You are on page 1of 20

Main Plant Scheme

Animesh Mitra
Asst. Manager(Mechanical Erection)
Contents
1 Main Power Plant

2 Coal Handling Plant

3 Water Treatment

4 Ash Handling Plant

5 Summary

2
Have a Feel, the vastness of MSTPP
SH Steam
Turbine
1940-2040 Generator
T/Hr 660MW

Boiler
Gross plant efficiency: 43.62%
5246-6744 T/day
Coal

Condenser
Cooling Water
73200 T/Hr.
Coal to Electricity ….. Basics
Pollutants

Super Heated Turbine Alternating current


Coal Steam Torque in Stator

Heat Loss Mech. Energy Elet. Energy


Heat In
ASH Loss Loss
Loss Condenser

Chemical Thermal Kinetic Electrical


Energy Energy Energy Energy Energy Change

Boiler Turbine Cond’r Pump


Basic Cycle

3
CEP BFP Bunker

Mill
NOTE
Contents
1 Main Power Plant

2 Coal Handling Plant

3 Water System

4 Ash Handling Plant

5 Summary

7
COAL HANDLING PLANT
• To unload Coal from barges at Jetty
• To eliminate foreign particles like metals
• Stacking of coal
• To feed coal to bunker of boiler.
• Boiler is designed based on coal GCV(Gross Calorific Value)
• The higher the GCV the lower will be pollutants and height of the
boiler will be less for a certain output power.
COAL HANDLING PLANT

Parameters Design Coal Worst Coal Best Coal


GCV 5700 kcal/kg 5200 kcal/kg 6300 kcal/kg

Coal required 247 MT 281 MT 219 MT


per hr
Coal Required 5928 MT 6744 MT 5256 MT
Per day
Coal Required 21,63,720 MT 24,61,560 MT 19,18,440 MT
per year
CONT .. General Layout of CHP CONT ..

COAL STOCK YARD-4

COAL STOCK YARD-3

COAL STOCK YARD-2

COAL STOCK YARD-1

JETTY PRIMARY
Ship Unloader Ship Unloader SCREEN
Ship Unloader HOUSE
1 2 3

t TP-1
General Layout of CHP (Cont ..)

COAL BUNKERS U#1 COAL BUNKERS U#2

Crusher House

2
1

COAL BLENDING SILO


Contents
1 Main Power Plant

2 Coal Handling Plant

3 Water System

4 Ash Handling Plant

5 Summary

12
Water System
• Water Source: Passur River
• Water is required for Water-Steam circulation in main power plant, cooling of
condenser and equipment, service water, potable water, fire-water etc.
• Water used for cooling the condenser is called Circulating/Cooling water(CW).
• Water used for cooling various equipment of TG and SG is called Equipment
Cooling Water(ECW) (i.e, Lub oil of TG, Compressor, Hydrogen, Seal Oil etc.)
• To cool ECW, we use Auxiliary Cooling Water(ACW).
• To cool CW and ACW we use IDCT.
• Water of Passur River is SALINE. Water has dissolved salt, silica, mud, cations,
anions etc.
• For Water-steam cycle and ECW we need DM water, for CW/ACW we need
clarified/ pretreated water. For service/potable, fire-water etc. we need
desalinated water.
Forebay
Condenser

Desilting Raw Water Pretreatment Pretreated CW


chamber Pump plant Storage Tank pump

River
ACW system

UF

Main Clarifier
sludge pit Filter Water
Tank
IDCT

RO 1st Pass
Service
Water Tank
Remin
System Desalinated
Plant Makeup 1s Pass RO Water Tank
tank
Potable
Water Tank
ECW
2nd Pass RO
RO 2nd pass
tank

Chemical
N-pit
DM Tank MB Vessel
CPU
Contents
1 Main Power Plant

2 Coal Handling Plant

3 Water System

4 Ash Handling Plant

5 Summary

15
Ash Distribution
What is Coal Ash ?

ESP
Furnace
(1300 - 1500°C)
• It is produced from
burning of coal in the
boiler
Electrostatic
Economizer Precipitator • Primarily there are two
type of ash
Bottom Ash, a coarse,
Duct
hopper
angular ash particle that is
Pulverized too large to be carried

Stage A: 80 %
up into the smoke stacks

Stage C: 3 %
Stage B: 17 %
Coal
so it forms in the bottom
of the coal furnace.
Bottom Ash Eco Ash Duct Hopper Fly ash Fly Ash, a very fine,
Ash powdery material
Ash 20 % 80 % composed mostly of silica
Particle made from the burning of
Fineness finely ground coal in a
boiler.
Bottom Ash Flow Diagram
Fly Ash Flow Diagram

• ) APH Duct ESP


• ) Hoppers Hoppers Hoppers Fly ash
(6nos) (6nos) (56nos) conveying
lines
Intermediate
Ash Ash Ash Silo
vessel vessel vessel

Air dryer-1
1st stage
Compressed
compressors
Air line
Air receiver-2 (1W+1S)
Air receiver-1
Air dryer-2
Summary

You might also like