Animesh Mitra
Asst. Manager(Mechanical Erection)
Contents
1 Main Power Plant
3 Water Treatment
5 Summary
2
Have a Feel, the vastness of MSTPP
SH Steam
Turbine
1940-2040 Generator
T/Hr 660MW
Boiler
Gross plant efficiency: 43.62%
5246-6744 T/day
Coal
Condenser
Cooling Water
73200 T/Hr.
Coal to Electricity ….. Basics
Pollutants
3
CEP BFP Bunker
Mill
NOTE
Contents
1 Main Power Plant
3 Water System
5 Summary
7
COAL HANDLING PLANT
• To unload Coal from barges at Jetty
• To eliminate foreign particles like metals
• Stacking of coal
• To feed coal to bunker of boiler.
• Boiler is designed based on coal GCV(Gross Calorific Value)
• The higher the GCV the lower will be pollutants and height of the
boiler will be less for a certain output power.
COAL HANDLING PLANT
JETTY PRIMARY
Ship Unloader Ship Unloader SCREEN
Ship Unloader HOUSE
1 2 3
t TP-1
General Layout of CHP (Cont ..)
Crusher House
2
1
3 Water System
5 Summary
12
Water System
• Water Source: Passur River
• Water is required for Water-Steam circulation in main power plant, cooling of
condenser and equipment, service water, potable water, fire-water etc.
• Water used for cooling the condenser is called Circulating/Cooling water(CW).
• Water used for cooling various equipment of TG and SG is called Equipment
Cooling Water(ECW) (i.e, Lub oil of TG, Compressor, Hydrogen, Seal Oil etc.)
• To cool ECW, we use Auxiliary Cooling Water(ACW).
• To cool CW and ACW we use IDCT.
• Water of Passur River is SALINE. Water has dissolved salt, silica, mud, cations,
anions etc.
• For Water-steam cycle and ECW we need DM water, for CW/ACW we need
clarified/ pretreated water. For service/potable, fire-water etc. we need
desalinated water.
Forebay
Condenser
River
ACW system
UF
Main Clarifier
sludge pit Filter Water
Tank
IDCT
RO 1st Pass
Service
Water Tank
Remin
System Desalinated
Plant Makeup 1s Pass RO Water Tank
tank
Potable
Water Tank
ECW
2nd Pass RO
RO 2nd pass
tank
Chemical
N-pit
DM Tank MB Vessel
CPU
Contents
1 Main Power Plant
3 Water System
5 Summary
15
Ash Distribution
What is Coal Ash ?
ESP
Furnace
(1300 - 1500°C)
• It is produced from
burning of coal in the
boiler
Electrostatic
Economizer Precipitator • Primarily there are two
type of ash
Bottom Ash, a coarse,
Duct
hopper
angular ash particle that is
Pulverized too large to be carried
Stage A: 80 %
up into the smoke stacks
Stage C: 3 %
Stage B: 17 %
Coal
so it forms in the bottom
of the coal furnace.
Bottom Ash Eco Ash Duct Hopper Fly ash Fly Ash, a very fine,
Ash powdery material
Ash 20 % 80 % composed mostly of silica
Particle made from the burning of
Fineness finely ground coal in a
boiler.
Bottom Ash Flow Diagram
Fly Ash Flow Diagram
Air dryer-1
1st stage
Compressed
compressors
Air line
Air receiver-2 (1W+1S)
Air receiver-1
Air dryer-2
Summary