Professional Documents
Culture Documents
No Description Unit
UNSKILLED LABOUR PRICE HOUR
SKILLED LABOUR PRICE HOUR
CHARGE HAND HOUR
150
Mechanical Shovel 966 No
Roller Compactor - 20T - 850 Dhs/No (1000 m2 / No) m2
Unskilled Labour - 2 No No
Charge Hand No
Compaction test - 200 Dhs/No (750 m2/Test) No
Manual Excavation No
Actual Cost
150
Mechanical Shovel 966 - 2 No No
Roller Compactor - 20T - 850 Dhs/No (1000 m2 / No) m2
Unskilled Labour - 2 No No
Charge Hand No
Compaction test - 200 Dhs/No (750 m2/Test) No
Manual Excavation
Actual Cost
50
Bucket Excavator No
Excavator with Drilling Hammer No
Roller Compactor - 20T - 700 Dhs/No (1000 m2/No) m2
Unskilled Labour - 2 No No
Charge Hand No
Compaction test - 200 Dhs/No (750 m2/Test) No
Hand tool item
Actual Cost
BACK FILLING - 250 m3 M3
200
Mechanical Shovel 966 - 750 QRs/ No - 2 No No
Roller Compactor - 20T - 700 Dhs/No (1000 m2/No) No
Unskilled Labour - 2 No No
Charge Hand No
Sweet water 5000 g- 10 g / m2 Trip
Compaction test - 200 Dhs/No (750 m2/Test) No
Hand tool item
Actual Cost
200
Mechanical Shovel 966 No
2 No - Dump Truck 35 T - 20 m3-6 trip/day Trip
Unskilled Labour - 2 No No
Charge Hand No
Hand tool item
Actual Cost
200
Imported Filling Sand No
Mechanical Shovel 966 - 2 No No
Roller Compactor - 20T No
Unskilled Labour - 2 No No
Charge Hand No
Sweet water 5000 g- 10 g / m2 Trip
Compaction test - 200 Dhs/No (750 m2/Test) No
Actual Cost
Polythene sheet M2
Polythene 1000 g (5.00 x 2.00 m = 100 m2 = 156 ) m2
lapping m2
wastage %
Labour - 300 M2/ Day No
Actual Cost
10
Foam Concrete Subcontract m2
OP Cement = (1 Bag / 1 m2) & ( 10 Bag/1 m3 ) m3
Mason No
Unskilled Labour No
Charge Hand No
Unskilled Labour - for Curing- 1 hr/m3 No
Sweet water 5000 g- 15 g / m3 Trip
Hand Tools
Actual Cost
10
Foam Concrete Subcontract m2
OP Cement = (1 Bag / 1 m2) & ( 10 Bag/1 m3 ) m3
Mason No
Unskilled Labour No
Charge Hand No
Unskilled Labour - for Curing- 1 hr/m3 No
Sweet water 5000 g- 15 g / m3 Trip
Hand Tools
Actual Cost
50 mm thk 30
Basic Cost - 5 % wastage m3
Pump - 5 % wastage m3
Temp.Control -5 % wastage m3
Mason - 4 No No
Unskilled Labour - 6 No No
Charge Hand No
Unskilled Labour - for Curing- No
Carpenter - No
Sweet water 5000 g- 15 g / m3 Trip
Hand Tools
White wood - 0.28 m3 / 5 times ( + 10% wastage ) m3
Nail
Actual Cost 50 mm thk
75 mm thk 40
Basic Cost - 5 % wastage m3
Pump - 5 % wastage m3
Temp.Control -5 % wastage m3
Mason - 4 No No
Unskilled Labour - 6 No No
Charge Hand No
Unskilled Labour - for Curing- No
Carpenter - No
Sweet water 5000 g- 15 g / m3 Trip
Hand Tools
White wood - 0.28 m3 / 5 times ( + 10% wastage ) m3
Nail
Actual Cost 75 mm thk
40
Basic Cost - 5 % wastage m3
Pump - 5 % wastage m3
Temp.Control -5 % wastage m3
Mason - 4 No No
Unskilled Labour - 6 No No
Charge Hand No
Unskilled Labour - for Curing- No
Carpenter - No
Sweet water 5000 g- 15 g / m3 Trip
Hand Tools
White wood - 0.28 m3 / 5 times ( + 10% wastage ) m3
Nail
Actual Cost 100 mm thk
40
Basic Cost - 5 % wastage m3
Pump - 5 % wastage m3
Temp.Control -5 % wastage m3
Mason - 4 No No
Unskilled Labour - 6 No No
Charge Hand No
Unskilled Labour - for Curing- No
Carpenter - No
Sweet water 5000 g- 15 g / m3 Trip
Hand Tools
White wood - 0.28 m3 / 5 times ( + 10% wastage ) m3
Nail
Actual Cost 100 mm thk
160
Basic Cost - 2 % wastage m3
Testing - 300 Dhs/ test x 2% LS
Pump - 2 % wastage m3
Temp.Control - 2 % wastage m3
Mason - 8 No No
Unskilled Labour - 16 No No
Charge Hand - 2 No No
Unskilled Labour - for Curing- 1 hr/m3 No
Carpenter - 2 No No
Steel Fixer - 1 No No
Sweet water 5000 g- 15 g / m3 Trip
Hand Tools
Vibrator - 26-50 mm size - 15 Dhs/day + Petrol - 5Gallonx10Dhs No
Actual Cost
160
Basic Cost - 2 % wastage m3
Testing - 300 Dhs/ test x 2% LS
Pump - 2 % wastage m3
Temp.Control - 2 % wastage m3
Mason - 8 No No
Unskilled Labour - 16 No No
Charge Hand - 2 No No
Unskilled Labour - for Curing- 1 hr/m3 No
Carpenter - 2 No No
Steel Fixer - 1 No No
Sweet water 5000 g- 15 g / m3 Trip
Hand Tools
Vibrator - 26-50 mm size - 15 Dhs/day + Petrol - 5Gallonx10Dhs No
Actual Cost
160
Basic Cost - 2 % wastage m3
Testing - 300 Dhs/ test x 2% LS
Pump - 2 % wastage m3
Temp.Control - 2 % wastage m3
Mason - 8 No No
Unskilled Labour - 16 No No
Charge Hand - 2 No No
Unskilled Labour - for Curing- 1 hr/m3 No
Carpenter - 2 No No
Steel Fixer - 1 No No
Sweet water 5000 g- 15 g / m3 Trip
Hand Tools
Vibrator - 26-50 mm size - 15 Dhs/day + Petrol - 5Gallonx10Dhs No
Actual Cost
160
Basic Cost - 2 % wastage m3
Testing - 300 Dhs/ test x 2% LS
Pump - 2 % wastage m3
Temp.Control - 2 % wastage m3
Mason - 8 No No
Unskilled Labour - 16 No No
Charge Hand - 2 No No
Unskilled Labour - for Curing- 1 hr/m3 No
Carpenter - 2 No No
Steel Fixer - 1 No No
Sweet water 5000 g- 15 g / m3 Trip
Hand Tools
Vibrator - 26-50 mm size - 15 Dhs/day + Petrol - 5Gallonx10Dhs No
Actual Cost
160
Basic Cost - 2 % wastage m3
Testing - 300 Dhs/ test x 2% LS
Pump - 2 % wastage m3
Temp.Control - 2 % wastage m3
Mason - 8 No No
Unskilled Labour - 16 No No
Charge Hand - 2 No No
Unskilled Labour - for Curing- 1 hr/m3 No
Carpenter - 2 No No
Steel Fixer - 1 No No
Sweet water 5000 g- 15 g / m3 Trip
Hand Tools
Vibrator - 26-50 mm size - 15 Dhs/day + Petrol - 5Gallonx10Dhs No
Actual Cost
160
Basic Cost - 2 % wastage m3
Testing - 300 Dhs/ test x 2% LS
Pump - 2 % wastage m3
Temp.Control - 2 % wastage m3
Mason - 8 No No
Unskilled Labour - 16 No No
Charge Hand - 2 No No
100
Material Price( Usage 3 Times) m2
White wood ( Usage 3 times ) m3
Nail - 32Dhs/ (6kg - Carton), 0.194 kg/ m2 m2
Wastage 5%
Unskilled Labour - 4 No No
Charge Hand - 1 No No
Waste Oil m2
Hand Tool
support scaffolding - 15Dhs / m2 m2
Actual Cost
100
Material Price( Usage 3 Times) m2
White wood ( Usage 3 times ) m3
Nail - 32 Dhs/ (6kg - Carton), 0.194 kg/ m2 m2
Wastage 5%
Waste Oil m2
Unskilled Labour - 5 No No
Charge Hand - 1 No No
Hand Tool
support scaffolding - 15Dhs / m2 m2
Actual Cost
REINFORCEMENT ( EMIRATES) Kg
75 mm thk 40
Basic Cost - 5 % wastage m3
Pump - 5 % wastage m3
Temp.Control -5 % wastage m3
Mason - 4 No No
Unskilled Labour - 6 No No
Charge Hand No
Concrete m3
Formwork m2
Reinforcement kg
Actual Cost
SWIMMING POOL m3
Concrete m3
Formwork m2
Reinforcement kg
Actual Cost
PILE CAP m3
Concrete m3
Formwork m2
Reinforcement kg
Actual Cost
ISOLATED FOOTING m3
Concrete m3
Formwork m2
Reinforcement kg
Actual Cost
RAFT FOUNDATION m3
Concrete m3
Formwork m2
Reinforcement kg
Actual Cost
NECK COLUMN m3
Concrete m3
Formwork m2
Reinforcement kg
Actual Cost
COLUMN m3
Concrete m3
Formwork m2
Reinforcement kg
Actual Cost
TIE BEAM m3
Concrete m3
Formwork m2
Reinforcement kg
Actual Cost
ROOF BEAM m3
Concrete m3
Formwork m2
Reinforcement kg
Actual Cost
COREWALL ( SUBSTRUCTURE ) m3
Concrete m3
Formwork m2
Reinforcement kg
Actual Cost
COREWALL ( SUPER-STRUCTURE ) m3
Concrete m3
Formwork m2
Reinforcement kg
Actual Cost
RETAINING WALL m3
Concrete m3
Formwork ( One Side ) m2
Reinforcement kg
Actual Cost
Concrete m3
Formwork m2
Reinforcement kg
Actual Cost
Concrete m3
Formwork m2
Reinforcement kg
Actual Cost
Concrete m3
Formwork m2
Reinforcement kg
Actual Cost
Concrete m3
Formwork m2
Reinforcement kg
Actual Cost
Concrete m3
Formwork m2
Reinforcement kg
Actual Cost
STAIRCASE m3
Concrete m3
Formwork m2
Reinforcement kg
Actual Cost
Concrete m3
Formwork m2
Reinforcement kg
Actual Cost
SILL M
Concrete m3
Formwork m2
Reinforcement kg
Actual Cost
LINTEL ( m3 ) m3
Concrete m3
Formwork m2
Reinforcement kg
Actual Cost
LINTEL ( m ) M
Concrete m3
Formwork m2
Reinforcement kg
Actual Cost
Concrete m3
Formwork m2
Reinforcement kg
Actual Cost
Concrete m
A393 BRC Mesh Times
Formwork m2
Flexel Board
Actual Cost
200 mm Grade Slab With A 393 Mesh ( m2 ) m2
Concrete m
A393 BRC Mesh Times
Formwork m2
Flexel Board
Actual Cost
Concrete m
A393 BRC Mesh Times
Formwork m2
Flexel Board
Actual Cost
Concrete m
A393 BRC Mesh Times
Formwork m2
Flexel Board
Actual Cost
Concrete m
A252 BRC Mesh Times
Formwork m2
Flexel Board
Actual Cost
Concrete m
A252 BRC Mesh Times
Formwork m2
Flexel Board
Actual Cost
100 mm Grade Slab With A 393 Mesh m3
Concrete m
A393 BRC Mesh Times
Formwork m2
Flexel Board
Actual Cost
Concrete m
A393 BRC Mesh Times
Formwork m2
Flexel Board
Actual Cost
Concrete m2
Formwork m2
Reinforcement kg
Slab Post Tensioning - 40 / m2
Grouting 10 % of concrete
Actual Cost
Concrete m2
Formwork m2
Reinforcement kg
Slab Post Tensioning - 40 / m2
Grouting 10 % of concrete
Actual Cost
Concrete m2
Formwork m2
Reinforcement kg
Slab Post Tensioning - 40 / m2
Grouting 10 % of concrete
Actual Cost
Concrete m2
Formwork m2
Reinforcement kg
Slab Post Tensioning - 40 / m2
Grouting 10 % of concrete
Actual Cost
Concrete m2
Formwork m2
Reinforcement kg
Slab Post Tensioning - 40 / m2
Grouting 10 % of concrete
Actual Cost
Concrete m2
Formwork m2
Reinforcement kg
Slab Post Tensioning - 40 / m2
Grouting 10 % of concrete
Actual Cost
Concrete m2
Formwork m2
Reinforcement kg
Slab Post Tensioning - 40 / m2
Grouting 10 % of concrete
Actual Cost
Concrete m3
Formwork m2
Reinforcement kg
Slab Post Tensioning - 350 / m3
Grouting 10 % of concrete
Actual Cost
Concrete m2
A393 BRC Mesh kg
Actual Cost
8
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No
Unskilled Labour - for Curing No
Sweet water 5000 g - 20 g / m2 Trip
Hand Tools
Actual Cost
8
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No
8
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No
8
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No
8
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No
8
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No
8
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No
8
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No
8
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No
8
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No
8
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No
8
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No
8
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No
10
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No
10
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No
10
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No
10
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No
9
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No
Actual Cost
10
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No
10
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No
10
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No
10
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No
11
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No
10
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No
10
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No
10
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No
10
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No
10
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No
11
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No
8
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No
8
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No
8
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No
8
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No
8
Blocks + 5 % Wastage (150 Dhs/m3 ) No.
AAC Mortor - 0.35kg x 40kg/m3 Bags
wastage
Sweet water 5000 g - 20 g / m2 Trip
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No
8
Blocks + 5 % Wastage (150 Dhs/m3 ) No.
AAC Mortor - 0.35kg x 40kg/m3 Bags
wastage
Sweet water 5000 g - 20 g / m2 Trip
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No
8
Blocks + 5 % Wastage (150 Dhs/m3 ) No.
AAC Mortor - 0.35kg x 40kg/m3 Bags
wastage
Sweet water 5000 g - 20 g / m2 Trip
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No
8
Blocks + 5 % Wastage (150 Dhs/m3 ) No.
AAC Mortor - 0.35kg x 40kg/m3 Bags
wastage
Sweet water 5000 g - 20 g / m2 Trip
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No
8
Blocks + 5 % Wastage (150 Dhs/m3 ) No.
AAC Mortor - 0.35kg x 40kg/m3 Bags
wastage
Sweet water 5000 g - 20 g / m2 Trip
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No
8
Blocks + 5 % Wastage (150 Dhs/m3 ) No.
AAC Mortor - 0.35kg x 40kg/m3 Bags
wastage
Sweet water 5000 g - 20 g / m2 Trip
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No
8
Blocks + 5 % Wastage (150 Dhs/m3 ) No.
AAC Mortor - 0.35kg x 40kg/m3 Bags
wastage
Sweet water 5000 g - 20 g / m2 Trip
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No
8
Blocks + 5 % Wastage (150 Dhs/m3 ) No.
AAC Mortor - 0.35kg x 40kg/m3 Bags
wastage
Sweet water 5000 g - 20 g / m2 Trip
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No
Unskilled Labour - for Curing No
AAC Block Set Tools - 260 Dhs/50m2 m2
Actual Cost
8
Blocks + 5 % Wastage (150 Dhs/m3 ) No.
AAC Mortor - 0.35kg x 40kg/m3 Bags
wastage
Sweet water 5000 g - 20 g / m2 Trip
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No
8
Blocks + 5 % Wastage (150 Dhs/m3 ) No.
AAC Mortor - 0.35kg x 40kg/m3 Bags
wastage
Sweet water 5000 g - 20 g / m2 Trip
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No
8
Blocks + 5 % Wastage (150 Dhs/m3 ) No.
AAC Mortor - 0.35kg x 40kg/m3 Bags
wastage
Sweet water 5000 g - 20 g / m2 Trip
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No
8
Blocks + 5 % Wastage (150 Dhs/m3 ) No.
AAC Mortor - 0.35kg x 40kg/m3 Bags
wastage
Sweet water 5000 g - 20 g / m2 Trip
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No
8
Blocks + 5 % Wastage (150 Dhs/m3 ) No.
AAC Mortor - 0.35kg x 40kg/m3 Bags
wastage
Sweet water 5000 g - 20 g / m2 Trip
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No
8
Blocks + 5 % Wastage (150 Dhs/m3 ) No.
AAC Mortor - 0.35kg x 40kg/m3 Bags
wastage
Sweet water 5000 g - 20 g / m2 Trip
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No
8
Blocks + 5 % Wastage (150 Dhs/m3 ) No.
AAC Mortor - 0.35kg x 40kg/m3 Bags
wastage
Sweet water 5000 g - 20 g / m2 Trip
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No
8
Blocks + 5 % Wastage (150 Dhs/m3 ) No.
AAC Mortor - 0.35kg x 40kg/m3 Bags
wastage
Sweet water 5000 g - 20 g / m2 Trip
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No
Unskilled Labour - for Curing No
AAC Block Set Tools - 260 Dhs/50m2 m2
Actual Cost
8
Blocks + 5 % Wastage (150 Dhs/m3 ) No.
AAC Mortor - 0.35kg x 40kg/m3 Bags
wastage
Sweet water 5000 g - 20 g / m2 Trip
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No
8
Blocks + 5 % Wastage (150 Dhs/m3 ) No.
AAC Mortor - 0.35kg x 40kg/m3 Bags
wastage
Sweet water 5000 g - 20 g / m2 Trip
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No
15 mm INTERNAL PLASTER - 17 m2 M2
17
Cement Bags
White washed Sand Cu.M
wastage
Sweet water 5000 g - 25 g / m2 Trip
Mason No
Unskilled Labour No
Charge Hand No
20 mm INTERNAL PLASTER - 17 m2 M2
17
Cement Bags
White washed Sand Cu.M
wastage
Sweet water 5000 g - 25 g / m2 Trip
Mason No
Unskilled Labour No
Charge Hand No
16
Cement Bags
White washed Sand Cu.M
wastage
Sweet water 5000 g - 25 g / m2 Trip
Mason No
Unskilled Labour No
Charge Hand No
16
Cement Bags
White washed Sand Cu.M
wastage
Sweet water 5000 g - 25 g / m2 Trip
Mason No
Unskilled Labour No
Charge Hand No
25 mm EXTERNAL PLASTER - 17 m2 M2
16
Cement Bags
White washed Sand Cu.M
wastage
Sweet water 5000 g - 25 g / m2 Trip
Mason No
Unskilled Labour No
Charge Hand No
150 mm thk 40
Basic Cost - 5 % wastage m3
Pump - 5 % wastage m3
Temp.Control -5 % wastage m3
Mason - 4 No No
Unskilled Labour - 6 No No
Charge Hand No
Unskilled Labour - for Curing- No
Carpenter - No
Sweet water 5000 g- 15 g / m3 Trip
Hand Tools
White wood - 0.28 m3 / 5 times ( + 10% wastage ) m3
Nail
Actual Cost M2
100 mm thk 40
Basic Cost - 5 % wastage m3
Pump - 5 % wastage m3
Temp.Control -5 % wastage m3
Mason - 4 No No
Unskilled Labour - 6 No No
Charge Hand No
90 mm thk 40
Basic Cost - 5 % wastage m3
Pump - 5 % wastage m3
Temp.Control -5 % wastage m3
Mason - 4 No No
Unskilled Labour - 6 No No
Charge Hand No
75 mm thk 40
Basic Cost - 5 % wastage m3
Pump - 5 % wastage m3
Temp.Control -5 % wastage m3
Mason - 4 No No
Unskilled Labour - 6 No No
Charge Hand No
50 mm thk 40
Basic Cost - 5 % wastage m3
Pump - 5 % wastage m3
Temp.Control -5 % wastage m3
Mason - 4 No No
Unskilled Labour - 6 No No
Charge Hand No
40 mm thk 40
Basic Cost - 5 % wastage m3
Pump - 5 % wastage m3
Temp.Control -5 % wastage m3
Mason - 4 No No
Unskilled Labour - 6 No No
Charge Hand No
25 mm thk 40
Basic Cost - 5 % wastage m3
Pump - 5 % wastage m3
Temp.Control -5 % wastage m3
Mason - 4 No No
Unskilled Labour - 6 No No
Charge Hand No
MOSAIC TILES M2
12
3 Times Polising
Misc./Tools
Cement Fix
Sweet Water
Mason No
Unskilled Labour No
Charge Hand No
Actual Cost
CERAMIC / PORCELAIN FLOOR M2
12
Misc./Tools
Cement Fix + Grout
Sweet Water
Mason No
Unskilled Labour No
Charge Hand No
Actual Cost
12
Misc./Tools
Epoxy Coat - 110 QR / 18 Litre ( 3 kg/ m2 )
Cement Fix + Grout
Sweet Water
Mason No
Unskilled Labour No
Charge Hand No
Actual Cost
10
Cement Fix + Grout m2
Seal Coating for Granite / Marble m2
Sweet Water
Misc./tools/Accessories m2
Mason No
Unskilled Labour No
Charge Hand No
Actual Cost
10
Epoxy Coat - 110 QR / 18 Litre ( 3 kg/ m2 )
Seal Coating for Granite / Marble m2
Sweet Water
Misc./tools/Accessories LS
Mason No
Unskilled Labour No
Charge Hand No
Actual Cost
CERAMIC FLOOORING m2
Screed
Fixing Adhesive + Labour Charges
CERAMIC FLOOORING m2
Screed
Fixing Adhesive + Labour Charges
PORCELAIN m2
Screed
Fixing Adhesive + Labour Charges
GRANITE / MARBLE m2
Screed
Fixing Adhesive + Labour Charges
PORCELAIN m2
Screed
Fixing Adhesive + Labour Charges
THRESHOLD - 250 mm m2
Screed
Fixing Adhesive + Labour Charges
THRESHOLD - 100 mm m2
Fixing Adhesive + Labour Charges
THRESHOLD - 130 mm m2
Fixing Adhesive + Labour Charges
THRESHOLD - 265 mm m2
Fixing Adhesive + Labour Charges
CERAMIC WALL m2
Plaster
Fixing Adhesive + Laying Charges
CERAMIC WALL m2
Plaster
Fixing Adhesive + Laying Charges
Mosaic Steps M
10
Mosaic Tile PC Rate- 25 Dhs/m m
Screed - 0.75 m2 / 2
Glue Fix + Grout
Sweet Water
Misc./tools/Accessories No
Mason No
Unskilled Labour No
Charge Hand No
Actual Cost
Granite/Marble Steps M
8
Granite / Marble PC Rate- 150 Dhs/m m
Screed - 0.75 m2 / 2
Glue Fix + Grout
Sweet Water
Misc./tools/Accessories No
Mason No
Unskilled Labour No
Charge Hand No
Actual Cost
Interlock paving 80 mm - 30 m2 M2
25
compaction & prepration of base m2
Interlock supply price - 42 Dhs /m2 m2
roadbase 250 mm m3
compaction of road base m3
Sweet water 5000 g- 10 g / m2
Sand 50 mm m3
wastage 5% %
Mason No
Unskilled Labour No
Charge Hand No
Actual Cost
Interlock paving 60 mm - 30 m2 M2
25
compaction & prepration of base m2
Interlock supply price - 37 Dhs /m2 m2
roadbase 150 mm m3
compaction of road base m3
Sweet water 5000 g- 10 g / m2
Sand 50 mm m3
wastage 5% %
Mason No
Unskilled Labour No
Charge Hand No
Actual Cost
Kerb stone - 10 m
10
kerbstone Price - 27 Dhs / m - ( 914 xx300 x 150 )mm m
Excavation m3
compaction of road base m2
wastage 5% %
Mason No
Unskilled Labour No
Charge Hand No
concrete Hunching m3
Sweet water 5000 g- 10 g / m2 G
Actual Cost
ASPHALT ROAD
SUBCONTRACTING WORK
FALSE CEILING
Gypsum False ceiling m2
Decorative Gypsum False ceiling m2
60 x 60 cm Gypsum Tile False ceiling m2
Gypsum Bulk Head m
Gypsum Cove m
Gypsum Cornice m
Plain Aluminium False ceiling m2
Perforated Aluminium False ceiling m2
10 cm Gypsum Partition m2
PAINTING
Emulsion Paint m2
External Epoxy Paint m2
External Acrylic Based Paint m2
Polyurethene Anti carbonate m2
Enamel Paint m2
Floor Epoxy Paint m2
Floor Hardner m2
Floor Sealer m2
WATERPROOFING
Membrane 4 mm SBS m2
Membrane 4 mm APP m2
3 mm GRP Lining m2
6 mm GRP Lining m2
METAL WORKS
Aluminium Cladding m2
Aluminium Composite Cladding m2
Su
Main contractor overhead & Pro
Grand
Guniting
Description Unit
Guniting m2
B.W - 5%
Shotcrete m3
Reinf - mesh A393 m2
Diesel-5 pumps @ 7 gall per day gall
Cleaning m2
scaffolding m2
Su
Main contractor overhead & Pro
Grand
Guniting 145
Description Unit
Guniting m2
B.W - 5%
Shotcrete m3
Reinf - mesh A393 m2
Diesel-5 pumps @ 7 gall per day gall
Cleaning m2
scaffolding m2
Excavation 1
Cart Away 1
Back Filling
Polythene Sheet 1
Blinding Concrete 1
Plaster 1
1
Membrane 1
1
Excavation 1
Cart Away 1
Back Filling
Polythene Sheet 1
Blinding Concrete 1
Plaster 1
1
Membrane 1
1
Excavation 1
Cart Away 1
Back Filling
Polythene Sheet 1
Boundary Wall
Footing, Beam Nos.
Boundary Wall
Footing 6
Column 7
Tie Beam 1
Coumn 7
Coping Beam 1
Total =
Description Unit
Excavation ( 5.0 x 4.0 x 2.80 ) m 6
Cart Away
Back Filling
Plaster 2
Epoxy paint 2
Total
Total Amount
2 Steel Reinforcement
Qatari Straight MT
Qatari Cut & Bend MT
7 Insulated Blocks
200mm No.
250mm No.
300mm No.
350mm No.
8 Interlock
60mm (Grey) ( Lime Stone ) m2
60mm ( Red ) m2
60mm (Block) m2
60mm ( Yellow ) m2
80mm (Grey) m2
80mm ( Red ) m2
80mm (Block) m2
80mm ( Yellow ) m2
80mm (Grey) m2
80mm ( Red ) m2
80mm (Block) m2
80mm ( Yellow ) m2
10 Cement
OPC GGBS Bags
SRC GGBS Bags
11 Sand
Black Washed Sand m3
White Washed Sand m3
Interlock Sand m3
Sweet Sand m3
Dune Sand m3
Filling Sand m3
12 Shuttering Materials
4mm commercial plywood ( 2.40 m x 1.20 m ) No.
6mm commercial plywood ( 2.40 m x 1.20 m ) No.
12mm commercial plywood ( 2.40 m x 1.20 m ) No.
18mm marine ply wood ( 2.40 m x 1.20 m ) No.
White Wood m3
13 Road Base
Road Base ( Natural ) m3
Road Base ( Crushed ) m3
14 Polythene Sheet
1200G Polythene Sheet ( 50.00 x 2.00 ) 100 m2
1000G Polythene Sheet ( 50.00 x 2.00 ) 100 m2
500G Polythene Sheet ( 50.00 x 2.00 ) 100 m2
17 Tiles Adhesive
Tiles Adhesive - 42 QR / 25 kg - ( 2 kg / m2 ) Bag
Tile Grouting - 69 QR / 25 kg - (1 kg / 4 m2 ) Bag
18 Painting
Internal Emulsion m2
External Epoxy m2
19 Asphalt Road
10
12
15
Qty Rate/Day 15
Qty Rate/Day 21
Qty Rate/Day 46
21
Qty Rate/Day 55
1 33 33.00 33.00
2 900 9.00 9.00
1 850 4.25 4.25
2 90.00 0.90 0.90
1 135.00 0.23 0.23
7500 0.12 4.50 4.50
3 200.00 3.00 3.00
54.9 1.1 37.5 13.3 3.0
Qty Rate 12
Qty Rate/Day
285.3
10 10 100 100.00
0.1 15 157.5 157.50
1 90 9.00 9.00
1.5 90.00 13.50 13.50
1 135.00 2.25 2.25
1 10.00 1.00 1.00
15 0.1 1.50 1.50
0.5 0.50
285.3 25.8 159.0 0.5 100.0
Qty Rate/Day
28.5
m3
10 10 100 100.00
0.1 15 157.5 157.50
1 90 9.00 9.00
1.5 90.00 13.50 13.50
1 135.00 2.25 2.25
1 10.00 1.00 1.00
15 0.1 1.50 1.50
0.5 0.50
28.5 2.6 15.9 0.1 10.0
Qty Rate/Day
19.7
m3
1.05 220 231 231.00
1.05 15 15.75 15.75
1.05 15 15.75 15.75 Temp.Control -5 % wastage
4 108.00 14.40 14.40
6 90.00 18.00 18.00
1 135.00 3.00 3.00
0.1 90.00 0.30 0.30
2 108.00 4.32 4.32
15 0.12 1.80 1.80
0.50 0.50
0.056 850 52.36 52.36
0.50 0.50
50 mm thk 19.7 2.2 17.4 0.028 0.0
Qty Rate/Day
29.5
m3
1.05 220 231 231.00
1.05 15 15.75 15.75
1.05 15 15.75 15.75
4 108.00 10.80 10.80
6 90.00 13.50 13.50
1 135.00 2.25 2.25
0.1 90.00 0.23 0.23
2 108.00 4.32 4.32
15 0.12 1.80 1.80
0.50 0.50
0.056 850 52.36 52.36
0.50 0.50
75 mm thk 29.5 2.6 26.8 0.042 0.0
Qty Rate/Day
34.9
m3
1.05 220 231 231.00
1.05 15 15.75 15.75
1.05 15 15.75 15.75
4 108.00 10.80 10.80
6 90.00 13.50 13.50
1 135.00 2.25 2.25
0.1 90.00 0.23 0.23
2 108.00 4.32 4.32
15 0.12 1.80 1.80
0.50 0.50
0.056 850 52.36 52.36
0.50 0.50
100 mm thk 34.9 3.1 31.7 0.1 0.0
m3
1.05 220 231 231.00
1.05 15 15.75 15.75
1.05 15 15.75 15.75
4 108.00 10.80 10.80
6 90.00 13.50 13.50
1 135.00 2.25 2.25
0.1 90.00 0.23 0.23
2 108.00 4.32 4.32
15 0.12 1.80 1.80
90.00
16 9.00 9.00
2 135.00 3.15 3.15
10.00
0.1 1.00 1.00
2 108.00 1.35 1.35
1 108.00 0.68 0.68
15 0.1 1.50 1.50
0.50 0.50
3 65 1.22 1.22
331.7 20.6 309.4 1.7 0.0
Qty Rate 53
306.00
7 21.42 21.42
90.00
5 4.50 4.50
108.00
2 2.16 2.16
2.5 1.00 0.40 0.40
2.00 2.00
0.00 15.00 0.00 0.00
52.9 28.1 22.8 2.0 0.0
Qty Rate 63
306.00
7 21.42 21.42
90.00
5 4.50 4.50
1.33 135.00 1.80 1.80
2.00 2.00
1.00 15.00 10.00 10.00
. 62.5 27.7 22.8 2.0 10.0
3,116
1 2500 2500.00
25 5.20 130.00 130.00
108.00
4 432.00 432.00
0 90.00 0.00 0.00
1 135.00 54.00 54.00
0.00
3116.0 486.0 2630.0 0.0 0.0
3.12
1 2500 2500.00
25 5.20 130.00 130.00
4 108.00 432.00 432.00
0 90.00 0.00 0.00
1 135.00 54.00 54.00
0.00
3.12 0.5 2.6 0.0 0.0
Qty Rate/Day
26.4
m3
1.05 200 210 210.00
1.05 10 10.5 10.50
1.05 10 10.5 10.50
2 108.00 5.40 5.40
90.00
6 13.50 13.50
1 135.00 2.25 2.25
90.00
0.1 0.23 0.23
2 108.00 4.32 4.32
15 0.12 1.80 1.80
0.50 0.50
0.056 850 52.36 52.36
0.50 0.50
75 mm thk 26.4 2.2 24.2 0.042 0.0
170
12.5 1.7 24.0 0.1 0.0
1 1.7 25.8 0.0 0.0
0.1 2.8 2.3 0.2
228.6 6.2 52.1 0.3 170.0
177
12.5 1.7 24.0 0.1 0.0
1 1.7 25.8 0.0 0.0
0.1 2.8 2.3 0.2
235.6 6.2 52.1 0.3 177.0
180
12.5 1.7 24.0 0.1 0.0
1 1.7 25.8 0.0 0.0
0.1 2.8 2.3 0.2
238.6 6.2 52.1 0.3 180.0
300
12.5 1.7 24.0 0.1 0.0
1 1.7 25.8 0.0 0.0
0.1 2.8 2.3 0.2
358.6 6.2 52.1 0.3 300.0
75
Rate
12.5 2.70 35.44 35.44
0.3 13.00 3.90 3.90
0.0225 60.00 1.35 1.35
5% 0.26 0.26
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81
0.1 10.00 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
75.0 30.0 45.5 1.0 0.0
80
Rate
12.5 2.90 38.06 38.06
0.375 13.00 4.88 4.88
0.039 60.00 2.34 2.34
5% 0.36 0.36
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81
10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
79.7 30.0 50.1 1.0 0.0
84
Rate
12.5 3.10 40.69 40.69
0.5 13.00 6.50 6.50
0.045 60.00 2.70 2.70
5% 0.46 0.46
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81
10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
84.4 30.0 54.8 1.0 0.0
101
Rate
12.5 4.10 53.81 53.81
0.675 13.00 8.78 8.78
0.062 60.00 3.72 3.72
5% 0.62 0.62
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81
10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
101.0 30.0 71.4 1.0 0.0
121
Rate
12.5 5.50 72.19 72.19
0.8 13.00 10.40 10.40
0.0675 60.00 4.05 4.05
5% 0.72 0.72
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81
10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
121.4 30.0 91.9 1.0 0.0
79
Rate
12.5 2.97 38.98 38.98
0.3 13.00 3.90 3.90
0.0225 60.00 1.35 1.35
5% 0.26 0.26
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81
10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
78.6 30.0 49.0 1.0 0.0
84
Rate
12.5 3.19 41.87 41.87
0.375 13.00 4.88 4.88
0.04 60.00 2.40 2.40
5% 0.36 0.36
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81
10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
83.6 30.0 54.0 1.0 0.0
88
Rate
12.5 3.41 44.76 44.76
0.5 13.00 6.50 6.50
0.045 60.00 2.70 2.70
5% 0.46 0.46
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81
10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
88.5 30.0 58.9 1.0 0.0
106
Rate
12.5 4.51 59.19 59.19
0.675 13.00 8.78 8.78
0.062 60.00 3.72 3.72
5% 0.62 0.62
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81
10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
106.4 30.0 76.8 1.0 0.0
129
Rate
12.5 6.05 79.41 79.41
0.8 13.00 10.40 10.40
0.0675 60.00 4.05 4.05
5% 0.72 0.72
3.00 3.00
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81
10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
129.1 30.0 99.6 1.0 0.0
82
Rate
12.5 3.24 42.53 42.53
0.3 13.00 3.90 3.90
0.0225 60.00 1.35 1.35
5% 0.26 0.26
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81
10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
82.1 30.0 52.5 1.0 0.0
87
Rate
12.5 3.48 45.68 45.68
0.375 13.00 4.88 4.88
0.039 60.00 2.34 2.34
5% 0.36 0.36
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81
10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
87.3 30.0 57.8 1.0 0.0
93
Rate
12.5 3.72 48.83 48.83
0.5 13.00 6.50 6.50
0.045 60.00 2.70 2.70
5% 0.46 0.46
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81
10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
92.5 30.0 63.0 1.0 0.0
101
Rate
12.5 4.10 53.81 53.81
0.9 13.00 11.70 11.70
0.095 60.00 5.70 5.70
5% 0.87 0.87
2.50 2.50
1 108.00 10.80 10.80
1 90.00 9.00 9.00
1 135.00 2.25 2.25
10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
100.6 30.0 76.6 1.0 0.0
92
Rate
12.5 3.60 47.25 47.25
0.8 13.00 10.40 10.40
0.084 60.00 5.04 5.04
5% 0.77 0.77
2.50 2.50
1 108.00 10.80 10.80
1 90.00 9.00 9.00
1 135.00 2.25 2.25
10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
92.0 30.0 68.0 1.0 0.0
88
Rate
12.5 3.60 47.25 47.25
0.675 13.00 8.78 8.78
0.04 60.00 2.40 2.40
5% 0.56 0.56
2.50 2.50
1 108.00 10.80 10.80
1 90.00 9.00 9.00
1 135.00 2.25 2.25
10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
87.5 30.0 63.5 1.0 0.0
70
Rate
12.5 2.40 31.50 31.50
0.5 13.00 6.50 6.50
0.055 60.00 3.30 3.30
5% 0.49 0.49
2.50 2.50
1 108.00 10.80 10.80
1 90.00 9.00 9.00
1 135.00 2.25 2.25
10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
70.3 30.0 46.3 1.0 0.0
65
Rate
12.5 2.20 28.88 28.88
0.375 13.00 4.88 4.88
0.042 60.00 2.52 2.52
5% 0.37 0.37
2.50 2.50
1 108.00 10.80 10.80
1 90.00 9.00 9.00
1 135.00 2.25 2.25
10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
65.2 30.0 41.1 1.0 0.0
63
Rate
12.5 2.00 26.25 26.25
0.3 13.00 3.90 3.90
0.0275 60.00 1.65 1.65
5% 0.28 0.28
2.50 2.50
1 108.00 12.00 12.00
1 90.00 10.00 10.00
1 135.00 2.50 2.50
10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
63.1 30.0 36.6 1.0 0.0
160
Rate
25.00 25
67.58 30.0 36.6 1.0 0.0
67.58 30.0 36.6 1.0 0.0
108
Rate
12.5 4.51 59.19 59.19
0.9 13.00 11.70 11.70
0.095 60.00 5.70 5.70
5% 0.87 0.87
2.50 2.50
1 108.00 12.00 12.00
1 90.00 10.00 10.00
1 135.00 2.50 2.50
10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
108.5 30.0 82.0 1.0 0.0
96
Rate
12.5 3.96 51.98 51.98
0.8 13.00 10.40 10.40
0.08 60.00 4.80 4.80
5% 0.76 0.76
2.50 2.50
1 108.00 10.80 10.80
1 90.00 9.00 9.00
1 135.00 2.25 2.25
10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
96.5 30.0 72.4 1.0 0.0
88
Rate
12.5 3.52 46.20 46.20
0.675 13.00 8.78 8.78
0.06 60.00 3.60 3.60
5% 0.62 0.62
2.50 2.50
1 108.00 10.80 10.80
1 90.00 9.00 9.00
1 135.00 2.25 2.25
10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
87.7 30.0 63.7 1.0 0.0
73
Rate
12.5 2.64 34.65 34.65
0.5 13.00 6.50 6.50
0.04 60.00 2.40 2.40
5% 0.45 0.45
2.50 2.50
1 108.00 10.80 10.80
1 90.00 9.00 9.00
1 135.00 2.25 2.25
10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
72.5 30.0 48.5 1.0 0.0
68
Rate
12.5 2.42 31.76 31.76
0.375 13.00 4.88 4.88
0.042 60.00 2.52 2.52
5% 0.37 0.37
2.50 2.50
1 108.00 10.80 10.80
1 90.00 9.00 9.00
1 135.00 2.25 2.25
10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
68.1 30.0 44.0 1.0 0.0
61
Rate
12.5 2.20 28.88 28.88
0.3 13.00 3.90 3.90
0.0275 60.00 1.65 1.65
5% 0.28 0.28
2.50 2.50
1 108.00 9.82 9.82
1 90.00 8.18 8.18
1 135.00 2.05 2.05
10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
61.2 30.0 39.2 1.0 0.0
111
Rate
12.5 4.92 64.58 64.58
0.9 13.00 11.70 11.70
0.095 60.00 5.70 5.70
5% 0.87 0.87
2.50 2.50
1 108.00 10.80 10.80
1 90.00 9.00 9.00
1 135.00 2.25 2.25
10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
111.4 30.0 87.3 1.0 0.0
101
Rate
12.5 4.32 56.70 56.70
0.8 13.00 10.40 10.40
0.084 60.00 5.04 5.04
5% 0.77 0.77
2.50 2.50
1 108.00 10.80 10.80
1 90.00 9.00 9.00
1 135.00 2.25 2.25
10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
101.5 30.0 77.4 1.0 0.0
92
Rate
12.5 3.84 50.40 50.40
0.675 13.00 8.78 8.78
0.06 60.00 3.60 3.60
5% 0.62 0.62
2.50 2.50
1 108.00 10.80 10.80
1 90.00 9.00 9.00
1 135.00 2.25 2.25
10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
91.9 30.0 67.9 1.0 0.0
76
Rate
12.5 2.88 37.80 37.80
0.5 13.00 6.50 6.50
0.04 60.00 2.40 2.40
5% 0.45 0.45
2.50 2.50
1 108.00 10.80 10.80
1 90.00 9.00 9.00
1 135.00 2.25 2.25
10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
75.7 30.0 51.6 1.0 0.0
71
Rate
12.5 2.64 34.65 34.65
0.375 13.00 4.88 4.88
0.042 60.00 2.52 2.52
5% 0.37 0.37
2.50 2.50
1 108.00 10.80 10.80
1 90.00 9.00 9.00
1 135.00 2.25 2.25
10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
71.0 30.0 46.9 1.0 0.0
64
Rate
12.5 2.40 31.50 31.50
0.3 13.00 3.90 3.90
0.0275 60.00 1.65 1.65
5% 0.28 0.28
2.50 2.50
1 108.00 9.82 9.82
1 90.00 8.18 8.18
1 135.00 2.05 2.05
10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
63.9 30.0 41.8 1.0 0.0
102
Rate
12.5 4.50 59.06 59.06
0.41 13.00 5.33 5.33
0.045 60.00 2.70 2.70
5% 0.40 0.40
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81
10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
101.6 30.0 72.0 1.0 0.0
113
Rate
12.5 5.20 68.25 68.25
0.515 13.00 6.70 6.70
0.062 60.00 3.72 3.72
5% 0.52 0.52
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81
10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
113.2 30.0 83.7 1.0 0.0
130
Rate
12.5 6.20 81.38 81.38
0.78 13.00 10.14 10.14
0.0675 60.00 4.05 4.05
5% 0.71 0.71
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81
10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
130.3 30.0 100.8 1.0 0.0
147
Rate
12.5 7.44 97.65 97.65
0.78 13.00 10.14 10.14
0.0675 60.00 4.05 4.05
5% 0.71 0.71
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81
10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
146.6 30.0 117.0 1.0 0.0
57
Rate
1 15.00 15.75 15.75
0.2 13.00 2.60 2.60
5% 0.13 0.13
20 0.1 2.00 2.00
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81
10.00
0.1 1.00 1.00
50 260 5.20 5.20
56.7 30.0 23.0 5.2 0.0
65
Rate
1 22.49 23.61 23.61
0.2 13.00 2.60 2.60
5% 0.13 0.13
20 0.1 2.00 2.00
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81
10.00
0.1 1.00 1.00
50 260 5.20 5.20
64.6 30.0 30.8 5.2 0.0
72
Rate
1 30.00 31.50 31.50
0.2 13.00 2.60 2.60
5% 0.13 0.13
20 0.1 2.00 2.00
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81
10.00
0.1 1.00 1.00
50 260 5.20 5.20
72.5 30.0 38.7 5.2 0.0
82
Rate
1 37.50 39.38 39.38
0.3 13.00 3.90 3.90
5% 0.20 0.20
20 0.1 2.00 2.00
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81
10.00
0.1 1.00 1.00
50 260 5.20 5.20
81.7 30.0 48.0 5.2 0.0
90
Rate
1 45.05 47.30 47.30
0.3 13.00 3.90 3.90
5% 0.20 0.20
20 0.1 2.00 2.00
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81
10.00
0.1 1.00 1.00
50 260 5.20 5.20
89.7 30.0 55.9 5.2 0.0
97
Rate
1 52.45 55.07 55.07
0.3 13.00 3.90 3.90
5% 0.20 0.20
20 0.1 2.00 2.00
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81
10.00
0.1 1.00 1.00
50 260 5.20 5.20
97.4 30.0 63.7 5.2 0.0
1.1 60
Rate
1 16.50 19.06 19.06
0.2 13.00 2.86 2.86
5% 0.16 0.16
20 0.1 2.00 2.00
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81
10.00
0.1 1.00 1.00
50 260 5.20 5.20
60.3 30.0 26.6 5.2 0.0
1.1 70
Rate
1 24.74 28.57 28.57
0.2 13.00 2.86 2.86
5% 0.16 0.16
20 0.1 2.00 2.00
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81
10.00
0.1 1.00 1.00
50 260 5.20 5.20
69.9 30.0 36.1 5.2 0.0
1.1 79
Rate
1 33.00 38.12 38.12
0.2 13.00 2.86 2.86
5% 0.16 0.16
20 0.1 2.00 2.00
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81
10.00
0.1 1.00 1.00
50 260 5.20 5.20
79.4 30.0 45.6 5.2 0.0
1.1 90
Rate
1 41.25 47.64 47.64
0.3 13.00 4.29 4.29
5% 0.24 0.24
20 0.1 2.00 2.00
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81
10.00
0.1 1.00 1.00
50 260 5.20 5.20
90.4 30.0 56.7 5.2 0.0
1.1 101
Rate
1 50.00 57.75 57.75
0.3 13.00 4.29 4.29
5% 0.24 0.24
20 0.1 2.00 2.00
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81
10.00
0.1 1.00 1.00
50 260 5.20 5.20
100.5 30.0 66.8 5.2 0.0
1.1 109
Rate
1 57.69 66.63 66.63
0.3 13.00 4.29 4.29
5% 0.24 0.24
20 0.1 2.00 2.00
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81
10.00
0.1 1.00 1.00
50 260 5.20 5.20
109.4 30.0 75.7 5.2 0.0
1.2 64
Rate
1 18.00 22.68 22.68
0.2 13.00 3.12 3.12
5% 0.19 0.19
20 0.1 2.00 2.00
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81
10.00
0.1 1.00 1.00
50 260 5.20 5.20
64.2 30.0 30.5 5.2 0.0
1.2 76
Rate
1 26.99 34.00 34.00
0.2 13.00 3.12 3.12
5% 0.19 0.19
20 0.1 2.00 2.00
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81
10.00
0.1 1.00 1.00
50 260 5.20 5.20
75.6 30.0 41.8 5.2 0.0
1.2 87
Rate
1 36.00 45.36 45.36
0.2 13.00 3.12 3.12
5% 0.19 0.19
20 0.1 2.00 2.00
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81
10.00
0.1 1.00 1.00
50 260 5.20 5.20
86.9 30.0 53.2 5.2 0.0
1.2 100
Rate
1 45.00 56.70 56.70
0.3 13.00 4.68 4.68
5% 0.28 0.28
20 0.1 2.00 2.00
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81
10.00
0.1 1.00 1.00
50 260 5.20 5.20
99.9 30.0 66.2 5.2 0.0
1.2 112
Rate
1 54.55 68.73 68.73
0.3 13.00 4.68 4.68
5% 0.28 0.28
20 0.1 2.00 2.00
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81
10.00
0.1 1.00 1.00
50 260 5.20 5.20
112.0 30.0 78.2 5.2 0.0
1.2 123
Rate
1 62.94 79.30 79.30
0.3 13.00 4.68 4.68
5% 0.28 0.28
20 0.1 2.00 2.00
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81
10.00
0.1 1.00 1.00
50 260 5.20 5.20
122.5 30.0 88.8 5.2 0.0
Qty Rate 34
10.00
0.1 1.00 1.00
0.10 0.10
2.00 2.00
0.00
34.2 25.0 7.1 0.1 2.0
Qty Rate 36
10.00
0.1 1.00 1.00
0.10 0.10
2.00 2.00
0.00
35.7 25.0 8.6 0.1 2.0
Qty Rate 34
10.00
0.1 1.00 1.00
0.10 0.10
2.00 2.00
0.00
34.2 25.0 7.1 0.1 2.0
Qty Rate 36
10.00
0.1 1.00 1.00
0.10 0.10
2.00 2.00
0.00
35.7 25.0 8.6 0.1 2.0
Qty Rate 35
10.00
0.1 1.00 1.00
0.50
2.00
0.00
34.7 25.0 9.7 0.0 0.0
Qty Rate/Day
46.4
m3
1.05 200 210 210.00
1.05 10 10.5 10.50
1.05 10 10.5 10.50
2 108.00 5.40 5.40
6 90.00 13.50 13.50
1 135.00 2.25 2.25
0.1 90.00 0.23 0.23
1 108.00 2.16 2.16
15 0.12 1.80 1.80
0.50 0.50
0.056 850 52.36 52.36
0.50 0.50
150 mm thk 46.4 3.5 42.8 0.1 0.0
Qty Rate/Day
31.0
m3
1.05 200 210 210.00
1.05 10 10.5 10.50
1.05 10 10.5 10.50
2 108.00 5.40 5.40
6 90.00 13.50 13.50
1 135.00 2.25 2.25
90.00
0.1 0.23 0.23
1 108.00 2.16 2.16
15 0.12 1.80 1.80
0.50 0.50
0.056 850 52.36 52.36
0.50 0.50
100 mm thk 31.0 2.4 28.6 0.1 0.0
Qty Rate/Day
28.2
m3
1.05 200 210 210.00
1.05 10 10.5 10.50
1.05 10 10.5 10.50
2 108.00 5.40 5.40
90.00
6 13.50 13.50
1 135.00 2.25 2.25
90.00
0.1 0.23 0.23
1 108.00 2.16 2.16
15 0.12 1.80 1.80
0.50 0.50
0.056 850 52.36 52.36
0.50 0.50
90 mm thk 28.2 2.1 26.0 0.0 0.0
Qty Rate/Day
25.6
m3
1.05 200 210 210.00
1.05 10 10.5 10.50
1.05 10 10.5 10.50
2 108.00 5.40 5.40
90.00
6 13.50 13.50
1 135.00 2.25 2.25
90.00
0.1 0.23 0.23
1 108.00 2.16 2.16
15 0.12 1.80 1.80
0.50 0.50
0.056 850 52.36 52.36
0.50 0.50
75 mm thk 25.6 1.9 23.6 0.0 0.0
Qty Rate/Day
17.0
m3
1.05 200 210 210.00
1.05 10 10.5 10.50
1.05 10 10.5 10.50
2 108.00 5.40 5.40
90.00
6 13.50 13.50
1 135.00 2.25 2.25
90.00
0.1 0.23 0.23
1 108.00 2.16 2.16
15 0.12 1.80 1.80
0.50 0.50
0.056 850 52.36 52.36
0.50 0.50
50 mm thk 17.0 1.3 15.7 0.0 0.0
.
Qty Rate/Day
13.6
m3
1.05 200 210 210.00
1.05 10 10.5 10.50
1.05 10 10.5 10.50
2 108.00 5.40 5.40
90.00
6 13.50 13.50
1 135.00 2.25 2.25
90.00
0.1 0.23 0.23
1 108.00 2.16 2.16
15 0.12 1.80 1.80
0.50 0.50
0.056 850 52.36 52.36
0.50 0.50
40 mm thk 13.6 1.0 12.6 0.0 0.0
.
Qty Rate/Day
8.5
m3
1.05 200 210 210.00
1.05 10 10.5 10.50
1.05 10 10.5 10.50
2 108.00 5.40 5.40
90.00
6 13.50 13.50
1 135.00 2.25 2.25
90.00
0.1 0.23 0.23
1 108.00 2.16 2.16
15 0.12 1.80 1.80
0.50 0.50
0.056 850 52.36 52.36
0.50 0.50
25 mm thk 8.5 0.6 7.9 0.0 0.0
.
Qty Rate 41
108.00
1 9.00 9.00
2 90.00 15.00 15.00
135.00
1 1.50 1.50
40.5 30.5 5.0 5.0 0.0
Qty Rate 29
0.50 0.50
4.00 4.00
0.50 0.50
1 108.00 9.00 9.00
1.5 90.00 11.25 11.25
1 135.00 3.75 3.75
29.0 24.0 5.0 0.0 0.0
Qty Rate 47
0.50 0.50
18.33 18.33
4.00 4.00
0.50 0.50
1 108.00 9.00 9.00
1.5 90.00 11.25 11.25
1 135.00 3.75 3.75
47.3 24.0 23.3 0.0 0.0
Qty Rate 53
Qty Rate 85
18.33 18.33
1 4.00 4.00 4.00
0.50 0.50
1 0.50 0.50
2 108.00 21.60 21.60
4 90.00 36.00 36.00
1 135.00 4.50 4.50
85.4 62.1 23.3 0.0 0.0
Qty Rate 33
2.00 2.00
6.00 6.00
0.50 0.50
1 108.00 9.00 9.00
1.5 90.00 11.25 11.25
1 135.00 3.75 3.75
32.5 24.0 8.5 0.0 0.0
Qty Rate 90
1 6.00 6.00 6.00
1 6.00 6.00 6.00
0.50 0.50
1 2.00 2.00
2 108.00 30.86 30.86
3 90.00 38.57 38.57
1 135.00 6.43 6.43
90.4 75.9 14.5 0.0 0.0
18.33 18.33
1 6.00 6.00 6.00
1 6.00 6.00 6.00
0.50 0.50
1 2.00 2.00
2 108.00 30.86 30.86
3 90.00 38.57 38.57
1 135.00 6.43 6.43
108.7 75.9 32.8 0.0 0.0
Qty Rate 13
Qty Rate 15
Qty Rate 13
Qty Rate 79
Qty Rate 94
Qty Rate 75
Qty Rate 28
Qty Rate 86
Qty Rate 72
Qty Rate 65
1.15 40 46 46.00
250 1500 6 6
250 700 2.8 2.8
5 75 1.5 1.5
10 90.00 3.60 3.60
1 135.00 0.36 0.36
2.5 500.00 5.0 5.00
65.3 4.0 51.0 8.8 1.5
Qty Rate 102
1.15 40 46 46.00
40 750 18.75 18.75
40 700 17.5 17.5
40 100 2.5 2.5
1 75 1.875 1.875
4 90.00 9.00 9.00
1 135.00 0.90 0.90
2000 0.10 5.0 5.00
101.5 9.9 51.0 38.8 1.9
Qty Rate/Day 60
1 40 42.00 42.00
1 750 5.00 5.0
1 700 4.67 4.7
4 90.00 2.40 2.40
1 135.00 0.30 0.30
3750 0.11 2.75 2.75
2 200.00 2.67 2.67
59.8 2.7 47.4 9.7 0.0
Qty Rate 93
1 18 18.00 18.00
1 4 4.00 4.00
1 61 61.00 61.00
1 4 4.00 4.00
1 36 36.00 36.00
123.0 0.0 0.0 0.0 123.0
75.00
170.00
80.00
60.00
90.00
45.00
125.00
175.00
100.00
18.00
40.00
20.00
65.00
30.00
40.00
20.00
20.00
40.00
40.00
150.00
250.00
350.00
400.00
L B D Rate Amount
25,000.00
8500 #VALUE!
3.14 0.1225 13.2 330.3
#REF! #VALUE! 3.12
145 0.2 1 900.0 #VALUE!
145 1.5 1 20 #VALUE!
145 0.7 0.6 900 #VALUE!
#VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE!
#VALUE!
M
Qty Rate Amount
4,950
69,830
121.7 980 119,233
121.7 225 27,375
4258.33 10 42,583
72,600
4 4500 18,000
35,457
98,000
90 3460 311,400
9,800
L B H Rate Amount
Dhs
15.00 #VALUE!
4 1 90.00 #VALUE!
1,150 #VALUE!
#VALUE! Dhs
L B H Rate Amount
Dhs
2 2 1 15.00 #VALUE!
0.7 0.7 1 15.00 #VALUE!
15.00 #VALUE!
2 1 90.00 #VALUE!
300 350
2.8 1 35 #VALUE!
0.7 0.7 35 #VALUE!
#VALUE! Dhs
L B H Rate Amount
Dhs
10 1 1 20.00 #VALUE!
20.00 #VALUE!
#VALUE! Dhs / m
Rate Amount
#VALUE! Dhs
L B H Rate Amount
3 3 1.45 25 #VALUE!
20 #VALUE!
20 #VALUE!
16 2 90 #VALUE!
16 2.3 35 #VALUE!
16 2.3 35 #VALUE!
Length
#VALUE! QR 16
409,000.00 3,556.52 m
409,000.00
Unit Rate
240
270
265
280
290
280
270
15
15
255
2600
2600
8.07
11.28
13.80
19.53
2.7
2.9
3.1
4.1
5.5
1.8
2
2.2
3.2
4.2
4.7
2.5
3.5
3
4.5
5
5.5
4.5
5.2
6.2
7
25
26
27
35
35
36
37
45
35
36
36
45
45
46
46
55
27
18
13
13
35
35
60
25
35
24
25
31
70
90
1250
55
65
175
156
78
33
49
63
500
45
40
35
65
17
30
42
69
18
35
18
4
61
4
36
12.5
175
12.5
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(No.) CATEG
(AED/m3) y (MHr/m3)
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m3) y (MHr/m3)
(No.) CATEG
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m3) y (MHr/m3)
(No.) CATEG
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m3) y (MHr/m3)
(No.) CATEG
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(No.) CATEG
(AED/m3) y (MHr/m3)
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
l -5 % wastage
Mason - 4 No 4.00 30.53% 0.72 0.06
Unskilled 6.00 45.80% 0.90 0.09
Charge hand 1.00 7.63% 0.15 0.01
Unskilled 0.10 0.76% 0.02 0.00
Carpenter - 2.00 15.27% 0.22 0.02
Crew 500m2/day 13.10 100.00% 2.00 0.18
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m3) y (MHr/m3)
(No.) CATEG
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m3) y (MHr/m3)
(No.) CATEG
Mason - 8 No 8.00 27.49% 5.40 0.45
Unskilled 16.00 54.98% 9.00 0.90
Charge hand 2.00 6.87% 3.15 0.21
Unskilled 0.10 0.34% 1.00 0.10
Carpenter - 2 No 2.00 6.87% 1.35 0.11
Steel Fixer - 1 No 1.00 3.44% 0.68 0.06
Crew 200m3/day 29.10 100% 20.58 1.83
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m3) y (MHr/m3)
(No.) CATEG
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m3) y (MHr/m3)
(No.) CATEG
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m3) y (MHr/m3)
(No.) CATEG
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m3) y (MHr/m3)
(No.) CATEG
(Carp - 2 No+Help - 1
no) - Gang - 6 Nos
(Incl Deshutter) 7.00 50.00% 21.42 1.79
Unskilled Labour - 4
No 5.00 35.71% 4.50 0.45
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(No.) CATEG
(AED/m2) y (MHr/m2)
(Carp - 2 No+Help - 1
no) - 1 Gang - 7 Nos
(Incl Deshutter) 7.00 52.50% 21.42 2.14
Unskilled Labour - 5
No 5.00 37.50% 4.50 0.30
Charge Hand - 1 No 1.33 10.00% 1.80 0.18
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/T) y (MHr/T)
(No.) CATEG
Steel Fixer - 3 No 4.00 80.00% 432.00 36.00
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/KG) y (MHr/KG)
(No.) CATEG
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)
% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)
% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)
% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)
% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)
% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)
% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)
% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)
% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)
% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)
% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)
% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)
% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m2)
y
(No.) CATEG (MHr/unit)
% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m2)
y
(No.) CATEG (MHr/unit)
% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m2)
y
(No.) CATEG (MHr/unit)
% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)
% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/M)
y
(No.) CATEG (MHr/unit)
% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)
% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)
% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)
% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)
% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)
% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)
% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)
% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)
% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m2)
y
(No.) CATEG (MHr/unit)
% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m2)
y
(No.) CATEG (MHr/unit)
% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)
% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m2)
y
(No.) CATEG (MHr/unit)
% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)
% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)
% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)
% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)
% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)
% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
Mason 1.00 32.26% 13.50 1.13
Unskilled Labour 1.00 32.26% 11.25 1.13
Charge Hand 1.00 32.26% 2.81 0.19
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
Mason 1.00 32.26% 13.50 1.13
Unskilled Labour 1.00 32.26% 11.25 1.13
Charge Hand 1.00 32.26% 2.81 0.19
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(No.) CATEG
(AED/m2) y (MHr/m2)
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(No.) CATEG
(AED/m2) y (MHr/m2)
Mason 1.00 32.26% 10.80 0.90
Unskilled Labour 1.00 32.26% 9.00 0.90
Charge Hand 1.00 32.26% 2.25 0.15
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(No.) CATEG
(AED/m2) y (MHr/m2)
Mason 1.00 32.26% 12.00 1.00
Unskilled Labour 1.00 32.26% 10.00 1.00
Charge Hand 1.00 32.26% 2.50 0.17
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
Mason 1.00 32.26% 9.82 0.82
Unskilled Labour 1.00 32.26% 8.18 0.82
Charge Hand 1.00 32.26% 2.05 0.14
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
Mason 1.00 32.26% 10.80 0.90
Unskilled Labour 1.00 32.26% 9.00 0.90
Charge Hand 1.00 32.26% 2.25 0.15
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
Mason 1.00 32.26% 13.50 1.13
Unskilled Labour 1.00 32.26% 11.25 1.13
Charge Hand 1.00 32.26% 2.81 0.19
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(No.) CATEG
(AED/m2) y (MHr/m2)
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
Mason 1.00 32.26% 13.50 1.13
Unskilled Labour 1.00 32.26% 11.25 1.13
Charge Hand 1.00 32.26% 2.81 0.19
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(No.) CATEG
(AED/m2) y (MHr/m2)
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
Mason 1.00 32.26% 9.53 0.79
Unskilled Labour 1.00 32.26% 7.94 0.79
Charge Hand 1.00 32.26% 2.38 0.16
Unskilled Labour - for
Curing 0.10 3.23% 1.50 0.15
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
MasonLabour
Unskilled - 4 No - 6 2.00 19.80% 0.54 0.05
No 6.00 59.41% 1.35 0.11
Charge Hand 1.00 9.90% 0.23 0.02
Unskilled Labour - for
Curing- 0.10 0.99% 0.02 0.00
Carpenter - 1.00 9.90% 0.22 0.02
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(No.) CATEG
(AED/m2) y (MHr/m2)
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
#VALUE!
QR/m
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT QTY
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)
SITE WORKS
Generally
Site Preparation
Clearance
Protection
To Collection 1,610.00
P2/S1/B1/SW/1
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT QTY
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)
Filling
Compaction
Disposal
Anti-termite treatment
To Collection 8,813.00
P2/S1/B1/SW/2/PTC1
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT QTY
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)
Generally
The Contractor shall list and price below, the items and quantities
of addition or deduction for any Bill of Quantity Item(s) and or
any omitted items that in his opinion are necessary for the full
and satisfactory completion of the work as described in the
Specifications or shown on the Drawings and for which either
expressed or implied provision is required and which are not
covered by the items or the rates in the Bill of Quantities.
Any such items not listed below shall be deemed to be included.
To Collection
P2/S1/B1/SW/3
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT QTY
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)
COLLECTION
Page P2/S1/B1/SW/3
SUBCONTRAC
LABOUR MATERIAL PLANT
T
TOTAL
SUBCONTRAC
LABOUR MATERIAL PLANT
T
TOTAL
SUBCONTRAC
LABOUR MATERIAL PLANT
T
TOTAL
1.15 MARK UP
SPLITTED AMOUNT
SUB
LABOUR MATERIAL PLANT
CONTRACT
DHS DHS DHS DHS
SUBCONTRAC
LABOUR MATERIAL PLANT
T
TOTAL
0.64
LABOUR DETAIL
MASON CARPENTER STEEL UNSKILLED CHARGE
FIXTURE LABOUR HAND
HRS HRS HRS HRS HRS
-
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)
CONCRETE WORKS
Substructure
Note:-Upto and including Ground Floor Grade slab
Substructure, Cont'd
Note:-Upto and including Ground Floor Grade slab
Formwork to
Sundries
F Isolation joint including filler, sealant, mastic, etc. item 1 575 575
To Collection 15,655.00
P2/S1/B1/CW/2/PTC1
Superstructure
To Collection 43,719.00
P2/S1/B1/CW/3
Superstructure, Cont'd
Formwork to
Sundries
G Control joints including filler, sealant, mastic, etc. item 1 575 575
To Collection 28,006.00
P2/S1/B1/CW/4/R1
Generally
The Contractor shall list and price below, the items and quantities
of addition or deduction for any Bill of Quantity Item(s) and or
any omitted items that in his opinion are necessary for the full
and satisfactory completion of the work as described in the
Specifications or shown on the Drawings and for which either
expressed or implied provision is required and which are not
covered by the items or the rates in the Bill of Quantities.
Any such items not listed below shall be deemed to be included.
A
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)
To Collection
P2/S1/B1/CW/5
COLLECTION
Page P2/S1/B1/CW/5 -
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)
MASONRY
Internal
MASONRY, Cont'd
External
Sundries
To Collection 7,682.00
P2/S1/B1/MA/2
MASONRY, Cont'd
Generally
The Contractor shall list and price below, the items and quantities
of addition or deduction for any Bill of Quantity Item(s) and or
any omitted items that in his opinion are necessary for the full
and satisfactory completion of the work as described in the
Specifications or shown on the Drawings and for which either
expressed or implied provision is required and which are not
covered by the items or the rates in the Bill of Quantities.
Any such items not listed below shall be deemed to be included.
A
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)
To Collection
P2/S1/B1/MA/3
MASONRY, Cont'd
COLLECTION
Page P2/S1/B1/MA/3 -
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)
0
METAL WORK
Steel profile
To Collection 6,216.00
P2/S1/B1/MW/1
Generally
The Contractor shall list and price below, the items and quantities
of addition or deduction for any Bill of Quantity Item(s) and or
any omitted items that in his opinion are necessary for the full
and satisfactory completion of the work as described in the
Specifications or shown on the Drawings and for which either
expressed or implied provision is required and which are not
covered by the items or the rates in the Bill of Quantities.
Any such items not listed below shall be deemed to be included.
A
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)
To Collection
P2/S1/B1/MW/2
COLLECTION
Page P2/S1/B1/MW/2
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)
Glass railing including balustrade, Aluminium handrail, steel sleeve, fixing, fittings,
bolts, screw, nuts, plates, special feature, finishes, accessories, etc.,
complete
Trellis
Parking Shade
D Trellis above car parking including 50x 150mm Powder coated
aluminium trellis including 75 x150mm aluminium frame, extruded
aluminium profile, steel post, aluminium/metal support fixed to
boundary wall fixing, special feature, supports system, accessories,
fittings, fixtures, etc.,complete as detailed on drg A-R-402 m2 30 345 10350
To Collection 16,622.00
P2/S1/B1/AG/1/PTC1
To Collection 29,050.00
P2/S1/B1/AG/2/PTC1
Generally
The Contractor shall list and price below, the items and quantities of
addition or deduction for any Bill of Quantity Item(s) and or any
omitted items that in his opinion are necessary for the full and
satisfactory completion of the work as described in the Specifications
or shown on the Drawings and for which either expressed or implied
provision is required and which are not covered by the items or the
rates in the Bill of Quantities. Any such items not listed below shall
be deemed to be included.
A
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)
To Collection
P2/S1/B1/AG/3
COLLECTION
Page P2/S1/B1/AG/3
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)
Total for Aluminium & Glazing - Carried to Bill No. 1 Summary 45,672
P2/S1/B1/AG/4
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)
Generally
The Contractor shall list and price below, the items and
quantities of addition or deduction for any Bill of Quantity
Item(s) and or any omitted items that in his opinion are
necessary for the full and satisfactory completion of the work
as described in the Specifications or shown on the Drawings
and for which either expressed or implied provision is required
and which are not covered by the items or the rates in the Bill
of Quantities. Any such items not listed below shall be deemed
to be included.
A
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)
To Collection
P2/S1/B1/CJ/2
COLLECTION
Page P2/S1/B1/CJ/2
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)
Total for Carpentry & Joinery - Carried to Bill No. 1 Summary 1,037.00
P2/S1/B1/CJ/3/R1
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
(AED) (AED)
NO.
Skirting
Skirting (External)
C Cement and sand plaster to receive Skirting m2 1 39 39
Threshold / Sill
F Cement and sand plaster to receive Threshold m2 6 29 174
L 150mm wide 1200mm high wc ledge finish type SF-01 including support &
framing system to wc cistern m 4 302 1208
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
(AED) (AED)
NO.
M Cills item 1 435 435
To Collection 7,335.00
P2/S1/B1/FIN/2/R1
D Hygiene moisture resistant emulsion paint RAL 9010, type PT-02 m2 59 21 1239
Sundries
K External paint to walls & soffit of ceiling over sand cement plaster
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
(AED) (AED)
NO.
including pvc grooves m2 173 32 5536
L White epoxy paint over cement sand plaster to parapet internal side m2 67 32 2144
To Collection 48,147.00
P2/S1/B1/FIN/3/PTC1
C Suspended gypsum board ceiling painted with emulsion paint RAL 9003,
type PT-03 m2 51 86 4386
To Collection 12,201.00
P2/S1/B1/FIN/4/R1
Generally
The Contractor shall list and price below, the items and quantities
of addition or deduction for any Bill of Quantity Item(s) and or
any omitted items that in his opinion are necessary for the full
and satisfactory completion of the work as described in the
Specifications or shown on the Drawings and for which either
expressed or implied provision is required and which are not
covered by the items or the rates in the Bill of Quantities.
Any such items not listed below shall be deemed to be included.
To Collection 1,032.00
P2/S1/B1/FIN/5
COLLECTION
Total for Internal & External Finishes - Carried to Bill No. 1 Summary 95,443.00
P2/S1/B1/FIN/6/R1
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
(AED) (AED)
NO.
Substructure waterproofing
B1 2 Coats of cold applied liquid bituminous paint laid horizontally m2 112 12 1344
To Collection 16,304.00
P2/S1/B1/TM/1/PTC1
D 4mm thick torch applied modified bitumen water proofing membrane m2 7 0 INCLUDED
2 Coat of Liquid Bitumen Paint
E Ditto at upstand m 23 INCLUDED
Waterproofing to shafts
To Collection 3,383.00
P2/S1/B1/TM/2/R1
A Waterproofing to base of AHU, duct and pipe penetration item 1 575 575
To Collection 1,725.00
P2/S1/B1/TM/3
Generally
The Contractor shall list and price below, the items and quantities
of addition or deduction for any Bill of Quantity Item(s) and or
any omitted items that in his opinion are necessary for the full
and satisfactory completion of the work as described in the
Specifications or shown on the Drawings and for which either
expressed or implied provision is required and which are not
covered by the items or the rates in the Bill of Quantities.
Any such items not listed below shall be deemed to be included.
A
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
(AED) (AED)
NO.
To Collection
P2/S1/B1/TM/4
COLLECTION
Page P2/S1/B1/TM/4
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
(AED) (AED)
NO.
Total for Thermal & Moisture Protection - Carried to Bill No. 1 Summary 21,412
P2/S1/B1/TM/5/R1
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
(AED) (AED)
NO.
A Full counter width full height mirror overall height 1550 mm m 4 345 1380
Full counter width full height mirror overall height 900 mm
B 500 x 1040 mm mirror no. 1 288 288
Garbage disposal
C Recycle garbage bins for glass, plastics, paper, metal, cardboard no. 2 288 576
Access Panels
Statutory Signage's
To Collection 2,560.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
(AED) (AED)
NO.
P2/S1/B1/AES/1
Take, delivery, store and fixing, testing and providing guarantee for
the following including incidental material, labour etc. complete as
shown on drawings and as per specifications
To Collection 2,299.00
P2/S1/B1/AES/2
Take, delivery, store and fixing, testing and providing guarantee for
the following including incidental material, labour etc. complete as
shown on drawings and as per specifications, cont'd
To Collection 410.00
P2/S1/B1/AES/3
Generally
The Contractor shall list and price below, the items and quantities
of addition or deduction for any Bill of Quantity Item(s) and or
any omitted items that in his opinion are necessary for the full
and satisfactory completion of the work as described in the
Specifications or shown on the Drawings and for which either
expressed or implied provision is required and which are not
covered by the items or the rates in the Bill of Quantities.
Any such items not listed below shall be deemed to be included.
A
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
(AED) (AED)
NO.
To Collection
P2/S1/B1/AES/4
COLLECTION
Page P2/S1/B1/AES/4
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
(AED) (AED)
NO.
Total for Accessories, Equipment, etc - Carried to Bill No. 1 Summary 5,269
P2/S1/B1/AES/5
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)
DRAINAGE INSTALLATIONS
D Floor clean out, type FCO - 110 mm dia. no. 4 145.00 580.00
To Collection 11,529.00
P2/S1/B1/ME/2/R1
To Collection 2,781.00
P2/S1/B1/ME/3
G All civil works related to Drainage works (e.g. Equipment base etc.) item 1 550.00 550.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)
To Collection 1,201.00
P2/S1/B1/ME/4
PLUMBING INSTALLATIONS
F Connection to sanitary ware/ sinks including angle valves etc. item 1 942.00 942.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)
To Collection 5,238.00
P2/S1/B1/ME/5/R1
To Collection 2,842.00
P2/S1/B1/ME/6/R1
To Collection 2,211.00
P2/S1/B1/ME/7
A Fixing of main water meter including incidental labour & material no. 1 1,155.00 1,155.00
GRP water tank and connection with fittings, float valves, vent
pipes, accessories, valves, supports, warning pipes, ladders,
partition low and high level float switches, etc., complete
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)
To Collection 4,974.00
P2/S1/B1/ME/8
To Collection 39,204.00
P2/S1/B1/ME/9/R1
G All civil works related to Plumbing works (e.g. Equipment base etc.) item 1 550.00 550.00
To Collection 3,036.00
P2/S1/B1/ME/10
To Collection 286.00
P2/S1/B1/ME/11
G All civil works related to Fire fighting works (e.g. Equipment base
etc.) item included
To Collection -
P2/S1/B1/ME/12
AIR-CONDITIONING INSTALLATIONS
To Collection 25,219.00
P2/S1/B1/ME/13
A Supply air grille, type SAG - 750 x 150 mm no. 1 174.00 174.00
B Supply air grille, type SAG - 600 x 150 mm no. 2 135.00 270.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)
C Return air grille, type RAG - 750 x 150 mm no. 1 123.00 123.00
D Return air grille, type RAG - 600 x 150 mm no. 1 100.00 100.00
L ED-1, 150 x 150 mm, 15 L/s air flow rate no. 4 79.00 316.00
M ED-3, 150 x 150 mm, 10 L/s air flow rate no. 1 79.00 79.00
N ED-4, 225 x 225 mm, 50 L/s air flow rate no. 1 95.00 95.00
To Collection 2,248.00
P2/S1/B1/ME/14/R1
To Collection 3,497.00
P2/S1/B1/ME/15/R1
To Collection 12,184.00
P2/S1/B1/ME/16/R1
G All civil works related to HVAC works (e.g. Equipment base etc.) item 1 550.00 550.00
To Collection 2,769.00
P2/S1/B1/ME/17
LPG INSTALLATIONS
To Collection 12,485.00
P2/S1/B1/ME/18
To Collection -
P2/S1/B1/ME/19/R1
G All civil works related to LPG works (e.g. Equipment base etc.) item included
To Collection -
P2/S1/B1/ME/20
Generally
The Contractor shall list and price below, the items and quantities
of addition or deduction for any Bill of Quantity Item(s) and or
any omitted items that in his opinion are necessary for the full and
satisfactory completion of the work as described in the
Specifications or shown on the Drawings and for which either
expressed or implied provision is required and which are not
covered by the items or the rates in the Bill of Quantities. Any
such items not listed below shall be deemed to be included in his
o1Fer.
To Collection 4,690.00
P2/S1/B1/ME/21
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)
SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)
COLLECTION
Page P2/S1/B1/ME/12 -
COLLECTION, (cont'd.)
Page P2/S1/B1/ME/19/R1 -
Page P2/S1/B1/ME/20 -
Total for Mechanical Engg. Installations - Carried to Bill No. 1 Summary 142,029.00
P2/S1/B1/ME/23/R1
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)
To Collection 1,115.00
P2/S1/B1/EE/2
B1 From meter to DB-GR, 1x100mm dia. uPVC duct item 1 186 186.00
B2 From meter to DB-FR, 1x75mm dia. uPVC duct item 1 296 296.00
C Glanding & termination works for DEWA incoming cable item 1 225 225.00
To Collection 5,177.00
P2/S1/B1/EE/3/R4
Miscellaneous item
To Collection 3,265.00
P2/S1/B1/EE/4/R1
G 1 x 30 W, led lamp with die-cast aluminum body and glass diffuser ip65,
Type W1 no. 3 113 339.00
To Collection 4,859.00
P2/S1/B1/EE/5
To Collection 2,538.00
P2/S1/B1/EE/6/R1
A 13A 230v 50 hz 2 pole & earth bs 1363 switch socket outlet no. 18 138 2,484.00
B 2 gang 13A 230v 50 hz 2 pole & earth bs 1363 switch socket outlet no. 5 138 690.00
To Collection 4,968.00
P2/S1/B1/EE/7
Take delivery, store and fix only the following light fittings and
accessories including any incidental materials, labour, coordination
with the supplier, etc. complete
G 1 x 30 W, led lamp with die-cast aluminum body and glass diffuser ip65,
Type W1 no. 3 31 93.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)
To Collection 1,333.00
P2/S1/B1/EE/8
To Collection 1,103.00
P2/S1/B1/EE/9/R1
A 13A 230v 50 hz 2 pole & earth bs 1363 switch socket outlet no. 18 35 630.00
B 2 gang 13A 230v 50 hz 2 pole & earth bs 1363 switch socket outlet no. 5 55 275.00
To Collection 2,210.00
P2/S1/B1/EE/10
TELEPHONE SYSTEM
To Collection 1,245.00
P2/S1/B1/EE/11
EARTHING SYSTEM
To Collection 9,906.00
P2/S1/B1/EE/12/R1
C Addressable smoke detector with built in isolator base no. 3 118 354.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)
To Collection 1,680.00
P2/S1/B1/EE/13/R4
C Addressable smoke detector with built in isolator base no. 3 477 1,431.00
To Collection 11,451.00
P2/S1/B1/EE/14/R4
To Collection 855.00
P2/S1/B1/EE/15/R4
To Collection 1,347.00
P2/S1/B1/EE/16
Generally
The Contractor shall list and price below, the items and quantities of
addition or deduction for any Bill of Quantity Item(s) and or any
omitted items that in his opinion are necessary for the full and
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)
satisfactory completion of the work as described in the
Specifications or shown on the Drawings and for which either
expressed or implied provision is required and which are not covered
by the items or the rates in the Bill of Quantities. Any such items not
listed below shall be deemed to be included.
To Collection -
P2/S1/B1/EE/17
COLLECTION
Page P2/S1/B1/EE/17 -
Total for Electrical Engg. installations - Carried to Bill No. 1 Summary 59,567.00
P2/S1/B1/EE/18/R4
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
EXTERNAL WORKS
Site clearance
Earthworks
To Collection 1,265.00
P2/S1/B1/EW/1
Boundary wall
Following including but not limited to all earth works, civil works,
blockwork, jointed and pointed in cement including all air gaps, crack
control joints, anchors, dowel bars, metal laths, joints, wall ties,
stiffener beams and columns, reinforcement, waterproofing, expansion
joints, plaster, finishes, special features, fittings, accessories, MEP etc.,
complete as per drawings and specifications
To Collection 20,274.00
P2/S1/B1/EW/2
Generally
The Contractor shall list and price below, the items and quantities
of addition or deduction for any Bill of Quantity Item(s) and or
any omitted items that in his opinion are necessary for the full
and satisfactory completion of the work as described in the
Specifications or shown on the Drawings and for which either
expressed or implied provision is required and which are not
covered by the items or the rates in the Bill of Quantities.
Any such items not listed below shall be deemed to be included.
A
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
To Collection
P2/S1/B1/EW/3
COLLECTION
Page P2/S1/B1/EW3
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
SUMMARY
MATERIA
ITEM LABOUR PLANT
L
METAL WORK - - -
TOTALS
NO OF
SUBCONTRACT LABOUR MATERIAL PLANT SUBCONTRACT
VILLAS
5,400.00 39 0 0 0 210,600
41,250.00 39 0 0 0 1,608,750
915.00 39 0 0 0 35,685
26,022.00 39 0 0 0 1,014,858
4,515.00 39 0 0 0 176,085
12,333,966