You are on page 1of 1

Item Type Specifications Justification Vendor/Source Unit cost No.

of The
items total
cost of
items
1 hardware An aluminum Used to blacksmith 30 pounds 1 30
plate (50 condense pounds
×50 ¿ water on its
surface
2 hardware White To keep the Building (28pounds/kg) 0.5 kg 14
concrete plate cold supplies stores pounds
and reflect
the sun’s
rays
3 hardware Aluminum To put Housewares 35 pounds 1 35
container water in it shop pounds
4 Hardware heater To boil Housewares 150 pounds 1 150
water shop pounds
5 hardware Electric To work as Electric 25 pounds 1 25
motor a generator supplies shop pounds
Total
cost:
254
pounds

You might also like