POWER DISTRIBUTION
SMELTER 765 MW
AUX.CONSMP CONSUMPTION
GRID
AUXILIARY 80.0 MW
POWER
T & D LOSS CONSUMPTION
EXPORT TO 40.0 MW
GRIDCO
SMELTER
T& D LOSS 5.0 MW
TOTAL 890 MW
SP. CON. OF AUX. POWER
9.6
9.5
9.4
9.3 NORM
9.2 ACTUAL
9.1
9
2 00 3-04 2 00 4-05 20 05-06 2 006 -07 2 007-08
NORM 9 .5 9.5 9 .5 9 .5 9 .5
ACTUAL 9 .18 1 9 .49 9 9 .4 9.32 9 9.44 5
Distribution system
Objective
Philosophy
Network
Dimensioning more
Operation
Energy management
Automation
Objective
Uninterrupted power to all area at
required level
Stability
To facilitate maintenance activities
To isolate during normal & abnormal
condition
To meet future demands
Philosophy
Power transmission
Voltage level
Selection of equipment
Protection of equipment
Unit power
Station power
Emergency power
RAW WATER HP D/A LP HEATER GRIDCO
HEATER BFP
WATER TREATMENT
HPT IPT LPT GENERATOR
SMELTER
COOLING 10.5 KV 220 KV
TOWER
CEP
CW PUMP 6.6 KV
CONDENSER UAT
REHEATED STEAM
GT 6.6 KV
SAT
CONDENSATE CHIMNEY
STORAGE TANK
BOILER
COAL BUNKERS
ECONOMISER
ELECTRO STATIC
PRECIPITATOR
FUEL OIL TANK
MILL ID FAN
FD FANS
PA FAN
COAL CRUSHER
ASH SLURRY PUMPS
GRID CONNECTIVITY AT
CPP
KANIHA
RENGALI
TTPS
Bus
NALCO-MERAMUNDALI-1&2 Coupler
SMELTER
CPP STATION FEEDERS
GENERATORS TRANSFORMER
TECHNICAL DATA OF GEN.
TRANSFORMER
UNIT # 7 TO 10
MAKE :BHEL
CAPACITY :150MVA
VOLTAGE PRI / SEC : 235KV / 10.5 KV
CURRENT PRI / SEC :368.53 A / 8248.1A
VECTOR : YN d 1
% OF IMPEDANCE : 12.5 %
INSULATION LEVEL :A
COOLING : OFAF
INSULATION LEVEL HV SIDE : 950KV PICK, 395 KV RMS
INSULATION LEVEL HV SIDE : 75KV PICK, 28KV RMS
OFF LOAD TAP CHANGER : + 5% TO - 5% IN 5 STEPS
TECHNICAL DATA OF UNIT AUX.
TRANSFORMER
UNIT # 1 TO 6
MAKE :BHEL
CAPACITY :16MVA
VOLTAGE PRIMARY :10.5KV
VOLTAGE SECONDARY : 6.9KV
CURRENT PRIMARY :879 AMPS
CURRENT SECONDARY : 1338 AMPS
VECTOR : D y n 11
% OF IMPEDANCE : 7.0%
INSULATION LEVEL :A
COOLING : ONAN / ONAF
OLTC : +/- 10% IN 17 STEPS
NGR : 7.4 OHM / 600AMPS
STATION TRANSFORMER
SAT-1, SAT-2, SAT-3
MAKE : TELK
RATING : 35 MVA
PRIMARY VOLTAGE : 220KV
SECONDARY VOLTAGE : 6.9 KV
PHASE : 3PHASE
FREQUENCY : 50Hz
VECTOR : YN yn0
IMPEDANCE : 12%
OLTC : +/- 10% IN 17 STEPS
NGR3.3 OHM , 7.2 KV ,1400A / 10 Sec
Distribution Network(Area wise)
220kv switchyard
Power house
Cooling water pump house
Coal handling Plant
DM Plant
Ash handling Plant
Intake Pump House
Ash Pond
FOPH
Ventilation System
Area Wise Distribution & Power Flow
IPH CHP ASH
POND
ASPH PH FOPH
Auxiliary Load
Power House
– Compressed air
– Fuel oil
– Fuel (Coal)
– Air & Flue gas
– Condensate & Feed water
– Lub oil & control oil
– Ash collection & evacuation
– Ventilation
Auxiliary Load
CWPH
– Cooling water
– Auxiliary cooling water
ASPH
– Ash disposal
– Ash removal from ESP
CHP
– Crushed coal
– Conveying of coal
– Stacking of coal
WTP
– DM water
– Clarifloculated water
– Smelter supply
– Service water
220kv Bus
SF6 Bkr
UAT
6.6 kv Ring Bus GT
SAT
VCB
Generator
Reserve Board 6.6 Kv
110 V AC
ACB
UPS
230V AC 24v DCDB 220v DCDB
CHGR CHGR
CHGR
DG
Switchyard Main Bus-1
Main Bus-2
Smelter GRIDCO
Transformer
Generator
Ring Bus Distribution Network SB-1
9BA ASPH-1 9BA,ASPH-1
Syd-1,CWPH-3
CWPH-3
WTP-4
ST-1
SB-1 WTP-4
WTP-2
ST-2
SB2
SB3
Syd-2
CHP-2
9BB SB-2
SB-3 9CDT WTP-3,CWPH-2
CWPH-1,CHP-1 CHP-2,9CBT
9BB,Syd-2 ASPH-2
WTP-2 ST-3 9CDT
Power House
(Reserve Switchgear)
TIE
9BA 9BB
x x x x
x x x x x x x x
x 1BA x x 1BB x
x x x x x x x x
X X X X
CT MCC-A AWPH CWPH MCC
Sec-A Sec-B Sec-C
CW1,3,4,11,13 CW-2,5,6,9,14 CW-8,10,12,15
ACW-1,2 ACW-3 ACW-4,5
IDCT-1,4 IDCT-2,5 IDCT_3,6
CWPH-Tr-1 AWPH Tr-1 AWPH Tr-2
CWPH Tr-2
Emergency Power
Total Power Failure
U-1 U-2 Tie-2 Tie-3
X X X X
Tie-1
X X X X
DG-G
DG-H
U-3
U-4 U-5 U-6
X X X X
X X X
X
Tie-2 Tie-3
DG-I DG-J
Voltage Level
Transmission
– 220 kv To Smelter
– 33kv to IPH & ASH Pond
10.5 kv ( Generation)
Distribution
– 6.6 kv HT switchgear
– 415v (PCC,MCC)
Control
– 220v Dc (Breaker control, Protection)
– 230v Ac UPS (Recorder, Instruments & DCS)
– 110v Ac (Oil gun, Flame scanner)
– +/- 24v Dc ( Control & Instrumentation)
Protection
Motor (CTMM/Numerical)
– Thermal o/c, E/F, I1, I1(t), Neg. seq.
– Differential above 1 Mw (BFP)
Feeder Protection
– Over current(51), E/F(51N)
Transformer Protection
– Over current(51), E/F(51N)
6.6 kv Board
– Under voltage
– O/C Current
MCC/LT Motors
Module Type 2 Coordination
Isolator AOP Motor
Fuse Motor Output - 90 Kw
Contactor F.L.Current-157A
Over Load Relay Contactor-3TA28
Aux. Contactor O/L Range-140-170A
Timer Fuse-250A
Cable-150 sq.mm
SCADA
CHALLENGES AHEAD
INSTALLATION OF AN EFFECTIVE PLANT-
WIDE ENERGY MANAGEMENT SYSTEM.
REDUCTION IN AUXILIARY POWER
CONSUMPTION AND ENERGY
CONSERVATION.
IMPROVING EQUIPMENT RELIABILITY .
MODERNISATION AND REPLACEMENT
STRATEGIES.
LIFE ENHANCEMENT STRATEGIES.