owner ..
Timizing L*W*H orD Squaring
1 12.8
20.32 260.096
21.32
1 13.15 280.358
540.454
1 12.8
20.32
0.5 130.048
1 21.32
20.32
0.5 216.6112
346.6592
18.82
2 1
0.8 30.112
30.7
2 1
0.8 49.12
79.232
2 18.82
0.8 30.112
2 30.7
0.8 49.12
79.232
18.2
1 1.4
0.4 10.192
30.12
1 1.4
0.5 21.084
30.2
3 0.3
0.25 6.795
10.8
2 0.4
0.5 4.32
18.32
1 0.4
0.5 3.664
30.12
1 0.4
0.5 6.024
52.079
18.32
2 1
0.1 3.664
30.12
2 1
0.1 6.024
30.12
18.32
0.5 275.8992
2 30.12
0.8 48.192
18.32
2 0.8 29.312
1 30.12
11.15 335.838
7.15
1 10.8 77.22
490.562
18.32
3 0.3
0.25 4.122
11.15
4 0.3
0.25 3.345
10.8
3 0.3
0.25 2.43
30.12
2 0.3
0.25 4.518
14.415
6 18.32
0.3 32.976
11.15
8 0.3 26.76
6 10.8
0.3 19.44
4 30.12
0.3 36.144
115.32
school 1
Describtion
A.sub structure
1.Earth work and excavation
1.1.site clearance
clearing of the top soil up to adepth of
20cm withen 1m working space in m2
m3
Total bulck excavation in m3
1.3 Trench excavation
Trench excavation withen 0.25 m working space
and up to depth of 0.80m in m3
in m3 for axise 2
in m3 for axis D
Total massonery work in m3
3.1 . Fill selected material around trench massonery
a). Around trench massonery
in m3
m3
b). Total fill under harde core
m2 lean concret
Total lean concret in m2
4.1 C-25 CONCRET WORK
a). For grad beam
m3 for axis 1,2,3
m2
m2
m2