Project: Prebid Engineering for 4-Laning of Nh-7 Rewa (242+600) to Maihar (311+000) in the state of Madhya Pradesh

Subject: Estimation of Minor Bridge Km: 53+900


DATA
No of spans 1
Middle Span 0.00 m 0 no. skew 0
End span 24.60 m 1 no.
No of carriageways 1
Carriage way width 11.00 m
Overall width 12.00 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.265 m
ACL-GL 3.200 m FRL 344
GL-FNL 6.535 m ACL 341.735
Toe width 3.70 m GL 338.535
Heel width 4.50 m FNL 332.000
Wall top width 1.10 m FRL-FNL 12.000
Wall bottom width 1.30 m
Total width of raft 9.500 m
Uniform thk 1.00 m
Varying thk 0.50 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.000 m
Width of abutment 1.20 m
Wall height 7.935 m
Abutment (Pile foundation)
No of abutments 0 FRL 344
FRL-ACL 2.265 m ACL 341.735
ACL-TOPC 31.735 m GL 309.000
Length of pile cap 0.00 m TOPC 310.000
Width of Pilecap 0.00 m BOPC 310.000
Depth of pile cap 0.00 m FNL 310
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height 31.435 m
Abutment cap
Length of abutment cap 1.200
Width of abutment cap (uniform) 12.000
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 0
FRL-PCTL 2.265 m FRL 344
PCTL-GL 26.235 m PCTL 341.735
GL-FNL 5.700 m GL 315.500
Length of footing 0.00 m FNL 309.800
Width of footing 0.00 m FRL-FNL 34.200
Pedestal width 0.25 m
Pedestal length 0.25 m
Pedestal depth 0.00 m
Uniform thk 0.00 m
Varying thk 0.00 m
Pier sub-structure
No of piers 0
Length of pier 0m (excluding cutwaters)
Width of pier 0m
Wall height 31.935 m
Pier (Pile foundation)
No of piers 0 FRL 344
FRL-PCTL 2.265 m PCL 341.735
PCTL-TOPC 31.735 m TOPC 310.000
Length of pile cap 0.00 m BOPC 310.000
Width of Pilecap 0.00 m FNL 310
Depth of pile cap 0.00 m
No of piles 0.00 m
Length of pile 0.000 m
Pier sub-structure
No of piers 0
Length of pier 0m (excluding cutwaters)
Width of pier 0m
Wall height 31.735 m
Pier cap
No 0
Length of pier cap 0.00
Width of pier cap (uniform) 0.00
Width of pier cap (Varying)) 0.00
Uniform thk 0.00
Varying thk 0.00
Dirtwall
No 2
Length 12
Width 0.300
Depth 2.265
Bracket
No 2
Length 11.350
Width 0.300
Depth 0.450
Super structure - end spans
Depth of girder +deckslab 1.800
No of girders in one span 4
Total no of girders 4 0.8
No of deck slabs 1
Length of deck slab 24.600
Width of deck slab 12.000
Depth of deck slab 0.250
Area of girder at mid section 0.765 m2
Area of girder at end section 1.240 m2 0.3
Area of girder at tapering portion 1.003 m2
Length of girder @ end section 1.800 m
Length of tapering portion 1.500 m
Length of girder @ mid section 17.600 m
No of cross girders 2 0.8
Length of cross girders 6.600
Width of cross girders 0.300 0
Depth of cross girders 1.300
Super structure - mid span
Depth of girder +deckslab 1.800
No of girders in one span 0
Total no of girders 0 0.8
No of deck slabs 0
Length of deck slab 0.000
Width of deck slab 12.000
Depth of deck slab 0.000
Area of girder at mid section 0.840 m2
Area of girder at end section 1.440 m2 0.3
Area of girder at tapering portion 1.140 m2
Length of girder @ end section 0.000 m
Length of tapering portion 0.000 m
Length of girder @ mid section 0.000 m
No of cross girders 0 0.8
Length of cross girders 5.700
Width of cross girders 0.000 0
Depth of cross girders 1.550
Elastomeric bearings
No 8
Length 50
width 32
depth 7.8
Quadrants Slope protection infront of ab
numbers 4 0 Numbers
Radius 8.197 52.500 m Length
Depth 5.465 35.000 m Width
v1 96.144 25255.5 m3 Depth
v2 84.337 24753.6 m3 width_Stone.Pit
v3 78.807 24505.2 m3 width_FilterMedia
v1-v2 11.807 501.8 m3 width_Soil filling
v2-v3 5.530 248.4 m3
Area 52.778 2164.8 m2
V4 679.601 178520.3 m3

Launching apron
No of aprons 0
Length of apron 64.5 m
Width of apron 0m
Depth of apron 0m
Retaining wall(Part 2)
No 0
Length 2.397
Ht above GL 5.46
Depth of foundation 0 5
Height of wall 5.46 4.4
Topwidth 0
below Wall 0.00
heel 0.00
Toe 0.00
Total width 0.00
uniform depth 0
Varying depth 0
Retaining wall(Part 1) Column at end of return wall
No 4 4
Length 4.500 1
width 0.650 0.6
Depth 10.750 10.750
Flywing
No 4
Length 4.000 m
width 0.500 m
Depth1 0.500 m
Depth2 2.640 m

DETAILED ESTIMATION
Item
Description Unit No L B D Quantity
No.
6.01 Earthwork in excavation of foundation for structures
complete as per drawing and Technical Specification
Clause 304 including all Leads and Lifts

a)Ordinary and soft Soils


Open foundation
Abutments Cum 2 9.700 12.200 6.685 1582
Piers Cum 0 0.200 0.200 5.850 0
Pile foundation
Abutments Cum 0 0.200 0.200 0.150 0
Piers Cum 0 0.200 0.200 0.150 0

Total = 1582
6.02 Providing Back filling for quadrants, with selected
imported granular material of approved quality
including all leads and lifts complete as per Technical
Specification Clause 305.

For quadrants (OF) Cum 4 Vol= 79 315


For quadrants (PF) Cum 0 Vol= 24505 0
Behind abutments (OF) Cum 2 10.700 3.900 10.100 843
Behind abutments (PF) Cum 0 -1.000 3.900 34.000 0
In front of abutments Cum 0 12.000 58.390 32.285 0
Total = 1158
6.03 Filter media behind abutments,wing walls and return
walls complete with all leads and lifts as per drawing
and Technical Specification Clause 2200

Behind Side walls (OF) Cum 2 10.700 0.600 10.100 130


Behind Side walls (PF) Cum 0 -1.000 0.600 34.000 0
Behind Retaining walls (Part-1) Cum 4 3.900 0.600 10.100 95
Behind flywings Cum 4 4.000 0.600 1.570 15
Total = 239
6.04 Providing Plain Cement concrete for levelling course
etc., under foundations including centering complete
as per drawing and Technical Specification clauses
1500,1700,& 2100.

PCC-M15 grade
Open foundation
Abutments Cum 2 9.700 12.200 0.150 36
Piers Cum 0 0.200 0.200 0.150 0
Pile foundation
Abutments Cum 0 0.200 0.200 0.150 0
Piers Cum 0 0.200 0.200 0.150 0

Total = 36
6.05 Providing and laying Reinforced cement concrete for
foundations complete as per drawing and Technical
Specifications Section 1500,1700, 2100 & 2200

RCC-M35
Open foundation
Abutment -Uniform width Cum 2 9.500 12.000 1.000 228
Abutment-- Varying width Cum 2 5.400 12.000 0.500 65
Pier-Uniform width Cum 0 0.000 0.000 0.000 0
Pier-- Varying width Cum 0 Vol = 0.000 0
Pier Pedestals Cum 0 0.250 0.250 0.000 0
Pile foundation
Abutments Cum 0 0.000 0.000 0.000 0
Piers Cum 0 0.000 0.000 0.000 0

Total = 293
HYSD bar reinforcement (Fe 500 gr)complete as per
drawing and Technical Specification clause no 1600.
Mt At 65kg per m3 of concrete 19
6.06 Structural Cement concrete for Reinforced cement
concrete for Sub structure including centering complete
as per drawing Technical specification clauses
1500,1700,2200

RCC-M35
Open foundation
Abutments (Wall type) Cum 2 12.000 1.200 7.935 229
Piers (Wall type) Cum 0 0.000 0.000 31.935 0
Piers _Cutwaters Cum 0 Area = 0.000 31.935 0
Pile foundation
Abutments (Wall type) Cum 0 0.00 0.00 31.435 0
Piers (Wall type) Cum 0 0.00 0.00 31.735 0
Piers _Cutwaters Cum 0 Area = 0.000 31.735 0
Abutmentcap Cum 2 1.200 12.000 0.300 9
Dirt wall Cum 2 12.000 0.300 2.265 16
Bracket Cum 2 11.350 0.300 0.450 2.55
Retaining wall (Part-1) Cum 4 4.500 0.650 10.750 126
Piercap (uniformportion) Cum 0 0.000 0.000 0.000 0
Piercap (Varyingportion) Cum 0 0.000 0.000 0.000 0
Bearing pedestals Cum 8 0.800 0.620 0.300 1
Retaining wall part2 Cum 0 2.397 0.000 5.465 0
Flywing Cum 4 4.000 0.500 1.570 13
Column at returnwall part-1 Cum 4 1.000 0.600 10.750 26
Median wall Cum 0 0.00 0.000 5.465 0
Total = 421
HYSD bar reinforcement (Fe 500 gr)complete as per
drawing and Technical Specification clause no 1600.
Mt At 110kg per m3 of concrete 46
6.07 Structural Cement concrete for Reinforced cement
concrete/PSC Super structure including centering
complete as per drawing Technical specification
clauses 809,1500,1700

PSC-M45
Deck slab Cum 1 24.600 12.000 0.250 74
Longitudinal girders (End section) Cum 8 1.800 Area = 1.240 18
Longitudinal girders (Tapering section) Cum 8 1.500 Area = 1.003 12
Longitudinal girders (Mid section) Cum 4 17.600 Area = 0.765 54
Cross girders Cum 2 6.600 0.300 1.300 5
Total = 163
HYSD bar reinforcement (Fe 500 gr)complete as per
drawing and Technical Specification clause no 1600.
Mt At 140kg per m3 of concrete 22.8
6.08 HT Steel for PSC concrete complete as per drawing and
Technical Specification 1800,1009 Mt At 35kg per m3 of concrete 5.7
6.09 Providing, cutting, bending and fixing in position of
TMT bar reinforcement(Fe 500 gr) in reinforced
concrete structure complete as per drawing and
Technical Specification Section 1600
Mt (foundation+substr+super stru.) 88
6.10 Providing bored cast-in-situ M35 grade RCC piles
excluding reinforcement complete as per drawings and
technical specifications and removal of excavated earth
with all lifts and lead up to 1000 m(pile dia 1200mm)

RCC M35 1.2m dia piles for abutments Rm 0.00 0.000 0


RCC M35 1.2m dia piles for piers Rm 0.00 0.000 0
Total = 0
HYSD bar reinforcement (Fe500 gr)complete as per
drawing and Technical Specification clause no 1600.
Mt At 150kg per Rm of piles 0.00
6.11 Bituminous Concrete Wearing Course of total 65 mm
thick comprising two layers of 25 mm thick Bituminous
Concrete laid over a coat of 15 mm thick Mastic
Asphalt as per Technical Specification Sections 509,
515, 521, & 2700.
Sqm 1 32.2 11.0 354
6.12 Providing and fixing drainage spouts complete as per
drawing, Technical Specification clause 2705. Nos 12 12
6.13 Providing and fixing bearings complete as per drawing
and Technical Specification 2000,2200 and 2300.

a) Elastomeric bearings CC 8 50 32 7.8 99840


b) Kraft Paper / Tar Paper bearings sqm 2 11 0.3 7
6.14 Providing and fixing expansion joints complete as per
drawing and Technical Specification No. 2600 and
confirming to MoRT&H modified interim
specifications

a) Filler joint / mastic Pad rm 2 11 22


b) Strip seal type of expansion joint complete as per
drawing and Technical specification for+/-20 mm
rm 2 12 24
6.15 Providing PCC M15 grade concrete for levelling course
under Approach Slabs Cum 2 11.0 3.5 0.15 12
6.16 Providing Reinforced Cement Concrete M 30 grade in
approach slabs including reinforcement complete as
per drawings and Technical Specifications 1500,1600
and 1700 & 2704

RCC M30 Cum 2 11.0 3.5 0.3 23


6.17 Filter media (150 mm thick) underneath pitching in
slopes and flat surfaces complete as per drawing &
Technical Specification Clause 2504
In quadrants (OF) Cum 4 Vol= 5.5 22
In quadrants (PF) Cum 0 Vol= 248.4 0
In front of abtments Cum 0 12 58.6 0.15 0
Total = 22
6.18 Stone pitching on sloped sufaces (300 mm thick) for
earth protection complete (for Quadrants) as per
drawings and Technical Specification 2504
In quadrants (OF) Cum 4 Vol= 11.8 47
In quadrants (PF) Cum 0 Vol= 501.8 0
In front of abtments Cum 0 12 59.0 0.30 0
Total = 47
6.19 Providing weep holes in abutments, wing walls and
return walls complete as per drawing and Technical
Specification 2706.
Nos 78 78
6.20 Providing and constructing RCC crash barrier M 40
grade including cost of centering as per approved
Drawings and Technical Specifications Clause 809 and
as per IRC-6
Rm 2 42.20 84
6.21 Painting of CD No. and Span arrangement as per
Technical specifications Nos 2 2
6.22 Providing and laying Dry Boulder apron complete as per
Drawings and Technical Specifications Clause 2503
Cum 0 64.50 0.000 0.0 0
6.23 Providing and laying PCC filling for bed protection as
per Drawings and Technical Specifications
PCC M15 grade Cum
PCC M15 grade Cum
6.24 Confirmatory boreholes Rm 2 25.00 50
6.25 Liner plate around piles (6mm thk)
Mt 0 Weight/rm 0.178 5.000 0
Project: Prebid Engineering for 4-Laning of Nh-7 Rewa (242+600) to Maihar (311+000) in the state of Madhya Pradesh
Subject : Abstract of quantities for Minor bridges

Item Description Unit 53+900 Total Qty


No.
6.01 Earthwork in excavation of foundation for structures
complete as per drawing and Technical Specification
Clause 304 including all Leads and Lifts

a)Ordinary and soft Soils Cu.m. 1582 1582


6.02 Providing Back filling for quadrants, with selected
imported granular material of approved quality including
all leads and lifts complete as per Technical Specification Cum 1158 1158
Clause 305.

6.03 Filter media behind abutments,wing walls and return


walls complete with all leads and lifts as per drawing Cum 239 239
and Technical Specification Clause 2200

6.04 Providing Plain Cement concrete for levelling course


etc., under foundations including centering complete as
per drawing and Technical Specification clauses
1500,1700,& 2100.

PCC M15 grade Cum 36 36


6.05 Providing and laying Reinforced cement concrete for
foundations / Raft of Box complete as per drawing and
Technical Specifications Section 1500,1700, 2100 &
2200

PCC M20 Cum


RCCM35 Cum 293 293
6.06 Structural Cement concrete for Reinforced cement
concrete for Sub structure / Side walls of Box including
centering complete as per drawing Technical
specification clauses 1500,1700,2200

PCC M30 Cum


RCC M35 Cum 421 421
6.07 Structural Cement concrete for Reinforced cement
concrete / PSC Super structure / Top slab of Box /
Precast /Cast-in-situ Beams including centering
complete as per drawing Technical specification clauses
809,1500,1700

RCC M35 Cum


PSC M45 Cum 163 163
6.08 HT Steel for PSC concrete complete as per drawing and
Technical Specification 1800,1009 Mt 6 6

6.09 Providing, cutting, bending and fixing in position of


TMT bar reinforcement(Fe500 Gr.) in reinforced
concrete structure complete as per drawing and Mt 88 88
Technical Specification Section 1600
Project: Prebid Engineering for 4-Laning of Nh-7 Rewa (242+600) to Maihar (311+000) in the state of Madhya Pradesh
Subject : Abstract of quantities for Minor bridges

Item Description Unit 53+900 Total Qty


No.
6.10 Providing bored cast-in-situ M35 grade RCC piles
excluding reinforcement complete as per drawings and
technical specifications and removal of excavated earth
with all lifts and lead up to 1000 m(pile dia 1200mm)

RCC M35 1.2m dia piles Rm 0


6.11 Bituminous Concrete Wearing Course of total 65 mm
thick comprising two layers of 25 mm thick Bituminous
Concrete laid over a coat of 15 mm thick Mastic
Asphalt as per Technical Specification Sections 509, Sqm 354 354
515, 521, & 2700.

6.12 Providing and fixing drainage spouts complete as per


drawing, Technical Specification clause 2705. Nos 12 12

6.13 Providing and fixing bearings complete as per drawing


and Technical Specification 2000,2200 and 2300.

a) Elastomeric bearings CC 99840 99840


b) Kraft Paper / Tar Paper bearings sqm 7 7
6.14 Providing and fixing expansion joints complete as per
drawing and Technical Specification No. 2600 and
confirming to MoRT&H modified interim specifications

a) Filler joint / mastic Pad rm 22 22


b) Strip seal type of expansion joint complete as per
drawing and Technical specification for+/-20 mm rm 24 24

6.15 Providing PCC M15 grade concrete for levelling course


under Approach Slabs Cum 12 12

6.16 Providing Reinforced Cement Concrete M 30 grade in


approach slabs including reinforcement complete as per
drawings and Technical Specifications 1500,1600 and
1700 & 2704

RCC M30 Cum 23 23


6.17 Filter media (150 mm thick) underneath pitching in
slopes and flat surfaces complete as per drawing & Cum 22 22
Technical Specification Clause 2504

6.18 Stone pitching on sloped sufaces (300 mm thick) for


earth protection complete (for Quadrants) as per Cum 47 47
drawings and Technical Specification 2504

6.19 Providing weep holes in abutments, wing walls and


return walls complete as per drawing and Technical Nos 78 78
Specification 2706.

6.20 Providing and constructing RCC crash barrier M 40


grade including cost of centering as per approved
Drawings and Technical Specifications Clause 809 and as Rm 84 84
per IRC-6
Project: Prebid Engineering for 4-Laning of Nh-7 Rewa (242+600) to Maihar (311+000) in the state of Madhya Pradesh
Subject : Abstract of quantities for Minor bridges

Item Description Unit 53+900 Total Qty


No.
6.21 Providing and constructing RCC Hand rail including cost
of reiforcement as per approved Drawings and Technical Rm 0
Specifications

6.21 Painting of CD No. and Span arrangement as per


Technical specifications Nos 2 2

6.22 Providing and laying Dry Boulder apron complete as


per Drawings and Technical Specifications Clause 2503 Cum 0

6.23 Providing and laying PCC filling for bed protection as


per Drawings and Technical Specifications

PCC M15 grade Cum


150mm Thk. flat stone apron embedded in 300mm thick
concrete (PCC M15 grade) Cum
6.24 Confirmatory bore holes Rm 50 50
6.25 Liner plate around piles (6mm thk) Mt 0
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana
Subject : Bill of ROB

Bill 7-ROB
Item Description Unit Total Qty Rate Amount
No.
7.01 Earthwork in excavation of foundation for structures
complete as per drawing and Technical Specification Clause
304 including all Leads and Lifts

a)Ordinary and soft Soils Cu.m. 6565 108 709051


7.02 Providing Back filling for quadrants, with selected
imported granular material of approved quality including all
leads and lifts complete as per Technical Specification
Clause 305.
Cum 603 550 331794
7.03 Filter media behind abutments,wing walls and return
walls complete with all leads and lifts as per drawing and
Technical Specification Clause 2200
Cum 172 1386 238764
7.04 Providing Plain Cement concrete for levelling course etc.,
under foundations including centering complete as per
drawing and Technical Specification clauses 1500,1700,&
2100.
0
PCC M15 grade Cum 266 4946 1315567
7.05 Providing and laying Reinforced cement concrete for
foundations / Raft of Box complete as per drawing and
Technical Specifications Section 1500,1700, 2100 & 2200

0
PCC M20 Cum 0 5676 0
RCCM35 Cum 1661 6460 10728445
7.06 Structural Cement concrete for Reinforced cement
concrete for Sub structure / Side walls of Box including
centering complete as per drawing Technical specification
clauses 1500,1700,2200
0
RCC M35 Cum 1789 7187 12858815
7.07 Structural Cement concrete for Reinforced cement
concrete / PSC Super structure / Top slab of Box /
Precast /Cast-in-situ Beams including centering complete
as per drawing Technical specification clauses
809,1500,1700
0
RCC M35 Cum 600 12500 7498400
PSC M45 Cum 2929 12500 36617309
7.08 HT Steel for PSC concrete complete as per drawing and
Technical Specification 1800,1009
Mt 105 125000 13182231
7.09 Providing, cutting, bending and fixing in position of TMT
bar reinforcement(Fe500 Gr.) in reinforced concrete
structure complete as per drawing and Technical
Specification Section 1600
Mt 885 63340 56057771
7.10 Providing bored cast-in-situ M35 grade RCC piles excluding
reinforcement complete as per drawings and technical
specifications and removal of excavated earth with all lifts
and lead up to 1000 m(pile dia 1200mm)

0
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana
Subject : Bill of ROB

Bill 7-ROB
Item Description Unit Total Qty Rate Amount
No.
7.11 Bituminous Concrete Wearing Course of total 65 mm thick
comprising two layers of 25 mm thick Bituminous
Concrete laid over a coat of 15 mm thick Mastic Asphalt
as per Technical Specification Sections 509, 515, 521, &
2700.
Sqm 4871 517 2519734
7.12 Providing and fixing drainage spouts complete as per
drawing, Technical Specification clause 2705.
Nos 204 879 179316
7.13 Providing and fixing bearings complete as per drawing and
Technical Specification 2000,2200 and 2300.
0
a) Elastomeric bearings CC 2126250 1.2 2572763
b) Pot bearings nos 10 75000 750000
b) Kraft Paper / Tar Paper bearings sqm 8 89 669
7.14 Providing and fixing expansion joints complete as per
drawing and Technical Specification No. 2600 and
confirming to MoRT&H modified interim specifications

0
a) Filler joint / mastic Pad rm 25 141 3530
b) Strip seal type of expansion joint complete as per
drawing and Technical specification for+/-20 mm
rm 288 17100 4916250
c) Strip seal type of expansion joint complete as per
drawing and Technical specification for+/-50 mm
rm 0
7.15 Providing PCC M15 grade concrete for levelling course
under Approach Slabs
Cum 13 4756 62423
7.16 Providing Reinforced Cement Concrete M 30 grade in
approach slabs including reinforcement complete as per
drawings and Technical Specifications 1500,1600 and 1700
& 2704
0
RCC M30 Cum 26 9407 246934
7.17 Filter media (150 mm thick) underneath pitching in slopes
and flat surfaces complete as per drawing & Technical
Specification Clause 2504
Cum 0 1386 0
7.18 Stone pitching on sloped sufaces (300 mm thick) for earth
protection complete (for Quadrants) as per drawings and
Technical Specification 2504
Cum 0 1060 0
7.19 Providing weep holes in abutments, wing walls and return
walls complete as per drawing and Technical Specification
2706.
Nos 76 267 20292
7.20 Providing and constructing RCC crash barrier M 40 grade
including cost of centering as per approved Drawings and
Technical Specifications Clause 809 and as per IRC-6

Rm 1043 3902 4071425


7.21 Providing and constructing RCC Hand rail including cost of
reiforcement as per approved Drawings and Technical
Specifications
Rm 522 1800 939078
7.22 Painting of CD No. and Span arrangement as per Technical
specifications
Nos 2 150 300
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana
Subject : Bill of ROB

Bill 7-ROB
Item Description Unit Total Qty Rate Amount
No.
7.23 Providing and laying Dry Boulder apron complete as per
Drawings and Technical Specifications Clause 2503
Cum 0 1060 0
7.24 Providing and laying PCC filling for bed protection as per
Drawings and Technical Specifications
Cum 0 4453 0
7.25 Confirmatory bore holes Rm 460 3000 1380000
7.26 Liner plate around piles (6mm thk) Mt 0
7.27 Providing and Construction Steel composite superstructure
as per drawings & Technical Specifications Mt
155 75000 11592000
7.28 Filter media behind MSE walls complete with all leads and lifts
as per drawing and Technical Specification Clause 2200 Cum
2400 1386 3326400
7.29 Construction of embankment with Reinforced Earth Cum 24638 550 13550625
7.30 Providing and constructing RCC crash barrier with friction
slab M 40 grade including cost of centering as per approved
Drawings and Technical Specifications Clause 809 and as per IRC-6 Rm
500 11000 5500000
7.31 Provision of MSE wall Sqm 2500 3000 7500000
Total cost = 198669884
= 19.87
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of
NH-167 in the state of Telangana

Subject : Abstract of quantities for ROB

Item
Description Unit ROB Total Qty
No.
7.01 Earthwork in excavation of foundation for
structures complete as per drawing and
Technical Specification Clause 304
including all Leads and Lifts

a)Ordinary and soft Soils Cu.m. 6565 6565


7.02 Providing Back filling for quadrants, with
selected imported granular material of
approved quality including all leads and
lifts complete as per Technical Specification Cum 603 603
Clause 305.

7.03 Filter media behind abutments,wing walls


and return walls complete with all leads
and lifts as per drawing and Technical Cum 172 172
Specification Clause 2200
7.04 Providing Plain Cement concrete for
levelling course etc., under foundations
including centering complete as per
drawing and Technical Specification 0
clauses 1500,1700,& 2100.

PCC M15 grade Cum 266 266


7.05 Providing and laying Reinforced cement
concrete for foundations / Raft of Box
complete as per drawing and Technical
Specifications Section 1500,1700, 2100 & 0
2200

PCC M20 Cum 0


RCCM35 Cum 1661 1661
7.06 Structural Cement concrete for Reinforced
cement concrete for Sub structure / Side
walls of Box including centering complete
as per drawing Technical specification 0
clauses 1500,1700,2200

PCC M30 Cum 0


RCC M35 Cum 1789 1789
7.07 Structural Cement concrete for Reinforced
cement concrete / PSC Super structure /
Top slab of Box / Precast /Cast-in-situ
Beams including centering complete as per
drawing Technical specification clauses 0
809,1500,1700

RCC M35 Cum 600 600


PSC M45 Cum 2929 2929
7.08 HT Steel for PSC concrete complete as per
drawing and Technical Specification Mt 105 105
1800,1009
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of
NH-167 in the state of Telangana

Subject : Abstract of quantities for ROB

Item
Description Unit ROB Total Qty
No.
7.09 Providing, cutting, bending and fixing in
position of TMT bar reinforcement(Fe500
Gr.) in reinforced concrete structure
complete as per drawing and Technical Mt 885 885
Specification Section 1600

7.10 Providing bored cast-in-situ M35 grade


RCC piles excluding reinforcement
complete as per drawings and technical
specifications and removal of excavated 0
earth with all lifts and lead up to 1000
m(pile dia 1200mm)

RCC M35 1.2m dia piles Rm 0 0


RCC M35 1.2m dia piles in rock Rm 0
7.11 Bituminous Concrete Wearing Course of
total 65 mm thick comprising two layers
of 25 mm thick Bituminous Concrete laid
over a coat of 15 mm thick Mastic Asphalt
as per Technical Specification Sections Sqm 4871 4871
509, 515, 521, & 2700.

7.12 Providing and fixing drainage spouts


complete as per drawing, Technical Nos 204 204
Specification clause 2705.

7.13 Providing and fixing bearings complete as


per drawing and Technical Specification 0
2000,2200 and 2300.

a) Elastomeric bearings CC 2126250 2126250


b) Pot bearings nos 10 10
b) Kraft Paper / Tar Paper bearings sqm 8 8
7.14 Providing and fixing expansion joints
complete as per drawing and Technical
Specification No. 2600 and confirming to
MoRT&H modified interim specifications 0

a) Filler joint / mastic Pad rm 25 25


b) Strip seal type of expansion joint
complete as per drawing and Technical rm 288 288
specification for+/-20 mm

7.15 Providing PCC M15 grade concrete for


levelling course under Approach Slabs Cum 13 13
7.16 Providing Reinforced Cement Concrete M
30 grade in approach slabs including
reinforcement complete as per drawings
and Technical Specifications 1500,1600 and 0
1700 & 2704

RCC M30 Cum 26 26


Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of
NH-167 in the state of Telangana

Subject : Abstract of quantities for ROB

Item
Description Unit ROB Total Qty
No.
7.17 Filter media (150 mm thick) underneath
pitching in slopes and flat surfaces
complete as per drawing & Technical Cum 0 0
Specification Clause 2504

7.18 Stone pitching on sloped sufaces (300 mm


thick) for earth protection complete (for
Quadrants) as per drawings and Technical
Specification 2504 Cum 0 0

7.19 Providing weep holes in abutments, wing


walls and return walls complete as per
drawing and Technical Specification 2706. Nos 76 76

7.20 Providing and constructing RCC crash


barrier M 40 grade including cost of
centering as per approved Drawings and
Technical Specifications Clause 809 and as Rm 1043 1043
per IRC-6

7.21 Providing and constructing RCC Hand rail


including cost of reiforcement as per
approved Drawings and Technical Rm 522 522
Specifications

7.22 Painting of CD No. and Span arrangement


as per Technical specifications Nos 2 2

7.23 Providing and laying Dry Boulder apron


complete as per Drawings and Technical Cum 0 0
Specifications Clause 2503

7.24 Providing and laying PCC filling for bed


protection as per Drawings and Technical Cum 0
Specifications

7.25 Confirmatory bore holes Rm 460 460


7.26 Liner plate around piles (6mm thk) Mt 0 0
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project :4-Laning of NH-167 from Mahabubnagar-Jadcherla road, from Km 266.348 to Km 283.000 of NH-167 in the state
of Telangana

Subject : Estimation of ROB


DATA
No of spans 22
RCC Spans 16.00 m 4 no. skew 0
PSc Span 23.83 m 17 no.
Steel Super str 36.00 m 1 no.
No of carriageways 1
Carriage way width 9.50 m
Overall width 12.50 m
Median (clear) 0.00 m
Abutment (Open foundation)
No of abutments 2
FRL-ACL 2.215 m
ACL-GL 3.000 m FRL 100
GL-FNL 5.000 m ACL 97.785
Toe width 3.00 m GL 94.785
Heel width 4.00 m FNL 89.785
Wall top width 1.35 m FRL-FNL 10.215
Wall bottom width 1.35 m
Total width of raft 8.350 m
Uniform thk 1.00 m
Varying thk 0.75 m
Abutment sub-structure
No of abutments 2
Length of abutment 12.500 m
Width of abutment 1.35 m
Wall height 5.950 m
Abutment (Pile foundation)
No of abutments 0 FRL 0
FRL-ACL 0.000 m ACL 0.000
ACL-TOPC 0.000 m GL 0.000
Length of pile cap 0.00 m TOPC 0.000
Width of Pilecap 0.00 m BOPC 0.000
Depth of pile cap 0.00 m FNL 0
No of piles 0.00 m
Length of pile 0.000 m
Abutment sub-structure
No of abutments 0
Length of abutment 0.00 m
Width of abutment 0.00 m
Wall height -0.300 m
Abutment cap
Length of abutment cap 1.450
Width of abutment cap (uniform) 12.500
Width of abutment cap (Varying)) 0.000
Uniform thk 0.300
Varying thk 0.000
Pier (Open foundation)
No of piers 21
FRL-PCTL 2.215 m FRL 100
PCTL-GL 5.000 m PCTL 97.785
GL-FNL 5.000 m GL 92.785
Length of footing 6.50 m FNL 87.785
Width of footing 6.50 m FRL-FNL 12.215
Pedestal width 2.75 m
Pedestal length 2.75 m
Pedestal depth 0.00 m
Uniform thk 1.00 m
Varying thk 1.00 m
Pier sub-structure
No of piers 21
Length of pier 2.5 m (excluding cutwaters)
Width of pier 2.5 m
Project : Prebid Engineering for NH-49 Project from Madurai to Ramanathapuram
Subject : Bill of Minor bridges
Bill 6A-Minor Bridges

Item Description Unit Abstract Rate Amount


No.
6.01 Earthwork in excavation of foundation for structures
complete as per drawing and Technical Specification Clause
304 including all Leads and Lifts

a)Ordinary and soft Soils Cu.m. #REF! 96 #REF!


6.02 Providing Back filling for quadrants, with selected imported
granular material of approved quality including all leads and
lifts complete as per Technical Specification Clause 305.

Cum #REF! 380 #REF!


6.03 Filter media behind abutments,wing walls and return walls
complete with all leads and lifts as per drawing and Technical
Specification Clause 2200
Cum #REF! 801 #REF!
6.04 Providing Plain Cement concrete for levelling course etc.,
under foundations including centering complete as per
drawing and Technical Specification clauses 1500,1700,&
2100.
#REF!
PCC M15 grade Cum #REF! 3205 #REF!
6.05 Providing and laying Reinforced cement concrete for
foundations / Raft of Box complete as per drawing and
Technical Specifications Section 1500,1700, 2100 & 2200

#REF!
PCC M20 Cum #REF! 3662 #REF!
RCCM35 Cum #REF! 5305 #REF!
6.06 Structural Cement concrete for Reinforced cement concrete
for Sub structure / Side walls of Box including centering
complete as per drawing Technical specification clauses
1500,1700,2200
#REF!
RCC M35 Cum #REF! 5809 #REF!
6.07 Structural Cement concrete for Reinforced cement concrete /
PSC Super structure / Top slab of Box / Precast /Cast-in-situ
Beams including centering complete as per drawing
Technical specification clauses 809,1500,1700

#REF!
RCC M35 Cum #REF! 6339 #REF!
6.08 Providing, cutting, bending and fixing in position of TMT bar
reinforcement(Fe500 Gr.) in reinforced concrete structure
complete as per drawing and Technical Specification Section
1600
Mt #REF! 50000 #REF!
6.09 Providing Reinforced Cement Concrete M 30 grade of 75mm
thick as wearing coat including reinforcement complete as
per drawings and Technical Specifications 1500,1600 and
1700 & 2704
Sqm #REF! 700 #REF!
6.10 Providing and fixing drainage spouts complete as per
drawing, Technical Specification clause 2705.
Nos #REF! 3415 #REF!
Project : Prebid Engineering for NH-49 Project from Madurai to Ramanathapuram
Subject : Bill of Minor bridges
Bill 6A-Minor Bridges

Item Description Unit Abstract Rate Amount


No.
6.11 Providing and fixing bearings complete as per drawing and
Technical Specification 2000,2200 and 2300.
#REF!
a) Elastomeric bearings CC #REF! 1.8 #REF!
b) Kraft Paper / Tar Paper bearings sqm #REF! 100 #REF!
6.12 Providing and fixing expansion joints complete as per
drawing and Technical Specification No. 2600 and confirming
to MoRT&H modified interim specifications

#REF!
a) Filler joint / mastic Pad rm #REF! 166 #REF!
b) Strip seal type of expansion joint complete as per drawing
and Technical specification for+/-20 mm
rm #REF! 39659 #REF!
6.13 Providing PCC M15 grade concrete for levelling course under
Approach Slabs
Cum #REF! 3082 #REF!
6.14 Providing Reinforced Cement Concrete M 30 grade in
approach slabs including reinforcement complete as per
drawings and Technical Specifications 1500,1600 and 1700 &
2704
#REF!
RCC M30 Cum #REF! 8688 #REF!
6.15 Filter media (150 mm thick) underneath pitching in slopes
and flat surfaces complete as per drawing & Technical
Specification Clause 2504
Cum #REF! 940 #REF!
6.16 Stone pitching on sloped sufaces (300 mm thick) for earth
protection complete (for Quadrants) as per drawings and
Technical Specification 2504
Cum #REF! 705 #REF!
6.17 Providing weep holes in abutments, wing walls and return
walls complete as per drawing and Technical Specification
2706.
Nos #REF! 417 #REF!
6.18 Providing and constructing RCC crash barrier M 40 grade
including cost of centering as per approved Drawings and
Technical Specifications Clause 809 and as per IRC-6

Rm #REF! 3492 #REF!


6.19 Providing and constructing RCC Hand rail including cost of
reiforcement as per approved Drawings and Technical
Specifications
Rm #REF! 1806 #REF!
6.20 Painting of CD No. and Span arrangement as per Technical
specifications
Nos #REF! 129 #REF!
6.21 Providing and laying Dry Boulder apron complete as per
Drawings and Technical Specifications Clause 2503
Cum #REF! 705 #REF!
6.22 Providing and laying PCC filling for bed protection as per
Drawings and Technical Specifications
#REF!
PCC M15 grade Cum #REF! 3191 #REF!
150mm Thk. flat stone apron embedded in 300mm thick
concrete (PCC M15 grade)
Cum #REF! 3896 #REF!
6.23 Confirmatory bores Rm #REF! 5332 #REF!
Project : Prebid Engineering for NH-49 Project from Madurai to Ramanathapuram
Subject : Bill of Minor bridges
Bill 6A-Minor Bridges

Item Description Unit Abstract Rate Amount


No.
TOTAL AMOUNT IN Rs. #REF!
TOTAL AMOUNT IN CRORES #REF!

You might also like