1 2.58
7.095 m2 Total HCB for wall b/n axis 4&5 (toilet)
52.1934 m2 Total HCB work for Internal partition wall
Agrostone interior wall
2.99 1.b/n axis 1,2,AB and 5,6,AB.
2 2.58
15.4284 m2 Total agrostone b/n axis 1,2,AB and 5,6,AB(bed room)
0.95 2,b/n axis 1,2,BC and 5,6, BC
2 2.58
4.902 m2 Total agrostone b/n axis 1,2,BC and 5,6, BC
2.63 3,b/n axis 2&3 and 4&5
2 2.58
4.38 13.5708 m2 For bed room1
2 2.58
22.6008 m2 For bed room2
36.1716 m2 Total for bed room(b/n axis 2,3 &4,5
0.2 4,On axis 2,3 and 3,4
1 2.58
0.516 m2 Total agrostone b/n 2,3 and 3,4
0.55 5,b/n axis 3&4
1 2.58
1.419 m2 Total HCB agrostone
0.21 6,b/n axis 4 ends on bottom for toilet room
1 2.58
0.5418 m2 Total agrostone
54.864 m2 Total agrostone
15 RIBED SLAB HCB
2 19
17 558 pcs Deduduct 6 no of solid slab around the slab
2 24
10 804 pcs Deduduct 6 no of solid slab around the slab
1 19
186 pcs Deduduct 4 no of solid slab around the slab
1548 pcs Total HCB for ribed slab
14.34 ROOF COVER
1 12.09
173.3706 m2
m2 Total roof cover EGA 500 sheet
6.82 RIDGE
4
14.34 27.28 m
1
14.34 m
41.62 m Total ridge required
BATTEN
A) Zigba wood batten with c/c 50cm
B/N AXIS 2,5
ALONG LENGTH=14.14/0.5=28.28 WITH 10.986 LENGTH
ALONG WIDTH 10.986/0.5=22 WITH14.14 LENGTH
B/NAXSIS 1,2&5,6
ALONG LENGTH( 4.015/0.5=8)*2=16WITH9.35 LENGTH
28.28 ALONG WIDTH 9.35/0.5=18.7)=37.4 WITH4.003M LENGT
1 10.98
22 310.5144 M
1 14.14
311.08 M
8
2 9.35
149.6 M
18.7
2 4.003
149.7122 M
920.9066 M TOTAL BATTEN REQUIRED
CHEEP WOOD CEILING
DEDACT 0.6M AT ALL END CORNERS CEILING
B/N AXIS 2,5
ALONG LENGTH=14.14-0.6=13.54 M
ALONG WIDTH 10.986-0.6=10.38 M
B/NAXSIS 1,2&5,6
ALONG LENGTH( 4.015-0.6=3.42 M
13.54 ALONG WIDTH 9.35-0.6=8.75 M
1 10.38
3.42 140.5452 M2
2 8.75
59.85 M2
200.3952 M2 TOTAL CHEEP WOOD REQUIRED
DOWN PIPE
10.6 L=7.2M+(0.6*6M)=10.6M
8 84.8 M TOTAL LENGTH OF 80MM DIAPVCDOWN PIPEWITH D
SO ADD 60%ALLOWANCE
GUTTER
24.47 G-28 FLAT metal sheet guter with development length is 720m
2 11.325 48.94 m
2 22.65 m
71.59 m total gutter work
finishing work
floor finish
4.23 b/n a1,2&5,6
2 2.17 8.46 m2 for kitchen room
2 18.3 4.34 m2 for toilet room
2 9.55 36.6 m2 for living/dinning room
2 19.1 m2 for bed room
WALL FINISH
PLASTERING
WALLPLASTERING
A,External WALL PLASTERING
FOR G+0
EXTERIOR FACE
8.457 1,on axis 1&6
2 2.4
1.5 40.5936 m2 ddt
2 1.5 w1`
0.6 4.5 m2 ddt
2 0.7
0.84 m2 w4
35.2536 m2 Total HCB on axis 1&6
4.065 2,on axis A and below C parallel to A
2 2.4
1.2 19.512 m2 ddt
2 1.5 w2
3.6 m2
15.912 m2 total HCB on axis A and below C parallel to A
9.385 3,On axis 2&5
2 2.4
1 45.048 m2 ddt
2 2.4
4.8 m2
40.248 m2 Total HCB on axis 2&5
4.77 4,On axis 3&4
2 2.4
22.896 m2 Total HCB on axis 3&4
3.84 5,b/n axis 3&4 parallel to axis A
1 2.4
9.216 m2 Total HCB b/n 3&4 parallel to axis A
3.24 6,b/n axis 3&4 parallel to axis 3&4
1 2.4
7.776 m2 Total HCB b/n axis 3&4 parallel to axis 3&4
4.825 7,b/n axis 2&3 on axis C
1 2.4
0.6 11.58 m2 ddt
1 0.7
1.5 0.42 m2 w4
1 1.5
1 2.25 m2 w1`
1 2.4
2.4 m2 D1
6.51 m2 Total HCB b/n axis 2&3 on axis C
4.825 8, b/n axis 4&5 and on axis C
1 2.4
0.6 11.58 m2 ddt
1 0.7 w4
1.5 0.42 m2 ddt
1 1.5
1 2.25 m2 w1`
1 2.4
2.4 m2 D1
6.51 m2 Total HCB b/n axis 4&5 and axis C
13.941 9,axis parallel to axis A and above A
1 2.4
1 33.4584 m2 ddt
2 1.5
1.2 3 m2 w3
4 1.5
7.2 m2 w2
23.2584 m2 Total HCB on axis parallel to axis A and above A
3.74 10,On axis A and below axis C parallel to C
2 2.4
1.2 17.952 m2 ddt
2 1.5
3.6 m2 w2
14.352 m2 Total HCB On axis A and below axis C parallel to C
181.932
5.657 INTERIOR FACE
2 2.4
2.865 27.1536 m2 on axis 1 and 6
2 2.4
7.885 13.752 m2 on axis A and below axis C parallel to A
2 2.4
4.57 37.848 m2 On axis 2 and 5
2 2.4
3.64 21.936 m2 on axis 3 and 5
1 2.4
3.24 8.736 m2 b/n axis 3 and 4 parallel to axis A
1 2.4
1.625 7.776 m2 B/n axis 3 and 4 parallel to 3 and 4
1 2.4
1.625 3.9 m2 B/n 2 and 3 on axis C
1 2.4
7.141 3.9 m2 B/n axis 4 and 5 on axis C
1 2.4
2.865 17.1384 m2 axis parallel to axis A and above A
2 2.4
13.752 m2 on axis A and below axis C parallel to C
155.892
337.82 TOTAL EXTERIOR& INTERIOR
FOR G+1
EXTERIOR
8.457 1,on axis 1&6
2 2.4
1.5 40.5936 m2 ddt
2 1.5 w1`
0.6 4.5 m2 ddt
2 0.7
0.84 m2 w4
35.2536 m2 Total HCB on axis 1&6
4.065 2,on axis A and below C parallel to A
2 2.4
1.2 19.512 m2 ddt
2 1.5 w2
3.6 m2
15.912 m2 total HCB on axis A and below C parallel to A
9.385 3,On axis 2&5
2 2.4
1 45.048 m2 ddt
2 2.4
4.8 m2
40.248 m2 Total HCB on axis 2&5
4.77 4,On axis 3&4
2 2.4
22.896 m2 Total HCB on axis 3&4
3.84 5,b/n axis 3&4 parallel to axis A
1 2.4
9.216 m2 Total HCB b/n 3&4 parallel to axis A
3.24 6,b/n axis 3&4 parallel to axis 3&4
1 2.4
7.776 m2 Total HCB b/n axis 3&4 parallel to axis 3&4
4.825 7,b/n axis 2&3 on axis C
1 2.4
0.6 11.58 m2 ddt
1 0.7
1.5 0.42 m2 w4
1 1.5
1 2.25 m2 w1`
1 2.4
2.4 m2 D1
6.51 m2 Total HCB b/n axis 2&3 on axis C
4.825 8, b/n axis 4&5 and on axis C
1 2.4
0.6 11.58 m2 ddt
1 0.7 w4
1.5 0.42 m2 ddt
1 1.5
1 2.25 m2 w1`
1 2.4
2.4 m2 D1
6.51 m2 Total HCB b/n axis 4&5 and axis C
13.941 9,axis parallel to axis A and above A
1 2.4
1 33.4584 m2 ddt
2 1.5
1.2 3 m2 w3
4 1.5
7.2 m2 w2
23.2584 m2 Total HCB on axis parallel to axis A and above A
3.74 10,On axis A and below axis C parallel to C
2 2.4
1.2 17.952 m2 ddt
2 1.5
3.6 m2 w2
14.352 m2 Total HCB On axis A and below axis C parallel to C
13.89 11,On corrider
1 0.9
12.501 m2 Total HCB for corrider
194.433
5.657 INTERIOR
2 2.4
2.865 27.1536 m2 on axis 1 and 6
2 2.4
7.885 13.752 m2 on axis A and below axis C parallel to A
2 2.4
4.57 37.848 m2 On axis 2 and 5
2 2.4
3.64 21.936 m2 on axis 3 and 5
1 2.4
3.24 8.736 m2 b/n axis 3 and 4 parallel to axis A
1 2.4
1.625 7.776 m2 B/n axis 3 and 4 parallel to 3 and 4
1 2.4
1.625 3.9 m2 B/n 2 and 3 on axis C
1 2.4
7.141 3.9 m2 B/n axis 4 and 5 on axis C
1 2.4
2.865 17.1384 m2 axis parallel to axis A and above A
2 2.4
13.752 m2 on axis A and below axis C parallel to C
155.892
350.32 TOTAL INTERIOR&EXTERIOR
G+2
EXTERIOR
8.457 1,on axis 1&6
2 2.4
1.5 40.5936 m2 ddt
2 1.5 w1`
0.6 4.5 m2 ddt
2 0.7
0.84 m2 w4
35.2536 m2 Total HCB on axis 1&6
4.065 2,on axis A and below C parallel to A
2 2.4
1.2 19.512 m2 ddt
2 1.5 w2
3.6 m2
15.912 m2 total HCB on axis A and below C parallel to A
9.385 3,On axis 2&5
2 2.4
1 45.048 m2 ddt
2 2.4
4.8 m2
40.248 m2 Total HCB on axis 2&5
4.77 4,On axis 3&4
2 2.4
22.896 m2 Total HCB on axis 3&4
3.84 5,b/n axis 3&4 parallel to axis A
1 2.4
9.216 m2 Total HCB b/n 3&4 parallel to axis A
3.24 6,b/n axis 3&4 parallel to axis 3&4
1 2.4
7.776 m2 Total HCB b/n axis 3&4 parallel to axis 3&4
4.825 7,b/n axis 2&3 on axis C
1 2.4
0.6 11.58 m2 ddt
1 0.7
1.5 0.42 m2 w4
1 1.5
1 2.25 m2 w1`
1 2.4
2.4 m2 D1
6.51 m2 Total HCB b/n axis 2&3 on axis C
4.825 8, b/n axis 4&5 and on axis C
1 2.4
0.6 11.58 m2 ddt
1 0.7 w4
1.5 0.42 m2 ddt
1 1.5
1 2.25 m2 w1`
1 2.4
2.4 m2 D1
6.51 m2 Total HCB b/n axis 4&5 and axis C
13.941 9,axis parallel to axis A and above A
1 2.4
1 33.4584 m2 ddt
2 1.5
1.2 3 m2 w3
4 1.5
7.2 m2 w2
23.2584 m2 Total HCB on axis parallel to axis A and above A
3.74 10,On axis A and below axis C parallel to C
2 2.4
1.2 17.952 m2 ddt
2 1.5
3.6 m2 w2
14.352 m2 Total HCB On axis A and below axis C parallel to C
13.89 11,On corrider
1 0.9
12.501 m2 Total HCB for corrider
194.433
5.657 INTERIOR
2 2.4
2.865 27.1536 m2 on axis 1 and 6
2 2.4
7.885 13.752 m2 on axis A and below axis C parallel to A
2 2.4
4.57 37.848 m2 On axis 2 and 5
2 2.4
3.64 21.936 m2 on axis 3 and 5
1 2.4
3.24 8.736 m2 b/n axis 3 and 4 parallel to axis A
1 2.4
1.625 7.776 m2 B/n axis 3 and 4 parallel to 3 and 4
1 2.4
1.625 3.9 m2 B/n 2 and 3 on axis C
1 2.4
7.141 3.9 m2 B/n axis 4 and 5 on axis C
1 2.4
2.865 17.1384 m2 axis parallel to axis A and above A
2 2.4
13.752 m2 on axis A and below axis C parallel to C
155.892
350.32 TOTAL INTERIOR&EXTERIOR
BEAM PLASTERING
GREAD BEAM PLASTERING
22.42
6 0.4
4.09 53.808 m2 For grade beam 1,2.6
4 0.4
9.04 6.544 m For grade beam 5 and landing beam
4 0.4
9.354 14.464 m2 For grade beam 3 and 4
4 0.4
10.785 14.9664 m2 For grade beam 7
8 0.4
14.14 34.512 m2 For grade beam 8 and 9
2 0.4
11.312 m2 For grade beam 10
135.6064 total GB plastering both two face
2.42 FOR G+1 AND G+2
8 0.48
9.154 9.2928 m2 For G+1 FB1 and 5
8 0.48
10.585 35.15136 m2 For FB 6
16 0.48
13.34 81.2928 m2 For FB 7 and 8
4 0.48
3.89 25.6128 m2 For FB 2
8 0.48
14.9376 m2 For Fb 3 and 4
166.28736 Total Floor beam plastering
22.42 TOP TILE BEAM PLASSTERIG
4 0.3
9.154 26.904 m2 For TTB 4 and 5
4 0.3
10.585 10.9848 m2 For TTB 6
8 0.3
3.815 25.404 m2 For TTB 7 and 8
4 0.3
13.9 4.578 m2 For TTB 2 and 3
2 0.3
8.34 m2 For TTB 1
76.2108 Total Top tile beam plastering
378.10456 total beam plastering &painting
COLUMN PLASTERING
24 FOR G+0,G+1&G+2 for two face
0.4
2.88 27.648 m3 For C1
12
0.4
2.88 13.824 m3 For C2
12
0.4
2.88 13.824 m3 For C2`
12
0.4
2.88 13.824 m3 For C3
12
0.4
2.88 13.824 m3 For C4
24
0.4
2.88 27.648 m3 For C5
12
0.4
2.88 13.824 m3 For C6
124.416 total colum plastering & painting
* 3.84 SLAB PLASTERING
3.552
4 4.85 54.55872 m2
3.552
4 4.85 68.9088 m2
3.902
4 3.84 59.93472 m2
3.903
6 3.84 89.92512 m2
1.4
4 4.85 21.504 m2
4 1.13
4.85 21.922 m2
4 1.4
3.84 27.16 m2
2 1.13
3.84 8.6784 m2
2 2.38
18.2782 m2
18.2784 m2
370.87016 TOTAL AREA OF PLASTERING & PAINTING FOR G+O
POINTING
BEAM POINTING
22.42
6 0.4
4.09 53.808 m2 For grade beam 1,2.6
4 0.4
9.04 6.544 m For grade beam 5 and landing beam
4 0.4
9.354 14.464 m2 For grade beam 3 and 4
4 0.4
10.785 14.9664 m2 For grade beam 7
8 0.4
14.14 34.512 m2 For grade beam 8 and 9
2 0.4
11.312 m2 For grade beam 10
135.6064 TOTAL POINTING
2.42 FOR G+1 AND G+2
4 0.48
9.154 4.6464 m2 For G+1 FB1 and 5
4 0.48
10.585 17.57568 m2 For FB 6
8 0.48
13.34 40.6464 m2 For FB 7 and 8
2 0.48
3.89 12.8064 m2 For FB 2
4 0.48
7.4688 m2 For Fb 3 and 4
83.14368 Total Floor beam pointing
22.42 TOP TILE BEAM pointing
4 0.3
9.154 26.904 m2 For TTB 4 and 5
4 0.3
10.585 10.9848 m2 For TTB 6
8 0.3
3.815 25.404 m2 For TTB 7 and 8
4 0.3
13.9 4.578 m2 For TTB 2 and 3
2 0.3
8.34 m2 For TTB 1
76.2108 Total Top tile beam pointing
294.96088 total beam pointing
column pointing
24 FOR G+0,G+1&G+2 for two face
0.4
2.88 27.648 m2 For C1
12
0.4 m2
2.88 13.824 m2 For C2
12
0.4 m2
2.88 13.824 m2 For C2`
12
0.4 m2
2.88 13.824 m2 For C3
12
0.4
2.88 13.824 m2 For C4
24
0.4
2.88 27.648 m2 S
12
0.4
2.88 13.824 m2 For C6
124.416 total colum pointing
419.37688 total pointing
MS ON G+2
plied by column depth.
TILE BEAM
y column depth
LID SLAB NEARER TO
N RIPED SLAB
and 6 on ''A''
s A, B, &C
depth on
parallel to
C parallel to C
and above A
C parallel to C
and above A
C parallel to C
5&6 bottom of B
nd bed room
,6,AB(bed room)
5&6 bottom of B
nd bed room
,6,AB(bed room)
5&6 bottom of B
nd bed room
,6,AB(bed room)
WITH 10.986 LENGTH
H14.14 LENGTH
6WITH9.35 LENGTH
4 WITH4.003M LENGTH
NERS CEILING
C parallel to C
and above A
C parallel to C
and above A
C parallel to C
&painted EXTERNAL WALL
ernal WALL