Sl.

No Description Unit
UNSKILLED LABOUR PRICE HOUR
SKILLED LABOUR PRICE HOUR
CHARGE HAND HOUR

Open Excavation - 150 m3 ( upto 1.50 m Depth ) Soft ,Medium Soil M3

150
Mechanical Shovel 966 No
Roller Compactor - 20T - 850 Dhs/No (1000 m2 / No) m2
Unskilled Labour - 2 No No
Charge Hand No
Compaction test - 200 Dhs/No (750 m2/Test) No
Manual Excavation No

Actual Cost

Open Excavation - 150 m3 ( upto 4.00 m Depth ) Soft ,Medium Soil M3

150
Mechanical Shovel 966 - 2 No No
Roller Compactor - 20T - 850 Dhs/No (1000 m2 / No) m2
Unskilled Labour - 2 No No
Charge Hand No
Compaction test - 200 Dhs/No (750 m2/Test) No
Manual Excavation

Actual Cost

Open Excavation - 50 m3 - Hard Soil M3

50
Bucket Excavator No
Excavator with Drilling Hammer No
Roller Compactor - 20T - 700 Dhs/No (1000 m2/No) m2
Unskilled Labour - 2 No No
Charge Hand No
Compaction test - 200 Dhs/No (750 m2/Test) No
Hand tool item
Actual Cost
BACK FILLING - 250 m3 M3

200
Mechanical Shovel 966 - 750 QRs/ No - 2 No No
Roller Compactor - 20T - 700 Dhs/No (1000 m2/No) No
Unskilled Labour - 2 No No
Charge Hand No
Sweet water 5000 g- 10 g / m2 Trip
Compaction test - 200 Dhs/No (750 m2/Test) No
Hand tool item
Actual Cost

CART AWAY - 240 m3 - Upto 50 KM - Bulkage 1.25 M3

200
Mechanical Shovel 966 No
2 No - Dump Truck 35 T - 20 m3-6 trip/day Trip
Unskilled Labour - 2 No No
Charge Hand No
Hand tool item
Actual Cost

IMPORTED FILLING SAND - 200 m3 M3

200
Imported Filling Sand No
Mechanical Shovel 966 - 2 No No
Roller Compactor - 20T No
Unskilled Labour - 2 No No
Charge Hand No
Sweet water 5000 g- 10 g / m2 Trip
Compaction test - 200 Dhs/No (750 m2/Test) No
Actual Cost

Anti Termite Treatment M2


Anti Termite Treatment - 3 Layer m2
Actual Cost

Polythene sheet M2
Polythene 1000 g (5.00 x 2.00 m = 100 m2 = 156 ) m2
lapping m2
wastage %
Labour - 300 M2/ Day No
Actual Cost

Ruberized Bitumine Paint - 100 m2 M2


80
Bitumen(200L=500Dhs) => 100 m2 of 2 coats 200L
wastage - 10 %
Misc./tools item
Labour - 40 M2/ Per No
Actual Cost

FOAM CONCRETE - 100 mm - (45 m2) M3

10
Foam Concrete Subcontract m2
OP Cement = (1 Bag / 1 m2) & ( 10 Bag/1 m3 ) m3
Mason No
Unskilled Labour No
Charge Hand No
Unskilled Labour - for Curing- 1 hr/m3 No
Sweet water 5000 g- 15 g / m3 Trip
Hand Tools
Actual Cost

FOAM CONCRETE - 100 mm - (45 m2) M2

10
Foam Concrete Subcontract m2
OP Cement = (1 Bag / 1 m2) & ( 10 Bag/1 m3 ) m3
Mason No
Unskilled Labour No
Charge Hand No
Unskilled Labour - for Curing- 1 hr/m3 No
Sweet water 5000 g- 15 g / m3 Trip
Hand Tools
Actual Cost

BLINDING CONCRETE - SRC - C20 - 50 mm THK - (500 m2) M2

50 mm thk 30
Basic Cost - 5 % wastage m3
Pump - 5 % wastage m3
Temp.Control -5 % wastage m3
Mason - 4 No No
Unskilled Labour - 6 No No
Charge Hand No
Unskilled Labour - for Curing- No
Carpenter - No
Sweet water 5000 g- 15 g / m3 Trip
Hand Tools
White wood - 0.28 m3 / 5 times ( + 10% wastage ) m3
Nail
Actual Cost 50 mm thk

BLINDING CONCRETE - SRC - C20 - 75 mm THK - (500 m2) M2

75 mm thk 40
Basic Cost - 5 % wastage m3
Pump - 5 % wastage m3
Temp.Control -5 % wastage m3
Mason - 4 No No
Unskilled Labour - 6 No No
Charge Hand No
Unskilled Labour - for Curing- No
Carpenter - No
Sweet water 5000 g- 15 g / m3 Trip
Hand Tools
White wood - 0.28 m3 / 5 times ( + 10% wastage ) m3
Nail
Actual Cost 75 mm thk

BLINDING CONCRETE - SRC - C20 - 100 mm THK - (500 m2) M2

40
Basic Cost - 5 % wastage m3
Pump - 5 % wastage m3
Temp.Control -5 % wastage m3
Mason - 4 No No
Unskilled Labour - 6 No No
Charge Hand No
Unskilled Labour - for Curing- No
Carpenter - No
Sweet water 5000 g- 15 g / m3 Trip
Hand Tools
White wood - 0.28 m3 / 5 times ( + 10% wastage ) m3
Nail
Actual Cost 100 mm thk

BLINDING CONCRETE - SRC - C20 - 100 mm THK - (500 m2) M3

40
Basic Cost - 5 % wastage m3
Pump - 5 % wastage m3
Temp.Control -5 % wastage m3
Mason - 4 No No
Unskilled Labour - 6 No No
Charge Hand No
Unskilled Labour - for Curing- No
Carpenter - No
Sweet water 5000 g- 15 g / m3 Trip
Hand Tools
White wood - 0.28 m3 / 5 times ( + 10% wastage ) m3
Nail
Actual Cost 100 mm thk

CONCRETE - OPC with GGBS - C40 - (200 m3)-SUBSTRUCTURE M3

160
Basic Cost - 2 % wastage m3
Testing - 300 Dhs/ test x 2% LS
Pump - 2 % wastage m3
Temp.Control - 2 % wastage m3
Mason - 8 No No
Unskilled Labour - 16 No No
Charge Hand - 2 No No
Unskilled Labour - for Curing- 1 hr/m3 No
Carpenter - 2 No No
Steel Fixer - 1 No No
Sweet water 5000 g- 15 g / m3 Trip
Hand Tools
Vibrator - 26-50 mm size - 15 Dhs/day + Petrol - 5Gallonx10Dhs No
Actual Cost

CONCRETE - OPC with GGBS - C50 - (200 m3)-SUBSTRUCTURE M3

160
Basic Cost - 2 % wastage m3
Testing - 300 Dhs/ test x 2% LS
Pump - 2 % wastage m3
Temp.Control - 2 % wastage m3
Mason - 8 No No
Unskilled Labour - 16 No No
Charge Hand - 2 No No
Unskilled Labour - for Curing- 1 hr/m3 No
Carpenter - 2 No No
Steel Fixer - 1 No No
Sweet water 5000 g- 15 g / m3 Trip
Hand Tools
Vibrator - 26-50 mm size - 15 Dhs/day + Petrol - 5Gallonx10Dhs No
Actual Cost

CONCRETE - OPC with GGBS - C60 - (200 m3)-SUBSTRUCTURE M3

160
Basic Cost - 2 % wastage m3
Testing - 300 Dhs/ test x 2% LS
Pump - 2 % wastage m3
Temp.Control - 2 % wastage m3
Mason - 8 No No
Unskilled Labour - 16 No No
Charge Hand - 2 No No
Unskilled Labour - for Curing- 1 hr/m3 No
Carpenter - 2 No No
Steel Fixer - 1 No No
Sweet water 5000 g- 15 g / m3 Trip
Hand Tools
Vibrator - 26-50 mm size - 15 Dhs/day + Petrol - 5Gallonx10Dhs No
Actual Cost

CONCRETE - OPC with GGBS - C40 - (200 m3)-SUPER-STRUCTURE M3

160
Basic Cost - 2 % wastage m3
Testing - 300 Dhs/ test x 2% LS
Pump - 2 % wastage m3
Temp.Control - 2 % wastage m3
Mason - 8 No No
Unskilled Labour - 16 No No
Charge Hand - 2 No No
Unskilled Labour - for Curing- 1 hr/m3 No
Carpenter - 2 No No
Steel Fixer - 1 No No
Sweet water 5000 g- 15 g / m3 Trip
Hand Tools
Vibrator - 26-50 mm size - 15 Dhs/day + Petrol - 5Gallonx10Dhs No
Actual Cost

CONCRETE - OPC with GGBS - C50 - (200 m3)-SUPER-STRUCTURE M3

160
Basic Cost - 2 % wastage m3
Testing - 300 Dhs/ test x 2% LS
Pump - 2 % wastage m3
Temp.Control - 2 % wastage m3
Mason - 8 No No
Unskilled Labour - 16 No No
Charge Hand - 2 No No
Unskilled Labour - for Curing- 1 hr/m3 No
Carpenter - 2 No No
Steel Fixer - 1 No No
Sweet water 5000 g- 15 g / m3 Trip
Hand Tools
Vibrator - 26-50 mm size - 15 Dhs/day + Petrol - 5Gallonx10Dhs No
Actual Cost

CONCRETE - OPC with GGBS - C60 - (200 m3)-SUPER-STRUCTURE M3

160
Basic Cost - 2 % wastage m3
Testing - 300 Dhs/ test x 2% LS
Pump - 2 % wastage m3
Temp.Control - 2 % wastage m3
Mason - 8 No No

Unskilled Labour - 16 No No
Charge Hand - 2 No No

Unskilled Labour - for Curing- 1 hr/m3 No


Carpenter - 2 No No
Steel Fixer - 1 No No
Sweet water 5000 g- 15 g / m3 Trip
Hand Tools
Vibrator - 26-50 mm size - 15 Dhs/day + Petrol - 5Gallonx10Dhs No
Actual Cost
FORMWORK ( Substructure ) - 100 m2 M2

100
Material Price( Usage 3 Times) m2
White wood ( Usage 3 times ) m3
Nail - 32Dhs/ (6kg - Carton), 0.194 kg/ m2 m2
Wastage 5%

(Carp - 2 No+Help - 1 no) - Gang - 6 Nos (Incl Deshutter) No

Unskilled Labour - 4 No No

Charge Hand - 1 No No
Waste Oil m2
Hand Tool
support scaffolding - 15Dhs / m2 m2
Actual Cost

FORMWORK ( Superstructure ) - 100 m2 M2

100
Material Price( Usage 3 Times) m2
White wood ( Usage 3 times ) m3
Nail - 32 Dhs/ (6kg - Carton), 0.194 kg/ m2 m2
Wastage 5%
Waste Oil m2

(Carp - 2 No+Help - 1 no) - 1 Gang - 7 Nos (Incl Deshutter) No

Unskilled Labour - 5 No No
Charge Hand - 1 No No
Hand Tool
support scaffolding - 15Dhs / m2 m2
Actual Cost

REINFORCEMENT ( EMIRATES) TONNE

Basic Cost ( Cut & Bent ) T


20 Gauge - Binding Wire- 25 kg/Ton Kg
Steel Fixer - 3 No No
Unskilled Labour - 3 No No
Charge Hand - 1 No No
Wastage 0%
Actual Cost
Epoxy coat 650 QRs/T

REINFORCEMENT ( EMIRATES) Kg

Basic Cost ( Cut & Bent ) Kg


20 Gauge - Binding Wire- 25 kg/Ton Kg
Steel Fixer - 3 No No
Unskilled Labour - 3 No No
Charge Hand - 1 No No
Wastage 0%
Actual Cost
Epoxy coat 650 QRs/T

SCREED CONCRETE - SRC - C20 - 75 mm THK - (500 m2) M2

75 mm thk 40
Basic Cost - 5 % wastage m3
Pump - 5 % wastage m3
Temp.Control -5 % wastage m3
Mason - 4 No No

Unskilled Labour - 6 No No
Charge Hand No

Unskilled Labour - for Curing- No


Carpenter - No
Sweet water 5000 g- 15 g / m3 Trip
Hand Tools
White wood - 0.28 m3 / 5 times ( + 10% wastage ) m3
Nail
Actual Cost 75 mm thk

WATER TANK, HOLDING TANK m3

Concrete m3
Formwork m2
Reinforcement kg
Actual Cost

SWIMMING POOL m3

Concrete m3
Formwork m2
Reinforcement kg
Actual Cost

PILE CAP m3

Concrete m3
Formwork m2
Reinforcement kg
Actual Cost

ISOLATED FOOTING m3

Concrete m3
Formwork m2
Reinforcement kg
Actual Cost

RAFT FOUNDATION m3

Concrete m3
Formwork m2
Reinforcement kg
Actual Cost

NECK COLUMN m3

Concrete m3
Formwork m2
Reinforcement kg
Actual Cost
COLUMN m3

Concrete m3
Formwork m2
Reinforcement kg
Actual Cost

TIE BEAM m3

Concrete m3
Formwork m2
Reinforcement kg
Actual Cost

ROOF BEAM m3

Concrete m3
Formwork m2
Reinforcement kg
Actual Cost

COREWALL ( SUBSTRUCTURE ) m3

Concrete m3
Formwork m2
Reinforcement kg
Actual Cost

COREWALL ( SUPER-STRUCTURE ) m3

Concrete m3
Formwork m2
Reinforcement kg
Actual Cost

RETAINING WALL m3

Concrete m3
Formwork ( One Side ) m2
Reinforcement kg
Actual Cost

STIFFNER COLUMN , COPPING BEAM m3

Concrete m3
Formwork m2
Reinforcement kg
Actual Cost

SLAB, RAMP - 200 mm thk m3

Concrete m3
Formwork m2
Reinforcement kg
Actual Cost

SLAB, RAMP - 200 mm thk m2

Concrete m3
Formwork m2
Reinforcement kg
Actual Cost

SLAB, RAMP - 320 mm thk m2

Concrete m3
Formwork m2
Reinforcement kg
Actual Cost

SLAB, RAMP - 420 mm thk m2

Concrete m3
Formwork m2
Reinforcement kg
Actual Cost
STAIRCASE m3

Concrete m3
Formwork m2
Reinforcement kg
Actual Cost

PARAPET - 150 mm thk m3

Concrete m3
Formwork m2
Reinforcement kg
Actual Cost

SILL M

Concrete m3
Formwork m2
Reinforcement kg
Actual Cost

LINTEL ( m3 ) m3

Concrete m3
Formwork m2
Reinforcement kg
Actual Cost

LINTEL ( m ) M

Concrete m3
Formwork m2
Reinforcement kg
Actual Cost

A/C EQUIPMENT BASE CONCRETE m3

Concrete m3
Formwork m2
Reinforcement kg
Actual Cost

265 mm thk HOLLOW CORE SLAB m2

Hollow Core Slab


Concrete m
A393 BRC Mesh Times
Formwork m2
Actual Cost

300 mm thk HOLLOW CORE SLAB m2

Hollow Core Slab


Concrete m
A393 BRC Mesh Times
Formwork m2
Actual Cost

320 mm thk HOLLOW CORE SLAB m2

Hollow Core Slab


Concrete m
A393 BRC Mesh Times
Formwork m2
Actual Cost

500 mm thk HOLLOW CORE SLAB m2

Hollow Core Slab


Concrete m
A393 BRC Mesh Times
Formwork m2
Actual Cost

200 mm Grade Slab With A 393 Mesh ( m3 ) m3

Concrete m
A393 BRC Mesh Times
Formwork m2
Flexel Board
Actual Cost
200 mm Grade Slab With A 393 Mesh ( m2 ) m2

Concrete m
A393 BRC Mesh Times
Formwork m2
Flexel Board
Actual Cost

150 mm Grade Slab With A 393 Mesh m3

Concrete m
A393 BRC Mesh Times
Formwork m2
Flexel Board
Actual Cost

150 mm Grade Slab With A 393 Mesh m2

Concrete m
A393 BRC Mesh Times
Formwork m2
Flexel Board
Actual Cost

120 mm Grade Slab With A 252 Mesh m3

Concrete m
A252 BRC Mesh Times
Formwork m2
Flexel Board
Actual Cost

120 mm Grade Slab With A 252 Mesh m2

Concrete m
A252 BRC Mesh Times
Formwork m2
Flexel Board
Actual Cost
100 mm Grade Slab With A 393 Mesh m3

Concrete m
A393 BRC Mesh Times
Formwork m2
Flexel Board
Actual Cost

100 mm Grade Slab With A 252 Mesh m2

Concrete m
A393 BRC Mesh Times
Formwork m2
Flexel Board
Actual Cost

200 mm POST TENSION SLAB m3

Concrete m2
Formwork m2
Reinforcement kg
Slab Post Tensioning - 40 / m2
Grouting 10 % of concrete
Actual Cost

230 mm POST TENSION SLAB m2

Concrete m2
Formwork m2
Reinforcement kg
Slab Post Tensioning - 40 / m2
Grouting 10 % of concrete
Actual Cost

250 mm POST TENSION SLAB m3

Concrete m2
Formwork m2
Reinforcement kg
Slab Post Tensioning - 40 / m2
Grouting 10 % of concrete
Actual Cost

270 mm POST TENSION SLAB m2

Concrete m2
Formwork m2
Reinforcement kg
Slab Post Tensioning - 40 / m2
Grouting 10 % of concrete
Actual Cost

280 mm POST TENSION SLAB m3

Concrete m2
Formwork m2
Reinforcement kg
Slab Post Tensioning - 40 / m2
Grouting 10 % of concrete
Actual Cost

300 mm POST TENSION SLAB m3

Concrete m2
Formwork m2
Reinforcement kg
Slab Post Tensioning - 40 / m2
Grouting 10 % of concrete
Actual Cost

320 mm POST TENSION SLAB m3

Concrete m2
Formwork m2
Reinforcement kg
Slab Post Tensioning - 40 / m2
Grouting 10 % of concrete
Actual Cost

POST TENSION ( BEAM ) m3

Concrete m3
Formwork m2
Reinforcement kg
Slab Post Tensioning - 350 / m3
Grouting 10 % of concrete
Actual Cost

100 mm DECKING SLAB With A 142 Mesh M2

Concrete m2
A393 BRC Mesh kg
Actual Cost

BRC Mesh 142 ( 230 m2) M2


230
Cost of materials 4.8*2.4=11.52 m2
Over laps %
cover block , binding wires item
Steel Fixer No
Unskilled Labour No
Actual Cost

BRC Mesh 193 (230 m2) M2


230
Cost of materials 4.8*2.4=11.52 m2
Over laps %
cover block , binding wires item
Steel Fixer No
Unskilled Labour No
Actual Cost

BRC Mesh 252 (230 m2) M2


230
Cost of materials 4.8*2.4=11.52 m2
Over laps %
cover block , binding wires item
Steel Fixer No
Unskilled Labour No
Actual Cost

BRC Mesh 393 (230 m2 ) M2


230
Cost of materials 4.8*2.4=11.52 m2
Over laps %
cover block , binding wires item
Steel Fixer No
Unskilled Labour No
Actual Cost

SOLID BLOCK - 100 mm - 8 m2 M2

8
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No
Unskilled Labour - for Curing No
Sweet water 5000 g - 20 g / m2 Trip
Hand Tools
Actual Cost

SOLID BLOCK - 150 mm - 8 m2 M2

8
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No

Unskilled Labour - for Curing No


Sweet water 5000 g - 20 g / m2 Trip
Hand Tools
Actual Cost

SOLID BLOCK - 200 mm - 8 m2 M2

8
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No

Unskilled Labour - for Curing No


Sweet water 5000 g - 20 g / m2 Trip
Hand Tools
Actual Cost

SOLID BLOCK - 250 mm - 8 m2 M2

8
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No

Unskilled Labour - for Curing No


Sweet water 5000 g - 20 g / m2 Trip
Hand Tools
Actual Cost

SOLID BLOCK - 300 mm - 8 m2 M2

8
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No

Unskilled Labour - for Curing No


Sweet water 5000 g - 20 g / m2 Trip
Hand Tools
Actual Cost

SOLID BLOCK - 100 mm - 8 m2 ( 1 Hr Fire Rated ) M2

8
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No

Unskilled Labour - for Curing No


Sweet water 5000 g - 20 g / m2 Trip
Hand Tools
Actual Cost

SOLID BLOCK - 150 mm - 8 m2 ( 1 Hr Fire Rated ) M2

8
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No

Unskilled Labour - for Curing No


Sweet water 5000 g - 20 g / m2 Trip
Hand Tools
Actual Cost
SOLID BLOCK - 200 mm - 8 m2 ( 1 Hr Fire Rated ) M2

8
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No

Unskilled Labour - for Curing No


Sweet water 5000 g - 20 g / m2 Trip
Hand Tools
Actual Cost

SOLID BLOCK - 250 mm - 8 m2 ( 1 Hr Fire Rated ) M2

8
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No

Unskilled Labour - for Curing No


Sweet water 5000 g - 20 g / m2 Trip
Hand Tools
Actual Cost

SOLID BLOCK - 300 mm - 8 m2 ( 1 Hr Fire Rated ) M2

8
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No

Unskilled Labour - for Curing No


Sweet water 5000 g - 20 g / m2 Trip
Hand Tools
Actual Cost

SOLID BLOCK - 100 mm - 8 m2 ( 2 Hr Fire Rated ) M2

8
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No

Unskilled Labour - for Curing No


Sweet water 5000 g - 20 g / m2 Trip
Hand Tools
Actual Cost

SOLID BLOCK - 150 mm - 8 m2 ( 2 Hr Fire Rated ) M2

8
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No

Unskilled Labour - for Curing No


Sweet water 5000 g - 20 g / m2 Trip
Hand Tools
Actual Cost
SOLID BLOCK - 200 mm - 8 m2 ( 2 Hr Fire Rated ) M2

8
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No

Unskilled Labour - for Curing No


Sweet water 5000 g - 20 g / m2 Trip
Hand Tools
Actual Cost

HOLLOW BLOCK - 350 mm - 10 m2 M2

10
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No

Unskilled Labour - for Curing No


Sweet water 5000 g - 20 g / m2 Trip
Hand Tools
Actual Cost

HOLLOW BLOCK - 300 mm - 10 m2 M2

10
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No

Unskilled Labour - for Curing No


Sweet water 5000 g - 20 g / m2 Trip
Hand Tools
Actual Cost

HOLLOW BLOCK - 250 mm - 10 m2 M2

10
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No

Unskilled Labour - for Curing No


Sweet water 5000 g - 20 g / m2 Trip
Hand Tools
Actual Cost

HOLLOW BLOCK - 200 mm - 10 m2 M2

10
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No

Unskilled Labour - for Curing No


Sweet water 5000 g - 20 g / m2 Trip
Hand Tools
Actual Cost

HOLLOW BLOCK - 150 mm - 10 m2 M2


10
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No

Unskilled Labour - for Curing No


Sweet water 5000 g - 20 g / m2 Trip
Hand Tools
Actual Cost

HOLLOW BLOCK - 100 mm - 11 m2 M2

9
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No

Unskilled Labour - for Curing No


Sweet water 5000 g - 20 g / m2 Trip
Hand Tools
Actual Cost

DOUBLE SKIN HOLLOW BLOCK with 50 mm Insulation -


M2
100+50+100 mm - 11 m2
11
50 mm Insulation
100 mm Hollow Block
100 mm Hollow Block

Actual Cost

HOLLOW BLOCK - 350 mm - 10 m2 ( 1 Hr Fire Rated ) M2


9
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No

Unskilled Labour - for Curing No


Sweet water 5000 g - 20 g / m2 Trip
Hand Tools
Actual Cost

HOLLOW BLOCK - 300 mm - 10 m2 ( 1 Hr Fire Rated ) M2

10
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No

Unskilled Labour - for Curing No


Sweet water 5000 g - 20 g / m2 Trip
Hand Tools
Actual Cost

HOLLOW BLOCK - 250 mm - 10 m2 ( 1 Hr Fire Rated ) M2

10
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No

Unskilled Labour - for Curing No


Sweet water 5000 g - 20 g / m2 Trip
Hand Tools
Actual Cost

HOLLOW BLOCK - 200 mm - 10 m2 ( 1 Hr Fire Rated ) M2

10
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No

Unskilled Labour - for Curing No


Sweet water 5000 g - 20 g / m2 Trip
Hand Tools
Actual Cost

HOLLOW BLOCK - 150 mm - 10 m2 (1 Hr Fire Rated ) M2

10
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No

Unskilled Labour - for Curing No


Sweet water 5000 g - 20 g / m2 Trip
Hand Tools
Actual Cost

HOLLOW BLOCK - 100 mm - 11 m2 (1 Hr Fire Rated ) M2

11
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No

Unskilled Labour - for Curing No


Sweet water 5000 g - 20 g / m2 Trip
Hand Tools
Actual Cost

HOLLOW BLOCK - 350 mm - 10 m2 ( 2 Hr Fire Rated ) M2

10
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No

Unskilled Labour - for Curing No


Sweet water 5000 g - 20 g / m2 Trip
Hand Tools
Actual Cost

HOLLOW BLOCK - 300 mm - 10 m2 ( 2 Hr Fire Rated ) M2

10
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No

Unskilled Labour - for Curing No


Sweet water 5000 g - 20 g / m2 Trip
Hand Tools
Actual Cost
HOLLOW BLOCK - 250 mm - 10 m2 ( 2 Hr Fire Rated ) M2

10
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No

Unskilled Labour - for Curing No


Sweet water 5000 g - 20 g / m2 Trip
Hand Tools
Actual Cost

HOLLOW BLOCK - 200 mm - 10 m2 ( 2 Hr Fire Rated ) M2

10
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No

Unskilled Labour - for Curing No


Sweet water 5000 g - 20 g / m2 Trip
Hand Tools
Actual Cost

HOLLOW BLOCK - 150 mm - 10 m2 (2 Hr Fire Rated ) M2

10
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No

Unskilled Labour - for Curing No


Sweet water 5000 g - 20 g / m2 Trip
Hand Tools
Actual Cost

HOLLOW BLOCK - 100 mm - 11 m2 ( 2 Hr Fire Rated ) M2

11
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No

Unskilled Labour - for Curing No


Sweet water 5000 g - 20 g / m2 Trip
Hand Tools
Actual Cost

INSULATED BLOCK - 200mm - 6 m2 M2

8
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No

Unskilled Labour - for Curing No


Sweet water 5000 g - 20 g / m2 Trip
Hand Tools
Actual Cost
INSULATED BLOCK - 250mm - 6 m2 M2

8
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No

Unskilled Labour - for Curing No


Sweet water 5000 g - 20 g / m2 Trip
Hand Tools
Actual Cost

INSULATED BLOCK - 300mm - 6 m2 M2

8
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No

Unskilled Labour - for Curing No


Sweet water 5000 g - 20 g / m2 Trip
Hand Tools
Actual Cost

INSULATED BLOCK -300mm - 6 m2(2 Hrs Fire Rated) M2

8
Blocks + 5 % Wastage No.
Cement Bags
Sand Cu.M
wastage
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No

Unskilled Labour - for Curing No


Sweet water 5000 g - 20 g / m2 Trip
Hand Tools
Actual Cost

THERMALITE AAC BLOCK - 100mm - 8 m2 M2

8
Blocks + 5 % Wastage (150 Dhs/m3 ) No.
AAC Mortor - 0.35kg x 40kg/m3 Bags
wastage
Sweet water 5000 g - 20 g / m2 Trip
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No

Unskilled Labour - for Curing No


AAC Block Set Tools - 260 Dhs/50m2 m2
Actual Cost

THERMALITE AAC BLOCK - 150mm - 8 m2 M2

8
Blocks + 5 % Wastage (150 Dhs/m3 ) No.
AAC Mortor - 0.35kg x 40kg/m3 Bags
wastage
Sweet water 5000 g - 20 g / m2 Trip
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No

Unskilled Labour - for Curing No


AAC Block Set Tools - 260 Dhs/50m2 m2
Actual Cost

THERMALITE AAC BLOCK - 200mm - 8 m2 M2

8
Blocks + 5 % Wastage (150 Dhs/m3 ) No.
AAC Mortor - 0.35kg x 40kg/m3 Bags
wastage
Sweet water 5000 g - 20 g / m2 Trip
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No

Unskilled Labour - for Curing No


AAC Block Set Tools - 260 Dhs/50m2 m2
Actual Cost

THERMALITE AAC BLOCK - 250mm - 8 m2 M2

8
Blocks + 5 % Wastage (150 Dhs/m3 ) No.
AAC Mortor - 0.35kg x 40kg/m3 Bags
wastage
Sweet water 5000 g - 20 g / m2 Trip
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No

Unskilled Labour - for Curing No


AAC Block Set Tools - 260 Dhs/50m2 m2
Actual Cost

THERMALITE AAC BLOCK - 300mm - 8 m2 M2

8
Blocks + 5 % Wastage (150 Dhs/m3 ) No.
AAC Mortor - 0.35kg x 40kg/m3 Bags
wastage
Sweet water 5000 g - 20 g / m2 Trip
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No

Unskilled Labour - for Curing No


AAC Block Set Tools - 260 Dhs/50m2 m2
Actual Cost
THERMALITE AAC BLOCK - 350mm - 8 m2 M2

8
Blocks + 5 % Wastage (150 Dhs/m3 ) No.
AAC Mortor - 0.35kg x 40kg/m3 Bags
wastage
Sweet water 5000 g - 20 g / m2 Trip
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No

Unskilled Labour - for Curing No


AAC Block Set Tools - 260 Dhs/50m2 m2
Actual Cost

THERMALITE AAC BLOCK - 100mm - 8 m2 ( 1 Hr Fire rated ) M2

8
Blocks + 5 % Wastage (150 Dhs/m3 ) No.
AAC Mortor - 0.35kg x 40kg/m3 Bags
wastage
Sweet water 5000 g - 20 g / m2 Trip
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No

Unskilled Labour - for Curing No


AAC Block Set Tools - 260 Dhs/50m2 m2
Actual Cost

THERMALITE AAC BLOCK - 150mm - 8 m2 ( 1 Hr Fire rated ) M2

8
Blocks + 5 % Wastage (150 Dhs/m3 ) No.
AAC Mortor - 0.35kg x 40kg/m3 Bags
wastage
Sweet water 5000 g - 20 g / m2 Trip
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No
Unskilled Labour - for Curing No
AAC Block Set Tools - 260 Dhs/50m2 m2
Actual Cost

THERMALITE AAC BLOCK - 200mm - 8 m2 ( 1 Hr Fire rated ) M2

8
Blocks + 5 % Wastage (150 Dhs/m3 ) No.
AAC Mortor - 0.35kg x 40kg/m3 Bags
wastage
Sweet water 5000 g - 20 g / m2 Trip
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No

Unskilled Labour - for Curing No


AAC Block Set Tools - 260 Dhs/50m2 m2
Actual Cost

THERMALITE AAC BLOCK - 250mm - 8 m2 ( 1 Hr Fire rated ) M2

8
Blocks + 5 % Wastage (150 Dhs/m3 ) No.
AAC Mortor - 0.35kg x 40kg/m3 Bags
wastage
Sweet water 5000 g - 20 g / m2 Trip
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No

Unskilled Labour - for Curing No


AAC Block Set Tools - 260 Dhs/50m2 m2
Actual Cost

THERMALITE AAC BLOCK - 300mm - 8 m2 ( 1 Hr Fire rated ) M2

8
Blocks + 5 % Wastage (150 Dhs/m3 ) No.
AAC Mortor - 0.35kg x 40kg/m3 Bags
wastage
Sweet water 5000 g - 20 g / m2 Trip
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No

Unskilled Labour - for Curing No


AAC Block Set Tools - 260 Dhs/50m2 m2
Actual Cost

THERMALITE AAC BLOCK - 350mm - 8 m2 ( 1 Hr Fire rated ) M2

8
Blocks + 5 % Wastage (150 Dhs/m3 ) No.
AAC Mortor - 0.35kg x 40kg/m3 Bags
wastage
Sweet water 5000 g - 20 g / m2 Trip
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No

Unskilled Labour - for Curing No


AAC Block Set Tools - 260 Dhs/50m2 m2
Actual Cost

THERMALITE AAC BLOCK - 100mm - 8 m2 ( 2 Hr Fire rated ) M2

8
Blocks + 5 % Wastage (150 Dhs/m3 ) No.
AAC Mortor - 0.35kg x 40kg/m3 Bags
wastage
Sweet water 5000 g - 20 g / m2 Trip
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No

Unskilled Labour - for Curing No


AAC Block Set Tools - 260 Dhs/50m2 m2
Actual Cost
THERMALITE AAC BLOCK - 150mm - 8 m2 ( 2 Hr Fire rated ) M2

8
Blocks + 5 % Wastage (150 Dhs/m3 ) No.
AAC Mortor - 0.35kg x 40kg/m3 Bags
wastage
Sweet water 5000 g - 20 g / m2 Trip
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No

Unskilled Labour - for Curing No


AAC Block Set Tools - 260 Dhs/50m2 m2
Actual Cost

THERMALITE AAC BLOCK - 200mm - 8 m2 ( 2 Hr Fire rated ) M2

8
Blocks + 5 % Wastage (150 Dhs/m3 ) No.
AAC Mortor - 0.35kg x 40kg/m3 Bags
wastage
Sweet water 5000 g - 20 g / m2 Trip
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No

Unskilled Labour - for Curing No


AAC Block Set Tools - 260 Dhs/50m2 m2
Actual Cost

THERMALITE AAC BLOCK - 250mm - 8 m2 ( 2 Hr Fire rated ) M2

8
Blocks + 5 % Wastage (150 Dhs/m3 ) No.
AAC Mortor - 0.35kg x 40kg/m3 Bags
wastage
Sweet water 5000 g - 20 g / m2 Trip
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No
Unskilled Labour - for Curing No
AAC Block Set Tools - 260 Dhs/50m2 m2
Actual Cost

THERMALITE AAC BLOCK - 300mm - 8 m2 ( 2 Hr Fire rated ) M2

8
Blocks + 5 % Wastage (150 Dhs/m3 ) No.
AAC Mortor - 0.35kg x 40kg/m3 Bags
wastage
Sweet water 5000 g - 20 g / m2 Trip
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No

Unskilled Labour - for Curing No


AAC Block Set Tools - 260 Dhs/50m2 m2
Actual Cost

THERMALITE AAC BLOCK - 350mm - 8 m2 ( 2 Hr Fire rated ) M2

8
Blocks + 5 % Wastage (150 Dhs/m3 ) No.
AAC Mortor - 0.35kg x 40kg/m3 Bags
wastage
Sweet water 5000 g - 20 g / m2 Trip
Accessories ,Mesh etc…
Mason No
Unskilled Labour No
Charge Hand No

Unskilled Labour - for Curing No


AAC Block Set Tools - 260 Dhs/50m2 m2
Actual Cost

15 mm INTERNAL PLASTER - 17 m2 M2

17
Cement Bags
White washed Sand Cu.M
wastage
Sweet water 5000 g - 25 g / m2 Trip
Mason No
Unskilled Labour No
Charge Hand No

Unskilled Labour - for Curing No


Hand Tools
Scaffolding
Accessories
Actual Cost

20 mm INTERNAL PLASTER - 17 m2 M2

17
Cement Bags
White washed Sand Cu.M
wastage
Sweet water 5000 g - 25 g / m2 Trip
Mason No
Unskilled Labour No
Charge Hand No

Unskilled Labour - for Curing No


Hand Tools
Scaffolding
Accessories
Actual Cost

15 mm INTERNAL PLASTER - 17 m2 (Above 6 m Height) M2

16
Cement Bags
White washed Sand Cu.M
wastage
Sweet water 5000 g - 25 g / m2 Trip
Mason No
Unskilled Labour No
Charge Hand No

Unskilled Labour - for Curing No


Hand Tools
Scaffolding
Accessories
Actual Cost
20 mm INTERNAL PLASTER - 16 m2 ( Above 6 m Height) M2

16
Cement Bags
White washed Sand Cu.M
wastage
Sweet water 5000 g - 25 g / m2 Trip
Mason No
Unskilled Labour No
Charge Hand No

Unskilled Labour - for Curing No


Hand Tools
Scaffolding
Accessories
Actual Cost

25 mm EXTERNAL PLASTER - 17 m2 M2

16
Cement Bags
White washed Sand Cu.M
wastage
Sweet water 5000 g - 25 g / m2 Trip
Mason No
Unskilled Labour No
Charge Hand No

Unskilled Labour - for Curing No


Hand Tools
Scaffolding
Accessories
Actual Cost

SCREED RMC CONCRETE - OPC - C20 - 150 mm THK - (400 m2) M2

150 mm thk 40
Basic Cost - 5 % wastage m3
Pump - 5 % wastage m3
Temp.Control -5 % wastage m3
Mason - 4 No No
Unskilled Labour - 6 No No
Charge Hand No
Unskilled Labour - for Curing- No
Carpenter - No
Sweet water 5000 g- 15 g / m3 Trip
Hand Tools
White wood - 0.28 m3 / 5 times ( + 10% wastage ) m3
Nail
Actual Cost M2

SCREED RMC CONCRETE - OPC - C20 - 100 mm THK - (400 m2) M2

100 mm thk 40
Basic Cost - 5 % wastage m3
Pump - 5 % wastage m3
Temp.Control -5 % wastage m3
Mason - 4 No No
Unskilled Labour - 6 No No
Charge Hand No

Unskilled Labour - for Curing- No


Carpenter - No
Sweet water 5000 g- 15 g / m3 Trip
Hand Tools
White wood - 0.28 m3 / 5 times ( + 10% wastage ) m3
Nail
Actual Cost M2

SCREED RMC CONCRETE - OPC - C20 - 90 mm THK - (400 m2) M2

90 mm thk 40
Basic Cost - 5 % wastage m3
Pump - 5 % wastage m3
Temp.Control -5 % wastage m3
Mason - 4 No No

Unskilled Labour - 6 No No
Charge Hand No

Unskilled Labour - for Curing- No


Carpenter - No
Sweet water 5000 g- 15 g / m3 Trip
Hand Tools
White wood - 0.28 m3 / 5 times ( + 10% wastage ) m3
Nail
Actual Cost M2
SCREED RMC CONCRETE - OPC - C20 - 75 mm THK - (400 m2) M2

75 mm thk 40
Basic Cost - 5 % wastage m3
Pump - 5 % wastage m3
Temp.Control -5 % wastage m3
Mason - 4 No No

Unskilled Labour - 6 No No
Charge Hand No

Unskilled Labour - for Curing- No


Carpenter - No
Sweet water 5000 g- 15 g / m3 Trip
Hand Tools
White wood - 0.28 m3 / 5 times ( + 10% wastage ) m3
Nail
Actual Cost M2

SCREED RMC CONCRETE - OPC - C20 - 50 mm THK - (400 m2) M2

50 mm thk 40
Basic Cost - 5 % wastage m3
Pump - 5 % wastage m3
Temp.Control -5 % wastage m3
Mason - 4 No No

Unskilled Labour - 6 No No
Charge Hand No

Unskilled Labour - for Curing- No


Carpenter - No
Sweet water 5000 g- 15 g / m3 Trip
Hand Tools
White wood - 0.28 m3 / 5 times ( + 10% wastage ) m3
Nail
Actual Cost M2

SCREED RMC CONCRETE - OPC - C20 - 40 mm THK - (400 m2) M2

40 mm thk 40
Basic Cost - 5 % wastage m3
Pump - 5 % wastage m3
Temp.Control -5 % wastage m3
Mason - 4 No No
Unskilled Labour - 6 No No
Charge Hand No

Unskilled Labour - for Curing- No


Carpenter - No
Sweet water 5000 g- 15 g / m3 Trip
Hand Tools
White wood - 0.28 m3 / 5 times ( + 10% wastage ) m3
Nail
Actual Cost M2

SCREED RMC CONCRETE - OPC - C20 - 25 mm THK - (400 m2) M2

25 mm thk 40
Basic Cost - 5 % wastage m3
Pump - 5 % wastage m3
Temp.Control -5 % wastage m3
Mason - 4 No No

Unskilled Labour - 6 No No
Charge Hand No

Unskilled Labour - for Curing- No


Carpenter - No
Sweet water 5000 g- 15 g / m3 Trip
Hand Tools
White wood - 0.28 m3 / 5 times ( + 10% wastage ) m3
Nail
Actual Cost M2

MOSAIC TILES M2

12
3 Times Polising
Misc./Tools
Cement Fix
Sweet Water

Mason No
Unskilled Labour No

Charge Hand No
Actual Cost
CERAMIC / PORCELAIN FLOOR M2

12
Misc./Tools
Cement Fix + Grout
Sweet Water
Mason No
Unskilled Labour No
Charge Hand No
Actual Cost

CERAMIC / PORCELAIN FLOOR ( Epoxy Coat ) M2

12
Misc./Tools
Epoxy Coat - 110 QR / 18 Litre ( 3 kg/ m2 )
Cement Fix + Grout
Sweet Water
Mason No
Unskilled Labour No
Charge Hand No
Actual Cost

GRANITE / MARBLE for floor M2

10
Cement Fix + Grout m2
Seal Coating for Granite / Marble m2
Sweet Water
Misc./tools/Accessories m2
Mason No
Unskilled Labour No
Charge Hand No
Actual Cost

GRANITE / MARBLE for floor ( Epoxy Coat ) M2

10
Epoxy Coat - 110 QR / 18 Litre ( 3 kg/ m2 )
Seal Coating for Granite / Marble m2
Sweet Water
Misc./tools/Accessories LS
Mason No
Unskilled Labour No
Charge Hand No
Actual Cost

CERAMIC / PORCELAIN FLOOR

CERAMIC FLOOORING m2
Screed
Fixing Adhesive + Labour Charges

CERAMIC FLOOORING m2
Screed
Fixing Adhesive + Labour Charges

PORCELAIN m2
Screed
Fixing Adhesive + Labour Charges

GRANITE / MARBLE m2
Screed
Fixing Adhesive + Labour Charges

SLOPED ROOF CLAY TILE m2


Plaster
Screed
Fixing Adhesive + Labour Charges

PORCELAIN m2
Screed
Fixing Adhesive + Labour Charges

GRANITE TREAD & RISER m2


Screed
Fixing Adhesive + Labour Charges
MOSAIC m2
Screed
Fixing Adhesive + Labour Charges

MOSAIC TREAD & RISER m2


Screed
Fixing Adhesive + Labour Charges

THRESHOLD - 250 mm m2
Screed
Fixing Adhesive + Labour Charges

THRESHOLD - 100 mm m2
Fixing Adhesive + Labour Charges

THRESHOLD - 130 mm m2
Fixing Adhesive + Labour Charges

THRESHOLD - 265 mm m2
Fixing Adhesive + Labour Charges

CERAMIC WALL TILES M2


12
Misc./tools/scaffolding
Glue Fix + Grout
Sweet Water
Mason No
Unskilled Labour No
Charge Hand No
Actual Cost

Granite for walls (wet Fix ) M2


7
Glue Ls
Seal Coating for Granite / Marble m2
Sweet Water
Misc./tools/scaffolding LS
Mason No
Unskilled Labour No
Charge Hand No
Actual Cost

Granite for walls (wet Fix - with Epoxy Coat ) M2


7
Epoxy Coat - 110 QR / 18 Litre ( 3 kg/ m2 )
Glue LS
Seal Coating for Granite / Marble m2
Sweet Water
Misc./tools/scaffolding LS
Mason No
Unskilled Labour No
Charge Hand No
Actual Cost

STONE / GRANITE FOR WALL (MECH FIX ) M2


6.5
Stainless Steel Fixure for wall tiles No
Seal Coating for Granite / Marble m2
Misc./tools/scaffolding LS
Mason No
Unskilled Labour No
Charge Hand No
Actual Cost

CERAMIC / PORCELAIN WALL

CERAMIC WALL m2
Plaster
Fixing Adhesive + Laying Charges

PORCELAIN / CERAMIC WALL m2


Plaster
Fixing Adhesive + Laying Charges
INTERNAL GRANITE / MARBLE WALL m2
Plaster
Fixing Adhesive + Laying Charges

CERAMIC WALL m2
Plaster
Fixing Adhesive + Laying Charges

EXTERNAL GRANITE / MARBLE WALL m2


Plaster
Bitumen Paint
Fixing Adhesive + Laying Charges

EXTERNAL STONE CLADDING m2


Plaster
Bitumen Paint
Fixing Adhesive + Laying Charges

10 cm High - Ceramic / Porcelain Skirting - 30 m/day M


30
FIXING - Mortar - Cement Bags
Sand Cu.M
wastage
Sweet Water
Hand Tool
Glue Fix + Grout
Mason No
Unskilled Labour No
Charge Hand No
Actual Cost

15 cm High - Ceramic / Porcelain Skirting - 30 m/day M


25
FIXING - Mortar - Cement Bags
Sand Cu.M
wastage
Sweet Water
Hand Tool
Glue Fix + Grout
Mason No
Unskilled Labour No
Charge Hand No
Actual Cost

Mosaic Skirting - 30 m/day M


30

Morter - Cement Bags


Sand Cu.M
wastage
Sweet Water
Hand Tool
Glue Fix + Grout
Mason No
Unskilled Labour No
Charge Hand No
Actual Cost

Granite/Marble Skirting - 30 m/day M


30
Granite / Marble PC Rate-50 Dhs/m m
Morter - Cement Bags
Sand Cu.M
wastage
Sweet Water
Hand Tool
Glue Fix + Grout
Mason No
Unskilled Labour No
Charge Hand No
Edging chages
Actual Cost

CERAMIC / PORCELAIN SKIRTING ( 30 m / Day )

10 cm High - PORCELAIN SKIRTING m


Fixing Adhesive + Laying Charges

10 cm High - TERRAZO SKIRTING m


Fixing Adhesive + Laying Charges

10 cm High - WOODEN SKIRTING m


Fixing Adhesive + Laying Charges

10 cm High - CERAMIC SKIRTING m


Fixing Adhesive + Laying Charges

10 cm High - GRANITE SKIRTING m


Fixing Adhesive + Laying Charges

10 cm High - GRANITE SKIRTING m


Fixing Adhesive + Laying Charges

10 cm High - MOSAIC SKIRTING m


Fixing Adhesive + Laying Charges

Ceramic Steps - 8 m / Day M


8
Ceramic Tile PC Rate-30 Dhs/m m
Screed - 0.75 m2 / 2
Glue Fix + Grout
Sweet Water
Misc./tools/Accessories No
Mason No
Unskilled Labour No
Charge Hand No
Actual Cost

Mosaic Steps M
10
Mosaic Tile PC Rate- 25 Dhs/m m
Screed - 0.75 m2 / 2
Glue Fix + Grout
Sweet Water
Misc./tools/Accessories No
Mason No
Unskilled Labour No
Charge Hand No
Actual Cost

Granite/Marble Steps M
8
Granite / Marble PC Rate- 150 Dhs/m m
Screed - 0.75 m2 / 2
Glue Fix + Grout
Sweet Water
Misc./tools/Accessories No
Mason No
Unskilled Labour No
Charge Hand No
Actual Cost

CEMENT TILES ( ROOF ) M2


17
Mosaic Tile PC Rate- 25 Dhs/m2 m2
Screed
Misc./Tools
Cement Fix
Sweet Water
Mason No
Unskilled Labour No
Charge Hand No
Actual Cost

CEMENT TILES SKIRTING - 30 m/day ( ROOF ) M


30
Mosaic Tile PC Rate- 10 Dhs/m m
Morter - Cement Bags
Sand Cu.M
wastage
Sweet Water
Hand Tool
Glue Fix + Grout
Mason No
Unskilled Labour No
Charge Hand No
Actual Cost

Interlock paving 80 mm - 30 m2 M2
25
compaction & prepration of base m2
Interlock supply price - 42 Dhs /m2 m2
roadbase 250 mm m3
compaction of road base m3
Sweet water 5000 g- 10 g / m2
Sand 50 mm m3
wastage 5% %
Mason No
Unskilled Labour No
Charge Hand No
Actual Cost

Interlock paving 60 mm - 30 m2 M2
25
compaction & prepration of base m2
Interlock supply price - 37 Dhs /m2 m2
roadbase 150 mm m3
compaction of road base m3
Sweet water 5000 g- 10 g / m2
Sand 50 mm m3
wastage 5% %
Mason No
Unskilled Labour No
Charge Hand No
Actual Cost

Roadbase for Large Area - 250 m3 M3


250
Material cost with Bulkage m3
Mechanical Shovel 966 - 2 No m3
Roller Compactor - 20T m2
compaction test for road base-500 m2/test-75 Dhs m2
Unskilled Labour - 10 No No
Charge Hand No
Sweet water 5000 g- 10 g / m2 Trip
Actual Cost
Roadbase for Footing / Small Area - 40 m3 M3
40
Material cost with Bulkage m3
Mechanical Shovel 966 m3
Roller Compactor - 20T m2
Baby Roller 1.5 T m2
compaction test for road base-500 m2/test-75Dhs m2
Unskilled Labour - 10 No No
Charge Hand No
Sweet water 5000 g- 10 g / m2 Trip
Actual Cost

IMPORTED FILLING SAND - 150 m3 M3


150
Imported Filling Sand + Bulkage m3
Mechanical Shovel 966 - 1 No m3
Roller Compactor - 20T m2
Unskilled Labour No
Charge Hand No
Sweet water 5000 g- 10 g / m2 G
Compaction test - 200 Dhs/No (750 m2/Test) No
Actual Cost

Kerb stone - 10 m
10
kerbstone Price - 27 Dhs / m - ( 914 xx300 x 150 )mm m
Excavation m3
compaction of road base m2
wastage 5% %
Mason No
Unskilled Labour No
Charge Hand No
concrete Hunching m3
Sweet water 5000 g- 10 g / m2 G
Actual Cost

ASPHALT ROAD

Granular Fill - 150 mm m2


Bitumen Prime Coat m2
70 mm Asphalt Base Course m2
Bitumen Tack Coat m2
40 mm Asphalt Wearing Course m2
Actual Cost

SUBCONTRACTING WORK

FALSE CEILING
Gypsum False ceiling m2
Decorative Gypsum False ceiling m2
60 x 60 cm Gypsum Tile False ceiling m2
Gypsum Bulk Head m
Gypsum Cove m
Gypsum Cornice m
Plain Aluminium False ceiling m2
Perforated Aluminium False ceiling m2
10 cm Gypsum Partition m2

PAINTING
Emulsion Paint m2
External Epoxy Paint m2
External Acrylic Based Paint m2
Polyurethene Anti carbonate m2
Enamel Paint m2
Floor Epoxy Paint m2
Floor Hardner m2
Floor Sealer m2

WATERPROOFING
Membrane 4 mm SBS m2
Membrane 4 mm APP m2
3 mm GRP Lining m2
6 mm GRP Lining m2
METAL WORKS
Aluminium Cladding m2
Aluminium Composite Cladding m2

POST TENSION SLAB & BEAM


S no Description Unit
POST TECH
Slab Post Tensioning - 80 / m2 m2
Grouting 10 % of concrete ( 5623 m3 x 10% x 1000 )/ Area m2
Beam Post Tensioning - 350 / m3 m3
Grouting 10 % of concrete ( 10% x 1000 )/ Area m3
Post Tensioning Slab & beams Formwork ( 90+35 ) m2
Post Tensioning concrete for Slab & beams m3
Post Tensioning Slab Reinforcement Kg
Post Tensioning Beam Reinforcement Kg

Su
Main contractor overhead & Pro
Grand

SHORING (Seacant Pile)


S no Description No
Total length=145 rm
Total amount as per the Stromek
Add O H & profit-15%
Concrete- C40 ( Dia 70 cm ) 238
steel 1
Guide beam 1
excavation for the same 1
Capping beam 1
B.W.- 10 %

Main contractor overhead & Profit -15%

Guniting
Description Unit

Guniting m2
B.W - 5%
Shotcrete m3
Reinf - mesh A393 m2
Diesel-5 pumps @ 7 gall per day gall
Cleaning m2
scaffolding m2

Su
Main contractor overhead & Pro
Grand
Guniting 145
Description Unit

Guniting m2
B.W - 5%
Shotcrete m3
Reinf - mesh A393 m2
Diesel-5 pumps @ 7 gall per day gall
Cleaning m2
scaffolding m2

Amount - AED 3470 per Day Phonix Engineering & M


Productivity - 15 to 20 m3 per day
Su
Main contractor overhead & Pro
Grand

Dewatering-12 month -365 Days


S no Description Unit
Dewatering system as per the ETA quotation-SRS/DEW/QUT/840-R1/09
Mobilisation , Installation Including technician ,Diesel, Oil and commisioning Lumsum
Installation of complete system
Hire charges Day
Hire charges for the diesel generators Day
Diesel-5 pumps @ 7 gall per day gall
Bore hole
Mobilization
Sacrificed pumps No
Diesel
Associated civil & builders works - Aggregate , Inject water , Make Trench , civil
works , Cranage ,wateranalysis,testing and making installation of dewatering
system complete(approximately 10% of above)
Su
Main contractor overhead & Pro
Grand

Dewatering- 4 month -120 Days


S no Description Unit
Dewatering system as per the ETA quotation-SRS/DEW/QUT/840-R1/09
Mobilisation , Installation Including technician ,Diesel, Oil and commisioning Lumsum
Installation of complete system
Hire charges
Hire charges for the diesel generators
Diesel-5 pumps @ 7 gall per day
Bore hole
Mobilization
Sacrificed pumps
Diesel
Daily Maintenance Days
Builders work
Associated civil & builders works - Aggregate , Inject water , Make Trench , civil
works , Cranage ,wateranalysis,testing and making installation of dewatering
system complete(approximately 10% of above)
Su
Main contractor overhead & Pro
Grand

MANHOLE SIZE - 1.20 X 1.20 X1.4


Description Unit
MANHOLE SIZE - 1.20 X 1.20 X1.4

Excavation 1

Cart Away 1

Back Filling

Polythene Sheet 1

Blinding Concrete 1

20 cm thk Block work 1

Plaster 1
1

Man Hole Cover 60 x 60 cm Dia - 850 / no+ 300

Membrane 1
1

GULLY TRAP SIZE - 0.30 X 0.30 X1.00


Description Unit
GULLY TRAP SIZE - 0.30 X 0.30 X1.00

Excavation 1
Cart Away 1

Back Filling

Polythene Sheet 1

Blinding Concrete 1

20 cm thk Block work 1

Plaster 1
1

Man Hole Cover 60 x 60 cm Dia - 300 / no+ 50

Membrane 1
1

DUCTED PVC PIPE SIZE - 0.50 X 0.30


Description Unit
DUCTED PVC PIPE SIZE - 0.50 X 0.30

Excavation 1

Cart Away 1

Back Filling

Polythene Sheet 1

Blinding Concrete & Shuttering 1

Boundary Wall
Footing, Beam Nos.

Boundary Wall
Footing 6
Column 7
Tie Beam 1
Coumn 7
Coping Beam 1

Total =

Description Unit
Excavation ( 5.0 x 4.0 x 2.80 ) m 6

Cart Away

Back Filling

Road Base Below Footing 6

20 cm thk Block Work 1

Plaster 2

Epoxy paint 2

H BEAM SHORING for 6 m Depth , 315 m Length


Sl No Description Qty
1 Mobilisation 1
2 Builders Work 1
3 H Beam Installation 115
4 H Beam Prices
5 Concrete Panel Supply- 4 m Depth 460
6 Concrete Panel Installation 5

Total

Add Overhead & Profit 15%

Total Amount

LIST FOR ALL THE MATERIALS


Item Description Unit
1 Concrete
OPC 250; Grade 20/20 m3
SRC 250; Grade 20/20 m3
OPC 400; Grade 40/20 m3
SRC 400; Grade 40/20 m3
OPC 420 ; Grade 50/20 m3
SRC 420 ; Grade 50/20 m3
OPC 420Kg; Grade C40/20 (45% OPC + 55% GGBS) m3
OPC 400Kg; Grade C40/20 (70%OPC + 30% GGBS) m3
OPC 400Kg; Grade C40/20 (45%OPC + 55% GGBS + WP) m3
SRC 420Kg; Grade C40/20 (45%OPC + 55% GGBS + WP) m3
Pump Charges m3
Temperature Control m3
Screed Concrete m3

2 Steel Reinforcement
Qatari Straight MT
Qatari Cut & Bend MT

3 BRC Mesh - Size ( 4.80 m x 2.40 m )


A 142 = ( 93QR / 11.52 m2 ) m2
A193 = ( 130 QR / 11.52 m2 ) m2
A252 = ( 159 QR / 11.52 m2 ) m2
A393 = ( 225 QR / 11.52 m2 ) m2

4 Solid Blocks - 10.5 - 15 N/ mm2


100mm No.
150mm No.
200mm No.
250mm No.
300mm No.

5 Hollow Blocks - 7 N/ mm2


100mm No.
150mm No.
200mm No.
250mm No.
300mm No.
350mm No.
200mm - SRC No.
Note - 1, 2 Hours Fire Rated 10% & 20% QR More
6 Hourdy Blocks
150mm No.
200mm No.
250mm No.
300mm No.
350mm No.

7 Insulated Blocks
200mm No.
250mm No.
300mm No.
350mm No.

8 Interlock
60mm (Grey) ( Lime Stone ) m2
60mm ( Red ) m2
60mm (Block) m2
60mm ( Yellow ) m2

80mm (Grey) m2
80mm ( Red ) m2
80mm (Block) m2
80mm ( Yellow ) m2

60mm (Grey) ( Gabbro Aggregate ) m2


60mm ( Red ) m2
60mm (Block) m2
60mm ( Yellow ) m2

80mm (Grey) m2
80mm ( Red ) m2
80mm (Block) m2
80mm ( Yellow ) m2

9 Kerb Stones (Heel)


Kerb Stones (915 x 300 x 150 ) mm m
Heel Kerb Stones (915 x 300 x 100 ) mm m

10 Cement
OPC GGBS Bags
SRC GGBS Bags

11 Sand
Black Washed Sand m3
White Washed Sand m3
Interlock Sand m3
Sweet Sand m3
Dune Sand m3
Filling Sand m3
12 Shuttering Materials
4mm commercial plywood ( 2.40 m x 1.20 m ) No.
6mm commercial plywood ( 2.40 m x 1.20 m ) No.
12mm commercial plywood ( 2.40 m x 1.20 m ) No.
18mm marine ply wood ( 2.40 m x 1.20 m ) No.
White Wood m3

13 Road Base
Road Base ( Natural ) m3
Road Base ( Crushed ) m3

14 Polythene Sheet
1200G Polythene Sheet ( 50.00 x 2.00 ) 100 m2
1000G Polythene Sheet ( 50.00 x 2.00 ) 100 m2
500G Polythene Sheet ( 50.00 x 2.00 ) 100 m2

15 Flexcell Sheel ( 2.40 m x 1.20 m )


12mm No.
18mm No.
25mm No.

16 Bitumen Paint 200 lts


Bituthene 8000 HC m2
Membrane 4 mm SBS m2
Membrane 4 mm APP Roof m2
Anti Root Membrane m2
Protection Board - 3 mm thk m2
Protection Board - 6 mm thk (1 *2 m - 48 QR / 2 m2 ) m2

17 Tiles Adhesive
Tiles Adhesive - 42 QR / 25 kg - ( 2 kg / m2 ) Bag
Tile Grouting - 69 QR / 25 kg - (1 kg / 4 m2 ) Bag

18 Painting
Internal Emulsion m2
External Epoxy m2

19 Asphalt Road

Granular Fill - 150 mm m2


Bitumen Prime Coat m2
70 mm Asphalt Base Course m2
Bitumen Tack Coat m2
40 mm Asphalt Wearing Course m2

20 Extruded Polystrene 50 mm thk - 2.00x 1.00 = 25 QR m2


21 Cast Iron Manhole Cover - India No
Wooden Nail
22 4 mm Membrane ( 1.00 x 10.00 = 10 m2 = 125 QR ) m2
Qty Rate/Day Rate ( Dhs ) LABOUR MATERIAL PLANT SUBCONTRACT

10
12
15

Qty Rate/Day 15

1 900 6.00 6.00


500 850 1.70 1.70
2 90.00 1.20 1.20
0.4 135.00 0.36 0.36
1 0.89 1.00 1.00
8.33 90 5.00 5

15.3 6.6 0.0 7.7 1.0

Qty Rate/Day 21

2 900 12.00 12.00


500 850 1.70 1.70
2 90.00 1.20 1.20
0.4 135.00 0.36 0.36
1 0.89 1.00 1.00
8.33 90 5.00 5

21.3 6.6 0.0 13.7 1.0

Qty Rate/Day 46

1 900 18.00 18.00


1 1000 20.00 20.00
500 850 1.70 1.70
2 90.00 3.60 3.60
0.4 135.00 1.08 1.08
1 0.89 1.00 1.00
1 0.50 0.50 0.50
45.9 4.7 0.0 40.2 1.0
Qty Rate/Day 22

2 900 9.00 9.00


1 850 4.25 4.25
2 90.00 0.90 0.90
0.4 135.00 0.27 0.27
1.5 550.00 4.13 4.13
3 200.00 3.00 3.00
1 0.50 0.50 0.50
22.0 1.2 4.1 13.8 3.0

21

1 900 5.63 5.63


1 2,000.00 12.50 12.50
4 90.00 2.25 2.25
0.4 135.00 0.34 0.34
1 0.50 0.50 0.50
21.2 2.6 0.0 18.6 0.0

Qty Rate/Day 55

1 33 33.00 33.00
2 900 9.00 9.00
1 850 4.25 4.25
2 90.00 0.90 0.90
1 135.00 0.23 0.23
7500 0.12 4.50 4.50
3 200.00 3.00 3.00
54.9 1.1 37.5 13.3 3.0

Qty Rate 4.00


1 2.5 4 4.00
4.0 0.0 0.0 0.0 4.0

Qty Rate 2.55


1 1.56 1.56 1.56
0.2 1.56 0.312 0.31
5% 1.56 0.078 0.08
2 90.00 0.60 0.60
2.6 0.6 2.0 0.0 0.0

Qty Rate 12

1 500 6.25 6.25


0.63 0.63
1 20 0.50
5 90.00 4.50 4.50
11.9 4.5 6.9 0.0 0.0

Qty Rate/Day
285.3

10 10 100 100.00
0.1 15 157.5 157.50
1 90 9.00 9.00
1.5 90.00 13.50 13.50
1 135.00 2.25 2.25
1 10.00 1.00 1.00
15 0.1 1.50 1.50
0.5 0.50
285.3 25.8 159.0 0.5 100.0

Qty Rate/Day
28.5
m3
10 10 100 100.00
0.1 15 157.5 157.50
1 90 9.00 9.00
1.5 90.00 13.50 13.50
1 135.00 2.25 2.25
1 10.00 1.00 1.00
15 0.1 1.50 1.50
0.5 0.50
28.5 2.6 15.9 0.1 10.0

Qty Rate/Day
19.7
m3
1.05 220 231 231.00
1.05 15 15.75 15.75
1.05 15 15.75 15.75 Temp.Control -5 % wastage
4 108.00 14.40 14.40
6 90.00 18.00 18.00
1 135.00 3.00 3.00
0.1 90.00 0.30 0.30
2 108.00 4.32 4.32
15 0.12 1.80 1.80
0.50 0.50
0.056 850 52.36 52.36
0.50 0.50
50 mm thk 19.7 2.2 17.4 0.028 0.0

Qty Rate/Day
29.5
m3
1.05 220 231 231.00
1.05 15 15.75 15.75
1.05 15 15.75 15.75
4 108.00 10.80 10.80
6 90.00 13.50 13.50
1 135.00 2.25 2.25
0.1 90.00 0.23 0.23
2 108.00 4.32 4.32
15 0.12 1.80 1.80
0.50 0.50
0.056 850 52.36 52.36
0.50 0.50
75 mm thk 29.5 2.6 26.8 0.042 0.0

Qty Rate/Day
34.9
m3
1.05 220 231 231.00
1.05 15 15.75 15.75
1.05 15 15.75 15.75
4 108.00 10.80 10.80
6 90.00 13.50 13.50
1 135.00 2.25 2.25
0.1 90.00 0.23 0.23
2 108.00 4.32 4.32
15 0.12 1.80 1.80
0.50 0.50
0.056 850 52.36 52.36
0.50 0.50
100 mm thk 34.9 3.1 31.7 0.1 0.0

Qty Rate/Day 348

m3
1.05 220 231 231.00
1.05 15 15.75 15.75
1.05 15 15.75 15.75
4 108.00 10.80 10.80
6 90.00 13.50 13.50
1 135.00 2.25 2.25
0.1 90.00 0.23 0.23
2 108.00 4.32 4.32
15 0.12 1.80 1.80

0.056 850 52.36 52.36


0.50 0.50
100 mm thk 348.3 31.1 317.2 0.0 0.0

Qty Rate/Day 310

1.02 245 249.9 249.90


2% 300 6.00 6.00
1.02 15 15.3 15.30
1.02 15 15.3 15.30
8 108.00 5.40 5.40
16 90.00 9.00 9.00
2 135.00 3.15 3.15
0.1 10.00 1.00 1.00
2 108.00 1.35 1.35
1 108.00 0.68 0.68
15 0.1 1.50 1.50
0.50 0.50
3 65 1.22 1.22
310.3 20.6 288.0 1.7 0.0

Qty Rate/Day 322


1.02 256 261.12 261.12
2% 300 6.00 6.00
1.02 15 15.3 15.30
1.02 15 15.3 15.30
8 108.00 5.40 5.40
16 90.00 9.00 9.00
2 135.00 3.15 3.15
0.1 10.00 1.00 1.00
2 108.00 1.35 1.35
1 108.00 0.68 0.68
15 0.1 1.50 1.50
0.50 0.50
3 65 1.22 1.22
321.5 20.6 299.2 1.7 0.0

Qty Rate/Day 334

1.02 268 273.36 273.36


2% 300 6.00 6.00
1.02 15 15.3 15.30
1.02 15 15.3 15.30
8 108.00 5.40 5.40
16 90.00 9.00 9.00
2 135.00 3.15 3.15
0.1 10.00 1.00 1.00
2 108.00 1.35 1.35
1 108.00 0.68 0.68
15 0.1 1.50 1.50
0.50 0.50
3 65 1.22 1.22
333.8 20.6 311.5 1.7 0.0

Qty Rate/Day 310

1.02 245 249.9 249.90


2% 300 6.00 6.00
1.02 15 15.3 15.30
1.02 15 15.3 15.30
8 108.00 5.40 5.40
16 90.00 9.00 9.00
2 135.00 3.15 3.15
0.1 10.00 1.00 1.00
2 108.00 1.35 1.35
1 108.00 0.68 0.68
15 0.1 1.50 1.50
0.50 0.50
3 65 1.22 1.22
310.3 20.6 288.0 1.7 0.0

Qty Rate/Day 315

1.02 250 255 255.00


2% 300 6.00 6.00
1.02 15 15.3 15.30
1.02 15 15.3 15.30
8 108.00 5.40 5.40
16 90.00 9.00 9.00
2 135.00 3.15 3.15
0.1 10.00 1.00 1.00
2 108.00 1.35 1.35
1 108.00 0.68 0.68
15 0.1 1.50 1.50
0.50 0.50
3 65 1.22 1.22
315.4 20.6 293.1 1.7 0.0

Qty Rate/Day 332

1.02 266 271.32 271.32


2% 300 6.00 6.00
1.02 15 15.3 15.30
1.02 15 15.3 15.30
8 108.00 5.40 5.40

90.00
16 9.00 9.00
2 135.00 3.15 3.15

10.00
0.1 1.00 1.00
2 108.00 1.35 1.35
1 108.00 0.68 0.68
15 0.1 1.50 1.50
0.50 0.50
3 65 1.22 1.22
331.7 20.6 309.4 1.7 0.0
Qty Rate 53

2.88 90.00 10.42 10.42


0.035 850.00 9.92 9.92
0.194 5.33 1.03 1.03
1.02 1.02

306.00
7 21.42 21.42

90.00
5 4.50 4.50

108.00
2 2.16 2.16
2.5 1.00 0.40 0.40
2.00 2.00
0.00 15.00 0.00 0.00
52.9 28.1 22.8 2.0 0.0

Qty Rate 63

2.88 90.00 10.42 10.42


0.035 850.00 9.92 9.92
0.194 5.33 1.03 1.03
100.00 1.02 1.02
2.5 1.00 0.40 0.40

306.00
7 21.42 21.42

90.00
5 4.50 4.50
1.33 135.00 1.80 1.80
2.00 2.00
1.00 15.00 10.00 10.00
. 62.5 27.7 22.8 2.0 10.0

3,116

1 2500 2500.00
25 5.20 130.00 130.00
108.00
4 432.00 432.00
0 90.00 0.00 0.00
1 135.00 54.00 54.00
0.00
3116.0 486.0 2630.0 0.0 0.0

3.12

1 2500 2500.00
25 5.20 130.00 130.00
4 108.00 432.00 432.00
0 90.00 0.00 0.00
1 135.00 54.00 54.00
0.00
3.12 0.5 2.6 0.0 0.0

Qty Rate/Day
26.4
m3
1.05 200 210 210.00
1.05 10 10.5 10.50
1.05 10 10.5 10.50
2 108.00 5.40 5.40

90.00
6 13.50 13.50
1 135.00 2.25 2.25

90.00
0.1 0.23 0.23
2 108.00 4.32 4.32
15 0.12 1.80 1.80
0.50 0.50
0.056 850 52.36 52.36
0.50 0.50
75 mm thk 26.4 2.2 24.2 0.042 0.0

1 20.0 288.0 1.7 0.0


6.5 130.0 148.1 13.0 0.0
100 75.0 263.0 0.0 0.0
938.8 225.0 699.1 14.7 0.0

1 20.0 288.0 1.7 0.0


3 130.0 68.4 6.0 0.0
100 75.0 263.0 0.0 0.0
852.1 225.0 619.4 7.7 0.0

16.275 20.0 288.0 1.7 0.0


1.50 42.1 34.2 3.0 0.0
80 38.9 210.4 0.0 0.0
638.3 101.0 532.6 4.7 0.0

1 20.0 288.0 1.7 0.0


2 56.2 45.6 4.0 0.0
80 38.9 210.4 0.0 0.0
664.7 115.0 544.0 5.7 0.0

1 20.0 288.0 1.7 0.0


0.25 7.0 5.7 0.5 0.0
110 53.5 289.3 0.0 0.0
665.7 80.5 583.0 2.2 0.0

1.001 20.0 299.2 1.7 0.0


7.722 56.2 175.9 15.4 0.0
250 75.0 657.5 0.0 0.0
1301.0 151.2 1132.7 17.2 0.0
1.001 20.0 293.1 1.7 0.0
7.722 130.0 175.9 15.4 77.2
200 75.0 526.0 0.0 0.0
1314.4 225.0 995.0 17.2 77.2

1.00625 20.0 288.0 1.7 0.0


8.05 56.2 183.4 16.1 0.0
175 75.0 460.3 0.0 0.0
1100.6 151.2 931.7 17.8 0.0

1.00625 1.01 20.0 288.0 1.7 0.0


8.05 130.0 183.4 16.1 80.5
175 75.0 460.3 0.0 0.0
1255.0 225.0 931.7 17.8 80.5

1.00 20.0 299.2 1.7 0.0


8 130.0 182.3 16.0 0.0
275 75.0 723.3 0.0 0.0
1447.5 225.0 1204.7 17.7 0.0

1.00 20.0 293.1 1.7 0.0


8 130.0 182.3 16.0 80.0
225 75.0 591.8 0.0 0.0
1389.8 225.0 1067.1 17.7 80.0

1 20.0 288.0 1.7 0.0


4 130.0 182.3 16.0 0.0
175 75.0 460.3 0.0 0.0
1173.2 225.0 930.5 17.7 0.0

1 20.0 288.0 1.7 0.0


10 130.0 227.8 20.0 100.0
140 75.0 394.5 0.0 0.0
1257.1 225.0 910.3 21.7 100.0

1 20.0 288.0 1.7 0.0


5 130.0 113.9 10.0 50.0
110 75.0 315.6 0.0 0.0
1004.2 225.0 717.5 11.7 50.0

1 20.0 288.0 1.7 0.0


5 130.0 113.9 10.0 50.0
110 75.0 315.6 0.0 0.0
200.8 45.0 143.5 2.3 10.0

1.04 20.0 288.0 1.7 0.0


3.125 130.0 71.2 6.3 31.3
110 75.0 315.6 0.0 0.0
300.5 72.0 215.9 2.6 10.0

1 20.0 288.0 1.7 0.0


2.38 130.0 54.2 4.8 23.8
110 75.0 315.6 0.0 0.0
383.7 94.5 276.4 2.7 10.0
1 20.0 288.0 1.7 0.0
6 130.0 136.7 12.0 60.0
110 75.0 315.6 0.0 0.0
1039.0 225.0 740.3 13.7 60.0

1.005 20.0 288.0 1.7 0.0


10.44 130.0 305.3 26.8 104.4
80 75.0 210.4 0.0 0.0
1161.6 225.0 803.7 28.5 104.4

1.005 20.0 288.0 1.7 0.0


12 337.0 273.4 24.0 120.0
100 48.6 263.0 0.0 0.0
22.9 6.8 13.7 0.4 2.0

1 20.0 288.0 1.7 0.0


12.5 351.0 284.8 25.0 125.0
90 43.7 236.7 0.0 0.0
1376.0 414.7 809.5 26.7 125.0

1 20.0 288.0 1.7 0.0


12.5 351.0 284.8 25.0 125.0
90 43.7 236.7 0.0 0.0
68.8 20.7 40.5 1.3 6.3

1 20.0 288.0 1.7 0.0


2 56.2 45.6 4.0 20.0
15 7.3 39.5 0.0 0.0
482.2 83.5 373.0 5.7 20.0

170
12.5 1.7 24.0 0.1 0.0
1 1.7 25.8 0.0 0.0
0.1 2.8 2.3 0.2
228.6 6.2 52.1 0.3 170.0

177
12.5 1.7 24.0 0.1 0.0
1 1.7 25.8 0.0 0.0
0.1 2.8 2.3 0.2
235.6 6.2 52.1 0.3 177.0

180
12.5 1.7 24.0 0.1 0.0
1 1.7 25.8 0.0 0.0
0.1 2.8 2.3 0.2
238.6 6.2 52.1 0.3 180.0

300
12.5 1.7 24.0 0.1 0.0
1 1.7 25.8 0.0 0.0
0.1 2.8 2.3 0.2
358.6 6.2 52.1 0.3 300.0

1 20.0 288.0 1.7 0.0


5 8.6 129.1 0.0 0.0
1 28.1 22.8 2.0 0.0
20.0 35.0
555.3 76.7 474.9 3.7 0.0
1 20.0 288.0 1.7 0.0
5 8.6 129.1 0.0 0.0
1 28.1 22.8 2.0 0.0
20.0 35.0
111.1 15.3 95.0 0.7 0.0

1 20.0 288.0 1.7 0.0


7 12.1 180.8 0.0 0.0
1 28.1 22.8 2.0 0.0
20.0 35.0
610.4 80.1 526.6 3.7 0.0

1 20.0 288.0 1.7 0.0


7 12.1 180.8 0.0 0.0
1 28.1 22.8 2.0 0.0
20.0 35.0
91.5 12.0 78.9 0.6 0.0

1 20.0 288.0 1.7 0.0


10 17.2 188.4 0.0 0.0
1 28.1 22.8 2.0 0.0
20.0 35.0
623.2 85.3 534.2 3.7 0.0

1 20.0 288.0 1.7 0.0


10 17.2 188.4 0.0 0.0
1 28.1 22.8 2.0 0.0
20.0 35.0
74.8 10.2 64.1 0.4 0.0
1 20.0 288.0 1.7 0.0
10 17.2 258.3 0.0 0.0
1 28.1 22.8 2.0 0.0
20.0 35.0
69.3 8.5 60.4 0.4 0.0

1 20.0 288.0 1.7 0.0


10 17.2 188.4 0.0 0.0
1 28.1 22.8 2.0 0.0
20.0 35.0
124.6 17.1 106.8 0.7 0.0

5.00 20.0 288.0 1.7 0.0


5.10 143.2 116.2 10.2 51.0
60 29.2 157.8 0.0 0.0
48.5 242.5
2.0 28.8 0.2 0.0
218.2 38.9 118.2 2.4 58.7

4.35 20.0 288.0 1.7 0.0


4.45 124.9 101.3 8.9 44.5
60 29.2 157.8 0.0 0.0
48.5 210.9
2.0 28.8 0.2 0.0
234.2 40.5 132.5 2.5 58.7

4.00 20.0 288.0 1.7 0.0


4.10 115.1 93.4 8.2 41.0
60 29.2 157.8 0.0 0.0
48.5 194.0
2.0 28.8 0.2 0.0
244.8 41.6 142.0 2.5 58.8

3.70 20.0 288.0 1.7 0.0


3.80 106.8 86.7 7.6 38.0
60 29.2 157.8 0.0 0.0
48.5 179.6
2.0 28.8 0.2 0.0
255.5 42.7 151.5 2.6 58.8

3.57 20.0 288.0 1.7 0.0


3.67 103.1 83.7 7.3 36.7
75 36.5 197.3 0.0 0.0
48.5 173.2
2.0 28.8 0.2 0.0
274.0 45.2 167.4 2.6 58.8

3.33 20.0 288.0 1.7 0.0


3.43 96.4 78.2 6.9 34.3
75 36.5 197.3 0.0 0.0
48.5 161.7
2.0 28.8 0.2 0.0
285.6 46.5 177.7 2.6 58.8

3.13 20.0 288.0 1.7 50.0


3.23 90.6 73.5 6.5 32.3
75 36.5 197.3 0.0 0.0
48.5 151.6
2.0 28.8 0.2 5.0
314.8 47.7 188.0 2.7 76.4

1.00 20.0 288.0 1.7 0.0


5.00 130.0 113.9 10.0 50.0
100 75.0 263.0 0.0 0.0
350 350.0
2.0 28.8 0.2 0.0
1332.6 227.0 693.7 11.9 400.0

0.1 2.1 28.8 0.2 5.0


1.7 11.8 0.0 0.0
49.6 3.8 40.6 0.2 5.0

Qty Rate 13.57

11.52 93.00 8.07 8.07


22% 1.78 1.78
1 1 2.00 2.00
2 108.00 0.94 0.94
2 90.00 0.78 0.78
13.6 1.7 11.8 0.0 0.0

Qty Rate 17.49

11.52 130.00 11.28 11.28


22% 2.48 2.48
1 1 2.00 2.00
2 108.00 0.94 0.94
2 90.00 0.78 0.78
17.5 1.7 15.8 0.0 0.0

Qty Rate 20.56

11.52 159.00 13.80 13.80


22% 3.04 3.04
1 1 2.00 2.00
2 108.00 0.94 0.94
2 90.00 0.78 0.78
20.6 1.7 18.8 0.0 0.0

Qty Rate 27.55

11.52 225.00 19.53 19.53


22% 4.30 4.30
1 1 2.00 2.00
2 108.00 0.94 0.94
2 90.00 0.78 0.78
27.5 1.7 25.8 0.0 0.0

75

Rate
12.5 2.70 35.44 35.44
0.3 13.00 3.90 3.90
0.0225 60.00 1.35 1.35
5% 0.26 0.26
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81
0.1 10.00 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
75.0 30.0 45.5 1.0 0.0

80

Rate
12.5 2.90 38.06 38.06
0.375 13.00 4.88 4.88
0.039 60.00 2.34 2.34
5% 0.36 0.36
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81

10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
79.7 30.0 50.1 1.0 0.0

84

Rate
12.5 3.10 40.69 40.69
0.5 13.00 6.50 6.50
0.045 60.00 2.70 2.70
5% 0.46 0.46
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81

10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
84.4 30.0 54.8 1.0 0.0

101

Rate
12.5 4.10 53.81 53.81
0.675 13.00 8.78 8.78
0.062 60.00 3.72 3.72
5% 0.62 0.62
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81

10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
101.0 30.0 71.4 1.0 0.0

121

Rate
12.5 5.50 72.19 72.19
0.8 13.00 10.40 10.40
0.0675 60.00 4.05 4.05
5% 0.72 0.72
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81

10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
121.4 30.0 91.9 1.0 0.0

79

Rate
12.5 2.97 38.98 38.98
0.3 13.00 3.90 3.90
0.0225 60.00 1.35 1.35
5% 0.26 0.26
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81

10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
78.6 30.0 49.0 1.0 0.0

84

Rate
12.5 3.19 41.87 41.87
0.375 13.00 4.88 4.88
0.04 60.00 2.40 2.40
5% 0.36 0.36
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81

10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
83.6 30.0 54.0 1.0 0.0
88

Rate
12.5 3.41 44.76 44.76
0.5 13.00 6.50 6.50
0.045 60.00 2.70 2.70
5% 0.46 0.46
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81

10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
88.5 30.0 58.9 1.0 0.0

106

Rate
12.5 4.51 59.19 59.19
0.675 13.00 8.78 8.78
0.062 60.00 3.72 3.72
5% 0.62 0.62
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81

10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
106.4 30.0 76.8 1.0 0.0

129

Rate
12.5 6.05 79.41 79.41
0.8 13.00 10.40 10.40
0.0675 60.00 4.05 4.05
5% 0.72 0.72
3.00 3.00
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81

10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
129.1 30.0 99.6 1.0 0.0

82

Rate
12.5 3.24 42.53 42.53
0.3 13.00 3.90 3.90
0.0225 60.00 1.35 1.35
5% 0.26 0.26
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81

10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
82.1 30.0 52.5 1.0 0.0

87

Rate
12.5 3.48 45.68 45.68
0.375 13.00 4.88 4.88
0.039 60.00 2.34 2.34
5% 0.36 0.36
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81

10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
87.3 30.0 57.8 1.0 0.0
93

Rate
12.5 3.72 48.83 48.83
0.5 13.00 6.50 6.50
0.045 60.00 2.70 2.70
5% 0.46 0.46
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81

10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
92.5 30.0 63.0 1.0 0.0

101

Rate
12.5 4.10 53.81 53.81
0.9 13.00 11.70 11.70
0.095 60.00 5.70 5.70
5% 0.87 0.87
2.50 2.50
1 108.00 10.80 10.80
1 90.00 9.00 9.00
1 135.00 2.25 2.25

10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
100.6 30.0 76.6 1.0 0.0

92

Rate
12.5 3.60 47.25 47.25
0.8 13.00 10.40 10.40
0.084 60.00 5.04 5.04
5% 0.77 0.77
2.50 2.50
1 108.00 10.80 10.80
1 90.00 9.00 9.00
1 135.00 2.25 2.25

10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
92.0 30.0 68.0 1.0 0.0

88

Rate
12.5 3.60 47.25 47.25
0.675 13.00 8.78 8.78
0.04 60.00 2.40 2.40
5% 0.56 0.56
2.50 2.50
1 108.00 10.80 10.80
1 90.00 9.00 9.00
1 135.00 2.25 2.25

10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
87.5 30.0 63.5 1.0 0.0

70

Rate
12.5 2.40 31.50 31.50
0.5 13.00 6.50 6.50
0.055 60.00 3.30 3.30
5% 0.49 0.49
2.50 2.50
1 108.00 10.80 10.80
1 90.00 9.00 9.00
1 135.00 2.25 2.25

10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
70.3 30.0 46.3 1.0 0.0

65
Rate
12.5 2.20 28.88 28.88
0.375 13.00 4.88 4.88
0.042 60.00 2.52 2.52
5% 0.37 0.37
2.50 2.50
1 108.00 10.80 10.80
1 90.00 9.00 9.00
1 135.00 2.25 2.25

10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
65.2 30.0 41.1 1.0 0.0

63

Rate
12.5 2.00 26.25 26.25
0.3 13.00 3.90 3.90
0.0275 60.00 1.65 1.65
5% 0.28 0.28
2.50 2.50
1 108.00 12.00 12.00
1 90.00 10.00 10.00
1 135.00 2.50 2.50

10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
63.1 30.0 36.6 1.0 0.0

160

Rate
25.00 25
67.58 30.0 36.6 1.0 0.0
67.58 30.0 36.6 1.0 0.0

160.2 60.0 98.2 2.0 0.0

108
Rate
12.5 4.51 59.19 59.19
0.9 13.00 11.70 11.70
0.095 60.00 5.70 5.70
5% 0.87 0.87
2.50 2.50
1 108.00 12.00 12.00
1 90.00 10.00 10.00
1 135.00 2.50 2.50

10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
108.5 30.0 82.0 1.0 0.0

96

Rate
12.5 3.96 51.98 51.98
0.8 13.00 10.40 10.40
0.08 60.00 4.80 4.80
5% 0.76 0.76
2.50 2.50
1 108.00 10.80 10.80
1 90.00 9.00 9.00
1 135.00 2.25 2.25

10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
96.5 30.0 72.4 1.0 0.0

88

Rate
12.5 3.52 46.20 46.20
0.675 13.00 8.78 8.78
0.06 60.00 3.60 3.60
5% 0.62 0.62
2.50 2.50
1 108.00 10.80 10.80
1 90.00 9.00 9.00
1 135.00 2.25 2.25

10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
87.7 30.0 63.7 1.0 0.0

73

Rate
12.5 2.64 34.65 34.65
0.5 13.00 6.50 6.50
0.04 60.00 2.40 2.40
5% 0.45 0.45
2.50 2.50
1 108.00 10.80 10.80
1 90.00 9.00 9.00
1 135.00 2.25 2.25

10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
72.5 30.0 48.5 1.0 0.0

68

Rate
12.5 2.42 31.76 31.76
0.375 13.00 4.88 4.88
0.042 60.00 2.52 2.52
5% 0.37 0.37
2.50 2.50
1 108.00 10.80 10.80
1 90.00 9.00 9.00
1 135.00 2.25 2.25

10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
68.1 30.0 44.0 1.0 0.0

61

Rate
12.5 2.20 28.88 28.88
0.3 13.00 3.90 3.90
0.0275 60.00 1.65 1.65
5% 0.28 0.28
2.50 2.50
1 108.00 9.82 9.82
1 90.00 8.18 8.18
1 135.00 2.05 2.05

10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
61.2 30.0 39.2 1.0 0.0

111

Rate
12.5 4.92 64.58 64.58
0.9 13.00 11.70 11.70
0.095 60.00 5.70 5.70
5% 0.87 0.87
2.50 2.50
1 108.00 10.80 10.80
1 90.00 9.00 9.00
1 135.00 2.25 2.25

10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
111.4 30.0 87.3 1.0 0.0

101

Rate
12.5 4.32 56.70 56.70
0.8 13.00 10.40 10.40
0.084 60.00 5.04 5.04
5% 0.77 0.77
2.50 2.50
1 108.00 10.80 10.80
1 90.00 9.00 9.00
1 135.00 2.25 2.25

10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
101.5 30.0 77.4 1.0 0.0
92

Rate
12.5 3.84 50.40 50.40
0.675 13.00 8.78 8.78
0.06 60.00 3.60 3.60
5% 0.62 0.62
2.50 2.50
1 108.00 10.80 10.80
1 90.00 9.00 9.00
1 135.00 2.25 2.25

10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
91.9 30.0 67.9 1.0 0.0

76

Rate
12.5 2.88 37.80 37.80
0.5 13.00 6.50 6.50
0.04 60.00 2.40 2.40
5% 0.45 0.45
2.50 2.50
1 108.00 10.80 10.80
1 90.00 9.00 9.00
1 135.00 2.25 2.25

10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
75.7 30.0 51.6 1.0 0.0

71

Rate
12.5 2.64 34.65 34.65
0.375 13.00 4.88 4.88
0.042 60.00 2.52 2.52
5% 0.37 0.37
2.50 2.50
1 108.00 10.80 10.80
1 90.00 9.00 9.00
1 135.00 2.25 2.25

10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
71.0 30.0 46.9 1.0 0.0

64

Rate
12.5 2.40 31.50 31.50
0.3 13.00 3.90 3.90
0.0275 60.00 1.65 1.65
5% 0.28 0.28
2.50 2.50
1 108.00 9.82 9.82
1 90.00 8.18 8.18
1 135.00 2.05 2.05

10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
63.9 30.0 41.8 1.0 0.0

102

Rate
12.5 4.50 59.06 59.06
0.41 13.00 5.33 5.33
0.045 60.00 2.70 2.70
5% 0.40 0.40
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81

10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
101.6 30.0 72.0 1.0 0.0
113

Rate
12.5 5.20 68.25 68.25
0.515 13.00 6.70 6.70
0.062 60.00 3.72 3.72
5% 0.52 0.52
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81

10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
113.2 30.0 83.7 1.0 0.0

130

Rate
12.5 6.20 81.38 81.38
0.78 13.00 10.14 10.14
0.0675 60.00 4.05 4.05
5% 0.71 0.71
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81

10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
130.3 30.0 100.8 1.0 0.0

147

Rate
12.5 7.44 97.65 97.65
0.78 13.00 10.14 10.14
0.0675 60.00 4.05 4.05
5% 0.71 0.71
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81

10.00
0.1 1.00 1.00
20 0.1 2.00 2.00
1.00 1.00
146.6 30.0 117.0 1.0 0.0

57

Rate
1 15.00 15.75 15.75
0.2 13.00 2.60 2.60
5% 0.13 0.13
20 0.1 2.00 2.00
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81

10.00
0.1 1.00 1.00
50 260 5.20 5.20
56.7 30.0 23.0 5.2 0.0

65

Rate
1 22.49 23.61 23.61
0.2 13.00 2.60 2.60
5% 0.13 0.13
20 0.1 2.00 2.00
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81

10.00
0.1 1.00 1.00
50 260 5.20 5.20
64.6 30.0 30.8 5.2 0.0

72

Rate
1 30.00 31.50 31.50
0.2 13.00 2.60 2.60
5% 0.13 0.13
20 0.1 2.00 2.00
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81

10.00
0.1 1.00 1.00
50 260 5.20 5.20
72.5 30.0 38.7 5.2 0.0

82

Rate
1 37.50 39.38 39.38
0.3 13.00 3.90 3.90
5% 0.20 0.20
20 0.1 2.00 2.00
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81

10.00
0.1 1.00 1.00
50 260 5.20 5.20
81.7 30.0 48.0 5.2 0.0

90

Rate
1 45.05 47.30 47.30
0.3 13.00 3.90 3.90
5% 0.20 0.20
20 0.1 2.00 2.00
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81

10.00
0.1 1.00 1.00
50 260 5.20 5.20
89.7 30.0 55.9 5.2 0.0
97

Rate
1 52.45 55.07 55.07
0.3 13.00 3.90 3.90
5% 0.20 0.20
20 0.1 2.00 2.00
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81

10.00
0.1 1.00 1.00
50 260 5.20 5.20
97.4 30.0 63.7 5.2 0.0

1.1 60

Rate
1 16.50 19.06 19.06
0.2 13.00 2.86 2.86
5% 0.16 0.16
20 0.1 2.00 2.00
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81

10.00
0.1 1.00 1.00
50 260 5.20 5.20
60.3 30.0 26.6 5.2 0.0

1.1 70

Rate
1 24.74 28.57 28.57
0.2 13.00 2.86 2.86
5% 0.16 0.16
20 0.1 2.00 2.00
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81
10.00
0.1 1.00 1.00
50 260 5.20 5.20
69.9 30.0 36.1 5.2 0.0

1.1 79

Rate
1 33.00 38.12 38.12
0.2 13.00 2.86 2.86
5% 0.16 0.16
20 0.1 2.00 2.00
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81

10.00
0.1 1.00 1.00
50 260 5.20 5.20
79.4 30.0 45.6 5.2 0.0

1.1 90

Rate
1 41.25 47.64 47.64
0.3 13.00 4.29 4.29
5% 0.24 0.24
20 0.1 2.00 2.00
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81

10.00
0.1 1.00 1.00
50 260 5.20 5.20
90.4 30.0 56.7 5.2 0.0

1.1 101

Rate
1 50.00 57.75 57.75
0.3 13.00 4.29 4.29
5% 0.24 0.24
20 0.1 2.00 2.00
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81

10.00
0.1 1.00 1.00
50 260 5.20 5.20
100.5 30.0 66.8 5.2 0.0

1.1 109

Rate
1 57.69 66.63 66.63
0.3 13.00 4.29 4.29
5% 0.24 0.24
20 0.1 2.00 2.00
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81

10.00
0.1 1.00 1.00
50 260 5.20 5.20
109.4 30.0 75.7 5.2 0.0

1.2 64

Rate
1 18.00 22.68 22.68
0.2 13.00 3.12 3.12
5% 0.19 0.19
20 0.1 2.00 2.00
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81

10.00
0.1 1.00 1.00
50 260 5.20 5.20
64.2 30.0 30.5 5.2 0.0
1.2 76

Rate
1 26.99 34.00 34.00
0.2 13.00 3.12 3.12
5% 0.19 0.19
20 0.1 2.00 2.00
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81

10.00
0.1 1.00 1.00
50 260 5.20 5.20
75.6 30.0 41.8 5.2 0.0

1.2 87

Rate
1 36.00 45.36 45.36
0.2 13.00 3.12 3.12
5% 0.19 0.19
20 0.1 2.00 2.00
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81

10.00
0.1 1.00 1.00
50 260 5.20 5.20
86.9 30.0 53.2 5.2 0.0

1.2 100

Rate
1 45.00 56.70 56.70
0.3 13.00 4.68 4.68
5% 0.28 0.28
20 0.1 2.00 2.00
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81
10.00
0.1 1.00 1.00
50 260 5.20 5.20
99.9 30.0 66.2 5.2 0.0

1.2 112

Rate
1 54.55 68.73 68.73
0.3 13.00 4.68 4.68
5% 0.28 0.28
20 0.1 2.00 2.00
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81

10.00
0.1 1.00 1.00
50 260 5.20 5.20
112.0 30.0 78.2 5.2 0.0

1.2 123

Rate
1 62.94 79.30 79.30
0.3 13.00 4.68 4.68
5% 0.28 0.28
20 0.1 2.00 2.00
2.50 2.50
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81

10.00
0.1 1.00 1.00
50 260 5.20 5.20
122.5 30.0 88.8 5.2 0.0

Qty Rate 34

0.2 13.00 2.60 2.60


0.025 65.00 1.63 1.63
10% 0.42 0.42
25 0.1 2.50 2.50
1 108.00 6.35 6.35
1 90.00 5.29 5.29
1 135.00 1.59 1.59

10.00
0.1 1.00 1.00
0.10 0.10
2.00 2.00
0.00
34.2 25.0 7.1 0.1 2.0

Qty Rate 36

0.25 13.00 3.25 3.25


0.035 65.00 2.28 2.28
10% 0.55 0.55
25 0.1 2.50 2.50
1 108.00 6.35 6.35
1 90.00 5.29 5.29
1 135.00 1.59 1.59

10.00
0.1 1.00 1.00
0.10 0.10
2.00 2.00
0.00
35.7 25.0 8.6 0.1 2.0

Qty Rate 34

0.2 13.00 2.60 2.60


0.025 65.00 1.63 1.63
10% 0.42 0.42
25 0.1 2.50 2.50
1 108.00 6.75 6.75
1.5 90.00 8.44 8.44
1 135.00 1.69 1.69

10.00
0.1 1.00 1.00
0.10 0.10
2.00 2.00
0.00
34.2 25.0 7.1 0.1 2.0
Qty Rate 36

0.25 13.00 3.25 3.25


0.035 65.00 2.28 2.28
10% 0.55 0.55
25 0.1 2.50 2.50
1 108.00 6.75 6.75
1.5 90.00 8.44 8.44
1 135.00 2.81 2.81

10.00
0.1 1.00 1.00
0.10 0.10
2.00 2.00
0.00
35.7 25.0 8.6 0.1 2.0

Qty Rate 35

0.3 13.00 3.90 3.90


0.04 65.00 2.60 2.60
10% 0.65 0.65
25 0.1 2.50 2.50
1 108.00 6.75 6.75
1.5 90.00 8.44 8.44
1 135.00 2.25 2.25

10.00
0.1 1.00 1.00
0.50
2.00
0.00
34.7 25.0 9.7 0.0 0.0

Qty Rate/Day
46.4
m3
1.05 200 210 210.00
1.05 10 10.5 10.50
1.05 10 10.5 10.50
2 108.00 5.40 5.40
6 90.00 13.50 13.50
1 135.00 2.25 2.25
0.1 90.00 0.23 0.23
1 108.00 2.16 2.16
15 0.12 1.80 1.80
0.50 0.50
0.056 850 52.36 52.36
0.50 0.50
150 mm thk 46.4 3.5 42.8 0.1 0.0

Qty Rate/Day
31.0
m3
1.05 200 210 210.00
1.05 10 10.5 10.50
1.05 10 10.5 10.50
2 108.00 5.40 5.40
6 90.00 13.50 13.50
1 135.00 2.25 2.25

90.00
0.1 0.23 0.23
1 108.00 2.16 2.16
15 0.12 1.80 1.80
0.50 0.50
0.056 850 52.36 52.36
0.50 0.50
100 mm thk 31.0 2.4 28.6 0.1 0.0

Qty Rate/Day
28.2
m3
1.05 200 210 210.00
1.05 10 10.5 10.50
1.05 10 10.5 10.50
2 108.00 5.40 5.40

90.00
6 13.50 13.50
1 135.00 2.25 2.25

90.00
0.1 0.23 0.23
1 108.00 2.16 2.16
15 0.12 1.80 1.80
0.50 0.50
0.056 850 52.36 52.36
0.50 0.50
90 mm thk 28.2 2.1 26.0 0.0 0.0
Qty Rate/Day
25.6
m3
1.05 200 210 210.00
1.05 10 10.5 10.50
1.05 10 10.5 10.50
2 108.00 5.40 5.40

90.00
6 13.50 13.50
1 135.00 2.25 2.25

90.00
0.1 0.23 0.23
1 108.00 2.16 2.16
15 0.12 1.80 1.80
0.50 0.50
0.056 850 52.36 52.36
0.50 0.50
75 mm thk 25.6 1.9 23.6 0.0 0.0

Qty Rate/Day
17.0
m3
1.05 200 210 210.00
1.05 10 10.5 10.50
1.05 10 10.5 10.50
2 108.00 5.40 5.40

90.00
6 13.50 13.50
1 135.00 2.25 2.25

90.00
0.1 0.23 0.23
1 108.00 2.16 2.16
15 0.12 1.80 1.80
0.50 0.50
0.056 850 52.36 52.36
0.50 0.50
50 mm thk 17.0 1.3 15.7 0.0 0.0
.

Qty Rate/Day
13.6
m3
1.05 200 210 210.00
1.05 10 10.5 10.50
1.05 10 10.5 10.50
2 108.00 5.40 5.40
90.00
6 13.50 13.50
1 135.00 2.25 2.25

90.00
0.1 0.23 0.23
1 108.00 2.16 2.16
15 0.12 1.80 1.80
0.50 0.50
0.056 850 52.36 52.36
0.50 0.50
40 mm thk 13.6 1.0 12.6 0.0 0.0
.

Qty Rate/Day
8.5
m3
1.05 200 210 210.00
1.05 10 10.5 10.50
1.05 10 10.5 10.50
2 108.00 5.40 5.40

90.00
6 13.50 13.50
1 135.00 2.25 2.25

90.00
0.1 0.23 0.23
1 108.00 2.16 2.16
15 0.12 1.80 1.80
0.50 0.50
0.056 850 52.36 52.36
0.50 0.50
25 mm thk 8.5 0.6 7.9 0.0 0.0
.

Qty Rate 41

10.00 5.00 5.00


0.50 0.50
4.00 4.00
0.50 0.50

108.00
1 9.00 9.00
2 90.00 15.00 15.00

135.00
1 1.50 1.50
40.5 30.5 5.0 5.0 0.0
Qty Rate 29

0.50 0.50
4.00 4.00
0.50 0.50
1 108.00 9.00 9.00
1.5 90.00 11.25 11.25
1 135.00 3.75 3.75
29.0 24.0 5.0 0.0 0.0

Qty Rate 47

0.50 0.50
18.33 18.33
4.00 4.00
0.50 0.50
1 108.00 9.00 9.00
1.5 90.00 11.25 11.25
1 135.00 3.75 3.75
47.3 24.0 23.3 0.0 0.0

Qty Rate 53

1 2.00 2.00 2.00


1 4.00 4.00 4.00
0.50 0.50
1 2.00 2.00
2 108.00 21.60 21.60
2 90.00 18.00 18.00
1 135.00 4.50 4.50
52.6 44.1 8.5 0.0 0.0

Qty Rate 85

18.33 18.33
1 4.00 4.00 4.00
0.50 0.50
1 0.50 0.50
2 108.00 21.60 21.60
4 90.00 36.00 36.00
1 135.00 4.50 4.50
85.4 62.1 23.3 0.0 0.0

1 35.00 37.45 37.45


28.15 2.1 26.0 0.0 0.0
29.00 24.00 5.00 - -
94.6 26.1 68.4 0.0 0.0

1 100.00 107.00 107.00


28.15 2.1 26.0 0.0 0.0
29.00 24.00 5.00 - -
164.2 26.1 138.0 0.0 0.0

1 40.00 42.80 42.80


28.15 2.1 26.0 0.0 0.0
29.00 24.00 5.00 - -
100.0 26.1 73.8 0.0 0.0

1 400.00 440.00 440.00


25.61 1.9 23.6 0.0 0.0
52.60 44.10 8.50 - -
518.2 46.0 472.1 0.0 0.0

1 70.00 74.90 74.90


34.65 25.0 9.7 0.0 0.0
25.61 1.9 23.6 0.0 0.0
29.00 24.00 5.00 - -
164.2 50.9 113.2 0.0 0.0

1 60.00 64.20 64.20


28.15 2.1 26.0 0.0 0.0
29.00 24.00 5.00 - -
121.4 26.1 95.2 0.0 0.0

1 120.00 128.40 128.40


25.61 1.9 23.6 0.0 0.0
52.60 44.10 8.50 - -
206.6 46.0 160.5 0.0 0.0
1 20.00 21.40 21.40
25.61 1.9 23.6 0.0 0.0
40.50 30.50 5.00 5.00 -
87.5 32.4 50.0 5.0 0.0

1 25.00 26.75 26.75


25.61 1.9 23.6 0.0 0.0
29.00 24.00 5.00 - -
81.4 25.9 55.4 0.0 0.0

1 81.00 81.00 81.00


6.40 0.5 5.9 0.0 0.0
7.25 6.00 1.25 - -
94.7 6.5 88.2 0.0 0.0

1 100.00 100.00 100.00


7.25 6.00 1.25 - -
107.3 6.0 101.3 0.0 0.0

1 130.00 130.00 130.00


7.26 6.00 1.25 0.01 -
137.3 6.0 131.3 0.0 0.0

1 250.00 250.00 250.00


7.25 6.00 1.25 - -
257.3 6.0 251.3 0.0 0.0

Qty Rate 33

2.00 2.00
6.00 6.00
0.50 0.50
1 108.00 9.00 9.00
1.5 90.00 11.25 11.25
1 135.00 3.75 3.75
32.5 24.0 8.5 0.0 0.0

Qty Rate 90
1 6.00 6.00 6.00
1 6.00 6.00 6.00
0.50 0.50
1 2.00 2.00
2 108.00 30.86 30.86
3 90.00 38.57 38.57
1 135.00 6.43 6.43
90.4 75.9 14.5 0.0 0.0

Qty Rate 109

18.33 18.33
1 6.00 6.00 6.00
1 6.00 6.00 6.00
0.50 0.50
1 2.00 2.00
2 108.00 30.86 30.86
3 90.00 38.57 38.57
1 135.00 6.43 6.43
108.7 75.9 32.8 0.0 0.0

Qty Rate 156

6 10.00 60.00 60.00


1 12.00 12.00 12.00
1 2.00 2.00 2.00
2 108.00 33.23 33.23
3 90.00 41.54 41.54
1 135.00 6.92 6.92
155.7 81.7 74.0 0.0 0.0

1 35.00 37.45 37.45


34.25 25.00 7.15 0.10 2.00
32.50 24.00 8.50 - -
104.2 49.0 53.1 0.1 2.0

1 40.00 42.80 42.80


34.25 25.00 7.15 0.10 2.00
32.50 24.00 8.50 - -
109.5 49.0 58.4 0.1 2.0

1 250.00 267.50 267.50


34.25 25.00 7.15 0.10 2.00
90.36 75.86 14.50 - -
392.1 100.9 289.1 0.1 2.0

1 20.00 21.40 21.40


34.25 25.00 7.15 0.10 2.00
32.50 24.00 8.50 - -
88.1 49.0 37.0 0.1 2.0

1 250.00 267.50 267.50


34.25 25.00 7.15 0.10 2.00
5.00 5.00
155.69 81.69 74.00 - -
457.4 111.7 353.6 0.1 2.0

1 300.00 321.00 321.00


34.25 25.00 7.15 0.10 2.00
5.00 5.00
155.69 81.69 74.00 - -
510.9 111.7 407.1 0.1 2.0

Qty Rate 13

0.07 13.00 0.91 0.91


0.01 65.00 0.65 0.65
5% 0.08 0.08
0.50 0.50
0.50 0.50
2.00 2.00
1 108.00 3.60 3.60
1 90.00 3.00 3.00
1 135.00 1.50 1.50
12.7 8.1 4.6 0.0 0.0

Qty Rate 15

0.07 13.00 1.37 1.37


0.01 65.00 0.98 0.98
5% 0.18 0.18
0.75 0.75
0.50 0.50
2.00 2.00
1 108.00 4.32 4.32
1 90.00 3.60 3.60
1 135.00 1.80 1.80
15.5 9.7 5.8 0.0 0.0

Qty Rate 13

0.07 13.00 0.91 0.91


0.01 65.00 0.65 0.65
10% 0.16 0.16
0.50 0.50
0.50 0.50
2.00 2.00
1 108.00 3.60 3.60
1 90.00 3.00 3.00
1 135.00 1.50 1.50
12.8 8.1 4.7 0.0 0.0

Qty Rate 79

1 50.00 51.00 51.00


0.07 13.00 0.91 0.91
0.01 65.00 0.65 0.65
20% 0.31 0.31
0.50 0.50
0.50 0.50
2.00 2.00
1 108.00 3.60 3.60
1 90.00 3.00 3.00
1 135.00 1.50 1.50
15% 15.00 15.00
79.0 23.1 55.9 0.0 0.0

1 15.00 15.45 15.45


12.7 8.1 4.6 0.0 0.0
28.2 8.1 20.1 0.0 0.0

1 10.00 10.30 10.30


12.7 8.1 4.6 0.0 0.0
23.0 8.1 14.9 0.0 0.0

1 25.00 25.75 25.75


12.7 8.1 4.6 0.0 0.0
38.5 8.1 30.4 0.0 0.0

1 10.00 10.30 10.30


12.7 8.1 4.6 0.0 0.0
23.0 8.1 14.9 0.0 0.0

1 50.00 51.50 51.50


12.7 8.1 4.6 0.0 0.0
64.2 8.1 56.1 0.0 0.0

1 50.00 51.50 51.50


12.7 8.1 4.6 0.0 0.0
64.2 8.1 56.1 0.0 0.0

1 10.00 10.30 10.30


12.7 8.1 4.6 0.0 0.0
23.0 8.1 14.9 0.0 0.0

Qty Rate 107

1 30.00 30.00 30.00


28.15 28.15
6.00 6.00
0.50 0.50
3 5 15.00 15.00
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 2.81 2.81
107.2 27.6 79.7 0.0 0.0

Qty Rate 94

1 25.00 25.00 25.00


25.61 25.61
6.00 6.00
0.50 0.50
3 5 15.00 15.00
1 108.00 10.80 10.80
1 90.00 9.00 9.00
1 135.00 2.25 2.25
94.2 22.1 72.1 0.0 0.0

Qty Rate 225.24

1 150.00 150.00 150.00


25.61 25.61
6.00 6.00
0.50 0.50
3 5 15.00 15.00
1 108.00 13.50 13.50
1 90.00 11.25 11.25
1 135.00 3.38 3.38
225.2 28.1 197.1 0.0 0.0

Qty Rate 75

1 25.00 26.75 26.75


25.61 1.95 23.63 0.04 -
2.00 2.00
2.00 2.00
0.50 0.50
1 108.00 6.35 6.35
2 90.00 10.59 10.59
1 135.00 1.06 1.06
74.9 19.9 54.9 0.0 0.0

Qty Rate 28

1 15.00 15.00 15.00


0.07 13.00 0.91 0.91
0.01 65.00 0.65 0.65
20% 0.31 0.31
0.50 0.50
0.50 0.50
2.00 2.00
1 108.00 3.60 3.60
1 90.00 3.00 3.00
1 135.00 1.50 1.50
28.0 8.1 19.9 0.0 0.0

Qty Rate 86

1 2.75 2.75 2.75


1.03 42 43.26 43.26
0.25 48 15 15.00
0.25 20 5 5.00
1.00 1.00
0.05 62 3.1 3.10
5% 3.068 3.07
1 108.00 4.32 4.32
2 90.00 7.20 7.20
1 135.00 1.26 1.26
86.0 12.8 73.2 0.0 0.0

Qty Rate 72

1 2.75 2.75 2.75


1.03 37 38.11 38.11
0.15 48 7.2 7.20
0.25 20 5 5.00
1.00 1.00
0.05 62 3.1 3.10
5% 2.4205 2.42
1 108.00 4.32 4.32
2 90.00 7.20 7.20
1 135.00 1.26 1.26
72.4 12.8 59.6 0.0 0.0

Qty Rate 65

1.15 40 46 46.00
250 1500 6 6
250 700 2.8 2.8
5 75 1.5 1.5
10 90.00 3.60 3.60
1 135.00 0.36 0.36
2.5 500.00 5.0 5.00
65.3 4.0 51.0 8.8 1.5
Qty Rate 102

1.15 40 46 46.00
40 750 18.75 18.75
40 700 17.5 17.5
40 100 2.5 2.5
1 75 1.875 1.875
4 90.00 9.00 9.00
1 135.00 0.90 0.90
2000 0.10 5.0 5.00
101.5 9.9 51.0 38.8 1.9

Qty Rate/Day 60

1 40 42.00 42.00
1 750 5.00 5.0
1 700 4.67 4.7
4 90.00 2.40 2.40
1 135.00 0.30 0.30
3750 0.11 2.75 2.75
2 200.00 2.67 2.67
59.8 2.7 47.4 9.7 0.0

Qty Rate 93

1.094 27 29.54 29.54


0.2 15 3.00 3.00
3.00 3.00
10% 27 2.70 2.70
1 108.00 10.80 10.80
1.25 90.00 11.25 11.25
1 135.00 3.15 3.15
0.095 300 28.50 28.50
1.00 1.00
92.9 28.2 61.7 0.0 3.0

Qty Rate 123

1 18 18.00 18.00
1 4 4.00 4.00
1 61 61.00 61.00
1 4 4.00 4.00
1 36 36.00 36.00
123.0 0.0 0.0 0.0 123.0

75.00
170.00
80.00
60.00
90.00
45.00
125.00
175.00
100.00

18.00
40.00
20.00
65.00
30.00
40.00
20.00
20.00

40.00
40.00
150.00
250.00

350.00
400.00

Qty Rate Amount


21868 80 1,749,440 4373.6
21868 25.7 69,830
40 350 14,000
40 100.0 4,000
21868 125 2,733,500
5623 400 2,249,200
394737 4 1,578,948 90.254481434
8000 4 32,000 200

Sub Total= 8,430,918.00


contractor overhead & Profit -15% 843,091.80
Grand Total= 9,274,009.80

L B D Rate Amount

25,000.00
8500 #VALUE!
3.14 0.1225 13.2 330.3
#REF! #VALUE! 3.12
145 0.2 1 900.0 #VALUE!
145 1.5 1 20 #VALUE!
145 0.7 0.6 900 #VALUE!
#VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE!
#VALUE!

Qty Rate Amount

725 115 83,375


4,169
145 270 39,150
725 28 20,300
70 15 1,050
725 5 3,625
725 10 7,250

Sub Total= 158,919.00


contractor overhead & Profit -15% 23,837.85
Grand Total= 182,756.85
128.70
302

M
Qty Rate Amount

42.64706 3500 149,265


7,463
145 270 39,150
725 28 20,300
70 20 1,400
725 5 3,625
725 10 7,250

Phonix Engineering & Marine Co

Sub Total= 228,453.00


contractor overhead & Profit -15% 34,267.95
Grand Total= 262,720.95
185.01
302

Qty Rate Amount

4,950
69,830
121.7 980 119,233
121.7 225 27,375
4258.33 10 42,583

72,600
4 4500 18,000

35,457

Sub Total= 390,029.00


contractor overhead & Profit -10% 39,002.90
Grand Total= 429,031.90

Qty Rate Amount

98,000
90 3460 311,400

9,800

Sub Total= 419,200.00


contractor overhead & Profit -15% 62,880.00
Grand Total= 482,080.00

L B H Rate Amount
Dhs

3 3 1.5 15.00 #VALUE!

1.2 1.2 1.5 15.00 #VALUE!

15.00 #VALUE!

1.2 1.2 4.00 #VALUE!

1.2 1.2 0.1 350 #VALUE!

4 1 90.00 #VALUE!

3.2 1 40.00 #VALUE!


0.8 0.8 40.00

1,150 #VALUE!

4.8 1.5 35 #VALUE!


1.2 1.2 35 #VALUE!

#VALUE! Dhs

L B H Rate Amount
Dhs

2 2 1 15.00 #VALUE!
0.7 0.7 1 15.00 #VALUE!

15.00 #VALUE!

0.9 0.9 5.00 #VALUE!

0.9 0.9 0.1 350 #VALUE!

2 1 90.00 #VALUE!

1.6 1 40.00 #VALUE!


0.3 0.3 40.00

300 350

2.8 1 35 #VALUE!
0.7 0.7 35 #VALUE!

#VALUE! Dhs

L B H Rate Amount
Dhs

10 1 1 20.00 #VALUE!

10 0.5 0.3 20.00 #VALUE!

20.00 #VALUE!

10 0.5 5.00 #VALUE!

10 0.5 0.3 550 #VALUE!

#VALUE! Dhs / m

L W H RCC Shutter Blind Steel Ratio


m3 m2 m2 Kg/m3

1.1 1.1 0.35 #VALUE! #VALUE! #VALUE! 70


0.2 0.2 0.85 #VALUE! #VALUE! 300
16 0.2 0.4 #VALUE! 13 6 200
0.2 0.2 2.2 #VALUE! #VALUE! 200
16 0.2 0.2 #VALUE! 6 200
#VALUE! #VALUE! #VALUE!

#VALUE! #VALUE! #VALUE! #VALUE!

348.00 60.00 28.00


#VALUE! #VALUE! #VALUE!

Rate Amount
#VALUE! Dhs
L B H Rate Amount
3 3 1.45 25 #VALUE!

20 #VALUE!

20 #VALUE!

1.5 1.5 0.25 75 #VALUE!

16 2 90 #VALUE!

16 2.3 35 #VALUE!

16 2.3 35 #VALUE!

Length

#VALUE! QR 16

Unit Rate Amount


LS 25000 25,000.00
LS 15000 15,000.00
m 2500 287,500.00
Nos 3000 -
m2 150 69,000.00
Days 2500 12,500.00

409,000.00 3,556.52 m

409,000.00

Unit Rate
240
270
265
280
290
280

270
15
15
255

2600
2600

8.07
11.28
13.80
19.53

2.7
2.9
3.1
4.1
5.5

1.8
2
2.2
3.2
4.2
4.7
2.5

3.5
3
4.5
5
5.5

4.5
5.2
6.2
7

25
26
27
35

35
36
37
45

35
36
36
45

45
46
46
55

27
18

13
13

35
35
60
25
35
24
25
31
70
90
1250

55
65

175
156
78

33
49
63

500
45
40
35
65
17
30

42
69

18
35

18
4
61
4
36

12.5
175

12.5
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(No.) CATEG
(AED/m3) y (MHr/m3)

Unskilled 2.00 18.63% 1.20 0.12


Charge hand 0.40 3.73% 0.36 0.02

Unskilled 8.33 77.64% 5.00 0.50


Crew 10.73 100.00% 6.56 0.64

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m3) y (MHr/m3)
(No.) CATEG

Unskilled 2.00 18.63% 1.20 0.12


Charge hand 0.40 3.73% 0.36 0.02

Unskilled 8.33 77.64% 5.00 0.50


Crew 10.73 100.00% 6.56 0.64

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m3) y (MHr/m3)
(No.) CATEG

Unskilled 2.00 83.33% 3.60 0.36


Charge hand 0.40 16.67% 1.08 0.07

Crew 2.40 100.00% 4.68 0.43


% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m3) y (MHr/m3)
(No.) CATEG

Unskilled 2.00 83.33% 0.90 0.09


Charge hand 0.40 16.67% 0.27 0.02

Crew 2.40 100.00% 1.17 0.11

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m3) y (MHr/m3)
(No.) CATEG

Unskilled 4.00 90.91% 2.25 0.23


Charge hand 0.40 9.09% 0.34 0.02

Crew 4.40 100.00% 2.59 0.25

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(No.) CATEG
(AED/m3) y (MHr/m3)

Unskilled 2.00 66.67% 0.90 0.09


Charge hand 1.00 33.33% 0.23 0.02
Crew 3.00 100.00% 1.13 0.11
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m3) y (MHr/m3)
(No.) CATEG

Mason 1.00 22.22% 9.00 0.75


Unskilled 1.50 33.33% 13.50 1.35
Charge hand 1.00 22.22% 2.25 0.15
Unskilled 1.00 22.22% 1.00 0.10

Crew 4.50 100.00% 25.75 2.35

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason 1.00 22.22% 0.90 0.08


Unskilled 1.50 33.33% 1.35 0.14
Charge hand 1.00 22.22% 0.23 0.02
Unskilled 1.00 22.22% 0.10 0.01

Crew 4.50 100.00% 2.58 0.24

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
l -5 % wastage
Mason - 4 No 4.00 30.53% 0.72 0.06
Unskilled 6.00 45.80% 0.90 0.09
Charge hand 1.00 7.63% 0.15 0.01
Unskilled 0.10 0.76% 0.02 0.00
Carpenter - 2.00 15.27% 0.22 0.02
Crew 500m2/day 13.10 100.00% 2.00 0.18

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason - 4 No 4.00 30.53% 0.81 0.07


Unskilled 6.00 45.80% 1.01 0.10
Charge hand 1.00 7.63% 0.17 0.01
Unskilled 0.10 0.76% 0.02 0.00
Carpenter - 2.00 15.27% 0.32 0.03
Crew 500m2/day 13.10 100.00% 2.33 0.21

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason - 4 No 4.00 30.53% 1.08 0.09


Unskilled 6.00 45.80% 1.35 0.14
Charge hand 1.00 7.63% 0.23 0.02
Unskilled 0.10 0.76% 0.02 0.00
Carpenter - 2.00 15.27% 0.43 0.04
Crew 500m2/day 13.10 100.00% 3.11 0.28
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m3) y (MHr/m3)
(No.) CATEG

Mason - 4 No 4.00 30.53% 10.80 0.90


Unskilled 6.00 45.80% 13.50 1.35
Charge hand 1.00 7.63% 2.25 0.15
Unskilled 0.10 0.76% 0.23 0.02
Carpenter - 2.00 15.27% 4.32 0.36
Crew 500m2/day 13.10 100.00% 31.10 2.78

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m3) y (MHr/m3)
(No.) CATEG

Mason - 8 No 8.00 27.49% 5.40 0.45


Unskilled 16.00 54.98% 9.00 0.90
Charge hand 2.00 6.87% 3.15 0.21
Unskilled 0.10 0.34% 1.00 0.10
Carpenter - 2 No 2.00 6.87% 1.35 0.11
Steel Fixer - 1 No 1.00 3.44% 0.68 0.06
Crew 200m3/day 29.10 100% 20.58 1.83

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m3) y (MHr/m3)
(No.) CATEG
Mason - 8 No 8.00 27.49% 5.40 0.45
Unskilled 16.00 54.98% 9.00 0.90
Charge hand 2.00 6.87% 3.15 0.21
Unskilled 0.10 0.34% 1.00 0.10
Carpenter - 2 No 2.00 6.87% 1.35 0.11
Steel Fixer - 1 No 1.00 3.44% 0.68 0.06
Crew 200m3/day 29.10 100% 20.58 1.83

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m3) y (MHr/m3)
(No.) CATEG

Mason - 8 No 8.00 27.49% 5.40 0.45


Unskilled 16.00 54.98% 9.00 0.90
Charge hand 2.00 6.87% 3.15 0.21
Unskilled 0.10 0.34% 1.00 0.10
Carpenter - 2 No 2.00 6.87% 1.35 0.11
Steel Fixer - 1 No 1.00 3.44% 0.68 0.06
Crew 200m3/day 29.10 100% 20.58 1.83

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m3) y (MHr/m3)
(No.) CATEG

Mason - 8 No 8.00 27.49% 5.40 0.45


Unskilled 16.00 54.98% 9.00 0.90
Charge hand 2.00 6.87% 3.15 0.21
Unskilled 0.10 0.34% 1.00 0.10
Carpenter - 2 No 2.00 6.87% 1.35 0.11
Steel Fixer - 1 No 1.00 3.44% 0.68 0.06
Crew 200m3/day 29.10 100% 20.58 1.83

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m3) y (MHr/m3)
(No.) CATEG

Mason - 8 No 8.00 27.49% 5.40 0.45


Unskilled 16.00 54.98% 9.00 0.90
Charge hand 2.00 6.87% 3.15 0.21
Unskilled 0.10 0.34% 1.00 0.10
Carpenter - 2 No 2.00 6.87% 1.35 0.11
Steel Fixer - 1 No 1.00 3.44% 0.68 0.06
Crew 200m3/day 29.10 100% 20.58 1.83

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m3) y (MHr/m3)
(No.) CATEG

Mason - 8 No 8.00 27.49% 5.40 0.45


Unskilled Labour - 16
No 16.00 54.98% 9.00 0.90
Charge Hand - 2 No 2.00 6.87% 3.15 0.21
Unskilled Labour - for
Curing- 1 hr/m3 0.10 0.34% 1.00 0.10
Carpenter - 2 No 2.00 6.87% 1.35 0.11
Steel Fixer - 1 No 1.00 3.44% 0.68 0.06
Crew 200m3/day 29.10 100% 20.58 1.83
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

(Carp - 2 No+Help - 1
no) - Gang - 6 Nos
(Incl Deshutter) 7.00 50.00% 21.42 1.79

Unskilled Labour - 4
No 5.00 35.71% 4.50 0.45

Charge Hand - 1 No 2.00 14.29% 2.16 0.14

Crew 100m2/day 14.00 100% 28.08 2.38

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(No.) CATEG
(AED/m2) y (MHr/m2)

(Carp - 2 No+Help - 1
no) - 1 Gang - 7 Nos
(Incl Deshutter) 7.00 52.50% 21.42 2.14
Unskilled Labour - 5
No 5.00 37.50% 4.50 0.30
Charge Hand - 1 No 1.33 10.00% 1.80 0.18

Crew 100m2/day 13.33 100% 27.72 2.62

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/T) y (MHr/T)
(No.) CATEG
Steel Fixer - 3 No 4.00 80.00% 432.00 36.00

Charge Hand - 1 No 1.00 20.00% 54.00 3.60

Crew/Tonne 5.00 100% 486.00 39.60

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/KG) y (MHr/KG)
(No.) CATEG

Steel Fixer - 3 No 4.00 80.00% 0.43 0.04

Charge Hand - 1 No 1.00 20.00% 0.05 0.00

Crew / KG 5.00 100% 0.49 0.04

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason - 4 No 2.00 18.02% 0.41 0.03


Unskilled Labour - 6
No 6.00 54.05% 1.01 0.10
Charge Hand 1.00 9.01% 0.17 0.01
Unskilled Labour - for
Curing- 0.10 0.90% 0.02 0.00
Carpenter - 2.00 18.02% 0.32 0.03
Crew 500m2/day 11.10 100.00% 1.93 0.17

% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)

Crew 200m3/day 29.10 100% 20.00 1.83


Crew 100m2/day 13.33 100% 130.00 2.62
Crew / KG 5.00 100% 75.00 0.04
225.00 AED/m3

% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)

Crew 200m3/day 29.10 100% 20.00 1.83


Crew 100m2/day 13.33 100% 130.00 2.62
Crew / KG 5.00 100% 75.00 0.04
225.00 AED/m3

% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)

Crew 200m3/day 29.10 100% 20.00 1.83


Crew 100m2/day 13.33 100% 42.12 2.62
Crew / KG 5.00 100% 38.88 0.04
101.00 AED/m3

% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)

Crew 200m3/day 29.10 100% 20.00 1.83


Crew 100m2/day 13.33 100% 56.16 2.62
Crew / KG 5.00 100% 38.88 0.04
115.04 AED/m3

% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)

Crew 200m3/day 29.10 100% 20.00 1.83


Crew 100m2/day 13.33 100% 7.02 2.62
Crew / KG 5.00 100% 53.46 0.04
80.48 AED/m3

% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)

Crew 200m3/day 29.10 100% 20.00 1.83


Crew 100m2/day 13.33 100% 56.16 2.62
Crew / KG 5.00 100% 75.00 0.04
151.16 AED/m3
% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)

Crew 200m3/day 29.10 100% 20.00 1.83


Crew 100m2/day 13.33 100% 130.00 2.62
Crew / KG 5.00 100% 75.00 0.04
225.00 AED/m3

% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)

Crew 200m3/day 29.10 100% 20.00 1.83


Crew 100m2/day 13.33 100% 56.16 2.62
Crew / KG 5.00 100% 75.00 0.04
151.16 AED/m3

% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)

Crew 200m3/day 29.10 100% 20.00 1.83


Crew 100m2/day 13.33 100% 130.00 2.62
Crew / KG 5.00 100% 75.00 0.04
225.00 AED/m3

% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)

Crew 200m3/day 29.10 100% 20.00 1.83


Crew 100m2/day 13.33 100% 130.00 2.62
Crew / KG 5.00 100% 75.00 0.04
225.00 AED/m3
% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)

Crew 200m3/day 29.10 100% 20.00 1.83


Crew 100m2/day 13.33 100% 130.00 2.62
Crew / KG 5.00 100% 75.00 0.04
225.00 AED/m3

% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)

Crew 200m3/day 29.10 100% 20.00 1.83


Crew 100m2/day 13.33 100% 130.00 2.62
Crew / KG 5.00 100% 75.00 0.04
225.00 AED/m3

% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)

Crew 200m3/day 29.10 100% 20.00 1.83


Crew 100m2/day 13.33 100% 130.00 2.62
Crew / KG 5.00 100% 75.00 0.04
225.00 AED/m3

% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)

Crew 200m3/day 29.10 100% 20.00 1.83


Crew 100m2/day 13.33 100% 130.00 2.62
Crew / KG 5.00 100% 75.00 0.04
225.00 AED/m3

% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m2)
y
(No.) CATEG (MHr/unit)

Crew 200m3/day 29.10 100% 4.00 1.83


Crew 100m2/day 13.33 100% 26.00 2.62
Crew / KG 5.00 100% 15.00 0.04
45.00 AED/m2

% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m2)
y
(No.) CATEG (MHr/unit)

Crew 200m3/day 29.10 100% 6.40 1.83


Crew 100m2/day 13.33 100% 41.60 2.62
Crew / KG 5.00 100% 24.00 0.04
72.00 AED/m2

% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m2)
y
(No.) CATEG (MHr/unit)

Crew 200m3/day 29.10 100% 8.40 1.83


Crew 100m2/day 13.33 100% 54.60 2.62
Crew / KG 5.00 100% 31.50 0.04
94.50 AED/m2
% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)

Crew 200m3/day 29.10 100% 20.00 1.83


Crew 100m2/day 13.33 100% 130.00 2.62
Crew / KG 5.00 100% 75.00 0.04
225.00 AED/m3

% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)

Crew 200m3/day 29.10 100% 20.00 1.83


Crew 100m2/day 13.33 100% 130.00 2.62
Crew / KG 5.00 100% 75.00 0.04
225.00 AED/m3

% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/M)
y
(No.) CATEG (MHr/unit)

Crew 200m3/day 29.10 100% 0.33 1.83


Crew 100m2/day 13.33 100% 5.62 2.62
Crew / KG 5.00 100% 0.81 0.04
6.76 AED/M

% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)

Crew 200m3/day 29.10 100% 20.00 1.83


Crew 100m2/day 13.33 100% 351.00 2.62
Crew / KG 5.00 100% 43.74 0.04
414.74 AED/m3

% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)

Crew 200m3/day 29.10 100% 1.00 1.83


Crew 100m2/day 13.33 100% 17.55 2.62
Crew / KG 5.00 100% 2.19 0.04
20.74 AED/m3

% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)

Crew 200m3/day 29.10 100% 20.00 1.83


Crew 100m2/day 13.33 100% 56.16 2.62
Crew / KG 5.00 100% 7.29 0.04
83.45 AED/m3

% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)

% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)

Crew 200m3/day 29.10 100% 20.00 1.83


Crew / KG 5.00 100% 28.08 0.04
Crew 100m2/day 13.33 100% 8.61 2.62
Crew / M 5.00 100% 20.00 6.00
76.69 AED/m3
% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m2)
y
(No.) CATEG (MHr/unit)

Crew 200m3/day 29.10 100% 4.00 1.83


Crew / KG 5.00 100% 5.62 0.04
Crew 100m2/day 13.33 100% 1.72 2.62
Crew / M 5.00 100% 4.00 6.00
15.34 AED/m2

% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)

Crew 200m3/day 29.10 100% 20.00 1.83


Crew / KG 5.00 100% 12.05 0.04
Crew 100m2/day 13.33 100% 28.08 2.62
Crew / M 5.00 100% 20.00 6.00
80.13 AED/m3

% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)

Crew 200m3/day 29.10 100% 3.00 1.83


Crew / KG 5.00 100% 1.81 0.04
Crew 100m2/day 13.33 100% 4.21 2.62
Crew / M 5.00 100% 3.00 6.00
12.02 AED/m3

% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)

Crew 200m3/day 29.10 100% 20.00 1.83


Crew / KG 5.00 100% 17.22 0.04
Crew 100m2/day 13.33 100% 28.08 2.62
Crew / M 5.00 100% 20.00 6.00
85.30 AED/m3

% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m2)
y
(No.) CATEG (MHr/unit)

Crew 200m3/day 29.10 100% 2.40 1.83


Crew / KG 5.00 100% 2.07 0.04
Crew 100m2/day 13.33 100% 3.37 2.62
Crew / M 5.00 100% 2.40 6.00
10.24 AED/m2
% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)

Crew 200m3/day 29.10 100% 2.00 1.83


Crew / KG 5.00 100% 1.72 0.04
Crew 100m2/day 13.33 100% 2.81 2.62
Crew / M 5.00 100% 2.00 6.00
8.53 AED/m3

% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m2)
y
(No.) CATEG (MHr/unit)

Crew 200m3/day 29.10 100% 4.00 1.83


Crew / KG 5.00 100% 3.44 0.04
Crew 100m2/day 13.33 100% 5.62 2.62
Crew / M 5.00 100% 4.00 6.00
17.06 AED/m2

% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)

Crew 200m3/day 29.10 100% 4.00 1.83


Crew / KG 5.00 100% 28.64 0.04
Crew 100m2/day 13.33 100% 5.83 2.62
Crew / M 5.00 100% 0.00 6.00
38.47 AED/m3

% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m2)
y
(No.) CATEG (MHr/unit)

Crew 200m3/day 29.10 100% 20.00 1.83


Crew / KG 5.00 100% 124.89 0.04
Crew 100m2/day 13.33 100% 29.16 2.62

Crew / M 5.00 100% 2.00 6.00


40.49 AED/m2

% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)

Crew 200m3/day 29.10 100% 20.00 1.83


Crew / KG 5.00 100% 115.13 0.04
Crew 100m2/day 13.33 100% 29.16 2.62
Crew / M 5.00 100% 2.00 6.00
41.57 AED/m3

% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)

Crew 200m3/day 29.10 100% 20.00 1.83


Crew / KG 5.00 100% 106.81 0.04
Crew 100m2/day 13.33 100% 29.16 2.62

Crew / M 5.00 100% 2.00 6.00


42.65 AED/m3

% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)

Crew 200m3/day 29.10 100% 20.00 1.83


Crew / KG 5.00 100% 103.09 0.04
Crew 100m2/day 13.33 100% 36.45 2.62

Crew / M 5.00 100% 2.00 6.00


45.23 AED/m3

% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)

Crew 200m3/day 29.10 100% 20.00 1.83


Crew / KG 5.00 100% 96.41 0.04
Crew 100m2/day 13.33 100% 36.45 2.62

Crew / M 5.00 100% 2.00 6.00


46.46 AED/m3

% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)

Crew 200m3/day 29.10 100% 20.00 1.83


Crew / KG 5.00 100% 90.56 0.04
Crew 100m2/day 13.33 100% 36.45 2.62

Crew / M 5.00 100% 2.00 6.00


47.68 AED/m3

% OF Productivit
No of Labour Amount
Labour Category LABOUR
(AED/m3)
y
(No.) CATEG (MHr/unit)

Crew 200m3/day 29.10 100% 20.00 1.83


Crew / KG 5.00 100% 130.00 0.04
Crew 100m2/day 13.33 100% 75.00 2.62

Crew / M 5.00 100% 2.00 6.00


227.00 AED/m3
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason 1.00 32.26% 13.50 1.13


Unskilled Labour 1.00 32.26% 11.25 1.13
ChargeLabour
Unskilled Hand - for 1.00 32.26% 2.81 0.19
Curing 0.10 3.23% 1.00 0.10

Crew 8m2/day 3.10 100% 28.56 2.54

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason 1.00 32.26% 13.50 1.13


Unskilled Labour 1.00 32.26% 11.25 1.13
Charge Hand 1.00 32.26% 2.81 0.19
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10
Crew 8m2/day 3.10 100% 28.56 2.54

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason 1.00 32.26% 13.50 1.13


Unskilled Labour 1.00 32.26% 11.25 1.13
Charge Hand 1.00 32.26% 2.81 0.19
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10

Crew 8m2/day 3.10 100% 28.56 2.54

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason 1.00 32.26% 13.50 1.13


Unskilled Labour 1.00 32.26% 11.25 1.13
Charge Hand 1.00 32.26% 2.81 0.19
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10

Crew 8m2/day 3.10 100% 28.56 2.54

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
Mason 1.00 32.26% 13.50 1.13
Unskilled Labour 1.00 32.26% 11.25 1.13
Charge Hand 1.00 32.26% 2.81 0.19
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10

Crew 8m2/day 3.10 100% 28.56 2.54

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason 1.00 32.26% 13.50 1.13


Unskilled Labour 1.00 32.26% 11.25 1.13
Charge Hand 1.00 32.26% 2.81 0.19
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10

Crew 8m2/day 3.10 100% 28.56 2.54

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason 1.00 32.26% 13.50 1.13


Unskilled Labour 1.00 32.26% 11.25 1.13
Charge Hand 1.00 32.26% 2.81 0.19
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10

Crew 8m2/day 3.10 100% 28.56 2.54


% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason 1.00 32.26% 13.50 1.13


Unskilled Labour 1.00 32.26% 11.25 1.13
Charge Hand 1.00 32.26% 2.81 0.19
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10

Crew 8m2/day 3.10 100% 28.56 2.54

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason 1.00 32.26% 13.50 1.13


Unskilled Labour 1.00 32.26% 11.25 1.13
Charge Hand 1.00 32.26% 2.81 0.19
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10

Crew 8m2/day 3.10 100% 28.56 2.54

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
Mason 1.00 32.26% 13.50 1.13
Unskilled Labour 1.00 32.26% 11.25 1.13
Charge Hand 1.00 32.26% 2.81 0.19
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10

Crew 8m2/day 3.10 100% 28.56 2.54

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason 1.00 32.26% 13.50 1.13


Unskilled Labour 1.00 32.26% 11.25 1.13
Charge Hand 1.00 32.26% 2.81 0.19
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10

Crew 8m2/day 3.10 100% 28.56 2.54

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason 1.00 32.26% 13.50 1.13


Unskilled Labour 1.00 32.26% 11.25 1.13
Charge Hand 1.00 32.26% 2.81 0.19
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10

Crew 8m2/day 3.10 100% 28.56 2.54


% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason 1.00 32.26% 13.50 1.13


Unskilled Labour 1.00 32.26% 11.25 1.13
Charge Hand 1.00 32.26% 2.81 0.19
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10

Crew 8m2/day 3.10 100% 28.56 2.54

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason 1.00 32.26% 10.80 0.90


Unskilled Labour 1.00 32.26% 9.00 0.90
Charge Hand 1.00 32.26% 2.25 0.15
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10

Crew 10 m2/day 3.10 100% 23.05 2.05

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason 1.00 32.26% 10.80 0.90


Unskilled Labour 1.00 32.26% 9.00 0.90
Charge Hand 1.00 32.26% 2.25 0.15
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10

Crew 10 m2/day 3.10 100% 23.05 2.05

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason 1.00 32.26% 10.80 0.90


Unskilled Labour 1.00 32.26% 9.00 0.90
Charge Hand 1.00 32.26% 2.25 0.15
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10

Crew 10 m2/day 3.10 100% 23.05 2.05

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(No.) CATEG
(AED/m2) y (MHr/m2)

Mason 1.00 32.26% 10.80 0.90


Unskilled Labour 1.00 32.26% 9.00 0.90
Charge Hand 1.00 32.26% 2.25 0.15
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10

Crew 10 m2/day 3.10 100% 23.05 2.05

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(No.) CATEG
(AED/m2) y (MHr/m2)
Mason 1.00 32.26% 10.80 0.90
Unskilled Labour 1.00 32.26% 9.00 0.90
Charge Hand 1.00 32.26% 2.25 0.15
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10

Crew 10 m2/day 3.10 100% 23.05 2.05

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason 1.00 32.26% 12.00 1.00


Unskilled Labour 1.00 32.26% 10.00 1.00
Charge Hand 1.00 32.26% 2.50 0.17
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10

Crew 11 m2/day 3.10 100% 25.50 2.27

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(No.) CATEG
(AED/m2) y (MHr/m2)
Mason 1.00 32.26% 12.00 1.00
Unskilled Labour 1.00 32.26% 10.00 1.00
Charge Hand 1.00 32.26% 2.50 0.17
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10

Crew 10 m2/day 3.10 100% 25.50 2.27

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason 1.00 32.26% 10.80 0.90


Unskilled Labour 1.00 32.26% 9.00 0.90
Charge Hand 1.00 32.26% 2.25 0.15
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10

Crew 10 m2/day 3.10 100% 23.05 2.05

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason 1.00 32.26% 10.80 0.90


Unskilled Labour 1.00 32.26% 9.00 0.90
Charge Hand 1.00 32.26% 2.25 0.15
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10
Crew 10 m2/day 3.10 100% 23.05 2.05

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason 1.00 32.26% 10.80 0.90


Unskilled Labour 1.00 32.26% 9.00 0.90
Charge Hand 1.00 32.26% 2.25 0.15
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10

Crew 10 m2/day 3.10 100% 23.05 2.05

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason 1.00 32.26% 10.80 0.90


Unskilled Labour 1.00 32.26% 9.00 0.90
Charge Hand 1.00 32.26% 2.25 0.15
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10

Crew 10 m2/day 3.10 100% 23.05 2.05

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
Mason 1.00 32.26% 9.82 0.82
Unskilled Labour 1.00 32.26% 8.18 0.82
Charge Hand 1.00 32.26% 2.05 0.14
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10

Crew 11 m2/day 3.10 1.00 21.05 1.87

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason 1.00 32.26% 10.80 0.90


Unskilled Labour 1.00 32.26% 9.00 0.90
Charge Hand 1.00 32.26% 2.25 0.15
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10

Crew 10 m2/day 3.10 1.00 23.05 2.05

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason 1.00 32.26% 10.80 0.90


Unskilled Labour 1.00 32.26% 9.00 0.90
Charge Hand 1.00 32.26% 2.25 0.15
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10

Crew 10 m2/day 3.10 1.00 23.05 2.05


% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason 1.00 32.26% 10.80 0.90


Unskilled Labour 1.00 32.26% 9.00 0.90
Charge Hand 1.00 32.26% 2.25 0.15
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10

Crew 10 m2/day 3.10 1.00 23.05 2.05

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason 1.00 32.26% 10.80 0.90


Unskilled Labour 1.00 32.26% 9.00 0.90
Charge Hand 1.00 32.26% 2.25 0.15
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10

Crew 10 m2/day 3.10 1.00 23.05 2.05

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
Mason 1.00 32.26% 10.80 0.90
Unskilled Labour 1.00 32.26% 9.00 0.90
Charge Hand 1.00 32.26% 2.25 0.15
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10

Crew 10 m2/day 3.10 1.00 23.05 2.05

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason 1.00 32.26% 9.82 0.82


Unskilled Labour 1.00 32.26% 8.18 0.82
Charge Hand 1.00 32.26% 2.05 0.14
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10

Crew 11 m2/day 3.10 1.00 21.05 1.87

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason 1.00 32.26% 13.50 1.13


Unskilled Labour 1.00 32.26% 11.25 1.13
Charge Hand 1.00 32.26% 2.81 0.19
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10

Crew 6 m2/day 3.10 1.00 28.56 2.54


% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason 1.00 32.26% 13.50 1.13


Unskilled Labour 1.00 32.26% 11.25 1.13
Charge Hand 1.00 32.26% 2.81 0.19
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10

Crew 6 m2/day 3.10 1.00 28.56 2.54

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason 1.00 32.26% 13.50 1.13


Unskilled Labour 1.00 32.26% 11.25 1.13
Charge Hand 1.00 32.26% 2.81 0.19
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10

Crew 6 m2/day 3.10 1.00 28.56 2.54

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason 1.00 32.26% 13.50 1.13


Unskilled Labour 1.00 32.26% 11.25 1.13
Charge Hand 1.00 32.26% 2.81 0.19
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10

Crew 6 m2/day 3.10 1.00 28.56 2.54

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason 1.00 32.26% 13.50 1.13


Unskilled Labour 1.00 32.26% 11.25 1.13
Charge Hand 1.00 32.26% 2.81 0.19
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10

Crew 8 m2/day 3.10 1.00 28.56 2.54

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason 1.00 32.26% 13.50 1.13


Unskilled Labour 1.00 32.26% 11.25 1.13
Charge Hand 1.00 32.26% 2.81 0.19
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10

Crew 8 m2/day 3.10 1.00 28.56 2.54

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
Mason 1.00 32.26% 13.50 1.13
Unskilled Labour 1.00 32.26% 11.25 1.13
Charge Hand 1.00 32.26% 2.81 0.19
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10

Crew 8 m2/day 3.10 1.00 28.56 2.54

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason 1.00 32.26% 13.50 1.13


Unskilled Labour 1.00 32.26% 11.25 1.13
Charge Hand 1.00 32.26% 2.81 0.19
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10

Crew 8 m2/day 3.10 1.00 28.56 2.54

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason 1.00 32.26% 13.50 1.13


Unskilled Labour 1.00 32.26% 11.25 1.13
Charge Hand 1.00 32.26% 2.81 0.19
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10

Crew 8 m2/day 3.10 1.00 28.56 2.54


% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason 1.00 32.26% 13.50 1.13


Unskilled Labour 1.00 32.26% 11.25 1.13
Charge Hand 1.00 32.26% 2.81 0.19
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10

Crew 8 m2/day 3.10 1.00 28.56 2.54

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason 1.00 32.26% 13.50 1.13


Unskilled Labour 1.00 32.26% 11.25 1.13
Charge Hand 1.00 32.26% 2.81 0.19
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10

Crew 8 m2/day 3.10 1.00 28.56 2.54

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason 1.00 32.26% 13.50 1.13


Unskilled Labour 1.00 32.26% 11.25 1.13
Charge Hand 1.00 32.26% 2.81 0.19
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10

Crew 8 m2/day 3.10 1.00 28.56 2.54

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason 1.00 32.26% 13.50 1.13


Unskilled Labour 1.00 32.26% 11.25 1.13
Charge Hand 1.00 32.26% 2.81 0.19
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10

Crew 8 m2/day 3.10 1.00 28.56 2.54

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(No.) CATEG
(AED/m2) y (MHr/m2)

Mason 1.00 32.26% 13.50 1.13


Unskilled Labour 1.00 32.26% 11.25 1.13
Charge Hand 1.00 32.26% 2.81 0.19
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10

Crew 8 m2/day 3.10 1.00 28.56 2.54

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
Mason 1.00 32.26% 13.50 1.13
Unskilled Labour 1.00 32.26% 11.25 1.13
Charge Hand 1.00 32.26% 2.81 0.19
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10

Crew 8 m2/day 3.10 1.00 28.56 2.54

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason 1.00 32.26% 13.50 1.13


Unskilled Labour 1.00 32.26% 11.25 1.13
Charge Hand 1.00 32.26% 2.81 0.19
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10

Crew 8 m2/day 3.10 1.00 28.56 2.54

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason 1.00 32.26% 13.50 1.13


Unskilled Labour 1.00 32.26% 11.25 1.13
Charge Hand 1.00 32.26% 2.81 0.19
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10

Crew 8 m2/day 3.10 1.00 28.56 2.54


% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason 1.00 32.26% 13.50 1.13


Unskilled Labour 1.00 32.26% 11.25 1.13
Charge Hand 1.00 32.26% 2.81 0.19
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10

Crew 8 m2/day 3.10 1.00 28.56 2.54

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason 1.00 32.26% 13.50 1.13


Unskilled Labour 1.00 32.26% 11.25 1.13
Charge Hand 1.00 32.26% 2.81 0.19
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10

Crew 8 m2/day 3.10 1.00 28.56 2.54

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason 1.00 32.26% 13.50 1.13


Unskilled Labour 1.00 32.26% 11.25 1.13
Charge Hand 1.00 32.26% 2.81 0.19
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10

Crew 8 m2/day 3.10 1.00 28.56 2.54

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason 1.00 32.26% 13.50 1.13


Unskilled Labour 1.00 32.26% 11.25 1.13
Charge Hand 1.00 32.26% 2.81 0.19
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10

Crew 8 m2/day 3.10 1.00 28.56 2.54

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(No.) CATEG
(AED/m2) y (MHr/m2)

Mason 1.00 32.26% 13.50 1.13


Unskilled Labour 1.00 32.26% 11.25 1.13
Charge Hand 1.00 32.26% 2.81 0.19
Unskilled Labour - for
Curing 0.10 3.23% 1.00 0.10

Crew 8 m2/day 3.10 1.00 28.56 2.54

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
Mason 1.00 32.26% 9.53 0.79
Unskilled Labour 1.00 32.26% 7.94 0.79
Charge Hand 1.00 32.26% 2.38 0.16
Unskilled Labour - for
Curing 0.10 3.23% 1.50 0.15

Crew 17 m2/day 3.10 1.00 21.35 1.90

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason 1.00 32.26% 10.16 0.85


Unskilled Labour 1.00 32.26% 8.47 0.85
Charge Hand 1.00 32.26% 2.54 0.17
Unskilled Labour - for
Curing 0.10 3.23% 1.60 0.16

Crew 17 m2/day 3.10 1.00 22.78 2.02

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason 1.00 27.78% 9.45 0.79


Unskilled Labour 1.50 41.67% 11.81 1.18
Charge Hand 1.00 27.78% 2.36 0.16
Unskilled Labour - for
Curing 0.10 2.78% 1.35 0.14

Crew 17 m2/day 3.60 1.00 24.98 2.26


% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason 1.00 27.78% 8.78 0.73


Unskilled Labour 1.50 41.67% 10.97 1.10
Charge Hand 1.00 27.78% 3.66 0.24
Unskilled Labour - for
Curing 0.10 2.78% 1.30 0.13

Crew 16 m2/day 3.60 1.00 24.70 2.20

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason 1.00 27.78% 8.78 0.73


Unskilled Labour 1.50 41.67% 10.97 1.10
Charge Hand 1.00 27.78% 2.93 0.20
Unskilled Labour - for
Curing 0.10 2.78% 1.30 0.13

Crew 17 m2/day 3.60 1.00 23.97 2.15

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason - 4 No 2.00 19.80% 0.81 0.07


Unskilled Labour - 6 N 6.00 59.41% 2.03 0.20
Charge Hand 1.00 9.90% 0.34 0.02
Unskilled Labour - for 0.10 0.99% 0.03 0.00
Carpenter - 1.00 9.90% 0.32 0.03

Crew 400 m2/day 10.10 100.00% 3.53 0.32

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

MasonLabour
Unskilled - 4 No - 6 2.00 19.80% 0.54 0.05
No 6.00 59.41% 1.35 0.11
Charge Hand 1.00 9.90% 0.23 0.02
Unskilled Labour - for
Curing- 0.10 0.99% 0.02 0.00
Carpenter - 1.00 9.90% 0.22 0.02

Crew 400 m2/day 10.10 100.00% 2.35 0.20

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason - 4 No 2.00 19.80% 0.54 0.05


Unskilled Labour - 6
No 6.00 59.41% 1.35 0.11
Charge Hand 1.00 9.90% 0.23 0.02
Unskilled Labour - for
Curing- 0.10 0.99% 0.02 0.00
Carpenter - 1.00 9.90% 0.22 0.02

Crew 400 m2/day 10.10 100.00% 2.35 0.20


% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason - 4 No 2.00 19.80% 0.41 0.03


Unskilled Labour - 6
No 6.00 59.41% 1.01 0.08
Charge Hand 1.00 9.90% 0.17 0.02
Unskilled Labour - for
Curing- 0.10 0.99% 0.02 0.00
Carpenter - 1.00 9.90% 0.16 0.02

Crew 400 m2/day 10.10 100.00% 1.77 0.15

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(No.) CATEG
(AED/m2) y (MHr/m2)

Mason - 4 No 2.00 19.80% 0.30 0.02


Unskilled Labour - 6
No 6.00 59.41% 0.75 0.06
Charge Hand 1.00 9.90% 0.12 0.01
Unskilled Labour - for
Curing- 0.10 0.99% 0.01 0.00
Carpenter - 1.00 9.90% 0.12 0.01

Crew 400 m2/day 10.10 100.00% 1.31 0.11

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason - 4 No 2.00 19.80% 0.24 0.02


Unskilled Labour - 6
No 6.00 59.41% 0.59 0.05
Charge Hand 1.00 9.90% 0.10 0.01
Unskilled Labour - for
Curing- 0.10 0.99% 0.01 0.00
Carpenter - 1.00 9.90% 0.10 0.01

Crew 400 m2/day 10.10 100.00% 1.04 0.09

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason - 4 No 2.00 19.80% 0.14 0.01


Unskilled Labour - 6
No 6.00 59.41% 0.34 0.03
Charge Hand 1.00 9.90% 0.06 0.01
Unskilled Labour - for
Curing- 0.10 0.99% 0.01 0.00
Carpenter - 1.00 9.90% 0.05 0.01

Crew 400 m2/day 10.10 100.00% 0.59 0.05

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

3 Times Polising 3.00 42.86% 5.00 0.42

Mason 1.00 14.29% 9.00 0.75


Unskilled Labour 2.00 28.57% 15.00 1.50

Charge Hand 1.00 14.29% 1.50 0.10


Crew 12 m2/day 7.00 100.00% 30.50 2.77
% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason 1.00 Err:522 9.00 0.75


Unskilled Labour 1.50 Err:522 11.25 1.13
Charge Hand 1.00 Err:522 3.75 0.25

Crew 12 m2/day Err:522 Err:522 Err:522 Err:522


% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason 1.00 28.57% 9.00 0.75


Unskilled Labour 1.50 42.86% 11.25 1.13
Charge Hand 1.00 28.57% 3.75 0.25

Crew 12 m2/day 3.50 100.00% 24.00 2.13

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Mason 2.00 40.00% 21.60 1.80


Unskilled Labour 2.00 40.00% 18.00 1.80
Charge Hand 1.00 20.00% 4.50 0.30

Crew 12 m2/day 5.00 100.00% 44.10 3.90


% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG
Mason 2.00 28.57% 21.60 1.80
Unskilled Labour 4.00 57.14% 36.00 3.60
Charge Hand 1.00 14.29% 4.50 0.30

Crew 10 m2/day 7.00 100.00% 62.10 5.70

% OF
No of Labour Amount Productivit
Labour Category LABOUR
(AED/m2) y (MHr/m2)
(No.) CATEG

Crew 10 m2/day #VALUE! #VALUE! #VALUE! #VALUE!


Steel WP (Hor) Poly. Sheet WP (Ver)
Kg m2 m2 Ver

#VALUE! #REF! #VALUE! #VALUE!


#VALUE! #VALUE!
#VALUE! #REF! 6 49
#VALUE!
#VALUE!
#VALUE! #REF! #VALUE! #VALUE!

#VALUE! #REF! #VALUE! #VALUE!


3.50 10.00 1.60 10.00
#VALUE! #REF! #VALUE! #VALUE!

#VALUE!

QR/m
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT QTY
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1)

BILL NO. 1 - TOWN HOUSE INNER UNIT

SITE WORKS

Site Exploration Generally

Generally

A Allow for keeping records of site observations, providing


samples, performing site tests, performing laboratory tests
and for preparing analysis and technical reports, strictly in
b item 1 115 115

Trial Holes / Trenches

B Allow for excavating trial holes as necessary commencing


from existing ground level include all necessary earthwork
supports strictly in accordance with specifications item 1 115 115

C Allow for hand excavating of a trench across the service


corridor to determine exact depth and location of existing
services item 1 115 115

Site Preparation

Clearance

D Allow for the removal and disposal off-site all vegetation


and loose materials including (but not limited to) undergrowth,
bushes, shrubs, debris, plants and any other organic materials,
strictly in accordance with the specifications item 1 1150 1150

Protection

E Protect existing services, road and adjacent building structure


and make good damaged areas item 1 115 115

To Collection 1,610.00
P2/S1/B1/SW/1
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT QTY
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

SITE WORKS, Cont'd

Excavation and earthworks

A Excavation to reduce levels as shown on the drawings m3 64 18 1152

B Trenching for the service pipes or the like for all


diameters any depth item 1 115 115

Filling

C Backfill with selected excavated


material in layers to make up levels m3 33 25 825

D Backfill and well compact in layers with imported materials m3 68 63 4284

Compaction

E Allow for compaction of the natural foundation all in


accordance with the specification and drawings m2 64 12 768

Disposal

E Cartaway surplus excavated material off site to Municipal yard


as directed by the Engineer m2 31 24 744

Anti-termite treatment

F To horizontal surfaces m2 157 5 785

G To vertical surfaces m 28 5 140

To Collection 8,813.00
P2/S1/B1/SW/2/PTC1
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT QTY
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

SITE WORKS, Cont'd

Generally

The Contractor shall list and price below, the items and quantities
of addition or deduction for any Bill of Quantity Item(s) and or
any omitted items that in his opinion are necessary for the full
and satisfactory completion of the work as described in the
Specifications or shown on the Drawings and for which either
expressed or implied provision is required and which are not
covered by the items or the rates in the Bill of Quantities.
Any such items not listed below shall be deemed to be included.

To Collection
P2/S1/B1/SW/3
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT QTY
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

SITE WORKS, Cont'd

COLLECTION

Page P2/S1/B1/SW/1 1,610.00

Page P2/S1/B1/SW/2 8,813.00

Page P2/S1/B1/SW/3

Total for Site Works - Carried to Bill No. 1 Summary 10,423.00


P2/S1/B1/SW/4/R1
1.15 MARK UP
SPLITTED AMOUNT
SUB
LABOUR MATERIAL PLANT
CONTRACT
DHS DHS DHS DHS

SUBCONTRAC
LABOUR MATERIAL PLANT
T
TOTAL

100.00 100.00 100

100.00 100.00 100

100.00 100.00 100

1,000.00 1,000.00 500 500

100.00 100.00 100


1.15 MARK UP
SPLITTED AMOUNT
SUB
LABOUR MATERIAL PLANT
CONTRACT
DHS DHS DHS DHS

SUBCONTRAC
LABOUR MATERIAL PLANT
T
TOTAL

6.56 - 7.70 1.00 15.26 419.84 - 492.80 64.00

100.00 100.00 100

1.17 4.13 13.75 3.00 22.05 38.61 136.13 453.75 99.00

1.13 37.50 13.25 3.00 54.88 76.50 2,550.00 901.00 204.00

5.00 5.00 10.00 320.00 320.00

10.00 10.00 310.00

4.00 4.00 628.00

4.00 4.00 112.00


1.15 MARK UP
SPLITTED AMOUNT
SUB
LABOUR MATERIAL PLANT
CONTRACT
DHS DHS DHS DHS

SUBCONTRAC
LABOUR MATERIAL PLANT
T
TOTAL
1.15 MARK UP
SPLITTED AMOUNT
SUB
LABOUR MATERIAL PLANT
CONTRACT
DHS DHS DHS DHS

SUBCONTRAC
LABOUR MATERIAL PLANT
T
TOTAL

1,854.95 2,686.13 2,347.55 1,737.00


LABOUR DETAIL
MASON CARPENTER STEEL UNSKILLED CHARGE
FIXTURE LABOUR HAND
HRS HRS HRS HRS HRS

0.64
LABOUR DETAIL
MASON CARPENTER STEEL UNSKILLED CHARGE
FIXTURE LABOUR HAND
HRS HRS HRS HRS HRS

-
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

CONCRETE WORKS

Substructure
Note:-Upto and including Ground Floor Grade slab

Plain in situ concrete with SRC, grade as required

A 50 mm thick blinding m2 64 20 1280

B 100 mm thick blinding m2 56 Deleted

Reinforced in situ concrete, grade 50 N/mm2

C Neck columns m3 1 363 363

Reinforced in situ concrete, grade 40 N/mm2

D Footings m3 20 357 7140

E Tie beams m3 4 357 1428

Reinforced in situ concrete, grade 20 N/mm2

F Grade slab, 100 mm thick m3 10 797 7970


GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)
To Collection 18,181.00
P2/S1/B1/CW/1

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

CONCRETE WORKS, Cont'd

Substructure, Cont'd
Note:-Upto and including Ground Floor Grade slab

High yield steel bar reinforcement, characteristic strength (FY) =


460 N/mm2 and comply with BS 4449

A Various diameters kg 2,860 3.6 10296

B A-252 mesh reinforcement m2 100 INCLUDED

Formwork to

C Sides of neck columns m2 13 61 793

D Sides of footing m2 22 61 1342

E Sides of tie beams m2 34 61 2074

Sundries

F Isolation joint including filler, sealant, mastic, etc. item 1 575 575

G Construction joints, control joints, and the like including filler,


sealant, mastic, etc. item 1 575 575
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)

To Collection 15,655.00
P2/S1/B1/CW/2/PTC1

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

CONCRETE WORKS, Cont'd

Superstructure

Reinforced in situ concrete, grade 50 N/mm2

A Columns m3 4 363 1452

Reinforced in situ concrete, grade 40 N/mm2

B Beams m3 7 357 2499

C Staircase m3 3 357 1071

D Suspended solid slab, 175 mm thick m3 30 357 10710

E Sections, upstands and parapets m3 6 357 2142

F Lintels m3 1 357 357

High yield steel bar reinforcement, characteristic strength (FY) =


460 N/mm2 and comply with BS 4449

G Various diameters kg 7,080 3.6 25488


GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)

To Collection 43,719.00
P2/S1/B1/CW/3

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

CONCRETE WORKS, Cont'd

Superstructure, Cont'd

Formwork to

A Sides of columns m2 51 72 3672

B Sides and soffits of beams m2 62 72 4464

C Sides and soffits of staircases m2 21 72 1512

D Sides and soffits of slab m2 178 72 12816

E Sides of sections, upstands and parapets m2 55 72 3960

F Sides of lintels m2 6 72 432

Sundries

G Control joints including filler, sealant, mastic, etc. item 1 575 575

H AHU, AC condensing units, water tank base, etc. including


upstands, connecting beams all as specified and in coordination
with MEP drawings item 1 575 575
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)

To Collection 28,006.00
P2/S1/B1/CW/4/R1

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

CONCRETE WORKS, Cont'd

Generally

The Contractor shall list and price below, the items and quantities
of addition or deduction for any Bill of Quantity Item(s) and or
any omitted items that in his opinion are necessary for the full
and satisfactory completion of the work as described in the
Specifications or shown on the Drawings and for which either
expressed or implied provision is required and which are not
covered by the items or the rates in the Bill of Quantities.
Any such items not listed below shall be deemed to be included.

A
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)

To Collection
P2/S1/B1/CW/5

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

CONCRETE WORKS, Cont'd

COLLECTION

Page P2/S1/B1/CW/1/PTC1 18,181

Page P2/S1/B1/CW/2/PTC1 15,655

Page P2/S1/B1/CW/3 43,719

Page P2/S1/B1/CW/4/R1 28,006

Page P2/S1/B1/CW/5 -
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)

Total for Concrete Works - Carried to Bill No. 1 Summary 105,561


P2/S1/B1/CW/6/R1
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

MASONRY

Substructure (in contact with soil)

Solid concrete blockwork bedded, jointed and pointed in cement and


sand mortar including all crack control joints, anchors, joints, wall
ties, stiffener beams and columns, reinforcement, formworks, etc.,
complete

A 200 mm thick walls m2 21 99 2079

B Entrance steps m3 1 494 494

Internal

Solid concrete blockwork bedded, jointed and pointed in cement


and sand mortar including all crack control joints, anchors, metal
laths, safing insulation fire rated walls compressible filler, control
joints, wall ties, stiffener beams and columns, reinforcement,
formworks, sound transmission, etc., complete

C 100 mm thick walls m2 71 88 6248

C1 150 mm thick walls m2 36 93 3348

D 200 mm thick walls m2 92 99 9108

Hollow blockwork bedded, jointed and pointed in cement


and sand mortar including all crack control joints, anchors, metal
laths, safing insulation fire rated walls compressible filler, control
joints, wall ties, stiffener beams and columns, reinforcement,
formworks, sound transmission, etc., complete

E 100 mm thick walls m2 55 78 4290


GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)
To Collection 25,567.00
P2/S1/B1/MA/1/PTC1

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

MASONRY, Cont'd

External

Solid concrete blockwork bedded, jointed and pointed in cement


and sand mortar including all crack control joints, anchors, metal
laths, safing insulation fire rated walls compressible filler, control
joints, wall ties, stiffener beams and columns, reinforcement,
formworks, sound transmission, etc., complete

A 200 mm thick walls m2 7 99 693

B 300 mm thick walls m2 10 141 1410

Thermalite blockwork bedded, jointed and pointed in cement


and sand mortar including all crack control joints, anchors, metal
laths, safing insulation fire rated walls compressible filler, control
joints, wall ties, stiffener beams and columns, reinforcement,
formworks, sound transmission, etc., complete

C 250 mm thick walls m2 39 96 3744

D 300 mm thick walls m2 12 105 1260

Sundries

E Extra-over for fire rating of blockwork item 1 575 575


GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)

To Collection 7,682.00
P2/S1/B1/MA/2

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

MASONRY, Cont'd

Generally

The Contractor shall list and price below, the items and quantities
of addition or deduction for any Bill of Quantity Item(s) and or
any omitted items that in his opinion are necessary for the full
and satisfactory completion of the work as described in the
Specifications or shown on the Drawings and for which either
expressed or implied provision is required and which are not
covered by the items or the rates in the Bill of Quantities.
Any such items not listed below shall be deemed to be included.

A
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)

To Collection
P2/S1/B1/MA/3

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

MASONRY, Cont'd

COLLECTION

Page P2/S1/B1/MA/1/PTC1 25,567

Page P2/S1/B1/MA/2 7,682.00

Page P2/S1/B1/MA/3 -
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)
0

Total for Masonry - Carried to Bill No. 1 Summary 33,249


P2/S1/B1/MA/4
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

METAL WORK

Staircase railings including balustrade, handrail, glazing, plates, bolts,


nuts, fittings, special features, finishes, accessories, etc., complete

A 1000 mm high m 12 518 6216

Steel profile

B 150 mm high Powder coated proprietary cold steel profile m 5 Deleted

C 300 mm high Powder coated proprietary cold steel profile m 2 Deleted


GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)

To Collection 6,216.00
P2/S1/B1/MW/1

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

METAL WORK, Cont'd

Generally

The Contractor shall list and price below, the items and quantities
of addition or deduction for any Bill of Quantity Item(s) and or
any omitted items that in his opinion are necessary for the full
and satisfactory completion of the work as described in the
Specifications or shown on the Drawings and for which either
expressed or implied provision is required and which are not
covered by the items or the rates in the Bill of Quantities.
Any such items not listed below shall be deemed to be included.

A
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)

To Collection
P2/S1/B1/MW/2

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

METAL WORK, Cont'd

COLLECTION

Page P2/S1/B1/MW/1/PTC1 6,216.00

Page P2/S1/B1/MW/2
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)

Total for Metal Work - Carried to Bill No. 1 Summary 6,216


P2/S1/B1/MW/3
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

ALUMINIUM AND GLAZING WORKS

Glass railing including balustrade, Aluminium handrail, steel sleeve, fixing, fittings,
bolts, screw, nuts, plates, special feature, finishes, accessories, etc.,
complete

A 1275 mm high frameless glass balustrade m 7 518 3626


Railings including balustrade, handrail, glazing, plates, bolts, nuts,
fittings, special features, finishes, accessories, etc., complete
B 1275 mm high frameless glass balustrade m 2 805 1610
Railings including balustrade, handrail, glazing, plates, bolts, nuts,
fittings, special features, finishes, accessories, etc., complete

Aluminium railing including balustrade, handrail, steel sleeve, fixing,


fittings, bolts, screw, nuts, plates, special feature, finishes,
accessories, etc., complete

C 900 mm high railing to porch m 2 518 1036

Trellis
Parking Shade
D Trellis above car parking including 50x 150mm Powder coated
aluminium trellis including 75 x150mm aluminium frame, extruded
aluminium profile, steel post, aluminium/metal support fixed to
boundary wall fixing, special feature, supports system, accessories,
fittings, fixtures, etc.,complete as detailed on drg A-R-402 m2 30 345 10350

E Trellis above balcony including 50x 150mm Powder coated


aluminium trellis including 150 x150mm aluminium frame, special
feature, supports system, accessories, fittings, fixtures, etc.,complete
as detailed on drg A-R-405 m2 3 DELETED
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)

To Collection 16,622.00
P2/S1/B1/AG/1/PTC1

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

ALUMINIUM AND GLAZING WORKS, Cont'd

Aluminium doors and windows including subframes, frames,


architraves, glazing, spandrel panel, transom, mullion, supports,
fasteners, gaskets, separator, insulation, sill, joints, fittings,
ironmongery, special features, accessories, tests, etc. complete as
detailed on drawings and specifications

A Type GL-01, overall size 600 x5300 mm no. 1 2560 2560

B Type GL-02, overall size 800 x 1500 mm no. 1 966 966

C Type GL-03, overall size 3300 x 2400 mm no. 1 6376 6376

D Type GL-04, overall size 1000 x 2400 mm no. 1 Deleted

E Type GL-05, overall size 1100 x 2400 mm no. 1 2581 2581

F Type GL-06, overall size 2200 x 2800 mm no. 2 4959 9918

G Type GL-07, overall size 1850 x 2800 mm no. 1 4170 4170

H Type GL-08, overall size 1400 x 2200 mm no. 1 2479 2479

Powder coated aluminium louvers including subframes, frames,


ironmongery, holdfast, special features, paint, fittings, accessories,
etc., complete

J Type LV-01, overall size 1100 x 3725 mm no. 2 Deleted


GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)

To Collection 29,050.00
P2/S1/B1/AG/2/PTC1

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

ALUMINIUM AND GLAZING WORKS, Cont'd

Generally

The Contractor shall list and price below, the items and quantities of
addition or deduction for any Bill of Quantity Item(s) and or any
omitted items that in his opinion are necessary for the full and
satisfactory completion of the work as described in the Specifications
or shown on the Drawings and for which either expressed or implied
provision is required and which are not covered by the items or the
rates in the Bill of Quantities. Any such items not listed below shall
be deemed to be included.

A
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)

To Collection

P2/S1/B1/AG/3

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

ALUMINIUM AND GLAZING WORKS, Cont'd

COLLECTION

Page P2/S1/B1/AG/1/PTC1 16,622

Page P2/S1/B1/AG/2/PTC1 29,050

Page P2/S1/B1/AG/3
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)

Total for Aluminium & Glazing - Carried to Bill No. 1 Summary 45,672
P2/S1/B1/AG/4
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

CARPENTRY & JOINERY WORKS

Sub frames for timber doors

A Subframes to doors as specified in particular specifications


including fixing with accessories as shown complete m 61 17 1037
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)
To Collection 1,037.00
P2/S1/B1/CJ/1

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

CARPENTRY & JOINERY WORKS, Cont'd

Generally

The Contractor shall list and price below, the items and
quantities of addition or deduction for any Bill of Quantity
Item(s) and or any omitted items that in his opinion are
necessary for the full and satisfactory completion of the work
as described in the Specifications or shown on the Drawings
and for which either expressed or implied provision is required
and which are not covered by the items or the rates in the Bill
of Quantities. Any such items not listed below shall be deemed
to be included.

A
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)

To Collection
P2/S1/B1/CJ/2

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

CARPENTRY & JOINERY WORKS, Cont'd

COLLECTION

Page P2/S1/B1/CJ/1 1,037.00

Page P2/S1/B1/CJ/2
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)

Total for Carpentry & Joinery - Carried to Bill No. 1 Summary 1,037.00
P2/S1/B1/CJ/3/R1
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
(AED) (AED)
NO.

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)


BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)
INTERNAL AND EXTERNAL FINISHES

Floor finishes (Internal)

A Cement and sand screed to receive tile m2 146 INCLUDED

Stone/Tiles including polishing, joint, grouting, pointing, sealant,


etc.,complete

B 600 x 600 mm porcelain floor tiles A, type TL-01


(P.C. rate for supply only of tile is Dhs. 25/- per m2) m2 14 96 1344

C 600 x 600 mm porcelain floor tiles, type TL-02


(P.C. rate for supply only of tile is Dhs. 25/- per m2) m2 1 96 96

D 1200 x 200 mm wood look porcelain floor tiles A, type TL-04


(P.C. rate for supply only of tile is Dhs. 25/- per m2) m2 119 96 11424

E Marble stone, type ST-01


(P.C. rate for supply only of tile is Dhs. 180/- per m2) m2 2 318 636

F Ditto to steps and risers


(P.C. rate for supply only of tile is Dhs. 120/- per m) m 23 238 5474

Floor finishes (External)

G Cement and sand screed to receive tile m2 10 0 INCLUDED

H 500 x 500 x 50 mm white cement tiles (hydraulic type) (at roof)


laid including, pedestals, spacers, etc., complete, type TR-1 m2 79 86 6794

J 300 x 300 mm porcelain floor tiles, type CT-7


(P.C. rate for supply only of tile is Dhs. 25/- per m2) m2 10 96 960
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
(AED) (AED)
NO.
To Collection 26,728.00
P2/S1/B1/FIN/1/R1

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)


BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)
INTERNAL AND EXTERNAL FINISHES, Cont'd

Skirting

A Cement and sand plaster to receive Skirting m2 11 39 429

Skirtings including fixing with adhesive, grouting, angles, etc., complete

B 100 mm high wood look porcelain skirting tile A, type TL-05


(P.C. rate for supply only of skirting tile is Dhs. 10/- per m) m 112 26 2912

Skirting (External)
C Cement and sand plaster to receive Skirting m2 1 39 39

Skirtings including fixing with adhesive, grouting, angles, etc., complete

D 100 mm high skirting tile, type CT-8


(P.C. rate for supply only of skirting tile is Dhs. 8/- per m) m 10 24 240

E 100 mm high Terrazo skirting, type TR-3 m 51 24 1224

Threshold / Sill
F Cement and sand plaster to receive Threshold m2 6 29 174

Thresholds including grouting, fixing, etc.


G 100 mm wide marble thresholds, ST-01
(P.C. rate for supply only of marble is Dhs. 50/- per m) m 1 66 66

H 130 mm wide marble thresholds, ST-01


(P.C. rate for supply only of marble is Dhs. 55/- per m) m 5 72 360

J 265 mm wide marble thresholds, ST-01


(P.C. rate for supply only of marble is Dhs. 80/- per m) m 2 100 200

K 75 mm high porcelain tile TL-02


(P.C. rate for supply only of tile is Dhs. 8/- per m) m 2 24 48

L 150mm wide 1200mm high wc ledge finish type SF-01 including support &
framing system to wc cistern m 4 302 1208
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
(AED) (AED)
NO.
M Cills item 1 435 435

To Collection 7,335.00
P2/S1/B1/FIN/2/R1

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)


BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)
INTERNAL AND EXTERNAL FINISHES, Cont'd

Walls finishes (Internal)

A Cement and sand plaster to receive paint m2 406 40 16240

B Cement and sand plaster to receive tile m2 39 39 1521

C Emulsion paint RAL 9010,type PT-01 m2 347 18 6246

D Hygiene moisture resistant emulsion paint RAL 9010, type PT-02 m2 59 21 1239

E Anti fungal paint to shaft m2 45 14 630

Wall tiles including grouting, pointing, polishing, etc., as required complete

F 300 x 600 mm porcelain tiles A, type TL-03


(P.C. rate for supply only of tile is Dhs. 20/- per m2) m2 39 101 3939

Glass including backing, framing system, fixing, accessories, fittings,


trims, special features etc. complete.

G Back painted glass, type GL-01 m2 4 251 1004


100 mm thick Hollow Block walls, Both side Plaster, One Side Paint &
One side Ceramic

Sundries

H PU paint , type PT-07 for ac grills item 1 288 288

Wall finishes (External)

J Cement and sand render including accessories to receive paint at


concrete / block walls as per drawing m2 240 39 9360

K External paint to walls & soffit of ceiling over sand cement plaster
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
(AED) (AED)
NO.
including pvc grooves m2 173 32 5536

L White epoxy paint over cement sand plaster to parapet internal side m2 67 32 2144

To Collection 48,147.00
P2/S1/B1/FIN/3/PTC1

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)


BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)
INTERNAL AND EXTERNAL FINISHES, Cont'd

Ceiling finishes (Internal)

A Cement and sand plaster to receive paint m2 67 41 2747

B Emulsion paint underslab RAL 9003 , type PT-03 m2 67 18 1206

Suspended ceilings including suspension system, shadow gap, fittings,


fixing, finishes, accessories, access panels, etc., complete

C Suspended gypsum board ceiling painted with emulsion paint RAL 9003,
type PT-03 m2 51 86 4386

D Suspended gypsum board ceiling painted with hygiene moisture resistant


emulsion paint RAL 9003, type PT-04 m2 19 86 1634

E 600 x 600 mm gypsum ceiling tiles, type TL-06 m2 6 75 450

F 1200 x 600 mm gypsum ceiling tiles, type TL-07 m2 2 75 150

G Bulkhead, 50 mm high including finishes m 17 29 493

H Ditto to 500 mm high m 3 35 105

J Ditto to 550 mm high m 4 35 140

K Ditto to 700 mm high m 5 35 175

L Access panels item 1 115 115

Ceiling finishes (External)

M Calcium silicate board lining m2 8 75 600


GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
(AED) (AED)
NO.

To Collection 12,201.00
P2/S1/B1/FIN/4/R1

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

INTERNAL AND EXTERNAL FINISHES, Cont'd

Generally

The Contractor shall list and price below, the items and quantities
of addition or deduction for any Bill of Quantity Item(s) and or
any omitted items that in his opinion are necessary for the full
and satisfactory completion of the work as described in the
Specifications or shown on the Drawings and for which either
expressed or implied provision is required and which are not
covered by the items or the rates in the Bill of Quantities.
Any such items not listed below shall be deemed to be included.

Anti Fungul Paint Above False Ceiling ( Wall, Ceiling ) - As per


A m2 86 12 1032
addendum - Tender Queries & Response No- 6
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
(AED) (AED)
NO.

To Collection 1,032.00
P2/S1/B1/FIN/5

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

INTERNAL AND EXTERNAL FINISHES, Cont'd

COLLECTION

Page P2/S1/B1/FIN/1/R1 26,728.00

Page P2/S1/B1/FIN/2/R1 7,335.00

Page P2/S1/B1/FIN/3/PTC1 48,147.00

Page P2/S1/B1/FIN/4/R1 12,201.00

Page P2/S1/B1/FIN/5 1,032.00


GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
(AED) (AED)
NO.

Total for Internal & External Finishes - Carried to Bill No. 1 Summary 95,443.00
P2/S1/B1/FIN/6/R1
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
(AED) (AED)
NO.

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

THERMAL AND MOISTURE PROTECTION

Substructure waterproofing

A 1000 gauge polythelein sheet m2 93 5 465

B 1 x 4mm thick S.B.S membrane laid horizontally m2 112 Deleted

B1 2 Coats of cold applied liquid bituminous paint laid horizontally m2 112 12 1344

C Ditto applied vertically m2 69 12 828

Roof Water proofing

D Lightweight concrete screed (thickness as per details) laid to slope


of density 600 to 800 Kg/m3 ( CONSIDERED COMBO ROOF ) m2 79 173 13667

E Bituminous primer coat m2 79 0 INCLUDED

F 5mm thick torch applied modified bitumen waterproofing membrane m2 79 0 INCLUDED

G Ditto at upstand m 51 0 INCLUDED

H 2 layer of filter membrane m2 79 0 INCLUDED

J 100 mm thick polystyrene rigid insulation board with


density of 35 kg/m m2 79 0 INCLUDED

K 50 mm thick loose gravel m2 79 0 INCLUDED

L Bitumen impregnated protection board m 51 INCLUDED

M Aluminium flashing/skirting fixed to parapet wall as per specification m 51 0 INCLUDED

N Sealant with back rod m 51 0 INCLUDED

P Finish waterproofing around rainwater outlets item 1 INCLUDED


GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
(AED) (AED)
NO.

To Collection 16,304.00
P2/S1/B1/TM/1/PTC1

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

THERMAL AND MOISTURE PROTECTION, Cont'd

Terrace/Balcony Water proofing

A Lightweight concrete screed (thickness as per details) laid to slope


of density 600Kg/m3 m2 7 57 399

B Bituminous primer coat m2 7 0 INCLUDED

C Filter membrane m2 7 0 INCLUDED

D 4mm thick torch applied modified bitumen water proofing membrane m2 7 0 INCLUDED
2 Coat of Liquid Bitumen Paint
E Ditto at upstand m 23 INCLUDED

Wet areas waterproofing

F Waterproofing laid horizontally including leveling screed m2 27 40 1080

G Ditto, to upstands m 43 40 1720

Waterproofing to shafts

H Waterproofing laid horizontally m2 2 92 184

J Ditto, to upstands m 12 INCLUDED


GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
(AED) (AED)
NO.

To Collection 3,383.00
P2/S1/B1/TM/2/R1

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

THERMAL AND MOISTURE PROTECTION, Cont'd

AHU, duct and pipe penetration

A Waterproofing to base of AHU, duct and pipe penetration item 1 575 575

Damp proof course

B Damp proof course laid in layers as specified to periphery of


building, wet areas, service rooms, OTS, etc., as specified item 1 575 575

At internal wall as specified

C Thermal insulation with gypsum board lining to structures as per


specifications and Authorities requirements item 1 575 575
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
(AED) (AED)
NO.

To Collection 1,725.00

P2/S1/B1/TM/3

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

THERMAL AND MOISTURE PROTECTION, Cont'd

Generally

The Contractor shall list and price below, the items and quantities
of addition or deduction for any Bill of Quantity Item(s) and or
any omitted items that in his opinion are necessary for the full
and satisfactory completion of the work as described in the
Specifications or shown on the Drawings and for which either
expressed or implied provision is required and which are not
covered by the items or the rates in the Bill of Quantities.
Any such items not listed below shall be deemed to be included.

A
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
(AED) (AED)
NO.

To Collection
P2/S1/B1/TM/4

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

THERMAL AND MOISTURE PROTECTION, Cont'd

COLLECTION

Page P2/S1/B1/TM/1/PTC1 16,304

Page P2/S1/B1/TM/2/R1 3,383

Page P2/S1/B1/TM/3 1,725

Page P2/S1/B1/TM/4
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
(AED) (AED)
NO.

Total for Thermal & Moisture Protection - Carried to Bill No. 1 Summary 21,412
P2/S1/B1/TM/5/R1
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
(AED) (AED)
NO.

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

ACCESSORIES AND SPECIAL CONSTRUCTION

Mirrors including framing, backing, fittings, accessories, with


splayed edges and concealed fixing etc., complete

A Full counter width full height mirror overall height 1550 mm m 4 345 1380
Full counter width full height mirror overall height 900 mm
B 500 x 1040 mm mirror no. 1 288 288

Garbage disposal

C Recycle garbage bins for glass, plastics, paper, metal, cardboard no. 2 288 576

Access Panels

D Allow for finishes to access panel to ducts and shafts as shown on


mechanical drawings item 1 86 86

Statutory Signage's

E Allow for statutory signage's as per Local Authorities requirement


and as per the drawings and specifications item 1 230 230

To Collection 2,560.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
(AED) (AED)
NO.
P2/S1/B1/AES/1

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

ACCESSORIES AND SPECIAL CONSTRUCTION, Cont'd

Sanitarywares & accessories

Take, delivery, store and fixing, testing and providing guarantee for
the following including incidental material, labour etc. complete as
shown on drawings and as per specifications

A Wall hung water closet, BA-01 no. 3 138 414

B Flush plate, BA-02 no. 3 0 INCLUDED

C Trigger spray, BA-03 no. 3 12 36

D Concealed cistern, BA-04 no. 3 138 414

E Semi-recessed wash basin, BA-05 no. 3 138 414

F Wash basin mixer, BA-06 no. 3 57 171

G Shower column, BA-07 no. 2 57 114

H Shower mixer, BA-08 no. 2 12 24

J Bathtub, BA-09 no. 1 253 253

K Bathtub mixer, BA-10 no. 1 57 57

L Floor mounted water closet, BA-11 no. 1 138 138

M Trigger spray, BA-12 no. 1 12 12

N Wall mounted wash basin, BA-13 no. 1 138 138

P Wash basin mixer, BA-14 no. 1 57 57

Q Shower, BA-15 no. 1 57 57


GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
(AED) (AED)
NO.

To Collection 2,299.00
P2/S1/B1/AES/2

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

ACCESSORIES AND SPECIAL CONSTRUCTION, Cont'd

Sanitarywares & accessories

Take, delivery, store and fixing, testing and providing guarantee for
the following including incidental material, labour etc. complete as
shown on drawings and as per specifications, cont'd

A Shower mixer, BA-16 no. 1 57 57

B Shower tray, BA-17 no. 1 23 23

C Tissue paper holder with cover, BA-18 no. 4 12 48

D Towel rail, BA-19 no. 2 12 24

E Towel ring, BA-20 no. 4 12 48

F Robe hook, BA-21 no. 4 12 48

G Soap & shampoo tray, BA-22 no. 2 12 24

H Kitchen sink no. 1 138 138

Note: Supply of all Sanitary wares& accessories is a Provisional sum


GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
(AED) (AED)
NO.

To Collection 410.00
P2/S1/B1/AES/3

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

ACCESSORIES AND SPECIAL CONSTRUCTION, Cont'd

Generally

The Contractor shall list and price below, the items and quantities
of addition or deduction for any Bill of Quantity Item(s) and or
any omitted items that in his opinion are necessary for the full
and satisfactory completion of the work as described in the
Specifications or shown on the Drawings and for which either
expressed or implied provision is required and which are not
covered by the items or the rates in the Bill of Quantities.
Any such items not listed below shall be deemed to be included.

A
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
(AED) (AED)
NO.

To Collection
P2/S1/B1/AES/4

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

ACCESSORIES AND SPECIAL CONSTRUCTION, Cont'd

COLLECTION

Page P2/S1/B1/AES/1 2,560.00

Page P2/S1/B1/AES/2 2,299.00

Page P2/S1/B1/AES/3 410.00

Page P2/S1/B1/AES/4
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
(AED) (AED)
NO.

Total for Accessories, Equipment, etc - Carried to Bill No. 1 Summary 5,269
P2/S1/B1/AES/5
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

MECHANICAL ENGINEERING INSTALLATIONS

Include for the supply & complete installation as detailed in


the Specifications and on the Drawings and to the complete
satisfaction and approval of the Engineer and all concerned
Statutory Authorities and under the following sections

DRAINAGE INSTALLATIONS

Pipe work of any kind (waste, soil, condensate, vent, rainwater)


including fittings, rodding eyes, protection barriers, supports,
accessories, etc., complete

A 32 mm dia. m 8 33.00 264.00

B 40 mm dia. m 7 34.00 238.00

C 50 mm dia. m 20 37.00 740.00

D 82 mm dia. m 18 53.00 954.00

E 110 mm dia. m 36 72.00 2,592.00

F Connections to sanitary ware with pipes item 1 847.00 847.00


GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)
To Collection 5,635.00
P2/S1/B1/ME/1/PTC1

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D)

Include for the supply & complete installation as detailed in


the Specifications and on the ….etc., (cont'd.)

DRAINAGE INSTALLATIONS, (cont'd.)

Underground pipework including protection, fittings, protection


barriers, supports, accessories, etc., complete

A 82 mm dia. m 11 92.00 1,012.00

B 110 mm dia. m 52 111.00 5,772.00

B 160 mm dia. m 2 144.00 288.00

C Connection from FIC to Main network item 1 1,650.00 1,650.00

The following including all fittings, fixings, accessories, cover


frame, etc., complete

D Floor clean out, type FCO - 110 mm dia. no. 4 145.00 580.00

E Clean out, type CO - 110 mm dia. no. 1 145.00 145.00

F Floor drain, type FD - 82 mm dia. no. 5 107.00 535.00

G Balcony drain, type BD - 50 mm dia. no. 2 449.00 898.00

H Rain water outlet, type RWO no. 1 539.00 539.00

J Vent cowl no. 2 55.00 110.00


GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)

To Collection 11,529.00
P2/S1/B1/ME/2/R1

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D)

Include for the supply & complete installation as detailed in


the Specifications and on the ….etc., (cont'd.)

DRAINAGE INSTALLATIONS, (cont'd.)

Connection to GT, MH including valves, fixing, fittings, etc, complete

A Gully trap, type GT no. 1 781.00 781.00

B Manhole, type MH, size 600 x 600 no. 1 2,000.00 2,000.00


GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)

To Collection 2,781.00
P2/S1/B1/ME/3

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D)

Include for the supply & complete installation as detailed in


the Specifications and on the ….etc., (cont'd.)

Generally for the complete Drainage installation

A Drawings, manuals, approvals & instruction books item included

B Testing and commissioning item 1 - included

C Training item included

D Labels, special tools, etc. item 1 651.00 651.00

E Protective and decorative painting item included

F Liaison and co-ordination with Local Authorities item included

G All civil works related to Drainage works (e.g. Equipment base etc.) item 1 550.00 550.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)

To Collection 1,201.00
P2/S1/B1/ME/4

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D)

Include for the supply & complete installation as detailed in


the Specifications and on the ….etc., (cont'd.)

PLUMBING INSTALLATIONS

Cold water pipe work including puddle flange, fittings, supports,


accessories, etc., complete

A 15 mm dia. m 53 20.00 1,060.00

B 20 mm dia. m 16 21.00 336.00

C 25 mm dia. m 21 26.00 546.00

D 32 mm dia m 38 33.00 1,254.00

E Connection to dewa water meter item 1 1,100.00 1,100.00

F Connection to sanitary ware/ sinks including angle valves etc. item 1 942.00 942.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)

To Collection 5,238.00
P2/S1/B1/ME/5/R1

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D)

Include for the supply & complete installation as detailed in


the Specifications and on the ….etc., (cont'd.)

PLUMBING INSTALLATIONS, (cont'd.)

Pexpipe work including fittings, conduit, supports, accessories, etc.


complete

A 15 mm dia. pipe m 24 29.00 696.00

Underground Cold water pipe work including valves, fittings,


supports, accessories, etc., complete

B 32 mm dia pipe (from Main water meter chamber) m 6 73.00 438.00

Hot water pipe work including fittings, supports, accessories,


insulation etc., complete

C 15 mm dia. m 31 34.00 1,054.00

D 20 mm dia. m 15 34.00 510.00

E 25 mm dia. m 4 36.00 144.00


GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)
F Connection to sanitary ware/ sinks including angle valves, etc. item included

To Collection 2,842.00
P2/S1/B1/ME/6/R1

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D)

Include for the supply & complete installation as detailed in


the Specifications and on the ….etc., (cont'd.)

PLUMBING INSTALLATIONS, (cont'd.)

Pexpipe work including fittings, supports, accessories, etc.


complete

A 15 mm dia. with 20 mm conduit m 18 31.00 558.00

The following including all fittings, fixings, cover, valves frame


accessories, etc., complete

B Bibtap -15 mm dia. no. 1 112.00 112.00

C Isolating valve, type IV - 15 mm dia. no. 16 48.00 768.00

D Isolating valve, type IV - 20 mm dia. no. 1 59.00 59.00

E Isolating valve, type IV - 25 mm dia. no. 2 75.00 150.00

F Isolating valve, type IV - 32 mm dia. no. 1 96.00 96.00


GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)

G Non return valve, type NRV - 15 mm dia. no. 6 63.00 378.00

H Non return valve, type NRV - 25 mm dia. no. 1 90.00 90.00

To Collection 2,211.00
P2/S1/B1/ME/7

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D)

Include for the supply & complete installation as detailed in


the Specifications and on the ….etc., (cont'd.)

PLUMBING INSTALLATIONS, (cont'd.)

The liaisoning, coordination with DEWA, collection and storage


will be done by the Contractor.

A Fixing of main water meter including incidental labour & material no. 1 1,155.00 1,155.00

B Supply and installation of main water meter cabinet including all


fittings, fixtures, accessories etc. complete no. 1 included

Note: The cost of only supply of meters will be paid by the


Employer, The liaisoning, coordination with DEWA,
collection and storage will be done by the Contractor.

GRP water tank and connection with fittings, float valves, vent
pipes, accessories, valves, supports, warning pipes, ladders,
partition low and high level float switches, etc., complete
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)

C Overhead insulated GRP panel water tank,


size 1000 x 1000 x 1000 mm (Capacity = 1 cum.) set 1 3,157.00 3,157.00

Connections only including incidental labour and material

D Connection to GRP water tanks including inlet, outlet, drainage,


backwash line, overflow pipe, etc., complete item 1 662.00 662.00

To Collection 4,974.00
P2/S1/B1/ME/8

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D)

Include for the supply & complete installation as detailed in


the Specifications and on the ….etc., (cont'd.)

PLUMBING INSTALLATIONS, (cont'd.)

Pump set including all controls, wiring, valves, piping, accessories,


vibration isolators, etc., complete

A Circulation pump set(cwcp-1) (1-duty/1-stand by) 0.2 l/s @ 0.5 bar,


0.4 kw each set 1 5,896.00 5,896.00

B Water heat pump cooling capacity= 9.3 kw/hr. electrical


load= 4.5 kw. set 1 8,316.00 8,316.00

C Cooled cold water boosting pump set (bp-01) 1-duty/1-standby


0.8 l/s @1.80 bar, 0.5 kw. Each + pressure vessel set 1 12,496.00 12,496.00

D Circulating pump (hwcp-01) (1-duty/1-stand by) 0.6 l/s@ 1.75 bar,


0.5 kw each set 1 5,896.00 5,896.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)

Solar system including solar panels, pumps, wiring, pipework,


connections, valves, fittings, fixtures, controls, control panels, isolators,
accessories etc. complete

E Solar panel thermosiphone system with electrical back up of 2.0 kw


tank capacity=200 ltr no. 1 6,600.00 6,600.00

To Collection 39,204.00
P2/S1/B1/ME/9/R1

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D)

Include for the supply & complete installation as detailed in


the Specifications and on the ….etc., (cont'd.)

PLUMBING INSTALLATIONS, (cont'd.)

Generally for the complete Plumbing installation

A Drawings, manuals, approvals & instruction books item included

B Testing and commissioning item 1 1,492.00 1,492.00

C Training item included

D Labels, special tools, etc. item 1 994.00 994.00

E Protective and decorative painting item included

F Liaison and co-ordination with Local Authorities item included


GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)

G All civil works related to Plumbing works (e.g. Equipment base etc.) item 1 550.00 550.00

To Collection 3,036.00
P2/S1/B1/ME/10

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D)

Include for the supply & complete installation as detailed in


the Specifications and on the ….etc., (cont'd.)

FIRE FIGHTING INSTALLATIONS

The following items including accessories, supports, etc. complete

A 6 kg dcp extinguisher -kitemark/lpcb approved no. 1 Deleted

B 2 kg co2 extinguisher -kitemark/lpcb approved no. 1 Deleted

B1 2.5 kg multipurpose dcp -kitemark/lpcb approved no. 1 154.00 154.00

C 1200 x 1200 mm Fire blanket no. 1 132.00 132.00


GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)

To Collection 286.00
P2/S1/B1/ME/11

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D)

Include for the supply & complete installation as detailed in


the Specifications and on the ….etc., (cont'd.)

FIRE FIGHTING INSTALLATIONS, (cont'd.)

Generally for the complete Fire fighting installation

A Drawings, manuals, approvals & instruction books item included

B Testing and commissioning item included

C Training item included

D Labels, special tools, etc. item included


GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)

E Protective and decorative painting item included

F Liaison and co-ordination with Local Authorities item included

G All civil works related to Fire fighting works (e.g. Equipment base
etc.) item included

To Collection -
P2/S1/B1/ME/12

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D)

Include for the supply & complete installation as detailed in


the Specifications and on the ….etc., (cont'd.)

AIR-CONDITIONING INSTALLATIONS

Fan coil units including controls, control valves, sensors, filters,


wiring, fixing, accessories, vibration isolators, etc., complete, (cont'd.)

A FCU-GF-01 / CU-GF-01 no. 1 6,061.00 6,061.00

B FCU-GF-02 / CU-GF-02 no. 1 3,166.00 3,166.00


GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)
C FCU-GF-03 / CU-GF-03 no. 1 Omitted

D FCU-1F-01 / CU-1F-01 no. 1 3,166.00 3,166.00

E FCU-1F-02 / CU-1F-02 no. 1 5,751.00 5,751.00

Refrigeration pipe work including insulation, supports, accessories,


fixing, refrigerant metering etc. complete as specified

F Refrigeration pipe (all size) m 90 45.00 4,050.00

The following items including accessories, supports, etc., complete

G Thermostat no. 5 605.00 3,025.00

To Collection 25,219.00
P2/S1/B1/ME/13

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D)

Include for the supply & complete installation as detailed in


the Specifications and on the ….etc., (cont'd.)

AIR-CONDITIONING INSTALLATIONS, (cont'd.)

Grilles, diffusers, dampers, louvers including all accessories

A Supply air grille, type SAG - 750 x 150 mm no. 1 174.00 174.00

B Supply air grille, type SAG - 600 x 150 mm no. 2 135.00 270.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)
C Return air grille, type RAG - 750 x 150 mm no. 1 123.00 123.00

D Return air grille, type RAG - 600 x 150 mm no. 1 100.00 100.00

Supply air diffuser

E SD 150 x 150 mm no. 1 97.00 97.00

F SD 225 x 225 mm no. 3 120.00 360.00

G SD 300 x 300 mm no. 1 156.00 156.00

Return air diffuser

H RD 150x150 mm no. 1 79.00 79.00

J RD 225x225 mm no. 3 95.00 285.00

K RD 300 x 300 mm no. 1 114.00 114.00

Extract square diffuser

L ED-1, 150 x 150 mm, 15 L/s air flow rate no. 4 79.00 316.00

M ED-3, 150 x 150 mm, 10 L/s air flow rate no. 1 79.00 79.00

N ED-4, 225 x 225 mm, 50 L/s air flow rate no. 1 95.00 95.00

To Collection 2,248.00
P2/S1/B1/ME/14/R1

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D)

Include for the supply & complete installation as detailed in


the Specifications and on the ….etc., (cont'd.)

AIR-CONDITIONING INSTALLATIONS, (cont'd.)

Grilles, diffusers, dampers, louvers including all accessories, (cont'd.)

A Fresh air louver 0.1 m2 no. 1 188.00 188.00


GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)

B Extract air louver 0.1 m2 no. 1 188.00 188.00

C Volume control dampers , VCD no. 7 193.00 1,351.00

D Dampers (all types and size) item 1 793.00 793.00

E Flexible connections (all sizes) item 1 977.00 977.00

To Collection 3,497.00
P2/S1/B1/ME/15/R1

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D)

Include for the supply & complete installation as detailed in


the Specifications and on the ….etc., (cont'd.)

AIR-CONDITIONING INSTALLATIONS, (cont'd.)

The following including acoustic lining, joints, supports, sensors,


GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)
mesh, access cover, plenum, flexible etc., complete

A Air conditioning ductwork m2 34 140.00 4,760.00

B Fresh air ductwork m2 15 140.00 2,100.00

C General extract air ductwork m2 3 140.00 420.00

D Staircase pressurization ductwork item deleted

E Insulation to ductwork as specified / required item 1 3,089.00 3,089.00

F Aluminium cladding to ductwork, externally item 1 1,815.00 1,815.00

To Collection 12,184.00
P2/S1/B1/ME/16/R1

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D)

Include for the supply & complete installation as detailed in


the Specifications and on the ….etc., (cont'd.)

AIR-CONDITIONING INSTALLATIONS, (cont'd.)


GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)

Generally for the complete Air-conditioning installations

A Drawings, manuals, approvals & instruction books item included

B Testing and commissioning item 1 1,440.00 1,440.00

C Training item included

D Labels, special tools, etc. item 1 779.00 779.00

E Protective and decorative painting item included

F Liaison and co-ordination with Local Authorities item included

G All civil works related to HVAC works (e.g. Equipment base etc.) item 1 550.00 550.00

To Collection 2,769.00
P2/S1/B1/ME/17

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D)

Include for the supply & complete installation as detailed in


the Specifications and on the ….etc., (cont'd.)
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)

LPG INSTALLATIONS

LPG gas pipe work including fittings, supports, accessories,


protection, leak detectors etc., complete

A 1/2" gas pipe (with pipe in pipe) m 7 included

B Connection to main pipe item 1 12,485.00 12,485.00

Note:LPG tank and all other fittings are included in Adjustment


Bills

To Collection 12,485.00
P2/S1/B1/ME/18

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D)


GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)
Include for the supply & complete installation as detailed in
the Specifications and on the ….etc., (cont'd.)

LPG INSTALLATIONS., (cont'd.)

The following including all accessories, fittings, controls, valves,


fire proof wiring , etc complete

A Gas Meter no. 1 included

B Gas leak detector no. 1 included

C Emergency on/off switch no. 1 included

D Quick close valve no. 1 included

E Solenoid valve no. 1 included

F Pressure regulator no. 1 included

G Hose pipe 6mm dia no. 1 included

To Collection -
P2/S1/B1/ME/19/R1

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)


GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)
MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D)

Include for the supply & complete installation as detailed in


the Specifications and on the ….etc., (cont'd.)

LPG SYSTEM INSTALLATIONS, (Cont'd.)

Generally for the complete LPG installations

A Drawings, manuals, approvals & instruction books item included

B Testing and commissioning item included

C Training item included

D Labels, special tools, etc. item included

E Protective and decorative painting item included

F Liaison and co-ordination with Local Authorities item included

G All civil works related to LPG works (e.g. Equipment base etc.) item included

To Collection -
P2/S1/B1/ME/20

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)


GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)
BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D)

Generally

The Contractor shall list and price below, the items and quantities
of addition or deduction for any Bill of Quantity Item(s) and or
any omitted items that in his opinion are necessary for the full and
satisfactory completion of the work as described in the
Specifications or shown on the Drawings and for which either
expressed or implied provision is required and which are not
covered by the items or the rates in the Bill of Quantities. Any
such items not listed below shall be deemed to be included in his
o1Fer.

VENTILATOR no. 1 4,690.00 4,690.00

To Collection 4,690.00
P2/S1/B1/ME/21
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)
SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D)

COLLECTION

Page P2/S1/B1/ME/1 5,635.00

Page P2/S1/B1/ME/2/R1 11,529.00

Page P2/S1/B1/ME/3 2,781.00

Page P2/S1/B1/ME/4 1,201.00

Page P2/S1/B1/ME/5/R1 5,238.00

Page P2/S1/B1/ME/6/R1 2,842.00

Page P2/S1/B1/ME/7 2,211.00

Page P2/S1/B1/ME/8 4,974.00

Page P2/S1/B1/ME/9/R1 39,204.00

Page P2/S1/B1/ME/10 3,036.00

Page P2/S1/B1/ME/11 286.00

Page P2/S1/B1/ME/12 -

Page P2/S1/B1/ME/13 25,219.00

Page P2/S1/B1/ME/14/R1 2,248.00

Page P2/S1/B1/ME/15/R1 3,497.00

Page P2/S1/B1/ME/16/R1 12,184.00

Carried Forward 122,085.00


GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)
P2/S1/B1/ME/22/R1

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D)

COLLECTION, (cont'd.)

Brought Forward 122,085.00

Page P2/S1/B1/ME/17 2,769.00

Page P2/S1/B1/ME/18 12,485.00

Page P2/S1/B1/ME/19/R1 -

Page P2/S1/B1/ME/20 -

Page P2/S1/B1/ME/21 4,690.00


GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)

Total for Mechanical Engg. Installations - Carried to Bill No. 1 Summary 142,029.00
P2/S1/B1/ME/23/R1
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

ELECTRICAL ENGINEERING INSTALLATIONS

Include for the complete supply & installation as detailed in the


Specifications and on the Drawings and to the complete
satisfaction and approval of the Engineer and all concerned
Statutory Authorities and under the following sections

LIGHTING AND POWER

Distribution boards including MCCB's, breakers, terminations, isolators,


supports, accessories, etc., complete

A DB - GR no. 1 2,368 2,368.00

B DB - FR no. 1 2,576 2,576.00

Control panel including MCCB's, ELCB's, Starter, VFD's, breakers,


terminations, supports, accessories, etc., complete

C CP- Cooled water boosting pump no. 1 INCLUDED

D CP-Circulating pump no. 2 INCLUDED

E CP-Ventilator no. 1 1,571 1,571.00


GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)
To Collection 6,515.00
P2/S1/B1/EE/1

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

ELECTRICAL ENGINEERING INSTALLATIONS, (Cont'd.)

Include for the complete supply & installation as detailed


in the Specifications and on the Drawings ….etc., (Cont'd.)

LIGHTING AND POWER, (Cont'd.)

Isolator panel including isolator, bus bar, enclosure terminations,


supports etc., complete

A 20A SP isolator W/P no. 4 183 732.00

B 20A TP isolator W/P no. 1 191 191.00

C 32A TP isolator W/P no. 1 192 192.00


GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)

To Collection 1,115.00
P2/S1/B1/EE/2

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

ELECTRICAL ENGINEERING INSTALLATIONS, (Cont'd.)

Include for the complete supply & installation as detailed


in the Specifications and on the Drawings ….etc., (Cont'd.)

LIGHTING AND POWER, (Cont'd.)

Cabling works including, accessories, support, termination


glanding, surge protection, cable tie, etc. complete

A 4C 35mm2 XLPE/SWA/PVC + 1C 16mm2 ECC m 10 69 690.00

B From DB's to Isolators and equipments item 1 3,106 3,106.00

B1 From meter to DB-GR, 1x100mm dia. uPVC duct item 1 186 186.00

B2 From meter to DB-FR, 1x75mm dia. uPVC duct item 1 296 296.00

C Glanding & termination works for DEWA incoming cable item 1 225 225.00

D Control cables as required item 1 674 674.00


GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)

To Collection 5,177.00
P2/S1/B1/EE/3/R4

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

ELECTRICAL ENGINEERING INSTALLATIONS, (Cont'd.)

Include for the complete supply & installation as detailed


in the Specifications and on the Drawings ….etc., (Cont'd.)

LIGHTING AND POWER, (Cont'd.)

The following including fittings, fixing accessories, etc. as per


DEWA regulations and requirement with all associated costs
complete

A kWH meter no. 1 3,079 3,079.00

Note: The cost of only supply of meters will be paid by the


Employer, The liaisoning, coordination with DEWA, collection
and storage will be done by the contractor.

Miscellaneous item

B uPVC underground sleeves item 1 186 186.00


GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)

To Collection 3,265.00
P2/S1/B1/EE/4/R1

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

ELECTRICAL ENGINEERING INSTALLATIONS, (Cont'd.)

Include for the complete supply & installation as detailed


in the Specifications and on the Drawings ….etc., (Cont'd.)

LIGHTING AND POWER, (Cont'd.)

Wiring including trunking and conduits in final sub circuits to light


fittings :

A Circular downlight-1, Type DL1 no. 7 113 791.00

B Circular downlight-2, Type DL2 no. 15 113 1,695.00

C Spot light, Type SL no. 7 113 791.00

D Pendent light, Type PL1 no. 2 113 226.00

E Pendent light, Type PL2 no. 2 113 226.00

F Pendent light, Type PL3 no. 1 113 113.00

G 1 x 30 W, led lamp with die-cast aluminum body and glass diffuser ip65,
Type W1 no. 3 113 339.00

H 1 x 18 W led surface mounted lighting fixture with die-cast aluminum


body and glass diffuser to ip65 (decorative type), Type W2 no. 5 113 565.00

J 1 x 18 W led lamp recessed down light fixture to architect approval


ip44, Type D1 no. 1 113 113.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)

To Collection 4,859.00
P2/S1/B1/EE/5

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

ELECTRICAL ENGINEERING INSTALLATIONS, (Cont'd.)

Include for the complete supply & installation as detailed


in the Specifications and on the Drawings ….etc., (Cont'd.)

LIGHTING AND POWER, (Cont'd.)

Wiring including trunking and conduits in final sub circuits to


wiring accessories

A One gang one way switch no. 8 94 752.00

B One gang two way switch no. 10 94 940.00

C Two gang one way switch no. 3 94 282.00

D Two gang two way switch no. 1 94 94.00

E Three gang one way switch no. 2 94 188.00

F Bell Push button no. 1 94 94.00

G Bell no. 1 94 94.00

H Intermediate switch no. 1 94 94.00


GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)

To Collection 2,538.00
P2/S1/B1/EE/6/R1

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

ELECTRICAL ENGINEERING INSTALLATIONS, (Cont'd.)

Include for the complete supply & installation as detailed


in the Specifications and on the Drawings ….etc., (Cont'd.)

LIGHTING AND POWER, (Cont'd.)

Wiring including trunking and conduits in final sub circuits to


following wiring accessories / Equipment

A 13A 230v 50 hz 2 pole & earth bs 1363 switch socket outlet no. 18 138 2,484.00

B 2 gang 13A 230v 50 hz 2 pole & earth bs 1363 switch socket outlet no. 5 138 690.00

C 13A, spur outlet, switched no. 6 138 828.00

D Flex outlet no. 4 138 552.00

E weather proof tp+n isolator to ip-65 no. 2 138 276.00

F weather proof sp isolator to ip-65 no. 1 138 138.00


GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)

To Collection 4,968.00
P2/S1/B1/EE/7

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

ELECTRICAL ENGINEERING INSTALLATIONS, (Cont'd.)

Include for the complete supply & installation as detailed


in the Specifications and on the Drawings ….etc., (Cont'd.)

LIGHTING AND POWER, (Cont'd.)

Take delivery, store and fix only the following light fittings and
accessories including any incidental materials, labour, coordination
with the supplier, etc. complete

A Circular downlight-1, Type DL1 no. 7 31 217.00

B Circular downlight-2, Type DL2 no. 15 31 465.00

C Spot light, Type SL no. 7 31 217.00

D Pendent light, Type PL1 no. 2 31 62.00

E Pendent light, Type PL2 no. 2 31 62.00

F Pendent light, Type PL3 no. 1 31 31.00

G 1 x 30 W, led lamp with die-cast aluminum body and glass diffuser ip65,
Type W1 no. 3 31 93.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)

H 1 x 18 W led surface mounted lighting fixture with die-cast aluminum


body and glass diffuser to ip65 (decorative type), Type W2 no. 5 31 155.00

J 1 x 18 W led lamp recessed down light fixture to architect approval


ip44, Type D1 no. 1 31 31.00

Note: Supply of all Light fittings is a Provisional Sum.

To Collection 1,333.00
P2/S1/B1/EE/8

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

ELECTRICAL ENGINEERING INSTALLATIONS, (Cont'd.)

Include for the complete supply & installation as detailed


in the Specifications and on the Drawings ….etc., (Cont'd.)

LIGHTING AND POWER, (Cont'd.)

Equipment and accessories including trays, terminations, supports,


fittings, complete
(P.C. rate for supply only of switches is Dhs. 20/- per no.)

A One gang one way switch no. 8 38 304.00

B One gang two way switch no. 10 38 380.00

C Two gang one way switch no. 3 38 114.00

D Two gang two way switch no. 1 38 38.00

E Three gang one way switch no. 2 38 76.00

F Bell Push button no. 1 38 38.00


GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)
G Bell no. 1 115 115.00

H Intermediate switch no. 1 38 38.00

To Collection 1,103.00
P2/S1/B1/EE/9/R1

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

ELECTRICAL ENGINEERING INSTALLATIONS, (Cont'd.)

Include for the complete supply & installation as detailed


in the Specifications and on the Drawings ….etc., (Cont'd.)

LIGHTING AND POWER, (Cont'd.)

Equipment and accessories including trays, terminations, supports,


fittings, complete, cont'd

A 13A 230v 50 hz 2 pole & earth bs 1363 switch socket outlet no. 18 35 630.00

B 2 gang 13A 230v 50 hz 2 pole & earth bs 1363 switch socket outlet no. 5 55 275.00

C 13A, spur outlet, switched no. 6 51 306.00

D Flex outlet no. 4 106 424.00

E weather proof tp+n isolator to ip-65 no. 2 192 384.00

F weather proof sp isolator to ip-65 no. 1 191 191.00


GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)

To Collection 2,210.00
P2/S1/B1/EE/10

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

ELECTRICAL ENGINEERING INSTALLATIONS, (Cont'd.)

Include for the complete supply & installation as detailed


in the Specifications and on the Drawings ….etc., (Cont'd.)

TELEPHONE SYSTEM

Tray and trunking, accessories, supports and conduits in final


sub-circuits to following as per "Etisalat / Du Design Guidelines
for 'Fiber to Home' requirement in New Building"

A 12u cabinet no. 1 86 86.00

B RJ-45 telephone outlet no. 7 86 602.00

C RJ-45 dual / telephone outlet no. 4 86 344.00

uPVC ducts laid and jointed in trenches including warning tape,


GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)
marker tape, draw ropes, end caps etc. complete

D 2 x 50 mm uPVC duct for Authority incoming line item 1 213 213.00

To Collection 1,245.00
P2/S1/B1/EE/11

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

ELECTRICAL ENGINEERING INSTALLATIONS, (Cont'd.)

Include for the complete supply & installation as detailed


in the Specifications and on the Drawings ….etc., (Cont'd.)

TELEPHONE SYSTEM, (cont'd.)

Equipment and accessories including cabling, terminations, supports


etc., complete as per "Etisalat / Du Design Guidelines for Fiber
to Home' requirement in New Building"

A 12u cabinet no. 1 3,341 3,341.00

B RJ-45 telephone outlet no. 7 232 1,624.00

C RJ-45 dual / telephone outlet no. 4 251 1,004.00


GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)

EARTHING SYSTEM

The following including all cables, earth rods, pits, cover


down conductor, air terminals, test link, cad welding,
accessories, earth bar etc., complete

D Earth pits item 1 3,937 3,937.00

E 25 x 3 mm bare copper tape item 1 Included

F Bonding points item 1 Included

G Earthing system for telephone system item 1 Included

To Collection 9,906.00
P2/S1/B1/EE/12/R1

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

ELECTRICAL ENGINEERING INSTALLATIONS, (Cont'd.)

Include for the complete supply & installation as detailed


in the Specifications and on the Drawings ….etc., (Cont'd.)

FIRE ALARM SYSTEM

Fire proof cable with tray, trunking, conduits accessories complete


with supports including communications cable etc. in final sub-circuit

A Main fire alarm control panel, FACP no. 1 550 550.00

B Speacker with flasher W/P no. 1 186 186.00

C Addressable smoke detector with built in isolator base no. 3 118 354.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)

D Addressable smoke detector with sounder no. 4 118 472.00

E Addressable combination detector with sounder no. 1 118 118.00

F Power point for fire alarm control no. 1 deleted

To Collection 1,680.00
P2/S1/B1/EE/13/R4

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

ELECTRICAL ENGINEERING INSTALLATIONS, (Cont'd.)

Include for the complete supply & installation as detailed


in the Specifications and on the Drawings ….etc., (Cont'd.)

FIRE ALARM SYSTEM, (Cont'd.)

Equipment and accessories including terminations, supports, etc.


complete

A Main fire alarm control panel, FACP no. 1 5,789 5,789.00

B Speacker with flasher W/P no. 1 542 542.00


GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)

C Addressable smoke detector with built in isolator base no. 3 477 1,431.00

D Addressable smoke detector with sounder no. 4 828 3,312.00

E Addressable combination detector with sounder no. 1 377 377.00

F Power point for fire alarm control no. 1 deleted

To Collection 11,451.00
P2/S1/B1/EE/14/R4

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

ELECTRICAL ENGINEERING INSTALLATIONS, (Cont'd.)

Include for the complete supply & installation as detailed


in the Specifications and on the Drawings ….etc., (Cont'd.)

SMATV SYSTEM (CONTAINMENT ONLY)

Following including containment tray, trunking, junction box and conduits


complete with accessories, supports in final sub-circuits to

A SMATV outlet no. 3


GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)

B IP65 PVC box for conduit termination no. 1 855.00

C Metal cabinet flush mounted with 1 no. 13A socket no. 1

To Collection 855.00
P2/S1/B1/EE/15/R4

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

ELECTRICAL ENGINEERING INSTALLATIONS, (Cont'd.)

Include for the complete supply & installation as detailed


in the Specifications and on the Drawings ….etc., (Cont'd.)

Generally for the complete Electrical installations

A Drawings, manuals, approvals & instruction books item 1 1,347 1,347.00


GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)
B Testing and commissioning item Included

C Training item Included

D Labels, special tools, etc. item Included

E Protective and decorative painting item Included

F Liaison and co-ordination with Local Authorities item Included

To Collection 1,347.00
P2/S1/B1/EE/16

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

ELECTRICAL ENGINEERING INSTALLATIONS, (Cont'd.)

Generally

The Contractor shall list and price below, the items and quantities of
addition or deduction for any Bill of Quantity Item(s) and or any
omitted items that in his opinion are necessary for the full and
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)
satisfactory completion of the work as described in the
Specifications or shown on the Drawings and for which either
expressed or implied provision is required and which are not covered
by the items or the rates in the Bill of Quantities. Any such items not
listed below shall be deemed to be included.

To Collection -
P2/S1/B1/EE/17

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

ELECTRICAL ENGINEERING INSTALLATIONS, (Cont'd.)

COLLECTION

Page P2/S1/B1/EE/1 6,515.00


GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
ITEM RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
NO. (AED) (AED)

Page P2/S1/B1/EE/2 1,115.00

Page P2/S1/B1/EE/3/R4 5,177.00

Page P2/S1/B1/EE/4/R1 3,265.00

Page P2/S1/B1/EE/5 4,859.00

Page P2/S1/B1/EE/6/R1 2,538.00

Page P2/S1/B1/EE/7 4,968.00

Page P2/S1/B1/EE/8 1,333.00

Page P2/S1/B1/EE/9/R1 1,103.00

Page P2/S1/B1/EE/10 2,210.00

Page P2/S1/B1/EE/11 1,245.00

Page P2/S1/B1/EE/12/R1 9,906.00

Page P2/S1/B1/EE/13/R4 1,680.00

Page P2/S1/B1/EE/14/R4 11,451.00

Page P2/S1/B1/EE/15/R4 855.00

Page P2/S1/B1/EE/16 1,347.00

Page P2/S1/B1/EE/17 -

Total for Electrical Engg. installations - Carried to Bill No. 1 Summary 59,567.00
P2/S1/B1/EE/18/R4
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)

ITEM RATE AMOUNT


ITEM DESCRIPTION UNIT QTY.
(AED) (AED)
NO.

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

EXTERNAL WORKS

Site clearance

A Site clearance including removal of rubbish, vegetation,


undergrowth, bushes, trees, existing tiling, curbs, etc. complete item 1 115 115

Earthworks

B Cut / fill to required levels including use of imported fill and


compacting in layers as per drawings, specifications and as
directed by the Engineer item 1 1150 1150
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)

ITEM RATE AMOUNT


ITEM DESCRIPTION UNIT QTY.
(AED) (AED)
NO.

To Collection 1,265.00
P2/S1/B1/EW/1

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

EXTERNAL WORKS, Cont'd

Pavements to pattern and colour including subgrade, sub-base,


sand filling, etc. complete

A Hard landscaping (rear side entrance) m2 11 83 913

B Hard landscaping (Parking area) m2 28 99 2772

C Hard landscaping (front side entrance) m2 15 83 1245

Boundary wall

Following including but not limited to all earth works, civil works,
blockwork, jointed and pointed in cement including all air gaps, crack
control joints, anchors, dowel bars, metal laths, joints, wall ties,
stiffener beams and columns, reinforcement, waterproofing, expansion
joints, plaster, finishes, special features, fittings, accessories, MEP etc.,
complete as per drawings and specifications

D 200 mm wide 2100 mm high boundary wall m 11 862 9482

E 300 mm wide 2100 mm high boundary wall m 6 977 5862


GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)

ITEM RATE AMOUNT


ITEM DESCRIPTION UNIT QTY.
(AED) (AED)
NO.

To Collection 20,274.00
P2/S1/B1/EW/2

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

EXTERNAL WORKS, Cont'd

Generally

The Contractor shall list and price below, the items and quantities
of addition or deduction for any Bill of Quantity Item(s) and or
any omitted items that in his opinion are necessary for the full
and satisfactory completion of the work as described in the
Specifications or shown on the Drawings and for which either
expressed or implied provision is required and which are not
covered by the items or the rates in the Bill of Quantities.
Any such items not listed below shall be deemed to be included.

A
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)

ITEM RATE AMOUNT


ITEM DESCRIPTION UNIT QTY.
(AED) (AED)
NO.

To Collection
P2/S1/B1/EW/3

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

EXTERNAL WORKS, Cont'd

COLLECTION

Page P2/S1/B1/EW1 1,265.00

Page P2/S1/B1/EW2 20,274.00

Page P2/S1/B1/EW3
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)

ITEM RATE AMOUNT


ITEM DESCRIPTION UNIT QTY.
(AED) (AED)
NO.

Total for External Works - Carried to Bill No. 1 Summary 21,539


P2/S1/B1/EW/4
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
AMOUNT
ITEM DESCRIPTION Page No.
(AED)

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

SUMMARY

SITE WORKS P2/S1/B1/SW/1 - P2/S1/B1/SW/4/PTC1 10,423.00

CONCRETE WORKS P2/S1/B1/CW/1/PTC1 - P2/S1/B1/CW/6/R1/PTC1 105,561.00

MASONRY P2/S1/B1/MA/1/PTC1 - P2/S1/B1/MA/4/PTC1 33,249.00

METAL WORK P2/S1/B1/MW/1/PTC1 - P2/S1/B1/MW/3/PTC1 6,216.00

ALUMINIUM AND GLAZING WORKS P2/S1/B1/AG/1/PTC1 - P2/S1/B1/AG/4/PTC1 45,672.00

CARPENTRY & JOINERY WORKS P2/S1/B1/CJ/1 - P2/S1/B1/CJ/3/R1 1,037.00

INTERNAL AND EXTERNAL FINISHES P2/S1/B1/FIN/1/R1 - P2/S1/B1/FIN/6/PTC1 95,443.00

THERMAL AND MOISTURE PROTECTION P2/S1/B1/TM/1/PTC1 - P2/S1/B1/TM/5/R1/PTC1 21,412.00

ACCESSORIES AND SPECIAL CONSTRUCTION P2/S1/B1/AES/1 - P2/S1/B1/AES/5 5,269.00

MECHANICAL ENGINEERING INSTALLATIONSP2/S1/B1/ME/1/PTC1 - P2/S1/B1/ME/23/R1 142,029.00

ELECTRICAL ENGINEERING INSTALLATIONS P2/S1/B1/EE/1 - P2/S1/B1/EE/18/R4 59,567.00

EXTERNAL WORKS P2/S1/B1/EW/1 - P2/S1/B1/EW/4 21,539.00


GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2)
AMOUNT
ITEM DESCRIPTION Page No.
(AED)
Total for Bill No. 1 - Carried to General Summary 547,417.00
`
DRY COST SPLITTED AMOUNTS

MATERIA
ITEM LABOUR PLANT
L

SITE WORKS 1,854.95 2,686.13 2,347.55

CONCRET WORKS ### ### 1,053.57

MASONRY ### ### 558.20

METAL WORK - - -

ALUMINIUM AND GLAZING WORKS - - -

CARPENTRY & JOINERY WORKS - - -

FINISHES ### ### 71.46

THERMAL AND MOISTURE PROTECTION - - -

ACCESSORIES AND SPECIAL CONSTRUCTION - - -

EXTERNAL WORKS 690.12 3,598.08 -

TOTALS
NO OF
SUBCONTRACT LABOUR MATERIAL PLANT SUBCONTRACT
VILLAS

1,737.00 39 72,343 104,759 91,554 67,743

5,730.00 39 764,690 2,541,537 41,089 223,470

500.00 39 402,480 668,475 21,770 19,500

5,400.00 39 0 0 0 210,600

41,250.00 39 0 0 0 1,608,750

915.00 39 0 0 0 35,685

27,984.00 39 1,136,386 1,307,240 2,787 1,091,376

26,022.00 39 0 0 0 1,014,858

4,515.00 39 0 0 0 176,085

14,450.00 39 26,915 140,325 0 563,550

2,402,814 4,762,335 157,201 5,011,617


TOTAL DRY COST

12,333,966