You are on page 1of 765

APPROVED

Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
Ed
BANGLADESH-INDIA FRIENDSHIP POWER
COMPANY (PVT.) LIMITED

DF
2x660 MW MAITREE SUPER THERMAL POWER PROJECT
RAMPAL, BANGLADESH

rP
OWNER’S CONSULTANT:
te
M/s FICHTNER GmbH & Co KG.
STUTTGART, GERMANY
as
COAL BLENDING SILO COMPLEX- 1 & 2 :
DESIGN OF FOUNDATION SYSTEM
HOUSE: DESIGN OF FOUNDATION SYSTEM
M

DOC NO.: Maitree-00-UEGF-ED-177248-ISG


(Rev 02
in

)
ed
at

BHARAT HEAVY
ELECTRICALS LIMITED
INDUSTRIAL SYSTEMS GROUP
re

BANGALORE-560012
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
INDUSTRIAL SYSYTEMS GROUP
(CIVIL ENGINEERING DEPARTMENT)

Ed
CALCULATION SUMMARY SHEET

PROJECT TITLE 2X660 MW MAITREE SUPER THERMAL POWER PROJECT


JOB NO 421 DOCUMENT NO Maitree-00-UEG-ED-177248-ISG

DF
BUILDING/SYSTEM COAL BLENDING SILO COMPLEX- 1 & 2 : DESIGN
OF FOUNDATION SYSTEM

rP
SUBJECT COAL HANDLING SYSYTEM

REV NO PARTICUL PREPRD CHKD BY APPD BY REMARKS


ARS BY
te
0 NAME ASHWIN Ravi.P SCC
SIGN
as
DATE 31.12.18 31.12.18 31.12.18
1 NAME ASHWIN Ravi.P SCC
SIGN
DATE 28.02.19 28.02.19 28.02.19
M

2 NAME ASHWIN Ravi.P SCC


SIGN
DATE 25.07.19 25.07.19 25.07.19
in

REFERENCES
ed
at
re

Page |2
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1.0 GENERAL

1.1 SCOPE
This document covers the analysis and design of pile foundations for COAL BLENDING SILO
COMPLEX. Pile cap details will be submitted separately.

Ed
1.2 UNITS OF MEASUREMENTS
Units of measurements used in analysis shall be of SI Units.

1.3 DOCUMENT REFERENCES


The following references have been referred:

F
Project Reference Drawings / Documents

PD
1. MAITREE-00-UEF-LH-175040-ISG-3: GA & MECHANICAL LOAD OF CBSH

2. MAITREE-00-UEG-ED- 177244-ISG-0: COAL BLENDING SILO COMPLEX :


DESIGN OF SUPERSTRUCTURE
3. MAITREE-00-UEA-LC-177011-ISG-0: RC DETAIL OF JOB PILE (BORED CAST
INSITU)
te r
1.4 SOFTWARE REFERENCE
The design of foundations is performed using In-House developed software. Super
structures loadings from document no. MAITREE-00-UEG-ED- 177244-ISG-0 is used for
the foundation design.
The foundations are checked for: -
as

1. Pile capacities (Compression, Tension & Shear)


The foundation is checked for various load combinations of Dead, Live, seismic and
wind loads. Two set of load calculations are provided for each foundation. The output
having summary of Factor of Safety is provided for all load combinations. Load
nM

combinations are considered as per Clause no. 2.4.1 of ASCE 7-02. Pile capacities has
been checked for all load cases/combination and critical load case is indicated in top of
the particular sheet. The load combinations inclusive of partial safety factors &
considered as per limit state design of BS EN 1990 2002. Pile reactions has been
checked with respect to all load cases, however final calculation for critical one load
combination is furnished in the document.
di

2. Pile Cap - Design of reinforcement


a te
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
TABLE OF CONTENT
TABLE OF CONTENT ................................................................................................................... 3
DESIGN PHILOSOPHY ................................................................................................................. 6

Ed
LOADS ........................................................................................................................................ 7
LOAD COMBINATIONS ........................................................................................................... 7
LOAD VALUES ...................................................................................................................... 13
FOUNDATION DESIGN ........................................................................................................... 192
FOUNDATION FOR PEDESTAL (P20) (P19) (P18) (P17) (P16) (P21) (P15) (P22) (P7) (P27)

F
(P28) (P8)-(Pile Capacity Check) ....................................................................................... 192
........................................................................................................................................... 193

PD
........................................................................................................................................... 194
........................................................................................................................................... 195
FOUNDATION FOR PEDESTAL (P20) (P19) (P18) (P17) (P16) (P21) (P15) (P22) (P7) (P27)
(P28) (P8)-(Pilecap Design) ............................................................................................... 196
........................................................................................................................................... 197
........................................................................................................................................... 198
te r
........................................................................................................................................... 199
FOUNDATION FOR PEDESTAL (P6)-(Pile Capacity Check) ................................................. 201
........................................................................................................................................... 202
as

........................................................................................................................................... 203
FOUNDATION FOR PEDESTAL (P6)-(Pilecap Design) ......................................................... 204
........................................................................................................................................... 205
........................................................................................................................................... 206
nM

FOUNDATION FOR PEDESTAL (P1)-(Pile Capacity Check) ................................................. 208


........................................................................................................................................... 209
........................................................................................................................................... 210
FOUNDATION FOR PEDESTAL (P1)-(Pilecap Design) ......................................................... 211
........................................................................................................................................... 212
di

........................................................................................................................................... 213
FOUNDATION FOR PEDESTAL (P5)-(Pile Capacity Check) ................................................. 215
........................................................................................................................................... 216
a te

........................................................................................................................................... 217
FOUNDATION FOR PEDESTAL (P5)-(Pilecap Design) ......................................................... 218
........................................................................................................................................... 219
........................................................................................................................................... 220
re

FOUNDATION FOR PEDESTAL (P2)-(Pile Capacity Check) ................................................. 222

3 OF 261
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
........................................................................................................................................... 223
........................................................................................................................................... 224
FOUNDATION FOR PEDESTAL (P2)-(Pilecap Design) ......................................................... 225

Ed
........................................................................................................................................... 226
........................................................................................................................................... 227
FOUNDATION FOR PEDESTAL (P4)-(Pile Capacity Check) ................................................. 229
........................................................................................................................................... 230
........................................................................................................................................... 231

F
FOUNDATION FOR PEDESTAL (P4)-(Pilecap Design) ......................................................... 232
........................................................................................................................................... 233

PD
........................................................................................................................................... 234
FOUNDATION FOR PEDESTAL (P3)-(Pile Capacity Check) ................................................. 236
........................................................................................................................................... 237
........................................................................................................................................... 238
FOUNDATION FOR PEDESTAL (P3)-(Pilecap Design) ......................................................... 239
te r
........................................................................................................................................... 240
........................................................................................................................................... 241
FOUNDATION FOR PEDESTAL (P10) (P11) (P12) (P13) (P14) (P23) (P24) (P25) (P26) (P29)
(P30) (P9)-(Pile Capacity Check) ....................................................................................... 243
as

........................................................................................................................................... 244
........................................................................................................................................... 245
........................................................................................................................................... 246
nM

FOUNDATION FOR PEDESTAL (P10) (P11) (P12) (P13) (P14) (P23) (P24) (P25) (P26) (P29)
(P30) (P9)-(Pilecap Design) ............................................................................................... 247
........................................................................................................................................... 248
........................................................................................................................................... 249
........................................................................................................................................... 250
FOUNDATION FOR PEDESTAL (P31) (P32) (P33) (P34) (P35) (P36) (P37) (P38)-(Pile Capacity
di

Check) ............................................................................................................................... 252


........................................................................................................................................... 253
........................................................................................................................................... 254
a te

........................................................................................................................................... 255
FOUNDATION FOR PEDESTAL (P31) (P32) (P33) (P34) (P35) (P36) (P37) (P38)-(Pilecap
Design) .............................................................................................................................. 256
........................................................................................................................................... 257
........................................................................................................................................... 258
re

........................................................................................................................................... 259

4 OF 261
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
Ed
F
PD
te r
as
nM
di
a te
re

5 OF 261
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
DESIGN PHILOSOPHY

The design of foundations is performed using In-House developed software. The foundations

Ed
are checked for Maximum Bearing Pressure, Uplift, Bending moment, shear, punching, sliding
and overturning. The foundation is checked for various load combinations of Dead, Live,
seismic and wind loads.

F
PD
te r
as
nM
di
a te
re

6 OF 261
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
LOADS

LOAD COMBINATIONS

Ed
LOAD COMB LOAD COMB NAME
NO.
500 500 1 DL1+1 LL1+1 EQUIP1

F
501 501 1 DL1+1 LL1+1 EQUIP1+1 TEMP1
502 502 1 DL1+1 WL1

PD
503 503 1 DL1+1 WL2
504 504 1 DL1+1 WL3
505 505 1 DL1+1 WL4
506 506 1 DL1+1 WL5
te r
507 507 1 DL1+1 WL6
508 508 1 DL1+1 WL7
509 509 1 DL1+1 WL8
as

510 510 1 DL1+0.7 WL1


511 511 1 DL1+0.7 WL2
512 512 1 DL1+0.7 WL3
nM

513 513 1 DL1+0.7 WL4


514 514 1 DL1+0.7 WL5
515 515 1 DL1+0.7 WL6
516 516 1 DL1+0.7 WL7
di

517 517 1 DL1+0.7 WL8


518 518 1 DL1+0.75 LL1+0.75 WL1+1 EQUIP1
519 519 1 DL1+0.75 LL1+0.75 WL2+1 EQUIP1
a te

520 520 1 DL1+0.75 LL1+0.75 WL3+1 EQUIP1


521 521 1 DL1+0.75 LL1+0.75 WL4+1 EQUIP1
522 522 1 DL1+0.75 LL1+0.75 WL5+1 EQUIP1
523 523 1 DL1+0.75 LL1+0.75 WL6+1 EQUIP1
re

7 OF 261
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
524 524 1 DL1+0.75 LL1+0.75 WL7+1 EQUIP1
525 525 1 DL1+0.75 LL1+0.75 WL8+1 EQUIP1
526 526 1 DL1+0.75 LL1+1 EQUIP1+0.525 SL1

Ed
527 527 1 DL1+0.75 LL1+1 EQUIP1+0.525 SL2
528 528 0.6 DL1+1 WL1
529 529 0.6 DL1+1 WL2
530 530 0.6 DL1+1 WL3

F
531 531 0.6 DL1+1 WL4

PD
532 532 0.6 DL1+1 WL5
533 533 0.6 DL1+1 WL6
534 534 0.6 DL1+1 WL7
535 535 0.6 DL1+1 WL8
te r
536 536 0.6 DL1+0.7 SL1
537 537 0.6 DL1+0.7 SL2
1001 1001 1.35 DL1+1.5 LL1+1.5 EQUIP1+0.9 TEMP1
as

1002 1002 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 TEMP1


1003 1003 1.35 DL1+1.5 WL1+0.9 TEMP1
1004 1004 1.35 DL1+1.5 WL2+0.9 TEMP1
nM

1005 1005 1.35 DL1+1.5 WL3+0.9 TEMP1


1006 1006 1.35 DL1+1.5 WL4+0.9 TEMP1
1007 1007 1.35 DL1+1.5 WL5+0.9 TEMP1
1008 1008 1.35 DL1+1.5 WL6+0.9 TEMP1
di

1009 1009 1.35 DL1+1.5 WL7+0.9 TEMP1


1010 1010 1.35 DL1+1.5 WL8+0.9 TEMP1
1011 1011 1.35 DL1+1.5 WL1+-0.9 TEMP1
a te

1012 1012 1.35 DL1+1.5 WL2+-0.9 TEMP1


1013 1013 1.35 DL1+1.5 WL3+-0.9 TEMP1
1014 1014 1.35 DL1+1.5 WL4+-0.9 TEMP1
1015 1015 1.35 DL1+1.5 WL5+-0.9 TEMP1
re

8 OF 261
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1016 1016 1.35 DL1+1.5 WL6+-0.9 TEMP1
1017 1017 1.35 DL1+1.5 WL7+-0.9 TEMP1
1018 1018 1.35 DL1+1.5 WL8+-0.9 TEMP1

Ed
1019 1019 1.35 DL1+0.9 TEMP1+1.35 MR1
1020 1020 1.35 DL1+-0.9 TEMP1+1.35 MR1
1021 1021 1.35 DL1+1.05 LL1+1.05 EQUIP1+0.9 TEMP1+1.35 MR1
1022 1022 1.35 DL1+1.05 LL1+1.05 EQUIP1+-0.9 TEMP1+1.35 MR1

F
1023 1023 1.148 DL1+1.05 LL1+1.05 EQUIP1+0.9 TEMP1+1.35 MR1

PD
1024 1024 1.148 DL1+1.05 LL1+1.05 EQUIP1+-0.9 TEMP1+1.35 MR1
1025 1025 1.35 DL1+1.05 LL1+0.9 WL1+1.05 EQUIP1+0.9 TEMP1+1.35
MR1
1026 1026 1.35 DL1+1.05 LL1+0.9 WL2+1.05 EQUIP1+0.9 TEMP1+1.35
MR1
te r
1027 1027 1.35 DL1+1.05 LL1+0.9 WL3+1.05 EQUIP1+0.9 TEMP1+1.35
MR1
1028 1028 1.35 DL1+1.05 LL1+0.9 WL4+1.05 EQUIP1+0.9 TEMP1+1.35
MR1
as

1029 1029 1.35 DL1+1.05 LL1+0.9 WL5+1.05 EQUIP1+0.9 TEMP1+1.35


MR1
1030 1030 1.35 DL1+1.05 LL1+0.9 WL6+1.05 EQUIP1+0.9 TEMP1+1.35
nM

MR1
1031 1031 1.35 DL1+1.05 LL1+0.9 WL7+1.05 EQUIP1+0.9 TEMP1+1.35
MR1
1032 1032 1.35 DL1+1.05 LL1+0.9 WL8+1.05 EQUIP1+0.9 TEMP1+1.35
MR1
di

1033 1033 1.35 DL1+1.05 LL1+0.9 WL1+1.05 EQUIP1+-0.9


TEMP1+1.35 MR1
1034 1034 1.35 DL1+1.05 LL1+0.9 WL2+1.05 EQUIP1+-0.9
TEMP1+1.35 MR1
a te

1035 1035 1.35 DL1+1.05 LL1+0.9 WL3+1.05 EQUIP1+-0.9


TEMP1+1.35 MR1
1036 1036 1.35 DL1+1.05 LL1+0.9 WL4+1.05 EQUIP1+-0.9
TEMP1+1.35 MR1
re

9 OF 261
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1037 1037 1.35 DL1+1.05 LL1+0.9 WL5+1.05 EQUIP1+-0.9
TEMP1+1.35 MR1
1038 1038 1.35 DL1+1.05 LL1+0.9 WL6+1.05 EQUIP1+-0.9

Ed
TEMP1+1.35 MR1
1039 1039 1.35 DL1+1.05 LL1+0.9 WL7+1.05 EQUIP1+-0.9
TEMP1+1.35 MR1
1040 1040 1.35 DL1+1.05 LL1+0.9 WL8+1.05 EQUIP1+-0.9
TEMP1+1.35 MR1

F
1041 1041 1.148 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+0.9 TEMP1+1.35
MR1

PD
1042 1042 1.148 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+0.9 TEMP1+1.35
MR1
1043 1043 1.148 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+0.9 TEMP1+1.35
MR1
1044 1044 1.148 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+0.9 TEMP1+1.35
te r
MR1
1045 1045 1.148 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+0.9 TEMP1+1.35
MR1
as

1046 1046 1.148 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+0.9 TEMP1+1.35


MR1
1047 1047 1.148 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+0.9 TEMP1+1.35
MR1
nM

1048 1048 1.148 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+0.9 TEMP1+1.35


MR1
1049 1049 1.148 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+-0.9 TEMP1+1.35
MR1
1050 1050 1.148 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+-0.9 TEMP1+1.35
di

MR1
1051 1051 1.148 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+-0.9 TEMP1+1.35
MR1
a te

1052 1052 1.148 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+-0.9 TEMP1+1.35


MR1
1053 1053 1.148 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+-0.9 TEMP1+1.35
MR1
re

10 OF 261
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1054 1054 1.148 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+-0.9 TEMP1+1.35
MR1
1055 1055 1.148 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+-0.9 TEMP1+1.35

Ed
MR1
1056 1056 1.148 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+-0.9 TEMP1+1.35
MR1
1057 1057 1.148 DL1+1.05 LL1+1.5 WL1+1.05 EQUIP1+0.9
TEMP1+1.35 MR1

F
1058 1058 1.148 DL1+1.05 LL1+1.5 WL2+1.05 EQUIP1+0.9
TEMP1+1.35 MR1

PD
1059 1059 1.148 DL1+1.05 LL1+1.5 WL3+1.05 EQUIP1+0.9
TEMP1+1.35 MR1
1060 1060 1.148 DL1+1.05 LL1+1.5 WL4+1.05 EQUIP1+0.9
TEMP1+1.35 MR1
1061 1061 1.148 DL1+1.05 LL1+1.5 WL5+1.05 EQUIP1+0.9
te r
TEMP1+1.35 MR1
1062 1062 1.148 DL1+1.05 LL1+1.5 WL6+1.05 EQUIP1+0.9
TEMP1+1.35 MR1
as

1063 1063 1.148 DL1+1.05 LL1+1.5 WL7+1.05 EQUIP1+0.9


TEMP1+1.35 MR1
1064 1064 1.148 DL1+1.05 LL1+1.5 WL8+1.05 EQUIP1+0.9
TEMP1+1.35 MR1
nM

1065 1065 1.148 DL1+1.05 LL1+1.5 WL1+1.05 EQUIP1+-0.9


TEMP1+1.35 MR1
1066 1066 1.148 DL1+1.05 LL1+1.5 WL2+1.05 EQUIP1+-0.9
TEMP1+1.35 MR1
1067 1067 1.148 DL1+1.05 LL1+1.5 WL3+1.05 EQUIP1+-0.9
di

TEMP1+1.35 MR1
1068 1068 1.148 DL1+1.05 LL1+1.5 WL4+1.05 EQUIP1+-0.9
TEMP1+1.35 MR1
a te

1069 1069 1.148 DL1+1.05 LL1+1.5 WL5+1.05 EQUIP1+-0.9


TEMP1+1.35 MR1
1070 1070 1.148 DL1+1.05 LL1+1.5 WL6+1.05 EQUIP1+-0.9
TEMP1+1.35 MR1
re

11 OF 261
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1071 1071 1.148 DL1+1.05 LL1+1.5 WL7+1.05 EQUIP1+-0.9
TEMP1+1.35 MR1
1072 1072 1.148 DL1+1.05 LL1+1.5 WL8+1.05 EQUIP1+-0.9

Ed
TEMP1+1.35 MR1
1073 1073 1 DL1+0.6 LL1+1 SL1
1074 1074 1 DL1+0.6 LL1+1 SL2
1075 1075 1 DL1+0.6 LL1+-1 SL1

F
1076 1076 1 DL1+0.6 LL1+-1 SL2
2001 2001 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+0.6 TEMP1+1 MR1

PD
2002 2002 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+0.6 TEMP1+1 MR1
2003 2003 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+0.6 TEMP1+1 MR1
2004 2004 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+0.6 TEMP1+1 MR1
2005 2005 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+0.6 TEMP1+1 MR1
te r
2006 2006 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+0.6 TEMP1+1 MR1
2007 2007 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+0.6 TEMP1+1 MR1
2008 2008 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+0.6 TEMP1+1 MR1
as

2009 2009 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+-0.6 TEMP1+1 MR1


2010 2010 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+-0.6 TEMP1+1 MR1
2011 2011 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+-0.6 TEMP1+1 MR1
nM

2012 2012 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+-0.6 TEMP1+1 MR1


2013 2013 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+-0.6 TEMP1+1 MR1
2014 2014 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+-0.6 TEMP1+1 MR1
2015 2015 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+-0.6 TEMP1+1 MR1
di

2016 2016 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+-0.6 TEMP1+1 MR1


2017 2017 1 DL1+0.7 LL1+1 WL1+1 EQUIP1+0.6 TEMP1+1 MR1
2018 2018 1 DL1+0.7 LL1+1 WL2+1 EQUIP1+0.6 TEMP1+1 MR1
a te

2019 2019 1 DL1+0.7 LL1+1 WL3+1 EQUIP1+0.6 TEMP1+1 MR1


2020 2020 1 DL1+0.7 LL1+1 WL4+1 EQUIP1+0.6 TEMP1+1 MR1
2021 2021 1 DL1+0.7 LL1+1 WL5+1 EQUIP1+0.6 TEMP1+1 MR1
re

12 OF 261
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
2022 2022 1 DL1+0.7 LL1+1 WL6+1 EQUIP1+0.6 TEMP1+1 MR1
2023 2023 1 DL1+0.7 LL1+1 WL7+1 EQUIP1+0.6 TEMP1+1 MR1
2024 2024 1 DL1+0.7 LL1+1 WL8+1 EQUIP1+0.6 TEMP1+1 MR1

Ed
2025 2025 1 DL1+0.7 LL1+1 WL1+1 EQUIP1+-0.6 TEMP1+1 MR1
2026 2026 1 DL1+0.7 LL1+1 WL2+1 EQUIP1+-0.6 TEMP1+1 MR1
2027 2027 1 DL1+0.7 LL1+1 WL3+1 EQUIP1+-0.6 TEMP1+1 MR1
2028 2028 1 DL1+0.7 LL1+1 WL4+1 EQUIP1+-0.6 TEMP1+1 MR1

F
2029 2029 1 DL1+0.7 LL1+1 WL5+1 EQUIP1+-0.6 TEMP1+1 MR1

PD
2030 2030 1 DL1+0.7 LL1+1 WL6+1 EQUIP1+-0.6 TEMP1+1 MR1
2031 2031 1 DL1+0.7 LL1+1 WL7+1 EQUIP1+-0.6 TEMP1+1 MR1
2032 2032 1 DL1+0.7 LL1+1 WL8+1 EQUIP1+-0.6 TEMP1+1 MR1
2033 2033 1 DL1+0.6 LL1+1 SL1
te r
2034 2034 1 DL1+0.6 LL1+1 SL2
2035 2035 1 DL1+0.6 LL1+-1 SL1
2036 2036 1 DL1+0.6 LL1+-1 SL2
as
nM

LOAD VALUES

Pedestal Load Case Vertical Horizontal Horizontal Moment Moment


No. Force (P) shear shear about axis about axis
[MT] along axis along axis X (Mx) Z (Mz)
Z (Hz) X (Hx) [MT-m] [MT-m]
[MT] [MT]
di

P1 500 108.54 0.52 -0.85 3.24 -3.70

501 115.32 -1.33 -3.38 -5.15 -15.44

502 -38.01 -0.50 12.21 0.09 60.35


a te

503 -39.69 -0.52 14.69 -0.05 71.92

504 126.63 -0.06 -12.54 0.57 -60.89

505 124.45 -0.08 -10.05 0.44 -49.29

506 104.40 23.64 -13.18 112.44 -62.32


re

13 OF 261
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
LOAD VALUES

Ed
Pede Load Case No. Vertic Horizo Horizo Mome Mom
stal al ntal ntal nt ent
Force shear shear about about
(P) along along axis X axis
[MT] axis Z axis X (Mx) Z
(Hz) (Hx) [MT- (Mz)
[MT] [MT] m] [MT-

F
m]

129.8

PD
P1 500 1 DL1+1 LL1+1 EQUIP1 6 0.50 -1.34 3.07 -5.64

136.7 -
501 1 DL1+1 LL1+1 EQUIP1+1 TEMP1 1 -2.43 -4.58 -10.32 21.07

-
502 1 DL1+1 WL1 14.33 -3.74 12.12 -15.72 63.46

503 1 DL1+1 WL2 -5.45 -3.76 14.93 -15.97 77.32


te r
120.0 -
504 1 DL1+1 WL3 6 3.31 -13.72 16.99 69.06

128.3 -
505 1 DL1+1 WL4 8 3.31 -10.91 16.80 55.19
as

132.3 -
506 1 DL1+1 WL5 88.47 26.99 -14.98 4 74.12

136.8 -
507 1 DL1+1 WL6 93.03 27.94 -12.26 3 60.73
nM

-
131.0 -
508 1 DL1+1 WL7 41.01 -27.41 -4.29 0 18.59

-
131.1
509 1 DL1+1 WL8 49.82 -27.41 -1.48 5 -4.74

510 1 DL1+0.7 WL1 10.25 -2.70 8.21 -10.94 43.42


di

511 1 DL1+0.7 WL2 16.47 -2.71 10.18 -11.11 53.11

104.3 -
512 1 DL1+0.7 WL3 2 2.24 -9.88 11.96 49.35
a te

110.1 -
513 1 DL1+0.7 WL4 5 2.24 -7.91 11.82 39.64

-
514 1 DL1+0.7 WL5 82.21 18.81 -10.76 92.71 52.89

-
re

515 1 DL1+0.7 WL6 85.40 19.48 -8.86 95.85 43.52


APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
516 1 DL1+0.7 WL7 48.99 -19.27 -3.27 -91.64 14.02

517 1 DL1+0.7 WL8 55.16 -19.26 -1.30 -91.74 -4.33

Ed
518 1 DL1+ 1LL1+0.75 WL1+1 EQUIP1 68.41 -2.11 8.43 -8.89 44.48

519 1 DL1+1.0 LL1+0.75 WL2+1 EQUIP1 75.08 -2.12 10.54 -9.08 54.87

169.2 -
520 1 DL1+1.0 LL1+0.75 WL3+1 EQUIP1 0 3.18 -10.95 15.64 54.92

175.4 -
521 1 DL1+1.0 LL1+0.75 WL4+1 EQUIP1 5 3.17 -8.84 15.50 44.52

F
145.5 102.1 -
522 1 DL1+1.0 LL1+0.75 WL5+1 EQUIP1 1 20.94 -11.90 5 58.71

PD
148.9 105.5 -
523 1 DL1+1.0 LL1+0.75 WL6+1 EQUIP1 3 21.65 -9.86 2 48.67

109.9 -
524 1 DL1+1.0 LL1+0.75 WL7+1 EQUIP1 2 -19.86 -3.88 -95.35 17.06

116.5
525 1 DL1+1.0 LL1+0.75 WL8+1 EQUIP1 3 -19.86 -1.77 -95.47 -6.68
te r
192.0
526 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL1 6 -0.81 -5.18 -3.41 14.53

157.1
527 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL2 7 -8.24 -3.08 -39.23 3.41
as

-
528 0.6 DL1+1 WL1 41.37 -3.64 12.48 -15.81 64.81

-
529 0.6 DL1+1 WL2 32.49 -3.65 15.29 -16.06 78.66
nM

-
530 0.6 DL1+1 WL3 93.02 3.42 -13.36 16.90 67.72

101.3 -
531 0.6 DL1+1 WL4 4 3.41 -10.55 16.71 53.85

132.2 -
532 0.6 DL1+1 WL5 61.43 27.09 -14.62 5 72.78
di

136.7 -
533 0.6 DL1+1 WL6 65.99 28.05 -11.90 4 59.38

-
131.0 -
a te

534 0.6 DL1+1 WL7 13.97 -27.30 -3.93 9 17.24

-
131.2
535 0.6 DL1+1 WL8 22.78 -27.30 -1.12 4 -3.40

123.4
re

536 0.6 DL1+0.7 SL1 9 -1.90 -5.66 -8.50 24.88


APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
537 0.6 DL1+0.7 SL2 76.97 -11.80 -2.87 -56.27 10.06

190.8 -
1001 1.35 DL1+1.5 LL1+1.5 EQUIP1+0.9 TEMP1 2 -1.85 -4.79 -7.48 21.84

Ed
178.4
1002 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 TEMP1 9 3.42 1.05 16.61 5.93

-
1003 1.35 DL1+1.5 WL1+0.9 TEMP1 25.47 -8.20 15.39 -35.66 81.82

- 102.5
1004 1.35 DL1+1.5 WL2+0.9 TEMP1 12.14 -8.23 19.61 -36.04 9

F
-
176.1 116.9
1005 1.35 DL1+1.5 WL3+0.9 TEMP1 1 2.38 -23.37 13.41 8

PD
188.6 -
1006 1.35 DL1+1.5 WL4+0.9 TEMP1 0 2.36 -19.14 13.12 96.17

-
128.7 186.4 124.5
1007 1.35 DL1+1.5 WL5+0.9 TEMP1 3 37.89 -25.26 3 6

-
te r
135.5 193.1 104.4
1008 1.35 DL1+1.5 WL6+0.9 TEMP1 7 39.32 -21.18 7 7

-
208.5 -
1009 1.35 DL1+1.5 WL7+0.9 TEMP1 57.55 -43.71 -9.22 9 41.26
as

-
208.8 -
1010 1.35 DL1+1.5 WL8+0.9 TEMP1 70.76 -43.70 -5.00 1 20.50

- 109.5
nM

1011 1.35 DL1+1.5 WL1+-0.9 TEMP1 37.80 -2.94 21.23 -11.57 8

- 130.3
1012 1.35 DL1+1.5 WL2+-0.9 TEMP1 24.48 -2.96 25.45 -11.95 6

163.7 -
1013 1.35 DL1+1.5 WL3+-0.9 TEMP1 8 7.64 -17.53 37.50 89.21

176.2 -
di

1014 1.35 DL1+1.5 WL4+-0.9 TEMP1 7 7.63 -13.31 37.21 68.40

116.4 210.5 -
1015 1.35 DL1+1.5 WL5+-0.9 TEMP1 0 43.16 -19.42 2 96.79
a te

123.2 217.2 -
1016 1.35 DL1+1.5 WL6+-0.9 TEMP1 4 44.59 -15.34 6 76.70

-
184.4 -
1017 1.35 DL1+1.5 WL7+-0.9 TEMP1 45.22 -38.44 -3.38 9 13.49
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
184.7
1018 1.35 DL1+1.5 WL8+-0.9 TEMP1 58.43 -38.44 0.84 2 7.27

108.3 -

Ed
1019 1.35 DL1+0.9 TEMP1+1.35 MR1 1 -2.66 -4.11 -10.24 18.33

1020 1.35 DL1+-0.9 TEMP1+1.35 MR1 95.98 2.61 1.73 13.86 9.44

1021 1.35 DL1+1.5LL1+1.5 EQUIP1+0.9 201.7 -


TEMP1+1.35 MR1 0 -1.52 -4.77 -5.97 21.75

1022 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 189.3

F
TEMP1+1.35 MR1 7 3.75 1.07 18.12 6.02

1023 1.148 DL1+1.5 LL1+1.5 EQUIP1+0.9 188.0 -


TEMP1+1.35 MR1 5 -1.46 -4.58 -6.02 21.07

PD
1024 1.148 DL1+1.5 LL1+1.5 EQUIP1+-0.9 175.7
TEMP1+1.35 MR1 1 3.81 1.25 18.08 6.70

1025 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+0.9 127.9


TEMP1+1.35 MR1 6 -4.64 6.95 -20.32 38.39

1026 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+0.9 135.9


TEMP1+1.35 MR1 6 -4.66 9.48 -20.55 50.85
te r
1027 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+0.9 248.9 -
TEMP1+1.35 MR1 1 1.70 -16.31 9.12 80.89

1028 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+0.9 256.4 -


TEMP1+1.35 MR1 1 1.70 -13.77 8.94 68.40
as

1029 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+0.9 220.4 112.9 -


TEMP1+1.35 MR1 8 23.01 -17.44 3 85.44

1030 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+0.9 224.5 116.9 -


TEMP1+1.35 MR1 9 23.87 -14.99 8 73.39
nM

-
1031 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+0.9 177.7 124.0 -
TEMP1+1.35 MR1 7 -25.95 -7.81 8 35.46

-
1032 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+0.9 185.7 124.2 -
TEMP1+1.35 MR1 0 -25.94 -5.28 1 23.00
di

1033 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+-0.9 115.6


TEMP1+1.35 MR1 3 0.62 12.79 3.77 66.16

1034 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+-0.9 123.6


TEMP1+1.35 MR1 3 0.61 15.32 3.55 78.62
a te

1035 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+-0.9 236.5 -


TEMP1+1.35 MR1 8 6.97 -10.47 33.21 53.12

1036 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+-0.9 244.0 -


TEMP1+1.35 MR1 8 6.96 -7.93 33.04 40.64

1037 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+-0.9 208.1 137.0 -


re

TEMP1+1.35 MR1 5 28.28 -11.60 3 57.67


APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1038 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+-0.9 212.2 141.0 -
TEMP1+1.35 MR1 6 29.14 -9.16 7 45.62

1039 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+-0.9 165.4


TEMP1+1.35 MR1 4 -20.68 -1.98 -99.99 -7.69

Ed
-
1040 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+-0.9 173.3 100.1
TEMP1+1.35 MR1 7 -20.68 0.56 2 4.77

1041 1.148 DL1+1.5 LL1+0.9 WL1+1.5 114.3


EQUIP1+0.9 TEMP1+1.35 MR1 1 -4.59 7.13 -20.37 39.07

F
1042 1.148 DL1+1.5 LL1+0.9 WL2+1.5 122.3
EQUIP1+0.9 TEMP1+1.35 MR1 0 -4.61 9.66 -20.59 51.53

1043 1.148 DL1+1.5 LL1+0.9 WL3+1.5 235.2 -

PD
EQUIP1+0.9 TEMP1+1.35 MR1 6 1.76 -16.12 9.08 80.21

1044 1.148 DL1+1.5 LL1+0.9 WL4+1.5 242.7 -


EQUIP1+0.9 TEMP1+1.35 MR1 5 1.75 -13.59 8.90 67.73

1045 1.148 DL1+1.5 LL1+0.9 WL5+1.5 206.8 112.8 -


EQUIP1+0.9 TEMP1+1.35 MR1 3 23.06 -17.26 9 84.76

1046 1.148 DL1+1.5 LL1+0.9 WL6+1.5 210.9 116.9 -


te r
EQUIP1+0.9 TEMP1+1.35 MR1 3 23.92 -14.81 3 72.71

-
1047 1.148 DL1+1.5 LL1+0.9 WL7+1.5 164.1 124.1 -
EQUIP1+0.9 TEMP1+1.35 MR1 2 -25.89 -7.63 2 34.78
as

-
1048 1.148 DL1+1.5 LL1+0.9 WL8+1.5 172.0 124.2 -
EQUIP1+0.9 TEMP1+1.35 MR1 5 -25.89 -5.10 6 22.32

1049 1.148 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+- 101.9


0.9 TEMP1+1.35 MR1 8 0.68 12.97 3.73 66.83
nM

1050 1.148 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+- 109.9


0.9 TEMP1+1.35 MR1 7 0.66 15.50 3.50 79.30

1051 1.148 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+- 222.9 -


0.9 TEMP1+1.35 MR1 2 7.03 -10.29 33.17 52.44

1052 1.148 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+- 230.4 -


0.9 TEMP1+1.35 MR1 2 7.02 -7.75 32.99 39.96
di

1053 1.148 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+- 194.5 136.9 -


0.9 TEMP1+1.35 MR1 0 28.33 -11.42 8 56.99

1054 1.148 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+- 198.6 141.0 -


a te

0.9 TEMP1+1.35 MR1 0 29.19 -8.97 2 44.94

-
1055 1.148 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+- 151.7 100.0
0.9 TEMP1+1.35 MR1 9 -20.63 -1.79 3 -7.01
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
1056 1.148 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+- 159.7 100.1
0.9 TEMP1+1.35 MR1 2 -20.62 0.74 6 5.45

1057 1.148 DL1+1.5 LL1+1.5 WL1+1.5

Ed
EQUIP1+0.9 TEMP1+1.35 MR1 65.15 -6.68 14.94 -29.93 79.16

1058 1.148 DL1+1.5 LL1+1.5 WL2+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 78.48 -6.71 19.16 -30.31 99.94

-
1059 1.148 DL1+1.5 LL1+1.5 WL3+1.5 266.7 119.6
EQUIP1+0.9 TEMP1+1.35 MR1 3 3.90 -23.82 19.14 3

F
1060 1.148 DL1+1.5 LL1+1.5 WL4+1.5 279.2 -
EQUIP1+0.9 TEMP1+1.35 MR1 2 3.89 -19.59 18.84 98.83

PD
-
1061 1.148 DL1+1.5 LL1+1.5 WL5+1.5 219.3 192.1 127.2
EQUIP1+0.9 TEMP1+1.35 MR1 5 39.41 -25.71 6 2

-
1062 1.148 DL1+1.5 LL1+1.5 WL6+1.5 226.1 198.9 107.1
EQUIP1+0.9 TEMP1+1.35 MR1 9 40.85 -21.63 0 3

-
te r
1063 1.148 DL1+1.5 LL1+1.5 WL7+1.5 148.1 202.8 -
EQUIP1+0.9 TEMP1+1.35 MR1 7 -42.18 -9.66 6 43.92

-
1064 1.148 DL1+1.5 LL1+1.5 WL8+1.5 161.3 203.0 -
EQUIP1+0.9 TEMP1+1.35 MR1 8 -42.18 -5.45 8 23.15
as

1065 1.148 DL1+1.5 LL1+1.5 WL1+1.5 EQUIP1+- 106.9


0.9 TEMP1+1.35 MR1 52.82 -1.41 20.78 -5.84 3

1066 1.148 DL1+1.5 LL1+1.5 WL2+1.5 EQUIP1+- 127.7


nM

0.9 TEMP1+1.35 MR1 66.15 -1.44 25.00 -6.22 0

1067 1.148 DL1+1.5 LL1+1.5 WL3+1.5 EQUIP1+- 254.4 -


0.9 TEMP1+1.35 MR1 0 9.17 -17.98 43.23 91.86

1068 1.148 DL1+1.5 LL1+1.5 WL4+1.5 EQUIP1+- 266.8 -


0.9 TEMP1+1.35 MR1 9 9.16 -13.75 42.93 71.06

1069 1.148 DL1+1.5 LL1+1.5 WL5+1.5 EQUIP1+- 207.0 216.2 -


di

0.9 TEMP1+1.35 MR1 2 44.68 -19.87 5 99.45

1070 1.148 DL1+1.5 LL1+1.5 WL6+1.5 EQUIP1+- 213.8 222.9 -


0.9 TEMP1+1.35 MR1 6 46.12 -15.79 9 79.36

-
a te

1071 1.148 DL1+1.5 LL1+1.5 WL7+1.5 EQUIP1+- 135.8 178.7 -


0.9 TEMP1+1.35 MR1 4 -36.91 -3.83 7 16.15

-
1072 1.148 DL1+1.5 LL1+1.5 WL8+1.5 EQUIP1+- 149.0 178.9
0.9 TEMP1+1.35 MR1 5 -36.91 0.39 9 4.62
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
232.0
1073 1 DL1+0.8 LL1+1 SL1 9 -2.15 -8.60 -9.78 33.04

165.6
1074 1 DL1+0.8 LL1+1 SL2 4 -16.29 -4.62 -78.02 11.86

Ed
-
1075 1 DL1+0.8 LL1+-1 SL1 -4.84 2.84 6.02 14.89 43.80

-
1076 1 DL1+0.8 LL1+-1 SL2 61.61 16.98 2.04 83.12 22.62

2001 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+0.6

F
TEMP1+1 MR1 92.88 -3.10 4.55 -13.41 25.26

2002 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+0.6


TEMP1+1 MR1 98.21 -3.11 6.23 -13.56 33.57

PD
2003 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+0.6 173.5 -
TEMP1+1 MR1 1 1.13 -10.96 6.21 54.25

2004 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+0.6 178.5 -


TEMP1+1 MR1 0 1.13 -9.27 6.10 45.93

2005 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+0.6 154.5 -


TEMP1+1 MR1 6 15.34 -11.72 75.42 57.29
te r
2006 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+0.6 157.2 -
TEMP1+1 MR1 9 15.91 -10.08 78.12 49.25

2007 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+0.6 126.0 -


TEMP1+1 MR1 8 -17.30 -5.30 -82.58 23.97
as

2008 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+0.6 131.3 -


TEMP1+1 MR1 7 -17.30 -3.61 -82.67 15.66

2009 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+-0.6


TEMP1+1 MR1 84.65 0.41 8.44 2.65 43.77
nM

2010 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+-0.6


TEMP1+1 MR1 89.99 0.40 10.13 2.50 52.09

2011 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+-0.6 165.2 -


TEMP1+1 MR1 9 4.65 -7.07 22.28 35.74

2012 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+-0.6 170.2 -


TEMP1+1 MR1 8 4.64 -5.38 22.16 27.42
di

2013 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+-0.6 146.3 -


TEMP1+1 MR1 4 18.85 -7.82 91.48 38.77

2014 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+-0.6 149.0 -


TEMP1+1 MR1 7 19.42 -6.19 94.18 30.74
a te

2015 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+-0.6 117.8


TEMP1+1 MR1 6 -13.79 -1.41 -66.52 -5.46

2016 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+-0.6 123.1


TEMP1+1 MR1 5 -13.79 0.28 -66.61 2.85
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
2017 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+0.6
TEMP1+1 MR1 60.10 -4.49 9.75 -19.79 51.99

2018 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+0.6


TEMP1+1 MR1 68.99 -4.51 12.57 -20.04 65.84

Ed
2019 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+0.6 194.4 -
TEMP1+1 MR1 9 2.57 -16.09 12.92 80.54

2020 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+0.6 202.8 -


TEMP1+1 MR1 2 2.56 -13.27 12.73 66.67

2021 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+0.6 162.9 128.2 -

F
TEMP1+1 MR1 0 26.24 -17.35 7 85.59

2022 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+0.6 167.4 132.7 -


TEMP1+1 MR1 6 27.19 -14.63 6 72.20

PD
-
2023 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+0.6 115.4 135.0 -
TEMP1+1 MR1 5 -28.16 -6.65 8 30.06

-
2024 1 DL1+1.0 LL1+1 WL8+1 EQUIP1+0.6 124.2 135.2 -
TEMP1+1 MR1 6 -28.16 -3.84 2 16.22
te r
2025 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+-0.6
TEMP1+1 MR1 51.88 -0.98 13.64 -3.73 70.50

2026 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+-0.6


TEMP1+1 MR1 60.77 -1.00 16.46 -3.98 84.36
as

2027 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+-0.6 186.2 -


TEMP1+1 MR1 7 6.08 -12.20 28.98 62.02

2028 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+-0.6 194.6 -


TEMP1+1 MR1 0 6.07 -9.38 28.79 48.15
nM

2029 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+-0.6 154.6 144.3 -


TEMP1+1 MR1 8 29.75 -13.46 3 67.08

2030 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+-0.6 159.2 148.8 -


TEMP1+1 MR1 4 30.71 -10.74 2 53.69

-
2031 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+-0.6 107.2 119.0 -
TEMP1+1 MR1 3 -24.65 -2.76 1 11.55
di

-
2032 1 DL1+0.7 LL1+1 WL8+1 EQUIP1+-0.6 116.0 119.1
TEMP1+1 MR1 4 -24.64 0.05 6 2.30
a te

232.0
2033 1 DL1+0.8 LL1+1 SL1 9 -2.15 -8.60 -9.78 33.04

165.6
2034 1 DL1+0.8 LL1+1 SL2 4 -16.29 -4.62 -78.02 11.86

-
2035 1 DL1+0.8 LL1+-1 SL1 -4.84 2.84 6.02 14.89 43.80
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
2036 1 DL1+0.8 LL1+-1 SL2 61.61 16.98 2.04 83.12 22.62

131.5
P2 500 1 DL1+1 LL1+1 EQUIP1 6 1.48 -0.86 6.57 -3.18

Ed
139.0 -
501 1 DL1+1 LL1+1 EQUIP1+1 TEMP1 2 4.62 -4.12 20.92 18.70

-
502 1 DL1+1 WL1 46.23 -2.57 11.25 -15.07 59.08

F
503 1 DL1+1 WL2 38.71 -2.61 14.08 -15.07 73.01

158.3 -
504 1 DL1+1 WL3 9 4.31 -12.76 20.21 64.23

PD
165.4 -
505 1 DL1+1 WL4 2 4.29 -9.92 20.25 50.27

113.8 135.0 -
506 1 DL1+1 WL5 3 28.02 -6.20 0 28.78

125.9 139.7 -
507 1 DL1+1 WL6 3 28.97 -3.29 4 14.43
te r
-
129.9 -
508 1 DL1+1 WL7 19.38 -26.29 -12.77 6 62.35

-
as

129.8 -
509 1 DL1+1 WL8 26.99 -26.31 -9.93 6 48.40

-
510 1 DL1+0.7 WL1 12.08 -1.56 7.65 -9.83 40.57
nM

511 1 DL1+0.7 WL2 -6.81 -1.58 9.63 -9.83 50.33

131.1 -
512 1 DL1+0.7 WL3 5 3.26 -9.16 14.86 45.74

136.0 -
513 1 DL1+0.7 WL4 7 3.24 -7.17 14.89 35.97

-
di

514 1 DL1+0.7 WL5 99.96 19.86 -4.57 95.22 20.93

108.4 -
515 1 DL1+0.7 WL6 3 20.52 -2.53 98.54 10.88

-
a te

516 1 DL1+0.7 WL7 33.84 -18.17 -9.16 -90.25 44.42

-
517 1 DL1+0.7 WL8 39.17 -18.17 -7.18 -90.18 34.66

518 1 DL1+ 1LL1+0.75 WL1+1 EQUIP1 46.18 -1.05 8.15 -6.53 43.08
re

519 1 DL1+1.0 LL1+0.75 WL2+1 EQUIP1 51.83 -1.07 10.27 -6.53 53.54
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
199.6 -
520 1 DL1+1.0 LL1+0.75 WL3+1 EQUIP1 5 4.12 -9.86 19.93 49.40

204.9 -
521 1 DL1+1.0 LL1+0.75 WL4+1 EQUIP1 3 4.10 -7.73 19.96 38.93

Ed
166.2 106.0 -
522 1 DL1+1.0 LL1+0.75 WL5+1 EQUIP1 3 21.90 -4.94 2 22.81

175.3 109.5 -
523 1 DL1+1.0 LL1+0.75 WL6+1 EQUIP1 0 22.61 -2.76 8 12.05

F
524 1 DL1+1.0 LL1+0.75 WL7+1 EQUIP1 95.39 -18.84 -9.86 -92.69 47.98

101.1 -
525 1 DL1+1.0 LL1+0.75 WL8+1 EQUIP1 0 -18.85 -7.74 -92.62 37.53

PD
207.4
526 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL1 6 0.17 -4.66 0.22 16.79

157.8
527 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL2 7 -7.24 -1.78 -35.98 1.53

-
528 0.6 DL1+1 WL1 73.27 -2.89 11.55 -16.02 60.12
te r
-
529 0.6 DL1+1 WL2 65.74 -2.93 14.38 -16.02 74.05

131.3 -
530 0.6 DL1+1 WL3 5 3.99 -12.46 19.25 63.19
as

138.3 -
531 0.6 DL1+1 WL4 8 3.97 -9.62 19.29 49.23

134.0 -
532 0.6 DL1+1 WL5 86.79 27.70 -5.90 4 27.74
nM

138.7 -
533 0.6 DL1+1 WL6 98.89 28.65 -2.99 9 13.39

-
130.9 -
534 0.6 DL1+1 WL7 -7.66 -26.61 -12.46 1 61.30

-
di

130.8 -
535 0.6 DL1+1 WL8 -0.05 -26.63 -9.63 1 47.36

141.7
536 0.6 DL1+0.7 SL1 6 -1.28 -5.53 -7.02 25.06
a te

537 0.6 DL1+0.7 SL2 75.64 -11.15 -1.69 -55.29 4.71

193.9 -
1001 1.35 DL1+1.5 LL1+1.5 EQUIP1+0.9 TEMP1 1 4.92 -4.11 22.41 18.35

180.4
1002 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 TEMP1 8 -0.71 1.77 -3.43 9.60
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
1003 1.35 DL1+1.5 WL1+0.9 TEMP1 72.77 -1.16 14.05 -10.04 75.04

-
1004 1.35 DL1+1.5 WL2+0.9 TEMP1 61.48 -1.21 18.29 -10.04 95.94

Ed
-
234.1 109.9
1005 1.35 DL1+1.5 WL3+0.9 TEMP1 6 9.17 -21.96 42.87 2

244.7 -
1006 1.35 DL1+1.5 WL4+0.9 TEMP1 1 9.14 -17.71 42.94 88.98

F
167.3 215.0 -
1007 1.35 DL1+1.5 WL5+0.9 TEMP1 2 44.74 -12.13 6 56.75

185.4 222.1 -

PD
1008 1.35 DL1+1.5 WL6+0.9 TEMP1 6 46.15 -7.75 8 35.23

- -
182.3 107.1
1009 1.35 DL1+1.5 WL7+0.9 TEMP1 25.64 -36.74 -21.97 7 0

-
182.2 -
te r
1010 1.35 DL1+1.5 WL8+0.9 TEMP1 37.06 -36.76 -17.73 2 86.19

- 102.9
1011 1.35 DL1+1.5 WL1+-0.9 TEMP1 86.20 -6.80 19.92 -35.88 8

- 123.8
1012 1.35 DL1+1.5 WL2+-0.9 TEMP1 74.91 -6.85 24.17 -35.88 8
as

220.7 -
1013 1.35 DL1+1.5 WL3+-0.9 TEMP1 3 3.53 -16.08 17.03 81.98

231.2 -
1014 1.35 DL1+1.5 WL4+-0.9 TEMP1 8 3.50 -11.83 17.09 61.04
nM

153.8 189.2 -
1015 1.35 DL1+1.5 WL5+-0.9 TEMP1 9 39.10 -6.25 2 28.81

172.0 196.3
1016 1.35 DL1+1.5 WL6+-0.9 TEMP1 4 40.51 -1.88 4 -7.28

-
208.2 -
di

1017 1.35 DL1+1.5 WL7+-0.9 TEMP1 12.22 -42.38 -16.10 1 79.16

-
208.0 -
1018 1.35 DL1+1.5 WL8+-0.9 TEMP1 23.63 -42.40 -11.85 6 58.24
a te

103.0 -
1019 1.35 DL1+0.9 TEMP1+1.35 MR1 1 4.22 -3.89 17.82 17.19

1020 1.35 DL1+-0.9 TEMP1+1.35 MR1 89.59 -1.41 1.98 -8.02 10.76

1021 1.35 DL1+1.5LL1+1.5 EQUIP1+0.9 198.9 -


TEMP1+1.35 MR1 5 5.25 -4.05 24.09 18.05
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1022 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 185.5
TEMP1+1.35 MR1 3 -0.39 1.83 -1.76 9.90

1023 1.148 DL1+1.5 LL1+1.5 EQUIP1+0.9 185.3 -


TEMP1+1.35 MR1 0 5.09 -3.89 23.60 17.52

Ed
1024 1.148 DL1+1.5 LL1+1.5 EQUIP1+-0.9 171.8
TEMP1+1.35 MR1 7 -0.55 1.98 -2.24 10.43

1025 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+0.9


TEMP1+1.35 MR1 96.51 2.21 6.76 8.38 37.47

1026 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+0.9 103.2

F
TEMP1+1.35 MR1 8 2.18 9.30 8.37 50.01

1027 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+0.9 280.6 -


TEMP1+1.35 MR1 7 8.41 -14.85 40.12 73.51

PD
1028 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+0.9 287.0 -
TEMP1+1.35 MR1 0 8.39 -12.30 40.16 60.94

1029 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+0.9 240.5 143.4 -


TEMP1+1.35 MR1 6 29.75 -8.95 3 41.60

1030 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+0.9 251.4 147.7 -


TEMP1+1.35 MR1 5 30.60 -6.33 0 28.69
te r
1031 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+0.9 155.5 -
TEMP1+1.35 MR1 6 -19.14 -14.86 -95.03 71.81

1032 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+0.9 162.4 -


TEMP1+1.35 MR1 1 -19.15 -12.31 -94.94 59.26
as

1033 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 83.08 -3.42 12.63 -17.47 65.41

1034 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 89.86 -3.45 15.18 -17.47 77.95
nM

1035 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+-0.9 267.2 -


TEMP1+1.35 MR1 4 2.77 -8.97 14.28 45.56

1036 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+-0.9 273.5 -


TEMP1+1.35 MR1 7 2.75 -6.42 14.32 33.00

1037 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+-0.9 227.1 117.5 -


TEMP1+1.35 MR1 4 24.11 -3.07 9 13.66
di

1038 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+-0.9 238.0 121.8


TEMP1+1.35 MR1 2 24.96 -0.45 6 -0.74

-
1039 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+-0.9 142.1 120.8 -
a te

TEMP1+1.35 MR1 3 -24.77 -8.98 7 43.87

-
1040 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+-0.9 148.9 120.7 -
TEMP1+1.35 MR1 8 -24.78 -6.43 8 31.32

1041 1.148 DL1+1.5 LL1+0.9 WL1+1.5


re

EQUIP1+0.9 TEMP1+1.35 MR1 82.85 2.05 6.91 7.89 38.00


APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1042 1.148 DL1+1.5 LL1+0.9 WL2+1.5
EQUIP1+0.9 TEMP1+1.35 MR1 89.63 2.02 9.45 7.89 50.54

1043 1.148 DL1+1.5 LL1+0.9 WL3+1.5 267.0 -


EQUIP1+0.9 TEMP1+1.35 MR1 1 8.25 -14.70 39.64 72.98

Ed
1044 1.148 DL1+1.5 LL1+0.9 WL4+1.5 273.3 -
EQUIP1+0.9 TEMP1+1.35 MR1 4 8.23 -12.15 39.68 60.42

1045 1.148 DL1+1.5 LL1+0.9 WL5+1.5 226.9 142.9 -


EQUIP1+0.9 TEMP1+1.35 MR1 1 29.59 -8.80 5 41.08

1046 1.148 DL1+1.5 LL1+0.9 WL6+1.5 237.7 147.2 -

F
EQUIP1+0.9 TEMP1+1.35 MR1 9 30.43 -6.17 2 28.16

1047 1.148 DL1+1.5 LL1+0.9 WL7+1.5 141.9 -


EQUIP1+0.9 TEMP1+1.35 MR1 0 -19.30 -14.70 -95.51 71.29

PD
1048 1.148 DL1+1.5 LL1+0.9 WL8+1.5 148.7 -
EQUIP1+0.9 TEMP1+1.35 MR1 5 -19.31 -12.16 -95.42 58.74

1049 1.148 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 69.43 -3.59 12.78 -17.95 65.94

1050 1.148 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 76.20 -3.62 15.33 -17.95 78.48
te r
1051 1.148 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+- 253.5 -
0.9 TEMP1+1.35 MR1 8 2.61 -8.82 13.80 45.04

1052 1.148 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+- 259.9 -


0.9 TEMP1+1.35 MR1 2 2.59 -6.27 13.84 32.47
as

1053 1.148 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+- 213.4 117.1 -


0.9 TEMP1+1.35 MR1 8 23.95 -2.92 1 13.13

1054 1.148 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+- 224.3 121.3


0.9 TEMP1+1.35 MR1 7 24.80 -0.30 8 -0.22
nM

-
1055 1.148 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+- 128.4 121.3 -
0.9 TEMP1+1.35 MR1 8 -24.94 -8.83 5 43.34

-
1056 1.148 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+- 135.3 121.2 -
0.9 TEMP1+1.35 MR1 3 -24.95 -6.28 6 30.79
di

1057 1.148 DL1+1.5 LL1+1.5 WL1+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 14.56 0.03 14.11 -2.58 75.01

1058 1.148 DL1+1.5 LL1+1.5 WL2+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 25.85 -0.02 18.35 -2.59 95.91
a te

-
1059 1.148 DL1+1.5 LL1+1.5 WL3+1.5 321.4 109.9
EQUIP1+0.9 TEMP1+1.35 MR1 9 10.36 -21.90 50.33 5

1060 1.148 DL1+1.5 LL1+1.5 WL4+1.5 332.0 -


EQUIP1+0.9 TEMP1+1.35 MR1 4 10.32 -17.65 50.39 89.01
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1061 1.148 DL1+1.5 LL1+1.5 WL5+1.5 254.6 222.5 -
EQUIP1+0.9 TEMP1+1.35 MR1 5 45.92 -12.07 2 56.78

1062 1.148 DL1+1.5 LL1+1.5 WL6+1.5 272.7 229.6 -


EQUIP1+0.9 TEMP1+1.35 MR1 9 47.33 -7.69 3 35.26

Ed
- -
1063 1.148 DL1+1.5 LL1+1.5 WL7+1.5 112.9 174.9 107.1
EQUIP1+0.9 TEMP1+1.35 MR1 7 -35.55 -21.91 2 3

-
1064 1.148 DL1+1.5 LL1+1.5 WL8+1.5 124.3 174.7 -
EQUIP1+0.9 TEMP1+1.35 MR1 9 -35.57 -17.66 7 86.22

F
1065 1.148 DL1+1.5 LL1+1.5 WL1+1.5 EQUIP1+- 102.9
0.9 TEMP1+1.35 MR1 1.13 -5.61 19.98 -28.42 5

PD
1066 1.148 DL1+1.5 LL1+1.5 WL2+1.5 EQUIP1+- 123.8
0.9 TEMP1+1.35 MR1 12.42 -5.66 24.23 -28.43 5

1067 1.148 DL1+1.5 LL1+1.5 WL3+1.5 EQUIP1+- 308.0 -


0.9 TEMP1+1.35 MR1 6 4.72 -16.02 24.49 82.01

1068 1.148 DL1+1.5 LL1+1.5 WL4+1.5 EQUIP1+- 318.6 -


0.9 TEMP1+1.35 MR1 1 4.69 -11.77 24.55 61.07
te r
1069 1.148 DL1+1.5 LL1+1.5 WL5+1.5 EQUIP1+- 241.2 196.6 -
0.9 TEMP1+1.35 MR1 2 40.29 -6.19 8 28.84

1070 1.148 DL1+1.5 LL1+1.5 WL6+1.5 EQUIP1+- 259.3 203.7


0.9 TEMP1+1.35 MR1 7 41.70 -1.82 9 -7.31
as

-
1071 1.148 DL1+1.5 LL1+1.5 WL7+1.5 EQUIP1+- 200.7 -
0.9 TEMP1+1.35 MR1 99.55 -41.19 -16.04 6 79.19

-
1072 1.148 DL1+1.5 LL1+1.5 WL8+1.5 EQUIP1+- 110.9 200.6 -
nM

0.9 TEMP1+1.35 MR1 6 -41.21 -11.79 1 58.27

258.9
1073 1 DL1+0.8 LL1+1 SL1 7 -1.16 -8.12 -6.38 34.81

164.5
1074 1 DL1+0.8 LL1+1 SL2 2 -15.26 -2.64 -75.33 5.73

- -
di

1075 1 DL1+0.8 LL1+-1 SL1 30.18 3.86 6.38 17.79 41.27

-
1076 1 DL1+0.8 LL1+-1 SL2 64.28 17.96 0.89 86.73 12.19
a te

2001 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+0.6


TEMP1+1 MR1 71.47 1.58 4.43 5.95 24.74

2002 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+0.6


TEMP1+1 MR1 75.99 1.56 6.13 5.95 33.10

2003 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+0.6 194.2 -


TEMP1+1 MR1 4 5.71 -9.97 27.11 49.24
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
2004 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+0.6 198.4 -
TEMP1+1 MR1 6 5.70 -8.27 27.14 40.87

2005 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+0.6 167.5 -


TEMP1+1 MR1 1 19.94 -6.04 95.99 27.97

Ed
2006 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+0.6 174.7 -
TEMP1+1 MR1 7 20.50 -4.29 98.83 19.36

2007 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+0.6 110.8 -


TEMP1+1 MR1 4 -12.65 -9.98 -62.99 48.11

2008 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+0.6 115.4 -

F
TEMP1+1 MR1 1 -12.66 -8.28 -62.93 39.75

2009 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+-0.6


TEMP1+1 MR1 62.52 -2.18 8.35 -11.28 43.37

PD
2010 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+-0.6
TEMP1+1 MR1 67.04 -2.20 10.05 -11.28 51.73

2011 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+-0.6 185.2 -


TEMP1+1 MR1 9 1.95 -6.05 9.88 30.61

2012 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+-0.6 189.5 -


TEMP1+1 MR1 1 1.94 -4.35 9.91 22.24
te r
2013 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+-0.6 158.5
TEMP1+1 MR1 6 16.18 -2.12 78.76 -9.35

2014 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+-0.6 165.8


TEMP1+1 MR1 2 16.74 -0.37 81.61 -0.73
as

2015 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+-0.6 101.8 -


TEMP1+1 MR1 9 -16.41 -6.06 -80.21 29.48

2016 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+-0.6 106.4 -


TEMP1+1 MR1 5 -16.42 -4.36 -80.15 21.12
nM

2017 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+0.6


TEMP1+1 MR1 25.94 0.23 9.23 -1.04 49.42

2018 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+0.6


TEMP1+1 MR1 33.47 0.20 12.06 -1.04 63.35

2019 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+0.6 230.5 -


TEMP1+1 MR1 6 7.12 -14.77 34.24 73.89
di

2020 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+0.6 237.5 -


TEMP1+1 MR1 9 7.09 -11.94 34.28 59.93

2021 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+0.6 186.0 149.0 -


TEMP1+1 MR1 0 30.83 -8.22 3 38.44
a te

2022 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+0.6 198.1 153.7 -


TEMP1+1 MR1 0 31.77 -5.30 7 24.09

-
2023 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+0.6 115.9 -
TEMP1+1 MR1 91.55 -23.49 -14.78 3 72.01
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
2024 1 DL1+1.0 LL1+1 WL8+1 EQUIP1+0.6 115.8 -
TEMP1+1 MR1 99.16 -23.50 -11.95 3 58.07

2025 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+-0.6

Ed
TEMP1+1 MR1 16.99 -3.53 13.15 -18.26 68.04

2026 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+-0.6


TEMP1+1 MR1 24.52 -3.56 15.98 -18.27 81.98

2027 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+-0.6 221.6 -


TEMP1+1 MR1 1 3.36 -10.85 17.01 55.26

F
2028 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+-0.6 228.6 -
TEMP1+1 MR1 4 3.34 -8.02 17.05 41.30

2029 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+-0.6 177.0 131.8 -

PD
TEMP1+1 MR1 5 27.07 -4.30 0 19.82

2030 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+-0.6 189.1 136.5


TEMP1+1 MR1 5 28.01 -1.38 5 -5.46

-
2031 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+-0.6 133.1 -
TEMP1+1 MR1 82.60 -27.25 -10.86 5 53.38
te r
-
2032 1 DL1+0.7 LL1+1 WL8+1 EQUIP1+-0.6 133.0 -
TEMP1+1 MR1 90.21 -27.26 -8.03 5 39.44

258.9
2033 1 DL1+0.8 LL1+1 SL1 7 -1.16 -8.12 -6.38 34.81
as

164.5
2034 1 DL1+0.8 LL1+1 SL2 2 -15.26 -2.64 -75.33 5.73

- -
2035 1 DL1+0.8 LL1+-1 SL1 30.18 3.86 6.38 17.79 41.27
nM

-
2036 1 DL1+0.8 LL1+-1 SL2 64.28 17.96 0.89 86.73 12.19

134.3
P3 500 1 DL1+1 LL1+1 EQUIP1 4 -1.67 -0.39 -5.66 -1.14

138.2 -
501 1 DL1+1 LL1+1 EQUIP1+1 TEMP1 6 -9.21 -3.27 -35.38 15.38
di

502 1 DL1+1 WL1 64.69 -2.82 0.89 -11.49 4.73

503 1 DL1+1 WL2 70.37 -2.58 0.92 -10.47 4.89

504 1 DL1+1 WL3 50.82 -1.87 -1.44 -6.19 -6.16


a te

505 1 DL1+1 WL4 56.51 -1.62 -1.40 -5.17 -5.96

-
346.5 171.9
506 1 DL1+1 WL5 5 43.02 -1.80 4 0.00
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
342.2 173.5
507 1 DL1+1 WL6 9 43.42 -1.77 6 0.18

Ed
456.2 175.7
508 1 DL1+1 WL7 3 -44.26 1.03 6 -1.92

-
461.8 174.7
509 1 DL1+1 WL8 6 -44.01 1.06 3 -1.75

510 1 DL1+0.7 WL1 64.85 -2.24 0.53 -8.91 3.15

F
511 1 DL1+0.7 WL2 68.83 -2.07 0.56 -8.19 3.27

512 1 DL1+0.7 WL3 55.15 -1.57 -1.10 -5.20 -4.47

PD
513 1 DL1+0.7 WL4 59.13 -1.40 -1.07 -4.49 -4.33

-
223.0 119.4
514 1 DL1+0.7 WL5 1 29.85 -1.34 9 -0.16

-
220.0 120.6
te r
515 1 DL1+0.7 WL6 3 30.13 -1.33 3 -0.03

-
338.9 123.9
516 1 DL1+0.7 WL7 3 -31.24 0.63 0 -1.50
as

-
342.8 123.1
517 1 DL1+0.7 WL8 8 -31.07 0.65 7 -1.38

133.9
518 1 DL1+ 1LL1+0.75 WL1+1 EQUIP1 2 -3.14 0.49 -12.11 2.79
nM

138.1
519 1 DL1+1.0 LL1+0.75 WL2+1 EQUIP1 8 -2.95 0.51 -11.34 2.92

123.5
520 1 DL1+1.0 LL1+0.75 WL3+1 EQUIP1 2 -2.42 -1.26 -8.13 -5.37

127.7
521 1 DL1+1.0 LL1+0.75 WL4+1 EQUIP1 9 -2.24 -1.23 -7.37 -5.22
di

-
174.5 125.4
522 1 DL1+1.0 LL1+0.75 WL5+1 EQUIP1 0 31.24 -1.52 6 -0.75
a te

-
171.3 126.6
523 1 DL1+1.0 LL1+0.75 WL6+1 EQUIP1 1 31.54 -1.50 8 -0.62

-
427.5 135.3
524 1 DL1+1.0 LL1+0.75 WL7+1 EQUIP1 8 -34.21 0.59 1 -2.19
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
431.8 134.5
525 1 DL1+1.0 LL1+0.75 WL8+1 EQUIP1 1 -34.03 0.62 3 -2.06

151.2

Ed
526 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL1 9 -3.74 -2.84 -13.19 10.63

252.2
527 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL2 1 -14.24 -0.92 -55.77 0.36

528 0.6 DL1+1 WL1 38.59 -2.47 1.00 -10.33 4.94

529 0.6 DL1+1 WL2 44.27 -2.23 1.03 -9.31 5.10

F
530 0.6 DL1+1 WL3 24.73 -1.52 -1.33 -5.04 -5.95

531 0.6 DL1+1 WL4 30.41 -1.27 -1.29 -4.02 -5.75

PD
-
372.6 173.0
532 0.6 DL1+1 WL5 4 43.37 -1.68 9 0.21

-
368.3 174.7
533 0.6 DL1+1 WL6 8 43.77 -1.66 2 0.39
te r
-
430.1 174.6
534 0.6 DL1+1 WL7 3 -43.91 1.14 1 -1.70

-
435.7 173.5
as

535 0.6 DL1+1 WL8 7 -43.66 1.17 7 -1.54

536 0.6 DL1+0.7 SL1 61.74 -3.27 -3.44 -11.78 15.38

196.3
537 0.6 DL1+0.7 SL2 1 -17.29 -0.88 -68.55 1.68
nM

195.2 -
1001 1.35 DL1+1.5 LL1+1.5 EQUIP1+0.9 TEMP1 5 -9.16 -3.13 -34.80 14.45

188.1
1002 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 TEMP1 9 4.41 2.05 18.70 11.17

1003 1.35 DL1+1.5 WL1+0.9 TEMP1 90.77 -10.89 -1.22 -43.55 -5.64
di

1004 1.35 DL1+1.5 WL2+0.9 TEMP1 99.29 -10.52 -1.17 -42.02 -5.39

-
1005 1.35 DL1+1.5 WL3+0.9 TEMP1 69.97 -9.46 -4.71 -35.61 21.97

-
a te

1006 1.35 DL1+1.5 WL4+0.9 TEMP1 78.50 -9.09 -4.65 -34.08 21.67

-
526.0 231.5 -
1007 1.35 DL1+1.5 WL5+0.9 TEMP1 8 57.87 -5.24 9 12.73
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
519.6 234.0 -
1008 1.35 DL1+1.5 WL6+0.9 TEMP1 9 58.47 -5.21 3 12.46

Ed
678.0 289.9 -
1009 1.35 DL1+1.5 WL7+0.9 TEMP1 8 -73.04 -1.01 6 15.60

-
686.5 288.4 -
1010 1.35 DL1+1.5 WL8+0.9 TEMP1 4 -72.67 -0.96 1 15.35

1011 1.35 DL1+1.5 WL1+-0.9 TEMP1 83.72 2.69 3.96 9.96 19.98

F
1012 1.35 DL1+1.5 WL2+-0.9 TEMP1 92.24 3.05 4.01 11.49 20.23

1013 1.35 DL1+1.5 WL3+-0.9 TEMP1 62.92 4.12 0.47 17.90 3.65

PD
1014 1.35 DL1+1.5 WL4+-0.9 TEMP1 71.45 4.48 0.53 19.43 3.95

-
533.1 285.0
1015 1.35 DL1+1.5 WL5+-0.9 TEMP1 3 71.45 -0.06 9 12.89

-
526.7 287.5
te r
1016 1.35 DL1+1.5 WL6+-0.9 TEMP1 4 72.04 -0.02 3 13.16

-
671.0 236.4
1017 1.35 DL1+1.5 WL7+-0.9 TEMP1 3 -59.47 4.17 6 10.02
as

-
679.4 234.9
1018 1.35 DL1+1.5 WL8+-0.9 TEMP1 8 -59.10 4.22 0 10.27

-
1019 1.35 DL1+0.9 TEMP1+1.35 MR1 95.04 -8.30 -2.98 -31.90 13.61
nM

1020 1.35 DL1+-0.9 TEMP1+1.35 MR1 87.98 5.28 2.21 21.61 12.01

1021 1.35 DL1+1.5LL1+1.5 EQUIP1+0.9 198.6 -


TEMP1+1.35 MR1 8 -9.50 -3.13 -36.05 14.53

1022 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 191.6


TEMP1+1.35 MR1 3 4.07 2.05 17.46 11.09
di

1023 1.148 DL1+1.5 LL1+1.5 EQUIP1+0.9 185.5 -


TEMP1+1.35 MR1 1 -9.32 -3.08 -35.47 14.43

1024 1.148 DL1+1.5 LL1+1.5 EQUIP1+-0.9 178.4


TEMP1+1.35 MR1 5 4.25 2.11 18.04 11.19
a te

1025 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+0.9 198.1


TEMP1+1.35 MR1 8 -11.26 -2.08 -43.79 -9.81

1026 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+0.9 203.3


TEMP1+1.35 MR1 0 -11.04 -2.05 -42.87 -9.66

1027 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+0.9 185.7 -


re

TEMP1+1.35 MR1 1 -10.40 -4.17 -39.02 19.60


APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1028 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+0.9 190.8 -
TEMP1+1.35 MR1 3 -10.18 -4.14 -38.11 19.42

-
1029 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+0.9 171.9 121.2 -

Ed
TEMP1+1.35 MR1 2 30.00 -4.49 9 14.06

-
1030 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+0.9 168.0 122.7 -
TEMP1+1.35 MR1 9 30.36 -4.47 6 13.90

-
1031 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+0.9 550.5 191.6 -

F
TEMP1+1.35 MR1 7 -48.55 -1.95 4 15.78

PD
1032 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+0.9 555.6 190.7 -
TEMP1+1.35 MR1 4 -48.33 -1.93 0 15.63

1033 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+-0.9 191.1


TEMP1+1.35 MR1 3 2.32 3.10 9.72 15.81

1034 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+-0.9 196.2


TEMP1+1.35 MR1 4 2.54 3.13 10.64 15.96

1035 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+-0.9 178.6


te r
TEMP1+1.35 MR1 5 3.18 1.01 14.48 6.02

1036 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+-0.9 183.7


TEMP1+1.35 MR1 7 3.40 1.04 15.40 6.20

-
as

1037 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+-0.9 178.9 174.8


TEMP1+1.35 MR1 8 43.57 0.69 0 11.56

-
1038 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+-0.9 175.1 176.2
nM

TEMP1+1.35 MR1 4 43.93 0.71 6 11.72

-
1039 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+-0.9 543.5 138.1
TEMP1+1.35 MR1 2 -34.98 3.23 3 9.84

-
1040 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+-0.9 548.5 137.2
TEMP1+1.35 MR1 9 -34.75 3.26 0 9.99
di

1041 1.148 DL1+1.5 LL1+0.9 WL1+1.5 185.0


EQUIP1+0.9 TEMP1+1.35 MR1 1 -11.08 -2.02 -43.21 -9.70

1042 1.148 DL1+1.5 LL1+0.9 WL2+1.5 190.1


EQUIP1+0.9 TEMP1+1.35 MR1 2 -10.86 -1.99 -42.29 -9.55
a te

1043 1.148 DL1+1.5 LL1+0.9 WL3+1.5 172.5 -


EQUIP1+0.9 TEMP1+1.35 MR1 3 -10.22 -4.12 -38.44 19.50

1044 1.148 DL1+1.5 LL1+0.9 WL4+1.5 177.6 -


EQUIP1+0.9 TEMP1+1.35 MR1 5 -10.00 -4.08 -37.52 19.32
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
1045 1.148 DL1+1.5 LL1+0.9 WL5+1.5 185.1 121.8 -
EQUIP1+0.9 TEMP1+1.35 MR1 0 30.18 -4.43 8 13.95

Ed
1046 1.148 DL1+1.5 LL1+0.9 WL6+1.5 181.2 123.3 -
EQUIP1+0.9 TEMP1+1.35 MR1 7 30.53 -4.41 4 13.79

-
1047 1.148 DL1+1.5 LL1+0.9 WL7+1.5 537.4 191.0 -
EQUIP1+0.9 TEMP1+1.35 MR1 0 -48.37 -1.89 5 15.68

F
1048 1.148 DL1+1.5 LL1+0.9 WL8+1.5 542.4 190.1 -
EQUIP1+0.9 TEMP1+1.35 MR1 7 -48.15 -1.87 2 15.53

PD
1049 1.148 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+- 177.9
0.9 TEMP1+1.35 MR1 5 2.49 3.16 10.30 15.92

1050 1.148 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+- 183.0


0.9 TEMP1+1.35 MR1 7 2.71 3.19 11.22 16.07

1051 1.148 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+- 165.4


0.9 TEMP1+1.35 MR1 8 3.35 1.07 15.07 6.13

1052 1.148 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+- 170.5


te r
0.9 TEMP1+1.35 MR1 9 3.57 1.10 15.98 6.30

-
1053 1.148 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+- 192.1 175.3
0.9 TEMP1+1.35 MR1 5 43.75 0.75 8 11.67
as

-
1054 1.148 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+- 188.3 176.8
0.9 TEMP1+1.35 MR1 2 44.11 0.77 5 11.83

-
nM

1055 1.148 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+- 530.3 137.5


0.9 TEMP1+1.35 MR1 4 -34.80 3.29 5 9.94

-
1056 1.148 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+- 535.4 136.6
0.9 TEMP1+1.35 MR1 1 -34.58 3.32 1 10.09

1057 1.148 DL1+1.5 LL1+1.5 WL1+1.5 184.6


EQUIP1+0.9 TEMP1+1.35 MR1 7 -12.25 -1.32 -48.37 -6.55
di

1058 1.148 DL1+1.5 LL1+1.5 WL2+1.5 193.1


EQUIP1+0.9 TEMP1+1.35 MR1 9 -11.89 -1.27 -46.83 -6.30

1059 1.148 DL1+1.5 LL1+1.5 WL3+1.5 163.8 -


EQUIP1+0.9 TEMP1+1.35 MR1 8 -10.82 -4.81 -40.42 22.87
a te

1060 1.148 DL1+1.5 LL1+1.5 WL4+1.5 172.4 -


EQUIP1+0.9 TEMP1+1.35 MR1 1 -10.45 -4.75 -38.89 22.57

-
1061 1.148 DL1+1.5 LL1+1.5 WL5+1.5 432.1 226.7 -
EQUIP1+0.9 TEMP1+1.35 MR1 7 56.51 -5.34 7 13.64
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
1062 1.148 DL1+1.5 LL1+1.5 WL6+1.5 425.7 229.2 -
EQUIP1+0.9 TEMP1+1.35 MR1 9 57.11 -5.30 1 13.37

Ed
1063 1.148 DL1+1.5 LL1+1.5 WL7+1.5 771.9 294.7 -
EQUIP1+0.9 TEMP1+1.35 MR1 9 -74.41 -1.11 8 16.51

-
1064 1.148 DL1+1.5 LL1+1.5 WL8+1.5 780.4 293.2 -
EQUIP1+0.9 TEMP1+1.35 MR1 4 -74.04 -1.06 2 16.26

1065 1.148 DL1+1.5 LL1+1.5 WL1+1.5 EQUIP1+- 177.6

F
0.9 TEMP1+1.35 MR1 2 1.32 3.87 5.14 19.07

1066 1.148 DL1+1.5 LL1+1.5 WL2+1.5 EQUIP1+- 186.1

PD
0.9 TEMP1+1.35 MR1 4 1.69 3.91 6.67 19.32

1067 1.148 DL1+1.5 LL1+1.5 WL3+1.5 EQUIP1+- 156.8


0.9 TEMP1+1.35 MR1 2 2.75 0.38 13.09 2.75

1068 1.148 DL1+1.5 LL1+1.5 WL4+1.5 EQUIP1+- 165.3


0.9 TEMP1+1.35 MR1 6 3.12 0.43 14.61 3.05

-
1069 1.148 DL1+1.5 LL1+1.5 WL5+1.5 EQUIP1+- 439.2 280.2
te r
0.9 TEMP1+1.35 MR1 2 70.08 -0.16 8 11.99

-
1070 1.148 DL1+1.5 LL1+1.5 WL6+1.5 EQUIP1+- 432.8 282.7
0.9 TEMP1+1.35 MR1 4 70.68 -0.12 2 12.25
as

-
1071 1.148 DL1+1.5 LL1+1.5 WL7+1.5 EQUIP1+- 764.9 241.2
0.9 TEMP1+1.35 MR1 4 -60.83 4.08 7 9.11

-
nM

1072 1.148 DL1+1.5 LL1+1.5 WL8+1.5 EQUIP1+- 773.3 239.7


0.9 TEMP1+1.35 MR1 9 -60.46 4.12 2 9.36

150.9
1073 1 DL1+0.8 LL1+1 SL1 0 -5.34 -5.03 -19.05 21.42

-
343.1 100.1
1074 1 DL1+0.8 LL1+1 SL2 3 -25.35 -1.38 5 1.86
di

-
1075 1 DL1+0.8 LL1+-1 SL1 86.33 2.52 4.29 9.65 23.42

-
105.9
a te

1076 1 DL1+0.8 LL1+-1 SL2 1 22.54 0.64 90.75 -3.86

2001 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+0.6 138.9


TEMP1+1 MR1 0 -7.62 -1.41 -29.57 -6.60

2002 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+0.6 142.3


TEMP1+1 MR1 1 -7.47 -1.40 -28.96 -6.50
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
2003 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+0.6 130.5 -
TEMP1+1 MR1 8 -7.04 -2.81 -26.40 13.13

2004 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+0.6 134.0 -


TEMP1+1 MR1 0 -6.90 -2.79 -25.78 13.01

Ed
-
2005 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+0.6 107.8
TEMP1+1 MR1 4 19.89 -3.02 80.48 -9.43

-
2006 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+0.6 105.2
TEMP1+1 MR1 8 20.13 -3.01 81.46 -9.33

F
-
2007 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+0.6 373.8 128.1 -

PD
TEMP1+1 MR1 3 -32.48 -1.33 4 10.58

-
2008 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+0.6 377.2 127.5 -
TEMP1+1 MR1 1 -32.33 -1.31 2 10.48

2009 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+-0.6 134.2


TEMP1+1 MR1 0 1.43 2.04 6.10 10.48

2010 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+-0.6 137.6


te r
TEMP1+1 MR1 1 1.58 2.06 6.71 10.58

2011 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+-0.6 125.8


TEMP1+1 MR1 8 2.01 0.65 9.28 3.95

2012 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+-0.6 129.2


as

TEMP1+1 MR1 9 2.15 0.67 9.89 4.07

-
2013 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+-0.6 112.5 116.1
TEMP1+1 MR1 4 28.94 0.43 5 7.65
nM

-
2014 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+-0.6 109.9 117.1
TEMP1+1 MR1 8 29.18 0.45 3 7.75

2015 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+-0.6 369.1


TEMP1+1 MR1 3 -23.43 2.13 -92.47 6.50

2016 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+-0.6 372.5


di

TEMP1+1 MR1 1 -23.28 2.14 -91.85 6.60

2017 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+0.6 138.6


TEMP1+1 MR1 8 -8.40 -0.95 -33.01 -4.50

2018 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+0.6 144.3


a te

TEMP1+1 MR1 6 -8.15 -0.92 -31.99 -4.33

2019 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+0.6 124.8 -


TEMP1+1 MR1 2 -7.44 -3.27 -27.72 15.38

2020 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+0.6 130.5 -


TEMP1+1 MR1 0 -7.20 -3.24 -26.70 15.18
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
2021 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+0.6 272.5 150.4
TEMP1+1 MR1 5 37.44 -3.63 1 -9.22

Ed
2022 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+0.6 268.2 152.0
TEMP1+1 MR1 9 37.84 -3.60 4 -9.04

-
2023 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+0.6 530.2 197.2 -
TEMP1+1 MR1 2 -49.83 -0.81 9 11.14

F
2024 1 DL1+1.0 LL1+1 WL8+1 EQUIP1+0.6 535.8 196.2 -
TEMP1+1 MR1 6 -49.59 -0.78 5 10.97

PD
2025 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+-0.6 133.9
TEMP1+1 MR1 8 0.65 2.51 2.66 12.58

2026 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+-0.6 139.6


TEMP1+1 MR1 6 0.90 2.54 3.68 12.75

2027 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+-0.6 120.1


TEMP1+1 MR1 1 1.61 0.18 7.95 1.70

2028 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+-0.6 125.8


te r
TEMP1+1 MR1 0 1.85 0.22 8.97 1.90

-
2029 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+-0.6 277.2 186.0
TEMP1+1 MR1 5 46.49 -0.17 8 7.86
as

-
2030 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+-0.6 273.0 187.7
TEMP1+1 MR1 0 46.89 -0.15 1 8.04

-
nM

2031 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+-0.6 525.5 161.6


TEMP1+1 MR1 2 -40.79 2.65 2 5.94

-
2032 1 DL1+0.7 LL1+1 WL8+1 EQUIP1+-0.6 531.1 160.5
TEMP1+1 MR1 6 -40.54 2.68 8 6.11

150.9
2033 1 DL1+0.8 LL1+1 SL1 0 -5.34 -5.03 -19.05 21.42
di

-
343.1 100.1
2034 1 DL1+0.8 LL1+1 SL2 3 -25.35 -1.38 5 1.86

-
a te

2035 1 DL1+0.8 LL1+-1 SL1 86.33 2.52 4.29 9.65 23.42

-
105.9
2036 1 DL1+0.8 LL1+-1 SL2 1 22.54 0.64 90.75 -3.86

194.4
re

P4 500 1 DL1+1 LL1+1 EQUIP1 9 -1.57 -2.80 -6.85 -6.15


APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
192.9 -
501 1 DL1+1 LL1+1 EQUIP1+1 TEMP1 2 -7.31 -12.53 -28.79 46.14

502 1 DL1+1 WL1 92.19 -2.12 11.93 -11.71 54.49

Ed
103.6
503 1 DL1+1 WL2 3 -1.88 12.37 -10.70 56.69

-
504 1 DL1+1 WL3 69.20 -2.55 -14.83 -8.96 56.54

-
505 1 DL1+1 WL4 80.63 -2.31 -14.32 -7.95 54.02

F
-
114.2 191.3 -
506 1 DL1+1 WL5 2 45.62 -2.73 6 11.03

PD
-
104.2 193.0
507 1 DL1+1 WL6 9 46.01 -2.30 4 -8.86

-
270.0 196.7
508 1 DL1+1 WL7 3 -47.98 -2.66 9 -4.65
te r
-
281.4 195.7
509 1 DL1+1 WL8 3 -47.74 -2.22 6 -2.44

510 1 DL1+0.7 WL1 93.35 -1.86 7.94 -9.40 37.84


as

101.3
511 1 DL1+0.7 WL2 6 -1.69 8.24 -8.69 39.38

-
512 1 DL1+0.7 WL3 77.26 -2.16 -10.80 -7.48 39.88
nM

-
513 1 DL1+0.7 WL4 85.26 -1.99 -10.44 -6.77 38.12

- 132.7
514 1 DL1+0.7 WL5 51.14 31.56 -2.33 5 -8.03

- 133.9
515 1 DL1+0.7 WL6 44.18 31.83 -2.03 2 -6.50
di

-
217.8 138.9
516 1 DL1+0.7 WL7 4 -33.96 -2.28 6 -3.56

-
a te

225.8 138.2
517 1 DL1+0.7 WL8 2 -33.79 -1.97 4 -2.01

191.5
518 1 DL1+ 1LL1+0.75 WL1+1 EQUIP1 9 -2.22 7.19 -12.62 35.47

200.1
519 1 DL1+1.0 LL1+0.75 WL2+1 EQUIP1 7 -2.04 7.52 -11.86 37.12
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
174.3 -
520 1 DL1+1.0 LL1+0.75 WL3+1 EQUIP1 5 -2.54 -12.88 -10.56 47.80

182.9 -
521 1 DL1+1.0 LL1+0.75 WL4+1 EQUIP1 2 -2.36 -12.50 -9.80 45.92

Ed
139.6 -
522 1 DL1+1.0 LL1+0.75 WL5+1 EQUIP1 36.78 33.59 -3.81 8 13.67

140.9 -
523 1 DL1+1.0 LL1+0.75 WL6+1 EQUIP1 44.23 33.88 -3.48 4 12.04

F
324.9 151.4
524 1 DL1+1.0 LL1+0.75 WL7+1 EQUIP1 7 -36.61 -3.75 3 -8.89

PD
333.5 150.6
525 1 DL1+1.0 LL1+0.75 WL8+1 EQUIP1 2 -36.43 -3.42 6 -7.23

204.8
526 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL1 5 -4.27 -18.27 -16.73 56.74

250.9
527 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL2 6 -15.09 -4.30 -62.73 0.38
te r
528 0.6 DL1+1 WL1 53.77 -1.62 12.49 -10.10 54.89

529 0.6 DL1+1 WL2 65.20 -1.38 12.93 -9.09 57.09

-
530 0.6 DL1+1 WL3 30.78 -2.05 -14.28 -7.36 56.14
as

-
531 0.6 DL1+1 WL4 42.20 -1.81 -13.76 -6.34 53.62

-
152.6 192.9 -
nM

532 0.6 DL1+1 WL5 5 46.12 -2.17 7 10.63

-
142.7 194.6
533 0.6 DL1+1 WL6 1 46.51 -1.74 5 -8.45

-
231.6 195.1
534 0.6 DL1+1 WL7 0 -47.48 -2.10 8 -4.25
di

-
243.0 194.1
535 0.6 DL1+1 WL8 1 -47.24 -1.66 5 -2.04
a te

536 0.6 DL1+0.7 SL1 71.45 -4.35 -21.46 -15.59 83.25

132.9
537 0.6 DL1+0.7 SL2 2 -18.78 -2.83 -76.93 8.11

275.9 -
1001 1.35 DL1+1.5 LL1+1.5 EQUIP1+0.9 TEMP1 2 -7.34 -12.75 -29.42 45.07
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
278.7
1002 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 TEMP1 5 3.01 4.76 10.08 26.91

122.4
1003 1.35 DL1+1.5 WL1+0.9 TEMP1 6 -8.16 9.35 -36.70 45.89

Ed
139.6
1004 1.35 DL1+1.5 WL2+0.9 TEMP1 2 -7.81 10.01 -35.19 49.20

-
120.6
1005 1.35 DL1+1.5 WL3+0.9 TEMP1 87.98 -8.81 -30.80 -32.59 4

F
-
105.1 116.8
1006 1.35 DL1+1.5 WL4+0.9 TEMP1 2 -8.45 -30.02 -31.06 7

PD
-
187.1 267.9 -
1007 1.35 DL1+1.5 WL5+0.9 TEMP1 6 63.45 -12.64 0 52.39

-
172.2 270.4 -
1008 1.35 DL1+1.5 WL6+0.9 TEMP1 6 64.02 -11.99 1 49.12

-
te r
389.2 314.3 -
1009 1.35 DL1+1.5 WL7+0.9 TEMP1 2 -76.95 -12.53 2 42.81

-
406.3 312.7 -
1010 1.35 DL1+1.5 WL8+0.9 TEMP1 2 -76.59 -11.87 8 39.50
as

125.2 117.8
1011 1.35 DL1+1.5 WL1+-0.9 TEMP1 9 2.19 26.87 2.79 7

142.4 121.1
nM

1012 1.35 DL1+1.5 WL2+-0.9 TEMP1 5 2.54 27.53 4.31 7

-
1013 1.35 DL1+1.5 WL3+-0.9 TEMP1 90.81 1.54 -13.29 6.90 48.67

107.9 -
1014 1.35 DL1+1.5 WL4+-0.9 TEMP1 5 1.90 -12.51 8.43 44.90

-
di

184.3 307.3
1015 1.35 DL1+1.5 WL5+-0.9 TEMP1 3 73.80 4.87 9 19.59

-
169.4 309.9
1016 1.35 DL1+1.5 WL6+-0.9 TEMP1 2 74.37 5.52 1 22.85
a te

-
392.0 274.8
1017 1.35 DL1+1.5 WL7+-0.9 TEMP1 5 -66.60 4.98 3 29.16

-
409.1 273.2
re

1018 1.35 DL1+1.5 WL8+-0.9 TEMP1 5 -66.25 5.64 9 32.47


APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
136.3 -
1019 1.35 DL1+0.9 TEMP1+1.35 MR1 6 -7.08 -10.70 -26.50 37.59

139.1
1020 1.35 DL1+-0.9 TEMP1+1.35 MR1 9 3.26 6.81 13.00 34.39

Ed
1021 1.35 DL1+1.5LL1+1.5 EQUIP1+0.9 284.0 -
TEMP1+1.35 MR1 1 -7.56 -12.82 -30.75 45.31

1022 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 286.8


TEMP1+1.35 MR1 4 2.79 4.69 8.75 26.67

1023 1.148 DL1+1.5 LL1+1.5 EQUIP1+0.9 264.6 -

F
TEMP1+1.35 MR1 1 -7.31 -12.54 -29.93 45.10

1024 1.148 DL1+1.5 LL1+1.5 EQUIP1+-0.9 267.4


TEMP1+1.35 MR1 4 3.04 4.98 9.56 26.87

PD
1025 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+0.9 280.5
TEMP1+1.35 MR1 2 -8.34 -0.82 -37.67 4.64

1026 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+0.9 290.8


TEMP1+1.35 MR1 2 -8.13 -0.43 -36.76 6.62

1027 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+0.9 259.8 -


TEMP1+1.35 MR1 3 -8.72 -24.91 -35.20 95.28
te r
1028 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+0.9 270.1 -
TEMP1+1.35 MR1 2 -8.51 -24.45 -34.28 93.02

1029 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+0.9 145.0 -


TEMP1+1.35 MR1 94.75 34.63 -14.02 9 54.33
as

1030 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+0.9 103.7 146.6 -


TEMP1+1.35 MR1 0 34.97 -13.63 0 52.37

-
1031 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+0.9 440.5 204.2 -
nM

TEMP1+1.35 MR1 8 -49.61 -13.96 4 48.58

-
1032 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+0.9 450.8 203.3 -
TEMP1+1.35 MR1 4 -49.40 -13.56 1 46.60

1033 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+-0.9 283.3


TEMP1+1.35 MR1 6 2.01 16.69 1.83 76.61
di

1034 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+-0.9 293.6


TEMP1+1.35 MR1 5 2.22 17.08 2.74 78.59

1035 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+-0.9 262.6 -


TEMP1+1.35 MR1 7 1.62 -7.40 4.30 23.31
a te

1036 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+-0.9 272.9 -


TEMP1+1.35 MR1 5 1.84 -6.94 5.21 21.05

1037 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+-0.9 184.5


TEMP1+1.35 MR1 97.59 44.97 3.49 9 17.64

1038 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+-0.9 106.5 186.1


re

TEMP1+1.35 MR1 3 45.32 3.88 0 19.60


APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
1039 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+-0.9 443.4 164.7
TEMP1+1.35 MR1 1 -39.26 3.56 4 23.39

Ed
1040 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+-0.9 453.6 163.8
TEMP1+1.35 MR1 7 -39.05 3.95 2 25.37

1041 1.148 DL1+1.5 LL1+0.9 WL1+1.5 261.1


EQUIP1+0.9 TEMP1+1.35 MR1 2 -8.09 -0.54 -36.85 4.84

1042 1.148 DL1+1.5 LL1+0.9 WL2+1.5 271.4


EQUIP1+0.9 TEMP1+1.35 MR1 1 -7.88 -0.15 -35.94 6.83

F
1043 1.148 DL1+1.5 LL1+0.9 WL3+1.5 240.4 -
EQUIP1+0.9 TEMP1+1.35 MR1 3 -8.47 -24.63 -34.39 95.08

PD
1044 1.148 DL1+1.5 LL1+0.9 WL4+1.5 250.7 -
EQUIP1+0.9 TEMP1+1.35 MR1 1 -8.26 -24.17 -33.47 92.82

1045 1.148 DL1+1.5 LL1+0.9 WL5+1.5 145.9 -


EQUIP1+0.9 TEMP1+1.35 MR1 75.35 34.88 -13.74 1 54.13

1046 1.148 DL1+1.5 LL1+0.9 WL6+1.5 147.4 -


EQUIP1+0.9 TEMP1+1.35 MR1 84.29 35.22 -13.35 2 52.17
te r
-
1047 1.148 DL1+1.5 LL1+0.9 WL7+1.5 421.1 203.4 -
EQUIP1+0.9 TEMP1+1.35 MR1 8 -49.36 -13.67 3 48.38

-
1048 1.148 DL1+1.5 LL1+0.9 WL8+1.5 431.4 202.5 -
as

EQUIP1+0.9 TEMP1+1.35 MR1 4 -49.15 -13.28 0 46.40

1049 1.148 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+- 263.9


0.9 TEMP1+1.35 MR1 5 2.26 16.97 2.64 76.81

1050 1.148 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+- 274.2


nM

0.9 TEMP1+1.35 MR1 5 2.47 17.37 3.55 78.80

1051 1.148 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+- 243.2 -


0.9 TEMP1+1.35 MR1 6 1.88 -7.12 5.11 23.11

1052 1.148 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+- 253.5 -


0.9 TEMP1+1.35 MR1 5 2.09 -6.66 6.02 20.84

1053 1.148 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+- 185.4


di

0.9 TEMP1+1.35 MR1 78.18 45.23 3.77 0 17.85

1054 1.148 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+- 186.9


0.9 TEMP1+1.35 MR1 87.12 45.57 4.16 1 19.81
a te

-
1055 1.148 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+- 424.0 163.9
0.9 TEMP1+1.35 MR1 1 -39.01 3.84 3 23.59

-
1056 1.148 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+- 434.2 163.0
0.9 TEMP1+1.35 MR1 7 -38.80 4.23 1 25.58
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1057 1.148 DL1+1.5 LL1+1.5 WL1+1.5 258.8
EQUIP1+0.9 TEMP1+1.35 MR1 0 -8.61 7.45 -41.47 38.14

1058 1.148 DL1+1.5 LL1+1.5 WL2+1.5 275.9


EQUIP1+0.9 TEMP1+1.35 MR1 5 -8.25 8.11 -39.95 41.45

Ed
-
1059 1.148 DL1+1.5 LL1+1.5 WL3+1.5 224.3 128.4
EQUIP1+0.9 TEMP1+1.35 MR1 1 -9.25 -32.70 -37.35 0

-
1060 1.148 DL1+1.5 LL1+1.5 WL4+1.5 241.4 124.6
EQUIP1+0.9 TEMP1+1.35 MR1 5 -8.90 -31.92 -35.83 3

F
1061 1.148 DL1+1.5 LL1+1.5 WL5+1.5 - 263.1 -
EQUIP1+0.9 TEMP1+1.35 MR1 50.82 63.00 -14.54 3 60.14

PD
1062 1.148 DL1+1.5 LL1+1.5 WL6+1.5 - 265.6 -
EQUIP1+0.9 TEMP1+1.35 MR1 35.92 63.58 -13.89 5 56.87

-
1063 1.148 DL1+1.5 LL1+1.5 WL7+1.5 525.5 319.0 -
EQUIP1+0.9 TEMP1+1.35 MR1 6 -77.39 -14.43 9 50.56

-
1064 1.148 DL1+1.5 LL1+1.5 WL8+1.5 542.6 317.5 -
te r
EQUIP1+0.9 TEMP1+1.35 MR1 6 -77.04 -13.77 5 47.26

1065 1.148 DL1+1.5 LL1+1.5 WL1+1.5 EQUIP1+- 261.6 110.1


0.9 TEMP1+1.35 MR1 3 1.74 24.97 -1.97 1

1066 1.148 DL1+1.5 LL1+1.5 WL2+1.5 EQUIP1+- 278.7 113.4


as

0.9 TEMP1+1.35 MR1 8 2.09 25.63 -0.46 2

1067 1.148 DL1+1.5 LL1+1.5 WL3+1.5 EQUIP1+- 227.1 -


0.9 TEMP1+1.35 MR1 4 1.10 -15.19 2.14 56.43

1068 1.148 DL1+1.5 LL1+1.5 WL4+1.5 EQUIP1+- 244.2 -


nM

0.9 TEMP1+1.35 MR1 8 1.45 -14.41 3.67 52.65

1069 1.148 DL1+1.5 LL1+1.5 WL5+1.5 EQUIP1+- - 302.6


0.9 TEMP1+1.35 MR1 47.99 73.35 2.97 3 11.83

1070 1.148 DL1+1.5 LL1+1.5 WL6+1.5 EQUIP1+- - 305.1


0.9 TEMP1+1.35 MR1 33.09 73.93 3.62 4 15.10

-
di

1071 1.148 DL1+1.5 LL1+1.5 WL7+1.5 EQUIP1+- 528.3 279.6


0.9 TEMP1+1.35 MR1 9 -67.05 3.08 0 21.41

-
1072 1.148 DL1+1.5 LL1+1.5 WL8+1.5 EQUIP1+- 545.4 278.0
a te

0.9 TEMP1+1.35 MR1 9 -66.69 3.74 5 24.71

191.6 114.7
1073 1 DL1+0.8 LL1+1 SL1 9 -6.54 -31.96 -24.66 7

-
279.5 112.2
1074 1 DL1+0.8 LL1+1 SL2 1 -27.16 -5.34 8 7.43
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
152.2 124.8
1075 1 DL1+0.8 LL1+-1 SL1 2 3.74 26.97 12.99 1

100.6 -

Ed
1076 1 DL1+0.8 LL1+-1 SL2 64.40 24.36 0.35 1 17.47

2001 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+0.6 197.2


TEMP1+1 MR1 2 -5.70 -0.69 -25.61 2.97

2002 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+0.6 204.0


TEMP1+1 MR1 9 -5.56 -0.43 -25.00 4.30

F
2003 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+0.6 183.4 -
TEMP1+1 MR1 3 -5.96 -16.75 -23.97 63.64

2004 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+0.6 190.2 -

PD
TEMP1+1 MR1 8 -5.82 -16.44 -23.36 62.13

2005 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+0.6 -


TEMP1+1 MR1 73.38 22.94 -9.49 96.23 36.34

2006 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+0.6 -


TEMP1+1 MR1 79.34 23.17 -9.23 97.24 35.03

-
te r
2007 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+0.6 303.9 136.6 -
TEMP1+1 MR1 3 -33.22 -9.45 6 32.51

-
2008 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+0.6 310.7 136.0 -
TEMP1+1 MR1 7 -33.07 -9.18 4 31.18
as

2009 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+-0.6 199.1


TEMP1+1 MR1 1 1.20 10.98 0.72 50.95

2010 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+-0.6 205.9


TEMP1+1 MR1 7 1.34 11.25 1.33 52.28
nM

2011 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+-0.6 185.3 -


TEMP1+1 MR1 2 0.94 -5.08 2.36 15.66

2012 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+-0.6 192.1 -


TEMP1+1 MR1 7 1.08 -4.77 2.97 14.15

2013 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+-0.6 122.5


TEMP1+1 MR1 75.26 29.84 2.18 6 11.64
di

2014 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+-0.6 123.5


TEMP1+1 MR1 81.22 30.07 2.44 7 12.95

-
a te

2015 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+-0.6 305.8 110.3


TEMP1+1 MR1 1 -26.32 2.23 3 15.47

-
2016 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+-0.6 312.6 109.7
TEMP1+1 MR1 5 -26.18 2.49 1 16.80
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
2017 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+0.6 195.6
TEMP1+1 MR1 7 -6.05 4.64 -28.69 25.17

2018 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+0.6 207.1


TEMP1+1 MR1 1 -5.81 5.08 -27.68 27.38

Ed
2019 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+0.6 172.6 -
TEMP1+1 MR1 8 -6.48 -22.13 -25.94 85.85

2020 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+0.6 184.1 -


TEMP1+1 MR1 1 -6.24 -21.61 -24.93 83.34

2021 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+0.6 - 174.3 -

F
TEMP1+1 MR1 10.74 41.69 -10.03 8 40.35

2022 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+0.6 176.0 -


TEMP1+1 MR1 -0.80 42.08 -9.59 6 38.17

PD
-
2023 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+0.6 373.5 213.7 -
TEMP1+1 MR1 1 -51.91 -9.95 7 33.96

-
2024 1 DL1+1.0 LL1+1 WL8+1 EQUIP1+0.6 384.9 212.7 -
TEMP1+1 MR1 1 -51.67 -9.51 4 31.76
te r
2025 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+-0.6 197.5
TEMP1+1 MR1 6 0.85 16.31 -2.36 73.15

2026 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+-0.6 209.0


TEMP1+1 MR1 0 1.09 16.75 -1.35 75.36
as

2027 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+-0.6 174.5 -


TEMP1+1 MR1 7 0.42 -10.46 0.39 37.87

2028 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+-0.6 186.0 -


TEMP1+1 MR1 0 0.66 -9.94 1.40 35.36
nM

2029 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+-0.6 200.7


TEMP1+1 MR1 -8.85 48.59 1.65 1 7.63

2030 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+-0.6 202.3


TEMP1+1 MR1 1.08 48.97 2.08 9 9.81

-
2031 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+-0.6 375.4 187.4
TEMP1+1 MR1 0 -45.01 1.72 4 14.02
di

-
2032 1 DL1+0.7 LL1+1 WL8+1 EQUIP1+-0.6 386.8 186.4
TEMP1+1 MR1 0 -44.77 2.16 1 16.22
a te

191.6 114.7
2033 1 DL1+0.8 LL1+1 SL1 9 -6.54 -31.96 -24.66 7

-
279.5 112.2
2034 1 DL1+0.8 LL1+1 SL2 1 -27.16 -5.34 8 7.43
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
152.2 124.8
2035 1 DL1+0.8 LL1+-1 SL1 2 3.74 26.97 12.99 1

100.6 -

Ed
2036 1 DL1+0.8 LL1+-1 SL2 64.40 24.36 0.35 1 17.47

155.8
P5 500 1 DL1+1 LL1+1 EQUIP1 0 0.97 0.30 0.57 -3.35

149.1
501 1 DL1+1 LL1+1 EQUIP1+1 TEMP1 3 -0.37 -0.08 -5.07 -4.97

F
116.3
502 1 DL1+1 WL1 7 -0.26 15.80 -1.69 63.56

130.0

PD
503 1 DL1+1 WL2 3 -0.01 18.91 -0.68 77.18

-
504 1 DL1+1 WL3 35.79 -0.27 -13.88 -4.64 64.86

-
505 1 DL1+1 WL4 49.42 -0.02 -10.77 -3.62 51.22

143.8 211.0 -
te r
506 1 DL1+1 WL5 8 48.55 -16.14 0 71.25

156.1 212.6 -
507 1 DL1+1 WL6 4 48.94 -13.14 1 58.07

-
as

- 211.9 -
508 1 DL1+1 WL7 33.62 -47.18 -1.41 1 15.77

-
- 210.8
509 1 DL1+1 WL8 19.98 -46.93 1.70 8 -2.15
nM

106.4
510 1 DL1+0.7 WL1 1 0.03 11.32 -1.16 44.14

115.9
511 1 DL1+0.7 WL2 7 0.21 13.49 -0.45 53.68

-
512 1 DL1+0.7 WL3 50.00 0.02 -9.46 -3.23 45.76
di

-
513 1 DL1+0.7 WL4 59.54 0.20 -7.28 -2.52 36.21

125.6 147.7 -
a te

514 1 DL1+0.7 WL5 7 34.20 -11.04 2 50.23

134.2 148.8 -
515 1 DL1+0.7 WL6 5 34.47 -8.94 5 41.00

-
148.3 -
516 1 DL1+0.7 WL7 1.42 -32.81 -0.73 2 11.39
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
147.6
517 1 DL1+0.7 WL8 10.96 -32.64 1.44 0 -1.86

180.7

Ed
518 1 DL1+ 1LL1+0.75 WL1+1 EQUIP1 0 0.24 11.52 -0.75 45.20

190.9
519 1 DL1+1.0 LL1+0.75 WL2+1 EQUIP1 5 0.43 13.85 0.01 55.42

120.2 -
520 1 DL1+1.0 LL1+0.75 WL3+1 EQUIP1 6 0.23 -10.74 -2.97 51.11

F
130.4 -
521 1 DL1+1.0 LL1+0.75 WL4+1 EQUIP1 9 0.42 -8.41 -2.20 40.88

201.3 158.7 -

PD
522 1 DL1+1.0 LL1+0.75 WL5+1 EQUIP1 4 36.85 -12.44 6 55.90

210.5 159.9 -
523 1 DL1+1.0 LL1+0.75 WL6+1 EQUIP1 3 37.14 -10.19 7 46.02

-
158.4 -
524 1 DL1+1.0 LL1+0.75 WL7+1 EQUIP1 68.21 -34.95 -1.39 2 14.29
te r
-
157.6
525 1 DL1+1.0 LL1+0.75 WL8+1 EQUIP1 78.44 -34.76 0.94 4 -4.08

180.1
526 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL1 1 -1.52 -4.05 -11.40 15.97
as

185.5
527 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL2 7 -12.88 -2.04 -60.82 5.65

528 0.6 DL1+1 WL1 83.11 -0.54 15.46 -1.72 64.03


nM

529 0.6 DL1+1 WL2 96.77 -0.29 18.57 -0.70 77.65

-
530 0.6 DL1+1 WL3 2.52 -0.56 -14.22 -4.67 64.39

-
531 0.6 DL1+1 WL4 16.15 -0.31 -11.11 -3.65 50.75

110.6 210.9 -
di

532 0.6 DL1+1 WL5 2 48.26 -16.48 7 70.78

122.8 212.5 -
533 0.6 DL1+1 WL6 7 48.66 -13.48 8 57.60

-
a te

- 211.9 -
534 0.6 DL1+1 WL7 66.89 -47.46 -1.75 4 15.30

-
- 210.9
535 0.6 DL1+1 WL8 53.25 -47.21 1.35 1 -1.68
re

536 0.6 DL1+0.7 SL1 82.31 -2.89 -5.29 -15.92 25.06


APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
537 0.6 DL1+0.7 SL2 89.60 -18.03 -2.61 -81.81 11.29

215.2
1001 1.35 DL1+1.5 LL1+1.5 EQUIP1+0.9 TEMP1 3 0.14 -0.01 -4.23 -6.31

Ed
227.2
1002 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 TEMP1 2 2.54 0.67 5.92 -3.38

156.0
1003 1.35 DL1+1.5 WL1+0.9 TEMP1 9 -1.70 23.24 -7.62 94.05

176.5 114.4
1004 1.35 DL1+1.5 WL2+0.9 TEMP1 7 -1.32 27.90 -6.10 9

F
-
1005 1.35 DL1+1.5 WL3+0.9 TEMP1 35.20 -1.72 -21.28 -12.05 98.58

PD
-
1006 1.35 DL1+1.5 WL4+0.9 TEMP1 55.65 -1.34 -16.62 -10.52 78.11

-
197.3 311.4 108.1
1007 1.35 DL1+1.5 WL5+0.9 TEMP1 5 71.51 -24.67 1 6

215.7 313.8 -
1008 1.35 DL1+1.5 WL6+0.9 TEMP1 4 72.11 -20.18 2 88.39
te r
-
- 322.9 -
1009 1.35 DL1+1.5 WL7+0.9 TEMP1 68.90 -72.08 -2.58 5 24.94

-
as

- 321.4
1010 1.35 DL1+1.5 WL8+0.9 TEMP1 48.44 -71.70 2.07 1 -4.51

168.0
1011 1.35 DL1+1.5 WL1+-0.9 TEMP1 8 0.71 23.92 2.54 96.97
nM

188.5 117.4
1012 1.35 DL1+1.5 WL2+-0.9 TEMP1 7 1.08 28.58 4.05 2

-
1013 1.35 DL1+1.5 WL3+-0.9 TEMP1 47.20 0.69 -20.60 -1.90 95.65

-
1014 1.35 DL1+1.5 WL4+-0.9 TEMP1 67.65 1.06 -15.94 -0.37 75.19
di

-
209.3 321.5 105.2
1015 1.35 DL1+1.5 WL5+-0.9 TEMP1 5 73.92 -23.99 6 3

227.7 323.9 -
a te

1016 1.35 DL1+1.5 WL6+-0.9 TEMP1 3 74.51 -19.50 8 85.46

-
- 312.8 -
1017 1.35 DL1+1.5 WL7+-0.9 TEMP1 56.90 -69.67 -1.90 0 22.01
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
- 311.2
1018 1.35 DL1+1.5 WL8+-0.9 TEMP1 36.45 -69.30 2.76 5 -1.58

116.4

Ed
1019 1.35 DL1+0.9 TEMP1+1.35 MR1 8 -0.44 0.82 -5.57 -2.97

128.4
1020 1.35 DL1+-0.9 TEMP1+1.35 MR1 8 1.97 1.51 4.58 -0.04

1021 1.35 DL1+1.5LL1+1.5 EQUIP1+0.9 225.4


TEMP1+1.35 MR1 3 -0.05 0.00 -4.82 -6.22

F
1022 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 237.4
TEMP1+1.35 MR1 3 2.35 0.68 5.33 -3.30

1023 1.148 DL1+1.5 LL1+1.5 EQUIP1+0.9 208.6

PD
TEMP1+1.35 MR1 3 -0.19 -0.17 -4.84 -5.98

1024 1.148 DL1+1.5 LL1+1.5 EQUIP1+-0.9 220.6


TEMP1+1.35 MR1 3 2.21 0.51 5.32 -3.06

1025 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+0.9 255.3


TEMP1+1.35 MR1 1 -0.92 13.45 -6.41 52.04

1026 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+0.9 267.6


te r
TEMP1+1.35 MR1 1 -0.70 16.25 -5.50 64.30

1027 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+0.9 182.7 -


TEMP1+1.35 MR1 9 -0.93 -13.26 -9.07 63.54

1028 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+0.9 195.0 -


as

TEMP1+1.35 MR1 5 -0.71 -10.46 -8.15 51.26

1029 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+0.9 280.0 185.0 -


TEMP1+1.35 MR1 7 43.01 -15.29 1 69.29

1030 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+0.9 291.1 186.4 -


nM

TEMP1+1.35 MR1 1 43.36 -12.60 6 57.42

-
1031 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+0.9 120.3 195.6 -
TEMP1+1.35 MR1 2 -43.15 -2.04 1 19.35

-
1032 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+0.9 132.6 194.6
TEMP1+1.35 MR1 0 -42.92 0.76 8 -7.10
di

1033 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+-0.9 267.3


TEMP1+1.35 MR1 1 1.48 14.13 3.75 54.96

1034 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+-0.9 279.6


a te

TEMP1+1.35 MR1 1 1.71 16.93 4.66 67.23

1035 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+-0.9 194.7 -


TEMP1+1.35 MR1 8 1.47 -12.58 1.09 60.61

1036 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+-0.9 207.0 -


TEMP1+1.35 MR1 5 1.70 -9.78 2.01 48.33
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1037 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+-0.9 292.0 195.1 -
TEMP1+1.35 MR1 7 45.41 -14.61 6 66.36

1038 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+-0.9 303.1 196.6 -


TEMP1+1.35 MR1 0 45.76 -11.91 1 54.50

Ed
-
1039 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+-0.9 132.3 185.4 -
TEMP1+1.35 MR1 2 -40.75 -1.36 5 16.43

-
1040 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+-0.9 144.6 184.5
TEMP1+1.35 MR1 0 -40.52 1.44 3 -4.17

F
1041 1.148 DL1+1.5 LL1+0.9 WL1+1.5 238.5
EQUIP1+0.9 TEMP1+1.35 MR1 2 -1.06 13.28 -6.42 52.28

PD
1042 1.148 DL1+1.5 LL1+0.9 WL2+1.5 250.8
EQUIP1+0.9 TEMP1+1.35 MR1 1 -0.84 16.08 -5.51 64.54

1043 1.148 DL1+1.5 LL1+0.9 WL3+1.5 165.9 -


EQUIP1+0.9 TEMP1+1.35 MR1 9 -1.08 -13.43 -9.08 63.30

1044 1.148 DL1+1.5 LL1+0.9 WL4+1.5 178.2 -


EQUIP1+0.9 TEMP1+1.35 MR1 5 -0.85 -10.63 -8.16 51.02
te r
1045 1.148 DL1+1.5 LL1+0.9 WL5+1.5 263.2 185.0 -
EQUIP1+0.9 TEMP1+1.35 MR1 7 42.86 -15.47 0 69.05

1046 1.148 DL1+1.5 LL1+0.9 WL6+1.5 274.3 186.4 -


EQUIP1+0.9 TEMP1+1.35 MR1 1 43.22 -12.77 4 57.19
as

-
1047 1.148 DL1+1.5 LL1+0.9 WL7+1.5 103.5 195.6 -
EQUIP1+0.9 TEMP1+1.35 MR1 2 -43.29 -2.21 2 19.11

-
1048 1.148 DL1+1.5 LL1+0.9 WL8+1.5 115.8 194.7
nM

EQUIP1+0.9 TEMP1+1.35 MR1 0 -43.06 0.58 0 -6.86

1049 1.148 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+- 250.5


0.9 TEMP1+1.35 MR1 1 1.34 13.96 3.73 55.20

1050 1.148 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+- 262.8


0.9 TEMP1+1.35 MR1 1 1.56 16.76 4.65 67.47

1051 1.148 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+- 177.9 -


di

0.9 TEMP1+1.35 MR1 8 1.33 -12.75 1.08 60.38

1052 1.148 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+- 190.2 -


0.9 TEMP1+1.35 MR1 5 1.55 -9.95 1.99 48.09
a te

1053 1.148 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+- 275.2 195.1 -


0.9 TEMP1+1.35 MR1 7 45.27 -14.78 5 66.12

1054 1.148 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+- 286.3 196.6 -


0.9 TEMP1+1.35 MR1 0 45.62 -12.09 0 54.26
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
1055 1.148 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+- 115.5 185.4 -
0.9 TEMP1+1.35 MR1 2 -40.89 -1.53 7 16.19

Ed
1056 1.148 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+- 127.8 184.5
0.9 TEMP1+1.35 MR1 0 -40.66 1.27 4 -3.93

1057 1.148 DL1+1.5 LL1+1.5 WL1+1.5 258.4


EQUIP1+0.9 TEMP1+1.35 MR1 4 -1.64 22.25 -7.48 91.11

1058 1.148 DL1+1.5 LL1+1.5 WL2+1.5 278.9 111.5


EQUIP1+0.9 TEMP1+1.35 MR1 3 -1.27 26.91 -5.96 6

F
-
1059 1.148 DL1+1.5 LL1+1.5 WL3+1.5 137.5 101.5

PD
EQUIP1+0.9 TEMP1+1.35 MR1 6 -1.66 -22.27 -11.91 1

1060 1.148 DL1+1.5 LL1+1.5 WL4+1.5 158.0 -


EQUIP1+0.9 TEMP1+1.35 MR1 0 -1.29 -17.61 -10.38 81.04

-
1061 1.148 DL1+1.5 LL1+1.5 WL5+1.5 299.7 311.5 111.0
EQUIP1+0.9 TEMP1+1.35 MR1 0 71.57 -25.66 5 9

1062 1.148 DL1+1.5 LL1+1.5 WL6+1.5 318.0 313.9 -


te r
EQUIP1+0.9 TEMP1+1.35 MR1 9 72.16 -21.17 6 91.32

-
1063 1.148 DL1+1.5 LL1+1.5 WL7+1.5 322.8 -
EQUIP1+0.9 TEMP1+1.35 MR1 33.45 -72.02 -3.57 1 27.87
as

-
1064 1.148 DL1+1.5 LL1+1.5 WL8+1.5 321.2
EQUIP1+0.9 TEMP1+1.35 MR1 53.91 -71.65 1.09 7 -7.44

1065 1.148 DL1+1.5 LL1+1.5 WL1+1.5 EQUIP1+- 270.4


nM

0.9 TEMP1+1.35 MR1 4 0.76 22.93 2.68 94.04

1066 1.148 DL1+1.5 LL1+1.5 WL2+1.5 EQUIP1+- 290.9 114.4


0.9 TEMP1+1.35 MR1 3 1.13 27.59 4.20 8

1067 1.148 DL1+1.5 LL1+1.5 WL3+1.5 EQUIP1+- 149.5 -


0.9 TEMP1+1.35 MR1 6 0.74 -21.59 -1.75 98.59

1068 1.148 DL1+1.5 LL1+1.5 WL4+1.5 EQUIP1+- 170.0 -


di

0.9 TEMP1+1.35 MR1 0 1.11 -16.92 -0.22 78.12

-
1069 1.148 DL1+1.5 LL1+1.5 WL5+1.5 EQUIP1+- 311.7 321.7 108.1
0.9 TEMP1+1.35 MR1 0 73.97 -24.98 1 6
a te

1070 1.148 DL1+1.5 LL1+1.5 WL6+1.5 EQUIP1+- 330.0 324.1 -


0.9 TEMP1+1.35 MR1 9 74.56 -20.48 2 88.39

-
1071 1.148 DL1+1.5 LL1+1.5 WL7+1.5 EQUIP1+- 312.6 -
0.9 TEMP1+1.35 MR1 45.45 -69.62 -2.89 5 24.94
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
1072 1.148 DL1+1.5 LL1+1.5 WL8+1.5 EQUIP1+- 311.1
0.9 TEMP1+1.35 MR1 65.91 -69.24 1.77 1 -4.51

184.0

Ed
1073 1 DL1+0.8 LL1+1 SL1 1 -3.77 -7.92 -21.96 33.69

-
194.4 116.0
1074 1 DL1+0.8 LL1+1 SL2 1 -25.40 -4.10 9 14.02

-
1075 1 DL1+0.8 LL1+-1 SL1 91.40 5.70 8.66 23.65 39.91

F
117.7 -
1076 1 DL1+0.8 LL1+-1 SL2 81.00 27.33 4.83 7 20.24

PD
2001 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+0.6 179.2
TEMP1+1 MR1 8 -0.56 9.05 -4.31 34.58

2002 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+0.6 187.4


TEMP1+1 MR1 8 -0.41 10.92 -3.70 42.76

2003 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+0.6 130.9 -


TEMP1+1 MR1 3 -0.56 -8.75 -6.08 42.47
te r
2004 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+0.6 139.1 -
TEMP1+1 MR1 1 -0.42 -6.89 -5.47 34.28

2005 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+0.6 195.7 123.3 -


TEMP1+1 MR1 9 28.73 -10.11 0 46.30
as

2006 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+0.6 203.1 124.2 -


TEMP1+1 MR1 4 28.96 -8.31 7 38.39

-
2007 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+0.6 130.4 -
TEMP1+1 MR1 89.29 -28.71 -1.27 4 13.01
nM

-
2008 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+0.6 129.8
TEMP1+1 MR1 97.47 -28.56 0.59 2 -4.84

2009 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+-0.6 187.2


TEMP1+1 MR1 8 1.05 9.51 2.46 36.53

2010 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+-0.6 195.4


di

TEMP1+1 MR1 8 1.19 11.37 3.07 44.71

2011 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+-0.6 138.9 -


TEMP1+1 MR1 3 1.04 -8.30 0.69 40.52
a te

2012 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+-0.6 147.1 -


TEMP1+1 MR1 1 1.19 -6.43 1.30 32.33

2013 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+-0.6 203.7 130.0 -


TEMP1+1 MR1 9 30.33 -9.66 7 44.35

2014 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+-0.6 211.1 131.0 -


TEMP1+1 MR1 4 30.57 -7.86 4 36.44
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
2015 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+-0.6 123.6 -
TEMP1+1 MR1 97.29 -27.11 -0.82 7 11.06

Ed
2016 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+-0.6 105.4 123.0
TEMP1+1 MR1 7 -26.96 1.04 5 -2.89

2017 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+0.6 192.5


TEMP1+1 MR1 7 -0.94 15.03 -5.01 60.47

2018 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+0.6 206.2


TEMP1+1 MR1 2 -0.70 18.14 -4.00 74.10

F
2019 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+0.6 111.9 -
TEMP1+1 MR1 8 -0.96 -14.65 -7.97 67.95

PD
2020 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+0.6 125.6 -
TEMP1+1 MR1 1 -0.71 -11.54 -6.95 54.30

2021 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+0.6 220.0 207.6 -


TEMP1+1 MR1 7 47.86 -16.91 7 74.33

2022 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+0.6 232.3 209.2 -


TEMP1+1 MR1 3 48.26 -13.91 8 61.15
te r
-
2023 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+0.6 215.2 -
TEMP1+1 MR1 42.57 -47.86 -2.18 3 18.85

-
2024 1 DL1+1.0 LL1+1 WL8+1 EQUIP1+0.6 214.2
as

TEMP1+1 MR1 56.21 -47.61 0.93 0 -5.23

2025 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+-0.6 200.5


TEMP1+1 MR1 6 0.66 15.49 1.76 62.42

2026 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+-0.6 214.2


nM

TEMP1+1 MR1 2 0.91 18.60 2.77 76.05

2027 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+-0.6 119.9 -


TEMP1+1 MR1 8 0.65 -14.19 -1.20 65.99

2028 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+-0.6 133.6 -


TEMP1+1 MR1 1 0.89 -11.08 -0.18 52.35

2029 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+-0.6 228.0 214.4 -


di

TEMP1+1 MR1 7 49.46 -16.45 4 72.38

2030 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+-0.6 240.3 216.0 -


TEMP1+1 MR1 3 49.86 -13.45 5 59.20
a te

-
2031 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+-0.6 208.4 -
TEMP1+1 MR1 50.57 -46.26 -1.73 6 16.90

-
2032 1 DL1+0.7 LL1+1 WL8+1 EQUIP1+-0.6 207.4
TEMP1+1 MR1 64.21 -46.01 1.38 3 -3.28
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
184.0
2033 1 DL1+0.8 LL1+1 SL1 1 -3.77 -7.92 -21.96 33.69

-
194.4 116.0

Ed
2034 1 DL1+0.8 LL1+1 SL2 1 -25.40 -4.10 9 14.02

-
2035 1 DL1+0.8 LL1+-1 SL1 91.40 5.70 8.66 23.65 39.91

117.7 -
2036 1 DL1+0.8 LL1+-1 SL2 81.00 27.33 4.83 7 20.24

F
151.5 -
P6 500 1 DL1+1 LL1+1 EQUIP1 4 1.39 -2.47 4.95 18.04

151.2 -

PD
501 1 DL1+1 LL1+1 EQUIP1+1 TEMP1 8 3.01 -12.81 10.89 63.69

502 1 DL1+1 WL1 17.04 0.24 17.37 0.81 80.92

503 1 DL1+1 WL2 16.73 0.43 18.63 1.50 88.22

128.3 -
504 1 DL1+1 WL3 2 -0.38 -17.88 -1.28 91.93
te r
127.8 -
505 1 DL1+1 WL4 3 -0.18 -16.60 -0.59 84.48

136.3 212.2 -
506 1 DL1+1 WL5 1 58.86 -6.25 5 39.34
as

136.0 213.5 -
507 1 DL1+1 WL6 9 59.21 -5.01 4 32.09

-
210.7 -
508 1 DL1+1 WL7 48.16 -58.43 -2.36 4 18.96
nM

-
210.0 -
509 1 DL1+1 WL8 47.85 -58.23 -1.11 4 11.67

510 1 DL1+0.7 WL1 36.70 0.28 12.06 0.97 54.86

511 1 DL1+0.7 WL2 36.49 0.42 12.94 1.45 59.97


di

114.6 -
512 1 DL1+0.7 WL3 0 -0.15 -12.62 -0.49 66.14

114.2 -
513 1 DL1+0.7 WL4 6 -0.02 -11.72 -0.01 60.92
a te

120.1 148.9 -
514 1 DL1+0.7 WL5 9 41.31 -4.48 8 29.32

120.0 149.8 -
515 1 DL1+0.7 WL6 4 41.56 -3.61 8 24.24
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
147.1 -
516 1 DL1+0.7 WL7 58.49 -40.79 -1.75 2 15.06

Ed
146.6
517 1 DL1+0.7 WL8 58.27 -40.65 -0.88 3 -9.95

102.3
518 1 DL1+ 1LL1+0.75 WL1+1 EQUIP1 7 1.28 10.81 4.55 47.11

102.1
519 1 DL1+1.0 LL1+0.75 WL2+1 EQUIP1 4 1.43 11.75 5.06 52.58

F
185.8 -
520 1 DL1+1.0 LL1+0.75 WL3+1 EQUIP1 3 0.82 -15.63 2.99 82.53

PD
185.4 -
521 1 DL1+1.0 LL1+0.75 WL4+1 EQUIP1 6 0.97 -14.67 3.50 76.94

191.8 163.1 -
522 1 DL1+1.0 LL1+0.75 WL5+1 EQUIP1 2 45.25 -6.91 3 43.09

191.6 164.1 -
523 1 DL1+1.0 LL1+0.75 WL6+1 EQUIP1 6 45.51 -5.98 0 37.65
te r
-
125.7 154.1 -
524 1 DL1+1.0 LL1+0.75 WL7+1 EQUIP1 1 -42.72 -3.99 1 27.80

-
125.4 153.5 -
as

525 1 DL1+1.0 LL1+0.75 WL8+1 EQUIP1 8 -42.57 -3.06 9 22.34

188.1
526 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL1 1 -1.95 -12.90 -7.02 32.00

166.6 -
nM

527 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL2 5 -15.66 -3.65 -56.44 12.18

-
528 0.6 DL1+1 WL1 16.00 0.09 17.51 0.28 83.30

-
529 0.6 DL1+1 WL2 16.31 0.28 18.76 0.96 90.60

-
di

530 0.6 DL1+1 WL3 95.28 -0.53 -17.75 -1.81 89.56

-
531 0.6 DL1+1 WL4 94.79 -0.33 -16.46 -1.12 82.10
a te

103.2 211.7 -
532 0.6 DL1+1 WL5 7 58.71 -6.12 1 36.97

103.0 213.0 -
533 0.6 DL1+1 WL6 5 59.06 -4.88 1 29.71
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
211.2 -
534 0.6 DL1+1 WL7 15.12 -58.58 -2.23 8 16.58

Ed
210.5
535 0.6 DL1+1 WL8 14.81 -58.39 -0.98 8 -9.29

536 0.6 DL1+0.7 SL1 98.32 -4.22 -14.10 -15.15 63.16

537 0.6 DL1+0.7 SL2 69.70 -22.50 -1.77 -81.04 4.24

214.6 -

F
1001 1.35 DL1+1.5 LL1+1.5 EQUIP1+0.9 TEMP1 9 3.48 -12.96 12.57 67.25

215.1
1002 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 TEMP1 4 0.56 5.65 1.88 14.92

PD
1003 1.35 DL1+1.5 WL1+0.9 TEMP1 12.94 1.77 16.81 6.36 81.19

1004 1.35 DL1+1.5 WL2+0.9 TEMP1 12.47 2.05 18.69 7.39 92.14

-
179.8 178.1
1005 1.35 DL1+1.5 WL3+0.9 TEMP1 6 0.84 -36.07 3.23 0
te r
-
179.1 166.9
1006 1.35 DL1+1.5 WL4+0.9 TEMP1 2 1.13 -34.15 4.26 1

191.8 323.5 -
1007 1.35 DL1+1.5 WL5+0.9 TEMP1 4 89.69 -18.63 2 99.21
as

191.5 325.4 -
1008 1.35 DL1+1.5 WL6+0.9 TEMP1 1 90.22 -16.77 6 88.32

-
310.9 -
nM

1009 1.35 DL1+1.5 WL7+0.9 TEMP1 59.62 -86.24 -12.80 7 68.64

-
309.9 -
1010 1.35 DL1+1.5 WL8+0.9 TEMP1 59.16 -85.95 -10.92 2 57.70

163.3
1011 1.35 DL1+1.5 WL1+-0.9 TEMP1 13.40 -1.16 35.41 -4.33 6
di

174.3
1012 1.35 DL1+1.5 WL2+-0.9 TEMP1 12.93 -0.87 37.29 -3.30 1

180.3 -
1013 1.35 DL1+1.5 WL3+-0.9 TEMP1 2 -2.08 -17.47 -7.46 95.92
a te

179.5 -
1014 1.35 DL1+1.5 WL4+-0.9 TEMP1 8 -1.79 -15.54 -6.43 84.73

192.3 312.8 -
1015 1.35 DL1+1.5 WL5+-0.9 TEMP1 0 86.77 -0.03 3 17.04

191.9 314.7
re

1016 1.35 DL1+1.5 WL6+-0.9 TEMP1 7 87.30 1.84 7 -6.15


APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
321.6
1017 1.35 DL1+1.5 WL7+-0.9 TEMP1 60.08 -89.16 5.81 6 13.54

Ed
320.6
1018 1.35 DL1+1.5 WL8+-0.9 TEMP1 59.62 -88.87 7.68 1 24.47

113.5 -
1019 1.35 DL1+0.9 TEMP1+1.35 MR1 5 1.90 -9.84 6.87 49.63

114.0
1020 1.35 DL1+-0.9 TEMP1+1.35 MR1 1 -1.02 8.77 -3.81 32.54

F
1021 1.35 DL1+1.5LL1+1.5 EQUIP1+0.9 216.9 -
TEMP1+1.35 MR1 7 3.42 -13.05 12.29 67.78

PD
1022 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 217.4
TEMP1+1.35 MR1 3 0.50 5.56 1.60 14.40

1023 1.148 DL1+1.5 LL1+1.5 EQUIP1+0.9 200.2 -


TEMP1+1.35 MR1 8 3.34 -12.98 12.02 66.58

1024 1.148 DL1+1.5 LL1+1.5 EQUIP1+-0.9 200.7


TEMP1+1.35 MR1 4 0.42 5.63 1.33 15.60
te r
1025 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+0.9 157.9
TEMP1+1.35 MR1 7 3.30 2.89 11.81 10.40

1026 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+0.9 157.6


TEMP1+1.35 MR1 9 3.47 4.01 12.43 16.97
as

-
1027 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+0.9 258.1 145.1
TEMP1+1.35 MR1 2 2.74 -28.84 9.93 7

-
1028 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+0.9 257.6 138.4
nM

TEMP1+1.35 MR1 8 2.92 -27.69 10.55 6

1029 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+0.9 265.3 202.1 -


TEMP1+1.35 MR1 1 56.05 -18.38 0 97.84

1030 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+0.9 265.1 203.2 -


TEMP1+1.35 MR1 1 56.37 -17.26 7 91.31

-
di

1031 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+0.9 185.9 178.5 -


TEMP1+1.35 MR1 8 -49.51 -14.88 9 79.49

-
1032 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+0.9 185.7 177.9 -
a te

TEMP1+1.35 MR1 0 -49.33 -13.75 6 72.93

1033 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+-0.9 158.4


TEMP1+1.35 MR1 3 0.38 21.49 1.12 92.58

1034 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+-0.9 158.1


TEMP1+1.35 MR1 5 0.55 22.62 1.74 99.14
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1035 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+-0.9 258.5 -
TEMP1+1.35 MR1 8 -0.18 -10.24 -0.76 63.00

1036 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+-0.9 258.1 -


TEMP1+1.35 MR1 4 -0.01 -9.08 -0.14 56.28

Ed
1037 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+-0.9 265.7 191.4 -
TEMP1+1.35 MR1 7 53.13 0.23 2 15.66

1038 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+-0.9 265.5 192.5


TEMP1+1.35 MR1 7 53.45 1.35 8 -9.13

F
1039 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+-0.9 186.4 189.2
TEMP1+1.35 MR1 4 -52.43 3.73 8 2.68

PD
1040 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+-0.9 186.1 188.6
TEMP1+1.35 MR1 6 -52.25 4.86 5 9.24

1041 1.148 DL1+1.5 LL1+0.9 WL1+1.5 141.2


EQUIP1+0.9 TEMP1+1.35 MR1 9 3.22 2.96 11.54 11.61

1042 1.148 DL1+1.5 LL1+0.9 WL2+1.5 141.0


EQUIP1+0.9 TEMP1+1.35 MR1 1 3.39 4.08 12.15 18.17
te r
-
1043 1.148 DL1+1.5 LL1+0.9 WL3+1.5 241.4 143.9
EQUIP1+0.9 TEMP1+1.35 MR1 4 2.67 -28.78 9.66 7

-
1044 1.148 DL1+1.5 LL1+0.9 WL4+1.5 241.0 137.2
as

EQUIP1+0.9 TEMP1+1.35 MR1 0 2.84 -27.62 10.28 5

1045 1.148 DL1+1.5 LL1+0.9 WL5+1.5 248.6 201.8 -


EQUIP1+0.9 TEMP1+1.35 MR1 3 55.98 -18.31 3 96.64

1046 1.148 DL1+1.5 LL1+0.9 WL6+1.5 248.4 203.0 -


nM

EQUIP1+0.9 TEMP1+1.35 MR1 3 56.30 -17.19 0 90.11

-
1047 1.148 DL1+1.5 LL1+0.9 WL7+1.5 169.2 178.8 -
EQUIP1+0.9 TEMP1+1.35 MR1 9 -49.58 -14.81 6 78.29

-
1048 1.148 DL1+1.5 LL1+0.9 WL8+1.5 169.0 178.2 -
di

EQUIP1+0.9 TEMP1+1.35 MR1 2 -49.41 -13.68 3 71.73

1049 1.148 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+- 141.7


0.9 TEMP1+1.35 MR1 5 0.30 21.56 0.85 93.78

1050 1.148 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+- 141.4 100.3


a te

0.9 TEMP1+1.35 MR1 7 0.47 22.69 1.47 4

1051 1.148 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+- 241.9 -


0.9 TEMP1+1.35 MR1 0 -0.26 -10.17 -1.03 61.80

1052 1.148 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+- 241.4 -


0.9 TEMP1+1.35 MR1 5 -0.08 -9.01 -0.41 55.08
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1053 1.148 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+- 249.0 191.1 -
0.9 TEMP1+1.35 MR1 9 53.05 0.30 5 14.46

1054 1.148 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+- 248.8 192.3


0.9 TEMP1+1.35 MR1 9 53.38 1.42 1 -7.93

Ed
-
1055 1.148 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+- 169.7 189.5
0.9 TEMP1+1.35 MR1 5 -52.51 3.80 5 3.88

-
1056 1.148 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+- 169.4 188.9
0.9 TEMP1+1.35 MR1 8 -52.33 4.92 2 10.44

F
1057 1.148 DL1+1.5 LL1+1.5 WL1+1.5 101.9
EQUIP1+0.9 TEMP1+1.35 MR1 6 3.14 13.58 11.22 63.73

PD
1058 1.148 DL1+1.5 LL1+1.5 WL2+1.5 101.4
EQUIP1+0.9 TEMP1+1.35 MR1 9 3.43 15.46 12.25 74.67

-
1059 1.148 DL1+1.5 LL1+1.5 WL3+1.5 268.8 195.5
EQUIP1+0.9 TEMP1+1.35 MR1 8 2.21 -39.30 8.09 6

-
1060 1.148 DL1+1.5 LL1+1.5 WL4+1.5 268.1 184.3
te r
EQUIP1+0.9 TEMP1+1.35 MR1 4 2.50 -37.38 9.12 7

-
1061 1.148 DL1+1.5 LL1+1.5 WL5+1.5 280.8 328.3 116.6
EQUIP1+0.9 TEMP1+1.35 MR1 6 91.06 -21.86 8 7
as

-
1062 1.148 DL1+1.5 LL1+1.5 WL6+1.5 280.5 330.3 105.7
EQUIP1+0.9 TEMP1+1.35 MR1 3 91.60 -20.00 2 9

-
nM

1063 1.148 DL1+1.5 LL1+1.5 WL7+1.5 148.6 306.1 -


EQUIP1+0.9 TEMP1+1.35 MR1 3 -84.87 -16.03 1 86.10

-
1064 1.148 DL1+1.5 LL1+1.5 WL8+1.5 148.1 305.0 -
EQUIP1+0.9 TEMP1+1.35 MR1 7 -84.57 -14.15 6 75.17

1065 1.148 DL1+1.5 LL1+1.5 WL1+1.5 EQUIP1+- 102.4 145.9


0.9 TEMP1+1.35 MR1 2 0.22 32.19 0.53 0
di

1066 1.148 DL1+1.5 LL1+1.5 WL2+1.5 EQUIP1+- 101.9 156.8


0.9 TEMP1+1.35 MR1 5 0.51 34.06 1.56 4

-
1067 1.148 DL1+1.5 LL1+1.5 WL3+1.5 EQUIP1+- 269.3 113.3
a te

0.9 TEMP1+1.35 MR1 4 -0.71 -20.70 -2.60 9

-
1068 1.148 DL1+1.5 LL1+1.5 WL4+1.5 EQUIP1+- 268.6 102.2
0.9 TEMP1+1.35 MR1 0 -0.42 -18.77 -1.57 0

1069 1.148 DL1+1.5 LL1+1.5 WL5+1.5 EQUIP1+- 281.3 317.6 -


re

0.9 TEMP1+1.35 MR1 2 88.14 -3.26 9 34.50


APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1070 1.148 DL1+1.5 LL1+1.5 WL6+1.5 EQUIP1+- 280.9 319.6 -
0.9 TEMP1+1.35 MR1 9 88.68 -1.39 3 23.62

-
1071 1.148 DL1+1.5 LL1+1.5 WL7+1.5 EQUIP1+- 149.0 316.7

Ed
0.9 TEMP1+1.35 MR1 9 -87.79 2.58 9 -3.93

-
1072 1.148 DL1+1.5 LL1+1.5 WL8+1.5 EQUIP1+- 148.6 315.7
0.9 TEMP1+1.35 MR1 3 -87.50 4.45 4 7.00

200.3
1073 1 DL1+0.8 LL1+1 SL1 8 -5.14 -21.93 -18.49 79.49

F
-
159.5 112.6

PD
1074 1 DL1+0.8 LL1+1 SL2 1 -31.26 -4.31 3 -4.67

-
111.1
1075 1 DL1+0.8 LL1+-1 SL1 61.07 7.55 17.78 27.08 5

101.9 121.2 -
1076 1 DL1+0.8 LL1+-1 SL2 4 33.67 0.17 1 26.98

2001 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+0.6 113.7


te r
TEMP1+1 MR1 4 2.23 1.89 7.99 6.30

2002 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+0.6 113.5


TEMP1+1 MR1 5 2.35 2.64 8.40 10.68

2003 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+0.6 180.5 -


as

TEMP1+1 MR1 1 1.86 -19.27 6.73 97.41

2004 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+0.6 180.2 -


TEMP1+1 MR1 1 1.98 -18.50 7.15 92.94

2005 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+0.6 185.3 134.8 -


nM

TEMP1+1 MR1 0 37.40 -12.29 5 65.86

2006 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+0.6 185.1 135.6 -


TEMP1+1 MR1 7 37.61 -11.55 2 61.50

-
2007 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+0.6 132.4 118.9 -
TEMP1+1 MR1 1 -32.97 -9.96 5 53.63
di

-
2008 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+0.6 132.2 118.5 -
TEMP1+1 MR1 3 -32.86 -9.21 3 49.25

2009 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+-0.6 114.0


a te

TEMP1+1 MR1 5 0.28 14.29 0.86 61.09

2010 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+-0.6 113.8


TEMP1+1 MR1 6 0.40 15.04 1.27 65.46

2011 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+-0.6 180.8 -


TEMP1+1 MR1 2 -0.09 -6.86 -0.39 42.63
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
2012 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+-0.6 180.5 -
TEMP1+1 MR1 2 0.03 -6.09 0.02 38.16

2013 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+-0.6 185.6 127.7 -


TEMP1+1 MR1 1 35.45 0.11 2 11.08

Ed
2014 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+-0.6 185.4 128.5
TEMP1+1 MR1 8 35.67 0.86 0 -6.72

-
2015 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+-0.6 132.7 126.0
TEMP1+1 MR1 2 -34.92 2.45 7 1.15

F
-
2016 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+-0.6 132.5 125.6
TEMP1+1 MR1 3 -34.80 3.20 5 5.53

PD
2017 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+0.6
TEMP1+1 MR1 87.52 2.18 8.97 7.78 41.05

2018 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+0.6


TEMP1+1 MR1 87.21 2.37 10.22 8.46 48.35

-
2019 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+0.6 198.8 131.8
te r
TEMP1+1 MR1 0 1.56 -26.29 5.69 1

-
2020 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+0.6 198.3 124.3
TEMP1+1 MR1 1 1.75 -25.00 6.38 5

2021 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+0.6 206.7 219.2 -


as

TEMP1+1 MR1 9 60.79 -14.66 1 79.22

2022 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+0.6 206.5 220.5 -


TEMP1+1 MR1 7 61.15 -13.42 1 71.96

-
nM

2023 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+0.6 118.6 203.7 -


TEMP1+1 MR1 4 -56.50 -10.77 8 58.84

-
2024 1 DL1+1.0 LL1+1 WL8+1 EQUIP1+0.6 118.3 203.0 -
TEMP1+1 MR1 3 -56.30 -9.52 8 51.55

2025 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+-0.6


di

TEMP1+1 MR1 87.83 0.23 21.37 0.65 95.83

2026 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+-0.6 103.1


TEMP1+1 MR1 87.51 0.42 22.62 1.33 3

2027 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+-0.6 199.1 -


a te

TEMP1+1 MR1 1 -0.39 -13.88 -1.44 77.03

2028 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+-0.6 198.6 -


TEMP1+1 MR1 1 -0.20 -12.60 -0.75 69.57

2029 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+-0.6 207.1 212.0 -


TEMP1+1 MR1 0 58.85 -2.26 9 24.43
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
2030 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+-0.6 206.8 213.3 -
TEMP1+1 MR1 8 59.20 -1.01 8 17.18

-
2031 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+-0.6 118.9 210.9

Ed
TEMP1+1 MR1 5 -58.44 1.64 0 -4.05

-
2032 1 DL1+0.7 LL1+1 WL8+1 EQUIP1+-0.6 118.6 210.2
TEMP1+1 MR1 4 -58.25 2.88 0 3.24

200.3
2033 1 DL1+0.8 LL1+1 SL1 8 -5.14 -21.93 -18.49 79.49

F
-
159.5 112.6

PD
2034 1 DL1+0.8 LL1+1 SL2 1 -31.26 -4.31 3 -4.67

-
111.1
2035 1 DL1+0.8 LL1+-1 SL1 61.07 7.55 17.78 27.08 5

101.9 121.2 -
2036 1 DL1+0.8 LL1+-1 SL2 4 33.67 0.17 1 26.98
te r
153.1
P7 500 1 DL1+1 LL1+1 EQUIP1 0 1.31 0.91 9.55 -0.93

148.4
501 1 DL1+1 LL1+1 EQUIP1+1 TEMP1 5 5.99 0.54 27.82 -2.61

100.9
as

502 1 DL1+1 WL1 3 0.78 14.75 3.61 59.30

113.3
503 1 DL1+1 WL2 8 0.83 17.88 4.00 73.02

-
nM

504 1 DL1+1 WL3 54.85 -0.35 -12.73 1.77 60.18

-
505 1 DL1+1 WL4 67.25 -0.29 -9.60 2.17 46.44

224.1 -
506 1 DL1+1 WL5 7.70 50.23 -3.71 0 25.56

225.1 -
di

507 1 DL1+1 WL6 21.64 50.44 -0.48 2 11.44

-
100.4 220.1 -
508 1 DL1+1 WL7 4 -50.92 -13.45 6 59.93
a te

-
112.9 219.7 -
509 1 DL1+1 WL8 0 -50.86 -10.31 5 46.20

510 1 DL1+0.7 WL1 95.14 0.52 10.64 3.32 41.38


re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
103.8
511 1 DL1+0.7 WL2 5 0.56 12.83 3.60 50.98

-
512 1 DL1+0.7 WL3 62.88 -0.27 -8.60 2.04 42.26

Ed
-
513 1 DL1+0.7 WL4 71.57 -0.23 -6.41 2.32 32.64

157.6 -
514 1 DL1+0.7 WL5 29.88 35.13 -2.28 7 18.02

158.3

F
515 1 DL1+0.7 WL6 39.64 35.28 -0.02 9 -8.14

-
153.3 -

PD
516 1 DL1+0.7 WL7 94.80 -35.67 -9.10 1 42.08

-
103.5 153.0 -
517 1 DL1+0.7 WL8 2 -35.63 -6.91 3 32.47

167.5
518 1 DL1+ 1LL1+0.75 WL1+1 EQUIP1 7 1.96 11.20 10.26 43.88
te r
176.9
519 1 DL1+1.0 LL1+0.75 WL2+1 EQUIP1 1 2.01 13.54 10.55 54.17

133.0 -
520 1 DL1+1.0 LL1+0.75 WL3+1 EQUIP1 1 1.12 -9.41 8.88 45.73
as

142.3 -
521 1 DL1+1.0 LL1+0.75 WL4+1 EQUIP1 1 1.16 -7.06 9.18 35.43

175.6 -
522 1 DL1+1.0 LL1+0.75 WL5+1 EQUIP1 97.65 39.05 -2.65 3 19.77
nM

108.1 176.3
523 1 DL1+1.0 LL1+0.75 WL6+1 EQUIP1 0 39.21 -0.22 9 -9.18

-
167.2 157.5 -
524 1 DL1+1.0 LL1+0.75 WL7+1 EQUIP1 1 -36.81 -9.95 7 45.54

-
176.5 157.2 -
di

525 1 DL1+1.0 LL1+0.75 WL8+1 EQUIP1 5 -36.76 -7.60 6 35.25

158.2
526 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL1 8 -1.89 -3.44 -3.12 18.26
a te

171.5
527 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL2 2 -13.24 -0.44 -54.84 3.87

528 0.6 DL1+1 WL1 68.28 0.81 14.33 2.54 59.48

529 0.6 DL1+1 WL2 80.73 0.87 17.46 2.93 73.19

-
re

530 0.6 DL1+1 WL3 22.20 -0.32 -13.15 0.71 60.01


APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
531 0.6 DL1+1 WL4 34.60 -0.26 -10.01 1.10 46.27

- 223.0 -
532 0.6 DL1+1 WL5 24.96 50.27 -4.12 3 25.38

Ed
- 224.0 -
533 0.6 DL1+1 WL6 11.01 50.48 -0.89 6 11.26

-
221.2 -
534 0.6 DL1+1 WL7 67.79 -50.88 -13.86 2 59.75

F
-
220.8 -
535 0.6 DL1+1 WL8 80.25 -50.82 -10.73 2 46.03

PD
536 0.6 DL1+0.7 SL1 55.89 -4.32 -5.18 -15.30 25.32

537 0.6 DL1+0.7 SL2 73.54 -19.46 -1.18 -84.25 6.13

213.2
1001 1.35 DL1+1.5 LL1+1.5 EQUIP1+0.9 TEMP1 2 6.19 0.88 30.37 -2.84

221.5
1002 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 TEMP1 8 -2.23 1.55 -2.52 0.19
te r
134.9
1003 1.35 DL1+1.5 WL1+0.9 TEMP1 7 5.39 21.63 21.46 87.51

153.6 108.0
1004 1.35 DL1+1.5 WL2+0.9 TEMP1 4 5.47 26.32 22.05 8
as

-
1005 1.35 DL1+1.5 WL3+0.9 TEMP1 65.84 3.70 -19.59 18.70 91.72

-
1006 1.35 DL1+1.5 WL4+0.9 TEMP1 84.45 3.79 -14.89 19.30 71.11
nM

352.2 -
1007 1.35 DL1+1.5 WL5+0.9 TEMP1 -4.88 79.57 -6.05 0 39.79

353.7 -
1008 1.35 DL1+1.5 WL6+0.9 TEMP1 16.03 79.89 -1.21 3 18.61

-
134.2 314.1 -
di

1009 1.35 DL1+1.5 WL7+0.9 TEMP1 4 -72.15 -20.66 9 91.33

-
152.9 313.5 -
1010 1.35 DL1+1.5 WL8+0.9 TEMP1 2 -72.07 -15.96 8 70.75
a te

143.3
1011 1.35 DL1+1.5 WL1+-0.9 TEMP1 4 -3.03 22.30 -11.44 90.53

162.0 111.1
1012 1.35 DL1+1.5 WL2+-0.9 TEMP1 1 -2.95 27.00 -10.85 1

-
re

1013 1.35 DL1+1.5 WL3+-0.9 TEMP1 74.21 -4.72 -18.92 -14.19 88.70
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
1014 1.35 DL1+1.5 WL4+-0.9 TEMP1 92.82 -4.64 -14.21 -13.60 68.09

319.3 -
1015 1.35 DL1+1.5 WL5+-0.9 TEMP1 3.48 71.15 -5.38 0 36.76

Ed
320.8 -
1016 1.35 DL1+1.5 WL6+-0.9 TEMP1 24.40 71.47 -0.53 4 15.58

-
142.6 347.0 -
1017 1.35 DL1+1.5 WL7+-0.9 TEMP1 1 -80.58 -19.99 8 88.31

F
-
161.2 346.4 -
1018 1.35 DL1+1.5 WL8+-0.9 TEMP1 9 -80.49 -15.29 7 67.72

PD
109.6
1019 1.35 DL1+0.9 TEMP1+1.35 MR1 8 4.05 1.14 19.93 -1.81

118.0
1020 1.35 DL1+-0.9 TEMP1+1.35 MR1 5 -4.38 1.81 -12.96 1.21

1021 1.35 DL1+1.5LL1+1.5 EQUIP1+0.9 216.8


TEMP1+1.35 MR1 8 6.15 0.95 30.26 -2.54
te r
1022 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 225.2
TEMP1+1.35 MR1 5 -2.27 1.62 -2.64 0.48

1023 1.148 DL1+1.5 LL1+1.5 EQUIP1+0.9 200.3


TEMP1+1.35 MR1 9 6.17 0.74 29.72 -2.45
as

1024 1.148 DL1+1.5 LL1+1.5 EQUIP1+-0.9 208.7


TEMP1+1.35 MR1 6 -2.25 1.41 -3.17 0.57

1025 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+0.9 234.2


TEMP1+1.35 MR1 5 6.93 13.28 31.11 51.23
nM

1026 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+0.9 245.4


TEMP1+1.35 MR1 6 6.98 16.10 31.46 63.57

1027 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+0.9 192.7 -


TEMP1+1.35 MR1 8 5.91 -11.45 29.45 56.31

1028 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+0.9 203.9 -


TEMP1+1.35 MR1 4 5.97 -8.63 29.81 43.95
di

1029 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+0.9 150.3 229.5 -


TEMP1+1.35 MR1 4 51.44 -3.33 5 25.15

1030 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+0.9 162.8 230.4 -


TEMP1+1.35 MR1 9 51.63 -0.42 7 12.44
a te

-
1031 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+0.9 233.8 170.2 -
TEMP1+1.35 MR1 1 -39.60 -12.09 8 56.08

-
1032 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+0.9 245.0 169.9 -
TEMP1+1.35 MR1 2 -39.54 -9.27 2 43.73
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1033 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+-0.9 242.6
TEMP1+1.35 MR1 2 -1.49 13.96 -1.79 54.25

1034 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+-0.9 253.8


TEMP1+1.35 MR1 2 -1.44 16.78 -1.43 66.60

Ed
1035 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+-0.9 201.1 -
TEMP1+1.35 MR1 4 -2.51 -10.77 -3.44 53.29

1036 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+-0.9 212.3 -


TEMP1+1.35 MR1 1 -2.45 -7.95 -3.08 40.92

1037 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+-0.9 158.7 196.6 -

F
TEMP1+1.35 MR1 1 43.02 -2.65 6 22.12

1038 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+-0.9 171.2 197.5


TEMP1+1.35 MR1 6 43.21 0.26 8 -9.42

PD
-
1039 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+-0.9 242.1 203.1 -
TEMP1+1.35 MR1 8 -48.02 -11.41 8 53.05

-
1040 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+-0.9 253.3 202.8 -
TEMP1+1.35 MR1 9 -47.96 -8.59 1 40.70
te r
1041 1.148 DL1+1.5 LL1+0.9 WL1+1.5 217.7
EQUIP1+0.9 TEMP1+1.35 MR1 7 6.95 13.07 30.57 51.31

1042 1.148 DL1+1.5 LL1+0.9 WL2+1.5 228.9


EQUIP1+0.9 TEMP1+1.35 MR1 7 7.00 15.89 30.92 63.66
as

1043 1.148 DL1+1.5 LL1+0.9 WL3+1.5 176.2 -


EQUIP1+0.9 TEMP1+1.35 MR1 9 5.93 -11.66 28.92 56.22

1044 1.148 DL1+1.5 LL1+0.9 WL4+1.5 187.4 -


EQUIP1+0.9 TEMP1+1.35 MR1 5 5.99 -8.84 29.27 43.86
nM

1045 1.148 DL1+1.5 LL1+0.9 WL5+1.5 133.8 229.0 -


EQUIP1+0.9 TEMP1+1.35 MR1 5 51.46 -3.54 1 25.06

1046 1.148 DL1+1.5 LL1+0.9 WL6+1.5 146.4 229.9 -


EQUIP1+0.9 TEMP1+1.35 MR1 0 51.65 -0.63 3 12.35

-
1047 1.148 DL1+1.5 LL1+0.9 WL7+1.5 217.3 170.8 -
EQUIP1+0.9 TEMP1+1.35 MR1 3 -39.58 -12.30 2 55.99
di

-
1048 1.148 DL1+1.5 LL1+0.9 WL8+1.5 228.5 170.4 -
EQUIP1+0.9 TEMP1+1.35 MR1 4 -39.53 -9.48 5 43.64
a te

1049 1.148 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+- 226.1


0.9 TEMP1+1.35 MR1 3 -1.47 13.75 -2.33 54.34

1050 1.148 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+- 237.3


0.9 TEMP1+1.35 MR1 3 -1.42 16.57 -1.97 66.68

1051 1.148 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+- 184.6 -


0.9 TEMP1+1.35 MR1 5 -2.49 -10.98 -3.98 53.20
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1052 1.148 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+- 195.8 -
0.9 TEMP1+1.35 MR1 2 -2.44 -8.16 -3.62 40.83

1053 1.148 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+- 142.2 196.1 -


0.9 TEMP1+1.35 MR1 2 43.03 -2.86 2 22.03

Ed
1054 1.148 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+- 154.7 197.0
0.9 TEMP1+1.35 MR1 7 43.23 0.05 4 -9.33

-
1055 1.148 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+- 225.6 203.7 -
0.9 TEMP1+1.35 MR1 9 -48.00 -11.62 1 52.96

F
-
1056 1.148 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+- 236.9 203.3 -
0.9 TEMP1+1.35 MR1 0 -47.95 -8.80 5 40.61

PD
1057 1.148 DL1+1.5 LL1+1.5 WL1+1.5 229.3
EQUIP1+0.9 TEMP1+1.35 MR1 5 7.47 21.30 31.13 87.16

1058 1.148 DL1+1.5 LL1+1.5 WL2+1.5 248.0 107.7


EQUIP1+0.9 TEMP1+1.35 MR1 2 7.55 26.00 31.72 3

1059 1.148 DL1+1.5 LL1+1.5 WL3+1.5 160.2 -


EQUIP1+0.9 TEMP1+1.35 MR1 2 5.78 -19.92 28.38 92.07
te r
1060 1.148 DL1+1.5 LL1+1.5 WL4+1.5 178.8 -
EQUIP1+0.9 TEMP1+1.35 MR1 3 5.86 -15.22 28.97 71.46

1061 1.148 DL1+1.5 LL1+1.5 WL5+1.5 361.8 -


EQUIP1+0.9 TEMP1+1.35 MR1 89.49 81.65 -6.38 7 40.13
as

1062 1.148 DL1+1.5 LL1+1.5 WL6+1.5 110.4 363.4 -


EQUIP1+0.9 TEMP1+1.35 MR1 1 81.97 -1.54 1 18.95

-
1063 1.148 DL1+1.5 LL1+1.5 WL7+1.5 228.6 304.5 -
EQUIP1+0.9 TEMP1+1.35 MR1 1 -70.08 -20.99 1 91.68
nM

-
1064 1.148 DL1+1.5 LL1+1.5 WL8+1.5 247.3 303.9 -
EQUIP1+0.9 TEMP1+1.35 MR1 0 -69.99 -16.29 0 71.10

1065 1.148 DL1+1.5 LL1+1.5 WL1+1.5 EQUIP1+- 237.7


0.9 TEMP1+1.35 MR1 1 -0.96 21.98 -1.76 90.19

1066 1.148 DL1+1.5 LL1+1.5 WL2+1.5 EQUIP1+- 256.3 110.7


di

0.9 TEMP1+1.35 MR1 8 -0.87 26.67 -1.17 6

1067 1.148 DL1+1.5 LL1+1.5 WL3+1.5 EQUIP1+- 168.5 -


0.9 TEMP1+1.35 MR1 8 -2.65 -19.24 -4.51 89.04
a te

1068 1.148 DL1+1.5 LL1+1.5 WL4+1.5 EQUIP1+- 187.1 -


0.9 TEMP1+1.35 MR1 9 -2.56 -14.54 -3.92 68.43

1069 1.148 DL1+1.5 LL1+1.5 WL5+1.5 EQUIP1+- 328.9 -


0.9 TEMP1+1.35 MR1 97.86 73.23 -5.71 8 37.11

1070 1.148 DL1+1.5 LL1+1.5 WL6+1.5 EQUIP1+- 118.7 330.5 -


0.9 TEMP1+1.35 MR1 7 73.55 -0.86 1 15.93
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
1071 1.148 DL1+1.5 LL1+1.5 WL7+1.5 EQUIP1+- 236.9 337.4 -
0.9 TEMP1+1.35 MR1 8 -78.50 -20.31 1 88.65

Ed
1072 1.148 DL1+1.5 LL1+1.5 WL8+1.5 EQUIP1+- 255.6 336.7 -
0.9 TEMP1+1.35 MR1 6 -78.41 -15.61 9 68.07

144.3
1073 1 DL1+0.8 LL1+1 SL1 7 -5.09 -7.39 -16.21 35.55

-
169.5 114.7

F
1074 1 DL1+0.8 LL1+1 SL2 9 -26.73 -1.68 2 8.13

124.6 -

PD
1075 1 DL1+0.8 LL1+-1 SL1 2 7.10 9.19 32.07 37.54

130.5 -
1076 1 DL1+0.8 LL1+-1 SL2 99.41 28.73 3.48 8 10.12

2001 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+0.6 164.6


TEMP1+1 MR1 0 4.61 8.97 21.00 34.13

2002 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+0.6 172.0


te r
TEMP1+1 MR1 7 4.64 10.84 21.23 42.36

2003 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+0.6 136.9 -


TEMP1+1 MR1 5 3.93 -7.52 19.89 37.56

2004 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+0.6 144.4 -


TEMP1+1 MR1 0 3.97 -5.64 20.13 29.32
as

2005 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+0.6 108.6 153.2 -


TEMP1+1 MR1 6 34.28 -2.11 9 16.79

2006 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+0.6 117.0 153.9


TEMP1+1 MR1 3 34.41 -0.17 0 -8.32
nM

-
2007 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+0.6 164.3 113.2 -
TEMP1+1 MR1 1 -26.41 -7.95 6 37.41

-
2008 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+0.6 171.7 113.0 -
TEMP1+1 MR1 8 -26.37 -6.07 2 29.17
di

2009 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+-0.6 170.1


TEMP1+1 MR1 8 -1.01 9.42 -0.93 36.15

2010 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+-0.6 177.6


TEMP1+1 MR1 5 -0.97 11.30 -0.70 44.38
a te

2011 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+-0.6 142.5 -


TEMP1+1 MR1 3 -1.68 -7.07 -2.04 35.55

2012 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+-0.6 149.9 -


TEMP1+1 MR1 7 -1.65 -5.19 -1.80 27.30
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
2013 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+-0.6 114.2 131.3 -
TEMP1+1 MR1 4 28.67 -1.66 6 14.77

2014 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+-0.6 122.6 131.9


TEMP1+1 MR1 1 28.79 0.28 8 -6.30

Ed
-
2015 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+-0.6 169.8 135.1 -
TEMP1+1 MR1 9 -32.02 -7.50 9 35.39

-
2016 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+-0.6 177.3 134.9 -
TEMP1+1 MR1 6 -31.99 -5.62 5 27.16

F
2017 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+0.6 172.3
TEMP1+1 MR1 3 4.95 14.45 21.37 58.03

PD
2018 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+0.6 184.7
TEMP1+1 MR1 7 5.01 17.58 21.76 71.74

2019 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+0.6 126.2 -


TEMP1+1 MR1 4 3.83 -13.03 19.54 61.46

2020 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+0.6 138.6 -


TEMP1+1 MR1 4 3.89 -9.90 19.93 47.72
te r
2021 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+0.6 241.8 -
TEMP1+1 MR1 79.09 54.41 -4.01 6 26.84

2022 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+0.6 242.8 -


TEMP1+1 MR1 93.03 54.62 -0.78 9 12.72
as

-
2023 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+0.6 171.8 202.3 -
TEMP1+1 MR1 4 -46.74 -13.74 9 61.20

-
2024 1 DL1+1.0 LL1+1 WL8+1 EQUIP1+0.6 184.2 201.9 -
nM

TEMP1+1 MR1 9 -46.68 -10.61 8 47.48

2025 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+-0.6 177.9


TEMP1+1 MR1 0 -0.66 14.90 -0.56 60.04

2026 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+-0.6 190.3


TEMP1+1 MR1 5 -0.61 18.03 -0.16 73.76

2027 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+-0.6 131.8 -


di

TEMP1+1 MR1 2 -1.79 -12.58 -2.39 59.44

2028 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+-0.6 144.2 -


TEMP1+1 MR1 2 -1.73 -9.44 -2.00 45.70
a te

2029 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+-0.6 219.9 -


TEMP1+1 MR1 84.67 48.79 -3.56 4 24.82

2030 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+-0.6 220.9 -


TEMP1+1 MR1 98.61 49.01 -0.32 6 10.70
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
2031 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+-0.6 177.4 224.3 -
TEMP1+1 MR1 1 -52.36 -13.29 2 59.18

Ed
2032 1 DL1+0.7 LL1+1 WL8+1 EQUIP1+-0.6 189.8 223.9 -
TEMP1+1 MR1 7 -52.30 -10.16 1 45.46

144.3
2033 1 DL1+0.8 LL1+1 SL1 7 -5.09 -7.39 -16.21 35.55

-
169.5 114.7

F
2034 1 DL1+0.8 LL1+1 SL2 9 -26.73 -1.68 2 8.13

124.6 -

PD
2035 1 DL1+0.8 LL1+-1 SL1 2 7.10 9.19 32.07 37.54

130.5 -
2036 1 DL1+0.8 LL1+-1 SL2 99.41 28.73 3.48 8 10.12

258.0
P8 500 1 DL1+1 LL1+1 EQUIP1 0 3.26 1.48 15.11 10.86

264.4 -
te r
501 1 DL1+1 LL1+1 EQUIP1+1 TEMP1 8 11.38 -8.22 50.36 30.39

502 1 DL1+1 WL1 25.13 2.30 17.19 11.80 76.98

503 1 DL1+1 WL2 35.28 2.38 17.79 11.99 80.02

165.1 -
as

504 1 DL1+1 WL3 5 1.65 -17.45 7.61 68.38

174.8 -
505 1 DL1+1 WL4 7 1.73 -16.75 7.80 64.92

459.9 211.6
nM

506 1 DL1+1 WL5 2 47.63 0.55 0 1.56

471.9 212.5
507 1 DL1+1 WL6 4 47.86 1.17 0 4.68

- -
266.8 203.6 -
508 1 DL1+1 WL7 9 -44.73 -4.75 9 13.43
di

- -
256.7 203.4 -
509 1 DL1+1 WL8 1 -44.64 -4.16 9 10.39

510 1 DL1+0.7 WL1 51.00 2.13 11.99 10.14 55.11


a te

511 1 DL1+0.7 WL2 58.10 2.19 12.41 10.27 57.24

149.0 -
512 1 DL1+0.7 WL3 1 1.68 -12.26 7.21 46.64

155.8 -
513 1 DL1+0.7 WL4 1 1.74 -11.77 7.34 44.22
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
355.3 150.0
514 1 DL1+0.7 WL5 5 33.87 0.34 0 2.32

363.7 150.6
515 1 DL1+0.7 WL6 6 34.03 0.77 2 4.50

Ed
- -
153.4 140.7
516 1 DL1+0.7 WL7 2 -30.79 -3.38 1 -8.18

- -
146.2 140.5
517 1 DL1+0.7 WL8 9 -30.73 -2.96 6 -6.05

F
193.3
518 1 DL1+ 1LL1+0.75 WL1+1 EQUIP1 4 3.67 14.50 19.27 65.54

PD
200.9
519 1 DL1+1.0 LL1+0.75 WL2+1 EQUIP1 5 3.73 14.95 19.41 67.82

298.3 -
520 1 DL1+1.0 LL1+0.75 WL3+1 EQUIP1 6 3.19 -11.48 16.12 43.48

305.6 -
521 1 DL1+1.0 LL1+0.75 WL4+1 EQUIP1 5 3.25 -10.96 16.26 40.89
te r
519.4 169.1
522 1 DL1+1.0 LL1+0.75 WL5+1 EQUIP1 3 37.67 2.02 2 8.98

528.4 169.7
523 1 DL1+1.0 LL1+0.75 WL6+1 EQUIP1 5 37.84 2.48 9 11.31
as

-
- 142.3
524 1 DL1+1.0 LL1+0.75 WL7+1 EQUIP1 25.68 -31.60 -1.96 5 -2.27

-
- 142.2
nM

525 1 DL1+1.0 LL1+0.75 WL8+1 EQUIP1 18.04 -31.53 -1.51 0 0.01

324.4
526 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL1 9 0.55 -19.52 3.22 97.46

370.1
527 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL2 4 -10.09 -0.23 -44.46 18.21

-
di

528 0.6 DL1+1 WL1 19.40 1.60 17.26 9.30 75.35

529 0.6 DL1+1 WL2 -9.26 1.68 17.86 9.49 78.39

120.6 -
a te

530 0.6 DL1+1 WL3 1 0.95 -17.39 5.11 70.01

130.3 -
531 0.6 DL1+1 WL4 4 1.04 -16.69 5.30 66.55

415.3 209.1
532 0.6 DL1+1 WL5 9 46.93 0.62 0 -0.07
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
427.4 209.9
533 0.6 DL1+1 WL6 0 47.16 1.24 9 3.05

- -
311.4 206.1 -

Ed
534 0.6 DL1+1 WL7 3 -45.43 -4.69 9 15.06

- -
301.2 205.9 -
535 0.6 DL1+1 WL8 4 -45.34 -4.09 9 12.02

155.4 117.9
536 0.6 DL1+0.7 SL1 6 -2.56 -28.10 -12.10 2

F
216.3
537 0.6 DL1+0.7 SL2 3 -16.75 -2.38 -75.67 12.25

PD
376.1 -
1001 1.35 DL1+1.5 LL1+1.5 EQUIP1+0.9 TEMP1 3 11.94 -6.48 53.45 21.45

364.4
1002 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 TEMP1 7 -2.68 10.98 -10.00 52.81

1003 1.35 DL1+1.5 WL1+0.9 TEMP1 26.83 10.49 17.09 48.49 77.73

1004 1.35 DL1+1.5 WL2+0.9 TEMP1 42.05 10.62 17.98 48.77 82.29
te r
-
236.8 140.3
1005 1.35 DL1+1.5 WL3+0.9 TEMP1 6 9.52 -34.88 42.21 0

-
as

251.4 135.1
1006 1.35 DL1+1.5 WL4+0.9 TEMP1 4 9.65 -33.83 42.49 2

679.0 348.1 -
1007 1.35 DL1+1.5 WL5+0.9 TEMP1 1 78.50 -7.88 9 35.39
nM

697.0 349.5 -
1008 1.35 DL1+1.5 WL6+0.9 TEMP1 4 78.84 -6.95 3 30.72

- -
411.2 274.7 -
1009 1.35 DL1+1.5 WL7+0.9 TEMP1 1 -60.05 -15.84 4 57.89

- -
395.9 274.4 -
di

1010 1.35 DL1+1.5 WL8+0.9 TEMP1 3 -59.92 -14.94 4 53.33

151.9
1011 1.35 DL1+1.5 WL1+-0.9 TEMP1 15.17 -4.12 34.54 -14.96 9
a te

156.5
1012 1.35 DL1+1.5 WL2+-0.9 TEMP1 30.38 -4.00 35.44 -14.68 5

225.1 -
1013 1.35 DL1+1.5 WL3+-0.9 TEMP1 9 -5.10 -17.42 -21.25 66.05

239.7 -
1014 1.35 DL1+1.5 WL4+-0.9 TEMP1 8 -4.97 -16.37 -20.97 60.86
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
667.3 284.7
1015 1.35 DL1+1.5 WL5+-0.9 TEMP1 5 63.88 9.58 4 38.86

685.3 286.0
1016 1.35 DL1+1.5 WL6+-0.9 TEMP1 8 64.22 10.51 8 43.54

Ed
- -
422.8 338.2
1017 1.35 DL1+1.5 WL7+-0.9 TEMP1 7 -74.66 1.62 0 16.37

- -
407.5 337.8
1018 1.35 DL1+1.5 WL8+-0.9 TEMP1 9 -74.53 2.52 9 20.93

F
164.6 -
1019 1.35 DL1+0.9 TEMP1+1.35 MR1 2 9.65 -8.79 40.24 30.96

PD
152.9
1020 1.35 DL1+-0.9 TEMP1+1.35 MR1 6 -4.96 8.67 -23.21 43.30

1021 1.35 DL1+1.5LL1+1.5 EQUIP1+0.9 384.6 -


TEMP1+1.35 MR1 1 11.92 -6.32 53.52 20.78

1022 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 372.9


TEMP1+1.35 MR1 5 -2.70 11.14 -9.93 53.47
te r
1023 1.148 DL1+1.5 LL1+1.5 EQUIP1+0.9 362.1 -
TEMP1+1.35 MR1 2 11.57 -6.29 52.25 21.61

1024 1.148 DL1+1.5 LL1+1.5 EQUIP1+-0.9 350.4


TEMP1+1.35 MR1 5 -3.05 11.17 -11.20 52.65
as

1025 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+0.9 307.0


TEMP1+1.35 MR1 2 12.41 9.30 58.51 44.83

1026 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+0.9 316.1


TEMP1+1.35 MR1 5 12.49 9.84 58.68 47.57
nM

1027 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+0.9 433.0 -


TEMP1+1.35 MR1 4 11.83 -21.88 54.74 85.99

1028 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+0.9 441.7 -


TEMP1+1.35 MR1 9 11.91 -21.25 54.91 82.88

1029 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+0.9 698.3 238.3 -


TEMP1+1.35 MR1 3 53.22 -5.68 3 23.05
di

1030 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+0.9 709.1 239.1 -


TEMP1+1.35 MR1 5 53.42 -5.12 3 20.24

-
1031 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+0.9 135.4 -
a te

TEMP1+1.35 MR1 44.20 -29.91 -10.45 3 36.54

-
1032 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+0.9 135.2 -
TEMP1+1.35 MR1 53.36 -29.83 -9.92 5 33.81

1033 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+-0.9 295.3 119.0


TEMP1+1.35 MR1 6 -2.20 26.75 -4.94 8
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1034 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+-0.9 304.4 121.8
TEMP1+1.35 MR1 9 -2.13 27.29 -4.78 2

1035 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+-0.9 421.3 -


TEMP1+1.35 MR1 7 -2.79 -4.42 -8.71 11.74

Ed
1036 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+-0.9 430.1
TEMP1+1.35 MR1 2 -2.71 -3.79 -8.55 -8.63

1037 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+-0.9 686.6 174.8


TEMP1+1.35 MR1 7 38.60 11.78 8 51.21

1038 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+-0.9 697.4 175.6

F
TEMP1+1.35 MR1 8 38.81 12.34 8 54.02

-
1039 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+-0.9 198.8

PD
TEMP1+1.35 MR1 32.53 -44.53 7.00 8 37.71

-
1040 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+-0.9 198.7
TEMP1+1.35 MR1 41.70 -44.45 7.54 0 40.45

1041 1.148 DL1+1.5 LL1+0.9 WL1+1.5 284.5


EQUIP1+0.9 TEMP1+1.35 MR1 3 12.06 9.33 57.25 44.01
te r
1042 1.148 DL1+1.5 LL1+0.9 WL2+1.5 293.6
EQUIP1+0.9 TEMP1+1.35 MR1 6 12.14 9.87 57.41 46.74

1043 1.148 DL1+1.5 LL1+0.9 WL3+1.5 410.5 -


EQUIP1+0.9 TEMP1+1.35 MR1 4 11.48 -21.85 53.47 86.82
as

1044 1.148 DL1+1.5 LL1+0.9 WL4+1.5 419.2 -


EQUIP1+0.9 TEMP1+1.35 MR1 9 11.55 -21.22 53.64 83.70

1045 1.148 DL1+1.5 LL1+0.9 WL5+1.5 675.8 237.0 -


EQUIP1+0.9 TEMP1+1.35 MR1 4 52.86 -5.65 7 23.87
nM

1046 1.148 DL1+1.5 LL1+0.9 WL6+1.5 686.6 237.8 -


EQUIP1+0.9 TEMP1+1.35 MR1 6 53.07 -5.09 7 21.06

-
1047 1.148 DL1+1.5 LL1+0.9 WL7+1.5 136.7 -
EQUIP1+0.9 TEMP1+1.35 MR1 21.71 -30.26 -10.42 0 37.37

-
1048 1.148 DL1+1.5 LL1+0.9 WL8+1.5 136.5 -
di

EQUIP1+0.9 TEMP1+1.35 MR1 30.87 -30.19 -9.88 1 34.63

1049 1.148 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+- 272.8 118.2


0.9 TEMP1+1.35 MR1 7 -2.56 26.79 -6.21 6
a te

1050 1.148 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+- 282.0 121.0


0.9 TEMP1+1.35 MR1 0 -2.48 27.33 -6.04 0

1051 1.148 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+- 398.8 -


0.9 TEMP1+1.35 MR1 8 -3.14 -4.39 -9.98 12.56

1052 1.148 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+- 407.6


0.9 TEMP1+1.35 MR1 3 -3.06 -3.76 -9.81 -9.45
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1053 1.148 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+- 664.1 173.6
0.9 TEMP1+1.35 MR1 8 38.25 11.81 1 50.39

1054 1.148 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+- 674.9 174.4


0.9 TEMP1+1.35 MR1 9 38.45 12.37 2 53.19

Ed
-
1055 1.148 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+- 200.1
0.9 TEMP1+1.35 MR1 10.04 -44.88 7.04 5 36.89

-
1056 1.148 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+- 199.9
0.9 TEMP1+1.35 MR1 19.21 -44.80 7.57 6 39.63

F
1057 1.148 DL1+1.5 LL1+1.5 WL1+1.5 232.8
EQUIP1+0.9 TEMP1+1.35 MR1 0 12.39 19.74 60.57 87.75

PD
1058 1.148 DL1+1.5 LL1+1.5 WL2+1.5 248.0
EQUIP1+0.9 TEMP1+1.35 MR1 2 12.52 20.64 60.85 92.31

-
1059 1.148 DL1+1.5 LL1+1.5 WL3+1.5 442.8 130.2
EQUIP1+0.9 TEMP1+1.35 MR1 3 11.42 -32.22 54.29 9

-
1060 1.148 DL1+1.5 LL1+1.5 WL4+1.5 457.4 125.1
te r
EQUIP1+0.9 TEMP1+1.35 MR1 1 11.54 -31.17 54.57 0

1061 1.148 DL1+1.5 LL1+1.5 WL5+1.5 884.9 360.2 -


EQUIP1+0.9 TEMP1+1.35 MR1 9 80.39 -5.22 7 25.38

1062 1.148 DL1+1.5 LL1+1.5 WL6+1.5 903.0 361.6 -


as

EQUIP1+0.9 TEMP1+1.35 MR1 1 80.73 -4.29 1 20.70

- -
1063 1.148 DL1+1.5 LL1+1.5 WL7+1.5 205.2 262.6 -
EQUIP1+0.9 TEMP1+1.35 MR1 4 -58.15 -13.18 6 47.87
nM

- -
1064 1.148 DL1+1.5 LL1+1.5 WL8+1.5 189.9 262.3 -
EQUIP1+0.9 TEMP1+1.35 MR1 6 -58.02 -12.28 6 43.31

1065 1.148 DL1+1.5 LL1+1.5 WL1+1.5 EQUIP1+- 221.1 162.0


0.9 TEMP1+1.35 MR1 4 -2.23 37.20 -2.88 0

1066 1.148 DL1+1.5 LL1+1.5 WL2+1.5 EQUIP1+- 236.3 166.5


di

0.9 TEMP1+1.35 MR1 6 -2.10 38.10 -2.60 7

1067 1.148 DL1+1.5 LL1+1.5 WL3+1.5 EQUIP1+- 431.1 -


0.9 TEMP1+1.35 MR1 7 -3.20 -14.77 -9.16 56.03

1068 1.148 DL1+1.5 LL1+1.5 WL4+1.5 EQUIP1+- 445.7 -


a te

0.9 TEMP1+1.35 MR1 5 -3.07 -13.72 -8.88 50.85

1069 1.148 DL1+1.5 LL1+1.5 WL5+1.5 EQUIP1+- 873.3 296.8


0.9 TEMP1+1.35 MR1 2 65.78 12.24 2 48.88

1070 1.148 DL1+1.5 LL1+1.5 WL6+1.5 EQUIP1+- 891.3 298.1


0.9 TEMP1+1.35 MR1 5 66.12 13.17 6 53.55
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
- -
1071 1.148 DL1+1.5 LL1+1.5 WL7+1.5 EQUIP1+- 216.9 326.1
0.9 TEMP1+1.35 MR1 0 -72.77 4.28 1 26.38

- -

Ed
1072 1.148 DL1+1.5 LL1+1.5 WL8+1.5 EQUIP1+- 201.6 325.8
0.9 TEMP1+1.35 MR1 2 -72.64 5.18 1 30.94

350.8 174.0
1073 1 DL1+0.8 LL1+1 SL1 0 -2.26 -38.95 -9.67 8

-
437.7 100.4

F
1074 1 DL1+0.8 LL1+1 SL2 6 -22.53 -2.20 8 23.13

PD
155.8
1075 1 DL1+0.8 LL1+-1 SL1 97.50 8.05 41.07 35.62 3

126.4
1076 1 DL1+0.8 LL1+-1 SL2 10.55 28.32 4.32 3 -4.87

2001 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+0.6 216.4


TEMP1+1 MR1 4 8.45 6.19 39.64 30.34

2002 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+0.6 222.5


te r
TEMP1+1 MR1 3 8.50 6.55 39.75 32.17

2003 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+0.6 300.4 -


TEMP1+1 MR1 5 8.06 -14.59 37.12 56.87

2004 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+0.6 306.2 -


as

TEMP1+1 MR1 9 8.11 -14.17 37.24 54.80

2005 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+0.6 477.3 159.5 -


TEMP1+1 MR1 2 35.65 -3.79 2 14.91

2006 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+0.6 484.5 160.0 -


nM

TEMP1+1 MR1 3 35.79 -3.42 5 13.04

2007 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+0.6 -


TEMP1+1 MR1 41.23 -19.77 -6.97 -89.66 23.90

2008 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+0.6 -


TEMP1+1 MR1 47.34 -19.72 -6.62 -89.54 22.08

2009 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+-0.6 208.6


di

TEMP1+1 MR1 7 -1.29 17.83 -2.66 79.85

2010 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+-0.6 214.7


TEMP1+1 MR1 5 -1.24 18.19 -2.55 81.67
a te

2011 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+-0.6 292.6


TEMP1+1 MR1 8 -1.68 -2.95 -5.18 -7.37

2012 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+-0.6 298.5


TEMP1+1 MR1 1 -1.63 -2.53 -5.07 -5.29

2013 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+-0.6 469.5 117.2


TEMP1+1 MR1 4 25.91 7.85 2 34.60
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
2014 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+-0.6 476.7 117.7
TEMP1+1 MR1 5 26.04 8.22 5 36.47

-
2015 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+-0.6 131.9

Ed
TEMP1+1 MR1 33.45 -29.51 4.66 6 25.60

-
2016 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+-0.6 131.8
TEMP1+1 MR1 39.56 -29.46 5.02 4 27.42

2017 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+0.6 181.9


TEMP1+1 MR1 6 8.67 13.14 41.85 59.50

F
2018 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+0.6 192.1
TEMP1+1 MR1 0 8.75 13.73 42.04 62.55

PD
2019 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+0.6 321.9 -
TEMP1+1 MR1 8 8.02 -21.51 37.67 85.85

2020 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+0.6 331.7 -


TEMP1+1 MR1 0 8.11 -20.81 37.85 82.40

2021 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+0.6 616.7 241.6 -


TEMP1+1 MR1 5 54.01 -3.51 6 15.91
te r
2022 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+0.6 628.7 242.5 -
TEMP1+1 MR1 7 54.23 -2.89 5 12.80

- -
2023 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+0.6 110.0 173.6 -
TEMP1+1 MR1 7 -38.36 -8.81 3 30.91
as

-
2024 1 DL1+1.0 LL1+1 WL8+1 EQUIP1+0.6 - 173.4 -
TEMP1+1 MR1 99.88 -38.27 -8.21 3 27.87

2025 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+-0.6 174.1 109.0


nM

TEMP1+1 MR1 8 -1.08 24.77 -0.45 1

2026 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+-0.6 184.3 112.0


TEMP1+1 MR1 3 -0.99 25.37 -0.26 5

2027 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+-0.6 314.2 -


TEMP1+1 MR1 0 -1.72 -9.87 -4.64 36.35

2028 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+-0.6 323.9 -


di

TEMP1+1 MR1 2 -1.64 -9.17 -4.45 32.89

2029 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+-0.6 608.9 199.3


TEMP1+1 MR1 7 44.26 8.13 5 33.59
a te

2030 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+-0.6 620.9 200.2


TEMP1+1 MR1 9 44.49 8.75 5 36.71

- -
2031 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+-0.6 117.8 215.9
TEMP1+1 MR1 4 -48.10 2.83 4 18.60
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
- -
2032 1 DL1+0.7 LL1+1 WL8+1 EQUIP1+-0.6 107.6 215.7
TEMP1+1 MR1 6 -48.01 3.43 3 21.64

350.8 174.0

Ed
2033 1 DL1+0.8 LL1+1 SL1 0 -2.26 -38.95 -9.67 8

-
437.7 100.4
2034 1 DL1+0.8 LL1+1 SL2 6 -22.53 -2.20 8 23.13

-
155.8

F
2035 1 DL1+0.8 LL1+-1 SL1 97.50 8.05 41.07 35.62 3

126.4

PD
2036 1 DL1+0.8 LL1+-1 SL2 10.55 28.32 4.32 3 -4.87

212.3
P9 500 1 DL1+1 LL1+1 EQUIP1 3 -4.21 0.10 -16.63 -0.57

214.3
501 1 DL1+1 LL1+1 EQUIP1+1 TEMP1 2 -10.11 1.79 -41.62 7.08

502 1 DL1+1 WL1 80.92 -4.35 1.40 -18.53 5.32


te r
503 1 DL1+1 WL2 78.86 -3.78 1.44 -16.04 5.49

107.6
504 1 DL1+1 WL3 9 -3.27 -0.98 -13.03 -5.57

105.5
as

505 1 DL1+1 WL4 2 -2.70 -0.93 -10.55 -5.36

-
184.1 187.1
506 1 DL1+1 WL5 3 44.25 0.91 8 3.07
nM

-
186.5 189.7
507 1 DL1+1 WL6 8 44.85 0.96 8 3.26

-
321.8 199.2
508 1 DL1+1 WL7 2 -47.43 -0.53 8 -3.63

-
di

319.7 196.7
509 1 DL1+1 WL8 4 -46.86 -0.48 9 -3.46

510 1 DL1+0.7 WL1 81.37 -3.54 1.07 -14.84 3.76


a te

511 1 DL1+0.7 WL2 79.92 -3.14 1.10 -13.10 3.89

100.1
512 1 DL1+0.7 WL3 1 -2.77 -0.60 -10.99 -3.86

513 1 DL1+0.7 WL4 98.59 -2.38 -0.57 -9.26 -3.71


re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
104.1 129.1
514 1 DL1+0.7 WL5 6 30.49 0.72 5 2.19

Ed
105.8 130.9
515 1 DL1+0.7 WL6 8 30.90 0.76 8 2.32

-
250.0 141.3
516 1 DL1+0.7 WL7 0 -33.69 -0.29 7 -2.50

F
248.5 139.6
517 1 DL1+0.7 WL8 4 -33.29 -0.25 3 -2.38

PD
211.2
518 1 DL1+ 1LL1+0.75 WL1+1 EQUIP1 1 -6.25 0.94 -25.84 3.32

209.6
519 1 DL1+1.0 LL1+0.75 WL2+1 EQUIP1 6 -5.83 0.97 -23.97 3.45

231.2
520 1 DL1+1.0 LL1+0.75 WL3+1 EQUIP1 9 -5.44 -0.85 -21.71 -4.84

229.6
te r
521 1 DL1+1.0 LL1+0.75 WL4+1 EQUIP1 6 -5.01 -0.81 -19.85 -4.69

128.4
522 1 DL1+1.0 LL1+0.75 WL5+1 EQUIP1 12.43 30.20 0.57 4 1.64

130.4
as

523 1 DL1+1.0 LL1+0.75 WL6+1 EQUIP1 10.59 30.65 0.61 0 1.78

-
391.8 161.4
524 1 DL1+1.0 LL1+0.75 WL7+1 EQUIP1 8 -38.56 -0.51 1 -3.39
nM

-
390.3 159.5
525 1 DL1+1.0 LL1+0.75 WL8+1 EQUIP1 2 -38.13 -0.48 4 -3.26

249.7
526 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL1 4 -6.39 -2.38 -25.35 11.24

286.6
di

527 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL2 0 -15.11 -0.26 -62.68 1.15

528 0.6 DL1+1 WL1 47.95 -3.70 1.29 -16.03 5.26

529 0.6 DL1+1 WL2 45.89 -3.13 1.33 -13.54 5.44


a te

530 0.6 DL1+1 WL3 74.73 -2.61 -1.09 -10.53 -5.62

531 0.6 DL1+1 WL4 72.55 -2.05 -1.04 -8.05 -5.41

-
217.0 189.6
532 0.6 DL1+1 WL5 9 44.90 0.80 8 3.01
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
219.5 192.2
533 0.6 DL1+1 WL6 4 45.50 0.85 8 3.21

Ed
288.8 196.7
534 0.6 DL1+1 WL7 5 -46.77 -0.64 9 -3.69

-
286.7 194.2
535 0.6 DL1+1 WL8 7 -46.20 -0.60 9 -3.51

536 0.6 DL1+0.7 SL1 99.33 -3.89 -3.14 -15.38 15.82

F
148.4
537 0.6 DL1+0.7 SL2 8 -15.51 -0.31 -65.15 2.37

PD
307.9
1001 1.35 DL1+1.5 LL1+1.5 EQUIP1+0.9 TEMP1 3 -11.38 1.63 -46.50 6.02

304.3
1002 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 TEMP1 4 -0.76 -1.42 -1.51 -7.75

110.8
1003 1.35 DL1+1.5 WL1+0.9 TEMP1 1 -11.60 3.59 -49.35 14.84
te r
107.7
1004 1.35 DL1+1.5 WL2+0.9 TEMP1 2 -10.74 3.65 -45.62 15.10

150.9
1005 1.35 DL1+1.5 WL3+0.9 TEMP1 7 -9.97 0.01 -41.10 -1.49
as

147.7
1006 1.35 DL1+1.5 WL4+0.9 TEMP1 1 -9.11 0.09 -37.38 -1.18

-
286.7 259.2
1007 1.35 DL1+1.5 WL5+0.9 TEMP1 6 61.31 2.85 1 11.47
nM

-
290.4 263.1
1008 1.35 DL1+1.5 WL6+0.9 TEMP1 3 62.20 2.92 2 11.76

-
472.1 320.4
1009 1.35 DL1+1.5 WL7+0.9 TEMP1 6 -76.21 0.69 8 1.42
di

-
469.0 316.7
1010 1.35 DL1+1.5 WL8+0.9 TEMP1 3 -75.35 0.76 5 1.68

107.2
a te

1011 1.35 DL1+1.5 WL1+-0.9 TEMP1 2 -0.97 0.53 -4.36 1.07

104.1
1012 1.35 DL1+1.5 WL2+-0.9 TEMP1 3 -0.12 0.60 -0.63 1.34

147.3 -
1013 1.35 DL1+1.5 WL3+-0.9 TEMP1 8 0.66 -3.04 3.89 15.26
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
144.1 -
1014 1.35 DL1+1.5 WL4+-0.9 TEMP1 2 1.51 -2.97 7.61 14.95

-
290.3 304.2

Ed
1015 1.35 DL1+1.5 WL5+-0.9 TEMP1 5 71.93 -0.20 0 -2.30

-
294.0 308.1
1016 1.35 DL1+1.5 WL6+-0.9 TEMP1 2 72.83 -0.13 1 -2.01

-
468.5 275.4 -

F
1017 1.35 DL1+1.5 WL7+-0.9 TEMP1 7 -65.58 -2.36 9 12.35

PD
465.4 271.7 -
1018 1.35 DL1+1.5 WL8+-0.9 TEMP1 5 -64.73 -2.29 6 12.09

113.9
1019 1.35 DL1+0.9 TEMP1+1.35 MR1 6 -7.51 1.88 -30.90 6.96

110.3
1020 1.35 DL1+-0.9 TEMP1+1.35 MR1 7 3.12 -1.17 14.09 -6.81

1021 1.35 DL1+1.5LL1+1.5 EQUIP1+0.9 308.8


te r
TEMP1+1.35 MR1 4 -11.38 1.61 -46.47 5.91

1022 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 305.2


TEMP1+1.35 MR1 5 -0.76 -1.45 -1.48 -7.86

1023 1.148 DL1+1.5 LL1+1.5 EQUIP1+0.9 292.1


as

TEMP1+1.35 MR1 9 -11.05 1.55 -45.21 5.88

1024 1.148 DL1+1.5 LL1+1.5 EQUIP1+-0.9 288.6


TEMP1+1.35 MR1 0 -0.43 -1.50 -0.22 -7.89

1025 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+0.9 307.4


nM

TEMP1+1.35 MR1 9 -13.83 2.62 -57.53 10.57

1026 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+0.9 305.6


TEMP1+1.35 MR1 3 -13.32 2.66 -55.29 10.73

1027 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+0.9 331.5


TEMP1+1.35 MR1 9 -12.85 0.47 -52.58 0.77

1028 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+0.9 329.6


di

TEMP1+1.35 MR1 3 -12.34 0.52 -50.34 0.96

1029 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+0.9 127.6


TEMP1+1.35 MR1 68.95 29.91 2.18 1 8.55
a te

1030 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+0.9 129.9


TEMP1+1.35 MR1 66.75 30.45 2.22 5 8.72

-
1031 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+0.9 524.3 220.2
TEMP1+1.35 MR1 0 -52.60 0.88 1 2.52
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
1032 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+0.9 522.4 217.9
TEMP1+1.35 MR1 2 -52.08 0.92 7 2.68

1033 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+-0.9 303.9

Ed
TEMP1+1.35 MR1 0 -3.21 -0.44 -12.54 -3.20

1034 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+-0.9 302.0


TEMP1+1.35 MR1 5 -2.70 -0.40 -10.30 -3.04

1035 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+-0.9 328.0 -


TEMP1+1.35 MR1 0 -2.23 -2.58 -7.59 12.99

F
1036 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+-0.9 326.0 -
TEMP1+1.35 MR1 4 -1.72 -2.54 -5.36 12.81

1037 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+-0.9 172.6

PD
TEMP1+1.35 MR1 65.36 40.54 -0.88 0 -5.22

1038 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+-0.9 174.9


TEMP1+1.35 MR1 63.16 41.07 -0.84 4 -5.05

-
1039 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+-0.9 520.7 175.2 -
TEMP1+1.35 MR1 1 -41.97 -2.17 2 11.25
te r
-
1040 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+-0.9 518.8 172.9 -
TEMP1+1.35 MR1 4 -41.46 -2.13 8 11.09

1041 1.148 DL1+1.5 LL1+0.9 WL1+1.5 290.8


EQUIP1+0.9 TEMP1+1.35 MR1 4 -13.50 2.56 -56.27 10.55
as

1042 1.148 DL1+1.5 LL1+0.9 WL2+1.5 288.9


EQUIP1+0.9 TEMP1+1.35 MR1 9 -12.99 2.60 -54.03 10.70

1043 1.148 DL1+1.5 LL1+0.9 WL3+1.5 314.9


EQUIP1+0.9 TEMP1+1.35 MR1 4 -12.52 0.42 -51.32 0.75
nM

1044 1.148 DL1+1.5 LL1+0.9 WL4+1.5 312.9


EQUIP1+0.9 TEMP1+1.35 MR1 8 -12.01 0.46 -49.08 0.94

1045 1.148 DL1+1.5 LL1+0.9 WL5+1.5 128.8


EQUIP1+0.9 TEMP1+1.35 MR1 52.30 30.24 2.12 7 8.52

1046 1.148 DL1+1.5 LL1+0.9 WL6+1.5 131.2


EQUIP1+0.9 TEMP1+1.35 MR1 50.10 30.78 2.16 1 8.70
di

-
1047 1.148 DL1+1.5 LL1+0.9 WL7+1.5 507.6 218.9
EQUIP1+0.9 TEMP1+1.35 MR1 5 -52.27 0.82 5 2.49
a te

-
1048 1.148 DL1+1.5 LL1+0.9 WL8+1.5 505.7 216.7
EQUIP1+0.9 TEMP1+1.35 MR1 8 -51.75 0.86 0 2.65

1049 1.148 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+- 287.2


0.9 TEMP1+1.35 MR1 5 -2.88 -0.49 -11.28 -3.22
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1050 1.148 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+- 285.4
0.9 TEMP1+1.35 MR1 0 -2.37 -0.46 -9.04 -3.06

1051 1.148 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+- 311.3 -


0.9 TEMP1+1.35 MR1 5 -1.90 -2.64 -6.33 13.02

Ed
1052 1.148 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+- 309.4 -
0.9 TEMP1+1.35 MR1 0 -1.39 -2.59 -4.09 12.83

1053 1.148 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+- 173.8


0.9 TEMP1+1.35 MR1 48.72 40.87 -0.93 6 -5.25

1054 1.148 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+- 176.2

F
0.9 TEMP1+1.35 MR1 46.51 41.40 -0.89 0 -5.07

-
1055 1.148 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+- 504.0 173.9 -

PD
0.9 TEMP1+1.35 MR1 6 -41.64 -2.23 6 11.28

-
1056 1.148 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+- 502.1 171.7 -
0.9 TEMP1+1.35 MR1 9 -41.13 -2.19 1 11.12

1057 1.148 DL1+1.5 LL1+1.5 WL1+1.5 289.9


EQUIP1+0.9 TEMP1+1.35 MR1 4 -15.13 3.23 -63.63 13.66
te r
1058 1.148 DL1+1.5 LL1+1.5 WL2+1.5 286.8
EQUIP1+0.9 TEMP1+1.35 MR1 5 -14.28 3.30 -59.91 13.92

1059 1.148 DL1+1.5 LL1+1.5 WL3+1.5 330.1


EQUIP1+0.9 TEMP1+1.35 MR1 1 -13.50 -0.34 -55.39 -2.68
as

1060 1.148 DL1+1.5 LL1+1.5 WL4+1.5 326.8


EQUIP1+0.9 TEMP1+1.35 MR1 4 -12.65 -0.27 -51.66 -2.36

-
1061 1.148 DL1+1.5 LL1+1.5 WL5+1.5 107.6 244.9
EQUIP1+0.9 TEMP1+1.35 MR1 2 57.77 2.50 2 10.28
nM

-
1062 1.148 DL1+1.5 LL1+1.5 WL6+1.5 111.3 248.8
EQUIP1+0.9 TEMP1+1.35 MR1 0 58.66 2.57 3 10.57

-
1063 1.148 DL1+1.5 LL1+1.5 WL7+1.5 651.2 334.7
EQUIP1+0.9 TEMP1+1.35 MR1 9 -79.74 0.34 7 0.23
di

-
1064 1.148 DL1+1.5 LL1+1.5 WL8+1.5 648.1 331.0
EQUIP1+0.9 TEMP1+1.35 MR1 7 -78.89 0.40 3 0.50

1065 1.148 DL1+1.5 LL1+1.5 WL1+1.5 EQUIP1+- 286.3


a te

0.9 TEMP1+1.35 MR1 6 -4.51 0.18 -18.65 -0.11

1066 1.148 DL1+1.5 LL1+1.5 WL2+1.5 EQUIP1+- 283.2


0.9 TEMP1+1.35 MR1 7 -3.66 0.24 -14.92 0.15

1067 1.148 DL1+1.5 LL1+1.5 WL3+1.5 EQUIP1+- 326.5 -


0.9 TEMP1+1.35 MR1 2 -2.88 -3.39 -10.40 16.44
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1068 1.148 DL1+1.5 LL1+1.5 WL4+1.5 EQUIP1+- 323.2 -
0.9 TEMP1+1.35 MR1 6 -2.03 -3.32 -6.68 16.13

-
1069 1.148 DL1+1.5 LL1+1.5 WL5+1.5 EQUIP1+- 111.2 289.9

Ed
0.9 TEMP1+1.35 MR1 1 68.40 -0.56 1 -3.49

-
1070 1.148 DL1+1.5 LL1+1.5 WL6+1.5 EQUIP1+- 114.8 293.8
0.9 TEMP1+1.35 MR1 8 69.29 -0.49 2 -3.20

-
1071 1.148 DL1+1.5 LL1+1.5 WL7+1.5 EQUIP1+- 647.7 289.7 -

F
0.9 TEMP1+1.35 MR1 1 -69.12 -2.71 8 13.54

PD
1072 1.148 DL1+1.5 LL1+1.5 WL8+1.5 EQUIP1+- 644.5 286.0 -
0.9 TEMP1+1.35 MR1 8 -68.27 -2.65 4 13.27

257.3
1073 1 DL1+0.8 LL1+1 SL1 6 -7.81 -4.59 -30.99 22.09

-
327.5 102.0
1074 1 DL1+0.8 LL1+1 SL2 7 -24.41 -0.54 8 2.87
te r
114.8 -
1075 1 DL1+0.8 LL1+-1 SL1 4 0.51 4.87 2.27 22.88

1076 1 DL1+0.8 LL1+-1 SL2 44.63 17.11 0.82 73.36 -3.66

2001 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+0.6 213.3


as

TEMP1+1 MR1 0 -9.38 1.77 -38.97 7.05

2002 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+0.6 212.0


TEMP1+1 MR1 6 -9.04 1.80 -37.48 7.16

2003 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+0.6 229.3


nM

TEMP1+1 MR1 7 -8.73 0.34 -35.68 0.52

2004 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+0.6 228.0


TEMP1+1 MR1 6 -8.39 0.37 -34.19 0.65

2005 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+0.6


TEMP1+1 MR1 54.28 19.78 1.48 84.45 5.70

2006 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+0.6


di

TEMP1+1 MR1 52.81 20.14 1.51 86.01 5.82

-
2007 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+0.6 357.8 147.4
TEMP1+1 MR1 4 -35.23 0.61 3 1.69
a te

-
2008 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+0.6 356.5 145.9
TEMP1+1 MR1 9 -34.89 0.64 3 1.79

2009 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+-0.6 210.9


TEMP1+1 MR1 1 -2.30 -0.27 -8.98 -2.13
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
2010 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+-0.6 209.6
TEMP1+1 MR1 7 -1.96 -0.24 -7.49 -2.02

2011 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+-0.6 226.9


TEMP1+1 MR1 8 -1.65 -1.69 -5.68 -8.66

Ed
2012 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+-0.6 225.6
TEMP1+1 MR1 7 -1.31 -1.66 -4.19 -8.53

2013 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+-0.6 114.4


TEMP1+1 MR1 51.88 26.86 -0.56 4 -3.48

2014 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+-0.6 116.0

F
TEMP1+1 MR1 50.42 27.22 -0.53 1 -3.36

-
2015 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+-0.6 355.4 117.4

PD
TEMP1+1 MR1 5 -28.14 -1.42 4 -7.49

-
2016 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+-0.6 354.2 115.9
TEMP1+1 MR1 0 -27.80 -1.40 4 -7.39

2017 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+0.6 212.7


TEMP1+1 MR1 0 -10.47 2.22 -43.89 9.13
te r
2018 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+0.6 210.6
TEMP1+1 MR1 4 -9.90 2.26 -41.40 9.30

2019 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+0.6 239.4


TEMP1+1 MR1 8 -9.38 -0.16 -38.39 -1.76
as

2020 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+0.6 237.3


TEMP1+1 MR1 0 -8.82 -0.11 -35.91 -1.55

2021 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+0.6 - 161.8


TEMP1+1 MR1 52.34 38.13 1.73 2 6.88
nM

2022 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+0.6 - 164.4


TEMP1+1 MR1 54.79 38.73 1.78 2 7.07

-
2023 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+0.6 453.6 224.6
TEMP1+1 MR1 0 -53.55 0.29 4 0.18

-
2024 1 DL1+1.0 LL1+1 WL8+1 EQUIP1+0.6 451.5 222.1
di

TEMP1+1 MR1 2 -52.98 0.33 5 0.36

2025 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+-0.6 210.3


TEMP1+1 MR1 1 -3.39 0.18 -13.89 -0.05
a te

2026 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+-0.6 208.2


TEMP1+1 MR1 5 -2.82 0.23 -11.41 0.12

2027 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+-0.6 237.0 -


TEMP1+1 MR1 9 -2.30 -2.20 -8.40 10.94

2028 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+-0.6 234.9 -


TEMP1+1 MR1 1 -1.73 -2.15 -5.91 10.73
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
2029 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+-0.6 - 191.8
TEMP1+1 MR1 54.73 45.21 -0.31 1 -2.30

2030 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+-0.6 - 194.4


TEMP1+1 MR1 57.18 45.81 -0.26 2 -2.11

Ed
-
2031 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+-0.6 451.2 194.6
TEMP1+1 MR1 1 -46.46 -1.75 5 -9.00

-
2032 1 DL1+0.7 LL1+1 WL8+1 EQUIP1+-0.6 449.1 192.1
TEMP1+1 MR1 3 -45.89 -1.70 6 -8.82

F
257.3
2033 1 DL1+0.8 LL1+1 SL1 6 -7.81 -4.59 -30.99 22.09

PD
-
327.5 102.0
2034 1 DL1+0.8 LL1+1 SL2 7 -24.41 -0.54 8 2.87

114.8 -
2035 1 DL1+0.8 LL1+-1 SL1 4 0.51 4.87 2.27 22.88

2036 1 DL1+0.8 LL1+-1 SL2 44.63 17.11 0.82 73.36 -3.66


te r
497.3 -
P10 500 1 DL1+1 LL1+1 EQUIP1 6 -7.45 -6.13 -41.93 20.77

501.9 -
501 1 DL1+1 LL1+1 EQUIP1+1 TEMP1 9 -16.20 -19.06 -80.53 77.48
as

154.3
502 1 DL1+1 WL1 53.48 -6.60 30.16 -45.05 7

158.8
503 1 DL1+1 WL2 58.76 -5.70 31.07 -39.02 5
nM

-
296.3 166.0
504 1 DL1+1 WL3 1 -3.87 -36.31 -29.95 0

-
300.8 160.5
505 1 DL1+1 WL4 0 -2.97 -35.21 -23.93 9

517.2 -
di

506 1 DL1+1 WL5 94.25 110.64 -6.97 0 24.82

523.5 -
507 1 DL1+1 WL6 99.49 111.61 -6.06 6 20.36
a te

-
272.7 - 543.3
508 1 DL1+1 WL7 7 113.09 -3.43 9 -7.90

-
278.0 - 537.3
509 1 DL1+1 WL8 5 112.18 -2.52 4 -3.43
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
106.8
510 1 DL1+0.7 WL1 96.26 -5.07 20.31 -35.72 9

110.0
511 1 DL1+0.7 WL2 99.95 -4.44 20.95 -31.50 3

Ed
-
266.2 117.3
512 1 DL1+0.7 WL3 4 -3.16 -26.22 -25.15 7

-
269.3 113.5
513 1 DL1+0.7 WL4 8 -2.53 -25.45 -20.93 8

F
124.7 357.8 -
514 1 DL1+0.7 WL5 9 76.99 -5.68 5 18.54

PD
128.4 362.3 -
515 1 DL1+0.7 WL6 6 77.67 -5.05 1 15.42

-
249.7 384.5
516 1 DL1+0.7 WL7 6 -79.62 -3.20 6 -6.70

-
253.4 380.3
te r
517 1 DL1+0.7 WL8 5 -78.98 -2.57 2 -3.56

390.4
518 1 DL1+ 1LL1+0.75 WL1+1 EQUIP1 2 -11.26 18.49 -65.26 97.92

394.3 101.2
as

519 1 DL1+1.0 LL1+0.75 WL2+1 EQUIP1 8 -10.58 19.18 -60.74 8

-
572.5 142.3
520 1 DL1+1.0 LL1+0.75 WL3+1 EQUIP1 4 -9.21 -31.36 -53.94 5
nM

-
575.9 138.3
521 1 DL1+1.0 LL1+0.75 WL4+1 EQUIP1 1 -8.53 -30.53 -49.42 0

421.0 356.4 -
522 1 DL1+1.0 LL1+0.75 WL5+1 EQUIP1 0 76.67 -9.35 2 36.47

424.9 361.1 -
di

523 1 DL1+1.0 LL1+0.75 WL6+1 EQUIP1 3 77.40 -8.67 9 33.12

-
554.8 439.0 -
524 1 DL1+1.0 LL1+0.75 WL7+1 EQUIP1 9 -91.12 -6.70 2 23.78
a te

-
558.8 434.4 -
525 1 DL1+1.0 LL1+0.75 WL8+1 EQUIP1 5 -90.44 -6.01 8 20.42

655.3 165.9
526 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL1 0 -12.72 -44.81 -65.87 6
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
517.0 168.5
527 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL2 1 -34.21 -10.17 8 -1.33

- 155.9

Ed
528 0.6 DL1+1 WL1 24.95 -5.99 31.22 -39.47 2

- 160.4
529 0.6 DL1+1 WL2 19.67 -5.09 32.14 -33.44 1

-
217.8 164.4
530 0.6 DL1+1 WL3 8 -3.26 -35.24 -24.38 5

F
-
222.3 159.0

PD
531 0.6 DL1+1 WL4 7 -2.36 -34.14 -18.35 3

522.7 -
532 0.6 DL1+1 WL5 15.82 111.25 -5.90 7 23.27

529.1 -
533 0.6 DL1+1 WL6 21.06 112.22 -5.00 3 18.80

-
194.3 - 537.8
te r
534 0.6 DL1+1 WL7 4 112.48 -2.36 2 -6.35

-
199.6 - 531.7
535 0.6 DL1+1 WL8 2 111.57 -1.45 7 -1.87
as

328.2 246.6
536 0.6 DL1+0.7 SL1 2 -7.94 -53.18 -40.28 4

-
143.8 177.2
nM

537 0.6 DL1+0.7 SL2 4 -36.60 -7.00 3 23.59

720.8 -
1001 1.35 DL1+1.5 LL1+1.5 EQUIP1+0.9 TEMP1 0 -18.82 -20.43 -95.55 81.61

712.4
1002 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 TEMP1 7 -3.07 2.85 -26.07 20.47

-
di

100.2 181.0
1003 1.35 DL1+1.5 WL1+0.9 TEMP1 54.98 -17.54 33.99 2 9

187.8
1004 1.35 DL1+1.5 WL2+0.9 TEMP1 62.89 -16.19 35.36 -91.17 2
a te

-
419.2 299.4
1005 1.35 DL1+1.5 WL3+0.9 TEMP1 2 -13.45 -65.71 -77.58 6

-
425.9 291.3
1006 1.35 DL1+1.5 WL4+0.9 TEMP1 6 -12.10 -64.05 -68.54 4
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
116.1 743.1 -
1007 1.35 DL1+1.5 WL5+0.9 TEMP1 3 158.31 -21.70 5 87.69

123.9 752.6 -
1008 1.35 DL1+1.5 WL6+0.9 TEMP1 9 159.77 -20.33 9 80.99

Ed
-
383.9 - 847.7 -
1009 1.35 DL1+1.5 WL7+0.9 TEMP1 1 177.28 -16.39 4 62.31

-
391.8 - 838.6 -
1010 1.35 DL1+1.5 WL8+0.9 TEMP1 3 175.92 -15.02 6 55.60

F
283.1
1011 1.35 DL1+1.5 WL1+-0.9 TEMP1 46.64 -1.79 57.27 -30.74 8

PD
289.9
1012 1.35 DL1+1.5 WL2+-0.9 TEMP1 54.56 -0.44 58.64 -21.70 0

-
410.8 197.3
1013 1.35 DL1+1.5 WL3+-0.9 TEMP1 8 2.30 -42.43 -8.10 8

-
417.6 189.2
te r
1014 1.35 DL1+1.5 WL4+-0.9 TEMP1 2 3.65 -40.77 0.93 6

107.7 812.6
1015 1.35 DL1+1.5 WL5+-0.9 TEMP1 9 174.06 1.58 2 14.40

115.6 822.1
as

1016 1.35 DL1+1.5 WL6+-0.9 TEMP1 6 175.51 2.94 6 21.09

-
375.5 - 778.2
1017 1.35 DL1+1.5 WL7+-0.9 TEMP1 7 161.53 6.89 6 39.77
nM

-
383.4 - 769.1
1018 1.35 DL1+1.5 WL8+-0.9 TEMP1 9 160.17 8.26 9 46.49

274.0 -
1019 1.35 DL1+0.9 TEMP1+1.35 MR1 3 -9.91 -15.48 -53.47 57.45

265.6
di

1020 1.35 DL1+-0.9 TEMP1+1.35 MR1 9 5.84 7.80 16.00 44.64

1021 1.35 DL1+1.5LL1+1.5 EQUIP1+0.9 725.9 -


TEMP1+1.35 MR1 7 -18.80 -20.66 -95.46 82.77

1022 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 717.6


a te

TEMP1+1.35 MR1 3 -3.05 2.61 -25.98 19.32

1023 1.148 DL1+1.5 LL1+1.5 EQUIP1+0.9 686.3 -


TEMP1+1.35 MR1 6 -18.49 -20.12 -92.64 81.98

1024 1.148 DL1+1.5 LL1+1.5 EQUIP1+-0.9 678.0


TEMP1+1.35 MR1 3 -2.74 3.15 -23.17 20.10
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
1025 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+0.9 597.6 123.4
TEMP1+1.35 MR1 4 -23.37 8.88 5 59.66

Ed
1026 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+0.9 602.3 118.0
TEMP1+1.35 MR1 9 -22.56 9.70 2 63.70

- -
1027 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+0.9 816.1 109.8 228.6
TEMP1+1.35 MR1 9 -20.91 -50.94 6 7

- -

F
1028 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+0.9 820.2 104.4 223.8
TEMP1+1.35 MR1 3 -20.10 -49.95 4 0

PD
-
1029 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+0.9 634.3 382.5 101.6
TEMP1+1.35 MR1 3 82.15 -24.53 7 1

1030 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+0.9 639.0 388.3 -


TEMP1+1.35 MR1 5 83.02 -23.72 0 97.59

-
1031 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+0.9 795.0 - 571.9 -
te r
TEMP1+1.35 MR1 0 119.21 -21.35 6 86.38

-
1032 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+0.9 799.7 - 566.5 -
TEMP1+1.35 MR1 5 118.39 -20.53 1 82.35

1033 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+-0.9 589.3 161.7


as

TEMP1+1.35 MR1 1 -7.62 32.16 -53.98 5

1034 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+-0.9 594.0 165.7


TEMP1+1.35 MR1 5 -6.81 32.98 -48.55 8
nM

-
1035 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+-0.9 807.8 126.5
TEMP1+1.35 MR1 5 -5.16 -27.66 -40.39 9

-
1036 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+-0.9 811.8 121.7
TEMP1+1.35 MR1 9 -4.35 -26.67 -34.97 2

1037 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+-0.9 626.0 452.0


di

TEMP1+1.35 MR1 0 97.89 -1.26 4 0.48

1038 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+-0.9 630.7 457.7


TEMP1+1.35 MR1 1 98.77 -0.44 7 4.49

-
a te

1039 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+-0.9 786.6 - 502.4


TEMP1+1.35 MR1 6 103.46 1.93 9 15.70

-
1040 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+-0.9 791.4 - 497.0
TEMP1+1.35 MR1 2 102.64 2.75 4 19.73
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
1041 1.148 DL1+1.5 LL1+0.9 WL1+1.5 558.0 120.6
EQUIP1+0.9 TEMP1+1.35 MR1 4 -23.06 9.42 3 60.45

Ed
1042 1.148 DL1+1.5 LL1+0.9 WL2+1.5 562.7 115.2
EQUIP1+0.9 TEMP1+1.35 MR1 8 -22.25 10.24 0 64.48

- -
1043 1.148 DL1+1.5 LL1+0.9 WL3+1.5 776.5 107.0 227.8
EQUIP1+0.9 TEMP1+1.35 MR1 8 -20.61 -50.40 5 9

- -

F
1044 1.148 DL1+1.5 LL1+0.9 WL4+1.5 780.6 101.6 223.0
EQUIP1+0.9 TEMP1+1.35 MR1 2 -19.80 -49.41 3 2

PD
-
1045 1.148 DL1+1.5 LL1+0.9 WL5+1.5 594.7 385.3 100.8
EQUIP1+0.9 TEMP1+1.35 MR1 3 82.45 -23.99 9 2

1046 1.148 DL1+1.5 LL1+0.9 WL6+1.5 599.4 391.1 -


EQUIP1+0.9 TEMP1+1.35 MR1 5 83.32 -23.18 1 96.81

-
1047 1.148 DL1+1.5 LL1+0.9 WL7+1.5 755.4 - 569.1 -
te r
EQUIP1+0.9 TEMP1+1.35 MR1 0 118.90 -20.81 4 85.60

-
1048 1.148 DL1+1.5 LL1+0.9 WL8+1.5 760.1 - 563.7 -
EQUIP1+0.9 TEMP1+1.35 MR1 5 118.09 -19.99 0 81.57

1049 1.148 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+- 549.7 162.5


as

0.9 TEMP1+1.35 MR1 0 -7.31 32.70 -51.16 3

1050 1.148 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+- 554.4 166.5


0.9 TEMP1+1.35 MR1 5 -6.50 33.52 -45.73 6
nM

-
1051 1.148 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+- 768.2 125.8
0.9 TEMP1+1.35 MR1 4 -4.86 -27.12 -37.57 0

-
1052 1.148 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+- 772.2 120.9
0.9 TEMP1+1.35 MR1 9 -4.05 -26.13 -32.15 3

1053 1.148 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+- 586.3 454.8


di

0.9 TEMP1+1.35 MR1 9 98.20 -0.72 6 1.26

1054 1.148 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+- 591.1 460.5


0.9 TEMP1+1.35 MR1 1 99.07 0.10 8 5.28

-
a te

1055 1.148 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+- 747.0 - 499.6


0.9 TEMP1+1.35 MR1 6 103.15 2.47 7 16.49

-
1056 1.148 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+- 751.8 - 494.2
0.9 TEMP1+1.35 MR1 1 102.34 3.29 3 20.52
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
1057 1.148 DL1+1.5 LL1+1.5 WL1+1.5 472.4 139.2 155.4
EQUIP1+0.9 TEMP1+1.35 MR1 8 -26.11 29.12 9 0

Ed
1058 1.148 DL1+1.5 LL1+1.5 WL2+1.5 480.4 130.2 162.1
EQUIP1+0.9 TEMP1+1.35 MR1 0 -24.76 30.49 5 2

- -
1059 1.148 DL1+1.5 LL1+1.5 WL3+1.5 836.7 116.6 325.1
EQUIP1+0.9 TEMP1+1.35 MR1 3 -22.02 -70.58 5 5

- -

F
1060 1.148 DL1+1.5 LL1+1.5 WL4+1.5 843.4 107.6 317.0
EQUIP1+0.9 TEMP1+1.35 MR1 6 -20.67 -68.93 2 4

PD
-
1061 1.148 DL1+1.5 LL1+1.5 WL5+1.5 533.6 704.0 113.3
EQUIP1+0.9 TEMP1+1.35 MR1 3 149.75 -26.57 7 8

-
1062 1.148 DL1+1.5 LL1+1.5 WL6+1.5 541.5 713.6 106.6
EQUIP1+0.9 TEMP1+1.35 MR1 0 151.20 -25.21 1 9

-
te r
1063 1.148 DL1+1.5 LL1+1.5 WL7+1.5 801.4 - 886.8 -
EQUIP1+0.9 TEMP1+1.35 MR1 2 185.84 -21.26 1 88.01

-
1064 1.148 DL1+1.5 LL1+1.5 WL8+1.5 809.3 - 877.7 -
EQUIP1+0.9 TEMP1+1.35 MR1 3 184.48 -19.89 4 81.29
as

1065 1.148 DL1+1.5 LL1+1.5 WL1+1.5 EQUIP1+- 464.1 257.4


0.9 TEMP1+1.35 MR1 5 -10.36 52.40 -69.82 8

1066 1.148 DL1+1.5 LL1+1.5 WL2+1.5 EQUIP1+- 472.0 264.2


0.9 TEMP1+1.35 MR1 6 -9.01 53.77 -60.77 1
nM

-
1067 1.148 DL1+1.5 LL1+1.5 WL3+1.5 EQUIP1+- 828.3 223.0
0.9 TEMP1+1.35 MR1 9 -6.27 -47.31 -47.18 7

-
1068 1.148 DL1+1.5 LL1+1.5 WL4+1.5 EQUIP1+- 835.1 214.9
0.9 TEMP1+1.35 MR1 3 -4.92 -45.65 -38.14 5
di

1069 1.148 DL1+1.5 LL1+1.5 WL5+1.5 EQUIP1+- 525.3 773.5 -


0.9 TEMP1+1.35 MR1 0 165.50 -3.29 4 11.30

1070 1.148 DL1+1.5 LL1+1.5 WL6+1.5 EQUIP1+- 533.1 783.0


0.9 TEMP1+1.35 MR1 6 166.95 -1.93 8 -4.60
a te

-
1071 1.148 DL1+1.5 LL1+1.5 WL7+1.5 EQUIP1+- 793.0 - 817.3
0.9 TEMP1+1.35 MR1 8 170.09 2.02 4 14.08

-
1072 1.148 DL1+1.5 LL1+1.5 WL8+1.5 EQUIP1+- 801.0 - 808.2
0.9 TEMP1+1.35 MR1 0 168.73 3.39 6 20.79
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
736.9 338.6
1073 1 DL1+0.8 LL1+1 SL1 0 -16.21 -79.03 -81.43 3

-
473.5 277.0

Ed
1074 1 DL1+0.8 LL1+1 SL2 0 -57.15 -13.06 7 20.00

-
135.2 372.7
1075 1 DL1+0.8 LL1+-1 SL1 5 3.87 68.32 9.74 0

398.6 205.3 -
1076 1 DL1+0.8 LL1+-1 SL2 5 44.81 2.34 9 54.07

F
2001 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+0.6 418.4
TEMP1+1 MR1 2 -15.73 5.64 -83.69 39.30

PD
2002 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+0.6 421.5
TEMP1+1 MR1 8 -15.19 6.18 -80.07 41.99

-
2003 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+0.6 564.1 152.9
TEMP1+1 MR1 1 -14.09 -34.24 -74.63 2

-
2004 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+0.6 566.8 149.6
te r
TEMP1+1 MR1 1 -13.55 -33.58 -71.02 7

2005 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+0.6 442.8 253.6 -


TEMP1+1 MR1 8 54.61 -16.64 6 68.21

2006 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+0.6 446.0 257.4 -


as

TEMP1+1 MR1 2 55.19 -16.10 8 65.54

-
2007 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+0.6 549.9 382.6 -
TEMP1+1 MR1 9 -79.62 -14.52 9 58.06
nM

-
2008 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+0.6 553.1 379.0 -
TEMP1+1 MR1 6 -79.08 -13.97 6 55.38

2009 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+-0.6 412.8 107.3


TEMP1+1 MR1 6 -5.23 21.16 -37.37 6

2010 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+-0.6 416.0 110.0


di

TEMP1+1 MR1 3 -4.69 21.70 -33.75 4

2011 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+-0.6 558.5 -


TEMP1+1 MR1 6 -3.59 -18.73 -28.32 84.87

2012 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+-0.6 561.2 -


a te

TEMP1+1 MR1 5 -3.05 -18.06 -24.70 81.62

2013 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+-0.6 437.3 299.9


TEMP1+1 MR1 2 65.11 -1.12 7 -0.16

2014 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+-0.6 440.4 303.7


TEMP1+1 MR1 7 65.69 -0.58 9 2.52
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
2015 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+-0.6 544.4 336.3
TEMP1+1 MR1 3 -69.12 1.00 8 9.99

Ed
2016 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+-0.6 547.6 332.7
TEMP1+1 MR1 0 -68.58 1.55 5 12.68

2017 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+0.6 361.3 102.6


TEMP1+1 MR1 8 -17.76 18.77 -96.13 0

2018 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+0.6 366.6 107.0


TEMP1+1 MR1 6 -16.86 19.68 -90.10 8

F
-
2019 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+0.6 604.2 217.7

PD
TEMP1+1 MR1 1 -15.03 -47.70 -81.03 7

-
2020 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+0.6 608.7 212.3
TEMP1+1 MR1 0 -14.13 -46.60 -75.01 6

2021 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+0.6 402.1 466.1 -


TEMP1+1 MR1 5 99.48 -18.36 2 76.59

2022 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+0.6 407.3 472.4 -


te r
TEMP1+1 MR1 9 100.45 -17.45 8 72.12

-
2023 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+0.6 580.6 - 594.4 -
TEMP1+1 MR1 7 124.25 -14.82 7 59.67
as

-
2024 1 DL1+1.0 LL1+1 WL8+1 EQUIP1+0.6 585.9 - 588.4 -
TEMP1+1 MR1 5 123.34 -13.91 2 55.19

2025 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+-0.6 355.8 170.6


nM

TEMP1+1 MR1 2 -7.26 34.29 -49.81 6

2026 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+-0.6 361.1 175.1


TEMP1+1 MR1 0 -6.36 35.20 -43.78 4

-
2027 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+-0.6 598.6 149.7
TEMP1+1 MR1 5 -4.53 -32.18 -34.72 1
di

-
2028 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+-0.6 603.1 144.3
TEMP1+1 MR1 5 -3.63 -31.08 -28.70 0

2029 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+-0.6 396.5 512.4


TEMP1+1 MR1 9 109.98 -2.84 3 -8.53
a te

2030 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+-0.6 401.8 518.7


TEMP1+1 MR1 4 110.94 -1.93 9 -4.07

-
2031 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+-0.6 575.1 - 548.1
TEMP1+1 MR1 1 113.75 0.70 6 8.39
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
2032 1 DL1+0.7 LL1+1 WL8+1 EQUIP1+-0.6 580.3 - 542.1
TEMP1+1 MR1 9 112.85 1.61 1 12.86

736.9 338.6

Ed
2033 1 DL1+0.8 LL1+1 SL1 0 -16.21 -79.03 -81.43 3

-
473.5 277.0
2034 1 DL1+0.8 LL1+1 SL2 0 -57.15 -13.06 7 20.00

-
135.2 372.7

F
2035 1 DL1+0.8 LL1+-1 SL1 5 3.87 68.32 9.74 0

398.6 205.3 -

PD
2036 1 DL1+0.8 LL1+-1 SL2 5 44.81 2.34 9 54.07

218.5 -
P11 500 1 DL1+1 LL1+1 EQUIP1 2 -3.06 -2.64 -17.77 13.16

211.7 -
501 1 DL1+1 LL1+1 EQUIP1+1 TEMP1 1 -2.08 -9.42 -13.56 42.17

502 1 DL1+1 WL1 87.58 -0.23 17.89 -2.35 80.41


te r
503 1 DL1+1 WL2 92.34 -0.65 19.08 -4.49 85.69

-
504 1 DL1+1 WL3 95.04 0.85 -19.89 3.88 89.29

-
as

505 1 DL1+1 WL4 99.74 0.43 -18.67 1.74 83.84

145.8 270.1 -
506 1 DL1+1 WL5 0 47.25 -6.72 2 30.13

150.6 268.1 -
nM

507 1 DL1+1 WL6 7 46.87 -5.54 5 24.88

-
274.0 -
508 1 DL1+1 WL7 43.92 -47.85 -2.97 7 13.11

-
276.1
509 1 DL1+1 WL8 48.68 -48.27 -1.78 9 -7.84
di

510 1 DL1+0.7 WL1 92.06 -0.38 12.20 -2.97 54.85

511 1 DL1+0.7 WL2 95.39 -0.68 13.03 -4.47 58.55

-
a te

512 1 DL1+0.7 WL3 97.28 0.37 -14.24 1.39 63.94

100.5 -
513 1 DL1+0.7 WL4 7 0.08 -13.39 -0.11 60.13

132.8 187.7 -
514 1 DL1+0.7 WL5 1 32.86 -5.03 6 22.53
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
136.2 186.3 -
515 1 DL1+0.7 WL6 2 32.58 -4.20 8 18.85

-
193.1 -

Ed
516 1 DL1+0.7 WL7 61.49 -33.72 -2.40 7 10.62

-
194.6
517 1 DL1+0.7 WL8 64.82 -34.01 -1.57 6 -6.92

207.3
518 1 DL1+ 1LL1+0.75 WL1+1 EQUIP1 4 -2.67 11.58 -16.21 50.73

F
210.9
519 1 DL1+1.0 LL1+0.75 WL2+1 EQUIP1 1 -2.99 12.47 -17.81 54.70

PD
212.9 -
520 1 DL1+1.0 LL1+0.75 WL3+1 EQUIP1 3 -1.87 -16.76 -11.54 76.54

216.4 -
521 1 DL1+1.0 LL1+0.75 WL4+1 EQUIP1 6 -2.18 -15.84 -13.14 72.45

251.0 188.1 -
522 1 DL1+1.0 LL1+0.75 WL5+1 EQUIP1 0 32.94 -6.88 4 32.17
te r
254.6 186.6 -
523 1 DL1+1.0 LL1+0.75 WL6+1 EQUIP1 5 32.65 -6.00 7 28.23

-
174.5 220.0 -
524 1 DL1+1.0 LL1+0.75 WL7+1 EQUIP1 9 -38.39 -4.06 0 19.41
as

-
178.1 221.5 -
525 1 DL1+1.0 LL1+0.75 WL8+1 EQUIP1 6 -38.70 -3.17 9 15.45

224.2
nM

526 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL1 3 -5.29 -13.76 -30.72 37.15

234.5
527 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL2 0 -14.41 -3.85 -83.56 -7.70

528 0.6 DL1+1 WL1 46.59 0.07 18.32 -0.58 82.32

529 0.6 DL1+1 WL2 51.34 -0.35 19.50 -2.72 87.61


di

-
530 0.6 DL1+1 WL3 54.05 1.14 -19.46 5.65 87.37

-
531 0.6 DL1+1 WL4 58.75 0.73 -18.24 3.51 81.93
a te

104.8 271.8 -
532 0.6 DL1+1 WL5 0 47.55 -6.30 9 28.21

109.6 269.9 -
533 0.6 DL1+1 WL6 7 47.16 -5.12 2 22.97
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
272.3 -
534 0.6 DL1+1 WL7 2.92 -47.56 -2.54 0 11.20

Ed
274.4
535 0.6 DL1+1 WL8 7.68 -47.97 -1.35 2 -5.92

536 0.6 DL1+0.7 SL1 69.10 -3.42 -15.46 -19.93 64.22

537 0.6 DL1+0.7 SL2 82.80 -15.58 -2.25 -90.37 4.41

306.2 -

F
1001 1.35 DL1+1.5 LL1+1.5 EQUIP1+0.9 TEMP1 8 -3.59 -9.90 -22.20 45.13

318.5
1002 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 TEMP1 4 -5.36 2.31 -29.78 7.08

PD
109.8
1003 1.35 DL1+1.5 WL1+0.9 TEMP1 7 0.65 20.89 0.93 95.22

117.0 103.1
1004 1.35 DL1+1.5 WL2+0.9 TEMP1 1 0.03 22.67 -2.28 5

-
121.0 159.3
te r
1005 1.35 DL1+1.5 WL3+0.9 TEMP1 6 2.27 -35.78 10.27 2

-
128.1 151.1
1006 1.35 DL1+1.5 WL4+0.9 TEMP1 1 1.64 -33.95 7.07 5
as

197.1 409.6 -
1007 1.35 DL1+1.5 WL5+0.9 TEMP1 9 71.88 -16.03 4 70.58

204.5 406.6 -
1008 1.35 DL1+1.5 WL6+0.9 TEMP1 0 71.30 -14.26 8 62.71
nM

-
406.6 -
1009 1.35 DL1+1.5 WL7+0.9 TEMP1 44.38 -70.78 -10.39 5 45.06

-
409.8 -
1010 1.35 DL1+1.5 WL8+0.9 TEMP1 51.52 -71.40 -8.62 4 37.14

122.1 147.4
di

1011 1.35 DL1+1.5 WL1+-0.9 TEMP1 3 -1.12 33.10 -6.66 3

129.2 155.3
1012 1.35 DL1+1.5 WL2+-0.9 TEMP1 6 -1.74 34.88 -9.86 6
a te

-
133.3 107.1
1013 1.35 DL1+1.5 WL3+-0.9 TEMP1 2 0.50 -23.57 2.69 1

140.3 -
1014 1.35 DL1+1.5 WL4+-0.9 TEMP1 7 -0.13 -21.74 -0.51 98.94
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
209.4 402.0 -
1015 1.35 DL1+1.5 WL5+-0.9 TEMP1 5 70.11 -3.82 6 18.37

216.7 399.1 -
1016 1.35 DL1+1.5 WL6+-0.9 TEMP1 5 69.53 -2.05 0 10.50

Ed
-
414.2
1017 1.35 DL1+1.5 WL7+-0.9 TEMP1 56.63 -72.55 1.82 3 7.15

-
417.4
1018 1.35 DL1+1.5 WL8+-0.9 TEMP1 63.77 -73.17 3.60 2 15.07

F
136.2 -
1019 1.35 DL1+0.9 TEMP1+1.35 MR1 9 -0.11 -7.63 -2.11 32.96

PD
148.5
1020 1.35 DL1+-0.9 TEMP1+1.35 MR1 5 -1.88 4.58 -9.69 19.25

1021 1.35 DL1+1.5LL1+1.5 EQUIP1+0.9 310.3 -


TEMP1+1.35 MR1 3 -3.58 -9.99 -22.12 45.53

1022 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 322.5


TEMP1+1.35 MR1 9 -5.35 2.22 -29.70 6.68
te r
1023 1.148 DL1+1.5 LL1+1.5 EQUIP1+0.9 289.6 -
TEMP1+1.35 MR1 3 -3.43 -9.77 -21.23 44.56

1024 1.148 DL1+1.5 LL1+1.5 EQUIP1+-0.9 301.8


TEMP1+1.35 MR1 8 -5.20 2.44 -28.81 7.65
as

1025 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+0.9 296.9


TEMP1+1.35 MR1 1 -3.12 7.08 -20.26 31.15

1026 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+0.9 301.1


TEMP1+1.35 MR1 9 -3.50 8.14 -22.18 35.91
nM

-
1027 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+0.9 303.6 121.5
TEMP1+1.35 MR1 2 -2.15 -26.93 -14.65 8

-
1028 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+0.9 307.8 116.6
TEMP1+1.35 MR1 5 -2.53 -25.83 -16.57 7

1029 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+0.9 349.3 224.9 -


di

TEMP1+1.35 MR1 0 39.61 -15.08 7 68.33

1030 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+0.9 353.6 223.2 -


TEMP1+1.35 MR1 8 39.27 -14.02 0 63.61
a te

-
1031 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+0.9 257.6 264.8 -
TEMP1+1.35 MR1 1 -45.98 -11.70 0 53.02

-
1032 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+0.9 261.9 266.7 -
TEMP1+1.35 MR1 0 -46.35 -10.63 1 48.27
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1033 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+-0.9 309.1
TEMP1+1.35 MR1 7 -4.89 19.29 -27.84 83.36

1034 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+-0.9 313.4


TEMP1+1.35 MR1 5 -5.26 20.35 -29.76 88.12

Ed
1035 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+-0.9 315.8 -
TEMP1+1.35 MR1 8 -3.92 -14.72 -22.23 69.37

1036 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+-0.9 320.1 -


TEMP1+1.35 MR1 1 -4.30 -13.62 -24.15 64.46

1037 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+-0.9 361.5 217.3 -

F
TEMP1+1.35 MR1 6 37.85 -2.87 9 16.12

1038 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+-0.9 365.9 215.6 -


TEMP1+1.35 MR1 4 37.50 -1.80 2 11.40

PD
-
1039 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+-0.9 269.8 272.3
TEMP1+1.35 MR1 7 -47.75 0.52 8 -0.81

-
1040 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+-0.9 274.1 274.2
TEMP1+1.35 MR1 5 -48.12 1.58 9 3.94
te r
1041 1.148 DL1+1.5 LL1+0.9 WL1+1.5 276.2
EQUIP1+0.9 TEMP1+1.35 MR1 1 -2.97 7.29 -19.36 32.12

1042 1.148 DL1+1.5 LL1+0.9 WL2+1.5 280.4


EQUIP1+0.9 TEMP1+1.35 MR1 9 -3.35 8.36 -21.28 36.87
as

-
1043 1.148 DL1+1.5 LL1+0.9 WL3+1.5 282.9 120.6
EQUIP1+0.9 TEMP1+1.35 MR1 2 -2.00 -26.71 -13.76 1

-
1044 1.148 DL1+1.5 LL1+0.9 WL4+1.5 287.1 115.7
nM

EQUIP1+0.9 TEMP1+1.35 MR1 5 -2.38 -25.61 -15.68 1

1045 1.148 DL1+1.5 LL1+0.9 WL5+1.5 328.6 225.8 -


EQUIP1+0.9 TEMP1+1.35 MR1 0 39.76 -14.86 6 67.37

1046 1.148 DL1+1.5 LL1+0.9 WL6+1.5 332.9 224.0 -


EQUIP1+0.9 TEMP1+1.35 MR1 8 39.42 -13.80 9 62.64

-
di

1047 1.148 DL1+1.5 LL1+0.9 WL7+1.5 236.9 263.9 -


EQUIP1+0.9 TEMP1+1.35 MR1 1 -45.83 -11.48 1 52.05

-
1048 1.148 DL1+1.5 LL1+0.9 WL8+1.5 241.1 265.8 -
a te

EQUIP1+0.9 TEMP1+1.35 MR1 9 -46.20 -10.41 2 47.30

1049 1.148 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+- 288.4


0.9 TEMP1+1.35 MR1 6 -4.74 19.50 -26.94 84.33

1050 1.148 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+- 292.7


0.9 TEMP1+1.35 MR1 4 -5.11 20.57 -28.86 89.08
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1051 1.148 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+- 295.1 -
0.9 TEMP1+1.35 MR1 8 -3.77 -14.50 -21.34 68.40

1052 1.148 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+- 299.4 -


0.9 TEMP1+1.35 MR1 1 -4.15 -13.40 -23.26 63.50

Ed
1053 1.148 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+- 340.8 218.2 -
0.9 TEMP1+1.35 MR1 6 38.00 -2.65 8 15.16

1054 1.148 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+- 345.2 216.5 -


0.9 TEMP1+1.35 MR1 4 37.65 -1.59 1 10.43

F
1055 1.148 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+- 249.1 271.4
0.9 TEMP1+1.35 MR1 7 -47.60 0.73 9 0.16

PD
1056 1.148 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+- 253.4 273.4
0.9 TEMP1+1.35 MR1 5 -47.97 1.80 0 4.91

1057 1.148 DL1+1.5 LL1+1.5 WL1+1.5 267.2


EQUIP1+0.9 TEMP1+1.35 MR1 6 -2.67 18.67 -18.12 83.23

1058 1.148 DL1+1.5 LL1+1.5 WL2+1.5 274.3


EQUIP1+0.9 TEMP1+1.35 MR1 9 -3.29 20.45 -21.32 91.16
te r
-
1059 1.148 DL1+1.5 LL1+1.5 WL3+1.5 278.4 171.3
EQUIP1+0.9 TEMP1+1.35 MR1 5 -1.05 -38.00 -8.78 1

-
1060 1.148 DL1+1.5 LL1+1.5 WL4+1.5 285.5 163.1
as

EQUIP1+0.9 TEMP1+1.35 MR1 0 -1.67 -36.17 -11.98 4

1061 1.148 DL1+1.5 LL1+1.5 WL5+1.5 354.5 390.5 -


EQUIP1+0.9 TEMP1+1.35 MR1 8 68.56 -18.25 9 82.57

1062 1.148 DL1+1.5 LL1+1.5 WL6+1.5 361.8 387.6 -


nM

EQUIP1+0.9 TEMP1+1.35 MR1 8 67.98 -16.49 4 74.70

-
1063 1.148 DL1+1.5 LL1+1.5 WL7+1.5 201.7 425.6 -
EQUIP1+0.9 TEMP1+1.35 MR1 6 -74.10 -12.62 9 57.05

-
1064 1.148 DL1+1.5 LL1+1.5 WL8+1.5 208.9 428.8 -
di

EQUIP1+0.9 TEMP1+1.35 MR1 0 -74.72 -10.84 8 49.13

1065 1.148 DL1+1.5 LL1+1.5 WL1+1.5 EQUIP1+- 279.5 135.4


0.9 TEMP1+1.35 MR1 2 -4.43 30.88 -25.70 4

1066 1.148 DL1+1.5 LL1+1.5 WL2+1.5 EQUIP1+- 286.6 143.3


a te

0.9 TEMP1+1.35 MR1 5 -5.06 32.66 -28.90 7

-
1067 1.148 DL1+1.5 LL1+1.5 WL3+1.5 EQUIP1+- 290.7 119.1
0.9 TEMP1+1.35 MR1 0 -2.82 -25.79 -16.36 0
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
1068 1.148 DL1+1.5 LL1+1.5 WL4+1.5 EQUIP1+- 297.7 110.9
0.9 TEMP1+1.35 MR1 5 -3.44 -23.96 -19.56 3

1069 1.148 DL1+1.5 LL1+1.5 WL5+1.5 EQUIP1+- 366.8 383.0 -

Ed
0.9 TEMP1+1.35 MR1 4 66.79 -6.04 1 30.36

1070 1.148 DL1+1.5 LL1+1.5 WL6+1.5 EQUIP1+- 374.1 380.0 -


0.9 TEMP1+1.35 MR1 4 66.21 -4.27 6 22.49

-
1071 1.148 DL1+1.5 LL1+1.5 WL7+1.5 EQUIP1+- 214.0 433.2
0.9 TEMP1+1.35 MR1 2 -75.87 -0.41 7 -4.84

F
-
1072 1.148 DL1+1.5 LL1+1.5 WL8+1.5 EQUIP1+- 221.1 436.4

PD
0.9 TEMP1+1.35 MR1 6 -76.49 1.37 6 3.08

203.8
1073 1 DL1+0.8 LL1+1 SL1 6 -6.83 -23.54 -39.64 84.19

-
223.4 140.2
1074 1 DL1+0.8 LL1+1 SL2 3 -24.19 -4.67 8 -1.25

-
te r
182.1 107.5
1075 1 DL1+0.8 LL1+-1 SL1 4 1.68 18.80 9.71 0

162.5 110.3 -
1076 1 DL1+0.8 LL1+-1 SL2 7 19.04 -0.07 4 22.07
as

2001 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+0.6 208.4


TEMP1+1 MR1 9 -2.16 4.60 -13.94 20.26

2002 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+0.6 211.3


TEMP1+1 MR1 4 -2.41 5.32 -15.22 23.43
nM

2003 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+0.6 212.9 -


TEMP1+1 MR1 6 -1.51 -18.06 -10.20 81.56

2004 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+0.6 215.7 -


TEMP1+1 MR1 8 -1.76 -17.33 -11.48 78.29

2005 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+0.6 243.4 149.5 -


TEMP1+1 MR1 2 26.34 -10.16 4 46.06
di

2006 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+0.6 246.3 148.3 -


TEMP1+1 MR1 4 26.10 -9.46 6 42.92

-
2007 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+0.6 182.2 176.9 -
a te

TEMP1+1 MR1 9 -30.73 -7.91 7 35.85

-
2008 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+0.6 185.1 178.2 -
TEMP1+1 MR1 5 -30.98 -7.20 5 32.69

2009 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+-0.6 216.6


TEMP1+1 MR1 6 -3.33 12.74 -18.99 55.07
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
2010 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+-0.6 219.5
TEMP1+1 MR1 1 -3.58 13.46 -20.28 58.24

2011 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+-0.6 221.1 -


TEMP1+1 MR1 4 -2.69 -9.92 -15.26 46.75

Ed
2012 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+-0.6 223.9 -
TEMP1+1 MR1 6 -2.94 -9.19 -16.54 43.48

2013 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+-0.6 251.5 144.4 -


TEMP1+1 MR1 9 25.16 -2.02 9 11.26

2014 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+-0.6 254.5 143.3

F
TEMP1+1 MR1 1 24.93 -1.32 1 -8.11

-
2015 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+-0.6 190.4 182.0

PD
TEMP1+1 MR1 6 -31.91 0.23 2 -1.05

-
2016 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+-0.6 193.3 183.3
TEMP1+1 MR1 2 -32.16 0.94 0 2.12

2017 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+0.6 202.5


TEMP1+1 MR1 3 -1.95 12.19 -13.11 54.34
te r
2018 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+0.6 207.2
TEMP1+1 MR1 8 -2.37 13.37 -15.25 59.62

-
2019 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+0.6 209.9 115.3
TEMP1+1 MR1 8 -0.87 -25.59 -6.88 6
as

-
2020 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+0.6 214.6 109.9
TEMP1+1 MR1 8 -1.29 -24.37 -9.02 1

2021 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+0.6 260.7 259.3 -


nM

TEMP1+1 MR1 4 45.53 -12.43 6 56.20

2022 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+0.6 265.6 257.3 -


TEMP1+1 MR1 1 45.15 -11.25 9 50.95

-
2023 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+0.6 158.8 284.8 -
TEMP1+1 MR1 6 -49.57 -8.67 3 39.18
di

-
2024 1 DL1+1.0 LL1+1 WL8+1 EQUIP1+0.6 163.6 286.9 -
TEMP1+1 MR1 2 -49.99 -7.48 5 33.91

2025 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+-0.6 210.7


a te

TEMP1+1 MR1 0 -3.13 20.33 -18.17 89.14

2026 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+-0.6 215.4


TEMP1+1 MR1 5 -3.55 21.51 -20.30 94.43

2027 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+-0.6 218.1 -


TEMP1+1 MR1 6 -2.05 -17.45 -11.94 80.55
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
2028 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+-0.6 222.8 -
TEMP1+1 MR1 6 -2.47 -16.23 -14.07 75.11

2029 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+-0.6 268.9 254.3 -


TEMP1+1 MR1 1 44.36 -4.28 1 21.39

Ed
2030 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+-0.6 273.7 252.3 -
TEMP1+1 MR1 8 43.97 -3.11 4 16.15

-
2031 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+-0.6 167.0 289.8
TEMP1+1 MR1 3 -50.75 -0.53 8 -4.38

F
-
2032 1 DL1+0.7 LL1+1 WL8+1 EQUIP1+-0.6 171.7 292.0
TEMP1+1 MR1 9 -51.17 0.66 1 0.90

PD
203.8
2033 1 DL1+0.8 LL1+1 SL1 6 -6.83 -23.54 -39.64 84.19

-
223.4 140.2
2034 1 DL1+0.8 LL1+1 SL2 3 -24.19 -4.67 8 -1.25

-
182.1 107.5
te r
2035 1 DL1+0.8 LL1+-1 SL1 4 1.68 18.80 9.71 0

162.5 110.3 -
2036 1 DL1+0.8 LL1+-1 SL2 7 19.04 -0.07 4 22.07

571.1
as

P12 500 1 DL1+1 LL1+1 EQUIP1 8 -8.04 3.77 -31.13 30.50

571.4 -
501 1 DL1+1 LL1+1 EQUIP1+1 TEMP1 9 5.60 -9.68 31.42 29.57

160.0 220.2
nM

502 1 DL1+1 WL1 0 5.32 42.84 40.06 4

171.4 226.5
503 1 DL1+1 WL2 0 2.41 44.10 24.15 5

-
233.9 199.9
504 1 DL1+1 WL3 4 7.65 -42.87 49.61 4
di

-
244.9 192.4
505 1 DL1+1 WL4 7 4.75 -41.37 33.71 0

558.9 612.0
a te

506 1 DL1+1 WL5 6 124.81 -0.09 5 14.18

571.4 596.5
507 1 DL1+1 WL6 7 121.98 1.20 0 20.65

- -
186.3 - 600.3 -
508 1 DL1+1 WL7 7 125.59 -7.29 3 30.38
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
- -
174.9 - 616.2 -
509 1 DL1+1 WL8 4 128.49 -6.04 3 24.08

177.7 157.6

Ed
510 1 DL1+0.7 WL1 2 3.04 30.06 26.92 3

185.7 162.0
511 1 DL1+0.7 WL2 0 1.01 30.94 15.78 5

-
229.4 136.5
512 1 DL1+0.7 WL3 8 4.68 -29.94 33.60 0

F
-
237.2 131.2

PD
513 1 DL1+0.7 WL4 0 2.65 -28.88 22.47 2

457.0 427.3
514 1 DL1+0.7 WL5 0 86.69 0.01 1 13.39

465.7 416.4
515 1 DL1+0.7 WL6 5 84.71 0.91 2 17.92

-
- 421.3 -
te r
516 1 DL1+0.7 WL7 64.74 -88.59 -5.03 6 17.81

-
- 432.4 -
517 1 DL1+0.7 WL8 56.73 -90.62 -4.15 9 13.40
as

526.8 187.0
518 1 DL1+ 1LL1+0.75 WL1+1 EQUIP1 7 -2.37 35.72 1.73 4

535.4 191.7
519 1 DL1+1.0 LL1+0.75 WL2+1 EQUIP1 2 -4.54 36.66 -10.21 7
nM

-
582.3 128.1
520 1 DL1+1.0 LL1+0.75 WL3+1 EQUIP1 3 -0.61 -28.56 8.89 0

-
590.6 122.4
521 1 DL1+1.0 LL1+0.75 WL4+1 EQUIP1 0 -2.79 -27.44 -3.04 4
di

826.0 430.7
522 1 DL1+1.0 LL1+0.75 WL5+1 EQUIP1 9 87.26 3.52 2 32.49

835.4 419.0
523 1 DL1+1.0 LL1+0.75 WL6+1 EQUIP1 7 85.14 4.48 6 37.35
a te

-
267.0 - 478.5
524 1 DL1+1.0 LL1+0.75 WL7+1 EQUIP1 9 100.54 -1.88 7 -0.93

-
275.6 - 490.4
525 1 DL1+1.0 LL1+0.75 WL8+1 EQUIP1 7 102.72 -0.94 9 3.80
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
592.3 287.5
526 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL1 2 -14.09 -48.57 -61.07 1

-
676.0 175.2

Ed
527 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL2 5 -37.93 -0.74 3 52.20

215.6
528 0.6 DL1+1 WL1 72.37 6.22 42.75 41.57 3

221.9
529 0.6 DL1+1 WL2 83.77 3.31 44.00 25.65 4

F
-
146.3 204.5
530 0.6 DL1+1 WL3 1 8.56 -42.97 51.11 5

PD
-
157.3 197.0
531 0.6 DL1+1 WL4 4 5.65 -41.46 35.21 1

471.3 613.5
532 0.6 DL1+1 WL5 3 125.71 -0.18 5 9.57

483.8 598.0
te r
533 0.6 DL1+1 WL6 4 122.88 1.10 0 16.04

- -
274.0 - 598.8 -
534 0.6 DL1+1 WL7 0 124.69 -7.38 3 34.99

- -
as

262.5 - 614.7 -
535 0.6 DL1+1 WL8 7 127.59 -6.13 3 28.69

159.6 349.5
536 0.6 DL1+0.7 SL1 3 -9.42 -69.64 -42.16 9
nM

-
271.2 194.3
537 0.6 DL1+0.7 SL2 8 -41.20 -5.86 9 35.85

824.1 -
1001 1.35 DL1+1.5 LL1+1.5 EQUIP1+0.9 TEMP1 9 0.56 -6.49 10.16 10.05

-
di

823.6 102.4
1002 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 TEMP1 2 -24.01 17.73 4 98.09

207.4 116.9 274.5


1003 1.35 DL1+1.5 WL1+0.9 TEMP1 2 20.59 52.12 6 7
a te

224.5 284.0
1004 1.35 DL1+1.5 WL2+0.9 TEMP1 2 16.24 54.00 93.08 3

-
318.3 131.2 355.7
1005 1.35 DL1+1.5 WL3+0.9 TEMP1 3 24.10 -76.45 8 1
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
334.8 107.4 344.3
1006 1.35 DL1+1.5 WL4+0.9 TEMP1 8 19.74 -74.19 2 9

805.8 974.9 -

Ed
1007 1.35 DL1+1.5 WL5+0.9 TEMP1 7 199.84 -12.27 4 34.52

824.6 951.6 -
1008 1.35 DL1+1.5 WL6+0.9 TEMP1 3 195.59 -10.35 1 24.82

- - -
312.1 - 843.6 101.3
1009 1.35 DL1+1.5 WL7+0.9 TEMP1 4 175.76 -23.07 4 7

F
- -
294.9 - 867.4 -

PD
1010 1.35 DL1+1.5 WL8+0.9 TEMP1 9 180.11 -21.20 8 91.91

206.8 382.7
1011 1.35 DL1+1.5 WL1+-0.9 TEMP1 5 -3.97 76.34 4.36 0

223.9 392.1
1012 1.35 DL1+1.5 WL2+-0.9 TEMP1 6 -8.33 78.21 -19.52 7

-
317.7 247.5
te r
1013 1.35 DL1+1.5 WL3+-0.9 TEMP1 7 -0.46 -52.23 18.68 7

-
334.3 236.2
1014 1.35 DL1+1.5 WL4+-0.9 TEMP1 1 -4.82 -49.98 -5.18 6
as

805.3 862.3
1015 1.35 DL1+1.5 WL5+-0.9 TEMP1 0 175.28 11.94 4 73.61

824.0 839.0
1016 1.35 DL1+1.5 WL6+-0.9 TEMP1 6 171.03 13.87 1 83.32
nM

- -
312.7 - 956.2
1017 1.35 DL1+1.5 WL7+-0.9 TEMP1 1 200.33 1.14 4 6.77

- -
295.5 - 980.0
1018 1.35 DL1+1.5 WL8+-0.9 TEMP1 5 204.68 3.02 8 16.22
di

313.2 -
1019 1.35 DL1+0.9 TEMP1+1.35 MR1 2 9.26 -11.42 51.35 36.62

312.6
1020 1.35 DL1+-0.9 TEMP1+1.35 MR1 5 -15.30 12.80 -61.25 71.51
a te

1021 1.35 DL1+1.5LL1+1.5 EQUIP1+0.9 841.3


TEMP1+1.35 MR1 7 0.58 -6.13 10.28 -8.16

-
1022 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 840.8 102.3
TEMP1+1.35 MR1 1 -23.98 18.09 2 99.97
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1023 1.148 DL1+1.5 LL1+1.5 EQUIP1+0.9 797.1 -
TEMP1+1.35 MR1 2 1.04 -6.18 11.04 10.49

-
1024 1.148 DL1+1.5 LL1+1.5 EQUIP1+-0.9 796.5 101.5

Ed
TEMP1+1.35 MR1 5 -23.53 18.04 6 97.65

1025 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+0.9 788.2 179.6


TEMP1+1.35 MR1 0 7.39 32.21 49.72 9

1026 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+0.9 798.4 185.3


TEMP1+1.35 MR1 6 4.78 33.34 35.40 7

F
-
1027 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+0.9 854.7 198.4
TEMP1+1.35 MR1 5 9.50 -44.93 58.31 8

PD
-
1028 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+0.9 864.6 191.6
TEMP1+1.35 MR1 8 6.88 -43.58 44.00 9

1029 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+0.9 1147. 564.5


TEMP1+1.35 MR1 27 114.94 -6.43 1 -5.77

1030 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+0.9 1158. 550.5


te r
TEMP1+1.35 MR1 53 112.39 -5.27 1 0.06

-
1031 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+0.9 476.4 - 526.6 -
TEMP1+1.35 MR1 7 110.42 -12.91 4 45.88

-
as

1032 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+0.9 486.7 - 540.9 -


TEMP1+1.35 MR1 6 113.03 -11.78 4 40.20

1033 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+-0.9 787.6 287.8


TEMP1+1.35 MR1 3 -17.17 56.43 -62.88 2
nM

1034 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+-0.9 797.9 293.5


TEMP1+1.35 MR1 0 -19.78 57.55 -77.21 0

1035 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+-0.9 854.1 -


TEMP1+1.35 MR1 8 -15.07 -20.72 -54.29 90.34

1036 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+-0.9 864.1 -


TEMP1+1.35 MR1 1 -17.68 -19.36 -68.60 83.55
di

1037 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+-0.9 1146. 451.9 102.3


TEMP1+1.35 MR1 70 90.38 17.79 1 7

1038 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+-0.9 1157. 437.9 108.1


TEMP1+1.35 MR1 96 87.83 18.94 1 9
a te

-
1039 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+-0.9 475.9 - 639.2
TEMP1+1.35 MR1 0 134.98 11.31 4 62.26

-
1040 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+-0.9 486.1 - 653.5
TEMP1+1.35 MR1 9 137.59 12.44 4 67.93
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1041 1.148 DL1+1.5 LL1+0.9 WL1+1.5 743.9 177.3
EQUIP1+0.9 TEMP1+1.35 MR1 5 7.85 32.16 50.48 6

1042 1.148 DL1+1.5 LL1+0.9 WL2+1.5 754.2 183.0


EQUIP1+0.9 TEMP1+1.35 MR1 1 5.24 33.29 36.16 4

Ed
-
1043 1.148 DL1+1.5 LL1+0.9 WL3+1.5 810.5 200.8
EQUIP1+0.9 TEMP1+1.35 MR1 0 9.95 -44.98 59.07 1

-
1044 1.148 DL1+1.5 LL1+0.9 WL4+1.5 820.4 194.0
EQUIP1+0.9 TEMP1+1.35 MR1 2 7.34 -43.63 44.76 2

F
1045 1.148 DL1+1.5 LL1+0.9 WL5+1.5 1103. 565.2
EQUIP1+0.9 TEMP1+1.35 MR1 02 115.40 -6.47 7 -8.10

PD
1046 1.148 DL1+1.5 LL1+0.9 WL6+1.5 1114. 551.2
EQUIP1+0.9 TEMP1+1.35 MR1 27 112.85 -5.32 7 -2.27

-
1047 1.148 DL1+1.5 LL1+0.9 WL7+1.5 432.2 - 525.8 -
EQUIP1+0.9 TEMP1+1.35 MR1 1 109.96 -12.96 8 48.20

-
1048 1.148 DL1+1.5 LL1+0.9 WL8+1.5 442.5 - 540.1 -
te r
EQUIP1+0.9 TEMP1+1.35 MR1 0 112.57 -11.83 8 42.53

1049 1.148 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+- 743.3 285.4


0.9 TEMP1+1.35 MR1 8 -16.71 56.38 -62.12 9

1050 1.148 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+- 753.6 291.1


as

0.9 TEMP1+1.35 MR1 4 -19.33 57.50 -76.45 7

1051 1.148 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+- 809.9 -


0.9 TEMP1+1.35 MR1 3 -14.61 -20.76 -53.53 92.67

1052 1.148 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+- 819.8 -


nM

0.9 TEMP1+1.35 MR1 6 -17.22 -19.41 -67.84 85.88

1053 1.148 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+- 1102. 452.6 100.0


0.9 TEMP1+1.35 MR1 45 90.83 17.74 7 4

1054 1.148 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+- 1113. 438.6 105.8


0.9 TEMP1+1.35 MR1 71 88.29 18.89 7 6

-
di

1055 1.148 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+- 431.6 - 638.4


0.9 TEMP1+1.35 MR1 5 134.53 11.26 8 59.93

-
1056 1.148 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+- 441.9 - 652.7
a te

0.9 TEMP1+1.35 MR1 4 137.14 12.39 8 65.60

1057 1.148 DL1+1.5 LL1+1.5 WL1+1.5 708.5 302.5


EQUIP1+0.9 TEMP1+1.35 MR1 0 12.39 57.72 76.77 9

1058 1.148 DL1+1.5 LL1+1.5 WL2+1.5 725.6 312.0


EQUIP1+0.9 TEMP1+1.35 MR1 1 8.03 59.60 52.90 5
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
1059 1.148 DL1+1.5 LL1+1.5 WL3+1.5 819.4 327.6
EQUIP1+0.9 TEMP1+1.35 MR1 1 15.90 -70.85 91.09 9

Ed
1060 1.148 DL1+1.5 LL1+1.5 WL4+1.5 835.9 316.3
EQUIP1+0.9 TEMP1+1.35 MR1 6 11.54 -68.59 67.23 7

1061 1.148 DL1+1.5 LL1+1.5 WL5+1.5 1306. 934.7


EQUIP1+0.9 TEMP1+1.35 MR1 95 191.64 -6.67 5 -6.50

1062 1.148 DL1+1.5 LL1+1.5 WL6+1.5 1325. 911.4


EQUIP1+0.9 TEMP1+1.35 MR1 71 187.39 -4.75 3 3.21

F
-
1063 1.148 DL1+1.5 LL1+1.5 WL7+1.5 188.9 - 883.8 -

PD
EQUIP1+0.9 TEMP1+1.35 MR1 4 183.96 -17.47 2 73.35

-
1064 1.148 DL1+1.5 LL1+1.5 WL8+1.5 206.0 - 907.6 -
EQUIP1+0.9 TEMP1+1.35 MR1 9 188.32 -15.60 7 63.89

1065 1.148 DL1+1.5 LL1+1.5 WL1+1.5 EQUIP1+- 707.9 410.7


0.9 TEMP1+1.35 MR1 3 -12.17 81.94 -35.83 2

1066 1.148 DL1+1.5 LL1+1.5 WL2+1.5 EQUIP1+- 725.0 420.1


te r
0.9 TEMP1+1.35 MR1 4 -16.53 83.81 -59.70 9

-
1067 1.148 DL1+1.5 LL1+1.5 WL3+1.5 EQUIP1+- 818.8 219.5
0.9 TEMP1+1.35 MR1 5 -8.67 -46.63 -21.51 5
as

-
1068 1.148 DL1+1.5 LL1+1.5 WL4+1.5 EQUIP1+- 835.4 208.2
0.9 TEMP1+1.35 MR1 0 -13.02 -44.38 -45.37 4

1069 1.148 DL1+1.5 LL1+1.5 WL5+1.5 EQUIP1+- 1306. 822.1 101.6


nM

0.9 TEMP1+1.35 MR1 38 167.07 17.54 5 3

1070 1.148 DL1+1.5 LL1+1.5 WL6+1.5 EQUIP1+- 1325. 798.8 111.3


0.9 TEMP1+1.35 MR1 14 162.83 19.47 2 4

-
1071 1.148 DL1+1.5 LL1+1.5 WL7+1.5 EQUIP1+- 188.3 - 996.4
0.9 TEMP1+1.35 MR1 8 208.53 6.74 3 34.79
di

-
1072 1.148 DL1+1.5 LL1+1.5 WL8+1.5 EQUIP1+- 205.5 - 1020.
0.9 TEMP1+1.35 MR1 3 212.88 8.62 27 44.24

534.8 515.2
1073 1 DL1+0.8 LL1+1 SL1 7 -18.40 -96.84 -82.64 0
a te

-
694.3 300.1
1074 1 DL1+0.8 LL1+1 SL2 7 -63.79 -5.73 1 67.00

-
454.3 463.8
re

1075 1 DL1+0.8 LL1+-1 SL1 4 4.65 102.55 31.38 7


APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
294.8 248.8 -
1076 1 DL1+0.8 LL1+-1 SL2 4 50.05 11.44 5 15.68

2001 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+0.6 548.6 121.0


TEMP1+1 MR1 5 4.71 21.53 32.78 8

Ed
2002 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+0.6 555.4 124.8
TEMP1+1 MR1 9 2.96 22.28 23.23 7

-
2003 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+0.6 593.0 131.0
TEMP1+1 MR1 1 6.11 -29.90 38.51 3

F
-
2004 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+0.6 599.6 126.5
TEMP1+1 MR1 3 4.37 -29.00 28.97 0

PD
2005 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+0.6 788.0 375.9
TEMP1+1 MR1 3 76.40 -4.23 7 -2.55

2006 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+0.6 795.5 366.6


TEMP1+1 MR1 3 74.71 -3.46 4 1.33

-
2007 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+0.6 340.8 351.4 -
te r
TEMP1+1 MR1 2 -73.84 -8.55 6 29.29

-
2008 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+0.6 347.6 360.9 -
TEMP1+1 MR1 9 -75.58 -7.80 9 25.51

2009 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+-0.6 548.2 193.1


as

TEMP1+1 MR1 7 -11.67 37.67 -42.29 7

2010 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+-0.6 555.1 196.9


TEMP1+1 MR1 1 -13.41 38.42 -51.84 6

2011 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+-0.6 592.6 -


nM

TEMP1+1 MR1 4 -10.27 -13.76 -36.56 58.94

2012 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+-0.6 599.2 -


TEMP1+1 MR1 6 -12.01 -12.86 -46.10 54.41

2013 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+-0.6 787.6 300.9


TEMP1+1 MR1 5 60.03 11.91 1 69.54

2014 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+-0.6 795.1 291.5


di

TEMP1+1 MR1 5 58.33 12.68 7 73.42

-
2015 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+-0.6 340.4 426.5
TEMP1+1 MR1 5 -90.21 7.59 3 42.80
a te

-
2016 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+-0.6 347.3 436.0
TEMP1+1 MR1 1 -91.95 8.34 6 46.58

2017 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+0.6 525.0 204.5


TEMP1+1 MR1 2 7.73 38.56 50.31 7
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
2018 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+0.6 536.4 210.8
TEMP1+1 MR1 2 4.83 39.82 34.39 8

-
2019 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+0.6 598.9 215.6

Ed
TEMP1+1 MR1 6 10.07 -47.15 59.85 1

-
2020 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+0.6 609.9 208.0
TEMP1+1 MR1 9 7.17 -45.64 43.95 7

2021 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+0.6 923.9 622.3


TEMP1+1 MR1 8 127.23 -4.36 0 -1.49

F
2022 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+0.6 936.4 606.7
TEMP1+1 MR1 9 124.40 -3.08 4 4.98

PD
-
2023 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+0.6 178.6 - 590.0 -
TEMP1+1 MR1 4 123.17 -11.57 9 46.05

-
2024 1 DL1+1.0 LL1+1 WL8+1 EQUIP1+0.6 190.0 - 605.9 -
TEMP1+1 MR1 8 126.07 -10.32 8 39.75

2025 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+-0.6 524.6 276.6


te r
TEMP1+1 MR1 4 -8.64 54.71 -24.76 6

2026 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+-0.6 536.0 282.9


TEMP1+1 MR1 4 -11.55 55.96 -40.68 7

-
as

2027 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+-0.6 598.5 143.5


TEMP1+1 MR1 8 -6.30 -31.00 -15.21 2

-
2028 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+-0.6 609.6 135.9
nM

TEMP1+1 MR1 1 -9.21 -29.50 -31.12 8

2029 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+-0.6 923.6 547.2


TEMP1+1 MR1 1 110.86 11.78 3 70.60

2030 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+-0.6 936.1 531.6


TEMP1+1 MR1 1 108.03 13.06 8 77.07

-
di

2031 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+-0.6 178.2 - 665.1


TEMP1+1 MR1 7 139.55 4.58 6 26.04

-
2032 1 DL1+0.7 LL1+1 WL8+1 EQUIP1+-0.6 189.7 - 681.0
TEMP1+1 MR1 0 142.45 5.83 5 32.34
a te

534.8 515.2
2033 1 DL1+0.8 LL1+1 SL1 7 -18.40 -96.84 -82.64 0

-
694.3 300.1
2034 1 DL1+0.8 LL1+1 SL2 7 -63.79 -5.73 1 67.00
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
454.3 463.8
2035 1 DL1+0.8 LL1+-1 SL1 4 4.65 102.55 31.38 7

294.8 248.8 -

Ed
2036 1 DL1+0.8 LL1+-1 SL2 4 50.05 11.44 5 15.68

988.7 -
P13 500 1 DL1+1 LL1+1 EQUIP1 7 -9.35 -8.54 -40.16 20.85

982.8 -
501 1 DL1+1 LL1+1 EQUIP1+1 TEMP1 0 -22.00 -13.07 -97.56 41.90

F
319.7 170.3
502 1 DL1+1 WL1 8 -6.22 32.74 -36.42 6

333.5 172.1

PD
503 1 DL1+1 WL2 3 -4.55 33.03 -26.60 0

-
274.7 189.7
504 1 DL1+1 WL3 9 -5.83 -42.56 -35.54 9

-
288.5 186.9
te r
505 1 DL1+1 WL4 4 -4.16 -42.04 -25.73 9

316.0 -
506 1 DL1+1 WL5 1 19.75 -5.05 99.24 13.10

329.6 109.0 -
507 1 DL1+1 WL6 8 21.41 -4.76 2 11.36
as

-
283.4 112.5
508 1 DL1+1 WL7 3 -21.77 -4.59 1 -7.74

-
nM

297.1 102.7
509 1 DL1+1 WL8 8 -20.10 -4.30 0 -6.00

325.5 117.1
510 1 DL1+0.7 WL1 6 -4.48 21.62 -26.46 4

335.1 118.3
511 1 DL1+0.7 WL2 9 -3.31 21.82 -19.59 6
di

-
294.0 134.9
512 1 DL1+0.7 WL3 7 -4.21 -31.09 -25.85 6

-
a te

303.7 133.0
513 1 DL1+0.7 WL4 0 -3.04 -30.73 -18.98 0

322.9 -
514 1 DL1+0.7 WL5 3 13.69 -4.84 68.50 11.28

332.4 -
515 1 DL1+0.7 WL6 9 14.86 -4.63 75.35 10.06
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
300.1
516 1 DL1+0.7 WL7 2 -15.37 -4.52 -79.73 -7.53

309.7
517 1 DL1+0.7 WL8 5 -14.20 -4.31 -72.86 -6.31

Ed
974.3 112.2
518 1 DL1+ 1LL1+0.75 WL1+1 EQUIP1 0 -13.69 19.27 -65.05 0

984.6 113.5
519 1 DL1+1.0 LL1+0.75 WL2+1 EQUIP1 1 -12.44 19.49 -57.69 0

F
940.5 157.9
520 1 DL1+1.0 LL1+0.75 WL3+1 EQUIP1 6 -13.40 -37.20 -64.40 1

PD
950.8 155.8
521 1 DL1+1.0 LL1+0.75 WL4+1 EQUIP1 7 -12.15 -36.82 -57.03 1

971.4 -
522 1 DL1+1.0 LL1+0.75 WL5+1 EQUIP1 7 5.79 -9.07 36.69 25.40

981.7 -
523 1 DL1+1.0 LL1+0.75 WL6+1 EQUIP1 2 7.03 -8.85 44.03 24.09
te r
-
947.0 122.1 -
524 1 DL1+1.0 LL1+0.75 WL7+1 EQUIP1 4 -25.35 -8.73 2 21.38

-
957.3 114.7 -
as

525 1 DL1+1.0 LL1+0.75 WL8+1 EQUIP1 5 -24.10 -8.51 6 20.07

1024. 192.3
526 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL1 72 -10.21 -53.04 -44.73 0

995.5
nM

527 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL2 7 -12.15 -12.90 -54.31 0.27

184.1 173.1
528 0.6 DL1+1 WL1 5 -6.04 34.47 -35.13 7

197.9 174.9
529 0.6 DL1+1 WL2 0 -4.37 34.77 -25.32 1

-
di

139.1 186.9
530 0.6 DL1+1 WL3 6 -5.66 -40.82 -34.25 7

-
152.9 184.1
a te

531 0.6 DL1+1 WL4 2 -3.99 -40.31 -24.44 7

180.3 100.5 -
532 0.6 DL1+1 WL5 8 19.92 -3.32 3 10.29

194.0 110.3
533 0.6 DL1+1 WL6 5 21.59 -3.03 1 -8.54
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
147.8 111.2
534 0.6 DL1+1 WL7 0 -21.59 -2.86 3 -4.92

Ed
161.5 101.4
535 0.6 DL1+1 WL8 5 -19.92 -2.57 1 -3.19

251.3 279.9
536 0.6 DL1+0.7 SL1 8 -1.41 -61.94 -8.04 8

212.5
537 0.6 DL1+0.7 SL2 0 -3.99 -8.43 -20.80 23.93

F
-
1426. 111.4 -

PD
1001 1.35 DL1+1.5 LL1+1.5 EQUIP1+0.9 TEMP1 92 -25.35 -16.24 1 49.17

1437. -
1002 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 TEMP1 66 -2.58 -8.08 -8.09 11.28

-
423.4 105.8 237.6
1003 1.35 DL1+1.5 WL1+0.9 TEMP1 4 -20.64 45.68 1 5

444.0 240.2
te r
1004 1.35 DL1+1.5 WL2+0.9 TEMP1 7 -18.14 46.12 -91.09 6

- -
355.9 104.5 302.5
1005 1.35 DL1+1.5 WL3+0.9 TEMP1 5 -20.06 -67.26 0 7
as

-
376.5 298.3
1006 1.35 DL1+1.5 WL4+0.9 TEMP1 9 -17.56 -66.50 -89.77 7

417.7 -
nM

1007 1.35 DL1+1.5 WL5+0.9 TEMP1 8 18.30 -11.01 97.67 37.54

438.2 112.3 -
1008 1.35 DL1+1.5 WL6+0.9 TEMP1 9 20.80 -10.57 5 34.92

-
368.9 219.9 -
1009 1.35 DL1+1.5 WL7+0.9 TEMP1 2 -43.97 -10.32 5 29.50
di

-
389.5 205.2 -
1010 1.35 DL1+1.5 WL8+0.9 TEMP1 4 -41.46 -9.88 3 26.89

434.1 275.5
1011 1.35 DL1+1.5 WL1+-0.9 TEMP1 7 2.12 53.84 -2.49 4
a te

454.8 278.1
1012 1.35 DL1+1.5 WL2+-0.9 TEMP1 0 4.63 54.27 12.24 5

-
366.6 264.6
1013 1.35 DL1+1.5 WL3+-0.9 TEMP1 9 2.70 -59.10 -1.17 8
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
387.3 260.4
1014 1.35 DL1+1.5 WL4+-0.9 TEMP1 2 5.21 -58.34 13.55 9

428.5 201.0

Ed
1015 1.35 DL1+1.5 WL5+-0.9 TEMP1 2 41.07 -2.85 0 0.35

449.0 215.6
1016 1.35 DL1+1.5 WL6+-0.9 TEMP1 2 43.57 -2.41 7 2.96

-
379.6 116.6
1017 1.35 DL1+1.5 WL7+-0.9 TEMP1 5 -21.20 -2.16 2 8.39

F
-
400.2 101.9

PD
1018 1.35 DL1+1.5 WL8+-0.9 TEMP1 8 -18.70 -1.72 0 11.00

462.8 -
1019 1.35 DL1+0.9 TEMP1+1.35 MR1 6 -12.34 -10.21 -57.90 29.73

473.5
1020 1.35 DL1+-0.9 TEMP1+1.35 MR1 9 10.43 -2.05 45.42 8.15

-
1021 1.35 DL1+1.5LL1+1.5 EQUIP1+0.9 1437. 113.3 -
te r
TEMP1+1.35 MR1 41 -25.71 -16.51 0 50.45

1022 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 1448. -


TEMP1+1.35 MR1 14 -2.95 -8.35 -9.97 12.57

-
as

1023 1.148 DL1+1.5 LL1+1.5 EQUIP1+0.9 1368. 112.6 -


TEMP1+1.35 MR1 92 -25.63 -15.63 5 49.03

1024 1.148 DL1+1.5 LL1+1.5 EQUIP1+-0.9 1379. -


TEMP1+1.35 MR1 65 -2.86 -7.47 -9.32 11.14
nM

-
1025 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+0.9 1420. 143.1 109.2
TEMP1+1.35 MR1 05 -30.92 16.86 8 0

-
1026 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+0.9 1432. 134.3 110.7
TEMP1+1.35 MR1 42 -29.41 17.12 4 7
di

- -
1027 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+0.9 1379. 142.3 214.9
TEMP1+1.35 MR1 56 -30.57 -50.91 9 3

- -
1028 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+0.9 1391. 133.5 212.4
a te

TEMP1+1.35 MR1 94 -29.07 -50.45 6 1

1029 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+0.9 1416. -


TEMP1+1.35 MR1 66 -7.55 -17.15 -21.09 55.91

1030 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+0.9 1428. -


TEMP1+1.35 MR1 96 -6.05 -16.89 -12.29 54.34
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
1031 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+0.9 1387. 211.6 -
TEMP1+1.35 MR1 34 -44.91 -16.74 6 51.08

Ed
1032 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+0.9 1399. 202.8 -
TEMP1+1.35 MR1 71 -43.41 -16.48 3 49.52

1033 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+-0.9 1430. 147.0


TEMP1+1.35 MR1 78 -8.15 25.02 -39.85 9

1034 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+-0.9 1443. 148.6


TEMP1+1.35 MR1 16 -6.65 25.28 -31.02 6

F
-
1035 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+-0.9 1390. 177.0

PD
TEMP1+1.35 MR1 29 -7.80 -42.75 -39.06 4

-
1036 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+-0.9 1402. 174.5
TEMP1+1.35 MR1 67 -6.30 -42.29 -30.23 2

1037 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+-0.9 1427. -


TEMP1+1.35 MR1 39 15.22 -9.00 82.24 18.02

1038 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+-0.9 1439. -


te r
TEMP1+1.35 MR1 69 16.71 -8.73 91.04 16.45

-
1039 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+-0.9 1398. 108.3 -
TEMP1+1.35 MR1 07 -22.15 -8.58 4 13.20
as

1040 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+-0.9 1410. -


TEMP1+1.35 MR1 45 -20.64 -8.32 -99.50 11.63

-
1041 1.148 DL1+1.5 LL1+0.9 WL1+1.5 1351. 142.5 110.6
nM

EQUIP1+0.9 TEMP1+1.35 MR1 56 -30.83 17.74 3 3

-
1042 1.148 DL1+1.5 LL1+0.9 WL2+1.5 1363. 133.6 112.1
EQUIP1+0.9 TEMP1+1.35 MR1 93 -29.33 18.00 9 9

- -
1043 1.148 DL1+1.5 LL1+0.9 WL3+1.5 1311. 141.7 213.5
EQUIP1+0.9 TEMP1+1.35 MR1 07 -30.48 -50.03 4 0
di

- -
1044 1.148 DL1+1.5 LL1+0.9 WL4+1.5 1323. 132.9 210.9
EQUIP1+0.9 TEMP1+1.35 MR1 45 -28.98 -49.57 1 9

1045 1.148 DL1+1.5 LL1+0.9 WL5+1.5 1348. -


a te

EQUIP1+0.9 TEMP1+1.35 MR1 16 -7.46 -16.28 -20.44 54.49

1046 1.148 DL1+1.5 LL1+0.9 WL6+1.5 1360. -


EQUIP1+0.9 TEMP1+1.35 MR1 47 -5.96 -16.01 -11.63 52.92

-
1047 1.148 DL1+1.5 LL1+0.9 WL7+1.5 1318. 211.0 -
re

EQUIP1+0.9 TEMP1+1.35 MR1 84 -44.83 -15.86 1 49.66


APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
1048 1.148 DL1+1.5 LL1+0.9 WL8+1.5 1331. 202.1 -
EQUIP1+0.9 TEMP1+1.35 MR1 22 -43.32 -15.60 8 48.10

1049 1.148 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+- 1362. 148.5

Ed
0.9 TEMP1+1.35 MR1 29 -8.06 25.90 -39.20 1

1050 1.148 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+- 1374. 150.0


0.9 TEMP1+1.35 MR1 67 -6.56 26.16 -30.37 8

-
1051 1.148 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+- 1321. 175.6
0.9 TEMP1+1.35 MR1 80 -7.72 -41.87 -38.41 2

F
-
1052 1.148 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+- 1334. 173.1

PD
0.9 TEMP1+1.35 MR1 18 -6.21 -41.41 -29.58 0

1053 1.148 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+- 1358. -


0.9 TEMP1+1.35 MR1 90 15.30 -8.12 82.89 16.60

1054 1.148 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+- 1371. -


0.9 TEMP1+1.35 MR1 20 16.80 -7.85 91.69 15.03

-
1055 1.148 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+- 1329. 107.6 -
te r
0.9 TEMP1+1.35 MR1 58 -22.06 -7.70 9 11.77

1056 1.148 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+- 1341. -


0.9 TEMP1+1.35 MR1 96 -20.56 -7.44 -98.85 10.21

-
as

1057 1.148 DL1+1.5 LL1+1.5 WL1+1.5 1339. 162.4 217.0


EQUIP1+0.9 TEMP1+1.35 MR1 98 -34.30 39.98 5 6

-
1058 1.148 DL1+1.5 LL1+1.5 WL2+1.5 1360. 147.7 219.6
nM

EQUIP1+0.9 TEMP1+1.35 MR1 61 -31.79 40.42 2 7

- -
1059 1.148 DL1+1.5 LL1+1.5 WL3+1.5 1272. 161.1 323.1
EQUIP1+0.9 TEMP1+1.35 MR1 50 -33.72 -72.96 3 5

- -
1060 1.148 DL1+1.5 LL1+1.5 WL4+1.5 1293. 146.4 318.9
EQUIP1+0.9 TEMP1+1.35 MR1 13 -31.21 -72.19 1 6
di

1061 1.148 DL1+1.5 LL1+1.5 WL5+1.5 1334. -


EQUIP1+0.9 TEMP1+1.35 MR1 33 4.65 -16.71 41.04 58.13

1062 1.148 DL1+1.5 LL1+1.5 WL6+1.5 1354. -


EQUIP1+0.9 TEMP1+1.35 MR1 83 7.14 -16.27 55.71 55.51
a te

-
1063 1.148 DL1+1.5 LL1+1.5 WL7+1.5 1285. 276.5 -
EQUIP1+0.9 TEMP1+1.35 MR1 46 -57.63 -16.02 9 50.08

-
1064 1.148 DL1+1.5 LL1+1.5 WL8+1.5 1306. 261.8 -
re

EQUIP1+0.9 TEMP1+1.35 MR1 09 -55.12 -15.58 6 47.48


APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1065 1.148 DL1+1.5 LL1+1.5 WL1+1.5 EQUIP1+- 1350. 254.9
0.9 TEMP1+1.35 MR1 72 -11.53 48.14 -59.12 5

1066 1.148 DL1+1.5 LL1+1.5 WL2+1.5 EQUIP1+- 1371. 257.5


0.9 TEMP1+1.35 MR1 35 -9.03 48.58 -44.39 6

Ed
-
1067 1.148 DL1+1.5 LL1+1.5 WL3+1.5 EQUIP1+- 1283. 285.2
0.9 TEMP1+1.35 MR1 24 -10.95 -64.80 -57.80 6

-
1068 1.148 DL1+1.5 LL1+1.5 WL4+1.5 EQUIP1+- 1303. 281.0
0.9 TEMP1+1.35 MR1 87 -8.45 -64.03 -43.08 7

F
1069 1.148 DL1+1.5 LL1+1.5 WL5+1.5 EQUIP1+- 1345. 144.3 -
0.9 TEMP1+1.35 MR1 07 27.41 -8.55 7 20.24

PD
1070 1.148 DL1+1.5 LL1+1.5 WL6+1.5 EQUIP1+- 1365. 159.0 -
0.9 TEMP1+1.35 MR1 57 29.91 -8.11 4 17.62

-
1071 1.148 DL1+1.5 LL1+1.5 WL7+1.5 EQUIP1+- 1296. 173.2 -
0.9 TEMP1+1.35 MR1 20 -34.86 -7.86 6 12.19

-
1072 1.148 DL1+1.5 LL1+1.5 WL8+1.5 EQUIP1+- 1316. 158.5
te r
0.9 TEMP1+1.35 MR1 83 -32.35 -7.42 3 -9.59

924.9 386.7
1073 1 DL1+0.8 LL1+1 SL1 9 -2.93 -92.72 -13.28 7

869.4
as

1074 1 DL1+0.8 LL1+1 SL2 6 -6.62 -16.27 -31.52 20.99

-
788.0 425.2
1075 1 DL1+0.8 LL1+-1 SL1 3 0.36 76.82 4.15 4
nM

843.5 -
1076 1 DL1+0.8 LL1+-1 SL2 6 4.04 0.37 22.39 59.46

2001 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+0.6 981.3


TEMP1+1 MR1 8 -20.68 10.79 -95.92 72.00

2002 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+0.6 989.6


TEMP1+1 MR1 3 -19.68 10.96 -90.03 73.05
di

-
2003 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+0.6 954.3 144.0
TEMP1+1 MR1 9 -20.45 -34.39 -95.39 8

-
a te

2004 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+0.6 962.6 142.4


TEMP1+1 MR1 4 -19.45 -34.08 -89.50 1

2005 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+0.6 979.1 -


TEMP1+1 MR1 2 -5.10 -11.89 -14.52 38.07

2006 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+0.6 987.3 -


TEMP1+1 MR1 2 -4.11 -11.71 -8.65 37.03
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
2007 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+0.6 959.5 141.5 -
TEMP1+1 MR1 7 -30.01 -11.61 7 34.85

Ed
2008 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+0.6 967.8 135.6 -
TEMP1+1 MR1 2 -29.01 -11.44 8 33.81

2009 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+-0.6 988.5


TEMP1+1 MR1 4 -5.51 16.23 -27.03 97.26

2010 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+-0.6 996.7


TEMP1+1 MR1 9 -4.50 16.40 -21.14 98.31

F
-
2011 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+-0.6 961.5 118.8

PD
TEMP1+1 MR1 5 -5.27 -28.95 -26.50 3

-
2012 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+-0.6 969.8 117.1
TEMP1+1 MR1 0 -4.27 -28.65 -20.61 5

2013 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+-0.6 986.2 -


TEMP1+1 MR1 8 10.07 -6.45 54.36 12.81

2014 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+-0.6 994.4 -


te r
TEMP1+1 MR1 8 11.07 -6.27 60.23 11.77

2015 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+-0.6 966.7


TEMP1+1 MR1 3 -14.84 -6.17 -72.69 -9.60

2016 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+-0.6 974.9


as

TEMP1+1 MR1 8 -13.83 -6.00 -66.80 -8.55

-
2017 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+0.6 973.6 109.2 142.9
TEMP1+1 MR1 7 -23.00 25.62 0 6
nM

2018 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+0.6 987.4 144.7


TEMP1+1 MR1 2 -21.32 25.91 -99.38 0

- -
2019 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+0.6 928.6 108.3 217.1
TEMP1+1 MR1 8 -22.61 -49.68 2 8

-
di

2020 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+0.6 942.4 214.3


TEMP1+1 MR1 3 -20.94 -49.17 -98.50 9

2021 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+0.6 969.9 -


TEMP1+1 MR1 0 2.97 -12.18 26.46 40.50
a te

2022 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+0.6 983.5 -


TEMP1+1 MR1 7 4.63 -11.88 36.24 38.75

-
2023 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+0.6 937.3 185.2 -
TEMP1+1 MR1 2 -38.55 -11.72 9 35.13
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
2024 1 DL1+1.0 LL1+1 WL8+1 EQUIP1+0.6 951.0 175.4 -
TEMP1+1 MR1 7 -36.88 -11.42 7 33.40

2025 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+-0.6 980.8 168.2

Ed
TEMP1+1 MR1 2 -7.82 31.06 -40.31 2

2026 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+-0.6 994.5 169.9


TEMP1+1 MR1 8 -6.15 31.35 -30.49 6

-
2027 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+-0.6 935.8 191.9
TEMP1+1 MR1 3 -7.43 -44.24 -39.43 2

F
-
2028 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+-0.6 949.5 189.1

PD
TEMP1+1 MR1 9 -5.76 -43.73 -29.62 3

2029 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+-0.6 977.0 -


TEMP1+1 MR1 6 18.15 -6.74 95.35 15.24

2030 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+-0.6 990.7 105.1 -


TEMP1+1 MR1 2 19.81 -6.44 3 13.49

-
2031 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+-0.6 944.4 116.4
te r
TEMP1+1 MR1 8 -23.37 -6.28 0 -9.88

-
2032 1 DL1+0.7 LL1+1 WL8+1 EQUIP1+-0.6 958.2 106.5
TEMP1+1 MR1 3 -21.70 -5.99 9 -8.14
as

924.9 386.7
2033 1 DL1+0.8 LL1+1 SL1 9 -2.93 -92.72 -13.28 7

869.4
2034 1 DL1+0.8 LL1+1 SL2 6 -6.62 -16.27 -31.52 20.99
nM

-
788.0 425.2
2035 1 DL1+0.8 LL1+-1 SL1 3 0.36 76.82 4.15 4

843.5 -
2036 1 DL1+0.8 LL1+-1 SL2 6 4.04 0.37 22.39 59.46

219.7 -
di

P14 500 1 DL1+1 LL1+1 EQUIP1 2 -1.14 -16.34 -15.96 20.16

218.4 -
501 1 DL1+1 LL1+1 EQUIP1+1 TEMP1 0 -1.47 -19.23 -16.31 31.87

162.8
a te

502 1 DL1+1 WL1 0 2.14 9.85 0.66 75.42

166.5
503 1 DL1+1 WL2 9 2.17 10.05 0.72 76.95

-
504 1 DL1+1 WL3 72.58 1.90 -29.24 1.31 98.07
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
505 1 DL1+1 WL4 76.47 1.93 -29.00 1.37 96.36

100.5 -
506 1 DL1+1 WL5 6 11.05 -11.79 39.81 22.36

Ed
104.3 -
507 1 DL1+1 WL6 3 11.08 -11.60 39.86 20.86

110.2 -
508 1 DL1+1 WL7 1 -6.83 -8.92 -37.03 10.37

113.9

F
509 1 DL1+1 WL8 9 -6.79 -8.73 -36.97 -8.84

149.1
510 1 DL1+0.7 WL1 8 2.13 3.98 0.86 49.36

PD
151.8
511 1 DL1+0.7 WL2 3 2.15 4.12 0.90 50.43

-
512 1 DL1+0.7 WL3 86.03 1.97 -23.38 1.31 72.08

-
513 1 DL1+0.7 WL4 88.75 1.99 -23.22 1.35 70.89
te r
105.6 -
514 1 DL1+0.7 WL5 1 8.38 -11.17 28.26 19.09

108.2 -
515 1 DL1+0.7 WL6 5 8.40 -11.04 28.29 18.04
as

112.3 -
516 1 DL1+0.7 WL7 6 -4.14 -9.16 -25.53 10.69

115.0
517 1 DL1+0.7 WL8 1 -4.12 -9.02 -25.49 -9.62
nM

253.7
518 1 DL1+ 1LL1+0.75 WL1+1 EQUIP1 8 -1.13 -1.67 -16.44 44.99

256.6
519 1 DL1+1.0 LL1+0.75 WL2+1 EQUIP1 2 -1.11 -1.52 -16.40 46.14

186.1 -
520 1 DL1+1.0 LL1+0.75 WL3+1 EQUIP1 1 -1.31 -30.98 -15.95 85.13
di

189.0 -
521 1 DL1+1.0 LL1+0.75 WL4+1 EQUIP1 3 -1.29 -30.80 -15.91 83.85

207.1 -
522 1 DL1+1.0 LL1+0.75 WL5+1 EQUIP1 0 5.56 -17.90 12.92 28.35
a te

209.9 -
523 1 DL1+1.0 LL1+0.75 WL6+1 EQUIP1 2 5.58 -17.75 12.96 27.22

214.3 -
524 1 DL1+1.0 LL1+0.75 WL7+1 EQUIP1 3 -7.85 -15.74 -44.71 19.35
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
217.1 -
525 1 DL1+1.0 LL1+0.75 WL8+1 EQUIP1 7 -7.83 -15.60 -44.67 18.21

248.0
526 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL1 9 -1.60 -28.27 -17.65 32.85

Ed
223.3 -
527 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL2 4 -2.37 -17.54 -21.17 15.01

115.8
528 0.6 DL1+1 WL1 5 1.29 13.74 0.14 79.99

119.6

F
529 0.6 DL1+1 WL2 3 1.32 13.93 0.20 81.53

-
530 0.6 DL1+1 WL3 25.63 1.05 -25.35 0.79 93.49

PD
-
531 0.6 DL1+1 WL4 29.52 1.08 -25.12 0.85 91.78

-
532 0.6 DL1+1 WL5 53.61 10.20 -7.91 39.29 17.78

-
533 0.6 DL1+1 WL6 57.38 10.23 -7.72 39.34 16.28
te r
534 0.6 DL1+1 WL7 63.25 -7.68 -5.03 -37.55 -5.79

535 0.6 DL1+1 WL8 67.04 -7.64 -4.84 -37.50 -4.26

108.2
as

536 0.6 DL1+0.7 SL1 7 0.66 -21.74 -1.47 63.81

537 0.6 DL1+0.7 SL2 75.27 -0.37 -7.43 -6.17 0.00

310.7 -
1001 1.35 DL1+1.5 LL1+1.5 EQUIP1+0.9 TEMP1 9 -2.32 -25.65 -24.45 39.06
nM

313.1 -
1002 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 TEMP1 5 -1.74 -20.45 -23.81 17.98

225.4 104.3
1003 1.35 DL1+1.5 WL1+0.9 TEMP1 1 2.59 13.63 0.48 0

231.0 106.6
1004 1.35 DL1+1.5 WL2+0.9 TEMP1 9 2.64 13.93 0.57 0
di

-
155.9
1005 1.35 DL1+1.5 WL3+0.9 TEMP1 90.08 2.23 -45.00 1.45 2

-
a te

153.3
1006 1.35 DL1+1.5 WL4+0.9 TEMP1 95.92 2.28 -44.65 1.54 6

132.0 -
1007 1.35 DL1+1.5 WL5+0.9 TEMP1 5 15.97 -18.83 59.20 42.36

137.7 -
re

1008 1.35 DL1+1.5 WL6+0.9 TEMP1 1 16.01 -18.55 59.27 40.11


APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
146.5 -
1009 1.35 DL1+1.5 WL7+0.9 TEMP1 2 -10.85 -14.52 -56.06 24.37

152.2 -
1010 1.35 DL1+1.5 WL8+0.9 TEMP1 0 -10.80 -14.23 -55.97 22.08

Ed
227.7 125.3
1011 1.35 DL1+1.5 WL1+-0.9 TEMP1 8 3.18 18.83 1.12 8

233.4 127.6
1012 1.35 DL1+1.5 WL2+-0.9 TEMP1 6 3.23 19.13 1.21 8

F
134.8
1013 1.35 DL1+1.5 WL3+-0.9 TEMP1 92.45 2.82 -39.80 2.09 5

PD
132.2
1014 1.35 DL1+1.5 WL4+-0.9 TEMP1 98.28 2.87 -39.45 2.18 9

134.4 -
1015 1.35 DL1+1.5 WL5+-0.9 TEMP1 2 16.56 -13.63 59.84 21.29

140.0 -
1016 1.35 DL1+1.5 WL6+-0.9 TEMP1 7 16.60 -13.35 59.91 19.04
te r
148.8
1017 1.35 DL1+1.5 WL7+-0.9 TEMP1 9 -10.26 -9.32 -55.42 -3.29

154.5
1018 1.35 DL1+1.5 WL8+-0.9 TEMP1 7 -10.22 -9.03 -55.34 -1.01
as

159.1 -
1019 1.35 DL1+0.9 TEMP1+1.35 MR1 4 2.42 -15.79 0.78 26.16

161.5
1020 1.35 DL1+-0.9 TEMP1+1.35 MR1 0 3.01 -10.58 1.42 -5.08
nM

1021 1.35 DL1+1.5LL1+1.5 EQUIP1+0.9 312.6 -


TEMP1+1.35 MR1 3 -2.48 -25.72 -25.12 39.23

1022 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 314.9 -


TEMP1+1.35 MR1 9 -1.89 -20.52 -24.48 18.15

1023 1.148 DL1+1.5 LL1+1.5 EQUIP1+0.9 288.9 -


TEMP1+1.35 MR1 2 -2.91 -23.76 -25.38 36.92
di

1024 1.148 DL1+1.5 LL1+1.5 EQUIP1+-0.9 291.2 -


TEMP1+1.35 MR1 8 -2.32 -18.56 -24.74 15.84

1025 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+0.9 353.5


TEMP1+1.35 MR1 0 -2.47 -8.11 -25.70 38.94
a te

1026 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+0.9 356.9


TEMP1+1.35 MR1 1 -2.44 -7.93 -25.64 40.32

-
1027 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+0.9 272.3 117.1
TEMP1+1.35 MR1 0 -2.68 -43.29 -25.11 9
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
1028 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+0.9 275.8 115.6
TEMP1+1.35 MR1 0 -2.65 -43.08 -25.06 6

1029 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+0.9 297.4 -

Ed
TEMP1+1.35 MR1 8 5.56 -27.59 9.54 49.06

1030 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+0.9 300.8 -


TEMP1+1.35 MR1 8 5.59 -27.42 9.58 47.71

1031 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+0.9 306.1 -


TEMP1+1.35 MR1 7 -10.53 -25.00 -59.62 38.26

F
1032 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+0.9 309.5 -
TEMP1+1.35 MR1 7 -10.50 -24.83 -59.57 36.89

1033 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+-0.9 355.8

PD
TEMP1+1.35 MR1 7 -1.88 -2.91 -25.06 60.02

1034 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+-0.9 359.2


TEMP1+1.35 MR1 7 -1.85 -2.73 -25.00 61.40

1035 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+-0.9 274.6 -


TEMP1+1.35 MR1 7 -2.09 -38.09 -24.47 96.12

1036 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+-0.9 278.1 -


te r
TEMP1+1.35 MR1 7 -2.06 -37.88 -24.42 94.58

1037 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+-0.9 299.8 -


TEMP1+1.35 MR1 5 6.15 -22.39 10.18 27.98

1038 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+-0.9 303.2 -


as

TEMP1+1.35 MR1 4 6.17 -22.22 10.22 26.63

1039 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+-0.9 308.5 -


TEMP1+1.35 MR1 3 -9.94 -19.80 -58.98 17.18

1040 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+-0.9 311.9 -


nM

TEMP1+1.35 MR1 4 -9.92 -19.63 -58.93 15.81

1041 1.148 DL1+1.5 LL1+0.9 WL1+1.5 329.7


EQUIP1+0.9 TEMP1+1.35 MR1 9 -2.90 -6.15 -25.96 41.25

1042 1.148 DL1+1.5 LL1+0.9 WL2+1.5 333.2


EQUIP1+0.9 TEMP1+1.35 MR1 0 -2.87 -5.97 -25.91 42.63

-
di

1043 1.148 DL1+1.5 LL1+0.9 WL3+1.5 248.5 114.8


EQUIP1+0.9 TEMP1+1.35 MR1 9 -3.11 -41.33 -25.38 8

-
1044 1.148 DL1+1.5 LL1+0.9 WL4+1.5 252.0 113.3
a te

EQUIP1+0.9 TEMP1+1.35 MR1 9 -3.08 -41.11 -25.33 5

1045 1.148 DL1+1.5 LL1+0.9 WL5+1.5 273.7 -


EQUIP1+0.9 TEMP1+1.35 MR1 7 5.13 -25.63 9.27 46.75

1046 1.148 DL1+1.5 LL1+0.9 WL6+1.5 277.1 -


EQUIP1+0.9 TEMP1+1.35 MR1 6 5.16 -25.45 9.31 45.40
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1047 1.148 DL1+1.5 LL1+0.9 WL7+1.5 282.4 -
EQUIP1+0.9 TEMP1+1.35 MR1 5 -10.96 -23.04 -59.89 35.95

1048 1.148 DL1+1.5 LL1+0.9 WL8+1.5 285.8 -


EQUIP1+0.9 TEMP1+1.35 MR1 6 -10.93 -22.86 -59.83 34.58

Ed
1049 1.148 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+- 332.1
0.9 TEMP1+1.35 MR1 5 -2.31 -0.95 -25.32 62.33

1050 1.148 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+- 335.5


0.9 TEMP1+1.35 MR1 6 -2.28 -0.77 -25.27 63.71

1051 1.148 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+- 250.9 -

F
0.9 TEMP1+1.35 MR1 6 -2.52 -36.13 -24.74 93.80

1052 1.148 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+- 254.4 -


0.9 TEMP1+1.35 MR1 5 -2.49 -35.91 -24.69 92.27

PD
1053 1.148 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+- 276.1 -
0.9 TEMP1+1.35 MR1 4 5.72 -20.42 9.91 25.67

1054 1.148 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+- 279.5 -


0.9 TEMP1+1.35 MR1 3 5.74 -20.25 9.95 24.32

1055 1.148 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+- 284.8 -


0.9 TEMP1+1.35 MR1 2 -10.37 -17.84 -59.25 14.87
te r
1056 1.148 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+- 288.2 -
0.9 TEMP1+1.35 MR1 2 -10.35 -17.66 -59.19 13.50

1057 1.148 DL1+1.5 LL1+1.5 WL1+1.5 357.0


EQUIP1+0.9 TEMP1+1.35 MR1 4 -2.89 5.59 -26.35 93.37
as

1058 1.148 DL1+1.5 LL1+1.5 WL2+1.5 362.7


EQUIP1+0.9 TEMP1+1.35 MR1 2 -2.84 5.89 -26.26 95.67

-
1059 1.148 DL1+1.5 LL1+1.5 WL3+1.5 221.7 166.8
nM

EQUIP1+0.9 TEMP1+1.35 MR1 1 -3.25 -53.04 -25.37 6

-
1060 1.148 DL1+1.5 LL1+1.5 WL4+1.5 227.5 164.3
EQUIP1+0.9 TEMP1+1.35 MR1 4 -3.20 -52.69 -25.29 0

1061 1.148 DL1+1.5 LL1+1.5 WL5+1.5 263.6 -


EQUIP1+0.9 TEMP1+1.35 MR1 8 10.49 -26.87 32.38 53.30
di

1062 1.148 DL1+1.5 LL1+1.5 WL6+1.5 269.3 -


EQUIP1+0.9 TEMP1+1.35 MR1 3 10.53 -26.59 32.45 51.05

1063 1.148 DL1+1.5 LL1+1.5 WL7+1.5 278.1 -


EQUIP1+0.9 TEMP1+1.35 MR1 4 -16.33 -22.56 -82.89 35.30
a te

1064 1.148 DL1+1.5 LL1+1.5 WL8+1.5 283.8 -


EQUIP1+0.9 TEMP1+1.35 MR1 2 -16.29 -22.27 -82.80 33.02

1065 1.148 DL1+1.5 LL1+1.5 WL1+1.5 EQUIP1+- 359.4 114.4


0.9 TEMP1+1.35 MR1 0 -2.30 10.79 -25.71 5

1066 1.148 DL1+1.5 LL1+1.5 WL2+1.5 EQUIP1+- 365.0 116.7


re

0.9 TEMP1+1.35 MR1 8 -2.26 11.09 -25.62 5


APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
1067 1.148 DL1+1.5 LL1+1.5 WL3+1.5 EQUIP1+- 224.0 145.7
0.9 TEMP1+1.35 MR1 7 -2.66 -47.84 -24.73 8

Ed
1068 1.148 DL1+1.5 LL1+1.5 WL4+1.5 EQUIP1+- 229.9 143.2
0.9 TEMP1+1.35 MR1 0 -2.61 -47.48 -24.65 2

1069 1.148 DL1+1.5 LL1+1.5 WL5+1.5 EQUIP1+- 266.0 -


0.9 TEMP1+1.35 MR1 4 11.08 -21.67 33.02 32.22

1070 1.148 DL1+1.5 LL1+1.5 WL6+1.5 EQUIP1+- 271.6 -


0.9 TEMP1+1.35 MR1 9 11.12 -21.39 33.09 29.97

F
1071 1.148 DL1+1.5 LL1+1.5 WL7+1.5 EQUIP1+- 280.5 -
0.9 TEMP1+1.35 MR1 1 -15.74 -17.36 -82.25 14.23

PD
1072 1.148 DL1+1.5 LL1+1.5 WL8+1.5 EQUIP1+- 286.1 -
0.9 TEMP1+1.35 MR1 9 -15.70 -17.07 -82.16 11.94

251.2
1073 1 DL1+0.8 LL1+1 SL1 5 2.02 -37.28 -1.79 83.13

204.1
1074 1 DL1+0.8 LL1+1 SL2 1 0.55 -16.84 -8.52 -8.03
te r
-
143.1 118.8
1075 1 DL1+0.8 LL1+-1 SL1 6 3.78 8.18 4.63 1

190.3 -
1076 1 DL1+0.8 LL1+-1 SL2 0 5.25 -12.26 11.36 27.65
as

2001 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+0.6 247.5


TEMP1+1 MR1 4 -1.44 -6.38 -17.05 24.80

2002 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+0.6 249.8


TEMP1+1 MR1 2 -1.42 -6.26 -17.02 25.73
nM

2003 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+0.6 193.4 -


TEMP1+1 MR1 1 -1.59 -29.84 -16.66 79.29

2004 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+0.6 195.7 -


TEMP1+1 MR1 4 -1.57 -29.69 -16.63 78.26

2005 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+0.6 210.2 -


TEMP1+1 MR1 0 3.91 -19.37 6.44 33.86
di

2006 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+0.6 212.4 -


TEMP1+1 MR1 6 3.93 -19.26 6.47 32.96

2007 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+0.6 215.9 -


a te

TEMP1+1 MR1 9 -6.82 -17.65 -39.67 26.66

2008 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+0.6 218.2 -


TEMP1+1 MR1 6 -6.80 -17.53 -39.63 25.75

2009 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+-0.6 249.1


TEMP1+1 MR1 2 -1.05 -2.92 -16.62 38.86
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
2010 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+-0.6 251.3
TEMP1+1 MR1 9 -1.03 -2.80 -16.59 39.78

2011 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+-0.6 194.9 -


TEMP1+1 MR1 9 -1.19 -26.37 -16.24 65.23

Ed
2012 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+-0.6 197.3 -
TEMP1+1 MR1 2 -1.18 -26.23 -16.20 64.21

2013 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+-0.6 211.7 -


TEMP1+1 MR1 8 4.30 -15.90 6.87 19.81

2014 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+-0.6 214.0 -

F
TEMP1+1 MR1 4 4.32 -15.79 6.89 18.91

2015 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+-0.6 217.5 -


TEMP1+1 MR1 6 -6.43 -14.18 -39.24 12.61

PD
2016 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+-0.6 219.8 -
TEMP1+1 MR1 3 -6.41 -14.06 -39.21 11.70

2017 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+0.6 265.7


TEMP1+1 MR1 1 -1.44 1.44 -17.31 59.55

2018 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+0.6 269.5


TEMP1+1 MR1 0 -1.41 1.64 -17.25 61.08
te r
-
2019 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+0.6 175.4 113.9
TEMP1+1 MR1 9 -1.68 -37.64 -16.66 4

-
as

2020 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+0.6 179.3 112.2


TEMP1+1 MR1 8 -1.65 -37.41 -16.60 3

2021 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+0.6 203.4 -


TEMP1+1 MR1 7 7.48 -20.20 21.84 38.23
nM

2022 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+0.6 207.2 -


TEMP1+1 MR1 4 7.51 -20.01 21.89 36.73

2023 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+0.6 213.1 -


TEMP1+1 MR1 1 -10.40 -17.33 -55.00 26.23

2024 1 DL1+1.0 LL1+1 WL8+1 EQUIP1+0.6 216.9 -


TEMP1+1 MR1 0 -10.37 -17.13 -54.94 24.71
di

2025 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+-0.6 267.2


TEMP1+1 MR1 9 -1.05 4.91 -16.88 73.60

2026 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+-0.6 271.0


TEMP1+1 MR1 7 -1.02 5.11 -16.82 75.13
a te

2027 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+-0.6 177.0 -


TEMP1+1 MR1 7 -1.29 -34.18 -16.23 99.88

2028 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+-0.6 180.9 -


TEMP1+1 MR1 5 -1.25 -33.94 -16.18 98.18

2029 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+-0.6 205.0 -


re

TEMP1+1 MR1 5 7.87 -16.73 22.27 24.18


APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
2030 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+-0.6 208.8 -
TEMP1+1 MR1 1 7.90 -16.54 22.31 22.68

2031 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+-0.6 214.6 -


TEMP1+1 MR1 9 -10.01 -13.86 -54.57 12.18

Ed
2032 1 DL1+0.7 LL1+1 WL8+1 EQUIP1+-0.6 218.4 -
TEMP1+1 MR1 8 -9.98 -13.66 -54.52 10.66

251.2
2033 1 DL1+0.8 LL1+1 SL1 5 2.02 -37.28 -1.79 83.13

204.1

F
2034 1 DL1+0.8 LL1+1 SL2 1 0.55 -16.84 -8.52 -8.03

-
143.1 118.8

PD
2035 1 DL1+0.8 LL1+-1 SL1 6 3.78 8.18 4.63 1

190.3 -
2036 1 DL1+0.8 LL1+-1 SL2 0 5.25 -12.26 11.36 27.65

1017.
P15 500 1 DL1+1 LL1+1 EQUIP1 93 -9.93 5.20 -36.13 22.53

1013.
te r
501 1 DL1+1 LL1+1 EQUIP1+1 TEMP1 34 2.25 0.87 18.67 3.55

248.7 219.4
502 1 DL1+1 WL1 7 3.12 43.88 30.66 3

263.1 220.9
as

503 1 DL1+1 WL2 7 1.28 44.27 20.03 3

-
353.3 203.5
504 1 DL1+1 WL3 9 3.71 -39.89 32.11 9
nM

-
367.3 200.8
505 1 DL1+1 WL4 6 1.87 -39.25 21.48 2

350.2 109.3
506 1 DL1+1 WL5 8 19.32 0.30 3 -4.93

364.9
507 1 DL1+1 WL6 8 17.48 0.70 98.66 -3.40
di

-
246.9 106.2
508 1 DL1+1 WL7 6 -22.70 0.93 2 8.93
a te

-
261.3 116.8
509 1 DL1+1 WL8 6 -24.53 1.32 5 10.43

276.9 156.0
510 1 DL1+0.7 WL1 0 1.43 31.33 20.55 2
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
286.9 157.0
511 1 DL1+0.7 WL2 8 0.14 31.61 13.10 8

-
350.1 140.0

Ed
512 1 DL1+0.7 WL3 3 1.84 -27.30 21.56 9

-
359.9 138.1
513 1 DL1+0.7 WL4 1 0.55 -26.85 14.12 5

347.9
514 1 DL1+0.7 WL5 5 12.77 0.83 75.61 -1.02

F
358.2
515 1 DL1+0.7 WL6 4 11.48 1.11 68.15 0.04

PD
275.6
516 1 DL1+0.7 WL7 3 -16.64 1.27 -75.27 8.67

285.7
517 1 DL1+0.7 WL8 1 -17.93 1.54 -82.71 9.72

947.6 181.0
518 1 DL1+ 1LL1+0.75 WL1+1 EQUIP1 2 -5.71 36.55 -10.84 4
te r
958.4 182.1
519 1 DL1+1.0 LL1+0.75 WL2+1 EQUIP1 2 -7.09 36.85 -18.81 7

-
1026. 136.2
520 1 DL1+1.0 LL1+0.75 WL3+1 EQUIP1 08 -5.27 -26.27 -9.75 3
as

-
1036. 134.1
521 1 DL1+1.0 LL1+0.75 WL4+1 EQUIP1 56 -6.64 -25.79 -17.73 5

1023.
nM

522 1 DL1+1.0 LL1+0.75 WL5+1 EQUIP1 75 6.45 3.87 48.16 12.77

1034.
523 1 DL1+1.0 LL1+0.75 WL6+1 EQUIP1 77 5.06 4.17 40.16 13.92

-
946.2 113.5
524 1 DL1+1.0 LL1+0.75 WL7+1 EQUIP1 6 -25.07 4.34 0 23.16
di

-
957.0 121.4
525 1 DL1+1.0 LL1+0.75 WL8+1 EQUIP1 6 -26.45 4.63 7 24.29

1077. 285.2
a te

526 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL1 60 -10.86 -46.71 -41.12 1

1036.
527 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL2 43 -12.77 0.20 -50.56 48.73

111.7 216.1
528 0.6 DL1+1 WL1 6 4.12 43.05 31.89 9
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
126.1 217.7
529 0.6 DL1+1 WL2 6 2.29 43.44 21.26 0

-
216.3 206.8

Ed
530 0.6 DL1+1 WL3 8 4.71 -40.72 33.34 3

-
230.3 204.0
531 0.6 DL1+1 WL4 5 2.87 -40.07 22.71 6

213.2 110.5
532 0.6 DL1+1 WL5 7 20.33 -0.53 6 -8.16

F
227.9
533 0.6 DL1+1 WL6 7 18.49 -0.13 99.89 -6.64

PD
-
109.9 104.9
534 0.6 DL1+1 WL7 5 -21.69 0.10 9 5.69

-
124.3 115.6
535 0.6 DL1+1 WL8 5 -23.53 0.49 2 7.19

285.0 355.0
te r
536 0.6 DL1+0.7 SL1 8 -2.75 -67.96 -8.48 9

230.1
537 0.6 DL1+0.7 SL2 8 -5.30 -5.43 -21.07 39.78

1471.
as

1001 1.35 DL1+1.5 LL1+1.5 EQUIP1+0.9 TEMP1 39 -3.56 3.59 -4.41 15.50

-
1479. 103.0
1002 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 TEMP1 64 -25.49 11.38 7 49.67
nM

317.6 310.8
1003 1.35 DL1+1.5 WL1+0.9 TEMP1 5 16.02 61.61 95.78 4

339.2 313.1
1004 1.35 DL1+1.5 WL2+0.9 TEMP1 5 13.26 62.20 79.83 1

-
474.5 323.6
di

1005 1.35 DL1+1.5 WL3+0.9 TEMP1 7 16.90 -64.04 97.95 8

-
495.5 319.5
1006 1.35 DL1+1.5 WL4+0.9 TEMP1 4 14.14 -63.07 82.01 3
a te

469.9 213.7 -
1007 1.35 DL1+1.5 WL5+0.9 TEMP1 1 40.33 -3.76 8 25.69

491.9 197.7 -
1008 1.35 DL1+1.5 WL6+0.9 TEMP1 6 37.56 -3.16 8 23.40
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
314.9 109.5
1009 1.35 DL1+1.5 WL7+0.9 TEMP1 3 -22.70 -2.82 4 -4.91

Ed
336.5 125.4
1010 1.35 DL1+1.5 WL8+0.9 TEMP1 4 -25.46 -2.23 9 -2.66

325.9 345.0
1011 1.35 DL1+1.5 WL1+-0.9 TEMP1 1 -5.91 69.40 -2.87 1

347.5 347.2
1012 1.35 DL1+1.5 WL2+-0.9 TEMP1 0 -8.67 69.99 -18.82 7

F
-
482.8 289.5

PD
1013 1.35 DL1+1.5 WL3+-0.9 TEMP1 3 -5.03 -56.25 -0.70 2

-
503.7 285.3
1014 1.35 DL1+1.5 WL4+-0.9 TEMP1 9 -7.79 -55.29 -16.65 6

478.1 115.1
1015 1.35 DL1+1.5 WL5+-0.9 TEMP1 7 18.40 4.03 3 8.48

500.2
te r
1016 1.35 DL1+1.5 WL6+-0.9 TEMP1 2 15.63 4.63 99.13 10.77

-
323.1 208.1
1017 1.35 DL1+1.5 WL7+-0.9 TEMP1 9 -44.63 4.97 9 29.26
as

-
344.7 224.1
1018 1.35 DL1+1.5 WL8+-0.9 TEMP1 9 -47.39 5.56 4 31.51

477.1
nM

1019 1.35 DL1+0.9 TEMP1+1.35 MR1 2 7.21 -0.81 43.40 -4.80

485.3
1020 1.35 DL1+-0.9 TEMP1+1.35 MR1 8 -14.72 6.97 -55.25 29.37

1021 1.35 DL1+1.5LL1+1.5 EQUIP1+0.9 1490.


TEMP1+1.35 MR1 23 -3.91 3.88 -6.21 16.87

-
di

1022 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 1498. 104.8


TEMP1+1.35 MR1 49 -25.84 11.67 6 51.04

1023 1.148 DL1+1.5 LL1+1.5 EQUIP1+0.9 1421.


TEMP1+1.35 MR1 04 -3.41 3.46 -5.59 15.24
a te

-
1024 1.148 DL1+1.5 LL1+1.5 EQUIP1+-0.9 1429. 104.2
TEMP1+1.35 MR1 30 -25.34 11.25 4 49.41

1025 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+0.9 1405. 207.0


TEMP1+1.35 MR1 86 1.15 41.51 24.14 8
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1026 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+0.9 1418. 208.4
TEMP1+1.35 MR1 82 -0.50 41.86 14.57 3

-
1027 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+0.9 1500. 173.6

Ed
TEMP1+1.35 MR1 01 1.68 -33.88 25.45 4

-
1028 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+0.9 1512. 171.1
TEMP1+1.35 MR1 59 0.03 -33.30 15.88 5

1029 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+0.9 1497.


TEMP1+1.35 MR1 22 15.74 2.29 94.94 5.16

F
1030 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+0.9 1510.
TEMP1+1.35 MR1 44 14.08 2.65 85.34 6.53

PD
1031 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+0.9 1404.
TEMP1+1.35 MR1 23 -22.08 2.85 -99.05 17.63

-
1032 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+0.9 1417. 108.6
TEMP1+1.35 MR1 19 -23.73 3.21 2 18.98

1033 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+-0.9 1414. 241.2


te r
TEMP1+1.35 MR1 12 -20.78 49.30 -74.51 4

1034 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+-0.9 1427. 242.6


TEMP1+1.35 MR1 07 -22.43 49.65 -84.08 0

-
1035 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+-0.9 1508. 139.4
as

TEMP1+1.35 MR1 27 -20.25 -26.09 -73.21 7

-
1036 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+-0.9 1520. 136.9
TEMP1+1.35 MR1 85 -21.90 -25.52 -82.77 8
nM

1037 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+-0.9 1505.


TEMP1+1.35 MR1 47 -6.19 10.07 -3.71 39.33

1038 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+-0.9 1518.


TEMP1+1.35 MR1 70 -7.85 10.43 -13.31 40.70

-
1039 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+-0.9 1412. 197.7
di

TEMP1+1.35 MR1 48 -44.01 10.64 0 51.79

-
1040 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+-0.9 1425. 207.2
TEMP1+1.35 MR1 45 -45.66 10.99 7 53.14
a te

1041 1.148 DL1+1.5 LL1+0.9 WL1+1.5 1336. 205.4


EQUIP1+0.9 TEMP1+1.35 MR1 67 1.66 41.09 24.76 4

1042 1.148 DL1+1.5 LL1+0.9 WL2+1.5 1349. 206.8


EQUIP1+0.9 TEMP1+1.35 MR1 63 0.01 41.45 15.19 0
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
1043 1.148 DL1+1.5 LL1+0.9 WL3+1.5 1430. 175.2
EQUIP1+0.9 TEMP1+1.35 MR1 82 2.19 -34.30 26.06 7

Ed
1044 1.148 DL1+1.5 LL1+0.9 WL4+1.5 1443. 172.7
EQUIP1+0.9 TEMP1+1.35 MR1 40 0.54 -33.72 16.50 8

1045 1.148 DL1+1.5 LL1+0.9 WL5+1.5 1428.


EQUIP1+0.9 TEMP1+1.35 MR1 03 16.25 1.87 95.56 3.53

1046 1.148 DL1+1.5 LL1+0.9 WL6+1.5 1441.


EQUIP1+0.9 TEMP1+1.35 MR1 25 14.59 2.23 85.96 4.90

F
1047 1.148 DL1+1.5 LL1+0.9 WL7+1.5 1335.
EQUIP1+0.9 TEMP1+1.35 MR1 04 -21.57 2.44 -98.43 15.99

PD
-
1048 1.148 DL1+1.5 LL1+0.9 WL8+1.5 1348. 108.0
EQUIP1+0.9 TEMP1+1.35 MR1 00 -23.22 2.79 0 17.34

1049 1.148 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+- 1344. 239.6


0.9 TEMP1+1.35 MR1 93 -20.27 48.88 -73.89 1

1050 1.148 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+- 1357. 240.9


te r
0.9 TEMP1+1.35 MR1 88 -21.92 49.23 -83.46 7

-
1051 1.148 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+- 1439. 141.1
0.9 TEMP1+1.35 MR1 08 -19.74 -26.51 -72.59 0

-
as

1052 1.148 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+- 1451. 138.6


0.9 TEMP1+1.35 MR1 66 -21.39 -25.93 -82.16 1

1053 1.148 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+- 1436.


0.9 TEMP1+1.35 MR1 28 -5.68 9.66 -3.09 37.69
nM

1054 1.148 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+- 1449.


0.9 TEMP1+1.35 MR1 51 -7.34 10.02 -12.69 39.07

-
1055 1.148 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+- 1343. 197.0
0.9 TEMP1+1.35 MR1 29 -43.50 10.22 8 50.16

-
di

1056 1.148 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+- 1356. 206.6


0.9 TEMP1+1.35 MR1 26 -45.15 10.57 5 51.51

1057 1.148 DL1+1.5 LL1+1.5 WL1+1.5 1280. 332.2


EQUIP1+0.9 TEMP1+1.35 MR1 42 5.04 66.18 44.99 5
a te

1058 1.148 DL1+1.5 LL1+1.5 WL2+1.5 1302. 334.5


EQUIP1+0.9 TEMP1+1.35 MR1 01 2.29 66.77 29.05 1

-
1059 1.148 DL1+1.5 LL1+1.5 WL3+1.5 1437. 302.2
EQUIP1+0.9 TEMP1+1.35 MR1 34 5.92 -59.47 47.17 8
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
1060 1.148 DL1+1.5 LL1+1.5 WL4+1.5 1458. 298.1
EQUIP1+0.9 TEMP1+1.35 MR1 30 3.17 -58.51 31.22 2

1061 1.148 DL1+1.5 LL1+1.5 WL5+1.5 1432. 163.0

Ed
EQUIP1+0.9 TEMP1+1.35 MR1 68 29.35 0.81 0 -4.28

1062 1.148 DL1+1.5 LL1+1.5 WL6+1.5 1454. 146.9


EQUIP1+0.9 TEMP1+1.35 MR1 73 26.59 1.41 9 -2.00

-
1063 1.148 DL1+1.5 LL1+1.5 WL7+1.5 1277. 160.3
EQUIP1+0.9 TEMP1+1.35 MR1 70 -33.68 1.75 2 16.50

F
-
1064 1.148 DL1+1.5 LL1+1.5 WL8+1.5 1299. 176.2

PD
EQUIP1+0.9 TEMP1+1.35 MR1 31 -36.43 2.34 7 18.75

1065 1.148 DL1+1.5 LL1+1.5 WL1+1.5 EQUIP1+- 1288. 366.4


0.9 TEMP1+1.35 MR1 68 -16.89 73.96 -53.66 1

1066 1.148 DL1+1.5 LL1+1.5 WL2+1.5 EQUIP1+- 1310. 368.6


0.9 TEMP1+1.35 MR1 27 -19.65 74.55 -69.61 8

-
1067 1.148 DL1+1.5 LL1+1.5 WL3+1.5 EQUIP1+- 1445. 268.1
te r
0.9 TEMP1+1.35 MR1 60 -16.01 -51.68 -51.49 1

-
1068 1.148 DL1+1.5 LL1+1.5 WL4+1.5 EQUIP1+- 1466. 263.9
0.9 TEMP1+1.35 MR1 56 -18.76 -50.72 -67.43 6
as

1069 1.148 DL1+1.5 LL1+1.5 WL5+1.5 EQUIP1+- 1440.


0.9 TEMP1+1.35 MR1 94 7.42 8.59 64.35 29.89

1070 1.148 DL1+1.5 LL1+1.5 WL6+1.5 EQUIP1+- 1462.


0.9 TEMP1+1.35 MR1 99 4.66 9.19 48.34 32.17
nM

-
1071 1.148 DL1+1.5 LL1+1.5 WL7+1.5 EQUIP1+- 1285. 258.9
0.9 TEMP1+1.35 MR1 95 -55.61 9.54 7 50.66

-
1072 1.148 DL1+1.5 LL1+1.5 WL8+1.5 EQUIP1+- 1307. 274.9
0.9 TEMP1+1.35 MR1 56 -58.36 10.13 2 52.91
di

993.0 519.0
1073 1 DL1+0.8 LL1+1 SL1 0 -5.20 -94.50 -16.47 4

914.5
1074 1 DL1+0.8 LL1+1 SL2 7 -8.85 -5.16 -34.45 68.60
a te

-
765.6 481.6
1075 1 DL1+0.8 LL1+-1 SL1 7 -1.67 103.22 2.52 4

844.0 -
1076 1 DL1+0.8 LL1+-1 SL2 9 1.98 13.88 20.51 31.20
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
2001 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+0.6 972.8 138.9
TEMP1+1 MR1 9 0.49 27.90 15.66 6

2002 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+0.6 981.5 139.8


TEMP1+1 MR1 2 -0.61 28.14 9.28 7

Ed
-
2003 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+0.6 1035. 114.8
TEMP1+1 MR1 66 0.84 -22.36 16.52 5

-
2004 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+0.6 1044. 113.1
TEMP1+1 MR1 04 -0.26 -21.97 10.15 9

F
2005 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+0.6 1033.
TEMP1+1 MR1 79 10.22 1.75 62.86 4.35

PD
2006 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+0.6 1042.
TEMP1+1 MR1 61 9.11 1.99 56.46 5.26

2007 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+0.6 971.8


TEMP1+1 MR1 0 -15.00 2.13 -66.47 12.66

2008 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+0.6 980.4


TEMP1+1 MR1 4 -16.10 2.37 -72.85 13.56
te r
2009 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+-0.6 978.3 161.7
TEMP1+1 MR1 9 -14.13 33.09 -50.11 4

2010 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+-0.6 987.0 162.6


TEMP1+1 MR1 3 -15.23 33.33 -56.49 5
as

2011 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+-0.6 1041. -


TEMP1+1 MR1 16 -13.78 -17.17 -49.24 92.07

2012 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+-0.6 1049. -


TEMP1+1 MR1 55 -14.88 -16.78 -55.62 90.41
nM

2013 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+-0.6 1039.


TEMP1+1 MR1 30 -4.40 6.94 -2.91 27.13

2014 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+-0.6 1048.


TEMP1+1 MR1 12 -5.51 7.18 -9.31 28.04

-
2015 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+-0.6 977.3 132.2
TEMP1+1 MR1 0 -29.62 7.32 4 35.44
di

-
2016 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+-0.6 985.9 138.6
TEMP1+1 MR1 5 -30.72 7.56 2 36.34
a te

2017 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+0.6 935.3 223.5


TEMP1+1 MR1 9 2.74 44.63 29.15 0

2018 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+0.6 949.7 225.0


TEMP1+1 MR1 8 0.91 45.02 18.51 1
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
2019 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+0.6 1040. 199.5
TEMP1+1 MR1 00 3.33 -39.14 30.59 2

Ed
2020 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+0.6 1053. 196.7
TEMP1+1 MR1 98 1.50 -38.50 19.96 5

2021 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+0.6 1036. 107.8


TEMP1+1 MR1 89 18.95 1.04 1 -0.86

2022 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+0.6 1051.


TEMP1+1 MR1 59 17.11 1.45 97.14 0.67

F
-
2023 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+0.6 933.5 107.7

PD
TEMP1+1 MR1 7 -23.07 1.67 3 13.00

-
2024 1 DL1+1.0 LL1+1 WL8+1 EQUIP1+0.6 947.9 118.3
TEMP1+1 MR1 8 -24.91 2.07 7 14.50

2025 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+-0.6 940.8 246.2


TEMP1+1 MR1 9 -11.88 49.82 -36.62 8

2026 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+-0.6 955.2 247.7


te r
TEMP1+1 MR1 9 -13.71 50.21 -47.25 8

-
2027 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+-0.6 1045. 176.7
TEMP1+1 MR1 51 -11.29 -33.95 -35.18 4
as

-
2028 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+-0.6 1059. 173.9
TEMP1+1 MR1 48 -13.12 -33.31 -45.81 7

2029 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+-0.6 1042.


nM

TEMP1+1 MR1 40 4.33 6.24 42.05 21.92

2030 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+-0.6 1057.


TEMP1+1 MR1 10 2.49 6.64 31.38 23.45

-
2031 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+-0.6 939.0 173.5
TEMP1+1 MR1 8 -37.69 6.86 0 35.78
di

-
2032 1 DL1+0.7 LL1+1 WL8+1 EQUIP1+-0.6 953.4 184.1
TEMP1+1 MR1 8 -39.53 7.26 3 37.28

993.0 519.0
2033 1 DL1+0.8 LL1+1 SL1 0 -5.20 -94.50 -16.47 4
a te

914.5
2034 1 DL1+0.8 LL1+1 SL2 7 -8.85 -5.16 -34.45 68.60

-
765.6 481.6
2035 1 DL1+0.8 LL1+-1 SL1 7 -1.67 103.22 2.52 4
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
844.0 -
2036 1 DL1+0.8 LL1+-1 SL2 9 1.98 13.88 20.51 31.20

1015. -
P16 500 1 DL1+1 LL1+1 EQUIP1 56 -9.56 1.10 -40.66 13.09

Ed
1011.
501 1 DL1+1 LL1+1 EQUIP1+1 TEMP1 11 -22.56 5.98 -99.84 8.86

280.4 183.8
502 1 DL1+1 WL1 0 -6.79 41.74 -40.07 8

293.6 181.8

F
503 1 DL1+1 WL2 9 -5.07 41.30 -30.00 4

-
341.2 196.4

PD
504 1 DL1+1 WL3 3 -5.26 -38.82 -31.44 9

-
354.3 197.4
505 1 DL1+1 WL4 9 -3.54 -39.02 -21.40 2

254.2
506 1 DL1+1 WL5 4 18.67 5.73 94.15 11.94
te r
267.2 104.2
507 1 DL1+1 WL6 0 20.39 5.30 0 9.97

-
360.7 109.5
508 1 DL1+1 WL7 2 -21.18 1.10 9 -5.63
as

374.0
509 1 DL1+1 WL8 0 -19.46 0.67 -99.52 -7.67

301.2 127.4
510 1 DL1+0.7 WL1 1 -4.90 29.77 -29.04 3
nM

310.5 126.0
511 1 DL1+0.7 WL2 1 -3.69 29.46 -22.00 0

-
343.7 138.8
512 1 DL1+0.7 WL3 9 -3.83 -26.62 -23.01 3

-
di

353.0 139.4
513 1 DL1+0.7 WL4 0 -2.63 -26.76 -15.97 8

282.8
514 1 DL1+0.7 WL5 9 12.92 4.56 64.91 7.08
a te

291.9
515 1 DL1+0.7 WL6 7 14.13 4.27 71.94 5.69

357.4
516 1 DL1+0.7 WL7 3 -14.97 1.33 -77.71 -5.23
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
366.7
517 1 DL1+0.7 WL8 3 -13.77 1.02 -70.66 -6.65

963.5 128.0
518 1 DL1+ 1LL1+0.75 WL1+1 EQUIP1 4 -14.29 31.02 -68.21 4

Ed
973.5 126.5
519 1 DL1+1.0 LL1+0.75 WL2+1 EQUIP1 1 -13.00 30.69 -60.66 1

-
1009. 157.2
520 1 DL1+1.0 LL1+0.75 WL3+1 EQUIP1 17 -13.14 -29.40 -61.75 4

F
-
1019. 157.9
521 1 DL1+1.0 LL1+0.75 WL4+1 EQUIP1 03 -11.85 -29.55 -54.21 3

PD
943.9
522 1 DL1+1.0 LL1+0.75 WL5+1 EQUIP1 2 4.81 4.01 32.45 -0.92

953.6
523 1 DL1+1.0 LL1+0.75 WL6+1 EQUIP1 4 6.09 3.70 39.98 -2.40

-
1023. 120.3 -
te r
524 1 DL1+1.0 LL1+0.75 WL7+1 EQUIP1 78 -25.08 0.55 5 14.09

-
1033. 112.8 -
525 1 DL1+1.0 LL1+0.75 WL8+1 EQUIP1 74 -23.79 0.22 0 15.62

1057. 212.6
as

526 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL1 73 -11.20 -46.60 -49.31 4

1026.
527 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL2 41 -12.29 -3.17 -54.40 7.47

140.5 185.5
nM

528 0.6 DL1+1 WL1 0 -6.60 41.00 -38.74 9

153.7 183.5
529 0.6 DL1+1 WL2 9 -4.87 40.56 -28.67 5

-
201.3 194.7
530 0.6 DL1+1 WL3 3 -5.07 -39.56 -30.11 8
di

-
214.4 195.7
531 0.6 DL1+1 WL4 8 -3.35 -39.76 -20.07 0

114.3
a te

532 0.6 DL1+1 WL5 3 18.87 4.99 95.48 13.66

127.3 105.5
533 0.6 DL1+1 WL6 0 20.59 4.57 3 11.68

-
220.8 108.2
534 0.6 DL1+1 WL7 2 -20.98 0.37 6 -3.92
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
234.1
535 0.6 DL1+1 WL8 0 -19.26 -0.07 -98.19 -5.95

266.0 298.4
536 0.6 DL1+0.7 SL1 8 -2.47 -62.50 -13.53 0

Ed
224.3
537 0.6 DL1+0.7 SL2 2 -3.93 -4.59 -20.31 24.84

-
1466. 113.7
1001 1.35 DL1+1.5 LL1+1.5 EQUIP1+0.9 TEMP1 87 -25.97 5.76 5 0.76

F
1474. -
1002 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 TEMP1 88 -2.57 -3.01 -7.23 38.74

PD
364.1 112.8 296.2
1003 1.35 DL1+1.5 WL1+0.9 TEMP1 3 -21.81 66.71 6 1

384.0 293.1
1004 1.35 DL1+1.5 WL2+0.9 TEMP1 7 -19.23 66.06 -97.76 5

-
455.3 274.3
te r
1005 1.35 DL1+1.5 WL3+0.9 TEMP1 8 -19.52 -54.12 -99.93 5

-
475.1 275.7
1006 1.35 DL1+1.5 WL4+0.9 TEMP1 2 -16.94 -54.43 -84.86 3

324.8
as

1007 1.35 DL1+1.5 WL5+0.9 TEMP1 9 16.38 12.70 88.46 38.31

344.3 103.5
1008 1.35 DL1+1.5 WL6+0.9 TEMP1 4 18.96 12.06 3 35.34

-
nM

484.6 217.1
1009 1.35 DL1+1.5 WL7+0.9 TEMP1 1 -43.39 5.76 4 11.95

-
504.5 202.0
1010 1.35 DL1+1.5 WL8+0.9 TEMP1 4 -40.81 5.11 4 8.89

372.1 256.7
di

1011 1.35 DL1+1.5 WL1+-0.9 TEMP1 4 1.58 57.94 -6.34 1

392.0 253.6
1012 1.35 DL1+1.5 WL2+-0.9 TEMP1 7 4.17 57.29 8.77 5

-
a te

463.3 313.8
1013 1.35 DL1+1.5 WL3+-0.9 TEMP1 9 3.88 -62.89 6.60 5

-
483.1 315.2
1014 1.35 DL1+1.5 WL4+-0.9 TEMP1 2 6.46 -63.20 21.67 3
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
332.9 194.9
1015 1.35 DL1+1.5 WL5+-0.9 TEMP1 0 39.78 3.93 8 -1.19

352.3 210.0
1016 1.35 DL1+1.5 WL6+-0.9 TEMP1 4 42.36 3.29 6 -4.16

Ed
-
492.6 110.6 -
1017 1.35 DL1+1.5 WL7+-0.9 TEMP1 2 -20.00 -3.01 2 27.55

512.5 -
1018 1.35 DL1+1.5 WL8+-0.9 TEMP1 4 -17.41 -3.66 -95.51 30.61

F
479.4
1019 1.35 DL1+0.9 TEMP1+1.35 MR1 3 -12.41 6.57 -57.93 12.56

487.4 -

PD
1020 1.35 DL1+-0.9 TEMP1+1.35 MR1 4 10.99 -2.20 48.60 26.94

-
1021 1.35 DL1+1.5LL1+1.5 EQUIP1+0.9 1478. 113.9
TEMP1+1.35 MR1 13 -26.02 5.46 3 -0.65

1022 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 1486. -


TEMP1+1.35 MR1 14 -2.63 -3.31 -7.40 40.14
te r
-
1023 1.148 DL1+1.5 LL1+1.5 EQUIP1+0.9 1407. 113.2
TEMP1+1.35 MR1 48 -25.92 5.09 6 0.22

1024 1.148 DL1+1.5 LL1+1.5 EQUIP1+-0.9 1415. -


TEMP1+1.35 MR1 49 -2.53 -3.68 -6.73 39.28
as

-
1025 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+0.9 1415. 147.0 168.7
TEMP1+1.35 MR1 71 -31.70 41.36 0 0

-
nM

1026 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+0.9 1427. 137.9 166.8


TEMP1+1.35 MR1 67 -30.15 40.97 4 7

- -
1027 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+0.9 1470. 139.2 173.6
TEMP1+1.35 MR1 46 -30.32 -31.14 4 3

- -
di

1028 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+0.9 1482. 130.1 174.4


TEMP1+1.35 MR1 30 -28.77 -31.32 9 6

1029 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+0.9 1392.


TEMP1+1.35 MR1 16 -8.78 8.95 -26.20 13.96
a te

1030 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+0.9 1403.


TEMP1+1.35 MR1 83 -7.23 8.57 -17.16 12.18

-
1031 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+0.9 1488. 209.5
TEMP1+1.35 MR1 00 -44.64 4.79 6 -1.86
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
1032 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+0.9 1499. 200.5
TEMP1+1.35 MR1 95 -43.09 4.40 0 -3.69

1033 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+-0.9 1423. 129.2

Ed
TEMP1+1.35 MR1 71 -8.30 32.59 -40.47 0

1034 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+-0.9 1435. 127.3


TEMP1+1.35 MR1 68 -6.75 32.20 -31.41 7

-
1035 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+-0.9 1478. 213.1
TEMP1+1.35 MR1 47 -6.92 -39.91 -32.71 3

F
-
1036 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+-0.9 1490. 213.9

PD
TEMP1+1.35 MR1 30 -5.37 -40.09 -23.67 6

1037 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+-0.9 1400. -


TEMP1+1.35 MR1 17 14.62 0.18 80.32 25.54

1038 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+-0.9 1411. -


TEMP1+1.35 MR1 84 16.17 -0.20 89.37 27.32

-
1039 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+-0.9 1496. 103.0 -
te r
TEMP1+1.35 MR1 00 -21.25 -3.98 4 41.35

1040 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+-0.9 1507. -


TEMP1+1.35 MR1 96 -19.70 -4.37 -93.98 43.19

-
as

1041 1.148 DL1+1.5 LL1+0.9 WL1+1.5 1345. 146.3 169.5


EQUIP1+0.9 TEMP1+1.35 MR1 06 -31.60 40.99 3 7

-
1042 1.148 DL1+1.5 LL1+0.9 WL2+1.5 1357. 137.2 167.7
nM

EQUIP1+0.9 TEMP1+1.35 MR1 02 -30.05 40.60 6 3

- -
1043 1.148 DL1+1.5 LL1+0.9 WL3+1.5 1399. 138.5 172.7
EQUIP1+0.9 TEMP1+1.35 MR1 81 -30.22 -31.51 6 7

- -
1044 1.148 DL1+1.5 LL1+0.9 WL4+1.5 1411. 129.5 173.6
EQUIP1+0.9 TEMP1+1.35 MR1 65 -28.67 -31.69 2 0
di

1045 1.148 DL1+1.5 LL1+0.9 WL5+1.5 1321.


EQUIP1+0.9 TEMP1+1.35 MR1 51 -8.68 8.58 -25.53 14.83

1046 1.148 DL1+1.5 LL1+0.9 WL6+1.5 1333.


EQUIP1+0.9 TEMP1+1.35 MR1 18 -7.14 8.20 -16.49 13.05
a te

-
1047 1.148 DL1+1.5 LL1+0.9 WL7+1.5 1417. 208.8
EQUIP1+0.9 TEMP1+1.35 MR1 35 -44.55 4.42 9 -0.99

-
1048 1.148 DL1+1.5 LL1+0.9 WL8+1.5 1429. 199.8
re

EQUIP1+0.9 TEMP1+1.35 MR1 30 -42.99 4.03 3 -2.83


APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1049 1.148 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+- 1353. 130.0
0.9 TEMP1+1.35 MR1 06 -8.20 32.22 -39.80 7

1050 1.148 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+- 1365. 128.2


0.9 TEMP1+1.35 MR1 03 -6.65 31.83 -30.74 3

Ed
-
1051 1.148 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+- 1407. 212.2
0.9 TEMP1+1.35 MR1 81 -6.82 -40.28 -32.04 6

-
1052 1.148 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+- 1419. 213.1
0.9 TEMP1+1.35 MR1 65 -5.27 -40.46 -23.00 0

F
1053 1.148 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+- 1329. -
0.9 TEMP1+1.35 MR1 52 14.72 -0.19 80.99 24.67

PD
1054 1.148 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+- 1341. -
0.9 TEMP1+1.35 MR1 19 16.26 -0.57 90.04 26.45

-
1055 1.148 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+- 1425. 102.3 -
0.9 TEMP1+1.35 MR1 35 -21.15 -4.35 7 40.49

1056 1.148 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+- 1437. -


te r
0.9 TEMP1+1.35 MR1 31 -19.60 -4.74 -93.31 42.32

-
1057 1.148 DL1+1.5 LL1+1.5 WL1+1.5 1303. 168.3 282.4
EQUIP1+0.9 TEMP1+1.35 MR1 44 -35.38 64.92 7 6

-
as

1058 1.148 DL1+1.5 LL1+1.5 WL2+1.5 1323. 153.2 279.4


EQUIP1+0.9 TEMP1+1.35 MR1 38 -32.80 64.27 7 1

- -
1059 1.148 DL1+1.5 LL1+1.5 WL3+1.5 1394. 155.4 288.0
nM

EQUIP1+0.9 TEMP1+1.35 MR1 69 -33.08 -55.91 4 9

- -
1060 1.148 DL1+1.5 LL1+1.5 WL4+1.5 1414. 140.3 289.4
EQUIP1+0.9 TEMP1+1.35 MR1 43 -30.50 -56.21 7 8

1061 1.148 DL1+1.5 LL1+1.5 WL5+1.5 1264.


EQUIP1+0.9 TEMP1+1.35 MR1 20 2.81 10.91 32.95 24.56
di

1062 1.148 DL1+1.5 LL1+1.5 WL6+1.5 1283.


EQUIP1+0.9 TEMP1+1.35 MR1 65 5.39 10.27 48.02 21.60

-
1063 1.148 DL1+1.5 LL1+1.5 WL7+1.5 1423. 272.6
EQUIP1+0.9 TEMP1+1.35 MR1 92 -56.96 3.98 5 -1.80
a te

-
1064 1.148 DL1+1.5 LL1+1.5 WL8+1.5 1443. 257.5
EQUIP1+0.9 TEMP1+1.35 MR1 85 -54.37 3.32 5 -4.85

1065 1.148 DL1+1.5 LL1+1.5 WL1+1.5 EQUIP1+- 1311. 242.9


0.9 TEMP1+1.35 MR1 45 -11.98 56.15 -61.84 6
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1066 1.148 DL1+1.5 LL1+1.5 WL2+1.5 EQUIP1+- 1331. 239.9
0.9 TEMP1+1.35 MR1 38 -9.40 55.50 -46.74 1

-
1067 1.148 DL1+1.5 LL1+1.5 WL3+1.5 EQUIP1+- 1402. 327.5

Ed
0.9 TEMP1+1.35 MR1 70 -9.69 -64.68 -48.91 9

-
1068 1.148 DL1+1.5 LL1+1.5 WL4+1.5 EQUIP1+- 1422. 328.9
0.9 TEMP1+1.35 MR1 43 -7.11 -64.98 -33.84 7

1069 1.148 DL1+1.5 LL1+1.5 WL5+1.5 EQUIP1+- 1272. 139.4 -


0.9 TEMP1+1.35 MR1 21 26.21 2.14 8 14.93

F
1070 1.148 DL1+1.5 LL1+1.5 WL6+1.5 EQUIP1+- 1291. 154.5 -
0.9 TEMP1+1.35 MR1 65 28.79 1.50 5 17.90

PD
-
1071 1.148 DL1+1.5 LL1+1.5 WL7+1.5 EQUIP1+- 1431. 166.1 -
0.9 TEMP1+1.35 MR1 93 -33.56 -4.79 2 41.29

-
1072 1.148 DL1+1.5 LL1+1.5 WL8+1.5 EQUIP1+- 1451. 151.0 -
0.9 TEMP1+1.35 MR1 85 -30.98 -5.45 2 44.35

960.3 419.5
te r
1073 1 DL1+0.8 LL1+1 SL1 2 -4.32 -89.41 -20.30 8

900.6
1074 1 DL1+0.8 LL1+1 SL2 6 -6.41 -6.69 -29.99 28.78

-
as

799.6 440.3
1075 1 DL1+0.8 LL1+-1 SL1 9 1.90 92.31 12.65 3

859.3 -
1076 1 DL1+0.8 LL1+-1 SL2 4 3.98 9.59 22.35 49.53
nM

2001 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+0.6 979.6 111.9


TEMP1+1 MR1 2 -21.18 27.74 -98.34 3

2002 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+0.6 987.5 110.7


TEMP1+1 MR1 9 -20.15 27.47 -92.30 1

-
2003 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+0.6 1016. 116.2
di

TEMP1+1 MR1 12 -20.27 -20.60 -93.17 9

-
2004 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+0.6 1024. 116.8
TEMP1+1 MR1 01 -19.23 -20.72 -87.14 4
a te

2005 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+0.6 963.9


TEMP1+1 MR1 2 -5.91 6.13 -17.82 8.77

2006 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+0.6 971.7


TEMP1+1 MR1 0 -4.88 5.88 -11.79 7.59
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
2007 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+0.6 1027. 140.0
TEMP1+1 MR1 81 -29.82 3.36 5 -1.77

Ed
2008 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+0.6 1035. 134.0
TEMP1+1 MR1 78 -28.78 3.10 1 -2.99

2009 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+-0.6 984.9


TEMP1+1 MR1 5 -5.59 21.89 -27.33 85.60

2010 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+-0.6 992.9


TEMP1+1 MR1 3 -4.55 21.63 -21.29 84.38

F
-
2011 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+-0.6 1021. 142.6

PD
TEMP1+1 MR1 45 -4.67 -26.44 -22.15 2

-
2012 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+-0.6 1029. 143.1
TEMP1+1 MR1 35 -3.63 -26.57 -16.12 7

2013 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+-0.6 969.2 -


TEMP1+1 MR1 6 9.69 0.28 53.20 17.56

2014 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+-0.6 977.0 -


te r
TEMP1+1 MR1 4 10.72 0.03 59.23 18.74

2015 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+-0.6 1033. -


TEMP1+1 MR1 15 -14.22 -2.49 -69.04 28.10

2016 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+-0.6 1041. -


as

TEMP1+1 MR1 12 -13.18 -2.75 -63.00 29.33

-
2017 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+0.6 951.8 113.0 187.2
TEMP1+1 MR1 7 -23.71 43.69 4 0
nM

-
2018 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+0.6 965.1 102.9 185.1
TEMP1+1 MR1 6 -21.98 43.26 7 6

- -
2019 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+0.6 1012. 104.4 193.1
TEMP1+1 MR1 71 -22.17 -36.86 2 7
di

-
2020 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+0.6 1025. 194.0
TEMP1+1 MR1 86 -20.45 -37.07 -94.37 9

2021 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+0.6 925.7


TEMP1+1 MR1 1 1.76 7.68 21.17 15.27
a te

2022 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+0.6 938.6


TEMP1+1 MR1 8 3.48 7.26 31.22 13.29

-
2023 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+0.6 1032. 182.5
TEMP1+1 MR1 19 -38.09 3.06 6 -2.31
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
2024 1 DL1+1.0 LL1+1 WL8+1 EQUIP1+0.6 1045. 172.4
TEMP1+1 MR1 48 -36.37 2.62 9 -4.35

2025 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+-0.6 957.2 160.8

Ed
TEMP1+1 MR1 1 -8.11 37.85 -42.02 7

2026 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+-0.6 970.5 158.8


TEMP1+1 MR1 0 -6.38 37.41 -31.95 3

-
2027 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+-0.6 1018. 219.5
TEMP1+1 MR1 04 -6.58 -42.71 -33.40 0

F
-
2028 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+-0.6 1031. 220.4

PD
TEMP1+1 MR1 20 -4.86 -42.91 -23.35 3

2029 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+-0.6 931.0 -


TEMP1+1 MR1 5 17.36 1.84 92.19 11.07

2030 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+-0.6 944.0 102.2 -


TEMP1+1 MR1 1 19.08 1.41 4 13.04

-
2031 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+-0.6 1037. 111.5 -
te r
TEMP1+1 MR1 53 -22.49 -2.79 4 28.64

-
2032 1 DL1+0.7 LL1+1 WL8+1 EQUIP1+-0.6 1050. 101.4 -
TEMP1+1 MR1 81 -20.77 -3.22 7 30.68
as

960.3 419.5
2033 1 DL1+0.8 LL1+1 SL1 2 -4.32 -89.41 -20.30 8

900.6
2034 1 DL1+0.8 LL1+1 SL2 6 -6.41 -6.69 -29.99 28.78
nM

-
799.6 440.3
2035 1 DL1+0.8 LL1+-1 SL1 9 1.90 92.31 12.65 3

859.3 -
2036 1 DL1+0.8 LL1+-1 SL2 4 3.98 9.59 22.35 49.53

237.1
di

P17 500 1 DL1+1 LL1+1 EQUIP1 0 -0.98 15.38 -16.71 14.90

235.6
501 1 DL1+1 LL1+1 EQUIP1+1 TEMP1 9 -1.49 18.31 -17.83 26.76

502 1 DL1+1 WL1 75.97 1.72 29.28 -0.64 97.47


a te

503 1 DL1+1 WL2 79.52 1.79 29.19 -0.44 96.39

166.0 -
504 1 DL1+1 WL3 2 2.85 -9.90 2.64 76.17

169.4 -
505 1 DL1+1 WL4 7 2.92 -9.96 2.83 77.07
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
108.0
506 1 DL1+1 WL5 1 10.88 8.22 37.81 7.52

111.5
507 1 DL1+1 WL6 6 10.94 8.11 38.00 6.42

Ed
112.0
508 1 DL1+1 WL7 6 -6.24 11.71 -35.60 20.39

115.6
509 1 DL1+1 WL8 1 -6.17 11.62 -35.40 19.30

510 1 DL1+0.7 WL1 89.48 1.93 23.40 -0.03 71.42

F
511 1 DL1+0.7 WL2 91.96 1.97 23.33 0.11 70.66

152.5 -

PD
512 1 DL1+0.7 WL3 1 2.72 -4.03 2.26 50.13

154.9 -
513 1 DL1+0.7 WL4 2 2.76 -4.07 2.40 50.76

111.9
514 1 DL1+0.7 WL5 0 8.34 8.66 26.88 8.46

114.3
te r
515 1 DL1+0.7 WL6 9 8.38 8.59 27.02 7.68

114.7
516 1 DL1+0.7 WL7 4 -3.64 11.10 -24.51 17.46

117.2
as

517 1 DL1+0.7 WL8 2 -3.60 11.04 -24.36 16.70

203.3
518 1 DL1+ 1LL1+0.75 WL1+1 EQUIP1 4 -1.50 30.08 -18.22 80.03

206.0
nM

519 1 DL1+1.0 LL1+0.75 WL2+1 EQUIP1 0 -1.45 30.01 -18.07 79.22

270.8 -
520 1 DL1+1.0 LL1+0.75 WL3+1 EQUIP1 8 -0.65 0.70 -15.76 50.20

273.4 -
521 1 DL1+1.0 LL1+0.75 WL4+1 EQUIP1 6 -0.61 0.65 -15.62 50.88

227.3
di

522 1 DL1+1.0 LL1+0.75 WL5+1 EQUIP1 7 5.37 14.29 10.61 12.57

230.0
523 1 DL1+1.0 LL1+0.75 WL6+1 EQUIP1 3 5.41 14.21 10.76 11.74

230.4
a te

524 1 DL1+1.0 LL1+0.75 WL7+1 EQUIP1 0 -7.47 16.91 -44.44 22.22

233.0
525 1 DL1+1.0 LL1+0.75 WL8+1 EQUIP1 7 -7.42 16.84 -44.29 21.40

266.1
526 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL1 0 -1.86 3.38 -19.94 68.15
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
239.2
527 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL2 2 -2.18 14.17 -21.80 20.08

528 0.6 DL1+1 WL1 27.58 0.76 25.41 -1.19 93.21

Ed
529 0.6 DL1+1 WL2 31.13 0.82 25.31 -0.99 92.14

117.6 -
530 0.6 DL1+1 WL3 3 1.89 -13.78 2.09 80.43

121.0 -
531 0.6 DL1+1 WL4 8 1.95 -13.83 2.28 81.33

532 0.6 DL1+1 WL5 59.62 9.91 4.34 37.26 3.27

F
533 0.6 DL1+1 WL6 63.17 9.98 4.24 37.45 2.16

PD
534 0.6 DL1+1 WL7 63.67 -7.20 7.84 -36.15 16.14

535 0.6 DL1+1 WL8 67.22 -7.14 7.74 -35.95 15.05

111.2
536 0.6 DL1+0.7 SL1 6 0.28 -10.20 -3.48 77.38

537 0.6 DL1+0.7 SL2 75.43 -0.15 4.20 -5.96 13.29

336.2
te r
1001 1.35 DL1+1.5 LL1+1.5 EQUIP1+0.9 TEMP1 3 -2.29 24.26 -26.28 31.43

338.7
1002 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 TEMP1 6 -1.38 18.99 -24.26 10.09

155.2
as

1003 1.35 DL1+1.5 WL1+0.9 TEMP1 94.55 1.77 45.10 -2.18 8

153.6
1004 1.35 DL1+1.5 WL2+0.9 TEMP1 99.86 1.86 44.96 -1.87 6

-
nM

229.6 105.1
1005 1.35 DL1+1.5 WL3+0.9 TEMP1 2 3.46 -13.67 2.74 8

-
234.7 106.5
1006 1.35 DL1+1.5 WL4+0.9 TEMP1 9 3.56 -13.75 3.04 3

142.6
1007 1.35 DL1+1.5 WL5+0.9 TEMP1 0 15.50 13.51 55.50 20.36
di

147.9
1008 1.35 DL1+1.5 WL6+0.9 TEMP1 3 15.59 13.36 55.79 18.70

148.6
a te

1009 1.35 DL1+1.5 WL7+0.9 TEMP1 8 -10.17 18.75 -54.62 39.66

154.0
1010 1.35 DL1+1.5 WL8+0.9 TEMP1 0 -10.08 18.61 -54.31 38.03

133.9
1011 1.35 DL1+1.5 WL1+-0.9 TEMP1 97.08 2.68 39.83 -0.16 3
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
102.4 132.3
1012 1.35 DL1+1.5 WL2+-0.9 TEMP1 0 2.77 39.69 0.15 2

-
232.1 126.5

Ed
1013 1.35 DL1+1.5 WL3+-0.9 TEMP1 5 4.37 -18.94 4.76 3

-
237.3 127.8
1014 1.35 DL1+1.5 WL4+-0.9 TEMP1 2 4.47 -19.03 5.05 8

145.1
1015 1.35 DL1+1.5 WL5+-0.9 TEMP1 3 16.41 8.24 57.51 -0.99

F
150.4
1016 1.35 DL1+1.5 WL6+-0.9 TEMP1 6 16.50 8.08 57.80 -2.65

PD
151.2
1017 1.35 DL1+1.5 WL7+-0.9 TEMP1 1 -9.26 13.48 -52.60 18.32

156.5
1018 1.35 DL1+1.5 WL8+-0.9 TEMP1 3 -9.17 13.34 -52.30 16.69

163.5
1019 1.35 DL1+0.9 TEMP1+1.35 MR1 8 2.74 15.75 0.58 24.96
te r
166.1
1020 1.35 DL1+-0.9 TEMP1+1.35 MR1 1 3.65 10.47 2.59 3.61

1021 1.35 DL1+1.5LL1+1.5 EQUIP1+0.9 337.7


TEMP1+1.35 MR1 5 -2.36 24.30 -26.56 31.36
as

1022 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 340.2


TEMP1+1.35 MR1 9 -1.45 19.03 -24.54 10.01

1023 1.148 DL1+1.5 LL1+1.5 EQUIP1+0.9 313.3


TEMP1+1.35 MR1 1 -2.84 22.34 -26.83 29.21
nM

1024 1.148 DL1+1.5 LL1+1.5 EQUIP1+-0.9 315.8


TEMP1+1.35 MR1 5 -1.93 17.07 -24.82 7.86

1025 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+0.9 297.2 109.5


TEMP1+1.35 MR1 5 -2.98 41.94 -28.37 0

1026 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+0.9 300.4 108.5


TEMP1+1.35 MR1 4 -2.92 41.85 -28.19 4
di

1027 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+0.9 378.2 -


TEMP1+1.35 MR1 9 -1.96 6.67 -25.42 46.77

1028 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+0.9 381.3 -


TEMP1+1.35 MR1 9 -1.90 6.62 -25.25 47.58
a te

1029 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+0.9 326.0


TEMP1+1.35 MR1 8 5.26 22.98 6.23 28.56

1030 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+0.9 329.2


TEMP1+1.35 MR1 8 5.32 22.89 6.41 27.56

1031 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+0.9 329.7


re

TEMP1+1.35 MR1 2 -10.14 26.13 -59.84 40.14


APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1032 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+0.9 332.9
TEMP1+1.35 MR1 2 -10.08 26.04 -59.65 39.16

1033 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+-0.9 299.7


TEMP1+1.35 MR1 8 -2.07 36.66 -26.36 88.16

Ed
1034 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+-0.9 302.9
TEMP1+1.35 MR1 7 -2.01 36.58 -26.17 87.19

1035 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+-0.9 380.8 -


TEMP1+1.35 MR1 2 -1.05 1.40 -23.41 68.12

1036 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+-0.9 383.9 -

F
TEMP1+1.35 MR1 2 -0.99 1.35 -23.23 68.93

1037 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+-0.9 328.6


TEMP1+1.35 MR1 1 6.17 17.71 8.25 7.21

PD
1038 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+-0.9 331.8
TEMP1+1.35 MR1 1 6.23 17.62 8.42 6.21

1039 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+-0.9 332.2


TEMP1+1.35 MR1 6 -9.23 20.85 -57.82 18.79

1040 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+-0.9 335.4


TEMP1+1.35 MR1 5 -9.17 20.77 -57.64 17.81
te r
1041 1.148 DL1+1.5 LL1+0.9 WL1+1.5 272.8 107.3
EQUIP1+0.9 TEMP1+1.35 MR1 1 -3.46 39.98 -28.65 6

1042 1.148 DL1+1.5 LL1+0.9 WL2+1.5 276.0 106.3


EQUIP1+0.9 TEMP1+1.35 MR1 0 -3.41 39.90 -28.47 9
as

1043 1.148 DL1+1.5 LL1+0.9 WL3+1.5 353.8 -


EQUIP1+0.9 TEMP1+1.35 MR1 5 -2.45 4.72 -25.70 48.92

1044 1.148 DL1+1.5 LL1+0.9 WL4+1.5 356.9 -


EQUIP1+0.9 TEMP1+1.35 MR1 5 -2.39 4.67 -25.53 49.73
nM

1045 1.148 DL1+1.5 LL1+0.9 WL5+1.5 301.6


EQUIP1+0.9 TEMP1+1.35 MR1 4 4.78 21.02 5.95 26.41

1046 1.148 DL1+1.5 LL1+0.9 WL6+1.5 304.8


EQUIP1+0.9 TEMP1+1.35 MR1 4 4.83 20.93 6.13 25.41

1047 1.148 DL1+1.5 LL1+0.9 WL7+1.5 305.2


EQUIP1+0.9 TEMP1+1.35 MR1 8 -10.63 24.17 -60.12 37.99
di

1048 1.148 DL1+1.5 LL1+0.9 WL8+1.5 308.4


EQUIP1+0.9 TEMP1+1.35 MR1 8 -10.57 24.08 -59.93 37.01

1049 1.148 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+- 275.3


0.9 TEMP1+1.35 MR1 4 -2.55 34.71 -26.63 86.01
a te

1050 1.148 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+- 278.5


0.9 TEMP1+1.35 MR1 3 -2.50 34.62 -26.45 85.04

1051 1.148 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+- 356.3 -


0.9 TEMP1+1.35 MR1 9 -1.54 -0.56 -23.68 70.26
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1052 1.148 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+- 359.4 -
0.9 TEMP1+1.35 MR1 9 -1.48 -0.61 -23.51 71.08

1053 1.148 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+- 304.1


0.9 TEMP1+1.35 MR1 7 5.69 15.75 7.97 5.06

Ed
1054 1.148 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+- 307.3
0.9 TEMP1+1.35 MR1 7 5.74 15.66 8.14 4.07

1055 1.148 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+- 307.8


0.9 TEMP1+1.35 MR1 2 -9.72 18.90 -58.10 16.64

1056 1.148 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+- 311.0

F
0.9 TEMP1+1.35 MR1 1 -9.66 18.81 -57.92 15.66

1057 1.148 DL1+1.5 LL1+1.5 WL1+1.5 245.8 159.4


EQUIP1+0.9 TEMP1+1.35 MR1 0 -3.88 51.74 -29.86 5

PD
1058 1.148 DL1+1.5 LL1+1.5 WL2+1.5 251.1 157.8
EQUIP1+0.9 TEMP1+1.35 MR1 2 -3.78 51.60 -29.56 4

-
1059 1.148 DL1+1.5 LL1+1.5 WL3+1.5 380.8 101.0
EQUIP1+0.9 TEMP1+1.35 MR1 8 -2.18 -7.04 -24.95 0

-
te r
1060 1.148 DL1+1.5 LL1+1.5 WL4+1.5 386.0 102.3
EQUIP1+0.9 TEMP1+1.35 MR1 4 -2.09 -7.12 -24.65 5

1061 1.148 DL1+1.5 LL1+1.5 WL5+1.5 293.8


EQUIP1+0.9 TEMP1+1.35 MR1 6 9.86 20.14 27.81 24.54
as

1062 1.148 DL1+1.5 LL1+1.5 WL6+1.5 299.1


EQUIP1+0.9 TEMP1+1.35 MR1 9 9.95 19.99 28.10 22.88

1063 1.148 DL1+1.5 LL1+1.5 WL7+1.5 299.9


EQUIP1+0.9 TEMP1+1.35 MR1 3 -15.82 25.39 -82.30 43.84
nM

1064 1.148 DL1+1.5 LL1+1.5 WL8+1.5 305.2


EQUIP1+0.9 TEMP1+1.35 MR1 6 -15.72 25.24 -82.00 42.21

1065 1.148 DL1+1.5 LL1+1.5 WL1+1.5 EQUIP1+- 248.3 138.1


0.9 TEMP1+1.35 MR1 4 -2.97 46.47 -27.85 1

1066 1.148 DL1+1.5 LL1+1.5 WL2+1.5 EQUIP1+- 253.6 136.4


0.9 TEMP1+1.35 MR1 5 -2.87 46.33 -27.54 9
di

-
1067 1.148 DL1+1.5 LL1+1.5 WL3+1.5 EQUIP1+- 383.4 122.3
0.9 TEMP1+1.35 MR1 1 -1.27 -12.31 -22.93 5

-
a te

1068 1.148 DL1+1.5 LL1+1.5 WL4+1.5 EQUIP1+- 388.5 123.7


0.9 TEMP1+1.35 MR1 8 -1.18 -12.39 -22.64 0

1069 1.148 DL1+1.5 LL1+1.5 WL5+1.5 EQUIP1+- 296.3


0.9 TEMP1+1.35 MR1 9 10.77 14.87 29.82 3.19

1070 1.148 DL1+1.5 LL1+1.5 WL6+1.5 EQUIP1+- 301.7


0.9 TEMP1+1.35 MR1 2 10.86 14.72 30.12 1.53
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1071 1.148 DL1+1.5 LL1+1.5 WL7+1.5 EQUIP1+- 302.4
0.9 TEMP1+1.35 MR1 7 -14.91 20.12 -80.29 22.49

1072 1.148 DL1+1.5 LL1+1.5 WL8+1.5 EQUIP1+- 307.7


0.9 TEMP1+1.35 MR1 9 -14.81 19.97 -79.98 20.86

Ed
267.2 115.7
1073 1 DL1+0.8 LL1+1 SL1 7 1.59 -8.86 -4.59 8

216.0
1074 1 DL1+0.8 LL1+1 SL2 7 0.98 11.71 -8.13 24.22

156.7 -

F
1075 1 DL1+0.8 LL1+-1 SL1 6 4.93 36.88 7.73 87.06

207.9
1076 1 DL1+0.8 LL1+-1 SL2 6 5.54 16.32 11.27 4.49

PD
2001 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+0.6 210.3
TEMP1+1 MR1 7 -1.75 28.93 -18.80 74.06

2002 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+0.6 212.5


TEMP1+1 MR1 0 -1.71 28.87 -18.68 73.42

2003 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+0.6 264.4 -


TEMP1+1 MR1 0 -1.07 5.42 -16.83 30.12
te r
2004 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+0.6 266.4 -
TEMP1+1 MR1 7 -1.03 5.39 -16.71 30.66

2005 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+0.6 229.6


TEMP1+1 MR1 0 3.75 16.29 4.27 20.10
as

2006 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+0.6 231.7


TEMP1+1 MR1 3 3.78 16.23 4.39 19.43

2007 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+0.6 232.0


TEMP1+1 MR1 3 -6.52 18.39 -39.77 27.82
nM

2008 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+0.6 234.1


TEMP1+1 MR1 6 -6.49 18.33 -39.65 27.16

2009 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+-0.6 212.0


TEMP1+1 MR1 6 -1.14 25.41 -17.45 59.83

2010 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+-0.6 214.1


TEMP1+1 MR1 9 -1.10 25.36 -17.33 59.19
di

2011 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+-0.6 266.0 -


TEMP1+1 MR1 9 -0.46 1.90 -15.49 44.35

2012 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+-0.6 268.1 -


TEMP1+1 MR1 6 -0.43 1.87 -15.37 44.89
a te

2013 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+-0.6 231.2


TEMP1+1 MR1 8 4.35 12.78 5.62 5.87

2014 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+-0.6 233.4


TEMP1+1 MR1 2 4.39 12.71 5.73 5.20
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
2015 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+-0.6 233.7
TEMP1+1 MR1 2 -5.92 14.87 -38.43 13.58

2016 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+-0.6 235.8


TEMP1+1 MR1 5 -5.88 14.82 -38.31 12.93

Ed
2017 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+0.6 192.3 108.7
TEMP1+1 MR1 7 -2.02 36.77 -19.61 9

2018 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+0.6 195.9 107.7


TEMP1+1 MR1 2 -1.96 36.67 -19.40 2

2019 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+0.6 282.4 -

F
TEMP1+1 MR1 2 -0.89 -2.42 -16.33 64.84

2020 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+0.6 285.8 -


TEMP1+1 MR1 7 -0.83 -2.47 -16.13 65.75

PD
2021 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+0.6 224.4
TEMP1+1 MR1 1 7.13 15.70 18.84 18.85

2022 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+0.6 227.9


TEMP1+1 MR1 6 7.19 15.60 19.04 17.74

2023 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+0.6 228.4


TEMP1+1 MR1 6 -9.98 19.20 -54.57 31.72
te r
2024 1 DL1+1.0 LL1+1 WL8+1 EQUIP1+0.6 232.0
TEMP1+1 MR1 1 -9.92 19.10 -54.36 30.63

2025 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+-0.6 194.0


TEMP1+1 MR1 6 -1.42 33.25 -18.26 94.56
as

2026 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+-0.6 197.6


TEMP1+1 MR1 1 -1.35 33.16 -18.06 93.49

2027 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+-0.6 284.1 -


TEMP1+1 MR1 1 -0.29 -5.93 -14.98 79.08
nM

2028 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+-0.6 287.5 -


TEMP1+1 MR1 5 -0.23 -5.99 -14.79 79.98

2029 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+-0.6 226.1


TEMP1+1 MR1 0 7.74 12.19 20.19 4.62

2030 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+-0.6 229.6


TEMP1+1 MR1 5 7.80 12.09 20.38 3.51
di

2031 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+-0.6 230.1


TEMP1+1 MR1 5 -9.38 15.69 -53.22 17.49

2032 1 DL1+0.7 LL1+1 WL8+1 EQUIP1+-0.6 233.7


TEMP1+1 MR1 0 -9.31 15.59 -53.02 16.40
a te

267.2 115.7
2033 1 DL1+0.8 LL1+1 SL1 7 1.59 -8.86 -4.59 8

216.0
2034 1 DL1+0.8 LL1+1 SL2 7 0.98 11.71 -8.13 24.22
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
156.7 -
2035 1 DL1+0.8 LL1+-1 SL1 6 4.93 36.88 7.73 87.06

207.9
2036 1 DL1+0.8 LL1+-1 SL2 6 5.54 16.32 11.27 4.49

Ed
1008.
P18 500 1 DL1+1 LL1+1 EQUIP1 05 -10.52 3.14 -39.17 17.83

1008.
501 1 DL1+1 LL1+1 EQUIP1+1 TEMP1 41 1.27 5.80 13.64 29.85

370.0 160.6

F
502 1 DL1+1 WL1 6 2.18 32.71 24.50 0

383.0 159.5
503 1 DL1+1 WL2 4 0.47 32.53 14.52 4

PD
-
220.0 152.7
504 1 DL1+1 WL3 5 3.93 -31.87 34.36 4

-
233.5 152.8
505 1 DL1+1 WL4 4 2.20 -31.87 24.36 7
te r
262.1 101.5
506 1 DL1+1 WL5 6 17.86 -1.60 5 -6.88

275.1
507 1 DL1+1 WL6 1 16.14 -1.79 91.55 -7.97
as

-
343.4 103.3
508 1 DL1+1 WL7 2 -22.18 3.24 3 19.49

-
356.3 113.3
nM

509 1 DL1+1 WL8 9 -23.89 3.05 0 18.42

361.0 113.6
510 1 DL1+0.7 WL1 2 0.71 23.04 15.88 6

370.1 112.9
511 1 DL1+0.7 WL2 0 -0.50 22.91 8.89 2

-
di

256.0 105.6
512 1 DL1+0.7 WL3 1 1.92 -22.17 22.78 8

-
265.4 105.7
a te

513 1 DL1+0.7 WL4 5 0.72 -22.17 15.78 7

285.4
514 1 DL1+0.7 WL5 8 11.68 -0.98 69.81 -3.58

294.5
515 1 DL1+0.7 WL6 5 10.47 -1.11 62.81 -4.34
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
342.3
516 1 DL1+0.7 WL7 6 -16.35 2.40 -73.60 14.88

351.4
517 1 DL1+0.7 WL8 4 -17.55 2.27 -80.59 14.13

Ed
1030. 135.1
518 1 DL1+ 1LL1+0.75 WL1+1 EQUIP1 67 -6.83 27.33 -17.61 9

1040. 134.3
519 1 DL1+1.0 LL1+0.75 WL2+1 EQUIP1 40 -8.11 27.19 -25.09 9

918.1 -

F
520 1 DL1+1.0 LL1+0.75 WL3+1 EQUIP1 5 -5.52 -21.11 -10.21 99.82

928.2 -
521 1 DL1+1.0 LL1+0.75 WL4+1 EQUIP1 7 -6.81 -21.10 -17.71 99.92

PD
949.7
522 1 DL1+1.0 LL1+0.75 WL5+1 EQUIP1 4 4.93 1.60 40.18 9.57

959.4
523 1 DL1+1.0 LL1+0.75 WL6+1 EQUIP1 5 3.64 1.46 32.68 8.76

-
1010. 113.4
te r
524 1 DL1+1.0 LL1+0.75 WL7+1 EQUIP1 68 -25.10 5.22 7 29.35

-
1020. 120.9
525 1 DL1+1.0 LL1+0.75 WL8+1 EQUIP1 41 -26.38 5.08 6 28.55
as

1098. 211.7
526 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL1 34 -12.46 -36.72 -49.22 1

1026.
527 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL2 86 -13.30 -1.07 -53.25 38.52
nM

234.1 158.9
528 0.6 DL1+1 WL1 0 3.28 32.53 26.20 5

247.0 157.8
529 0.6 DL1+1 WL2 8 1.57 32.34 16.22 9

-
154.3
530 0.6 DL1+1 WL3 84.08 5.02 -32.06 36.06 9
di

-
154.5
531 0.6 DL1+1 WL4 97.57 3.30 -32.05 26.05 3
a te

126.1 103.2
532 0.6 DL1+1 WL5 9 18.95 -1.78 5 -8.53

139.1
533 0.6 DL1+1 WL6 4 17.23 -1.97 93.25 -9.62
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
207.4 101.6
534 0.6 DL1+1 WL7 5 -21.08 3.05 3 17.84

Ed
220.4 111.6
535 0.6 DL1+1 WL8 2 -22.79 2.86 1 16.77

324.3 260.9
536 0.6 DL1+0.7 SL1 3 -4.23 -52.87 -15.96 9

229.0
537 0.6 DL1+0.7 SL2 3 -5.34 -5.35 -21.33 30.06

F
1461.
1001 1.35 DL1+1.5 LL1+1.5 EQUIP1+0.9 TEMP1 41 -4.76 7.04 -10.58 36.94

PD
-
1460. 105.6
1002 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 TEMP1 76 -25.98 2.25 4 15.32

504.4 251.0
1003 1.35 DL1+1.5 WL1+0.9 TEMP1 3 14.30 51.39 84.91 9

523.9 249.5
te r
1004 1.35 DL1+1.5 WL2+0.9 TEMP1 0 11.72 51.11 69.95 0

-
279.4 218.9
1005 1.35 DL1+1.5 WL3+0.9 TEMP1 1 16.91 -45.49 99.71 1

-
as

299.6 219.1
1006 1.35 DL1+1.5 WL4+0.9 TEMP1 4 14.33 -45.48 84.70 2

342.5 200.4
1007 1.35 DL1+1.5 WL5+0.9 TEMP1 7 37.80 -0.07 9 -0.13
nM

362.0 185.4
1008 1.35 DL1+1.5 WL6+0.9 TEMP1 0 35.23 -0.36 9 -1.76

-
464.4 106.8
1009 1.35 DL1+1.5 WL7+0.9 TEMP1 6 -22.24 7.18 2 39.43

-
di

483.9 121.7
1010 1.35 DL1+1.5 WL8+0.9 TEMP1 2 -24.81 6.90 9 37.82

503.7 229.4
1011 1.35 DL1+1.5 WL1+-0.9 TEMP1 9 -6.93 46.60 -10.14 7
a te

523.2 227.8
1012 1.35 DL1+1.5 WL2+-0.9 TEMP1 5 -9.50 46.33 -25.11 8

-
278.7 240.5
1013 1.35 DL1+1.5 WL3+-0.9 TEMP1 6 -4.31 -50.27 4.65 4
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
299.0 240.7
1014 1.35 DL1+1.5 WL4+-0.9 TEMP1 0 -6.89 -50.27 -10.36 4

341.9 105.4 -

Ed
1015 1.35 DL1+1.5 WL5+-0.9 TEMP1 3 16.58 -4.86 3 21.75

361.3 -
1016 1.35 DL1+1.5 WL6+-0.9 TEMP1 5 14.00 -5.15 90.43 23.38

-
463.8 201.8
1017 1.35 DL1+1.5 WL7+-0.9 TEMP1 1 -43.46 2.39 8 17.81

F
-
483.2 216.8

PD
1018 1.35 DL1+1.5 WL8+-0.9 TEMP1 7 -46.04 2.11 5 16.20

475.1
1019 1.35 DL1+0.9 TEMP1+1.35 MR1 0 6.63 3.21 40.31 17.34

474.4
1020 1.35 DL1+-0.9 TEMP1+1.35 MR1 5 -14.59 -1.57 -54.75 -4.28

1021 1.35 DL1+1.5LL1+1.5 EQUIP1+0.9 1477.


te r
TEMP1+1.35 MR1 31 -5.04 7.24 -12.07 37.89

-
1022 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 1476. 107.1
TEMP1+1.35 MR1 66 -26.26 2.45 2 16.27

1023 1.148 DL1+1.5 LL1+1.5 EQUIP1+0.9 1408.


as

TEMP1+1.35 MR1 65 -4.48 7.15 -11.21 37.06

-
1024 1.148 DL1+1.5 LL1+1.5 EQUIP1+-0.9 1408. 106.2
TEMP1+1.35 MR1 00 -25.71 2.36 7 15.43
nM

1025 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+0.9 1504. 178.7


TEMP1+1.35 MR1 45 -0.61 36.27 13.80 1

1026 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+0.9 1516. 177.7


TEMP1+1.35 MR1 13 -2.15 36.10 4.82 6

-
1027 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+0.9 1369. 103.2
di

TEMP1+1.35 MR1 44 0.96 -21.86 22.68 9

-
1028 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+0.9 1381. 103.4
TEMP1+1.35 MR1 58 -0.59 -21.86 13.67 1
a te

1029 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+0.9 1407.


TEMP1+1.35 MR1 33 13.50 5.39 83.15 27.98

1030 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+0.9 1418.


TEMP1+1.35 MR1 99 11.95 5.22 74.15 27.00
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
1031 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+0.9 1480. 101.2
TEMP1+1.35 MR1 47 -22.53 9.74 4 51.71

Ed
1032 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+0.9 1492. 110.2
TEMP1+1.35 MR1 14 -24.07 9.57 2 50.75

1033 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+-0.9 1503. 157.0


TEMP1+1.35 MR1 80 -21.83 31.48 -81.25 9

1034 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+-0.9 1515. 156.1


TEMP1+1.35 MR1 48 -23.37 31.31 -90.23 3

F
-
1035 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+-0.9 1368. 124.9

PD
TEMP1+1.35 MR1 79 -20.26 -26.65 -72.38 1

-
1036 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+-0.9 1380. 125.0
TEMP1+1.35 MR1 93 -21.81 -26.64 -81.38 4

1037 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+-0.9 1406.


TEMP1+1.35 MR1 69 -7.72 0.60 -11.91 6.36

1038 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+-0.9 1418.


te r
TEMP1+1.35 MR1 34 -9.27 0.43 -20.91 5.38

-
1039 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+-0.9 1479. 196.3
TEMP1+1.35 MR1 82 -43.75 4.95 0 30.09
as

-
1040 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+-0.9 1491. 205.2
TEMP1+1.35 MR1 49 -45.29 4.78 8 29.13

1041 1.148 DL1+1.5 LL1+0.9 WL1+1.5 1435. 177.8


nM

EQUIP1+0.9 TEMP1+1.35 MR1 79 -0.05 36.17 14.66 8

1042 1.148 DL1+1.5 LL1+0.9 WL2+1.5 1447. 176.9


EQUIP1+0.9 TEMP1+1.35 MR1 47 -1.59 36.01 5.68 2

-
1043 1.148 DL1+1.5 LL1+0.9 WL3+1.5 1300. 104.1
EQUIP1+0.9 TEMP1+1.35 MR1 77 1.52 -21.95 23.54 3
di

-
1044 1.148 DL1+1.5 LL1+0.9 WL4+1.5 1312. 104.2
EQUIP1+0.9 TEMP1+1.35 MR1 92 -0.03 -21.95 14.53 5

1045 1.148 DL1+1.5 LL1+0.9 WL5+1.5 1338.


EQUIP1+0.9 TEMP1+1.35 MR1 67 14.05 5.29 84.01 27.15
a te

1046 1.148 DL1+1.5 LL1+0.9 WL6+1.5 1350.


EQUIP1+0.9 TEMP1+1.35 MR1 33 12.51 5.12 75.01 26.17

-
1047 1.148 DL1+1.5 LL1+0.9 WL7+1.5 1411. 100.3
EQUIP1+0.9 TEMP1+1.35 MR1 81 -21.97 9.64 8 50.88
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
1048 1.148 DL1+1.5 LL1+0.9 WL8+1.5 1423. 109.3
EQUIP1+0.9 TEMP1+1.35 MR1 48 -23.52 9.48 6 49.92

1049 1.148 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+- 1435. 156.2

Ed
0.9 TEMP1+1.35 MR1 14 -21.27 31.39 -80.40 6

1050 1.148 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+- 1446. 155.3


0.9 TEMP1+1.35 MR1 82 -22.82 31.22 -89.38 0

-
1051 1.148 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+- 1300. 125.7
0.9 TEMP1+1.35 MR1 13 -19.70 -26.74 -71.52 5

F
-
1052 1.148 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+- 1312. 125.8

PD
0.9 TEMP1+1.35 MR1 27 -21.25 -26.74 -80.53 7

1053 1.148 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+- 1338.


0.9 TEMP1+1.35 MR1 03 -7.17 0.51 -11.05 5.52

1054 1.148 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+- 1349.


0.9 TEMP1+1.35 MR1 68 -8.71 0.34 -20.05 4.54

-
1055 1.148 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+- 1411. 195.4
te r
0.9 TEMP1+1.35 MR1 16 -43.19 4.86 4 29.26

-
1056 1.148 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+- 1422. 204.4
0.9 TEMP1+1.35 MR1 83 -44.74 4.69 2 28.29
as

1057 1.148 DL1+1.5 LL1+1.5 WL1+1.5 1453. 271.7


EQUIP1+0.9 TEMP1+1.35 MR1 88 2.91 55.53 31.91 6

1058 1.148 DL1+1.5 LL1+1.5 WL2+1.5 1473. 270.1


EQUIP1+0.9 TEMP1+1.35 MR1 35 0.33 55.25 16.94 7
nM

-
1059 1.148 DL1+1.5 LL1+1.5 WL3+1.5 1228. 198.2
EQUIP1+0.9 TEMP1+1.35 MR1 86 5.52 -41.35 46.70 5

-
1060 1.148 DL1+1.5 LL1+1.5 WL4+1.5 1249. 198.4
EQUIP1+0.9 TEMP1+1.35 MR1 09 2.94 -41.35 31.69 5
di

1061 1.148 DL1+1.5 LL1+1.5 WL5+1.5 1292. 147.4


EQUIP1+0.9 TEMP1+1.35 MR1 02 26.41 4.06 8 20.54

1062 1.148 DL1+1.5 LL1+1.5 WL6+1.5 1311. 132.4


EQUIP1+0.9 TEMP1+1.35 MR1 45 23.83 3.78 8 18.91
a te

-
1063 1.148 DL1+1.5 LL1+1.5 WL7+1.5 1413. 159.8
EQUIP1+0.9 TEMP1+1.35 MR1 91 -33.63 11.31 3 60.10

-
1064 1.148 DL1+1.5 LL1+1.5 WL8+1.5 1433. 174.8
EQUIP1+0.9 TEMP1+1.35 MR1 37 -36.21 11.03 0 58.49
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1065 1.148 DL1+1.5 LL1+1.5 WL1+1.5 EQUIP1+- 1453. 250.1
0.9 TEMP1+1.35 MR1 24 -18.32 50.74 -63.15 4

1066 1.148 DL1+1.5 LL1+1.5 WL2+1.5 EQUIP1+- 1472. 248.5


0.9 TEMP1+1.35 MR1 70 -20.89 50.46 -78.12 4

Ed
-
1067 1.148 DL1+1.5 LL1+1.5 WL3+1.5 EQUIP1+- 1228. 219.8
0.9 TEMP1+1.35 MR1 21 -15.70 -46.14 -48.35 7

-
1068 1.148 DL1+1.5 LL1+1.5 WL4+1.5 EQUIP1+- 1248. 220.0
0.9 TEMP1+1.35 MR1 45 -18.28 -46.13 -63.36 7

F
1069 1.148 DL1+1.5 LL1+1.5 WL5+1.5 EQUIP1+- 1291.
0.9 TEMP1+1.35 MR1 38 5.19 -0.73 52.43 -1.09

PD
1070 1.148 DL1+1.5 LL1+1.5 WL6+1.5 EQUIP1+- 1310.
0.9 TEMP1+1.35 MR1 80 2.61 -1.01 37.43 -2.72

-
1071 1.148 DL1+1.5 LL1+1.5 WL7+1.5 EQUIP1+- 1413. 254.8
0.9 TEMP1+1.35 MR1 26 -54.85 6.52 8 38.47

-
1072 1.148 DL1+1.5 LL1+1.5 WL8+1.5 EQUIP1+- 1432. 269.8
te r
0.9 TEMP1+1.35 MR1 72 -57.43 6.24 5 36.87

1044. 384.1
1073 1 DL1+0.8 LL1+1 SL1 08 -7.50 -73.36 -28.09 3

907.9
as

1074 1 DL1+0.8 LL1+1 SL2 4 -9.08 -5.47 -35.75 54.24

-
700.1 354.4
1075 1 DL1+0.8 LL1+-1 SL1 1 -0.11 78.48 10.23 6
nM

836.2 -
1076 1 DL1+0.8 LL1+-1 SL2 6 1.48 10.59 17.90 24.57

2001 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+0.6 1038. 119.6


TEMP1+1 MR1 14 -0.70 24.24 8.67 3

2002 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+0.6 1045. 118.9


TEMP1+1 MR1 92 -1.73 24.13 2.68 9
di

2003 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+0.6 948.1 -


TEMP1+1 MR1 3 0.35 -14.51 14.59 68.38

2004 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+0.6 956.2 -


TEMP1+1 MR1 2 -0.69 -14.51 8.58 68.46
a te

2005 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+0.6 973.3


TEMP1+1 MR1 9 8.71 3.65 54.90 19.14

2006 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+0.6 981.1


TEMP1+1 MR1 6 7.67 3.54 48.90 18.49
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
2007 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+0.6 1022.
TEMP1+1 MR1 15 -15.31 6.55 -68.03 34.96

2008 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+0.6 1029.


TEMP1+1 MR1 93 -16.34 6.44 -74.01 34.32

Ed
2009 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+-0.6 1037. 105.2
TEMP1+1 MR1 70 -14.85 21.05 -54.70 1

2010 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+-0.6 1045. 104.5


TEMP1+1 MR1 49 -15.87 20.94 -60.69 7

2011 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+-0.6 947.6 -

F
TEMP1+1 MR1 9 -13.80 -17.71 -48.79 82.79

2012 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+-0.6 955.7 -


TEMP1+1 MR1 9 -14.83 -17.70 -54.79 82.87

PD
2013 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+-0.6 972.9
TEMP1+1 MR1 6 -5.44 0.46 -8.47 4.72

2014 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+-0.6 980.7


TEMP1+1 MR1 3 -6.47 0.35 -14.47 4.07

-
2015 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+-0.6 1021. 131.4
te r
TEMP1+1 MR1 72 -29.46 3.36 0 20.54

-
2016 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+-0.6 1029. 137.3
TEMP1+1 MR1 50 -30.49 3.25 9 19.90
as

2017 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+0.6 1050. 182.2


TEMP1+1 MR1 20 1.27 37.14 20.17 1

2018 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+0.6 1063. 181.1


TEMP1+1 MR1 18 -0.44 36.95 10.19 5
nM

-
2019 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+0.6 900.1 131.1
TEMP1+1 MR1 8 3.01 -27.45 30.03 2

-
2020 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+0.6 913.6 131.2
TEMP1+1 MR1 7 1.29 -27.44 20.02 6

2021 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+0.6 942.2


di

TEMP1+1 MR1 9 16.94 2.83 97.22 14.73

2022 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+0.6 955.2


TEMP1+1 MR1 4 15.23 2.64 87.22 13.65
a te

-
2023 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+0.6 1023. 107.6
TEMP1+1 MR1 55 -23.09 7.66 6 41.10

-
2024 1 DL1+1.0 LL1+1 WL8+1 EQUIP1+0.6 1036. 117.6
TEMP1+1 MR1 52 -24.80 7.48 4 40.03
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
2025 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+-0.6 1049. 167.8
TEMP1+1 MR1 77 -12.88 33.95 -43.21 0

2026 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+-0.6 1062. 166.7


TEMP1+1 MR1 75 -14.59 33.76 -53.18 4

Ed
-
2027 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+-0.6 899.7 145.5
TEMP1+1 MR1 5 -11.13 -30.64 -33.34 4

-
2028 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+-0.6 913.2 145.6
TEMP1+1 MR1 4 -12.85 -30.63 -43.35 8

F
2029 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+-0.6 941.8
TEMP1+1 MR1 6 2.80 -0.36 33.84 0.32

PD
2030 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+-0.6 954.8
TEMP1+1 MR1 1 1.08 -0.55 23.84 -0.77

-
2031 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+-0.6 1023. 171.0
TEMP1+1 MR1 12 -37.23 4.47 3 26.69

-
2032 1 DL1+0.7 LL1+1 WL8+1 EQUIP1+-0.6 1036. 181.0
te r
TEMP1+1 MR1 09 -38.95 4.28 1 25.62

1044. 384.1
2033 1 DL1+0.8 LL1+1 SL1 08 -7.50 -73.36 -28.09 3

907.9
as

2034 1 DL1+0.8 LL1+1 SL2 4 -9.08 -5.47 -35.75 54.24

-
700.1 354.4
2035 1 DL1+0.8 LL1+-1 SL1 1 -0.11 78.48 10.23 6
nM

836.2 -
2036 1 DL1+0.8 LL1+-1 SL2 6 1.48 10.59 17.90 24.57

574.4 -
P19 500 1 DL1+1 LL1+1 EQUIP1 2 4.90 -2.18 14.76 21.74

575.7
501 1 DL1+1 LL1+1 EQUIP1+1 TEMP1 4 -8.56 11.68 -46.98 39.95
di

268.5 196.6
502 1 DL1+1 WL1 6 -6.40 41.25 -43.75 8

279.0 189.6
503 1 DL1+1 WL2 8 -3.62 39.86 -28.49 5
a te

-
133.5 220.4
504 1 DL1+1 WL3 2 -6.70 -42.11 -46.64 3

-
144.5 226.2
505 1 DL1+1 WL4 5 -3.92 -43.26 -31.33 6
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
174.2 600.2
506 1 DL1+1 WL5 2 125.72 10.22 5 44.47

Ed
164.7 615.8
507 1 DL1+1 WL6 9 128.57 8.86 5 37.62

-
553.7 - 617.6 -
508 1 DL1+1 WL7 4 126.08 -1.43 7 19.67

F
564.2 - 602.3 -
509 1 DL1+1 WL8 3 123.31 -2.82 9 26.69

PD
254.0 134.6
510 1 DL1+0.7 WL1 3 -3.97 28.85 -30.35 3

261.4 129.7
511 1 DL1+0.7 WL2 0 -2.03 27.88 -19.67 1

-
159.5 157.3
512 1 DL1+0.7 WL3 1 -4.18 -29.50 -32.37 5
te r
-
167.2 161.4
513 1 DL1+0.7 WL4 3 -2.23 -30.30 -21.65 3

- 420.4
514 1 DL1+0.7 WL5 55.91 88.51 7.13 5 28.09
as

- 431.3
515 1 DL1+0.7 WL6 49.31 90.50 6.18 7 23.29

-
nM

453.6 432.0 -
516 1 DL1+0.7 WL7 6 -87.75 -1.02 9 16.81

-
461.0 421.4 -
517 1 DL1+0.7 WL8 0 -85.81 -1.99 0 21.73

610.7 133.3
518 1 DL1+ 1LL1+0.75 WL1+1 EQUIP1 3 -1.17 28.82 -18.73 8
di

618.6 128.1
519 1 DL1+1.0 LL1+0.75 WL2+1 EQUIP1 2 0.91 27.78 -7.29 0

-
509.4 179.4
a te

520 1 DL1+1.0 LL1+0.75 WL3+1 EQUIP1 5 -1.39 -33.70 -20.90 6

-
517.7 183.8
521 1 DL1+1.0 LL1+0.75 WL4+1 EQUIP1 3 0.69 -34.56 -9.42 3

278.6 464.2
re

522 1 DL1+1.0 LL1+0.75 WL5+1 EQUIP1 5 97.92 5.54 6 19.22


APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
285.7 475.9
523 1 DL1+1.0 LL1+0.75 WL6+1 EQUIP1 2 100.05 4.53 6 14.08

-
824.6 449.1 -

Ed
524 1 DL1+1.0 LL1+0.75 WL7+1 EQUIP1 2 -90.93 -3.19 8 28.88

-
832.4 437.7 -
525 1 DL1+1.0 LL1+0.75 WL8+1 EQUIP1 9 -88.85 -4.23 2 34.15

644.0 222.9
526 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL1 7 -0.92 -50.95 -13.86 5

F
-
679.4 128.0

PD
527 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL2 0 -24.75 -6.22 7 -1.59

180.5 200.7
528 0.6 DL1+1 WL1 0 -7.07 41.28 -44.11 4

191.0 193.7
529 0.6 DL1+1 WL2 2 -4.30 39.89 -28.86 1

-
216.3
te r
530 0.6 DL1+1 WL3 45.46 -7.38 -42.08 -47.01 8

-
222.2
531 0.6 DL1+1 WL4 56.49 -4.59 -43.23 -31.69 0
as

-
262.2 599.8
532 0.6 DL1+1 WL5 7 125.05 10.25 9 48.53

-
nM

252.8 615.4
533 0.6 DL1+1 WL6 4 127.89 8.89 8 41.68

-
465.6 - 618.0 -
534 0.6 DL1+1 WL7 9 126.76 -1.40 4 15.61

-
476.1 - 602.7 -
di

535 0.6 DL1+1 WL8 7 123.98 -2.79 6 22.64

224.9 320.1
536 0.6 DL1+0.7 SL1 5 -6.74 -65.07 -37.62 6

-
a te

272.0 189.8
537 0.6 DL1+0.7 SL2 6 -38.51 -5.44 9 20.78

829.7
1001 1.35 DL1+1.5 LL1+1.5 EQUIP1+0.9 TEMP1 9 -5.02 9.22 -33.56 24.43

827.4 -
re

1002 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 TEMP1 2 19.21 -15.73 77.57 86.61
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
371.0 121.3 352.0
1003 1.35 DL1+1.5 WL1+0.9 TEMP1 0 -21.96 74.36 2 6

386.7 341.5

Ed
1004 1.35 DL1+1.5 WL2+0.9 TEMP1 8 -17.80 72.28 -98.44 2

- -
168.4 125.6 273.6
1005 1.35 DL1+1.5 WL3+0.9 TEMP1 5 -22.41 -50.68 6 1

- -
184.9 102.6 282.3

F
1006 1.35 DL1+1.5 WL4+0.9 TEMP1 9 -18.24 -52.40 9 5

PD
293.1 844.6 123.7
1007 1.35 DL1+1.5 WL5+0.9 TEMP1 6 176.22 27.81 7 5

-
279.0 868.0 113.4
1008 1.35 DL1+1.5 WL6+0.9 TEMP1 2 180.48 25.78 7 7

-
798.7 - 982.2
te r
1009 1.35 DL1+1.5 WL7+0.9 TEMP1 8 201.49 10.34 1 27.54

-
814.5 - 959.2
1010 1.35 DL1+1.5 WL8+0.9 TEMP1 1 197.32 8.26 9 17.00

368.6 241.0
as

1011 1.35 DL1+1.5 WL1+-0.9 TEMP1 3 2.26 49.42 -10.19 2

384.4 230.4
1012 1.35 DL1+1.5 WL2+-0.9 TEMP1 1 6.42 47.34 12.69 7
nM

-
166.0 384.6
1013 1.35 DL1+1.5 WL3+-0.9 TEMP1 7 1.81 -75.62 -14.53 5

-
182.6 393.3
1014 1.35 DL1+1.5 WL4+-0.9 TEMP1 1 5.98 -77.34 8.44 9

-
di

295.5 955.8
1015 1.35 DL1+1.5 WL5+-0.9 TEMP1 4 200.44 2.87 0 12.71

-
281.3 979.2
1016 1.35 DL1+1.5 WL6+-0.9 TEMP1 9 204.71 0.84 0 2.43
a te

-
796.4 - 871.0 -
1017 1.35 DL1+1.5 WL7+-0.9 TEMP1 0 177.27 -14.60 8 83.50
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
812.1 - 848.1 -
1018 1.35 DL1+1.5 WL8+-0.9 TEMP1 4 173.10 -16.68 6 94.04

305.7

Ed
1019 1.35 DL1+0.9 TEMP1+1.35 MR1 2 -9.51 12.02 -52.87 40.02

303.3 -
1020 1.35 DL1+-0.9 TEMP1+1.35 MR1 4 14.71 -12.92 58.26 71.03

1021 1.35 DL1+1.5LL1+1.5 EQUIP1+0.9 837.1


TEMP1+1.35 MR1 3 -4.70 8.86 -32.10 22.62

F
1022 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 834.7 -
TEMP1+1.35 MR1 6 19.52 -16.08 79.03 88.43

1023 1.148 DL1+1.5 LL1+1.5 EQUIP1+0.9 792.6

PD
TEMP1+1.35 MR1 7 -5.04 8.88 -32.29 24.67

1024 1.148 DL1+1.5 LL1+1.5 EQUIP1+-0.9 790.2 -


TEMP1+1.35 MR1 9 19.18 -16.06 78.85 86.38

1025 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+0.9 880.7 208.7


TEMP1+1.35 MR1 1 -11.98 46.05 -72.30 6

1026 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+0.9 890.1 202.4


te r
TEMP1+1.35 MR1 8 -9.48 44.81 -58.56 3

-
1027 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+0.9 759.1 166.6
TEMP1+1.35 MR1 8 -12.25 -28.97 -74.90 4
as

-
1028 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+0.9 769.1 171.8
TEMP1+1.35 MR1 0 -9.75 -30.00 -61.12 9

1029 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+0.9 482.2 507.3


TEMP1+1.35 MR1 1 106.93 18.13 0 71.77
nM

1030 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+0.9 490.7 521.3


TEMP1+1.35 MR1 0 109.49 16.91 4 65.60

-
1031 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+0.9 1137. - 588.8
TEMP1+1.35 MR1 38 119.70 7.64 3 14.05

-
di

1032 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+0.9 1146. - 575.0


TEMP1+1.35 MR1 82 117.20 6.40 8 7.72

1033 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+-0.9 878.3


TEMP1+1.35 MR1 4 12.24 21.11 38.84 97.71
a te

1034 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+-0.9 887.8


TEMP1+1.35 MR1 1 14.74 19.87 52.57 91.39

-
1035 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+-0.9 756.8 277.6
TEMP1+1.35 MR1 0 11.97 -53.91 36.23 9
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
1036 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+-0.9 766.7 282.9
TEMP1+1.35 MR1 3 14.48 -54.94 50.01 3

1037 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+-0.9 479.8 618.4 -

Ed
TEMP1+1.35 MR1 4 131.15 -6.82 3 39.27

1038 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+-0.9 488.3 632.4 -


TEMP1+1.35 MR1 3 133.71 -8.04 7 45.44

-
1039 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+-0.9 1135. 477.7 -
TEMP1+1.35 MR1 00 -95.48 -17.30 0 97.00

F
- -
1040 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+-0.9 1144. 463.9 103.3

PD
TEMP1+1.35 MR1 44 -92.98 -18.55 5 2

1041 1.148 DL1+1.5 LL1+0.9 WL1+1.5 836.2 210.8


EQUIP1+0.9 TEMP1+1.35 MR1 4 -12.32 46.07 -72.48 1

1042 1.148 DL1+1.5 LL1+0.9 WL2+1.5 845.7 204.4


EQUIP1+0.9 TEMP1+1.35 MR1 1 -9.83 44.82 -58.75 8

-
1043 1.148 DL1+1.5 LL1+0.9 WL3+1.5 714.7 164.5
te r
EQUIP1+0.9 TEMP1+1.35 MR1 1 -12.59 -28.95 -75.08 9

-
1044 1.148 DL1+1.5 LL1+0.9 WL4+1.5 724.6 169.8
EQUIP1+0.9 TEMP1+1.35 MR1 4 -10.09 -29.99 -61.30 4
as

1045 1.148 DL1+1.5 LL1+0.9 WL5+1.5 437.7 507.1


EQUIP1+0.9 TEMP1+1.35 MR1 5 106.59 18.14 2 73.82

1046 1.148 DL1+1.5 LL1+0.9 WL6+1.5 446.2 521.1


EQUIP1+0.9 TEMP1+1.35 MR1 3 109.14 16.92 5 67.65
nM

-
1047 1.148 DL1+1.5 LL1+0.9 WL7+1.5 1092. - 589.0
EQUIP1+0.9 TEMP1+1.35 MR1 91 120.04 7.66 1 16.10

-
1048 1.148 DL1+1.5 LL1+0.9 WL8+1.5 1102. - 575.2
EQUIP1+0.9 TEMP1+1.35 MR1 35 117.54 6.41 6 9.77
di

1049 1.148 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+- 833.8


0.9 TEMP1+1.35 MR1 7 11.90 21.13 38.65 99.76

1050 1.148 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+- 843.3


0.9 TEMP1+1.35 MR1 4 14.40 19.88 52.38 93.44
a te

-
1051 1.148 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+- 712.3 275.6
0.9 TEMP1+1.35 MR1 4 11.63 -53.89 36.05 4

-
1052 1.148 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+- 722.2 280.8
0.9 TEMP1+1.35 MR1 6 14.13 -54.93 49.83 8
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1053 1.148 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+- 435.3 618.2 -
0.9 TEMP1+1.35 MR1 7 130.81 -6.80 5 37.22

1054 1.148 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+- 443.8 632.2 -


0.9 TEMP1+1.35 MR1 6 133.37 -8.02 8 43.39

Ed
-
1055 1.148 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+- 1090. 477.8 -
0.9 TEMP1+1.35 MR1 53 -95.82 -17.28 8 94.95

- -
1056 1.148 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+- 1099. 464.1 101.2
0.9 TEMP1+1.35 MR1 97 -93.32 -18.53 3 7

F
1057 1.148 DL1+1.5 LL1+1.5 WL1+1.5 865.2 334.9
EQUIP1+0.9 TEMP1+1.35 MR1 9 -17.17 70.86 -99.28 0

PD
1058 1.148 DL1+1.5 LL1+1.5 WL2+1.5 881.0 324.3
EQUIP1+0.9 TEMP1+1.35 MR1 8 -13.01 68.78 -76.39 6

- -
1059 1.148 DL1+1.5 LL1+1.5 WL3+1.5 662.7 103.6 290.7
EQUIP1+0.9 TEMP1+1.35 MR1 4 -17.63 -54.17 2 7

-
1060 1.148 DL1+1.5 LL1+1.5 WL4+1.5 679.2 299.5
te r
EQUIP1+0.9 TEMP1+1.35 MR1 8 -13.45 -55.90 -80.65 1

1061 1.148 DL1+1.5 LL1+1.5 WL5+1.5 201.1 866.7 106.5


EQUIP1+0.9 TEMP1+1.35 MR1 3 181.00 24.31 2 9

1062 1.148 DL1+1.5 LL1+1.5 WL6+1.5 215.2 890.1


as

EQUIP1+0.9 TEMP1+1.35 MR1 8 185.27 22.28 1 96.31

-
1063 1.148 DL1+1.5 LL1+1.5 WL7+1.5 1293. - 960.1
EQUIP1+0.9 TEMP1+1.35 MR1 07 196.70 6.85 6 10.38
nM

-
1064 1.148 DL1+1.5 LL1+1.5 WL8+1.5 1308. - 937.2
EQUIP1+0.9 TEMP1+1.35 MR1 80 192.54 4.77 5 -0.16

1065 1.148 DL1+1.5 LL1+1.5 WL1+1.5 EQUIP1+- 862.9 223.8


0.9 TEMP1+1.35 MR1 2 7.05 45.92 11.85 6

1066 1.148 DL1+1.5 LL1+1.5 WL2+1.5 EQUIP1+- 878.7 213.3


di

0.9 TEMP1+1.35 MR1 0 11.21 43.84 34.74 1

-
1067 1.148 DL1+1.5 LL1+1.5 WL3+1.5 EQUIP1+- 660.3 401.8
0.9 TEMP1+1.35 MR1 6 6.59 -79.11 7.52 1
a te

-
1068 1.148 DL1+1.5 LL1+1.5 WL4+1.5 EQUIP1+- 676.9 410.5
0.9 TEMP1+1.35 MR1 1 10.77 -80.84 30.48 5

1069 1.148 DL1+1.5 LL1+1.5 WL5+1.5 EQUIP1+- 198.7 977.8


0.9 TEMP1+1.35 MR1 6 205.23 -0.63 5 -4.45
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1070 1.148 DL1+1.5 LL1+1.5 WL6+1.5 EQUIP1+- 212.9 1001. -
0.9 TEMP1+1.35 MR1 0 209.49 -2.66 24 14.74

- -
1071 1.148 DL1+1.5 LL1+1.5 WL7+1.5 EQUIP1+- 1290. - 849.0 100.6

Ed
0.9 TEMP1+1.35 MR1 70 172.48 -18.10 3 6

- -
1072 1.148 DL1+1.5 LL1+1.5 WL8+1.5 EQUIP1+- 1306. - 826.1 111.2
0.9 TEMP1+1.35 MR1 43 168.32 -20.18 2 0

633.2 446.8
1073 1 DL1+0.8 LL1+1 SL1 7 -6.79 -94.64 -42.36 5

F
-
700.5 259.8

PD
1074 1 DL1+0.8 LL1+1 SL2 7 -52.18 -9.45 9 19.16

-
367.9 485.2
1075 1 DL1+0.8 LL1+-1 SL1 2 15.37 91.15 66.69 9

300.6 284.2 -
1076 1 DL1+0.8 LL1+-1 SL2 2 60.75 5.96 2 57.61

2001 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+0.6 609.7 138.0


te r
TEMP1+1 MR1 0 -7.79 30.67 -48.00 2

2002 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+0.6 616.0 133.8


TEMP1+1 MR1 1 -6.13 29.84 -38.84 1

-
as

2003 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+0.6 528.6 112.2


TEMP1+1 MR1 8 -7.98 -19.35 -49.73 4

-
2004 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+0.6 535.2 115.7
nM

TEMP1+1 MR1 9 -6.31 -20.03 -40.55 4

2005 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+0.6 344.0 338.4


TEMP1+1 MR1 3 71.48 12.05 0 46.70

2006 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+0.6 349.6 347.7


TEMP1+1 MR1 9 73.18 11.24 6 42.59

-
di

2007 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+0.6 780.8 392.3


TEMP1+1 MR1 1 -79.61 5.06 5 8.22

-
2008 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+0.6 787.1 383.1
TEMP1+1 MR1 0 -77.94 4.23 9 4.00
a te

2009 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+-0.6 608.1


TEMP1+1 MR1 2 8.35 14.04 26.09 63.99

2010 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+-0.6 614.4


TEMP1+1 MR1 3 10.02 13.21 35.24 59.78
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
2011 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+-0.6 527.0 186.2
TEMP1+1 MR1 9 8.17 -35.97 24.35 7

Ed
2012 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+-0.6 533.7 189.7
TEMP1+1 MR1 1 9.84 -36.66 33.54 7

2013 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+-0.6 342.4 412.4 -


TEMP1+1 MR1 5 87.63 -4.58 9 27.33

2014 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+-0.6 348.1 421.8 -


TEMP1+1 MR1 1 89.33 -5.39 5 31.44

F
-
2015 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+-0.6 779.2 318.2 -

PD
TEMP1+1 MR1 3 -63.46 -11.57 6 65.81

-
2016 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+-0.6 785.5 309.1 -
TEMP1+1 MR1 2 -61.79 -12.40 0 70.03

2017 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+0.6 629.0 220.7


TEMP1+1 MR1 7 -11.03 47.20 -65.86 5

2018 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+0.6 639.5 213.7


te r
TEMP1+1 MR1 9 -8.26 45.81 -50.61 2

-
2019 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+0.6 494.0 196.3
TEMP1+1 MR1 3 -11.33 -36.16 -68.75 6
as

-
2020 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+0.6 505.0 202.1
TEMP1+1 MR1 6 -8.55 -37.31 -53.44 9

2021 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+0.6 186.2 578.1


nM

TEMP1+1 MR1 9 121.09 16.17 4 68.55

2022 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+0.6 195.7 593.7


TEMP1+1 MR1 2 123.93 14.81 3 61.69

-
2023 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+0.6 914.2 - 639.7
TEMP1+1 MR1 5 130.72 4.52 8 4.41
di

-
2024 1 DL1+1.0 LL1+1 WL8+1 EQUIP1+0.6 924.7 - 624.5
TEMP1+1 MR1 4 127.94 3.13 1 -2.62

2025 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+-0.6 627.4 146.7


TEMP1+1 MR1 8 5.12 30.57 8.23 2
a te

2026 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+-0.6 638.0 139.7


TEMP1+1 MR1 0 7.89 29.19 23.48 0

-
2027 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+-0.6 492.4 270.3
TEMP1+1 MR1 5 4.82 -52.79 5.33 9
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
2028 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+-0.6 503.4 276.2
TEMP1+1 MR1 7 7.60 -53.93 20.65 2

2029 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+-0.6 184.7 652.2

Ed
TEMP1+1 MR1 1 137.24 -0.46 2 -5.48

2030 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+-0.6 194.1 667.8 -


TEMP1+1 MR1 4 140.08 -1.82 2 12.34

-
2031 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+-0.6 912.6 - 565.7 -
TEMP1+1 MR1 7 114.57 -12.11 0 69.62

F
-
2032 1 DL1+0.7 LL1+1 WL8+1 EQUIP1+-0.6 923.1 - 550.4 -

PD
TEMP1+1 MR1 6 111.79 -13.49 2 76.65

633.2 446.8
2033 1 DL1+0.8 LL1+1 SL1 7 -6.79 -94.64 -42.36 5

-
700.5 259.8
2034 1 DL1+0.8 LL1+1 SL2 7 -52.18 -9.45 9 19.16

-
te r
367.9 485.2
2035 1 DL1+0.8 LL1+-1 SL1 2 15.37 91.15 66.69 9

300.6 284.2 -
2036 1 DL1+0.8 LL1+-1 SL2 2 60.75 5.96 2 57.61
as

243.3
P20 500 1 DL1+1 LL1+1 EQUIP1 5 2.76 1.68 14.00 9.44

236.1
501 1 DL1+1 LL1+1 EQUIP1+1 TEMP1 9 1.88 8.50 10.39 38.59
nM

502 1 DL1+1 WL1 97.47 -0.16 19.76 -0.43 88.76

102.5
503 1 DL1+1 WL2 7 0.21 18.67 1.45 83.92

-
504 1 DL1+1 WL3 87.96 -0.27 -18.12 -0.83 81.27

-
di

505 1 DL1+1 WL4 93.12 0.11 -19.17 1.08 85.95

275.9
506 1 DL1+1 WL5 37.74 48.23 2.30 7 10.19
a te

278.0
507 1 DL1+1 WL6 42.71 48.63 1.20 1 5.31

-
157.3 273.6
508 1 DL1+1 WL7 7 -47.80 6.31 8 28.33
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
162.4 271.7
509 1 DL1+1 WL8 6 -47.43 5.22 9 23.48

510 1 DL1+0.7 WL1 99.70 0.09 14.09 0.79 63.32

Ed
103.2
511 1 DL1+0.7 WL2 7 0.35 13.33 2.10 59.93

-
512 1 DL1+0.7 WL3 93.04 0.01 -12.43 0.51 55.71

F
513 1 DL1+0.7 WL4 96.65 0.27 -13.16 1.84 58.98

194.2
514 1 DL1+0.7 WL5 57.89 33.96 1.87 6 8.32

PD
195.6
515 1 DL1+0.7 WL6 61.37 34.24 1.10 9 4.90

-
141.6 190.4
516 1 DL1+0.7 WL7 3 -33.26 4.67 9 21.02

-
te r
145.1 189.1
517 1 DL1+0.7 WL8 9 -33.00 3.91 7 17.62

237.7
518 1 DL1+ 1LL1+0.75 WL1+1 EQUIP1 8 2.14 15.85 10.97 73.05
as

241.6
519 1 DL1+1.0 LL1+0.75 WL2+1 EQUIP1 0 2.42 15.03 12.38 69.42

230.6 -
520 1 DL1+1.0 LL1+0.75 WL3+1 EQUIP1 4 2.06 -12.56 10.67 54.48
nM

234.5 -
521 1 DL1+1.0 LL1+0.75 WL4+1 EQUIP1 1 2.34 -13.35 12.09 57.98

192.9 218.2
522 1 DL1+1.0 LL1+0.75 WL5+1 EQUIP1 8 38.44 2.75 7 14.12

196.7 219.7
523 1 DL1+1.0 LL1+0.75 WL6+1 EQUIP1 1 38.73 1.93 9 10.46
di

-
282.7 193.9
524 1 DL1+1.0 LL1+0.75 WL7+1 EQUIP1 0 -33.59 5.76 8 27.73

-
a te

286.5 192.5
525 1 DL1+1.0 LL1+0.75 WL8+1 EQUIP1 1 -33.31 4.94 6 24.09

251.0
526 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL1 1 0.52 -9.62 1.15 60.53

261.8
527 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL2 1 -8.54 0.42 -51.51 15.13
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
528 0.6 DL1+1 WL1 55.51 -0.42 19.41 -1.88 87.18

529 0.6 DL1+1 WL2 60.61 -0.05 18.32 0.01 82.34

Ed
530 0.6 DL1+1 WL3 46.00 -0.53 -18.47 -2.27 82.85

-
531 0.6 DL1+1 WL4 51.16 -0.16 -19.52 -0.37 87.53

274.5
532 0.6 DL1+1 WL5 -4.22 47.97 1.95 3 8.61

276.5

F
533 0.6 DL1+1 WL6 0.75 48.36 0.86 6 3.73

PD
115.4 275.1
534 0.6 DL1+1 WL7 1 -48.06 5.96 3 26.75

-
120.5 273.2
535 0.6 DL1+1 WL8 0 -47.69 4.87 4 21.90

536 0.6 DL1+0.7 SL1 73.16 -2.59 -14.55 -14.97 70.49


te r
537 0.6 DL1+0.7 SL2 87.56 -14.67 -1.16 -85.18 9.95

342.8
1001 1.35 DL1+1.5 LL1+1.5 EQUIP1+0.9 TEMP1 5 3.25 8.52 17.21 39.80

355.7 -
as

1002 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 TEMP1 3 4.83 -3.75 23.70 12.66

124.0 158.7
1003 1.35 DL1+1.5 WL1+0.9 TEMP1 4 -1.12 35.64 -4.43 7

131.6 151.5
nM

1004 1.35 DL1+1.5 WL2+0.9 TEMP1 7 -0.57 34.01 -1.62 1

109.7 -
1005 1.35 DL1+1.5 WL3+0.9 TEMP1 6 -1.29 -21.18 -5.03 96.27

-
117.5 103.2
1006 1.35 DL1+1.5 WL4+0.9 TEMP1 0 -0.73 -22.75 -2.18 8
di

410.1
1007 1.35 DL1+1.5 WL5+0.9 TEMP1 34.44 71.46 9.45 7 40.92

413.2
1008 1.35 DL1+1.5 WL6+0.9 TEMP1 41.90 72.05 7.81 2 33.60
a te

-
213.8 414.3
1009 1.35 DL1+1.5 WL7+0.9 TEMP1 8 -72.58 15.47 1 68.14

-
221.5 411.4
1010 1.35 DL1+1.5 WL8+0.9 TEMP1 1 -72.03 13.83 8 60.86
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
136.9 106.3
1011 1.35 DL1+1.5 WL1+-0.9 TEMP1 2 0.45 23.37 2.06 1

144.5
1012 1.35 DL1+1.5 WL2+-0.9 TEMP1 6 1.01 21.74 4.88 99.05

Ed
-
122.6 148.7
1013 1.35 DL1+1.5 WL3+-0.9 TEMP1 4 0.29 -33.45 1.47 3

-
130.3 155.7
1014 1.35 DL1+1.5 WL4+-0.9 TEMP1 8 0.85 -35.02 4.32 5

F
416.6 -
1015 1.35 DL1+1.5 WL5+-0.9 TEMP1 47.32 73.04 -2.82 6 11.55

PD
419.7 -
1016 1.35 DL1+1.5 WL6+-0.9 TEMP1 54.78 73.63 -4.47 2 18.86

-
226.7 407.8
1017 1.35 DL1+1.5 WL7+-0.9 TEMP1 6 -71.00 3.20 2 15.68

-
234.3 404.9
te r
1018 1.35 DL1+1.5 WL8+-0.9 TEMP1 9 -70.45 1.56 8 8.40

143.0
1019 1.35 DL1+0.9 TEMP1+1.35 MR1 9 0.25 7.40 2.44 32.08

155.9 -
as

1020 1.35 DL1+-0.9 TEMP1+1.35 MR1 7 1.83 -4.87 8.93 20.39

1021 1.35 DL1+1.5LL1+1.5 EQUIP1+0.9 350.7


TEMP1+1.35 MR1 5 3.39 8.63 18.01 40.31

1022 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 363.6 -


nM

TEMP1+1.35 MR1 3 4.97 -3.64 24.51 12.15

1023 1.148 DL1+1.5 LL1+1.5 EQUIP1+0.9 329.5


TEMP1+1.35 MR1 6 3.26 8.45 17.28 39.52

1024 1.148 DL1+1.5 LL1+1.5 EQUIP1+-0.9 342.4 -


TEMP1+1.35 MR1 4 4.83 -3.82 23.78 12.95

1025 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+0.9 344.0 116.6


di

TEMP1+1.35 MR1 7 2.65 25.63 14.37 4

1026 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+0.9 348.6 112.2


TEMP1+1.35 MR1 5 2.98 24.65 16.06 8
a te

1027 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+0.9 335.5 -


TEMP1+1.35 MR1 0 2.55 -8.46 14.01 36.39

1028 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+0.9 340.1 -


TEMP1+1.35 MR1 5 2.89 -9.40 15.73 40.60

1029 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+0.9 290.3 263.1


TEMP1+1.35 MR1 1 46.20 9.92 3 45.93
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1030 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+0.9 294.7 264.9
TEMP1+1.35 MR1 8 46.56 8.93 6 41.53

-
1031 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+0.9 397.9 231.5

Ed
TEMP1+1.35 MR1 7 -40.22 13.53 6 62.26

-
1032 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+0.9 402.5 229.8
TEMP1+1.35 MR1 5 -39.89 12.55 6 57.89

1033 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+-0.9 356.9


TEMP1+1.35 MR1 5 4.23 13.36 20.87 64.17

F
1034 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+-0.9 361.5
TEMP1+1.35 MR1 3 4.56 12.38 22.56 59.82

PD
1035 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+-0.9 348.3 -
TEMP1+1.35 MR1 9 4.13 -20.73 20.51 88.85

1036 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+-0.9 353.0 -


TEMP1+1.35 MR1 3 4.46 -21.67 22.22 93.06

1037 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+-0.9 303.1 269.6


TEMP1+1.35 MR1 9 47.78 -2.35 3 -6.54
te r
1038 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+-0.9 307.6 271.4 -
TEMP1+1.35 MR1 7 48.13 -3.34 6 10.93

-
1039 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+-0.9 410.8 225.0
TEMP1+1.35 MR1 6 -38.65 1.26 6 9.79
as

-
1040 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+-0.9 415.4 223.3
TEMP1+1.35 MR1 4 -38.31 0.28 6 5.42

1041 1.148 DL1+1.5 LL1+0.9 WL1+1.5 322.8 115.8


nM

EQUIP1+0.9 TEMP1+1.35 MR1 8 2.52 25.46 13.64 4

1042 1.148 DL1+1.5 LL1+0.9 WL2+1.5 327.4 111.4


EQUIP1+0.9 TEMP1+1.35 MR1 6 2.85 24.48 15.33 8

1043 1.148 DL1+1.5 LL1+0.9 WL3+1.5 314.3 -


EQUIP1+0.9 TEMP1+1.35 MR1 1 2.42 -8.63 13.28 37.19

1044 1.148 DL1+1.5 LL1+0.9 WL4+1.5 318.9 -


di

EQUIP1+0.9 TEMP1+1.35 MR1 6 2.75 -9.58 15.00 41.40

1045 1.148 DL1+1.5 LL1+0.9 WL5+1.5 269.1 262.4


EQUIP1+0.9 TEMP1+1.35 MR1 2 46.07 9.74 0 45.13
a te

1046 1.148 DL1+1.5 LL1+0.9 WL6+1.5 273.5 264.2


EQUIP1+0.9 TEMP1+1.35 MR1 9 46.42 8.76 3 40.74

-
1047 1.148 DL1+1.5 LL1+0.9 WL7+1.5 376.7 232.2
EQUIP1+0.9 TEMP1+1.35 MR1 8 -40.36 13.35 9 61.46
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
1048 1.148 DL1+1.5 LL1+0.9 WL8+1.5 381.3 230.5
EQUIP1+0.9 TEMP1+1.35 MR1 6 -40.03 12.37 9 57.09

1049 1.148 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+- 335.7

Ed
0.9 TEMP1+1.35 MR1 6 4.09 13.19 20.14 63.38

1050 1.148 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+- 340.3


0.9 TEMP1+1.35 MR1 4 4.43 12.21 21.83 59.02

1051 1.148 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+- 327.2 -


0.9 TEMP1+1.35 MR1 0 3.99 -20.90 19.78 89.65

F
1052 1.148 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+- 331.8 -
0.9 TEMP1+1.35 MR1 4 4.33 -21.85 21.49 93.86

1053 1.148 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+- 282.0 268.9

PD
0.9 TEMP1+1.35 MR1 0 47.64 -2.53 0 -7.34

1054 1.148 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+- 286.4 270.7 -


0.9 TEMP1+1.35 MR1 8 48.00 -3.51 3 11.73

-
1055 1.148 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+- 389.6 225.7
0.9 TEMP1+1.35 MR1 6 -38.78 1.08 9 9.00
te r
-
1056 1.148 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+- 394.2 224.0
0.9 TEMP1+1.35 MR1 4 -38.45 0.10 9 4.63

1057 1.148 DL1+1.5 LL1+1.5 WL1+1.5 318.4 166.7


EQUIP1+0.9 TEMP1+1.35 MR1 2 2.02 36.79 11.21 2
as

1058 1.148 DL1+1.5 LL1+1.5 WL2+1.5 326.0 159.4


EQUIP1+0.9 TEMP1+1.35 MR1 6 2.58 35.16 14.03 6

1059 1.148 DL1+1.5 LL1+1.5 WL3+1.5 304.1 -


EQUIP1+0.9 TEMP1+1.35 MR1 5 1.86 -20.02 10.62 88.32
nM

1060 1.148 DL1+1.5 LL1+1.5 WL4+1.5 311.8 -


EQUIP1+0.9 TEMP1+1.35 MR1 8 2.42 -21.60 13.47 95.34

1061 1.148 DL1+1.5 LL1+1.5 WL5+1.5 228.8 425.8


EQUIP1+0.9 TEMP1+1.35 MR1 3 74.61 10.60 1 48.87

1062 1.148 DL1+1.5 LL1+1.5 WL6+1.5 236.2 428.8


EQUIP1+0.9 TEMP1+1.35 MR1 8 75.20 8.96 7 41.55
di

-
1063 1.148 DL1+1.5 LL1+1.5 WL7+1.5 408.2 398.6
EQUIP1+0.9 TEMP1+1.35 MR1 6 -69.44 16.62 7 76.09
a te

-
1064 1.148 DL1+1.5 LL1+1.5 WL8+1.5 415.9 395.8
EQUIP1+0.9 TEMP1+1.35 MR1 0 -68.88 14.98 3 68.81

1065 1.148 DL1+1.5 LL1+1.5 WL1+1.5 EQUIP1+- 331.3 114.2


0.9 TEMP1+1.35 MR1 0 3.60 24.52 17.71 6
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1066 1.148 DL1+1.5 LL1+1.5 WL2+1.5 EQUIP1+- 338.9 107.0
0.9 TEMP1+1.35 MR1 4 4.15 22.89 20.53 0

-
1067 1.148 DL1+1.5 LL1+1.5 WL3+1.5 EQUIP1+- 317.0 140.7

Ed
0.9 TEMP1+1.35 MR1 3 3.44 -32.29 17.12 9

-
1068 1.148 DL1+1.5 LL1+1.5 WL4+1.5 EQUIP1+- 324.7 147.8
0.9 TEMP1+1.35 MR1 6 3.99 -33.87 19.97 0

1069 1.148 DL1+1.5 LL1+1.5 WL5+1.5 EQUIP1+- 241.7 432.3


0.9 TEMP1+1.35 MR1 1 76.18 -1.67 1 -3.60

F
1070 1.148 DL1+1.5 LL1+1.5 WL6+1.5 EQUIP1+- 249.1 435.3 -
0.9 TEMP1+1.35 MR1 6 76.78 -3.31 7 10.92

PD
-
1071 1.148 DL1+1.5 LL1+1.5 WL7+1.5 EQUIP1+- 421.1 392.1
0.9 TEMP1+1.35 MR1 5 -67.86 4.35 7 23.62

-
1072 1.148 DL1+1.5 LL1+1.5 WL8+1.5 EQUIP1+- 428.7 389.3
0.9 TEMP1+1.35 MR1 8 -67.30 2.71 4 16.34

229.2 106.4
te r
1073 1 DL1+0.8 LL1+1 SL1 0 -1.92 -19.82 -12.49 5

-
249.7 112.7
1074 1 DL1+0.8 LL1+1 SL2 8 -19.18 -0.68 9 19.97
as

200.0 -
1075 1 DL1+0.8 LL1+-1 SL1 2 6.62 23.23 36.47 88.17

179.4 136.7
1076 1 DL1+0.8 LL1+-1 SL2 5 23.88 4.10 7 -1.70
nM

2001 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+0.6 240.4


TEMP1+1 MR1 5 1.84 17.18 10.00 78.19

2002 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+0.6 243.5


TEMP1+1 MR1 1 2.07 16.53 11.13 75.29

2003 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+0.6 234.7 -


TEMP1+1 MR1 5 1.78 -5.55 9.76 23.83
di

2004 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+0.6 237.8 -


TEMP1+1 MR1 4 2.00 -6.18 10.91 26.63

2005 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+0.6 204.6 175.8


TEMP1+1 MR1 2 30.88 6.71 4 31.05
a te

2006 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+0.6 207.6 177.0


TEMP1+1 MR1 0 31.11 6.05 6 28.12

-
2007 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+0.6 276.3 153.9
TEMP1+1 MR1 9 -26.74 9.11 5 41.94
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
2008 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+0.6 279.4 152.8
TEMP1+1 MR1 5 -26.52 8.46 2 39.03

2009 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+-0.6 249.0

Ed
TEMP1+1 MR1 4 2.90 9.00 14.33 43.22

2010 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+-0.6 252.1


TEMP1+1 MR1 0 3.12 8.35 15.46 40.31

2011 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+-0.6 243.3 -


TEMP1+1 MR1 3 2.83 -13.73 14.10 58.80

F
2012 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+-0.6 246.4 -
TEMP1+1 MR1 3 3.05 -14.36 15.24 61.61

2013 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+-0.6 213.2 180.1

PD
TEMP1+1 MR1 0 31.93 -1.48 7 -3.93

2014 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+-0.6 216.1 181.4


TEMP1+1 MR1 9 32.17 -2.13 0 -6.85

-
2015 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+-0.6 284.9 149.6
TEMP1+1 MR1 8 -25.69 0.93 2 6.96
te r
-
2016 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+-0.6 288.0 148.4
TEMP1+1 MR1 3 -25.47 0.28 9 4.05

2017 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+0.6 237.4 112.1


TEMP1+1 MR1 8 1.52 24.74 8.38 1
as

2018 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+0.6 242.5 107.2


TEMP1+1 MR1 8 1.88 23.65 10.26 7

2019 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+0.6 227.9 -


TEMP1+1 MR1 7 1.40 -13.14 7.99 57.92
nM

2020 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+0.6 233.1 -


TEMP1+1 MR1 3 1.78 -14.19 9.89 62.59

2021 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+0.6 177.7 284.7


TEMP1+1 MR1 5 49.90 7.28 8 33.54

2022 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+0.6 182.7 286.8


TEMP1+1 MR1 2 50.30 6.18 2 28.67
di

-
2023 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+0.6 297.3 264.8
TEMP1+1 MR1 8 -46.12 11.29 7 51.69
a te

-
2024 1 DL1+1.0 LL1+1 WL8+1 EQUIP1+0.6 302.4 262.9
TEMP1+1 MR1 7 -45.75 10.20 8 46.84

2025 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+-0.6 246.0


TEMP1+1 MR1 7 2.57 16.56 12.72 77.14
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
2026 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+-0.6 251.1
TEMP1+1 MR1 6 2.94 15.47 14.60 72.30

2027 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+-0.6 236.5 -


TEMP1+1 MR1 6 2.46 -21.32 12.32 92.89

Ed
2028 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+-0.6 241.7 -
TEMP1+1 MR1 1 2.83 -22.37 14.22 97.57

2029 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+-0.6 186.3 289.1


TEMP1+1 MR1 4 50.96 -0.90 2 -1.43

2030 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+-0.6 191.3 291.1

F
TEMP1+1 MR1 1 51.35 -2.00 5 -6.31

-
2031 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+-0.6 305.9 260.5

PD
TEMP1+1 MR1 7 -45.07 3.11 4 16.72

-
2032 1 DL1+0.7 LL1+1 WL8+1 EQUIP1+-0.6 311.0 258.6
TEMP1+1 MR1 6 -44.70 2.02 5 11.86

229.2 106.4
2033 1 DL1+0.8 LL1+1 SL1 0 -1.92 -19.82 -12.49 5
te r
-
249.7 112.7
2034 1 DL1+0.8 LL1+1 SL2 8 -19.18 -0.68 9 19.97

200.0 -
2035 1 DL1+0.8 LL1+-1 SL1 2 6.62 23.23 36.47 88.17
as

179.4 136.7
2036 1 DL1+0.8 LL1+-1 SL2 5 23.88 4.10 7 -1.70

524.3
P21 500 1 DL1+1 LL1+1 EQUIP1 3 8.71 4.15 50.97 7.95
nM

524.3
501 1 DL1+1 LL1+1 EQUIP1+1 TEMP1 9 17.81 15.23 91.27 55.42

254.2
502 1 DL1+1 WL1 7 5.79 23.39 39.92 91.54

260.6
503 1 DL1+1 WL2 1 4.80 22.77 33.45 88.75
di

102.6 -
504 1 DL1+1 WL3 7 5.51 -19.14 40.02 91.64

109.6 -
a te

505 1 DL1+1 WL4 2 4.54 -19.63 33.59 93.91

288.2 552.5
506 1 DL1+1 WL5 0 114.87 2.00 2 0.99

294.5 546.3
507 1 DL1+1 WL6 6 113.95 1.38 6 -1.81
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
- 524.7
508 1 DL1+1 WL7 81.61 112.29 5.95 6 15.93

Ed
- 531.2
509 1 DL1+1 WL8 87.96 113.28 5.33 1 13.13

237.9
510 1 DL1+0.7 WL1 1 4.53 17.02 32.39 64.11

242.3
511 1 DL1+0.7 WL2 6 3.84 16.59 27.86 62.16

F
131.8 -
512 1 DL1+0.7 WL3 0 4.34 -12.75 32.46 64.12

PD
136.6 -
513 1 DL1+0.7 WL4 6 3.66 -13.10 27.96 65.70

261.6 391.2
514 1 DL1+0.7 WL5 7 80.89 2.05 1 0.73

266.1 386.9
515 1 DL1+0.7 WL6 2 80.25 1.61 0 -1.24
te r
-
117.0 362.8
516 1 DL1+0.7 WL7 6 -78.12 4.82 8 11.18

-
121.5 367.4
as

517 1 DL1+0.7 WL8 0 -78.81 4.38 0 9.23

565.2
518 1 DL1+ 1LL1+0.75 WL1+1 EQUIP1 1 11.84 20.08 69.79 76.52

569.9
nM

519 1 DL1+1.0 LL1+0.75 WL2+1 EQUIP1 7 11.10 19.61 64.93 74.43

451.5 -
520 1 DL1+1.0 LL1+0.75 WL3+1 EQUIP1 1 11.64 -11.82 69.86 60.86

456.7 -
521 1 DL1+1.0 LL1+0.75 WL4+1 EQUIP1 3 10.90 -12.19 65.04 62.56

590.6 454.2
di

522 1 DL1+1.0 LL1+0.75 WL5+1 EQUIP1 6 93.65 4.03 4 8.61

595.4 449.6
523 1 DL1+1.0 LL1+0.75 WL6+1 EQUIP1 3 92.96 3.57 1 6.51
a te

-
435.7 353.7
524 1 DL1+1.0 LL1+0.75 WL7+1 EQUIP1 2 -76.72 7.00 2 19.81

-
440.4 358.5
525 1 DL1+1.0 LL1+0.75 WL8+1 EQUIP1 8 -77.45 6.54 6 17.72
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
624.0 116.9
526 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL1 0 3.31 -21.23 26.09 0

544.6
527 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL2 6 -18.06 1.33 -75.76 19.81

Ed
174.3
528 0.6 DL1+1 WL1 7 5.14 22.53 33.99 91.50

180.7
529 0.6 DL1+1 WL2 1 4.15 21.91 27.52 88.71

F
530 0.6 DL1+1 WL3 22.77 4.87 -20.00 34.09 91.68

-
531 0.6 DL1+1 WL4 29.72 3.89 -20.50 27.66 93.95

PD
208.3 546.5
532 0.6 DL1+1 WL5 0 114.22 1.14 9 0.95

214.6 540.4
533 0.6 DL1+1 WL6 6 113.30 0.51 3 -1.85

-
- 530.6
te r
534 0.6 DL1+1 WL7 1.71 112.94 5.09 9 15.88

-
- 537.1
535 0.6 DL1+1 WL8 8.05 113.92 4.47 4 13.09
as

252.7 145.3
536 0.6 DL1+0.7 SL1 5 -6.23 -32.55 -24.27 4

-
146.9 160.0
537 0.6 DL1+0.7 SL2 7 -34.72 -2.47 7 15.88
nM

756.5 110.5
1001 1.35 DL1+1.5 LL1+1.5 EQUIP1+0.9 TEMP1 9 21.01 15.88 0 54.63

756.4 -
1002 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 TEMP1 7 4.64 -4.07 37.95 30.82

351.5 180.0
1003 1.35 DL1+1.5 WL1+0.9 TEMP1 0 16.62 44.73 93.93 2
di

361.0 175.8
1004 1.35 DL1+1.5 WL2+0.9 TEMP1 2 15.14 43.80 84.22 4

124.1 -
a te

1005 1.35 DL1+1.5 WL3+0.9 TEMP1 0 16.21 -19.06 94.07 94.75

134.5 -
1006 1.35 DL1+1.5 WL4+0.9 TEMP1 3 14.75 -19.80 84.43 98.15

402.4 862.8
1007 1.35 DL1+1.5 WL5+0.9 TEMP1 0 180.25 12.65 3 44.20
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
411.9 853.5
1008 1.35 DL1+1.5 WL6+0.9 TEMP1 3 178.86 11.71 8 39.99

-
- 753.0

Ed
1009 1.35 DL1+1.5 WL7+0.9 TEMP1 92.51 160.49 18.58 8 66.60

-
102.0 - 762.7
1010 1.35 DL1+1.5 WL8+0.9 TEMP1 3 161.97 17.65 7 62.41

351.3
1011 1.35 DL1+1.5 WL1+-0.9 TEMP1 8 0.25 24.79 21.39 94.57

F
360.9
1012 1.35 DL1+1.5 WL2+-0.9 TEMP1 0 -1.23 23.86 11.67 90.39

PD
-
123.9 180.2
1013 1.35 DL1+1.5 WL3+-0.9 TEMP1 8 -0.16 -39.00 21.53 0

-
134.4 183.6
1014 1.35 DL1+1.5 WL4+-0.9 TEMP1 1 -1.62 -39.74 11.88 1

402.2 790.2 -
te r
1015 1.35 DL1+1.5 WL5+-0.9 TEMP1 8 163.88 -7.29 8 41.25

411.8 781.0 -
1016 1.35 DL1+1.5 WL6+-0.9 TEMP1 1 162.49 -8.23 4 45.46

-
as

- 825.6 -
1017 1.35 DL1+1.5 WL7+-0.9 TEMP1 92.40 176.86 -1.36 3 18.86

-
101.9 - 835.3 -
nM

1018 1.35 DL1+1.5 WL8+-0.9 TEMP1 1 178.34 -2.29 2 23.04

277.1
1019 1.35 DL1+0.9 TEMP1+1.35 MR1 0 10.75 13.01 58.14 43.42

276.9 -
1020 1.35 DL1+-0.9 TEMP1+1.35 MR1 8 -5.62 -6.93 -14.40 42.04

1021 1.35 DL1+1.5LL1+1.5 EQUIP1+0.9 763.9 112.3


di

TEMP1+1.35 MR1 5 21.39 16.00 6 55.18

1022 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 763.8 -


TEMP1+1.35 MR1 4 5.03 -3.94 39.81 30.28

1023 1.148 DL1+1.5 LL1+1.5 EQUIP1+0.9 723.6 109.3


a te

TEMP1+1.35 MR1 0 21.07 15.57 6 55.16

1024 1.148 DL1+1.5 LL1+1.5 EQUIP1+-0.9 723.4 -


TEMP1+1.35 MR1 9 4.70 -4.37 36.82 30.30

1025 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+0.9 813.0 134.9 137.4


TEMP1+1.35 MR1 2 25.15 35.11 4 7
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1026 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+0.9 818.7 129.1 134.9
TEMP1+1.35 MR1 3 24.26 34.56 1 6

1027 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+0.9 676.5 135.0 -


TEMP1+1.35 MR1 8 24.91 -3.16 3 27.40

Ed
1028 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+0.9 682.8 129.2 -
TEMP1+1.35 MR1 3 24.03 -3.61 4 29.44

1029 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+0.9 843.5 596.2


TEMP1+1.35 MR1 6 123.33 15.86 8 55.98

1030 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+0.9 849.2 590.7

F
TEMP1+1.35 MR1 8 122.49 15.30 3 53.45

-
1031 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+0.9 657.6 373.2

PD
TEMP1+1.35 MR1 2 -81.12 19.42 7 69.41

-
1032 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+0.9 663.3 379.0
TEMP1+1.35 MR1 3 -82.01 18.86 8 66.90

1033 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+-0.9 812.9


TEMP1+1.35 MR1 0 8.78 15.17 62.40 52.01
te r
1034 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+-0.9 818.6
TEMP1+1.35 MR1 1 7.89 14.62 56.57 49.51

-
1035 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+-0.9 676.4 112.8
TEMP1+1.35 MR1 6 8.54 -23.10 62.48 5
as

-
1036 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+-0.9 682.7 114.8
TEMP1+1.35 MR1 1 7.66 -23.55 56.70 9

1037 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+-0.9 843.4 523.7 -


nM

TEMP1+1.35 MR1 4 106.96 -4.08 4 29.48

1038 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+-0.9 849.1 518.1 -


TEMP1+1.35 MR1 6 106.13 -4.64 9 32.00

-
1039 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+-0.9 657.5 445.8 -
TEMP1+1.35 MR1 1 -97.49 -0.52 1 16.04
di

-
1040 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+-0.9 663.2 451.6 -
TEMP1+1.35 MR1 2 -98.37 -1.08 2 18.55

1041 1.148 DL1+1.5 LL1+0.9 WL1+1.5 772.6 131.9 137.4


a te

EQUIP1+0.9 TEMP1+1.35 MR1 6 24.82 34.68 5 5

1042 1.148 DL1+1.5 LL1+0.9 WL2+1.5 778.3 126.1 134.9


EQUIP1+0.9 TEMP1+1.35 MR1 8 23.94 34.12 2 4

1043 1.148 DL1+1.5 LL1+0.9 WL3+1.5 636.2 132.0 -


EQUIP1+0.9 TEMP1+1.35 MR1 3 24.58 -3.60 3 27.42
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1044 1.148 DL1+1.5 LL1+0.9 WL4+1.5 642.4 126.2 -
EQUIP1+0.9 TEMP1+1.35 MR1 8 23.70 -4.04 5 29.46

1045 1.148 DL1+1.5 LL1+0.9 WL5+1.5 803.2 593.2


EQUIP1+0.9 TEMP1+1.35 MR1 0 123.00 15.43 9 55.95

Ed
1046 1.148 DL1+1.5 LL1+0.9 WL6+1.5 808.9 587.7
EQUIP1+0.9 TEMP1+1.35 MR1 3 122.17 14.86 4 53.43

-
1047 1.148 DL1+1.5 LL1+0.9 WL7+1.5 617.2 376.2
EQUIP1+0.9 TEMP1+1.35 MR1 7 -81.45 18.98 6 69.39

F
-
1048 1.148 DL1+1.5 LL1+0.9 WL8+1.5 622.9 382.0
EQUIP1+0.9 TEMP1+1.35 MR1 8 -82.33 18.43 7 66.88

PD
1049 1.148 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+- 772.5
0.9 TEMP1+1.35 MR1 5 8.46 14.74 59.40 51.99

1050 1.148 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+- 778.2


0.9 TEMP1+1.35 MR1 6 7.57 14.18 53.58 49.48

-
1051 1.148 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+- 636.1 112.8
te r
0.9 TEMP1+1.35 MR1 1 8.21 -23.54 59.49 7

-
1052 1.148 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+- 642.3 114.9
0.9 TEMP1+1.35 MR1 6 7.33 -23.98 53.70 1

1053 1.148 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+- 803.0 520.7 -


as

0.9 TEMP1+1.35 MR1 9 106.63 -4.52 4 29.50

1054 1.148 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+- 808.8 515.1 -


0.9 TEMP1+1.35 MR1 1 105.80 -5.08 9 32.03

-
nM

1055 1.148 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+- 617.1 448.8 -


0.9 TEMP1+1.35 MR1 6 -97.81 -0.96 1 16.06

-
1056 1.148 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+- 622.8 454.6 -
0.9 TEMP1+1.35 MR1 6 -98.70 -1.51 2 18.57

1057 1.148 DL1+1.5 LL1+1.5 WL1+1.5 805.3 147.0 192.3


di

EQUIP1+0.9 TEMP1+1.35 MR1 7 27.33 47.42 0 1

1058 1.148 DL1+1.5 LL1+1.5 WL2+1.5 814.8 137.2 188.1


EQUIP1+0.9 TEMP1+1.35 MR1 9 25.85 46.49 9 3

1059 1.148 DL1+1.5 LL1+1.5 WL3+1.5 577.9 147.1 -


a te

EQUIP1+0.9 TEMP1+1.35 MR1 8 26.92 -16.37 5 82.46

1060 1.148 DL1+1.5 LL1+1.5 WL4+1.5 588.4 137.5 -


EQUIP1+0.9 TEMP1+1.35 MR1 0 25.45 -17.12 0 85.87

1061 1.148 DL1+1.5 LL1+1.5 WL5+1.5 856.2 915.9


EQUIP1+0.9 TEMP1+1.35 MR1 7 190.95 15.33 0 56.48
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1062 1.148 DL1+1.5 LL1+1.5 WL6+1.5 865.8 906.6
EQUIP1+0.9 TEMP1+1.35 MR1 1 189.57 14.40 6 52.28

-
1063 1.148 DL1+1.5 LL1+1.5 WL7+1.5 546.3 - 700.0

Ed
EQUIP1+0.9 TEMP1+1.35 MR1 9 149.79 21.26 1 78.88

-
1064 1.148 DL1+1.5 LL1+1.5 WL8+1.5 555.9 - 709.7
EQUIP1+0.9 TEMP1+1.35 MR1 0 151.26 20.33 0 74.70

1065 1.148 DL1+1.5 LL1+1.5 WL1+1.5 EQUIP1+- 805.2 106.8


0.9 TEMP1+1.35 MR1 5 10.96 27.48 74.46 5

F
1066 1.148 DL1+1.5 LL1+1.5 WL2+1.5 EQUIP1+- 814.7 102.6
0.9 TEMP1+1.35 MR1 7 9.48 26.55 64.75 7

PD
-
1067 1.148 DL1+1.5 LL1+1.5 WL3+1.5 EQUIP1+- 577.8 167.9
0.9 TEMP1+1.35 MR1 6 10.55 -36.31 74.60 2

-
1068 1.148 DL1+1.5 LL1+1.5 WL4+1.5 EQUIP1+- 588.2 171.3
0.9 TEMP1+1.35 MR1 8 9.09 -37.06 64.96 2

1069 1.148 DL1+1.5 LL1+1.5 WL5+1.5 EQUIP1+- 856.1 843.3 -


te r
0.9 TEMP1+1.35 MR1 5 174.59 -4.61 6 28.97

1070 1.148 DL1+1.5 LL1+1.5 WL6+1.5 EQUIP1+- 865.6 834.1 -


0.9 TEMP1+1.35 MR1 9 173.20 -5.55 1 33.18

-
as

1071 1.148 DL1+1.5 LL1+1.5 WL7+1.5 EQUIP1+- 546.2 - 772.5


0.9 TEMP1+1.35 MR1 7 166.16 1.32 5 -6.57

-
1072 1.148 DL1+1.5 LL1+1.5 WL8+1.5 EQUIP1+- 555.7 - 782.2 -
nM

0.9 TEMP1+1.35 MR1 8 167.63 0.39 4 10.76

648.4 213.7
1073 1 DL1+0.8 LL1+1 SL1 0 -2.96 -44.64 -3.48 1

-
497.2 197.4
1074 1 DL1+0.8 LL1+1 SL2 8 -43.66 -1.67 8 28.77
di

-
268.7 201.3
1075 1 DL1+0.8 LL1+-1 SL1 0 17.60 52.07 91.28 6

419.8 285.2 -
1076 1 DL1+0.8 LL1+-1 SL2 2 58.31 9.10 8 16.42
a te

2001 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+0.6 562.5


TEMP1+1 MR1 3 16.96 23.63 91.58 91.70

2002 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+0.6 566.3


TEMP1+1 MR1 4 16.36 23.26 87.70 90.02
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
2003 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+0.6 471.5 -
TEMP1+1 MR1 7 16.79 -1.88 91.64 18.21

2004 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+0.6 475.7 -


TEMP1+1 MR1 4 16.21 -2.18 87.78 19.57

Ed
2005 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+0.6 582.8 399.1
TEMP1+1 MR1 9 82.41 10.80 4 37.37

2006 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+0.6 586.7 395.4


TEMP1+1 MR1 1 81.85 10.43 4 35.69

F
2007 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+0.6 458.9 247.2
TEMP1+1 MR1 4 -53.89 13.17 2 46.33

PD
2008 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+0.6 462.7 251.1
TEMP1+1 MR1 4 -54.48 12.80 0 44.65

2009 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+-0.6 562.4


TEMP1+1 MR1 5 6.04 10.34 43.22 34.73

2010 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+-0.6 566.2


TEMP1+1 MR1 6 5.45 9.97 39.33 33.06
te r
2011 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+-0.6 471.4 -
TEMP1+1 MR1 9 5.88 -15.18 43.28 75.18

2012 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+-0.6 475.6 -


TEMP1+1 MR1 6 5.29 -15.47 39.42 76.54
as

2013 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+-0.6 582.8 350.7 -


TEMP1+1 MR1 1 71.49 -2.49 8 19.60

2014 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+-0.6 586.6 347.0 -


TEMP1+1 MR1 3 70.94 -2.87 8 21.29
nM

-
2015 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+-0.6 458.8 295.5 -
TEMP1+1 MR1 6 -64.80 -0.12 9 10.64

-
2016 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+-0.6 462.6 299.4 -
TEMP1+1 MR1 7 -65.39 -0.49 6 12.32

2017 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+0.6 584.3 101.6 128.2


di

TEMP1+1 MR1 4 18.63 32.13 2 7

2018 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+0.6 590.6 125.4


TEMP1+1 MR1 8 17.64 31.51 95.14 8
a te

2019 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+0.6 432.7 101.7 -


TEMP1+1 MR1 4 18.35 -10.40 2 54.91

2020 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+0.6 439.6 -


TEMP1+1 MR1 9 17.38 -10.90 95.28 57.18

2021 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+0.6 618.2 614.2


TEMP1+1 MR1 7 127.71 10.74 2 37.72
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
2022 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+0.6 624.6 608.0
TEMP1+1 MR1 3 126.79 10.11 5 34.92

-
2023 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+0.6 411.6 463.0

Ed
TEMP1+1 MR1 8 -99.45 14.69 6 52.65

-
2024 1 DL1+1.0 LL1+1 WL8+1 EQUIP1+0.6 418.0 - 469.5
TEMP1+1 MR1 2 100.44 14.07 1 49.86

2025 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+-0.6 584.2


TEMP1+1 MR1 6 7.71 18.83 53.26 71.30

F
2026 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+-0.6 590.6
TEMP1+1 MR1 0 6.73 18.22 46.78 68.51

PD
-
2027 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+-0.6 432.6 111.8
TEMP1+1 MR1 6 7.44 -23.69 53.35 8

-
2028 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+-0.6 439.6 114.1
TEMP1+1 MR1 1 6.46 -24.19 46.92 5

2029 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+-0.6 618.1 565.8 -


te r
TEMP1+1 MR1 9 116.80 -2.56 6 19.25

2030 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+-0.6 624.5 559.6 -


TEMP1+1 MR1 5 115.87 -3.18 9 22.05

-
as

2031 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+-0.6 411.6 - 511.4


TEMP1+1 MR1 0 110.36 1.40 2 -4.32

-
2032 1 DL1+0.7 LL1+1 WL8+1 EQUIP1+-0.6 417.9 - 517.8
nM

TEMP1+1 MR1 5 111.35 0.78 8 -7.11

648.4 213.7
2033 1 DL1+0.8 LL1+1 SL1 0 -2.96 -44.64 -3.48 1

-
497.2 197.4
2034 1 DL1+0.8 LL1+1 SL2 8 -43.66 -1.67 8 28.77
di

-
268.7 201.3
2035 1 DL1+0.8 LL1+-1 SL1 0 17.60 52.07 91.28 6

419.8 285.2 -
2036 1 DL1+0.8 LL1+-1 SL2 2 58.31 9.10 8 16.42
a te

203.9
P22 500 1 DL1+1 LL1+1 EQUIP1 4 5.15 1.38 20.57 7.67

202.0
501 1 DL1+1 LL1+1 EQUIP1+1 TEMP1 2 11.20 1.30 46.22 7.85

502 1 DL1+1 WL1 93.46 4.13 8.39 16.84 41.34


re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
503 1 DL1+1 WL2 89.99 3.53 8.17 14.20 40.31

-
504 1 DL1+1 WL3 99.93 3.95 -7.91 16.68 36.81

Ed
-
505 1 DL1+1 WL4 96.53 3.35 -8.08 14.06 37.60

319.9 202.9
506 1 DL1+1 WL5 2 48.25 6.29 3 31.32

316.8 200.4
507 1 DL1+1 WL6 7 47.67 6.06 0 30.25

F
- -
184.8 190.0 -
508 1 DL1+1 WL7 0 -44.91 -5.11 2 23.29

PD
- -
188.2 192.6 -
509 1 DL1+1 WL8 4 -45.51 -5.33 5 24.31

510 1 DL1+0.7 WL1 89.33 3.41 5.92 13.79 29.50

511 1 DL1+0.7 WL2 86.91 2.99 5.76 11.95 28.78


te r
-
512 1 DL1+0.7 WL3 93.86 3.28 -5.49 13.68 25.20

-
513 1 DL1+0.7 WL4 91.49 2.86 -5.61 11.85 25.76
as

247.8 144.0
514 1 DL1+0.7 WL5 6 34.29 4.44 6 22.49

245.7 142.2
515 1 DL1+0.7 WL6 2 33.89 4.28 9 21.74
nM

- -
105.4 131.0 -
516 1 DL1+0.7 WL7 4 -30.92 -3.54 1 15.74

- -
107.8 132.8 -
517 1 DL1+0.7 WL8 6 -31.34 -3.69 5 16.46

214.2
di

518 1 DL1+ 1LL1+0.75 WL1+1 EQUIP1 5 6.95 7.56 28.18 37.26

211.6
519 1 DL1+1.0 LL1+0.75 WL2+1 EQUIP1 5 6.50 7.40 26.21 36.50

219.1 -
a te

520 1 DL1+1.0 LL1+0.75 WL3+1 EQUIP1 0 6.81 -4.66 28.06 21.35

216.5 -
521 1 DL1+1.0 LL1+0.75 WL4+1 EQUIP1 5 6.36 -4.79 26.10 21.94

384.1 167.7
522 1 DL1+1.0 LL1+0.75 WL5+1 EQUIP1 0 40.04 5.98 5 29.75
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
381.8 165.8
523 1 DL1+1.0 LL1+0.75 WL6+1 EQUIP1 0 39.61 5.81 6 28.95

-
126.9 -

Ed
524 1 DL1+1.0 LL1+0.75 WL7+1 EQUIP1 5.56 -29.83 -2.57 6 11.21

-
128.9 -
525 1 DL1+1.0 LL1+0.75 WL8+1 EQUIP1 2.97 -30.28 -2.73 3 11.98

214.8
526 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL1 3 2.89 -8.75 11.39 56.19

F
283.2
527 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL2 0 -5.75 -0.15 -25.54 15.03

PD
528 0.6 DL1+1 WL1 61.57 3.44 8.33 14.16 40.59

529 0.6 DL1+1 WL2 58.10 2.84 8.11 11.53 39.56

-
530 0.6 DL1+1 WL3 68.04 3.26 -7.96 14.01 37.56

-
531 0.6 DL1+1 WL4 64.65 2.66 -8.13 11.39 38.35
te r
288.0 200.2
532 0.6 DL1+1 WL5 3 47.56 6.23 5 30.57

284.9 197.7
533 0.6 DL1+1 WL6 8 46.98 6.00 3 29.50
as

- -
216.6 192.7 -
534 0.6 DL1+1 WL7 8 -45.60 -5.17 0 24.04

- -
nM

220.1 195.3 -
535 0.6 DL1+1 WL8 3 -46.20 -5.39 3 25.06

536 0.6 DL1+0.7 SL1 62.35 -1.98 -13.41 -8.23 65.82

153.5
537 0.6 DL1+0.7 SL2 1 -13.50 -1.95 -57.47 10.95

292.2
di

1001 1.35 DL1+1.5 LL1+1.5 EQUIP1+0.9 TEMP1 3 12.91 1.98 52.94 11.39

295.6
1002 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 TEMP1 9 2.01 2.11 6.77 11.05

126.4
a te

1003 1.35 DL1+1.5 WL1+0.9 TEMP1 9 11.39 12.50 47.34 61.90

121.3
1004 1.35 DL1+1.5 WL2+0.9 TEMP1 0 10.48 12.17 43.38 60.36

136.2 -
1005 1.35 DL1+1.5 WL3+0.9 TEMP1 0 11.11 -11.95 47.10 55.32
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
131.1 -
1006 1.35 DL1+1.5 WL4+0.9 TEMP1 1 10.21 -12.20 43.17 56.50

466.1 326.4
1007 1.35 DL1+1.5 WL5+0.9 TEMP1 9 77.57 9.35 7 46.87

Ed
461.6 322.6
1008 1.35 DL1+1.5 WL6+0.9 TEMP1 1 76.70 9.00 9 45.27

- -
290.8 262.9 -
1009 1.35 DL1+1.5 WL7+0.9 TEMP1 8 -62.17 -7.76 5 35.04

F
- -
296.0 266.9 -
1010 1.35 DL1+1.5 WL8+0.9 TEMP1 5 -63.07 -8.08 0 36.58

PD
129.9
1011 1.35 DL1+1.5 WL1+-0.9 TEMP1 6 0.49 12.63 1.17 61.56

124.7
1012 1.35 DL1+1.5 WL2+-0.9 TEMP1 6 -0.42 12.30 -2.78 60.02

139.6 -
1013 1.35 DL1+1.5 WL3+-0.9 TEMP1 6 0.21 -11.81 0.93 55.66
te r
134.5 -
1014 1.35 DL1+1.5 WL4+-0.9 TEMP1 7 -0.69 -12.07 -3.00 56.84

469.6 280.3
1015 1.35 DL1+1.5 WL5+-0.9 TEMP1 6 66.67 9.48 0 46.53
as

465.0 276.5
1016 1.35 DL1+1.5 WL6+-0.9 TEMP1 7 65.80 9.13 2 44.93

- -
287.4 309.1 -
1017 1.35 DL1+1.5 WL7+-0.9 TEMP1 2 -73.07 -7.62 2 35.38
nM

- -
292.5 313.0 -
1018 1.35 DL1+1.5 WL8+-0.9 TEMP1 9 -73.97 -7.95 6 36.92

109.8
1019 1.35 DL1+0.9 TEMP1+1.35 MR1 6 7.95 0.23 32.80 3.21

113.3
di

1020 1.35 DL1+-0.9 TEMP1+1.35 MR1 3 -2.95 0.37 -13.37 2.87

1021 1.35 DL1+1.5LL1+1.5 EQUIP1+0.9 296.2


TEMP1+1.35 MR1 0 13.08 2.08 53.63 11.90
a te

1022 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 299.6


TEMP1+1.35 MR1 6 2.18 2.22 7.46 11.56

1023 1.148 DL1+1.5 LL1+1.5 EQUIP1+0.9 280.1


TEMP1+1.35 MR1 0 12.73 2.06 52.27 11.52

1024 1.148 DL1+1.5 LL1+1.5 EQUIP1+-0.9 283.5


TEMP1+1.35 MR1 6 1.83 2.19 6.11 11.18
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1025 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+0.9 308.5
TEMP1+1.35 MR1 7 15.24 9.51 62.76 47.42

1026 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+0.9 305.4


TEMP1+1.35 MR1 5 14.70 9.31 60.39 46.50

Ed
1027 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+0.9 314.3 -
TEMP1+1.35 MR1 9 15.07 -5.16 62.62 22.91

1028 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+0.9 311.3 -


TEMP1+1.35 MR1 4 14.53 -5.31 60.26 23.62

1029 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+0.9 512.3 230.2

F
TEMP1+1.35 MR1 9 54.95 7.62 4 38.40

1030 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+0.9 509.6 227.9


TEMP1+1.35 MR1 4 54.43 7.41 7 37.44

PD
-
1031 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+0.9 123.4 -
TEMP1+1.35 MR1 58.14 -28.90 -2.65 2 10.74

-
1032 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+0.9 125.7 -
TEMP1+1.35 MR1 55.04 -29.44 -2.84 8 11.67
te r
1033 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+-0.9 312.0
TEMP1+1.35 MR1 3 4.34 9.64 16.59 47.08

1034 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+-0.9 308.9


TEMP1+1.35 MR1 1 3.80 9.44 14.22 46.16
as

1035 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+-0.9 317.8 -


TEMP1+1.35 MR1 5 4.17 -5.03 16.45 23.25

1036 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+-0.9 314.8 -


TEMP1+1.35 MR1 0 3.63 -5.18 14.09 23.96
nM

1037 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+-0.9 515.8 184.0


TEMP1+1.35 MR1 5 44.05 7.75 7 38.06

1038 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+-0.9 513.1 181.8


TEMP1+1.35 MR1 0 43.53 7.54 0 37.10

-
1039 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+-0.9 169.5 -
TEMP1+1.35 MR1 61.60 -39.80 -2.51 8 11.08
di

-
1040 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+-0.9 171.9 -
TEMP1+1.35 MR1 58.50 -40.34 -2.71 5 12.01
a te

1041 1.148 DL1+1.5 LL1+0.9 WL1+1.5 292.4


EQUIP1+0.9 TEMP1+1.35 MR1 6 14.89 9.48 61.41 47.04

1042 1.148 DL1+1.5 LL1+0.9 WL2+1.5 289.3


EQUIP1+0.9 TEMP1+1.35 MR1 4 14.35 9.28 59.04 46.12

1043 1.148 DL1+1.5 LL1+0.9 WL3+1.5 298.2 -


EQUIP1+0.9 TEMP1+1.35 MR1 9 14.72 -5.19 61.27 23.29
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1044 1.148 DL1+1.5 LL1+0.9 WL4+1.5 295.2 -
EQUIP1+0.9 TEMP1+1.35 MR1 3 14.18 -5.34 58.91 24.00

1045 1.148 DL1+1.5 LL1+0.9 WL5+1.5 496.2 228.8


EQUIP1+0.9 TEMP1+1.35 MR1 8 54.60 7.59 9 38.02

Ed
1046 1.148 DL1+1.5 LL1+0.9 WL6+1.5 493.5 226.6
EQUIP1+0.9 TEMP1+1.35 MR1 3 54.08 7.38 2 37.06

-
1047 1.148 DL1+1.5 LL1+0.9 WL7+1.5 124.7 -
EQUIP1+0.9 TEMP1+1.35 MR1 42.04 -29.25 -2.67 7 11.12

F
-
1048 1.148 DL1+1.5 LL1+0.9 WL8+1.5 127.1 -
EQUIP1+0.9 TEMP1+1.35 MR1 38.94 -29.79 -2.87 3 12.05

PD
1049 1.148 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+- 295.9
0.9 TEMP1+1.35 MR1 2 3.99 9.61 15.24 46.70

1050 1.148 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+- 292.8


0.9 TEMP1+1.35 MR1 1 3.45 9.41 12.87 45.78

1051 1.148 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+- 301.7 -


0.9 TEMP1+1.35 MR1 5 3.82 -5.06 15.10 23.63
te r
1052 1.148 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+- 298.6 -
0.9 TEMP1+1.35 MR1 9 3.29 -5.21 12.74 24.34

1053 1.148 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+- 499.7 182.7


0.9 TEMP1+1.35 MR1 4 43.70 7.72 2 37.68
as

1054 1.148 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+- 496.9 180.4


0.9 TEMP1+1.35 MR1 9 43.18 7.51 5 36.72

-
1055 1.148 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+- 170.9 -
0.9 TEMP1+1.35 MR1 45.50 -40.14 -2.54 3 11.46
nM

-
1056 1.148 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+- 173.3 -
0.9 TEMP1+1.35 MR1 42.40 -40.69 -2.74 0 12.39

1057 1.148 DL1+1.5 LL1+1.5 WL1+1.5 300.7


EQUIP1+0.9 TEMP1+1.35 MR1 1 16.33 14.43 67.50 70.72

1058 1.148 DL1+1.5 LL1+1.5 WL2+1.5 295.5


di

EQUIP1+0.9 TEMP1+1.35 MR1 1 15.43 14.10 63.54 69.18

1059 1.148 DL1+1.5 LL1+1.5 WL3+1.5 310.4 -


EQUIP1+0.9 TEMP1+1.35 MR1 1 16.06 -10.02 67.26 46.50
a te

1060 1.148 DL1+1.5 LL1+1.5 WL4+1.5 305.3 -


EQUIP1+0.9 TEMP1+1.35 MR1 2 15.16 -10.27 63.33 47.68

1061 1.148 DL1+1.5 LL1+1.5 WL5+1.5 640.4 346.6


EQUIP1+0.9 TEMP1+1.35 MR1 1 82.51 11.27 3 55.69

1062 1.148 DL1+1.5 LL1+1.5 WL6+1.5 635.8 342.8


EQUIP1+0.9 TEMP1+1.35 MR1 2 81.64 10.93 5 54.09
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
- -
1063 1.148 DL1+1.5 LL1+1.5 WL7+1.5 116.6 242.7 -
EQUIP1+0.9 TEMP1+1.35 MR1 7 -57.23 -5.83 9 26.22

- -

Ed
1064 1.148 DL1+1.5 LL1+1.5 WL8+1.5 121.8 246.7 -
EQUIP1+0.9 TEMP1+1.35 MR1 4 -58.13 -6.16 4 27.76

1065 1.148 DL1+1.5 LL1+1.5 WL1+1.5 EQUIP1+- 304.1


0.9 TEMP1+1.35 MR1 7 5.44 14.56 21.33 70.38

1066 1.148 DL1+1.5 LL1+1.5 WL2+1.5 EQUIP1+- 298.9


0.9 TEMP1+1.35 MR1 7 4.53 14.23 17.38 68.84

F
1067 1.148 DL1+1.5 LL1+1.5 WL3+1.5 EQUIP1+- 313.8 -
0.9 TEMP1+1.35 MR1 8 5.16 -9.89 21.09 46.84

PD
1068 1.148 DL1+1.5 LL1+1.5 WL4+1.5 EQUIP1+- 308.7 -
0.9 TEMP1+1.35 MR1 8 4.26 -10.14 17.17 48.02

1069 1.148 DL1+1.5 LL1+1.5 WL5+1.5 EQUIP1+- 643.8 300.4


0.9 TEMP1+1.35 MR1 7 71.61 11.40 6 55.35

1070 1.148 DL1+1.5 LL1+1.5 WL6+1.5 EQUIP1+- 639.2 296.6


0.9 TEMP1+1.35 MR1 8 70.75 11.06 8 53.75
te r
- -
1071 1.148 DL1+1.5 LL1+1.5 WL7+1.5 EQUIP1+- 113.2 288.9 -
0.9 TEMP1+1.35 MR1 1 -68.13 -5.70 6 26.56

- -
1072 1.148 DL1+1.5 LL1+1.5 WL8+1.5 EQUIP1+- 118.3 292.9 -
as

0.9 TEMP1+1.35 MR1 8 -69.03 -6.03 0 28.10

199.4
1073 1 DL1+0.8 LL1+1 SL1 8 0.17 -18.12 0.37 99.11

329.7
nM

1074 1 DL1+0.8 LL1+1 SL2 1 -16.28 -1.74 -69.98 20.71

158.0 -
1075 1 DL1+0.8 LL1+-1 SL1 0 8.78 20.45 35.35 85.74

105.6
1076 1 DL1+0.8 LL1+-1 SL2 27.77 25.24 4.07 9 -7.35

2001 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+0.6 213.9


di

TEMP1+1 MR1 8 10.35 6.36 42.56 31.84

2002 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+0.6 211.9


TEMP1+1 MR1 0 9.98 6.23 40.98 31.22
a te

2003 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+0.6 217.8 -


TEMP1+1 MR1 6 10.23 -3.42 42.47 15.05

2004 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+0.6 215.8 -


TEMP1+1 MR1 2 9.87 -3.52 40.89 15.52

2005 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+0.6 349.8 154.2


TEMP1+1 MR1 6 36.82 5.10 1 25.83
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
2006 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+0.6 348.0 152.7
TEMP1+1 MR1 2 36.47 4.96 0 25.19

2007 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+0.6


TEMP1+1 MR1 47.03 -19.08 -1.74 -81.56 -6.94

Ed
2008 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+0.6
TEMP1+1 MR1 44.96 -19.44 -1.87 -83.13 -7.55

2009 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+-0.6 216.2


TEMP1+1 MR1 8 3.08 6.45 11.78 31.61

2010 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+-0.6 214.2

F
TEMP1+1 MR1 1 2.72 6.32 10.20 31.00

2011 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+-0.6 220.1 -


TEMP1+1 MR1 7 2.97 -3.33 11.69 15.28

PD
2012 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+-0.6 218.1 -
TEMP1+1 MR1 3 2.61 -3.43 10.12 15.75

2013 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+-0.6 352.1 123.4


TEMP1+1 MR1 6 29.55 5.19 3 25.60

2014 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+-0.6 350.3 121.9


TEMP1+1 MR1 3 29.20 5.05 2 24.96
te r
-
2015 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+-0.6 112.3
TEMP1+1 MR1 49.33 -26.35 -1.65 4 -7.16

-
as

2016 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+-0.6 113.9


TEMP1+1 MR1 47.27 -26.71 -1.79 1 -7.78

2017 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+0.6 219.4


TEMP1+1 MR1 7 11.31 9.66 46.62 47.62
nM

2018 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+0.6 216.0


TEMP1+1 MR1 1 10.70 9.44 43.98 46.60

2019 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+0.6 225.9 -


TEMP1+1 MR1 4 11.12 -6.64 46.46 30.52

2020 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+0.6 222.5 -


TEMP1+1 MR1 5 10.52 -6.81 43.84 31.31
di

2021 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+0.6 445.9 232.7


TEMP1+1 MR1 4 55.43 7.56 1 37.61

2022 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+0.6 442.8 230.1


TEMP1+1 MR1 8 54.85 7.33 9 36.54
a te

-
2023 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+0.6 - 160.2 -
TEMP1+1 MR1 58.78 -37.73 -3.84 4 17.00

-
2024 1 DL1+1.0 LL1+1 WL8+1 EQUIP1+0.6 - 162.8 -
TEMP1+1 MR1 62.23 -38.34 -4.06 7 18.03
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
2025 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+-0.6 221.7
TEMP1+1 MR1 8 4.04 9.75 15.84 47.40

2026 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+-0.6 218.3


TEMP1+1 MR1 1 3.44 9.53 13.21 46.37

Ed
2027 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+-0.6 228.2 -
TEMP1+1 MR1 5 3.86 -6.55 15.68 30.75

2028 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+-0.6 224.8 -


TEMP1+1 MR1 6 3.26 -6.72 13.07 31.54

2029 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+-0.6 448.2 201.9

F
TEMP1+1 MR1 5 48.16 7.64 3 37.38

2030 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+-0.6 445.1 199.4


TEMP1+1 MR1 9 47.58 7.42 1 36.31

PD
-
2031 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+-0.6 - 191.0 -
TEMP1+1 MR1 56.47 -45.00 -3.76 2 17.23

-
2032 1 DL1+0.7 LL1+1 WL8+1 EQUIP1+-0.6 - 193.6 -
TEMP1+1 MR1 59.92 -45.60 -3.98 5 18.26
te r
199.4
2033 1 DL1+0.8 LL1+1 SL1 8 0.17 -18.12 0.37 99.11

329.7
2034 1 DL1+0.8 LL1+1 SL2 1 -16.28 -1.74 -69.98 20.71
as

158.0 -
2035 1 DL1+0.8 LL1+-1 SL1 0 8.78 20.45 35.35 85.74

105.6
2036 1 DL1+0.8 LL1+-1 SL2 27.77 25.24 4.07 9 -7.35
nM

268.0
P23 500 1 DL1+1 LL1+1 EQUIP1 4 -3.25 -0.80 -15.69 -8.01

274.3
501 1 DL1+1 LL1+1 EQUIP1+1 TEMP1 0 -11.40 9.03 -51.10 33.75

165.9
502 1 DL1+1 WL1 6 -2.01 17.25 -9.13 67.40
di

175.8
503 1 DL1+1 WL2 8 -2.08 16.58 -9.30 64.10

-
504 1 DL1+1 WL3 25.60 -2.14 -17.24 -10.84 77.02
a te

-
505 1 DL1+1 WL4 35.98 -2.20 -17.80 -11.00 79.92

-
264.9 201.5
506 1 DL1+1 WL5 1 44.26 5.89 6 18.11
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
256.7 202.0
507 1 DL1+1 WL6 6 44.33 5.25 9 14.89

Ed
463.3 209.0
508 1 DL1+1 WL7 7 -47.02 -0.97 5 -3.29

-
473.2 209.2
509 1 DL1+1 WL8 4 -47.08 -1.63 0 -6.59

150.2

F
510 1 DL1+0.7 WL1 4 -1.92 12.15 -8.24 46.10

157.1

PD
511 1 DL1+0.7 WL2 8 -1.96 11.69 -8.36 43.78

-
512 1 DL1+0.7 WL3 51.99 -2.01 -11.98 -9.44 55.00

-
513 1 DL1+0.7 WL4 59.25 -2.05 -12.38 -9.55 57.03

-
151.3 139.2
te r
514 1 DL1+0.7 WL5 7 30.47 4.20 4 11.60

-
145.6 139.6
515 1 DL1+0.7 WL6 7 30.52 3.76 1 9.34
as

-
358.4 148.1
516 1 DL1+0.7 WL7 2 -33.42 -0.60 9 -3.39

-
nM

365.3 148.2
517 1 DL1+0.7 WL8 4 -33.47 -1.06 9 -5.70

307.3
518 1 DL1+ 1LL1+0.75 WL1+1 EQUIP1 6 -3.48 11.93 -17.91 45.24

314.8
519 1 DL1+1.0 LL1+0.75 WL2+1 EQUIP1 0 -3.53 11.44 -18.04 42.77
di

202.0 -
520 1 DL1+1.0 LL1+0.75 WL3+1 EQUIP1 9 -3.58 -13.93 -19.19 63.07

209.8 -
521 1 DL1+1.0 LL1+0.75 WL4+1 EQUIP1 7 -3.63 -14.35 -19.31 65.25
a te

- 140.1
522 1 DL1+1.0 LL1+0.75 WL5+1 EQUIP1 15.80 31.22 3.42 1 8.28

140.5
523 1 DL1+1.0 LL1+0.75 WL6+1 EQUIP1 -9.69 31.27 2.94 0 5.86
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
530.4 167.8
524 1 DL1+1.0 LL1+0.75 WL7+1 EQUIP1 1 -37.24 -1.73 5 -7.77

Ed
537.8 167.9 -
525 1 DL1+1.0 LL1+0.75 WL8+1 EQUIP1 2 -37.29 -2.22 6 10.25

337.7
526 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL1 6 -4.93 -20.84 -23.09 74.52

383.3
527 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL2 2 -17.01 -2.42 -77.17 -1.20

F
120.5
528 0.6 DL1+1 WL1 4 -1.33 17.14 -6.67 68.84

PD
130.4
529 0.6 DL1+1 WL2 7 -1.39 16.48 -6.83 65.54

- -
530 0.6 DL1+1 WL3 19.82 -1.46 -17.35 -8.37 75.58

-
531 0.6 DL1+1 WL4 -9.44 -1.52 -17.91 -8.53 78.48
te r
-
310.3 204.0
532 0.6 DL1+1 WL5 3 44.94 5.78 2 19.56

-
302.1 204.5
as

533 0.6 DL1+1 WL6 8 45.01 5.14 5 16.33

-
417.9 206.5
534 0.6 DL1+1 WL7 5 -46.34 -1.08 9 -1.85
nM

-
427.8 206.7
535 0.6 DL1+1 WL8 2 -46.40 -1.74 3 -5.15

161.0 107.8
536 0.6 DL1+0.7 SL1 8 -3.26 -26.56 -13.57 8

221.8
di

537 0.6 DL1+0.7 SL2 3 -19.37 -2.00 -85.68 6.92

390.6
1001 1.35 DL1+1.5 LL1+1.5 EQUIP1+0.9 TEMP1 6 -11.96 7.61 -54.47 26.11

379.4 -
a te

1002 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 TEMP1 1 2.71 -10.08 9.27 49.07

237.5 139.2
1003 1.35 DL1+1.5 WL1+0.9 TEMP1 4 -10.09 34.67 -44.65 3

252.4 134.2
1004 1.35 DL1+1.5 WL2+0.9 TEMP1 2 -10.19 33.68 -44.89 7
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
1005 1.35 DL1+1.5 WL3+0.9 TEMP1 27.00 -10.28 -17.06 -47.20 77.40

-
1006 1.35 DL1+1.5 WL4+0.9 TEMP1 42.57 -10.38 -17.90 -47.44 81.75

Ed
-
408.7 271.3
1007 1.35 DL1+1.5 WL5+0.9 TEMP1 7 59.31 17.63 9 65.30

-
396.5 272.1
1008 1.35 DL1+1.5 WL6+0.9 TEMP1 5 59.42 16.67 9 60.46

F
-
683.6 344.5

PD
1009 1.35 DL1+1.5 WL7+0.9 TEMP1 5 -77.60 7.35 2 33.20

-
698.4 344.7
1010 1.35 DL1+1.5 WL8+0.9 TEMP1 6 -77.70 6.36 4 28.24

226.2
1011 1.35 DL1+1.5 WL1+-0.9 TEMP1 8 4.57 16.99 19.10 64.05

241.1
te r
1012 1.35 DL1+1.5 WL2+-0.9 TEMP1 7 4.47 16.00 18.85 59.10

-
152.5
1013 1.35 DL1+1.5 WL3+-0.9 TEMP1 15.75 4.38 -34.74 16.54 7
as

-
156.9
1014 1.35 DL1+1.5 WL4+-0.9 TEMP1 31.32 4.29 -35.58 16.30 2

-
nM

420.0 335.1
1015 1.35 DL1+1.5 WL5+-0.9 TEMP1 2 73.97 -0.05 3 -9.88

-
407.8 335.9 -
1016 1.35 DL1+1.5 WL6+-0.9 TEMP1 0 74.08 -1.01 3 14.72

-
672.3 280.7 -
di

1017 1.35 DL1+1.5 WL7+-0.9 TEMP1 9 -62.94 -10.33 8 41.98

-
687.2 281.0 -
1018 1.35 DL1+1.5 WL8+-0.9 TEMP1 1 -63.03 -11.33 0 46.94
a te

165.3
1019 1.35 DL1+0.9 TEMP1+1.35 MR1 9 -9.70 9.03 -40.91 32.00

154.1 -
1020 1.35 DL1+-0.9 TEMP1+1.35 MR1 3 4.96 -8.65 22.83 43.18

1021 1.35 DL1+1.5LL1+1.5 EQUIP1+0.9 397.1


re

TEMP1+1.35 MR1 3 -12.03 7.43 -55.20 25.39


APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1022 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 385.8 -
TEMP1+1.35 MR1 8 2.63 -10.26 8.55 49.78

1023 1.148 DL1+1.5 LL1+1.5 EQUIP1+0.9 374.2


TEMP1+1.35 MR1 0 -11.69 7.37 -53.95 26.12

Ed
1024 1.148 DL1+1.5 LL1+1.5 EQUIP1+-0.9 362.9 -
TEMP1+1.35 MR1 4 2.98 -10.31 9.79 49.05

1025 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+0.9 444.3


TEMP1+1.35 MR1 0 -12.31 22.70 -57.87 89.30

1026 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+0.9 453.2

F
TEMP1+1.35 MR1 3 -12.36 22.11 -58.01 86.33

1027 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+0.9 317.9 -


TEMP1+1.35 MR1 8 -12.42 -8.33 -59.40 40.67

PD
1028 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+0.9 327.3 -
TEMP1+1.35 MR1 2 -12.48 -8.84 -59.55 43.28

1029 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+0.9 131.7


TEMP1+1.35 MR1 56.52 29.34 12.48 5 44.94

1030 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+0.9 132.2


TEMP1+1.35 MR1 63.85 29.40 11.90 3 42.04
te r
-
1031 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+0.9 711.9 237.8
TEMP1+1.35 MR1 7 -52.81 6.31 0 25.68

-
as

1032 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+0.9 720.8 237.9


TEMP1+1.35 MR1 6 -52.87 5.71 2 22.71

1033 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+-0.9 433.0


TEMP1+1.35 MR1 5 2.36 5.02 5.87 14.13
nM

1034 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+-0.9 441.9


TEMP1+1.35 MR1 8 2.30 4.42 5.73 11.15

-
1035 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+-0.9 306.7 115.8
TEMP1+1.35 MR1 3 2.24 -26.02 4.34 5

-
1036 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+-0.9 316.0 118.4
di

TEMP1+1.35 MR1 7 2.19 -26.52 4.20 6

1037 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+-0.9 195.5 -


TEMP1+1.35 MR1 45.26 44.00 -5.20 0 30.23
a te

1038 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+-0.9 195.9 -


TEMP1+1.35 MR1 52.60 44.06 -5.78 7 33.14

-
1039 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+-0.9 700.7 174.0 -
TEMP1+1.35 MR1 2 -38.15 -11.37 6 49.49
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
1040 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+-0.9 709.6 174.1 -
TEMP1+1.35 MR1 0 -38.21 -11.97 8 52.47

1041 1.148 DL1+1.5 LL1+0.9 WL1+1.5 421.3

Ed
EQUIP1+0.9 TEMP1+1.35 MR1 7 -11.96 22.65 -56.62 90.03

1042 1.148 DL1+1.5 LL1+0.9 WL2+1.5 430.3


EQUIP1+0.9 TEMP1+1.35 MR1 0 -12.02 22.05 -56.77 87.06

1043 1.148 DL1+1.5 LL1+0.9 WL3+1.5 295.0 -


EQUIP1+0.9 TEMP1+1.35 MR1 4 -12.08 -8.39 -58.16 39.95

F
1044 1.148 DL1+1.5 LL1+0.9 WL4+1.5 304.3 -
EQUIP1+0.9 TEMP1+1.35 MR1 9 -12.13 -8.90 -58.30 42.56

1045 1.148 DL1+1.5 LL1+0.9 WL5+1.5 133.0

PD
EQUIP1+0.9 TEMP1+1.35 MR1 33.58 29.68 12.42 0 45.67

1046 1.148 DL1+1.5 LL1+0.9 WL6+1.5 133.4


EQUIP1+0.9 TEMP1+1.35 MR1 40.92 29.75 11.85 8 42.77

-
1047 1.148 DL1+1.5 LL1+0.9 WL7+1.5 689.0 236.5
EQUIP1+0.9 TEMP1+1.35 MR1 3 -52.47 6.25 5 26.41
te r
-
1048 1.148 DL1+1.5 LL1+0.9 WL8+1.5 697.9 236.6
EQUIP1+0.9 TEMP1+1.35 MR1 2 -52.52 5.66 8 23.44

1049 1.148 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+- 410.1


0.9 TEMP1+1.35 MR1 1 2.70 4.97 7.12 14.86
as

1050 1.148 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+- 419.0


0.9 TEMP1+1.35 MR1 4 2.64 4.37 6.97 11.88

-
1051 1.148 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+- 283.7 115.1
nM

0.9 TEMP1+1.35 MR1 9 2.59 -26.07 5.58 2

-
1052 1.148 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+- 293.1 117.7
0.9 TEMP1+1.35 MR1 3 2.53 -26.58 5.44 3

1053 1.148 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+- 196.7 -


0.9 TEMP1+1.35 MR1 22.33 44.34 -5.26 4 29.50
di

1054 1.148 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+- 197.2 -


0.9 TEMP1+1.35 MR1 29.66 44.41 -5.83 2 32.41

-
1055 1.148 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+- 677.7 172.8 -
a te

0.9 TEMP1+1.35 MR1 8 -37.81 -11.43 1 48.76

-
1056 1.148 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+- 686.6 172.9 -
0.9 TEMP1+1.35 MR1 7 -37.86 -12.02 4 51.74

1057 1.148 DL1+1.5 LL1+1.5 WL1+1.5 452.8 132.6


EQUIP1+0.9 TEMP1+1.35 MR1 2 -12.15 32.83 -58.41 4
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1058 1.148 DL1+1.5 LL1+1.5 WL2+1.5 467.7 127.6
EQUIP1+0.9 TEMP1+1.35 MR1 0 -12.24 31.84 -58.65 8

1059 1.148 DL1+1.5 LL1+1.5 WL3+1.5 242.2 -


EQUIP1+0.9 TEMP1+1.35 MR1 8 -12.34 -18.90 -60.96 83.99

Ed
1060 1.148 DL1+1.5 LL1+1.5 WL4+1.5 257.8 -
EQUIP1+0.9 TEMP1+1.35 MR1 5 -12.43 -19.74 -61.20 88.34

-
1061 1.148 DL1+1.5 LL1+1.5 WL5+1.5 193.4 257.6
EQUIP1+0.9 TEMP1+1.35 MR1 9 57.25 15.79 3 58.71

F
-
1062 1.148 DL1+1.5 LL1+1.5 WL6+1.5 181.2 258.4
EQUIP1+0.9 TEMP1+1.35 MR1 7 57.37 14.83 3 53.87

PD
-
1063 1.148 DL1+1.5 LL1+1.5 WL7+1.5 898.9 358.2
EQUIP1+0.9 TEMP1+1.35 MR1 3 -79.66 5.51 9 26.60

-
1064 1.148 DL1+1.5 LL1+1.5 WL8+1.5 913.7 358.5
EQUIP1+0.9 TEMP1+1.35 MR1 4 -79.75 4.52 0 21.65

1065 1.148 DL1+1.5 LL1+1.5 WL1+1.5 EQUIP1+- 441.5


te r
0.9 TEMP1+1.35 MR1 6 2.52 15.15 5.33 57.46

1066 1.148 DL1+1.5 LL1+1.5 WL2+1.5 EQUIP1+- 456.4


0.9 TEMP1+1.35 MR1 4 2.42 14.16 5.09 52.51

-
as

1067 1.148 DL1+1.5 LL1+1.5 WL3+1.5 EQUIP1+- 231.0 159.1


0.9 TEMP1+1.35 MR1 2 2.33 -36.58 2.78 7

-
1068 1.148 DL1+1.5 LL1+1.5 WL4+1.5 EQUIP1+- 246.5 163.5
nM

0.9 TEMP1+1.35 MR1 9 2.23 -37.42 2.54 2

-
1069 1.148 DL1+1.5 LL1+1.5 WL5+1.5 EQUIP1+- 204.7 321.3 -
0.9 TEMP1+1.35 MR1 5 71.92 -1.89 7 16.47

-
1070 1.148 DL1+1.5 LL1+1.5 WL6+1.5 EQUIP1+- 192.5 322.1 -
0.9 TEMP1+1.35 MR1 2 72.03 -2.85 7 21.31
di

-
1071 1.148 DL1+1.5 LL1+1.5 WL7+1.5 EQUIP1+- 887.6 294.5 -
0.9 TEMP1+1.35 MR1 7 -65.00 -12.17 5 48.57

-
a te

1072 1.148 DL1+1.5 LL1+1.5 WL8+1.5 EQUIP1+- 902.4 294.7 -


0.9 TEMP1+1.35 MR1 8 -65.09 -13.17 6 53.53

366.7 150.1
1073 1 DL1+0.8 LL1+1 SL1 5 -6.08 -38.74 -27.55 6
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
453.5 130.5
1074 1 DL1+0.8 LL1+1 SL2 3 -29.09 -3.65 6 5.94

Ed
101.1 164.2
1075 1 DL1+0.8 LL1+-1 SL1 8 0.31 37.62 0.66 5

103.6 -
1076 1 DL1+0.8 LL1+-1 SL2 14.40 23.32 2.54 7 20.03

2001 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+0.6 308.0


TEMP1+1 MR1 4 -8.38 15.15 -39.25 59.12

F
2002 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+0.6 313.9
TEMP1+1 MR1 9 -8.42 14.75 -39.35 57.14

PD
2003 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+0.6 223.8 -
TEMP1+1 MR1 2 -8.46 -5.54 -40.27 27.53

2004 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+0.6 230.0 -


TEMP1+1 MR1 5 -8.49 -5.88 -40.37 29.27

2005 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+0.6


TEMP1+1 MR1 49.51 19.38 8.33 87.17 29.55
te r
2006 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+0.6
TEMP1+1 MR1 54.40 19.43 7.95 87.49 27.61

-
2007 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+0.6 486.4 159.2
TEMP1+1 MR1 8 -35.38 4.22 0 16.71
as

-
2008 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+0.6 492.4 159.2
TEMP1+1 MR1 1 -35.42 3.82 9 14.73

2009 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+-0.6 300.5


nM

TEMP1+1 MR1 3 1.40 3.36 3.25 9.00

2010 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+-0.6 306.4


TEMP1+1 MR1 9 1.36 2.96 3.15 7.02

2011 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+-0.6 216.3 -


TEMP1+1 MR1 2 1.32 -17.33 2.22 77.65

2012 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+-0.6 222.5 -


di

TEMP1+1 MR1 5 1.28 -17.67 2.13 79.39

2013 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+-0.6 129.6 -


TEMP1+1 MR1 42.01 29.16 -3.45 6 20.57
a te

2014 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+-0.6 129.9 -


TEMP1+1 MR1 46.90 29.20 -3.84 8 22.50

-
2015 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+-0.6 478.9 116.7 -
TEMP1+1 MR1 8 -25.61 -7.57 1 33.41
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
2016 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+-0.6 484.9 116.7 -
TEMP1+1 MR1 0 -25.65 -7.97 9 35.39

2017 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+0.6 329.0

Ed
TEMP1+1 MR1 0 -8.50 21.94 -40.44 87.52

2018 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+0.6 338.9


TEMP1+1 MR1 2 -8.57 21.28 -40.60 84.22

2019 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+0.6 188.6 -


TEMP1+1 MR1 4 -8.63 -12.55 -42.14 56.89

F
2020 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+0.6 199.0 -
TEMP1+1 MR1 2 -8.69 -13.11 -42.30 59.79

PD
2021 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+0.6 101.8 170.2
TEMP1+1 MR1 7 37.77 10.58 6 38.24

2022 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+0.6 - 170.7


TEMP1+1 MR1 93.72 37.84 9.94 9 35.01

-
2023 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+0.6 626.4 240.3
te r
TEMP1+1 MR1 1 -53.51 3.72 6 16.84

-
2024 1 DL1+1.0 LL1+1 WL8+1 EQUIP1+0.6 636.2 240.5
TEMP1+1 MR1 8 -53.57 3.06 0 13.53

2025 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+-0.6 321.5


as

TEMP1+1 MR1 0 1.27 10.15 2.06 37.41

2026 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+-0.6 331.4


TEMP1+1 MR1 2 1.21 9.49 1.90 34.10

-
nM

2027 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+-0.6 181.1 107.0


TEMP1+1 MR1 4 1.15 -24.33 0.35 1

-
2028 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+-0.6 191.5 109.9
TEMP1+1 MR1 2 1.08 -24.90 0.19 1

-
di

2029 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+-0.6 109.3 212.7 -


TEMP1+1 MR1 7 47.54 -1.21 5 11.88

-
2030 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+-0.6 101.2 213.2 -
TEMP1+1 MR1 2 47.61 -1.85 8 15.11
a te

-
2031 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+-0.6 618.9 197.8 -
TEMP1+1 MR1 1 -43.74 -8.07 6 33.28

-
2032 1 DL1+0.7 LL1+1 WL8+1 EQUIP1+-0.6 628.7 198.0 -
re

TEMP1+1 MR1 8 -43.80 -8.73 1 36.58


APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
366.7 150.1
2033 1 DL1+0.8 LL1+1 SL1 5 -6.08 -38.74 -27.55 6

-
453.5 130.5

Ed
2034 1 DL1+0.8 LL1+1 SL2 3 -29.09 -3.65 6 5.94

-
101.1 164.2
2035 1 DL1+0.8 LL1+-1 SL1 8 0.31 37.62 0.66 5

103.6 -
2036 1 DL1+0.8 LL1+-1 SL2 14.40 23.32 2.54 7 20.03

F
171.6
P24 500 1 DL1+1 LL1+1 EQUIP1 2 -1.13 -1.03 -9.20 0.37

PD
166.9
501 1 DL1+1 LL1+1 EQUIP1+1 TEMP1 5 -5.83 -0.62 -27.58 2.19

502 1 DL1+1 WL1 55.10 0.01 13.24 -3.46 62.29

503 1 DL1+1 WL2 68.08 -0.03 10.11 -3.75 48.60

102.9 -
504 1 DL1+1 WL3 8 -0.56 -15.10 -2.91 60.77
te r
115.9 -
505 1 DL1+1 WL4 8 -0.60 -18.21 -3.19 74.43

110.3 218.1
506 1 DL1+1 WL5 9 50.67 13.77 4 61.21
as

121.9 218.4
507 1 DL1+1 WL6 7 50.78 10.74 8 47.91

-
221.3
nM

508 1 DL1+1 WL7 2.35 -49.76 3.42 3 24.37

-
221.6
509 1 DL1+1 WL8 15.31 -49.80 0.30 0 10.68

510 1 DL1+0.7 WL1 64.01 0.06 8.97 -3.14 43.78

511 1 DL1+0.7 WL2 73.10 0.03 6.78 -3.34 34.19


di

-
512 1 DL1+0.7 WL3 97.52 -0.34 -10.87 -2.75 42.37

106.6 -
513 1 DL1+0.7 WL4 3 -0.37 -13.05 -2.95 51.92
a te

102.7 151.9
514 1 DL1+0.7 WL5 1 35.52 9.34 8 43.02

110.8 152.2
515 1 DL1+0.7 WL6 2 35.60 7.22 2 33.71
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
155.6
516 1 DL1+0.7 WL7 27.08 -34.78 2.10 5 17.23

Ed
155.8
517 1 DL1+0.7 WL8 36.15 -34.81 -0.09 3 7.65

149.3
518 1 DL1+ 1LL1+0.75 WL1+1 EQUIP1 5 -1.26 9.65 -10.01 46.66

159.0
519 1 DL1+1.0 LL1+0.75 WL2+1 EQUIP1 8 -1.28 7.30 -10.22 36.39

F
185.2 -
520 1 DL1+1.0 LL1+0.75 WL3+1 EQUIP1 5 -1.68 -11.60 -9.60 45.64

PD
195.0 -
521 1 DL1+1.0 LL1+0.75 WL4+1 EQUIP1 1 -1.71 -13.94 -9.81 55.88

190.8 156.1
522 1 DL1+1.0 LL1+0.75 WL5+1 EQUIP1 1 36.74 10.05 9 45.85

199.5 156.4
523 1 DL1+1.0 LL1+0.75 WL6+1 EQUIP1 0 36.83 7.78 5 35.87
te r
-
109.7 173.4
524 1 DL1+1.0 LL1+0.75 WL7+1 EQUIP1 8 -38.58 2.29 1 18.22

-
119.5 173.6
as

525 1 DL1+1.0 LL1+0.75 WL8+1 EQUIP1 0 -38.61 -0.05 1 7.95

180.1
526 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL1 3 -3.10 -5.70 -17.12 20.97

191.6
nM

527 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL2 1 -16.21 -2.67 -75.60 6.35

528 0.6 DL1+1 WL1 21.18 -0.06 13.64 -2.51 62.06

529 0.6 DL1+1 WL2 34.16 -0.10 10.51 -2.79 48.37

-
530 0.6 DL1+1 WL3 69.06 -0.63 -14.70 -1.96 61.00
di

-
531 0.6 DL1+1 WL4 82.07 -0.67 -17.81 -2.23 74.66

219.1
532 0.6 DL1+1 WL5 76.47 50.60 14.17 0 60.98
a te

219.4
533 0.6 DL1+1 WL6 88.06 50.71 11.14 3 47.68

-
- 220.3
534 0.6 DL1+1 WL7 31.57 -49.83 3.83 8 24.14
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
- 220.6
535 0.6 DL1+1 WL8 18.61 -49.87 0.70 4 10.45

536 0.6 DL1+0.7 SL1 62.23 -2.53 -6.83 -11.99 27.81

Ed
537 0.6 DL1+0.7 SL2 77.53 -20.01 -2.79 -89.97 8.32

240.5
1001 1.35 DL1+1.5 LL1+1.5 EQUIP1+0.9 TEMP1 1 -5.95 -1.03 -29.99 2.11

248.9
1002 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 TEMP1 0 2.51 -1.76 3.10 -1.17

F
1003 1.35 DL1+1.5 WL1+0.9 TEMP1 65.74 -4.25 20.37 -21.38 94.99

1004 1.35 DL1+1.5 WL2+0.9 TEMP1 85.21 -4.31 15.68 -21.80 74.45

PD
137.5 -
1005 1.35 DL1+1.5 WL3+0.9 TEMP1 5 -5.10 -22.13 -20.55 89.61

-
157.0 110.0
1006 1.35 DL1+1.5 WL4+0.9 TEMP1 6 -5.16 -26.80 -20.97 8

148.6 311.0
te r
1007 1.35 DL1+1.5 WL5+0.9 TEMP1 7 71.74 21.18 3 93.37

166.0 311.5
1008 1.35 DL1+1.5 WL6+0.9 TEMP1 4 71.92 16.63 4 73.42

-
as

- 348.1
1009 1.35 DL1+1.5 WL7+0.9 TEMP1 13.40 -78.90 5.65 8 38.11

-
348.5
1010 1.35 DL1+1.5 WL8+0.9 TEMP1 6.04 -78.95 0.97 8 17.58
nM

1011 1.35 DL1+1.5 WL1+-0.9 TEMP1 74.13 4.21 19.64 11.70 91.72

1012 1.35 DL1+1.5 WL2+-0.9 TEMP1 93.60 4.16 14.95 11.28 71.18

145.9 -
1013 1.35 DL1+1.5 WL3+-0.9 TEMP1 4 3.36 -22.86 12.53 92.89

-
di

165.4 113.3
1014 1.35 DL1+1.5 WL4+-0.9 TEMP1 5 3.31 -27.54 12.12 6

157.0 344.1
1015 1.35 DL1+1.5 WL5+-0.9 TEMP1 6 80.20 20.44 1 90.09
a te

174.4 344.6
1016 1.35 DL1+1.5 WL6+-0.9 TEMP1 4 80.38 15.90 2 70.14

-
315.1
1017 1.35 DL1+1.5 WL7+-0.9 TEMP1 -5.00 -70.44 4.92 0 34.83
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
315.5
1018 1.35 DL1+1.5 WL8+-0.9 TEMP1 14.44 -70.49 0.23 0 14.30

118.5

Ed
1019 1.35 DL1+0.9 TEMP1+1.35 MR1 9 -4.09 -1.04 -19.97 2.16

126.9
1020 1.35 DL1+-0.9 TEMP1+1.35 MR1 9 4.37 -1.77 13.11 -1.12

1021 1.35 DL1+1.5LL1+1.5 EQUIP1+0.9 248.8


TEMP1+1.35 MR1 3 -6.04 -1.08 -30.20 1.85

F
1022 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 257.2
TEMP1+1.35 MR1 2 2.42 -1.82 2.89 -1.43

1023 1.148 DL1+1.5 LL1+1.5 EQUIP1+0.9 231.7

PD
TEMP1+1.35 MR1 0 -6.08 -0.88 -29.71 1.73

1024 1.148 DL1+1.5 LL1+1.5 EQUIP1+-0.9 240.0


TEMP1+1.35 MR1 9 2.38 -1.61 3.37 -1.55

1025 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+0.9 222.1


TEMP1+1.35 MR1 1 -6.20 11.73 -31.17 57.39

1026 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+0.9 233.7


te r
TEMP1+1.35 MR1 9 -6.23 8.92 -31.42 45.07

1027 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+0.9 265.1 -


TEMP1+1.35 MR1 9 -6.71 -13.77 -30.67 53.37

1028 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+0.9 276.9 -


as

TEMP1+1.35 MR1 0 -6.74 -16.57 -30.92 65.65

1029 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+0.9 271.8 168.2


TEMP1+1.35 MR1 6 39.40 12.21 8 56.42

1030 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+0.9 282.2 168.5


nM

TEMP1+1.35 MR1 9 39.50 9.49 8 44.45

-
1031 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+0.9 174.6 227.2
TEMP1+1.35 MR1 2 -50.99 2.90 5 23.26

-
1032 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+0.9 186.2 227.4
TEMP1+1.35 MR1 9 -51.02 0.09 9 10.94
di

1033 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+-0.9 230.5


TEMP1+1.35 MR1 0 2.27 11.00 1.92 54.12

1034 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+-0.9 242.1


a te

TEMP1+1.35 MR1 8 2.23 8.18 1.66 41.79

1035 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+-0.9 273.5 -


TEMP1+1.35 MR1 9 1.76 -14.50 2.41 56.65

1036 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+-0.9 285.2 -


TEMP1+1.35 MR1 9 1.72 -17.31 2.16 68.93
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1037 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+-0.9 280.2 201.3
TEMP1+1.35 MR1 6 47.86 11.48 6 53.14

1038 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+-0.9 290.6 201.6


TEMP1+1.35 MR1 8 47.97 8.75 7 41.17

Ed
-
1039 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+-0.9 183.0 194.1
TEMP1+1.35 MR1 2 -42.52 2.17 7 19.98

-
1040 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+-0.9 194.6 194.4
TEMP1+1.35 MR1 8 -42.56 -0.65 0 7.67

F
1041 1.148 DL1+1.5 LL1+0.9 WL1+1.5 204.9
EQUIP1+0.9 TEMP1+1.35 MR1 8 -6.23 11.93 -30.68 57.28

PD
1042 1.148 DL1+1.5 LL1+0.9 WL2+1.5 216.6
EQUIP1+0.9 TEMP1+1.35 MR1 6 -6.26 9.12 -30.94 44.95

1043 1.148 DL1+1.5 LL1+0.9 WL3+1.5 248.0 -


EQUIP1+0.9 TEMP1+1.35 MR1 6 -6.74 -13.57 -30.19 53.48

1044 1.148 DL1+1.5 LL1+0.9 WL4+1.5 259.7 -


EQUIP1+0.9 TEMP1+1.35 MR1 7 -6.77 -16.37 -30.44 65.77
te r
1045 1.148 DL1+1.5 LL1+0.9 WL5+1.5 254.7 168.7
EQUIP1+0.9 TEMP1+1.35 MR1 3 39.37 12.42 6 56.30

1046 1.148 DL1+1.5 LL1+0.9 WL6+1.5 265.1 169.0


EQUIP1+0.9 TEMP1+1.35 MR1 6 39.47 9.69 7 44.33
as

-
1047 1.148 DL1+1.5 LL1+0.9 WL7+1.5 157.5 226.7
EQUIP1+0.9 TEMP1+1.35 MR1 0 -51.02 3.10 7 23.15

-
1048 1.148 DL1+1.5 LL1+0.9 WL8+1.5 169.1 227.0
nM

EQUIP1+0.9 TEMP1+1.35 MR1 6 -51.05 0.29 0 10.83

1049 1.148 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+- 213.3


0.9 TEMP1+1.35 MR1 7 2.23 11.20 2.40 54.00

1050 1.148 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+- 225.0


0.9 TEMP1+1.35 MR1 5 2.20 8.39 2.15 41.68

1051 1.148 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+- 256.4 -


di

0.9 TEMP1+1.35 MR1 6 1.72 -14.30 2.90 56.76

1052 1.148 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+- 268.1 -


0.9 TEMP1+1.35 MR1 6 1.69 -17.11 2.65 69.05
a te

1053 1.148 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+- 263.1 201.8


0.9 TEMP1+1.35 MR1 3 47.83 11.68 4 53.03

1054 1.148 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+- 273.5 202.1


0.9 TEMP1+1.35 MR1 5 47.93 8.96 5 41.05
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
1055 1.148 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+- 165.8 193.6
0.9 TEMP1+1.35 MR1 9 -42.56 2.37 9 19.87

Ed
1056 1.148 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+- 177.5 193.9
0.9 TEMP1+1.35 MR1 5 -42.59 -0.44 2 7.55

1057 1.148 DL1+1.5 LL1+1.5 WL1+1.5 187.1


EQUIP1+0.9 TEMP1+1.35 MR1 6 -6.33 20.48 -31.33 94.31

1058 1.148 DL1+1.5 LL1+1.5 WL2+1.5 206.6


EQUIP1+0.9 TEMP1+1.35 MR1 3 -6.39 15.79 -31.75 73.77

F
1059 1.148 DL1+1.5 LL1+1.5 WL3+1.5 258.9 -
EQUIP1+0.9 TEMP1+1.35 MR1 7 -7.18 -22.02 -30.50 90.29

PD
-
1060 1.148 DL1+1.5 LL1+1.5 WL4+1.5 278.4 110.7
EQUIP1+0.9 TEMP1+1.35 MR1 8 -7.24 -26.70 -30.92 7

1061 1.148 DL1+1.5 LL1+1.5 WL5+1.5 270.0 301.0


EQUIP1+0.9 TEMP1+1.35 MR1 9 69.66 21.28 8 92.68

1062 1.148 DL1+1.5 LL1+1.5 WL6+1.5 287.4 301.5


te r
EQUIP1+0.9 TEMP1+1.35 MR1 7 69.84 16.74 9 72.73

-
1063 1.148 DL1+1.5 LL1+1.5 WL7+1.5 108.0 358.1
EQUIP1+0.9 TEMP1+1.35 MR1 3 -80.98 5.76 4 37.42

-
as

1064 1.148 DL1+1.5 LL1+1.5 WL8+1.5 127.4 358.5


EQUIP1+0.9 TEMP1+1.35 MR1 7 -81.03 1.07 3 16.89

1065 1.148 DL1+1.5 LL1+1.5 WL1+1.5 EQUIP1+- 195.5


0.9 TEMP1+1.35 MR1 6 2.13 19.74 1.75 91.03
nM

1066 1.148 DL1+1.5 LL1+1.5 WL2+1.5 EQUIP1+- 215.0


0.9 TEMP1+1.35 MR1 2 2.08 15.05 1.33 70.49

1067 1.148 DL1+1.5 LL1+1.5 WL3+1.5 EQUIP1+- 267.3 -


0.9 TEMP1+1.35 MR1 7 1.28 -22.76 2.58 93.57

-
1068 1.148 DL1+1.5 LL1+1.5 WL4+1.5 EQUIP1+- 286.8 114.0
di

0.9 TEMP1+1.35 MR1 8 1.23 -27.43 2.16 5

1069 1.148 DL1+1.5 LL1+1.5 WL5+1.5 EQUIP1+- 278.4 334.1


0.9 TEMP1+1.35 MR1 9 78.12 20.55 6 89.41

1070 1.148 DL1+1.5 LL1+1.5 WL6+1.5 EQUIP1+- 295.8 334.6


a te

0.9 TEMP1+1.35 MR1 6 78.30 16.00 7 69.45

-
1071 1.148 DL1+1.5 LL1+1.5 WL7+1.5 EQUIP1+- 116.4 325.0
0.9 TEMP1+1.35 MR1 2 -72.52 5.02 5 34.14
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
1072 1.148 DL1+1.5 LL1+1.5 WL8+1.5 EQUIP1+- 135.8 325.4
0.9 TEMP1+1.35 MR1 6 -72.57 0.34 5 13.61

166.9

Ed
1073 1 DL1+0.8 LL1+1 SL1 4 -4.60 -9.87 -22.67 39.89

-
188.7 134.0
1074 1 DL1+0.8 LL1+1 SL2 9 -29.57 -4.10 6 12.04

134.4 -
1075 1 DL1+0.8 LL1+-1 SL1 9 2.92 7.93 7.50 38.58

F
112.6 118.8 -
1076 1 DL1+0.8 LL1+-1 SL2 4 27.89 2.16 9 10.73

PD
2001 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+0.6 157.1
TEMP1+1 MR1 7 -4.12 7.72 -21.03 38.30

2002 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+0.6 164.9


TEMP1+1 MR1 5 -4.14 5.84 -21.20 30.09

2003 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+0.6 185.8 -


TEMP1+1 MR1 9 -4.46 -9.28 -20.70 35.54
te r
2004 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+0.6 193.6 -
TEMP1+1 MR1 9 -4.48 -11.15 -20.87 43.73

2005 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+0.6 190.3 111.9


TEMP1+1 MR1 4 26.28 8.04 3 37.65
as

2006 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+0.6 197.2 112.1


TEMP1+1 MR1 9 26.35 6.22 4 29.67

-
2007 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+0.6 125.5 151.7
TEMP1+1 MR1 1 -33.98 1.83 5 15.55
nM

-
2008 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+0.6 133.2 151.9
TEMP1+1 MR1 9 -34.00 -0.05 1 7.33

2009 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+-0.6 162.7


TEMP1+1 MR1 6 1.52 7.23 1.02 36.12

2010 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+-0.6 170.5


di

TEMP1+1 MR1 5 1.50 5.35 0.85 27.90

2011 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+-0.6 191.4 -


TEMP1+1 MR1 9 1.18 -9.77 1.36 37.73
a te

2012 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+-0.6 199.2 -


TEMP1+1 MR1 9 1.16 -11.64 1.19 45.92

2013 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+-0.6 195.9 133.9


TEMP1+1 MR1 3 31.92 7.55 9 35.47

2014 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+-0.6 202.8 134.1


TEMP1+1 MR1 8 31.99 5.73 9 27.48
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
2015 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+-0.6 131.1 129.7
TEMP1+1 MR1 1 -28.34 1.34 0 13.36

Ed
2016 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+-0.6 138.8 129.8
TEMP1+1 MR1 8 -28.36 -0.54 6 5.15

2017 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+0.6 145.2


TEMP1+1 MR1 9 -4.19 13.41 -21.46 62.99

2018 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+0.6 158.2


TEMP1+1 MR1 7 -4.23 10.29 -21.74 49.30

F
2019 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+0.6 193.1 -
TEMP1+1 MR1 6 -4.76 -14.92 -20.91 60.08

PD
2020 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+0.6 206.1 -
TEMP1+1 MR1 7 -4.79 -18.04 -21.19 73.73

2021 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+0.6 200.5 200.1


TEMP1+1 MR1 8 46.48 13.95 4 61.91

2022 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+0.6 212.1 200.4


TEMP1+1 MR1 6 46.59 10.92 8 48.60
te r
-
2023 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+0.6 239.3
TEMP1+1 MR1 92.53 -53.96 3.60 3 25.06

-
2024 1 DL1+1.0 LL1+1 WL8+1 EQUIP1+0.6 105.4 239.6
as

TEMP1+1 MR1 9 -53.99 0.48 0 11.38

2025 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+-0.6 150.8


TEMP1+1 MR1 9 1.46 12.92 0.59 60.80

2026 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+-0.6 163.8


nM

TEMP1+1 MR1 6 1.42 9.80 0.31 47.11

2027 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+-0.6 198.7 -


TEMP1+1 MR1 6 0.89 -15.41 1.15 62.27

2028 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+-0.6 211.7 -


TEMP1+1 MR1 7 0.85 -18.53 0.87 75.92

2029 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+-0.6 206.1 222.2


di

TEMP1+1 MR1 7 52.12 13.46 0 59.72

2030 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+-0.6 217.7 222.5


TEMP1+1 MR1 6 52.23 10.43 4 46.42
a te

-
2031 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+-0.6 217.2
TEMP1+1 MR1 98.13 -48.31 3.11 8 22.88

-
2032 1 DL1+0.7 LL1+1 WL8+1 EQUIP1+-0.6 111.0 217.5
TEMP1+1 MR1 9 -48.35 -0.02 4 9.19
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
166.9
2033 1 DL1+0.8 LL1+1 SL1 4 -4.60 -9.87 -22.67 39.89

-
188.7 134.0

Ed
2034 1 DL1+0.8 LL1+1 SL2 9 -29.57 -4.10 6 12.04

134.4 -
2035 1 DL1+0.8 LL1+-1 SL1 9 2.92 7.93 7.50 38.58

112.6 118.8 -
2036 1 DL1+0.8 LL1+-1 SL2 4 27.89 2.16 9 10.73

F
175.5
P25 500 1 DL1+1 LL1+1 EQUIP1 6 -0.92 1.79 -3.27 14.72

175.3

PD
501 1 DL1+1 LL1+1 EQUIP1+1 TEMP1 0 -2.55 12.16 -9.26 60.52

132.4
502 1 DL1+1 WL1 4 -0.01 17.79 -0.13 91.49

132.2
503 1 DL1+1 WL2 5 -0.16 16.63 -0.67 84.64

-
te r
504 1 DL1+1 WL3 21.39 -0.05 -17.55 -0.11 81.85

-
505 1 DL1+1 WL4 21.38 -0.20 -18.67 -0.64 88.53

210.0
as

506 1 DL1+1 WL5 58.23 58.26 1.76 1 15.84

210.0
507 1 DL1+1 WL6 57.96 58.27 0.59 8 8.95

-
nM

129.3 210.4
508 1 DL1+1 WL7 6 -58.40 5.90 9 37.83

-
129.1 211.0
509 1 DL1+1 WL8 5 -58.54 4.74 1 30.97

118.3
510 1 DL1+0.7 WL1 9 -0.08 12.50 -0.35 65.59
di

118.2
511 1 DL1+0.7 WL2 5 -0.18 11.69 -0.72 60.79

-
a te

512 1 DL1+0.7 WL3 40.65 -0.11 -12.23 -0.33 55.75

-
513 1 DL1+0.7 WL4 40.64 -0.21 -13.02 -0.71 60.43

146.7
514 1 DL1+0.7 WL5 66.44 40.71 1.28 5 12.63
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
146.8
515 1 DL1+0.7 WL6 66.25 40.72 0.47 0 7.81

-
116.2 147.6

Ed
516 1 DL1+0.7 WL7 3 -40.95 4.18 0 28.03

-
116.0 147.9
517 1 DL1+0.7 WL8 9 -41.05 3.37 6 23.23

210.7
518 1 DL1+ 1LL1+0.75 WL1+1 EQUIP1 0 -0.75 15.00 -2.73 79.48

F
210.5
519 1 DL1+1.0 LL1+0.75 WL2+1 EQUIP1 5 -0.86 14.13 -3.13 74.35

PD
127.4 -
520 1 DL1+1.0 LL1+0.75 WL3+1 EQUIP1 1 -0.78 -11.50 -2.72 50.52

127.4 -
521 1 DL1+1.0 LL1+0.75 WL4+1 EQUIP1 0 -0.89 -12.34 -3.12 55.53

155.0 154.8
522 1 DL1+1.0 LL1+0.75 WL5+1 EQUIP1 4 42.96 2.98 8 22.75
te r
154.8 154.9
523 1 DL1+1.0 LL1+0.75 WL6+1 EQUIP1 4 42.97 2.11 3 17.58

-
208.3 160.5
524 1 DL1+1.0 LL1+0.75 WL7+1 EQUIP1 8 -44.54 6.09 0 39.24
as

-
208.2 160.8
525 1 DL1+1.0 LL1+0.75 WL8+1 EQUIP1 3 -44.65 5.22 9 34.10

212.9
nM

526 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL1 5 -3.02 -8.81 -10.83 65.74

188.4
527 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL2 1 -18.58 0.57 -66.85 20.87

528 0.6 DL1+1 WL1 98.21 0.09 17.72 0.21 89.43

529 0.6 DL1+1 WL2 98.02 -0.07 16.56 -0.33 82.59


di

- -
530 0.6 DL1+1 WL3 12.85 0.05 -17.61 0.23 83.91

- -
531 0.6 DL1+1 WL4 12.86 -0.10 -18.74 -0.30 90.59
a te

210.3
532 0.6 DL1+1 WL5 23.99 58.36 1.69 5 13.78

210.4
533 0.6 DL1+1 WL6 23.73 58.37 0.53 2 6.90
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
210.1
534 0.6 DL1+1 WL7 95.12 -58.30 5.83 5 35.78

Ed
210.6
535 0.6 DL1+1 WL8 94.92 -58.45 4.67 7 28.92

101.2
536 0.6 DL1+0.7 SL1 1 -2.95 -14.03 -10.58 71.11

537 0.6 DL1+0.7 SL2 68.49 -23.69 -1.53 -85.28 11.29

F
250.2
1001 1.35 DL1+1.5 LL1+1.5 EQUIP1+0.9 TEMP1 7 -2.81 11.99 -10.17 62.53

250.7 -

PD
1002 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 TEMP1 3 0.13 -6.67 0.61 19.90

185.5 177.6
1003 1.35 DL1+1.5 WL1+0.9 TEMP1 9 -1.45 35.98 -5.46 8

185.3 167.4
1004 1.35 DL1+1.5 WL2+0.9 TEMP1 1 -1.68 34.25 -6.26 1

-
te r
1005 1.35 DL1+1.5 WL3+0.9 TEMP1 19.02 -1.51 -17.01 -5.43 82.33

-
1006 1.35 DL1+1.5 WL4+0.9 TEMP1 19.00 -1.74 -18.70 -6.23 92.35

309.7
as

1007 1.35 DL1+1.5 WL5+0.9 TEMP1 74.27 85.95 11.94 6 64.21

309.8
1008 1.35 DL1+1.5 WL6+0.9 TEMP1 73.87 85.97 10.19 6 53.88

-
nM

180.9 320.9
1009 1.35 DL1+1.5 WL7+0.9 TEMP1 6 -89.04 18.16 9 97.20

-
180.6 321.7
1010 1.35 DL1+1.5 WL8+0.9 TEMP1 6 -89.25 16.41 7 86.91

186.0
1011 1.35 DL1+1.5 WL1+-0.9 TEMP1 6 1.49 17.33 5.32 95.24
di

185.7
1012 1.35 DL1+1.5 WL2+-0.9 TEMP1 7 1.27 15.59 4.51 84.98

-
a te

164.7
1013 1.35 DL1+1.5 WL3+-0.9 TEMP1 19.48 1.43 -35.67 5.35 6

-
174.7
1014 1.35 DL1+1.5 WL4+-0.9 TEMP1 19.46 1.21 -37.36 4.55 8
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
320.5 -
1015 1.35 DL1+1.5 WL5+-0.9 TEMP1 74.74 88.90 -6.71 3 18.23

320.6 -
1016 1.35 DL1+1.5 WL6+-0.9 TEMP1 74.34 88.92 -8.47 3 28.56

Ed
-
181.4 310.2
1017 1.35 DL1+1.5 WL7+-0.9 TEMP1 3 -86.09 -0.50 2 14.76

-
181.1 311.0
1018 1.35 DL1+1.5 WL8+-0.9 TEMP1 3 -86.31 -2.25 0 4.47

F
117.9
1019 1.35 DL1+0.9 TEMP1+1.35 MR1 5 -1.77 9.69 -6.47 49.00

PD
118.4 -
1020 1.35 DL1+-0.9 TEMP1+1.35 MR1 2 1.18 -8.97 4.30 33.44

1021 1.35 DL1+1.5LL1+1.5 EQUIP1+0.9 252.9


TEMP1+1.35 MR1 0 -2.78 12.12 -10.10 63.37

1022 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 253.3 -


TEMP1+1.35 MR1 7 0.16 -6.53 0.67 19.07
te r
1023 1.148 DL1+1.5 LL1+1.5 EQUIP1+0.9 235.6
TEMP1+1.35 MR1 1 -2.74 12.09 -9.93 62.33

1024 1.148 DL1+1.5 LL1+1.5 EQUIP1+-0.9 236.0 -


TEMP1+1.35 MR1 8 0.21 -6.57 0.84 20.11
as

1025 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+0.9 295.0 141.0


TEMP1+1.35 MR1 7 -2.58 27.98 -9.46 8

1026 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+0.9 294.9 134.9


TEMP1+1.35 MR1 0 -2.71 26.94 -9.94 2
nM

1027 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+0.9 195.1 -


TEMP1+1.35 MR1 2 -2.62 -3.82 -9.44 14.92

1028 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+0.9 195.1 -


TEMP1+1.35 MR1 1 -2.75 -4.83 -9.92 20.93

1029 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+0.9 228.2 179.6


TEMP1+1.35 MR1 7 49.86 13.56 7 73.00
di

1030 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+0.9 228.0 179.7


TEMP1+1.35 MR1 4 49.88 12.51 3 66.80

-
1031 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+0.9 292.2 198.7
a te

TEMP1+1.35 MR1 9 -55.13 17.28 8 92.79

-
1032 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+0.9 292.1 199.2
TEMP1+1.35 MR1 1 -55.26 16.24 4 86.62

1033 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+-0.9 295.5


TEMP1+1.35 MR1 4 0.37 9.32 1.32 58.64
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1034 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+-0.9 295.3
TEMP1+1.35 MR1 6 0.23 8.28 0.83 52.48

1035 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+-0.9 195.5 -


TEMP1+1.35 MR1 9 0.33 -22.48 1.34 97.36

Ed
-
1036 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+-0.9 195.5 103.3
TEMP1+1.35 MR1 8 0.20 -23.49 0.86 7

1037 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+-0.9 228.7 190.4


TEMP1+1.35 MR1 4 52.81 -5.10 5 -9.44

F
1038 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+-0.9 228.5 190.5 -
TEMP1+1.35 MR1 0 52.82 -6.15 1 15.64

PD
1039 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+-0.9 292.7 188.0
TEMP1+1.35 MR1 6 -52.18 -1.38 0 10.36

-
1040 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+-0.9 292.5 188.4
TEMP1+1.35 MR1 8 -52.31 -2.42 7 4.18

1041 1.148 DL1+1.5 LL1+0.9 WL1+1.5 277.7 140.0


te r
EQUIP1+0.9 TEMP1+1.35 MR1 8 -2.53 27.94 -9.29 4

1042 1.148 DL1+1.5 LL1+0.9 WL2+1.5 277.6 133.8


EQUIP1+0.9 TEMP1+1.35 MR1 1 -2.67 26.90 -9.77 8

1043 1.148 DL1+1.5 LL1+0.9 WL3+1.5 177.8 -


EQUIP1+0.9 TEMP1+1.35 MR1 3 -2.57 -3.85 -9.27 15.96
as

1044 1.148 DL1+1.5 LL1+0.9 WL4+1.5 177.8 -


EQUIP1+0.9 TEMP1+1.35 MR1 2 -2.70 -4.87 -9.75 21.97

1045 1.148 DL1+1.5 LL1+0.9 WL5+1.5 210.9 179.8


EQUIP1+0.9 TEMP1+1.35 MR1 9 49.91 13.52 5 71.96
nM

1046 1.148 DL1+1.5 LL1+0.9 WL6+1.5 210.7 179.9


EQUIP1+0.9 TEMP1+1.35 MR1 5 49.92 12.47 1 65.76

-
1047 1.148 DL1+1.5 LL1+0.9 WL7+1.5 275.0 198.6
EQUIP1+0.9 TEMP1+1.35 MR1 0 -55.08 17.25 1 91.75

-
di

1048 1.148 DL1+1.5 LL1+0.9 WL8+1.5 274.8 199.0


EQUIP1+0.9 TEMP1+1.35 MR1 2 -55.21 16.20 7 85.58

1049 1.148 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+- 278.2


0.9 TEMP1+1.35 MR1 5 0.42 9.29 1.49 57.61
a te

1050 1.148 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+- 278.0


0.9 TEMP1+1.35 MR1 7 0.28 8.24 1.01 51.45

1051 1.148 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+- 178.3 -


0.9 TEMP1+1.35 MR1 0 0.38 -22.51 1.51 98.40
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
1052 1.148 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+- 178.2 104.4
0.9 TEMP1+1.35 MR1 9 0.25 -23.53 1.03 1

1053 1.148 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+- 211.4 190.6 -

Ed
0.9 TEMP1+1.35 MR1 5 52.86 -5.14 2 10.48

1054 1.148 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+- 211.2 190.6 -


0.9 TEMP1+1.35 MR1 1 52.87 -6.19 8 16.68

-
1055 1.148 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+- 275.4 187.8
0.9 TEMP1+1.35 MR1 7 -52.14 -1.41 3 9.32

F
-
1056 1.148 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+- 275.2 188.3

PD
0.9 TEMP1+1.35 MR1 9 -52.27 -2.46 0 3.14

1057 1.148 DL1+1.5 LL1+1.5 WL1+1.5 305.8 191.8


EQUIP1+0.9 TEMP1+1.35 MR1 9 -2.39 38.51 -8.85 5

1058 1.148 DL1+1.5 LL1+1.5 WL2+1.5 305.6 181.5


EQUIP1+0.9 TEMP1+1.35 MR1 0 -2.62 36.78 -9.66 8

1059 1.148 DL1+1.5 LL1+1.5 WL3+1.5 139.3 -


te r
EQUIP1+0.9 TEMP1+1.35 MR1 1 -2.46 -14.48 -8.82 68.16

1060 1.148 DL1+1.5 LL1+1.5 WL4+1.5 139.2 -


EQUIP1+0.9 TEMP1+1.35 MR1 9 -2.68 -16.17 -9.62 78.18

1061 1.148 DL1+1.5 LL1+1.5 WL5+1.5 194.5 306.3


EQUIP1+0.9 TEMP1+1.35 MR1 7 85.01 14.48 6 78.38
as

1062 1.148 DL1+1.5 LL1+1.5 WL6+1.5 194.1 306.4


EQUIP1+0.9 TEMP1+1.35 MR1 7 85.03 12.72 6 68.05

-
1063 1.148 DL1+1.5 LL1+1.5 WL7+1.5 301.2 324.3 111.3
nM

EQUIP1+0.9 TEMP1+1.35 MR1 6 -89.98 20.69 9 7

-
1064 1.148 DL1+1.5 LL1+1.5 WL8+1.5 300.9 325.1 101.0
EQUIP1+0.9 TEMP1+1.35 MR1 5 -90.20 18.94 7 8

1065 1.148 DL1+1.5 LL1+1.5 WL1+1.5 EQUIP1+- 306.3 109.4


0.9 TEMP1+1.35 MR1 6 0.55 19.86 1.92 1
di

1066 1.148 DL1+1.5 LL1+1.5 WL2+1.5 EQUIP1+- 306.0


0.9 TEMP1+1.35 MR1 7 0.33 18.12 1.12 99.15

-
1067 1.148 DL1+1.5 LL1+1.5 WL3+1.5 EQUIP1+- 139.7 150.5
a te

0.9 TEMP1+1.35 MR1 8 0.49 -33.14 1.95 9

-
1068 1.148 DL1+1.5 LL1+1.5 WL4+1.5 EQUIP1+- 139.7 160.6
0.9 TEMP1+1.35 MR1 6 0.27 -34.83 1.15 1

1069 1.148 DL1+1.5 LL1+1.5 WL5+1.5 EQUIP1+- 195.0 317.1


0.9 TEMP1+1.35 MR1 4 87.96 -4.18 4 -4.06
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1070 1.148 DL1+1.5 LL1+1.5 WL6+1.5 EQUIP1+- 194.6 317.2 -
0.9 TEMP1+1.35 MR1 4 87.98 -5.94 4 14.39

-
1071 1.148 DL1+1.5 LL1+1.5 WL7+1.5 EQUIP1+- 301.7 313.6

Ed
0.9 TEMP1+1.35 MR1 2 -87.03 2.03 2 28.93

-
1072 1.148 DL1+1.5 LL1+1.5 WL8+1.5 EQUIP1+- 301.4 314.3
0.9 TEMP1+1.35 MR1 2 -87.25 0.29 9 18.64

222.0 110.7
1073 1 DL1+0.8 LL1+1 SL1 6 -4.80 -18.57 -17.22 8

F
-
175.3 123.9

PD
1074 1 DL1+0.8 LL1+1 SL2 2 -34.44 -0.71 4 25.31

-
1075 1 DL1+0.8 LL1+-1 SL1 79.63 3.21 21.82 11.56 83.59

126.3 118.2
1076 1 DL1+0.8 LL1+-1 SL2 7 32.85 3.96 7 1.88

2001 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+0.6 205.4


te r
TEMP1+1 MR1 7 -1.74 18.68 -6.39 94.63

2002 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+0.6 205.3


TEMP1+1 MR1 5 -1.83 17.98 -6.71 90.52

2003 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+0.6 138.8


TEMP1+1 MR1 4 -1.77 -2.52 -6.37 -9.37
as

2004 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+0.6 138.8 -


TEMP1+1 MR1 3 -1.86 -3.19 -6.69 13.38

2005 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+0.6 160.9 119.7


TEMP1+1 MR1 4 33.22 9.06 0 49.24
nM

2006 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+0.6 160.7 119.7


TEMP1+1 MR1 8 33.23 8.36 4 45.11

-
2007 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+0.6 203.6 132.6
TEMP1+1 MR1 1 -36.77 11.55 0 62.44

-
di

2008 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+0.6 203.4 132.9


TEMP1+1 MR1 9 -36.86 10.85 1 58.32

2009 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+-0.6 205.7


TEMP1+1 MR1 8 0.22 6.24 0.80 39.67
a te

2010 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+-0.6 205.6


TEMP1+1 MR1 6 0.13 5.55 0.48 35.57

2011 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+-0.6 139.1 -


TEMP1+1 MR1 5 0.20 -14.96 0.81 64.33
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
2012 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+-0.6 139.1 -
TEMP1+1 MR1 4 0.11 -15.63 0.49 68.34

2013 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+-0.6 161.2 126.8


TEMP1+1 MR1 5 35.19 -3.38 8 -5.72

Ed
2014 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+-0.6 161.0 126.9
TEMP1+1 MR1 9 35.19 -4.08 2 -9.85

-
2015 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+-0.6 203.9 125.4
TEMP1+1 MR1 3 -34.81 -0.89 2 7.48

F
-
2016 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+-0.6 203.8 125.7
TEMP1+1 MR1 1 -34.90 -1.59 3 3.36

PD
2017 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+0.6 224.2 129.1
TEMP1+1 MR1 1 -1.65 25.73 -6.10 7

2018 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+0.6 224.0 122.3


TEMP1+1 MR1 2 -1.80 24.57 -6.63 2

2019 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+0.6 113.1 -


TEMP1+1 MR1 6 -1.69 -9.61 -6.08 44.17
te r
2020 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+0.6 113.1 -
TEMP1+1 MR1 4 -1.84 -10.73 -6.61 50.85

2021 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+0.6 149.9 204.0


TEMP1+1 MR1 9 56.62 9.70 5 53.52
as

2022 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+0.6 149.7 204.1


TEMP1+1 MR1 3 56.63 8.53 1 46.63

-
2023 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+0.6 221.1 216.4
TEMP1+1 MR1 2 -60.04 13.84 5 75.51
nM

-
2024 1 DL1+1.0 LL1+1 WL8+1 EQUIP1+0.6 220.9 216.9
TEMP1+1 MR1 2 -60.18 12.68 7 68.65

2025 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+-0.6 224.5


TEMP1+1 MR1 2 0.32 13.29 1.09 74.21

2026 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+-0.6 224.3


di

TEMP1+1 MR1 3 0.16 12.13 0.55 67.37

2027 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+-0.6 113.4 -


TEMP1+1 MR1 7 0.27 -22.04 1.11 99.13
a te

-
2028 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+-0.6 113.4 105.8
TEMP1+1 MR1 5 0.13 -23.17 0.57 1

2029 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+-0.6 150.3 211.2


TEMP1+1 MR1 0 58.58 -2.74 3 -1.44
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
2030 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+-0.6 150.0 211.3
TEMP1+1 MR1 4 58.60 -3.91 0 -8.32

-
2031 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+-0.6 221.4 209.2

Ed
TEMP1+1 MR1 3 -58.08 1.40 7 20.56

-
2032 1 DL1+0.7 LL1+1 WL8+1 EQUIP1+-0.6 221.2 209.7
TEMP1+1 MR1 3 -58.22 0.24 9 13.70

222.0 110.7
2033 1 DL1+0.8 LL1+1 SL1 6 -4.80 -18.57 -17.22 8

F
-
175.3 123.9

PD
2034 1 DL1+0.8 LL1+1 SL2 2 -34.44 -0.71 4 25.31

-
2035 1 DL1+0.8 LL1+-1 SL1 79.63 3.21 21.82 11.56 83.59

126.3 118.2
2036 1 DL1+0.8 LL1+-1 SL2 7 32.85 3.96 7 1.88

171.1
te r
P26 500 1 DL1+1 LL1+1 EQUIP1 3 -0.27 -0.50 2.61 2.47

164.4
501 1 DL1+1 LL1+1 EQUIP1+1 TEMP1 4 1.09 -0.13 8.25 4.03

502 1 DL1+1 WL1 37.74 0.04 13.55 3.45 63.38


as

503 1 DL1+1 WL2 52.02 -0.15 10.32 2.64 49.22

115.8 -
504 1 DL1+1 WL3 4 0.35 -15.31 2.44 61.41

130.1 -
nM

505 1 DL1+1 WL4 1 0.15 -18.54 1.63 75.54

- 212.5
506 1 DL1+1 WL5 44.39 47.54 1.50 8 16.23

- 212.3
507 1 DL1+1 WL6 28.78 47.49 -1.84 6 1.64

-
di

153.0 210.3
508 1 DL1+1 WL7 1 -48.60 16.74 1 73.68

-
167.2 211.1
a te

509 1 DL1+1 WL8 9 -48.79 13.51 1 59.51

510 1 DL1+0.7 WL1 51.74 -0.13 9.23 2.62 44.71

511 1 DL1+0.7 WL2 61.74 -0.27 6.96 2.05 34.80

106.4 -
512 1 DL1+0.7 WL3 1 0.09 -10.98 1.91 42.64
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
116.4 -
513 1 DL1+0.7 WL4 0 -0.05 -13.24 1.34 52.53

149.0
514 1 DL1+0.7 WL5 -5.75 33.12 0.79 1 11.71

Ed
148.8
515 1 DL1+0.7 WL6 5.18 33.08 -1.55 6 1.50

-
132.4 147.0
516 1 DL1+0.7 WL7 3 -34.18 11.46 2 51.92

F
-
142.4 147.5
517 1 DL1+0.7 WL8 2 -34.31 9.20 8 42.00

PD
136.1
518 1 DL1+ 1LL1+0.75 WL1+1 EQUIP1 3 0.16 10.31 4.69 49.14

146.8
519 1 DL1+1.0 LL1+0.75 WL2+1 EQUIP1 3 0.02 7.88 4.08 38.52

194.7 -
520 1 DL1+1.0 LL1+0.75 WL3+1 EQUIP1 0 0.39 -11.34 3.93 44.45
te r
205.4 -
521 1 DL1+1.0 LL1+0.75 WL4+1 EQUIP1 1 0.25 -13.76 3.33 55.05

161.5
522 1 DL1+1.0 LL1+0.75 WL5+1 EQUIP1 74.53 35.78 1.27 4 13.78
as

161.3
523 1 DL1+1.0 LL1+0.75 WL6+1 EQUIP1 86.24 35.75 -1.24 7 2.83

-
222.5 155.6
524 1 DL1+1.0 LL1+0.75 WL7+1 EQUIP1 8 -36.32 12.70 3 56.86
nM

-
233.2 156.2
525 1 DL1+1.0 LL1+0.75 WL8+1 EQUIP1 8 -36.46 10.27 3 46.24

192.6
526 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL1 5 -1.93 -4.76 -5.01 21.22

204.5
di

527 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL2 8 -14.75 -3.03 -61.36 12.13

528 0.6 DL1+1 WL1 3.98 0.26 13.89 3.18 62.92

529 0.6 DL1+1 WL2 18.26 0.06 10.66 2.37 48.75


a te

-
530 0.6 DL1+1 WL3 82.08 0.56 -14.97 2.17 61.87

-
531 0.6 DL1+1 WL4 96.35 0.37 -18.20 1.36 76.00

- 212.3
re

532 0.6 DL1+1 WL5 78.16 47.75 1.84 1 15.77


APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
- 212.0
533 0.6 DL1+1 WL6 62.54 47.70 -1.50 9 1.18

-
119.2 210.5

Ed
534 0.6 DL1+1 WL7 5 -48.38 17.09 8 73.22

-
133.5 211.3
535 0.6 DL1+1 WL8 2 -48.57 13.85 8 59.05

536 0.6 DL1+0.7 SL1 79.35 -2.54 -6.20 -9.75 25.69

F
537 0.6 DL1+0.7 SL2 95.25 -19.63 -3.88 -84.88 13.57

238.0
1001 1.35 DL1+1.5 LL1+1.5 EQUIP1+0.9 TEMP1 1 0.90 -0.29 8.89 4.94

PD
250.0
1002 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 TEMP1 4 -1.54 -0.95 -1.27 2.12

1003 1.35 DL1+1.5 WL1+0.9 TEMP1 37.94 1.36 20.78 10.16 96.30

1004 1.35 DL1+1.5 WL2+0.9 TEMP1 59.35 1.07 15.93 8.93 75.06

155.0 -
te r
1005 1.35 DL1+1.5 WL3+0.9 TEMP1 9 1.82 -22.51 8.64 90.88

-
176.5 112.0
1006 1.35 DL1+1.5 WL4+0.9 TEMP1 0 1.53 -27.35 7.43 8
as

- 323.8
1007 1.35 DL1+1.5 WL5+0.9 TEMP1 85.27 72.60 2.71 6 25.58

- 323.5
1008 1.35 DL1+1.5 WL6+0.9 TEMP1 61.84 72.53 -2.31 3 3.70
nM

-
210.8 310.4 111.7
1009 1.35 DL1+1.5 WL7+0.9 TEMP1 4 -71.60 25.58 9 6

-
232.2 311.6
1010 1.35 DL1+1.5 WL8+0.9 TEMP1 5 -71.88 20.72 9 90.50

1011 1.35 DL1+1.5 WL1+-0.9 TEMP1 49.97 -1.07 20.12 -0.01 93.49
di

1012 1.35 DL1+1.5 WL2+-0.9 TEMP1 71.38 -1.37 15.27 -1.23 72.24

167.1 -
1013 1.35 DL1+1.5 WL3+-0.9 TEMP1 2 -0.61 -23.17 -1.52 93.70
a te

-
188.5 114.9
1014 1.35 DL1+1.5 WL4+-0.9 TEMP1 3 -0.91 -28.02 -2.74 0

- 313.6
1015 1.35 DL1+1.5 WL5+-0.9 TEMP1 73.24 70.17 2.04 9 22.77
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
- 313.3
1016 1.35 DL1+1.5 WL6+-0.9 TEMP1 49.81 70.09 -2.97 6 0.88

-
222.8 320.6 108.9

Ed
1017 1.35 DL1+1.5 WL7+-0.9 TEMP1 7 -74.03 24.91 5 4

-
244.2 321.8
1018 1.35 DL1+1.5 WL8+-0.9 TEMP1 8 -74.32 20.06 5 87.68

110.2
1019 1.35 DL1+0.9 TEMP1+1.35 MR1 3 0.54 -0.85 6.23 2.87

F
122.2
1020 1.35 DL1+-0.9 TEMP1+1.35 MR1 7 -1.89 -1.51 -3.93 0.05

PD
1021 1.35 DL1+1.5LL1+1.5 EQUIP1+0.9 240.3
TEMP1+1.35 MR1 1 0.94 -0.32 9.13 4.84

1022 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 252.3


TEMP1+1.35 MR1 4 -1.50 -0.98 -1.03 2.02

1023 1.148 DL1+1.5 LL1+1.5 EQUIP1+0.9 223.2


TEMP1+1.35 MR1 6 1.05 -0.14 9.00 4.61
te r
1024 1.148 DL1+1.5 LL1+1.5 EQUIP1+-0.9 235.2
TEMP1+1.35 MR1 9 -1.39 -0.81 -1.17 1.79

1025 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+0.9 198.3


TEMP1+1.35 MR1 1 1.45 12.65 11.63 60.84
as

1026 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+0.9 211.1


TEMP1+1.35 MR1 6 1.28 9.74 10.90 48.10

1027 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+0.9 268.6 -


TEMP1+1.35 MR1 0 1.73 -13.33 10.72 51.47
nM

1028 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+0.9 281.4 -


TEMP1+1.35 MR1 5 1.56 -16.23 10.00 64.19

1029 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+0.9 124.3 199.8


TEMP1+1.35 MR1 9 44.20 1.80 5 18.41

1030 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+0.9 138.4 199.6


TEMP1+1.35 MR1 4 44.15 -1.20 5 5.28
di

-
1031 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+0.9 302.0 180.7
TEMP1+1.35 MR1 5 -42.32 15.53 6 70.12

-
a te

1032 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+0.9 314.9 181.4


TEMP1+1.35 MR1 0 -42.49 12.61 7 57.36

1033 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+-0.9 210.3


TEMP1+1.35 MR1 4 -0.98 11.99 1.47 58.03

1034 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+-0.9 223.1


TEMP1+1.35 MR1 9 -1.16 9.08 0.73 45.28
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1035 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+-0.9 280.6 -
TEMP1+1.35 MR1 3 -0.70 -13.99 0.56 54.28

1036 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+-0.9 293.4 -


TEMP1+1.35 MR1 8 -0.88 -16.89 -0.17 67.00

Ed
1037 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+-0.9 136.4 189.6
TEMP1+1.35 MR1 2 41.76 1.14 9 15.59

1038 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+-0.9 150.4 189.4


TEMP1+1.35 MR1 8 41.72 -1.87 9 2.46

F
1039 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+-0.9 314.0 190.9
TEMP1+1.35 MR1 8 -44.75 14.86 2 67.30

PD
1040 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+-0.9 326.9 191.6
TEMP1+1.35 MR1 3 -44.93 11.95 4 54.54

1041 1.148 DL1+1.5 LL1+0.9 WL1+1.5 181.2


EQUIP1+0.9 TEMP1+1.35 MR1 6 1.56 12.82 11.50 60.61

1042 1.148 DL1+1.5 LL1+0.9 WL2+1.5 194.1


EQUIP1+0.9 TEMP1+1.35 MR1 1 1.39 9.91 10.76 47.86
te r
1043 1.148 DL1+1.5 LL1+0.9 WL3+1.5 251.5 -
EQUIP1+0.9 TEMP1+1.35 MR1 5 1.84 -13.15 10.59 51.70

1044 1.148 DL1+1.5 LL1+0.9 WL4+1.5 264.3 -


EQUIP1+0.9 TEMP1+1.35 MR1 9 1.66 -16.06 9.86 64.42
as

1045 1.148 DL1+1.5 LL1+0.9 WL5+1.5 107.3 199.7


EQUIP1+0.9 TEMP1+1.35 MR1 4 44.30 1.98 2 18.18

1046 1.148 DL1+1.5 LL1+0.9 WL6+1.5 121.3 199.5


EQUIP1+0.9 TEMP1+1.35 MR1 9 44.26 -1.03 2 5.05
nM

-
1047 1.148 DL1+1.5 LL1+0.9 WL7+1.5 285.0 180.8
EQUIP1+0.9 TEMP1+1.35 MR1 0 -42.21 15.70 9 69.88

-
1048 1.148 DL1+1.5 LL1+0.9 WL8+1.5 297.8 181.6
EQUIP1+0.9 TEMP1+1.35 MR1 5 -42.39 12.79 1 57.13

1049 1.148 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+- 193.2


di

0.9 TEMP1+1.35 MR1 9 -0.87 12.16 1.33 57.79

1050 1.148 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+- 206.1


0.9 TEMP1+1.35 MR1 4 -1.05 9.25 0.60 45.05
a te

1051 1.148 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+- 263.5 -


0.9 TEMP1+1.35 MR1 8 -0.60 -13.82 0.42 54.52

1052 1.148 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+- 276.4 -


0.9 TEMP1+1.35 MR1 3 -0.77 -16.72 -0.31 67.24

1053 1.148 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+- 119.3 189.5


0.9 TEMP1+1.35 MR1 7 41.87 1.31 5 15.36
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1054 1.148 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+- 133.4 189.3
0.9 TEMP1+1.35 MR1 3 41.83 -1.69 5 2.23

-
1055 1.148 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+- 297.0 191.0

Ed
0.9 TEMP1+1.35 MR1 3 -44.65 15.04 6 67.07

-
1056 1.148 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+- 309.8 191.7
0.9 TEMP1+1.35 MR1 8 -44.82 12.12 8 54.31

1057 1.148 DL1+1.5 LL1+1.5 WL1+1.5 153.2


EQUIP1+0.9 TEMP1+1.35 MR1 6 1.91 21.47 13.16 97.95

F
1058 1.148 DL1+1.5 LL1+1.5 WL2+1.5 174.6
EQUIP1+0.9 TEMP1+1.35 MR1 7 1.61 16.62 11.94 76.70

PD
1059 1.148 DL1+1.5 LL1+1.5 WL3+1.5 270.4 -
EQUIP1+0.9 TEMP1+1.35 MR1 1 2.37 -21.83 11.65 89.24

-
1060 1.148 DL1+1.5 LL1+1.5 WL4+1.5 291.8 110.4
EQUIP1+0.9 TEMP1+1.35 MR1 2 2.07 -26.67 10.44 4

1061 1.148 DL1+1.5 LL1+1.5 WL5+1.5 326.8


te r
EQUIP1+0.9 TEMP1+1.35 MR1 30.06 73.14 3.39 6 27.23

1062 1.148 DL1+1.5 LL1+1.5 WL6+1.5 326.5


EQUIP1+0.9 TEMP1+1.35 MR1 53.48 73.07 -1.62 3 5.34

-
1063 1.148 DL1+1.5 LL1+1.5 WL7+1.5 326.1 307.4 113.4
as

EQUIP1+0.9 TEMP1+1.35 MR1 6 -71.05 26.26 8 0

-
1064 1.148 DL1+1.5 LL1+1.5 WL8+1.5 347.5 308.6
EQUIP1+0.9 TEMP1+1.35 MR1 7 -71.34 21.40 8 92.14
nM

1065 1.148 DL1+1.5 LL1+1.5 WL1+1.5 EQUIP1+- 165.2


0.9 TEMP1+1.35 MR1 9 -0.53 20.81 3.00 95.13

1066 1.148 DL1+1.5 LL1+1.5 WL2+1.5 EQUIP1+- 186.7


0.9 TEMP1+1.35 MR1 1 -0.82 15.95 1.77 73.88

1067 1.148 DL1+1.5 LL1+1.5 WL3+1.5 EQUIP1+- 282.4 -


0.9 TEMP1+1.35 MR1 4 -0.07 -22.49 1.48 92.05
di

-
1068 1.148 DL1+1.5 LL1+1.5 WL4+1.5 EQUIP1+- 303.8 113.2
0.9 TEMP1+1.35 MR1 5 -0.36 -27.33 0.27 5

1069 1.148 DL1+1.5 LL1+1.5 WL5+1.5 EQUIP1+- 316.7


a te

0.9 TEMP1+1.35 MR1 42.09 70.71 2.73 0 24.41

1070 1.148 DL1+1.5 LL1+1.5 WL6+1.5 EQUIP1+- 316.3


0.9 TEMP1+1.35 MR1 65.51 70.64 -2.28 7 2.52

-
1071 1.148 DL1+1.5 LL1+1.5 WL7+1.5 EQUIP1+- 338.1 317.6 110.5
0.9 TEMP1+1.35 MR1 9 -73.49 25.60 5 8
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
1072 1.148 DL1+1.5 LL1+1.5 WL8+1.5 EQUIP1+- 359.6 318.8
0.9 TEMP1+1.35 MR1 1 -73.77 20.74 5 89.32

191.3

Ed
1073 1 DL1+0.8 LL1+1 SL1 6 -3.53 -8.64 -12.63 38.13

-
214.0 119.9
1074 1 DL1+0.8 LL1+1 SL2 9 -27.96 -5.33 6 20.82

109.3 -
1075 1 DL1+0.8 LL1+-1 SL1 6 2.80 7.60 16.37 33.28

F
123.7 -
1076 1 DL1+0.8 LL1+-1 SL2 86.64 27.23 4.29 1 15.98

PD
2001 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+0.6 140.8
TEMP1+1 MR1 2 0.92 8.35 7.84 40.67

2002 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+0.6 149.3


TEMP1+1 MR1 8 0.80 6.41 7.35 32.17

2003 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+0.6 187.6 -


TEMP1+1 MR1 8 1.10 -8.97 7.23 34.20
te r
2004 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+0.6 196.2 -
TEMP1+1 MR1 4 0.99 -10.91 6.75 42.68

2005 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+0.6 133.3


TEMP1+1 MR1 91.54 29.42 1.11 2 12.38
as

2006 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+0.6 100.9 133.1


TEMP1+1 MR1 1 29.39 -0.89 9 3.63

-
2007 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+0.6 209.9 120.4
TEMP1+1 MR1 8 -28.26 10.26 2 46.85
nM

-
2008 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+0.6 218.5 120.9
TEMP1+1 MR1 4 -28.38 8.32 0 38.35

2009 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+-0.6 148.8


TEMP1+1 MR1 4 -0.70 7.91 1.06 38.79

2010 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+-0.6 157.4


di

TEMP1+1 MR1 0 -0.82 5.96 0.57 30.29

2011 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+-0.6 195.7 -


TEMP1+1 MR1 0 -0.52 -9.41 0.46 36.08
a te

2012 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+-0.6 204.2 -


TEMP1+1 MR1 6 -0.64 -11.35 -0.03 44.56

2013 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+-0.6 126.5


TEMP1+1 MR1 99.56 27.79 0.67 4 10.50

2014 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+-0.6 108.9 126.4


TEMP1+1 MR1 3 27.76 -1.33 1 1.75
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
2015 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+-0.6 218.0 127.2
TEMP1+1 MR1 0 -29.89 9.82 0 44.97

Ed
2016 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+-0.6 226.5 127.6
TEMP1+1 MR1 6 -30.00 7.88 7 36.47

2017 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+0.6 122.1


TEMP1+1 MR1 5 1.15 14.11 8.95 65.56

2018 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+0.6 136.4


TEMP1+1 MR1 3 0.95 10.87 8.14 51.40

F
2019 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+0.6 200.2 -
TEMP1+1 MR1 5 1.46 -14.75 7.94 59.23

PD
2020 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+0.6 214.5 -
TEMP1+1 MR1 2 1.26 -17.98 7.13 73.36

2021 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+0.6 218.0


TEMP1+1 MR1 40.02 48.64 2.06 8 18.41

2022 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+0.6 217.8


TEMP1+1 MR1 55.63 48.59 -1.29 6 3.82
te r
-
2023 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+0.6 237.4 204.8
TEMP1+1 MR1 2 -47.49 17.30 1 75.86

-
2024 1 DL1+1.0 LL1+1 WL8+1 EQUIP1+0.6 251.6 205.6
as

TEMP1+1 MR1 9 -47.68 14.07 1 61.69

2025 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+-0.6 130.1


TEMP1+1 MR1 7 -0.47 13.67 2.17 63.68

2026 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+-0.6 144.4


nM

TEMP1+1 MR1 5 -0.67 10.43 1.36 49.52

2027 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+-0.6 208.2 -


TEMP1+1 MR1 7 -0.17 -15.20 1.17 61.11

2028 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+-0.6 222.5 -


TEMP1+1 MR1 4 -0.36 -18.42 0.36 75.24

2029 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+-0.6 211.3


di

TEMP1+1 MR1 48.04 47.02 1.62 1 16.54

2030 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+-0.6 211.0


TEMP1+1 MR1 63.65 46.97 -1.73 9 1.95
a te

-
2031 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+-0.6 245.4 211.5
TEMP1+1 MR1 4 -49.11 16.86 9 73.98

-
2032 1 DL1+0.7 LL1+1 WL8+1 EQUIP1+-0.6 259.7 212.3
TEMP1+1 MR1 2 -49.30 13.63 9 59.81
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
191.3
2033 1 DL1+0.8 LL1+1 SL1 6 -3.53 -8.64 -12.63 38.13

-
214.0 119.9

Ed
2034 1 DL1+0.8 LL1+1 SL2 9 -27.96 -5.33 6 20.82

109.3 -
2035 1 DL1+0.8 LL1+-1 SL1 6 2.80 7.60 16.37 33.28

123.7 -
2036 1 DL1+0.8 LL1+-1 SL2 86.64 27.23 4.29 1 15.98

F
198.1
P27 500 1 DL1+1 LL1+1 EQUIP1 6 2.64 1.77 11.16 1.95

196.3

PD
501 1 DL1+1 LL1+1 EQUIP1+1 TEMP1 9 8.44 10.76 33.21 39.01

502 1 DL1+1 WL1 68.23 2.22 8.65 7.56 32.10

503 1 DL1+1 WL2 79.52 1.99 8.33 6.81 30.37

-
504 1 DL1+1 WL3 89.54 3.10 -6.51 13.07 33.15
te r
100.8 -
505 1 DL1+1 WL4 5 2.87 -6.79 12.32 34.70

254.8 201.6
506 1 DL1+1 WL5 1 50.95 2.72 8 4.87
as

267.5 201.6
507 1 DL1+1 WL6 3 50.88 2.40 1 3.12

- -
100.0 194.7
508 1 DL1+1 WL7 7 -48.18 1.38 4 5.74
nM

-
- 195.4
509 1 DL1+1 WL8 88.75 -48.41 1.06 7 4.00

510 1 DL1+0.7 WL1 76.19 2.02 6.38 6.80 22.41

511 1 DL1+0.7 WL2 84.10 1.86 6.16 6.27 21.20


di

-
512 1 DL1+0.7 WL3 91.11 2.63 -4.23 10.66 23.26

-
513 1 DL1+0.7 WL4 99.03 2.47 -4.42 10.13 24.35
a te

206.8 142.6
514 1 DL1+0.7 WL5 0 36.13 2.23 8 3.35

215.7 142.6
515 1 DL1+0.7 WL6 0 36.08 2.01 3 2.12
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
- 134.8
516 1 DL1+0.7 WL7 41.62 -33.27 1.29 1 3.96

Ed
- 135.3
517 1 DL1+0.7 WL8 33.69 -33.42 1.07 3 2.74

178.2
518 1 DL1+ 1LL1+0.75 WL1+1 EQUIP1 5 3.15 7.44 13.07 26.16

186.7
519 1 DL1+1.0 LL1+0.75 WL2+1 EQUIP1 2 2.98 7.20 12.50 24.86

F
194.2 -
520 1 DL1+1.0 LL1+0.75 WL3+1 EQUIP1 4 3.81 -3.93 17.20 22.77

PD
202.7 -
521 1 DL1+1.0 LL1+0.75 WL4+1 EQUIP1 2 3.64 -4.14 16.64 23.94

318.1 158.6
522 1 DL1+1.0 LL1+0.75 WL5+1 EQUIP1 9 39.70 2.99 6 5.74

327.7 158.6
523 1 DL1+1.0 LL1+0.75 WL6+1 EQUIP1 3 39.65 2.75 0 4.43
te r
-
138.6
524 1 DL1+1.0 LL1+0.75 WL7+1 EQUIP1 52.03 -34.65 1.98 6 6.39

-
139.2
as

525 1 DL1+1.0 LL1+0.75 WL8+1 EQUIP1 60.52 -34.82 1.75 1 5.09

209.4
526 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL1 8 0.97 -7.08 4.52 38.92

251.3
nM

527 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL2 0 -12.33 1.01 -48.36 5.56

528 0.6 DL1+1 WL1 30.32 1.60 8.21 5.55 32.17

529 0.6 DL1+1 WL2 41.61 1.38 7.89 4.80 30.44

-
530 0.6 DL1+1 WL3 51.63 2.48 -6.95 11.07 33.07
di

-
531 0.6 DL1+1 WL4 62.94 2.25 -7.22 10.31 34.62

216.9 199.6
532 0.6 DL1+1 WL5 0 50.33 2.28 7 4.94
a te

229.6 199.6
533 0.6 DL1+1 WL6 2 50.27 1.96 0 3.19

- -
137.9 196.7
534 0.6 DL1+1 WL7 8 -48.80 0.94 5 5.81
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
- -
126.6 197.4
535 0.6 DL1+1 WL8 6 -49.02 0.62 8 4.08

536 0.6 DL1+0.7 SL1 71.96 -1.31 -11.15 -5.85 49.18

Ed
127.7
537 0.6 DL1+0.7 SL2 1 -19.04 -0.36 -76.35 4.70

281.4
1001 1.35 DL1+1.5 LL1+1.5 EQUIP1+0.9 TEMP1 3 8.95 10.58 35.83 36.31

284.6 -

F
1002 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 TEMP1 2 -1.48 -5.59 -3.85 30.41

1003 1.35 DL1+1.5 WL1+0.9 TEMP1 86.53 8.32 20.90 30.42 81.53

PD
103.4
1004 1.35 DL1+1.5 WL2+0.9 TEMP1 7 7.98 20.42 29.30 78.94

118.5 -
1005 1.35 DL1+1.5 WL3+0.9 TEMP1 0 9.63 -1.85 38.70 16.33

135.4 -
1006 1.35 DL1+1.5 WL4+0.9 TEMP1 6 9.29 -2.26 37.57 18.66
te r
366.4 321.6
1007 1.35 DL1+1.5 WL5+0.9 TEMP1 1 81.41 12.00 0 40.69

385.4 321.5
1008 1.35 DL1+1.5 WL6+0.9 TEMP1 8 81.31 11.52 0 38.06
as

- -
165.9 273.0
1009 1.35 DL1+1.5 WL7+0.9 TEMP1 1 -67.29 9.98 2 41.99

- -
148.9 274.1
nM

1010 1.35 DL1+1.5 WL8+0.9 TEMP1 4 -67.62 9.51 2 39.39

1011 1.35 DL1+1.5 WL1+-0.9 TEMP1 89.72 -2.12 4.72 -9.25 14.81

106.6
1012 1.35 DL1+1.5 WL2+-0.9 TEMP1 6 -2.46 4.25 -10.38 12.22

121.6 -
1013 1.35 DL1+1.5 WL3+-0.9 TEMP1 9 -0.80 -18.02 -0.98 83.05
di

138.6 -
1014 1.35 DL1+1.5 WL4+-0.9 TEMP1 5 -1.14 -18.43 -2.11 85.38

369.6 281.9 -
1015 1.35 DL1+1.5 WL5+-0.9 TEMP1 0 70.98 -4.17 3 26.03
a te

388.6 281.8 -
1016 1.35 DL1+1.5 WL6+-0.9 TEMP1 7 70.88 -4.65 2 28.66

- -
162.7 312.7 -
1017 1.35 DL1+1.5 WL7+-0.9 TEMP1 3 -77.73 -6.19 0 24.73
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
- -
145.7 313.8 -
1018 1.35 DL1+1.5 WL8+-0.9 TEMP1 5 -78.06 -6.66 0 27.33

129.8

Ed
1019 1.35 DL1+0.9 TEMP1+1.35 MR1 7 7.38 9.61 27.02 33.27

133.0 -
1020 1.35 DL1+-0.9 TEMP1+1.35 MR1 6 -3.06 -6.57 -12.66 33.46

1021 1.35 DL1+1.5LL1+1.5 EQUIP1+0.9 284.9


TEMP1+1.35 MR1 5 9.03 10.62 36.24 36.47

F
1022 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 288.1 -
TEMP1+1.35 MR1 4 -1.40 -5.55 -3.44 30.25

1023 1.148 DL1+1.5 LL1+1.5 EQUIP1+0.9 265.8

PD
TEMP1+1.35 MR1 1 8.72 10.40 35.22 36.51

1024 1.148 DL1+1.5 LL1+1.5 EQUIP1+-0.9 269.0 -


TEMP1+1.35 MR1 0 -1.72 -5.77 -4.46 30.21

1025 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+0.9 261.0


TEMP1+1.35 MR1 6 9.64 17.42 38.52 65.53

1026 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+0.9 271.2


te r
TEMP1+1.35 MR1 3 9.44 17.14 37.84 63.98

1027 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+0.9 280.2


TEMP1+1.35 MR1 5 10.43 3.78 43.48 6.82

1028 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+0.9 290.4


as

TEMP1+1.35 MR1 2 10.23 3.53 42.81 5.42

1029 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+0.9 428.9 213.2


TEMP1+1.35 MR1 9 53.50 12.08 3 41.03

1030 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+0.9 440.4 213.1


nM

TEMP1+1.35 MR1 3 53.44 11.80 6 39.45

-
1031 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+0.9 109.6 143.5
TEMP1+1.35 MR1 0 -35.72 10.88 5 41.81

-
1032 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+0.9 119.7 144.2
TEMP1+1.35 MR1 8 -35.92 10.59 1 40.25
di

1033 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+-0.9 264.2


TEMP1+1.35 MR1 5 -0.79 1.25 -1.16 -1.19

1034 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+-0.9 274.4


a te

TEMP1+1.35 MR1 2 -1.00 0.97 -1.83 -2.75

1035 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+-0.9 283.4 -


TEMP1+1.35 MR1 4 0.00 -12.39 3.81 59.90

1036 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+-0.9 293.6 -


TEMP1+1.35 MR1 1 -0.21 -12.64 3.13 61.31
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1037 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+-0.9 432.1 173.5 -
TEMP1+1.35 MR1 8 43.06 -4.09 5 25.70

1038 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+-0.9 443.6 173.4 -


TEMP1+1.35 MR1 2 43.00 -4.37 9 27.27

Ed
-
1039 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+-0.9 112.7 183.2 -
TEMP1+1.35 MR1 9 -46.16 -5.30 2 24.91

-
1040 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+-0.9 122.9 183.8 -
TEMP1+1.35 MR1 7 -46.36 -5.58 9 26.47

F
1041 1.148 DL1+1.5 LL1+0.9 WL1+1.5 241.9
EQUIP1+0.9 TEMP1+1.35 MR1 2 9.33 17.20 37.51 65.57

PD
1042 1.148 DL1+1.5 LL1+0.9 WL2+1.5 252.0
EQUIP1+0.9 TEMP1+1.35 MR1 8 9.13 16.92 36.83 64.01

1043 1.148 DL1+1.5 LL1+0.9 WL3+1.5 261.1


EQUIP1+0.9 TEMP1+1.35 MR1 0 10.12 3.56 42.47 6.86

1044 1.148 DL1+1.5 LL1+0.9 WL4+1.5 271.2


EQUIP1+0.9 TEMP1+1.35 MR1 8 9.92 3.31 41.79 5.45
te r
1045 1.148 DL1+1.5 LL1+0.9 WL5+1.5 409.8 212.2
EQUIP1+0.9 TEMP1+1.35 MR1 5 53.19 11.86 1 41.06

1046 1.148 DL1+1.5 LL1+0.9 WL6+1.5 421.2 212.1


EQUIP1+0.9 TEMP1+1.35 MR1 9 53.13 11.58 5 39.49
as

-
1047 1.148 DL1+1.5 LL1+0.9 WL7+1.5 144.5
EQUIP1+0.9 TEMP1+1.35 MR1 90.45 -36.03 10.66 6 41.85

-
1048 1.148 DL1+1.5 LL1+0.9 WL8+1.5 100.6 145.2
nM

EQUIP1+0.9 TEMP1+1.35 MR1 4 -36.23 10.37 2 40.29

1049 1.148 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+- 245.1


0.9 TEMP1+1.35 MR1 1 -1.10 1.03 -2.17 -1.15

1050 1.148 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+- 255.2


0.9 TEMP1+1.35 MR1 7 -1.31 0.75 -2.85 -2.71

1051 1.148 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+- 264.2 -


di

0.9 TEMP1+1.35 MR1 9 -0.31 -12.62 2.79 59.87

1052 1.148 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+- 274.4 -


0.9 TEMP1+1.35 MR1 7 -0.52 -12.86 2.12 61.27
a te

1053 1.148 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+- 413.0 172.5 -


0.9 TEMP1+1.35 MR1 4 42.75 -4.31 4 25.66

1054 1.148 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+- 424.4 172.4 -


0.9 TEMP1+1.35 MR1 8 42.69 -4.60 7 27.23
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
1055 1.148 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+- 184.2 -
0.9 TEMP1+1.35 MR1 93.64 -46.47 -5.52 4 24.87

Ed
1056 1.148 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+- 103.8 184.9 -
0.9 TEMP1+1.35 MR1 3 -46.67 -5.80 0 26.43

1057 1.148 DL1+1.5 LL1+1.5 WL1+1.5 225.9


EQUIP1+0.9 TEMP1+1.35 MR1 9 9.74 21.73 39.03 84.95

1058 1.148 DL1+1.5 LL1+1.5 WL2+1.5 242.9


EQUIP1+0.9 TEMP1+1.35 MR1 3 9.40 21.26 37.90 82.35

F
1059 1.148 DL1+1.5 LL1+1.5 WL3+1.5 257.9 -
EQUIP1+0.9 TEMP1+1.35 MR1 6 11.06 -1.01 47.30 12.92

PD
1060 1.148 DL1+1.5 LL1+1.5 WL4+1.5 274.9 -
EQUIP1+0.9 TEMP1+1.35 MR1 2 10.72 -1.42 46.17 15.25

1061 1.148 DL1+1.5 LL1+1.5 WL5+1.5 505.8 330.2


EQUIP1+0.9 TEMP1+1.35 MR1 7 82.83 12.84 1 44.10

1062 1.148 DL1+1.5 LL1+1.5 WL6+1.5 524.9 330.1


EQUIP1+0.9 TEMP1+1.35 MR1 4 82.73 12.36 0 41.48
te r
-
1063 1.148 DL1+1.5 LL1+1.5 WL7+1.5 - 264.4
EQUIP1+0.9 TEMP1+1.35 MR1 26.45 -65.87 10.82 2 45.40

-
1064 1.148 DL1+1.5 LL1+1.5 WL8+1.5 265.5
as

EQUIP1+0.9 TEMP1+1.35 MR1 -9.48 -66.20 10.35 2 42.81

1065 1.148 DL1+1.5 LL1+1.5 WL1+1.5 EQUIP1+- 229.1


0.9 TEMP1+1.35 MR1 8 -0.70 5.56 -0.65 18.23

1066 1.148 DL1+1.5 LL1+1.5 WL2+1.5 EQUIP1+- 246.1


nM

0.9 TEMP1+1.35 MR1 2 -1.04 5.09 -1.78 15.63

1067 1.148 DL1+1.5 LL1+1.5 WL3+1.5 EQUIP1+- 261.1 -


0.9 TEMP1+1.35 MR1 5 0.62 -17.18 7.62 79.64

1068 1.148 DL1+1.5 LL1+1.5 WL4+1.5 EQUIP1+- 278.1 -


0.9 TEMP1+1.35 MR1 1 0.28 -17.59 6.50 81.97

1069 1.148 DL1+1.5 LL1+1.5 WL5+1.5 EQUIP1+- 509.0 290.5 -


di

0.9 TEMP1+1.35 MR1 6 72.40 -3.34 3 22.62

1070 1.148 DL1+1.5 LL1+1.5 WL6+1.5 EQUIP1+- 528.1 290.4 -


0.9 TEMP1+1.35 MR1 3 72.30 -3.81 2 25.25
a te

-
1071 1.148 DL1+1.5 LL1+1.5 WL7+1.5 EQUIP1+- - 304.0 -
0.9 TEMP1+1.35 MR1 23.27 -76.30 -5.35 9 21.32

-
1072 1.148 DL1+1.5 LL1+1.5 WL8+1.5 EQUIP1+- 305.2 -
0.9 TEMP1+1.35 MR1 -6.29 -76.64 -5.82 0 23.92
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
196.3
1073 1 DL1+0.8 LL1+1 SL1 3 -0.87 -15.25 -3.16 71.88

-
275.9 103.8

Ed
1074 1 DL1+0.8 LL1+1 SL2 8 -26.21 0.18 7 8.35

153.2 -
1075 1 DL1+0.8 LL1+-1 SL1 0 5.52 18.49 22.16 68.96

122.8
1076 1 DL1+0.8 LL1+-1 SL2 73.56 30.85 3.07 7 -5.42

F
2001 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+0.6 183.7
TEMP1+1 MR1 8 6.59 11.73 26.21 43.68

2002 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+0.6 190.5

PD
TEMP1+1 MR1 6 6.45 11.54 25.76 42.64

2003 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+0.6 196.5


TEMP1+1 MR1 7 7.12 2.63 29.52 4.54

2004 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+0.6 203.3


TEMP1+1 MR1 5 6.98 2.47 29.07 3.60

2005 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+0.6 295.7 142.6


te r
TEMP1+1 MR1 3 35.83 8.17 8 27.34

2006 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+0.6 303.3 142.6


TEMP1+1 MR1 6 35.79 7.98 4 26.29

2007 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+0.6


as

TEMP1+1 MR1 82.80 -23.65 7.36 -95.17 27.87

2008 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+0.6


TEMP1+1 MR1 89.59 -23.79 7.17 -95.61 26.83

2009 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+-0.6 185.9


nM

TEMP1+1 MR1 1 -0.37 0.95 -0.24 -0.80

2010 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+-0.6 192.6


TEMP1+1 MR1 8 -0.50 0.76 -0.69 -1.84

2011 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+-0.6 198.7 -


TEMP1+1 MR1 0 0.16 -8.15 3.07 39.94

2012 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+-0.6 205.4 -


di

TEMP1+1 MR1 8 0.02 -8.31 2.62 40.88

2013 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+-0.6 297.8 116.2 -


TEMP1+1 MR1 6 28.87 -2.61 3 17.14

2014 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+-0.6 305.4 116.1 -


a te

TEMP1+1 MR1 9 28.83 -2.80 9 18.19

-
2015 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+-0.6 121.6 -
TEMP1+1 MR1 84.93 -30.61 -3.42 2 16.62
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
2016 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+-0.6 122.0 -
TEMP1+1 MR1 91.72 -30.74 -3.61 6 17.66

2017 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+0.6 173.1

Ed
TEMP1+1 MR1 6 6.86 14.75 27.23 56.60

2018 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+0.6 184.4


TEMP1+1 MR1 5 6.63 14.43 26.48 54.87

2019 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+0.6 194.4


TEMP1+1 MR1 8 7.74 -0.41 32.74 -8.64

F
2020 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+0.6 205.7 -
TEMP1+1 MR1 8 7.51 -0.69 31.99 10.20

2021 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+0.6 359.7 221.3

PD
TEMP1+1 MR1 5 55.59 8.82 5 29.37

2022 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+0.6 372.4 221.2


TEMP1+1 MR1 6 55.52 8.50 8 27.62

-
2023 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+0.6 175.0
TEMP1+1 MR1 4.87 -43.54 7.48 7 30.24
te r
-
2024 1 DL1+1.0 LL1+1 WL8+1 EQUIP1+0.6 175.8
TEMP1+1 MR1 16.18 -43.77 7.16 0 28.50

2025 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+-0.6 175.2


TEMP1+1 MR1 9 -0.10 3.97 0.78 12.12
as

2026 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+-0.6 186.5


TEMP1+1 MR1 8 -0.32 3.65 0.02 10.39

2027 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+-0.6 196.6 -


TEMP1+1 MR1 0 0.78 -11.19 6.29 53.12
nM

2028 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+-0.6 207.9 -


TEMP1+1 MR1 1 0.55 -11.47 5.54 54.68

2029 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+-0.6 361.8 194.9 -


TEMP1+1 MR1 7 48.63 -1.96 0 15.11

2030 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+-0.6 374.5 194.8 -


TEMP1+1 MR1 9 48.57 -2.28 2 16.86
di

-
2031 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+-0.6 201.5 -
TEMP1+1 MR1 6.99 -50.50 -3.31 2 14.24
a te

-
2032 1 DL1+0.7 LL1+1 WL8+1 EQUIP1+-0.6 202.2 -
TEMP1+1 MR1 18.31 -50.72 -3.62 6 15.98

196.3
2033 1 DL1+0.8 LL1+1 SL1 3 -0.87 -15.25 -3.16 71.88
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
275.9 103.8
2034 1 DL1+0.8 LL1+1 SL2 8 -26.21 0.18 7 8.35

153.2 -

Ed
2035 1 DL1+0.8 LL1+-1 SL1 0 5.52 18.49 22.16 68.96

122.8
2036 1 DL1+0.8 LL1+-1 SL2 73.56 30.85 3.07 7 -5.42

146.3
P28 500 1 DL1+1 LL1+1 EQUIP1 3 2.55 1.82 10.59 8.25

F
154.2
501 1 DL1+1 LL1+1 EQUIP1+1 TEMP1 6 10.05 6.33 40.80 30.36

502 1 DL1+1 WL1 65.41 1.35 8.93 6.53 42.12

PD
503 1 DL1+1 WL2 70.89 1.18 8.72 5.58 41.10

-
504 1 DL1+1 WL3 55.98 3.04 -7.49 13.40 36.31

-
505 1 DL1+1 WL4 61.54 2.87 -7.65 12.45 37.10
te r
489.6 188.1
506 1 DL1+1 WL5 6 44.29 4.69 4 29.77

496.6 187.8
507 1 DL1+1 WL6 1 44.28 4.46 3 28.70
as

- -
372.2 182.2 -
508 1 DL1+1 WL7 7 -42.79 -2.37 7 20.30

- -
366.7 183.2 -
nM

509 1 DL1+1 WL8 4 -42.95 -2.58 0 21.32

510 1 DL1+0.7 WL1 66.27 1.26 6.46 5.83 30.26

511 1 DL1+0.7 WL2 70.11 1.14 6.31 5.16 29.54

-
512 1 DL1+0.7 WL3 59.67 2.44 -5.03 10.64 24.65
di

-
513 1 DL1+0.7 WL4 63.56 2.33 -5.15 9.97 25.20

363.2 132.9
514 1 DL1+0.7 WL5 4 31.32 3.49 5 21.61
a te

368.1 132.7
515 1 DL1+0.7 WL6 1 31.31 3.33 4 20.86

- -
240.1 126.3 -
516 1 DL1+0.7 WL7 1 -29.64 -1.45 3 13.44
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
- -
236.2 126.9 -
517 1 DL1+0.7 WL8 4 -29.75 -1.60 8 14.15

144.1

Ed
518 1 DL1+ 1LL1+0.75 WL1+1 EQUIP1 8 2.77 7.99 12.34 37.91

148.2
519 1 DL1+1.0 LL1+0.75 WL2+1 EQUIP1 9 2.65 7.84 11.63 37.15

137.1 -
520 1 DL1+1.0 LL1+0.75 WL3+1 EQUIP1 1 4.04 -4.32 17.49 20.92

F
141.2 -
521 1 DL1+1.0 LL1+0.75 WL4+1 EQUIP1 8 3.92 -4.44 16.78 21.51

462.3 148.5

PD
522 1 DL1+1.0 LL1+0.75 WL5+1 EQUIP1 7 34.98 4.81 5 28.64

467.5 148.3
523 1 DL1+1.0 LL1+0.75 WL6+1 EQUIP1 8 34.97 4.64 2 27.84

- -
184.0 129.2
524 1 DL1+1.0 LL1+0.75 WL7+1 EQUIP1 8 -30.33 -0.48 6 -8.90
te r
- -
179.9 129.9
525 1 DL1+1.0 LL1+0.75 WL8+1 EQUIP1 3 -30.45 -0.64 5 -9.67

163.7
526 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL1 8 1.07 -8.35 4.36 56.90
as

273.1
527 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL2 3 -10.59 -0.05 -44.97 15.89

528 0.6 DL1+1 WL1 38.10 0.93 8.66 4.85 41.10


nM

529 0.6 DL1+1 WL2 43.58 0.76 8.44 3.90 40.08

-
530 0.6 DL1+1 WL3 28.67 2.62 -7.76 11.72 37.34

-
531 0.6 DL1+1 WL4 34.24 2.45 -7.92 10.77 38.13

462.3 186.4
di

532 0.6 DL1+1 WL5 5 43.87 4.41 6 28.74

469.3 186.1
533 0.6 DL1+1 WL6 0 43.86 4.18 6 27.67

- -
a te

399.5 183.9 -
534 0.6 DL1+1 WL7 8 -43.21 -2.65 4 21.32

- -
394.0 184.8 -
535 0.6 DL1+1 WL8 5 -43.37 -2.86 7 22.35
re

536 0.6 DL1+0.7 SL1 64.24 -1.35 -13.14 -5.79 66.41


APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
210.0
537 0.6 DL1+0.7 SL2 4 -16.88 -2.06 -71.56 11.74

216.3
1001 1.35 DL1+1.5 LL1+1.5 EQUIP1+0.9 TEMP1 9 10.42 6.68 42.44 31.89

Ed
202.1
1002 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 TEMP1 1 -3.08 -1.45 -11.94 -7.92

1003 1.35 DL1+1.5 WL1+0.9 TEMP1 95.00 8.61 17.36 36.35 82.70

103.2
1004 1.35 DL1+1.5 WL2+0.9 TEMP1 3 8.36 17.04 34.93 81.17

F
-
1005 1.35 DL1+1.5 WL3+0.9 TEMP1 80.87 11.15 -7.27 46.66 34.95

PD
-
1006 1.35 DL1+1.5 WL4+0.9 TEMP1 89.21 10.90 -7.51 45.24 36.13

731.3 308.7
1007 1.35 DL1+1.5 WL5+0.9 TEMP1 9 73.03 10.99 7 64.17

741.8 308.3
1008 1.35 DL1+1.5 WL6+0.9 TEMP1 0 73.02 10.65 1 62.56
te r
- -
561.5 246.8 -
1009 1.35 DL1+1.5 WL7+0.9 TEMP1 1 -57.59 0.41 4 10.93

- -
553.2 248.2 -
as

1010 1.35 DL1+1.5 WL8+0.9 TEMP1 1 -57.83 0.09 3 12.46

1011 1.35 DL1+1.5 WL1+-0.9 TEMP1 80.73 -4.89 9.23 -18.03 42.90

1012 1.35 DL1+1.5 WL2+-0.9 TEMP1 88.96 -5.14 8.91 -19.45 41.37
nM

-
1013 1.35 DL1+1.5 WL3+-0.9 TEMP1 66.59 -2.35 -15.40 -7.72 74.76

-
1014 1.35 DL1+1.5 WL4+-0.9 TEMP1 74.94 -2.60 -15.64 -9.15 75.94

717.1 254.3
1015 1.35 DL1+1.5 WL5+-0.9 TEMP1 1 59.53 2.86 9 24.37
di

727.5 253.9
1016 1.35 DL1+1.5 WL6+-0.9 TEMP1 3 59.52 2.52 3 22.76

- -
575.7 301.2 -
1017 1.35 DL1+1.5 WL7+-0.9 TEMP1 8 -71.09 -7.72 2 50.73
a te

- -
567.4 302.6 -
1018 1.35 DL1+1.5 WL8+-0.9 TEMP1 9 -71.33 -8.04 1 52.27

103.0
1019 1.35 DL1+0.9 TEMP1+1.35 MR1 8 8.26 5.10 33.26 23.89
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
1020 1.35 DL1+-0.9 TEMP1+1.35 MR1 88.81 -5.24 -3.03 -21.13 15.92

1021 1.35 DL1+1.5LL1+1.5 EQUIP1+0.9 220.1


TEMP1+1.35 MR1 6 10.51 6.79 42.85 32.40

Ed
1022 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 205.8
TEMP1+1.35 MR1 9 -2.99 -1.34 -11.54 -7.41

1023 1.148 DL1+1.5 LL1+1.5 EQUIP1+0.9 206.3


TEMP1+1.35 MR1 7 10.29 6.65 42.00 31.88

1024 1.148 DL1+1.5 LL1+1.5 EQUIP1+-0.9 192.1

F
TEMP1+1.35 MR1 0 -3.20 -1.48 -12.38 -7.93

1025 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+0.9 217.5


TEMP1+1.35 MR1 8 10.77 14.20 44.95 67.99

PD
1026 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+0.9 222.5
TEMP1+1.35 MR1 2 10.63 14.01 44.10 67.08

1027 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+0.9 209.1


TEMP1+1.35 MR1 0 12.30 -0.58 51.13 -2.60

1028 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+0.9 214.1


TEMP1+1.35 MR1 0 12.15 -0.72 50.28 -3.31
te r
1029 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+0.9 599.4 208.4
TEMP1+1.35 MR1 1 49.43 10.38 0 56.88

1030 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+0.9 605.6 208.1


TEMP1+1.35 MR1 6 49.42 10.17 3 55.91
as

- -
1031 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+0.9 176.3 124.9
TEMP1+1.35 MR1 3 -28.95 4.03 6 11.82

- -
nM

1032 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+0.9 171.3 125.8


TEMP1+1.35 MR1 5 -29.09 3.84 0 10.90

1033 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+-0.9 203.3


TEMP1+1.35 MR1 1 -2.73 6.07 -9.44 28.19

1034 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+-0.9 208.2


TEMP1+1.35 MR1 4 -2.87 5.88 -10.29 27.27
di

1035 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+-0.9 194.8 -


TEMP1+1.35 MR1 2 -1.20 -8.70 -3.25 42.41

1036 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+-0.9 199.8 -


TEMP1+1.35 MR1 3 -1.35 -8.85 -4.11 43.11
a te

1037 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+-0.9 585.1 154.0


TEMP1+1.35 MR1 3 35.93 2.25 2 17.07

1038 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+-0.9 591.3 153.7


TEMP1+1.35 MR1 8 35.92 2.04 4 16.10
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
- -
1039 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+-0.9 190.6 179.3 -
TEMP1+1.35 MR1 0 -42.44 -4.10 5 27.99

- -

Ed
1040 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+-0.9 185.6 180.1 -
TEMP1+1.35 MR1 3 -42.59 -4.29 8 28.91

1041 1.148 DL1+1.5 LL1+0.9 WL1+1.5 203.7


EQUIP1+0.9 TEMP1+1.35 MR1 9 10.56 14.06 44.10 67.48

1042 1.148 DL1+1.5 LL1+0.9 WL2+1.5 208.7


EQUIP1+0.9 TEMP1+1.35 MR1 2 10.41 13.87 43.25 66.56

F
1043 1.148 DL1+1.5 LL1+0.9 WL3+1.5 195.3
EQUIP1+0.9 TEMP1+1.35 MR1 1 12.08 -0.72 50.29 -3.12

PD
1044 1.148 DL1+1.5 LL1+0.9 WL4+1.5 200.3
EQUIP1+0.9 TEMP1+1.35 MR1 1 11.93 -0.86 49.43 -3.83

1045 1.148 DL1+1.5 LL1+0.9 WL5+1.5 585.6 207.5


EQUIP1+0.9 TEMP1+1.35 MR1 2 49.21 10.24 5 56.36

1046 1.148 DL1+1.5 LL1+0.9 WL6+1.5 591.8 207.2


EQUIP1+0.9 TEMP1+1.35 MR1 7 49.20 10.03 8 55.39
te r
- -
1047 1.148 DL1+1.5 LL1+0.9 WL7+1.5 190.1 125.8
EQUIP1+0.9 TEMP1+1.35 MR1 2 -29.16 3.89 1 11.30

- -
1048 1.148 DL1+1.5 LL1+0.9 WL8+1.5 185.1 126.6
as

EQUIP1+0.9 TEMP1+1.35 MR1 4 -29.30 3.70 5 10.38

1049 1.148 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+- 189.5


0.9 TEMP1+1.35 MR1 1 -2.94 5.93 -10.28 27.67

1050 1.148 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+- 194.4


nM

0.9 TEMP1+1.35 MR1 5 -3.09 5.74 -11.13 26.75

1051 1.148 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+- 181.0 -


0.9 TEMP1+1.35 MR1 3 -1.41 -8.84 -4.10 42.92

1052 1.148 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+- 186.0 -


0.9 TEMP1+1.35 MR1 4 -1.56 -8.99 -4.95 43.63

1053 1.148 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+- 571.3 153.1


di

0.9 TEMP1+1.35 MR1 4 35.72 2.11 7 16.55

1054 1.148 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+- 577.5 152.9


0.9 TEMP1+1.35 MR1 9 35.71 1.90 0 15.59
a te

- -
1055 1.148 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+- 204.3 180.1 -
0.9 TEMP1+1.35 MR1 9 -42.66 -4.24 9 28.51

- -
1056 1.148 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+- 199.4 181.0 -
0.9 TEMP1+1.35 MR1 2 -42.80 -4.43 3 29.43
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1057 1.148 DL1+1.5 LL1+1.5 WL1+1.5 202.0
EQUIP1+0.9 TEMP1+1.35 MR1 7 10.74 19.00 45.50 91.21

1058 1.148 DL1+1.5 LL1+1.5 WL2+1.5 210.2


EQUIP1+0.9 TEMP1+1.35 MR1 9 10.49 18.69 44.08 89.68

Ed
1059 1.148 DL1+1.5 LL1+1.5 WL3+1.5 187.9 -
EQUIP1+0.9 TEMP1+1.35 MR1 3 13.28 -5.62 55.81 26.45

1060 1.148 DL1+1.5 LL1+1.5 WL4+1.5 196.2 -


EQUIP1+0.9 TEMP1+1.35 MR1 8 13.03 -5.87 54.39 27.63

1061 1.148 DL1+1.5 LL1+1.5 WL5+1.5 838.4 317.9

F
EQUIP1+0.9 TEMP1+1.35 MR1 5 75.16 12.63 2 72.67

1062 1.148 DL1+1.5 LL1+1.5 WL6+1.5 848.8 317.4


EQUIP1+0.9 TEMP1+1.35 MR1 7 75.14 12.29 6 71.07

PD
- -
1063 1.148 DL1+1.5 LL1+1.5 WL7+1.5 454.4 237.6
EQUIP1+0.9 TEMP1+1.35 MR1 4 -55.46 2.05 9 -2.42

- -
1064 1.148 DL1+1.5 LL1+1.5 WL8+1.5 446.1 239.0
EQUIP1+0.9 TEMP1+1.35 MR1 5 -55.70 1.73 8 -3.96
te r
1065 1.148 DL1+1.5 LL1+1.5 WL1+1.5 EQUIP1+- 187.7
0.9 TEMP1+1.35 MR1 9 -2.76 10.87 -8.88 51.40

1066 1.148 DL1+1.5 LL1+1.5 WL2+1.5 EQUIP1+- 196.0


0.9 TEMP1+1.35 MR1 2 -3.01 10.56 -10.30 49.87
as

1067 1.148 DL1+1.5 LL1+1.5 WL3+1.5 EQUIP1+- 173.6 -


0.9 TEMP1+1.35 MR1 6 -0.22 -13.75 1.43 66.26

1068 1.148 DL1+1.5 LL1+1.5 WL4+1.5 EQUIP1+- 182.0 -


0.9 TEMP1+1.35 MR1 0 -0.47 -13.99 0.00 67.43
nM

1069 1.148 DL1+1.5 LL1+1.5 WL5+1.5 EQUIP1+- 824.1 263.5


0.9 TEMP1+1.35 MR1 7 61.66 4.50 4 32.87

1070 1.148 DL1+1.5 LL1+1.5 WL6+1.5 EQUIP1+- 834.5 263.0


0.9 TEMP1+1.35 MR1 9 61.65 4.16 8 31.26

- -
1071 1.148 DL1+1.5 LL1+1.5 WL7+1.5 EQUIP1+- 468.7 292.0 -
0.9 TEMP1+1.35 MR1 2 -68.96 -6.08 7 42.23
di

- -
1072 1.148 DL1+1.5 LL1+1.5 WL8+1.5 EQUIP1+- 460.4 293.4 -
0.9 TEMP1+1.35 MR1 3 -69.20 -6.40 6 43.76
a te

162.0
1073 1 DL1+0.8 LL1+1 SL1 3 -0.68 -17.72 -2.96 99.96

370.3
1074 1 DL1+0.8 LL1+1 SL2 1 -22.87 -1.91 -96.92 21.86

-
1075 1 DL1+0.8 LL1+-1 SL1 95.53 4.97 20.99 20.76 85.38
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
112.7 114.7
1076 1 DL1+0.8 LL1+-1 SL2 6 27.17 5.18 2 -7.27

2001 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+0.6 152.1

Ed
TEMP1+1 MR1 6 7.29 9.54 30.41 45.62

2002 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+0.6 155.4


TEMP1+1 MR1 5 7.20 9.42 29.85 45.01

2003 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+0.6 146.5


TEMP1+1 MR1 1 8.31 -0.31 34.54 -1.44

F
2004 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+0.6 149.8
TEMP1+1 MR1 4 8.21 -0.40 33.97 -1.91

2005 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+0.6 406.7 139.3

PD
TEMP1+1 MR1 1 33.06 7.00 8 38.21

2006 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+0.6 410.8 139.2


TEMP1+1 MR1 8 33.06 6.86 0 37.57

-
2007 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+0.6 110.4
TEMP1+1 MR1 4 -19.19 2.76 -82.86 8.17
te r
-
2008 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+0.6 107.1
TEMP1+1 MR1 3 -19.28 2.64 -83.42 7.56

2009 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+-0.6 142.6


TEMP1+1 MR1 4 -1.71 4.13 -5.84 19.09
as

2010 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+-0.6 145.9


TEMP1+1 MR1 3 -1.80 4.00 -6.41 18.48

2011 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+-0.6 136.9 -


TEMP1+1 MR1 9 -0.69 -5.73 -1.72 27.98
nM

2012 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+-0.6 140.3 -


TEMP1+1 MR1 3 -0.79 -5.82 -2.29 28.45

2013 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+-0.6 397.2 103.1


TEMP1+1 MR1 0 24.06 1.58 3 11.68

2014 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+-0.6 401.3 102.9


TEMP1+1 MR1 6 24.06 1.44 4 11.03
di

- -
2015 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+-0.6 119.9 119.1 -
TEMP1+1 MR1 6 -28.18 -2.66 2 18.36
a te

- -
2016 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+-0.6 116.6 119.6 -
TEMP1+1 MR1 4 -28.28 -2.78 7 18.98

2017 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+0.6 151.0


TEMP1+1 MR1 1 7.41 12.84 31.35 61.45
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
2018 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+0.6 156.5
TEMP1+1 MR1 0 7.25 12.63 30.40 60.43

2019 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+0.6 141.5 -


TEMP1+1 MR1 9 9.10 -3.58 38.22 16.99

Ed
2020 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+0.6 147.1 -
TEMP1+1 MR1 5 8.94 -3.74 37.27 17.78

2021 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+0.6 575.2 212.9


TEMP1+1 MR1 7 50.36 8.59 6 49.09

2022 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+0.6 582.2 212.6

F
TEMP1+1 MR1 1 50.35 8.36 6 48.02

- -
2023 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+0.6 286.6 157.4

PD
TEMP1+1 MR1 6 -36.72 1.54 4 -0.97

- -
2024 1 DL1+1.0 LL1+1 WL8+1 EQUIP1+0.6 281.1 158.3
TEMP1+1 MR1 3 -36.88 1.33 7 -2.00

2025 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+-0.6 141.5


TEMP1+1 MR1 0 -1.59 7.42 -4.91 34.91
te r
2026 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+-0.6 146.9
TEMP1+1 MR1 8 -1.75 7.21 -5.85 33.89

2027 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+-0.6 132.0 -


TEMP1+1 MR1 7 0.11 -9.00 1.97 43.53
as

2028 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+-0.6 137.6 -


TEMP1+1 MR1 4 -0.06 -9.16 1.02 44.31

2029 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+-0.6 565.7 176.7


TEMP1+1 MR1 5 41.36 3.17 0 22.55
nM

2030 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+-0.6 572.7 176.4


TEMP1+1 MR1 0 41.35 2.95 0 21.48

- -
2031 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+-0.6 296.1 193.7 -
TEMP1+1 MR1 8 -45.72 -3.88 0 27.51

- -
2032 1 DL1+0.7 LL1+1 WL8+1 EQUIP1+-0.6 290.6 194.6 -
di

TEMP1+1 MR1 5 -45.88 -4.09 3 28.53

162.0
2033 1 DL1+0.8 LL1+1 SL1 3 -0.68 -17.72 -2.96 99.96
a te

370.3
2034 1 DL1+0.8 LL1+1 SL2 1 -22.87 -1.91 -96.92 21.86

-
2035 1 DL1+0.8 LL1+-1 SL1 95.53 4.97 20.99 20.76 85.38
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
112.7 114.7
2036 1 DL1+0.8 LL1+-1 SL2 6 27.17 5.18 2 -7.27

151.3

Ed
P29 500 1 DL1+1 LL1+1 EQUIP1 1 -1.56 0.73 -7.40 2.61

159.0
501 1 DL1+1 LL1+1 EQUIP1+1 TEMP1 1 -4.69 4.03 -21.74 18.28

160.4
502 1 DL1+1 WL1 1 -4.53 13.18 -21.25 66.43

F
168.7
503 1 DL1+1 WL2 0 -4.50 10.35 -21.26 52.52

- -

PD
504 1 DL1+1 WL3 48.60 2.66 -11.54 15.48 60.61

- -
505 1 DL1+1 WL4 39.87 2.70 -14.35 15.49 74.48

128.6
506 1 DL1+1 WL5 23.02 26.04 13.02 1 63.70

133.3
te r
507 1 DL1+1 WL6 26.74 27.04 10.28 0 50.19

-
112.3 132.5
508 1 DL1+1 WL7 3 -27.54 5.95 6 27.54
as

-
120.5 132.4
509 1 DL1+1 WL8 5 -27.49 3.13 8 13.63

133.4
510 1 DL1+0.7 WL1 1 -3.41 9.46 -15.60 47.33
nM

139.2
511 1 DL1+0.7 WL2 2 -3.39 7.48 -15.62 37.59

- -
512 1 DL1+0.7 WL3 12.89 1.62 -7.84 10.11 41.60

-
513 1 DL1+0.7 WL4 -6.78 1.65 -9.81 10.11 51.31
di

514 1 DL1+0.7 WL5 37.24 17.99 9.35 89.30 45.41

515 1 DL1+0.7 WL6 39.85 18.68 7.43 92.58 35.96

516 1 DL1+0.7 WL7 99.76 -19.52 4.40 -93.52 20.10


a te

105.5
517 1 DL1+0.7 WL8 1 -19.48 2.43 -93.47 10.37

218.7
518 1 DL1+ 1LL1+0.75 WL1+1 EQUIP1 9 -4.35 10.03 -21.51 50.38
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
225.0
519 1 DL1+1.0 LL1+0.75 WL2+1 EQUIP1 1 -4.33 7.91 -21.52 39.94

-
520 1 DL1+1.0 LL1+0.75 WL3+1 EQUIP1 62.04 1.04 -8.50 6.04 44.90

Ed
-
521 1 DL1+1.0 LL1+0.75 WL4+1 EQUIP1 68.59 1.07 -10.62 6.05 55.31

115.7
522 1 DL1+1.0 LL1+0.75 WL5+1 EQUIP1 5 18.58 9.92 90.89 48.33

118.5

F
523 1 DL1+1.0 LL1+0.75 WL6+1 EQUIP1 4 19.32 7.86 94.40 38.20

-
182.7 104.9

PD
524 1 DL1+1.0 LL1+0.75 WL7+1 EQUIP1 4 -21.60 4.61 9 21.21

-
188.9 104.9
525 1 DL1+1.0 LL1+0.75 WL8+1 EQUIP1 0 -21.57 2.50 3 10.78

228.7
526 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL1 3 -3.38 -3.36 -16.64 24.08
te r
176.0
527 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL2 4 -10.41 -0.43 -50.57 8.54

132.2
528 0.6 DL1+1 WL1 4 -4.21 12.87 -20.27 65.33
as

140.5
529 0.6 DL1+1 WL2 3 -4.18 10.04 -20.29 51.42

- -
530 0.6 DL1+1 WL3 76.77 2.98 -11.85 16.46 61.71
nM

- -
531 0.6 DL1+1 WL4 68.04 3.02 -14.67 16.47 75.58

129.5
532 0.6 DL1+1 WL5 -5.15 26.37 12.71 9 62.60

134.2
533 0.6 DL1+1 WL6 -1.43 27.36 9.97 8 49.09
di

-
131.5
534 0.6 DL1+1 WL7 84.16 -27.21 5.64 9 26.44

-
a te

131.5
535 0.6 DL1+1 WL8 92.38 -27.17 2.82 1 12.53

145.4
536 0.6 DL1+0.7 SL1 9 -2.91 -4.99 -13.78 30.27

537 0.6 DL1+0.7 SL2 75.24 -12.29 -1.08 -59.02 9.55


re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
223.3
1001 1.35 DL1+1.5 LL1+1.5 EQUIP1+0.9 TEMP1 3 -5.03 3.95 -23.64 17.61

209.4 -
1002 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 TEMP1 7 0.60 -1.98 2.17 10.59

Ed
236.9 113.3
1003 1.35 DL1+1.5 WL1+0.9 TEMP1 8 -9.49 22.61 -44.41 4

249.4
1004 1.35 DL1+1.5 WL2+0.9 TEMP1 2 -9.45 18.37 -44.44 92.47

- -

F
1005 1.35 DL1+1.5 WL3+0.9 TEMP1 76.53 1.30 -14.46 10.68 77.23

- -
1006 1.35 DL1+1.5 WL4+0.9 TEMP1 63.43 1.35 -18.68 10.70 98.03

PD
180.3 109.2
1007 1.35 DL1+1.5 WL5+0.9 TEMP1 30.90 36.37 22.38 7 4

187.4
1008 1.35 DL1+1.5 WL6+0.9 TEMP1 36.48 37.86 18.27 1 88.97

-
164.8 211.3
te r
1009 1.35 DL1+1.5 WL7+0.9 TEMP1 7 -44.00 11.78 8 55.00

-
177.1 211.2
1010 1.35 DL1+1.5 WL8+0.9 TEMP1 9 -43.93 7.54 6 34.14
as

223.1
1011 1.35 DL1+1.5 WL1+-0.9 TEMP1 2 -3.86 16.68 -18.59 85.14

235.5
1012 1.35 DL1+1.5 WL2+-0.9 TEMP1 6 -3.82 12.45 -18.62 64.26
nM

-
- 105.4
1013 1.35 DL1+1.5 WL3+-0.9 TEMP1 90.39 6.93 -20.39 36.50 3

-
- 126.2
1014 1.35 DL1+1.5 WL4+-0.9 TEMP1 77.29 6.98 -24.61 36.52 4

206.1
di

1015 1.35 DL1+1.5 WL5+-0.9 TEMP1 17.04 42.00 16.45 9 81.04

213.2
1016 1.35 DL1+1.5 WL6+-0.9 TEMP1 22.62 43.49 12.34 3 60.77
a te

-
151.0 185.5
1017 1.35 DL1+1.5 WL7+-0.9 TEMP1 1 -38.37 5.85 7 26.79

-
163.3 185.4
1018 1.35 DL1+1.5 WL8+-0.9 TEMP1 3 -38.29 1.62 5 5.93
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
110.7
1019 1.35 DL1+0.9 TEMP1+1.35 MR1 9 -3.70 3.96 -15.29 17.54

-
1020 1.35 DL1+-0.9 TEMP1+1.35 MR1 96.93 1.94 -1.97 10.53 10.67

Ed
1021 1.35 DL1+1.5LL1+1.5 EQUIP1+0.9 232.1
TEMP1+1.35 MR1 1 -4.83 3.89 -22.73 17.34

1022 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 218.2 -


TEMP1+1.35 MR1 5 0.81 -2.04 3.09 10.86

1023 1.148 DL1+1.5 LL1+1.5 EQUIP1+0.9 217.8

F
TEMP1+1.35 MR1 8 -4.66 3.73 -22.24 16.79

1024 1.148 DL1+1.5 LL1+1.5 EQUIP1+-0.9 204.0 -


TEMP1+1.35 MR1 2 0.97 -2.20 3.58 11.42

PD
1025 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+0.9 313.0
TEMP1+1.35 MR1 9 -8.18 15.05 -39.66 74.66

1026 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+0.9 320.5


TEMP1+1.35 MR1 6 -8.15 12.50 -39.67 62.14

1027 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+0.9 124.9 -


TEMP1+1.35 MR1 9 -1.71 -7.20 -6.60 39.68
te r
1028 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+0.9 132.8 -
TEMP1+1.35 MR1 5 -1.68 -9.73 -6.59 52.16

1029 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+0.9 189.4


TEMP1+1.35 MR1 5 19.34 14.91 95.21 72.20
as

1030 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+0.9 192.7


TEMP1+1.35 MR1 9 20.23 12.44 99.44 60.04

-
1031 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+0.9 269.8 139.8
nM

TEMP1+1.35 MR1 3 -28.88 8.55 4 39.65

-
1032 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+0.9 277.2 139.7
TEMP1+1.35 MR1 2 -28.84 6.00 7 27.14

1033 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+-0.9 299.2


TEMP1+1.35 MR1 3 -2.55 9.12 -13.84 46.45
di

1034 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+-0.9 306.7


TEMP1+1.35 MR1 0 -2.52 6.58 -13.85 33.93

1035 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+-0.9 111.1 -


TEMP1+1.35 MR1 3 3.93 -13.12 19.22 67.89
a te

1036 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+-0.9 118.9 -


TEMP1+1.35 MR1 9 3.96 -15.66 19.23 80.37

1037 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+-0.9 175.5 121.0


TEMP1+1.35 MR1 9 24.97 8.98 3 43.99

1038 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+-0.9 178.9 125.2


re

TEMP1+1.35 MR1 3 25.86 6.51 5 31.83


APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
1039 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+-0.9 255.9 114.0
TEMP1+1.35 MR1 6 -23.25 2.62 2 11.45

Ed
1040 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+-0.9 263.3 113.9
TEMP1+1.35 MR1 6 -23.21 0.08 5 -1.07

1041 1.148 DL1+1.5 LL1+0.9 WL1+1.5 298.8


EQUIP1+0.9 TEMP1+1.35 MR1 7 -8.02 14.89 -39.16 74.10

1042 1.148 DL1+1.5 LL1+0.9 WL2+1.5 306.3


EQUIP1+0.9 TEMP1+1.35 MR1 3 -7.99 12.35 -39.18 61.58

F
1043 1.148 DL1+1.5 LL1+0.9 WL3+1.5 110.7 -
EQUIP1+0.9 TEMP1+1.35 MR1 6 -1.54 -7.35 -6.11 40.24

PD
1044 1.148 DL1+1.5 LL1+0.9 WL4+1.5 118.6 -
EQUIP1+0.9 TEMP1+1.35 MR1 2 -1.51 -9.89 -6.10 52.72

1045 1.148 DL1+1.5 LL1+0.9 WL5+1.5 175.2


EQUIP1+0.9 TEMP1+1.35 MR1 2 19.50 14.75 95.71 71.64

1046 1.148 DL1+1.5 LL1+0.9 WL6+1.5 178.5


EQUIP1+0.9 TEMP1+1.35 MR1 7 20.39 12.28 99.93 59.48
te r
-
1047 1.148 DL1+1.5 LL1+0.9 WL7+1.5 255.6 139.3
EQUIP1+0.9 TEMP1+1.35 MR1 0 -28.72 8.39 5 39.10

-
1048 1.148 DL1+1.5 LL1+0.9 WL8+1.5 262.9 139.2
as

EQUIP1+0.9 TEMP1+1.35 MR1 9 -28.68 5.85 8 26.58

1049 1.148 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+- 285.0


0.9 TEMP1+1.35 MR1 1 -2.38 8.96 -13.35 45.90

1050 1.148 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+- 292.4


nM

0.9 TEMP1+1.35 MR1 7 -2.36 6.42 -13.36 33.38

1051 1.148 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+- -


0.9 TEMP1+1.35 MR1 96.90 4.09 -13.28 19.71 68.44

1052 1.148 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+- 104.7 -


0.9 TEMP1+1.35 MR1 6 4.12 -15.82 19.72 80.92

1053 1.148 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+- 161.3 121.5


di

0.9 TEMP1+1.35 MR1 6 25.13 8.82 2 43.44

1054 1.148 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+- 164.7 125.7


0.9 TEMP1+1.35 MR1 0 26.03 6.36 5 31.28
a te

-
1055 1.148 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+- 241.7 113.5
0.9 TEMP1+1.35 MR1 4 -23.09 2.46 3 10.89

-
1056 1.148 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+- 249.1 113.4
0.9 TEMP1+1.35 MR1 3 -23.05 -0.08 6 -1.62
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1057 1.148 DL1+1.5 LL1+1.5 WL1+1.5 352.8 112.3
EQUIP1+0.9 TEMP1+1.35 MR1 6 -10.25 22.33 -50.45 2

1058 1.148 DL1+1.5 LL1+1.5 WL2+1.5 365.3


EQUIP1+0.9 TEMP1+1.35 MR1 0 -10.21 18.09 -50.47 91.44

Ed
1059 1.148 DL1+1.5 LL1+1.5 WL3+1.5 -
EQUIP1+0.9 TEMP1+1.35 MR1 39.34 0.54 -14.74 4.64 78.25

1060 1.148 DL1+1.5 LL1+1.5 WL4+1.5 -


EQUIP1+0.9 TEMP1+1.35 MR1 52.45 0.59 -18.97 4.66 99.06

1061 1.148 DL1+1.5 LL1+1.5 WL5+1.5 146.7 174.3 108.2

F
EQUIP1+0.9 TEMP1+1.35 MR1 8 35.61 22.10 4 2

1062 1.148 DL1+1.5 LL1+1.5 WL6+1.5 152.3 181.3


EQUIP1+0.9 TEMP1+1.35 MR1 5 37.10 17.98 7 87.95

PD
-
1063 1.148 DL1+1.5 LL1+1.5 WL7+1.5 280.7 217.4
EQUIP1+0.9 TEMP1+1.35 MR1 4 -44.76 11.49 2 53.97

-
1064 1.148 DL1+1.5 LL1+1.5 WL8+1.5 293.0 217.3
EQUIP1+0.9 TEMP1+1.35 MR1 7 -44.69 7.26 0 33.11
te r
1065 1.148 DL1+1.5 LL1+1.5 WL1+1.5 EQUIP1+- 338.9
0.9 TEMP1+1.35 MR1 9 -4.62 16.40 -24.63 84.11

1066 1.148 DL1+1.5 LL1+1.5 WL2+1.5 EQUIP1+- 351.4


0.9 TEMP1+1.35 MR1 4 -4.58 12.16 -24.65 63.24
as

-
1067 1.148 DL1+1.5 LL1+1.5 WL3+1.5 EQUIP1+- 106.4
0.9 TEMP1+1.35 MR1 25.48 6.17 -20.67 30.46 5

-
1068 1.148 DL1+1.5 LL1+1.5 WL4+1.5 EQUIP1+- 127.2
nM

0.9 TEMP1+1.35 MR1 38.59 6.22 -24.89 30.48 6

1069 1.148 DL1+1.5 LL1+1.5 WL5+1.5 EQUIP1+- 132.9 200.1


0.9 TEMP1+1.35 MR1 2 41.24 16.17 5 80.01

1070 1.148 DL1+1.5 LL1+1.5 WL6+1.5 EQUIP1+- 138.4 207.1


0.9 TEMP1+1.35 MR1 9 42.73 12.06 9 59.74

-
di

1071 1.148 DL1+1.5 LL1+1.5 WL7+1.5 EQUIP1+- 266.8 191.6


0.9 TEMP1+1.35 MR1 8 -39.13 5.57 0 25.77

-
1072 1.148 DL1+1.5 LL1+1.5 WL8+1.5 EQUIP1+- 279.2 191.4
a te

0.9 TEMP1+1.35 MR1 1 -39.06 1.33 8 4.91

278.6
1073 1 DL1+0.8 LL1+1 SL1 0 -4.89 -7.00 -24.03 43.78

178.2
1074 1 DL1+0.8 LL1+1 SL2 4 -18.29 -1.42 -88.66 14.18
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
- -
1075 1 DL1+0.8 LL1+-1 SL1 16.35 2.04 8.58 11.17 38.01

1076 1 DL1+0.8 LL1+-1 SL2 84.01 15.45 3.01 75.79 -8.41

Ed
2001 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+0.6 216.4
TEMP1+1 MR1 2 -5.52 10.10 -26.61 50.03

2002 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+0.6 221.4


TEMP1+1 MR1 0 -5.50 8.41 -26.62 41.68

2003 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+0.6 -


TEMP1+1 MR1 91.02 -1.20 -4.72 -4.58 26.20

F
2004 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+0.6 -
TEMP1+1 MR1 96.26 -1.18 -6.41 -4.57 34.52

PD
2005 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+0.6 133.9
TEMP1+1 MR1 9 12.83 10.01 63.30 48.39

2006 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+0.6 136.2


TEMP1+1 MR1 2 13.42 8.37 66.11 40.28

2007 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+0.6 187.5


TEMP1+1 MR1 8 -19.32 5.77 -93.40 26.69
te r
2008 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+0.6 192.5
TEMP1+1 MR1 1 -19.29 4.08 -93.36 18.35

2009 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+-0.6 207.1


TEMP1+1 MR1 8 -1.76 6.15 -9.40 31.22
as

2010 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+-0.6 212.1


TEMP1+1 MR1 6 -1.75 4.46 -9.41 22.88

2011 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+-0.6 -


TEMP1+1 MR1 81.78 2.55 -8.68 12.63 45.00
nM

2012 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+-0.6 -


TEMP1+1 MR1 87.02 2.57 -10.37 12.64 53.32

2013 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+-0.6 124.7


TEMP1+1 MR1 5 16.58 6.06 80.51 29.58

2014 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+-0.6 126.9


TEMP1+1 MR1 8 17.18 4.42 83.33 21.48
di

2015 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+-0.6 178.3


TEMP1+1 MR1 4 -15.57 1.82 -76.19 7.89

2016 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+-0.6 183.2


TEMP1+1 MR1 7 -15.54 0.13 -76.14 -0.46
a te

2017 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+0.6 252.4


TEMP1+1 MR1 1 -7.01 15.06 -34.14 75.50

2018 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+0.6 260.7


TEMP1+1 MR1 1 -6.98 12.24 -34.15 61.59

2019 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+0.6 -


re

TEMP1+1 MR1 43.41 0.18 -9.65 2.59 51.54


APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
2020 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+0.6 -
TEMP1+1 MR1 52.14 0.22 -12.47 2.60 65.41

2021 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+0.6 115.0 115.7


TEMP1+1 MR1 3 23.56 14.91 2 72.77

Ed
2022 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+0.6 118.7 120.4
TEMP1+1 MR1 5 24.56 12.17 1 59.26

-
2023 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+0.6 204.3 145.4
TEMP1+1 MR1 4 -30.01 7.84 5 36.61

F
-
2024 1 DL1+1.0 LL1+1 WL8+1 EQUIP1+0.6 212.5 145.3
TEMP1+1 MR1 6 -29.97 5.02 7 22.70

PD
2025 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+-0.6 243.1
TEMP1+1 MR1 7 -3.25 11.11 -16.92 56.70

2026 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+-0.6 251.4


TEMP1+1 MR1 7 -3.23 8.29 -16.94 42.78

2027 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+-0.6 -


TEMP1+1 MR1 34.17 3.94 -13.60 19.80 70.35
te r
2028 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+-0.6 -
TEMP1+1 MR1 42.90 3.97 -16.42 19.82 84.22

2029 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+-0.6 105.7 132.9


TEMP1+1 MR1 9 27.32 10.96 3 53.97
as

2030 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+-0.6 109.5 137.6


TEMP1+1 MR1 1 28.31 8.22 2 40.45

-
2031 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+-0.6 195.1 128.2
TEMP1+1 MR1 0 -26.26 3.89 4 17.80
nM

-
2032 1 DL1+0.7 LL1+1 WL8+1 EQUIP1+-0.6 203.3 128.1
TEMP1+1 MR1 2 -26.21 1.07 6 3.90

278.6
2033 1 DL1+0.8 LL1+1 SL1 0 -4.89 -7.00 -24.03 43.78

178.2
di

2034 1 DL1+0.8 LL1+1 SL2 4 -18.29 -1.42 -88.66 14.18

- -
2035 1 DL1+0.8 LL1+-1 SL1 16.35 2.04 8.58 11.17 38.01
a te

2036 1 DL1+0.8 LL1+-1 SL2 84.01 15.45 3.01 75.79 -8.41

146.0
P30 500 1 DL1+1 LL1+1 EQUIP1 6 -0.62 1.15 -3.17 4.75

152.9
501 1 DL1+1 LL1+1 EQUIP1+1 TEMP1 8 2.31 4.38 10.22 20.11
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
120.3
502 1 DL1+1 WL1 2 -3.53 13.41 -18.05 67.51

128.7
503 1 DL1+1 WL2 5 -3.51 10.49 -17.83 53.10

Ed
- -
504 1 DL1+1 WL3 15.27 3.83 -11.67 16.17 61.22

-
505 1 DL1+1 WL4 -6.36 3.85 -14.59 16.43 75.59

129.8

F
506 1 DL1+1 WL5 40.22 27.15 4.37 4 19.06

134.7
507 1 DL1+1 WL6 52.94 28.13 1.37 6 4.21

PD
-
129.9
508 1 DL1+1 WL7 95.90 -26.50 15.46 6 76.66

-
104.3 129.6
509 1 DL1+1 WL8 9 -26.46 12.54 5 62.24
te r
104.9
510 1 DL1+0.7 WL1 8 -2.39 9.66 -12.71 48.25

110.8
511 1 DL1+0.7 WL2 9 -2.38 7.61 -12.55 38.17
as

-
512 1 DL1+0.7 WL3 10.07 2.76 -7.90 11.25 41.85

-
513 1 DL1+0.7 WL4 16.31 2.77 -9.94 11.43 51.92
nM

514 1 DL1+0.7 WL5 48.92 19.08 3.33 90.82 14.34

515 1 DL1+0.7 WL6 57.82 19.77 1.22 94.26 3.95

516 1 DL1+0.7 WL7 87.89 -18.47 11.09 -91.04 54.66

517 1 DL1+0.7 WL8 93.83 -18.45 9.05 -90.82 44.57

184.3
di

518 1 DL1+ 1LL1+0.75 WL1+1 EQUIP1 8 -3.45 10.54 -16.54 52.88

190.7
519 1 DL1+1.0 LL1+0.75 WL2+1 EQUIP1 1 -3.44 8.35 -16.37 42.07

-
a te

520 1 DL1+1.0 LL1+0.75 WL3+1 EQUIP1 82.69 2.06 -8.28 9.13 43.67

-
521 1 DL1+1.0 LL1+0.75 WL4+1 EQUIP1 89.37 2.08 -10.46 9.32 54.45

124.3
522 1 DL1+1.0 LL1+0.75 WL5+1 EQUIP1 1 19.56 3.76 94.38 16.54
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
133.8
523 1 DL1+1.0 LL1+0.75 WL6+1 EQUIP1 5 20.29 1.50 98.07 5.41

-
166.0 100.4

Ed
524 1 DL1+1.0 LL1+0.75 WL7+1 EQUIP1 7 -20.68 12.08 7 59.74

-
172.4 100.2
525 1 DL1+1.0 LL1+0.75 WL8+1 EQUIP1 4 -20.65 9.88 3 48.93

207.1
526 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL1 0 -2.47 -2.56 -11.85 24.28

F
172.9
527 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL2 8 -9.48 -0.72 -46.12 14.48

PD
528 0.6 DL1+1 WL1 92.63 -3.63 13.06 -17.96 66.17

101.0
529 0.6 DL1+1 WL2 6 -3.62 10.14 -17.74 51.77

- -
530 0.6 DL1+1 WL3 42.96 3.72 -12.03 16.26 62.55

- -
te r
531 0.6 DL1+1 WL4 34.05 3.74 -14.95 16.52 76.93

129.9
532 0.6 DL1+1 WL5 12.54 27.05 4.02 3 17.72

134.8
as

533 0.6 DL1+1 WL6 25.25 28.03 1.01 5 2.88

-
129.8
534 0.6 DL1+1 WL7 68.21 -26.60 15.10 7 75.32
nM

-
129.5
535 0.6 DL1+1 WL8 76.70 -26.56 12.18 5 60.91

122.9
536 0.6 DL1+0.7 SL1 3 -2.32 -4.41 -11.71 28.04

537 0.6 DL1+0.7 SL2 77.43 -11.67 -1.96 -57.40 14.97


di

214.9
1001 1.35 DL1+1.5 LL1+1.5 EQUIP1+0.9 TEMP1 3 1.68 4.50 7.33 20.45

202.4
1002 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 TEMP1 7 -3.60 -1.31 -16.78 -7.21
a te

176.3 114.5
1003 1.35 DL1+1.5 WL1+0.9 TEMP1 2 -2.69 22.89 -14.99 8

188.9
1004 1.35 DL1+1.5 WL2+0.9 TEMP1 7 -2.67 18.51 -14.66 92.98

- -
re

1005 1.35 DL1+1.5 WL3+0.9 TEMP1 27.06 8.34 -14.74 36.35 78.50
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
- 100.0
1006 1.35 DL1+1.5 WL4+0.9 TEMP1 13.70 8.37 -19.11 36.73 6

206.8

Ed
1007 1.35 DL1+1.5 WL5+0.9 TEMP1 56.18 43.32 9.33 4 41.91

214.2
1008 1.35 DL1+1.5 WL6+0.9 TEMP1 75.25 44.79 4.82 3 19.65

-
139.7 182.8 128.3
1009 1.35 DL1+1.5 WL7+0.9 TEMP1 0 -37.15 25.96 5 1

F
-
152.4 182.3 106.6

PD
1010 1.35 DL1+1.5 WL8+0.9 TEMP1 3 -37.10 21.58 8 9

163.8
1011 1.35 DL1+1.5 WL1+-0.9 TEMP1 6 -7.97 17.08 -39.10 86.93

176.5
1012 1.35 DL1+1.5 WL2+-0.9 TEMP1 1 -7.95 12.70 -38.77 65.32

-
- 106.1
te r
1013 1.35 DL1+1.5 WL3+-0.9 TEMP1 39.52 3.06 -20.55 12.24 6

-
- 127.7
1014 1.35 DL1+1.5 WL4+-0.9 TEMP1 26.16 3.10 -24.92 12.62 2
as

182.7
1015 1.35 DL1+1.5 WL5+-0.9 TEMP1 43.72 38.05 3.52 3 14.26

190.1
1016 1.35 DL1+1.5 WL6+-0.9 TEMP1 62.79 39.52 -0.99 2 -8.01
nM

-
127.2 206.9 100.6
1017 1.35 DL1+1.5 WL7+-0.9 TEMP1 4 -42.42 20.15 6 6

-
139.9 206.4
1018 1.35 DL1+1.5 WL8+-0.9 TEMP1 7 -42.37 15.77 9 79.04
di

102.9
1019 1.35 DL1+0.9 TEMP1+1.35 MR1 3 3.18 4.09 12.78 18.23

1020 1.35 DL1+-0.9 TEMP1+1.35 MR1 90.47 -2.09 -1.72 -11.33 -9.42

1021 1.35 DL1+1.5LL1+1.5 EQUIP1+0.9 218.1


a te

TEMP1+1.35 MR1 9 1.87 4.48 8.37 20.35

1022 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 205.7


TEMP1+1.35 MR1 3 -3.40 -1.34 -15.75 -7.31

1023 1.148 DL1+1.5 LL1+1.5 EQUIP1+0.9 204.2


TEMP1+1.35 MR1 1 1.82 4.30 8.41 19.68
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1024 1.148 DL1+1.5 LL1+1.5 EQUIP1+-0.9 191.7
TEMP1+1.35 MR1 5 -3.45 -1.52 -15.70 -7.98

1025 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+0.9 264.1


TEMP1+1.35 MR1 9 -1.53 15.75 -7.67 78.10

Ed
1026 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+0.9 271.7
TEMP1+1.35 MR1 7 -1.52 13.12 -7.48 65.14

1027 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+0.9 142.1 -


TEMP1+1.35 MR1 6 5.09 -6.83 23.13 37.75

1028 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+0.9 150.1 -

F
TEMP1+1.35 MR1 8 5.11 -9.46 23.36 50.69

1029 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+0.9 192.1 125.4


TEMP1+1.35 MR1 0 26.08 7.61 2 34.50

PD
1030 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+0.9 203.5 129.8
TEMP1+1.35 MR1 4 26.96 4.90 6 21.14

-
1031 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+0.9 242.2 108.3
TEMP1+1.35 MR1 1 -22.20 17.59 9 86.34

-
te r
1032 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+0.9 249.8 108.1
TEMP1+1.35 MR1 5 -22.17 14.96 1 73.37

1033 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+-0.9 251.7


TEMP1+1.35 MR1 3 -6.80 9.93 -31.79 50.45
as

1034 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+-0.9 259.3


TEMP1+1.35 MR1 1 -6.79 7.31 -31.59 37.48

1035 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+-0.9 129.7 -


TEMP1+1.35 MR1 0 -0.19 -12.65 -0.99 65.40
nM

1036 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+-0.9 137.7 -


TEMP1+1.35 MR1 2 -0.17 -15.27 -0.75 78.34

1037 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+-0.9 179.6 101.3


TEMP1+1.35 MR1 4 20.81 1.80 1 6.85

1038 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+-0.9 191.0 105.7


TEMP1+1.35 MR1 9 21.69 -0.91 5 -6.52
di

-
1039 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+-0.9 229.7 132.5
TEMP1+1.35 MR1 5 -27.48 11.78 1 58.68

-
a te

1040 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+-0.9 237.3 132.2


TEMP1+1.35 MR1 9 -27.45 9.15 2 45.71

1041 1.148 DL1+1.5 LL1+0.9 WL1+1.5 250.2


EQUIP1+0.9 TEMP1+1.35 MR1 1 -1.58 15.57 -7.63 77.43

1042 1.148 DL1+1.5 LL1+0.9 WL2+1.5 257.7


EQUIP1+0.9 TEMP1+1.35 MR1 9 -1.57 12.94 -7.43 64.46
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1043 1.148 DL1+1.5 LL1+0.9 WL3+1.5 128.1 -
EQUIP1+0.9 TEMP1+1.35 MR1 8 5.04 -7.01 23.17 38.42

1044 1.148 DL1+1.5 LL1+0.9 WL4+1.5 136.1 -


EQUIP1+0.9 TEMP1+1.35 MR1 9 5.05 -9.64 23.40 51.36

Ed
1045 1.148 DL1+1.5 LL1+0.9 WL5+1.5 178.1 125.4
EQUIP1+0.9 TEMP1+1.35 MR1 2 26.03 7.43 7 33.83

1046 1.148 DL1+1.5 LL1+0.9 WL6+1.5 189.5 129.9


EQUIP1+0.9 TEMP1+1.35 MR1 6 26.91 4.72 0 20.46

F
1047 1.148 DL1+1.5 LL1+0.9 WL7+1.5 228.2 108.3
EQUIP1+0.9 TEMP1+1.35 MR1 3 -22.25 17.41 5 85.66

PD
1048 1.148 DL1+1.5 LL1+0.9 WL8+1.5 235.8 108.0
EQUIP1+0.9 TEMP1+1.35 MR1 7 -22.22 14.78 6 72.69

1049 1.148 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+- 237.7


0.9 TEMP1+1.35 MR1 5 -6.86 9.75 -31.74 49.77

1050 1.148 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+- 245.3


0.9 TEMP1+1.35 MR1 3 -6.84 7.13 -31.54 36.81
te r
1051 1.148 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+- 115.7 -
0.9 TEMP1+1.35 MR1 2 -0.24 -12.83 -0.94 66.08

1052 1.148 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+- 123.7 -


0.9 TEMP1+1.35 MR1 4 -0.22 -15.45 -0.71 79.02
as

1053 1.148 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+- 165.6 101.3


0.9 TEMP1+1.35 MR1 6 20.75 1.62 6 6.17

1054 1.148 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+- 177.1 105.7


0.9 TEMP1+1.35 MR1 1 21.64 -1.09 9 -7.19
nM

-
1055 1.148 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+- 215.7 132.4
0.9 TEMP1+1.35 MR1 7 -27.53 11.59 6 58.01

-
1056 1.148 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+- 223.4 132.1
0.9 TEMP1+1.35 MR1 1 -27.50 8.97 7 45.04

1057 1.148 DL1+1.5 LL1+1.5 WL1+1.5 280.8 115.9


di

EQUIP1+0.9 TEMP1+1.35 MR1 7 -3.85 23.08 -18.32 3

1058 1.148 DL1+1.5 LL1+1.5 WL2+1.5 293.5


EQUIP1+0.9 TEMP1+1.35 MR1 1 -3.83 18.70 -17.99 94.32
a te

1059 1.148 DL1+1.5 LL1+1.5 WL3+1.5 -


EQUIP1+0.9 TEMP1+1.35 MR1 77.49 7.18 -14.55 33.01 77.16

1060 1.148 DL1+1.5 LL1+1.5 WL4+1.5 -


EQUIP1+0.9 TEMP1+1.35 MR1 90.85 7.21 -18.93 33.40 98.72

1061 1.148 DL1+1.5 LL1+1.5 WL5+1.5 160.7 203.5


EQUIP1+0.9 TEMP1+1.35 MR1 2 42.16 9.52 1 43.26
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1062 1.148 DL1+1.5 LL1+1.5 WL6+1.5 179.8 210.9
EQUIP1+0.9 TEMP1+1.35 MR1 0 43.63 5.00 0 20.99

-
1063 1.148 DL1+1.5 LL1+1.5 WL7+1.5 244.2 186.1 129.6

Ed
EQUIP1+0.9 TEMP1+1.35 MR1 4 -38.31 26.15 9 6

-
1064 1.148 DL1+1.5 LL1+1.5 WL8+1.5 256.9 185.7 108.0
EQUIP1+0.9 TEMP1+1.35 MR1 7 -38.25 21.77 1 4

1065 1.148 DL1+1.5 LL1+1.5 WL1+1.5 EQUIP1+- 268.4


0.9 TEMP1+1.35 MR1 1 -9.13 17.27 -42.43 88.28

F
1066 1.148 DL1+1.5 LL1+1.5 WL2+1.5 EQUIP1+- 281.0
0.9 TEMP1+1.35 MR1 5 -9.10 12.89 -42.10 66.67

PD
-
1067 1.148 DL1+1.5 LL1+1.5 WL3+1.5 EQUIP1+- 104.8
0.9 TEMP1+1.35 MR1 65.03 1.90 -20.37 8.90 1

-
1068 1.148 DL1+1.5 LL1+1.5 WL4+1.5 EQUIP1+- 126.3
0.9 TEMP1+1.35 MR1 78.39 1.94 -24.74 9.29 7

1069 1.148 DL1+1.5 LL1+1.5 WL5+1.5 EQUIP1+- 148.2 179.4


te r
0.9 TEMP1+1.35 MR1 7 36.89 3.71 0 15.61

1070 1.148 DL1+1.5 LL1+1.5 WL6+1.5 EQUIP1+- 167.3 186.7


0.9 TEMP1+1.35 MR1 4 38.36 -0.81 9 -6.66

-
as

1071 1.148 DL1+1.5 LL1+1.5 WL7+1.5 EQUIP1+- 231.7 210.3 102.0


0.9 TEMP1+1.35 MR1 8 -43.58 20.33 0 0

-
1072 1.148 DL1+1.5 LL1+1.5 WL8+1.5 EQUIP1+- 244.5 209.8
nM

0.9 TEMP1+1.35 MR1 1 -43.53 15.95 2 80.38

243.2
1073 1 DL1+0.8 LL1+1 SL1 3 -3.98 -5.92 -19.21 41.88

178.2
1074 1 DL1+0.8 LL1+1 SL2 3 -17.34 -2.42 -84.49 23.22

-
di

1075 1 DL1+0.8 LL1+-1 SL1 10.66 3.08 8.21 13.85 32.51

-
1076 1 DL1+0.8 LL1+-1 SL2 75.66 16.44 4.71 79.12 13.85

2001 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+0.6 183.2


a te

TEMP1+1 MR1 9 -0.98 10.59 -5.06 52.39

2002 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+0.6 188.3


TEMP1+1 MR1 5 -0.97 8.83 -4.93 43.75

2003 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+0.6 101.9 -


TEMP1+1 MR1 3 3.43 -4.47 15.47 24.84
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
2004 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+0.6 107.2 -
TEMP1+1 MR1 8 3.44 -6.22 15.63 33.47

2005 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+0.6 135.2


TEMP1+1 MR1 3 17.43 5.16 83.67 23.33

Ed
2006 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+0.6 142.8
TEMP1+1 MR1 6 18.01 3.36 86.63 14.42

2007 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+0.6 168.6


TEMP1+1 MR1 4 -14.76 11.81 -72.21 57.89

2008 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+0.6 173.7

F
TEMP1+1 MR1 3 -14.74 10.06 -72.02 49.24

2009 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+-0.6 174.9


TEMP1+1 MR1 8 -4.50 6.71 -21.14 33.96

PD
2010 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+-0.6 180.0
TEMP1+1 MR1 4 -4.49 4.96 -21.00 25.32

2011 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+-0.6 -


TEMP1+1 MR1 93.63 -0.08 -8.34 -0.60 43.28

2012 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+-0.6 -


TEMP1+1 MR1 98.97 -0.07 -10.09 -0.45 51.90
te r
2013 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+-0.6 126.9
TEMP1+1 MR1 2 13.91 1.29 67.60 4.89

2014 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+-0.6 134.5


TEMP1+1 MR1 5 14.50 -0.52 70.55 -4.02
as

2015 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+-0.6 160.3


TEMP1+1 MR1 3 -18.28 7.94 -88.28 39.45

2016 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+-0.6 165.4


TEMP1+1 MR1 2 -18.26 6.19 -88.09 30.80
nM

2017 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+0.6 203.7


TEMP1+1 MR1 3 -2.49 15.59 -12.19 78.06

2018 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+0.6 212.1


TEMP1+1 MR1 6 -2.48 12.67 -11.97 63.66

2019 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+0.6 -


TEMP1+1 MR1 68.14 4.86 -9.49 22.03 50.66
di

2020 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+0.6 -


TEMP1+1 MR1 77.05 4.88 -12.41 22.29 65.04

2021 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+0.6 123.6 135.7


TEMP1+1 MR1 3 28.18 6.55 0 29.62
a te

2022 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+0.6 136.3 140.6


TEMP1+1 MR1 5 29.16 3.54 2 14.77

-
2023 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+0.6 179.3 124.1
TEMP1+1 MR1 1 -25.46 17.64 0 87.21
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
-
2024 1 DL1+1.0 LL1+1 WL8+1 EQUIP1+0.6 187.8 123.7
TEMP1+1 MR1 0 -25.43 14.72 9 72.80

2025 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+-0.6 195.4

Ed
TEMP1+1 MR1 2 -6.01 11.72 -28.27 59.63

2026 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+-0.6 203.8


TEMP1+1 MR1 5 -6.00 8.80 -28.04 45.22

2027 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+-0.6 -


TEMP1+1 MR1 59.84 1.34 -13.37 5.96 69.10

F
2028 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+-0.6 -
TEMP1+1 MR1 68.74 1.37 -16.28 6.22 83.47

2029 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+-0.6 115.3 119.6

PD
TEMP1+1 MR1 3 24.67 2.68 2 11.18

2030 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+-0.6 128.0 124.5


TEMP1+1 MR1 4 25.65 -0.33 5 -3.67

-
2031 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+-0.6 171.0 140.1
TEMP1+1 MR1 1 -28.98 13.76 8 68.78
te r
-
2032 1 DL1+0.7 LL1+1 WL8+1 EQUIP1+-0.6 179.4 139.8
TEMP1+1 MR1 9 -28.94 10.84 6 54.36

243.2
2033 1 DL1+0.8 LL1+1 SL1 3 -3.98 -5.92 -19.21 41.88
as

178.2
2034 1 DL1+0.8 LL1+1 SL2 3 -17.34 -2.42 -84.49 23.22

-
2035 1 DL1+0.8 LL1+-1 SL1 10.66 3.08 8.21 13.85 32.51
nM

-
2036 1 DL1+0.8 LL1+-1 SL2 75.66 16.44 4.71 79.12 13.85

P31 500 1 DL1+1 LL1+1 EQUIP1 16.78 -0.48 -0.04 -2.47 -0.06

501 1 DL1+1 LL1+1 EQUIP1+1 TEMP1 15.55 -0.30 -0.19 -1.82 -0.40

502 1 DL1+1 WL1 8.11 0.27 0.34 0.24 0.95


di

503 1 DL1+1 WL2 8.14 0.28 0.34 0.27 0.96

504 1 DL1+1 WL3 7.24 0.06 -0.32 -0.04 -0.93

505 1 DL1+1 WL4 7.26 0.07 -0.32 -0.01 -0.92


a te

506 1 DL1+1 WL5 6.72 0.83 0.01 1.98 -0.03

507 1 DL1+1 WL6 6.75 0.84 0.01 2.01 -0.02

508 1 DL1+1 WL7 8.41 -0.46 0.03 -1.61 0.07

509 1 DL1+1 WL8 8.43 -0.45 0.03 -1.58 0.08


re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
510 1 DL1+0.7 WL1 7.98 0.25 0.24 0.23 0.68

511 1 DL1+0.7 WL2 7.99 0.26 0.25 0.25 0.68

512 1 DL1+0.7 WL3 7.36 0.10 -0.22 0.03 -0.64

Ed
513 1 DL1+0.7 WL4 7.38 0.11 -0.21 0.06 -0.63

514 1 DL1+0.7 WL5 7.00 0.64 0.01 1.44 -0.01

515 1 DL1+0.7 WL6 7.02 0.65 0.01 1.47 0.00

516 1 DL1+0.7 WL7 8.18 -0.27 0.03 -1.07 0.06

F
517 1 DL1+0.7 WL8 8.20 -0.26 0.03 -1.05 0.07

518 1 DL1+ 1LL1+0.75 WL1+1 EQUIP1 17.12 -0.43 0.20 -2.44 0.63

PD
519 1 DL1+1.0 LL1+0.75 WL2+1 EQUIP1 17.14 -0.42 0.21 -2.41 0.63

520 1 DL1+1.0 LL1+0.75 WL3+1 EQUIP1 16.46 -0.59 -0.29 -2.64 -0.78

521 1 DL1+1.0 LL1+0.75 WL4+1 EQUIP1 16.48 -0.58 -0.29 -2.62 -0.77

522 1 DL1+1.0 LL1+0.75 WL5+1 EQUIP1 16.08 -0.01 -0.05 -1.13 -0.11

523 1 DL1+1.0 LL1+0.75 WL6+1 EQUIP1 16.09 0.00 -0.04 -1.11 -0.10
te r
524 1 DL1+1.0 LL1+0.75 WL7+1 EQUIP1 17.34 -0.98 -0.03 -3.83 -0.04

525 1 DL1+1.0 LL1+0.75 WL8+1 EQUIP1 17.36 -0.97 -0.03 -3.80 -0.03

526 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL1 17.02 -0.55 -0.26 -2.58 0.60
as

527 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL2 16.88 -0.57 -0.06 -2.72 0.01

528 0.6 DL1+1 WL1 5.05 0.19 0.33 0.16 0.94

529 0.6 DL1+1 WL2 5.07 0.20 0.33 0.19 0.95


nM

530 0.6 DL1+1 WL3 4.18 -0.02 -0.33 -0.12 -0.94

531 0.6 DL1+1 WL4 4.20 -0.01 -0.33 -0.08 -0.93

532 0.6 DL1+1 WL5 3.66 0.75 0.00 1.90 -0.04

533 0.6 DL1+1 WL6 3.68 0.76 0.00 1.93 -0.03

534 0.6 DL1+1 WL7 5.35 -0.54 0.02 -1.69 0.05


di

535 0.6 DL1+1 WL8 5.37 -0.53 0.02 -1.66 0.06

536 0.6 DL1+0.7 SL1 4.92 0.02 -0.29 -0.03 0.89

537 0.6 DL1+0.7 SL2 4.74 -0.01 -0.02 -0.21 0.11


a te

1001 1.35 DL1+1.5 LL1+1.5 EQUIP1+0.9 TEMP1 22.91 -0.59 -0.19 -3.15 -0.40

1002 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 TEMP1 25.12 -0.92 0.08 -4.32 0.21

1003 1.35 DL1+1.5 WL1+0.9 TEMP1 9.92 0.54 0.37 0.91 1.11

1004 1.35 DL1+1.5 WL2+0.9 TEMP1 9.95 0.56 0.38 0.96 1.13
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1005 1.35 DL1+1.5 WL3+0.9 TEMP1 8.60 0.22 -0.62 0.50 -1.71

1006 1.35 DL1+1.5 WL4+0.9 TEMP1 8.64 0.24 -0.61 0.55 -1.69

1007 1.35 DL1+1.5 WL5+0.9 TEMP1 7.83 1.38 -0.13 3.52 -0.36

Ed
1008 1.35 DL1+1.5 WL6+0.9 TEMP1 7.86 1.40 -0.12 3.57 -0.34

1009 1.35 DL1+1.5 WL7+0.9 TEMP1 10.36 -0.56 -0.10 -1.87 -0.21

1010 1.35 DL1+1.5 WL8+0.9 TEMP1 10.39 -0.54 -0.09 -1.82 -0.20

1011 1.35 DL1+1.5 WL1+-0.9 TEMP1 12.13 0.21 0.64 -0.26 1.73

F
1012 1.35 DL1+1.5 WL2+-0.9 TEMP1 12.16 0.23 0.65 -0.21 1.74

1013 1.35 DL1+1.5 WL3+-0.9 TEMP1 10.82 -0.11 -0.35 -0.67 -1.09

PD
1014 1.35 DL1+1.5 WL4+-0.9 TEMP1 10.85 -0.09 -0.34 -0.62 -1.07

1015 1.35 DL1+1.5 WL5+-0.9 TEMP1 10.04 1.05 0.14 2.35 0.26

1016 1.35 DL1+1.5 WL6+-0.9 TEMP1 10.08 1.07 0.15 2.40 0.28

1017 1.35 DL1+1.5 WL7+-0.9 TEMP1 12.57 -0.89 0.17 -3.03 0.40

1018 1.35 DL1+1.5 WL8+-0.9 TEMP1 12.61 -0.87 0.18 -2.99 0.42
te r
1019 1.35 DL1+0.9 TEMP1+1.35 MR1 9.25 0.42 -0.10 0.82 -0.26

1020 1.35 DL1+-0.9 TEMP1+1.35 MR1 11.46 0.09 0.17 -0.35 0.36

1021 1.35 DL1+1.5LL1+1.5 EQUIP1+0.9


TEMP1+1.35 MR1 22.93 -0.60 -0.19 -3.18 -0.40
as

1022 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 25.14 -0.93 0.08 -4.35 0.21

1023 1.148 DL1+1.5 LL1+1.5 EQUIP1+0.9


TEMP1+1.35 MR1 21.38 -0.64 -0.20 -3.22 -0.41
nM

1024 1.148 DL1+1.5 LL1+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 23.60 -0.97 0.08 -4.39 0.21

1025 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+0.9


TEMP1+1.35 MR1 23.34 -0.53 0.09 -3.14 0.42

1026 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+0.9


TEMP1+1.35 MR1 23.36 -0.52 0.10 -3.11 0.43
di

1027 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+0.9


TEMP1+1.35 MR1 22.55 -0.72 -0.50 -3.39 -1.27

1028 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+0.9


TEMP1+1.35 MR1 22.57 -0.71 -0.50 -3.36 -1.26
a te

1029 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+0.9


TEMP1+1.35 MR1 22.09 -0.03 -0.21 -1.58 -0.46

1030 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+0.9


TEMP1+1.35 MR1 22.11 -0.02 -0.20 -1.55 -0.45
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1031 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+0.9
TEMP1+1.35 MR1 23.61 -1.19 -0.19 -4.81 -0.37

1032 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+0.9


TEMP1+1.35 MR1 23.63 -1.18 -0.18 -4.78 -0.36

Ed
1033 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+-0.9
TEMP1+1.35 MR1 25.56 -0.86 0.36 -4.31 1.04

1034 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 25.58 -0.85 0.37 -4.28 1.05

1035 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+-0.9

F
TEMP1+1.35 MR1 24.77 -1.05 -0.23 -4.56 -0.66

1036 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 24.79 -1.04 -0.23 -4.53 -0.64

PD
1037 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+-0.9
TEMP1+1.35 MR1 24.30 -0.36 0.06 -2.74 0.16

1038 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 24.32 -0.35 0.07 -2.72 0.17

1039 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 25.82 -1.52 0.08 -5.98 0.24
te r
1040 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+-0.9
TEMP1+1.35 MR1 25.84 -1.51 0.09 -5.95 0.25

1041 1.148 DL1+1.5 LL1+0.9 WL1+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 21.80 -0.57 0.09 -3.18 0.41
as

1042 1.148 DL1+1.5 LL1+0.9 WL2+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 21.81 -0.56 0.09 -3.15 0.42

1043 1.148 DL1+1.5 LL1+0.9 WL3+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 21.01 -0.76 -0.51 -3.43 -1.28
nM

1044 1.148 DL1+1.5 LL1+0.9 WL4+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 21.03 -0.75 -0.50 -3.40 -1.27

1045 1.148 DL1+1.5 LL1+0.9 WL5+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 20.54 -0.07 -0.21 -1.62 -0.47

1046 1.148 DL1+1.5 LL1+0.9 WL6+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 20.56 -0.06 -0.21 -1.59 -0.46
di

1047 1.148 DL1+1.5 LL1+0.9 WL7+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 22.06 -1.23 -0.19 -4.85 -0.38

1048 1.148 DL1+1.5 LL1+0.9 WL8+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 22.08 -1.22 -0.19 -4.82 -0.37
a te

1049 1.148 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 24.01 -0.90 0.36 -4.35 1.03

1050 1.148 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 24.03 -0.89 0.36 -4.32 1.04
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1051 1.148 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+-
0.9 TEMP1+1.35 MR1 23.22 -1.09 -0.24 -4.60 -0.66

1052 1.148 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 23.24 -1.08 -0.23 -4.57 -0.65

Ed
1053 1.148 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+-
0.9 TEMP1+1.35 MR1 22.76 -0.40 0.06 -2.78 0.15

1054 1.148 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 22.78 -0.39 0.07 -2.76 0.16

1055 1.148 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+-

F
0.9 TEMP1+1.35 MR1 24.28 -1.56 0.08 -6.02 0.24

1056 1.148 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 24.30 -1.55 0.08 -5.99 0.25

PD
1057 1.148 DL1+1.5 LL1+1.5 WL1+1.5
EQUIP1+0.9 TEMP1+1.35 MR1 22.07 -0.53 0.28 -3.16 0.96

1058 1.148 DL1+1.5 LL1+1.5 WL2+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 22.10 -0.51 0.29 -3.11 0.98

1059 1.148 DL1+1.5 LL1+1.5 WL3+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 20.76 -0.85 -0.71 -3.57 -1.86
te r
1060 1.148 DL1+1.5 LL1+1.5 WL4+1.5
EQUIP1+0.9 TEMP1+1.35 MR1 20.79 -0.83 -0.70 -3.52 -1.84

1061 1.148 DL1+1.5 LL1+1.5 WL5+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 19.98 0.31 -0.22 -0.55 -0.51
as

1062 1.148 DL1+1.5 LL1+1.5 WL6+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 20.02 0.33 -0.21 -0.50 -0.49

1063 1.148 DL1+1.5 LL1+1.5 WL7+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 22.51 -1.63 -0.19 -5.93 -0.36
nM

1064 1.148 DL1+1.5 LL1+1.5 WL8+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 22.55 -1.61 -0.18 -5.89 -0.35

1065 1.148 DL1+1.5 LL1+1.5 WL1+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 24.28 -0.86 0.55 -4.32 1.58

1066 1.148 DL1+1.5 LL1+1.5 WL2+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 24.32 -0.84 0.56 -4.28 1.59
di

1067 1.148 DL1+1.5 LL1+1.5 WL3+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 22.97 -1.18 -0.44 -4.74 -1.24

1068 1.148 DL1+1.5 LL1+1.5 WL4+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 23.01 -1.16 -0.43 -4.69 -1.22
a te

1069 1.148 DL1+1.5 LL1+1.5 WL5+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 22.20 -0.02 0.05 -1.72 0.11

1070 1.148 DL1+1.5 LL1+1.5 WL6+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 22.23 0.00 0.06 -1.67 0.13
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1071 1.148 DL1+1.5 LL1+1.5 WL7+1.5 EQUIP1+-
0.9 TEMP1+1.35 MR1 24.73 -1.96 0.08 -7.10 0.26

1072 1.148 DL1+1.5 LL1+1.5 WL8+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 24.76 -1.94 0.09 -7.06 0.27

Ed
1073 1 DL1+0.8 LL1+1 SL1 9.79 0.15 -0.43 0.07 1.26

1074 1 DL1+0.8 LL1+1 SL2 9.52 0.11 -0.04 -0.19 0.14

1075 1 DL1+0.8 LL1+-1 SL1 8.85 0.42 0.44 0.50 -1.23

1076 1 DL1+0.8 LL1+-1 SL2 9.12 0.46 0.05 0.76 -0.11

F
2001 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+0.6
TEMP1+1 MR1 16.33 -0.34 0.06 -2.08 0.28

PD
2002 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+0.6
TEMP1+1 MR1 16.34 -0.33 0.07 -2.06 0.29

2003 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+0.6


TEMP1+1 MR1 15.80 -0.46 -0.33 -2.24 -0.84

2004 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+0.6


TEMP1+1 MR1 15.82 -0.46 -0.33 -2.22 -0.84
te r
2005 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+0.6
TEMP1+1 MR1 15.49 0.00 -0.14 -1.03 -0.30

2006 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+0.6


TEMP1+1 MR1 15.51 0.01 -0.13 -1.01 -0.30

2007 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+0.6


as

TEMP1+1 MR1 16.51 -0.78 -0.12 -3.19 -0.25

2008 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+0.6


TEMP1+1 MR1 16.52 -0.77 -0.12 -3.17 -0.24

2009 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+-0.6


nM

TEMP1+1 MR1 17.80 -0.56 0.24 -2.86 0.70

2010 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+-0.6


TEMP1+1 MR1 17.82 -0.55 0.25 -2.84 0.70

2011 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+-0.6


TEMP1+1 MR1 17.28 -0.68 -0.15 -3.02 -0.43

2012 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+-0.6


di

TEMP1+1 MR1 17.29 -0.68 -0.15 -3.00 -0.43

2013 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+-0.6


TEMP1+1 MR1 16.97 -0.22 0.05 -1.81 0.11
a te

2014 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+-0.6


TEMP1+1 MR1 16.98 -0.21 0.05 -1.79 0.11

2015 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+-0.6


TEMP1+1 MR1 17.98 -1.00 0.06 -3.97 0.17

2016 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+-0.6


TEMP1+1 MR1 17.99 -0.99 0.06 -3.95 0.17
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
2017 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+0.6
TEMP1+1 MR1 16.51 -0.31 0.19 -2.06 0.65

2018 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+0.6


TEMP1+1 MR1 16.53 -0.29 0.20 -2.03 0.66

Ed
2019 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+0.6
TEMP1+1 MR1 15.64 -0.52 -0.47 -2.33 -1.23

2020 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+0.6


TEMP1+1 MR1 15.66 -0.51 -0.46 -2.30 -1.22

2021 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+0.6

F
TEMP1+1 MR1 15.12 0.25 -0.14 -0.32 -0.33

2022 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+0.6


TEMP1+1 MR1 15.14 0.27 -0.14 -0.29 -0.32

PD
2023 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+0.6
TEMP1+1 MR1 16.81 -1.04 -0.12 -3.91 -0.23

2024 1 DL1+1.0 LL1+1 WL8+1 EQUIP1+0.6


TEMP1+1 MR1 16.83 -1.03 -0.12 -3.88 -0.22

2025 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+-0.6


TEMP1+1 MR1 17.99 -0.53 0.37 -2.84 1.06
te r
2026 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+-0.6
TEMP1+1 MR1 18.01 -0.51 0.38 -2.81 1.07

2027 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+-0.6


TEMP1+1 MR1 17.11 -0.74 -0.29 -3.11 -0.82
as

2028 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+-0.6


TEMP1+1 MR1 17.14 -0.73 -0.28 -3.08 -0.81

2029 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+-0.6


TEMP1+1 MR1 16.60 0.03 0.04 -1.10 0.08
nM

2030 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+-0.6


TEMP1+1 MR1 16.62 0.04 0.04 -1.07 0.09

2031 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+-0.6


TEMP1+1 MR1 18.28 -1.26 0.06 -4.69 0.18

2032 1 DL1+0.7 LL1+1 WL8+1 EQUIP1+-0.6


TEMP1+1 MR1 18.31 -1.25 0.07 -4.66 0.19
di

2033 1 DL1+0.8 LL1+1 SL1 9.79 0.15 -0.43 0.07 1.26

2034 1 DL1+0.8 LL1+1 SL2 9.52 0.11 -0.04 -0.19 0.14

2035 1 DL1+0.8 LL1+-1 SL1 8.85 0.42 0.44 0.50 -1.23


a te

2036 1 DL1+0.8 LL1+-1 SL2 9.12 0.46 0.05 0.76 -0.11

P32 500 1 DL1+1 LL1+1 EQUIP1 -0.59 -0.48 0.28 -2.50 0.48

501 1 DL1+1 LL1+1 EQUIP1+1 TEMP1 -0.23 -0.19 0.10 -1.58 0.10

502 1 DL1+1 WL1 4.79 -0.05 0.44 -0.24 1.10


re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
503 1 DL1+1 WL2 4.85 -0.05 0.45 -0.22 1.10

504 1 DL1+1 WL3 5.36 -0.01 -0.18 -0.14 -0.68

505 1 DL1+1 WL4 5.42 -0.01 -0.17 -0.12 -0.67

Ed
506 1 DL1+1 WL5 6.35 0.52 0.10 1.52 0.13

507 1 DL1+1 WL6 6.40 0.53 0.11 1.53 0.14

508 1 DL1+1 WL7 4.17 -0.53 0.17 -1.71 0.29

509 1 DL1+1 WL8 4.23 -0.53 0.18 -1.69 0.29

F
510 1 DL1+0.7 WL1 4.94 -0.04 0.35 -0.20 0.84

511 1 DL1+0.7 WL2 4.98 -0.04 0.36 -0.18 0.84

PD
512 1 DL1+0.7 WL3 5.34 -0.01 -0.08 -0.13 -0.41

513 1 DL1+0.7 WL4 5.37 -0.01 -0.08 -0.12 -0.40

514 1 DL1+0.7 WL5 6.03 0.36 0.11 1.03 0.16

515 1 DL1+0.7 WL6 6.06 0.37 0.12 1.04 0.17

516 1 DL1+0.7 WL7 4.50 -0.37 0.17 -1.23 0.27


te r
517 1 DL1+0.7 WL8 4.54 -0.37 0.17 -1.22 0.27

518 1 DL1+ 1LL1+0.75 WL1+1 EQUIP1 -0.95 -0.51 0.50 -2.59 1.13

519 1 DL1+1.0 LL1+0.75 WL2+1 EQUIP1 -0.91 -0.51 0.50 -2.58 1.14
as

520 1 DL1+1.0 LL1+0.75 WL3+1 EQUIP1 -0.52 -0.49 0.03 -2.52 -0.20

521 1 DL1+1.0 LL1+0.75 WL4+1 EQUIP1 -0.48 -0.48 0.04 -2.50 -0.19

522 1 DL1+1.0 LL1+0.75 WL5+1 EQUIP1 0.21 -0.08 0.24 -1.28 0.41
nM

523 1 DL1+1.0 LL1+0.75 WL6+1 EQUIP1 0.25 -0.08 0.25 -1.26 0.42

524 1 DL1+1.0 LL1+0.75 WL7+1 EQUIP1 -1.42 -0.87 0.30 -3.70 0.53

525 1 DL1+1.0 LL1+0.75 WL8+1 EQUIP1 -1.38 -0.87 0.30 -3.68 0.53

526 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL1 -0.42 -0.50 0.05 -2.56 1.15

527 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL2 -0.45 -0.55 0.26 -2.71 0.55
di

528 0.6 DL1+1 WL1 2.68 -0.05 0.38 -0.19 1.01

529 0.6 DL1+1 WL2 2.74 -0.04 0.39 -0.18 1.01

530 0.6 DL1+1 WL3 3.25 -0.01 -0.24 -0.09 -0.77


a te

531 0.6 DL1+1 WL4 3.30 -0.01 -0.23 -0.08 -0.76

532 0.6 DL1+1 WL5 4.23 0.52 0.04 1.56 0.04

533 0.6 DL1+1 WL6 4.29 0.53 0.05 1.58 0.05

534 0.6 DL1+1 WL7 2.06 -0.53 0.12 -1.67 0.20


re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
535 0.6 DL1+1 WL8 2.12 -0.52 0.12 -1.65 0.20

536 0.6 DL1+0.7 SL1 3.39 -0.04 -0.22 -0.15 1.03

537 0.6 DL1+0.7 SL2 3.35 -0.10 0.06 -0.35 0.22

Ed
1001 1.35 DL1+1.5 LL1+1.5 EQUIP1+0.9 TEMP1 -1.35 -0.45 0.24 -2.91 0.34

1002 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 TEMP1 -2.00 -0.99 0.55 -4.55 1.04

1003 1.35 DL1+1.5 WL1+0.9 TEMP1 6.72 0.19 0.48 0.48 1.26

1004 1.35 DL1+1.5 WL2+0.9 TEMP1 6.80 0.20 0.49 0.51 1.28

F
1005 1.35 DL1+1.5 WL3+0.9 TEMP1 7.58 0.25 -0.45 0.63 -1.40

1006 1.35 DL1+1.5 WL4+0.9 TEMP1 7.66 0.25 -0.44 0.66 -1.38

PD
1007 1.35 DL1+1.5 WL5+0.9 TEMP1 9.05 1.05 -0.03 3.11 -0.18

1008 1.35 DL1+1.5 WL6+0.9 TEMP1 9.13 1.06 -0.02 3.14 -0.17

1009 1.35 DL1+1.5 WL7+0.9 TEMP1 5.79 -0.53 0.08 -1.72 0.05

1010 1.35 DL1+1.5 WL8+0.9 TEMP1 5.87 -0.52 0.09 -1.70 0.06

1011 1.35 DL1+1.5 WL1+-0.9 TEMP1 6.07 -0.34 0.79 -1.16 1.96
te r
1012 1.35 DL1+1.5 WL2+-0.9 TEMP1 6.15 -0.33 0.80 -1.13 1.97

1013 1.35 DL1+1.5 WL3+-0.9 TEMP1 6.93 -0.29 -0.14 -1.01 -0.71

1014 1.35 DL1+1.5 WL4+-0.9 TEMP1 7.01 -0.28 -0.13 -0.98 -0.69
as

1015 1.35 DL1+1.5 WL5+-0.9 TEMP1 8.40 0.52 0.28 1.47 0.51

1016 1.35 DL1+1.5 WL6+-0.9 TEMP1 8.48 0.52 0.29 1.50 0.52

1017 1.35 DL1+1.5 WL7+-0.9 TEMP1 5.14 -1.06 0.40 -3.37 0.74
nM

1018 1.35 DL1+1.5 WL8+-0.9 TEMP1 5.22 -1.05 0.41 -3.34 0.75

1019 1.35 DL1+0.9 TEMP1+1.35 MR1 7.44 0.25 0.04 0.65 -0.04

1020 1.35 DL1+-0.9 TEMP1+1.35 MR1 6.79 -0.29 0.36 -0.99 0.65

1021 1.35 DL1+1.5LL1+1.5 EQUIP1+0.9


TEMP1+1.35 MR1 -1.35 -0.46 0.24 -2.93 0.34

1022 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9


di

TEMP1+1.35 MR1 -2.01 -1.00 0.55 -4.58 1.04

1023 1.148 DL1+1.5 LL1+1.5 EQUIP1+0.9


TEMP1+1.35 MR1 -2.42 -0.46 0.21 -2.91 0.30
a te

1024 1.148 DL1+1.5 LL1+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 -3.07 -0.99 0.52 -4.55 0.99

1025 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+0.9


TEMP1+1.35 MR1 -1.79 -0.50 0.50 -3.05 1.13

1026 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+0.9


TEMP1+1.35 MR1 -1.74 -0.50 0.51 -3.03 1.13
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1027 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+0.9
TEMP1+1.35 MR1 -1.28 -0.47 -0.05 -2.96 -0.47

1028 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+0.9


TEMP1+1.35 MR1 -1.23 -0.46 -0.05 -2.94 -0.46

Ed
1029 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+0.9
TEMP1+1.35 MR1 -0.39 0.01 0.20 -1.47 0.26

1030 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+0.9


TEMP1+1.35 MR1 -0.35 0.02 0.20 -1.46 0.27

1031 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+0.9

F
TEMP1+1.35 MR1 -2.35 -0.93 0.27 -4.37 0.40

1032 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+0.9


TEMP1+1.35 MR1 -2.30 -0.93 0.27 -4.36 0.41

PD
1033 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+-0.9
TEMP1+1.35 MR1 -2.44 -1.03 0.82 -4.69 1.82

1034 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 -2.39 -1.03 0.82 -4.68 1.83

1035 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 -1.93 -1.00 0.26 -4.60 0.22
te r
1036 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+-0.9
TEMP1+1.35 MR1 -1.88 -1.00 0.27 -4.59 0.23

1037 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 -1.04 -0.52 0.51 -3.12 0.95
as

1038 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 -1.00 -0.52 0.52 -3.10 0.96

1039 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 -3.00 -1.47 0.58 -6.02 1.09
nM

1040 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 -2.95 -1.46 0.58 -6.00 1.10

1041 1.148 DL1+1.5 LL1+0.9 WL1+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 -2.86 -0.50 0.48 -3.03 1.08

1042 1.148 DL1+1.5 LL1+0.9 WL2+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 -2.81 -0.49 0.48 -3.01 1.09
di

1043 1.148 DL1+1.5 LL1+0.9 WL3+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 -2.34 -0.47 -0.08 -2.94 -0.52

1044 1.148 DL1+1.5 LL1+0.9 WL4+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 -2.30 -0.46 -0.08 -2.92 -0.51
a te

1045 1.148 DL1+1.5 LL1+0.9 WL5+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 -1.46 0.02 0.17 -1.45 0.21

1046 1.148 DL1+1.5 LL1+0.9 WL6+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 -1.41 0.02 0.18 -1.43 0.22
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1047 1.148 DL1+1.5 LL1+0.9 WL7+1.5
EQUIP1+0.9 TEMP1+1.35 MR1 -3.42 -0.93 0.24 -4.35 0.35

1048 1.148 DL1+1.5 LL1+0.9 WL8+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 -3.37 -0.93 0.24 -4.34 0.36

Ed
1049 1.148 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+-
0.9 TEMP1+1.35 MR1 -3.51 -1.03 0.79 -4.67 1.78

1050 1.148 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 -3.46 -1.03 0.79 -4.65 1.78

1051 1.148 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+-

F
0.9 TEMP1+1.35 MR1 -2.99 -1.00 0.23 -4.58 0.18

1052 1.148 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 -2.95 -1.00 0.24 -4.57 0.19

PD
1053 1.148 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+-
0.9 TEMP1+1.35 MR1 -2.11 -0.52 0.48 -3.09 0.91

1054 1.148 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 -2.06 -0.51 0.49 -3.08 0.91

1055 1.148 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 -4.07 -1.46 0.55 -6.00 1.05
te r
1056 1.148 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+-
0.9 TEMP1+1.35 MR1 -4.02 -1.46 0.55 -5.98 1.05

1057 1.148 DL1+1.5 LL1+1.5 WL1+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 -3.15 -0.52 0.65 -3.11 1.60
as

1058 1.148 DL1+1.5 LL1+1.5 WL2+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 -3.07 -0.52 0.66 -3.08 1.62

1059 1.148 DL1+1.5 LL1+1.5 WL3+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 -2.29 -0.47 -0.28 -2.96 -1.06
nM

1060 1.148 DL1+1.5 LL1+1.5 WL4+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 -2.21 -0.46 -0.27 -2.93 -1.04

1061 1.148 DL1+1.5 LL1+1.5 WL5+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 -0.82 0.33 0.14 -0.48 0.16

1062 1.148 DL1+1.5 LL1+1.5 WL6+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 -0.74 0.34 0.15 -0.45 0.17
di

1063 1.148 DL1+1.5 LL1+1.5 WL7+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 -4.08 -1.24 0.25 -5.31 0.39

1064 1.148 DL1+1.5 LL1+1.5 WL8+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 -4.00 -1.23 0.26 -5.29 0.40
a te

1065 1.148 DL1+1.5 LL1+1.5 WL1+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 -3.80 -1.06 0.96 -4.75 2.30

1066 1.148 DL1+1.5 LL1+1.5 WL2+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 -3.72 -1.05 0.97 -4.72 2.31
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1067 1.148 DL1+1.5 LL1+1.5 WL3+1.5 EQUIP1+-
0.9 TEMP1+1.35 MR1 -2.94 -1.00 0.03 -4.60 -0.37

1068 1.148 DL1+1.5 LL1+1.5 WL4+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 -2.86 -1.00 0.04 -4.57 -0.35

Ed
1069 1.148 DL1+1.5 LL1+1.5 WL5+1.5 EQUIP1+-
0.9 TEMP1+1.35 MR1 -1.47 -0.20 0.45 -2.12 0.85

1070 1.148 DL1+1.5 LL1+1.5 WL6+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 -1.39 -0.19 0.46 -2.09 0.86

1071 1.148 DL1+1.5 LL1+1.5 WL7+1.5 EQUIP1+-

F
0.9 TEMP1+1.35 MR1 -4.73 -1.78 0.57 -6.96 1.08

1072 1.148 DL1+1.5 LL1+1.5 WL8+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 -4.65 -1.77 0.58 -6.93 1.09

PD
1073 1 DL1+0.8 LL1+1 SL1 6.21 -0.07 -0.25 -0.31 1.57

1074 1 DL1+0.8 LL1+1 SL2 6.15 -0.16 0.15 -0.59 0.43

1075 1 DL1+0.8 LL1+-1 SL1 5.57 0.01 0.64 -0.05 -0.97

1076 1 DL1+0.8 LL1+-1 SL2 5.63 0.11 0.24 0.24 0.18


te r
2001 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+0.6
TEMP1+1 MR1 -0.67 -0.34 0.35 -2.05 0.77

2002 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+0.6


TEMP1+1 MR1 -0.63 -0.33 0.36 -2.03 0.78

2003 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+0.6


as

TEMP1+1 MR1 -0.33 -0.31 -0.02 -1.99 -0.29

2004 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+0.6


TEMP1+1 MR1 -0.29 -0.31 -0.02 -1.98 -0.29

2005 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+0.6


nM

TEMP1+1 MR1 0.27 0.01 0.15 -0.99 0.20

2006 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+0.6


TEMP1+1 MR1 0.30 0.01 0.15 -0.98 0.20

2007 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+0.6


TEMP1+1 MR1 -1.04 -0.62 0.19 -2.93 0.29

2008 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+0.6


di

TEMP1+1 MR1 -1.01 -0.62 0.20 -2.92 0.29

2009 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+-0.6


TEMP1+1 MR1 -1.10 -0.69 0.56 -3.14 1.24
a te

2010 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+-0.6


TEMP1+1 MR1 -1.07 -0.69 0.56 -3.13 1.24

2011 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+-0.6


TEMP1+1 MR1 -0.76 -0.67 0.19 -3.08 0.17

2012 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+-0.6


TEMP1+1 MR1 -0.73 -0.67 0.19 -3.07 0.18
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
2013 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+-0.6
TEMP1+1 MR1 -0.17 -0.35 0.36 -2.09 0.66

2014 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+-0.6


TEMP1+1 MR1 -0.14 -0.35 0.36 -2.08 0.66

Ed
2015 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+-0.6
TEMP1+1 MR1 -1.47 -0.98 0.40 -4.02 0.75

2016 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+-0.6


TEMP1+1 MR1 -1.44 -0.98 0.40 -4.01 0.76

2017 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+0.6

F
TEMP1+1 MR1 -0.86 -0.35 0.47 -2.10 1.12

2018 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+0.6


TEMP1+1 MR1 -0.81 -0.35 0.47 -2.08 1.13

PD
2019 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+0.6
TEMP1+1 MR1 -0.29 -0.32 -0.15 -2.00 -0.65

2020 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+0.6


TEMP1+1 MR1 -0.24 -0.31 -0.14 -1.98 -0.64

2021 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+0.6


TEMP1+1 MR1 0.69 0.22 0.13 -0.35 0.16
te r
2022 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+0.6
TEMP1+1 MR1 0.75 0.22 0.14 -0.33 0.16

2023 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+0.6


TEMP1+1 MR1 -1.48 -0.83 0.20 -3.57 0.31
as

2024 1 DL1+1.0 LL1+1 WL8+1 EQUIP1+0.6


TEMP1+1 MR1 -1.43 -0.83 0.21 -3.55 0.32

2025 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+-0.6


TEMP1+1 MR1 -1.29 -0.71 0.68 -3.19 1.59
nM

2026 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+-0.6


TEMP1+1 MR1 -1.24 -0.70 0.68 -3.17 1.59

2027 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+-0.6


TEMP1+1 MR1 -0.72 -0.67 0.06 -3.09 -0.19

2028 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+-0.6


TEMP1+1 MR1 -0.67 -0.67 0.06 -3.08 -0.18
di

2029 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+-0.6


TEMP1+1 MR1 0.26 -0.14 0.34 -1.44 0.62

2030 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+-0.6


TEMP1+1 MR1 0.31 -0.13 0.34 -1.42 0.63
a te

2031 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+-0.6


TEMP1+1 MR1 -1.91 -1.19 0.41 -4.66 0.78

2032 1 DL1+0.7 LL1+1 WL8+1 EQUIP1+-0.6


TEMP1+1 MR1 -1.86 -1.18 0.42 -4.65 0.78
re

2033 1 DL1+0.8 LL1+1 SL1 6.21 -0.07 -0.25 -0.31 1.57


APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
2034 1 DL1+0.8 LL1+1 SL2 6.15 -0.16 0.15 -0.59 0.43

2035 1 DL1+0.8 LL1+-1 SL1 5.57 0.01 0.64 -0.05 -0.97

2036 1 DL1+0.8 LL1+-1 SL2 5.63 0.11 0.24 0.24 0.18

Ed
P33 500 1 DL1+1 LL1+1 EQUIP1 19.96 -0.83 -0.01 -4.32 0.00

501 1 DL1+1 LL1+1 EQUIP1+1 TEMP1 19.09 -0.69 -0.03 -3.77 -0.06

502 1 DL1+1 WL1 8.20 0.52 0.43 0.54 1.10

503 1 DL1+1 WL2 8.19 0.54 0.44 0.58 1.10

F
504 1 DL1+1 WL3 8.45 0.44 -0.43 0.45 -1.09

505 1 DL1+1 WL4 8.45 0.45 -0.43 0.49 -1.09

PD
506 1 DL1+1 WL5 7.20 1.00 -0.03 2.02 -0.08

507 1 DL1+1 WL6 7.20 1.02 -0.03 2.06 -0.08

508 1 DL1+1 WL7 9.12 0.01 0.02 -0.83 0.06

509 1 DL1+1 WL8 9.12 0.02 0.02 -0.79 0.06

510 1 DL1+0.7 WL1 8.21 0.52 0.30 0.57 0.77


te r
511 1 DL1+0.7 WL2 8.20 0.53 0.30 0.59 0.77

512 1 DL1+0.7 WL3 8.39 0.46 -0.30 0.50 -0.76

513 1 DL1+0.7 WL4 8.38 0.47 -0.30 0.53 -0.76


as

514 1 DL1+0.7 WL5 7.51 0.86 -0.03 1.60 -0.06

515 1 DL1+0.7 WL6 7.51 0.87 -0.02 1.63 -0.06

516 1 DL1+0.7 WL7 8.85 0.16 0.01 -0.40 0.04


nM

517 1 DL1+0.7 WL8 8.85 0.17 0.01 -0.37 0.04

518 1 DL1+ 1LL1+0.75 WL1+1 EQUIP1 19.94 -0.84 0.32 -4.37 0.82

519 1 DL1+1.0 LL1+0.75 WL2+1 EQUIP1 19.94 -0.82 0.32 -4.34 0.83

520 1 DL1+1.0 LL1+0.75 WL3+1 EQUIP1 20.13 -0.90 -0.33 -4.44 -0.82

521 1 DL1+1.0 LL1+0.75 WL4+1 EQUIP1 20.13 -0.88 -0.33 -4.42 -0.82
di

522 1 DL1+1.0 LL1+0.75 WL5+1 EQUIP1 19.20 -0.47 -0.04 -3.27 -0.07

523 1 DL1+1.0 LL1+0.75 WL6+1 EQUIP1 19.19 -0.46 -0.03 -3.24 -0.06

524 1 DL1+1.0 LL1+0.75 WL7+1 EQUIP1 20.63 -1.22 0.01 -5.40 0.04
a te

525 1 DL1+1.0 LL1+0.75 WL8+1 EQUIP1 20.63 -1.21 0.01 -5.37 0.04

526 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL1 20.06 -0.86 -0.31 -4.38 0.77

527 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL2 20.10 -0.90 -0.04 -4.51 0.07

528 0.6 DL1+1 WL1 4.91 0.31 0.44 0.30 1.10


re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
529 0.6 DL1+1 WL2 4.90 0.33 0.44 0.34 1.10

530 0.6 DL1+1 WL3 5.16 0.23 -0.43 0.20 -1.09

531 0.6 DL1+1 WL4 5.16 0.25 -0.43 0.24 -1.09

Ed
532 0.6 DL1+1 WL5 3.91 0.79 -0.03 1.77 -0.08

533 0.6 DL1+1 WL6 3.91 0.81 -0.03 1.81 -0.08

534 0.6 DL1+1 WL7 5.83 -0.20 0.02 -1.08 0.06

535 0.6 DL1+1 WL8 5.83 -0.18 0.02 -1.04 0.06

F
536 0.6 DL1+0.7 SL1 5.06 0.28 -0.41 0.29 1.02

537 0.6 DL1+0.7 SL2 5.12 0.22 -0.04 0.11 0.10

PD
1001 1.35 DL1+1.5 LL1+1.5 EQUIP1+0.9 TEMP1 27.92 -1.20 -0.04 -6.07 -0.06

1002 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 TEMP1 29.50 -1.46 0.01 -7.07 0.05

1003 1.35 DL1+1.5 WL1+0.9 TEMP1 10.27 0.83 0.63 1.22 1.60

1004 1.35 DL1+1.5 WL2+0.9 TEMP1 10.26 0.86 0.63 1.28 1.60

1005 1.35 DL1+1.5 WL3+0.9 TEMP1 10.66 0.71 -0.67 1.08 -1.69
te r
1006 1.35 DL1+1.5 WL4+0.9 TEMP1 10.65 0.73 -0.67 1.14 -1.68

1007 1.35 DL1+1.5 WL5+0.9 TEMP1 8.78 1.55 -0.07 3.43 -0.18

1008 1.35 DL1+1.5 WL6+0.9 TEMP1 8.77 1.58 -0.07 3.49 -0.18
as

1009 1.35 DL1+1.5 WL7+0.9 TEMP1 11.66 0.06 0.01 -0.84 0.03

1010 1.35 DL1+1.5 WL8+0.9 TEMP1 11.65 0.09 0.01 -0.78 0.03

1011 1.35 DL1+1.5 WL1+-0.9 TEMP1 11.85 0.57 0.67 0.23 1.71
nM

1012 1.35 DL1+1.5 WL2+-0.9 TEMP1 11.84 0.59 0.67 0.29 1.71

1013 1.35 DL1+1.5 WL3+-0.9 TEMP1 12.24 0.45 -0.63 0.08 -1.58

1014 1.35 DL1+1.5 WL4+-0.9 TEMP1 12.23 0.47 -0.63 0.14 -1.58

1015 1.35 DL1+1.5 WL5+-0.9 TEMP1 10.36 1.29 -0.03 2.44 -0.07

1016 1.35 DL1+1.5 WL6+-0.9 TEMP1 10.35 1.31 -0.03 2.50 -0.07
di

1017 1.35 DL1+1.5 WL7+-0.9 TEMP1 13.23 -0.20 0.05 -1.84 0.14

1018 1.35 DL1+1.5 WL8+-0.9 TEMP1 13.23 -0.18 0.05 -1.78 0.14

1019 1.35 DL1+0.9 TEMP1+1.35 MR1 10.33 0.83 -0.03 1.31 -0.06
a te

1020 1.35 DL1+-0.9 TEMP1+1.35 MR1 11.91 0.56 0.02 0.32 0.05

1021 1.35 DL1+1.5LL1+1.5 EQUIP1+0.9


TEMP1+1.35 MR1 27.94 -1.20 -0.04 -6.09 -0.06

1022 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 29.51 -1.47 0.00 -7.08 0.05
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1023 1.148 DL1+1.5 LL1+1.5 EQUIP1+0.9
TEMP1+1.35 MR1 26.27 -1.31 -0.04 -6.22 -0.06

1024 1.148 DL1+1.5 LL1+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 27.85 -1.57 0.01 -7.21 0.05

Ed
1025 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+0.9
TEMP1+1.35 MR1 27.91 -1.20 0.36 -6.16 0.93

1026 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+0.9


TEMP1+1.35 MR1 27.90 -1.19 0.36 -6.12 0.93

1027 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+0.9

F
TEMP1+1.35 MR1 28.14 -1.28 -0.42 -6.24 -1.04

1028 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+0.9


TEMP1+1.35 MR1 28.14 -1.26 -0.42 -6.21 -1.04

PD
1029 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+0.9
TEMP1+1.35 MR1 27.01 -0.77 -0.07 -4.83 -0.13

1030 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+0.9


TEMP1+1.35 MR1 27.01 -0.76 -0.07 -4.79 -0.13

1031 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+0.9


TEMP1+1.35 MR1 28.74 -1.66 -0.02 -7.39 -0.01
te r
1032 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+0.9
TEMP1+1.35 MR1 28.74 -1.65 -0.02 -7.36 -0.01

1033 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 29.49 -1.47 0.40 -7.15 1.04
as

1034 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 29.48 -1.45 0.40 -7.11 1.04

1035 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 29.72 -1.54 -0.38 -7.24 -0.93
nM

1036 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 29.71 -1.53 -0.38 -7.20 -0.93

1037 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 28.59 -1.04 -0.02 -5.82 -0.03

1038 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 28.59 -1.02 -0.02 -5.78 -0.03
di

1039 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 30.32 -1.93 0.02 -8.39 0.10

1040 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 30.31 -1.91 0.02 -8.35 0.10
a te

1041 1.148 DL1+1.5 LL1+0.9 WL1+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 26.25 -1.31 0.36 -6.28 0.93

1042 1.148 DL1+1.5 LL1+0.9 WL2+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 26.24 -1.29 0.36 -6.25 0.93
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1043 1.148 DL1+1.5 LL1+0.9 WL3+1.5
EQUIP1+0.9 TEMP1+1.35 MR1 26.48 -1.38 -0.42 -6.37 -1.04

1044 1.148 DL1+1.5 LL1+0.9 WL4+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 26.48 -1.37 -0.42 -6.33 -1.04

Ed
1045 1.148 DL1+1.5 LL1+0.9 WL5+1.5
EQUIP1+0.9 TEMP1+1.35 MR1 25.35 -0.88 -0.07 -4.95 -0.13

1046 1.148 DL1+1.5 LL1+0.9 WL6+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 25.35 -0.86 -0.07 -4.92 -0.13

1047 1.148 DL1+1.5 LL1+0.9 WL7+1.5

F
EQUIP1+0.9 TEMP1+1.35 MR1 27.08 -1.77 -0.02 -7.52 -0.01

1048 1.148 DL1+1.5 LL1+0.9 WL8+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 27.07 -1.75 -0.02 -7.48 -0.01

PD
1049 1.148 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+-
0.9 TEMP1+1.35 MR1 27.82 -1.57 0.40 -7.28 1.04

1050 1.148 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 27.82 -1.56 0.40 -7.24 1.04

1051 1.148 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 28.06 -1.65 -0.38 -7.36 -0.93
te r
1052 1.148 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+-
0.9 TEMP1+1.35 MR1 28.05 -1.63 -0.38 -7.32 -0.93

1053 1.148 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 26.93 -1.14 -0.02 -5.95 -0.03
as

1054 1.148 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 26.93 -1.13 -0.02 -5.91 -0.02

1055 1.148 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 28.66 -2.03 0.03 -8.51 0.10
nM

1056 1.148 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 28.65 -2.02 0.03 -8.48 0.10

1057 1.148 DL1+1.5 LL1+1.5 WL1+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 26.23 -1.31 0.62 -6.33 1.59

1058 1.148 DL1+1.5 LL1+1.5 WL2+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 26.22 -1.29 0.62 -6.27 1.60
di

1059 1.148 DL1+1.5 LL1+1.5 WL3+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 26.62 -1.43 -0.68 -6.47 -1.69

1060 1.148 DL1+1.5 LL1+1.5 WL4+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 26.61 -1.41 -0.68 -6.41 -1.69
a te

1061 1.148 DL1+1.5 LL1+1.5 WL5+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 24.74 -0.59 -0.08 -4.11 -0.18

1062 1.148 DL1+1.5 LL1+1.5 WL6+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 24.73 -0.56 -0.08 -4.05 -0.18
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1063 1.148 DL1+1.5 LL1+1.5 WL7+1.5
EQUIP1+0.9 TEMP1+1.35 MR1 27.62 -2.08 0.00 -8.39 0.03

1064 1.148 DL1+1.5 LL1+1.5 WL8+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 27.61 -2.05 0.00 -8.33 0.03

Ed
1065 1.148 DL1+1.5 LL1+1.5 WL1+1.5 EQUIP1+-
0.9 TEMP1+1.35 MR1 27.81 -1.57 0.66 -7.32 1.70

1066 1.148 DL1+1.5 LL1+1.5 WL2+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 27.80 -1.55 0.66 -7.26 1.70

1067 1.148 DL1+1.5 LL1+1.5 WL3+1.5 EQUIP1+-

F
0.9 TEMP1+1.35 MR1 28.19 -1.70 -0.64 -7.46 -1.59

1068 1.148 DL1+1.5 LL1+1.5 WL4+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 28.19 -1.67 -0.64 -7.40 -1.58

PD
1069 1.148 DL1+1.5 LL1+1.5 WL5+1.5 EQUIP1+-
0.9 TEMP1+1.35 MR1 26.32 -0.85 -0.04 -5.10 -0.07

1070 1.148 DL1+1.5 LL1+1.5 WL6+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 26.31 -0.83 -0.04 -5.04 -0.07

1071 1.148 DL1+1.5 LL1+1.5 WL7+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 29.19 -2.34 0.04 -9.38 0.14
te r
1072 1.148 DL1+1.5 LL1+1.5 WL8+1.5 EQUIP1+-
0.9 TEMP1+1.35 MR1 29.19 -2.32 0.04 -9.32 0.14

1073 1 DL1+0.8 LL1+1 SL1 10.47 0.69 -0.59 0.77 1.45


as

1074 1 DL1+0.8 LL1+1 SL2 10.54 0.61 -0.07 0.50 0.14

1075 1 DL1+0.8 LL1+-1 SL1 10.10 0.79 0.57 0.99 -1.48

1076 1 DL1+0.8 LL1+-1 SL2 10.02 0.87 0.05 1.25 -0.16

2001 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+0.6


nM

TEMP1+1 MR1 19.43 -0.75 0.24 -4.05 0.62

2002 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+0.6


TEMP1+1 MR1 19.43 -0.74 0.24 -4.02 0.62

2003 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+0.6


TEMP1+1 MR1 19.58 -0.80 -0.28 -4.10 -0.69

2004 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+0.6


di

TEMP1+1 MR1 19.58 -0.79 -0.28 -4.08 -0.69

2005 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+0.6


TEMP1+1 MR1 18.83 -0.46 -0.04 -3.16 -0.09
a te

2006 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+0.6


TEMP1+1 MR1 18.83 -0.45 -0.04 -3.13 -0.09

2007 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+0.6


TEMP1+1 MR1 19.98 -1.06 -0.01 -4.87 -0.01

2008 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+0.6


TEMP1+1 MR1 19.98 -1.05 -0.01 -4.85 -0.01
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
2009 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+-0.6
TEMP1+1 MR1 20.48 -0.93 0.26 -4.71 0.69

2010 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+-0.6


TEMP1+1 MR1 20.48 -0.92 0.27 -4.68 0.69

Ed
2011 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+-0.6
TEMP1+1 MR1 20.64 -0.98 -0.26 -4.76 -0.62

2012 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+-0.6


TEMP1+1 MR1 20.63 -0.97 -0.26 -4.74 -0.62

2013 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+-0.6

F
TEMP1+1 MR1 19.89 -0.64 -0.02 -3.82 -0.02

2014 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+-0.6


TEMP1+1 MR1 19.88 -0.63 -0.02 -3.80 -0.02

PD
2015 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+-0.6
TEMP1+1 MR1 21.04 -1.23 0.02 -5.53 0.07

2016 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+-0.6


TEMP1+1 MR1 21.03 -1.22 0.02 -5.51 0.07

2017 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+0.6


TEMP1+1 MR1 19.42 -0.75 0.41 -4.08 1.06
te r
2018 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+0.6
TEMP1+1 MR1 19.41 -0.74 0.41 -4.04 1.06

2019 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+0.6


TEMP1+1 MR1 19.68 -0.83 -0.46 -4.17 -1.13
as

2020 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+0.6


TEMP1+1 MR1 19.67 -0.82 -0.45 -4.13 -1.13

2021 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+0.6


TEMP1+1 MR1 18.42 -0.27 -0.06 -2.60 -0.12
nM

2022 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+0.6


TEMP1+1 MR1 18.42 -0.26 -0.06 -2.56 -0.12

2023 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+0.6


TEMP1+1 MR1 20.34 -1.26 0.00 -5.45 0.02

2024 1 DL1+1.0 LL1+1 WL8+1 EQUIP1+0.6


TEMP1+1 MR1 20.34 -1.25 0.00 -5.41 0.02
di

2025 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+-0.6


TEMP1+1 MR1 20.47 -0.93 0.44 -4.74 1.13

2026 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+-0.6


TEMP1+1 MR1 20.46 -0.91 0.44 -4.70 1.14
a te

2027 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+-0.6


TEMP1+1 MR1 20.73 -1.01 -0.43 -4.83 -1.06

2028 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+-0.6


TEMP1+1 MR1 20.72 -0.99 -0.43 -4.79 -1.05
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
2029 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+-0.6
TEMP1+1 MR1 19.48 -0.45 -0.03 -3.26 -0.05

2030 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+-0.6


TEMP1+1 MR1 19.47 -0.43 -0.03 -3.22 -0.05

Ed
2031 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+-0.6
TEMP1+1 MR1 21.39 -1.44 0.03 -6.11 0.09

2032 1 DL1+0.7 LL1+1 WL8+1 EQUIP1+-0.6


TEMP1+1 MR1 21.39 -1.42 0.03 -6.07 0.09

2033 1 DL1+0.8 LL1+1 SL1 10.47 0.69 -0.59 0.77 1.45

F
2034 1 DL1+0.8 LL1+1 SL2 10.54 0.61 -0.07 0.50 0.14

2035 1 DL1+0.8 LL1+-1 SL1 10.10 0.79 0.57 0.99 -1.48

PD
2036 1 DL1+0.8 LL1+-1 SL2 10.02 0.87 0.05 1.25 -0.16

P34 500 1 DL1+1 LL1+1 EQUIP1 -4.79 -1.25 0.02 -4.97 0.07

501 1 DL1+1 LL1+1 EQUIP1+1 TEMP1 -4.08 -0.99 0.00 -4.15 0.01

502 1 DL1+1 WL1 3.34 -0.10 0.39 -0.39 1.02

503 1 DL1+1 WL2 3.35 -0.10 0.39 -0.36 1.02


te r
504 1 DL1+1 WL3 4.17 -0.08 -0.38 -0.33 -0.99

505 1 DL1+1 WL4 4.18 -0.08 -0.38 -0.30 -0.99

506 1 DL1+1 WL5 4.98 0.35 -0.02 1.04 -0.06


as

507 1 DL1+1 WL6 4.99 0.35 -0.02 1.07 -0.06

508 1 DL1+1 WL7 2.74 -0.46 0.02 -1.52 0.05

509 1 DL1+1 WL8 2.75 -0.45 0.02 -1.50 0.05


nM

510 1 DL1+0.7 WL1 3.48 -0.09 0.28 -0.35 0.72

511 1 DL1+0.7 WL2 3.49 -0.09 0.28 -0.33 0.71

512 1 DL1+0.7 WL3 4.07 -0.08 -0.27 -0.31 -0.69

513 1 DL1+0.7 WL4 4.07 -0.07 -0.27 -0.29 -0.69

514 1 DL1+0.7 WL5 4.63 0.22 -0.02 0.65 -0.04


di

515 1 DL1+0.7 WL6 4.64 0.23 -0.02 0.67 -0.04

516 1 DL1+0.7 WL7 3.07 -0.34 0.01 -1.14 0.04

517 1 DL1+0.7 WL8 3.08 -0.33 0.01 -1.12 0.04


a te

518 1 DL1+ 1LL1+0.75 WL1+1 EQUIP1 -5.16 -1.28 0.32 -5.07 0.83

519 1 DL1+1.0 LL1+0.75 WL2+1 EQUIP1 -5.15 -1.28 0.32 -5.05 0.83

520 1 DL1+1.0 LL1+0.75 WL3+1 EQUIP1 -4.53 -1.27 -0.26 -5.03 -0.67

521 1 DL1+1.0 LL1+0.75 WL4+1 EQUIP1 -4.52 -1.26 -0.26 -5.01 -0.67
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
522 1 DL1+1.0 LL1+0.75 WL5+1 EQUIP1 -3.92 -0.95 0.01 -4.00 0.02

523 1 DL1+1.0 LL1+0.75 WL6+1 EQUIP1 -3.92 -0.94 0.01 -3.98 0.02

524 1 DL1+1.0 LL1+0.75 WL7+1 EQUIP1 -5.60 -1.55 0.04 -5.92 0.10

Ed
525 1 DL1+1.0 LL1+0.75 WL8+1 EQUIP1 -5.59 -1.54 0.04 -5.90 0.10

526 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL1 -4.46 -1.27 -0.27 -5.04 0.82

527 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL2 -4.64 -1.30 -0.01 -5.14 0.15

528 0.6 DL1+1 WL1 1.81 -0.08 0.39 -0.29 1.02

F
529 0.6 DL1+1 WL2 1.82 -0.07 0.39 -0.26 1.02

530 0.6 DL1+1 WL3 2.64 -0.06 -0.38 -0.23 -0.99

PD
531 0.6 DL1+1 WL4 2.65 -0.05 -0.38 -0.21 -0.99

532 0.6 DL1+1 WL5 3.45 0.37 -0.02 1.14 -0.06

533 0.6 DL1+1 WL6 3.46 0.38 -0.02 1.17 -0.06

534 0.6 DL1+1 WL7 1.21 -0.43 0.02 -1.42 0.05

535 0.6 DL1+1 WL8 1.22 -0.43 0.02 -1.40 0.05


te r
536 0.6 DL1+0.7 SL1 2.74 -0.07 -0.39 -0.24 1.00

537 0.6 DL1+0.7 SL2 2.49 -0.11 -0.04 -0.38 0.10

1001 1.35 DL1+1.5 LL1+1.5 EQUIP1+0.9 TEMP1 -7.11 -1.63 0.02 -6.68 0.05
as

1002 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 TEMP1 -8.40 -2.10 0.05 -8.15 0.15

1003 1.35 DL1+1.5 WL1+0.9 TEMP1 5.07 0.08 0.57 0.19 1.48

1004 1.35 DL1+1.5 WL2+0.9 TEMP1 5.09 0.10 0.57 0.23 1.48
nM

1005 1.35 DL1+1.5 WL3+0.9 TEMP1 6.33 0.11 -0.59 0.27 -1.53

1006 1.35 DL1+1.5 WL4+0.9 TEMP1 6.34 0.13 -0.59 0.31 -1.53

1007 1.35 DL1+1.5 WL5+0.9 TEMP1 7.54 0.76 -0.05 2.33 -0.14

1008 1.35 DL1+1.5 WL6+0.9 TEMP1 7.55 0.77 -0.05 2.37 -0.14

1009 1.35 DL1+1.5 WL7+0.9 TEMP1 4.18 -0.45 0.01 -1.51 0.03
di

1010 1.35 DL1+1.5 WL8+0.9 TEMP1 4.20 -0.43 0.01 -1.47 0.02

1011 1.35 DL1+1.5 WL1+-0.9 TEMP1 3.79 -0.38 0.61 -1.28 1.58

1012 1.35 DL1+1.5 WL2+-0.9 TEMP1 3.80 -0.37 0.61 -1.24 1.58
a te

1013 1.35 DL1+1.5 WL3+-0.9 TEMP1 5.04 -0.35 -0.56 -1.19 -1.43

1014 1.35 DL1+1.5 WL4+-0.9 TEMP1 5.05 -0.34 -0.55 -1.15 -1.43

1015 1.35 DL1+1.5 WL5+-0.9 TEMP1 6.25 0.30 -0.02 0.86 -0.04

1016 1.35 DL1+1.5 WL6+-0.9 TEMP1 6.27 0.31 -0.02 0.90 -0.04
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1017 1.35 DL1+1.5 WL7+-0.9 TEMP1 2.90 -0.91 0.04 -2.98 0.13

1018 1.35 DL1+1.5 WL8+-0.9 TEMP1 2.92 -0.90 0.04 -2.94 0.13

1019 1.35 DL1+0.9 TEMP1+1.35 MR1 5.79 0.15 -0.02 0.38 -0.05

Ed
1020 1.35 DL1+-0.9 TEMP1+1.35 MR1 4.51 -0.32 0.02 -1.09 0.06

1021 1.35 DL1+1.5LL1+1.5 EQUIP1+0.9


TEMP1+1.35 MR1 -7.13 -1.64 0.02 -6.70 0.05

1022 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 -8.41 -2.10 0.05 -8.16 0.15

F
1023 1.148 DL1+1.5 LL1+1.5 EQUIP1+0.9
TEMP1+1.35 MR1 -7.90 -1.63 0.02 -6.65 0.05

PD
1024 1.148 DL1+1.5 LL1+1.5 EQUIP1+-0.9
TEMP1+1.35 MR1 -9.19 -2.09 0.05 -8.11 0.15

1025 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+0.9


TEMP1+1.35 MR1 -7.57 -1.68 0.37 -6.82 0.97

1026 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+0.9


TEMP1+1.35 MR1 -7.56 -1.67 0.37 -6.80 0.96
te r
1027 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+0.9
TEMP1+1.35 MR1 -6.82 -1.66 -0.33 -6.77 -0.84

1028 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+0.9


TEMP1+1.35 MR1 -6.81 -1.66 -0.33 -6.75 -0.84

1029 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+0.9


as

TEMP1+1.35 MR1 -6.09 -1.28 0.00 -5.54 -0.01

1030 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+0.9


TEMP1+1.35 MR1 -6.09 -1.27 0.00 -5.51 -0.01

1031 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+0.9


nM

TEMP1+1.35 MR1 -8.11 -2.00 0.03 -7.84 0.09

1032 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+0.9


TEMP1+1.35 MR1 -8.10 -1.99 0.03 -7.82 0.09

1033 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 -8.86 -2.14 0.41 -8.29 1.07

1034 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+-0.9


di

TEMP1+1.35 MR1 -8.85 -2.13 0.41 -8.26 1.07

1035 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 -8.11 -2.12 -0.29 -8.24 -0.74
a te

1036 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 -8.10 -2.12 -0.29 -8.21 -0.74

1037 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 -7.38 -1.74 0.03 -7.00 0.10

1038 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 -7.37 -1.73 0.03 -6.98 0.10
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1039 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+-0.9
TEMP1+1.35 MR1 -9.39 -2.46 0.07 -9.31 0.20

1040 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 -9.38 -2.45 0.07 -9.28 0.19

Ed
1041 1.148 DL1+1.5 LL1+0.9 WL1+1.5
EQUIP1+0.9 TEMP1+1.35 MR1 -8.35 -1.67 0.37 -6.77 0.96

1042 1.148 DL1+1.5 LL1+0.9 WL2+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 -8.34 -1.66 0.37 -6.75 0.96

1043 1.148 DL1+1.5 LL1+0.9 WL3+1.5

F
EQUIP1+0.9 TEMP1+1.35 MR1 -7.60 -1.65 -0.33 -6.72 -0.84

1044 1.148 DL1+1.5 LL1+0.9 WL4+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 -7.59 -1.64 -0.33 -6.70 -0.84

PD
1045 1.148 DL1+1.5 LL1+0.9 WL5+1.5
EQUIP1+0.9 TEMP1+1.35 MR1 -6.87 -1.26 0.00 -5.49 -0.01

1046 1.148 DL1+1.5 LL1+0.9 WL6+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 -6.86 -1.26 0.00 -5.46 -0.01

1047 1.148 DL1+1.5 LL1+0.9 WL7+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 -8.88 -1.99 0.03 -7.79 0.09
te r
1048 1.148 DL1+1.5 LL1+0.9 WL8+1.5
EQUIP1+0.9 TEMP1+1.35 MR1 -8.87 -1.98 0.03 -7.77 0.09

1049 1.148 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 -9.63 -2.13 0.41 -8.24 1.07
as

1050 1.148 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 -9.62 -2.12 0.41 -8.21 1.07

1051 1.148 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 -8.88 -2.11 -0.29 -8.19 -0.74
nM

1052 1.148 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 -8.87 -2.10 -0.29 -8.16 -0.74

1053 1.148 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 -8.15 -1.73 0.03 -6.95 0.10

1054 1.148 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 -8.14 -1.72 0.03 -6.93 0.09
di

1055 1.148 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+- -


0.9 TEMP1+1.35 MR1 10.16 -2.45 0.07 -9.26 0.19

1056 1.148 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+- -


0.9 TEMP1+1.35 MR1 10.15 -2.44 0.07 -9.23 0.19
a te

1057 1.148 DL1+1.5 LL1+1.5 WL1+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 -8.64 -1.70 0.61 -6.86 1.57

1058 1.148 DL1+1.5 LL1+1.5 WL2+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 -8.63 -1.68 0.61 -6.82 1.57
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1059 1.148 DL1+1.5 LL1+1.5 WL3+1.5
EQUIP1+0.9 TEMP1+1.35 MR1 -7.39 -1.67 -0.56 -6.77 -1.44

1060 1.148 DL1+1.5 LL1+1.5 WL4+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 -7.38 -1.65 -0.56 -6.73 -1.44

Ed
1061 1.148 DL1+1.5 LL1+1.5 WL5+1.5
EQUIP1+0.9 TEMP1+1.35 MR1 -6.18 -1.02 -0.02 -4.71 -0.04

1062 1.148 DL1+1.5 LL1+1.5 WL6+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 -6.16 -1.01 -0.02 -4.67 -0.05

1063 1.148 DL1+1.5 LL1+1.5 WL7+1.5

F
EQUIP1+0.9 TEMP1+1.35 MR1 -9.53 -2.23 0.04 -8.56 0.12

1064 1.148 DL1+1.5 LL1+1.5 WL8+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 -9.51 -2.21 0.04 -8.52 0.12

PD
1065 1.148 DL1+1.5 LL1+1.5 WL1+1.5 EQUIP1+-
0.9 TEMP1+1.35 MR1 -9.92 -2.16 0.64 -8.32 1.68

1066 1.148 DL1+1.5 LL1+1.5 WL2+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 -9.91 -2.14 0.64 -8.28 1.67

1067 1.148 DL1+1.5 LL1+1.5 WL3+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 -8.67 -2.13 -0.52 -8.24 -1.33
te r
1068 1.148 DL1+1.5 LL1+1.5 WL4+1.5 EQUIP1+-
0.9 TEMP1+1.35 MR1 -8.66 -2.11 -0.52 -8.20 -1.33

1069 1.148 DL1+1.5 LL1+1.5 WL5+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 -7.46 -1.48 0.02 -6.18 0.06
as

1070 1.148 DL1+1.5 LL1+1.5 WL6+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 -7.45 -1.47 0.02 -6.14 0.06

1071 1.148 DL1+1.5 LL1+1.5 WL7+1.5 EQUIP1+- -


0.9 TEMP1+1.35 MR1 10.81 -2.69 0.08 -10.02 0.22
nM

1072 1.148 DL1+1.5 LL1+1.5 WL8+1.5 EQUIP1+- -


0.9 TEMP1+1.35 MR1 10.80 -2.67 0.08 -9.98 0.22

1073 1 DL1+0.8 LL1+1 SL1 4.55 -0.13 -0.56 -0.49 1.43

1074 1 DL1+0.8 LL1+1 SL2 4.19 -0.19 -0.06 -0.69 0.15

1075 1 DL1+0.8 LL1+-1 SL1 3.29 -0.04 0.55 -0.23 -1.43


di

1076 1 DL1+0.8 LL1+-1 SL2 3.65 0.02 0.05 -0.03 -0.15

2001 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+0.6


TEMP1+1 MR1 -4.67 -1.13 0.25 -4.57 0.64
a te

2002 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+0.6


TEMP1+1 MR1 -4.66 -1.12 0.25 -4.56 0.64

2003 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+0.6


TEMP1+1 MR1 -4.17 -1.11 -0.22 -4.54 -0.56

2004 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+0.6


TEMP1+1 MR1 -4.16 -1.11 -0.22 -4.52 -0.56
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
2005 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+0.6
TEMP1+1 MR1 -3.68 -0.86 0.00 -3.72 0.00

2006 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+0.6


TEMP1+1 MR1 -3.68 -0.85 0.00 -3.70 -0.01

Ed
2007 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+0.6
TEMP1+1 MR1 -5.02 -1.34 0.02 -5.25 0.06

2008 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+0.6


TEMP1+1 MR1 -5.02 -1.33 0.02 -5.24 0.06

2009 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+-0.6

F
TEMP1+1 MR1 -5.52 -1.43 0.27 -5.55 0.71

2010 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+-0.6


TEMP1+1 MR1 -5.52 -1.43 0.27 -5.54 0.71

PD
2011 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+-0.6
TEMP1+1 MR1 -5.02 -1.42 -0.19 -5.52 -0.49

2012 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+-0.6


TEMP1+1 MR1 -5.02 -1.42 -0.19 -5.50 -0.49

2013 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+-0.6


TEMP1+1 MR1 -4.54 -1.16 0.02 -4.70 0.07
te r
2014 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+-0.6
TEMP1+1 MR1 -4.53 -1.16 0.02 -4.68 0.06

2015 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+-0.6


TEMP1+1 MR1 -5.88 -1.65 0.05 -6.23 0.13
as

2016 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+-0.6


TEMP1+1 MR1 -5.87 -1.64 0.05 -6.22 0.13

2017 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+0.6


TEMP1+1 MR1 -4.86 -1.14 0.41 -4.63 1.05
nM

2018 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+0.6


TEMP1+1 MR1 -4.85 -1.14 0.41 -4.60 1.05

2019 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+0.6


TEMP1+1 MR1 -4.03 -1.12 -0.37 -4.57 -0.96

2020 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+0.6


TEMP1+1 MR1 -4.02 -1.12 -0.37 -4.55 -0.96
di

2021 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+0.6


TEMP1+1 MR1 -3.22 -0.70 -0.01 -3.20 -0.03

2022 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+0.6


TEMP1+1 MR1 -3.21 -0.69 -0.01 -3.18 -0.03
a te

2023 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+0.6


TEMP1+1 MR1 -5.46 -1.50 0.03 -5.76 0.08

2024 1 DL1+1.0 LL1+1 WL8+1 EQUIP1+0.6


TEMP1+1 MR1 -5.45 -1.49 0.03 -5.74 0.08
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
2025 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+-0.6
TEMP1+1 MR1 -5.72 -1.45 0.43 -5.61 1.12

2026 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+-0.6


TEMP1+1 MR1 -5.71 -1.44 0.43 -5.58 1.12

Ed
2027 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+-0.6
TEMP1+1 MR1 -4.88 -1.43 -0.35 -5.55 -0.89

2028 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+-0.6


TEMP1+1 MR1 -4.88 -1.42 -0.35 -5.52 -0.89

2029 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+-0.6

F
TEMP1+1 MR1 -4.08 -1.00 0.01 -4.18 0.04

2030 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+-0.6


TEMP1+1 MR1 -4.07 -0.99 0.01 -4.15 0.04

PD
2031 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+-0.6
TEMP1+1 MR1 -6.31 -1.80 0.05 -6.74 0.15

2032 1 DL1+0.7 LL1+1 WL8+1 EQUIP1+-0.6


TEMP1+1 MR1 -6.30 -1.80 0.05 -6.71 0.15

2033 1 DL1+0.8 LL1+1 SL1 4.55 -0.13 -0.56 -0.49 1.43


te r
2034 1 DL1+0.8 LL1+1 SL2 4.19 -0.19 -0.06 -0.69 0.15

2035 1 DL1+0.8 LL1+-1 SL1 3.29 -0.04 0.55 -0.23 -1.43

2036 1 DL1+0.8 LL1+-1 SL2 3.65 0.02 0.05 -0.03 -0.15

P35 500 1 DL1+1 LL1+1 EQUIP1 20.01 -0.80 0.05 -4.24 0.10
as

501 1 DL1+1 LL1+1 EQUIP1+1 TEMP1 19.13 -0.66 0.07 -3.69 0.16

502 1 DL1+1 WL1 8.52 0.42 0.44 0.39 1.11

503 1 DL1+1 WL2 8.51 0.44 0.44 0.44 1.11


nM

504 1 DL1+1 WL3 8.18 0.54 -0.43 0.61 -1.08

505 1 DL1+1 WL4 8.18 0.56 -0.42 0.65 -1.07

506 1 DL1+1 WL5 7.22 1.00 -0.03 2.02 -0.07

507 1 DL1+1 WL6 7.21 1.02 -0.03 2.06 -0.07


di

508 1 DL1+1 WL7 9.15 0.01 0.03 -0.83 0.07

509 1 DL1+1 WL8 9.14 0.02 0.03 -0.79 0.07

510 1 DL1+0.7 WL1 8.44 0.45 0.31 0.46 0.78


a te

511 1 DL1+0.7 WL2 8.43 0.46 0.31 0.49 0.78

512 1 DL1+0.7 WL3 8.20 0.54 -0.30 0.61 -0.75

513 1 DL1+0.7 WL4 8.20 0.55 -0.30 0.64 -0.75

514 1 DL1+0.7 WL5 7.53 0.86 -0.02 1.60 -0.05

515 1 DL1+0.7 WL6 7.52 0.87 -0.02 1.63 -0.05


re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
516 1 DL1+0.7 WL7 8.88 0.16 0.02 -0.39 0.05

517 1 DL1+0.7 WL8 8.87 0.17 0.02 -0.36 0.05

518 1 DL1+ 1LL1+0.75 WL1+1 EQUIP1 20.21 -0.88 0.37 -4.41 0.92

Ed
519 1 DL1+1.0 LL1+0.75 WL2+1 EQUIP1 20.21 -0.87 0.37 -4.38 0.92

520 1 DL1+1.0 LL1+0.75 WL3+1 EQUIP1 19.96 -0.79 -0.28 -4.25 -0.72

521 1 DL1+1.0 LL1+0.75 WL4+1 EQUIP1 19.95 -0.78 -0.28 -4.22 -0.72

522 1 DL1+1.0 LL1+0.75 WL5+1 EQUIP1 19.24 -0.44 0.02 -3.20 0.04

F
523 1 DL1+1.0 LL1+0.75 WL6+1 EQUIP1 19.23 -0.43 0.02 -3.17 0.04

524 1 DL1+1.0 LL1+0.75 WL7+1 EQUIP1 20.68 -1.19 0.07 -5.33 0.14

PD
525 1 DL1+1.0 LL1+0.75 WL8+1 EQUIP1 20.68 -1.18 0.07 -5.30 0.14

526 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL1 20.20 -0.87 -0.26 -4.38 0.87

527 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL2 20.13 -0.87 0.02 -4.44 0.17

528 0.6 DL1+1 WL1 5.22 0.21 0.44 0.15 1.11

529 0.6 DL1+1 WL2 5.21 0.23 0.44 0.19 1.11


te r
530 0.6 DL1+1 WL3 4.88 0.33 -0.43 0.36 -1.08

531 0.6 DL1+1 WL4 4.88 0.35 -0.43 0.40 -1.08

532 0.6 DL1+1 WL5 3.92 0.79 -0.03 1.77 -0.08


as

533 0.6 DL1+1 WL6 3.91 0.81 -0.03 1.81 -0.08

534 0.6 DL1+1 WL7 5.85 -0.20 0.03 -1.08 0.07

535 0.6 DL1+1 WL8 5.84 -0.19 0.03 -1.04 0.07


nM

536 0.6 DL1+0.7 SL1 5.20 0.23 -0.40 0.19 1.03

537 0.6 DL1+0.7 SL2 5.12 0.22 -0.04 0.12 0.11

1001 1.35 DL1+1.5 LL1+1.5 EQUIP1+0.9 TEMP1 27.98 -1.15 0.09 -5.96 0.20

1002 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 TEMP1 29.56 -1.42 0.05 -6.95 0.09

1003 1.35 DL1+1.5 WL1+0.9 TEMP1 10.75 0.68 0.68 0.99 1.72
di

1004 1.35 DL1+1.5 WL2+0.9 TEMP1 10.74 0.71 0.68 1.06 1.72

1005 1.35 DL1+1.5 WL3+0.9 TEMP1 10.25 0.87 -0.62 1.31 -1.56

1006 1.35 DL1+1.5 WL4+0.9 TEMP1 10.24 0.89 -0.62 1.38 -1.56
a te

1007 1.35 DL1+1.5 WL5+0.9 TEMP1 8.80 1.56 -0.02 3.43 -0.05

1008 1.35 DL1+1.5 WL6+0.9 TEMP1 8.79 1.58 -0.02 3.49 -0.05

1009 1.35 DL1+1.5 WL7+0.9 TEMP1 11.69 0.06 0.07 -0.84 0.16

1010 1.35 DL1+1.5 WL8+0.9 TEMP1 11.68 0.09 0.07 -0.78 0.16
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1011 1.35 DL1+1.5 WL1+-0.9 TEMP1 12.33 0.42 0.64 0.00 1.61

1012 1.35 DL1+1.5 WL2+-0.9 TEMP1 12.32 0.44 0.64 0.07 1.61

1013 1.35 DL1+1.5 WL3+-0.9 TEMP1 11.83 0.60 -0.66 0.32 -1.67

Ed
1014 1.35 DL1+1.5 WL4+-0.9 TEMP1 11.82 0.63 -0.66 0.38 -1.67

1015 1.35 DL1+1.5 WL5+-0.9 TEMP1 10.38 1.29 -0.06 2.43 -0.16

1016 1.35 DL1+1.5 WL6+-0.9 TEMP1 10.37 1.32 -0.06 2.50 -0.16

1017 1.35 DL1+1.5 WL7+-0.9 TEMP1 13.27 -0.20 0.03 -1.83 0.05

F
1018 1.35 DL1+1.5 WL8+-0.9 TEMP1 13.26 -0.18 0.03 -1.77 0.05

1019 1.35 DL1+0.9 TEMP1+1.35 MR1 10.36 0.83 0.03 1.32 0.07

PD
1020 1.35 DL1+-0.9 TEMP1+1.35 MR1 11.93 0.57 -0.01 0.33 -0.04

1021 1.35 DL1+1.5LL1+1.5 EQUIP1+0.9


TEMP1+1.35 MR1 27.99 -1.16 0.09 -5.97 0.20

1022 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 29.57 -1.42 0.05 -6.97 0.09

1023 1.148 DL1+1.5 LL1+1.5 EQUIP1+0.9


te r
TEMP1+1.35 MR1 26.33 -1.26 0.09 -6.10 0.20

1024 1.148 DL1+1.5 LL1+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 27.91 -1.52 0.05 -7.09 0.09

1025 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+0.9


as

TEMP1+1.35 MR1 28.24 -1.25 0.48 -6.18 1.19

1026 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+0.9


TEMP1+1.35 MR1 28.23 -1.23 0.48 -6.14 1.19

1027 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+0.9


nM

TEMP1+1.35 MR1 27.94 -1.14 -0.30 -5.99 -0.78

1028 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+0.9


TEMP1+1.35 MR1 27.93 -1.12 -0.30 -5.95 -0.78

1029 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+0.9


TEMP1+1.35 MR1 27.07 -0.73 0.06 -4.72 0.12

1030 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+0.9


di

TEMP1+1.35 MR1 27.06 -0.71 0.06 -4.68 0.12

1031 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+0.9


TEMP1+1.35 MR1 28.81 -1.62 0.11 -7.28 0.25

1032 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+0.9


a te

TEMP1+1.35 MR1 28.80 -1.60 0.11 -7.24 0.25

1033 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 29.82 -1.51 0.44 -7.17 1.08

1034 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 29.81 -1.50 0.44 -7.13 1.08
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1035 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+-0.9
TEMP1+1.35 MR1 29.52 -1.40 -0.34 -6.98 -0.89

1036 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 29.51 -1.39 -0.34 -6.94 -0.89

Ed
1037 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+-0.9
TEMP1+1.35 MR1 28.65 -0.99 0.02 -5.71 0.02

1038 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 28.64 -0.97 0.02 -5.67 0.02

1039 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+-0.9

F
TEMP1+1.35 MR1 30.38 -1.88 0.07 -8.27 0.14

1040 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 30.38 -1.87 0.07 -8.23 0.15

PD
1041 1.148 DL1+1.5 LL1+0.9 WL1+1.5
EQUIP1+0.9 TEMP1+1.35 MR1 26.57 -1.36 0.48 -6.30 1.19

1042 1.148 DL1+1.5 LL1+0.9 WL2+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 26.57 -1.34 0.48 -6.27 1.19

1043 1.148 DL1+1.5 LL1+0.9 WL3+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 26.27 -1.24 -0.30 -6.11 -0.78
te r
1044 1.148 DL1+1.5 LL1+0.9 WL4+1.5
EQUIP1+0.9 TEMP1+1.35 MR1 26.27 -1.23 -0.30 -6.07 -0.78

1045 1.148 DL1+1.5 LL1+0.9 WL5+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 25.40 -0.83 0.06 -4.84 0.12
as

1046 1.148 DL1+1.5 LL1+0.9 WL6+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 25.40 -0.81 0.06 -4.81 0.12

1047 1.148 DL1+1.5 LL1+0.9 WL7+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 27.14 -1.73 0.11 -7.40 0.25
nM

1048 1.148 DL1+1.5 LL1+0.9 WL8+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 27.13 -1.71 0.11 -7.37 0.25

1049 1.148 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 28.15 -1.62 0.44 -7.30 1.08

1050 1.148 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 28.15 -1.60 0.44 -7.26 1.08
di

1051 1.148 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 27.85 -1.51 -0.34 -7.11 -0.89

1052 1.148 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 27.84 -1.49 -0.34 -7.07 -0.89
a te

1053 1.148 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 26.98 -1.09 0.02 -5.84 0.01

1054 1.148 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 26.98 -1.08 0.02 -5.80 0.01
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1055 1.148 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+-
0.9 TEMP1+1.35 MR1 28.72 -1.99 0.07 -8.40 0.14

1056 1.148 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 28.71 -1.97 0.07 -8.36 0.14

Ed
1057 1.148 DL1+1.5 LL1+1.5 WL1+1.5
EQUIP1+0.9 TEMP1+1.35 MR1 26.74 -1.42 0.74 -6.44 1.85

1058 1.148 DL1+1.5 LL1+1.5 WL2+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 26.73 -1.39 0.74 -6.38 1.85

1059 1.148 DL1+1.5 LL1+1.5 WL3+1.5

F
EQUIP1+0.9 TEMP1+1.35 MR1 26.23 -1.23 -0.56 -6.12 -1.44

1060 1.148 DL1+1.5 LL1+1.5 WL4+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 26.22 -1.21 -0.56 -6.06 -1.43

PD
1061 1.148 DL1+1.5 LL1+1.5 WL5+1.5
EQUIP1+0.9 TEMP1+1.35 MR1 24.79 -0.54 0.04 -4.01 0.07

1062 1.148 DL1+1.5 LL1+1.5 WL6+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 24.78 -0.52 0.04 -3.95 0.07

1063 1.148 DL1+1.5 LL1+1.5 WL7+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 27.68 -2.04 0.13 -8.27 0.29
te r
1064 1.148 DL1+1.5 LL1+1.5 WL8+1.5
EQUIP1+0.9 TEMP1+1.35 MR1 27.67 -2.01 0.13 -8.21 0.29

1065 1.148 DL1+1.5 LL1+1.5 WL1+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 28.32 -1.68 0.70 -7.43 1.74
as

1066 1.148 DL1+1.5 LL1+1.5 WL2+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 28.31 -1.66 0.70 -7.37 1.74

1067 1.148 DL1+1.5 LL1+1.5 WL3+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 27.81 -1.50 -0.60 -7.12 -1.54
nM

1068 1.148 DL1+1.5 LL1+1.5 WL4+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 27.80 -1.47 -0.60 -7.05 -1.54

1069 1.148 DL1+1.5 LL1+1.5 WL5+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 26.37 -0.81 0.00 -5.00 -0.04

1070 1.148 DL1+1.5 LL1+1.5 WL6+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 26.36 -0.78 0.00 -4.94 -0.04
di

1071 1.148 DL1+1.5 LL1+1.5 WL7+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 29.26 -2.30 0.08 -9.27 0.18

1072 1.148 DL1+1.5 LL1+1.5 WL8+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 29.25 -2.27 0.09 -9.20 0.18
a te

1073 1 DL1+0.8 LL1+1 SL1 10.68 0.63 -0.57 0.62 1.48

1074 1 DL1+0.8 LL1+1 SL2 10.56 0.62 -0.05 0.52 0.16

1075 1 DL1+0.8 LL1+-1 SL1 9.95 0.87 0.58 1.16 -1.45

1076 1 DL1+0.8 LL1+-1 SL2 10.08 0.88 0.06 1.26 -0.13


re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
2001 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+0.6
TEMP1+1 MR1 19.65 -0.78 0.32 -4.06 0.79

2002 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+0.6


TEMP1+1 MR1 19.65 -0.77 0.32 -4.03 0.79

Ed
2003 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+0.6
TEMP1+1 MR1 19.45 -0.71 -0.20 -3.93 -0.52

2004 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+0.6


TEMP1+1 MR1 19.45 -0.70 -0.20 -3.90 -0.52

2005 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+0.6

F
TEMP1+1 MR1 18.87 -0.43 0.04 -3.08 0.08

2006 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+0.6


TEMP1+1 MR1 18.87 -0.42 0.04 -3.06 0.08

PD
2007 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+0.6
TEMP1+1 MR1 20.03 -1.03 0.08 -4.79 0.17

2008 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+0.6


TEMP1+1 MR1 20.03 -1.02 0.08 -4.77 0.17

2009 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+-0.6


TEMP1+1 MR1 20.70 -0.96 0.29 -4.72 0.72
te r
2010 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+-0.6
TEMP1+1 MR1 20.70 -0.95 0.29 -4.69 0.72

2011 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+-0.6


TEMP1+1 MR1 20.50 -0.88 -0.23 -4.59 -0.59
as

2012 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+-0.6


TEMP1+1 MR1 20.50 -0.87 -0.23 -4.57 -0.59

2013 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+-0.6


TEMP1+1 MR1 19.92 -0.61 0.01 -3.75 0.01
nM

2014 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+-0.6


TEMP1+1 MR1 19.92 -0.60 0.01 -3.72 0.01

2015 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+-0.6


TEMP1+1 MR1 21.08 -1.20 0.05 -5.45 0.10

2016 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+-0.6


TEMP1+1 MR1 21.08 -1.19 0.05 -5.43 0.10
di

2017 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+0.6


TEMP1+1 MR1 19.76 -0.82 0.49 -4.15 1.23

2018 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+0.6


TEMP1+1 MR1 19.75 -0.81 0.50 -4.11 1.23
a te

2019 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+0.6


TEMP1+1 MR1 19.42 -0.70 -0.37 -3.94 -0.96

2020 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+0.6


TEMP1+1 MR1 19.42 -0.68 -0.37 -3.89 -0.95
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
2021 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+0.6
TEMP1+1 MR1 18.46 -0.24 0.03 -2.53 0.05

2022 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+0.6


TEMP1+1 MR1 18.45 -0.22 0.03 -2.49 0.05

Ed
2023 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+0.6
TEMP1+1 MR1 20.39 -1.24 0.09 -5.37 0.19

2024 1 DL1+1.0 LL1+1 WL8+1 EQUIP1+0.6


TEMP1+1 MR1 20.38 -1.22 0.09 -5.33 0.19

2025 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+-0.6

F
TEMP1+1 MR1 20.81 -1.00 0.47 -4.81 1.16

2026 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+-0.6


TEMP1+1 MR1 20.81 -0.98 0.47 -4.77 1.16

PD
2027 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+-0.6
TEMP1+1 MR1 20.48 -0.87 -0.40 -4.60 -1.03

2028 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+-0.6


TEMP1+1 MR1 20.47 -0.86 -0.40 -4.56 -1.02

2029 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+-0.6


TEMP1+1 MR1 19.51 -0.42 0.00 -3.19 -0.02
te r
2030 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+-0.6
TEMP1+1 MR1 19.51 -0.40 0.00 -3.15 -0.02

2031 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+-0.6


TEMP1+1 MR1 21.44 -1.41 0.06 -6.03 0.12
as

2032 1 DL1+0.7 LL1+1 WL8+1 EQUIP1+-0.6


TEMP1+1 MR1 21.44 -1.39 0.06 -5.99 0.12

2033 1 DL1+0.8 LL1+1 SL1 10.68 0.63 -0.57 0.62 1.48


nM

2034 1 DL1+0.8 LL1+1 SL2 10.56 0.62 -0.05 0.52 0.16

2035 1 DL1+0.8 LL1+-1 SL1 9.95 0.87 0.58 1.16 -1.45

2036 1 DL1+0.8 LL1+-1 SL2 10.08 0.88 0.06 1.26 -0.13

P36 500 1 DL1+1 LL1+1 EQUIP1 -4.72 -1.23 0.02 -4.91 0.04

501 1 DL1+1 LL1+1 EQUIP1+1 TEMP1 -4.01 -0.97 0.04 -4.09 0.10
di

502 1 DL1+1 WL1 4.14 -0.10 0.39 -0.38 1.02

503 1 DL1+1 WL2 4.15 -0.09 0.39 -0.35 1.02

504 1 DL1+1 WL3 3.39 -0.09 -0.38 -0.34 -0.99


a te

505 1 DL1+1 WL4 3.40 -0.08 -0.38 -0.31 -0.99

506 1 DL1+1 WL5 4.92 0.34 -0.03 1.02 -0.07

507 1 DL1+1 WL6 4.93 0.35 -0.03 1.05 -0.07

508 1 DL1+1 WL7 2.78 -0.46 0.03 -1.52 0.07


re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
509 1 DL1+1 WL8 2.80 -0.45 0.03 -1.49 0.07

510 1 DL1+0.7 WL1 4.05 -0.09 0.28 -0.34 0.72

511 1 DL1+0.7 WL2 4.06 -0.08 0.28 -0.32 0.72

Ed
512 1 DL1+0.7 WL3 3.52 -0.08 -0.27 -0.31 -0.69

513 1 DL1+0.7 WL4 3.53 -0.07 -0.26 -0.29 -0.69

514 1 DL1+0.7 WL5 4.59 0.22 -0.02 0.64 -0.04

515 1 DL1+0.7 WL6 4.60 0.23 -0.02 0.66 -0.04

F
516 1 DL1+0.7 WL7 3.10 -0.34 0.02 -1.14 0.05

517 1 DL1+0.7 WL8 3.11 -0.33 0.02 -1.12 0.06

PD
518 1 DL1+ 1LL1+0.75 WL1+1 EQUIP1 -4.49 -1.26 0.31 -5.01 0.79

519 1 DL1+1.0 LL1+0.75 WL2+1 EQUIP1 -4.48 -1.25 0.31 -4.99 0.79

520 1 DL1+1.0 LL1+0.75 WL3+1 EQUIP1 -5.05 -1.25 -0.27 -4.98 -0.71

521 1 DL1+1.0 LL1+0.75 WL4+1 EQUIP1 -5.04 -1.25 -0.27 -4.96 -0.71

522 1 DL1+1.0 LL1+0.75 WL5+1 EQUIP1 -3.90 -0.93 -0.01 -3.96 -0.02
te r
523 1 DL1+1.0 LL1+0.75 WL6+1 EQUIP1 -3.89 -0.93 -0.01 -3.93 -0.02

524 1 DL1+1.0 LL1+0.75 WL7+1 EQUIP1 -5.50 -1.53 0.04 -5.86 0.08

525 1 DL1+1.0 LL1+0.75 WL8+1 EQUIP1 -5.49 -1.52 0.04 -5.84 0.09
as

526 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL1 -4.49 -1.26 -0.27 -5.00 0.79

527 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL2 -4.56 -1.29 -0.01 -5.08 0.11

528 0.6 DL1+1 WL1 2.61 -0.08 0.39 -0.28 1.01


nM

529 0.6 DL1+1 WL2 2.62 -0.07 0.39 -0.25 1.01

530 0.6 DL1+1 WL3 1.85 -0.07 -0.39 -0.24 -1.00

531 0.6 DL1+1 WL4 1.87 -0.06 -0.38 -0.21 -0.99

532 0.6 DL1+1 WL5 3.39 0.36 -0.03 1.12 -0.07

533 0.6 DL1+1 WL6 3.40 0.37 -0.03 1.15 -0.07


di

534 0.6 DL1+1 WL7 1.25 -0.43 0.03 -1.42 0.07

535 0.6 DL1+1 WL8 1.26 -0.42 0.03 -1.39 0.07

536 0.6 DL1+0.7 SL1 2.61 -0.07 -0.38 -0.27 1.01


a te

537 0.6 DL1+0.7 SL2 2.51 -0.11 -0.04 -0.38 0.11

1001 1.35 DL1+1.5 LL1+1.5 EQUIP1+0.9 TEMP1 -7.01 -1.61 0.04 -6.59 0.11

1002 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 TEMP1 -8.29 -2.07 0.01 -8.06 0.00

1003 1.35 DL1+1.5 WL1+0.9 TEMP1 6.28 0.09 0.61 0.20 1.57
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1004 1.35 DL1+1.5 WL2+0.9 TEMP1 6.29 0.11 0.61 0.25 1.58

1005 1.35 DL1+1.5 WL3+0.9 TEMP1 5.15 0.11 -0.56 0.27 -1.43

1006 1.35 DL1+1.5 WL4+0.9 TEMP1 5.17 0.12 -0.55 0.31 -1.43

Ed
1007 1.35 DL1+1.5 WL5+0.9 TEMP1 7.45 0.75 -0.02 2.31 -0.05

1008 1.35 DL1+1.5 WL6+0.9 TEMP1 7.46 0.76 -0.02 2.35 -0.05

1009 1.35 DL1+1.5 WL7+0.9 TEMP1 4.24 -0.44 0.06 -1.50 0.16

1010 1.35 DL1+1.5 WL8+0.9 TEMP1 4.26 -0.43 0.06 -1.46 0.16

F
1011 1.35 DL1+1.5 WL1+-0.9 TEMP1 4.99 -0.37 0.57 -1.27 1.47

1012 1.35 DL1+1.5 WL2+-0.9 TEMP1 5.01 -0.36 0.57 -1.22 1.47

PD
1013 1.35 DL1+1.5 WL3+-0.9 TEMP1 3.86 -0.35 -0.59 -1.20 -1.54

1014 1.35 DL1+1.5 WL4+-0.9 TEMP1 3.88 -0.34 -0.59 -1.16 -1.53

1015 1.35 DL1+1.5 WL5+-0.9 TEMP1 6.16 0.29 -0.06 0.84 -0.15

1016 1.35 DL1+1.5 WL6+-0.9 TEMP1 6.18 0.30 -0.06 0.88 -0.15

1017 1.35 DL1+1.5 WL7+-0.9 TEMP1 2.96 -0.91 0.03 -2.97 0.05
te r
1018 1.35 DL1+1.5 WL8+-0.9 TEMP1 2.98 -0.89 0.03 -2.93 0.06

1019 1.35 DL1+0.9 TEMP1+1.35 MR1 5.80 0.15 0.03 0.39 0.07

1020 1.35 DL1+-0.9 TEMP1+1.35 MR1 4.52 -0.31 -0.01 -1.08 -0.04
as

1021 1.35 DL1+1.5LL1+1.5 EQUIP1+0.9


TEMP1+1.35 MR1 -7.02 -1.61 0.04 -6.61 0.11

1022 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 -8.31 -2.07 0.01 -8.07 0.00
nM

1023 1.148 DL1+1.5 LL1+1.5 EQUIP1+0.9


TEMP1+1.35 MR1 -7.80 -1.60 0.04 -6.56 0.11

1024 1.148 DL1+1.5 LL1+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 -9.08 -2.06 0.01 -8.03 0.00

1025 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+0.9


TEMP1+1.35 MR1 -6.75 -1.65 0.39 -6.73 1.01
di

1026 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+0.9


TEMP1+1.35 MR1 -6.74 -1.64 0.39 -6.70 1.01

1027 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+0.9


TEMP1+1.35 MR1 -7.43 -1.64 -0.31 -6.69 -0.80
a te

1028 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+0.9


TEMP1+1.35 MR1 -7.41 -1.63 -0.30 -6.66 -0.79

1029 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+0.9


TEMP1+1.35 MR1 -6.05 -1.25 0.02 -5.46 0.04

1030 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+0.9


re

TEMP1+1.35 MR1 -6.03 -1.24 0.02 -5.44 0.04


APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1031 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+0.9
TEMP1+1.35 MR1 -7.97 -1.97 0.07 -7.75 0.16

1032 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+0.9


TEMP1+1.35 MR1 -7.96 -1.96 0.07 -7.72 0.16

Ed
1033 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+-0.9
TEMP1+1.35 MR1 -8.03 -2.11 0.35 -8.19 0.91

1034 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 -8.02 -2.10 0.36 -8.17 0.91

1035 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+-0.9

F
TEMP1+1.35 MR1 -8.71 -2.10 -0.34 -8.16 -0.90

1036 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 -8.70 -2.09 -0.34 -8.13 -0.90

PD
1037 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+-0.9
TEMP1+1.35 MR1 -7.33 -1.71 -0.02 -6.93 -0.07

1038 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 -7.32 -1.71 -0.02 -6.90 -0.07

1039 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 -9.25 -2.43 0.03 -9.22 0.06
te r
1040 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+-0.9
TEMP1+1.35 MR1 -9.24 -2.42 0.03 -9.19 0.06

1041 1.148 DL1+1.5 LL1+0.9 WL1+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 -7.52 -1.64 0.39 -6.68 1.01
as

1042 1.148 DL1+1.5 LL1+0.9 WL2+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 -7.51 -1.63 0.39 -6.65 1.01

1043 1.148 DL1+1.5 LL1+0.9 WL3+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 -8.20 -1.63 -0.31 -6.64 -0.80
nM

1044 1.148 DL1+1.5 LL1+0.9 WL4+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 -8.19 -1.62 -0.31 -6.61 -0.79

1045 1.148 DL1+1.5 LL1+0.9 WL5+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 -6.82 -1.24 0.01 -5.41 0.03

1046 1.148 DL1+1.5 LL1+0.9 WL6+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 -6.81 -1.23 0.01 -5.39 0.04
di

1047 1.148 DL1+1.5 LL1+0.9 WL7+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 -8.74 -1.96 0.06 -7.70 0.16

1048 1.148 DL1+1.5 LL1+0.9 WL8+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 -8.73 -1.95 0.07 -7.67 0.16
a te

1049 1.148 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 -8.80 -2.10 0.35 -8.14 0.90

1050 1.148 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 -8.79 -2.09 0.35 -8.12 0.90
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1051 1.148 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+-
0.9 TEMP1+1.35 MR1 -9.48 -2.09 -0.35 -8.11 -0.90

1052 1.148 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 -9.47 -2.08 -0.34 -8.08 -0.90

Ed
1053 1.148 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+-
0.9 TEMP1+1.35 MR1 -8.10 -1.70 -0.02 -6.88 -0.07

1054 1.148 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 -8.09 -1.69 -0.02 -6.86 -0.07

1055 1.148 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+- -

F
0.9 TEMP1+1.35 MR1 10.02 -2.42 0.03 -9.17 0.05

1056 1.148 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+- -


0.9 TEMP1+1.35 MR1 10.01 -2.41 0.03 -9.14 0.06

PD
1057 1.148 DL1+1.5 LL1+1.5 WL1+1.5
EQUIP1+0.9 TEMP1+1.35 MR1 -7.34 -1.66 0.62 -6.76 1.61

1058 1.148 DL1+1.5 LL1+1.5 WL2+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 -7.32 -1.65 0.62 -6.71 1.61

1059 1.148 DL1+1.5 LL1+1.5 WL3+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 -8.47 -1.64 -0.54 -6.69 -1.40
te r
1060 1.148 DL1+1.5 LL1+1.5 WL4+1.5
EQUIP1+0.9 TEMP1+1.35 MR1 -8.45 -1.63 -0.54 -6.65 -1.39

1061 1.148 DL1+1.5 LL1+1.5 WL5+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 -6.17 -1.00 -0.01 -4.65 -0.01
as

1062 1.148 DL1+1.5 LL1+1.5 WL6+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 -6.15 -0.99 0.00 -4.61 -0.01

1063 1.148 DL1+1.5 LL1+1.5 WL7+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 -9.37 -2.19 0.08 -8.46 0.19
nM

1064 1.148 DL1+1.5 LL1+1.5 WL8+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 -9.35 -2.18 0.08 -8.42 0.20

1065 1.148 DL1+1.5 LL1+1.5 WL1+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 -8.62 -2.12 0.59 -8.22 1.50

1066 1.148 DL1+1.5 LL1+1.5 WL2+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 -8.60 -2.11 0.59 -8.18 1.51
di

1067 1.148 DL1+1.5 LL1+1.5 WL3+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 -9.75 -2.10 -0.58 -8.16 -1.50

1068 1.148 DL1+1.5 LL1+1.5 WL4+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 -9.73 -2.09 -0.57 -8.12 -1.50
a te

1069 1.148 DL1+1.5 LL1+1.5 WL5+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 -7.45 -1.46 -0.04 -6.12 -0.12

1070 1.148 DL1+1.5 LL1+1.5 WL6+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 -7.43 -1.45 -0.04 -6.08 -0.12
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1071 1.148 DL1+1.5 LL1+1.5 WL7+1.5 EQUIP1+- -
0.9 TEMP1+1.35 MR1 10.65 -2.66 0.04 -9.93 0.09

1072 1.148 DL1+1.5 LL1+1.5 WL8+1.5 EQUIP1+- -


0.9 TEMP1+1.35 MR1 10.63 -2.64 0.04 -9.88 0.09

Ed
1073 1 DL1+0.8 LL1+1 SL1 4.36 -0.14 -0.54 -0.53 1.45

1074 1 DL1+0.8 LL1+1 SL2 4.22 -0.19 -0.04 -0.69 0.17

1075 1 DL1+0.8 LL1+-1 SL1 3.48 -0.03 0.56 -0.18 -1.41

1076 1 DL1+0.8 LL1+-1 SL2 3.62 0.02 0.07 -0.02 -0.12

F
2001 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+0.6
TEMP1+1 MR1 -4.12 -1.10 0.26 -4.51 0.68

PD
2002 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+0.6
TEMP1+1 MR1 -4.11 -1.10 0.26 -4.49 0.68

2003 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+0.6


TEMP1+1 MR1 -4.57 -1.10 -0.20 -4.48 -0.53

2004 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+0.6


TEMP1+1 MR1 -4.56 -1.09 -0.20 -4.47 -0.53
te r
2005 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+0.6
TEMP1+1 MR1 -3.65 -0.84 0.01 -3.67 0.03

2006 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+0.6


TEMP1+1 MR1 -3.64 -0.84 0.01 -3.65 0.03

2007 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+0.6


as

TEMP1+1 MR1 -4.93 -1.32 0.04 -5.19 0.11

2008 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+0.6


TEMP1+1 MR1 -4.92 -1.31 0.04 -5.17 0.11

2009 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+-0.6


nM

TEMP1+1 MR1 -4.97 -1.41 0.24 -5.49 0.61

2010 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+-0.6


TEMP1+1 MR1 -4.96 -1.41 0.24 -5.47 0.61

2011 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+-0.6


TEMP1+1 MR1 -5.42 -1.41 -0.23 -5.46 -0.60

2012 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+-0.6


di

TEMP1+1 MR1 -5.42 -1.40 -0.23 -5.45 -0.60

2013 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+-0.6


TEMP1+1 MR1 -4.50 -1.15 -0.01 -4.65 -0.05
a te

2014 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+-0.6


TEMP1+1 MR1 -4.50 -1.14 -0.01 -4.63 -0.04

2015 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+-0.6


TEMP1+1 MR1 -5.78 -1.63 0.02 -6.17 0.04

2016 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+-0.6


TEMP1+1 MR1 -5.78 -1.62 0.02 -6.15 0.04
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
2017 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+0.6
TEMP1+1 MR1 -3.99 -1.12 0.42 -4.56 1.08

2018 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+0.6


TEMP1+1 MR1 -3.98 -1.11 0.42 -4.53 1.08

Ed
2019 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+0.6
TEMP1+1 MR1 -4.75 -1.11 -0.36 -4.52 -0.93

2020 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+0.6


TEMP1+1 MR1 -4.73 -1.10 -0.36 -4.49 -0.93

2021 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+0.6

F
TEMP1+1 MR1 -3.21 -0.68 0.00 -3.16 -0.01

2022 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+0.6


TEMP1+1 MR1 -3.20 -0.67 0.00 -3.13 0.00

PD
2023 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+0.6
TEMP1+1 MR1 -5.35 -1.48 0.05 -5.70 0.13

2024 1 DL1+1.0 LL1+1 WL8+1 EQUIP1+0.6


TEMP1+1 MR1 -5.34 -1.47 0.06 -5.67 0.13

2025 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+-0.6


TEMP1+1 MR1 -4.85 -1.43 0.39 -5.54 1.01
te r
2026 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+-0.6
TEMP1+1 MR1 -4.84 -1.42 0.39 -5.51 1.01

2027 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+-0.6


TEMP1+1 MR1 -5.60 -1.42 -0.38 -5.50 -1.00
as

2028 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+-0.6


TEMP1+1 MR1 -5.59 -1.41 -0.38 -5.47 -1.00

2029 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+-0.6


TEMP1+1 MR1 -4.07 -0.99 -0.03 -4.14 -0.08
nM

2030 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+-0.6


TEMP1+1 MR1 -4.06 -0.98 -0.03 -4.11 -0.07

2031 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+-0.6


TEMP1+1 MR1 -6.20 -1.78 0.03 -6.68 0.06

2032 1 DL1+0.7 LL1+1 WL8+1 EQUIP1+-0.6


TEMP1+1 MR1 -6.19 -1.78 0.03 -6.65 0.06
di

2033 1 DL1+0.8 LL1+1 SL1 4.36 -0.14 -0.54 -0.53 1.45

2034 1 DL1+0.8 LL1+1 SL2 4.22 -0.19 -0.04 -0.69 0.17

2035 1 DL1+0.8 LL1+-1 SL1 3.48 -0.03 0.56 -0.18 -1.41


a te

2036 1 DL1+0.8 LL1+-1 SL2 3.62 0.02 0.07 -0.02 -0.12

P37 500 1 DL1+1 LL1+1 EQUIP1 16.79 -0.42 0.07 -2.32 0.15

501 1 DL1+1 LL1+1 EQUIP1+1 TEMP1 15.57 -0.25 0.22 -1.70 0.49

502 1 DL1+1 WL1 7.26 0.03 0.34 -0.12 0.96


re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
503 1 DL1+1 WL2 7.28 0.04 0.33 -0.08 0.95

504 1 DL1+1 WL3 8.06 0.29 -0.33 0.31 -0.93

505 1 DL1+1 WL4 8.08 0.31 -0.34 0.34 -0.94

Ed
506 1 DL1+1 WL5 6.79 0.81 -0.04 1.92 -0.09

507 1 DL1+1 WL6 6.80 0.83 -0.05 1.95 -0.10

508 1 DL1+1 WL7 8.35 -0.46 0.01 -1.58 0.04

509 1 DL1+1 WL8 8.36 -0.44 0.00 -1.54 0.03

F
510 1 DL1+0.7 WL1 7.37 0.08 0.23 -0.02 0.67

511 1 DL1+0.7 WL2 7.39 0.09 0.23 0.00 0.66

PD
512 1 DL1+0.7 WL3 7.94 0.26 -0.24 0.27 -0.66

513 1 DL1+0.7 WL4 7.95 0.27 -0.24 0.30 -0.66

514 1 DL1+0.7 WL5 7.04 0.63 -0.04 1.40 -0.07

515 1 DL1+0.7 WL6 7.05 0.64 -0.04 1.42 -0.08

516 1 DL1+0.7 WL7 8.13 -0.26 0.00 -1.05 0.02


te r
517 1 DL1+0.7 WL8 8.15 -0.25 0.00 -1.02 0.01

518 1 DL1+ 1LL1+0.75 WL1+1 EQUIP1 16.51 -0.55 0.33 -2.55 0.89

519 1 DL1+1.0 LL1+0.75 WL2+1 EQUIP1 16.52 -0.54 0.33 -2.53 0.88
as

520 1 DL1+1.0 LL1+0.75 WL3+1 EQUIP1 17.11 -0.35 -0.17 -2.24 -0.53

521 1 DL1+1.0 LL1+0.75 WL4+1 EQUIP1 17.12 -0.34 -0.17 -2.21 -0.54

522 1 DL1+1.0 LL1+0.75 WL5+1 EQUIP1 16.15 0.04 0.05 -1.03 0.10
nM

523 1 DL1+1.0 LL1+0.75 WL6+1 EQUIP1 16.16 0.05 0.04 -1.00 0.09

524 1 DL1+1.0 LL1+0.75 WL7+1 EQUIP1 17.32 -0.91 0.09 -3.65 0.20

525 1 DL1+1.0 LL1+0.75 WL8+1 EQUIP1 17.33 -0.90 0.08 -3.62 0.19

526 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL1 16.98 -0.54 -0.16 -2.56 0.81

527 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL2 16.90 -0.51 0.05 -2.56 0.21
di

528 0.6 DL1+1 WL1 4.21 -0.05 0.34 -0.19 0.97

529 0.6 DL1+1 WL2 4.22 -0.04 0.34 -0.16 0.96

530 0.6 DL1+1 WL3 5.01 0.22 -0.32 0.23 -0.92


a te

531 0.6 DL1+1 WL4 5.02 0.23 -0.33 0.26 -0.93

532 0.6 DL1+1 WL5 3.73 0.74 -0.04 1.84 -0.08

533 0.6 DL1+1 WL6 3.75 0.75 -0.04 1.87 -0.09

534 0.6 DL1+1 WL7 5.29 -0.53 0.02 -1.66 0.05


re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
535 0.6 DL1+1 WL8 5.31 -0.52 0.01 -1.62 0.04

536 0.6 DL1+0.7 SL1 4.84 -0.04 -0.32 -0.20 0.87

537 0.6 DL1+0.7 SL2 4.74 0.00 -0.04 -0.20 0.07

Ed
1001 1.35 DL1+1.5 LL1+1.5 EQUIP1+0.9 TEMP1 22.94 -0.51 0.24 -2.95 0.54

1002 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 TEMP1 25.13 -0.82 -0.03 -4.07 -0.08

1003 1.35 DL1+1.5 WL1+0.9 TEMP1 8.65 0.17 0.64 0.36 1.75

1004 1.35 DL1+1.5 WL2+0.9 TEMP1 8.67 0.19 0.64 0.41 1.74

F
1005 1.35 DL1+1.5 WL3+0.9 TEMP1 9.85 0.57 -0.36 0.99 -1.08

1006 1.35 DL1+1.5 WL4+0.9 TEMP1 9.88 0.59 -0.36 1.04 -1.09

PD
1007 1.35 DL1+1.5 WL5+0.9 TEMP1 7.94 1.35 0.07 3.40 0.18

1008 1.35 DL1+1.5 WL6+0.9 TEMP1 7.96 1.37 0.06 3.46 0.16

1009 1.35 DL1+1.5 WL7+0.9 TEMP1 10.28 -0.56 0.15 -1.84 0.37

1010 1.35 DL1+1.5 WL8+0.9 TEMP1 10.30 -0.54 0.14 -1.79 0.36

1011 1.35 DL1+1.5 WL1+-0.9 TEMP1 10.84 -0.14 0.37 -0.76 1.14
te r
1012 1.35 DL1+1.5 WL2+-0.9 TEMP1 10.87 -0.12 0.37 -0.71 1.12

1013 1.35 DL1+1.5 WL3+-0.9 TEMP1 12.05 0.26 -0.63 -0.13 -1.70

1014 1.35 DL1+1.5 WL4+-0.9 TEMP1 12.07 0.28 -0.64 -0.08 -1.71
as

1015 1.35 DL1+1.5 WL5+-0.9 TEMP1 10.13 1.04 -0.20 2.29 -0.44

1016 1.35 DL1+1.5 WL6+-0.9 TEMP1 10.15 1.06 -0.21 2.34 -0.46

1017 1.35 DL1+1.5 WL7+-0.9 TEMP1 12.47 -0.87 -0.12 -2.96 -0.25
nM

1018 1.35 DL1+1.5 WL8+-0.9 TEMP1 12.50 -0.85 -0.13 -2.90 -0.26

1019 1.35 DL1+0.9 TEMP1+1.35 MR1 9.23 0.42 0.11 0.81 0.27

1020 1.35 DL1+-0.9 TEMP1+1.35 MR1 11.42 0.10 -0.16 -0.31 -0.34

1021 1.35 DL1+1.5LL1+1.5 EQUIP1+0.9


TEMP1+1.35 MR1 22.95 -0.51 0.24 -2.96 0.53

1022 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9


di

TEMP1+1.35 MR1 25.15 -0.82 -0.03 -4.08 -0.09

1023 1.148 DL1+1.5 LL1+1.5 EQUIP1+0.9


TEMP1+1.35 MR1 21.41 -0.55 0.24 -3.00 0.54
a te

1024 1.148 DL1+1.5 LL1+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 23.61 -0.86 -0.03 -4.12 -0.08

1025 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+0.9


TEMP1+1.35 MR1 22.61 -0.66 0.56 -3.24 1.42

1026 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+0.9


TEMP1+1.35 MR1 22.63 -0.65 0.55 -3.21 1.41
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1027 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+0.9
TEMP1+1.35 MR1 23.34 -0.42 -0.04 -2.86 -0.28

1028 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+0.9


TEMP1+1.35 MR1 23.35 -0.41 -0.05 -2.83 -0.29

Ed
1029 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+0.9
TEMP1+1.35 MR1 22.19 0.05 0.21 -1.41 0.47

1030 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+0.9


TEMP1+1.35 MR1 22.20 0.06 0.21 -1.38 0.46

1031 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+0.9

F
TEMP1+1.35 MR1 23.59 -1.10 0.26 -4.56 0.59

1032 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+0.9


TEMP1+1.35 MR1 23.61 -1.08 0.26 -4.53 0.58

PD
1033 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+-0.9
TEMP1+1.35 MR1 24.81 -0.97 0.29 -4.36 0.80

1034 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 24.82 -0.96 0.28 -4.33 0.79

1035 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 25.53 -0.73 -0.32 -3.98 -0.90
te r
1036 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+-0.9
TEMP1+1.35 MR1 25.55 -0.72 -0.32 -3.95 -0.91

1037 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 24.38 -0.26 -0.06 -2.53 -0.15
as

1038 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 24.39 -0.25 -0.06 -2.50 -0.15

1039 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 25.79 -1.41 -0.01 -5.68 -0.03
nM

1040 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 25.80 -1.39 -0.01 -5.65 -0.04

1041 1.148 DL1+1.5 LL1+0.9 WL1+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 21.07 -0.70 0.56 -3.28 1.42

1042 1.148 DL1+1.5 LL1+0.9 WL2+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 21.09 -0.69 0.56 -3.25 1.42
di

1043 1.148 DL1+1.5 LL1+0.9 WL3+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 21.79 -0.46 -0.04 -2.90 -0.28

1044 1.148 DL1+1.5 LL1+0.9 WL4+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 21.81 -0.45 -0.04 -2.87 -0.28
a te

1045 1.148 DL1+1.5 LL1+0.9 WL5+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 20.64 0.01 0.22 -1.45 0.48

1046 1.148 DL1+1.5 LL1+0.9 WL6+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 20.66 0.02 0.21 -1.42 0.47
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1047 1.148 DL1+1.5 LL1+0.9 WL7+1.5
EQUIP1+0.9 TEMP1+1.35 MR1 22.05 -1.13 0.27 -4.60 0.59

1048 1.148 DL1+1.5 LL1+0.9 WL8+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 22.06 -1.12 0.26 -4.57 0.59

Ed
1049 1.148 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+-
0.9 TEMP1+1.35 MR1 23.26 -1.01 0.29 -4.40 0.81

1050 1.148 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 23.28 -1.00 0.28 -4.37 0.80

1051 1.148 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+-

F
0.9 TEMP1+1.35 MR1 23.99 -0.77 -0.31 -4.02 -0.90

1052 1.148 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 24.00 -0.76 -0.32 -3.99 -0.90

PD
1053 1.148 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+-
0.9 TEMP1+1.35 MR1 22.84 -0.30 -0.05 -2.57 -0.14

1054 1.148 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 22.85 -0.29 -0.06 -2.54 -0.15

1055 1.148 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 24.24 -1.45 -0.01 -5.72 -0.02
te r
1056 1.148 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+-
0.9 TEMP1+1.35 MR1 24.26 -1.43 -0.01 -5.68 -0.03

1057 1.148 DL1+1.5 LL1+1.5 WL1+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 20.84 -0.80 0.77 -3.47 2.01
as

1058 1.148 DL1+1.5 LL1+1.5 WL2+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 20.87 -0.78 0.77 -3.41 2.00

1059 1.148 DL1+1.5 LL1+1.5 WL3+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 22.05 -0.40 -0.23 -2.84 -0.82
nM

1060 1.148 DL1+1.5 LL1+1.5 WL4+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 22.07 -0.38 -0.24 -2.78 -0.83

1061 1.148 DL1+1.5 LL1+1.5 WL5+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 20.13 0.38 0.20 -0.42 0.44

1062 1.148 DL1+1.5 LL1+1.5 WL6+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 20.16 0.40 0.19 -0.37 0.42
di

1063 1.148 DL1+1.5 LL1+1.5 WL7+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 22.47 -1.53 0.28 -5.66 0.63

1064 1.148 DL1+1.5 LL1+1.5 WL8+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 22.50 -1.50 0.27 -5.61 0.62
a te

1065 1.148 DL1+1.5 LL1+1.5 WL1+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 23.04 -1.11 0.50 -4.59 1.40

1066 1.148 DL1+1.5 LL1+1.5 WL2+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 23.06 -1.09 0.49 -4.53 1.38
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1067 1.148 DL1+1.5 LL1+1.5 WL3+1.5 EQUIP1+-
0.9 TEMP1+1.35 MR1 24.24 -0.71 -0.50 -3.95 -1.44

1068 1.148 DL1+1.5 LL1+1.5 WL4+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 24.27 -0.69 -0.51 -3.90 -1.45

Ed
1069 1.148 DL1+1.5 LL1+1.5 WL5+1.5 EQUIP1+-
0.9 TEMP1+1.35 MR1 22.32 0.07 -0.07 -1.54 -0.18

1070 1.148 DL1+1.5 LL1+1.5 WL6+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 22.35 0.09 -0.08 -1.49 -0.20

1071 1.148 DL1+1.5 LL1+1.5 WL7+1.5 EQUIP1+-

F
0.9 TEMP1+1.35 MR1 24.67 -1.84 0.01 -6.78 0.01

1072 1.148 DL1+1.5 LL1+1.5 WL8+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 24.69 -1.82 0.00 -6.73 0.00

PD
1073 1 DL1+0.8 LL1+1 SL1 9.73 0.07 -0.45 -0.15 1.25

1074 1 DL1+0.8 LL1+1 SL2 9.58 0.13 -0.05 -0.15 0.12

1075 1 DL1+0.8 LL1+-1 SL1 9.00 0.52 0.43 0.76 -1.27

1076 1 DL1+0.8 LL1+-1 SL2 9.15 0.46 0.04 0.76 -0.13


te r
2001 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+0.6
TEMP1+1 MR1 15.84 -0.42 0.37 -2.14 0.94

2002 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+0.6


TEMP1+1 MR1 15.85 -0.41 0.37 -2.12 0.94

2003 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+0.6


as

TEMP1+1 MR1 16.32 -0.26 -0.03 -1.89 -0.19

2004 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+0.6


TEMP1+1 MR1 16.33 -0.25 -0.03 -1.87 -0.20

2005 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+0.6


nM

TEMP1+1 MR1 15.56 0.05 0.14 -0.92 0.31

2006 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+0.6


TEMP1+1 MR1 15.57 0.06 0.14 -0.90 0.31

2007 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+0.6


TEMP1+1 MR1 16.49 -0.71 0.17 -3.02 0.39

2008 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+0.6


di

TEMP1+1 MR1 16.50 -0.70 0.17 -3.00 0.38

2009 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+-0.6


TEMP1+1 MR1 17.30 -0.63 0.19 -2.89 0.53
a te

2010 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+-0.6


TEMP1+1 MR1 17.31 -0.62 0.19 -2.87 0.53

2011 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+-0.6


TEMP1+1 MR1 17.79 -0.47 -0.21 -2.64 -0.60

2012 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+-0.6


TEMP1+1 MR1 17.80 -0.46 -0.21 -2.62 -0.61
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
2013 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+-0.6
TEMP1+1 MR1 17.02 -0.16 -0.04 -1.67 -0.10

2014 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+-0.6


TEMP1+1 MR1 17.03 -0.15 -0.04 -1.65 -0.11

Ed
2015 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+-0.6
TEMP1+1 MR1 17.96 -0.92 -0.01 -3.77 -0.02

2016 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+-0.6


TEMP1+1 MR1 17.97 -0.91 -0.01 -3.75 -0.03

2017 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+0.6

F
TEMP1+1 MR1 15.69 -0.49 0.51 -2.27 1.34

2018 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+0.6


TEMP1+1 MR1 15.71 -0.47 0.51 -2.23 1.33

PD
2019 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+0.6
TEMP1+1 MR1 16.49 -0.22 -0.16 -1.85 -0.55

2020 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+0.6


TEMP1+1 MR1 16.51 -0.21 -0.16 -1.81 -0.56

2021 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+0.6


TEMP1+1 MR1 15.21 0.30 0.13 -0.24 0.29
te r
2022 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+0.6
TEMP1+1 MR1 15.23 0.31 0.13 -0.20 0.28

2023 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+0.6


TEMP1+1 MR1 16.78 -0.97 0.18 -3.73 0.42
as

2024 1 DL1+1.0 LL1+1 WL8+1 EQUIP1+0.6


TEMP1+1 MR1 16.79 -0.96 0.18 -3.70 0.41

2025 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+-0.6


TEMP1+1 MR1 17.15 -0.69 0.33 -3.01 0.93
nM

2026 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+-0.6


TEMP1+1 MR1 17.17 -0.68 0.33 -2.98 0.92

2027 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+-0.6


TEMP1+1 MR1 17.96 -0.43 -0.34 -2.59 -0.97

2028 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+-0.6


TEMP1+1 MR1 17.97 -0.42 -0.34 -2.56 -0.97
di

2029 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+-0.6


TEMP1+1 MR1 16.68 0.09 -0.05 -0.98 -0.13

2030 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+-0.6


TEMP1+1 MR1 16.69 0.11 -0.06 -0.95 -0.14
a te

2031 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+-0.6


TEMP1+1 MR1 18.24 -1.18 0.00 -4.48 0.00

2032 1 DL1+0.7 LL1+1 WL8+1 EQUIP1+-0.6


TEMP1+1 MR1 18.25 -1.17 0.00 -4.44 -0.01
re

2033 1 DL1+0.8 LL1+1 SL1 9.73 0.07 -0.45 -0.15 1.25


APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
2034 1 DL1+0.8 LL1+1 SL2 9.58 0.13 -0.05 -0.15 0.12

2035 1 DL1+0.8 LL1+-1 SL1 9.00 0.52 0.43 0.76 -1.27

2036 1 DL1+0.8 LL1+-1 SL2 9.15 0.46 0.04 0.76 -0.13

Ed
P38 500 1 DL1+1 LL1+1 EQUIP1 -0.53 -0.45 -0.25 -2.39 -0.39

501 1 DL1+1 LL1+1 EQUIP1+1 TEMP1 -0.18 -0.16 -0.07 -1.50 0.00

502 1 DL1+1 WL1 5.34 -0.04 0.18 -0.22 0.69

503 1 DL1+1 WL2 5.40 -0.03 0.18 -0.19 0.69

F
504 1 DL1+1 WL3 4.79 -0.03 -0.43 -0.18 -1.06

505 1 DL1+1 WL4 4.84 -0.02 -0.43 -0.15 -1.07

PD
506 1 DL1+1 WL5 6.21 0.50 -0.13 1.44 -0.24

507 1 DL1+1 WL6 6.27 0.50 -0.14 1.46 -0.24

508 1 DL1+1 WL7 4.26 -0.52 -0.15 -1.67 -0.19

509 1 DL1+1 WL8 4.31 -0.51 -0.15 -1.65 -0.20

510 1 DL1+0.7 WL1 5.32 -0.03 0.09 -0.19 0.42


te r
511 1 DL1+0.7 WL2 5.36 -0.03 0.08 -0.17 0.42

512 1 DL1+0.7 WL3 4.93 -0.03 -0.34 -0.16 -0.81

513 1 DL1+0.7 WL4 4.97 -0.02 -0.35 -0.14 -0.81


as

514 1 DL1+0.7 WL5 5.93 0.34 -0.14 0.97 -0.23

515 1 DL1+0.7 WL6 5.97 0.35 -0.14 0.99 -0.23

516 1 DL1+0.7 WL7 4.56 -0.37 -0.15 -1.20 -0.20


nM

517 1 DL1+0.7 WL8 4.60 -0.36 -0.15 -1.19 -0.20

518 1 DL1+ 1LL1+0.75 WL1+1 EQUIP1 -0.47 -0.47 0.00 -2.47 0.30

519 1 DL1+1.0 LL1+0.75 WL2+1 EQUIP1 -0.42 -0.46 -0.01 -2.45 0.29

520 1 DL1+1.0 LL1+0.75 WL3+1 EQUIP1 -0.88 -0.46 -0.46 -2.44 -1.02

521 1 DL1+1.0 LL1+0.75 WL4+1 EQUIP1 -0.84 -0.46 -0.46 -2.42 -1.03
di

522 1 DL1+1.0 LL1+0.75 WL5+1 EQUIP1 0.19 -0.07 -0.24 -1.23 -0.40

523 1 DL1+1.0 LL1+0.75 WL6+1 EQUIP1 0.23 -0.06 -0.24 -1.21 -0.41

524 1 DL1+1.0 LL1+0.75 WL7+1 EQUIP1 -1.28 -0.83 -0.25 -3.56 -0.37
a te

525 1 DL1+1.0 LL1+0.75 WL8+1 EQUIP1 -1.24 -0.82 -0.25 -3.54 -0.38

526 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL1 -0.39 -0.49 -0.47 -2.52 0.27

527 1 DL1+1.0 LL1+1 EQUIP1+0.525 SL2 -0.38 -0.52 -0.27 -2.61 -0.32

528 0.6 DL1+1 WL1 3.24 -0.04 0.24 -0.17 0.78


re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
529 0.6 DL1+1 WL2 3.29 -0.03 0.23 -0.15 0.77

530 0.6 DL1+1 WL3 2.68 -0.03 -0.37 -0.13 -0.98

531 0.6 DL1+1 WL4 2.74 -0.02 -0.37 -0.11 -0.98

Ed
532 0.6 DL1+1 WL5 4.11 0.50 -0.08 1.48 -0.15

533 0.6 DL1+1 WL6 4.16 0.51 -0.08 1.51 -0.16

534 0.6 DL1+1 WL7 2.15 -0.51 -0.09 -1.62 -0.11

535 0.6 DL1+1 WL8 2.21 -0.51 -0.10 -1.60 -0.12

F
536 0.6 DL1+0.7 SL1 3.34 -0.06 -0.39 -0.24 0.74

537 0.6 DL1+0.7 SL2 3.36 -0.10 -0.12 -0.36 -0.04

PD
1001 1.35 DL1+1.5 LL1+1.5 EQUIP1+0.9 TEMP1 -1.26 -0.41 -0.19 -2.77 -0.20

1002 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9 TEMP1 -1.89 -0.93 -0.50 -4.37 -0.89

1003 1.35 DL1+1.5 WL1+0.9 TEMP1 7.54 0.20 0.45 0.49 1.42

1004 1.35 DL1+1.5 WL2+0.9 TEMP1 7.62 0.21 0.44 0.53 1.41

1005 1.35 DL1+1.5 WL3+0.9 TEMP1 6.70 0.22 -0.46 0.55 -1.22
te r
1006 1.35 DL1+1.5 WL4+0.9 TEMP1 6.79 0.23 -0.47 0.59 -1.22

1007 1.35 DL1+1.5 WL5+0.9 TEMP1 8.84 1.00 -0.02 2.97 0.03

1008 1.35 DL1+1.5 WL6+0.9 TEMP1 8.93 1.01 -0.03 3.01 0.02
as

1009 1.35 DL1+1.5 WL7+0.9 TEMP1 5.91 -0.52 -0.04 -1.69 0.09

1010 1.35 DL1+1.5 WL8+0.9 TEMP1 5.99 -0.51 -0.05 -1.65 0.08

1011 1.35 DL1+1.5 WL1+-0.9 TEMP1 6.91 -0.32 0.14 -1.10 0.73
nM

1012 1.35 DL1+1.5 WL2+-0.9 TEMP1 6.99 -0.31 0.13 -1.07 0.72

1013 1.35 DL1+1.5 WL3+-0.9 TEMP1 6.07 -0.30 -0.78 -1.05 -1.91

1014 1.35 DL1+1.5 WL4+-0.9 TEMP1 6.16 -0.29 -0.78 -1.01 -1.92

1015 1.35 DL1+1.5 WL5+-0.9 TEMP1 8.21 0.49 -0.34 1.37 -0.67

1016 1.35 DL1+1.5 WL6+-0.9 TEMP1 8.30 0.50 -0.34 1.41 -0.68
di

1017 1.35 DL1+1.5 WL7+-0.9 TEMP1 5.28 -1.03 -0.35 -3.29 -0.61

1018 1.35 DL1+1.5 WL8+-0.9 TEMP1 5.36 -1.02 -0.36 -3.25 -0.62

1019 1.35 DL1+0.9 TEMP1+1.35 MR1 7.42 0.24 -0.04 0.63 0.05
a te

1020 1.35 DL1+-0.9 TEMP1+1.35 MR1 6.79 -0.28 -0.35 -0.96 -0.64

1021 1.35 DL1+1.5LL1+1.5 EQUIP1+0.9


TEMP1+1.35 MR1 -1.26 -0.42 -0.19 -2.78 -0.20

1022 1.35 DL1+1.5 LL1+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 -1.89 -0.93 -0.51 -4.38 -0.90
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1023 1.148 DL1+1.5 LL1+1.5 EQUIP1+0.9
TEMP1+1.35 MR1 -2.32 -0.41 -0.17 -2.76 -0.16

1024 1.148 DL1+1.5 LL1+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 -2.95 -0.93 -0.48 -4.36 -0.86

Ed
1025 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+0.9
TEMP1+1.35 MR1 -1.19 -0.44 0.10 -2.87 0.61

1026 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+0.9


TEMP1+1.35 MR1 -1.14 -0.43 0.10 -2.85 0.61

1027 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+0.9

F
TEMP1+1.35 MR1 -1.69 -0.43 -0.45 -2.84 -0.97

1028 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+0.9


TEMP1+1.35 MR1 -1.64 -0.43 -0.45 -2.82 -0.97

PD
1029 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+0.9
TEMP1+1.35 MR1 -0.40 0.04 -0.19 -1.39 -0.22

1030 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+0.9


TEMP1+1.35 MR1 -0.36 0.05 -0.19 -1.37 -0.23

1031 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+0.9


TEMP1+1.35 MR1 -2.17 -0.87 -0.20 -4.18 -0.19
te r
1032 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+0.9
TEMP1+1.35 MR1 -2.12 -0.86 -0.20 -4.16 -0.19

1033 1.35 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 -1.82 -0.96 -0.21 -4.47 -0.08
as

1034 1.35 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 -1.77 -0.95 -0.22 -4.45 -0.09

1035 1.35 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 -2.32 -0.95 -0.76 -4.44 -1.66
nM

1036 1.35 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 -2.27 -0.94 -0.77 -4.42 -1.67

1037 1.35 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 -1.04 -0.48 -0.50 -2.98 -0.92

1038 1.35 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 -0.99 -0.47 -0.50 -2.96 -0.92
di

1039 1.35 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 -2.80 -1.39 -0.51 -5.78 -0.88

1040 1.35 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+-0.9


TEMP1+1.35 MR1 -2.75 -1.38 -0.51 -5.76 -0.89
a te

1041 1.148 DL1+1.5 LL1+0.9 WL1+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 -2.25 -0.44 0.13 -2.85 0.66

1042 1.148 DL1+1.5 LL1+0.9 WL2+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 -2.20 -0.43 0.12 -2.83 0.65
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1043 1.148 DL1+1.5 LL1+0.9 WL3+1.5
EQUIP1+0.9 TEMP1+1.35 MR1 -2.75 -0.43 -0.42 -2.82 -0.93

1044 1.148 DL1+1.5 LL1+0.9 WL4+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 -2.70 -0.42 -0.42 -2.80 -0.93

Ed
1045 1.148 DL1+1.5 LL1+0.9 WL5+1.5
EQUIP1+0.9 TEMP1+1.35 MR1 -1.47 0.04 -0.16 -1.36 -0.18

1046 1.148 DL1+1.5 LL1+0.9 WL6+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 -1.42 0.05 -0.16 -1.34 -0.19

1047 1.148 DL1+1.5 LL1+0.9 WL7+1.5

F
EQUIP1+0.9 TEMP1+1.35 MR1 -3.23 -0.87 -0.17 -4.16 -0.14

1048 1.148 DL1+1.5 LL1+0.9 WL8+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 -3.18 -0.86 -0.17 -4.14 -0.15

PD
1049 1.148 DL1+1.5 LL1+0.9 WL1+1.5 EQUIP1+-
0.9 TEMP1+1.35 MR1 -2.88 -0.96 -0.18 -4.45 -0.04

1050 1.148 DL1+1.5 LL1+0.9 WL2+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 -2.83 -0.95 -0.19 -4.43 -0.04

1051 1.148 DL1+1.5 LL1+0.9 WL3+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 -3.38 -0.95 -0.73 -4.41 -1.62
te r
1052 1.148 DL1+1.5 LL1+0.9 WL4+1.5 EQUIP1+-
0.9 TEMP1+1.35 MR1 -3.33 -0.94 -0.74 -4.39 -1.62

1053 1.148 DL1+1.5 LL1+0.9 WL5+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 -2.10 -0.48 -0.47 -2.96 -0.87
as

1054 1.148 DL1+1.5 LL1+0.9 WL6+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 -2.05 -0.47 -0.47 -2.94 -0.88

1055 1.148 DL1+1.5 LL1+0.9 WL7+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 -3.86 -1.39 -0.48 -5.76 -0.84
nM

1056 1.148 DL1+1.5 LL1+0.9 WL8+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 -3.81 -1.38 -0.49 -5.74 -0.84

1057 1.148 DL1+1.5 LL1+1.5 WL1+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 -2.20 -0.46 0.32 -2.91 1.20

1058 1.148 DL1+1.5 LL1+1.5 WL2+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 -2.12 -0.45 0.32 -2.88 1.19
di

1059 1.148 DL1+1.5 LL1+1.5 WL3+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 -3.04 -0.44 -0.59 -2.86 -1.43

1060 1.148 DL1+1.5 LL1+1.5 WL4+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 -2.95 -0.43 -0.60 -2.82 -1.44
a te

1061 1.148 DL1+1.5 LL1+1.5 WL5+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 -0.90 0.35 -0.15 -0.43 -0.19

1062 1.148 DL1+1.5 LL1+1.5 WL6+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 -0.81 0.36 -0.16 -0.40 -0.20
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1063 1.148 DL1+1.5 LL1+1.5 WL7+1.5
EQUIP1+0.9 TEMP1+1.35 MR1 -3.83 -1.17 -0.17 -5.09 -0.13

1064 1.148 DL1+1.5 LL1+1.5 WL8+1.5


EQUIP1+0.9 TEMP1+1.35 MR1 -3.75 -1.16 -0.18 -5.06 -0.14

Ed
1065 1.148 DL1+1.5 LL1+1.5 WL1+1.5 EQUIP1+-
0.9 TEMP1+1.35 MR1 -2.83 -0.97 0.01 -4.51 0.51

1066 1.148 DL1+1.5 LL1+1.5 WL2+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 -2.75 -0.96 0.00 -4.47 0.50

1067 1.148 DL1+1.5 LL1+1.5 WL3+1.5 EQUIP1+-

F
0.9 TEMP1+1.35 MR1 -3.67 -0.96 -0.90 -4.45 -2.13

1068 1.148 DL1+1.5 LL1+1.5 WL4+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 -3.58 -0.95 -0.91 -4.42 -2.13

PD
1069 1.148 DL1+1.5 LL1+1.5 WL5+1.5 EQUIP1+-
0.9 TEMP1+1.35 MR1 -1.53 -0.17 -0.46 -2.03 -0.89

1070 1.148 DL1+1.5 LL1+1.5 WL6+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 -1.44 -0.16 -0.47 -2.00 -0.90

1071 1.148 DL1+1.5 LL1+1.5 WL7+1.5 EQUIP1+-


0.9 TEMP1+1.35 MR1 -4.46 -1.69 -0.48 -6.69 -0.82
te r
1072 1.148 DL1+1.5 LL1+1.5 WL8+1.5 EQUIP1+-
0.9 TEMP1+1.35 MR1 -4.38 -1.68 -0.49 -6.65 -0.83

1073 1 DL1+0.8 LL1+1 SL1 6.13 -0.11 -0.62 -0.43 0.96


as

1074 1 DL1+0.8 LL1+1 SL2 6.15 -0.16 -0.24 -0.59 -0.16

1075 1 DL1+0.8 LL1+-1 SL1 5.59 0.05 0.24 0.07 -1.53

1076 1 DL1+0.8 LL1+-1 SL2 5.57 0.11 -0.15 0.23 -0.41

2001 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+0.6


nM

TEMP1+1 MR1 -0.27 -0.30 0.05 -1.93 0.39

2002 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+0.6


TEMP1+1 MR1 -0.23 -0.29 0.05 -1.91 0.38

2003 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+0.6


TEMP1+1 MR1 -0.60 -0.29 -0.31 -1.91 -0.67

2004 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+0.6


di

TEMP1+1 MR1 -0.57 -0.29 -0.32 -1.89 -0.67

2005 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+0.6


TEMP1+1 MR1 0.26 0.03 -0.14 -0.94 -0.17
a te

2006 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+0.6


TEMP1+1 MR1 0.29 0.03 -0.14 -0.92 -0.17

2007 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+0.6


TEMP1+1 MR1 -0.92 -0.58 -0.15 -2.80 -0.15

2008 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+0.6


TEMP1+1 MR1 -0.88 -0.58 -0.15 -2.79 -0.15
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
2009 1 DL1+1 LL1+0.6 WL1+1 EQUIP1+-0.6
TEMP1+1 MR1 -0.69 -0.64 -0.16 -2.99 -0.08

2010 1 DL1+1 LL1+0.6 WL2+1 EQUIP1+-0.6


TEMP1+1 MR1 -0.65 -0.64 -0.16 -2.98 -0.08

Ed
2011 1 DL1+1 LL1+0.6 WL3+1 EQUIP1+-0.6
TEMP1+1 MR1 -1.02 -0.64 -0.52 -2.97 -1.13

2012 1 DL1+1 LL1+0.6 WL4+1 EQUIP1+-0.6


TEMP1+1 MR1 -0.99 -0.63 -0.52 -2.96 -1.13

2013 1 DL1+1 LL1+0.6 WL5+1 EQUIP1+-0.6

F
TEMP1+1 MR1 -0.16 -0.32 -0.35 -2.00 -0.63

2014 1 DL1+1 LL1+0.6 WL6+1 EQUIP1+-0.6


TEMP1+1 MR1 -0.13 -0.32 -0.35 -1.99 -0.64

PD
2015 1 DL1+1 LL1+0.6 WL7+1 EQUIP1+-0.6
TEMP1+1 MR1 -1.34 -0.93 -0.35 -3.87 -0.61

2016 1 DL1+1 LL1+0.6 WL8+1 EQUIP1+-0.6


TEMP1+1 MR1 -1.31 -0.92 -0.36 -3.85 -0.61

2017 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+0.6


TEMP1+1 MR1 -0.23 -0.31 0.18 -1.97 0.75
te r
2018 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+0.6
TEMP1+1 MR1 -0.18 -0.30 0.18 -1.95 0.74

2019 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+0.6


TEMP1+1 MR1 -0.79 -0.30 -0.43 -1.93 -1.01
as

2020 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+0.6


TEMP1+1 MR1 -0.73 -0.29 -0.43 -1.91 -1.01

2021 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+0.6


TEMP1+1 MR1 0.64 0.23 -0.14 -0.32 -0.18
nM

2022 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+0.6


TEMP1+1 MR1 0.69 0.24 -0.14 -0.29 -0.19

2023 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+0.6


TEMP1+1 MR1 -1.32 -0.78 -0.15 -3.42 -0.14

2024 1 DL1+1.0 LL1+1 WL8+1 EQUIP1+0.6


TEMP1+1 MR1 -1.26 -0.78 -0.15 -3.40 -0.14
di

2025 1 DL1+1.0 LL1+1 WL1+1 EQUIP1+-0.6


TEMP1+1 MR1 -0.65 -0.65 -0.03 -3.03 0.29

2026 1 DL1+1.0 LL1+1 WL2+1 EQUIP1+-0.6


TEMP1+1 MR1 -0.60 -0.65 -0.03 -3.01 0.28
a te

2027 1 DL1+1.0 LL1+1 WL3+1 EQUIP1+-0.6


TEMP1+1 MR1 -1.21 -0.64 -0.64 -3.00 -1.47

2028 1 DL1+1.0 LL1+1 WL4+1 EQUIP1+-0.6


TEMP1+1 MR1 -1.16 -0.64 -0.64 -2.97 -1.47
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
2029 1 DL1+1.0 LL1+1 WL5+1 EQUIP1+-0.6
TEMP1+1 MR1 0.22 -0.12 -0.34 -1.38 -0.64

2030 1 DL1+1.0 LL1+1 WL6+1 EQUIP1+-0.6


TEMP1+1 MR1 0.27 -0.11 -0.35 -1.36 -0.65

Ed
2031 1 DL1+1.0 LL1+1 WL7+1 EQUIP1+-0.6
TEMP1+1 MR1 -1.74 -1.13 -0.36 -4.49 -0.60

2032 1 DL1+0.7 LL1+1 WL8+1 EQUIP1+-0.6


TEMP1+1 MR1 -1.68 -1.12 -0.36 -4.46 -0.61

2033 1 DL1+0.8 LL1+1 SL1 6.13 -0.11 -0.62 -0.43 0.96

F
2034 1 DL1+0.8 LL1+1 SL2 6.15 -0.16 -0.24 -0.59 -0.16

2035 1 DL1+0.8 LL1+-1 SL1 5.59 0.05 0.24 0.07 -1.53

PD
2036 1 DL1+0.8 LL1+-1 SL2 5.57 0.11 -0.15 0.23 -0.41

te r
as
nM
di
a te
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
Ed
F
PD
WATER TABLE AT -0.6M
te r
as
nM
di
a te
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
FOUNDATION DESIGN
FOUNDATION FOR PEDESTAL (P3) (P4) (P9) (P10) (P1) (P5) (P6) (P11) (P2) (P7)

Ed
(P8) (P12)-(Pile Capacity Check)
LOAD CASE: 508 1 DL1+1
508
W1L7
DL1+1 W L7

G E N E RA L PI L E C A P DI ME N SI O N S, PO SI T I O N
Concrete Density 2.5 ton/m 3 Pile ca p thickne ss 2.300 m
Soil Density 2 ton/m 3 Z cordinate of center of the pilecap -13.663 m
Grade of Concrete (Cylinder) C 30 X cordinate of center of the pilecap 4.838 m
Grade of Steel Fe 500 Le ngth a long a x is Z, L z 25.580 m
Level of Base of pilecap -5.1 m Le ngth a long a x is X, L x 13.898 m
Finished Ground level -0.6 m Area of base of pilecap, A 347.90 m2
Level of max water table -0.6 m

PE DE ST A L ( C O L U MN ) DI ME N SI O N S, PO SI T I O N S & L O A DS
C.G. of Pedestal Ped top P + W ped
Pedestal ID Lz-z (m) Lx-x (m) P (T) Hz (T) Mx (T-m) Hx (T) Mz (T-m)
Z X [Level of (T)

F
P3 1.250 1.250 -24.500 3.500 -5.100 456.23 -44.26 -175.76 1.03 -1.91 456.23
P4 1.250 1.250 -21.000 3.500 -5.100 270.03 -47.97 -196.79 -2.66 -4.65 270.03
P9 1.250 1.250 -24.500 9.500 -5.100 321.82 -47.42 -199.28 -0.53 -3.63 321.82
P10 1.600 1.600 -21.000 9.500 -5.100 272.77 -113.09 -543.39 -3.43 -7.90 272.77
P1 1.250 1.250 -15.800 0.000 -5.100 41.01 -27.41 -131.00 -4.29 -18.58 41.01
P5 1.250 1.250 -15.800 3.500 -5.100 -33.62 -47.18 -211.91 -1.41 -15.77 -33.62
P6 1.250 1.250 -12.000 3.500 -5.100 48.16 -58.43 -210.74 -2.36 -18.96 48.16

PD
P11 1.250 1.250 -12.000 9.500 -5.100 43.92 -47.85 -274.07 -2.97 -13.11 43.92
P2 1.250 1.250 -8.200 0.000 -5.100 19.38 -26.29 -129.96 -12.77 -62.35 19.38
P7 1.250 1.250 -8.200 3.500 -5.100 100.44 -50.92 -220.16 -13.44 -59.92 100.44
P8 1.250 1.250 -3.000 3.500 -5.100 -266.89 -44.73 -203.69 -4.75 -13.43 -266.89
P12 1.600 1.600 -3.000 9.500 -5.100 -186.37 -125.59 -600.33 -7.29 -30.38 -186.37

PI L E DE T A I L S
Number of Piles 73 CGz of Pile group -13.663 m
Diameter of Piles 760 mm CGx of Pile group 4.838 m
2
Compressive capacity of piles 192 T SUM[(Xi-Xc g)2] of Pile group 1277.601 m
2
Tensile capacity of piles 40 T SUM[(Zi-Zc g)2] of Pile group 3903.652 m
Shear capacity of piles 11.5 T

W eight of soil, W s oil 1565.55 T


W eight of footing, W f oot ing 400.08 T
Axial load due to [P+ W ped] 1086.87 T
Total axial Load 3052.50 T

Mz due to [Mz+(P+W ped)*ex ] 796.56 Ton-m Mx due to [Mx+(P+W ped)*ez] -19552.51 Ton-m
te r
Eccentricity between Pilecap and Pile group 0.00 mm Eccentricity between Pilecap and Pile group 0.00 mm
Mz due to pilecap and pile group eccentricity 0.00 Ton-m Mx due to pilecap and pile group eccentricity 0.00 Ton-m
Total Mz 796.56 Ton-m Total Mx -19552.51 Ton-m

Distance Distance P due to


from pile from pile Axial P due to P due to
Pile ID CGx CGz group CGx group CGz Load (T) Mx (T) Mz (T) Total P (T) Shear (T)
PCG-1-1 -1.48 -24.61 -6.32 -10.94 41.82 54.82 -3.94 92.69 9.36
PCG-1-2 -1.48 -22.17 -6.32 -8.51 41.82 42.63 -3.94 80.51 9.36
PCG-1-3 -1.48 -19.74 -6.32 -6.08 41.82 30.45 -3.94 68.33 9.36
PCG-1-4 -1.48 -17.31 -6.32 -3.65 41.82 18.27 -3.94 56.15 9.36
PCG-1-5 -1.48 -14.88 -6.32 -1.22 41.82 6.09 -3.94 43.97 9.36
as

PCG-1-6 -1.48 -12.45 -6.32 1.22 41.82 -6.09 -3.94 31.78 9.36
PCG-1-7 -1.48 -10.02 -6.32 3.65 41.82 -18.27 -3.94 19.60 9.36
PCG-1-8 -1.48 -7.58 -6.32 6.08 41.82 -30.45 -3.94 7.42 9.36
PCG-1-9 -1.48 -5.15 -6.32 8.51 41.82 -42.63 -3.94 -4.76 9.36
PCG-1-10 -1.48 -2.72 -6.32 10.94 41.82 -54.82 -3.94 -16.94 9.36
PCG-1-11 0.63 -25.82 -4.21 -12.16 41.82 60.91 -2.63 100.10 9.36
PCG-1-12 0.63 -23.39 -4.21 -9.73 41.82 48.73 -2.63 87.91 9.36
PCG-1-13 0.63 -20.96 -4.21 -7.30 41.82 36.54 -2.63 75.73 9.36
PCG-1-14 0.63 -18.53 -4.21 -4.86 41.82 24.36 -2.63 63.55 9.36
PCG-1-15 0.63 -16.09 -4.21 -2.43 41.82 12.18 -2.63 51.37 9.36
PCG-1-16 0.63 -13.66 -4.21 0.00 41.82 0.00 -2.63 39.19 9.36
PCG-1-17 0.63 -11.23 -4.21 2.43 41.82 -12.18 -2.63 27.01 9.36
PCG-1-18 0.63 -8.80 -4.21 4.86 41.82 -24.36 -2.63 14.83 9.36
nM

PCG-1-19 0.63 -6.37 -4.21 7.30 41.82 -36.54 -2.63 2.64 9.36
PCG-1-20 0.63 -3.93 -4.21 9.73 41.82 -48.73 -2.63 -9.54 9.36
PCG-1-21 0.63 -1.50 -4.21 12.16 41.82 -60.91 -2.63 -21.72 9.36
PCG-1-22 2.73 -24.61 -2.11 -10.94 41.82 54.82 -1.31 95.32 9.36
PCG-1-23 2.73 -22.17 -2.11 -8.51 41.82 42.63 -1.31 83.14 9.36
PCG-1-24 2.73 -19.74 -2.11 -6.08 41.82 30.45 -1.31 70.96 9.36
PCG-1-25 2.73 -17.31 -2.11 -3.65 41.82 18.27 -1.31 58.77 9.36
PCG-1-26 2.73 -14.88 -2.11 -1.22 41.82 6.09 -1.31 46.59 9.36
PCG-1-27 2.73 -12.45 -2.11 1.22 41.82 -6.09 -1.31 34.41 9.36
PCG-1-28 2.73 -10.02 -2.11 3.65 41.82 -18.27 -1.31 22.23 9.36
PCG-1-29 2.73 -7.58 -2.11 6.08 41.82 -30.45 -1.31 10.05 9.36
PCG-1-30 2.73 -5.15 -2.11 8.51 41.82 -42.63 -1.31 -2.13 9.36
PCG-1-31 2.73 -2.72 -2.11 10.94 41.82 -54.82 -1.31 -14.31 9.36
PCG-1-32 4.84 -25.82 0.00 -12.16 41.82 60.91 0.00 102.72 9.36
PCG-1-33 4.84 -23.39 0.00 -9.73 41.82 48.73 0.00 90.54 9.36
PCG-1-34 4.84 -20.96 0.00 -7.30 41.82 36.54 0.00 78.36 9.36
PCG-1-35 4.84 -18.53 0.00 -4.86 41.82 24.36 0.00 66.18 9.36
PCG-1-36 4.84 -16.09 0.00 -2.43 41.82 12.18 0.00 54.00 9.36
PCG-1-37 4.84 -13.66 0.00 0.00 41.82 0.00 0.00 41.82 9.36
di

PCG-1-38 4.84 -11.23 0.00 2.43 41.82 -12.18 0.00 29.63 9.36
PCG-1-39 4.84 -8.80 0.00 4.86 41.82 -24.36 0.00 17.45 9.36
PCG-1-40 4.84 -6.37 0.00 7.30 41.82 -36.54 0.00 5.27 9.36
PCG-1-41 4.84 -3.93 0.00 9.73 41.82 -48.73 0.00 -6.91 9.36
PCG-1-42 4.84 -1.50 0.00 12.16 41.82 -60.91 0.00 -19.09 9.36
PCG-1-43 6.94 -24.61 2.11 -10.94 41.82 54.82 1.31 97.94 9.36
PCG-1-44 6.94 -22.17 2.11 -8.51 41.82 42.63 1.31 85.76 9.36
PCG-1-45 6.94 -19.74 2.11 -6.08 41.82 30.45 1.31 73.58 9.36
PCG-1-46 6.94 -17.31 2.11 -3.65 41.82 18.27 1.31 61.40 9.36
PCG-1-47 6.94 -14.88 2.11 -1.22 41.82 6.09 1.31 49.22 9.36
PCG-1-48 6.94 -12.45 2.11 1.22 41.82 -6.09 1.31 37.04 9.36
PCG-1-49 6.94 -10.02 2.11 3.65 41.82 -18.27 1.31 24.86 9.36
PCG-1-50 6.94 -7.58 2.11 6.08 41.82 -30.45 1.31 12.67 9.36
a te

PCG-1-51 6.94 -5.15 2.11 8.51 41.82 -42.63 1.31 0.49 9.36
PCG-1-52 6.94 -2.72 2.11 10.94 41.82 -54.82 1.31 -11.69 9.36
PCG-1-53 9.05 -25.82 4.21 -12.16 41.82 60.91 2.63 105.35 9.36
PCG-1-54 9.05 -23.39 4.21 -9.73 41.82 48.73 2.63 93.17 9.36
PCG-1-55 9.05 -20.96 4.21 -7.30 41.82 36.54 2.63 80.99 9.36
PCG-1-56 9.05 -18.53 4.21 -4.86 41.82 24.36 2.63 68.80 9.36
PCG-1-57 9.05 -16.09 4.21 -2.43 41.82 12.18 2.63 56.62 9.36
PCG-1-58 9.05 -13.66 4.21 0.00 41.82 0.00 2.63 44.44 9.36
PCG-1-59 9.05 -11.23 4.21 2.43 41.82 -12.18 2.63 32.26 9.36
PCG-1-60 9.05 -8.80 4.21 4.86 41.82 -24.36 2.63 20.08 9.36
PCG-1-61 9.05 -6.37 4.21 7.30 41.82 -36.54 2.63 7.90 9.36
PCG-1-62 9.05 -3.93 4.21 9.73 41.82 -48.73 2.63 -4.28 9.36
PCG-1-63 9.05 -1.50 4.21 12.16 41.82 -60.91 2.63 -16.47 9.36
PCG-1-64 11.16 -24.61 6.32 -10.94 41.82 54.82 3.94 100.57 9.36
PCG-1-65 11.16 -22.17 6.32 -8.51 41.82 42.63 3.94 88.39 9.36
PCG-1-66 11.16 -19.74 6.32 -6.08 41.82 30.45 3.94 76.21 9.36
re

PCG-1-67 11.16 -17.31 6.32 -3.65 41.82 18.27 3.94 64.03 9.36
PCG-1-68 11.16 -14.88 6.32 -1.22 41.82 6.09 3.94 51.85 9.36
PCG-1-69 11.16 -12.45 6.32 1.22 41.82 -6.09 3.94 39.66 9.36
PCG-1-70 11.16 -10.02 6.32 3.65 41.82 -18.27 3.94 27.48 9.36
PCG-1-71 11.16 -7.58 6.32 6.08 41.82 -30.45 3.94 15.30 9.36
PCG-1-72 11.16 -5.15 6.32 8.51 41.82 -42.63 3.94 3.12 9.36
PCG-1-73 11.16 -2.72 6.32 10.94 41.82 -54.82 3.94 -9.06 9.36
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
F AC TOR OF SAF ETY F OR ALL LOAD C ASES ( Per mis s ible/ Ac tual)

Pile Reaction ALONG Z-Z ALONG X-X


Compressi pt at Shear pt at Shear

Ed
Load case pt at top pt at top Punching
on Tension Shear bottom stress bottom stress
500 1 DL1+1 LL1+12.11
EQUIP1
N/a 42.34 N/A N/A N/A N/A N/A N/A N/A
501 1 DL1+1 LL1+12.16
EQUIP1+1
N/a TEMP1 10.09 N/A N/A N/A N/A N/A N/A N/A
502 1 DL1+1 WL1 3.81 N/a 4.33 N/A N/A N/A N/A N/A N/A N/A
503 1 DL1+1 WL2 3.73 N/a 3.97 N/A N/A N/A N/A N/A N/A N/A
504 1 DL1+1 WL3 3.62 N/a 4.10 N/A N/A N/A N/A N/A N/A N/A
505 1 DL1+1 WL4 3.51 N/a 4.50 N/A N/A N/A N/A N/A N/A N/A
506 1 DL1+1 WL5 1.75 1.55 1.24 N/A N/A N/A N/A N/A N/A N/A
507 1 DL1+1 WL6 1.72 1.57 1.24 N/A N/A N/A N/A N/A N/A N/A
508 1 DL1+1 WL7 1.82 1.84 1.23 N/A N/A N/A N/A N/A N/A N/A

F
509 1 DL1+1 WL8 1.81 1.98 1.23 N/A N/A N/A N/A N/A N/A N/A
510 1 DL1+0.7 WL13.82 N/a 6.24 N/A N/A N/A N/A N/A N/A N/A
511 1 DL1+0.7 WL23.77 N/a 5.72 N/A N/A N/A N/A N/A N/A N/A
512 1 DL1+0.7 WL33.63 N/a 5.79 N/A N/A N/A N/A N/A N/A N/A

PD
513 1 DL1+0.7 WL43.55 N/a 6.36 N/A N/A N/A N/A N/A N/A N/A
514 1 DL1+0.7 WL52.09 5.95 1.77 N/A N/A N/A N/A N/A N/A N/A
515 1 DL1+0.7 WL62.05 6.16 1.77 N/A N/A N/A N/A N/A N/A N/A
516 1 DL1+0.7 WL72.18 13.95 1.75 N/A N/A N/A N/A N/A N/A N/A
517 1 DL1+0.7 WL82.17 22.47 1.75 N/A N/A N/A N/A N/A N/A N/A
518 1 DL1+ 1LL1+0.75
2.21WL1+1
N/a EQUIP1 5.95 N/A N/A N/A N/A N/A N/A N/A
519 1 DL1+1.0 LL1+0.75
2.17 N/a
WL2+1 EQUIP1 5.45 N/A N/A N/A N/A N/A N/A N/A
520 1 DL1+1.0 LL1+0.75
2.11 N/a
WL3+1 EQUIP1 5.25 N/A N/A N/A N/A N/A N/A N/A
521 1 DL1+1.0 LL1+0.75
2.08 N/a
WL4+1 EQUIP1 5.74 N/A N/A N/A N/A N/A N/A N/A
522 1 DL1+1.0 LL1+0.75
1.47 WL5+115.29
EQUIP1 1.69 N/A N/A N/A N/A N/A N/A N/A
523 1 DL1+1.0 LL1+0.75
1.46 WL6+117.11
EQUIP1 1.69 N/A N/A N/A N/A N/A N/A N/A
te r
524 1 DL1+1.0 LL1+0.75
1.59 N/a
WL7+1 EQUIP1 1.59 N/A N/A N/A N/A N/A N/A N/A
525 1 DL1+1.0 LL1+0.75
1.58 N/a
WL8+1 EQUIP1 1.60 N/A N/A N/A N/A N/A N/A N/A
526 1 DL1+1.0 LL1+11.91
EQUIP1+0.525
N/a SL1 4.47 N/A N/A N/A N/A N/A N/A N/A
527 1 DL1+1.0 LL1+11.95
EQUIP1+0.525
N/a SL2 4.18 N/A N/A N/A N/A N/A N/A N/A
528 0.6 DL1+1 WL14.64 N/a 4.28 N/A N/A N/A N/A N/A N/A N/A
529 0.6 DL1+1 WL24.54 N/a 3.93 N/A N/A N/A N/A N/A N/A N/A
530 0.6 DL1+1 WL34.37 N/a 4.14 N/A N/A N/A N/A N/A N/A N/A
531 0.6 DL1+1 WL44.23 N/a 4.55 N/A N/A N/A N/A N/A N/A N/A
as

532 0.6 DL1+1 WL51.91 1.33 1.23 N/A N/A N/A N/A N/A N/A N/A
533 0.6 DL1+1 WL61.87 1.35 1.23 N/A N/A N/A N/A N/A N/A N/A
534 0.6 DL1+1 WL71.97 1.46 1.23 N/A N/A N/A N/A N/A N/A N/A
535 0.6 DL1+1 WL81.96 1.55 1.23 N/A N/A N/A N/A N/A N/A N/A
536 0.6 DL1+0.7 SL13.25 N/a 3.57 N/A N/A N/A N/A N/A N/A N/A
537 0.6 DL1+0.7 SL23.31 N/a 3.40 N/A N/A N/A N/A N/A N/A N/A
1001 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1 N/A N/A N/A N/A N/A N/A N/A
nM

1002 1.35 DL1+1.5


N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1N/A N/A N/A N/A N/A N/A N/A
1003 1.35 DL1+1.5
N/a WL1+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1004 1.35 DL1+1.5
N/a WL2+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1005 1.35 DL1+1.5
N/a WL3+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1006 1.35 DL1+1.5
N/a WL4+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1007 1.35 DL1+1.5
N/a WL5+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1008 1.35 DL1+1.5
N/a WL6+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1009 1.35 DL1+1.5
N/a WL7+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1010 1.35 DL1+1.5
N/a WL8+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1011 1.35 DL1+1.5
N/a WL1+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1012 1.35 DL1+1.5
N/a WL2+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
di

1013 1.35 DL1+1.5


N/a WL3+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1014 1.35 DL1+1.5
N/a WL4+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1015 1.35 DL1+1.5
N/a WL5+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1016 1.35 DL1+1.5
N/a WL6+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1017 1.35 DL1+1.5
N/a WL7+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1018 1.35 DL1+1.5
N/a WL8+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1019 1.35 DL1+0.9
N/a TEMP1+1.35
N/a MR1
N/a N/A N/A N/A N/A N/A N/A N/A
a te

1020 1.35 DL1+-0.9


N/a TEMP1+1.35
N/a MR1
N/a N/A N/A N/A N/A N/A N/A N/A
1021 1.35 DL1+1.5LL1+1.5
N/a N/aEQUIP1+0.9
N/a TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A N/A
1022 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1023 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1024 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1028 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1029 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

Ed
1030 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1031 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1032 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1033 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1034 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1035 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1036 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1037 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1038 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1039 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1040 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1041 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

F
1042 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1043 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1044 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1045 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1046 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

PD
1047 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1048 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1049 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1050 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1051 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1052 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1053 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1054 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1055 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1056 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1057 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1058 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1059 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1060 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
te r
1061 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1062 1.148 DL1+1.5
N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1063 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1064 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1065 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1066 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1067 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1068 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1069 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
as

1070 1.148 DL1+1.5


N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1071 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1072 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1073 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1074 1 DL1+0.8
N/a LL1+1 SL2
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1075 1 DL1+0.8
N/a LL1+-1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1076 1 DL1+0.8
N/a LL1+-1 SL2
N/a N/a N/A N/A N/A N/A N/A N/A N/A
2001 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
nM

2002 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2003 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2004 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2005 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2006 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2007 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2008 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2009 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2010 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2011 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2012 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2013 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2014 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2015 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
di

2016 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2017 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2018 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2019 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2020 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2021 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2022 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2023 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
a te

2024 1 DL1+1.0
N/a LL1+1 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2025 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2026 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2027 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2028 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2029 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2030 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2031 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2032 1 DL1+0.7
N/a LL1+1 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2033 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
FOUNDATION FOR PEDESTAL (P3) (P4) (P9) (P10) (P1) (P5) (P6) (P11) (P2) (P7)
(P8) (P12)-(Pilecap Design)

Ed
LOAD CASE: 1062 1.1481062
DL1+1.5
1.148
LL1+1.5
DL1+1.05
W L6+1.5
LL1+1.5
EQUIP1+0.9
W L6+1.05 TEMP1+1.35
EQUIP1+0.9 TEMP1+1.35
MR1 MR1

G E N E RA L PI L E C A P DI ME N SI O N S, PO SI T I O N
Concrete Density 2.5 ton/m 3 Pile ca p thickne ss 2.300 m
Soil Density 2 ton/m 3 Z cordinate of center of the pilecap -13.663 m
Grade of Concrete (Cylinder) C 30 X cordinate of center of the pilecap 4.838 m
Grade of Steel Fe 500 Le ngth a long a x is Z, L z 25.580 m
Level of Base of pilecap -5.1 m Le ngth a long a x is X, L x 13.898 m
Finished Ground level -0.6 m Area of base of pilecap, A 347.90 m2
Level of max water table -0.6 m

PE DE ST A L ( C O L U MN ) DI ME N SI O N S, PO SI T I O N S & L O A DS
C.G. of Pedestal Ped top P + W ped
Pedestal ID Lz-z (m) Lx-x (m) P (T) Hz (T) Mx (T-m) Hx (T) Mz (T-m)
Z X [Level of (T)

F
P3 1.250 1.250 -24.500 3.500 -5.100 -425.79 57.11 229.21 -5.30 -13.37 -425.79
P4 1.250 1.250 -21.000 3.500 -5.100 -35.92 63.58 265.65 -13.89 -56.87 -35.92
P9 1.250 1.250 -24.500 9.500 -5.100 -111.29 58.66 248.83 2.57 10.57 -111.29
P10 1.600 1.600 -21.000 9.500 -5.100 541.50 151.20 713.61 -25.21 -106.69 541.50
P1 1.250 1.250 -15.800 0.000 -5.100 226.19 40.85 198.90 -21.63 -107.13 226.19
P5 1.250 1.250 -15.800 3.500 -5.100 318.09 72.16 313.96 -21.17 -91.32 318.09
P6 1.250 1.250 -12.000 3.500 -5.100 280.53 91.60 330.32 -20.00 -105.79 280.53

PD
P11 1.250 1.250 -12.000 9.500 -5.100 361.88 67.98 387.64 -16.49 -74.70 361.88
P2 1.250 1.250 -8.200 0.000 -5.100 272.79 47.33 229.63 -7.69 -35.26 272.79
P7 1.250 1.250 -8.200 3.500 -5.100 110.41 81.96 363.41 -1.54 -18.95 110.41
P8 1.250 1.250 -3.000 3.500 -5.100 903.01 80.73 361.61 -4.29 -20.70 903.01
P12 1.600 1.600 -3.000 9.500 -5.100 1325.71 187.39 911.42 -4.75 3.20 1325.71

PI L E DE T A I L S
Number of Piles 73 CGz of Pile group -13.663 m
Diameter of Piles 760 mm CGx of Pile group 4.838 m
2
Compressive capacity of piles 192 T SUM[(Xi-Xc g)2] of Pile group 1277.601 m
2
Tensile capacity of piles 40 T SUM[(Zi-Zc g)2] of Pile group 3903.652 m
Shear capacity of piles 11.5 T

W eight of soil, W s oil 2113.49 T


W eight of footing, W f oot ing 540.11 T
Axial load due to [P+ W ped] 3767.11 T
Total axial Load 6420.71 T

Mz due to [Mz+(P+W ped)*ex ] 5302.94 Ton-m Mx due to [Mx+(P+W ped)*ez] 32428.58 Ton-m
te r
Eccentricity between Pilecap and Pile group 0.00 mm Eccentricity between Pilecap and Pile group 0.00 mm
Mz due to pilecap and pile group eccentricity 0.00 Ton-m Mx due to pilecap and pile group eccentricity 0.00 Ton-m
Total Mz 5302.94 Ton-m Total Mx 32428.58 Ton-m

Distance Distance P due to


from pile from pile Axial P due to P due to
Pile ID CGx CGz group CGx group CGz Load (T) Mx (T) Mz (T) Total P (T) Shear (T)
PCG-1-1 -1.48 -24.61 -6.32 -10.94 87.95 -90.91 -26.23 -29.19 13.84
PCG-1-2 -1.48 -22.17 -6.32 -8.51 87.95 -70.71 -26.23 -8.98 13.84
PCG-1-3 -1.48 -19.74 -6.32 -6.08 87.95 -50.51 -26.23 11.22 13.84
PCG-1-4 -1.48 -17.31 -6.32 -3.65 87.95 -30.30 -26.23 31.42 13.84
PCG-1-5 -1.48 -14.88 -6.32 -1.22 87.95 -10.10 -26.23 51.63 13.84
as

PCG-1-6 -1.48 -12.45 -6.32 1.22 87.95 10.10 -26.23 71.83 13.84
PCG-1-7 -1.48 -10.02 -6.32 3.65 87.95 30.30 -26.23 92.03 13.84
PCG-1-8 -1.48 -7.58 -6.32 6.08 87.95 50.51 -26.23 112.23 13.84
PCG-1-9 -1.48 -5.15 -6.32 8.51 87.95 70.71 -26.23 132.44 13.84
PCG-1-10 -1.48 -2.72 -6.32 10.94 87.95 90.91 -26.23 152.64 13.84
PCG-1-11 0.63 -25.82 -4.21 -12.16 87.95 -101.02 -17.48 -30.54 13.84
PCG-1-12 0.63 -23.39 -4.21 -9.73 87.95 -80.81 -17.48 -10.34 13.84
PCG-1-13 0.63 -20.96 -4.21 -7.30 87.95 -60.61 -17.48 9.86 13.84
PCG-1-14 0.63 -18.53 -4.21 -4.86 87.95 -40.41 -17.48 30.07 13.84
PCG-1-15 0.63 -16.09 -4.21 -2.43 87.95 -20.20 -17.48 50.27 13.84
PCG-1-16 0.63 -13.66 -4.21 0.00 87.95 0.00 -17.48 70.47 13.84
PCG-1-17 0.63 -11.23 -4.21 2.43 87.95 20.20 -17.48 90.68 13.84
PCG-1-18 0.63 -8.80 -4.21 4.86 87.95 40.41 -17.48 110.88 13.84
nM

PCG-1-19 0.63 -6.37 -4.21 7.30 87.95 60.61 -17.48 131.08 13.84
PCG-1-20 0.63 -3.93 -4.21 9.73 87.95 80.81 -17.48 151.29 13.84
PCG-1-21 0.63 -1.50 -4.21 12.16 87.95 101.02 -17.48 171.49 13.84
PCG-1-22 2.73 -24.61 -2.11 -10.94 87.95 -90.91 -8.74 -11.70 13.84
PCG-1-23 2.73 -22.17 -2.11 -8.51 87.95 -70.71 -8.74 8.50 13.84
PCG-1-24 2.73 -19.74 -2.11 -6.08 87.95 -50.51 -8.74 28.71 13.84
PCG-1-25 2.73 -17.31 -2.11 -3.65 87.95 -30.30 -8.74 48.91 13.84
PCG-1-26 2.73 -14.88 -2.11 -1.22 87.95 -10.10 -8.74 69.11 13.84
PCG-1-27 2.73 -12.45 -2.11 1.22 87.95 10.10 -8.74 89.32 13.84
PCG-1-28 2.73 -10.02 -2.11 3.65 87.95 30.30 -8.74 109.52 13.84
PCG-1-29 2.73 -7.58 -2.11 6.08 87.95 50.51 -8.74 129.72 13.84
PCG-1-30 2.73 -5.15 -2.11 8.51 87.95 70.71 -8.74 149.92 13.84
PCG-1-31 2.73 -2.72 -2.11 10.94 87.95 90.91 -8.74 170.13 13.84
PCG-1-32 4.84 -25.82 0.00 -12.16 87.95 -101.02 0.00 -13.06 13.84
PCG-1-33 4.84 -23.39 0.00 -9.73 87.95 -80.81 0.00 7.14 13.84
PCG-1-34 4.84 -20.96 0.00 -7.30 87.95 -60.61 0.00 27.35 13.84
PCG-1-35 4.84 -18.53 0.00 -4.86 87.95 -40.41 0.00 47.55 13.84
PCG-1-36 4.84 -16.09 0.00 -2.43 87.95 -20.20 0.00 67.75 13.84
PCG-1-37 4.84 -13.66 0.00 0.00 87.95 0.00 0.00 87.95 13.84
di

PCG-1-38 4.84 -11.23 0.00 2.43 87.95 20.20 0.00 108.16 13.84
PCG-1-39 4.84 -8.80 0.00 4.86 87.95 40.41 0.00 128.36 13.84
PCG-1-40 4.84 -6.37 0.00 7.30 87.95 60.61 0.00 148.56 13.84
PCG-1-41 4.84 -3.93 0.00 9.73 87.95 80.81 0.00 168.77 13.84
PCG-1-42 4.84 -1.50 0.00 12.16 87.95 101.02 0.00 188.97 13.84
PCG-1-43 6.94 -24.61 2.11 -10.94 87.95 -90.91 8.74 5.78 13.84
PCG-1-44 6.94 -22.17 2.11 -8.51 87.95 -70.71 8.74 25.99 13.84
PCG-1-45 6.94 -19.74 2.11 -6.08 87.95 -50.51 8.74 46.19 13.84
PCG-1-46 6.94 -17.31 2.11 -3.65 87.95 -30.30 8.74 66.39 13.84
PCG-1-47 6.94 -14.88 2.11 -1.22 87.95 -10.10 8.74 86.59 13.84
PCG-1-48 6.94 -12.45 2.11 1.22 87.95 10.10 8.74 106.80 13.84
PCG-1-49 6.94 -10.02 2.11 3.65 87.95 30.30 8.74 127.00 13.84
PCG-1-50 6.94 -7.58 2.11 6.08 87.95 50.51 8.74 147.20 13.84
a te

PCG-1-51 6.94 -5.15 2.11 8.51 87.95 70.71 8.74 167.41 13.84
PCG-1-52 6.94 -2.72 2.11 10.94 87.95 90.91 8.74 187.61 13.84
PCG-1-53 9.05 -25.82 4.21 -12.16 87.95 -101.02 17.48 4.42 13.84
PCG-1-54 9.05 -23.39 4.21 -9.73 87.95 -80.81 17.48 24.62 13.84
PCG-1-55 9.05 -20.96 4.21 -7.30 87.95 -60.61 17.48 44.83 13.84
PCG-1-56 9.05 -18.53 4.21 -4.86 87.95 -40.41 17.48 65.03 13.84
PCG-1-57 9.05 -16.09 4.21 -2.43 87.95 -20.20 17.48 85.23 13.84
PCG-1-58 9.05 -13.66 4.21 0.00 87.95 0.00 17.48 105.44 13.84
PCG-1-59 9.05 -11.23 4.21 2.43 87.95 20.20 17.48 125.64 13.84
PCG-1-60 9.05 -8.80 4.21 4.86 87.95 40.41 17.48 145.84 13.84
PCG-1-61 9.05 -6.37 4.21 7.30 87.95 60.61 17.48 166.05 13.84
PCG-1-62 9.05 -3.93 4.21 9.73 87.95 80.81 17.48 186.25 13.84
PCG-1-63 9.05 -1.50 4.21 12.16 87.95 101.02 17.48 206.45 13.84
PCG-1-64 11.16 -24.61 6.32 -10.94 87.95 -90.91 26.23 23.27 13.84
PCG-1-65 11.16 -22.17 6.32 -8.51 87.95 -70.71 26.23 43.47 13.84
PCG-1-66 11.16 -19.74 6.32 -6.08 87.95 -50.51 26.23 63.68 13.84
re

PCG-1-67 11.16 -17.31 6.32 -3.65 87.95 -30.30 26.23 83.88 13.84
PCG-1-68 11.16 -14.88 6.32 -1.22 87.95 -10.10 26.23 104.08 13.84
PCG-1-69 11.16 -12.45 6.32 1.22 87.95 10.10 26.23 124.28 13.84
PCG-1-70 11.16 -10.02 6.32 3.65 87.95 30.30 26.23 144.49 13.84
PCG-1-71 11.16 -7.58 6.32 6.08 87.95 50.51 26.23 164.69 13.84
PCG-1-72 11.16 -5.15 6.32 8.51 87.95 70.71 26.23 184.89 13.84
PCG-1-73 11.16 -2.72 6.32 10.94 87.95 90.91 26.23 205.10 13.84
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
Load factor for Limit State design 1 Along Axis -----> Z-Z X-X
Ultimate sagging(+)
Moment,Mup(Tm/width) 103.94 32.11
Along Axis -----> Z-Z X-X Effective Depth (for + M), d (m) 2.152 2.152

Ed
Ultimate Shear force (In sagging zone)(T/width) 33.69 25.71 Mup/bd2 (N/mm2) 0.22 0.07
Nominal shear stress (N/mm 2) 0.16 0.12 Tensile steel required at bottom (%) 0.05 0.02
Max allowable shear stress (N/mm 2) 0.31 0.31 Provide bars of dia (mm) 32 32
Ultimate Shear force (In hogging zone)(T) 54.45 18.18 at c/c distance (mm) 150 150
Nominal shear stress (N/mm 2) 0.25 0.08 Tensile steel provided at bottom (%) 0.25 0.25
Max allowable shear stress (N/mm 2) 0.31 0.31 Ultimate hogging(-)
Stirrup Diameter (mm) 12 Moment,Mun(Tm/meter width) -220.89 0.00
Stirrup spacing (N/mm 2) 150 150 Mun/bd2 (N/mm2) 0.48 0.00

F
Stress in stirrup (N/mm 2) 22.38 10.57 Tensile steel required at top (%) 0.11 0.00
Total Stirrup stress (N/mm 2) 32.95 Provide bars of dia (mm) 32 32
Permissible Stirrup stress (N/mm 2) 434.78 at c/c distance (mm) 150 150

PD
Tensile steel provided at top (%) 0.25 0.25
Effective Depth (for - M), d (m) 2.152 2.152
P UNCH ING SH EAR FO R P EDESTALS
Pedestal ID Ultimate Design Area for resisting Punching Shear Allowable punching
P3 408.17 Ton 29.28 m2 0.14 N/mm2 1.37 N/mm2
P4 100.47 Ton 29.28 m2 0.03 N/mm2 1.37 N/mm2
P9 163.61 Ton 29.28 m2 0.06 N/mm2 1.37 N/mm2
P10 389.52 Ton 32.30 m2 0.12 N/mm2 1.37 N/mm2
P1 92.87 Ton 29.28 m2 0.03 N/mm2 1.37 N/mm2
P5 132.32 Ton 29.28 m2 0.05 N/mm2 1.37 N/mm2
P6 4.90 Ton 29.28 m2 0.00 N/mm2 1.37 N/mm2
te r
P11 6.52 Ton 29.28 m2 0.00 N/mm2 1.37 N/mm2
P2 49.68 Ton 29.28 m2 0.02 N/mm2 1.37 N/mm2
P7 147.68 Ton 29.28 m2 0.05 N/mm2 1.37 N/mm2
P8 375.15 Ton 29.28 m2 0.13 N/mm2 1.37 N/mm2
P12 727.91 Ton 32.30 m2 0.23 N/mm2 1.37 N/mm2
as
nM
di
a te
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
F AC TOR OF SAF ETY F OR ALL LOAD C ASES ( Per mis s ible/ Ac tual)

Pile Reaction ALONG Z-Z ALONG X-X


Compressi pt at Shear pt at Shear

Ed
Load case pt at top pt at top Punching
on Tension Shear bottom stress bottom stress
500 1 DL1+1N/a
LL1+1 EQUIP1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
501 1 DL1+1N/a
LL1+1 EQUIP1+1
N/a TEMP1
N/a N/A N/A N/A N/A N/A N/A N/A
502 1 DL1+1N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
503 1 DL1+1N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
504 1 DL1+1N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A
505 1 DL1+1N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
506 1 DL1+1N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
507 1 DL1+1N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
508 1 DL1+1N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A

F
509 1 DL1+1N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
510 1 DL1+0.7
N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
511 1 DL1+0.7
N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
512 1 DL1+0.7
N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A

PD
513 1 DL1+0.7
N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
514 1 DL1+0.7
N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
515 1 DL1+0.7
N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
516 1 DL1+0.7
N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A
517 1 DL1+0.7
N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
518 1 DL1+ 1LL1+0.75
N/a WL1+1
N/a EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
519 1 DL1+1.0
N/a
LL1+0.75 N/a
WL2+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
520 1 DL1+1.0
N/a
LL1+0.75 N/a
WL3+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
521 1 DL1+1.0
N/a
LL1+0.75 N/a
WL4+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
522 1 DL1+1.0
N/a
LL1+0.75 N/a
WL5+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
523 1 DL1+1.0
N/a
LL1+0.75 N/a
WL6+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
te r
524 1 DL1+1.0
N/a
LL1+0.75 N/a
WL7+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
525 1 DL1+1.0
N/a
LL1+0.75 N/a
WL8+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
526 1 DL1+1.0
N/a
LL1+1 EQUIP1+0.525
N/a N/a
SL1 N/A N/A N/A N/A N/A N/A N/A
527 1 DL1+1.0
N/a
LL1+1 EQUIP1+0.525
N/a N/a
SL2 N/A N/A N/A N/A N/A N/A N/A
528 0.6 DL1+1
N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
529 0.6 DL1+1
N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
530 0.6 DL1+1
N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A
531 0.6 DL1+1
N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
as

532 0.6 DL1+1


N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
533 0.6 DL1+1
N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
534 0.6 DL1+1
N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A
535 0.6 DL1+1
N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
536 0.6 DL1+0.7
N/a SL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
537 0.6 DL1+0.7
N/a SL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
1001 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1 50.76 3.29 16.66 10.63 N/A 16.66 9.54
nM

1002 1.35 DL1+1.5


N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1 38.77 3.84 17.41 11.14 N/A 17.41 9.70
1003 1.35 DL1+1.5
N/a WL1+0.9
N/a TEMP1 N/a 172.52 11.64 43.82 13.45 N/A 43.82 28.03
1004 1.35 DL1+1.5
N/a WL2+0.9
N/a TEMP1 N/a 161.90 11.88 40.85 11.81 N/A 40.85 29.55
1005 1.35 DL1+1.5
N/a WL3+0.9
N/a TEMP1 N/a 75.13 8.77 30.67 12.73 N/A 30.67 19.13
1006 1.35 DL1+1.5
N/a WL4+0.9
N/a TEMP1 N/a 58.19 9.05 30.68 12.65 N/A 30.68 18.97
1007 1.35 DL1+1.5
N/a WL5+0.9
N/a TEMP1 N/a 4.07 3.69 17.65 29.91 N/A 17.65 9.19
1008 1.35 DL1+1.5
N/a WL6+0.9
N/a TEMP1 N/a 3.99 3.72 17.89 29.31 N/A 17.89 9.28
1009 1.35 DL1+1.5
N/a WL7+0.9
N/a TEMP1 N/a 6.29 3.34 20.14 12.12 N/A 20.14 12.10
1010 1.35 DL1+1.5
N/a WL8+0.9
N/a TEMP1 N/a 6.21 3.40 20.25 11.19 N/A 20.25 12.40
1011 1.35 DL1+1.5
N/a WL1+-0.9
N/a TEMP1 N/a 169.64 23.08 40.94 12.22 N/A 40.94 26.67
1012 1.35 DL1+1.5
N/a WL2+-0.9
N/a TEMP1 N/a 129.45 24.20 38.33 10.85 N/A 38.33 28.05
di

1013 1.35 DL1+1.5


N/a WL3+-0.9
N/a TEMP1 N/a 33.12 14.40 33.31 15.22 N/A 33.31 20.60
1014 1.35 DL1+1.5
N/a WL4+-0.9
N/a TEMP1 N/a 29.35 14.80 33.33 15.12 N/A 33.33 20.41
1015 1.35 DL1+1.5
N/a WL5+-0.9
N/a TEMP1 N/a 3.56 4.14 18.06 33.59 N/A 18.06 9.09
1016 1.35 DL1+1.5
N/a WL6+-0.9
N/a TEMP1 N/a 3.50 4.18 18.31 32.08 N/A 18.31 9.17
1017 1.35 DL1+1.5
N/a WL7+-0.9
N/a TEMP1 N/a 5.33 3.81 20.53 12.86 N/A 20.53 11.75
1018 1.35 DL1+1.5
N/a WL8+-0.9
N/a TEMP1 N/a 5.28 3.89 20.32 11.35 N/A 20.32 12.04
1019 1.35 DL1+0.9
N/a TEMP1+1.35
N/a MR1
N/a 101.25 10.45 41.76 15.43 N/A 41.76 42.20
a te

1020 1.35 DL1+-0.9


N/a TEMP1+1.35
N/a MR1
N/a 37.37 18.92 41.77 15.01 N/A 41.77 44.57
1021 1.35 DL1+1.5LL1+1.5
N/a N/aEQUIP1+0.9
N/a TEMP1+1.35 49.60
MR1 3.25 16.43 10.37 N/A 16.43 9.29
1022 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
37.27
MR1 3.78 17.16 10.87 N/A 17.16 9.44
1023 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1+1.35
52.61
MR1 3.38 17.20 11.06 N/A 17.20 9.90
1024 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
39.57MR1 3.97 18.00 11.57 N/A 18.00 10.08
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
57.61 3.28
MR1 18.79 10.52 N/A 18.79 10.06
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
56.19 3.29
MR1 18.78 9.88 N/A 18.78 9.93
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
46.33 3.12
MR1 15.03 10.32 N/A 15.03 9.10
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+0.9 TEMP1+1.35
57.61 3.28
MR1 18.79 10.52 N/A 18.79 10.06
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+0.9 TEMP1+1.35
56.19 3.29
MR1 18.78 9.88 N/A 18.78 9.93
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+0.9 TEMP1+1.35
46.33 3.12
MR1 15.03 10.32 N/A 15.03 9.10
1028 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+0.9 TEMP1+1.35
45.43 3.13
MR1 15.03 9.90 N/A 15.03 9.00
1029 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+0.9 TEMP1+1.35
10.36 2.58
MR1 14.00 14.18 N/A 14.00 6.92

Ed
1030 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+0.9 TEMP1+1.35
10.08 2.60
MR1 14.00 13.42 N/A 14.00 6.86
1031 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+0.9 TEMP1+1.35
19.51 2.67
MR1 20.53 9.22 N/A 20.53 12.13
1032 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+0.9 TEMP1+1.35
18.72 2.69
MR1 20.52 8.88 N/A 20.52 12.07
1033 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
57.89 3.83
MR1 18.86 9.76 N/A 18.86 10.24
1034 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
56.44 3.84
MR1 18.51 9.20 N/A 18.51 10.10
1035 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
33.89 3.61
MR1 15.63 11.18 N/A 15.63 9.24
1036 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
31.41 3.62
MR1 15.63 10.69 N/A 15.63 9.14
1037 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
7.62 2.89
MR1 14.53 14.60 N/A 14.53 7.00
1038 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
7.47 2.91
MR1 14.52 14.42 N/A 14.52 6.94
1039 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
12.91 3.04
MR1 21.68 9.90 N/A 21.68 12.71
1040 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
12.56 3.08
MR1 21.67 9.41 N/A 21.67 12.64
1041 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+0.9 TEMP1+1.35
61.71 3.42
MR1 19.80 11.18 N/A 19.80 10.79

F
1042 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+0.9 TEMP1+1.35
60.08 3.43
MR1 19.79 10.45 N/A 19.79 10.64
1043 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+0.9 TEMP1+1.35
48.94 3.24
MR1 15.66 10.74 N/A 15.66 9.69
1044 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+0.9 TEMP1+1.35
47.94 3.25
MR1 15.66 10.53 N/A 15.66 9.57
1045 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+0.9 TEMP1+1.35
10.22 2.66
MR1 14.55 15.15 N/A 14.55 7.25
1046 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+0.9 TEMP1+1.35
9.94 2.67
MR1 14.55 14.59 N/A 14.55 7.19

PD
1047 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+0.9 TEMP1+1.35
18.97 2.74
MR1 21.74 9.76 N/A 21.74 13.07
1048 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+0.9 TEMP1+1.35
18.22 2.77
MR1 21.72 9.38 N/A 21.72 12.99
1049 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+-0.9 62.01
TEMP1+1.35
4.02
MR1 19.77 10.32 N/A 19.77 10.99
1050 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+-0.9 60.36
TEMP1+1.35
4.04
MR1 19.38 9.70 N/A 19.38 10.84
1051 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+-0.9 35.77
TEMP1+1.35
3.77
MR1 16.32 11.98 N/A 16.32 9.85
1052 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+-0.9 33.02
TEMP1+1.35
3.79
MR1 16.32 11.42 N/A 16.32 9.73
1053 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
7.54 2.99
MR1 15.12 15.36 N/A 15.12 7.35
1054 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
7.39 3.01
MR1 15.12 15.17 N/A 15.12 7.28
1055 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+-0.9 12.67
TEMP1+1.35
3.14
MR1 23.03 10.52 N/A 23.03 13.73
1056 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+-0.9 12.33
TEMP1+1.35
3.18
MR1 23.02 9.93 N/A 23.02 13.65
1057 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+0.9 TEMP1+1.35
69.77 3.45
MR1 20.18 10.37 N/A 20.18 11.47
1058 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+0.9 TEMP1+1.35
66.36 3.47
MR1 19.53 9.36 N/A 19.53 11.19
1059 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+0.9 TEMP1+1.35
46.77 3.15
MR1 14.78 9.22 N/A 14.78 8.58
1060 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+0.9 TEMP1+1.35
45.27 3.17
MR1 14.78 9.18 N/A 14.78 8.55
te r
1061 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.92 2.23
MR1 13.20 15.82 N/A 13.20 6.16
1062 1.148 DL1+1.5
N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.81 2.25
MR1 13.20 15.65 N/A 13.20 6.08
1063 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+0.9 TEMP1+1.35
8.70 2.29
MR1 17.49 9.05 N/A 17.49 13.56
1064 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+0.9 TEMP1+1.35
8.43 2.32
MR1 17.52 8.52 N/A 17.52 13.43
1065 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+-0.9 70.15
TEMP1+1.35
4.06
MR1 19.55 9.62 N/A 19.55 11.70
1066 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+-0.9 66.71
TEMP1+1.35
4.08
MR1 18.93 8.75 N/A 18.93 11.41
1067 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+-0.9 33.62
TEMP1+1.35
3.66
MR1 15.37 10.47 N/A 15.37 8.86
1068 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+-0.9 29.74
TEMP1+1.35
3.68
MR1 15.37 10.42 N/A 15.37 8.83
1069 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.20 2.46
MR1 13.66 15.68 N/A 13.66 6.22
as

1070 1.148 DL1+1.5


N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.12 2.48
MR1 13.66 15.34 N/A 13.66 6.14
1071 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
7.08 2.54
MR1 18.34 9.70 N/A 18.34 14.23
1072 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
6.90 2.58
MR1 18.37 9.08 N/A 18.37 13.99
1073 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a 22.79 5.44 22.81 16.43 29.44 22.81 10.73
1074 1 DL1+0.8
N/a LL1+1 SL2
N/a N/a 57.99 2.85 16.94 8.55 N/A 16.94 11.33
1075 1 DL1+0.8
N/a LL1+-1 SL1
N/a N/a 105.55 7.03 30.33 10.22 N/A 30.33 18.33
1076 1 DL1+0.8
N/a LL1+-1 SL2
N/a N/a 7.52 20.23 37.31 28.65 N/A 37.31 16.93
2001 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1 79.89
MR1 4.88 26.23 13.49 N/A 26.23 16.24
nM

2002 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1 78.05
MR1 4.89 26.19 12.78 N/A 26.19 16.02
2003 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1 65.21
MR1 4.64 21.27 13.52 N/A 21.27 14.58
2004 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1 64.03
MR1 4.65 21.27 13.04 N/A 21.27 14.41
2005 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+1 14.97
MR1 3.86 19.89 17.73 N/A 19.89 10.91
2006 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+1 14.57
MR1 3.88 19.89 16.93 N/A 19.89 10.81
2007 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+1 28.79
MR1 4.00 28.47 12.24 N/A 28.47 20.13
2008 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+1 27.64
MR1 4.04 28.46 11.84 N/A 28.46 20.02
2009 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+180.23
MR1 5.68 25.91 12.65 N/A 25.91 16.55
2010 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+177.02
MR1 5.70 25.47 12.02 N/A 25.47 16.32
2011 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+143.83
MR1 5.35 22.08 14.49 N/A 22.08 14.83
2012 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+141.04
MR1 5.37 22.08 13.94 N/A 22.08 14.65
2013 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+111.13
MR1 4.32 20.60 19.42 N/A 20.60 11.05
2014 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+110.91
MR1 4.35 20.60 18.47 N/A 20.60 10.95
2015 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+119.16
MR1 4.57 29.94 12.91 N/A 29.94 21.19
di

2016 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+118.65
MR1 4.62 29.92 12.26 N/A 29.92 21.06
2017 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1 88.75
MR1 4.91 26.38 12.70 N/A 26.38 17.27
2018 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1 85.04
MR1 4.94 25.63 11.68 N/A 25.63 16.85
2019 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1 62.63
MR1 4.52 20.18 12.46 N/A 20.18 13.10
2020 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1 60.82
MR1 4.54 20.18 12.41 N/A 20.18 13.05
2021 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+17.31
MR1 3.26 18.19 19.94 N/A 18.19 9.26
2022 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+17.15
MR1 3.28 18.19 19.76 N/A 18.19 9.13
2023 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+1 13.13
MR1 3.36 24.76 11.49 N/A 24.76 19.95
a te

2024 1 DL1+1.0
N/a LL1+1 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+1 12.73
MR1 3.41 24.80 10.91 N/A 24.80 20.72
2025 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+189.14
MR1 5.72 25.66 11.94 N/A 25.66 17.62
2026 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+185.42
MR1 5.76 24.95 11.04 N/A 24.95 17.19
2027 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+141.66
MR1 5.20 20.91 13.95 N/A 20.91 13.54
2028 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+137.61
MR1 5.23 20.91 13.56 N/A 20.91 13.48
2029 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1 6.25
MR1 3.58 18.78 20.16 N/A 18.78 9.36
2030 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1 6.13
MR1 3.61 18.78 19.78 N/A 18.78 9.23
2031 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+110.68
MR1 3.73 25.89 12.18 N/A 25.89 21.00
2032 1 DL1+0.7
N/a LL1+1 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+110.41
MR1 3.78 25.93 11.38 N/A 25.93 21.83
2033 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a 22.79 5.44 22.81 16.43 29.44 22.81 10.73
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
FOUNDATION FOR PEDESTAL (P13)-(Pile Capacity Check)

Ed
LOAD CASE: 526 1 DL1+1.0
526 LL1+1
1 DL1+0.75
EQUIP1+0.525
LL1+1 EQUIP1+0.525
SL1 SL1

GENERAL PILECAP DIMENSIONS, POSITION


Concrete Density 2.5 ton/m3 Pilecap thickness 1.400 m
Soil Density 2 ton/m3 Z cordinate of center of the pilecap -21.000 m
Grade of Concrete (Cylinder) C 30 X cordinate of center of the pilecap 18.250 m
Grade of Steel Fe 500 Length along axis Z, L z 5.820 m
Level of Base of pilecap -5.1 m Length along axis X, L x 5.820 m

F
Finished Ground level -0.6 m Area of base of pilecap, A 33.87 m2
Level of max water table -0.6 m

PD
PEDESTAL (COLUMN) DIMENSIONS, POSITIONS & LOADS
C.G. of Pedestal Ped top P + W ped
Pedestal ID Lz-z (m) Lx-x (m) P (T) Hz (T) Mx (T-m) Hx (T) Mz (T-m)
Z X [Level of (T)
P13 1.600 1.600 -21.000 18.250 -5.100 1024.72 -10.21 -44.73 -53.04 192.30 1024.72

PILE DETAILS
Number of Piles 9 CGz of Pile group -21 m
Diameter of Piles 760 mm CGx of Pile group 18.25 m
2
Compressive capacity of piles 192 T SUM[(Xi-Xcg)2] of Pile group 31.190 m
2
SUM[(Zi-Zcg)2] of Pile group
te r
Tensile capacity of piles 40 T 31.190 m
Shear capacity of piles 11.5 T

Weight of soil, W soil 152.43 T


Weight of footing, W f ooting 23.71 T
Axial load due to [P+ W ped] 1024.72 T
Total axial Load 1200.85 T
as

Mz due to [Mz+(P+W ped)*ex ] 192.30 Ton-m Mx due to [Mx+(P+W ped)*ez] -44.73 Ton-m
Eccentricity between Pilecap and Pile group 0.00 mm Eccentricity between Pilecap and Pile group 0.00 mm
Mz due to pilecap and pile group eccentricity 0.00 Ton-m Mx due to pilecap and pile group eccentricity 0.00 Ton-m
Total Mz 192.30 Ton-m Total Mx -44.73 Ton-m
nM

Distance Distance P due to


from pile from pile Axial P due to P due to
Pile ID CGx CGz group CGx group CGz Load (T) Mx (T) Mz (T) Total P (T) Shear (T)
PCG-2-1 15.97 -23.28 -2.28 -2.28 133.43 3.27 -14.06 122.64 6.00
PCG-2-2 15.97 -21.00 -2.28 0.00 133.43 0.00 -14.06 119.37 6.00
PCG-2-3 15.97 -18.72 -2.28 2.28 133.43 -3.27 -14.06 116.10 6.00
PCG-2-4 18.25 -23.28 0.00 -2.28 133.43 3.27 0.00 136.70 6.00
PCG-2-5 18.25 -21.00 0.00 0.00 133.43 0.00 0.00 133.43 6.00
PCG-2-6 18.25 -18.72 0.00 2.28 133.43 -3.27 0.00 130.16 6.00
di

PCG-2-7 20.53 -23.28 2.28 -2.28 133.43 3.27 14.06 150.76 6.00
PCG-2-8 20.53 -21.00 2.28 0.00 133.43 0.00 14.06 147.49 6.00
PCG-2-9 20.53 -18.72 2.28 2.28 133.43 -3.27 14.06 144.22 6.00
a te
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
F AC TOR OF SAF ETY F OR ALL LOAD C ASES ( Per mis s ible/ Ac tual)

Pile Reaction ALONG Z-Z ALONG X-X


Compressi pt at Shear pt at Shear

Ed
Load case pt at top pt at top Punching
on Tension Shear bottom stress bottom stress
500 1 DL1+1 LL1+11.43
EQUIP1
N/a 8.17 N/A N/A N/A N/A N/A N/A N/A
501 1 DL1+1 LL1+11.38
EQUIP1+1
N/a TEMP1 4.04 N/A N/A N/A N/A N/A N/A N/A
502 1 DL1+1 WL1 2.73 N/a 3.11 N/A N/A N/A N/A N/A N/A N/A
503 1 DL1+1 WL2 2.70 N/a 3.10 N/A N/A N/A N/A N/A N/A N/A
504 1 DL1+1 WL3 2.88 N/a 2.41 N/A N/A N/A N/A N/A N/A N/A
505 1 DL1+1 WL4 2.86 N/a 2.45 N/A N/A N/A N/A N/A N/A N/A
506 1 DL1+1 WL5 3.05 N/a 5.08 N/A N/A N/A N/A N/A N/A N/A
507 1 DL1+1 WL6 2.95 N/a 4.72 N/A N/A N/A N/A N/A N/A N/A
508 1 DL1+1 WL7 3.21 N/a 4.65 N/A N/A N/A N/A N/A N/A N/A

F
509 1 DL1+1 WL8 3.17 N/a 5.04 N/A N/A N/A N/A N/A N/A N/A
510 1 DL1+0.7 WL12.90 N/a 4.69 N/A N/A N/A N/A N/A N/A N/A
511 1 DL1+0.7 WL22.87 N/a 4.69 N/A N/A N/A N/A N/A N/A N/A
512 1 DL1+0.7 WL33.00 N/a 3.30 N/A N/A N/A N/A N/A N/A N/A

PD
513 1 DL1+0.7 WL42.98 N/a 3.35 N/A N/A N/A N/A N/A N/A N/A
514 1 DL1+0.7 WL53.13 N/a 7.13 N/A N/A N/A N/A N/A N/A N/A
515 1 DL1+0.7 WL63.06 N/a 6.65 N/A N/A N/A N/A N/A N/A N/A
516 1 DL1+0.7 WL73.24 N/a 6.46 N/A N/A N/A N/A N/A N/A N/A
517 1 DL1+0.7 WL83.21 N/a 6.98 N/A N/A N/A N/A N/A N/A N/A
518 1 DL1+ 1LL1+0.75
1.36WL1+1
N/a EQUIP1 4.38 N/A N/A N/A N/A N/A N/A N/A
519 1 DL1+1.0 LL1+0.75
1.36 N/a
WL2+1 EQUIP1 4.48 N/A N/A N/A N/A N/A N/A N/A
520 1 DL1+1.0 LL1+0.75
1.37 N/a
WL3+1 EQUIP1 2.62 N/A N/A N/A N/A N/A N/A N/A
521 1 DL1+1.0 LL1+0.75
1.36 N/a
WL4+1 EQUIP1 2.67 N/A N/A N/A N/A N/A N/A N/A
522 1 DL1+1.0 LL1+0.75
1.45 N/a
WL5+1 EQUIP1 9.62 N/A N/A N/A N/A N/A N/A N/A
523 1 DL1+1.0 LL1+0.75
1.44 N/a
WL6+1 EQUIP1 9.15 N/A N/A N/A N/A N/A N/A N/A
te r
524 1 DL1+1.0 LL1+0.75
1.42 N/a
WL7+1 EQUIP1 3.86 N/A N/A N/A N/A N/A N/A N/A
525 1 DL1+1.0 LL1+0.75
1.41 N/a
WL8+1 EQUIP1 4.05 N/A N/A N/A N/A N/A N/A N/A
526 1 DL1+1.0 LL1+11.27
EQUIP1+0.525
N/a SL1 1.92 N/A N/A N/A N/A N/A N/A N/A
527 1 DL1+1.0 LL1+11.43
EQUIP1+0.525
N/a SL2 5.84 N/A N/A N/A N/A N/A N/A N/A
528 0.6 DL1+1 WL13.47 N/a 2.96 N/A N/A N/A N/A N/A N/A N/A
529 0.6 DL1+1 WL23.42 N/a 2.95 N/A N/A N/A N/A N/A N/A N/A
530 0.6 DL1+1 WL33.75 N/a 2.51 N/A N/A N/A N/A N/A N/A N/A
531 0.6 DL1+1 WL43.71 N/a 2.56 N/A N/A N/A N/A N/A N/A N/A
as

532 0.6 DL1+1 WL54.02 N/a 5.12 N/A N/A N/A N/A N/A N/A N/A
533 0.6 DL1+1 WL63.85 N/a 4.75 N/A N/A N/A N/A N/A N/A N/A
534 0.6 DL1+1 WL74.32 N/a 4.75 N/A N/A N/A N/A N/A N/A N/A
535 0.6 DL1+1 WL84.25 N/a 5.15 N/A N/A N/A N/A N/A N/A N/A
536 0.6 DL1+0.7 SL12.80 N/a 1.67 N/A N/A N/A N/A N/A N/A N/A
537 0.6 DL1+0.7 SL24.13 N/a 11.10 N/A N/A N/A N/A N/A N/A N/A
1001 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1 N/A N/A N/A N/A N/A N/A N/A
nM

1002 1.35 DL1+1.5


N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1N/A N/A N/A N/A N/A N/A N/A
1003 1.35 DL1+1.5
N/a WL1+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1004 1.35 DL1+1.5
N/a WL2+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1005 1.35 DL1+1.5
N/a WL3+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1006 1.35 DL1+1.5
N/a WL4+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1007 1.35 DL1+1.5
N/a WL5+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1008 1.35 DL1+1.5
N/a WL6+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1009 1.35 DL1+1.5
N/a WL7+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1010 1.35 DL1+1.5
N/a WL8+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1011 1.35 DL1+1.5
N/a WL1+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1012 1.35 DL1+1.5
N/a WL2+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
di

1013 1.35 DL1+1.5


N/a WL3+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1014 1.35 DL1+1.5
N/a WL4+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1015 1.35 DL1+1.5
N/a WL5+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1016 1.35 DL1+1.5
N/a WL6+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1017 1.35 DL1+1.5
N/a WL7+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1018 1.35 DL1+1.5
N/a WL8+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1019 1.35 DL1+0.9
N/a TEMP1+1.35
N/a MR1
N/a N/A N/A N/A N/A N/A N/A N/A
a te

1020 1.35 DL1+-0.9


N/a TEMP1+1.35
N/a MR1
N/a N/A N/A N/A N/A N/A N/A N/A
1021 1.35 DL1+1.5LL1+1.5
N/a N/aEQUIP1+0.9
N/a TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A N/A
1022 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1023 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1024 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1028 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1029 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

Ed
1030 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1031 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1032 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1033 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1034 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1035 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1036 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1037 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1038 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1039 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1040 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1041 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

F
1042 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1043 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1044 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1045 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1046 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

PD
1047 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1048 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1049 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1050 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1051 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1052 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1053 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1054 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1055 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1056 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1057 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1058 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1059 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1060 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
te r
1061 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1062 1.148 DL1+1.5
N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1063 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1064 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1065 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1066 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1067 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1068 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1069 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
as

1070 1.148 DL1+1.5


N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1071 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1072 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1073 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1074 1 DL1+0.8
N/a LL1+1 SL2
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1075 1 DL1+0.8
N/a LL1+-1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1076 1 DL1+0.8
N/a LL1+-1 SL2
N/a N/a N/A N/A N/A N/A N/A N/A N/A
2001 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
nM

2002 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2003 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2004 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2005 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2006 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2007 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2008 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2009 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2010 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2011 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2012 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2013 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2014 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2015 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
di

2016 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2017 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2018 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2019 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2020 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2021 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2022 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2023 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
a te

2024 1 DL1+1.0
N/a LL1+1 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2025 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2026 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2027 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2028 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2029 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2030 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2031 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2032 1 DL1+0.7
N/a LL1+1 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2033 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
FOUNDATION FOR PEDESTAL (P13)-(Pilecap Design)

Ed
LOAD CASE: 1068 1.1481068
DL1+1.5
1.148
LL1+1.5
DL1+1.05
WL4+1.5
LL1+1.5
EQUIP1+-0.9
WL4+1.05 EQUIP1+-0.9
TEMP1+1.35 TEMP1+1.35
MR1 MR1

GENERAL PILECAP DIMENSIONS, POSITION


Concrete Density 2.5 ton/m3 Pilecap thickness 1.400 m
Soil Density 2 ton/m3 Z cordinate of center of the pilecap -21.000 m
Grade of Concrete (Cylinder) C 30 X cordinate of center of the pilecap 18.250 m
Grade of Steel Fe 500 Length along axis Z, L z 5.820 m
Level of Base of pilecap -5.1 m Length along axis X, L x 5.820 m
Finished Ground level -0.6 m Area of base of pilecap, A 33.87 m2

F
Level of max water table -0.6 m

PEDESTAL (COLUMN) DIMENSIONS, POSITIONS & LOADS

PD
C.G. of Pedestal Ped top P + W ped
Pedestal ID Lz-z (m) Lx-x (m) P (T) Hz (T) Mx (T-m) Hx (T) Mz (T-m)
Z X [Level of (T)
P13 1.600 1.600 -21.000 18.250 -5.100 1303.87 -8.45 -43.08 -64.03 -281.07 1303.87

PILE DETAILS
Number of Piles 9 CGz of Pile group -21 m
Diameter of Piles 760 mm CGx of Pile group 18.25 m
2
Compressive capacity of piles 192 T SUM[(Xi-Xcg)2] of Pile group 31.190 m
2
Tensile capacity of piles 40 T SUM[(Zi-Zcg)2] of Pile group 31.190 m
Shear capacity of piles 11.5 T
te r
Weight of soil, W soil 205.77 T
Weight of footing, W f ooting 32.01 T
Axial load due to [P+ W ped] 1303.87 T
Total axial Load 1541.65 T

Mz due to [Mz+(P+W ped)*ex ] -281.07 Ton-m Mx due to [Mx+(P+W ped)*ez] -43.08 Ton-m
Eccentricity between Pilecap and Pile group 0.00 mm Eccentricity between Pilecap and Pile group 0.00 mm
Mz due to pilecap and pile group eccentricity 0.00 Ton-m Mx due to pilecap and pile group eccentricity 0.00 Ton-m
as

Total Mz -281.07 Ton-m Total Mx -43.08 Ton-m

Distance Distance P due to


from pile from pile Axial P due to P due to
Pile ID CGx CGz group CGx group CGz Load (T) Mx (T) Mz (T) Total P (T) Shear (T)
PCG-2-1 15.97 -23.28 -2.28 -2.28 171.29 3.15 20.55 194.99 7.18
nM

PCG-2-2 15.97 -21.00 -2.28 0.00 171.29 0.00 20.55 191.84 7.18
PCG-2-3 15.97 -18.72 -2.28 2.28 171.29 -3.15 20.55 188.69 7.18
PCG-2-4 18.25 -23.28 0.00 -2.28 171.29 3.15 0.00 174.44 7.18
PCG-2-5 18.25 -21.00 0.00 0.00 171.29 0.00 0.00 171.29 7.18
PCG-2-6 18.25 -18.72 0.00 2.28 171.29 -3.15 0.00 168.15 7.18
PCG-2-7 20.53 -23.28 2.28 -2.28 171.29 3.15 -20.55 153.90 7.18
PCG-2-8 20.53 -21.00 2.28 0.00 171.29 0.00 -20.55 150.75 7.18
PCG-2-9 20.53 -18.72 2.28 2.28 171.29 -3.15 -20.55 147.60 7.18

Load factor for Limit State design 1 Along Axis -----> Z-Z X-X
di

Ultimate sagging(+)
Moment,Mup(Tm/width) 117.65 130.95
Along Axis -----> Z-Z X-X Effective Depth (for + M), d (m) 1.2625 1.2625
Ultimate Shear force (In sagging zone)(T/width) 82.81 91.78 Mup/bd2 (N/mm2) 0.74 0.82
Nominal shear stress (N/mm 2) 0.66 0.73 Tensile steel required at bottom (%) 0.17 0.19
Max allowable shear stress (N/mm 2) 0.33 0.33 Provide bars of dia (mm) 25 25
Ultimate Shear force (In hogging zone)(T) 6.99 6.87 at c/c distance (mm) 150 150
a te

Nominal shear stress (N/mm 2) 0.06 0.05 Tensile steel provided at bottom (%) 0.26 0.26
Max allowable shear stress (N/mm 2) 0.33 0.33 Ultimate hogging(-)
Stirrup Diameter (mm) 12 Moment,Mun(Tm/meter width) 0.00 0.00
Stirrup spacing (N/mm 2) 150 150 Mun/bd2 (N/mm2) 0.00 0.00
Stress in stirrup (N/mm 2) 58.02 64.30 Tensile steel required at top (%) 0.00 0.00
Total Stirrup stress (N/mm 2) 122.33 Provide bars of dia (mm) 25 25
Permissible Stirrup stress (N/mm 2) 434.78 at c/c distance (mm) 150 150
Tensile steel provided at top (%) 0.26 0.26
Effective Depth (for - M), d (m) 1.262 1.262
re

P U N C H I N G S H EAR FO R P EDES TALS


Pedestal ID Ultimate Design Area for resisting Punching Shear Allowable punching
P13 1132.57 Ton 14.46 m2 0.78 N/mm2 1.37 N/mm2
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
F AC TOR OF SAF ETY F OR ALL LOAD C ASES ( Per mis s ible/ Ac tual)

Pile Reaction ALONG Z-Z ALONG X-X


Compressi pt at Shear pt at Shear

Ed
Load case pt at top pt at top Punching
on Tension Shear bottom stress bottom stress
500 1 DL1+1N/a
LL1+1 EQUIP1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
501 1 DL1+1N/a
LL1+1 EQUIP1+1
N/a TEMP1
N/a N/A N/A N/A N/A N/A N/A N/A
502 1 DL1+1N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
503 1 DL1+1N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
504 1 DL1+1N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A
505 1 DL1+1N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
506 1 DL1+1N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
507 1 DL1+1N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
508 1 DL1+1N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A

F
509 1 DL1+1N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
510 1 DL1+0.7
N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
511 1 DL1+0.7
N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
512 1 DL1+0.7
N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A

PD
513 1 DL1+0.7
N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
514 1 DL1+0.7
N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
515 1 DL1+0.7
N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
516 1 DL1+0.7
N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A
517 1 DL1+0.7
N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
518 1 DL1+ 1LL1+0.75
N/a WL1+1
N/a EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
519 1 DL1+1.0
N/a
LL1+0.75 N/a
WL2+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
520 1 DL1+1.0
N/a
LL1+0.75 N/a
WL3+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
521 1 DL1+1.0
N/a
LL1+0.75 N/a
WL4+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
522 1 DL1+1.0
N/a
LL1+0.75 N/a
WL5+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
523 1 DL1+1.0
N/a
LL1+0.75 N/a
WL6+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
te r
524 1 DL1+1.0
N/a
LL1+0.75 N/a
WL7+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
525 1 DL1+1.0
N/a
LL1+0.75 N/a
WL8+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
526 1 DL1+1.0
N/a
LL1+1 EQUIP1+0.525
N/a N/a
SL1 N/A N/A N/A N/A N/A N/A N/A
527 1 DL1+1.0
N/a
LL1+1 EQUIP1+0.525
N/a N/a
SL2 N/A N/A N/A N/A N/A N/A N/A
528 0.6 DL1+1
N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
529 0.6 DL1+1
N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
530 0.6 DL1+1
N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A
531 0.6 DL1+1
N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
as

532 0.6 DL1+1


N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
533 0.6 DL1+1
N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
534 0.6 DL1+1
N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A
535 0.6 DL1+1
N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
536 0.6 DL1+0.7
N/a SL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
537 0.6 DL1+0.7
N/a SL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
1001 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1 1.33 N/A 3.40 1.37 N/A 3.40 1.59
nM

1002 1.35 DL1+1.5


N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1 1.38 N/A 3.48 1.38 N/A 3.48 1.58
1003 1.35 DL1+1.5
N/a WL1+0.9
N/a TEMP1 N/a 3.85 N/A 8.33 3.33 N/A 8.33 5.66
1004 1.35 DL1+1.5
N/a WL2+0.9
N/a TEMP1 N/a 3.78 N/A 8.13 3.22 N/A 8.13 5.37
1005 1.35 DL1+1.5
N/a WL3+0.9
N/a TEMP1 N/a 4.41 N/A 8.98 3.46 N/A 8.98 6.83
1006 1.35 DL1+1.5
N/a WL4+0.9
N/a TEMP1 N/a 4.31 N/A 8.77 3.36 N/A 8.77 6.42
1007 1.35 DL1+1.5
N/a WL5+0.9
N/a TEMP1 N/a 3.95 N/A 9.41 4.25 N/A 9.41 5.74
1008 1.35 DL1+1.5
N/a WL6+0.9
N/a TEMP1 N/a 3.73 N/A 9.02 4.09 N/A 9.02 5.45
1009 1.35 DL1+1.5
N/a WL7+0.9
N/a TEMP1 N/a 3.71 N/A 9.59 4.77 N/A 9.59 6.57
1010 1.35 DL1+1.5
N/a WL8+0.9
N/a TEMP1 N/a 3.64 N/A 9.35 4.58 N/A 9.35 6.19
1011 1.35 DL1+1.5
N/a WL1+-0.9
N/a TEMP1 N/a 4.31 N/A 8.47 3.15 N/A 8.47 5.51
1012 1.35 DL1+1.5
N/a WL2+-0.9
N/a TEMP1 N/a 4.09 N/A 8.16 3.05 N/A 8.16 5.24
di

1013 1.35 DL1+1.5


N/a WL3+-0.9
N/a TEMP1 N/a 5.01 N/A 9.54 3.54 N/A 9.54 6.61
1014 1.35 DL1+1.5
N/a WL4+-0.9
N/a TEMP1 N/a 4.70 N/A 9.16 3.44 N/A 9.16 6.23
1015 1.35 DL1+1.5
N/a WL5+-0.9
N/a TEMP1 N/a 3.44 N/A 8.90 4.37 N/A 8.90 5.58
1016 1.35 DL1+1.5
N/a WL6+-0.9
N/a TEMP1 N/a 3.27 N/A 8.54 4.19 N/A 8.54 5.31
1017 1.35 DL1+1.5
N/a WL7+-0.9
N/a TEMP1 N/a 4.13 N/A 10.14 4.82 N/A 10.14 6.36
1018 1.35 DL1+1.5
N/a WL8+-0.9
N/a TEMP1 N/a 4.04 N/A 9.83 4.59 N/A 9.83 6.01
1019 1.35 DL1+0.9
N/a TEMP1+1.35
N/a MR1
N/a 3.80 N/A 8.95 3.93 N/A 8.95 5.14
a te

1020 1.35 DL1+-0.9


N/a TEMP1+1.35
N/a MR1
N/a 3.79 N/A 8.96 3.97 N/A 8.96 5.02
1021 1.35 DL1+1.5LL1+1.5
N/a N/aEQUIP1+0.9
N/a TEMP1+1.35 1.32
MR1N/A 3.38 1.36 N/A 3.38 1.58
1022 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35 1.37
MR1N/A 3.45 1.37 N/A 3.45 1.57
1023 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1+1.35 1.38
MR1N/A 3.53 1.43 N/A 3.53 1.66
1024 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.351.44
MR1
N/A 3.61 1.44 N/A 3.61 1.65
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
1.32 N/A MR1 3.35 1.34 N/A 3.35 1.60
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
1.31 N/A MR1 3.33 1.33 N/A 3.33 1.59
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
1.36 N/A MR1 3.36 1.31 N/A 3.36 1.65
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+0.9 TEMP1+1.35
1.32 N/A MR1 3.35 1.34 N/A 3.35 1.60
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+0.9 TEMP1+1.35
1.31 N/A MR1 3.33 1.33 N/A 3.33 1.59
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+0.9 TEMP1+1.35
1.36 N/A MR1 3.36 1.31 N/A 3.36 1.65
1028 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+0.9 TEMP1+1.35
1.35 N/A MR1 3.35 1.31 N/A 3.35 1.63
1029 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+0.9 TEMP1+1.35
1.40 N/A MR1 3.48 1.37 N/A 3.48 1.61

Ed
1030 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+0.9 TEMP1+1.35
1.39 N/A MR1 3.46 1.36 N/A 3.46 1.59
1031 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+0.9 TEMP1+1.35
1.31 N/A MR1 3.41 1.41 N/A 3.41 1.64
1032 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+0.9 TEMP1+1.35
1.30 N/A MR1 3.39 1.39 N/A 3.39 1.63
1033 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
1.37 N/A MR1 3.37 1.31 N/A 3.37 1.59
1034 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
1.37 N/A MR1 3.35 1.30 N/A 3.35 1.58
1035 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
1.41 N/A MR1 3.44 1.33 N/A 3.44 1.64
1036 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
1.40 N/A MR1 3.42 1.32 N/A 3.42 1.62
1037 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
1.35 N/A MR1 3.44 1.39 N/A 3.44 1.59
1038 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
1.34 N/A MR1 3.41 1.38 N/A 3.41 1.58
1039 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
1.36 N/A MR1 3.49 1.42 N/A 3.49 1.63
1040 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
1.35 N/A MR1 3.47 1.41 N/A 3.47 1.61
1041 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.38 N/A MR1 3.50 1.41 N/A 3.50 1.68

F
1042 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.38 N/A MR1 3.48 1.40 N/A 3.48 1.67
1043 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.42 N/A MR1 3.51 1.38 N/A 3.51 1.74
1044 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.42 N/A MR1 3.49 1.37 N/A 3.49 1.72
1045 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.47 N/A MR1 3.64 1.44 N/A 3.64 1.69
1046 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.46 N/A MR1 3.62 1.43 N/A 3.62 1.67

PD
1047 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.37 N/A MR1 3.57 1.48 N/A 3.57 1.73
1048 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.36 N/A MR1 3.55 1.47 N/A 3.55 1.71
1049 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.44 N/A MR1 3.52 1.37 N/A 3.52 1.67
1050 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.43 N/A MR1 3.50 1.36 N/A 3.50 1.66
1051 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.48 N/A MR1 3.60 1.39 N/A 3.60 1.72
1052 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.47 N/A MR1 3.58 1.38 N/A 3.58 1.71
1053 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.42 N/A MR1 3.60 1.46 N/A 3.60 1.68
1054 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.40 N/A MR1 3.56 1.45 N/A 3.56 1.66
1055 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.43 N/A MR1 3.65 1.49 N/A 3.65 1.71
1056 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.42 N/A MR1 3.63 1.48 N/A 3.63 1.70
1057 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.38 N/A MR1 3.43 1.35 N/A 3.43 1.70
1058 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.37 N/A MR1 3.40 1.33 N/A 3.40 1.67
1059 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.45 N/A MR1 3.51 1.35 N/A 3.51 1.79
1060 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.44 N/A MR1 3.47 1.33 N/A 3.47 1.76
te r
1061 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.47 N/A MR1 3.66 1.45 N/A 3.66 1.71
1062 1.148 DL1+1.5
N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.44 N/A MR1 3.60 1.44 N/A 3.60 1.68
1063 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.36 N/A MR1 3.60 1.51 N/A 3.60 1.77
1064 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.35 N/A MR1 3.56 1.49 N/A 3.56 1.74
1065 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.44 N/A MR1 3.46 1.32 N/A 3.46 1.69
1066 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.43 N/A MR1 3.42 1.30 N/A 3.42 1.66
1067 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.51 N/A MR1 3.59 1.36 N/A 3.59 1.78
1068 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.50 N/A MR1 3.55 1.34 N/A 3.55 1.75
1069 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.39 N/A MR1 3.58 1.47 N/A 3.58 1.69
as

1070 1.148 DL1+1.5


N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.36 N/A MR1 3.52 1.45 N/A 3.52 1.67
1071 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.42 N/A MR1 3.68 1.53 N/A 3.68 1.76
1072 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.41 N/A MR1 3.65 1.51 N/A 3.65 1.73
1073 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a 2.12 N/A 4.63 1.69 N/A 4.63 2.49
1074 1 DL1+0.8
N/a LL1+1 SL2
N/a N/a 2.22 N/A 5.42 2.24 N/A 5.42 2.65
1075 1 DL1+0.8
N/a LL1+-1 SL1
N/a N/a 2.49 N/A 5.19 1.86 N/A 5.19 2.94
1076 1 DL1+0.8
N/a LL1+-1 SL2
N/a N/a 2.30 N/A 5.50 2.23 N/A 5.50 2.74
2001 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+11.90
MR1N/A 4.71 1.94 N/A 4.71 2.34
nM

2002 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+11.89
MR1N/A 4.68 1.92 N/A 4.68 2.32
2003 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+11.95
MR1N/A 4.72 1.89 N/A 4.72 2.41
2004 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+11.94
MR1N/A 4.70 1.88 N/A 4.70 2.39
2005 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+12.00
MR1N/A 4.88 1.97 N/A 4.88 2.35
2006 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+12.00
MR1N/A 4.85 1.96 N/A 4.85 2.33
2007 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+11.89
MR1N/A 4.79 2.02 N/A 4.79 2.39
2008 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+11.88
MR1N/A 4.76 2.00 N/A 4.76 2.37
2009 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.97
MR1N/A 4.74 1.89 N/A 4.74 2.32
2010 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.96
MR1N/A 4.71 1.88 N/A 4.71 2.30
2011 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1 2.02
MR1N/A 4.82 1.91 N/A 4.82 2.39
2012 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1 2.01
MR1N/A 4.80 1.90 N/A 4.80 2.37
2013 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.95
MR1N/A 4.83 1.99 N/A 4.83 2.33
2014 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.93
MR1N/A 4.79 1.98 N/A 4.79 2.31
2015 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.95
MR1N/A 4.89 2.03 N/A 4.89 2.38
di

2016 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.95
MR1N/A 4.87 2.02 N/A 4.87 2.36
2017 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+11.90
MR1N/A 4.63 1.87 N/A 4.63 2.36
2018 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+11.89
MR1N/A 4.59 1.84 N/A 4.59 2.33
2019 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+11.98
MR1N/A 4.71 1.85 N/A 4.71 2.48
2020 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+11.97
MR1N/A 4.67 1.83 N/A 4.67 2.44
2021 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+12.01
MR1N/A 4.90 1.99 N/A 4.90 2.37
2022 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+11.97
MR1N/A 4.83 1.96 N/A 4.83 2.33
2023 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+11.87
MR1N/A 4.82 2.06 N/A 4.82 2.45
a te

2024 1 DL1+1.0
N/a LL1+1 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+11.86
MR1N/A 4.78 2.03 N/A 4.78 2.42
2025 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.97
MR1N/A 4.66 1.83 N/A 4.66 2.34
2026 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.95
MR1N/A 4.61 1.80 N/A 4.61 2.31
2027 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1 2.06
MR1N/A 4.81 1.87 N/A 4.81 2.46
2028 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1 2.04
MR1N/A 4.77 1.85 N/A 4.77 2.42
2029 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.92
MR1N/A 4.81 2.01 N/A 4.81 2.35
2030 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.88
MR1N/A 4.74 1.98 N/A 4.74 2.32
2031 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.94
MR1N/A 4.93 2.08 N/A 4.93 2.43
2032 1 DL1+0.7
N/a LL1+1 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.93
MR1N/A 4.88 2.05 N/A 4.88 2.40
2033 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a 2.12 N/A 4.63 1.69 N/A 4.63 2.49
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
FOUNDATION FOR PEDESTAL (P14)-(Pile Capacity Check)

Ed
LOAD CASE: 520 1 DL1+1.0
520 LL1+0.75
1 DL1+0.75
WL3+1
LL1+0.75
EQUIP1
WL3+1 EQUIP1

GENERAL PILECAP DIMENSIONS, POSITION


Concrete Density 2.5 ton/m3 Pilecap thickness 1.300 m
Soil Density 2 ton/m3 Z cordinate of center of the pilecap -12.000 m
Grade of Concrete (Cylinder) C 30 X cordinate of center of the pilecap 18.250 m
Grade of Steel Fe 500 Length along axis Z, L z 3.540 m
Level of Base of pilecap -5.1 m Length along axis X, L x 3.540 m

F
Finished Ground level -0.6 m Area of base of pilecap, A 12.53 m2
Level of max water table -0.6 m

PD
PEDESTAL (COLUMN) DIMENSIONS, POSITIONS & LOADS
C.G. of Pedestal Ped top P + W ped
Pedestal ID Lz-z (m) Lx-x (m) P (T) Hz (T) Mx (T-m) Hx (T) Mz (T-m)
Z X [Level of (T)
P14 1.250 1.250 -12.000 18.250 -5.100 186.11 -1.31 -15.95 -30.98 -85.13 186.11

PILE DETAILS
Number of Piles 4 CGz of Pile group -12 m
Diameter of Piles 760 mm CGx of Pile group 18.25 m
2
Compressive capacity of piles 192 T SUM[(Xi-Xcg)2] of Pile group 5.198 m
2
SUM[(Zi-Zcg)2] of Pile group
te r
Tensile capacity of piles 40 T 5.198 m
Shear capacity of piles 11.5 T

Weight of soil, W soil 56.39 T


Weight of footing, W f ooting 8.15 T
Axial load due to [P+ W ped] 186.11 T
Total axial Load 250.65 T
as

Mz due to [Mz+(P+W ped)*ex ] -85.13 Ton-m Mx due to [Mx+(P+W ped)*ez] -15.95 Ton-m
Eccentricity between Pilecap and Pile group 0.00 mm Eccentricity between Pilecap and Pile group 0.00 mm
Mz due to pilecap and pile group eccentricity 0.00 Ton-m Mx due to pilecap and pile group eccentricity 0.00 Ton-m
Total Mz -85.13 Ton-m Total Mx -15.95 Ton-m
nM

Distance Distance P due to


from pile from pile Axial P due to P due to
Pile ID CGx CGz group CGx group CGz Load (T) Mx (T) Mz (T) Total P (T) Shear (T)
PCG-3-1 17.11 -13.14 -1.14 -1.14 62.66 3.50 18.67 84.83 7.75
PCG-3-2 17.11 -10.86 -1.14 1.14 62.66 -3.50 18.67 77.83 7.75
PCG-3-3 19.39 -13.14 1.14 -1.14 62.66 3.50 -18.67 47.49 7.75
PCG-3-4 19.39 -10.86 1.14 1.14 62.66 -3.50 -18.67 40.50 7.75
di
a te
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
F AC TOR OF SAF ETY F OR ALL LOAD C ASES ( Per mis s ible/ Ac tual)

Pile Reaction ALONG Z-Z ALONG X-X


Compressi pt at Shear pt at Shear

Ed
Load case pt at top pt at top Punching
on Tension Shear bottom stress bottom stress
500 1 DL1+1 LL1+12.43
EQUIP1
N/a 2.81 N/A N/A N/A N/A N/A N/A N/A
501 1 DL1+1 LL1+12.36
EQUIP1+1
N/a TEMP1 2.39 N/A N/A N/A N/A N/A N/A N/A
502 1 DL1+1 WL1 2.61 N/a 4.56 N/A N/A N/A N/A N/A N/A N/A
503 1 DL1+1 WL2 2.57 N/a 4.48 N/A N/A N/A N/A N/A N/A N/A
504 1 DL1+1 WL3 3.42 N/a 1.57 N/A N/A N/A N/A N/A N/A N/A
505 1 DL1+1 WL4 3.39 N/a 1.58 N/A N/A N/A N/A N/A N/A N/A
506 1 DL1+1 WL5 3.50 N/a 2.85 N/A N/A N/A N/A N/A N/A N/A
507 1 DL1+1 WL6 3.46 N/a 2.87 N/A N/A N/A N/A N/A N/A N/A
508 1 DL1+1 WL7 3.55 N/a 4.10 N/A N/A N/A N/A N/A N/A N/A

F
509 1 DL1+1 WL8 3.51 N/a 4.16 N/A N/A N/A N/A N/A N/A N/A
510 1 DL1+0.7 WL12.98 N/a 10.19 N/A N/A N/A N/A N/A N/A N/A
511 1 DL1+0.7 WL22.94 N/a 9.90 N/A N/A N/A N/A N/A N/A N/A
512 1 DL1+0.7 WL33.57 N/a 1.96 N/A N/A N/A N/A N/A N/A N/A

PD
513 1 DL1+0.7 WL43.54 N/a 1.97 N/A N/A N/A N/A N/A N/A N/A
514 1 DL1+0.7 WL53.63 N/a 3.29 N/A N/A N/A N/A N/A N/A N/A
515 1 DL1+0.7 WL63.60 N/a 3.32 N/A N/A N/A N/A N/A N/A N/A
516 1 DL1+0.7 WL73.68 N/a 4.58 N/A N/A N/A N/A N/A N/A N/A
517 1 DL1+0.7 WL83.65 N/a 4.64 N/A N/A N/A N/A N/A N/A N/A
518 1 DL1+ 1LL1+0.75
2.06WL1+1
N/a EQUIP1 22.84 N/A N/A N/A N/A N/A N/A N/A
519 1 DL1+1.0 LL1+0.75
2.04 N/a
WL2+1 EQUIP1 24.48 N/A N/A N/A N/A N/A N/A N/A
520 1 DL1+1.0 LL1+0.75
2.26 N/a
WL3+1 EQUIP1 1.48 N/A N/A N/A N/A N/A N/A N/A
521 1 DL1+1.0 LL1+0.75
2.25 N/a
WL4+1 EQUIP1 1.49 N/A N/A N/A N/A N/A N/A N/A
522 1 DL1+1.0 LL1+0.75
2.49 N/a
WL5+1 EQUIP1 2.45 N/A N/A N/A N/A N/A N/A N/A
523 1 DL1+1.0 LL1+0.75
2.48 N/a
WL6+1 EQUIP1 2.47 N/A N/A N/A N/A N/A N/A N/A
te r
524 1 DL1+1.0 LL1+0.75
2.29 N/a
WL7+1 EQUIP1 2.61 N/A N/A N/A N/A N/A N/A N/A
525 1 DL1+1.0 LL1+0.75
2.28 N/a
WL8+1 EQUIP1 2.64 N/A N/A N/A N/A N/A N/A N/A
526 1 DL1+1.0 LL1+12.15
EQUIP1+0.525
N/a SL1 1.62 N/A N/A N/A N/A N/A N/A N/A
527 1 DL1+1.0 LL1+12.40
EQUIP1+0.525
N/a SL2 2.60 N/A N/A N/A N/A N/A N/A N/A
528 0.6 DL1+1 WL13.06 N/a 3.33 N/A N/A N/A N/A N/A N/A N/A
529 0.6 DL1+1 WL23.00 N/a 3.29 N/A N/A N/A N/A N/A N/A N/A
530 0.6 DL1+1 WL34.44 N/a 1.81 N/A N/A N/A N/A N/A N/A N/A
531 0.6 DL1+1 WL44.38 N/a 1.83 N/A N/A N/A N/A N/A N/A N/A
as

532 0.6 DL1+1 WL54.57 N/a 3.56 N/A N/A N/A N/A N/A N/A N/A
533 0.6 DL1+1 WL64.50 N/a 3.59 N/A N/A N/A N/A N/A N/A N/A
534 0.6 DL1+1 WL74.63 N/a 5.01 N/A N/A N/A N/A N/A N/A N/A
535 0.6 DL1+1 WL84.57 N/a 5.08 N/A N/A N/A N/A N/A N/A N/A
536 0.6 DL1+0.7 SL13.34 N/a 2.11 N/A N/A N/A N/A N/A N/A N/A
537 0.6 DL1+0.7 SL25.29 N/a 6.18 N/A N/A N/A N/A N/A N/A N/A
1001 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1 N/A N/A N/A N/A N/A N/A N/A
nM

1002 1.35 DL1+1.5


N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1N/A N/A N/A N/A N/A N/A N/A
1003 1.35 DL1+1.5
N/a WL1+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1004 1.35 DL1+1.5
N/a WL2+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1005 1.35 DL1+1.5
N/a WL3+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1006 1.35 DL1+1.5
N/a WL4+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1007 1.35 DL1+1.5
N/a WL5+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1008 1.35 DL1+1.5
N/a WL6+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1009 1.35 DL1+1.5
N/a WL7+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1010 1.35 DL1+1.5
N/a WL8+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1011 1.35 DL1+1.5
N/a WL1+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1012 1.35 DL1+1.5
N/a WL2+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
di

1013 1.35 DL1+1.5


N/a WL3+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1014 1.35 DL1+1.5
N/a WL4+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1015 1.35 DL1+1.5
N/a WL5+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1016 1.35 DL1+1.5
N/a WL6+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1017 1.35 DL1+1.5
N/a WL7+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1018 1.35 DL1+1.5
N/a WL8+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1019 1.35 DL1+0.9
N/a TEMP1+1.35
N/a MR1
N/a N/A N/A N/A N/A N/A N/A N/A
a te

1020 1.35 DL1+-0.9


N/a TEMP1+1.35
N/a MR1
N/a N/A N/A N/A N/A N/A N/A N/A
1021 1.35 DL1+1.5LL1+1.5
N/a N/aEQUIP1+0.9
N/a TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A N/A
1022 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1023 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1024 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1028 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1029 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

Ed
1030 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1031 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1032 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1033 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1034 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1035 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1036 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1037 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1038 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1039 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1040 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1041 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

F
1042 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1043 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1044 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1045 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1046 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

PD
1047 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1048 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1049 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1050 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1051 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1052 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1053 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1054 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1055 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1056 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1057 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1058 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1059 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1060 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
te r
1061 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1062 1.148 DL1+1.5
N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1063 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1064 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1065 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1066 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1067 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1068 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1069 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
as

1070 1.148 DL1+1.5


N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1071 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1072 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1073 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1074 1 DL1+0.8
N/a LL1+1 SL2
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1075 1 DL1+0.8
N/a LL1+-1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1076 1 DL1+0.8
N/a LL1+-1 SL2
N/a N/a N/A N/A N/A N/A N/A N/A N/A
2001 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
nM

2002 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2003 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2004 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2005 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2006 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2007 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2008 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2009 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2010 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2011 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2012 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2013 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2014 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2015 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
di

2016 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2017 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2018 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2019 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2020 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2021 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2022 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2023 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
a te

2024 1 DL1+1.0
N/a LL1+1 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2025 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2026 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2027 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2028 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2029 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2030 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2031 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2032 1 DL1+0.7
N/a LL1+1 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2033 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
FOUNDATION FOR PEDESTAL (P14)-(Pilecap Design)

Ed
LOAD CASE: 1066 1.1481066
DL1+1.5
1.148
LL1+1.5
DL1+1.05
WL2+1.5
LL1+1.5
EQUIP1+-0.9
WL2+1.05 EQUIP1+-0.9
TEMP1+1.35 TEMP1+1.35
MR1 MR1

GENERAL PILECAP DIMENSIONS, POSITION


Concrete Density 2.5 ton/m3 Pilecap thickness 1.300 m
Soil Density 2 ton/m3 Z cordinate of center of the pilecap -12.000 m
Grade of Concrete (Cylinder) C 30 X cordinate of center of the pilecap 18.250 m
Grade of Steel Fe 500 Length along axis Z, L z 3.540 m
Level of Base of pilecap -5.1 m Length along axis X, L x 3.540 m
m2

F
Finished Ground level -0.6 m Area of base of pilecap, A 12.53
Level of max water table -0.6 m

PD
PEDESTAL (COLUMN) DIMENSIONS, POSITIONS & LOADS
C.G. of Pedestal Ped top P + W ped
Pedestal ID Lz-z (m) Lx-x (m) P (T) Hz (T) Mx (T-m) Hx (T) Mz (T-m)
Z X [Level of (T)
P14 1.250 1.250 -12.000 18.250 -5.100 365.08 -2.26 -25.62 11.09 116.75 365.08

PILE DETAILS
Number of Piles 4 CGz of Pile group -12 m
Diameter of Piles 760 mm CGx of Pile group 18.25 m
2
Compressive capacity of piles 192 T SUM[(Xi-Xcg)2] of Pile group 5.198 m
2
Tensile capacity of piles 40 T SUM[(Zi-Zcg)2] of Pile group 5.198 m
Shear capacity of piles 11.5 T
te r
Weight of soil, W soil 76.13 T
Weight of footing, W f ooting 11.00 T
Axial load due to [P+ W ped] 365.08 T
Total axial Load 452.21 T

Mz due to [Mz+(P+W ped)*ex ] 116.75 Ton-m Mx due to [Mx+(P+W ped)*ez] -25.62 Ton-m
as

Eccentricity between Pilecap and Pile group 0.00 mm Eccentricity between Pilecap and Pile group 0.00 mm
Mz due to pilecap and pile group eccentricity 0.00 Ton-m Mx due to pilecap and pile group eccentricity 0.00 Ton-m
Total Mz 116.75 Ton-m Total Mx -25.62 Ton-m

Distance Distance P due to


from pile from pile Axial P due to P due to
nM

Pile ID CGx CGz group CGx group CGz Load (T) Mx (T) Mz (T) Total P (T) Shear (T)
PCG-3-1 17.11 -13.14 -1.14 -1.14 113.05 5.62 -25.60 93.07 2.83
PCG-3-2 17.11 -10.86 -1.14 1.14 113.05 -5.62 -25.60 81.83 2.83
PCG-3-3 19.39 -13.14 1.14 -1.14 113.05 5.62 25.60 144.27 2.83
PCG-3-4 19.39 -10.86 1.14 1.14 113.05 -5.62 25.60 133.04 2.83

Load factor for Limit State design 1 Along Axis -----> Z-Z X-X
Ultimate sagging(+)
di

Moment,Mup(Tm/width) 29.88 35.42


Along Axis -----> Z-Z X-X Effective Depth (for + M), d (m) 1.17 1.17
Ultimate Shear force (In sagging zone)(T/width) 23.40 27.65 Mup/bd2 (N/mm2) 0.22 0.26
Nominal shear stress (N/mm 2) 0.20 0.24 Tensile steel required at bottom (%) 0.05 0.06
Max allowable shear stress (N/mm 2) 0.32 0.32 Provide bars of dia (mm) 20 20
Ultimate Shear force (In hogging zone)(T) 6.14 6.56 at c/c distance (mm) 150 150
Nominal shear stress (N/mm 2) 0.05 0.06 Tensile steel provided at bottom (%) 0.18 0.18
a te

Max allowable shear stress (N/mm 2) 0.32 0.32 Ultimate hogging(-)


Stirrup Diameter (mm) 12 Moment,Mun(Tm/meter width) 0.00 0.00
Stirrup spacing (N/mm 2) 150 150 Mun/bd2 (N/mm2) 0.00 0.00
Stress in stirrup (N/mm 2) 17.69 20.91 Tensile steel required at top (%) 0.00 0.00
Total Stirrup stress (N/mm 2) 38.60 Provide bars of dia (mm) 20 20
Permissible Stirrup stress (N/mm 2) 434.78 at c/c distance (mm) 150 150
Tensile steel provided at top (%) 0.18 0.18
Effective Depth (for - M), d (m) 1.170 1.170
re

P UNC H I NG S H EAR FO R P EDES TALS


Pedestal ID Ultimate Design Area for resisting Punching Shear Allowable punching
P14 87.13 Ton 11.33 m2 0.08 N/mm2 1.37 N/mm2
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
F AC TOR OF SAF ETY F OR ALL LOAD C ASES ( Per mis s ible/ Ac tual)

Pile Reaction ALONG Z-Z ALONG X-X


Compressi pt at Shear pt at Shear

Ed
Load case pt at top pt at top Punching
on Tension Shear bottom stress bottom stress
500 1 DL1+1N/a
LL1+1 EQUIP1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
501 1 DL1+1N/a
LL1+1 EQUIP1+1
N/a TEMP1
N/a N/A N/A N/A N/A N/A N/A N/A
502 1 DL1+1N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
503 1 DL1+1N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
504 1 DL1+1N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A
505 1 DL1+1N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
506 1 DL1+1N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
507 1 DL1+1N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
508 1 DL1+1N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A

F
509 1 DL1+1N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
510 1 DL1+0.7
N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
511 1 DL1+0.7
N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
512 1 DL1+0.7
N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A

PD
513 1 DL1+0.7
N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
514 1 DL1+0.7
N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
515 1 DL1+0.7
N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
516 1 DL1+0.7
N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A
517 1 DL1+0.7
N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
518 1 DL1+ 1LL1+0.75
N/a WL1+1
N/a EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
519 1 DL1+1.0
N/a
LL1+0.75 N/a
WL2+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
520 1 DL1+1.0
N/a
LL1+0.75 N/a
WL3+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
521 1 DL1+1.0
N/a
LL1+0.75 N/a
WL4+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
522 1 DL1+1.0
N/a
LL1+0.75 N/a
WL5+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
523 1 DL1+1.0
N/a
LL1+0.75 N/a
WL6+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
te r
524 1 DL1+1.0
N/a
LL1+0.75 N/a
WL7+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
525 1 DL1+1.0
N/a
LL1+0.75 N/a
WL8+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
526 1 DL1+1.0
N/a
LL1+1 EQUIP1+0.525
N/a N/a
SL1 N/A N/A N/A N/A N/A N/A N/A
527 1 DL1+1.0
N/a
LL1+1 EQUIP1+0.525
N/a N/a
SL2 N/A N/A N/A N/A N/A N/A N/A
528 0.6 DL1+1
N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
529 0.6 DL1+1
N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
530 0.6 DL1+1
N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A
531 0.6 DL1+1
N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
as

532 0.6 DL1+1


N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
533 0.6 DL1+1
N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
534 0.6 DL1+1
N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A
535 0.6 DL1+1
N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
536 0.6 DL1+0.7
N/a SL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
537 0.6 DL1+0.7
N/a SL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
1001 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1 4.12 N/A 13.97 3.98 N/A 13.97 17.80
nM

1002 1.35 DL1+1.5


N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1 4.10 N/A 14.25 4.16 N/A 14.25 17.80
1003 1.35 DL1+1.5
N/a WL1+0.9
N/a TEMP1 N/a 5.90 N/A 17.35 4.34 N/A 17.35 17.80
1004 1.35 DL1+1.5
N/a WL2+0.9
N/a TEMP1 N/a 5.77 N/A 16.96 4.24 N/A 16.96 17.80
1005 1.35 DL1+1.5
N/a WL3+0.9
N/a TEMP1 N/a 12.83 N/A 28.13 5.86 N/A 28.13 17.80
1006 1.35 DL1+1.5
N/a WL4+0.9
N/a TEMP1 N/a 12.21 N/A 27.41 5.78 N/A 27.41 17.80
1007 1.35 DL1+1.5
N/a WL5+0.9
N/a TEMP1 N/a 7.12 N/A 25.68 7.61 N/A 25.68 17.80
1008 1.35 DL1+1.5
N/a WL6+0.9
N/a TEMP1 N/a 6.93 N/A 25.08 7.47 N/A 25.08 17.80
1009 1.35 DL1+1.5
N/a WL7+0.9
N/a TEMP1 N/a 6.69 N/A 24.85 7.66 N/A 24.85 17.80
1010 1.35 DL1+1.5
N/a WL8+0.9
N/a TEMP1 N/a 6.52 N/A 24.29 7.52 N/A 24.29 17.80
1011 1.35 DL1+1.5
N/a WL1+-0.9
N/a TEMP1 N/a 5.86 N/A 16.70 4.09 N/A 16.70 17.80
1012 1.35 DL1+1.5
N/a WL2+-0.9
N/a TEMP1 N/a 5.72 N/A 16.34 4.00 N/A 16.34 17.80
di

1013 1.35 DL1+1.5


N/a WL3+-0.9
N/a TEMP1 N/a 12.52 N/A 29.22 6.26 N/A 29.22 17.80
1014 1.35 DL1+1.5
N/a WL4+-0.9
N/a TEMP1 N/a 11.92 N/A 28.44 6.17 N/A 28.44 17.80
1015 1.35 DL1+1.5
N/a WL5+-0.9
N/a TEMP1 N/a 7.02 N/A 26.59 8.30 N/A 26.59 17.80
1016 1.35 DL1+1.5
N/a WL6+-0.9
N/a TEMP1 N/a 6.83 N/A 25.94 8.13 N/A 25.94 17.80
1017 1.35 DL1+1.5
N/a WL7+-0.9
N/a TEMP1 N/a 6.64 N/A 25.77 8.36 N/A 25.77 17.80
1018 1.35 DL1+1.5
N/a WL8+-0.9
N/a TEMP1 N/a 6.47 N/A 25.17 8.19 N/A 25.17 17.80
1019 1.35 DL1+0.9
N/a TEMP1+1.35
N/a MR1
N/a 8.06 N/A 26.36 7.13 N/A 26.36 17.80
a te

1020 1.35 DL1+-0.9


N/a TEMP1+1.35
N/a MR1
N/a 7.93 N/A 27.39 7.74 N/A 27.39 17.80
1021 1.35 DL1+1.5LL1+1.5
N/a N/aEQUIP1+0.9
N/a TEMP1+1.35 4.09
MR1N/A 13.88 3.96 N/A 13.88 17.80
1022 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35 4.07
MR1N/A 14.16 4.14 N/A 14.16 17.80
1023 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1+1.35 4.38
MR1N/A 14.90 4.25 N/A 14.90 17.80
1024 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.354.36
MR1
N/A 15.22 4.46 N/A 15.22 17.80
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
3.67 N/A MR1 12.54 3.59 N/A 12.54 17.80
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
3.64 N/A MR1 12.42 3.55 N/A 12.42 17.80
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
4.61 N/A MR1 14.12 3.68 N/A 14.12 17.80
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+0.9 TEMP1+1.35
3.67 N/A MR1 12.54 3.59 N/A 12.54 17.80
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+0.9 TEMP1+1.35
3.64 N/A MR1 12.42 3.55 N/A 12.42 17.80
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+0.9 TEMP1+1.35
4.61 N/A MR1 14.12 3.68 N/A 14.12 17.80
1028 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+0.9 TEMP1+1.35
4.56 N/A MR1 14.01 3.66 N/A 14.01 17.80
1029 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+0.9 TEMP1+1.35
4.48 N/A MR1 14.68 4.03 N/A 14.68 17.80

Ed
1030 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+0.9 TEMP1+1.35
4.44 N/A MR1 14.56 4.00 N/A 14.56 17.80
1031 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+0.9 TEMP1+1.35
3.84 N/A MR1 13.57 4.04 N/A 13.57 17.80
1032 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+0.9 TEMP1+1.35
3.80 N/A MR1 13.47 4.01 N/A 13.47 17.80
1033 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
3.65 N/A MR1 12.20 3.41 N/A 12.20 17.80
1034 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
3.62 N/A MR1 12.08 3.38 N/A 12.08 17.80
1035 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
4.59 N/A MR1 14.41 3.83 N/A 14.41 17.80
1036 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
4.54 N/A MR1 14.30 3.81 N/A 14.30 17.80
1037 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
4.44 N/A MR1 14.97 4.21 N/A 14.97 17.80
1038 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
4.40 N/A MR1 14.85 4.19 N/A 14.85 17.80
1039 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
3.82 N/A MR1 13.84 4.22 N/A 13.84 17.80
1040 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
3.79 N/A MR1 13.73 4.20 N/A 13.73 17.80
1041 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+0.9 TEMP1+1.35
3.90 N/A MR1 13.29 3.79 N/A 13.29 17.80

F
1042 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+0.9 TEMP1+1.35
3.86 N/A MR1 13.15 3.74 N/A 13.15 17.80
1043 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.98 N/A MR1 15.18 3.93 N/A 15.18 17.80
1044 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.92 N/A MR1 15.05 3.91 N/A 15.05 17.80
1045 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.84 N/A MR1 15.83 4.33 N/A 15.83 17.80
1046 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.78 N/A MR1 15.69 4.31 N/A 15.69 17.80

PD
1047 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.09 N/A MR1 14.54 4.34 N/A 14.54 17.80
1048 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.05 N/A MR1 14.43 4.32 N/A 14.43 17.80
1049 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
3.88 N/A MR1 12.91 3.60 N/A 12.91 17.80
1050 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
3.84 N/A MR1 12.77 3.56 N/A 12.77 17.80
1051 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.95 N/A MR1 15.51 4.11 N/A 15.51 17.80
1052 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.89 N/A MR1 15.38 4.08 N/A 15.38 17.80
1053 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.79 N/A MR1 16.17 4.55 N/A 16.17 17.80
1054 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.74 N/A MR1 16.03 4.52 N/A 16.03 17.80
1055 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.07 N/A MR1 14.85 4.56 N/A 14.85 17.80
1056 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.03 N/A MR1 14.73 4.53 N/A 14.73 17.80
1057 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+0.9 TEMP1+1.35
3.63 N/A MR1 11.74 3.19 N/A 11.74 17.80
1058 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+0.9 TEMP1+1.35
3.58 N/A MR1 11.56 3.14 N/A 11.56 17.80
1059 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+0.9 TEMP1+1.35
5.48 N/A MR1 15.37 3.74 N/A 15.37 17.80
1060 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+0.9 TEMP1+1.35
5.37 N/A MR1 15.15 3.71 N/A 15.15 17.80
te r
1061 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.68 N/A MR1 15.69 4.39 N/A 15.69 17.80
1062 1.148 DL1+1.5
N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.60 N/A MR1 15.46 4.34 N/A 15.46 17.80
1063 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+0.9 TEMP1+1.35
3.92 N/A MR1 14.31 4.41 N/A 14.31 17.80
1064 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+0.9 TEMP1+1.35
3.86 N/A MR1 14.13 4.36 N/A 14.13 17.80
1065 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
3.61 N/A MR1 11.43 3.05 N/A 11.43 17.80
1066 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
3.56 N/A MR1 11.26 3.00 N/A 11.26 17.80
1067 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
5.45 N/A MR1 15.71 3.90 N/A 15.71 17.80
1068 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
5.33 N/A MR1 15.49 3.87 N/A 15.49 17.80
1069 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.64 N/A MR1 16.02 4.61 N/A 16.02 17.80
as

1070 1.148 DL1+1.5


N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.55 N/A MR1 15.79 4.56 N/A 15.79 17.80
1071 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
3.90 N/A MR1 14.61 4.63 N/A 14.61 17.80
1072 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
3.84 N/A MR1 14.42 4.58 N/A 14.42 17.80
1073 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a 5.31 N/A 16.35 4.25 N/A 16.35 17.80
1074 1 DL1+0.8
N/a LL1+1 SL2
N/a N/a 6.24 N/A 21.67 6.25 N/A 21.67 17.80
1075 1 DL1+0.8
N/a LL1+-1 SL1
N/a N/a 8.65 N/A 23.19 5.41 N/A 23.19 17.80
1076 1 DL1+0.8
N/a LL1+-1 SL2
N/a N/a 6.60 N/A 22.19 6.16 N/A 22.19 17.80
2001 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+15.13
MR1N/A 17.64 5.04 N/A 17.64 17.80
nM

2002 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+15.09
MR1N/A 17.48 4.99 N/A 17.48 17.80
2003 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+16.33
MR1N/A 19.62 5.12 N/A 19.62 17.80
2004 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+16.27
MR1N/A 19.47 5.09 N/A 19.47 17.80
2005 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+16.17
MR1N/A 20.35 5.57 N/A 20.35 17.80
2006 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+16.11
MR1N/A 20.19 5.54 N/A 20.19 17.80
2007 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+15.35
MR1N/A 18.91 5.58 N/A 18.91 17.80
2008 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+15.30
MR1N/A 18.77 5.55 N/A 18.77 17.80
2009 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1 5.11
MR1N/A 17.19 4.82 N/A 17.19 17.80
2010 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1 5.07
MR1N/A 17.03 4.77 N/A 17.03 17.80
2011 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1 6.30
MR1N/A 19.99 5.32 N/A 19.99 17.80
2012 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1 6.24
MR1N/A 19.84 5.29 N/A 19.84 17.80
2013 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1 6.12
MR1N/A 20.72 5.81 N/A 20.72 17.80
2014 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1 6.06
MR1N/A 20.56 5.77 N/A 20.56 17.80
2015 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1 5.32
MR1N/A 19.25 5.82 N/A 19.25 17.80
di

2016 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1 5.28
MR1N/A 19.12 5.78 N/A 19.12 17.80
2017 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+14.82
MR1N/A 15.79 4.32 N/A 15.79 17.80
2018 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+14.76
MR1N/A 15.57 4.26 N/A 15.57 17.80
2019 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+16.87
MR1N/A 19.83 4.91 N/A 19.83 17.80
2020 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+16.74
MR1N/A 19.59 4.87 N/A 19.59 17.80
2021 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+16.00
MR1N/A 20.19 5.63 N/A 20.19 17.80
2022 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+15.91
MR1N/A 19.94 5.58 N/A 19.94 17.80
2023 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+15.15
MR1N/A 18.65 5.65 N/A 18.65 17.80
a te

2024 1 DL1+1.0
N/a LL1+1 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+15.08
MR1N/A 18.44 5.60 N/A 18.44 17.80
2025 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1 4.80
MR1N/A 15.42 4.15 N/A 15.42 17.80
2026 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1 4.74
MR1N/A 15.22 4.10 N/A 15.22 17.80
2027 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1 6.83
MR1N/A 20.21 5.09 N/A 20.21 17.80
2028 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1 6.71
MR1N/A 19.96 5.05 N/A 19.96 17.80
2029 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1 5.95
MR1N/A 20.56 5.87 N/A 20.56 17.80
2030 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1 5.86
MR1N/A 20.30 5.82 N/A 20.30 17.80
2031 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1 5.13
MR1N/A 18.99 5.89 N/A 18.99 17.80
2032 1 DL1+0.7
N/a LL1+1 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1 5.06
MR1N/A 18.77 5.84 N/A 18.77 17.80
2033 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a 5.31 N/A 16.35 4.25 N/A 16.35 17.80
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
FOUNDATION FOR PEDESTAL (P17)-(Pile Capacity Check)

Ed
LOAD CASE: 518 1 DL1+518
1LL1+0.75
1 DL1+0.75
WL1+1
LL1+0.75
EQUIP1WL1+1 EQUIP1

GENERAL PILECAP DIMENSIONS, POSITION


Concrete Density 2.5 ton/m3 Pilecap thickness 1.300 m
Soil Density 2 ton/m3 Z cordinate of center of the pilecap -12.000 m
Grade of Concrete (Cylinder) C 30 X cordinate of center of the pilecap 26.750 m
Grade of Steel Fe 500 Length along axis Z, L z 3.540 m
Level of Base of pilecap -5.1 m Length along axis X, L x 3.540 m

F
Finished Ground level -0.6 m Area of base of pilecap, A 12.53 m2
Level of max water table -0.6 m

PD
PEDESTAL (COLUMN) DIMENSIONS, POSITIONS & LOADS
C.G. of Pedestal Ped top P + W ped
Pedestal ID Lz-z (m) Lx-x (m) P (T) Hz (T) Mx (T-m) Hx (T) Mz (T-m)
Z X [Level of (T)
P17 1.250 1.250 -12.000 26.750 -5.100 203.34 -1.50 -18.22 30.08 80.03 203.34

PILE DETAILS
Number of Piles 4 CGz of Pile group -12 m
Diameter of Piles 760 mm CGx of Pile group 26.75 m
2
Compressive capacity of piles 192 T SUM[(Xi-Xcg)2] of Pile group 5.198 m
2
SUM[(Zi-Zcg)2] of Pile group
te r
Tensile capacity of piles 40 T 5.198 m
Shear capacity of piles 11.5 T

Weight of soil, W soil 56.39 T


Weight of footing, W f ooting 8.15 T
Axial load due to [P+ W ped] 203.34 T
Total axial Load 267.88 T
as

Mz due to [Mz+(P+W ped)*ex ] 80.03 Ton-m Mx due to [Mx+(P+W ped)*ez] -18.22 Ton-m
Eccentricity between Pilecap and Pile group 0.00 mm Eccentricity between Pilecap and Pile group 0.00 mm
Mz due to pilecap and pile group eccentricity 0.00 Ton-m Mx due to pilecap and pile group eccentricity 0.00 Ton-m
Total Mz 80.03 Ton-m Total Mx -18.22 Ton-m
nM

Distance Distance P due to


from pile from pile Axial P due to P due to
Pile ID CGx CGz group CGx group CGz Load (T) Mx (T) Mz (T) Total P (T) Shear (T)
PCG-5-1 25.61 -13.14 -1.14 -1.14 66.97 4.00 -17.55 53.42 7.53
PCG-5-2 25.61 -10.86 -1.14 1.14 66.97 -4.00 -17.55 45.42 7.53
PCG-5-3 27.89 -13.14 1.14 -1.14 66.97 4.00 17.55 88.52 7.53
PCG-5-4 27.89 -10.86 1.14 1.14 66.97 -4.00 17.55 80.52 7.53
di
a te
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
F AC TOR OF SAF ETY F OR ALL LOAD C ASES ( Per mis s ible/ Ac tual)

Pile Reaction ALONG Z-Z ALONG X-X


Compressi pt at Shear pt at Shear

Ed
Load case pt at top pt at top Punching
on Tension Shear bottom stress bottom stress
500 1 DL1+1 LL1+12.33
EQUIP1
N/a 2.98 N/A N/A N/A N/A N/A N/A N/A
501 1 DL1+1 LL1+12.26
EQUIP1+1
N/a TEMP1 2.50 N/A N/A N/A N/A N/A N/A N/A
502 1 DL1+1 WL1 3.39 N/a 1.57 N/A N/A N/A N/A N/A N/A N/A
503 1 DL1+1 WL2 3.35 N/a 1.57 N/A N/A N/A N/A N/A N/A N/A
504 1 DL1+1 WL3 2.56 N/a 4.46 N/A N/A N/A N/A N/A N/A N/A
505 1 DL1+1 WL4 2.53 N/a 4.43 N/A N/A N/A N/A N/A N/A N/A
506 1 DL1+1 WL5 3.62 N/a 3.37 N/A N/A N/A N/A N/A N/A N/A
507 1 DL1+1 WL6 3.57 N/a 3.38 N/A N/A N/A N/A N/A N/A N/A
508 1 DL1+1 WL7 3.40 N/a 3.47 N/A N/A N/A N/A N/A N/A N/A

F
509 1 DL1+1 WL8 3.37 N/a 3.50 N/A N/A N/A N/A N/A N/A N/A
510 1 DL1+0.7 WL13.54 N/a 1.96 N/A N/A N/A N/A N/A N/A N/A
511 1 DL1+0.7 WL23.51 N/a 1.96 N/A N/A N/A N/A N/A N/A N/A
512 1 DL1+0.7 WL32.92 N/a 9.46 N/A N/A N/A N/A N/A N/A N/A

PD
513 1 DL1+0.7 WL42.89 N/a 9.36 N/A N/A N/A N/A N/A N/A N/A
514 1 DL1+0.7 WL53.70 N/a 3.83 N/A N/A N/A N/A N/A N/A N/A
515 1 DL1+0.7 WL63.67 N/a 3.83 N/A N/A N/A N/A N/A N/A N/A
516 1 DL1+0.7 WL73.55 N/a 3.94 N/A N/A N/A N/A N/A N/A N/A
517 1 DL1+0.7 WL83.53 N/a 3.96 N/A N/A N/A N/A N/A N/A N/A
518 1 DL1+ 1LL1+0.75
2.17WL1+1
N/a EQUIP1 1.53 N/A N/A N/A N/A N/A N/A N/A
519 1 DL1+1.0 LL1+0.75
2.16 N/a
WL2+1 EQUIP1 1.53 N/A N/A N/A N/A N/A N/A N/A
520 1 DL1+1.0 LL1+0.75
1.95 N/a
WL3+1 EQUIP1 48.23 N/A N/A N/A N/A N/A N/A N/A
521 1 DL1+1.0 LL1+0.75
1.94 N/a
WL4+1 EQUIP1 51.59 N/A N/A N/A N/A N/A N/A N/A
522 1 DL1+1.0 LL1+0.75
2.46 N/a
WL5+1 EQUIP1 3.01 N/A N/A N/A N/A N/A N/A N/A
523 1 DL1+1.0 LL1+0.75
2.44 N/a
WL6+1 EQUIP1 3.03 N/A N/A N/A N/A N/A N/A N/A
te r
524 1 DL1+1.0 LL1+0.75
2.17 N/a
WL7+1 EQUIP1 2.49 N/A N/A N/A N/A N/A N/A N/A
525 1 DL1+1.0 LL1+0.75
2.16 N/a
WL8+1 EQUIP1 2.50 N/A N/A N/A N/A N/A N/A N/A
526 1 DL1+1.0 LL1+11.88
EQUIP1+0.525
N/a SL111.93 N/A N/A N/A N/A N/A N/A N/A
527 1 DL1+1.0 LL1+12.26
EQUIP1+0.525
N/a SL2 3.21 N/A N/A N/A N/A N/A N/A N/A
528 0.6 DL1+1 WL14.39 N/a 1.81 N/A N/A N/A N/A N/A N/A N/A
529 0.6 DL1+1 WL24.33 N/a 1.82 N/A N/A N/A N/A N/A N/A N/A
530 0.6 DL1+1 WL33.02 N/a 3.31 N/A N/A N/A N/A N/A N/A N/A
531 0.6 DL1+1 WL42.97 N/a 3.29 N/A N/A N/A N/A N/A N/A N/A
as

532 0.6 DL1+1 WL54.81 N/a 4.25 N/A N/A N/A N/A N/A N/A N/A
533 0.6 DL1+1 WL64.73 N/a 4.24 N/A N/A N/A N/A N/A N/A N/A
534 0.6 DL1+1 WL74.41 N/a 4.32 N/A N/A N/A N/A N/A N/A N/A
535 0.6 DL1+1 WL84.35 N/a 4.37 N/A N/A N/A N/A N/A N/A N/A
536 0.6 DL1+0.7 SL13.11 N/a 4.51 N/A N/A N/A N/A N/A N/A N/A
537 0.6 DL1+0.7 SL24.90 N/a 10.96 N/A N/A N/A N/A N/A N/A N/A
1001 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1 N/A N/A N/A N/A N/A N/A N/A
nM

1002 1.35 DL1+1.5


N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1N/A N/A N/A N/A N/A N/A N/A
1003 1.35 DL1+1.5
N/a WL1+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1004 1.35 DL1+1.5
N/a WL2+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1005 1.35 DL1+1.5
N/a WL3+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1006 1.35 DL1+1.5
N/a WL4+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1007 1.35 DL1+1.5
N/a WL5+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1008 1.35 DL1+1.5
N/a WL6+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1009 1.35 DL1+1.5
N/a WL7+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1010 1.35 DL1+1.5
N/a WL8+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1011 1.35 DL1+1.5
N/a WL1+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1012 1.35 DL1+1.5
N/a WL2+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
di

1013 1.35 DL1+1.5


N/a WL3+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1014 1.35 DL1+1.5
N/a WL4+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1015 1.35 DL1+1.5
N/a WL5+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1016 1.35 DL1+1.5
N/a WL6+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1017 1.35 DL1+1.5
N/a WL7+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1018 1.35 DL1+1.5
N/a WL8+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1019 1.35 DL1+0.9
N/a TEMP1+1.35
N/a MR1
N/a N/A N/A N/A N/A N/A N/A N/A
a te

1020 1.35 DL1+-0.9


N/a TEMP1+1.35
N/a MR1
N/a N/A N/A N/A N/A N/A N/A N/A
1021 1.35 DL1+1.5LL1+1.5
N/a N/aEQUIP1+0.9
N/a TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A N/A
1022 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1023 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1024 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1028 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1029 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

Ed
1030 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1031 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1032 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1033 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1034 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1035 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1036 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1037 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1038 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1039 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1040 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1041 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

F
1042 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1043 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1044 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1045 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1046 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

PD
1047 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1048 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1049 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1050 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1051 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1052 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1053 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1054 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1055 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1056 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1057 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1058 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1059 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1060 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
te r
1061 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1062 1.148 DL1+1.5
N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1063 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1064 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1065 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1066 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1067 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1068 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1069 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
as

1070 1.148 DL1+1.5


N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1071 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1072 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1073 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1074 1 DL1+0.8
N/a LL1+1 SL2
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1075 1 DL1+0.8
N/a LL1+-1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1076 1 DL1+0.8
N/a LL1+-1 SL2
N/a N/a N/A N/A N/A N/A N/A N/A N/A
2001 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
nM

2002 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2003 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2004 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2005 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2006 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2007 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2008 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2009 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2010 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2011 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2012 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2013 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2014 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2015 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
di

2016 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2017 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2018 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2019 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2020 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2021 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2022 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2023 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
a te

2024 1 DL1+1.0
N/a LL1+1 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2025 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2026 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2027 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2028 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2029 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2030 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2031 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2032 1 DL1+0.7
N/a LL1+1 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2033 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
FOUNDATION FOR PEDESTAL (P17)-(Pilecap Design)

Ed
LOAD CASE: 1068 1.1481068
DL1+1.5
1.148
LL1+1.5
DL1+1.05
WL4+1.5
LL1+1.5
EQUIP1+-0.9
WL4+1.05 EQUIP1+-0.9
TEMP1+1.35 TEMP1+1.35
MR1 MR1

GENERAL PILECAP DIMENSIONS, POSITION


Concrete Density 2.5 ton/m3 Pilecap thickness 1.300 m
Soil Density 2 ton/m3 Z cordinate of center of the pilecap -12.000 m
Grade of Concrete (Cylinder) C 30 X cordinate of center of the pilecap 26.750 m
Grade of Steel Fe 500 Length along axis Z, L z 3.540 m
Level of Base of pilecap -5.1 m Length along axis X, L x 3.540 m
m2

F
Finished Ground level -0.6 m Area of base of pilecap, A 12.53
Level of max water table -0.6 m

PD
PEDESTAL (COLUMN) DIMENSIONS, POSITIONS & LOADS
C.G. of Pedestal Ped top P + W ped
Pedestal ID Lz-z (m) Lx-x (m) P (T) Hz (T) Mx (T-m) Hx (T) Mz (T-m)
Z X [Level of (T)
P17 1.250 1.250 -12.000 26.750 -5.100 388.58 -1.18 -22.64 -12.39 -123.70 388.58

PILE DETAILS
Number of Piles 4 CGz of Pile group -12 m
Diameter of Piles 760 mm CGx of Pile group 26.75 m
2
Compressive capacity of piles 192 T SUM[(Xi-Xcg)2] of Pile group 5.198 m
2
Tensile capacity of piles 40 T SUM[(Zi-Zcg)2] of Pile group 5.198 m
Shear capacity of piles 11.5 T
te r
Weight of soil, W soil 76.13 T
Weight of footing, W f ooting 11.00 T
Axial load due to [P+ W ped] 388.58 T
Total axial Load 475.70 T

Mz due to [Mz+(P+W ped)*ex ] -123.70 Ton-m Mx due to [Mx+(P+W ped)*ez] -22.64 Ton-m
as

Eccentricity between Pilecap and Pile group 0.00 mm Eccentricity between Pilecap and Pile group 0.00 mm
Mz due to pilecap and pile group eccentricity 0.00 Ton-m Mx due to pilecap and pile group eccentricity 0.00 Ton-m
Total Mz -123.70 Ton-m Total Mx -22.64 Ton-m

Distance Distance P due to


from pile from pile Axial P due to P due to
nM

Pile ID CGx CGz group CGx group CGz Load (T) Mx (T) Mz (T) Total P (T) Shear (T)
PCG-5-1 25.61 -13.14 -1.14 -1.14 118.93 4.96 27.13 151.02 3.11
PCG-5-2 25.61 -10.86 -1.14 1.14 118.93 -4.96 27.13 141.09 3.11
PCG-5-3 27.89 -13.14 1.14 -1.14 118.93 4.96 -27.13 96.76 3.11
PCG-5-4 27.89 -10.86 1.14 1.14 118.93 -4.96 -27.13 86.83 3.11

Load factor for Limit State design 1 Along Axis -----> Z-Z X-X
Ultimate sagging(+)
di

Moment,Mup(Tm/width) 31.39 37.82


Along Axis -----> Z-Z X-X Effective Depth (for + M), d (m) 1.17 1.17
Ultimate Shear force (In sagging zone)(T/width) 24.60 29.70 Mup/bd2 (N/mm2) 0.23 0.28
Nominal shear stress (N/mm 2) 0.21 0.25 Tensile steel required at bottom (%) 0.05 0.06
Max allowable shear stress (N/mm 2) 0.32 0.32 Provide bars of dia (mm) 20 20
Ultimate Shear force (In hogging zone)(T) 6.21 6.67 at c/c distance (mm) 150 150
Nominal shear stress (N/mm 2) 0.05 0.06 Tensile steel provided at bottom (%) 0.18 0.18
a te

Max allowable shear stress (N/mm 2) 0.32 0.32 Ultimate hogging(-)


Stirrup Diameter (mm) 12 Moment,Mun(Tm/meter width) 0.00 0.00
Stirrup spacing (N/mm 2) 150 150 Mun/bd2 (N/mm2) 0.00 0.00
Stress in stirrup (N/mm 2) 18.60 22.45 Tensile steel required at top (%) 0.00 0.00
Total Stirrup stress (N/mm 2) 41.05 Provide bars of dia (mm) 20 20
Permissible Stirrup stress (N/mm 2) 434.78 at c/c distance (mm) 150 150
Tensile steel provided at top (%) 0.18 0.18
Effective Depth (for - M), d (m) 1.170 1.170
re

P UNC H I NG S H EAR FO R P EDES TALS


Pedestal ID Ultimate Design Area for resisting Punching Shear Allowable punching
P17 87.13 Ton 11.33 m2 0.08 N/mm2 1.37 N/mm2
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
F AC TOR OF SAF ETY F OR ALL LOAD C ASES ( Per mis s ible/ Ac tual)

Pile Reaction ALONG Z-Z ALONG X-X


Compressi pt at Shear pt at Shear

Ed
Load case pt at top pt at top Punching
on Tension Shear bottom stress bottom stress
500 1 DL1+1N/a
LL1+1 EQUIP1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
501 1 DL1+1N/a
LL1+1 EQUIP1+1
N/a TEMP1
N/a N/A N/A N/A N/A N/A N/A N/A
502 1 DL1+1N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
503 1 DL1+1N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
504 1 DL1+1N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A
505 1 DL1+1N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
506 1 DL1+1N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
507 1 DL1+1N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
508 1 DL1+1N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A

F
509 1 DL1+1N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
510 1 DL1+0.7
N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
511 1 DL1+0.7
N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
512 1 DL1+0.7
N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A

PD
513 1 DL1+0.7
N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
514 1 DL1+0.7
N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
515 1 DL1+0.7
N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
516 1 DL1+0.7
N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A
517 1 DL1+0.7
N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
518 1 DL1+ 1LL1+0.75
N/a WL1+1
N/a EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
519 1 DL1+1.0
N/a
LL1+0.75 N/a
WL2+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
520 1 DL1+1.0
N/a
LL1+0.75 N/a
WL3+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
521 1 DL1+1.0
N/a
LL1+0.75 N/a
WL4+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
522 1 DL1+1.0
N/a
LL1+0.75 N/a
WL5+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
523 1 DL1+1.0
N/a
LL1+0.75 N/a
WL6+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
te r
524 1 DL1+1.0
N/a
LL1+0.75 N/a
WL7+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
525 1 DL1+1.0
N/a
LL1+0.75 N/a
WL8+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
526 1 DL1+1.0
N/a
LL1+1 EQUIP1+0.525
N/a N/a
SL1 N/A N/A N/A N/A N/A N/A N/A
527 1 DL1+1.0
N/a
LL1+1 EQUIP1+0.525
N/a N/a
SL2 N/A N/A N/A N/A N/A N/A N/A
528 0.6 DL1+1
N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
529 0.6 DL1+1
N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
530 0.6 DL1+1
N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A
531 0.6 DL1+1
N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
as

532 0.6 DL1+1


N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
533 0.6 DL1+1
N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
534 0.6 DL1+1
N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A
535 0.6 DL1+1
N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
536 0.6 DL1+0.7
N/a SL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
537 0.6 DL1+0.7
N/a SL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
1001 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1 3.83 N/A 13.21 3.81 N/A 13.21 17.80
nM

1002 1.35 DL1+1.5


N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1 3.82 N/A 13.48 3.98 N/A 13.48 17.80
1003 1.35 DL1+1.5
N/a WL1+0.9
N/a TEMP1 N/a 12.20 N/A 27.56 5.81 N/A 27.56 17.80
1004 1.35 DL1+1.5
N/a WL2+0.9
N/a TEMP1 N/a 11.71 N/A 26.90 5.72 N/A 26.90 17.80
1005 1.35 DL1+1.5
N/a WL3+0.9
N/a TEMP1 N/a 5.78 N/A 16.97 4.24 N/A 16.97 17.80
1006 1.35 DL1+1.5
N/a WL4+0.9
N/a TEMP1 N/a 5.66 N/A 16.64 4.17 N/A 16.64 17.80
1007 1.35 DL1+1.5
N/a WL5+0.9
N/a TEMP1 N/a 6.88 N/A 25.95 8.03 N/A 25.95 17.80
1008 1.35 DL1+1.5
N/a WL6+0.9
N/a TEMP1 N/a 6.70 N/A 25.33 7.86 N/A 25.33 17.80
1009 1.35 DL1+1.5
N/a WL7+0.9
N/a TEMP1 N/a 6.66 N/A 24.03 7.14 N/A 24.03 17.80
1010 1.35 DL1+1.5
N/a WL8+0.9
N/a TEMP1 N/a 6.51 N/A 23.52 7.00 N/A 23.52 17.80
1011 1.35 DL1+1.5
N/a WL1+-0.9
N/a TEMP1 N/a 12.12 N/A 28.77 6.21 N/A 28.77 17.80
1012 1.35 DL1+1.5
N/a WL2+-0.9
N/a TEMP1 N/a 11.64 N/A 28.05 6.10 N/A 28.05 17.80
di

1013 1.35 DL1+1.5


N/a WL3+-0.9
N/a TEMP1 N/a 5.69 N/A 16.26 4.00 N/A 16.26 17.80
1014 1.35 DL1+1.5
N/a WL4+-0.9
N/a TEMP1 N/a 5.57 N/A 15.96 3.93 N/A 15.96 17.80
1015 1.35 DL1+1.5
N/a WL5+-0.9
N/a TEMP1 N/a 6.74 N/A 26.48 8.65 N/A 26.48 17.80
1016 1.35 DL1+1.5
N/a WL6+-0.9
N/a TEMP1 N/a 6.57 N/A 25.65 8.32 N/A 25.65 17.80
1017 1.35 DL1+1.5
N/a WL7+-0.9
N/a TEMP1 N/a 6.64 N/A 24.94 7.74 N/A 24.94 17.80
1018 1.35 DL1+1.5
N/a WL8+-0.9
N/a TEMP1 N/a 6.49 N/A 24.40 7.59 N/A 24.40 17.80
1019 1.35 DL1+0.9
N/a TEMP1+1.35
N/a MR1
N/a 7.86 N/A 26.00 7.07 N/A 26.00 17.80
a te

1020 1.35 DL1+-0.9


N/a TEMP1+1.35
N/a MR1
N/a 7.70 N/A 26.92 7.66 N/A 26.92 17.80
1021 1.35 DL1+1.5LL1+1.5
N/a N/aEQUIP1+0.9
N/a TEMP1+1.35 3.81
MR1N/A 13.15 3.80 N/A 13.15 17.80
1022 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35 3.80
MR1N/A 13.42 3.96 N/A 13.42 17.80
1023 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1+1.35 4.07
MR1N/A 14.08 4.07 N/A 14.08 17.80
1024 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.354.06
MR1
N/A 14.39 4.26 N/A 14.39 17.80
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
4.24 N/A MR1 13.35 3.54 N/A 13.35 17.80
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
4.20 N/A MR1 13.26 3.52 N/A 13.26 17.80
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
3.45 N/A MR1 11.65 3.31 N/A 11.65 17.80
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+0.9 TEMP1+1.35
4.24 N/A MR1 13.35 3.54 N/A 13.35 17.80
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+0.9 TEMP1+1.35
4.20 N/A MR1 13.26 3.52 N/A 13.26 17.80
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+0.9 TEMP1+1.35
3.45 N/A MR1 11.65 3.31 N/A 11.65 17.80
1028 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+0.9 TEMP1+1.35
3.43 N/A MR1 11.56 3.28 N/A 11.56 17.80
1029 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+0.9 TEMP1+1.35
4.16 N/A MR1 14.04 3.94 N/A 14.04 17.80

Ed
1030 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+0.9 TEMP1+1.35
4.12 N/A MR1 13.93 3.92 N/A 13.93 17.80
1031 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+0.9 TEMP1+1.35
3.61 N/A MR1 12.80 3.80 N/A 12.80 17.80
1032 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+0.9 TEMP1+1.35
3.58 N/A MR1 12.72 3.78 N/A 12.72 17.80
1033 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
4.23 N/A MR1 13.63 3.68 N/A 13.63 17.80
1034 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
4.20 N/A MR1 13.53 3.66 N/A 13.53 17.80
1035 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
3.45 N/A MR1 11.36 3.16 N/A 11.36 17.80
1036 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
3.42 N/A MR1 11.27 3.13 N/A 11.27 17.80
1037 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
4.11 N/A MR1 14.27 4.12 N/A 14.27 17.80
1038 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
4.07 N/A MR1 14.16 4.09 N/A 14.16 17.80
1039 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
3.60 N/A MR1 13.06 3.97 N/A 13.06 17.80
1040 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
3.58 N/A MR1 12.97 3.94 N/A 12.97 17.80
1041 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.56 N/A MR1 14.31 3.78 N/A 14.31 17.80

F
1042 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.52 N/A MR1 14.20 3.76 N/A 14.20 17.80
1043 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+0.9 TEMP1+1.35
3.66 N/A MR1 12.32 3.49 N/A 12.32 17.80
1044 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+0.9 TEMP1+1.35
3.64 N/A MR1 12.22 3.45 N/A 12.22 17.80
1045 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.47 N/A MR1 15.11 4.24 N/A 15.11 17.80
1046 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.42 N/A MR1 14.98 4.21 N/A 14.98 17.80

PD
1047 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+0.9 TEMP1+1.35
3.84 N/A MR1 13.68 4.08 N/A 13.68 17.80
1048 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+0.9 TEMP1+1.35
3.81 N/A MR1 13.58 4.05 N/A 13.58 17.80
1049 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.55 N/A MR1 14.63 3.94 N/A 14.63 17.80
1050 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.51 N/A MR1 14.51 3.92 N/A 14.51 17.80
1051 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
3.66 N/A MR1 11.99 3.32 N/A 11.99 17.80
1052 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
3.63 N/A MR1 11.90 3.29 N/A 11.90 17.80
1053 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.41 N/A MR1 15.38 4.45 N/A 15.38 17.80
1054 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.37 N/A MR1 15.25 4.42 N/A 15.25 17.80
1055 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
3.83 N/A MR1 13.97 4.27 N/A 13.97 17.80
1056 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
3.80 N/A MR1 13.87 4.24 N/A 13.87 17.80
1057 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.96 N/A MR1 14.46 3.61 N/A 14.46 17.80
1058 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.88 N/A MR1 14.28 3.57 N/A 14.28 17.80
1059 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+0.9 TEMP1+1.35
3.44 N/A MR1 10.98 2.97 N/A 10.98 17.80
1060 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+0.9 TEMP1+1.35
3.40 N/A MR1 10.84 2.93 N/A 10.84 17.80
te r
1061 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.32 N/A MR1 15.06 4.36 N/A 15.06 17.80
1062 1.148 DL1+1.5
N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.25 N/A MR1 14.85 4.31 N/A 14.85 17.80
1063 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+0.9 TEMP1+1.35
3.70 N/A MR1 13.43 4.08 N/A 13.43 17.80
1064 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+0.9 TEMP1+1.35
3.66 N/A MR1 13.27 4.04 N/A 13.27 17.80
1065 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.95 N/A MR1 14.79 3.76 N/A 14.79 17.80
1066 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.87 N/A MR1 14.60 3.72 N/A 14.60 17.80
1067 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
3.43 N/A MR1 10.72 2.85 N/A 10.72 17.80
1068 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
3.39 N/A MR1 10.59 2.81 N/A 10.59 17.80
1069 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.27 N/A MR1 15.33 4.58 N/A 15.33 17.80
as

1070 1.148 DL1+1.5


N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.20 N/A MR1 15.08 4.52 N/A 15.08 17.80
1071 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
3.70 N/A MR1 13.71 4.27 N/A 13.71 17.80
1072 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
3.65 N/A MR1 13.54 4.22 N/A 13.54 17.80
1073 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a 4.97 N/A 14.84 3.76 N/A 14.84 17.80
1074 1 DL1+0.8
N/a LL1+1 SL2
N/a N/a 5.95 N/A 20.16 5.66 N/A 20.16 17.80
1075 1 DL1+0.8
N/a LL1+-1 SL1
N/a N/a 7.90 N/A 23.09 5.72 N/A 23.09 17.80
1076 1 DL1+0.8
N/a LL1+-1 SL2
N/a N/a 6.12 N/A 21.62 6.28 N/A 21.62 17.80
2001 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+15.86
MR1N/A 18.61 4.94 N/A 18.61 17.80
nM

2002 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+15.81
MR1N/A 18.49 4.92 N/A 18.49 17.80
2003 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+14.85
MR1N/A 16.43 4.67 N/A 16.43 17.80
2004 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+14.81
MR1N/A 16.31 4.63 N/A 16.31 17.80
2005 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+15.75
MR1N/A 19.50 5.46 N/A 19.50 17.80
2006 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+15.70
MR1N/A 19.36 5.43 N/A 19.36 17.80
2007 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+15.05
MR1N/A 17.90 5.28 N/A 17.90 17.80
2008 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+15.01
MR1N/A 17.79 5.25 N/A 17.79 17.80
2009 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1 5.85
MR1N/A 18.97 5.13 N/A 18.97 17.80
2010 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1 5.80
MR1N/A 18.84 5.10 N/A 18.84 17.80
2011 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1 4.84
MR1N/A 16.04 4.46 N/A 16.04 17.80
2012 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1 4.81
MR1N/A 15.93 4.43 N/A 15.93 17.80
2013 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1 5.69
MR1N/A 19.81 5.68 N/A 19.81 17.80
2014 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1 5.64
MR1N/A 19.66 5.65 N/A 19.66 17.80
2015 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1 5.04
MR1N/A 18.23 5.49 N/A 18.23 17.80
di

2016 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1 5.01
MR1N/A 18.12 5.46 N/A 18.12 17.80
2017 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+16.29
MR1N/A 18.79 4.74 N/A 18.79 17.80
2018 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+16.20
MR1N/A 18.58 4.70 N/A 18.58 17.80
2019 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+14.58
MR1N/A 14.82 4.04 N/A 14.82 17.80
2020 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+14.53
MR1N/A 14.66 3.99 N/A 14.66 17.80
2021 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+15.59
MR1N/A 19.46 5.59 N/A 19.46 17.80
2022 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+15.51
MR1N/A 19.22 5.53 N/A 19.22 17.80
2023 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+14.89
MR1N/A 17.61 5.28 N/A 17.61 17.80
a te

2024 1 DL1+1.0
N/a LL1+1 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+14.84
MR1N/A 17.43 5.23 N/A 17.43 17.80
2025 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1 6.28
MR1N/A 19.15 4.91 N/A 19.15 17.80
2026 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1 6.19
MR1N/A 18.94 4.87 N/A 18.94 17.80
2027 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1 4.57
MR1N/A 14.50 3.89 N/A 14.50 17.80
2028 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1 4.53
MR1N/A 14.35 3.84 N/A 14.35 17.80
2029 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1 5.53
MR1N/A 19.76 5.82 N/A 19.76 17.80
2030 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1 5.45
MR1N/A 19.52 5.76 N/A 19.52 17.80
2031 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1 4.88
MR1N/A 17.93 5.49 N/A 17.93 17.80
2032 1 DL1+0.7
N/a LL1+1 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1 4.83
MR1N/A 17.74 5.44 N/A 17.74 17.80
2033 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a 4.97 N/A 14.84 3.76 N/A 14.84 17.80
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
FOUNDATION FOR PEDESTAL (P16)-(Pile Capacity Check)

Ed
LOAD CASE: 526 1 DL1+1.0
526 LL1+1
1 DL1+0.75
EQUIP1+0.525
LL1+1 EQUIP1+0.525
SL1 SL1

GENERAL PILECAP DIMENSIONS, POSITION


Concrete Density 2.5 ton/m3 Pilecap thickness 1.400 m
Soil Density 2 ton/m3 Z cordinate of center of the pilecap -21.000 m
Grade of Concrete (Cylinder) C 30 X cordinate of center of the pilecap 26.750 m
Grade of Steel Fe 500 Length along axis Z, L z 5.820 m
Level of Base of pilecap -5.1 m Length along axis X, L x 5.820 m

F
Finished Ground level -0.6 m Area of base of pilecap, A 33.87 m2
Level of max water table -0.6 m

PD
PEDESTAL (COLUMN) DIMENSIONS, POSITIONS & LOADS
C.G. of Pedestal Ped top P + W ped
Pedestal ID Lz-z (m) Lx-x (m) P (T) Hz (T) Mx (T-m) Hx (T) Mz (T-m)
Z X [Level of (T)
P16 1.600 1.600 -21.000 26.750 -5.100 1057.72 -11.20 -49.31 -46.60 212.64 1057.72

PILE DETAILS
Number of Piles 9 CGz of Pile group -21 m
Diameter of Piles 760 mm CGx of Pile group 26.75 m
2
Compressive capacity of piles 192 T SUM[(Xi-Xcg)2] of Pile group 31.190 m
2
SUM[(Zi-Zcg)2] of Pile group
te r
Tensile capacity of piles 40 T 31.190 m
Shear capacity of piles 11.5 T

Weight of soil, W soil 152.43 T


Weight of footing, W f ooting 23.71 T
Axial load due to [P+ W ped] 1057.72 T
Total axial Load 1233.86 T
as

Mz due to [Mz+(P+W ped)*ex ] 212.64 Ton-m Mx due to [Mx+(P+W ped)*ez] -49.31 Ton-m
Eccentricity between Pilecap and Pile group 0.00 mm Eccentricity between Pilecap and Pile group 0.00 mm
Mz due to pilecap and pile group eccentricity 0.00 Ton-m Mx due to pilecap and pile group eccentricity 0.00 Ton-m
Total Mz 212.64 Ton-m Total Mx -49.31 Ton-m
nM

Distance Distance P due to


from pile from pile Axial P due to P due to
Pile ID CGx CGz group CGx group CGz Load (T) Mx (T) Mz (T) Total P (T) Shear (T)
PCG-6-1 24.47 -23.28 -2.28 -2.28 137.10 3.60 -15.54 125.16 5.33
PCG-6-2 24.47 -21.00 -2.28 0.00 137.10 0.00 -15.54 121.55 5.33
PCG-6-3 24.47 -18.72 -2.28 2.28 137.10 -3.60 -15.54 117.95 5.33
PCG-6-4 26.75 -23.28 0.00 -2.28 137.10 3.60 0.00 140.70 5.33
PCG-6-5 26.75 -21.00 0.00 0.00 137.10 0.00 0.00 137.10 5.33
PCG-6-6 26.75 -18.72 0.00 2.28 137.10 -3.60 0.00 133.49 5.33
di

PCG-6-7 29.03 -23.28 2.28 -2.28 137.10 3.60 15.54 156.24 5.33
PCG-6-8 29.03 -21.00 2.28 0.00 137.10 0.00 15.54 152.64 5.33
PCG-6-9 29.03 -18.72 2.28 2.28 137.10 -3.60 15.54 149.04 5.33
a te
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
F AC TOR OF SAF ETY F OR ALL LOAD C ASES ( Per mis s ible/ Ac tual)

Pile Reaction ALONG Z-Z ALONG X-X


Compressi pt at Shear pt at Shear

Ed
Load case pt at top pt at top Punching
on Tension Shear bottom stress bottom stress
500 1 DL1+1 LL1+11.41
EQUIP1
N/a 10.75 N/A N/A N/A N/A N/A N/A N/A
501 1 DL1+1 LL1+11.37
EQUIP1+1
N/a TEMP1 4.43 N/A N/A N/A N/A N/A N/A N/A
502 1 DL1+1 WL1 2.86 N/a 2.45 N/A N/A N/A N/A N/A N/A N/A
503 1 DL1+1 WL2 2.84 N/a 2.49 N/A N/A N/A N/A N/A N/A N/A
504 1 DL1+1 WL3 2.59 N/a 2.64 N/A N/A N/A N/A N/A N/A N/A
505 1 DL1+1 WL4 2.56 N/a 2.64 N/A N/A N/A N/A N/A N/A N/A
506 1 DL1+1 WL5 3.45 N/a 5.30 N/A N/A N/A N/A N/A N/A N/A
507 1 DL1+1 WL6 3.33 N/a 4.91 N/A N/A N/A N/A N/A N/A N/A
508 1 DL1+1 WL7 2.82 N/a 4.88 N/A N/A N/A N/A N/A N/A N/A

F
509 1 DL1+1 WL8 2.78 N/a 5.32 N/A N/A N/A N/A N/A N/A N/A
510 1 DL1+0.7 WL12.98 N/a 3.43 N/A N/A N/A N/A N/A N/A N/A
511 1 DL1+0.7 WL22.96 N/a 3.49 N/A N/A N/A N/A N/A N/A N/A
512 1 DL1+0.7 WL32.76 N/a 3.85 N/A N/A N/A N/A N/A N/A N/A

PD
513 1 DL1+0.7 WL42.74 N/a 3.85 N/A N/A N/A N/A N/A N/A N/A
514 1 DL1+0.7 WL53.41 N/a 7.55 N/A N/A N/A N/A N/A N/A N/A
515 1 DL1+0.7 WL63.33 N/a 7.01 N/A N/A N/A N/A N/A N/A N/A
516 1 DL1+0.7 WL72.94 N/a 6.89 N/A N/A N/A N/A N/A N/A N/A
517 1 DL1+0.7 WL82.91 N/a 7.50 N/A N/A N/A N/A N/A N/A N/A
518 1 DL1+ 1LL1+0.75
1.36WL1+1
N/a EQUIP1 3.03 N/A N/A N/A N/A N/A N/A N/A
519 1 DL1+1.0 LL1+0.75
1.36 N/a
WL2+1 EQUIP1 3.11 N/A N/A N/A N/A N/A N/A N/A
520 1 DL1+1.0 LL1+0.75
1.30 N/a
WL3+1 EQUIP1 3.21 N/A N/A N/A N/A N/A N/A N/A
521 1 DL1+1.0 LL1+0.75
1.29 N/a
WL4+1 EQUIP1 3.25 N/A N/A N/A N/A N/A N/A N/A
522 1 DL1+1.0 LL1+0.75
1.51 N/a
WL5+1 EQUIP1 16.53 N/A N/A N/A N/A N/A N/A N/A
523 1 DL1+1.0 LL1+0.75
1.49 N/a
WL6+1 EQUIP1 14.52 N/A N/A N/A N/A N/A N/A N/A
te r
524 1 DL1+1.0 LL1+0.75
1.34 N/a
WL7+1 EQUIP1 4.13 N/A N/A N/A N/A N/A N/A N/A
525 1 DL1+1.0 LL1+0.75
1.34 N/a
WL8+1 EQUIP1 4.35 N/A N/A N/A N/A N/A N/A N/A
526 1 DL1+1.0 LL1+11.23
EQUIP1+0.525
N/a SL1 2.16 N/A N/A N/A N/A N/A N/A N/A
527 1 DL1+1.0 LL1+11.39
EQUIP1+0.525
N/a SL2 8.15 N/A N/A N/A N/A N/A N/A N/A
528 0.6 DL1+1 WL13.72 N/a 2.49 N/A N/A N/A N/A N/A N/A N/A
529 0.6 DL1+1 WL23.68 N/a 2.53 N/A N/A N/A N/A N/A N/A N/A
530 0.6 DL1+1 WL33.29 N/a 2.60 N/A N/A N/A N/A N/A N/A N/A
531 0.6 DL1+1 WL43.24 N/a 2.59 N/A N/A N/A N/A N/A N/A N/A
as

532 0.6 DL1+1 WL54.77 N/a 5.30 N/A N/A N/A N/A N/A N/A N/A
533 0.6 DL1+1 WL64.54 N/a 4.91 N/A N/A N/A N/A N/A N/A N/A
534 0.6 DL1+1 WL73.67 N/a 4.93 N/A N/A N/A N/A N/A N/A N/A
535 0.6 DL1+1 WL83.61 N/a 5.37 N/A N/A N/A N/A N/A N/A N/A
536 0.6 DL1+0.7 SL12.67 N/a 1.65 N/A N/A N/A N/A N/A N/A N/A
537 0.6 DL1+0.7 SL24.02 N/a 17.13 N/A N/A N/A N/A N/A N/A N/A
1001 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1 N/A N/A N/A N/A N/A N/A N/A
nM

1002 1.35 DL1+1.5


N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1N/A N/A N/A N/A N/A N/A N/A
1003 1.35 DL1+1.5
N/a WL1+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1004 1.35 DL1+1.5
N/a WL2+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1005 1.35 DL1+1.5
N/a WL3+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1006 1.35 DL1+1.5
N/a WL4+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1007 1.35 DL1+1.5
N/a WL5+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1008 1.35 DL1+1.5
N/a WL6+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1009 1.35 DL1+1.5
N/a WL7+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1010 1.35 DL1+1.5
N/a WL8+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1011 1.35 DL1+1.5
N/a WL1+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1012 1.35 DL1+1.5
N/a WL2+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
di

1013 1.35 DL1+1.5


N/a WL3+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1014 1.35 DL1+1.5
N/a WL4+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1015 1.35 DL1+1.5
N/a WL5+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1016 1.35 DL1+1.5
N/a WL6+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1017 1.35 DL1+1.5
N/a WL7+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1018 1.35 DL1+1.5
N/a WL8+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1019 1.35 DL1+0.9
N/a TEMP1+1.35
N/a MR1
N/a N/A N/A N/A N/A N/A N/A N/A
a te

1020 1.35 DL1+-0.9


N/a TEMP1+1.35
N/a MR1
N/a N/A N/A N/A N/A N/A N/A N/A
1021 1.35 DL1+1.5LL1+1.5
N/a N/aEQUIP1+0.9
N/a TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A N/A
1022 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1023 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1024 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1028 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1029 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

Ed
1030 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1031 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1032 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1033 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1034 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1035 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1036 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1037 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1038 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1039 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1040 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1041 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

F
1042 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1043 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1044 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1045 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1046 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

PD
1047 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1048 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1049 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1050 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1051 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1052 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1053 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1054 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1055 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1056 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1057 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1058 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1059 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1060 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
te r
1061 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1062 1.148 DL1+1.5
N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1063 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1064 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1065 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1066 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1067 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1068 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1069 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
as

1070 1.148 DL1+1.5


N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1071 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1072 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1073 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1074 1 DL1+0.8
N/a LL1+1 SL2
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1075 1 DL1+0.8
N/a LL1+-1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1076 1 DL1+0.8
N/a LL1+-1 SL2
N/a N/a N/A N/A N/A N/A N/A N/A N/A
2001 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
nM

2002 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2003 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2004 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2005 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2006 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2007 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2008 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2009 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2010 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2011 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2012 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2013 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2014 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2015 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
di

2016 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2017 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2018 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2019 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2020 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2021 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2022 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2023 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
a te

2024 1 DL1+1.0
N/a LL1+1 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2025 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2026 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2027 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2028 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2029 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2030 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2031 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2032 1 DL1+0.7
N/a LL1+1 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2033 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
FOUNDATION FOR PEDESTAL (P16)-(Pilecap Design)

Ed
LOAD CASE: 1032 1.35 DL1+1.5
1032 1.35
LL1+0.9
DL1+1.05
WL8+1.5
LL1+0.9
EQUIP1+0.9
WL8+1.05 TEMP1+1.35
EQUIP1+0.9 TEMP1+1.35
MR1 MR1

GENERAL PILECAP DIMENSIONS, POSITION


Concrete Density 2.5 ton/m3 Pilecap thickness 1.400 m
Soil Density 2 ton/m3 Z cordinate of center of the pilecap -21.000 m
Grade of Concrete (Cylinder) C 30 X cordinate of center of the pilecap 26.750 m
Grade of Steel Fe 500 Length along axis Z, L z 5.820 m
Level of Base of pilecap -5.1 m Length along axis X, L x 5.820 m
Finished Ground level -0.6 m Area of base of pilecap, A 33.87 m2

F
Level of max water table -0.6 m

PEDESTAL (COLUMN) DIMENSIONS, POSITIONS & LOADS

PD
C.G. of Pedestal Ped top P + W ped
Pedestal ID Lz-z (m) Lx-x (m) P (T) Hz (T) Mx (T-m) Hx (T) Mz (T-m)
Z X [Level of (T)
P16 1.600 1.600 -21.000 26.750 -5.100 1499.95 -43.09 -200.50 4.40 -3.69 1499.95

PILE DETAILS
Number of Piles 9 CGz of Pile group -21 m
Diameter of Piles 760 mm CGx of Pile group 26.75 m
2
Compressive capacity of piles 192 T SUM[(Xi-Xcg)2] of Pile group 31.190 m
2
Tensile capacity of piles 40 T SUM[(Zi-Zcg)2] of Pile group 31.190 m
Shear capacity of piles 11.5 T
te r
Weight of soil, W soil 205.77 T
Weight of footing, W f ooting 32.01 T
Axial load due to [P+ W ped] 1499.95 T
Total axial Load 1737.74 T

Mz due to [Mz+(P+W ped)*ex ] -3.69 Ton-m Mx due to [Mx+(P+W ped)*ez] -200.50 Ton-m
Eccentricity between Pilecap and Pile group 0.00 mm Eccentricity between Pilecap and Pile group 0.00 mm
Mz due to pilecap and pile group eccentricity 0.00 Ton-m Mx due to pilecap and pile group eccentricity 0.00 Ton-m
as

Total Mz -3.69 Ton-m Total Mx -200.50 Ton-m

Distance Distance P due to


from pile from pile Axial P due to P due to
Pile ID CGx CGz group CGx group CGz Load (T) Mx (T) Mz (T) Total P (T) Shear (T)
PCG-6-1 24.47 -23.28 -2.28 -2.28 193.08 14.66 0.27 208.01 4.81
nM

PCG-6-2 24.47 -21.00 -2.28 0.00 193.08 0.00 0.27 193.35 4.81
PCG-6-3 24.47 -18.72 -2.28 2.28 193.08 -14.66 0.27 178.70 4.81
PCG-6-4 26.75 -23.28 0.00 -2.28 193.08 14.66 0.00 207.74 4.81
PCG-6-5 26.75 -21.00 0.00 0.00 193.08 0.00 0.00 193.08 4.81
PCG-6-6 26.75 -18.72 0.00 2.28 193.08 -14.66 0.00 178.43 4.81
PCG-6-7 29.03 -23.28 2.28 -2.28 193.08 14.66 -0.27 207.47 4.81
PCG-6-8 29.03 -21.00 2.28 0.00 193.08 0.00 -0.27 192.81 4.81
PCG-6-9 29.03 -18.72 2.28 2.28 193.08 -14.66 -0.27 178.16 4.81

Load factor for Limit State design 1 Along Axis -----> Z-Z X-X
di

Ultimate sagging(+)
Moment,Mup(Tm/width) 143.10 132.10
Along Axis -----> Z-Z X-X Effective Depth (for + M), d (m) 1.2625 1.2625
Ultimate Shear force (In sagging zone)(T/width) 99.97 92.56 Mup/bd2 (N/mm2) 0.90 0.83
Nominal shear stress (N/mm 2) 0.79 0.73 Tensile steel required at bottom (%) 0.21 0.20
Max allowable shear stress (N/mm 2) 0.33 0.33 Provide bars of dia (mm) 25 25
Ultimate Shear force (In hogging zone)(T) 7.63 6.95 at c/c distance (mm) 150 150
a te

Nominal shear stress (N/mm 2) 0.06 0.06 Tensile steel provided at bottom (%) 0.26 0.26
Max allowable shear stress (N/mm 2) 0.33 0.33 Ultimate hogging(-)
Stirrup Diameter (mm) 12 Moment,Mun(Tm/meter width) 0.00 0.00
Stirrup spacing (N/mm 2) 150 150 Mun/bd2 (N/mm2) 0.00 0.00
Stress in stirrup (N/mm 2) 70.05 64.85 Tensile steel required at top (%) 0.00 0.00
Total Stirrup stress (N/mm 2) 134.90 Provide bars of dia (mm) 25 25
Permissible Stirrup stress (N/mm 2) 434.78 at c/c distance (mm) 150 150
Tensile steel provided at top (%) 0.26 0.26
Effective Depth (for - M), d (m) 1.262 1.262
re

P U N C H I N G S H EAR FO R P EDES TALS


Pedestal ID Ultimate Design Area for resisting Punching Shear Allowable punching
P16 1306.87 Ton 14.46 m2 0.90 N/mm2 1.37 N/mm2
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
F AC TOR OF SAF ETY F OR ALL LOAD C ASES ( Per mis s ible/ Ac tual)

Pile Reaction ALONG Z-Z ALONG X-X


Compressi pt at Shear pt at Shear

Ed
Load case pt at top pt at top Punching
on Tension Shear bottom stress bottom stress
500 1 DL1+1N/a
LL1+1 EQUIP1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
501 1 DL1+1N/a
LL1+1 EQUIP1+1
N/a TEMP1
N/a N/A N/A N/A N/A N/A N/A N/A
502 1 DL1+1N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
503 1 DL1+1N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
504 1 DL1+1N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A
505 1 DL1+1N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
506 1 DL1+1N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
507 1 DL1+1N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
508 1 DL1+1N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A

F
509 1 DL1+1N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
510 1 DL1+0.7
N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
511 1 DL1+0.7
N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
512 1 DL1+0.7
N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A

PD
513 1 DL1+0.7
N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
514 1 DL1+0.7
N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
515 1 DL1+0.7
N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
516 1 DL1+0.7
N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A
517 1 DL1+0.7
N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
518 1 DL1+ 1LL1+0.75
N/a WL1+1
N/a EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
519 1 DL1+1.0
N/a
LL1+0.75 N/a
WL2+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
520 1 DL1+1.0
N/a
LL1+0.75 N/a
WL3+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
521 1 DL1+1.0
N/a
LL1+0.75 N/a
WL4+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
522 1 DL1+1.0
N/a
LL1+0.75 N/a
WL5+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
523 1 DL1+1.0
N/a
LL1+0.75 N/a
WL6+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
te r
524 1 DL1+1.0
N/a
LL1+0.75 N/a
WL7+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
525 1 DL1+1.0
N/a
LL1+0.75 N/a
WL8+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
526 1 DL1+1.0
N/a
LL1+1 EQUIP1+0.525
N/a N/a
SL1 N/A N/A N/A N/A N/A N/A N/A
527 1 DL1+1.0
N/a
LL1+1 EQUIP1+0.525
N/a N/a
SL2 N/A N/A N/A N/A N/A N/A N/A
528 0.6 DL1+1
N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
529 0.6 DL1+1
N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
530 0.6 DL1+1
N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A
531 0.6 DL1+1
N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
as

532 0.6 DL1+1


N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
533 0.6 DL1+1
N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
534 0.6 DL1+1
N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A
535 0.6 DL1+1
N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
536 0.6 DL1+0.7
N/a SL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
537 0.6 DL1+0.7
N/a SL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
1001 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1 1.30 N/A 3.35 1.36 N/A 3.35 1.55
nM

1002 1.35 DL1+1.5


N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1 1.35 N/A 3.38 1.33 N/A 3.38 1.54
1003 1.35 DL1+1.5
N/a WL1+0.9
N/a TEMP1 N/a 4.28 N/A 8.85 3.45 N/A 8.85 6.66
1004 1.35 DL1+1.5
N/a WL2+0.9
N/a TEMP1 N/a 4.20 N/A 8.65 3.35 N/A 8.65 6.28
1005 1.35 DL1+1.5
N/a WL3+0.9
N/a TEMP1 N/a 3.66 N/A 7.83 3.05 N/A 7.83 5.23
1006 1.35 DL1+1.5
N/a WL4+0.9
N/a TEMP1 N/a 3.60 N/A 7.66 2.96 N/A 7.66 5.00
1007 1.35 DL1+1.5
N/a WL5+0.9
N/a TEMP1 N/a 4.85 N/A 11.28 5.25 N/A 11.28 7.54
1008 1.35 DL1+1.5
N/a WL6+0.9
N/a TEMP1 N/a 4.54 N/A 10.76 5.03 N/A 10.76 7.08
1009 1.35 DL1+1.5
N/a WL7+0.9
N/a TEMP1 N/a 3.08 N/A 8.04 3.87 N/A 8.04 4.90
1010 1.35 DL1+1.5
N/a WL8+0.9
N/a TEMP1 N/a 3.04 N/A 7.88 3.75 N/A 7.88 4.69
1011 1.35 DL1+1.5
N/a WL1+-0.9
N/a TEMP1 N/a 4.91 N/A 9.47 3.55 N/A 9.47 6.50
1012 1.35 DL1+1.5
N/a WL2+-0.9
N/a TEMP1 N/a 4.69 N/A 9.15 3.45 N/A 9.15 6.15
di

1013 1.35 DL1+1.5


N/a WL3+-0.9
N/a TEMP1 N/a 4.05 N/A 7.94 2.90 N/A 7.94 5.13
1014 1.35 DL1+1.5
N/a WL4+-0.9
N/a TEMP1 N/a 3.83 N/A 7.66 2.82 N/A 7.66 4.91
1015 1.35 DL1+1.5
N/a WL5+-0.9
N/a TEMP1 N/a 4.11 N/A 10.60 5.45 N/A 10.60 7.35
1016 1.35 DL1+1.5
N/a WL6+-0.9
N/a TEMP1 N/a 3.88 N/A 10.10 5.16 N/A 10.10 6.90
1017 1.35 DL1+1.5
N/a WL7+-0.9
N/a TEMP1 N/a 3.40 N/A 8.31 3.73 N/A 8.31 4.81
1018 1.35 DL1+1.5
N/a WL8+-0.9
N/a TEMP1 N/a 3.34 N/A 8.11 3.59 N/A 8.11 4.61
1019 1.35 DL1+0.9
N/a TEMP1+1.35
N/a MR1
N/a 3.69 N/A 8.79 3.90 N/A 8.79 4.95
a te

1020 1.35 DL1+-0.9


N/a TEMP1+1.35
N/a MR1
N/a 3.69 N/A 8.65 3.77 N/A 8.65 4.87
1021 1.35 DL1+1.5LL1+1.5
N/a N/aEQUIP1+0.9
N/a TEMP1+1.35 1.29
MR1N/A 3.32 1.35 N/A 3.32 1.54
1022 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35 1.34
MR1N/A 3.35 1.32 N/A 3.35 1.53
1023 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1+1.35 1.35
MR1N/A 3.48 1.42 N/A 3.48 1.62
1024 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.351.41
MR1
N/A 3.51 1.39 N/A 3.51 1.61
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
1.32 N/A MR1 3.32 1.31 N/A 3.32 1.61
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
1.32 N/A MR1 3.30 1.31 N/A 3.30 1.59
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
1.28 N/A MR1 3.21 1.26 N/A 3.21 1.55
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+0.9 TEMP1+1.35
1.32 N/A MR1 3.32 1.31 N/A 3.32 1.61
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+0.9 TEMP1+1.35
1.32 N/A MR1 3.30 1.31 N/A 3.30 1.59
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+0.9 TEMP1+1.35
1.28 N/A MR1 3.21 1.26 N/A 3.21 1.55
1028 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+0.9 TEMP1+1.35
1.28 N/A MR1 3.19 1.25 N/A 3.19 1.53
1029 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+0.9 TEMP1+1.35
1.42 N/A MR1 3.57 1.43 N/A 3.57 1.63

Ed
1030 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+0.9 TEMP1+1.35
1.41 N/A MR1 3.55 1.42 N/A 3.55 1.62
1031 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+0.9 TEMP1+1.35
1.23 N/A MR1 3.24 1.34 N/A 3.24 1.53
1032 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+0.9 TEMP1+1.35
1.23 N/A MR1 3.22 1.33 N/A 3.22 1.51
1033 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
1.38 N/A MR1 3.40 1.33 N/A 3.40 1.60
1034 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
1.37 N/A MR1 3.38 1.32 N/A 3.38 1.58
1035 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
1.33 N/A MR1 3.24 1.24 N/A 3.24 1.54
1036 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
1.33 N/A MR1 3.22 1.23 N/A 3.22 1.52
1037 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
1.38 N/A MR1 3.50 1.41 N/A 3.50 1.62
1038 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
1.36 N/A MR1 3.46 1.40 N/A 3.46 1.61
1039 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
1.28 N/A MR1 3.27 1.31 N/A 3.27 1.52
1040 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
1.27 N/A MR1 3.25 1.30 N/A 3.25 1.51
1041 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.39 N/A MR1 3.47 1.38 N/A 3.47 1.69

F
1042 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.38 N/A MR1 3.45 1.37 N/A 3.45 1.68
1043 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.34 N/A MR1 3.35 1.32 N/A 3.35 1.63
1044 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.34 N/A MR1 3.33 1.31 N/A 3.33 1.61
1045 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.49 N/A MR1 3.74 1.50 N/A 3.74 1.72
1046 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.49 N/A MR1 3.72 1.49 N/A 3.72 1.71

PD
1047 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.29 N/A MR1 3.39 1.41 N/A 3.39 1.60
1048 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.28 N/A MR1 3.37 1.40 N/A 3.37 1.59
1049 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.45 N/A MR1 3.56 1.39 N/A 3.56 1.68
1050 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.44 N/A MR1 3.54 1.38 N/A 3.54 1.67
1051 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.40 N/A MR1 3.38 1.29 N/A 3.38 1.62
1052 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.39 N/A MR1 3.36 1.28 N/A 3.36 1.60
1053 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.45 N/A MR1 3.67 1.48 N/A 3.67 1.71
1054 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.43 N/A MR1 3.63 1.47 N/A 3.63 1.70
1055 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.34 N/A MR1 3.42 1.38 N/A 3.42 1.60
1056 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.33 N/A MR1 3.40 1.36 N/A 3.40 1.58
1057 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.41 N/A MR1 3.46 1.35 N/A 3.46 1.75
1058 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.40 N/A MR1 3.43 1.33 N/A 3.43 1.72
1059 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.34 N/A MR1 3.27 1.26 N/A 3.27 1.63
1060 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.33 N/A MR1 3.24 1.25 N/A 3.24 1.61
te r
1061 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.56 N/A MR1 3.88 1.56 N/A 3.88 1.80
1062 1.148 DL1+1.5
N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.52 N/A MR1 3.81 1.54 N/A 3.81 1.78
1063 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.25 N/A MR1 3.33 1.40 N/A 3.33 1.60
1064 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.24 N/A MR1 3.30 1.38 N/A 3.30 1.57
1065 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.48 N/A MR1 3.55 1.36 N/A 3.55 1.74
1066 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.47 N/A MR1 3.52 1.35 N/A 3.52 1.71
1067 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.39 N/A MR1 3.30 1.24 N/A 3.30 1.62
1068 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.38 N/A MR1 3.27 1.22 N/A 3.27 1.60
1069 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.47 N/A MR1 3.77 1.56 N/A 3.77 1.79
as

1070 1.148 DL1+1.5


N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.44 N/A MR1 3.71 1.53 N/A 3.71 1.76
1071 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.30 N/A MR1 3.36 1.37 N/A 3.36 1.59
1072 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.29 N/A MR1 3.32 1.35 N/A 3.32 1.57
1073 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a 2.03 N/A 4.45 1.62 N/A 4.45 2.39
1074 1 DL1+0.8
N/a LL1+1 SL2
N/a N/a 2.15 N/A 5.24 2.16 N/A 5.24 2.56
1075 1 DL1+0.8
N/a LL1+-1 SL1
N/a N/a 2.44 N/A 5.10 1.82 N/A 5.10 2.89
1076 1 DL1+0.8
N/a LL1+-1 SL2
N/a N/a 2.26 N/A 5.44 2.21 N/A 5.44 2.68
2001 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+11.90
MR1N/A 4.66 1.89 N/A 4.66 2.34
nM

2002 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+11.89
MR1N/A 4.64 1.88 N/A 4.64 2.32
2003 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+11.84
MR1N/A 4.52 1.82 N/A 4.52 2.26
2004 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+11.84
MR1N/A 4.50 1.81 N/A 4.50 2.24
2005 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+12.03
MR1N/A 4.99 2.05 N/A 4.99 2.38
2006 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+12.02
MR1N/A 4.96 2.03 N/A 4.96 2.36
2007 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+11.78
MR1N/A 4.56 1.93 N/A 4.56 2.23
2008 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+11.77
MR1N/A 4.54 1.91 N/A 4.54 2.21
2009 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.98
MR1N/A 4.77 1.91 N/A 4.77 2.33
2010 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.97
MR1N/A 4.75 1.90 N/A 4.75 2.31
2011 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.91
MR1N/A 4.55 1.78 N/A 4.55 2.25
2012 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.91
MR1N/A 4.53 1.77 N/A 4.53 2.23
2013 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.98
MR1N/A 4.90 2.02 N/A 4.90 2.37
2014 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.96
MR1N/A 4.85 2.00 N/A 4.85 2.35
2015 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.84
MR1N/A 4.60 1.89 N/A 4.60 2.22
di

2016 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.84
MR1N/A 4.57 1.87 N/A 4.57 2.20
2017 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+11.93
MR1N/A 4.65 1.85 N/A 4.65 2.41
2018 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+11.92
MR1N/A 4.62 1.83 N/A 4.62 2.38
2019 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+11.84
MR1N/A 4.42 1.75 N/A 4.42 2.27
2020 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+11.83
MR1N/A 4.39 1.73 N/A 4.39 2.24
2021 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+12.11
MR1N/A 5.15 2.12 N/A 5.15 2.49
2022 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+12.07
MR1N/A 5.08 2.10 N/A 5.08 2.45
2023 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+11.73
MR1N/A 4.49 1.92 N/A 4.49 2.22
a te

2024 1 DL1+1.0
N/a LL1+1 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+11.72
MR1N/A 4.45 1.89 N/A 4.45 2.19
2025 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1 2.01
MR1N/A 4.76 1.87 N/A 4.76 2.40
2026 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1 2.00
MR1N/A 4.72 1.85 N/A 4.72 2.37
2027 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.91
MR1N/A 4.46 1.71 N/A 4.46 2.25
2028 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.90
MR1N/A 4.42 1.69 N/A 4.42 2.22
2029 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1 2.01
MR1N/A 5.02 2.11 N/A 5.02 2.47
2030 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.97
MR1N/A 4.94 2.08 N/A 4.94 2.44
2031 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.79
MR1N/A 4.52 1.88 N/A 4.52 2.21
2032 1 DL1+0.7
N/a LL1+1 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.78
MR1N/A 4.48 1.85 N/A 4.48 2.18
2033 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a 2.03 N/A 4.45 1.62 N/A 4.45 2.39
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
FOUNDATION FOR PEDESTAL (P19) (P23) (P24) (P29) (P20) (P25) (P26) (P30)
(P21) (P27) (P22) (P28)-(Pile Capacity Check)

Ed
LOAD CASE: 534 0.6 DL1+1
534 W
0.6
L7DL1+1 W L7

G E N E RA L PI L E C A P DI ME N SI O N S, PO SI T I O N
Concrete Density 2.5 ton/m 3 Pile ca p thickne ss 2.100 m
Soil Density 2 ton/m 3 Z cordinate of center of the pilecap -10.338 m
Grade of Concrete (Cylinder) C 30 X cordinate of center of the pilecap 40.163 m
Grade of Steel Fe 500 Le ngth a long a x is Z, L z 24.060 m
Level of Base of pilecap -5.1 m Le ngth a long a x is X, L x 12.660 m
Finished Ground level -0.6 m Area of base of pilecap, A 304.60 m2
Level of max water table -0.6 m

PE DE ST A L ( C O L U MN ) DI ME N SI O N S, PO SI T I O N S & L O A DS
C.G. of Pedestal Ped top P + W ped
Pedestal ID Lz-z (m) Lx-x (m) P (T) Hz (T) Mx (T-m) Hx (T) Mz (T-m)

F
Z X [Level of (T)
P19 1.600 1.600 -21.000 35.500 -5.100 465.68 -126.76 -618.03 -1.40 -15.61 465.68
P23 1.250 1.250 -21.000 41.500 -5.100 417.95 -46.34 -206.59 -1.08 -1.85 417.95
P24 1.250 1.250 -15.800 41.500 -5.100 -31.57 -49.83 -220.38 3.83 24.14 -31.57
P29 1.250 1.250 -15.800 45.000 -5.100 84.16 -27.21 -131.59 5.64 26.44 84.16
P20 1.250 1.250 -12.000 35.500 -5.100 115.41 -48.06 -275.13 5.96 26.75 115.41
P25 1.250 1.250 -12.000 41.500 -5.100 95.12 -58.30 -210.15 5.83 35.78 95.12

PD
P26 1.250 1.250 -8.200 41.500 -5.100 119.25 -48.38 -210.58 17.09 73.22 119.25
P30 1.250 1.250 -8.200 45.000 -5.100 68.21 -26.60 -129.87 15.10 75.32 68.21
P21 1.600 1.600 -3.000 35.500 -5.100 1.71 -112.94 -530.68 5.09 15.88 1.71
P27 1.250 1.250 -3.000 41.500 -5.100 -137.98 -48.80 -196.75 0.94 5.81 -137.98
P22 1.250 1.250 0.500 35.500 -5.100 -216.68 -45.60 -192.70 -5.17 -24.04 -216.68
P28 1.250 1.250 0.500 41.500 -5.100 -399.58 -43.21 -183.94 -2.65 -21.32 -399.58

PI L E DE T A I L S
Number of Piles 66 CGz of Pile group -10.338 m
Diameter of Piles 760 mm CGx of Pile group 40.163 m
2
Compressive capacity of piles 192 T SUM[(Xi-Xc g)2] of Pile group 1000.692 m
2
Tensile capacity of piles 40 T SUM[(Zi-Zc g)2] of Pile group 3430.944 m
Shear capacity of piles 11.5 T

W eight of soil, W s oil 1370.70 T


W eight of footing, W f oot ing 319.83 T
Axial load due to [P+ W ped] 581.68 T
te r
Total axial Load 2272.21 T

Mz due to [Mz+(P+W ped)*ex ] -665.16 Ton-m Mx due to [Mx+(P+W ped)*ez] -20443.03 Ton-m
Eccentricity between Pilecap and Pile group 0.00 mm Eccentricity between Pilecap and Pile group 0.00 mm
Mz due to pilecap and pile group eccentricity 0.00 Ton-m Mx due to pilecap and pile group eccentricity 0.00 Ton-m
Total Mz -665.16 Ton-m Total Mx -20443.03 Ton-m

Distance Distance P due to


from pile from pile Axial P due to P due to
Pile ID CGx CGz group CGx group CGz Load (T) Mx (T) Mz (T) Total P (T) Shear (T)
PCG-8-1 34.46 -21.74 -5.70 -11.40 34.43 67.93 3.79 106.14 10.36
PCG-8-2 34.46 -19.46 -5.70 -9.12 34.43 54.34 3.79 92.56 10.36
as

PCG-8-3 34.46 -17.18 -5.70 -6.84 34.43 40.76 3.79 78.97 10.36
PCG-8-4 34.46 -14.90 -5.70 -4.56 34.43 27.17 3.79 65.39 10.36
PCG-8-5 34.46 -12.62 -5.70 -2.28 34.43 13.59 3.79 51.80 10.36
PCG-8-6 34.46 -10.34 -5.70 0.00 34.43 0.00 3.79 38.22 10.36
PCG-8-7 34.46 -8.06 -5.70 2.28 34.43 -13.59 3.79 24.63 10.36
PCG-8-8 34.46 -5.78 -5.70 4.56 34.43 -27.17 3.79 11.05 10.36
PCG-8-9 34.46 -3.50 -5.70 6.84 34.43 -40.76 3.79 -2.54 10.36
PCG-8-10 34.46 -1.22 -5.70 9.12 34.43 -54.34 3.79 -16.12 10.36
PCG-8-11 34.46 1.06 -5.70 11.40 34.43 -67.93 3.79 -29.71 10.36
PCG-8-12 36.74 -21.74 -3.42 -11.40 34.43 67.93 2.27 104.63 10.36
PCG-8-13 36.74 -19.46 -3.42 -9.12 34.43 54.34 2.27 91.04 10.36
PCG-8-14 36.74 -17.18 -3.42 -6.84 34.43 40.76 2.27 77.46 10.36
nM

PCG-8-15 36.74 -14.90 -3.42 -4.56 34.43 27.17 2.27 63.87 10.36
PCG-8-16 36.74 -12.62 -3.42 -2.28 34.43 13.59 2.27 50.29 10.36
PCG-8-17 36.74 -10.34 -3.42 0.00 34.43 0.00 2.27 36.70 10.36
PCG-8-18 36.74 -8.06 -3.42 2.28 34.43 -13.59 2.27 23.12 10.36
PCG-8-19 36.74 -5.78 -3.42 4.56 34.43 -27.17 2.27 9.53 10.36
PCG-8-20 36.74 -3.50 -3.42 6.84 34.43 -40.76 2.27 -4.05 10.36
PCG-8-21 36.74 -1.22 -3.42 9.12 34.43 -54.34 2.27 -17.64 10.36
PCG-8-22 36.74 1.06 -3.42 11.40 34.43 -67.93 2.27 -31.23 10.36
PCG-8-23 39.02 -21.74 -1.14 -11.40 34.43 67.93 0.76 103.11 10.36
PCG-8-24 39.02 -19.46 -1.14 -9.12 34.43 54.34 0.76 89.53 10.36
PCG-8-25 39.02 -17.18 -1.14 -6.84 34.43 40.76 0.76 75.94 10.36
PCG-8-26 39.02 -14.90 -1.14 -4.56 34.43 27.17 0.76 62.36 10.36
PCG-8-27 39.02 -12.62 -1.14 -2.28 34.43 13.59 0.76 48.77 10.36
PCG-8-28 39.02 -10.34 -1.14 0.00 34.43 0.00 0.76 35.19 10.36
PCG-8-29 39.02 -8.06 -1.14 2.28 34.43 -13.59 0.76 21.60 10.36
PCG-8-30 39.02 -5.78 -1.14 4.56 34.43 -27.17 0.76 8.01 10.36
PCG-8-31 39.02 -3.50 -1.14 6.84 34.43 -40.76 0.76 -5.57 10.36
PCG-8-32 39.02 -1.22 -1.14 9.12 34.43 -54.34 0.76 -19.16 10.36
di

PCG-8-33 39.02 1.06 -1.14 11.40 34.43 -67.93 0.76 -32.74 10.36
PCG-8-34 41.30 -21.74 1.14 -11.40 34.43 67.93 -0.76 101.60 10.36
PCG-8-35 41.30 -19.46 1.14 -9.12 34.43 54.34 -0.76 88.01 10.36
PCG-8-36 41.30 -17.18 1.14 -6.84 34.43 40.76 -0.76 74.43 10.36
PCG-8-37 41.30 -14.90 1.14 -4.56 34.43 27.17 -0.76 60.84 10.36
PCG-8-38 41.30 -12.62 1.14 -2.28 34.43 13.59 -0.76 47.25 10.36
PCG-8-39 41.30 -10.34 1.14 0.00 34.43 0.00 -0.76 33.67 10.36
PCG-8-40 41.30 -8.06 1.14 2.28 34.43 -13.59 -0.76 20.08 10.36
PCG-8-41 41.30 -5.78 1.14 4.56 34.43 -27.17 -0.76 6.50 10.36
PCG-8-42 41.30 -3.50 1.14 6.84 34.43 -40.76 -0.76 -7.09 10.36
PCG-8-43 41.30 -1.22 1.14 9.12 34.43 -54.34 -0.76 -20.67 10.36
PCG-8-44 41.30 1.06 1.14 11.40 34.43 -67.93 -0.76 -34.26 10.36
a te

PCG-8-45 43.58 -21.74 3.42 -11.40 34.43 67.93 -2.27 100.08 10.36
PCG-8-46 43.58 -19.46 3.42 -9.12 34.43 54.34 -2.27 86.49 10.36
PCG-8-47 43.58 -17.18 3.42 -6.84 34.43 40.76 -2.27 72.91 10.36
PCG-8-48 43.58 -14.90 3.42 -4.56 34.43 27.17 -2.27 59.32 10.36
PCG-8-49 43.58 -12.62 3.42 -2.28 34.43 13.59 -2.27 45.74 10.36
PCG-8-50 43.58 -10.34 3.42 0.00 34.43 0.00 -2.27 32.15 10.36
PCG-8-51 43.58 -8.06 3.42 2.28 34.43 -13.59 -2.27 18.57 10.36
PCG-8-52 43.58 -5.78 3.42 4.56 34.43 -27.17 -2.27 4.98 10.36
PCG-8-53 43.58 -3.50 3.42 6.84 34.43 -40.76 -2.27 -8.60 10.36
PCG-8-54 43.58 -1.22 3.42 9.12 34.43 -54.34 -2.27 -22.19 10.36
PCG-8-55 43.58 1.06 3.42 11.40 34.43 -67.93 -2.27 -35.77 10.36
PCG-8-56 45.86 -21.74 5.70 -11.40 34.43 67.93 -3.79 98.56 10.36
PCG-8-57 45.86 -19.46 5.70 -9.12 34.43 54.34 -3.79 84.98 10.36
PCG-8-58 45.86 -17.18 5.70 -6.84 34.43 40.76 -3.79 71.39 10.36
PCG-8-59 45.86 -14.90 5.70 -4.56 34.43 27.17 -3.79 57.81 10.36
PCG-8-60 45.86 -12.62 5.70 -2.28 34.43 13.59 -3.79 44.22 10.36
re

PCG-8-61 45.86 -10.34 5.70 0.00 34.43 0.00 -3.79 30.64 10.36
PCG-8-62 45.86 -8.06 5.70 2.28 34.43 -13.59 -3.79 17.05 10.36
PCG-8-63 45.86 -5.78 5.70 4.56 34.43 -27.17 -3.79 3.47 10.36
PCG-8-64 45.86 -3.50 5.70 6.84 34.43 -40.76 -3.79 -10.12 10.36
PCG-8-65 45.86 -1.22 5.70 9.12 34.43 -54.34 -3.79 -23.70 10.36
PCG-8-66 45.86 1.06 5.70 11.40 34.43 -67.93 -3.79 -37.29 10.36
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
F AC TOR OF SAF ETY F OR ALL LOAD C ASES ( Per mis s ible/ Ac tual)

Pile Reaction ALONG Z-Z ALONG X-X


Compressi pt at Shear pt at Shear

Ed
Load case pt at top pt at top Punching
on Tension Shear bottom stress bottom stress
500 1 DL1+1 LL1+11.92
EQUIP1
N/a 35.42 N/A N/A N/A N/A N/A N/A N/A
501 1 DL1+1 LL1+11.96
EQUIP1+1
N/a TEMP1 8.93 N/A N/A N/A N/A N/A N/A N/A
502 1 DL1+1 WL1 3.39 N/a 3.82 N/A N/A N/A N/A N/A N/A N/A
503 1 DL1+1 WL2 3.28 N/a 4.19 N/A N/A N/A N/A N/A N/A N/A
504 1 DL1+1 WL3 3.41 N/a 3.99 N/A N/A N/A N/A N/A N/A N/A
505 1 DL1+1 WL4 3.35 N/a 3.66 N/A N/A N/A N/A N/A N/A N/A
506 1 DL1+1 WL5 1.71 1.49 1.10 N/A N/A N/A N/A N/A N/A N/A
507 1 DL1+1 WL6 1.68 1.57 1.10 N/A N/A N/A N/A N/A N/A N/A
508 1 DL1+1 WL7 1.63 1.19 1.11 N/A N/A N/A N/A N/A N/A N/A

F
509 1 DL1+1 WL8 1.60 1.22 1.12 N/A N/A N/A N/A N/A N/A N/A
510 1 DL1+0.7 WL13.42 N/a 5.40 N/A N/A N/A N/A N/A N/A N/A
511 1 DL1+0.7 WL23.34 N/a 5.92 N/A N/A N/A N/A N/A N/A N/A
512 1 DL1+0.7 WL33.51 N/a 5.77 N/A N/A N/A N/A N/A N/A N/A

PD
513 1 DL1+0.7 WL43.46 N/a 5.29 N/A N/A N/A N/A N/A N/A N/A
514 1 DL1+0.7 WL52.04 5.59 1.57 N/A N/A N/A N/A N/A N/A N/A
515 1 DL1+0.7 WL62.02 6.42 1.56 N/A N/A N/A N/A N/A N/A N/A
516 1 DL1+0.7 WL71.94 3.06 1.60 N/A N/A N/A N/A N/A N/A N/A
517 1 DL1+0.7 WL81.91 3.19 1.60 N/A N/A N/A N/A N/A N/A N/A
518 1 DL1+ 1LL1+0.75
1.90WL1+1
N/a EQUIP1 4.87 N/A N/A N/A N/A N/A N/A N/A
519 1 DL1+1.0 LL1+0.75
1.87 N/a
WL2+1 EQUIP1 5.33 N/A N/A N/A N/A N/A N/A N/A
520 1 DL1+1.0 LL1+0.75
2.02 N/a
WL3+1 EQUIP1 5.49 N/A N/A N/A N/A N/A N/A N/A
521 1 DL1+1.0 LL1+0.75
1.99 N/a
WL4+1 EQUIP1 5.03 N/A N/A N/A N/A N/A N/A N/A
522 1 DL1+1.0 LL1+0.75
1.42 N/a
WL5+1 EQUIP1 1.42 N/A N/A N/A N/A N/A N/A N/A
523 1 DL1+1.0 LL1+0.75
1.40 N/a
WL6+1 EQUIP1 1.42 N/A N/A N/A N/A N/A N/A N/A
te r
524 1 DL1+1.0 LL1+0.75
1.30 WL7+14.01
EQUIP1 1.53 N/A N/A N/A N/A N/A N/A N/A
525 1 DL1+1.0 LL1+0.75
1.29 WL8+14.27
EQUIP1 1.53 N/A N/A N/A N/A N/A N/A N/A
526 1 DL1+1.0 LL1+11.81
EQUIP1+0.525
N/a SL1 4.98 N/A N/A N/A N/A N/A N/A N/A
527 1 DL1+1.0 LL1+11.70
EQUIP1+0.525
N/a SL2 4.55 N/A N/A N/A N/A N/A N/A N/A
528 0.6 DL1+1 WL14.06 N/a 3.86 N/A N/A N/A N/A N/A N/A N/A
529 0.6 DL1+1 WL23.92 N/a 4.24 N/A N/A N/A N/A N/A N/A N/A
530 0.6 DL1+1 WL34.16 N/a 3.95 N/A N/A N/A N/A N/A N/A N/A
531 0.6 DL1+1 WL44.07 N/a 3.63 N/A N/A N/A N/A N/A N/A N/A
as

532 0.6 DL1+1 WL51.87 1.24 1.10 N/A N/A N/A N/A N/A N/A N/A
533 0.6 DL1+1 WL61.85 1.30 1.10 N/A N/A N/A N/A N/A N/A N/A
534 0.6 DL1+1 WL71.81 1.07 1.11 N/A N/A N/A N/A N/A N/A N/A
535 0.6 DL1+1 WL81.78 1.10 1.11 N/A N/A N/A N/A N/A N/A N/A
536 0.6 DL1+0.7 SL13.61 N/a 3.51 N/A N/A N/A N/A N/A N/A N/A
537 0.6 DL1+0.7 SL23.19 N/a 3.09 N/A N/A N/A N/A N/A N/A N/A
1001 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1 N/A N/A N/A N/A N/A N/A N/A
nM

1002 1.35 DL1+1.5


N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1N/A N/A N/A N/A N/A N/A N/A
1003 1.35 DL1+1.5
N/a WL1+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1004 1.35 DL1+1.5
N/a WL2+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1005 1.35 DL1+1.5
N/a WL3+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1006 1.35 DL1+1.5
N/a WL4+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1007 1.35 DL1+1.5
N/a WL5+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1008 1.35 DL1+1.5
N/a WL6+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1009 1.35 DL1+1.5
N/a WL7+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1010 1.35 DL1+1.5
N/a WL8+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1011 1.35 DL1+1.5
N/a WL1+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1012 1.35 DL1+1.5
N/a WL2+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
di

1013 1.35 DL1+1.5


N/a WL3+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1014 1.35 DL1+1.5
N/a WL4+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1015 1.35 DL1+1.5
N/a WL5+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1016 1.35 DL1+1.5
N/a WL6+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1017 1.35 DL1+1.5
N/a WL7+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1018 1.35 DL1+1.5
N/a WL8+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1019 1.35 DL1+0.9
N/a TEMP1+1.35
N/a MR1
N/a N/A N/A N/A N/A N/A N/A N/A
a te

1020 1.35 DL1+-0.9


N/a TEMP1+1.35
N/a MR1
N/a N/A N/A N/A N/A N/A N/A N/A
1021 1.35 DL1+1.5LL1+1.5
N/a N/aEQUIP1+0.9
N/a TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A N/A
1022 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1023 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1024 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1028 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1029 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

Ed
1030 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1031 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1032 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1033 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1034 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1035 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1036 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1037 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1038 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1039 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1040 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1041 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

F
1042 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1043 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1044 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1045 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1046 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

PD
1047 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1048 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1049 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1050 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1051 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1052 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1053 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1054 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1055 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1056 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1057 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1058 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1059 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1060 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
te r
1061 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1062 1.148 DL1+1.5
N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1063 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1064 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1065 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1066 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1067 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1068 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1069 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
as

1070 1.148 DL1+1.5


N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1071 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1072 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1073 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1074 1 DL1+0.8
N/a LL1+1 SL2
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1075 1 DL1+0.8
N/a LL1+-1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1076 1 DL1+0.8
N/a LL1+-1 SL2
N/a N/a N/A N/A N/A N/A N/A N/A N/A
2001 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
nM

2002 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2003 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2004 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2005 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2006 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2007 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2008 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2009 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2010 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2011 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2012 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2013 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2014 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2015 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
di

2016 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2017 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2018 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2019 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2020 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2021 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2022 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2023 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
a te

2024 1 DL1+1.0
N/a LL1+1 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2025 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2026 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2027 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2028 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2029 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2030 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2031 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2032 1 DL1+0.7
N/a LL1+1 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2033 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
FOUNDATION FOR PEDESTAL (P19) (P23) (P24) (P29) (P20) (P25) (P26) (P30)
(P21) (P27) (P22) (P28)-(Pilecap Design)

Ed
LOAD CASE: 1072 1.1481072
DL1+1.5
1.148
LL1+1.5
DL1+1.05
W L8+1.5
LL1+1.5
EQUIP1+-0.9
W L8+1.05 EQUIP1+-0.9
TEMP1+1.35 TEMP1+1.35
MR1 MR1

G E N E RA L PI L E C A P DI ME N SI O N S, PO SI T I O N
Concrete Density 2.5 ton/m 3 Pile ca p thickne ss 2.100 m
Soil Density 2 ton/m 3 Z cordinate of center of the pilecap -10.338 m
Grade of Concrete (Cylinder) C 30 X cordinate of center of the pilecap 40.163 m
Grade of Steel Fe 500 Le ngth a long a x is Z, L z 24.060 m
Level of Base of pilecap -5.1 m Le ngth a long a x is X, L x 12.660 m
Finished Ground level -0.6 m Area of base of pilecap, A 304.60 m2
Level of max water table -0.6 m

PE DE ST A L ( C O L U MN ) DI ME N SI O N S, PO SI T I O N S & L O A DS
C.G. of Pedestal Ped top P + W ped
Pedestal ID Lz-z (m) Lx-x (m) P (T) Hz (T) Mx (T-m) Hx (T) Mz (T-m)

F
Z X [Level of (T)
P19 1.600 1.600 -21.000 35.500 -5.100 1306.43 -168.32 -826.12 -20.18 -111.20 1306.43
P23 1.250 1.250 -21.000 41.500 -5.100 902.48 -65.09 -294.76 -13.17 -53.53 902.48
P24 1.250 1.250 -15.800 41.500 -5.100 135.86 -72.57 -325.45 0.34 13.61 135.86
P29 1.250 1.250 -15.800 45.000 -5.100 279.21 -39.06 -191.48 1.33 4.91 279.21
P20 1.250 1.250 -12.000 35.500 -5.100 428.78 -67.30 -389.33 2.71 16.34 428.78
P25 1.250 1.250 -12.000 41.500 -5.100 301.42 -87.25 -314.39 0.28 18.64 301.42

PD
P26 1.250 1.250 -8.200 41.500 -5.100 359.61 -73.77 -318.85 20.74 89.32 359.61
P30 1.250 1.250 -8.200 45.000 -5.100 244.51 -43.53 -209.82 15.95 80.38 244.51
P21 1.600 1.600 -3.000 35.500 -5.100 555.78 -167.63 -782.24 0.39 -10.76 555.78
P27 1.250 1.250 -3.000 41.500 -5.100 -6.29 -76.64 -305.20 -5.82 -23.92 -6.29
P22 1.250 1.250 0.500 35.500 -5.100 -118.38 -69.03 -292.90 -6.03 -28.10 -118.38
P28 1.250 1.250 0.500 41.500 -5.100 -460.42 -69.20 -293.46 -6.40 -43.76 -460.42

PI L E DE T A I L S
Number of Piles 66 CGz of Pile group -10.338 m
Diameter of Piles 760 mm CGx of Pile group 40.163 m
2
Compressive capacity of piles 192 T SUM[(Xi-Xc g)2] of Pile group 1000.692 m
2
Tensile capacity of piles 40 T SUM[(Zi-Zc g)2] of Pile group 3430.944 m
Shear capacity of piles 11.5 T

W eight of soil, W s oil 1850.44 T


W eight of footing, W f oot ing 431.77 T
Axial load due to [P+ W ped] 3928.99 T
te r
Total axial Load 6211.20 T

Mz due to [Mz+(P+W ped)*ex ] -5997.63 Ton-m Mx due to [Mx+(P+W ped)*ez] -32525.37 Ton-m
Eccentricity between Pilecap and Pile group 0.00 mm Eccentricity between Pilecap and Pile group 0.00 mm
Mz due to pilecap and pile group eccentricity 0.00 Ton-m Mx due to pilecap and pile group eccentricity 0.00 Ton-m
Total Mz -5997.63 Ton-m Total Mx -32525.37 Ton-m

Distance Distance P due to


from pile from pile Axial P due to P due to
Pile ID CGx CGz group CGx group CGz Load (T) Mx (T) Mz (T) Total P (T) Shear (T)
PCG-8-1 34.46 -21.74 -5.70 -11.40 94.11 108.07 34.16 236.34 15.14
PCG-8-2 34.46 -19.46 -5.70 -9.12 94.11 86.46 34.16 214.73 15.14
as

PCG-8-3 34.46 -17.18 -5.70 -6.84 94.11 64.84 34.16 193.12 15.14
PCG-8-4 34.46 -14.90 -5.70 -4.56 94.11 43.23 34.16 171.50 15.14
PCG-8-5 34.46 -12.62 -5.70 -2.28 94.11 21.61 34.16 149.89 15.14
PCG-8-6 34.46 -10.34 -5.70 0.00 94.11 0.00 34.16 128.27 15.14
PCG-8-7 34.46 -8.06 -5.70 2.28 94.11 -21.61 34.16 106.66 15.14
PCG-8-8 34.46 -5.78 -5.70 4.56 94.11 -43.23 34.16 85.04 15.14
PCG-8-9 34.46 -3.50 -5.70 6.84 94.11 -64.84 34.16 63.43 15.14
PCG-8-10 34.46 -1.22 -5.70 9.12 94.11 -86.46 34.16 41.81 15.14
PCG-8-11 34.46 1.06 -5.70 11.40 94.11 -108.07 34.16 20.20 15.14
PCG-8-12 36.74 -21.74 -3.42 -11.40 94.11 108.07 20.50 222.68 15.14
PCG-8-13 36.74 -19.46 -3.42 -9.12 94.11 86.46 20.50 201.06 15.14
PCG-8-14 36.74 -17.18 -3.42 -6.84 94.11 64.84 20.50 179.45 15.14
nM

PCG-8-15 36.74 -14.90 -3.42 -4.56 94.11 43.23 20.50 157.84 15.14
PCG-8-16 36.74 -12.62 -3.42 -2.28 94.11 21.61 20.50 136.22 15.14
PCG-8-17 36.74 -10.34 -3.42 0.00 94.11 0.00 20.50 114.61 15.14
PCG-8-18 36.74 -8.06 -3.42 2.28 94.11 -21.61 20.50 92.99 15.14
PCG-8-19 36.74 -5.78 -3.42 4.56 94.11 -43.23 20.50 71.38 15.14
PCG-8-20 36.74 -3.50 -3.42 6.84 94.11 -64.84 20.50 49.76 15.14
PCG-8-21 36.74 -1.22 -3.42 9.12 94.11 -86.46 20.50 28.15 15.14
PCG-8-22 36.74 1.06 -3.42 11.40 94.11 -108.07 20.50 6.53 15.14
PCG-8-23 39.02 -21.74 -1.14 -11.40 94.11 108.07 6.83 209.01 15.14
PCG-8-24 39.02 -19.46 -1.14 -9.12 94.11 86.46 6.83 187.40 15.14
PCG-8-25 39.02 -17.18 -1.14 -6.84 94.11 64.84 6.83 165.78 15.14
PCG-8-26 39.02 -14.90 -1.14 -4.56 94.11 43.23 6.83 144.17 15.14
PCG-8-27 39.02 -12.62 -1.14 -2.28 94.11 21.61 6.83 122.56 15.14
PCG-8-28 39.02 -10.34 -1.14 0.00 94.11 0.00 6.83 100.94 15.14
PCG-8-29 39.02 -8.06 -1.14 2.28 94.11 -21.61 6.83 79.33 15.14
PCG-8-30 39.02 -5.78 -1.14 4.56 94.11 -43.23 6.83 57.71 15.14
PCG-8-31 39.02 -3.50 -1.14 6.84 94.11 -64.84 6.83 36.10 15.14
PCG-8-32 39.02 -1.22 -1.14 9.12 94.11 -86.46 6.83 14.48 15.14
di

PCG-8-33 39.02 1.06 -1.14 11.40 94.11 -108.07 6.83 -7.13 15.14
PCG-8-34 41.30 -21.74 1.14 -11.40 94.11 108.07 -6.83 195.35 15.14
PCG-8-35 41.30 -19.46 1.14 -9.12 94.11 86.46 -6.83 173.73 15.14
PCG-8-36 41.30 -17.18 1.14 -6.84 94.11 64.84 -6.83 152.12 15.14
PCG-8-37 41.30 -14.90 1.14 -4.56 94.11 43.23 -6.83 130.51 15.14
PCG-8-38 41.30 -12.62 1.14 -2.28 94.11 21.61 -6.83 108.89 15.14
PCG-8-39 41.30 -10.34 1.14 0.00 94.11 0.00 -6.83 87.28 15.14
PCG-8-40 41.30 -8.06 1.14 2.28 94.11 -21.61 -6.83 65.66 15.14
PCG-8-41 41.30 -5.78 1.14 4.56 94.11 -43.23 -6.83 44.05 15.14
PCG-8-42 41.30 -3.50 1.14 6.84 94.11 -64.84 -6.83 22.43 15.14
PCG-8-43 41.30 -1.22 1.14 9.12 94.11 -86.46 -6.83 0.82 15.14
PCG-8-44 41.30 1.06 1.14 11.40 94.11 -108.07 -6.83 -20.80 15.14
a te

PCG-8-45 43.58 -21.74 3.42 -11.40 94.11 108.07 -20.50 181.68 15.14
PCG-8-46 43.58 -19.46 3.42 -9.12 94.11 86.46 -20.50 160.07 15.14
PCG-8-47 43.58 -17.18 3.42 -6.84 94.11 64.84 -20.50 138.45 15.14
PCG-8-48 43.58 -14.90 3.42 -4.56 94.11 43.23 -20.50 116.84 15.14
PCG-8-49 43.58 -12.62 3.42 -2.28 94.11 21.61 -20.50 95.23 15.14
PCG-8-50 43.58 -10.34 3.42 0.00 94.11 0.00 -20.50 73.61 15.14
PCG-8-51 43.58 -8.06 3.42 2.28 94.11 -21.61 -20.50 52.00 15.14
PCG-8-52 43.58 -5.78 3.42 4.56 94.11 -43.23 -20.50 30.38 15.14
PCG-8-53 43.58 -3.50 3.42 6.84 94.11 -64.84 -20.50 8.77 15.14
PCG-8-54 43.58 -1.22 3.42 9.12 94.11 -86.46 -20.50 -12.85 15.14
PCG-8-55 43.58 1.06 3.42 11.40 94.11 -108.07 -20.50 -34.46 15.14
PCG-8-56 45.86 -21.74 5.70 -11.40 94.11 108.07 -34.16 168.02 15.14
PCG-8-57 45.86 -19.46 5.70 -9.12 94.11 86.46 -34.16 146.40 15.14
PCG-8-58 45.86 -17.18 5.70 -6.84 94.11 64.84 -34.16 124.79 15.14
PCG-8-59 45.86 -14.90 5.70 -4.56 94.11 43.23 -34.16 103.18 15.14
PCG-8-60 45.86 -12.62 5.70 -2.28 94.11 21.61 -34.16 81.56 15.14
re

PCG-8-61 45.86 -10.34 5.70 0.00 94.11 0.00 -34.16 59.95 15.14
PCG-8-62 45.86 -8.06 5.70 2.28 94.11 -21.61 -34.16 38.33 15.14
PCG-8-63 45.86 -5.78 5.70 4.56 94.11 -43.23 -34.16 16.72 15.14
PCG-8-64 45.86 -3.50 5.70 6.84 94.11 -64.84 -34.16 -4.90 15.14
PCG-8-65 45.86 -1.22 5.70 9.12 94.11 -86.46 -34.16 -26.51 15.14
PCG-8-66 45.86 1.06 5.70 11.40 94.11 -108.07 -34.16 -48.13 15.14
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
FOUNDATION DESIGN
FOUNDATION FOR PEDESTAL (P3) (P4) (P9) (P10) (P1) (P5) (P6) (P11) (P2) (P7)
(P8) (P12)-(Pile Capacity Check)

Ed
LOAD CASE: 508 1 DL1+1
508
W1L7
DL1+1 W L7

G E N E RA L PI L E C A P DI ME N SI O N S, PO SI T I O N
Concrete Density 2.5 ton/m 3 Pile ca p thickne ss 2.300 m
Soil Density 2 ton/m 3 Z cordinate of center of the pilecap -13.663 m
Grade of Concrete (Cylinder) C 30 X cordinate of center of the pilecap 4.838 m
Grade of Steel Fe 500 Le ngth a long a x is Z, L z 25.580 m
Level of Base of pilecap -5.1 m Le ngth a long a x is X, L x 13.898 m
Finished Ground level -0.6 m Area of base of pilecap, A 347.90 m2
Level of max water table -0.6 m

PE DE ST A L ( C O L U MN ) DI ME N SI O N S, PO SI T I O N S & L O A DS
C.G. of Pedestal Ped top P + W ped
Pedestal ID Lz-z (m) Lx-x (m) P (T) Hz (T) Mx (T-m) Hx (T) Mz (T-m)
Z X [Level of (T)

F
P3 1.250 1.250 -24.500 3.500 -5.100 456.23 -44.26 -175.76 1.03 -1.91 456.23
P4 1.250 1.250 -21.000 3.500 -5.100 270.03 -47.97 -196.79 -2.66 -4.65 270.03
P9 1.250 1.250 -24.500 9.500 -5.100 321.82 -47.42 -199.28 -0.53 -3.63 321.82
P10 1.600 1.600 -21.000 9.500 -5.100 272.77 -113.09 -543.39 -3.43 -7.90 272.77
P1 1.250 1.250 -15.800 0.000 -5.100 41.01 -27.41 -131.00 -4.29 -18.58 41.01
P5 1.250 1.250 -15.800 3.500 -5.100 -33.62 -47.18 -211.91 -1.41 -15.77 -33.62
P6 1.250 1.250 -12.000 3.500 -5.100 48.16 -58.43 -210.74 -2.36 -18.96 48.16

PD
P11 1.250 1.250 -12.000 9.500 -5.100 43.92 -47.85 -274.07 -2.97 -13.11 43.92
P2 1.250 1.250 -8.200 0.000 -5.100 19.38 -26.29 -129.96 -12.77 -62.35 19.38
P7 1.250 1.250 -8.200 3.500 -5.100 100.44 -50.92 -220.16 -13.44 -59.92 100.44
P8 1.250 1.250 -3.000 3.500 -5.100 -266.89 -44.73 -203.69 -4.75 -13.43 -266.89
P12 1.600 1.600 -3.000 9.500 -5.100 -186.37 -125.59 -600.33 -7.29 -30.38 -186.37

PI L E DE T A I L S
Number of Piles 73 CGz of Pile group -13.663 m
Diameter of Piles 760 mm CGx of Pile group 4.838 m
2
Compressive capacity of piles 192 T SUM[(Xi-Xc g)2] of Pile group 1277.601 m
2
Tensile capacity of piles 40 T SUM[(Zi-Zc g)2] of Pile group 3903.652 m
Shear capacity of piles 11.5 T

W eight of soil, W s oil 1565.55 T


W eight of footing, W f oot ing 400.08 T
Axial load due to [P+ W ped] 1086.87 T
Total axial Load 3052.50 T

Mz due to [Mz+(P+W ped)*ex ] 796.56 Ton-m Mx due to [Mx+(P+W ped)*ez] -19552.51 Ton-m
te r
Eccentricity between Pilecap and Pile group 0.00 mm Eccentricity between Pilecap and Pile group 0.00 mm
Mz due to pilecap and pile group eccentricity 0.00 Ton-m Mx due to pilecap and pile group eccentricity 0.00 Ton-m
Total Mz 796.56 Ton-m Total Mx -19552.51 Ton-m

Distance Distance P due to


from pile from pile Axial P due to P due to
Pile ID CGx CGz group CGx group CGz Load (T) Mx (T) Mz (T) Total P (T) Shear (T)
PCG-1-1 -1.48 -24.61 -6.32 -10.94 41.82 54.82 -3.94 92.69 9.36
PCG-1-2 -1.48 -22.17 -6.32 -8.51 41.82 42.63 -3.94 80.51 9.36
PCG-1-3 -1.48 -19.74 -6.32 -6.08 41.82 30.45 -3.94 68.33 9.36
PCG-1-4 -1.48 -17.31 -6.32 -3.65 41.82 18.27 -3.94 56.15 9.36
PCG-1-5 -1.48 -14.88 -6.32 -1.22 41.82 6.09 -3.94 43.97 9.36
as

PCG-1-6 -1.48 -12.45 -6.32 1.22 41.82 -6.09 -3.94 31.78 9.36
PCG-1-7 -1.48 -10.02 -6.32 3.65 41.82 -18.27 -3.94 19.60 9.36
PCG-1-8 -1.48 -7.58 -6.32 6.08 41.82 -30.45 -3.94 7.42 9.36
PCG-1-9 -1.48 -5.15 -6.32 8.51 41.82 -42.63 -3.94 -4.76 9.36
PCG-1-10 -1.48 -2.72 -6.32 10.94 41.82 -54.82 -3.94 -16.94 9.36
PCG-1-11 0.63 -25.82 -4.21 -12.16 41.82 60.91 -2.63 100.10 9.36
PCG-1-12 0.63 -23.39 -4.21 -9.73 41.82 48.73 -2.63 87.91 9.36
PCG-1-13 0.63 -20.96 -4.21 -7.30 41.82 36.54 -2.63 75.73 9.36
PCG-1-14 0.63 -18.53 -4.21 -4.86 41.82 24.36 -2.63 63.55 9.36
PCG-1-15 0.63 -16.09 -4.21 -2.43 41.82 12.18 -2.63 51.37 9.36
PCG-1-16 0.63 -13.66 -4.21 0.00 41.82 0.00 -2.63 39.19 9.36
PCG-1-17 0.63 -11.23 -4.21 2.43 41.82 -12.18 -2.63 27.01 9.36
PCG-1-18 0.63 -8.80 -4.21 4.86 41.82 -24.36 -2.63 14.83 9.36
nM

PCG-1-19 0.63 -6.37 -4.21 7.30 41.82 -36.54 -2.63 2.64 9.36
PCG-1-20 0.63 -3.93 -4.21 9.73 41.82 -48.73 -2.63 -9.54 9.36
PCG-1-21 0.63 -1.50 -4.21 12.16 41.82 -60.91 -2.63 -21.72 9.36
PCG-1-22 2.73 -24.61 -2.11 -10.94 41.82 54.82 -1.31 95.32 9.36
PCG-1-23 2.73 -22.17 -2.11 -8.51 41.82 42.63 -1.31 83.14 9.36
PCG-1-24 2.73 -19.74 -2.11 -6.08 41.82 30.45 -1.31 70.96 9.36
PCG-1-25 2.73 -17.31 -2.11 -3.65 41.82 18.27 -1.31 58.77 9.36
PCG-1-26 2.73 -14.88 -2.11 -1.22 41.82 6.09 -1.31 46.59 9.36
PCG-1-27 2.73 -12.45 -2.11 1.22 41.82 -6.09 -1.31 34.41 9.36
PCG-1-28 2.73 -10.02 -2.11 3.65 41.82 -18.27 -1.31 22.23 9.36
PCG-1-29 2.73 -7.58 -2.11 6.08 41.82 -30.45 -1.31 10.05 9.36
PCG-1-30 2.73 -5.15 -2.11 8.51 41.82 -42.63 -1.31 -2.13 9.36
PCG-1-31 2.73 -2.72 -2.11 10.94 41.82 -54.82 -1.31 -14.31 9.36
PCG-1-32 4.84 -25.82 0.00 -12.16 41.82 60.91 0.00 102.72 9.36
PCG-1-33 4.84 -23.39 0.00 -9.73 41.82 48.73 0.00 90.54 9.36
PCG-1-34 4.84 -20.96 0.00 -7.30 41.82 36.54 0.00 78.36 9.36
PCG-1-35 4.84 -18.53 0.00 -4.86 41.82 24.36 0.00 66.18 9.36
PCG-1-36 4.84 -16.09 0.00 -2.43 41.82 12.18 0.00 54.00 9.36
PCG-1-37 4.84 -13.66 0.00 0.00 41.82 0.00 0.00 41.82 9.36
di

PCG-1-38 4.84 -11.23 0.00 2.43 41.82 -12.18 0.00 29.63 9.36
PCG-1-39 4.84 -8.80 0.00 4.86 41.82 -24.36 0.00 17.45 9.36
PCG-1-40 4.84 -6.37 0.00 7.30 41.82 -36.54 0.00 5.27 9.36
PCG-1-41 4.84 -3.93 0.00 9.73 41.82 -48.73 0.00 -6.91 9.36
PCG-1-42 4.84 -1.50 0.00 12.16 41.82 -60.91 0.00 -19.09 9.36
PCG-1-43 6.94 -24.61 2.11 -10.94 41.82 54.82 1.31 97.94 9.36
PCG-1-44 6.94 -22.17 2.11 -8.51 41.82 42.63 1.31 85.76 9.36
PCG-1-45 6.94 -19.74 2.11 -6.08 41.82 30.45 1.31 73.58 9.36
PCG-1-46 6.94 -17.31 2.11 -3.65 41.82 18.27 1.31 61.40 9.36
PCG-1-47 6.94 -14.88 2.11 -1.22 41.82 6.09 1.31 49.22 9.36
PCG-1-48 6.94 -12.45 2.11 1.22 41.82 -6.09 1.31 37.04 9.36
PCG-1-49 6.94 -10.02 2.11 3.65 41.82 -18.27 1.31 24.86 9.36
PCG-1-50 6.94 -7.58 2.11 6.08 41.82 -30.45 1.31 12.67 9.36
a te

PCG-1-51 6.94 -5.15 2.11 8.51 41.82 -42.63 1.31 0.49 9.36
PCG-1-52 6.94 -2.72 2.11 10.94 41.82 -54.82 1.31 -11.69 9.36
PCG-1-53 9.05 -25.82 4.21 -12.16 41.82 60.91 2.63 105.35 9.36
PCG-1-54 9.05 -23.39 4.21 -9.73 41.82 48.73 2.63 93.17 9.36
PCG-1-55 9.05 -20.96 4.21 -7.30 41.82 36.54 2.63 80.99 9.36
PCG-1-56 9.05 -18.53 4.21 -4.86 41.82 24.36 2.63 68.80 9.36
PCG-1-57 9.05 -16.09 4.21 -2.43 41.82 12.18 2.63 56.62 9.36
PCG-1-58 9.05 -13.66 4.21 0.00 41.82 0.00 2.63 44.44 9.36
PCG-1-59 9.05 -11.23 4.21 2.43 41.82 -12.18 2.63 32.26 9.36
PCG-1-60 9.05 -8.80 4.21 4.86 41.82 -24.36 2.63 20.08 9.36
PCG-1-61 9.05 -6.37 4.21 7.30 41.82 -36.54 2.63 7.90 9.36
PCG-1-62 9.05 -3.93 4.21 9.73 41.82 -48.73 2.63 -4.28 9.36
PCG-1-63 9.05 -1.50 4.21 12.16 41.82 -60.91 2.63 -16.47 9.36
PCG-1-64 11.16 -24.61 6.32 -10.94 41.82 54.82 3.94 100.57 9.36
PCG-1-65 11.16 -22.17 6.32 -8.51 41.82 42.63 3.94 88.39 9.36
PCG-1-66 11.16 -19.74 6.32 -6.08 41.82 30.45 3.94 76.21 9.36
re

PCG-1-67 11.16 -17.31 6.32 -3.65 41.82 18.27 3.94 64.03 9.36
PCG-1-68 11.16 -14.88 6.32 -1.22 41.82 6.09 3.94 51.85 9.36
PCG-1-69 11.16 -12.45 6.32 1.22 41.82 -6.09 3.94 39.66 9.36
PCG-1-70 11.16 -10.02 6.32 3.65 41.82 -18.27 3.94 27.48 9.36
PCG-1-71 11.16 -7.58 6.32 6.08 41.82 -30.45 3.94 15.30 9.36
PCG-1-72 11.16 -5.15 6.32 8.51 41.82 -42.63 3.94 3.12 9.36
PCG-1-73 11.16 -2.72 6.32 10.94 41.82 -54.82 3.94 -9.06 9.36
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
F AC TOR OF SAF ETY F OR ALL LOAD C ASES ( Per mis s ible/ Ac tual)

Pile Reaction ALONG Z-Z ALONG X-X


Compressi pt at Shear pt at Shear

Ed
Load case pt at top pt at top Punching
on Tension Shear bottom stress bottom stress
500 1 DL1+1 LL1+12.11
EQUIP1
N/a 42.34 N/A N/A N/A N/A N/A N/A N/A
501 1 DL1+1 LL1+12.16
EQUIP1+1
N/a TEMP1 10.09 N/A N/A N/A N/A N/A N/A N/A
502 1 DL1+1 WL1 3.81 N/a 4.33 N/A N/A N/A N/A N/A N/A N/A
503 1 DL1+1 WL2 3.73 N/a 3.97 N/A N/A N/A N/A N/A N/A N/A
504 1 DL1+1 WL3 3.62 N/a 4.10 N/A N/A N/A N/A N/A N/A N/A
505 1 DL1+1 WL4 3.51 N/a 4.50 N/A N/A N/A N/A N/A N/A N/A
506 1 DL1+1 WL5 1.75 1.55 1.24 N/A N/A N/A N/A N/A N/A N/A
507 1 DL1+1 WL6 1.72 1.57 1.24 N/A N/A N/A N/A N/A N/A N/A
508 1 DL1+1 WL7 1.82 1.84 1.23 N/A N/A N/A N/A N/A N/A N/A

F
509 1 DL1+1 WL8 1.81 1.98 1.23 N/A N/A N/A N/A N/A N/A N/A
510 1 DL1+0.7 WL13.82 N/a 6.24 N/A N/A N/A N/A N/A N/A N/A
511 1 DL1+0.7 WL23.77 N/a 5.72 N/A N/A N/A N/A N/A N/A N/A
512 1 DL1+0.7 WL33.63 N/a 5.79 N/A N/A N/A N/A N/A N/A N/A

PD
513 1 DL1+0.7 WL43.55 N/a 6.36 N/A N/A N/A N/A N/A N/A N/A
514 1 DL1+0.7 WL52.09 5.95 1.77 N/A N/A N/A N/A N/A N/A N/A
515 1 DL1+0.7 WL62.05 6.16 1.77 N/A N/A N/A N/A N/A N/A N/A
516 1 DL1+0.7 WL72.18 13.95 1.75 N/A N/A N/A N/A N/A N/A N/A
517 1 DL1+0.7 WL82.17 22.47 1.75 N/A N/A N/A N/A N/A N/A N/A
518 1 DL1+ 1LL1+0.75
2.21WL1+1
N/a EQUIP1 5.95 N/A N/A N/A N/A N/A N/A N/A
519 1 DL1+1.0 LL1+0.75
2.17 N/a
WL2+1 EQUIP1 5.45 N/A N/A N/A N/A N/A N/A N/A
520 1 DL1+1.0 LL1+0.75
2.11 N/a
WL3+1 EQUIP1 5.25 N/A N/A N/A N/A N/A N/A N/A
521 1 DL1+1.0 LL1+0.75
2.08 N/a
WL4+1 EQUIP1 5.74 N/A N/A N/A N/A N/A N/A N/A
522 1 DL1+1.0 LL1+0.75
1.47 WL5+115.29
EQUIP1 1.69 N/A N/A N/A N/A N/A N/A N/A
523 1 DL1+1.0 LL1+0.75
1.46 WL6+117.11
EQUIP1 1.69 N/A N/A N/A N/A N/A N/A N/A
te r
524 1 DL1+1.0 LL1+0.75
1.59 N/a
WL7+1 EQUIP1 1.59 N/A N/A N/A N/A N/A N/A N/A
525 1 DL1+1.0 LL1+0.75
1.58 N/a
WL8+1 EQUIP1 1.60 N/A N/A N/A N/A N/A N/A N/A
526 1 DL1+1.0 LL1+11.91
EQUIP1+0.525
N/a SL1 4.47 N/A N/A N/A N/A N/A N/A N/A
527 1 DL1+1.0 LL1+11.95
EQUIP1+0.525
N/a SL2 4.18 N/A N/A N/A N/A N/A N/A N/A
528 0.6 DL1+1 WL14.64 N/a 4.28 N/A N/A N/A N/A N/A N/A N/A
529 0.6 DL1+1 WL24.54 N/a 3.93 N/A N/A N/A N/A N/A N/A N/A
530 0.6 DL1+1 WL34.37 N/a 4.14 N/A N/A N/A N/A N/A N/A N/A
531 0.6 DL1+1 WL44.23 N/a 4.55 N/A N/A N/A N/A N/A N/A N/A
as

532 0.6 DL1+1 WL51.91 1.33 1.23 N/A N/A N/A N/A N/A N/A N/A
533 0.6 DL1+1 WL61.87 1.35 1.23 N/A N/A N/A N/A N/A N/A N/A
534 0.6 DL1+1 WL71.97 1.46 1.23 N/A N/A N/A N/A N/A N/A N/A
535 0.6 DL1+1 WL81.96 1.55 1.23 N/A N/A N/A N/A N/A N/A N/A
536 0.6 DL1+0.7 SL13.25 N/a 3.57 N/A N/A N/A N/A N/A N/A N/A
537 0.6 DL1+0.7 SL23.31 N/a 3.40 N/A N/A N/A N/A N/A N/A N/A
1001 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1 N/A N/A N/A N/A N/A N/A N/A
nM

1002 1.35 DL1+1.5


N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1N/A N/A N/A N/A N/A N/A N/A
1003 1.35 DL1+1.5
N/a WL1+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1004 1.35 DL1+1.5
N/a WL2+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1005 1.35 DL1+1.5
N/a WL3+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1006 1.35 DL1+1.5
N/a WL4+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1007 1.35 DL1+1.5
N/a WL5+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1008 1.35 DL1+1.5
N/a WL6+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1009 1.35 DL1+1.5
N/a WL7+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1010 1.35 DL1+1.5
N/a WL8+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1011 1.35 DL1+1.5
N/a WL1+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1012 1.35 DL1+1.5
N/a WL2+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
di

1013 1.35 DL1+1.5


N/a WL3+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1014 1.35 DL1+1.5
N/a WL4+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1015 1.35 DL1+1.5
N/a WL5+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1016 1.35 DL1+1.5
N/a WL6+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1017 1.35 DL1+1.5
N/a WL7+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1018 1.35 DL1+1.5
N/a WL8+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1019 1.35 DL1+0.9
N/a TEMP1+1.35
N/a MR1
N/a N/A N/A N/A N/A N/A N/A N/A
a te

1020 1.35 DL1+-0.9


N/a TEMP1+1.35
N/a MR1
N/a N/A N/A N/A N/A N/A N/A N/A
1021 1.35 DL1+1.5LL1+1.5
N/a N/aEQUIP1+0.9
N/a TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A N/A
1022 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1023 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1024 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1028 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1029 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

Ed
1030 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1031 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1032 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1033 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1034 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1035 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1036 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1037 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1038 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1039 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1040 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1041 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

F
1042 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1043 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1044 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1045 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1046 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

PD
1047 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1048 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1049 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1050 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1051 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1052 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1053 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1054 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1055 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1056 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1057 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1058 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1059 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1060 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
te r
1061 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1062 1.148 DL1+1.5
N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1063 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1064 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1065 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1066 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1067 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1068 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1069 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
as

1070 1.148 DL1+1.5


N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1071 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1072 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1073 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1074 1 DL1+0.8
N/a LL1+1 SL2
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1075 1 DL1+0.8
N/a LL1+-1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1076 1 DL1+0.8
N/a LL1+-1 SL2
N/a N/a N/A N/A N/A N/A N/A N/A N/A
2001 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
nM

2002 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2003 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2004 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2005 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2006 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2007 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2008 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2009 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2010 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2011 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2012 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2013 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2014 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2015 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
di

2016 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2017 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2018 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2019 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2020 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2021 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2022 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2023 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
a te

2024 1 DL1+1.0
N/a LL1+1 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2025 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2026 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2027 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2028 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2029 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2030 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2031 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2032 1 DL1+0.7
N/a LL1+1 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2033 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
FOUNDATION FOR PEDESTAL (P3) (P4) (P9) (P10) (P1) (P5) (P6) (P11) (P2) (P7)
(P8) (P12)-(Pilecap Design)

Ed
LOAD CASE: 1062 1.1481062
DL1+1.5
1.148
LL1+1.5
DL1+1.05
W L6+1.5
LL1+1.5
EQUIP1+0.9
W L6+1.05 TEMP1+1.35
EQUIP1+0.9 TEMP1+1.35
MR1 MR1

G E N E RA L PI L E C A P DI ME N SI O N S, PO SI T I O N
Concrete Density 2.5 ton/m 3 Pile ca p thickne ss 2.300 m
Soil Density 2 ton/m 3 Z cordinate of center of the pilecap -13.663 m
Grade of Concrete (Cylinder) C 30 X cordinate of center of the pilecap 4.838 m
Grade of Steel Fe 500 Le ngth a long a x is Z, L z 25.580 m
Level of Base of pilecap -5.1 m Le ngth a long a x is X, L x 13.898 m
Finished Ground level -0.6 m Area of base of pilecap, A 347.90 m2
Level of max water table -0.6 m

PE DE ST A L ( C O L U MN ) DI ME N SI O N S, PO SI T I O N S & L O A DS
C.G. of Pedestal Ped top P + W ped
Pedestal ID Lz-z (m) Lx-x (m) P (T) Hz (T) Mx (T-m) Hx (T) Mz (T-m)
Z X [Level of (T)

F
P3 1.250 1.250 -24.500 3.500 -5.100 -425.79 57.11 229.21 -5.30 -13.37 -425.79
P4 1.250 1.250 -21.000 3.500 -5.100 -35.92 63.58 265.65 -13.89 -56.87 -35.92
P9 1.250 1.250 -24.500 9.500 -5.100 -111.29 58.66 248.83 2.57 10.57 -111.29
P10 1.600 1.600 -21.000 9.500 -5.100 541.50 151.20 713.61 -25.21 -106.69 541.50
P1 1.250 1.250 -15.800 0.000 -5.100 226.19 40.85 198.90 -21.63 -107.13 226.19
P5 1.250 1.250 -15.800 3.500 -5.100 318.09 72.16 313.96 -21.17 -91.32 318.09
P6 1.250 1.250 -12.000 3.500 -5.100 280.53 91.60 330.32 -20.00 -105.79 280.53

PD
P11 1.250 1.250 -12.000 9.500 -5.100 361.88 67.98 387.64 -16.49 -74.70 361.88
P2 1.250 1.250 -8.200 0.000 -5.100 272.79 47.33 229.63 -7.69 -35.26 272.79
P7 1.250 1.250 -8.200 3.500 -5.100 110.41 81.96 363.41 -1.54 -18.95 110.41
P8 1.250 1.250 -3.000 3.500 -5.100 903.01 80.73 361.61 -4.29 -20.70 903.01
P12 1.600 1.600 -3.000 9.500 -5.100 1325.71 187.39 911.42 -4.75 3.20 1325.71

PI L E DE T A I L S
Number of Piles 73 CGz of Pile group -13.663 m
Diameter of Piles 760 mm CGx of Pile group 4.838 m
2
Compressive capacity of piles 192 T SUM[(Xi-Xc g)2] of Pile group 1277.601 m
2
Tensile capacity of piles 40 T SUM[(Zi-Zc g)2] of Pile group 3903.652 m
Shear capacity of piles 11.5 T

W eight of soil, W s oil 2113.49 T


W eight of footing, W f oot ing 540.11 T
Axial load due to [P+ W ped] 3767.11 T
Total axial Load 6420.71 T

Mz due to [Mz+(P+W ped)*ex ] 5302.94 Ton-m Mx due to [Mx+(P+W ped)*ez] 32428.58 Ton-m
te r
Eccentricity between Pilecap and Pile group 0.00 mm Eccentricity between Pilecap and Pile group 0.00 mm
Mz due to pilecap and pile group eccentricity 0.00 Ton-m Mx due to pilecap and pile group eccentricity 0.00 Ton-m
Total Mz 5302.94 Ton-m Total Mx 32428.58 Ton-m

Distance Distance P due to


from pile from pile Axial P due to P due to
Pile ID CGx CGz group CGx group CGz Load (T) Mx (T) Mz (T) Total P (T) Shear (T)
PCG-1-1 -1.48 -24.61 -6.32 -10.94 87.95 -90.91 -26.23 -29.19 13.84
PCG-1-2 -1.48 -22.17 -6.32 -8.51 87.95 -70.71 -26.23 -8.98 13.84
PCG-1-3 -1.48 -19.74 -6.32 -6.08 87.95 -50.51 -26.23 11.22 13.84
PCG-1-4 -1.48 -17.31 -6.32 -3.65 87.95 -30.30 -26.23 31.42 13.84
PCG-1-5 -1.48 -14.88 -6.32 -1.22 87.95 -10.10 -26.23 51.63 13.84
as

PCG-1-6 -1.48 -12.45 -6.32 1.22 87.95 10.10 -26.23 71.83 13.84
PCG-1-7 -1.48 -10.02 -6.32 3.65 87.95 30.30 -26.23 92.03 13.84
PCG-1-8 -1.48 -7.58 -6.32 6.08 87.95 50.51 -26.23 112.23 13.84
PCG-1-9 -1.48 -5.15 -6.32 8.51 87.95 70.71 -26.23 132.44 13.84
PCG-1-10 -1.48 -2.72 -6.32 10.94 87.95 90.91 -26.23 152.64 13.84
PCG-1-11 0.63 -25.82 -4.21 -12.16 87.95 -101.02 -17.48 -30.54 13.84
PCG-1-12 0.63 -23.39 -4.21 -9.73 87.95 -80.81 -17.48 -10.34 13.84
PCG-1-13 0.63 -20.96 -4.21 -7.30 87.95 -60.61 -17.48 9.86 13.84
PCG-1-14 0.63 -18.53 -4.21 -4.86 87.95 -40.41 -17.48 30.07 13.84
PCG-1-15 0.63 -16.09 -4.21 -2.43 87.95 -20.20 -17.48 50.27 13.84
PCG-1-16 0.63 -13.66 -4.21 0.00 87.95 0.00 -17.48 70.47 13.84
PCG-1-17 0.63 -11.23 -4.21 2.43 87.95 20.20 -17.48 90.68 13.84
PCG-1-18 0.63 -8.80 -4.21 4.86 87.95 40.41 -17.48 110.88 13.84
nM

PCG-1-19 0.63 -6.37 -4.21 7.30 87.95 60.61 -17.48 131.08 13.84
PCG-1-20 0.63 -3.93 -4.21 9.73 87.95 80.81 -17.48 151.29 13.84
PCG-1-21 0.63 -1.50 -4.21 12.16 87.95 101.02 -17.48 171.49 13.84
PCG-1-22 2.73 -24.61 -2.11 -10.94 87.95 -90.91 -8.74 -11.70 13.84
PCG-1-23 2.73 -22.17 -2.11 -8.51 87.95 -70.71 -8.74 8.50 13.84
PCG-1-24 2.73 -19.74 -2.11 -6.08 87.95 -50.51 -8.74 28.71 13.84
PCG-1-25 2.73 -17.31 -2.11 -3.65 87.95 -30.30 -8.74 48.91 13.84
PCG-1-26 2.73 -14.88 -2.11 -1.22 87.95 -10.10 -8.74 69.11 13.84
PCG-1-27 2.73 -12.45 -2.11 1.22 87.95 10.10 -8.74 89.32 13.84
PCG-1-28 2.73 -10.02 -2.11 3.65 87.95 30.30 -8.74 109.52 13.84
PCG-1-29 2.73 -7.58 -2.11 6.08 87.95 50.51 -8.74 129.72 13.84
PCG-1-30 2.73 -5.15 -2.11 8.51 87.95 70.71 -8.74 149.92 13.84
PCG-1-31 2.73 -2.72 -2.11 10.94 87.95 90.91 -8.74 170.13 13.84
PCG-1-32 4.84 -25.82 0.00 -12.16 87.95 -101.02 0.00 -13.06 13.84
PCG-1-33 4.84 -23.39 0.00 -9.73 87.95 -80.81 0.00 7.14 13.84
PCG-1-34 4.84 -20.96 0.00 -7.30 87.95 -60.61 0.00 27.35 13.84
PCG-1-35 4.84 -18.53 0.00 -4.86 87.95 -40.41 0.00 47.55 13.84
PCG-1-36 4.84 -16.09 0.00 -2.43 87.95 -20.20 0.00 67.75 13.84
PCG-1-37 4.84 -13.66 0.00 0.00 87.95 0.00 0.00 87.95 13.84
di

PCG-1-38 4.84 -11.23 0.00 2.43 87.95 20.20 0.00 108.16 13.84
PCG-1-39 4.84 -8.80 0.00 4.86 87.95 40.41 0.00 128.36 13.84
PCG-1-40 4.84 -6.37 0.00 7.30 87.95 60.61 0.00 148.56 13.84
PCG-1-41 4.84 -3.93 0.00 9.73 87.95 80.81 0.00 168.77 13.84
PCG-1-42 4.84 -1.50 0.00 12.16 87.95 101.02 0.00 188.97 13.84
PCG-1-43 6.94 -24.61 2.11 -10.94 87.95 -90.91 8.74 5.78 13.84
PCG-1-44 6.94 -22.17 2.11 -8.51 87.95 -70.71 8.74 25.99 13.84
PCG-1-45 6.94 -19.74 2.11 -6.08 87.95 -50.51 8.74 46.19 13.84
PCG-1-46 6.94 -17.31 2.11 -3.65 87.95 -30.30 8.74 66.39 13.84
PCG-1-47 6.94 -14.88 2.11 -1.22 87.95 -10.10 8.74 86.59 13.84
PCG-1-48 6.94 -12.45 2.11 1.22 87.95 10.10 8.74 106.80 13.84
PCG-1-49 6.94 -10.02 2.11 3.65 87.95 30.30 8.74 127.00 13.84
PCG-1-50 6.94 -7.58 2.11 6.08 87.95 50.51 8.74 147.20 13.84
a te

PCG-1-51 6.94 -5.15 2.11 8.51 87.95 70.71 8.74 167.41 13.84
PCG-1-52 6.94 -2.72 2.11 10.94 87.95 90.91 8.74 187.61 13.84
PCG-1-53 9.05 -25.82 4.21 -12.16 87.95 -101.02 17.48 4.42 13.84
PCG-1-54 9.05 -23.39 4.21 -9.73 87.95 -80.81 17.48 24.62 13.84
PCG-1-55 9.05 -20.96 4.21 -7.30 87.95 -60.61 17.48 44.83 13.84
PCG-1-56 9.05 -18.53 4.21 -4.86 87.95 -40.41 17.48 65.03 13.84
PCG-1-57 9.05 -16.09 4.21 -2.43 87.95 -20.20 17.48 85.23 13.84
PCG-1-58 9.05 -13.66 4.21 0.00 87.95 0.00 17.48 105.44 13.84
PCG-1-59 9.05 -11.23 4.21 2.43 87.95 20.20 17.48 125.64 13.84
PCG-1-60 9.05 -8.80 4.21 4.86 87.95 40.41 17.48 145.84 13.84
PCG-1-61 9.05 -6.37 4.21 7.30 87.95 60.61 17.48 166.05 13.84
PCG-1-62 9.05 -3.93 4.21 9.73 87.95 80.81 17.48 186.25 13.84
PCG-1-63 9.05 -1.50 4.21 12.16 87.95 101.02 17.48 206.45 13.84
PCG-1-64 11.16 -24.61 6.32 -10.94 87.95 -90.91 26.23 23.27 13.84
PCG-1-65 11.16 -22.17 6.32 -8.51 87.95 -70.71 26.23 43.47 13.84
PCG-1-66 11.16 -19.74 6.32 -6.08 87.95 -50.51 26.23 63.68 13.84
re

PCG-1-67 11.16 -17.31 6.32 -3.65 87.95 -30.30 26.23 83.88 13.84
PCG-1-68 11.16 -14.88 6.32 -1.22 87.95 -10.10 26.23 104.08 13.84
PCG-1-69 11.16 -12.45 6.32 1.22 87.95 10.10 26.23 124.28 13.84
PCG-1-70 11.16 -10.02 6.32 3.65 87.95 30.30 26.23 144.49 13.84
PCG-1-71 11.16 -7.58 6.32 6.08 87.95 50.51 26.23 164.69 13.84
PCG-1-72 11.16 -5.15 6.32 8.51 87.95 70.71 26.23 184.89 13.84
PCG-1-73 11.16 -2.72 6.32 10.94 87.95 90.91 26.23 205.10 13.84
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
Load factor for Limit State design 1 Along Axis -----> Z-Z X-X
Ultimate sagging(+)
Moment,Mup(Tm/width) 103.94 32.11
Along Axis -----> Z-Z X-X Effective Depth (for + M), d (m) 2.152 2.152

Ed
Ultimate Shear force (In sagging zone)(T/width) 33.69 25.71 Mup/bd2 (N/mm2) 0.22 0.07
Nominal shear stress (N/mm 2) 0.16 0.12 Tensile steel required at bottom (%) 0.05 0.02
Max allowable shear stress (N/mm 2) 0.31 0.31 Provide bars of dia (mm) 32 32
Ultimate Shear force (In hogging zone)(T) 54.45 18.18 at c/c distance (mm) 150 150
Nominal shear stress (N/mm 2) 0.25 0.08 Tensile steel provided at bottom (%) 0.25 0.25
Max allowable shear stress (N/mm 2) 0.31 0.31 Ultimate hogging(-)
Stirrup Diameter (mm) 12 Moment,Mun(Tm/meter width) -220.89 0.00
Stirrup spacing (N/mm 2) 150 150 Mun/bd2 (N/mm2) 0.48 0.00

F
Stress in stirrup (N/mm 2) 22.38 10.57 Tensile steel required at top (%) 0.11 0.00
Total Stirrup stress (N/mm 2) 32.95 Provide bars of dia (mm) 32 32
Permissible Stirrup stress (N/mm 2) 434.78 at c/c distance (mm) 150 150

PD
Tensile steel provided at top (%) 0.25 0.25
Effective Depth (for - M), d (m) 2.152 2.152
P UNCH ING SH EAR FO R P EDESTALS
Pedestal ID Ultimate Design Area for resisting Punching Shear Allowable punching
P3 408.17 Ton 29.28 m2 0.14 N/mm2 1.37 N/mm2
P4 100.47 Ton 29.28 m2 0.03 N/mm2 1.37 N/mm2
P9 163.61 Ton 29.28 m2 0.06 N/mm2 1.37 N/mm2
P10 389.52 Ton 32.30 m2 0.12 N/mm2 1.37 N/mm2
P1 92.87 Ton 29.28 m2 0.03 N/mm2 1.37 N/mm2
P5 132.32 Ton 29.28 m2 0.05 N/mm2 1.37 N/mm2
P6 4.90 Ton 29.28 m2 0.00 N/mm2 1.37 N/mm2
te r
P11 6.52 Ton 29.28 m2 0.00 N/mm2 1.37 N/mm2
P2 49.68 Ton 29.28 m2 0.02 N/mm2 1.37 N/mm2
P7 147.68 Ton 29.28 m2 0.05 N/mm2 1.37 N/mm2
P8 375.15 Ton 29.28 m2 0.13 N/mm2 1.37 N/mm2
P12 727.91 Ton 32.30 m2 0.23 N/mm2 1.37 N/mm2
as
nM
di
a te
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
F AC TOR OF SAF ETY F OR ALL LOAD C ASES ( Per mis s ible/ Ac tual)

Pile Reaction ALONG Z-Z ALONG X-X


Compressi pt at Shear pt at Shear

Ed
Load case pt at top pt at top Punching
on Tension Shear bottom stress bottom stress
500 1 DL1+1N/a
LL1+1 EQUIP1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
501 1 DL1+1N/a
LL1+1 EQUIP1+1
N/a TEMP1
N/a N/A N/A N/A N/A N/A N/A N/A
502 1 DL1+1N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
503 1 DL1+1N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
504 1 DL1+1N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A
505 1 DL1+1N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
506 1 DL1+1N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
507 1 DL1+1N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
508 1 DL1+1N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A

F
509 1 DL1+1N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
510 1 DL1+0.7
N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
511 1 DL1+0.7
N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
512 1 DL1+0.7
N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A

PD
513 1 DL1+0.7
N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
514 1 DL1+0.7
N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
515 1 DL1+0.7
N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
516 1 DL1+0.7
N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A
517 1 DL1+0.7
N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
518 1 DL1+ 1LL1+0.75
N/a WL1+1
N/a EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
519 1 DL1+1.0
N/a
LL1+0.75 N/a
WL2+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
520 1 DL1+1.0
N/a
LL1+0.75 N/a
WL3+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
521 1 DL1+1.0
N/a
LL1+0.75 N/a
WL4+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
522 1 DL1+1.0
N/a
LL1+0.75 N/a
WL5+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
523 1 DL1+1.0
N/a
LL1+0.75 N/a
WL6+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
te r
524 1 DL1+1.0
N/a
LL1+0.75 N/a
WL7+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
525 1 DL1+1.0
N/a
LL1+0.75 N/a
WL8+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
526 1 DL1+1.0
N/a
LL1+1 EQUIP1+0.525
N/a N/a
SL1 N/A N/A N/A N/A N/A N/A N/A
527 1 DL1+1.0
N/a
LL1+1 EQUIP1+0.525
N/a N/a
SL2 N/A N/A N/A N/A N/A N/A N/A
528 0.6 DL1+1
N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
529 0.6 DL1+1
N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
530 0.6 DL1+1
N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A
531 0.6 DL1+1
N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
as

532 0.6 DL1+1


N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
533 0.6 DL1+1
N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
534 0.6 DL1+1
N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A
535 0.6 DL1+1
N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
536 0.6 DL1+0.7
N/a SL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
537 0.6 DL1+0.7
N/a SL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
1001 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1 50.76 3.29 16.66 10.63 N/A 16.66 9.54
nM

1002 1.35 DL1+1.5


N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1 38.77 3.84 17.41 11.14 N/A 17.41 9.70
1003 1.35 DL1+1.5
N/a WL1+0.9
N/a TEMP1 N/a 172.52 11.64 43.82 13.45 N/A 43.82 28.03
1004 1.35 DL1+1.5
N/a WL2+0.9
N/a TEMP1 N/a 161.90 11.88 40.85 11.81 N/A 40.85 29.55
1005 1.35 DL1+1.5
N/a WL3+0.9
N/a TEMP1 N/a 75.13 8.77 30.67 12.73 N/A 30.67 19.13
1006 1.35 DL1+1.5
N/a WL4+0.9
N/a TEMP1 N/a 58.19 9.05 30.68 12.65 N/A 30.68 18.97
1007 1.35 DL1+1.5
N/a WL5+0.9
N/a TEMP1 N/a 4.07 3.69 17.65 29.91 N/A 17.65 9.19
1008 1.35 DL1+1.5
N/a WL6+0.9
N/a TEMP1 N/a 3.99 3.72 17.89 29.31 N/A 17.89 9.28
1009 1.35 DL1+1.5
N/a WL7+0.9
N/a TEMP1 N/a 6.29 3.34 20.14 12.12 N/A 20.14 12.10
1010 1.35 DL1+1.5
N/a WL8+0.9
N/a TEMP1 N/a 6.21 3.40 20.25 11.19 N/A 20.25 12.40
1011 1.35 DL1+1.5
N/a WL1+-0.9
N/a TEMP1 N/a 169.64 23.08 40.94 12.22 N/A 40.94 26.67
1012 1.35 DL1+1.5
N/a WL2+-0.9
N/a TEMP1 N/a 129.45 24.20 38.33 10.85 N/A 38.33 28.05
di

1013 1.35 DL1+1.5


N/a WL3+-0.9
N/a TEMP1 N/a 33.12 14.40 33.31 15.22 N/A 33.31 20.60
1014 1.35 DL1+1.5
N/a WL4+-0.9
N/a TEMP1 N/a 29.35 14.80 33.33 15.12 N/A 33.33 20.41
1015 1.35 DL1+1.5
N/a WL5+-0.9
N/a TEMP1 N/a 3.56 4.14 18.06 33.59 N/A 18.06 9.09
1016 1.35 DL1+1.5
N/a WL6+-0.9
N/a TEMP1 N/a 3.50 4.18 18.31 32.08 N/A 18.31 9.17
1017 1.35 DL1+1.5
N/a WL7+-0.9
N/a TEMP1 N/a 5.33 3.81 20.53 12.86 N/A 20.53 11.75
1018 1.35 DL1+1.5
N/a WL8+-0.9
N/a TEMP1 N/a 5.28 3.89 20.32 11.35 N/A 20.32 12.04
1019 1.35 DL1+0.9
N/a TEMP1+1.35
N/a MR1
N/a 101.25 10.45 41.76 15.43 N/A 41.76 42.20
a te

1020 1.35 DL1+-0.9


N/a TEMP1+1.35
N/a MR1
N/a 37.37 18.92 41.77 15.01 N/A 41.77 44.57
1021 1.35 DL1+1.5LL1+1.5
N/a N/aEQUIP1+0.9
N/a TEMP1+1.35 49.60
MR1 3.25 16.43 10.37 N/A 16.43 9.29
1022 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
37.27
MR1 3.78 17.16 10.87 N/A 17.16 9.44
1023 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1+1.35
52.61
MR1 3.38 17.20 11.06 N/A 17.20 9.90
1024 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
39.57MR1 3.97 18.00 11.57 N/A 18.00 10.08
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
57.61 3.28
MR1 18.79 10.52 N/A 18.79 10.06
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
56.19 3.29
MR1 18.78 9.88 N/A 18.78 9.93
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
46.33 3.12
MR1 15.03 10.32 N/A 15.03 9.10
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+0.9 TEMP1+1.35
57.61 3.28
MR1 18.79 10.52 N/A 18.79 10.06
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+0.9 TEMP1+1.35
56.19 3.29
MR1 18.78 9.88 N/A 18.78 9.93
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+0.9 TEMP1+1.35
46.33 3.12
MR1 15.03 10.32 N/A 15.03 9.10
1028 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+0.9 TEMP1+1.35
45.43 3.13
MR1 15.03 9.90 N/A 15.03 9.00
1029 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+0.9 TEMP1+1.35
10.36 2.58
MR1 14.00 14.18 N/A 14.00 6.92

Ed
1030 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+0.9 TEMP1+1.35
10.08 2.60
MR1 14.00 13.42 N/A 14.00 6.86
1031 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+0.9 TEMP1+1.35
19.51 2.67
MR1 20.53 9.22 N/A 20.53 12.13
1032 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+0.9 TEMP1+1.35
18.72 2.69
MR1 20.52 8.88 N/A 20.52 12.07
1033 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
57.89 3.83
MR1 18.86 9.76 N/A 18.86 10.24
1034 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
56.44 3.84
MR1 18.51 9.20 N/A 18.51 10.10
1035 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
33.89 3.61
MR1 15.63 11.18 N/A 15.63 9.24
1036 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
31.41 3.62
MR1 15.63 10.69 N/A 15.63 9.14
1037 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
7.62 2.89
MR1 14.53 14.60 N/A 14.53 7.00
1038 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
7.47 2.91
MR1 14.52 14.42 N/A 14.52 6.94
1039 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
12.91 3.04
MR1 21.68 9.90 N/A 21.68 12.71
1040 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
12.56 3.08
MR1 21.67 9.41 N/A 21.67 12.64
1041 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+0.9 TEMP1+1.35
61.71 3.42
MR1 19.80 11.18 N/A 19.80 10.79

F
1042 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+0.9 TEMP1+1.35
60.08 3.43
MR1 19.79 10.45 N/A 19.79 10.64
1043 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+0.9 TEMP1+1.35
48.94 3.24
MR1 15.66 10.74 N/A 15.66 9.69
1044 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+0.9 TEMP1+1.35
47.94 3.25
MR1 15.66 10.53 N/A 15.66 9.57
1045 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+0.9 TEMP1+1.35
10.22 2.66
MR1 14.55 15.15 N/A 14.55 7.25
1046 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+0.9 TEMP1+1.35
9.94 2.67
MR1 14.55 14.59 N/A 14.55 7.19

PD
1047 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+0.9 TEMP1+1.35
18.97 2.74
MR1 21.74 9.76 N/A 21.74 13.07
1048 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+0.9 TEMP1+1.35
18.22 2.77
MR1 21.72 9.38 N/A 21.72 12.99
1049 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+-0.9 62.01
TEMP1+1.35
4.02
MR1 19.77 10.32 N/A 19.77 10.99
1050 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+-0.9 60.36
TEMP1+1.35
4.04
MR1 19.38 9.70 N/A 19.38 10.84
1051 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+-0.9 35.77
TEMP1+1.35
3.77
MR1 16.32 11.98 N/A 16.32 9.85
1052 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+-0.9 33.02
TEMP1+1.35
3.79
MR1 16.32 11.42 N/A 16.32 9.73
1053 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
7.54 2.99
MR1 15.12 15.36 N/A 15.12 7.35
1054 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
7.39 3.01
MR1 15.12 15.17 N/A 15.12 7.28
1055 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+-0.9 12.67
TEMP1+1.35
3.14
MR1 23.03 10.52 N/A 23.03 13.73
1056 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+-0.9 12.33
TEMP1+1.35
3.18
MR1 23.02 9.93 N/A 23.02 13.65
1057 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+0.9 TEMP1+1.35
69.77 3.45
MR1 20.18 10.37 N/A 20.18 11.47
1058 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+0.9 TEMP1+1.35
66.36 3.47
MR1 19.53 9.36 N/A 19.53 11.19
1059 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+0.9 TEMP1+1.35
46.77 3.15
MR1 14.78 9.22 N/A 14.78 8.58
1060 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+0.9 TEMP1+1.35
45.27 3.17
MR1 14.78 9.18 N/A 14.78 8.55
te r
1061 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.92 2.23
MR1 13.20 15.82 N/A 13.20 6.16
1062 1.148 DL1+1.5
N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.81 2.25
MR1 13.20 15.65 N/A 13.20 6.08
1063 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+0.9 TEMP1+1.35
8.70 2.29
MR1 17.49 9.05 N/A 17.49 13.56
1064 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+0.9 TEMP1+1.35
8.43 2.32
MR1 17.52 8.52 N/A 17.52 13.43
1065 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+-0.9 70.15
TEMP1+1.35
4.06
MR1 19.55 9.62 N/A 19.55 11.70
1066 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+-0.9 66.71
TEMP1+1.35
4.08
MR1 18.93 8.75 N/A 18.93 11.41
1067 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+-0.9 33.62
TEMP1+1.35
3.66
MR1 15.37 10.47 N/A 15.37 8.86
1068 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+-0.9 29.74
TEMP1+1.35
3.68
MR1 15.37 10.42 N/A 15.37 8.83
1069 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.20 2.46
MR1 13.66 15.68 N/A 13.66 6.22
as

1070 1.148 DL1+1.5


N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.12 2.48
MR1 13.66 15.34 N/A 13.66 6.14
1071 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
7.08 2.54
MR1 18.34 9.70 N/A 18.34 14.23
1072 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
6.90 2.58
MR1 18.37 9.08 N/A 18.37 13.99
1073 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a 22.79 5.44 22.81 16.43 29.44 22.81 10.73
1074 1 DL1+0.8
N/a LL1+1 SL2
N/a N/a 57.99 2.85 16.94 8.55 N/A 16.94 11.33
1075 1 DL1+0.8
N/a LL1+-1 SL1
N/a N/a 105.55 7.03 30.33 10.22 N/A 30.33 18.33
1076 1 DL1+0.8
N/a LL1+-1 SL2
N/a N/a 7.52 20.23 37.31 28.65 N/A 37.31 16.93
2001 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1 79.89
MR1 4.88 26.23 13.49 N/A 26.23 16.24
nM

2002 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1 78.05
MR1 4.89 26.19 12.78 N/A 26.19 16.02
2003 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1 65.21
MR1 4.64 21.27 13.52 N/A 21.27 14.58
2004 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1 64.03
MR1 4.65 21.27 13.04 N/A 21.27 14.41
2005 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+1 14.97
MR1 3.86 19.89 17.73 N/A 19.89 10.91
2006 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+1 14.57
MR1 3.88 19.89 16.93 N/A 19.89 10.81
2007 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+1 28.79
MR1 4.00 28.47 12.24 N/A 28.47 20.13
2008 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+1 27.64
MR1 4.04 28.46 11.84 N/A 28.46 20.02
2009 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+180.23
MR1 5.68 25.91 12.65 N/A 25.91 16.55
2010 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+177.02
MR1 5.70 25.47 12.02 N/A 25.47 16.32
2011 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+143.83
MR1 5.35 22.08 14.49 N/A 22.08 14.83
2012 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+141.04
MR1 5.37 22.08 13.94 N/A 22.08 14.65
2013 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+111.13
MR1 4.32 20.60 19.42 N/A 20.60 11.05
2014 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+110.91
MR1 4.35 20.60 18.47 N/A 20.60 10.95
2015 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+119.16
MR1 4.57 29.94 12.91 N/A 29.94 21.19
di

2016 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+118.65
MR1 4.62 29.92 12.26 N/A 29.92 21.06
2017 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1 88.75
MR1 4.91 26.38 12.70 N/A 26.38 17.27
2018 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1 85.04
MR1 4.94 25.63 11.68 N/A 25.63 16.85
2019 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1 62.63
MR1 4.52 20.18 12.46 N/A 20.18 13.10
2020 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1 60.82
MR1 4.54 20.18 12.41 N/A 20.18 13.05
2021 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+17.31
MR1 3.26 18.19 19.94 N/A 18.19 9.26
2022 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+17.15
MR1 3.28 18.19 19.76 N/A 18.19 9.13
2023 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+1 13.13
MR1 3.36 24.76 11.49 N/A 24.76 19.95
a te

2024 1 DL1+1.0
N/a LL1+1 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+1 12.73
MR1 3.41 24.80 10.91 N/A 24.80 20.72
2025 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+189.14
MR1 5.72 25.66 11.94 N/A 25.66 17.62
2026 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+185.42
MR1 5.76 24.95 11.04 N/A 24.95 17.19
2027 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+141.66
MR1 5.20 20.91 13.95 N/A 20.91 13.54
2028 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+137.61
MR1 5.23 20.91 13.56 N/A 20.91 13.48
2029 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1 6.25
MR1 3.58 18.78 20.16 N/A 18.78 9.36
2030 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1 6.13
MR1 3.61 18.78 19.78 N/A 18.78 9.23
2031 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+110.68
MR1 3.73 25.89 12.18 N/A 25.89 21.00
2032 1 DL1+0.7
N/a LL1+1 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+110.41
MR1 3.78 25.93 11.38 N/A 25.93 21.83
2033 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a 22.79 5.44 22.81 16.43 29.44 22.81 10.73
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
FOUNDATION FOR PEDESTAL (P13)-(Pile Capacity Check)

Ed
LOAD CASE: 526 1 DL1+1.0
526 LL1+1
1 DL1+0.75
EQUIP1+0.525
LL1+1 EQUIP1+0.525
SL1 SL1

GENERAL PILECAP DIMENSIONS, POSITION


Concrete Density 2.5 ton/m3 Pilecap thickness 1.400 m
Soil Density 2 ton/m3 Z cordinate of center of the pilecap -21.000 m
Grade of Concrete (Cylinder) C 30 X cordinate of center of the pilecap 18.250 m
Grade of Steel Fe 500 Length along axis Z, L z 5.820 m
Level of Base of pilecap -5.1 m Length along axis X, L x 5.820 m

F
Finished Ground level -0.6 m Area of base of pilecap, A 33.87 m2
Level of max water table -0.6 m

PD
PEDESTAL (COLUMN) DIMENSIONS, POSITIONS & LOADS
C.G. of Pedestal Ped top P + W ped
Pedestal ID Lz-z (m) Lx-x (m) P (T) Hz (T) Mx (T-m) Hx (T) Mz (T-m)
Z X [Level of (T)
P13 1.600 1.600 -21.000 18.250 -5.100 1024.72 -10.21 -44.73 -53.04 192.30 1024.72

PILE DETAILS
Number of Piles 9 CGz of Pile group -21 m
Diameter of Piles 760 mm CGx of Pile group 18.25 m
2
Compressive capacity of piles 192 T SUM[(Xi-Xcg)2] of Pile group 31.190 m
2
SUM[(Zi-Zcg)2] of Pile group
te r
Tensile capacity of piles 40 T 31.190 m
Shear capacity of piles 11.5 T

Weight of soil, W soil 152.43 T


Weight of footing, W f ooting 23.71 T
Axial load due to [P+ W ped] 1024.72 T
Total axial Load 1200.85 T
as

Mz due to [Mz+(P+W ped)*ex ] 192.30 Ton-m Mx due to [Mx+(P+W ped)*ez] -44.73 Ton-m
Eccentricity between Pilecap and Pile group 0.00 mm Eccentricity between Pilecap and Pile group 0.00 mm
Mz due to pilecap and pile group eccentricity 0.00 Ton-m Mx due to pilecap and pile group eccentricity 0.00 Ton-m
Total Mz 192.30 Ton-m Total Mx -44.73 Ton-m
nM

Distance Distance P due to


from pile from pile Axial P due to P due to
Pile ID CGx CGz group CGx group CGz Load (T) Mx (T) Mz (T) Total P (T) Shear (T)
PCG-2-1 15.97 -23.28 -2.28 -2.28 133.43 3.27 -14.06 122.64 6.00
PCG-2-2 15.97 -21.00 -2.28 0.00 133.43 0.00 -14.06 119.37 6.00
PCG-2-3 15.97 -18.72 -2.28 2.28 133.43 -3.27 -14.06 116.10 6.00
PCG-2-4 18.25 -23.28 0.00 -2.28 133.43 3.27 0.00 136.70 6.00
PCG-2-5 18.25 -21.00 0.00 0.00 133.43 0.00 0.00 133.43 6.00
PCG-2-6 18.25 -18.72 0.00 2.28 133.43 -3.27 0.00 130.16 6.00
di

PCG-2-7 20.53 -23.28 2.28 -2.28 133.43 3.27 14.06 150.76 6.00
PCG-2-8 20.53 -21.00 2.28 0.00 133.43 0.00 14.06 147.49 6.00
PCG-2-9 20.53 -18.72 2.28 2.28 133.43 -3.27 14.06 144.22 6.00
a te
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
F AC TOR OF SAF ETY F OR ALL LOAD C ASES ( Per mis s ible/ Ac tual)

Pile Reaction ALONG Z-Z ALONG X-X


Compressi pt at Shear pt at Shear

Ed
Load case pt at top pt at top Punching
on Tension Shear bottom stress bottom stress
500 1 DL1+1 LL1+11.43
EQUIP1
N/a 8.17 N/A N/A N/A N/A N/A N/A N/A
501 1 DL1+1 LL1+11.38
EQUIP1+1
N/a TEMP1 4.04 N/A N/A N/A N/A N/A N/A N/A
502 1 DL1+1 WL1 2.73 N/a 3.11 N/A N/A N/A N/A N/A N/A N/A
503 1 DL1+1 WL2 2.70 N/a 3.10 N/A N/A N/A N/A N/A N/A N/A
504 1 DL1+1 WL3 2.88 N/a 2.41 N/A N/A N/A N/A N/A N/A N/A
505 1 DL1+1 WL4 2.86 N/a 2.45 N/A N/A N/A N/A N/A N/A N/A
506 1 DL1+1 WL5 3.05 N/a 5.08 N/A N/A N/A N/A N/A N/A N/A
507 1 DL1+1 WL6 2.95 N/a 4.72 N/A N/A N/A N/A N/A N/A N/A
508 1 DL1+1 WL7 3.21 N/a 4.65 N/A N/A N/A N/A N/A N/A N/A

F
509 1 DL1+1 WL8 3.17 N/a 5.04 N/A N/A N/A N/A N/A N/A N/A
510 1 DL1+0.7 WL12.90 N/a 4.69 N/A N/A N/A N/A N/A N/A N/A
511 1 DL1+0.7 WL22.87 N/a 4.69 N/A N/A N/A N/A N/A N/A N/A
512 1 DL1+0.7 WL33.00 N/a 3.30 N/A N/A N/A N/A N/A N/A N/A

PD
513 1 DL1+0.7 WL42.98 N/a 3.35 N/A N/A N/A N/A N/A N/A N/A
514 1 DL1+0.7 WL53.13 N/a 7.13 N/A N/A N/A N/A N/A N/A N/A
515 1 DL1+0.7 WL63.06 N/a 6.65 N/A N/A N/A N/A N/A N/A N/A
516 1 DL1+0.7 WL73.24 N/a 6.46 N/A N/A N/A N/A N/A N/A N/A
517 1 DL1+0.7 WL83.21 N/a 6.98 N/A N/A N/A N/A N/A N/A N/A
518 1 DL1+ 1LL1+0.75
1.36WL1+1
N/a EQUIP1 4.38 N/A N/A N/A N/A N/A N/A N/A
519 1 DL1+1.0 LL1+0.75
1.36 N/a
WL2+1 EQUIP1 4.48 N/A N/A N/A N/A N/A N/A N/A
520 1 DL1+1.0 LL1+0.75
1.37 N/a
WL3+1 EQUIP1 2.62 N/A N/A N/A N/A N/A N/A N/A
521 1 DL1+1.0 LL1+0.75
1.36 N/a
WL4+1 EQUIP1 2.67 N/A N/A N/A N/A N/A N/A N/A
522 1 DL1+1.0 LL1+0.75
1.45 N/a
WL5+1 EQUIP1 9.62 N/A N/A N/A N/A N/A N/A N/A
523 1 DL1+1.0 LL1+0.75
1.44 N/a
WL6+1 EQUIP1 9.15 N/A N/A N/A N/A N/A N/A N/A
te r
524 1 DL1+1.0 LL1+0.75
1.42 N/a
WL7+1 EQUIP1 3.86 N/A N/A N/A N/A N/A N/A N/A
525 1 DL1+1.0 LL1+0.75
1.41 N/a
WL8+1 EQUIP1 4.05 N/A N/A N/A N/A N/A N/A N/A
526 1 DL1+1.0 LL1+11.27
EQUIP1+0.525
N/a SL1 1.92 N/A N/A N/A N/A N/A N/A N/A
527 1 DL1+1.0 LL1+11.43
EQUIP1+0.525
N/a SL2 5.84 N/A N/A N/A N/A N/A N/A N/A
528 0.6 DL1+1 WL13.47 N/a 2.96 N/A N/A N/A N/A N/A N/A N/A
529 0.6 DL1+1 WL23.42 N/a 2.95 N/A N/A N/A N/A N/A N/A N/A
530 0.6 DL1+1 WL33.75 N/a 2.51 N/A N/A N/A N/A N/A N/A N/A
531 0.6 DL1+1 WL43.71 N/a 2.56 N/A N/A N/A N/A N/A N/A N/A
as

532 0.6 DL1+1 WL54.02 N/a 5.12 N/A N/A N/A N/A N/A N/A N/A
533 0.6 DL1+1 WL63.85 N/a 4.75 N/A N/A N/A N/A N/A N/A N/A
534 0.6 DL1+1 WL74.32 N/a 4.75 N/A N/A N/A N/A N/A N/A N/A
535 0.6 DL1+1 WL84.25 N/a 5.15 N/A N/A N/A N/A N/A N/A N/A
536 0.6 DL1+0.7 SL12.80 N/a 1.67 N/A N/A N/A N/A N/A N/A N/A
537 0.6 DL1+0.7 SL24.13 N/a 11.10 N/A N/A N/A N/A N/A N/A N/A
1001 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1 N/A N/A N/A N/A N/A N/A N/A
nM

1002 1.35 DL1+1.5


N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1N/A N/A N/A N/A N/A N/A N/A
1003 1.35 DL1+1.5
N/a WL1+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1004 1.35 DL1+1.5
N/a WL2+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1005 1.35 DL1+1.5
N/a WL3+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1006 1.35 DL1+1.5
N/a WL4+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1007 1.35 DL1+1.5
N/a WL5+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1008 1.35 DL1+1.5
N/a WL6+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1009 1.35 DL1+1.5
N/a WL7+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1010 1.35 DL1+1.5
N/a WL8+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1011 1.35 DL1+1.5
N/a WL1+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1012 1.35 DL1+1.5
N/a WL2+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
di

1013 1.35 DL1+1.5


N/a WL3+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1014 1.35 DL1+1.5
N/a WL4+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1015 1.35 DL1+1.5
N/a WL5+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1016 1.35 DL1+1.5
N/a WL6+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1017 1.35 DL1+1.5
N/a WL7+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1018 1.35 DL1+1.5
N/a WL8+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1019 1.35 DL1+0.9
N/a TEMP1+1.35
N/a MR1
N/a N/A N/A N/A N/A N/A N/A N/A
a te

1020 1.35 DL1+-0.9


N/a TEMP1+1.35
N/a MR1
N/a N/A N/A N/A N/A N/A N/A N/A
1021 1.35 DL1+1.5LL1+1.5
N/a N/aEQUIP1+0.9
N/a TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A N/A
1022 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1023 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1024 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1028 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1029 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

Ed
1030 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1031 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1032 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1033 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1034 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1035 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1036 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1037 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1038 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1039 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1040 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1041 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

F
1042 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1043 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1044 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1045 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1046 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

PD
1047 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1048 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1049 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1050 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1051 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1052 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1053 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1054 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1055 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1056 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1057 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1058 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1059 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1060 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
te r
1061 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1062 1.148 DL1+1.5
N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1063 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1064 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1065 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1066 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1067 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1068 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1069 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
as

1070 1.148 DL1+1.5


N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1071 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1072 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1073 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1074 1 DL1+0.8
N/a LL1+1 SL2
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1075 1 DL1+0.8
N/a LL1+-1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1076 1 DL1+0.8
N/a LL1+-1 SL2
N/a N/a N/A N/A N/A N/A N/A N/A N/A
2001 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
nM

2002 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2003 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2004 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2005 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2006 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2007 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2008 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2009 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2010 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2011 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2012 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2013 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2014 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2015 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
di

2016 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2017 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2018 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2019 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2020 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2021 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2022 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2023 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
a te

2024 1 DL1+1.0
N/a LL1+1 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2025 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2026 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2027 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2028 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2029 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2030 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2031 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2032 1 DL1+0.7
N/a LL1+1 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2033 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
FOUNDATION FOR PEDESTAL (P13)-(Pilecap Design)

Ed
LOAD CASE: 1068 1.1481068
DL1+1.5
1.148
LL1+1.5
DL1+1.05
WL4+1.5
LL1+1.5
EQUIP1+-0.9
WL4+1.05 EQUIP1+-0.9
TEMP1+1.35 TEMP1+1.35
MR1 MR1

GENERAL PILECAP DIMENSIONS, POSITION


Concrete Density 2.5 ton/m3 Pilecap thickness 1.400 m
Soil Density 2 ton/m3 Z cordinate of center of the pilecap -21.000 m
Grade of Concrete (Cylinder) C 30 X cordinate of center of the pilecap 18.250 m
Grade of Steel Fe 500 Length along axis Z, L z 5.820 m
Level of Base of pilecap -5.1 m Length along axis X, L x 5.820 m
Finished Ground level -0.6 m Area of base of pilecap, A 33.87 m2

F
Level of max water table -0.6 m

PEDESTAL (COLUMN) DIMENSIONS, POSITIONS & LOADS

PD
C.G. of Pedestal Ped top P + W ped
Pedestal ID Lz-z (m) Lx-x (m) P (T) Hz (T) Mx (T-m) Hx (T) Mz (T-m)
Z X [Level of (T)
P13 1.600 1.600 -21.000 18.250 -5.100 1303.87 -8.45 -43.08 -64.03 -281.07 1303.87

PILE DETAILS
Number of Piles 9 CGz of Pile group -21 m
Diameter of Piles 760 mm CGx of Pile group 18.25 m
2
Compressive capacity of piles 192 T SUM[(Xi-Xcg)2] of Pile group 31.190 m
2
Tensile capacity of piles 40 T SUM[(Zi-Zcg)2] of Pile group 31.190 m
Shear capacity of piles 11.5 T
te r
Weight of soil, W soil 205.77 T
Weight of footing, W f ooting 32.01 T
Axial load due to [P+ W ped] 1303.87 T
Total axial Load 1541.65 T

Mz due to [Mz+(P+W ped)*ex ] -281.07 Ton-m Mx due to [Mx+(P+W ped)*ez] -43.08 Ton-m
Eccentricity between Pilecap and Pile group 0.00 mm Eccentricity between Pilecap and Pile group 0.00 mm
Mz due to pilecap and pile group eccentricity 0.00 Ton-m Mx due to pilecap and pile group eccentricity 0.00 Ton-m
as

Total Mz -281.07 Ton-m Total Mx -43.08 Ton-m

Distance Distance P due to


from pile from pile Axial P due to P due to
Pile ID CGx CGz group CGx group CGz Load (T) Mx (T) Mz (T) Total P (T) Shear (T)
PCG-2-1 15.97 -23.28 -2.28 -2.28 171.29 3.15 20.55 194.99 7.18
nM

PCG-2-2 15.97 -21.00 -2.28 0.00 171.29 0.00 20.55 191.84 7.18
PCG-2-3 15.97 -18.72 -2.28 2.28 171.29 -3.15 20.55 188.69 7.18
PCG-2-4 18.25 -23.28 0.00 -2.28 171.29 3.15 0.00 174.44 7.18
PCG-2-5 18.25 -21.00 0.00 0.00 171.29 0.00 0.00 171.29 7.18
PCG-2-6 18.25 -18.72 0.00 2.28 171.29 -3.15 0.00 168.15 7.18
PCG-2-7 20.53 -23.28 2.28 -2.28 171.29 3.15 -20.55 153.90 7.18
PCG-2-8 20.53 -21.00 2.28 0.00 171.29 0.00 -20.55 150.75 7.18
PCG-2-9 20.53 -18.72 2.28 2.28 171.29 -3.15 -20.55 147.60 7.18

Load factor for Limit State design 1 Along Axis -----> Z-Z X-X
di

Ultimate sagging(+)
Moment,Mup(Tm/width) 117.65 130.95
Along Axis -----> Z-Z X-X Effective Depth (for + M), d (m) 1.2625 1.2625
Ultimate Shear force (In sagging zone)(T/width) 82.81 91.78 Mup/bd2 (N/mm2) 0.74 0.82
Nominal shear stress (N/mm 2) 0.66 0.73 Tensile steel required at bottom (%) 0.17 0.19
Max allowable shear stress (N/mm 2) 0.33 0.33 Provide bars of dia (mm) 25 25
Ultimate Shear force (In hogging zone)(T) 6.99 6.87 at c/c distance (mm) 150 150
a te

Nominal shear stress (N/mm 2) 0.06 0.05 Tensile steel provided at bottom (%) 0.26 0.26
Max allowable shear stress (N/mm 2) 0.33 0.33 Ultimate hogging(-)
Stirrup Diameter (mm) 12 Moment,Mun(Tm/meter width) 0.00 0.00
Stirrup spacing (N/mm 2) 150 150 Mun/bd2 (N/mm2) 0.00 0.00
Stress in stirrup (N/mm 2) 58.02 64.30 Tensile steel required at top (%) 0.00 0.00
Total Stirrup stress (N/mm 2) 122.33 Provide bars of dia (mm) 25 25
Permissible Stirrup stress (N/mm 2) 434.78 at c/c distance (mm) 150 150
Tensile steel provided at top (%) 0.26 0.26
Effective Depth (for - M), d (m) 1.262 1.262
re

P U N C H I N G S H EAR FO R P EDES TALS


Pedestal ID Ultimate Design Area for resisting Punching Shear Allowable punching
P13 1132.57 Ton 14.46 m2 0.78 N/mm2 1.37 N/mm2
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
F AC TOR OF SAF ETY F OR ALL LOAD C ASES ( Per mis s ible/ Ac tual)

Pile Reaction ALONG Z-Z ALONG X-X


Compressi pt at Shear pt at Shear

Ed
Load case pt at top pt at top Punching
on Tension Shear bottom stress bottom stress
500 1 DL1+1N/a
LL1+1 EQUIP1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
501 1 DL1+1N/a
LL1+1 EQUIP1+1
N/a TEMP1
N/a N/A N/A N/A N/A N/A N/A N/A
502 1 DL1+1N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
503 1 DL1+1N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
504 1 DL1+1N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A
505 1 DL1+1N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
506 1 DL1+1N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
507 1 DL1+1N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
508 1 DL1+1N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A

F
509 1 DL1+1N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
510 1 DL1+0.7
N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
511 1 DL1+0.7
N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
512 1 DL1+0.7
N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A

PD
513 1 DL1+0.7
N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
514 1 DL1+0.7
N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
515 1 DL1+0.7
N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
516 1 DL1+0.7
N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A
517 1 DL1+0.7
N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
518 1 DL1+ 1LL1+0.75
N/a WL1+1
N/a EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
519 1 DL1+1.0
N/a
LL1+0.75 N/a
WL2+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
520 1 DL1+1.0
N/a
LL1+0.75 N/a
WL3+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
521 1 DL1+1.0
N/a
LL1+0.75 N/a
WL4+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
522 1 DL1+1.0
N/a
LL1+0.75 N/a
WL5+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
523 1 DL1+1.0
N/a
LL1+0.75 N/a
WL6+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
te r
524 1 DL1+1.0
N/a
LL1+0.75 N/a
WL7+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
525 1 DL1+1.0
N/a
LL1+0.75 N/a
WL8+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
526 1 DL1+1.0
N/a
LL1+1 EQUIP1+0.525
N/a N/a
SL1 N/A N/A N/A N/A N/A N/A N/A
527 1 DL1+1.0
N/a
LL1+1 EQUIP1+0.525
N/a N/a
SL2 N/A N/A N/A N/A N/A N/A N/A
528 0.6 DL1+1
N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
529 0.6 DL1+1
N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
530 0.6 DL1+1
N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A
531 0.6 DL1+1
N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
as

532 0.6 DL1+1


N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
533 0.6 DL1+1
N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
534 0.6 DL1+1
N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A
535 0.6 DL1+1
N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
536 0.6 DL1+0.7
N/a SL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
537 0.6 DL1+0.7
N/a SL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
1001 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1 1.33 N/A 3.40 1.37 N/A 3.40 1.59
nM

1002 1.35 DL1+1.5


N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1 1.38 N/A 3.48 1.38 N/A 3.48 1.58
1003 1.35 DL1+1.5
N/a WL1+0.9
N/a TEMP1 N/a 3.85 N/A 8.33 3.33 N/A 8.33 5.66
1004 1.35 DL1+1.5
N/a WL2+0.9
N/a TEMP1 N/a 3.78 N/A 8.13 3.22 N/A 8.13 5.37
1005 1.35 DL1+1.5
N/a WL3+0.9
N/a TEMP1 N/a 4.41 N/A 8.98 3.46 N/A 8.98 6.83
1006 1.35 DL1+1.5
N/a WL4+0.9
N/a TEMP1 N/a 4.31 N/A 8.77 3.36 N/A 8.77 6.42
1007 1.35 DL1+1.5
N/a WL5+0.9
N/a TEMP1 N/a 3.95 N/A 9.41 4.25 N/A 9.41 5.74
1008 1.35 DL1+1.5
N/a WL6+0.9
N/a TEMP1 N/a 3.73 N/A 9.02 4.09 N/A 9.02 5.45
1009 1.35 DL1+1.5
N/a WL7+0.9
N/a TEMP1 N/a 3.71 N/A 9.59 4.77 N/A 9.59 6.57
1010 1.35 DL1+1.5
N/a WL8+0.9
N/a TEMP1 N/a 3.64 N/A 9.35 4.58 N/A 9.35 6.19
1011 1.35 DL1+1.5
N/a WL1+-0.9
N/a TEMP1 N/a 4.31 N/A 8.47 3.15 N/A 8.47 5.51
1012 1.35 DL1+1.5
N/a WL2+-0.9
N/a TEMP1 N/a 4.09 N/A 8.16 3.05 N/A 8.16 5.24
di

1013 1.35 DL1+1.5


N/a WL3+-0.9
N/a TEMP1 N/a 5.01 N/A 9.54 3.54 N/A 9.54 6.61
1014 1.35 DL1+1.5
N/a WL4+-0.9
N/a TEMP1 N/a 4.70 N/A 9.16 3.44 N/A 9.16 6.23
1015 1.35 DL1+1.5
N/a WL5+-0.9
N/a TEMP1 N/a 3.44 N/A 8.90 4.37 N/A 8.90 5.58
1016 1.35 DL1+1.5
N/a WL6+-0.9
N/a TEMP1 N/a 3.27 N/A 8.54 4.19 N/A 8.54 5.31
1017 1.35 DL1+1.5
N/a WL7+-0.9
N/a TEMP1 N/a 4.13 N/A 10.14 4.82 N/A 10.14 6.36
1018 1.35 DL1+1.5
N/a WL8+-0.9
N/a TEMP1 N/a 4.04 N/A 9.83 4.59 N/A 9.83 6.01
1019 1.35 DL1+0.9
N/a TEMP1+1.35
N/a MR1
N/a 3.80 N/A 8.95 3.93 N/A 8.95 5.14
a te

1020 1.35 DL1+-0.9


N/a TEMP1+1.35
N/a MR1
N/a 3.79 N/A 8.96 3.97 N/A 8.96 5.02
1021 1.35 DL1+1.5LL1+1.5
N/a N/aEQUIP1+0.9
N/a TEMP1+1.35 1.32
MR1N/A 3.38 1.36 N/A 3.38 1.58
1022 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35 1.37
MR1N/A 3.45 1.37 N/A 3.45 1.57
1023 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1+1.35 1.38
MR1N/A 3.53 1.43 N/A 3.53 1.66
1024 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.351.44
MR1
N/A 3.61 1.44 N/A 3.61 1.65
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
1.32 N/A MR1 3.35 1.34 N/A 3.35 1.60
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
1.31 N/A MR1 3.33 1.33 N/A 3.33 1.59
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
1.36 N/A MR1 3.36 1.31 N/A 3.36 1.65
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+0.9 TEMP1+1.35
1.32 N/A MR1 3.35 1.34 N/A 3.35 1.60
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+0.9 TEMP1+1.35
1.31 N/A MR1 3.33 1.33 N/A 3.33 1.59
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+0.9 TEMP1+1.35
1.36 N/A MR1 3.36 1.31 N/A 3.36 1.65
1028 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+0.9 TEMP1+1.35
1.35 N/A MR1 3.35 1.31 N/A 3.35 1.63
1029 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+0.9 TEMP1+1.35
1.40 N/A MR1 3.48 1.37 N/A 3.48 1.61

Ed
1030 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+0.9 TEMP1+1.35
1.39 N/A MR1 3.46 1.36 N/A 3.46 1.59
1031 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+0.9 TEMP1+1.35
1.31 N/A MR1 3.41 1.41 N/A 3.41 1.64
1032 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+0.9 TEMP1+1.35
1.30 N/A MR1 3.39 1.39 N/A 3.39 1.63
1033 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
1.37 N/A MR1 3.37 1.31 N/A 3.37 1.59
1034 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
1.37 N/A MR1 3.35 1.30 N/A 3.35 1.58
1035 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
1.41 N/A MR1 3.44 1.33 N/A 3.44 1.64
1036 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
1.40 N/A MR1 3.42 1.32 N/A 3.42 1.62
1037 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
1.35 N/A MR1 3.44 1.39 N/A 3.44 1.59
1038 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
1.34 N/A MR1 3.41 1.38 N/A 3.41 1.58
1039 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
1.36 N/A MR1 3.49 1.42 N/A 3.49 1.63
1040 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
1.35 N/A MR1 3.47 1.41 N/A 3.47 1.61
1041 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.38 N/A MR1 3.50 1.41 N/A 3.50 1.68

F
1042 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.38 N/A MR1 3.48 1.40 N/A 3.48 1.67
1043 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.42 N/A MR1 3.51 1.38 N/A 3.51 1.74
1044 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.42 N/A MR1 3.49 1.37 N/A 3.49 1.72
1045 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.47 N/A MR1 3.64 1.44 N/A 3.64 1.69
1046 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.46 N/A MR1 3.62 1.43 N/A 3.62 1.67

PD
1047 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.37 N/A MR1 3.57 1.48 N/A 3.57 1.73
1048 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.36 N/A MR1 3.55 1.47 N/A 3.55 1.71
1049 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.44 N/A MR1 3.52 1.37 N/A 3.52 1.67
1050 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.43 N/A MR1 3.50 1.36 N/A 3.50 1.66
1051 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.48 N/A MR1 3.60 1.39 N/A 3.60 1.72
1052 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.47 N/A MR1 3.58 1.38 N/A 3.58 1.71
1053 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.42 N/A MR1 3.60 1.46 N/A 3.60 1.68
1054 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.40 N/A MR1 3.56 1.45 N/A 3.56 1.66
1055 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.43 N/A MR1 3.65 1.49 N/A 3.65 1.71
1056 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.42 N/A MR1 3.63 1.48 N/A 3.63 1.70
1057 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.38 N/A MR1 3.43 1.35 N/A 3.43 1.70
1058 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.37 N/A MR1 3.40 1.33 N/A 3.40 1.67
1059 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.45 N/A MR1 3.51 1.35 N/A 3.51 1.79
1060 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.44 N/A MR1 3.47 1.33 N/A 3.47 1.76
te r
1061 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.47 N/A MR1 3.66 1.45 N/A 3.66 1.71
1062 1.148 DL1+1.5
N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.44 N/A MR1 3.60 1.44 N/A 3.60 1.68
1063 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.36 N/A MR1 3.60 1.51 N/A 3.60 1.77
1064 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.35 N/A MR1 3.56 1.49 N/A 3.56 1.74
1065 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.44 N/A MR1 3.46 1.32 N/A 3.46 1.69
1066 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.43 N/A MR1 3.42 1.30 N/A 3.42 1.66
1067 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.51 N/A MR1 3.59 1.36 N/A 3.59 1.78
1068 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.50 N/A MR1 3.55 1.34 N/A 3.55 1.75
1069 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.39 N/A MR1 3.58 1.47 N/A 3.58 1.69
as

1070 1.148 DL1+1.5


N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.36 N/A MR1 3.52 1.45 N/A 3.52 1.67
1071 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.42 N/A MR1 3.68 1.53 N/A 3.68 1.76
1072 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.41 N/A MR1 3.65 1.51 N/A 3.65 1.73
1073 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a 2.12 N/A 4.63 1.69 N/A 4.63 2.49
1074 1 DL1+0.8
N/a LL1+1 SL2
N/a N/a 2.22 N/A 5.42 2.24 N/A 5.42 2.65
1075 1 DL1+0.8
N/a LL1+-1 SL1
N/a N/a 2.49 N/A 5.19 1.86 N/A 5.19 2.94
1076 1 DL1+0.8
N/a LL1+-1 SL2
N/a N/a 2.30 N/A 5.50 2.23 N/A 5.50 2.74
2001 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+11.90
MR1N/A 4.71 1.94 N/A 4.71 2.34
nM

2002 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+11.89
MR1N/A 4.68 1.92 N/A 4.68 2.32
2003 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+11.95
MR1N/A 4.72 1.89 N/A 4.72 2.41
2004 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+11.94
MR1N/A 4.70 1.88 N/A 4.70 2.39
2005 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+12.00
MR1N/A 4.88 1.97 N/A 4.88 2.35
2006 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+12.00
MR1N/A 4.85 1.96 N/A 4.85 2.33
2007 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+11.89
MR1N/A 4.79 2.02 N/A 4.79 2.39
2008 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+11.88
MR1N/A 4.76 2.00 N/A 4.76 2.37
2009 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.97
MR1N/A 4.74 1.89 N/A 4.74 2.32
2010 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.96
MR1N/A 4.71 1.88 N/A 4.71 2.30
2011 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1 2.02
MR1N/A 4.82 1.91 N/A 4.82 2.39
2012 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1 2.01
MR1N/A 4.80 1.90 N/A 4.80 2.37
2013 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.95
MR1N/A 4.83 1.99 N/A 4.83 2.33
2014 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.93
MR1N/A 4.79 1.98 N/A 4.79 2.31
2015 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.95
MR1N/A 4.89 2.03 N/A 4.89 2.38
di

2016 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.95
MR1N/A 4.87 2.02 N/A 4.87 2.36
2017 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+11.90
MR1N/A 4.63 1.87 N/A 4.63 2.36
2018 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+11.89
MR1N/A 4.59 1.84 N/A 4.59 2.33
2019 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+11.98
MR1N/A 4.71 1.85 N/A 4.71 2.48
2020 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+11.97
MR1N/A 4.67 1.83 N/A 4.67 2.44
2021 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+12.01
MR1N/A 4.90 1.99 N/A 4.90 2.37
2022 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+11.97
MR1N/A 4.83 1.96 N/A 4.83 2.33
2023 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+11.87
MR1N/A 4.82 2.06 N/A 4.82 2.45
a te

2024 1 DL1+1.0
N/a LL1+1 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+11.86
MR1N/A 4.78 2.03 N/A 4.78 2.42
2025 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.97
MR1N/A 4.66 1.83 N/A 4.66 2.34
2026 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.95
MR1N/A 4.61 1.80 N/A 4.61 2.31
2027 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1 2.06
MR1N/A 4.81 1.87 N/A 4.81 2.46
2028 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1 2.04
MR1N/A 4.77 1.85 N/A 4.77 2.42
2029 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.92
MR1N/A 4.81 2.01 N/A 4.81 2.35
2030 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.88
MR1N/A 4.74 1.98 N/A 4.74 2.32
2031 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.94
MR1N/A 4.93 2.08 N/A 4.93 2.43
2032 1 DL1+0.7
N/a LL1+1 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.93
MR1N/A 4.88 2.05 N/A 4.88 2.40
2033 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a 2.12 N/A 4.63 1.69 N/A 4.63 2.49
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
FOUNDATION FOR PEDESTAL (P14)-(Pile Capacity Check)

Ed
LOAD CASE: 520 1 DL1+1.0
520 LL1+0.75
1 DL1+0.75
WL3+1
LL1+0.75
EQUIP1
WL3+1 EQUIP1

GENERAL PILECAP DIMENSIONS, POSITION


Concrete Density 2.5 ton/m3 Pilecap thickness 1.300 m
Soil Density 2 ton/m3 Z cordinate of center of the pilecap -12.000 m
Grade of Concrete (Cylinder) C 30 X cordinate of center of the pilecap 18.250 m
Grade of Steel Fe 500 Length along axis Z, L z 3.540 m
Level of Base of pilecap -5.1 m Length along axis X, L x 3.540 m

F
Finished Ground level -0.6 m Area of base of pilecap, A 12.53 m2
Level of max water table -0.6 m

PD
PEDESTAL (COLUMN) DIMENSIONS, POSITIONS & LOADS
C.G. of Pedestal Ped top P + W ped
Pedestal ID Lz-z (m) Lx-x (m) P (T) Hz (T) Mx (T-m) Hx (T) Mz (T-m)
Z X [Level of (T)
P14 1.250 1.250 -12.000 18.250 -5.100 186.11 -1.31 -15.95 -30.98 -85.13 186.11

PILE DETAILS
Number of Piles 4 CGz of Pile group -12 m
Diameter of Piles 760 mm CGx of Pile group 18.25 m
2
Compressive capacity of piles 192 T SUM[(Xi-Xcg)2] of Pile group 5.198 m
2
SUM[(Zi-Zcg)2] of Pile group
te r
Tensile capacity of piles 40 T 5.198 m
Shear capacity of piles 11.5 T

Weight of soil, W soil 56.39 T


Weight of footing, W f ooting 8.15 T
Axial load due to [P+ W ped] 186.11 T
Total axial Load 250.65 T
as

Mz due to [Mz+(P+W ped)*ex ] -85.13 Ton-m Mx due to [Mx+(P+W ped)*ez] -15.95 Ton-m
Eccentricity between Pilecap and Pile group 0.00 mm Eccentricity between Pilecap and Pile group 0.00 mm
Mz due to pilecap and pile group eccentricity 0.00 Ton-m Mx due to pilecap and pile group eccentricity 0.00 Ton-m
Total Mz -85.13 Ton-m Total Mx -15.95 Ton-m
nM

Distance Distance P due to


from pile from pile Axial P due to P due to
Pile ID CGx CGz group CGx group CGz Load (T) Mx (T) Mz (T) Total P (T) Shear (T)
PCG-3-1 17.11 -13.14 -1.14 -1.14 62.66 3.50 18.67 84.83 7.75
PCG-3-2 17.11 -10.86 -1.14 1.14 62.66 -3.50 18.67 77.83 7.75
PCG-3-3 19.39 -13.14 1.14 -1.14 62.66 3.50 -18.67 47.49 7.75
PCG-3-4 19.39 -10.86 1.14 1.14 62.66 -3.50 -18.67 40.50 7.75
di
a te
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
F AC TOR OF SAF ETY F OR ALL LOAD C ASES ( Per mis s ible/ Ac tual)

Pile Reaction ALONG Z-Z ALONG X-X


Compressi pt at Shear pt at Shear

Ed
Load case pt at top pt at top Punching
on Tension Shear bottom stress bottom stress
500 1 DL1+1 LL1+12.43
EQUIP1
N/a 2.81 N/A N/A N/A N/A N/A N/A N/A
501 1 DL1+1 LL1+12.36
EQUIP1+1
N/a TEMP1 2.39 N/A N/A N/A N/A N/A N/A N/A
502 1 DL1+1 WL1 2.61 N/a 4.56 N/A N/A N/A N/A N/A N/A N/A
503 1 DL1+1 WL2 2.57 N/a 4.48 N/A N/A N/A N/A N/A N/A N/A
504 1 DL1+1 WL3 3.42 N/a 1.57 N/A N/A N/A N/A N/A N/A N/A
505 1 DL1+1 WL4 3.39 N/a 1.58 N/A N/A N/A N/A N/A N/A N/A
506 1 DL1+1 WL5 3.50 N/a 2.85 N/A N/A N/A N/A N/A N/A N/A
507 1 DL1+1 WL6 3.46 N/a 2.87 N/A N/A N/A N/A N/A N/A N/A
508 1 DL1+1 WL7 3.55 N/a 4.10 N/A N/A N/A N/A N/A N/A N/A

F
509 1 DL1+1 WL8 3.51 N/a 4.16 N/A N/A N/A N/A N/A N/A N/A
510 1 DL1+0.7 WL12.98 N/a 10.19 N/A N/A N/A N/A N/A N/A N/A
511 1 DL1+0.7 WL22.94 N/a 9.90 N/A N/A N/A N/A N/A N/A N/A
512 1 DL1+0.7 WL33.57 N/a 1.96 N/A N/A N/A N/A N/A N/A N/A

PD
513 1 DL1+0.7 WL43.54 N/a 1.97 N/A N/A N/A N/A N/A N/A N/A
514 1 DL1+0.7 WL53.63 N/a 3.29 N/A N/A N/A N/A N/A N/A N/A
515 1 DL1+0.7 WL63.60 N/a 3.32 N/A N/A N/A N/A N/A N/A N/A
516 1 DL1+0.7 WL73.68 N/a 4.58 N/A N/A N/A N/A N/A N/A N/A
517 1 DL1+0.7 WL83.65 N/a 4.64 N/A N/A N/A N/A N/A N/A N/A
518 1 DL1+ 1LL1+0.75
2.06WL1+1
N/a EQUIP1 22.84 N/A N/A N/A N/A N/A N/A N/A
519 1 DL1+1.0 LL1+0.75
2.04 N/a
WL2+1 EQUIP1 24.48 N/A N/A N/A N/A N/A N/A N/A
520 1 DL1+1.0 LL1+0.75
2.26 N/a
WL3+1 EQUIP1 1.48 N/A N/A N/A N/A N/A N/A N/A
521 1 DL1+1.0 LL1+0.75
2.25 N/a
WL4+1 EQUIP1 1.49 N/A N/A N/A N/A N/A N/A N/A
522 1 DL1+1.0 LL1+0.75
2.49 N/a
WL5+1 EQUIP1 2.45 N/A N/A N/A N/A N/A N/A N/A
523 1 DL1+1.0 LL1+0.75
2.48 N/a
WL6+1 EQUIP1 2.47 N/A N/A N/A N/A N/A N/A N/A
te r
524 1 DL1+1.0 LL1+0.75
2.29 N/a
WL7+1 EQUIP1 2.61 N/A N/A N/A N/A N/A N/A N/A
525 1 DL1+1.0 LL1+0.75
2.28 N/a
WL8+1 EQUIP1 2.64 N/A N/A N/A N/A N/A N/A N/A
526 1 DL1+1.0 LL1+12.15
EQUIP1+0.525
N/a SL1 1.62 N/A N/A N/A N/A N/A N/A N/A
527 1 DL1+1.0 LL1+12.40
EQUIP1+0.525
N/a SL2 2.60 N/A N/A N/A N/A N/A N/A N/A
528 0.6 DL1+1 WL13.06 N/a 3.33 N/A N/A N/A N/A N/A N/A N/A
529 0.6 DL1+1 WL23.00 N/a 3.29 N/A N/A N/A N/A N/A N/A N/A
530 0.6 DL1+1 WL34.44 N/a 1.81 N/A N/A N/A N/A N/A N/A N/A
531 0.6 DL1+1 WL44.38 N/a 1.83 N/A N/A N/A N/A N/A N/A N/A
as

532 0.6 DL1+1 WL54.57 N/a 3.56 N/A N/A N/A N/A N/A N/A N/A
533 0.6 DL1+1 WL64.50 N/a 3.59 N/A N/A N/A N/A N/A N/A N/A
534 0.6 DL1+1 WL74.63 N/a 5.01 N/A N/A N/A N/A N/A N/A N/A
535 0.6 DL1+1 WL84.57 N/a 5.08 N/A N/A N/A N/A N/A N/A N/A
536 0.6 DL1+0.7 SL13.34 N/a 2.11 N/A N/A N/A N/A N/A N/A N/A
537 0.6 DL1+0.7 SL25.29 N/a 6.18 N/A N/A N/A N/A N/A N/A N/A
1001 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1 N/A N/A N/A N/A N/A N/A N/A
nM

1002 1.35 DL1+1.5


N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1N/A N/A N/A N/A N/A N/A N/A
1003 1.35 DL1+1.5
N/a WL1+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1004 1.35 DL1+1.5
N/a WL2+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1005 1.35 DL1+1.5
N/a WL3+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1006 1.35 DL1+1.5
N/a WL4+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1007 1.35 DL1+1.5
N/a WL5+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1008 1.35 DL1+1.5
N/a WL6+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1009 1.35 DL1+1.5
N/a WL7+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1010 1.35 DL1+1.5
N/a WL8+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1011 1.35 DL1+1.5
N/a WL1+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1012 1.35 DL1+1.5
N/a WL2+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
di

1013 1.35 DL1+1.5


N/a WL3+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1014 1.35 DL1+1.5
N/a WL4+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1015 1.35 DL1+1.5
N/a WL5+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1016 1.35 DL1+1.5
N/a WL6+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1017 1.35 DL1+1.5
N/a WL7+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1018 1.35 DL1+1.5
N/a WL8+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1019 1.35 DL1+0.9
N/a TEMP1+1.35
N/a MR1
N/a N/A N/A N/A N/A N/A N/A N/A
a te

1020 1.35 DL1+-0.9


N/a TEMP1+1.35
N/a MR1
N/a N/A N/A N/A N/A N/A N/A N/A
1021 1.35 DL1+1.5LL1+1.5
N/a N/aEQUIP1+0.9
N/a TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A N/A
1022 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1023 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1024 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1028 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1029 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

Ed
1030 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1031 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1032 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1033 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1034 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1035 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1036 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1037 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1038 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1039 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1040 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1041 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

F
1042 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1043 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1044 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1045 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1046 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

PD
1047 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1048 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1049 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1050 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1051 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1052 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1053 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1054 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1055 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1056 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1057 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1058 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1059 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1060 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
te r
1061 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1062 1.148 DL1+1.5
N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1063 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1064 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1065 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1066 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1067 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1068 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1069 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
as

1070 1.148 DL1+1.5


N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1071 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1072 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1073 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1074 1 DL1+0.8
N/a LL1+1 SL2
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1075 1 DL1+0.8
N/a LL1+-1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1076 1 DL1+0.8
N/a LL1+-1 SL2
N/a N/a N/A N/A N/A N/A N/A N/A N/A
2001 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
nM

2002 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2003 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2004 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2005 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2006 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2007 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2008 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2009 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2010 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2011 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2012 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2013 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2014 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2015 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
di

2016 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2017 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2018 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2019 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2020 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2021 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2022 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2023 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
a te

2024 1 DL1+1.0
N/a LL1+1 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2025 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2026 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2027 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2028 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2029 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2030 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2031 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2032 1 DL1+0.7
N/a LL1+1 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2033 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
FOUNDATION FOR PEDESTAL (P14)-(Pilecap Design)

Ed
LOAD CASE: 1066 1.1481066
DL1+1.5
1.148
LL1+1.5
DL1+1.05
WL2+1.5
LL1+1.5
EQUIP1+-0.9
WL2+1.05 EQUIP1+-0.9
TEMP1+1.35 TEMP1+1.35
MR1 MR1

GENERAL PILECAP DIMENSIONS, POSITION


Concrete Density 2.5 ton/m3 Pilecap thickness 1.300 m
Soil Density 2 ton/m3 Z cordinate of center of the pilecap -12.000 m
Grade of Concrete (Cylinder) C 30 X cordinate of center of the pilecap 18.250 m
Grade of Steel Fe 500 Length along axis Z, L z 3.540 m
Level of Base of pilecap -5.1 m Length along axis X, L x 3.540 m
m2

F
Finished Ground level -0.6 m Area of base of pilecap, A 12.53
Level of max water table -0.6 m

PD
PEDESTAL (COLUMN) DIMENSIONS, POSITIONS & LOADS
C.G. of Pedestal Ped top P + W ped
Pedestal ID Lz-z (m) Lx-x (m) P (T) Hz (T) Mx (T-m) Hx (T) Mz (T-m)
Z X [Level of (T)
P14 1.250 1.250 -12.000 18.250 -5.100 365.08 -2.26 -25.62 11.09 116.75 365.08

PILE DETAILS
Number of Piles 4 CGz of Pile group -12 m
Diameter of Piles 760 mm CGx of Pile group 18.25 m
2
Compressive capacity of piles 192 T SUM[(Xi-Xcg)2] of Pile group 5.198 m
2
Tensile capacity of piles 40 T SUM[(Zi-Zcg)2] of Pile group 5.198 m
Shear capacity of piles 11.5 T
te r
Weight of soil, W soil 76.13 T
Weight of footing, W f ooting 11.00 T
Axial load due to [P+ W ped] 365.08 T
Total axial Load 452.21 T

Mz due to [Mz+(P+W ped)*ex ] 116.75 Ton-m Mx due to [Mx+(P+W ped)*ez] -25.62 Ton-m
as

Eccentricity between Pilecap and Pile group 0.00 mm Eccentricity between Pilecap and Pile group 0.00 mm
Mz due to pilecap and pile group eccentricity 0.00 Ton-m Mx due to pilecap and pile group eccentricity 0.00 Ton-m
Total Mz 116.75 Ton-m Total Mx -25.62 Ton-m

Distance Distance P due to


from pile from pile Axial P due to P due to
nM

Pile ID CGx CGz group CGx group CGz Load (T) Mx (T) Mz (T) Total P (T) Shear (T)
PCG-3-1 17.11 -13.14 -1.14 -1.14 113.05 5.62 -25.60 93.07 2.83
PCG-3-2 17.11 -10.86 -1.14 1.14 113.05 -5.62 -25.60 81.83 2.83
PCG-3-3 19.39 -13.14 1.14 -1.14 113.05 5.62 25.60 144.27 2.83
PCG-3-4 19.39 -10.86 1.14 1.14 113.05 -5.62 25.60 133.04 2.83

Load factor for Limit State design 1 Along Axis -----> Z-Z X-X
Ultimate sagging(+)
di

Moment,Mup(Tm/width) 29.88 35.42


Along Axis -----> Z-Z X-X Effective Depth (for + M), d (m) 1.17 1.17
Ultimate Shear force (In sagging zone)(T/width) 23.40 27.65 Mup/bd2 (N/mm2) 0.22 0.26
Nominal shear stress (N/mm 2) 0.20 0.24 Tensile steel required at bottom (%) 0.05 0.06
Max allowable shear stress (N/mm 2) 0.32 0.32 Provide bars of dia (mm) 20 20
Ultimate Shear force (In hogging zone)(T) 6.14 6.56 at c/c distance (mm) 150 150
Nominal shear stress (N/mm 2) 0.05 0.06 Tensile steel provided at bottom (%) 0.18 0.18
a te

Max allowable shear stress (N/mm 2) 0.32 0.32 Ultimate hogging(-)


Stirrup Diameter (mm) 12 Moment,Mun(Tm/meter width) 0.00 0.00
Stirrup spacing (N/mm 2) 150 150 Mun/bd2 (N/mm2) 0.00 0.00
Stress in stirrup (N/mm 2) 17.69 20.91 Tensile steel required at top (%) 0.00 0.00
Total Stirrup stress (N/mm 2) 38.60 Provide bars of dia (mm) 20 20
Permissible Stirrup stress (N/mm 2) 434.78 at c/c distance (mm) 150 150
Tensile steel provided at top (%) 0.18 0.18
Effective Depth (for - M), d (m) 1.170 1.170
re

P UNC H I NG S H EAR FO R P EDES TALS


Pedestal ID Ultimate Design Area for resisting Punching Shear Allowable punching
P14 87.13 Ton 11.33 m2 0.08 N/mm2 1.37 N/mm2
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
F AC TOR OF SAF ETY F OR ALL LOAD C ASES ( Per mis s ible/ Ac tual)

Pile Reaction ALONG Z-Z ALONG X-X


Compressi pt at Shear pt at Shear

Ed
Load case pt at top pt at top Punching
on Tension Shear bottom stress bottom stress
500 1 DL1+1N/a
LL1+1 EQUIP1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
501 1 DL1+1N/a
LL1+1 EQUIP1+1
N/a TEMP1
N/a N/A N/A N/A N/A N/A N/A N/A
502 1 DL1+1N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
503 1 DL1+1N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
504 1 DL1+1N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A
505 1 DL1+1N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
506 1 DL1+1N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
507 1 DL1+1N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
508 1 DL1+1N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A

F
509 1 DL1+1N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
510 1 DL1+0.7
N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
511 1 DL1+0.7
N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
512 1 DL1+0.7
N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A

PD
513 1 DL1+0.7
N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
514 1 DL1+0.7
N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
515 1 DL1+0.7
N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
516 1 DL1+0.7
N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A
517 1 DL1+0.7
N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
518 1 DL1+ 1LL1+0.75
N/a WL1+1
N/a EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
519 1 DL1+1.0
N/a
LL1+0.75 N/a
WL2+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
520 1 DL1+1.0
N/a
LL1+0.75 N/a
WL3+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
521 1 DL1+1.0
N/a
LL1+0.75 N/a
WL4+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
522 1 DL1+1.0
N/a
LL1+0.75 N/a
WL5+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
523 1 DL1+1.0
N/a
LL1+0.75 N/a
WL6+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
te r
524 1 DL1+1.0
N/a
LL1+0.75 N/a
WL7+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
525 1 DL1+1.0
N/a
LL1+0.75 N/a
WL8+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
526 1 DL1+1.0
N/a
LL1+1 EQUIP1+0.525
N/a N/a
SL1 N/A N/A N/A N/A N/A N/A N/A
527 1 DL1+1.0
N/a
LL1+1 EQUIP1+0.525
N/a N/a
SL2 N/A N/A N/A N/A N/A N/A N/A
528 0.6 DL1+1
N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
529 0.6 DL1+1
N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
530 0.6 DL1+1
N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A
531 0.6 DL1+1
N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
as

532 0.6 DL1+1


N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
533 0.6 DL1+1
N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
534 0.6 DL1+1
N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A
535 0.6 DL1+1
N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
536 0.6 DL1+0.7
N/a SL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
537 0.6 DL1+0.7
N/a SL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
1001 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1 4.12 N/A 13.97 3.98 N/A 13.97 17.80
nM

1002 1.35 DL1+1.5


N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1 4.10 N/A 14.25 4.16 N/A 14.25 17.80
1003 1.35 DL1+1.5
N/a WL1+0.9
N/a TEMP1 N/a 5.90 N/A 17.35 4.34 N/A 17.35 17.80
1004 1.35 DL1+1.5
N/a WL2+0.9
N/a TEMP1 N/a 5.77 N/A 16.96 4.24 N/A 16.96 17.80
1005 1.35 DL1+1.5
N/a WL3+0.9
N/a TEMP1 N/a 12.83 N/A 28.13 5.86 N/A 28.13 17.80
1006 1.35 DL1+1.5
N/a WL4+0.9
N/a TEMP1 N/a 12.21 N/A 27.41 5.78 N/A 27.41 17.80
1007 1.35 DL1+1.5
N/a WL5+0.9
N/a TEMP1 N/a 7.12 N/A 25.68 7.61 N/A 25.68 17.80
1008 1.35 DL1+1.5
N/a WL6+0.9
N/a TEMP1 N/a 6.93 N/A 25.08 7.47 N/A 25.08 17.80
1009 1.35 DL1+1.5
N/a WL7+0.9
N/a TEMP1 N/a 6.69 N/A 24.85 7.66 N/A 24.85 17.80
1010 1.35 DL1+1.5
N/a WL8+0.9
N/a TEMP1 N/a 6.52 N/A 24.29 7.52 N/A 24.29 17.80
1011 1.35 DL1+1.5
N/a WL1+-0.9
N/a TEMP1 N/a 5.86 N/A 16.70 4.09 N/A 16.70 17.80
1012 1.35 DL1+1.5
N/a WL2+-0.9
N/a TEMP1 N/a 5.72 N/A 16.34 4.00 N/A 16.34 17.80
di

1013 1.35 DL1+1.5


N/a WL3+-0.9
N/a TEMP1 N/a 12.52 N/A 29.22 6.26 N/A 29.22 17.80
1014 1.35 DL1+1.5
N/a WL4+-0.9
N/a TEMP1 N/a 11.92 N/A 28.44 6.17 N/A 28.44 17.80
1015 1.35 DL1+1.5
N/a WL5+-0.9
N/a TEMP1 N/a 7.02 N/A 26.59 8.30 N/A 26.59 17.80
1016 1.35 DL1+1.5
N/a WL6+-0.9
N/a TEMP1 N/a 6.83 N/A 25.94 8.13 N/A 25.94 17.80
1017 1.35 DL1+1.5
N/a WL7+-0.9
N/a TEMP1 N/a 6.64 N/A 25.77 8.36 N/A 25.77 17.80
1018 1.35 DL1+1.5
N/a WL8+-0.9
N/a TEMP1 N/a 6.47 N/A 25.17 8.19 N/A 25.17 17.80
1019 1.35 DL1+0.9
N/a TEMP1+1.35
N/a MR1
N/a 8.06 N/A 26.36 7.13 N/A 26.36 17.80
a te

1020 1.35 DL1+-0.9


N/a TEMP1+1.35
N/a MR1
N/a 7.93 N/A 27.39 7.74 N/A 27.39 17.80
1021 1.35 DL1+1.5LL1+1.5
N/a N/aEQUIP1+0.9
N/a TEMP1+1.35 4.09
MR1N/A 13.88 3.96 N/A 13.88 17.80
1022 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35 4.07
MR1N/A 14.16 4.14 N/A 14.16 17.80
1023 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1+1.35 4.38
MR1N/A 14.90 4.25 N/A 14.90 17.80
1024 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.354.36
MR1
N/A 15.22 4.46 N/A 15.22 17.80
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
3.67 N/A MR1 12.54 3.59 N/A 12.54 17.80
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
3.64 N/A MR1 12.42 3.55 N/A 12.42 17.80
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
4.61 N/A MR1 14.12 3.68 N/A 14.12 17.80
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+0.9 TEMP1+1.35
3.67 N/A MR1 12.54 3.59 N/A 12.54 17.80
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+0.9 TEMP1+1.35
3.64 N/A MR1 12.42 3.55 N/A 12.42 17.80
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+0.9 TEMP1+1.35
4.61 N/A MR1 14.12 3.68 N/A 14.12 17.80
1028 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+0.9 TEMP1+1.35
4.56 N/A MR1 14.01 3.66 N/A 14.01 17.80
1029 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+0.9 TEMP1+1.35
4.48 N/A MR1 14.68 4.03 N/A 14.68 17.80

Ed
1030 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+0.9 TEMP1+1.35
4.44 N/A MR1 14.56 4.00 N/A 14.56 17.80
1031 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+0.9 TEMP1+1.35
3.84 N/A MR1 13.57 4.04 N/A 13.57 17.80
1032 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+0.9 TEMP1+1.35
3.80 N/A MR1 13.47 4.01 N/A 13.47 17.80
1033 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
3.65 N/A MR1 12.20 3.41 N/A 12.20 17.80
1034 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
3.62 N/A MR1 12.08 3.38 N/A 12.08 17.80
1035 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
4.59 N/A MR1 14.41 3.83 N/A 14.41 17.80
1036 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
4.54 N/A MR1 14.30 3.81 N/A 14.30 17.80
1037 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
4.44 N/A MR1 14.97 4.21 N/A 14.97 17.80
1038 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
4.40 N/A MR1 14.85 4.19 N/A 14.85 17.80
1039 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
3.82 N/A MR1 13.84 4.22 N/A 13.84 17.80
1040 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
3.79 N/A MR1 13.73 4.20 N/A 13.73 17.80
1041 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+0.9 TEMP1+1.35
3.90 N/A MR1 13.29 3.79 N/A 13.29 17.80

F
1042 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+0.9 TEMP1+1.35
3.86 N/A MR1 13.15 3.74 N/A 13.15 17.80
1043 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.98 N/A MR1 15.18 3.93 N/A 15.18 17.80
1044 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.92 N/A MR1 15.05 3.91 N/A 15.05 17.80
1045 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.84 N/A MR1 15.83 4.33 N/A 15.83 17.80
1046 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.78 N/A MR1 15.69 4.31 N/A 15.69 17.80

PD
1047 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.09 N/A MR1 14.54 4.34 N/A 14.54 17.80
1048 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.05 N/A MR1 14.43 4.32 N/A 14.43 17.80
1049 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
3.88 N/A MR1 12.91 3.60 N/A 12.91 17.80
1050 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
3.84 N/A MR1 12.77 3.56 N/A 12.77 17.80
1051 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.95 N/A MR1 15.51 4.11 N/A 15.51 17.80
1052 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.89 N/A MR1 15.38 4.08 N/A 15.38 17.80
1053 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.79 N/A MR1 16.17 4.55 N/A 16.17 17.80
1054 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.74 N/A MR1 16.03 4.52 N/A 16.03 17.80
1055 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.07 N/A MR1 14.85 4.56 N/A 14.85 17.80
1056 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.03 N/A MR1 14.73 4.53 N/A 14.73 17.80
1057 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+0.9 TEMP1+1.35
3.63 N/A MR1 11.74 3.19 N/A 11.74 17.80
1058 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+0.9 TEMP1+1.35
3.58 N/A MR1 11.56 3.14 N/A 11.56 17.80
1059 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+0.9 TEMP1+1.35
5.48 N/A MR1 15.37 3.74 N/A 15.37 17.80
1060 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+0.9 TEMP1+1.35
5.37 N/A MR1 15.15 3.71 N/A 15.15 17.80
te r
1061 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.68 N/A MR1 15.69 4.39 N/A 15.69 17.80
1062 1.148 DL1+1.5
N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.60 N/A MR1 15.46 4.34 N/A 15.46 17.80
1063 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+0.9 TEMP1+1.35
3.92 N/A MR1 14.31 4.41 N/A 14.31 17.80
1064 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+0.9 TEMP1+1.35
3.86 N/A MR1 14.13 4.36 N/A 14.13 17.80
1065 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
3.61 N/A MR1 11.43 3.05 N/A 11.43 17.80
1066 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
3.56 N/A MR1 11.26 3.00 N/A 11.26 17.80
1067 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
5.45 N/A MR1 15.71 3.90 N/A 15.71 17.80
1068 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
5.33 N/A MR1 15.49 3.87 N/A 15.49 17.80
1069 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.64 N/A MR1 16.02 4.61 N/A 16.02 17.80
as

1070 1.148 DL1+1.5


N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.55 N/A MR1 15.79 4.56 N/A 15.79 17.80
1071 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
3.90 N/A MR1 14.61 4.63 N/A 14.61 17.80
1072 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
3.84 N/A MR1 14.42 4.58 N/A 14.42 17.80
1073 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a 5.31 N/A 16.35 4.25 N/A 16.35 17.80
1074 1 DL1+0.8
N/a LL1+1 SL2
N/a N/a 6.24 N/A 21.67 6.25 N/A 21.67 17.80
1075 1 DL1+0.8
N/a LL1+-1 SL1
N/a N/a 8.65 N/A 23.19 5.41 N/A 23.19 17.80
1076 1 DL1+0.8
N/a LL1+-1 SL2
N/a N/a 6.60 N/A 22.19 6.16 N/A 22.19 17.80
2001 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+15.13
MR1N/A 17.64 5.04 N/A 17.64 17.80
nM

2002 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+15.09
MR1N/A 17.48 4.99 N/A 17.48 17.80
2003 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+16.33
MR1N/A 19.62 5.12 N/A 19.62 17.80
2004 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+16.27
MR1N/A 19.47 5.09 N/A 19.47 17.80
2005 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+16.17
MR1N/A 20.35 5.57 N/A 20.35 17.80
2006 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+16.11
MR1N/A 20.19 5.54 N/A 20.19 17.80
2007 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+15.35
MR1N/A 18.91 5.58 N/A 18.91 17.80
2008 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+15.30
MR1N/A 18.77 5.55 N/A 18.77 17.80
2009 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1 5.11
MR1N/A 17.19 4.82 N/A 17.19 17.80
2010 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1 5.07
MR1N/A 17.03 4.77 N/A 17.03 17.80
2011 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1 6.30
MR1N/A 19.99 5.32 N/A 19.99 17.80
2012 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1 6.24
MR1N/A 19.84 5.29 N/A 19.84 17.80
2013 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1 6.12
MR1N/A 20.72 5.81 N/A 20.72 17.80
2014 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1 6.06
MR1N/A 20.56 5.77 N/A 20.56 17.80
2015 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1 5.32
MR1N/A 19.25 5.82 N/A 19.25 17.80
di

2016 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1 5.28
MR1N/A 19.12 5.78 N/A 19.12 17.80
2017 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+14.82
MR1N/A 15.79 4.32 N/A 15.79 17.80
2018 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+14.76
MR1N/A 15.57 4.26 N/A 15.57 17.80
2019 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+16.87
MR1N/A 19.83 4.91 N/A 19.83 17.80
2020 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+16.74
MR1N/A 19.59 4.87 N/A 19.59 17.80
2021 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+16.00
MR1N/A 20.19 5.63 N/A 20.19 17.80
2022 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+15.91
MR1N/A 19.94 5.58 N/A 19.94 17.80
2023 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+15.15
MR1N/A 18.65 5.65 N/A 18.65 17.80
a te

2024 1 DL1+1.0
N/a LL1+1 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+15.08
MR1N/A 18.44 5.60 N/A 18.44 17.80
2025 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1 4.80
MR1N/A 15.42 4.15 N/A 15.42 17.80
2026 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1 4.74
MR1N/A 15.22 4.10 N/A 15.22 17.80
2027 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1 6.83
MR1N/A 20.21 5.09 N/A 20.21 17.80
2028 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1 6.71
MR1N/A 19.96 5.05 N/A 19.96 17.80
2029 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1 5.95
MR1N/A 20.56 5.87 N/A 20.56 17.80
2030 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1 5.86
MR1N/A 20.30 5.82 N/A 20.30 17.80
2031 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1 5.13
MR1N/A 18.99 5.89 N/A 18.99 17.80
2032 1 DL1+0.7
N/a LL1+1 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1 5.06
MR1N/A 18.77 5.84 N/A 18.77 17.80
2033 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a 5.31 N/A 16.35 4.25 N/A 16.35 17.80
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
FOUNDATION FOR PEDESTAL (P17)-(Pile Capacity Check)

Ed
LOAD CASE: 518 1 DL1+518
1LL1+0.75
1 DL1+0.75
WL1+1
LL1+0.75
EQUIP1WL1+1 EQUIP1

GENERAL PILECAP DIMENSIONS, POSITION


Concrete Density 2.5 ton/m3 Pilecap thickness 1.300 m
Soil Density 2 ton/m3 Z cordinate of center of the pilecap -12.000 m
Grade of Concrete (Cylinder) C 30 X cordinate of center of the pilecap 26.750 m
Grade of Steel Fe 500 Length along axis Z, L z 3.540 m
Level of Base of pilecap -5.1 m Length along axis X, L x 3.540 m

F
Finished Ground level -0.6 m Area of base of pilecap, A 12.53 m2
Level of max water table -0.6 m

PD
PEDESTAL (COLUMN) DIMENSIONS, POSITIONS & LOADS
C.G. of Pedestal Ped top P + W ped
Pedestal ID Lz-z (m) Lx-x (m) P (T) Hz (T) Mx (T-m) Hx (T) Mz (T-m)
Z X [Level of (T)
P17 1.250 1.250 -12.000 26.750 -5.100 203.34 -1.50 -18.22 30.08 80.03 203.34

PILE DETAILS
Number of Piles 4 CGz of Pile group -12 m
Diameter of Piles 760 mm CGx of Pile group 26.75 m
2
Compressive capacity of piles 192 T SUM[(Xi-Xcg)2] of Pile group 5.198 m
2
SUM[(Zi-Zcg)2] of Pile group
te r
Tensile capacity of piles 40 T 5.198 m
Shear capacity of piles 11.5 T

Weight of soil, W soil 56.39 T


Weight of footing, W f ooting 8.15 T
Axial load due to [P+ W ped] 203.34 T
Total axial Load 267.88 T
as

Mz due to [Mz+(P+W ped)*ex ] 80.03 Ton-m Mx due to [Mx+(P+W ped)*ez] -18.22 Ton-m
Eccentricity between Pilecap and Pile group 0.00 mm Eccentricity between Pilecap and Pile group 0.00 mm
Mz due to pilecap and pile group eccentricity 0.00 Ton-m Mx due to pilecap and pile group eccentricity 0.00 Ton-m
Total Mz 80.03 Ton-m Total Mx -18.22 Ton-m
nM

Distance Distance P due to


from pile from pile Axial P due to P due to
Pile ID CGx CGz group CGx group CGz Load (T) Mx (T) Mz (T) Total P (T) Shear (T)
PCG-5-1 25.61 -13.14 -1.14 -1.14 66.97 4.00 -17.55 53.42 7.53
PCG-5-2 25.61 -10.86 -1.14 1.14 66.97 -4.00 -17.55 45.42 7.53
PCG-5-3 27.89 -13.14 1.14 -1.14 66.97 4.00 17.55 88.52 7.53
PCG-5-4 27.89 -10.86 1.14 1.14 66.97 -4.00 17.55 80.52 7.53
di
a te
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
F AC TOR OF SAF ETY F OR ALL LOAD C ASES ( Per mis s ible/ Ac tual)

Pile Reaction ALONG Z-Z ALONG X-X


Compressi pt at Shear pt at Shear

Ed
Load case pt at top pt at top Punching
on Tension Shear bottom stress bottom stress
500 1 DL1+1 LL1+12.33
EQUIP1
N/a 2.98 N/A N/A N/A N/A N/A N/A N/A
501 1 DL1+1 LL1+12.26
EQUIP1+1
N/a TEMP1 2.50 N/A N/A N/A N/A N/A N/A N/A
502 1 DL1+1 WL1 3.39 N/a 1.57 N/A N/A N/A N/A N/A N/A N/A
503 1 DL1+1 WL2 3.35 N/a 1.57 N/A N/A N/A N/A N/A N/A N/A
504 1 DL1+1 WL3 2.56 N/a 4.46 N/A N/A N/A N/A N/A N/A N/A
505 1 DL1+1 WL4 2.53 N/a 4.43 N/A N/A N/A N/A N/A N/A N/A
506 1 DL1+1 WL5 3.62 N/a 3.37 N/A N/A N/A N/A N/A N/A N/A
507 1 DL1+1 WL6 3.57 N/a 3.38 N/A N/A N/A N/A N/A N/A N/A
508 1 DL1+1 WL7 3.40 N/a 3.47 N/A N/A N/A N/A N/A N/A N/A

F
509 1 DL1+1 WL8 3.37 N/a 3.50 N/A N/A N/A N/A N/A N/A N/A
510 1 DL1+0.7 WL13.54 N/a 1.96 N/A N/A N/A N/A N/A N/A N/A
511 1 DL1+0.7 WL23.51 N/a 1.96 N/A N/A N/A N/A N/A N/A N/A
512 1 DL1+0.7 WL32.92 N/a 9.46 N/A N/A N/A N/A N/A N/A N/A

PD
513 1 DL1+0.7 WL42.89 N/a 9.36 N/A N/A N/A N/A N/A N/A N/A
514 1 DL1+0.7 WL53.70 N/a 3.83 N/A N/A N/A N/A N/A N/A N/A
515 1 DL1+0.7 WL63.67 N/a 3.83 N/A N/A N/A N/A N/A N/A N/A
516 1 DL1+0.7 WL73.55 N/a 3.94 N/A N/A N/A N/A N/A N/A N/A
517 1 DL1+0.7 WL83.53 N/a 3.96 N/A N/A N/A N/A N/A N/A N/A
518 1 DL1+ 1LL1+0.75
2.17WL1+1
N/a EQUIP1 1.53 N/A N/A N/A N/A N/A N/A N/A
519 1 DL1+1.0 LL1+0.75
2.16 N/a
WL2+1 EQUIP1 1.53 N/A N/A N/A N/A N/A N/A N/A
520 1 DL1+1.0 LL1+0.75
1.95 N/a
WL3+1 EQUIP1 48.23 N/A N/A N/A N/A N/A N/A N/A
521 1 DL1+1.0 LL1+0.75
1.94 N/a
WL4+1 EQUIP1 51.59 N/A N/A N/A N/A N/A N/A N/A
522 1 DL1+1.0 LL1+0.75
2.46 N/a
WL5+1 EQUIP1 3.01 N/A N/A N/A N/A N/A N/A N/A
523 1 DL1+1.0 LL1+0.75
2.44 N/a
WL6+1 EQUIP1 3.03 N/A N/A N/A N/A N/A N/A N/A
te r
524 1 DL1+1.0 LL1+0.75
2.17 N/a
WL7+1 EQUIP1 2.49 N/A N/A N/A N/A N/A N/A N/A
525 1 DL1+1.0 LL1+0.75
2.16 N/a
WL8+1 EQUIP1 2.50 N/A N/A N/A N/A N/A N/A N/A
526 1 DL1+1.0 LL1+11.88
EQUIP1+0.525
N/a SL111.93 N/A N/A N/A N/A N/A N/A N/A
527 1 DL1+1.0 LL1+12.26
EQUIP1+0.525
N/a SL2 3.21 N/A N/A N/A N/A N/A N/A N/A
528 0.6 DL1+1 WL14.39 N/a 1.81 N/A N/A N/A N/A N/A N/A N/A
529 0.6 DL1+1 WL24.33 N/a 1.82 N/A N/A N/A N/A N/A N/A N/A
530 0.6 DL1+1 WL33.02 N/a 3.31 N/A N/A N/A N/A N/A N/A N/A
531 0.6 DL1+1 WL42.97 N/a 3.29 N/A N/A N/A N/A N/A N/A N/A
as

532 0.6 DL1+1 WL54.81 N/a 4.25 N/A N/A N/A N/A N/A N/A N/A
533 0.6 DL1+1 WL64.73 N/a 4.24 N/A N/A N/A N/A N/A N/A N/A
534 0.6 DL1+1 WL74.41 N/a 4.32 N/A N/A N/A N/A N/A N/A N/A
535 0.6 DL1+1 WL84.35 N/a 4.37 N/A N/A N/A N/A N/A N/A N/A
536 0.6 DL1+0.7 SL13.11 N/a 4.51 N/A N/A N/A N/A N/A N/A N/A
537 0.6 DL1+0.7 SL24.90 N/a 10.96 N/A N/A N/A N/A N/A N/A N/A
1001 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1 N/A N/A N/A N/A N/A N/A N/A
nM

1002 1.35 DL1+1.5


N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1N/A N/A N/A N/A N/A N/A N/A
1003 1.35 DL1+1.5
N/a WL1+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1004 1.35 DL1+1.5
N/a WL2+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1005 1.35 DL1+1.5
N/a WL3+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1006 1.35 DL1+1.5
N/a WL4+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1007 1.35 DL1+1.5
N/a WL5+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1008 1.35 DL1+1.5
N/a WL6+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1009 1.35 DL1+1.5
N/a WL7+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1010 1.35 DL1+1.5
N/a WL8+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1011 1.35 DL1+1.5
N/a WL1+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1012 1.35 DL1+1.5
N/a WL2+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
di

1013 1.35 DL1+1.5


N/a WL3+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1014 1.35 DL1+1.5
N/a WL4+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1015 1.35 DL1+1.5
N/a WL5+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1016 1.35 DL1+1.5
N/a WL6+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1017 1.35 DL1+1.5
N/a WL7+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1018 1.35 DL1+1.5
N/a WL8+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1019 1.35 DL1+0.9
N/a TEMP1+1.35
N/a MR1
N/a N/A N/A N/A N/A N/A N/A N/A
a te

1020 1.35 DL1+-0.9


N/a TEMP1+1.35
N/a MR1
N/a N/A N/A N/A N/A N/A N/A N/A
1021 1.35 DL1+1.5LL1+1.5
N/a N/aEQUIP1+0.9
N/a TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A N/A
1022 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1023 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1024 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1028 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1029 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

Ed
1030 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1031 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1032 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1033 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1034 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1035 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1036 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1037 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1038 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1039 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1040 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1041 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

F
1042 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1043 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1044 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1045 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1046 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

PD
1047 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1048 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1049 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1050 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1051 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1052 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1053 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1054 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1055 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1056 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1057 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1058 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1059 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1060 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
te r
1061 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1062 1.148 DL1+1.5
N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1063 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1064 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1065 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1066 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1067 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1068 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1069 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
as

1070 1.148 DL1+1.5


N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1071 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1072 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1073 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1074 1 DL1+0.8
N/a LL1+1 SL2
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1075 1 DL1+0.8
N/a LL1+-1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1076 1 DL1+0.8
N/a LL1+-1 SL2
N/a N/a N/A N/A N/A N/A N/A N/A N/A
2001 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
nM

2002 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2003 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2004 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2005 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2006 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2007 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2008 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2009 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2010 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2011 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2012 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2013 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2014 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2015 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
di

2016 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2017 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2018 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2019 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2020 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2021 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2022 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2023 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
a te

2024 1 DL1+1.0
N/a LL1+1 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2025 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2026 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2027 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2028 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2029 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2030 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2031 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2032 1 DL1+0.7
N/a LL1+1 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2033 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
FOUNDATION FOR PEDESTAL (P17)-(Pilecap Design)

Ed
LOAD CASE: 1068 1.1481068
DL1+1.5
1.148
LL1+1.5
DL1+1.05
WL4+1.5
LL1+1.5
EQUIP1+-0.9
WL4+1.05 EQUIP1+-0.9
TEMP1+1.35 TEMP1+1.35
MR1 MR1

GENERAL PILECAP DIMENSIONS, POSITION


Concrete Density 2.5 ton/m3 Pilecap thickness 1.300 m
Soil Density 2 ton/m3 Z cordinate of center of the pilecap -12.000 m
Grade of Concrete (Cylinder) C 30 X cordinate of center of the pilecap 26.750 m
Grade of Steel Fe 500 Length along axis Z, L z 3.540 m
Level of Base of pilecap -5.1 m Length along axis X, L x 3.540 m
m2

F
Finished Ground level -0.6 m Area of base of pilecap, A 12.53
Level of max water table -0.6 m

PD
PEDESTAL (COLUMN) DIMENSIONS, POSITIONS & LOADS
C.G. of Pedestal Ped top P + W ped
Pedestal ID Lz-z (m) Lx-x (m) P (T) Hz (T) Mx (T-m) Hx (T) Mz (T-m)
Z X [Level of (T)
P17 1.250 1.250 -12.000 26.750 -5.100 388.58 -1.18 -22.64 -12.39 -123.70 388.58

PILE DETAILS
Number of Piles 4 CGz of Pile group -12 m
Diameter of Piles 760 mm CGx of Pile group 26.75 m
2
Compressive capacity of piles 192 T SUM[(Xi-Xcg)2] of Pile group 5.198 m
2
Tensile capacity of piles 40 T SUM[(Zi-Zcg)2] of Pile group 5.198 m
Shear capacity of piles 11.5 T
te r
Weight of soil, W soil 76.13 T
Weight of footing, W f ooting 11.00 T
Axial load due to [P+ W ped] 388.58 T
Total axial Load 475.70 T

Mz due to [Mz+(P+W ped)*ex ] -123.70 Ton-m Mx due to [Mx+(P+W ped)*ez] -22.64 Ton-m
as

Eccentricity between Pilecap and Pile group 0.00 mm Eccentricity between Pilecap and Pile group 0.00 mm
Mz due to pilecap and pile group eccentricity 0.00 Ton-m Mx due to pilecap and pile group eccentricity 0.00 Ton-m
Total Mz -123.70 Ton-m Total Mx -22.64 Ton-m

Distance Distance P due to


from pile from pile Axial P due to P due to
nM

Pile ID CGx CGz group CGx group CGz Load (T) Mx (T) Mz (T) Total P (T) Shear (T)
PCG-5-1 25.61 -13.14 -1.14 -1.14 118.93 4.96 27.13 151.02 3.11
PCG-5-2 25.61 -10.86 -1.14 1.14 118.93 -4.96 27.13 141.09 3.11
PCG-5-3 27.89 -13.14 1.14 -1.14 118.93 4.96 -27.13 96.76 3.11
PCG-5-4 27.89 -10.86 1.14 1.14 118.93 -4.96 -27.13 86.83 3.11

Load factor for Limit State design 1 Along Axis -----> Z-Z X-X
Ultimate sagging(+)
di

Moment,Mup(Tm/width) 31.39 37.82


Along Axis -----> Z-Z X-X Effective Depth (for + M), d (m) 1.17 1.17
Ultimate Shear force (In sagging zone)(T/width) 24.60 29.70 Mup/bd2 (N/mm2) 0.23 0.28
Nominal shear stress (N/mm 2) 0.21 0.25 Tensile steel required at bottom (%) 0.05 0.06
Max allowable shear stress (N/mm 2) 0.32 0.32 Provide bars of dia (mm) 20 20
Ultimate Shear force (In hogging zone)(T) 6.21 6.67 at c/c distance (mm) 150 150
Nominal shear stress (N/mm 2) 0.05 0.06 Tensile steel provided at bottom (%) 0.18 0.18
a te

Max allowable shear stress (N/mm 2) 0.32 0.32 Ultimate hogging(-)


Stirrup Diameter (mm) 12 Moment,Mun(Tm/meter width) 0.00 0.00
Stirrup spacing (N/mm 2) 150 150 Mun/bd2 (N/mm2) 0.00 0.00
Stress in stirrup (N/mm 2) 18.60 22.45 Tensile steel required at top (%) 0.00 0.00
Total Stirrup stress (N/mm 2) 41.05 Provide bars of dia (mm) 20 20
Permissible Stirrup stress (N/mm 2) 434.78 at c/c distance (mm) 150 150
Tensile steel provided at top (%) 0.18 0.18
Effective Depth (for - M), d (m) 1.170 1.170
re

P UNC H I NG S H EAR FO R P EDES TALS


Pedestal ID Ultimate Design Area for resisting Punching Shear Allowable punching
P17 87.13 Ton 11.33 m2 0.08 N/mm2 1.37 N/mm2
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
F AC TOR OF SAF ETY F OR ALL LOAD C ASES ( Per mis s ible/ Ac tual)

Pile Reaction ALONG Z-Z ALONG X-X


Compressi pt at Shear pt at Shear

Ed
Load case pt at top pt at top Punching
on Tension Shear bottom stress bottom stress
500 1 DL1+1N/a
LL1+1 EQUIP1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
501 1 DL1+1N/a
LL1+1 EQUIP1+1
N/a TEMP1
N/a N/A N/A N/A N/A N/A N/A N/A
502 1 DL1+1N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
503 1 DL1+1N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
504 1 DL1+1N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A
505 1 DL1+1N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
506 1 DL1+1N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
507 1 DL1+1N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
508 1 DL1+1N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A

F
509 1 DL1+1N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
510 1 DL1+0.7
N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
511 1 DL1+0.7
N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
512 1 DL1+0.7
N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A

PD
513 1 DL1+0.7
N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
514 1 DL1+0.7
N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
515 1 DL1+0.7
N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
516 1 DL1+0.7
N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A
517 1 DL1+0.7
N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
518 1 DL1+ 1LL1+0.75
N/a WL1+1
N/a EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
519 1 DL1+1.0
N/a
LL1+0.75 N/a
WL2+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
520 1 DL1+1.0
N/a
LL1+0.75 N/a
WL3+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
521 1 DL1+1.0
N/a
LL1+0.75 N/a
WL4+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
522 1 DL1+1.0
N/a
LL1+0.75 N/a
WL5+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
523 1 DL1+1.0
N/a
LL1+0.75 N/a
WL6+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
te r
524 1 DL1+1.0
N/a
LL1+0.75 N/a
WL7+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
525 1 DL1+1.0
N/a
LL1+0.75 N/a
WL8+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
526 1 DL1+1.0
N/a
LL1+1 EQUIP1+0.525
N/a N/a
SL1 N/A N/A N/A N/A N/A N/A N/A
527 1 DL1+1.0
N/a
LL1+1 EQUIP1+0.525
N/a N/a
SL2 N/A N/A N/A N/A N/A N/A N/A
528 0.6 DL1+1
N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
529 0.6 DL1+1
N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
530 0.6 DL1+1
N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A
531 0.6 DL1+1
N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
as

532 0.6 DL1+1


N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
533 0.6 DL1+1
N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
534 0.6 DL1+1
N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A
535 0.6 DL1+1
N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
536 0.6 DL1+0.7
N/a SL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
537 0.6 DL1+0.7
N/a SL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
1001 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1 3.83 N/A 13.21 3.81 N/A 13.21 17.80
nM

1002 1.35 DL1+1.5


N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1 3.82 N/A 13.48 3.98 N/A 13.48 17.80
1003 1.35 DL1+1.5
N/a WL1+0.9
N/a TEMP1 N/a 12.20 N/A 27.56 5.81 N/A 27.56 17.80
1004 1.35 DL1+1.5
N/a WL2+0.9
N/a TEMP1 N/a 11.71 N/A 26.90 5.72 N/A 26.90 17.80
1005 1.35 DL1+1.5
N/a WL3+0.9
N/a TEMP1 N/a 5.78 N/A 16.97 4.24 N/A 16.97 17.80
1006 1.35 DL1+1.5
N/a WL4+0.9
N/a TEMP1 N/a 5.66 N/A 16.64 4.17 N/A 16.64 17.80
1007 1.35 DL1+1.5
N/a WL5+0.9
N/a TEMP1 N/a 6.88 N/A 25.95 8.03 N/A 25.95 17.80
1008 1.35 DL1+1.5
N/a WL6+0.9
N/a TEMP1 N/a 6.70 N/A 25.33 7.86 N/A 25.33 17.80
1009 1.35 DL1+1.5
N/a WL7+0.9
N/a TEMP1 N/a 6.66 N/A 24.03 7.14 N/A 24.03 17.80
1010 1.35 DL1+1.5
N/a WL8+0.9
N/a TEMP1 N/a 6.51 N/A 23.52 7.00 N/A 23.52 17.80
1011 1.35 DL1+1.5
N/a WL1+-0.9
N/a TEMP1 N/a 12.12 N/A 28.77 6.21 N/A 28.77 17.80
1012 1.35 DL1+1.5
N/a WL2+-0.9
N/a TEMP1 N/a 11.64 N/A 28.05 6.10 N/A 28.05 17.80
di

1013 1.35 DL1+1.5


N/a WL3+-0.9
N/a TEMP1 N/a 5.69 N/A 16.26 4.00 N/A 16.26 17.80
1014 1.35 DL1+1.5
N/a WL4+-0.9
N/a TEMP1 N/a 5.57 N/A 15.96 3.93 N/A 15.96 17.80
1015 1.35 DL1+1.5
N/a WL5+-0.9
N/a TEMP1 N/a 6.74 N/A 26.48 8.65 N/A 26.48 17.80
1016 1.35 DL1+1.5
N/a WL6+-0.9
N/a TEMP1 N/a 6.57 N/A 25.65 8.32 N/A 25.65 17.80
1017 1.35 DL1+1.5
N/a WL7+-0.9
N/a TEMP1 N/a 6.64 N/A 24.94 7.74 N/A 24.94 17.80
1018 1.35 DL1+1.5
N/a WL8+-0.9
N/a TEMP1 N/a 6.49 N/A 24.40 7.59 N/A 24.40 17.80
1019 1.35 DL1+0.9
N/a TEMP1+1.35
N/a MR1
N/a 7.86 N/A 26.00 7.07 N/A 26.00 17.80
a te

1020 1.35 DL1+-0.9


N/a TEMP1+1.35
N/a MR1
N/a 7.70 N/A 26.92 7.66 N/A 26.92 17.80
1021 1.35 DL1+1.5LL1+1.5
N/a N/aEQUIP1+0.9
N/a TEMP1+1.35 3.81
MR1N/A 13.15 3.80 N/A 13.15 17.80
1022 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35 3.80
MR1N/A 13.42 3.96 N/A 13.42 17.80
1023 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1+1.35 4.07
MR1N/A 14.08 4.07 N/A 14.08 17.80
1024 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.354.06
MR1
N/A 14.39 4.26 N/A 14.39 17.80
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
4.24 N/A MR1 13.35 3.54 N/A 13.35 17.80
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
4.20 N/A MR1 13.26 3.52 N/A 13.26 17.80
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
3.45 N/A MR1 11.65 3.31 N/A 11.65 17.80
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+0.9 TEMP1+1.35
4.24 N/A MR1 13.35 3.54 N/A 13.35 17.80
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+0.9 TEMP1+1.35
4.20 N/A MR1 13.26 3.52 N/A 13.26 17.80
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+0.9 TEMP1+1.35
3.45 N/A MR1 11.65 3.31 N/A 11.65 17.80
1028 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+0.9 TEMP1+1.35
3.43 N/A MR1 11.56 3.28 N/A 11.56 17.80
1029 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+0.9 TEMP1+1.35
4.16 N/A MR1 14.04 3.94 N/A 14.04 17.80

Ed
1030 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+0.9 TEMP1+1.35
4.12 N/A MR1 13.93 3.92 N/A 13.93 17.80
1031 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+0.9 TEMP1+1.35
3.61 N/A MR1 12.80 3.80 N/A 12.80 17.80
1032 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+0.9 TEMP1+1.35
3.58 N/A MR1 12.72 3.78 N/A 12.72 17.80
1033 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
4.23 N/A MR1 13.63 3.68 N/A 13.63 17.80
1034 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
4.20 N/A MR1 13.53 3.66 N/A 13.53 17.80
1035 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
3.45 N/A MR1 11.36 3.16 N/A 11.36 17.80
1036 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
3.42 N/A MR1 11.27 3.13 N/A 11.27 17.80
1037 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
4.11 N/A MR1 14.27 4.12 N/A 14.27 17.80
1038 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
4.07 N/A MR1 14.16 4.09 N/A 14.16 17.80
1039 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
3.60 N/A MR1 13.06 3.97 N/A 13.06 17.80
1040 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
3.58 N/A MR1 12.97 3.94 N/A 12.97 17.80
1041 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.56 N/A MR1 14.31 3.78 N/A 14.31 17.80

F
1042 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.52 N/A MR1 14.20 3.76 N/A 14.20 17.80
1043 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+0.9 TEMP1+1.35
3.66 N/A MR1 12.32 3.49 N/A 12.32 17.80
1044 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+0.9 TEMP1+1.35
3.64 N/A MR1 12.22 3.45 N/A 12.22 17.80
1045 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.47 N/A MR1 15.11 4.24 N/A 15.11 17.80
1046 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.42 N/A MR1 14.98 4.21 N/A 14.98 17.80

PD
1047 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+0.9 TEMP1+1.35
3.84 N/A MR1 13.68 4.08 N/A 13.68 17.80
1048 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+0.9 TEMP1+1.35
3.81 N/A MR1 13.58 4.05 N/A 13.58 17.80
1049 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.55 N/A MR1 14.63 3.94 N/A 14.63 17.80
1050 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.51 N/A MR1 14.51 3.92 N/A 14.51 17.80
1051 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
3.66 N/A MR1 11.99 3.32 N/A 11.99 17.80
1052 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
3.63 N/A MR1 11.90 3.29 N/A 11.90 17.80
1053 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.41 N/A MR1 15.38 4.45 N/A 15.38 17.80
1054 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.37 N/A MR1 15.25 4.42 N/A 15.25 17.80
1055 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
3.83 N/A MR1 13.97 4.27 N/A 13.97 17.80
1056 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
3.80 N/A MR1 13.87 4.24 N/A 13.87 17.80
1057 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.96 N/A MR1 14.46 3.61 N/A 14.46 17.80
1058 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.88 N/A MR1 14.28 3.57 N/A 14.28 17.80
1059 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+0.9 TEMP1+1.35
3.44 N/A MR1 10.98 2.97 N/A 10.98 17.80
1060 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+0.9 TEMP1+1.35
3.40 N/A MR1 10.84 2.93 N/A 10.84 17.80
te r
1061 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.32 N/A MR1 15.06 4.36 N/A 15.06 17.80
1062 1.148 DL1+1.5
N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.25 N/A MR1 14.85 4.31 N/A 14.85 17.80
1063 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+0.9 TEMP1+1.35
3.70 N/A MR1 13.43 4.08 N/A 13.43 17.80
1064 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+0.9 TEMP1+1.35
3.66 N/A MR1 13.27 4.04 N/A 13.27 17.80
1065 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.95 N/A MR1 14.79 3.76 N/A 14.79 17.80
1066 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.87 N/A MR1 14.60 3.72 N/A 14.60 17.80
1067 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
3.43 N/A MR1 10.72 2.85 N/A 10.72 17.80
1068 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
3.39 N/A MR1 10.59 2.81 N/A 10.59 17.80
1069 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.27 N/A MR1 15.33 4.58 N/A 15.33 17.80
as

1070 1.148 DL1+1.5


N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.20 N/A MR1 15.08 4.52 N/A 15.08 17.80
1071 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
3.70 N/A MR1 13.71 4.27 N/A 13.71 17.80
1072 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
3.65 N/A MR1 13.54 4.22 N/A 13.54 17.80
1073 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a 4.97 N/A 14.84 3.76 N/A 14.84 17.80
1074 1 DL1+0.8
N/a LL1+1 SL2
N/a N/a 5.95 N/A 20.16 5.66 N/A 20.16 17.80
1075 1 DL1+0.8
N/a LL1+-1 SL1
N/a N/a 7.90 N/A 23.09 5.72 N/A 23.09 17.80
1076 1 DL1+0.8
N/a LL1+-1 SL2
N/a N/a 6.12 N/A 21.62 6.28 N/A 21.62 17.80
2001 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+15.86
MR1N/A 18.61 4.94 N/A 18.61 17.80
nM

2002 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+15.81
MR1N/A 18.49 4.92 N/A 18.49 17.80
2003 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+14.85
MR1N/A 16.43 4.67 N/A 16.43 17.80
2004 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+14.81
MR1N/A 16.31 4.63 N/A 16.31 17.80
2005 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+15.75
MR1N/A 19.50 5.46 N/A 19.50 17.80
2006 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+15.70
MR1N/A 19.36 5.43 N/A 19.36 17.80
2007 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+15.05
MR1N/A 17.90 5.28 N/A 17.90 17.80
2008 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+15.01
MR1N/A 17.79 5.25 N/A 17.79 17.80
2009 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1 5.85
MR1N/A 18.97 5.13 N/A 18.97 17.80
2010 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1 5.80
MR1N/A 18.84 5.10 N/A 18.84 17.80
2011 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1 4.84
MR1N/A 16.04 4.46 N/A 16.04 17.80
2012 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1 4.81
MR1N/A 15.93 4.43 N/A 15.93 17.80
2013 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1 5.69
MR1N/A 19.81 5.68 N/A 19.81 17.80
2014 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1 5.64
MR1N/A 19.66 5.65 N/A 19.66 17.80
2015 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1 5.04
MR1N/A 18.23 5.49 N/A 18.23 17.80
di

2016 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1 5.01
MR1N/A 18.12 5.46 N/A 18.12 17.80
2017 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+16.29
MR1N/A 18.79 4.74 N/A 18.79 17.80
2018 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+16.20
MR1N/A 18.58 4.70 N/A 18.58 17.80
2019 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+14.58
MR1N/A 14.82 4.04 N/A 14.82 17.80
2020 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+14.53
MR1N/A 14.66 3.99 N/A 14.66 17.80
2021 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+15.59
MR1N/A 19.46 5.59 N/A 19.46 17.80
2022 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+15.51
MR1N/A 19.22 5.53 N/A 19.22 17.80
2023 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+14.89
MR1N/A 17.61 5.28 N/A 17.61 17.80
a te

2024 1 DL1+1.0
N/a LL1+1 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+14.84
MR1N/A 17.43 5.23 N/A 17.43 17.80
2025 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1 6.28
MR1N/A 19.15 4.91 N/A 19.15 17.80
2026 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1 6.19
MR1N/A 18.94 4.87 N/A 18.94 17.80
2027 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1 4.57
MR1N/A 14.50 3.89 N/A 14.50 17.80
2028 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1 4.53
MR1N/A 14.35 3.84 N/A 14.35 17.80
2029 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1 5.53
MR1N/A 19.76 5.82 N/A 19.76 17.80
2030 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1 5.45
MR1N/A 19.52 5.76 N/A 19.52 17.80
2031 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1 4.88
MR1N/A 17.93 5.49 N/A 17.93 17.80
2032 1 DL1+0.7
N/a LL1+1 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1 4.83
MR1N/A 17.74 5.44 N/A 17.74 17.80
2033 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a 4.97 N/A 14.84 3.76 N/A 14.84 17.80
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
FOUNDATION FOR PEDESTAL (P16)-(Pile Capacity Check)

Ed
LOAD CASE: 526 1 DL1+1.0
526 LL1+1
1 DL1+0.75
EQUIP1+0.525
LL1+1 EQUIP1+0.525
SL1 SL1

GENERAL PILECAP DIMENSIONS, POSITION


Concrete Density 2.5 ton/m3 Pilecap thickness 1.400 m
Soil Density 2 ton/m3 Z cordinate of center of the pilecap -21.000 m
Grade of Concrete (Cylinder) C 30 X cordinate of center of the pilecap 26.750 m
Grade of Steel Fe 500 Length along axis Z, L z 5.820 m
Level of Base of pilecap -5.1 m Length along axis X, L x 5.820 m

F
Finished Ground level -0.6 m Area of base of pilecap, A 33.87 m2
Level of max water table -0.6 m

PD
PEDESTAL (COLUMN) DIMENSIONS, POSITIONS & LOADS
C.G. of Pedestal Ped top P + W ped
Pedestal ID Lz-z (m) Lx-x (m) P (T) Hz (T) Mx (T-m) Hx (T) Mz (T-m)
Z X [Level of (T)
P16 1.600 1.600 -21.000 26.750 -5.100 1057.72 -11.20 -49.31 -46.60 212.64 1057.72

PILE DETAILS
Number of Piles 9 CGz of Pile group -21 m
Diameter of Piles 760 mm CGx of Pile group 26.75 m
2
Compressive capacity of piles 192 T SUM[(Xi-Xcg)2] of Pile group 31.190 m
2
SUM[(Zi-Zcg)2] of Pile group
te r
Tensile capacity of piles 40 T 31.190 m
Shear capacity of piles 11.5 T

Weight of soil, W soil 152.43 T


Weight of footing, W f ooting 23.71 T
Axial load due to [P+ W ped] 1057.72 T
Total axial Load 1233.86 T
as

Mz due to [Mz+(P+W ped)*ex ] 212.64 Ton-m Mx due to [Mx+(P+W ped)*ez] -49.31 Ton-m
Eccentricity between Pilecap and Pile group 0.00 mm Eccentricity between Pilecap and Pile group 0.00 mm
Mz due to pilecap and pile group eccentricity 0.00 Ton-m Mx due to pilecap and pile group eccentricity 0.00 Ton-m
Total Mz 212.64 Ton-m Total Mx -49.31 Ton-m
nM

Distance Distance P due to


from pile from pile Axial P due to P due to
Pile ID CGx CGz group CGx group CGz Load (T) Mx (T) Mz (T) Total P (T) Shear (T)
PCG-6-1 24.47 -23.28 -2.28 -2.28 137.10 3.60 -15.54 125.16 5.33
PCG-6-2 24.47 -21.00 -2.28 0.00 137.10 0.00 -15.54 121.55 5.33
PCG-6-3 24.47 -18.72 -2.28 2.28 137.10 -3.60 -15.54 117.95 5.33
PCG-6-4 26.75 -23.28 0.00 -2.28 137.10 3.60 0.00 140.70 5.33
PCG-6-5 26.75 -21.00 0.00 0.00 137.10 0.00 0.00 137.10 5.33
PCG-6-6 26.75 -18.72 0.00 2.28 137.10 -3.60 0.00 133.49 5.33
di

PCG-6-7 29.03 -23.28 2.28 -2.28 137.10 3.60 15.54 156.24 5.33
PCG-6-8 29.03 -21.00 2.28 0.00 137.10 0.00 15.54 152.64 5.33
PCG-6-9 29.03 -18.72 2.28 2.28 137.10 -3.60 15.54 149.04 5.33
a te
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
F AC TOR OF SAF ETY F OR ALL LOAD C ASES ( Per mis s ible/ Ac tual)

Pile Reaction ALONG Z-Z ALONG X-X


Compressi pt at Shear pt at Shear

Ed
Load case pt at top pt at top Punching
on Tension Shear bottom stress bottom stress
500 1 DL1+1 LL1+11.41
EQUIP1
N/a 10.75 N/A N/A N/A N/A N/A N/A N/A
501 1 DL1+1 LL1+11.37
EQUIP1+1
N/a TEMP1 4.43 N/A N/A N/A N/A N/A N/A N/A
502 1 DL1+1 WL1 2.86 N/a 2.45 N/A N/A N/A N/A N/A N/A N/A
503 1 DL1+1 WL2 2.84 N/a 2.49 N/A N/A N/A N/A N/A N/A N/A
504 1 DL1+1 WL3 2.59 N/a 2.64 N/A N/A N/A N/A N/A N/A N/A
505 1 DL1+1 WL4 2.56 N/a 2.64 N/A N/A N/A N/A N/A N/A N/A
506 1 DL1+1 WL5 3.45 N/a 5.30 N/A N/A N/A N/A N/A N/A N/A
507 1 DL1+1 WL6 3.33 N/a 4.91 N/A N/A N/A N/A N/A N/A N/A
508 1 DL1+1 WL7 2.82 N/a 4.88 N/A N/A N/A N/A N/A N/A N/A

F
509 1 DL1+1 WL8 2.78 N/a 5.32 N/A N/A N/A N/A N/A N/A N/A
510 1 DL1+0.7 WL12.98 N/a 3.43 N/A N/A N/A N/A N/A N/A N/A
511 1 DL1+0.7 WL22.96 N/a 3.49 N/A N/A N/A N/A N/A N/A N/A
512 1 DL1+0.7 WL32.76 N/a 3.85 N/A N/A N/A N/A N/A N/A N/A

PD
513 1 DL1+0.7 WL42.74 N/a 3.85 N/A N/A N/A N/A N/A N/A N/A
514 1 DL1+0.7 WL53.41 N/a 7.55 N/A N/A N/A N/A N/A N/A N/A
515 1 DL1+0.7 WL63.33 N/a 7.01 N/A N/A N/A N/A N/A N/A N/A
516 1 DL1+0.7 WL72.94 N/a 6.89 N/A N/A N/A N/A N/A N/A N/A
517 1 DL1+0.7 WL82.91 N/a 7.50 N/A N/A N/A N/A N/A N/A N/A
518 1 DL1+ 1LL1+0.75
1.36WL1+1
N/a EQUIP1 3.03 N/A N/A N/A N/A N/A N/A N/A
519 1 DL1+1.0 LL1+0.75
1.36 N/a
WL2+1 EQUIP1 3.11 N/A N/A N/A N/A N/A N/A N/A
520 1 DL1+1.0 LL1+0.75
1.30 N/a
WL3+1 EQUIP1 3.21 N/A N/A N/A N/A N/A N/A N/A
521 1 DL1+1.0 LL1+0.75
1.29 N/a
WL4+1 EQUIP1 3.25 N/A N/A N/A N/A N/A N/A N/A
522 1 DL1+1.0 LL1+0.75
1.51 N/a
WL5+1 EQUIP1 16.53 N/A N/A N/A N/A N/A N/A N/A
523 1 DL1+1.0 LL1+0.75
1.49 N/a
WL6+1 EQUIP1 14.52 N/A N/A N/A N/A N/A N/A N/A
te r
524 1 DL1+1.0 LL1+0.75
1.34 N/a
WL7+1 EQUIP1 4.13 N/A N/A N/A N/A N/A N/A N/A
525 1 DL1+1.0 LL1+0.75
1.34 N/a
WL8+1 EQUIP1 4.35 N/A N/A N/A N/A N/A N/A N/A
526 1 DL1+1.0 LL1+11.23
EQUIP1+0.525
N/a SL1 2.16 N/A N/A N/A N/A N/A N/A N/A
527 1 DL1+1.0 LL1+11.39
EQUIP1+0.525
N/a SL2 8.15 N/A N/A N/A N/A N/A N/A N/A
528 0.6 DL1+1 WL13.72 N/a 2.49 N/A N/A N/A N/A N/A N/A N/A
529 0.6 DL1+1 WL23.68 N/a 2.53 N/A N/A N/A N/A N/A N/A N/A
530 0.6 DL1+1 WL33.29 N/a 2.60 N/A N/A N/A N/A N/A N/A N/A
531 0.6 DL1+1 WL43.24 N/a 2.59 N/A N/A N/A N/A N/A N/A N/A
as

532 0.6 DL1+1 WL54.77 N/a 5.30 N/A N/A N/A N/A N/A N/A N/A
533 0.6 DL1+1 WL64.54 N/a 4.91 N/A N/A N/A N/A N/A N/A N/A
534 0.6 DL1+1 WL73.67 N/a 4.93 N/A N/A N/A N/A N/A N/A N/A
535 0.6 DL1+1 WL83.61 N/a 5.37 N/A N/A N/A N/A N/A N/A N/A
536 0.6 DL1+0.7 SL12.67 N/a 1.65 N/A N/A N/A N/A N/A N/A N/A
537 0.6 DL1+0.7 SL24.02 N/a 17.13 N/A N/A N/A N/A N/A N/A N/A
1001 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1 N/A N/A N/A N/A N/A N/A N/A
nM

1002 1.35 DL1+1.5


N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1N/A N/A N/A N/A N/A N/A N/A
1003 1.35 DL1+1.5
N/a WL1+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1004 1.35 DL1+1.5
N/a WL2+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1005 1.35 DL1+1.5
N/a WL3+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1006 1.35 DL1+1.5
N/a WL4+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1007 1.35 DL1+1.5
N/a WL5+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1008 1.35 DL1+1.5
N/a WL6+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1009 1.35 DL1+1.5
N/a WL7+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1010 1.35 DL1+1.5
N/a WL8+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1011 1.35 DL1+1.5
N/a WL1+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1012 1.35 DL1+1.5
N/a WL2+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
di

1013 1.35 DL1+1.5


N/a WL3+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1014 1.35 DL1+1.5
N/a WL4+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1015 1.35 DL1+1.5
N/a WL5+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1016 1.35 DL1+1.5
N/a WL6+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1017 1.35 DL1+1.5
N/a WL7+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1018 1.35 DL1+1.5
N/a WL8+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1019 1.35 DL1+0.9
N/a TEMP1+1.35
N/a MR1
N/a N/A N/A N/A N/A N/A N/A N/A
a te

1020 1.35 DL1+-0.9


N/a TEMP1+1.35
N/a MR1
N/a N/A N/A N/A N/A N/A N/A N/A
1021 1.35 DL1+1.5LL1+1.5
N/a N/aEQUIP1+0.9
N/a TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A N/A
1022 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1023 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1024 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1028 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1029 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

Ed
1030 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1031 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1032 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1033 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1034 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1035 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1036 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1037 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1038 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1039 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1040 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1041 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

F
1042 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1043 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1044 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1045 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1046 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

PD
1047 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1048 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1049 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1050 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1051 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1052 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1053 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1054 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1055 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1056 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1057 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1058 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1059 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1060 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
te r
1061 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1062 1.148 DL1+1.5
N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1063 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1064 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1065 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1066 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1067 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1068 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1069 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
as

1070 1.148 DL1+1.5


N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1071 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1072 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1073 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1074 1 DL1+0.8
N/a LL1+1 SL2
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1075 1 DL1+0.8
N/a LL1+-1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1076 1 DL1+0.8
N/a LL1+-1 SL2
N/a N/a N/A N/A N/A N/A N/A N/A N/A
2001 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
nM

2002 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2003 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2004 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2005 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2006 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2007 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2008 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2009 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2010 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2011 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2012 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2013 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2014 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2015 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
di

2016 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2017 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2018 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2019 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2020 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2021 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2022 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2023 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
a te

2024 1 DL1+1.0
N/a LL1+1 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2025 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2026 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2027 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2028 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2029 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2030 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2031 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2032 1 DL1+0.7
N/a LL1+1 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2033 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
FOUNDATION FOR PEDESTAL (P16)-(Pilecap Design)

Ed
LOAD CASE: 1032 1.35 DL1+1.5
1032 1.35
LL1+0.9
DL1+1.05
WL8+1.5
LL1+0.9
EQUIP1+0.9
WL8+1.05 TEMP1+1.35
EQUIP1+0.9 TEMP1+1.35
MR1 MR1

GENERAL PILECAP DIMENSIONS, POSITION


Concrete Density 2.5 ton/m3 Pilecap thickness 1.400 m
Soil Density 2 ton/m3 Z cordinate of center of the pilecap -21.000 m
Grade of Concrete (Cylinder) C 30 X cordinate of center of the pilecap 26.750 m
Grade of Steel Fe 500 Length along axis Z, L z 5.820 m
Level of Base of pilecap -5.1 m Length along axis X, L x 5.820 m
Finished Ground level -0.6 m Area of base of pilecap, A 33.87 m2

F
Level of max water table -0.6 m

PEDESTAL (COLUMN) DIMENSIONS, POSITIONS & LOADS

PD
C.G. of Pedestal Ped top P + W ped
Pedestal ID Lz-z (m) Lx-x (m) P (T) Hz (T) Mx (T-m) Hx (T) Mz (T-m)
Z X [Level of (T)
P16 1.600 1.600 -21.000 26.750 -5.100 1499.95 -43.09 -200.50 4.40 -3.69 1499.95

PILE DETAILS
Number of Piles 9 CGz of Pile group -21 m
Diameter of Piles 760 mm CGx of Pile group 26.75 m
2
Compressive capacity of piles 192 T SUM[(Xi-Xcg)2] of Pile group 31.190 m
2
Tensile capacity of piles 40 T SUM[(Zi-Zcg)2] of Pile group 31.190 m
Shear capacity of piles 11.5 T
te r
Weight of soil, W soil 205.77 T
Weight of footing, W f ooting 32.01 T
Axial load due to [P+ W ped] 1499.95 T
Total axial Load 1737.74 T

Mz due to [Mz+(P+W ped)*ex ] -3.69 Ton-m Mx due to [Mx+(P+W ped)*ez] -200.50 Ton-m
Eccentricity between Pilecap and Pile group 0.00 mm Eccentricity between Pilecap and Pile group 0.00 mm
Mz due to pilecap and pile group eccentricity 0.00 Ton-m Mx due to pilecap and pile group eccentricity 0.00 Ton-m
as

Total Mz -3.69 Ton-m Total Mx -200.50 Ton-m

Distance Distance P due to


from pile from pile Axial P due to P due to
Pile ID CGx CGz group CGx group CGz Load (T) Mx (T) Mz (T) Total P (T) Shear (T)
PCG-6-1 24.47 -23.28 -2.28 -2.28 193.08 14.66 0.27 208.01 4.81
nM

PCG-6-2 24.47 -21.00 -2.28 0.00 193.08 0.00 0.27 193.35 4.81
PCG-6-3 24.47 -18.72 -2.28 2.28 193.08 -14.66 0.27 178.70 4.81
PCG-6-4 26.75 -23.28 0.00 -2.28 193.08 14.66 0.00 207.74 4.81
PCG-6-5 26.75 -21.00 0.00 0.00 193.08 0.00 0.00 193.08 4.81
PCG-6-6 26.75 -18.72 0.00 2.28 193.08 -14.66 0.00 178.43 4.81
PCG-6-7 29.03 -23.28 2.28 -2.28 193.08 14.66 -0.27 207.47 4.81
PCG-6-8 29.03 -21.00 2.28 0.00 193.08 0.00 -0.27 192.81 4.81
PCG-6-9 29.03 -18.72 2.28 2.28 193.08 -14.66 -0.27 178.16 4.81

Load factor for Limit State design 1 Along Axis -----> Z-Z X-X
di

Ultimate sagging(+)
Moment,Mup(Tm/width) 143.10 132.10
Along Axis -----> Z-Z X-X Effective Depth (for + M), d (m) 1.2625 1.2625
Ultimate Shear force (In sagging zone)(T/width) 99.97 92.56 Mup/bd2 (N/mm2) 0.90 0.83
Nominal shear stress (N/mm 2) 0.79 0.73 Tensile steel required at bottom (%) 0.21 0.20
Max allowable shear stress (N/mm 2) 0.33 0.33 Provide bars of dia (mm) 25 25
Ultimate Shear force (In hogging zone)(T) 7.63 6.95 at c/c distance (mm) 150 150
a te

Nominal shear stress (N/mm 2) 0.06 0.06 Tensile steel provided at bottom (%) 0.26 0.26
Max allowable shear stress (N/mm 2) 0.33 0.33 Ultimate hogging(-)
Stirrup Diameter (mm) 12 Moment,Mun(Tm/meter width) 0.00 0.00
Stirrup spacing (N/mm 2) 150 150 Mun/bd2 (N/mm2) 0.00 0.00
Stress in stirrup (N/mm 2) 70.05 64.85 Tensile steel required at top (%) 0.00 0.00
Total Stirrup stress (N/mm 2) 134.90 Provide bars of dia (mm) 25 25
Permissible Stirrup stress (N/mm 2) 434.78 at c/c distance (mm) 150 150
Tensile steel provided at top (%) 0.26 0.26
Effective Depth (for - M), d (m) 1.262 1.262
re

P U N C H I N G S H EAR FO R P EDES TALS


Pedestal ID Ultimate Design Area for resisting Punching Shear Allowable punching
P16 1306.87 Ton 14.46 m2 0.90 N/mm2 1.37 N/mm2
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
F AC TOR OF SAF ETY F OR ALL LOAD C ASES ( Per mis s ible/ Ac tual)

Pile Reaction ALONG Z-Z ALONG X-X


Compressi pt at Shear pt at Shear

Ed
Load case pt at top pt at top Punching
on Tension Shear bottom stress bottom stress
500 1 DL1+1N/a
LL1+1 EQUIP1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
501 1 DL1+1N/a
LL1+1 EQUIP1+1
N/a TEMP1
N/a N/A N/A N/A N/A N/A N/A N/A
502 1 DL1+1N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
503 1 DL1+1N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
504 1 DL1+1N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A
505 1 DL1+1N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
506 1 DL1+1N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
507 1 DL1+1N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
508 1 DL1+1N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A

F
509 1 DL1+1N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
510 1 DL1+0.7
N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
511 1 DL1+0.7
N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
512 1 DL1+0.7
N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A

PD
513 1 DL1+0.7
N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
514 1 DL1+0.7
N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
515 1 DL1+0.7
N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
516 1 DL1+0.7
N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A
517 1 DL1+0.7
N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
518 1 DL1+ 1LL1+0.75
N/a WL1+1
N/a EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
519 1 DL1+1.0
N/a
LL1+0.75 N/a
WL2+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
520 1 DL1+1.0
N/a
LL1+0.75 N/a
WL3+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
521 1 DL1+1.0
N/a
LL1+0.75 N/a
WL4+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
522 1 DL1+1.0
N/a
LL1+0.75 N/a
WL5+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
523 1 DL1+1.0
N/a
LL1+0.75 N/a
WL6+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
te r
524 1 DL1+1.0
N/a
LL1+0.75 N/a
WL7+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
525 1 DL1+1.0
N/a
LL1+0.75 N/a
WL8+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
526 1 DL1+1.0
N/a
LL1+1 EQUIP1+0.525
N/a N/a
SL1 N/A N/A N/A N/A N/A N/A N/A
527 1 DL1+1.0
N/a
LL1+1 EQUIP1+0.525
N/a N/a
SL2 N/A N/A N/A N/A N/A N/A N/A
528 0.6 DL1+1
N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
529 0.6 DL1+1
N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
530 0.6 DL1+1
N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A
531 0.6 DL1+1
N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
as

532 0.6 DL1+1


N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
533 0.6 DL1+1
N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
534 0.6 DL1+1
N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A
535 0.6 DL1+1
N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
536 0.6 DL1+0.7
N/a SL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
537 0.6 DL1+0.7
N/a SL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
1001 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1 1.30 N/A 3.35 1.36 N/A 3.35 1.55
nM

1002 1.35 DL1+1.5


N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1 1.35 N/A 3.38 1.33 N/A 3.38 1.54
1003 1.35 DL1+1.5
N/a WL1+0.9
N/a TEMP1 N/a 4.28 N/A 8.85 3.45 N/A 8.85 6.66
1004 1.35 DL1+1.5
N/a WL2+0.9
N/a TEMP1 N/a 4.20 N/A 8.65 3.35 N/A 8.65 6.28
1005 1.35 DL1+1.5
N/a WL3+0.9
N/a TEMP1 N/a 3.66 N/A 7.83 3.05 N/A 7.83 5.23
1006 1.35 DL1+1.5
N/a WL4+0.9
N/a TEMP1 N/a 3.60 N/A 7.66 2.96 N/A 7.66 5.00
1007 1.35 DL1+1.5
N/a WL5+0.9
N/a TEMP1 N/a 4.85 N/A 11.28 5.25 N/A 11.28 7.54
1008 1.35 DL1+1.5
N/a WL6+0.9
N/a TEMP1 N/a 4.54 N/A 10.76 5.03 N/A 10.76 7.08
1009 1.35 DL1+1.5
N/a WL7+0.9
N/a TEMP1 N/a 3.08 N/A 8.04 3.87 N/A 8.04 4.90
1010 1.35 DL1+1.5
N/a WL8+0.9
N/a TEMP1 N/a 3.04 N/A 7.88 3.75 N/A 7.88 4.69
1011 1.35 DL1+1.5
N/a WL1+-0.9
N/a TEMP1 N/a 4.91 N/A 9.47 3.55 N/A 9.47 6.50
1012 1.35 DL1+1.5
N/a WL2+-0.9
N/a TEMP1 N/a 4.69 N/A 9.15 3.45 N/A 9.15 6.15
di

1013 1.35 DL1+1.5


N/a WL3+-0.9
N/a TEMP1 N/a 4.05 N/A 7.94 2.90 N/A 7.94 5.13
1014 1.35 DL1+1.5
N/a WL4+-0.9
N/a TEMP1 N/a 3.83 N/A 7.66 2.82 N/A 7.66 4.91
1015 1.35 DL1+1.5
N/a WL5+-0.9
N/a TEMP1 N/a 4.11 N/A 10.60 5.45 N/A 10.60 7.35
1016 1.35 DL1+1.5
N/a WL6+-0.9
N/a TEMP1 N/a 3.88 N/A 10.10 5.16 N/A 10.10 6.90
1017 1.35 DL1+1.5
N/a WL7+-0.9
N/a TEMP1 N/a 3.40 N/A 8.31 3.73 N/A 8.31 4.81
1018 1.35 DL1+1.5
N/a WL8+-0.9
N/a TEMP1 N/a 3.34 N/A 8.11 3.59 N/A 8.11 4.61
1019 1.35 DL1+0.9
N/a TEMP1+1.35
N/a MR1
N/a 3.69 N/A 8.79 3.90 N/A 8.79 4.95
a te

1020 1.35 DL1+-0.9


N/a TEMP1+1.35
N/a MR1
N/a 3.69 N/A 8.65 3.77 N/A 8.65 4.87
1021 1.35 DL1+1.5LL1+1.5
N/a N/aEQUIP1+0.9
N/a TEMP1+1.35 1.29
MR1N/A 3.32 1.35 N/A 3.32 1.54
1022 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35 1.34
MR1N/A 3.35 1.32 N/A 3.35 1.53
1023 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1+1.35 1.35
MR1N/A 3.48 1.42 N/A 3.48 1.62
1024 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.351.41
MR1
N/A 3.51 1.39 N/A 3.51 1.61
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
1.32 N/A MR1 3.32 1.31 N/A 3.32 1.61
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
1.32 N/A MR1 3.30 1.31 N/A 3.30 1.59
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
1.28 N/A MR1 3.21 1.26 N/A 3.21 1.55
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+0.9 TEMP1+1.35
1.32 N/A MR1 3.32 1.31 N/A 3.32 1.61
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+0.9 TEMP1+1.35
1.32 N/A MR1 3.30 1.31 N/A 3.30 1.59
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+0.9 TEMP1+1.35
1.28 N/A MR1 3.21 1.26 N/A 3.21 1.55
1028 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+0.9 TEMP1+1.35
1.28 N/A MR1 3.19 1.25 N/A 3.19 1.53
1029 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+0.9 TEMP1+1.35
1.42 N/A MR1 3.57 1.43 N/A 3.57 1.63

Ed
1030 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+0.9 TEMP1+1.35
1.41 N/A MR1 3.55 1.42 N/A 3.55 1.62
1031 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+0.9 TEMP1+1.35
1.23 N/A MR1 3.24 1.34 N/A 3.24 1.53
1032 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+0.9 TEMP1+1.35
1.23 N/A MR1 3.22 1.33 N/A 3.22 1.51
1033 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
1.38 N/A MR1 3.40 1.33 N/A 3.40 1.60
1034 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
1.37 N/A MR1 3.38 1.32 N/A 3.38 1.58
1035 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
1.33 N/A MR1 3.24 1.24 N/A 3.24 1.54
1036 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
1.33 N/A MR1 3.22 1.23 N/A 3.22 1.52
1037 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
1.38 N/A MR1 3.50 1.41 N/A 3.50 1.62
1038 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
1.36 N/A MR1 3.46 1.40 N/A 3.46 1.61
1039 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
1.28 N/A MR1 3.27 1.31 N/A 3.27 1.52
1040 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
1.27 N/A MR1 3.25 1.30 N/A 3.25 1.51
1041 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.39 N/A MR1 3.47 1.38 N/A 3.47 1.69

F
1042 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.38 N/A MR1 3.45 1.37 N/A 3.45 1.68
1043 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.34 N/A MR1 3.35 1.32 N/A 3.35 1.63
1044 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.34 N/A MR1 3.33 1.31 N/A 3.33 1.61
1045 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.49 N/A MR1 3.74 1.50 N/A 3.74 1.72
1046 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.49 N/A MR1 3.72 1.49 N/A 3.72 1.71

PD
1047 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.29 N/A MR1 3.39 1.41 N/A 3.39 1.60
1048 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.28 N/A MR1 3.37 1.40 N/A 3.37 1.59
1049 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.45 N/A MR1 3.56 1.39 N/A 3.56 1.68
1050 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.44 N/A MR1 3.54 1.38 N/A 3.54 1.67
1051 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.40 N/A MR1 3.38 1.29 N/A 3.38 1.62
1052 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.39 N/A MR1 3.36 1.28 N/A 3.36 1.60
1053 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.45 N/A MR1 3.67 1.48 N/A 3.67 1.71
1054 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.43 N/A MR1 3.63 1.47 N/A 3.63 1.70
1055 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.34 N/A MR1 3.42 1.38 N/A 3.42 1.60
1056 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.33 N/A MR1 3.40 1.36 N/A 3.40 1.58
1057 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.41 N/A MR1 3.46 1.35 N/A 3.46 1.75
1058 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.40 N/A MR1 3.43 1.33 N/A 3.43 1.72
1059 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.34 N/A MR1 3.27 1.26 N/A 3.27 1.63
1060 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.33 N/A MR1 3.24 1.25 N/A 3.24 1.61
te r
1061 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.56 N/A MR1 3.88 1.56 N/A 3.88 1.80
1062 1.148 DL1+1.5
N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.52 N/A MR1 3.81 1.54 N/A 3.81 1.78
1063 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.25 N/A MR1 3.33 1.40 N/A 3.33 1.60
1064 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.24 N/A MR1 3.30 1.38 N/A 3.30 1.57
1065 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.48 N/A MR1 3.55 1.36 N/A 3.55 1.74
1066 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.47 N/A MR1 3.52 1.35 N/A 3.52 1.71
1067 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.39 N/A MR1 3.30 1.24 N/A 3.30 1.62
1068 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.38 N/A MR1 3.27 1.22 N/A 3.27 1.60
1069 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.47 N/A MR1 3.77 1.56 N/A 3.77 1.79
as

1070 1.148 DL1+1.5


N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.44 N/A MR1 3.71 1.53 N/A 3.71 1.76
1071 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.30 N/A MR1 3.36 1.37 N/A 3.36 1.59
1072 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.29 N/A MR1 3.32 1.35 N/A 3.32 1.57
1073 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a 2.03 N/A 4.45 1.62 N/A 4.45 2.39
1074 1 DL1+0.8
N/a LL1+1 SL2
N/a N/a 2.15 N/A 5.24 2.16 N/A 5.24 2.56
1075 1 DL1+0.8
N/a LL1+-1 SL1
N/a N/a 2.44 N/A 5.10 1.82 N/A 5.10 2.89
1076 1 DL1+0.8
N/a LL1+-1 SL2
N/a N/a 2.26 N/A 5.44 2.21 N/A 5.44 2.68
2001 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+11.90
MR1N/A 4.66 1.89 N/A 4.66 2.34
nM

2002 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+11.89
MR1N/A 4.64 1.88 N/A 4.64 2.32
2003 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+11.84
MR1N/A 4.52 1.82 N/A 4.52 2.26
2004 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+11.84
MR1N/A 4.50 1.81 N/A 4.50 2.24
2005 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+12.03
MR1N/A 4.99 2.05 N/A 4.99 2.38
2006 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+12.02
MR1N/A 4.96 2.03 N/A 4.96 2.36
2007 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+11.78
MR1N/A 4.56 1.93 N/A 4.56 2.23
2008 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+11.77
MR1N/A 4.54 1.91 N/A 4.54 2.21
2009 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.98
MR1N/A 4.77 1.91 N/A 4.77 2.33
2010 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.97
MR1N/A 4.75 1.90 N/A 4.75 2.31
2011 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.91
MR1N/A 4.55 1.78 N/A 4.55 2.25
2012 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.91
MR1N/A 4.53 1.77 N/A 4.53 2.23
2013 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.98
MR1N/A 4.90 2.02 N/A 4.90 2.37
2014 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.96
MR1N/A 4.85 2.00 N/A 4.85 2.35
2015 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.84
MR1N/A 4.60 1.89 N/A 4.60 2.22
di

2016 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.84
MR1N/A 4.57 1.87 N/A 4.57 2.20
2017 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+11.93
MR1N/A 4.65 1.85 N/A 4.65 2.41
2018 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+11.92
MR1N/A 4.62 1.83 N/A 4.62 2.38
2019 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+11.84
MR1N/A 4.42 1.75 N/A 4.42 2.27
2020 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+11.83
MR1N/A 4.39 1.73 N/A 4.39 2.24
2021 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+12.11
MR1N/A 5.15 2.12 N/A 5.15 2.49
2022 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+12.07
MR1N/A 5.08 2.10 N/A 5.08 2.45
2023 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+11.73
MR1N/A 4.49 1.92 N/A 4.49 2.22
a te

2024 1 DL1+1.0
N/a LL1+1 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+11.72
MR1N/A 4.45 1.89 N/A 4.45 2.19
2025 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1 2.01
MR1N/A 4.76 1.87 N/A 4.76 2.40
2026 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1 2.00
MR1N/A 4.72 1.85 N/A 4.72 2.37
2027 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.91
MR1N/A 4.46 1.71 N/A 4.46 2.25
2028 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.90
MR1N/A 4.42 1.69 N/A 4.42 2.22
2029 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1 2.01
MR1N/A 5.02 2.11 N/A 5.02 2.47
2030 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.97
MR1N/A 4.94 2.08 N/A 4.94 2.44
2031 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.79
MR1N/A 4.52 1.88 N/A 4.52 2.21
2032 1 DL1+0.7
N/a LL1+1 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.78
MR1N/A 4.48 1.85 N/A 4.48 2.18
2033 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a 2.03 N/A 4.45 1.62 N/A 4.45 2.39
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
FOUNDATION FOR PEDESTAL (P19) (P23) (P24) (P29) (P20) (P25) (P26) (P30)
(P21) (P27) (P22) (P28)-(Pile Capacity Check)

Ed
LOAD CASE: 534 0.6 DL1+1
534 W
0.6
L7DL1+1 W L7

G E N E RA L PI L E C A P DI ME N SI O N S, PO SI T I O N
Concrete Density 2.5 ton/m 3 Pile ca p thickne ss 2.100 m
Soil Density 2 ton/m 3 Z cordinate of center of the pilecap -10.338 m
Grade of Concrete (Cylinder) C 30 X cordinate of center of the pilecap 40.163 m
Grade of Steel Fe 500 Le ngth a long a x is Z, L z 24.060 m
Level of Base of pilecap -5.1 m Le ngth a long a x is X, L x 12.660 m
Finished Ground level -0.6 m Area of base of pilecap, A 304.60 m2
Level of max water table -0.6 m

PE DE ST A L ( C O L U MN ) DI ME N SI O N S, PO SI T I O N S & L O A DS
C.G. of Pedestal Ped top P + W ped
Pedestal ID Lz-z (m) Lx-x (m) P (T) Hz (T) Mx (T-m) Hx (T) Mz (T-m)

F
Z X [Level of (T)
P19 1.600 1.600 -21.000 35.500 -5.100 465.68 -126.76 -618.03 -1.40 -15.61 465.68
P23 1.250 1.250 -21.000 41.500 -5.100 417.95 -46.34 -206.59 -1.08 -1.85 417.95
P24 1.250 1.250 -15.800 41.500 -5.100 -31.57 -49.83 -220.38 3.83 24.14 -31.57
P29 1.250 1.250 -15.800 45.000 -5.100 84.16 -27.21 -131.59 5.64 26.44 84.16
P20 1.250 1.250 -12.000 35.500 -5.100 115.41 -48.06 -275.13 5.96 26.75 115.41
P25 1.250 1.250 -12.000 41.500 -5.100 95.12 -58.30 -210.15 5.83 35.78 95.12

PD
P26 1.250 1.250 -8.200 41.500 -5.100 119.25 -48.38 -210.58 17.09 73.22 119.25
P30 1.250 1.250 -8.200 45.000 -5.100 68.21 -26.60 -129.87 15.10 75.32 68.21
P21 1.600 1.600 -3.000 35.500 -5.100 1.71 -112.94 -530.68 5.09 15.88 1.71
P27 1.250 1.250 -3.000 41.500 -5.100 -137.98 -48.80 -196.75 0.94 5.81 -137.98
P22 1.250 1.250 0.500 35.500 -5.100 -216.68 -45.60 -192.70 -5.17 -24.04 -216.68
P28 1.250 1.250 0.500 41.500 -5.100 -399.58 -43.21 -183.94 -2.65 -21.32 -399.58

PI L E DE T A I L S
Number of Piles 66 CGz of Pile group -10.338 m
Diameter of Piles 760 mm CGx of Pile group 40.163 m
2
Compressive capacity of piles 192 T SUM[(Xi-Xc g)2] of Pile group 1000.692 m
2
Tensile capacity of piles 40 T SUM[(Zi-Zc g)2] of Pile group 3430.944 m
Shear capacity of piles 11.5 T

W eight of soil, W s oil 1370.70 T


W eight of footing, W f oot ing 319.83 T
Axial load due to [P+ W ped] 581.68 T
te r
Total axial Load 2272.21 T

Mz due to [Mz+(P+W ped)*ex ] -665.16 Ton-m Mx due to [Mx+(P+W ped)*ez] -20443.03 Ton-m
Eccentricity between Pilecap and Pile group 0.00 mm Eccentricity between Pilecap and Pile group 0.00 mm
Mz due to pilecap and pile group eccentricity 0.00 Ton-m Mx due to pilecap and pile group eccentricity 0.00 Ton-m
Total Mz -665.16 Ton-m Total Mx -20443.03 Ton-m

Distance Distance P due to


from pile from pile Axial P due to P due to
Pile ID CGx CGz group CGx group CGz Load (T) Mx (T) Mz (T) Total P (T) Shear (T)
PCG-8-1 34.46 -21.74 -5.70 -11.40 34.43 67.93 3.79 106.14 10.36
PCG-8-2 34.46 -19.46 -5.70 -9.12 34.43 54.34 3.79 92.56 10.36
as

PCG-8-3 34.46 -17.18 -5.70 -6.84 34.43 40.76 3.79 78.97 10.36
PCG-8-4 34.46 -14.90 -5.70 -4.56 34.43 27.17 3.79 65.39 10.36
PCG-8-5 34.46 -12.62 -5.70 -2.28 34.43 13.59 3.79 51.80 10.36
PCG-8-6 34.46 -10.34 -5.70 0.00 34.43 0.00 3.79 38.22 10.36
PCG-8-7 34.46 -8.06 -5.70 2.28 34.43 -13.59 3.79 24.63 10.36
PCG-8-8 34.46 -5.78 -5.70 4.56 34.43 -27.17 3.79 11.05 10.36
PCG-8-9 34.46 -3.50 -5.70 6.84 34.43 -40.76 3.79 -2.54 10.36
PCG-8-10 34.46 -1.22 -5.70 9.12 34.43 -54.34 3.79 -16.12 10.36
PCG-8-11 34.46 1.06 -5.70 11.40 34.43 -67.93 3.79 -29.71 10.36
PCG-8-12 36.74 -21.74 -3.42 -11.40 34.43 67.93 2.27 104.63 10.36
PCG-8-13 36.74 -19.46 -3.42 -9.12 34.43 54.34 2.27 91.04 10.36
PCG-8-14 36.74 -17.18 -3.42 -6.84 34.43 40.76 2.27 77.46 10.36
nM

PCG-8-15 36.74 -14.90 -3.42 -4.56 34.43 27.17 2.27 63.87 10.36
PCG-8-16 36.74 -12.62 -3.42 -2.28 34.43 13.59 2.27 50.29 10.36
PCG-8-17 36.74 -10.34 -3.42 0.00 34.43 0.00 2.27 36.70 10.36
PCG-8-18 36.74 -8.06 -3.42 2.28 34.43 -13.59 2.27 23.12 10.36
PCG-8-19 36.74 -5.78 -3.42 4.56 34.43 -27.17 2.27 9.53 10.36
PCG-8-20 36.74 -3.50 -3.42 6.84 34.43 -40.76 2.27 -4.05 10.36
PCG-8-21 36.74 -1.22 -3.42 9.12 34.43 -54.34 2.27 -17.64 10.36
PCG-8-22 36.74 1.06 -3.42 11.40 34.43 -67.93 2.27 -31.23 10.36
PCG-8-23 39.02 -21.74 -1.14 -11.40 34.43 67.93 0.76 103.11 10.36
PCG-8-24 39.02 -19.46 -1.14 -9.12 34.43 54.34 0.76 89.53 10.36
PCG-8-25 39.02 -17.18 -1.14 -6.84 34.43 40.76 0.76 75.94 10.36
PCG-8-26 39.02 -14.90 -1.14 -4.56 34.43 27.17 0.76 62.36 10.36
PCG-8-27 39.02 -12.62 -1.14 -2.28 34.43 13.59 0.76 48.77 10.36
PCG-8-28 39.02 -10.34 -1.14 0.00 34.43 0.00 0.76 35.19 10.36
PCG-8-29 39.02 -8.06 -1.14 2.28 34.43 -13.59 0.76 21.60 10.36
PCG-8-30 39.02 -5.78 -1.14 4.56 34.43 -27.17 0.76 8.01 10.36
PCG-8-31 39.02 -3.50 -1.14 6.84 34.43 -40.76 0.76 -5.57 10.36
PCG-8-32 39.02 -1.22 -1.14 9.12 34.43 -54.34 0.76 -19.16 10.36
di

PCG-8-33 39.02 1.06 -1.14 11.40 34.43 -67.93 0.76 -32.74 10.36
PCG-8-34 41.30 -21.74 1.14 -11.40 34.43 67.93 -0.76 101.60 10.36
PCG-8-35 41.30 -19.46 1.14 -9.12 34.43 54.34 -0.76 88.01 10.36
PCG-8-36 41.30 -17.18 1.14 -6.84 34.43 40.76 -0.76 74.43 10.36
PCG-8-37 41.30 -14.90 1.14 -4.56 34.43 27.17 -0.76 60.84 10.36
PCG-8-38 41.30 -12.62 1.14 -2.28 34.43 13.59 -0.76 47.25 10.36
PCG-8-39 41.30 -10.34 1.14 0.00 34.43 0.00 -0.76 33.67 10.36
PCG-8-40 41.30 -8.06 1.14 2.28 34.43 -13.59 -0.76 20.08 10.36
PCG-8-41 41.30 -5.78 1.14 4.56 34.43 -27.17 -0.76 6.50 10.36
PCG-8-42 41.30 -3.50 1.14 6.84 34.43 -40.76 -0.76 -7.09 10.36
PCG-8-43 41.30 -1.22 1.14 9.12 34.43 -54.34 -0.76 -20.67 10.36
PCG-8-44 41.30 1.06 1.14 11.40 34.43 -67.93 -0.76 -34.26 10.36
a te

PCG-8-45 43.58 -21.74 3.42 -11.40 34.43 67.93 -2.27 100.08 10.36
PCG-8-46 43.58 -19.46 3.42 -9.12 34.43 54.34 -2.27 86.49 10.36
PCG-8-47 43.58 -17.18 3.42 -6.84 34.43 40.76 -2.27 72.91 10.36
PCG-8-48 43.58 -14.90 3.42 -4.56 34.43 27.17 -2.27 59.32 10.36
PCG-8-49 43.58 -12.62 3.42 -2.28 34.43 13.59 -2.27 45.74 10.36
PCG-8-50 43.58 -10.34 3.42 0.00 34.43 0.00 -2.27 32.15 10.36
PCG-8-51 43.58 -8.06 3.42 2.28 34.43 -13.59 -2.27 18.57 10.36
PCG-8-52 43.58 -5.78 3.42 4.56 34.43 -27.17 -2.27 4.98 10.36
PCG-8-53 43.58 -3.50 3.42 6.84 34.43 -40.76 -2.27 -8.60 10.36
PCG-8-54 43.58 -1.22 3.42 9.12 34.43 -54.34 -2.27 -22.19 10.36
PCG-8-55 43.58 1.06 3.42 11.40 34.43 -67.93 -2.27 -35.77 10.36
PCG-8-56 45.86 -21.74 5.70 -11.40 34.43 67.93 -3.79 98.56 10.36
PCG-8-57 45.86 -19.46 5.70 -9.12 34.43 54.34 -3.79 84.98 10.36
PCG-8-58 45.86 -17.18 5.70 -6.84 34.43 40.76 -3.79 71.39 10.36
PCG-8-59 45.86 -14.90 5.70 -4.56 34.43 27.17 -3.79 57.81 10.36
PCG-8-60 45.86 -12.62 5.70 -2.28 34.43 13.59 -3.79 44.22 10.36
re

PCG-8-61 45.86 -10.34 5.70 0.00 34.43 0.00 -3.79 30.64 10.36
PCG-8-62 45.86 -8.06 5.70 2.28 34.43 -13.59 -3.79 17.05 10.36
PCG-8-63 45.86 -5.78 5.70 4.56 34.43 -27.17 -3.79 3.47 10.36
PCG-8-64 45.86 -3.50 5.70 6.84 34.43 -40.76 -3.79 -10.12 10.36
PCG-8-65 45.86 -1.22 5.70 9.12 34.43 -54.34 -3.79 -23.70 10.36
PCG-8-66 45.86 1.06 5.70 11.40 34.43 -67.93 -3.79 -37.29 10.36
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
F AC TOR OF SAF ETY F OR ALL LOAD C ASES ( Per mis s ible/ Ac tual)

Pile Reaction ALONG Z-Z ALONG X-X


Compressi pt at Shear pt at Shear

Ed
Load case pt at top pt at top Punching
on Tension Shear bottom stress bottom stress
500 1 DL1+1 LL1+11.92
EQUIP1
N/a 35.42 N/A N/A N/A N/A N/A N/A N/A
501 1 DL1+1 LL1+11.96
EQUIP1+1
N/a TEMP1 8.93 N/A N/A N/A N/A N/A N/A N/A
502 1 DL1+1 WL1 3.39 N/a 3.82 N/A N/A N/A N/A N/A N/A N/A
503 1 DL1+1 WL2 3.28 N/a 4.19 N/A N/A N/A N/A N/A N/A N/A
504 1 DL1+1 WL3 3.41 N/a 3.99 N/A N/A N/A N/A N/A N/A N/A
505 1 DL1+1 WL4 3.35 N/a 3.66 N/A N/A N/A N/A N/A N/A N/A
506 1 DL1+1 WL5 1.71 1.49 1.10 N/A N/A N/A N/A N/A N/A N/A
507 1 DL1+1 WL6 1.68 1.57 1.10 N/A N/A N/A N/A N/A N/A N/A
508 1 DL1+1 WL7 1.63 1.19 1.11 N/A N/A N/A N/A N/A N/A N/A

F
509 1 DL1+1 WL8 1.60 1.22 1.12 N/A N/A N/A N/A N/A N/A N/A
510 1 DL1+0.7 WL13.42 N/a 5.40 N/A N/A N/A N/A N/A N/A N/A
511 1 DL1+0.7 WL23.34 N/a 5.92 N/A N/A N/A N/A N/A N/A N/A
512 1 DL1+0.7 WL33.51 N/a 5.77 N/A N/A N/A N/A N/A N/A N/A

PD
513 1 DL1+0.7 WL43.46 N/a 5.29 N/A N/A N/A N/A N/A N/A N/A
514 1 DL1+0.7 WL52.04 5.59 1.57 N/A N/A N/A N/A N/A N/A N/A
515 1 DL1+0.7 WL62.02 6.42 1.56 N/A N/A N/A N/A N/A N/A N/A
516 1 DL1+0.7 WL71.94 3.06 1.60 N/A N/A N/A N/A N/A N/A N/A
517 1 DL1+0.7 WL81.91 3.19 1.60 N/A N/A N/A N/A N/A N/A N/A
518 1 DL1+ 1LL1+0.75
1.90WL1+1
N/a EQUIP1 4.87 N/A N/A N/A N/A N/A N/A N/A
519 1 DL1+1.0 LL1+0.75
1.87 N/a
WL2+1 EQUIP1 5.33 N/A N/A N/A N/A N/A N/A N/A
520 1 DL1+1.0 LL1+0.75
2.02 N/a
WL3+1 EQUIP1 5.49 N/A N/A N/A N/A N/A N/A N/A
521 1 DL1+1.0 LL1+0.75
1.99 N/a
WL4+1 EQUIP1 5.03 N/A N/A N/A N/A N/A N/A N/A
522 1 DL1+1.0 LL1+0.75
1.42 N/a
WL5+1 EQUIP1 1.42 N/A N/A N/A N/A N/A N/A N/A
523 1 DL1+1.0 LL1+0.75
1.40 N/a
WL6+1 EQUIP1 1.42 N/A N/A N/A N/A N/A N/A N/A
te r
524 1 DL1+1.0 LL1+0.75
1.30 WL7+14.01
EQUIP1 1.53 N/A N/A N/A N/A N/A N/A N/A
525 1 DL1+1.0 LL1+0.75
1.29 WL8+14.27
EQUIP1 1.53 N/A N/A N/A N/A N/A N/A N/A
526 1 DL1+1.0 LL1+11.81
EQUIP1+0.525
N/a SL1 4.98 N/A N/A N/A N/A N/A N/A N/A
527 1 DL1+1.0 LL1+11.70
EQUIP1+0.525
N/a SL2 4.55 N/A N/A N/A N/A N/A N/A N/A
528 0.6 DL1+1 WL14.06 N/a 3.86 N/A N/A N/A N/A N/A N/A N/A
529 0.6 DL1+1 WL23.92 N/a 4.24 N/A N/A N/A N/A N/A N/A N/A
530 0.6 DL1+1 WL34.16 N/a 3.95 N/A N/A N/A N/A N/A N/A N/A
531 0.6 DL1+1 WL44.07 N/a 3.63 N/A N/A N/A N/A N/A N/A N/A
as

532 0.6 DL1+1 WL51.87 1.24 1.10 N/A N/A N/A N/A N/A N/A N/A
533 0.6 DL1+1 WL61.85 1.30 1.10 N/A N/A N/A N/A N/A N/A N/A
534 0.6 DL1+1 WL71.81 1.07 1.11 N/A N/A N/A N/A N/A N/A N/A
535 0.6 DL1+1 WL81.78 1.10 1.11 N/A N/A N/A N/A N/A N/A N/A
536 0.6 DL1+0.7 SL13.61 N/a 3.51 N/A N/A N/A N/A N/A N/A N/A
537 0.6 DL1+0.7 SL23.19 N/a 3.09 N/A N/A N/A N/A N/A N/A N/A
1001 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1 N/A N/A N/A N/A N/A N/A N/A
nM

1002 1.35 DL1+1.5


N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1N/A N/A N/A N/A N/A N/A N/A
1003 1.35 DL1+1.5
N/a WL1+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1004 1.35 DL1+1.5
N/a WL2+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1005 1.35 DL1+1.5
N/a WL3+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1006 1.35 DL1+1.5
N/a WL4+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1007 1.35 DL1+1.5
N/a WL5+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1008 1.35 DL1+1.5
N/a WL6+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1009 1.35 DL1+1.5
N/a WL7+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1010 1.35 DL1+1.5
N/a WL8+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1011 1.35 DL1+1.5
N/a WL1+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1012 1.35 DL1+1.5
N/a WL2+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
di

1013 1.35 DL1+1.5


N/a WL3+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1014 1.35 DL1+1.5
N/a WL4+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1015 1.35 DL1+1.5
N/a WL5+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1016 1.35 DL1+1.5
N/a WL6+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1017 1.35 DL1+1.5
N/a WL7+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1018 1.35 DL1+1.5
N/a WL8+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1019 1.35 DL1+0.9
N/a TEMP1+1.35
N/a MR1
N/a N/A N/A N/A N/A N/A N/A N/A
a te

1020 1.35 DL1+-0.9


N/a TEMP1+1.35
N/a MR1
N/a N/A N/A N/A N/A N/A N/A N/A
1021 1.35 DL1+1.5LL1+1.5
N/a N/aEQUIP1+0.9
N/a TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A N/A
1022 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1023 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1024 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1028 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1029 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

Ed
1030 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1031 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1032 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1033 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1034 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1035 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1036 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1037 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1038 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1039 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1040 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1041 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

F
1042 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1043 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1044 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1045 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1046 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

PD
1047 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1048 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1049 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1050 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1051 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1052 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1053 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1054 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1055 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1056 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1057 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1058 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1059 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1060 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
te r
1061 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1062 1.148 DL1+1.5
N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1063 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1064 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1065 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1066 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1067 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1068 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1069 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
as

1070 1.148 DL1+1.5


N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1071 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1072 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1073 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1074 1 DL1+0.8
N/a LL1+1 SL2
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1075 1 DL1+0.8
N/a LL1+-1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1076 1 DL1+0.8
N/a LL1+-1 SL2
N/a N/a N/A N/A N/A N/A N/A N/A N/A
2001 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
nM

2002 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2003 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2004 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2005 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2006 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2007 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2008 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2009 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2010 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2011 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2012 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2013 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2014 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2015 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
di

2016 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2017 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2018 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2019 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2020 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2021 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2022 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2023 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
a te

2024 1 DL1+1.0
N/a LL1+1 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2025 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2026 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2027 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2028 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2029 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2030 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2031 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2032 1 DL1+0.7
N/a LL1+1 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2033 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
FOUNDATION FOR PEDESTAL (P19) (P23) (P24) (P29) (P20) (P25) (P26) (P30)
(P21) (P27) (P22) (P28)-(Pilecap Design)

Ed
LOAD CASE: 1072 1.1481072
DL1+1.5
1.148
LL1+1.5
DL1+1.05
W L8+1.5
LL1+1.5
EQUIP1+-0.9
W L8+1.05 EQUIP1+-0.9
TEMP1+1.35 TEMP1+1.35
MR1 MR1

G E N E RA L PI L E C A P DI ME N SI O N S, PO SI T I O N
Concrete Density 2.5 ton/m 3 Pile ca p thickne ss 2.100 m
Soil Density 2 ton/m 3 Z cordinate of center of the pilecap -10.338 m
Grade of Concrete (Cylinder) C 30 X cordinate of center of the pilecap 40.163 m
Grade of Steel Fe 500 Le ngth a long a x is Z, L z 24.060 m
Level of Base of pilecap -5.1 m Le ngth a long a x is X, L x 12.660 m
Finished Ground level -0.6 m Area of base of pilecap, A 304.60 m2
Level of max water table -0.6 m

PE DE ST A L ( C O L U MN ) DI ME N SI O N S, PO SI T I O N S & L O A DS
C.G. of Pedestal Ped top P + W ped
Pedestal ID Lz-z (m) Lx-x (m) P (T) Hz (T) Mx (T-m) Hx (T) Mz (T-m)

F
Z X [Level of (T)
P19 1.600 1.600 -21.000 35.500 -5.100 1306.43 -168.32 -826.12 -20.18 -111.20 1306.43
P23 1.250 1.250 -21.000 41.500 -5.100 902.48 -65.09 -294.76 -13.17 -53.53 902.48
P24 1.250 1.250 -15.800 41.500 -5.100 135.86 -72.57 -325.45 0.34 13.61 135.86
P29 1.250 1.250 -15.800 45.000 -5.100 279.21 -39.06 -191.48 1.33 4.91 279.21
P20 1.250 1.250 -12.000 35.500 -5.100 428.78 -67.30 -389.33 2.71 16.34 428.78
P25 1.250 1.250 -12.000 41.500 -5.100 301.42 -87.25 -314.39 0.28 18.64 301.42

PD
P26 1.250 1.250 -8.200 41.500 -5.100 359.61 -73.77 -318.85 20.74 89.32 359.61
P30 1.250 1.250 -8.200 45.000 -5.100 244.51 -43.53 -209.82 15.95 80.38 244.51
P21 1.600 1.600 -3.000 35.500 -5.100 555.78 -167.63 -782.24 0.39 -10.76 555.78
P27 1.250 1.250 -3.000 41.500 -5.100 -6.29 -76.64 -305.20 -5.82 -23.92 -6.29
P22 1.250 1.250 0.500 35.500 -5.100 -118.38 -69.03 -292.90 -6.03 -28.10 -118.38
P28 1.250 1.250 0.500 41.500 -5.100 -460.42 -69.20 -293.46 -6.40 -43.76 -460.42

PI L E DE T A I L S
Number of Piles 66 CGz of Pile group -10.338 m
Diameter of Piles 760 mm CGx of Pile group 40.163 m
2
Compressive capacity of piles 192 T SUM[(Xi-Xc g)2] of Pile group 1000.692 m
2
Tensile capacity of piles 40 T SUM[(Zi-Zc g)2] of Pile group 3430.944 m
Shear capacity of piles 11.5 T

W eight of soil, W s oil 1850.44 T


W eight of footing, W f oot ing 431.77 T
Axial load due to [P+ W ped] 3928.99 T
te r
Total axial Load 6211.20 T

Mz due to [Mz+(P+W ped)*ex ] -5997.63 Ton-m Mx due to [Mx+(P+W ped)*ez] -32525.37 Ton-m
Eccentricity between Pilecap and Pile group 0.00 mm Eccentricity between Pilecap and Pile group 0.00 mm
Mz due to pilecap and pile group eccentricity 0.00 Ton-m Mx due to pilecap and pile group eccentricity 0.00 Ton-m
Total Mz -5997.63 Ton-m Total Mx -32525.37 Ton-m

Distance Distance P due to


from pile from pile Axial P due to P due to
Pile ID CGx CGz group CGx group CGz Load (T) Mx (T) Mz (T) Total P (T) Shear (T)
PCG-8-1 34.46 -21.74 -5.70 -11.40 94.11 108.07 34.16 236.34 15.14
PCG-8-2 34.46 -19.46 -5.70 -9.12 94.11 86.46 34.16 214.73 15.14
as

PCG-8-3 34.46 -17.18 -5.70 -6.84 94.11 64.84 34.16 193.12 15.14
PCG-8-4 34.46 -14.90 -5.70 -4.56 94.11 43.23 34.16 171.50 15.14
PCG-8-5 34.46 -12.62 -5.70 -2.28 94.11 21.61 34.16 149.89 15.14
PCG-8-6 34.46 -10.34 -5.70 0.00 94.11 0.00 34.16 128.27 15.14
PCG-8-7 34.46 -8.06 -5.70 2.28 94.11 -21.61 34.16 106.66 15.14
PCG-8-8 34.46 -5.78 -5.70 4.56 94.11 -43.23 34.16 85.04 15.14
PCG-8-9 34.46 -3.50 -5.70 6.84 94.11 -64.84 34.16 63.43 15.14
PCG-8-10 34.46 -1.22 -5.70 9.12 94.11 -86.46 34.16 41.81 15.14
PCG-8-11 34.46 1.06 -5.70 11.40 94.11 -108.07 34.16 20.20 15.14
PCG-8-12 36.74 -21.74 -3.42 -11.40 94.11 108.07 20.50 222.68 15.14
PCG-8-13 36.74 -19.46 -3.42 -9.12 94.11 86.46 20.50 201.06 15.14
PCG-8-14 36.74 -17.18 -3.42 -6.84 94.11 64.84 20.50 179.45 15.14
nM

PCG-8-15 36.74 -14.90 -3.42 -4.56 94.11 43.23 20.50 157.84 15.14
PCG-8-16 36.74 -12.62 -3.42 -2.28 94.11 21.61 20.50 136.22 15.14
PCG-8-17 36.74 -10.34 -3.42 0.00 94.11 0.00 20.50 114.61 15.14
PCG-8-18 36.74 -8.06 -3.42 2.28 94.11 -21.61 20.50 92.99 15.14
PCG-8-19 36.74 -5.78 -3.42 4.56 94.11 -43.23 20.50 71.38 15.14
PCG-8-20 36.74 -3.50 -3.42 6.84 94.11 -64.84 20.50 49.76 15.14
PCG-8-21 36.74 -1.22 -3.42 9.12 94.11 -86.46 20.50 28.15 15.14
PCG-8-22 36.74 1.06 -3.42 11.40 94.11 -108.07 20.50 6.53 15.14
PCG-8-23 39.02 -21.74 -1.14 -11.40 94.11 108.07 6.83 209.01 15.14
PCG-8-24 39.02 -19.46 -1.14 -9.12 94.11 86.46 6.83 187.40 15.14
PCG-8-25 39.02 -17.18 -1.14 -6.84 94.11 64.84 6.83 165.78 15.14
PCG-8-26 39.02 -14.90 -1.14 -4.56 94.11 43.23 6.83 144.17 15.14
PCG-8-27 39.02 -12.62 -1.14 -2.28 94.11 21.61 6.83 122.56 15.14
PCG-8-28 39.02 -10.34 -1.14 0.00 94.11 0.00 6.83 100.94 15.14
PCG-8-29 39.02 -8.06 -1.14 2.28 94.11 -21.61 6.83 79.33 15.14
PCG-8-30 39.02 -5.78 -1.14 4.56 94.11 -43.23 6.83 57.71 15.14
PCG-8-31 39.02 -3.50 -1.14 6.84 94.11 -64.84 6.83 36.10 15.14
PCG-8-32 39.02 -1.22 -1.14 9.12 94.11 -86.46 6.83 14.48 15.14
di

PCG-8-33 39.02 1.06 -1.14 11.40 94.11 -108.07 6.83 -7.13 15.14
PCG-8-34 41.30 -21.74 1.14 -11.40 94.11 108.07 -6.83 195.35 15.14
PCG-8-35 41.30 -19.46 1.14 -9.12 94.11 86.46 -6.83 173.73 15.14
PCG-8-36 41.30 -17.18 1.14 -6.84 94.11 64.84 -6.83 152.12 15.14
PCG-8-37 41.30 -14.90 1.14 -4.56 94.11 43.23 -6.83 130.51 15.14
PCG-8-38 41.30 -12.62 1.14 -2.28 94.11 21.61 -6.83 108.89 15.14
PCG-8-39 41.30 -10.34 1.14 0.00 94.11 0.00 -6.83 87.28 15.14
PCG-8-40 41.30 -8.06 1.14 2.28 94.11 -21.61 -6.83 65.66 15.14
PCG-8-41 41.30 -5.78 1.14 4.56 94.11 -43.23 -6.83 44.05 15.14
PCG-8-42 41.30 -3.50 1.14 6.84 94.11 -64.84 -6.83 22.43 15.14
PCG-8-43 41.30 -1.22 1.14 9.12 94.11 -86.46 -6.83 0.82 15.14
PCG-8-44 41.30 1.06 1.14 11.40 94.11 -108.07 -6.83 -20.80 15.14
a te

PCG-8-45 43.58 -21.74 3.42 -11.40 94.11 108.07 -20.50 181.68 15.14
PCG-8-46 43.58 -19.46 3.42 -9.12 94.11 86.46 -20.50 160.07 15.14
PCG-8-47 43.58 -17.18 3.42 -6.84 94.11 64.84 -20.50 138.45 15.14
PCG-8-48 43.58 -14.90 3.42 -4.56 94.11 43.23 -20.50 116.84 15.14
PCG-8-49 43.58 -12.62 3.42 -2.28 94.11 21.61 -20.50 95.23 15.14
PCG-8-50 43.58 -10.34 3.42 0.00 94.11 0.00 -20.50 73.61 15.14
PCG-8-51 43.58 -8.06 3.42 2.28 94.11 -21.61 -20.50 52.00 15.14
PCG-8-52 43.58 -5.78 3.42 4.56 94.11 -43.23 -20.50 30.38 15.14
PCG-8-53 43.58 -3.50 3.42 6.84 94.11 -64.84 -20.50 8.77 15.14
PCG-8-54 43.58 -1.22 3.42 9.12 94.11 -86.46 -20.50 -12.85 15.14
PCG-8-55 43.58 1.06 3.42 11.40 94.11 -108.07 -20.50 -34.46 15.14
PCG-8-56 45.86 -21.74 5.70 -11.40 94.11 108.07 -34.16 168.02 15.14
PCG-8-57 45.86 -19.46 5.70 -9.12 94.11 86.46 -34.16 146.40 15.14
PCG-8-58 45.86 -17.18 5.70 -6.84 94.11 64.84 -34.16 124.79 15.14
PCG-8-59 45.86 -14.90 5.70 -4.56 94.11 43.23 -34.16 103.18 15.14
PCG-8-60 45.86 -12.62 5.70 -2.28 94.11 21.61 -34.16 81.56 15.14
re

PCG-8-61 45.86 -10.34 5.70 0.00 94.11 0.00 -34.16 59.95 15.14
PCG-8-62 45.86 -8.06 5.70 2.28 94.11 -21.61 -34.16 38.33 15.14
PCG-8-63 45.86 -5.78 5.70 4.56 94.11 -43.23 -34.16 16.72 15.14
PCG-8-64 45.86 -3.50 5.70 6.84 94.11 -64.84 -34.16 -4.90 15.14
PCG-8-65 45.86 -1.22 5.70 9.12 94.11 -86.46 -34.16 -26.51 15.14
PCG-8-66 45.86 1.06 5.70 11.40 94.11 -108.07 -34.16 -48.13 15.14
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
Load factor for Limit State design 1 Along Axis -----> Z-Z X-X
Ultimate sagging(+)
Moment,Mup(Tm/width) 162.70 13.83
Along Axis -----> Z-Z X-X Effective Depth (for + M), d (m) 1.952 1.952

Ed
Ultimate Shear force (In sagging zone)(T/width) 39.80 14.63 Mup/bd2 (N/mm2) 0.43 0.04
Nominal shear stress (N/mm 2) 0.20 0.07 Tensile steel required at bottom (%) 0.10 0.01
Max allowable shear stress (N/mm 2) 0.32 0.32 Provide bars of dia (mm) 32 32
Ultimate Shear force (In hogging zone)(T) 63.30 25.16 at c/c distance (mm) 150 150
Nominal shear stress (N/mm 2) 0.32 0.13 Tensile steel provided at bottom (%) 0.27 0.27
Max allowable shear stress (N/mm 2) 0.32 0.32 Ultimate hogging(-)
Stirrup Diameter (mm) 12 Moment,Mun(Tm/meter width) -217.26 -33.55
Stirrup spacing (N/mm 2) 150 150 Mun/bd2 (N/mm2) 0.57 0.09

F
Stress in stirrup (N/mm 2) 28.69 11.40 Tensile steel required at top (%) 0.13 0.02
Total Stirrup stress (N/mm 2) 40.09 Provide bars of dia (mm) 32 32
Permissible Stirrup stress (N/mm 2) 434.78 at c/c distance (mm) 150 150

PD
Tensile steel provided at top (%) 0.27 0.27
Effective Depth (for - M), d (m) 1.952 1.952
P UNCH ING SH EAR FO R P EDESTALS
Pedestal ID Ultimate Design Area for resisting Punching Shear Allowable punching
P19 431.61 Ton 12.86 m2 0.34 N/mm2 1.37 N/mm2
P23 533.40 Ton 17.84 m2 0.30 N/mm2 1.37 N/mm2
P24 146.76 Ton 25.00 m2 0.06 N/mm2 1.37 N/mm2
P29 204.05 Ton 18.33 m2 0.11 N/mm2 1.37 N/mm2
P20 142.67 Ton 25.00 m2 0.06 N/mm2 1.37 N/mm2
P25 192.53 Ton 25.00 m2 0.08 N/mm2 1.37 N/mm2
P26 293.94 Ton 25.00 m2 0.12 N/mm2 1.37 N/mm2
te r
P30 154.19 Ton 18.33 m2 0.08 N/mm2 1.37 N/mm2
P21 442.59 Ton 20.37 m2 0.22 N/mm2 1.37 N/mm2
P27 28.72 Ton 25.00 m2 0.01 N/mm2 1.37 N/mm2
P22 145.11 Ton 17.15 m2 0.08 N/mm2 1.37 N/mm2
P28 439.63 Ton 17.15 m2 0.26 N/mm2 1.37 N/mm2
as
nM
di
a te
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
F AC TOR OF SAF ETY F OR ALL LOAD C ASES ( Per mis s ible/ Ac tual)

Pile Reaction ALONG Z-Z ALONG X-X


Compressi pt at Shear pt at Shear

Ed
Load case pt at top pt at top Punching
on Tension Shear bottom stress bottom stress
500 1 DL1+1N/a
LL1+1 EQUIP1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
501 1 DL1+1N/a
LL1+1 EQUIP1+1
N/a TEMP1
N/a N/A N/A N/A N/A N/A N/A N/A
502 1 DL1+1N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
503 1 DL1+1N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
504 1 DL1+1N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A
505 1 DL1+1N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
506 1 DL1+1N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
507 1 DL1+1N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
508 1 DL1+1N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A

F
509 1 DL1+1N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
510 1 DL1+0.7
N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
511 1 DL1+0.7
N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
512 1 DL1+0.7
N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A

PD
513 1 DL1+0.7
N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
514 1 DL1+0.7
N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
515 1 DL1+0.7
N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
516 1 DL1+0.7
N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A
517 1 DL1+0.7
N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
518 1 DL1+ 1LL1+0.75
N/a WL1+1
N/a EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
519 1 DL1+1.0
N/a
LL1+0.75 N/a
WL2+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
520 1 DL1+1.0
N/a
LL1+0.75 N/a
WL3+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
521 1 DL1+1.0
N/a
LL1+0.75 N/a
WL4+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
522 1 DL1+1.0
N/a
LL1+0.75 N/a
WL5+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
523 1 DL1+1.0
N/a
LL1+0.75 N/a
WL6+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
te r
524 1 DL1+1.0
N/a
LL1+0.75 N/a
WL7+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
525 1 DL1+1.0
N/a
LL1+0.75 N/a
WL8+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
526 1 DL1+1.0
N/a
LL1+1 EQUIP1+0.525
N/a N/a
SL1 N/A N/A N/A N/A N/A N/A N/A
527 1 DL1+1.0
N/a
LL1+1 EQUIP1+0.525
N/a N/a
SL2 N/A N/A N/A N/A N/A N/A N/A
528 0.6 DL1+1
N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
529 0.6 DL1+1
N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
530 0.6 DL1+1
N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A
531 0.6 DL1+1
N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
as

532 0.6 DL1+1


N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
533 0.6 DL1+1
N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
534 0.6 DL1+1
N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A
535 0.6 DL1+1
N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
536 0.6 DL1+0.7
N/a SL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
537 0.6 DL1+0.7
N/a SL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
1001 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1 37.04 2.91 13.37 10.76 25.91 13.37 5.42
nM

1002 1.35 DL1+1.5


N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1 20.06 3.45 12.97 11.99 23.76 12.97 5.49
1003 1.35 DL1+1.5
N/a WL1+0.9
N/a TEMP1 N/a 75.64 7.00 24.12 14.35 N/A 24.12 12.14
1004 1.35 DL1+1.5
N/a WL2+0.9
N/a TEMP1 N/a 53.09 7.28 23.57 14.38 N/A 23.57 11.83
1005 1.35 DL1+1.5
N/a WL3+0.9
N/a TEMP1 N/a 670.44 12.11 30.50 13.59 N/A 30.50 12.53
1006 1.35 DL1+1.5
N/a WL4+0.9
N/a TEMP1 N/a 149.14 12.91 28.67 11.81 N/A 28.67 12.77
1007 1.35 DL1+1.5
N/a WL5+0.9
N/a TEMP1 N/a 4.46 2.38 13.65 10.63 N/A 13.65 4.08
1008 1.35 DL1+1.5
N/a WL6+0.9
N/a TEMP1 N/a 4.42 2.44 13.68 9.85 N/A 13.68 4.02
1009 1.35 DL1+1.5
N/a WL7+0.9
N/a TEMP1 N/a 2.70 2.86 14.35 51.89 27.81 14.35 4.57
1010 1.35 DL1+1.5
N/a WL8+0.9
N/a TEMP1 N/a 2.64 2.88 14.27 52.34 31.50 14.27 4.63
1011 1.35 DL1+1.5
N/a WL1+-0.9
N/a TEMP1 N/a 27.74 11.79 25.98 18.75 N/A 25.98 12.51
1012 1.35 DL1+1.5
N/a WL2+-0.9
N/a TEMP1 N/a 23.99 12.34 25.35 16.67 N/A 25.35 12.18
di

1013 1.35 DL1+1.5


N/a WL3+-0.9
N/a TEMP1 N/a 41.93 32.63 28.51 12.15 32.13 28.51 12.62
1014 1.35 DL1+1.5
N/a WL4+-0.9
N/a TEMP1 N/a 33.87 35.72 26.91 10.71 32.16 26.91 12.86
1015 1.35 DL1+1.5
N/a WL5+-0.9
N/a TEMP1 N/a 3.86 2.69 14.03 11.84 N/A 14.03 4.17
1016 1.35 DL1+1.5
N/a WL6+-0.9
N/a TEMP1 N/a 3.83 2.77 14.06 10.87 N/A 14.06 4.11
1017 1.35 DL1+1.5
N/a WL7+-0.9
N/a TEMP1 N/a 2.40 3.21 14.80 92.28 26.13 14.80 4.46
1018 1.35 DL1+1.5
N/a WL8+-0.9
N/a TEMP1 N/a 2.35 3.24 14.28 87.85 29.13 14.28 4.52
1019 1.35 DL1+0.9
N/a TEMP1+1.35
N/a MR1
N/a 41.41 10.49 28.20 15.25 N/A 28.20 19.52
a te

1020 1.35 DL1+-0.9


N/a TEMP1+1.35
N/a MR1
N/a 21.28 20.72 27.08 17.84 N/A 27.08 20.52
1021 1.35 DL1+1.5LL1+1.5
N/a N/aEQUIP1+0.9
N/a TEMP1+1.35 37.74
MR1 2.89 13.23 10.61 25.46 13.23 5.36
1022 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
20.26
MR1 3.46 12.84 11.81 23.38 12.84 5.44
1023 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1+1.35
39.42
MR1 3.03 13.92 11.25 27.24 13.92 5.70
1024 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
20.74MR1 3.67 13.49 12.61 24.88 13.49 5.78
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
50.91 2.65
MR1 13.49 10.75 22.31 13.49 4.85
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
43.45 2.68
MR1 13.38 10.27 23.52 13.38 4.82
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
81.11 2.94
MR1 13.35 11.35 29.20 13.35 6.49
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+0.9 TEMP1+1.35
50.91 2.65
MR1 13.49 10.75 22.31 13.49 4.85
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+0.9 TEMP1+1.35
43.45 2.68
MR1 13.38 10.27 23.52 13.38 4.82
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+0.9 TEMP1+1.35
81.11 2.94
MR1 13.35 11.35 29.20 13.35 6.49
1028 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+0.9 TEMP1+1.35
63.55 2.97
MR1 13.13 10.81 31.09 13.13 6.43
1029 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+0.9 TEMP1+1.35
14.20 2.18
MR1 13.60 8.92 38.11 13.60 5.17

Ed
1030 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+0.9 TEMP1+1.35
13.74 2.21
MR1 13.40 8.57 41.74 13.40 5.12
1031 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+0.9 TEMP1+1.35
6.39 2.15
MR1 13.43 16.45 15.95 13.43 4.41
1032 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+0.9 TEMP1+1.35
6.19 2.16
MR1 13.11 15.35 16.56 13.11 4.38
1033 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
23.53 3.15
MR1 13.19 11.98 20.89 13.19 4.91
1034 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
21.80 3.18
MR1 12.98 11.38 21.92 12.98 4.88
1035 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
28.44 3.56
MR1 12.95 12.02 26.19 12.95 6.59
1036 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
25.93 3.60
MR1 12.74 11.13 27.65 12.74 6.53
1037 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
9.73 2.47
MR1 13.19 9.75 33.58 13.19 5.27
1038 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
9.51 2.51
MR1 13.00 9.34 36.28 13.00 5.24
1039 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
4.94 2.42
MR1 13.01 19.51 15.19 13.01 4.58
1040 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
4.82 2.44
MR1 12.71 17.98 15.72 12.71 4.55
1041 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+0.9 TEMP1+1.35
54.01 2.77
MR1 14.12 11.41 23.62 14.12 5.12

F
1042 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+0.9 TEMP1+1.35
45.70 2.80
MR1 14.01 10.87 24.99 14.01 5.08
1043 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+0.9 TEMP1+1.35
89.32 3.09
MR1 14.05 12.09 31.60 14.05 6.98
1044 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+0.9 TEMP1+1.35
68.48 3.12
MR1 13.81 11.48 33.83 13.81 6.91
1045 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+0.9 TEMP1+1.35
13.65 2.25
MR1 14.33 9.37 42.25 14.33 5.30
1046 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+0.9 TEMP1+1.35
13.22 2.29
MR1 14.11 8.99 N/A 14.11 5.24

PD
1047 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+0.9 TEMP1+1.35
6.26 2.23
MR1 13.91 18.04 16.62 13.91 4.67
1048 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+0.9 TEMP1+1.35
6.07 2.24
MR1 13.56 16.72 17.28 13.56 4.64
1049 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+-0.9 24.18
TEMP1+1.353.32
MR1 13.88 12.80 22.06 13.88 5.18
1050 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+-0.9 22.36
TEMP1+1.353.36
MR1 13.64 12.12 23.21 13.64 5.15
1051 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+-0.9 29.39
TEMP1+1.353.78
MR1 13.61 12.62 28.10 13.61 7.10
1052 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+-0.9 26.71
TEMP1+1.353.83
MR1 13.38 11.64 28.95 13.38 7.03
1053 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
9.47 2.55
MR1 13.87 10.29 36.78 13.87 5.46
1054 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
9.26 2.59
MR1 13.67 9.83 40.05 13.67 5.40
1055 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.87 2.52
MR1 13.46 21.78 15.81 13.46 4.86
1056 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.75 2.54
MR1 13.13 19.89 16.38 13.13 4.82
1057 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+0.9 TEMP1+1.35
71.70 2.62
MR1 13.61 11.51 21.47 13.61 4.79
1058 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+0.9 TEMP1+1.35
51.12 2.66
MR1 13.43 10.62 23.49 13.43 4.74
1059 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+0.9247.53
TEMP1+1.35 3.13
MR1 14.14 12.18 31.81 14.14 8.22
1060 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+0.9134.64
TEMP1+1.35 3.18
MR1 13.73 10.74 32.16 13.73 8.05
te r
1061 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+0.9 TEMP1+1.35
6.34 1.71
MR1 12.25 8.43 N/A 12.25 3.58
1062 1.148 DL1+1.5
N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+0.9 TEMP1+1.35
6.18 1.74
MR1 12.28 7.92 N/A 12.28 3.53
1063 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+0.9 TEMP1+1.35
3.19 1.85
MR1 11.53 30.13 13.13 11.53 3.99
1064 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+0.9 TEMP1+1.35
3.11 1.86
MR1 11.14 24.73 13.85 11.14 3.94
1065 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+-0.9 27.19
TEMP1+1.353.11
MR1 14.15 12.93 20.31 14.15 4.85
1066 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+-0.9 23.58
TEMP1+1.353.16
MR1 13.75 11.82 22.04 13.75 4.80
1067 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+-0.9 40.69
TEMP1+1.353.84
MR1 13.69 11.01 22.17 13.69 8.39
1068 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+-0.9 33.05
TEMP1+1.353.92
MR1 13.31 9.81 22.31 13.31 8.22
1069 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
5.25 1.87
MR1 12.05 9.16 N/A 12.05 3.65
as

1070 1.148 DL1+1.5


N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
5.15 1.91
MR1 11.92 8.57 N/A 11.92 3.60
1071 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
2.78 2.01
MR1 11.22 39.30 12.66 11.22 4.12
1072 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
2.72 2.02
MR1 10.85 32.33 13.30 10.85 4.08
1073 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a 18.34 4.36 16.23 9.93 N/A 16.23 6.02
1074 1 DL1+0.8
N/a LL1+1 SL2
N/a N/a 33.61 2.21 12.37 8.22 N/A 12.37 7.74
1075 1 DL1+0.8
N/a LL1+-1 SL1
N/a N/a 65.19 7.96 22.16 22.76 19.60 22.16 15.78
1076 1 DL1+0.8
N/a LL1+-1 SL2
N/a N/a 7.15 N/A 27.53 80.09 35.60 27.53 9.99
2001 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1 43.26
MR1 4.11 18.23 13.76 40.56 18.23 7.42
nM

2002 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1 39.43
MR1 4.14 18.11 13.23 43.25 18.11 7.37
2003 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1 54.83
MR1 4.56 18.12 14.41 N/A 18.12 10.00
2004 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1 48.77
MR1 4.61 17.85 13.83 N/A 17.85 9.90
2005 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+1 19.54
MR1 3.39 18.43 11.71 N/A 18.43 7.92
2006 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+1 18.96
MR1 3.45 18.19 11.31 N/A 18.19 7.83
2007 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+18.85
MR1 3.29 18.26 19.53 27.37 18.26 7.62
2008 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+18.60
MR1 3.31 17.86 18.48 28.55 17.86 7.56
2009 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+126.08
MR1 4.90 17.93 15.08 37.48 17.93 7.51
2010 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+124.63
MR1 4.94 17.67 14.44 39.70 17.67 7.46
2011 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+129.89
MR1 5.55 17.64 15.37 N/A 17.64 10.17
2012 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+127.99
MR1 5.59 17.38 14.40 N/A 17.38 10.06
2013 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+113.75
MR1 3.82 17.93 12.65 N/A 17.93 8.08
2014 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+113.46
MR1 3.89 17.70 12.19 N/A 17.70 8.03
2015 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1 6.98
MR1 3.72 17.74 22.29 25.89 17.74 7.96
di

2016 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1 6.82
MR1 3.74 17.36 20.94 26.91 17.36 7.89
2017 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1 49.82
MR1 3.89 17.66 13.86 36.52 17.66 6.96
2018 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1 41.99
MR1 3.95 17.46 12.99 40.39 17.46 6.89
2019 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1 83.74
MR1 4.62 18.22 14.94 N/A 18.22 11.67
2020 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1 63.60
MR1 4.69 17.77 13.46 N/A 17.77 11.45
2021 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+19.31
MR1 2.57 17.01 10.71 N/A 17.01 5.35
2022 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+19.09
MR1 2.62 17.03 10.17 N/A 17.03 5.28
2023 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+14.65
MR1 2.75 15.47 27.49 21.23 15.47 6.42
a te

2024 1 DL1+1.0
N/a LL1+1 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+14.53
MR1 2.77 14.99 24.27 22.46 14.99 6.35
2025 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+128.33
MR1 4.60 18.23 15.20 34.20 18.23 7.04
2026 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+125.61
MR1 4.67 17.78 14.16 37.48 17.78 6.97
2027 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+136.82
MR1 5.64 17.73 13.74 37.41 17.73 11.90
2028 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+132.32
MR1 5.75 17.30 12.48 37.67 17.30 11.67
2029 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1 7.75
MR1 2.81 16.72 11.50 N/A 16.72 5.46
2030 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1 7.59
MR1 2.87 16.55 10.87 N/A 16.55 5.39
2031 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1 4.07
MR1 2.97 15.09 33.29 20.39 15.09 6.66
2032 1 DL1+0.7
N/a LL1+1 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1 3.98
MR1 2.99 14.64 28.68 21.49 14.64 6.58
2033 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a 18.34 4.36 16.23 9.93 N/A 16.23 6.02
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
FOUNDATION FOR PEDESTAL (P31) (P32) (P33) (P34) (P35) (P36) (P37) (P38)-
(Pile Capacity Check)

Ed
LOAD CASE: 524 1 DL1+1.0
524 LL1+0.75
1 DL1+0.75
WL7+1
LL1+0.75
EQUIP1
WL7+1 EQUIP1

GENERAL PILECAP DIMENSIONS, POSITION


Concrete Density 2.5 ton/m3 Pilecap thickness 0.550 m
Soil Density 2 ton/m3 Z cordinate of center of the pilecap -7.200 m
Grade of Concrete (Cylinder) C 30 X cordinate of center of the pilecap 22.500 m
Grade of Steel Fe 500 Length along axis Z, L z 2.480 m
Level of Base of pilecap -5.1 m Length along axis X, L x 6.250 m

F
Finished Ground level -0.6 m Area of base of pilecap, A 15.50 m2
Level of max water table -0.6 m

PD
PEDESTAL (COLUMN) DIMENSIONS, POSITIONS & LOADS
C.G. of Pedestal Ped top P + W ped
Pedestal ID Lz-z (m) Lx-x (m) P (T) Hz (T) Mx (T-m) Hx (T) Mz (T-m)
Z X [Level of (T)
P31 0.600 0.400 -7.700 19.800 -5.100 17.34 -0.98 -3.83 -0.03 -0.04 17.34
P32 0.600 0.400 -6.700 19.800 -5.100 -1.42 -0.87 -3.70 0.30 0.53 -1.42
P33 0.600 0.400 -7.700 21.900 -5.100 20.63 -1.22 -5.40 0.01 0.04 20.63
P34 0.600 0.400 -6.700 21.900 -5.100 -5.60 -1.55 -5.92 0.04 0.10 -5.60
P35 0.600 0.400 -7.700 23.100 -5.100 20.68 -1.19 -5.33 0.06 0.14 20.68
P36 0.600 0.400 -6.700 23.100 -5.100 -5.50 -1.53 -5.86 0.04 0.08 -5.50
P37 0.600 0.400 -7.700 25.200 -5.100 17.32 -0.91 -3.65 0.09 0.20 17.32
te r
P38 0.600 0.400 -6.700 25.200 -5.100 -1.28 -0.83 -3.56 -0.25 -0.37 -1.28

PILE DETAILS
Number of Piles 8 CGz of Pile group -7.2 m
Diameter of Piles 450 mm CGx of Pile group 22.5 m
2
Compressive capacity of piles 73 T SUM[(Xi-Xcg)2] of Pile group 31.601 m
2
Tensile capacity of piles 19 T SUM[(Zi-Zcg)2] of Pile group 3.511 m
as

Shear capacity of piles 7T

Weight of soil, W soil 69.75 T


Weight of footing, W f ooting 4.26 T
Axial load due to [P+ W ped] 62.17 T
nM

Total axial Load 136.19 T

Mz due to [Mz+(P+W ped)*ex ] 1.08 Ton-m Mx due to [Mx+(P+W ped)*ez] -82.13 Ton-m
Eccentricity between Pilecap and Pile group 0.00 mm Eccentricity between Pilecap and Pile group 0.00 mm
Mz due to pilecap and pile group eccentricity 0.00 Ton-m Mx due to pilecap and pile group eccentricity 0.00 Ton-m
Total Mz 1.08 Ton-m Total Mx -82.13 Ton-m

Distance Distance P due to


from pile from pile Axial P due to P due to
di

Pile ID CGx CGz group CGx group CGz Load (T) Mx (T) Mz (T) Total P (T) Shear (T)
PCG-9-1 19.85 -7.97 -2.65 -0.77 17.02 17.89 -0.09 34.83 1.13
PCG-9-2 19.85 -6.43 -2.65 0.76 17.02 -17.89 -0.09 -0.96 1.13
PCG-9-3 21.17 -7.20 -1.33 0.00 17.02 0.00 -0.05 16.98 1.13
PCG-9-4 22.50 -7.97 0.00 -0.77 17.02 17.89 0.00 34.92 1.13
PCG-9-5 22.50 -6.43 0.00 0.76 17.02 -17.89 0.00 -0.87 1.13
PCG-9-6 23.83 -7.20 1.33 0.00 17.02 0.00 0.05 17.07 1.13
a te

PCG-9-7 25.15 -7.97 2.65 -0.77 17.02 17.89 0.09 35.01 1.13
PCG-9-8 25.15 -6.43 2.65 0.76 17.02 -17.89 0.09 -0.78 1.13
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
F AC TOR OF SAF ETY F OR ALL LOAD C ASES ( Per mis s ible/ Ac tual)

Pile Reaction ALONG Z-Z ALONG X-X


Compressi pt at Shear pt at Shear

Ed
Load case pt at top pt at top Punching
on Tension Shear bottom stress bottom stress
500 1 DL1+1 LL1+12.25
EQUIP1
N/a 9.41 N/A N/A N/A N/A N/A N/A N/A
501 1 DL1+1 LL1+12.41
EQUIP1+1
N/a TEMP1 13.32 N/A N/A N/A N/A N/A N/A N/A
502 1 DL1+1 WL1 4.12 N/a 18.05 N/A N/A N/A N/A N/A N/A N/A
503 1 DL1+1 WL2 4.13 N/a 17.87 N/A N/A N/A N/A N/A N/A N/A
504 1 DL1+1 WL3 4.15 N/a 18.12 N/A N/A N/A N/A N/A N/A N/A
505 1 DL1+1 WL4 4.16 N/a 17.99 N/A N/A N/A N/A N/A N/A N/A
506 1 DL1+1 WL5 4.09 N/a 10.48 N/A N/A N/A N/A N/A N/A N/A
507 1 DL1+1 WL6 4.07 N/a 10.31 N/A N/A N/A N/A N/A N/A N/A
508 1 DL1+1 WL7 3.62 N/a 19.50 N/A N/A N/A N/A N/A N/A N/A

F
509 1 DL1+1 WL8 3.63 N/a 20.13 N/A N/A N/A N/A N/A N/A N/A
510 1 DL1+0.7 WL14.19 N/a 24.11 N/A N/A N/A N/A N/A N/A N/A
511 1 DL1+0.7 WL24.19 N/a 23.78 N/A N/A N/A N/A N/A N/A N/A
512 1 DL1+0.7 WL34.21 N/a 24.08 N/A N/A N/A N/A N/A N/A N/A

PD
513 1 DL1+0.7 WL44.22 N/a 23.81 N/A N/A N/A N/A N/A N/A N/A
514 1 DL1+0.7 WL54.36 N/a 13.57 N/A N/A N/A N/A N/A N/A N/A
515 1 DL1+0.7 WL64.34 N/a 13.36 N/A N/A N/A N/A N/A N/A N/A
516 1 DL1+0.7 WL73.81 N/a 34.45 N/A N/A N/A N/A N/A N/A N/A
517 1 DL1+0.7 WL83.82 N/a 35.86 N/A N/A N/A N/A N/A N/A N/A
518 1 DL1+ 1LL1+0.75
2.20WL1+1
N/a EQUIP1 8.43 N/A N/A N/A N/A N/A N/A N/A
519 1 DL1+1.0 LL1+0.75
2.20 N/a
WL2+1 EQUIP1 8.51 N/A N/A N/A N/A N/A N/A N/A
520 1 DL1+1.0 LL1+0.75
2.22 N/a
WL3+1 EQUIP1 8.73 N/A N/A N/A N/A N/A N/A N/A
521 1 DL1+1.0 LL1+0.75
2.22 N/a
WL4+1 EQUIP1 8.82 N/A N/A N/A N/A N/A N/A N/A
522 1 DL1+1.0 LL1+0.75
2.45 N/a
WL5+1 EQUIP1 19.22 N/A N/A N/A N/A N/A N/A N/A
523 1 DL1+1.0 LL1+0.75
2.45 N/a
WL6+1 EQUIP1 19.67 N/A N/A N/A N/A N/A N/A N/A
te r
524 1 DL1+1.0 LL1+0.75
2.09 WL7+119.77
EQUIP1 6.17 N/A N/A N/A N/A N/A N/A N/A
525 1 DL1+1.0 LL1+0.75
2.09 WL8+121.19
EQUIP1 6.22 N/A N/A N/A N/A N/A N/A N/A
526 1 DL1+1.0 LL1+12.19
EQUIP1+0.525
N/a SL1 8.44 N/A N/A N/A N/A N/A N/A N/A
527 1 DL1+1.0 LL1+12.21
EQUIP1+0.525
N/a SL2 8.60 N/A N/A N/A N/A N/A N/A N/A
528 0.6 DL1+1 WL14.96 N/a 18.79 N/A N/A N/A N/A N/A N/A N/A
529 0.6 DL1+1 WL24.97 N/a 18.69 N/A N/A N/A N/A N/A N/A N/A
530 0.6 DL1+1 WL35.01 N/a 18.98 N/A N/A N/A N/A N/A N/A N/A
531 0.6 DL1+1 WL45.03 N/a 18.91 N/A N/A N/A N/A N/A N/A N/A
as

532 0.6 DL1+1 WL54.61 N/a 11.60 N/A N/A N/A N/A N/A N/A N/A
533 0.6 DL1+1 WL64.58 N/a 11.39 N/A N/A N/A N/A N/A N/A N/A
534 0.6 DL1+1 WL74.25 N/a 16.53 N/A N/A N/A N/A N/A N/A N/A
535 0.6 DL1+1 WL84.27 N/a 16.99 N/A N/A N/A N/A N/A N/A N/A
536 0.6 DL1+0.7 SL14.90 N/a 19.95 N/A N/A N/A N/A N/A N/A N/A
537 0.6 DL1+0.7 SL25.04 N/a 207.42 N/A N/A N/A N/A N/A N/A N/A
1001 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1 N/A N/A N/A N/A N/A N/A N/A
nM

1002 1.35 DL1+1.5


N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1N/A N/A N/A N/A N/A N/A N/A
1003 1.35 DL1+1.5
N/a WL1+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1004 1.35 DL1+1.5
N/a WL2+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1005 1.35 DL1+1.5
N/a WL3+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1006 1.35 DL1+1.5
N/a WL4+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1007 1.35 DL1+1.5
N/a WL5+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1008 1.35 DL1+1.5
N/a WL6+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1009 1.35 DL1+1.5
N/a WL7+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1010 1.35 DL1+1.5
N/a WL8+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1011 1.35 DL1+1.5
N/a WL1+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1012 1.35 DL1+1.5
N/a WL2+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
di

1013 1.35 DL1+1.5


N/a WL3+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1014 1.35 DL1+1.5
N/a WL4+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1015 1.35 DL1+1.5
N/a WL5+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1016 1.35 DL1+1.5
N/a WL6+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1017 1.35 DL1+1.5
N/a WL7+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1018 1.35 DL1+1.5
N/a WL8+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1019 1.35 DL1+0.9
N/a TEMP1+1.35
N/a MR1
N/a N/A N/A N/A N/A N/A N/A N/A
a te

1020 1.35 DL1+-0.9


N/a TEMP1+1.35
N/a MR1
N/a N/A N/A N/A N/A N/A N/A N/A
1021 1.35 DL1+1.5LL1+1.5
N/a N/aEQUIP1+0.9
N/a TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A N/A
1022 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1023 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1024 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1028 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1029 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

Ed
1030 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1031 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1032 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1033 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1034 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1035 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1036 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1037 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1038 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1039 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1040 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1041 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

F
1042 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1043 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1044 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1045 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1046 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

PD
1047 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1048 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1049 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1050 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1051 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1052 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1053 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1054 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1055 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1056 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1057 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1058 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1059 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1060 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
te r
1061 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1062 1.148 DL1+1.5
N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1063 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1064 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1065 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1066 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1067 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1068 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1069 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
as

1070 1.148 DL1+1.5


N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1071 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1072 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1073 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1074 1 DL1+0.8
N/a LL1+1 SL2
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1075 1 DL1+0.8
N/a LL1+-1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1076 1 DL1+0.8
N/a LL1+-1 SL2
N/a N/a N/A N/A N/A N/A N/A N/A N/A
2001 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
nM

2002 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2003 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2004 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2005 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2006 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2007 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2008 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2009 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2010 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2011 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2012 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2013 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2014 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2015 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
di

2016 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2017 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2018 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2019 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2020 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2021 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2022 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2023 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
a te

2024 1 DL1+1.0
N/a LL1+1 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2025 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2026 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2027 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2028 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2029 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2030 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2031 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2032 1 DL1+0.7
N/a LL1+1 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2033 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
FOUNDATION FOR PEDESTAL (P31) (P32) (P33) (P34) (P35) (P36) (P37) (P38)-
(Pilecap Design)

Ed
LOAD CASE: 1067 1.1481067
DL1+1.5
1.148
LL1+1.5
DL1+1.05
WL3+1.5
LL1+1.5
EQUIP1+-0.9
WL3+1.05 EQUIP1+-0.9
TEMP1+1.35 TEMP1+1.35
MR1 MR1

GENERAL PILECAP DIMENSIONS, POSITION


Concrete Density 2.5 ton/m3 Pilecap thickness 0.550 m
Soil Density 2 ton/m3 Z cordinate of center of the pilecap -7.200 m
Grade of Concrete (Cylinder) C 30 X cordinate of center of the pilecap 22.500 m
Grade of Steel Fe 500 Length along axis Z, L z 2.480 m
Level of Base of pilecap -5.1 m Length along axis X, L x 6.250 m

F
Finished Ground level -0.6 m Area of base of pilecap, A 15.50 m2
Level of max water table -0.6 m

PD
PEDESTAL (COLUMN) DIMENSIONS, POSITIONS & LOADS
C.G. of Pedestal Ped top P + W ped
Pedestal ID Lz-z (m) Lx-x (m) P (T) Hz (T) Mx (T-m) Hx (T) Mz (T-m)
Z X [Level of (T)
P31 0.600 0.400 -7.700 19.800 -5.100 22.97 -1.18 -4.74 -0.44 -1.24 22.97
P32 0.600 0.400 -6.700 19.800 -5.100 -2.94 -1.00 -4.60 0.03 -0.37 -2.94
P33 0.600 0.400 -7.700 21.900 -5.100 28.19 -1.70 -7.46 -0.64 -1.59 28.19
P34 0.600 0.400 -6.700 21.900 -5.100 -8.67 -2.13 -8.24 -0.52 -1.33 -8.67
P35 0.600 0.400 -7.700 23.100 -5.100 27.81 -1.50 -7.11 -0.60 -1.54 27.81
P36 0.600 0.400 -6.700 23.100 -5.100 -9.75 -2.10 -8.16 -0.58 -1.50 -9.75
P37 0.600 0.400 -7.700 25.200 -5.100 24.24 -0.71 -3.95 -0.50 -1.44 24.24
te r
P38 0.600 0.400 -6.700 25.200 -5.100 -3.67 -0.96 -4.45 -0.90 -2.13 -3.67

PILE DETAILS
Number of Piles 8 CGz of Pile group -7.2 m
Diameter of Piles 450 mm CGx of Pile group 22.5 m
2
Compressive capacity of piles 73 T SUM[(Xi-Xcg)2] of Pile group 31.601 m
2
Tensile capacity of piles 19 T SUM[(Zi-Zcg)2] of Pile group 3.511 m
as

Shear capacity of piles 7T

Weight of soil, W soil 94.16 T


Weight of footing, W f ooting 5.75 T
Axial load due to [P+ W ped] 78.19 T
nM

Total axial Load 178.10 T

Mz due to [Mz+(P+W ped)*ex ] -10.54 Ton-m Mx due to [Mx+(P+W ped)*ez] -112.84 Ton-m
Eccentricity between Pilecap and Pile group 0.00 mm Eccentricity between Pilecap and Pile group 0.00 mm
Mz due to pilecap and pile group eccentricity 0.00 Ton-m Mx due to pilecap and pile group eccentricity 0.00 Ton-m
Total Mz -10.54 Ton-m Total Mx -112.84 Ton-m

Distance Distance P due to


from pile from pile Axial P due to P due to
di

Pile ID CGx CGz group CGx group CGz Load (T) Mx (T) Mz (T) Total P (T) Shear (T)
PCG-9-1 19.85 -7.97 -2.65 -0.77 22.26 24.58 0.88 47.73 1.50
PCG-9-2 19.85 -6.43 -2.65 0.76 22.26 -24.58 0.88 -1.44 1.50
PCG-9-3 21.17 -7.20 -1.33 0.00 22.26 0.00 0.44 22.70 1.50
PCG-9-4 22.50 -7.97 0.00 -0.77 22.26 24.58 0.00 46.85 1.50
PCG-9-5 22.50 -6.43 0.00 0.76 22.26 -24.58 0.00 -2.32 1.50
PCG-9-6 23.83 -7.20 1.33 0.00 22.26 0.00 -0.44 21.82 1.50
a te

PCG-9-7 25.15 -7.97 2.65 -0.77 22.26 24.58 -0.88 45.96 1.50
PCG-9-8 25.15 -6.43 2.65 0.76 22.26 -24.58 -0.88 -3.20 1.50
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
Load factor for Limit State design 1 Along Axis -----> Z-Z X-X
Ultimate sagging(+)
Moment,Mup(Tm/width) 1.17 5.93
Along Axis -----> Z-Z X-X Effective Depth (for + M), d (m) 0.432 0.432

Ed
Ultimate Shear force (In sagging zone)(T/width) 0.06 6.77 Mup/bd2 (N/mm2) 0.06 0.32
Nominal shear stress (N/mm 2) 0.00 0.16 Tensile steel required at bottom (%) 0.01 0.07
Max allowable shear stress (N/mm 2) 0.42 0.42 Provide bars of dia (mm) 12 12
Ultimate Shear force (In hogging zone)(T) 1.44 0.04 at c/c distance (mm) 160 160
Nominal shear stress (N/mm 2) 0.03 0.00 Tensile steel provided at bottom (%) 0.17 0.17
Max allowable shear stress (N/mm 2) 0.42 0.42 Ultimate hogging(-)
Stirrup Diameter (mm) NA Moment,Mun(Tm/meter width) -0.66 -0.58
Stirrup spacing (N/mm 2) NA NA Mun/bd2 (N/mm2) 0.04 0.03

F
Stress in stirrup (N/mm 2) NA NA Tensile steel required at top (%) 0.01 0.01
Total Stirrup stress (N/mm 2) NA Provide bars of dia (mm) 12 12
Permissible Stirrup stress (N/mm 2) NA at c/c distance (mm) 160 160

PD
Tensile steel provided at top (%) 0.17 0.17
Effective Depth (for - M), d (m) 0.432 0.432
P UNCH ING SH EAR FO R P EDESTALS
Pedestal ID Ultimate Design Area for resisting Punching Shear Allowable punching
P31 24.76 Ton 1.61 m2 0.15 N/mm2 1.37 N/mm2
P32 1.51 Ton 1.61 m2 0.01 N/mm2 1.37 N/mm2
P33 28.19 Ton 1.61 m2 0.18 N/mm2 1.37 N/mm2
P34 8.67 Ton 1.61 m2 0.05 N/mm2 1.37 N/mm2
P35 27.81 Ton 1.61 m2 0.17 N/mm2 1.37 N/mm2
P36 9.75 Ton 1.61 m2 0.06 N/mm2 1.37 N/mm2
P37 21.72 Ton 1.61 m2 0.13 N/mm2 1.37 N/mm2
te r
P38 0.46 Ton 1.61 m2 0.00 N/mm2 1.37 N/mm2
as
nM
di
a te
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
F AC TOR OF SAF ETY F OR ALL LOAD C ASES ( Per mis s ible/ Ac tual)

Pile Reaction ALONG Z-Z ALONG X-X


Compressi pt at Shear pt at Shear

Ed
Load case pt at top pt at top Punching
on Tension Shear bottom stress bottom stress
500 1 DL1+1N/a
LL1+1 EQUIP1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
501 1 DL1+1N/a
LL1+1 EQUIP1+1
N/a TEMP1
N/a N/A N/A N/A N/A N/A N/A N/A
502 1 DL1+1N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
503 1 DL1+1N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
504 1 DL1+1N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A
505 1 DL1+1N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
506 1 DL1+1N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
507 1 DL1+1N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
508 1 DL1+1N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A

F
509 1 DL1+1N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
510 1 DL1+0.7
N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
511 1 DL1+0.7
N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
512 1 DL1+0.7
N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A

PD
513 1 DL1+0.7
N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
514 1 DL1+0.7
N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
515 1 DL1+0.7
N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
516 1 DL1+0.7
N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A
517 1 DL1+0.7
N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
518 1 DL1+ 1LL1+0.75
N/a WL1+1
N/a EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
519 1 DL1+1.0
N/a
LL1+0.75 N/a
WL2+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
520 1 DL1+1.0
N/a
LL1+0.75 N/a
WL3+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
521 1 DL1+1.0
N/a
LL1+0.75 N/a
WL4+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
522 1 DL1+1.0
N/a
LL1+0.75 N/a
WL5+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
523 1 DL1+1.0
N/a
LL1+0.75 N/a
WL6+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
te r
524 1 DL1+1.0
N/a
LL1+0.75 N/a
WL7+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
525 1 DL1+1.0
N/a
LL1+0.75 N/a
WL8+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
526 1 DL1+1.0
N/a
LL1+1 EQUIP1+0.525
N/a N/a
SL1 N/A N/A N/A N/A N/A N/A N/A
527 1 DL1+1.0
N/a
LL1+1 EQUIP1+0.525
N/a N/a
SL2 N/A N/A N/A N/A N/A N/A N/A
528 0.6 DL1+1
N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
529 0.6 DL1+1
N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
530 0.6 DL1+1
N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A
531 0.6 DL1+1
N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
as

532 0.6 DL1+1


N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
533 0.6 DL1+1
N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
534 0.6 DL1+1
N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A
535 0.6 DL1+1
N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
536 0.6 DL1+0.7
N/a SL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
537 0.6 DL1+0.7
N/a SL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
1001 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1 14.75 24.00 12.54 2.57 N/A 2.86 7.88
nM

1002 1.35 DL1+1.5


N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1 10.77 21.85 12.54 2.51 N/A 2.79 7.46
1003 1.35 DL1+1.5
N/a WL1+0.9
N/a TEMP1 N/a 15.40 N/A 12.54 2.44 12.31 2.83 16.20
1004 1.35 DL1+1.5
N/a WL2+0.9
N/a TEMP1 N/a 15.14 N/A 12.54 2.45 12.36 2.83 16.15
1005 1.35 DL1+1.5
N/a WL3+0.9
N/a TEMP1 N/a 15.13 N/A 12.54 2.43 12.87 2.84 16.03
1006 1.35 DL1+1.5
N/a WL4+0.9
N/a TEMP1 N/a 14.88 N/A 12.54 2.44 12.97 2.84 15.98
1007 1.35 DL1+1.5
N/a WL5+0.9
N/a TEMP1 N/a 10.47 N/A 12.54 2.77 N/A 3.20 12.88
1008 1.35 DL1+1.5
N/a WL6+0.9
N/a TEMP1 N/a 10.35 N/A 12.54 2.78 N/A 3.20 12.85
1009 1.35 DL1+1.5
N/a WL7+0.9
N/a TEMP1 N/a 18.61 N/A 12.54 2.73 N/A 3.31 14.26
1010 1.35 DL1+1.5
N/a WL8+0.9
N/a TEMP1 N/a 18.58 N/A 12.54 2.74 N/A 3.31 14.34
1011 1.35 DL1+1.5
N/a WL1+-0.9
N/a TEMP1 N/a 14.82 N/A 12.54 2.39 20.97 2.86 14.48
1012 1.35 DL1+1.5
N/a WL2+-0.9
N/a TEMP1 N/a 14.58 N/A 12.54 2.40 21.12 2.86 14.57
di

1013 1.35 DL1+1.5


N/a WL3+-0.9
N/a TEMP1 N/a 14.57 N/A 12.54 2.38 22.56 2.81 14.68
1014 1.35 DL1+1.5
N/a WL4+-0.9
N/a TEMP1 N/a 14.34 N/A 12.54 2.39 22.87 2.81 14.78
1015 1.35 DL1+1.5
N/a WL5+-0.9
N/a TEMP1 N/a 10.20 N/A 12.54 2.70 N/A 3.12 15.00
1016 1.35 DL1+1.5
N/a WL6+-0.9
N/a TEMP1 N/a 10.09 N/A 12.54 2.71 N/A 3.11 14.96
1017 1.35 DL1+1.5
N/a WL7+-0.9
N/a TEMP1 N/a 12.69 N/A 12.54 2.67 N/A 3.22 12.78
1018 1.35 DL1+1.5
N/a WL8+-0.9
N/a TEMP1 N/a 12.68 N/A 12.54 2.68 N/A 3.22 12.85
1019 1.35 DL1+0.9
N/a TEMP1+1.35
N/a MR1
N/a 14.81 N/A 12.54 2.78 N/A 3.25 16.63
a te

1020 1.35 DL1+-0.9


N/a TEMP1+1.35
N/a MR1
N/a 14.27 N/A 12.54 2.71 N/A 3.16 16.64
1021 1.35 DL1+1.5LL1+1.5
N/a N/aEQUIP1+0.9
N/a TEMP1+1.35 14.71
MR1 23.97 12.54 2.57 N/A 2.86 7.88
1022 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
10.74
MR1 21.82 12.54 2.51 N/A 2.79 7.46
1023 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1+1.35
16.85
MR1 23.22 12.54 2.66 N/A 3.05 8.38
1024 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
11.85MR1 21.20 12.54 2.60 N/A 2.98 7.90
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
14.58 23.72
MR1 12.54 2.39 17.00 2.61 7.81
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
14.56 23.78
MR1 12.54 2.39 17.06 2.61 7.81
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
14.68 23.81
MR1 12.54 2.40 20.13 2.66 7.84
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+0.9 TEMP1+1.35
14.58 23.72
MR1 12.54 2.39 17.00 2.61 7.81
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+0.9 TEMP1+1.35
14.56 23.78
MR1 12.54 2.39 17.06 2.61 7.81
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+0.9 TEMP1+1.35
14.68 23.81
MR1 12.54 2.40 20.13 2.66 7.84
1028 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+0.9 TEMP1+1.35
14.67 23.87
MR1 12.54 2.41 20.27 2.66 7.84
1029 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+0.9 TEMP1+1.35
14.99 26.73
MR1 12.54 2.59 N/A 2.83 8.15

Ed
1030 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+0.9 TEMP1+1.35
14.85 26.81
MR1 12.54 2.59 N/A 2.83 8.15
1031 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+0.9 TEMP1+1.35
12.94 21.71
MR1 12.54 2.55 N/A 2.88 7.66
1032 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+0.9 TEMP1+1.35
12.93 21.76
MR1 12.54 2.55 N/A 2.88 7.66
1033 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
10.67 21.61
MR1 12.54 2.34 N/A 2.63 7.40
1034 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
10.67 21.66
MR1 12.54 2.34 N/A 2.64 7.40
1035 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
10.73 21.68
MR1 12.54 2.35 N/A 2.62 7.42
1036 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
10.72 21.73
MR1 12.54 2.36 N/A 2.61 7.42
1037 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
12.09 24.08
MR1 12.54 2.53 N/A 2.77 7.70
1038 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
12.08 24.14
MR1 12.54 2.53 N/A 2.77 7.70
1039 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
9.77 19.93
MR1 12.54 2.49 N/A 2.82 7.26
1040 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
9.76 19.97
MR1 12.54 2.50 N/A 2.81 7.26
1041 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+0.9 TEMP1+1.35
16.68 22.98
MR1 12.54 2.46 17.69 2.80 8.30

F
1042 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+0.9 TEMP1+1.35
16.66 23.04
MR1 12.54 2.47 17.75 2.80 8.30
1043 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+0.9 TEMP1+1.35
16.82 23.07
MR1 12.54 2.48 21.10 2.85 8.33
1044 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+0.9 TEMP1+1.35
16.80 23.12
MR1 12.54 2.48 21.26 2.85 8.33
1045 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+0.9 TEMP1+1.35
18.09 25.80
MR1 12.54 2.67 N/A 3.03 8.68
1046 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+0.9 TEMP1+1.35
17.87 25.87
MR1 12.54 2.68 N/A 3.03 8.68

PD
1047 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+0.9 TEMP1+1.35
14.58 21.09
MR1 12.54 2.63 N/A 3.09 8.13
1048 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+0.9 TEMP1+1.35
14.56 21.13
MR1 12.54 2.64 N/A 3.08 8.13
1049 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+-0.9 11.76
TEMP1+1.3521.00
MR1 12.54 2.41 N/A 2.83 7.83
1050 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+-0.9 11.75
TEMP1+1.3521.04
MR1 12.54 2.41 N/A 2.83 7.83
1051 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+-0.9 11.83
TEMP1+1.3521.07
MR1 12.54 2.42 N/A 2.78 7.86
1052 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+-0.9 11.82
TEMP1+1.3521.11
MR1 12.54 2.43 N/A 2.78 7.86
1053 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+-0.9 13.51
TEMP1+1.3523.32
MR1 12.54 2.61 N/A 2.95 8.17
1054 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+-0.9 13.49
TEMP1+1.3523.38
MR1 12.54 2.62 N/A 2.95 8.17
1055 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+-0.9 10.68
TEMP1+1.3519.40
MR1 12.54 2.57 N/A 3.01 7.68
1056 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+-0.9 10.67
TEMP1+1.3519.44
MR1 12.54 2.58 N/A 3.01 7.68
1057 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+0.9 TEMP1+1.35
16.57 22.83
MR1 12.54 2.35 11.72 2.62 8.25
1058 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+0.9 TEMP1+1.35
16.54 22.92
MR1 12.54 2.36 11.77 2.62 8.25
1059 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+0.9 TEMP1+1.35
16.80 22.97
MR1 12.54 2.36 13.22 2.67 8.29
1060 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+0.9 TEMP1+1.35
16.77 23.05
MR1 12.54 2.37 13.33 2.67 8.29
te r
1061 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+0.9 TEMP1+1.35
15.06 27.87
MR1 12.54 2.67 N/A 3.01 8.90
1062 1.148 DL1+1.5
N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+0.9 TEMP1+1.35
14.82 28.00
MR1 12.54 2.68 N/A 3.01 8.90
1063 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+0.9 TEMP1+1.35
13.37 19.87
MR1 12.54 2.61 N/A 3.11 7.97
1064 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+0.9 TEMP1+1.35
13.35 19.94
MR1 12.54 2.62 N/A 3.10 7.97
1065 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+-0.9 11.70
TEMP1+1.3520.87
MR1 12.54 2.30 19.30 2.65 7.79
1066 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+-0.9 11.69
TEMP1+1.3520.94
MR1 12.54 2.31 19.43 2.65 7.79
1067 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+-0.9 11.82
TEMP1+1.3520.98
MR1 12.54 2.31 23.66 2.66 7.82
1068 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+-0.9 11.80
TEMP1+1.3521.06
MR1 12.54 2.32 24.00 2.66 7.82
1069 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+-0.9 14.51
TEMP1+1.3525.00
MR1 12.54 2.60 N/A 2.94 8.36
as

1070 1.148 DL1+1.5


N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+-0.9 14.28
TEMP1+1.3525.11
MR1 12.54 2.62 N/A 2.93 8.37
1071 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+-0.9 10.01
TEMP1+1.3518.37
MR1 12.54 2.55 N/A 3.03 7.54
1072 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+-0.9 10.00
TEMP1+1.3518.43
MR1 12.54 2.56 N/A 3.03 7.54
1073 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a 16.05 N/A 12.54 2.54 17.97 2.95 16.23
1074 1 DL1+0.8
N/a LL1+1 SL2
N/a N/a 16.51 N/A 12.54 2.77 N/A 3.42 16.75
1075 1 DL1+0.8
N/a LL1+-1 SL1
N/a N/a 14.77 N/A 12.54 2.64 19.05 2.97 16.65
1076 1 DL1+0.8
N/a LL1+-1 SL2
N/a N/a 14.40 N/A 12.54 2.83 N/A 3.41 17.15
2001 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1 20.97
MR1 27.26 12.54 2.64 N/A 3.26 11.22
nM

2002 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1 20.95
MR1 27.31 12.54 2.64 N/A 3.26 11.22
2003 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1 21.12
MR1 27.34 12.54 2.65 N/A 3.19 11.26
2004 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1 21.09
MR1 27.39 12.54 2.66 N/A 3.18 11.26
2005 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+1 20.96
MR1N/A 12.54 2.80 N/A 3.34 11.69
2006 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+1 20.76
MR1N/A 12.54 2.80 N/A 3.33 11.69
2007 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+1 18.71
MR1 25.45 12.54 2.77 N/A 3.38 11.01
2008 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+1 18.69
MR1 25.50 12.54 2.77 N/A 3.38 11.01
2009 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+115.53
MR1 25.37 12.54 2.60 N/A 3.21 10.65
2010 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+115.52
MR1 25.41 12.54 2.60 N/A 3.21 10.65
2011 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+115.61
MR1 25.43 12.54 2.61 N/A 3.13 10.69
2012 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+115.60
MR1 25.48 12.54 2.61 N/A 3.13 10.69
2013 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+117.52
MR1 27.58 12.54 2.75 N/A 3.27 11.07
2014 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+117.50
MR1 27.63 12.54 2.75 N/A 3.27 11.07
2015 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+114.25
MR1 23.79 12.54 2.72 N/A 3.32 10.43
di

2016 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+114.24
MR1 23.83 12.54 2.73 N/A 3.32 10.45
2017 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1 20.85
MR1 27.12 12.54 2.55 19.27 3.10 11.16
2018 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1 20.82
MR1 27.20 12.54 2.56 19.36 3.10 11.16
2019 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1 21.09
MR1 27.24 12.54 2.56 22.34 3.08 11.21
2020 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1 21.06
MR1 27.33 12.54 2.57 22.54 3.08 11.21
2021 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+1 18.15
MR1N/A 12.54 2.79 N/A 3.32 11.95
2022 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+1 17.91
MR1N/A 12.54 2.80 N/A 3.32 11.95
2023 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+1 17.37
MR1 24.26 12.54 2.75 N/A 3.40 10.49
a te

2024 1 DL1+1.0
N/a LL1+1 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+1 17.35
MR1 24.33 12.54 2.76 N/A 3.39 10.52
2025 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+115.46
MR1 25.24 12.54 2.51 N/A 3.11 10.57
2026 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+115.45
MR1 25.31 12.54 2.52 N/A 3.10 10.60
2027 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+115.60
MR1 25.35 12.54 2.52 N/A 3.03 10.64
2028 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+115.58
MR1 25.42 12.54 2.53 N/A 3.03 10.64
2029 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+117.61
MR1N/A 12.54 2.75 N/A 3.26 11.30
2030 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+117.38
MR1N/A 12.54 2.76 N/A 3.26 11.30
2031 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+113.46
MR1 22.74 12.54 2.71 N/A 3.34 9.93
2032 1 DL1+0.7
N/a LL1+1 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+113.45
MR1 22.81 12.54 2.72 N/A 3.33 9.95
2033 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a 16.05 N/A 12.54 2.54 17.97 2.95 16.23
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
FOUNDATION FOR PEDESTAL (P15) (P18)-(Pile Capacity Check)

Ed
LOAD CASE: 526 1 DL1+1.0
526 LL1+1
1 DL1+0.75
EQUIP1+0.525
LL1+1 EQUIP1+0.525
SL1 SL1

GENERAL PILECAP DIMENSIONS, POSITION


Concrete Density 2.5 ton/m3 Pilecap thickness 2.500 m
Soil Density 2 ton/m3 Z cordinate of center of the pilecap -3.000 m
Grade of Concrete (Cylinder) C 30 X cordinate of center of the pilecap 22.500 m
Grade of Steel Fe 500 Length along axis Z, L z 5.820 m
Level of Base of pilecap -5.1 m Length along axis X, L x 14.940 m

F
Finished Ground level -0.6 m Area of base of pilecap, A 86.95 m2
Level of max water table -0.6 m

PD
PEDESTAL (COLUMN) DIMENSIONS, POSITIONS & LOADS
C.G. of Pedestal Ped top P + W ped
Pedestal ID Lz-z (m) Lx-x (m) P (T) Hz (T) Mx (T-m) Hx (T) Mz (T-m)
Z X [Level of (T)
P15 1.600 1.600 -3.000 18.250 -5.100 1077.60 -10.86 -41.12 -46.71 285.21 1077.60
P18 1.600 1.600 -3.000 26.750 -5.100 1098.34 -12.46 -49.22 -36.72 211.71 1098.34

PILE DETAILS
Number of Piles 21 CGz of Pile group -3 m
Diameter of Piles 760 mm CGx of Pile group 22.5 m
2
Compressive capacity of piles 192 T SUM[(Xi-Xcg)2] of Pile group 436.666 m
te r
2
Tensile capacity of piles 40 T SUM[(Zi-Zcg)2] of Pile group 72.778 m
Shear capacity of piles 11.5 T

Weight of soil, W soil 391.28 T


Weight of footing, W f ooting 108.69 T
Axial load due to [P+ W ped] 2175.94 T
as

Total axial Load 2675.91 T

Mz due to [Mz+(P+W ped)*ex ] 585.06 Ton-m Mx due to [Mx+(P+W ped)*ez] -90.34 Ton-m
Eccentricity between Pilecap and Pile group 0.00 mm Eccentricity between Pilecap and Pile group 0.00 mm
Mz due to pilecap and pile group eccentricity 0.00 Ton-m Mx due to pilecap and pile group eccentricity 0.00 Ton-m
Total Mz 585.06 Ton-m Total Mx -90.34 Ton-m
nM

Distance Distance P due to


from pile from pile Axial P due to P due to
Pile ID CGx CGz group CGx group CGz Load (T) Mx (T) Mz (T) Total P (T) Shear (T)
PCG-4-1 15.66 -5.28 -6.84 -2.28 127.42 2.83 -9.16 121.09 4.12
PCG-4-2 15.66 -3.00 -6.84 0.00 127.42 0.00 -9.16 118.26 4.12
PCG-4-3 15.66 -0.72 -6.84 2.28 127.42 -2.83 -9.16 115.43 4.12
PCG-4-4 17.94 -5.28 -4.56 -2.28 127.42 2.83 -6.11 124.14 4.12
PCG-4-5 17.94 -3.00 -4.56 0.00 127.42 0.00 -6.11 121.31 4.12
di

PCG-4-6 17.94 -0.72 -4.56 2.28 127.42 -2.83 -6.11 118.48 4.12
PCG-4-7 20.22 -5.28 -2.28 -2.28 127.42 2.83 -3.05 127.20 4.12
PCG-4-8 20.22 -3.00 -2.28 0.00 127.42 0.00 -3.05 124.37 4.12
PCG-4-9 20.22 -0.72 -2.28 2.28 127.42 -2.83 -3.05 121.54 4.12
PCG-4-10 22.50 -5.28 0.00 -2.28 127.42 2.83 0.00 130.25 4.12
PCG-4-11 22.50 -3.00 0.00 0.00 127.42 0.00 0.00 127.42 4.12
PCG-4-12 22.50 -0.72 0.00 2.28 127.42 -2.83 0.00 124.59 4.12
a te

PCG-4-13 24.78 -5.28 2.28 -2.28 127.42 2.83 3.05 133.31 4.12
PCG-4-14 24.78 -3.00 2.28 0.00 127.42 0.00 3.05 130.48 4.12
PCG-4-15 24.78 -0.72 2.28 2.28 127.42 -2.83 3.05 127.65 4.12
PCG-4-16 27.06 -5.28 4.56 -2.28 127.42 2.83 6.11 136.36 4.12
PCG-4-17 27.06 -3.00 4.56 0.00 127.42 0.00 6.11 133.53 4.12
PCG-4-18 27.06 -0.72 4.56 2.28 127.42 -2.83 6.11 130.70 4.12
PCG-4-19 29.34 -5.28 6.84 -2.28 127.42 2.83 9.16 139.42 4.12
PCG-4-20 29.34 -3.00 6.84 0.00 127.42 0.00 9.16 136.59 4.12
re

PCG-4-21 29.34 -0.72 6.84 2.28 127.42 -2.83 9.16 133.76 4.12
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
F AC TOR OF SAF ETY F OR ALL LOAD C ASES ( Per mis s ible/ Ac tual)

Pile Reaction ALONG Z-Z ALONG X-X


Compressi pt at Shear pt at Shear

Ed
Load case pt at top pt at top Punching
on Tension Shear bottom stress bottom stress
500 1 DL1+1 LL1+11.57
EQUIP1
N/a 10.93 N/A N/A N/A N/A N/A N/A N/A
501 1 DL1+1 LL1+11.58
EQUIP1+1
N/a TEMP1 32.02 N/A N/A N/A N/A N/A N/A N/A
502 1 DL1+1 WL1 2.78 N/a 3.15 N/A N/A N/A N/A N/A N/A N/A
503 1 DL1+1 WL2 2.76 N/a 3.14 N/A N/A N/A N/A N/A N/A N/A
504 1 DL1+1 WL3 2.84 N/a 3.35 N/A N/A N/A N/A N/A N/A N/A
505 1 DL1+1 WL4 2.81 N/a 3.39 N/A N/A N/A N/A N/A N/A N/A
506 1 DL1+1 WL5 2.93 N/a 6.49 N/A N/A N/A N/A N/A N/A N/A
507 1 DL1+1 WL6 2.89 N/a 7.18 N/A N/A N/A N/A N/A N/A N/A
508 1 DL1+1 WL7 2.94 N/a 5.36 N/A N/A N/A N/A N/A N/A N/A

F
509 1 DL1+1 WL8 2.86 N/a 4.97 N/A N/A N/A N/A N/A N/A N/A
510 1 DL1+0.7 WL12.95 N/a 4.44 N/A N/A N/A N/A N/A N/A N/A
511 1 DL1+0.7 WL22.93 N/a 4.43 N/A N/A N/A N/A N/A N/A N/A
512 1 DL1+0.7 WL32.99 N/a 4.87 N/A N/A N/A N/A N/A N/A N/A

PD
513 1 DL1+0.7 WL42.97 N/a 4.92 N/A N/A N/A N/A N/A N/A N/A
514 1 DL1+0.7 WL53.06 N/a 9.88 N/A N/A N/A N/A N/A N/A N/A
515 1 DL1+0.7 WL63.03 N/a 11.00 N/A N/A N/A N/A N/A N/A N/A
516 1 DL1+0.7 WL73.06 N/a 7.28 N/A N/A N/A N/A N/A N/A N/A
517 1 DL1+0.7 WL83.00 N/a 6.77 N/A N/A N/A N/A N/A N/A N/A
518 1 DL1+ 1LL1+0.75
1.48WL1+1
N/a EQUIP1 3.71 N/A N/A N/A N/A N/A N/A N/A
519 1 DL1+1.0 LL1+0.75
1.47 N/a
WL2+1 EQUIP1 3.67 N/A N/A N/A N/A N/A N/A N/A
520 1 DL1+1.0 LL1+0.75
1.50 N/a
WL3+1 EQUIP1 4.97 N/A N/A N/A N/A N/A N/A N/A
521 1 DL1+1.0 LL1+0.75
1.48 N/a
WL4+1 EQUIP1 4.95 N/A N/A N/A N/A N/A N/A N/A
522 1 DL1+1.0 LL1+0.75
1.53 N/a
WL5+1 EQUIP1 19.14 N/A N/A N/A N/A N/A N/A N/A
523 1 DL1+1.0 LL1+0.75
1.53 N/a
WL6+1 EQUIP1 23.31 N/A N/A N/A N/A N/A N/A N/A
te r
524 1 DL1+1.0 LL1+0.75
1.49 N/a
WL7+1 EQUIP1 4.73 N/A N/A N/A N/A N/A N/A N/A
525 1 DL1+1.0 LL1+0.75
1.47 N/a
WL8+1 EQUIP1 4.50 N/A N/A N/A N/A N/A N/A N/A
526 1 DL1+1.0 LL1+11.38
EQUIP1+0.525
N/a SL1 2.79 N/A N/A N/A N/A N/A N/A N/A
527 1 DL1+1.0 LL1+11.52
EQUIP1+0.525
N/a SL2 9.26 N/A N/A N/A N/A N/A N/A N/A
528 0.6 DL1+1 WL13.42 N/a 3.18 N/A N/A N/A N/A N/A N/A N/A
529 0.6 DL1+1 WL23.39 N/a 3.18 N/A N/A N/A N/A N/A N/A N/A
530 0.6 DL1+1 WL33.51 N/a 3.29 N/A N/A N/A N/A N/A N/A N/A
531 0.6 DL1+1 WL43.47 N/a 3.34 N/A N/A N/A N/A N/A N/A N/A
as

532 0.6 DL1+1 WL53.64 N/a 6.14 N/A N/A N/A N/A N/A N/A N/A
533 0.6 DL1+1 WL63.59 N/a 6.75 N/A N/A N/A N/A N/A N/A N/A
534 0.6 DL1+1 WL73.67 N/a 5.63 N/A N/A N/A N/A N/A N/A N/A
535 0.6 DL1+1 WL83.55 N/a 5.20 N/A N/A N/A N/A N/A N/A N/A
536 0.6 DL1+0.7 SL12.92 N/a 2.00 N/A N/A N/A N/A N/A N/A N/A
537 0.6 DL1+0.7 SL24.00 N/a 15.95 N/A N/A N/A N/A N/A N/A N/A
1001 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1 N/A N/A N/A N/A N/A N/A N/A
nM

1002 1.35 DL1+1.5


N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1N/A N/A N/A N/A N/A N/A N/A
1003 1.35 DL1+1.5
N/a WL1+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1004 1.35 DL1+1.5
N/a WL2+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1005 1.35 DL1+1.5
N/a WL3+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1006 1.35 DL1+1.5
N/a WL4+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1007 1.35 DL1+1.5
N/a WL5+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1008 1.35 DL1+1.5
N/a WL6+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1009 1.35 DL1+1.5
N/a WL7+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1010 1.35 DL1+1.5
N/a WL8+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1011 1.35 DL1+1.5
N/a WL1+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1012 1.35 DL1+1.5
N/a WL2+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
di

1013 1.35 DL1+1.5


N/a WL3+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1014 1.35 DL1+1.5
N/a WL4+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1015 1.35 DL1+1.5
N/a WL5+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1016 1.35 DL1+1.5
N/a WL6+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1017 1.35 DL1+1.5
N/a WL7+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1018 1.35 DL1+1.5
N/a WL8+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1019 1.35 DL1+0.9
N/a TEMP1+1.35
N/a MR1
N/a N/A N/A N/A N/A N/A N/A N/A
a te

1020 1.35 DL1+-0.9


N/a TEMP1+1.35
N/a MR1
N/a N/A N/A N/A N/A N/A N/A N/A
1021 1.35 DL1+1.5LL1+1.5
N/a N/aEQUIP1+0.9
N/a TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A N/A
1022 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1023 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1024 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1028 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1029 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

Ed
1030 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1031 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1032 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1033 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1034 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1035 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1036 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1037 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1038 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1039 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1040 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1041 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

F
1042 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1043 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1044 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1045 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1046 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

PD
1047 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1048 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1049 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1050 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1051 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1052 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1053 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1054 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1055 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1056 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1057 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1058 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1059 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1060 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
te r
1061 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1062 1.148 DL1+1.5
N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1063 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1064 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1065 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1066 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1067 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1068 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1069 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
as

1070 1.148 DL1+1.5


N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1071 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1072 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1073 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1074 1 DL1+0.8
N/a LL1+1 SL2
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1075 1 DL1+0.8
N/a LL1+-1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1076 1 DL1+0.8
N/a LL1+-1 SL2
N/a N/a N/A N/A N/A N/A N/A N/A N/A
2001 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
nM

2002 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2003 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2004 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2005 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2006 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2007 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2008 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2009 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2010 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2011 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2012 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2013 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2014 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2015 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
di

2016 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2017 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2018 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2019 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2020 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2021 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2022 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2023 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
a te

2024 1 DL1+1.0
N/a LL1+1 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2025 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2026 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2027 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2028 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2029 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2030 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2031 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2032 1 DL1+0.7
N/a LL1+1 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2033 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
FOUNDATION FOR PEDESTAL (P15) (P18)-(Pilecap Design)

Ed
LOAD CASE: 1026 1.35 DL1+1.5
1026 1.35
LL1+0.9
DL1+1.05
WL2+1.5
LL1+0.9
EQUIP1+0.9
WL2+1.05 TEMP1+1.35
EQUIP1+0.9 TEMP1+1.35
MR1 MR1

GENERAL PILECAP DIMENSIONS, POSITION


Concrete Density 2.5 ton/m3 Pilecap thickness 2.500 m
Soil Density 2 ton/m3 Z cordinate of center of the pilecap -3.000 m
Grade of Concrete (Cylinder) C 30 X cordinate of center of the pilecap 22.500 m
Grade of Steel Fe 500 Length along axis Z, L z 5.820 m
Level of Base of pilecap -5.1 m Length along axis X, L x 14.940 m

F
Finished Ground level -0.6 m Area of base of pilecap, A 86.95 m2
Level of max water table -0.6 m

PD
PEDESTAL (COLUMN) DIMENSIONS, POSITIONS & LOADS
C.G. of Pedestal Ped top P + W ped
Pedestal ID Lz-z (m) Lx-x (m) P (T) Hz (T) Mx (T-m) Hx (T) Mz (T-m)
Z X [Level of (T)
P15 1.600 1.600 -3.000 18.250 -5.100 1418.81 -0.50 14.57 41.86 208.43 1418.81
P18 1.600 1.600 -3.000 26.750 -5.100 1516.13 -2.15 4.82 36.10 177.76 1516.13

PILE DETAILS
Number of Piles 21 CGz of Pile group -3 m
Diameter of Piles 760 mm CGx of Pile group 22.5 m
2
Compressive capacity of piles 192 T SUM[(Xi-Xcg)2] of Pile group 436.666 m
te r
2
Tensile capacity of piles 40 T SUM[(Zi-Zcg)2] of Pile group 72.778 m
Shear capacity of piles 11.5 T

Weight of soil, W soil 528.23 T


Weight of footing, W f ooting 146.73 T
Axial load due to [P+ W ped] 2934.95 T
as

Total axial Load 3609.90 T

Mz due to [Mz+(P+W ped)*ex ] 799.78 Ton-m Mx due to [Mx+(P+W ped)*ez] 19.40 Ton-m
Eccentricity between Pilecap and Pile group 0.00 mm Eccentricity between Pilecap and Pile group 0.00 mm
Mz due to pilecap and pile group eccentricity 0.00 Ton-m Mx due to pilecap and pile group eccentricity 0.00 Ton-m
Total Mz 799.78 Ton-m Total Mx 19.40 Ton-m
nM

Distance Distance P due to


from pile from pile Axial P due to P due to
Pile ID CGx CGz group CGx group CGz Load (T) Mx (T) Mz (T) Total P (T) Shear (T)
PCG-4-1 15.66 -5.28 -6.84 -2.28 171.90 -0.61 -12.53 158.76 3.71
PCG-4-2 15.66 -3.00 -6.84 0.00 171.90 0.00 -12.53 159.37 3.71
PCG-4-3 15.66 -0.72 -6.84 2.28 171.90 0.61 -12.53 159.98 3.71
PCG-4-4 17.94 -5.28 -4.56 -2.28 171.90 -0.61 -8.35 162.94 3.71
PCG-4-5 17.94 -3.00 -4.56 0.00 171.90 0.00 -8.35 163.55 3.71
di

PCG-4-6 17.94 -0.72 -4.56 2.28 171.90 0.61 -8.35 164.16 3.71
PCG-4-7 20.22 -5.28 -2.28 -2.28 171.90 -0.61 -4.18 167.12 3.71
PCG-4-8 20.22 -3.00 -2.28 0.00 171.90 0.00 -4.18 167.72 3.71
PCG-4-9 20.22 -0.72 -2.28 2.28 171.90 0.61 -4.18 168.33 3.71
PCG-4-10 22.50 -5.28 0.00 -2.28 171.90 -0.61 0.00 171.29 3.71
PCG-4-11 22.50 -3.00 0.00 0.00 171.90 0.00 0.00 171.90 3.71
PCG-4-12 22.50 -0.72 0.00 2.28 171.90 0.61 0.00 172.51 3.71
a te

PCG-4-13 24.78 -5.28 2.28 -2.28 171.90 -0.61 4.18 175.47 3.71
PCG-4-14 24.78 -3.00 2.28 0.00 171.90 0.00 4.18 176.08 3.71
PCG-4-15 24.78 -0.72 2.28 2.28 171.90 0.61 4.18 176.68 3.71
PCG-4-16 27.06 -5.28 4.56 -2.28 171.90 -0.61 8.35 179.64 3.71
PCG-4-17 27.06 -3.00 4.56 0.00 171.90 0.00 8.35 180.25 3.71
PCG-4-18 27.06 -0.72 4.56 2.28 171.90 0.61 8.35 180.86 3.71
PCG-4-19 29.34 -5.28 6.84 -2.28 171.90 -0.61 12.53 183.82 3.71
PCG-4-20 29.34 -3.00 6.84 0.00 171.90 0.00 12.53 184.43 3.71
re

PCG-4-21 29.34 -0.72 6.84 2.28 171.90 0.61 12.53 185.04 3.71
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
Load factor for Limit State design 1 Along Axis -----> Z-Z X-X
Ultimate sagging(+)
Moment,Mup(Tm/width) 102.14 148.63
Along Axis -----> Z-Z X-X Effective Depth (for + M), d (m) 2.3415 2.3415

Ed
Ultimate Shear force (In sagging zone)(T/width) 65.28 87.18 Mup/bd2 (N/mm2) 0.19 0.27
Nominal shear stress (N/mm 2) 0.28 0.37 Tensile steel required at bottom (%) 0.04 0.06
Max allowable shear stress (N/mm 2) 0.28 0.28 Provide bars of dia (mm) 39 39
Ultimate Shear force (In hogging zone)(T) 6.69 56.40 at c/c distance (mm) 250 250
Nominal shear stress (N/mm 2) 0.03 0.24 Tensile steel provided at bottom (%) 0.2 0.2
Max allowable shear stress (N/mm 2) 0.28 0.28 Ultimate hogging(-)
Stirrup Diameter (mm) 10 Moment,Mun(Tm/meter width) 0.00 -65.06
Stirrup spacing (N/mm 2) 250 250 Mun/bd2 (N/mm2) 0.00 0.12

F
Stress in stirrup (N/mm 2) 98.64 131.74 Tensile steel required at top (%) 0.00 0.03
Total Stirrup stress (N/mm 2) 230.38 Provide bars of dia (mm) 39 39
Permissible Stirrup stress (N/mm 2) 434.78 at c/c distance (mm) 250 250

PD
Tensile steel provided at top (%) 0.2 0.2
Effective Depth (for - M), d (m) 2.342 2.342
P UNCH ING SH EAR FO R P EDESTALS
Pedestal ID Ultimate Design Area for resisting Punching Shear Allowable punching
P15 1087.54 Ton 36.92 m2 0.29 N/mm2 1.37 N/mm2
P18 1159.80 Ton 36.92 m2 0.31 N/mm2 1.37 N/mm2
te r
as
nM
di
a te
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
F AC TOR OF SAF ETY F OR ALL LOAD C ASES ( Per mis s ible/ Ac tual)

Pile Reaction ALONG Z-Z ALONG X-X


Compressi pt at Shear pt at Shear

Ed
Load case pt at top pt at top Punching
on Tension Shear bottom stress bottom stress
500 1 DL1+1N/a
LL1+1 EQUIP1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
501 1 DL1+1N/a
LL1+1 EQUIP1+1
N/a TEMP1
N/a N/A N/A N/A N/A N/A N/A N/A
502 1 DL1+1N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
503 1 DL1+1N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
504 1 DL1+1N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A
505 1 DL1+1N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
506 1 DL1+1N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
507 1 DL1+1N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
508 1 DL1+1N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A

F
509 1 DL1+1N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
510 1 DL1+0.7
N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
511 1 DL1+0.7
N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
512 1 DL1+0.7
N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A

PD
513 1 DL1+0.7
N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
514 1 DL1+0.7
N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
515 1 DL1+0.7
N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
516 1 DL1+0.7
N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A
517 1 DL1+0.7
N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
518 1 DL1+ 1LL1+0.75
N/a WL1+1
N/a EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
519 1 DL1+1.0
N/a
LL1+0.75 N/a
WL2+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
520 1 DL1+1.0
N/a
LL1+0.75 N/a
WL3+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
521 1 DL1+1.0
N/a
LL1+0.75 N/a
WL4+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
522 1 DL1+1.0
N/a
LL1+0.75 N/a
WL5+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
523 1 DL1+1.0
N/a
LL1+0.75 N/a
WL6+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
te r
524 1 DL1+1.0
N/a
LL1+0.75 N/a
WL7+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
525 1 DL1+1.0
N/a
LL1+0.75 N/a
WL8+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
526 1 DL1+1.0
N/a
LL1+1 EQUIP1+0.525
N/a N/a
SL1 N/A N/A N/A N/A N/A N/A N/A
527 1 DL1+1.0
N/a
LL1+1 EQUIP1+0.525
N/a N/a
SL2 N/A N/A N/A N/A N/A N/A N/A
528 0.6 DL1+1
N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
529 0.6 DL1+1
N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
530 0.6 DL1+1
N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A
531 0.6 DL1+1
N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
as

532 0.6 DL1+1


N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
533 0.6 DL1+1
N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
534 0.6 DL1+1
N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A
535 0.6 DL1+1
N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
536 0.6 DL1+0.7
N/a SL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
537 0.6 DL1+0.7
N/a SL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
1001 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1 4.63 N/A 1.96 3.49 6.85 1.96 4.48
nM

1002 1.35 DL1+1.5


N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1 4.44 N/A 1.93 3.36 7.33 1.93 4.45
1003 1.35 DL1+1.5
N/a WL1+0.9
N/a TEMP1 N/a 13.22 N/A 4.43 7.12 N/A 4.43 14.84
1004 1.35 DL1+1.5
N/a WL2+0.9
N/a TEMP1 N/a 12.97 N/A 4.34 6.89 N/A 4.34 14.19
1005 1.35 DL1+1.5
N/a WL3+0.9
N/a TEMP1 N/a 13.95 N/A 4.62 7.94 26.33 4.62 15.95
1006 1.35 DL1+1.5
N/a WL4+0.9
N/a TEMP1 N/a 13.67 N/A 4.52 7.71 25.33 4.52 15.13
1007 1.35 DL1+1.5
N/a WL5+0.9
N/a TEMP1 N/a 11.68 N/A 4.70 9.32 N/A 4.70 15.83
1008 1.35 DL1+1.5
N/a WL6+0.9
N/a TEMP1 N/a 11.48 N/A 4.59 8.92 N/A 4.59 14.99
1009 1.35 DL1+1.5
N/a WL7+0.9
N/a TEMP1 N/a 13.41 N/A 4.95 9.42 N/A 4.95 16.02
1010 1.35 DL1+1.5
N/a WL8+0.9
N/a TEMP1 N/a 12.68 N/A 4.77 9.11 N/A 4.77 15.27
1011 1.35 DL1+1.5
N/a WL1+-0.9
N/a TEMP1 N/a 14.55 N/A 4.56 6.49 N/A 4.56 14.88
1012 1.35 DL1+1.5
N/a WL2+-0.9
N/a TEMP1 N/a 13.69 N/A 4.41 6.30 N/A 4.41 14.23
di

1013 1.35 DL1+1.5


N/a WL3+-0.9
N/a TEMP1 N/a 15.77 N/A 4.77 7.85 N/A 4.77 15.60
1014 1.35 DL1+1.5
N/a WL4+-0.9
N/a TEMP1 N/a 14.81 N/A 4.60 7.62 N/A 4.60 14.82
1015 1.35 DL1+1.5
N/a WL5+-0.9
N/a TEMP1 N/a 12.93 N/A 4.86 8.28 N/A 4.86 15.48
1016 1.35 DL1+1.5
N/a WL6+-0.9
N/a TEMP1 N/a 12.69 N/A 4.74 7.96 N/A 4.74 14.68
1017 1.35 DL1+1.5
N/a WL7+-0.9
N/a TEMP1 N/a 11.91 N/A 4.73 8.89 N/A 4.73 16.07
1018 1.35 DL1+1.5
N/a WL8+-0.9
N/a TEMP1 N/a 11.33 N/A 4.56 8.59 N/A 4.56 15.31
1019 1.35 DL1+0.9
N/a TEMP1+1.35
N/a MR1
N/a 12.46 N/A 4.92 9.51 29.84 4.92 15.69
a te

1020 1.35 DL1+-0.9


N/a TEMP1+1.35
N/a MR1
N/a 12.16 N/A 4.83 8.43 N/A 4.83 15.35
1021 1.35 DL1+1.5LL1+1.5
N/a N/aEQUIP1+0.9
N/a TEMP1+1.35 4.58
MR1N/A 1.94 3.45 6.76 1.94 4.42
1022 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35 4.39
MR1N/A 1.90 3.32 7.23 1.90 4.39
1023 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1+1.35 4.79
MR1N/A 2.03 3.61 7.13 2.03 4.65
1024 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.354.59
MR1
N/A 1.99 3.46 7.66 1.99 4.62
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
4.66 N/A MR1 1.90 3.21 7.36 1.90 4.39
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
4.64 N/A MR1 1.89 3.18 7.31 1.89 4.36
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
4.72 N/A MR1 1.92 3.26 6.61 1.92 4.40
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+0.9 TEMP1+1.35
4.66 N/A MR1 1.90 3.21 7.36 1.90 4.39
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+0.9 TEMP1+1.35
4.64 N/A MR1 1.89 3.18 7.31 1.89 4.36
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+0.9 TEMP1+1.35
4.72 N/A MR1 1.92 3.26 6.61 1.92 4.40
1028 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+0.9 TEMP1+1.35
4.70 N/A MR1 1.91 3.24 6.57 1.91 4.36
1029 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+0.9 TEMP1+1.35
4.54 N/A MR1 1.92 3.39 6.91 1.92 4.39

Ed
1030 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+0.9 TEMP1+1.35
4.52 N/A MR1 1.91 3.36 6.86 1.91 4.35
1031 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+0.9 TEMP1+1.35
4.53 N/A MR1 1.92 3.42 6.87 1.92 4.45
1032 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+0.9 TEMP1+1.35
4.47 N/A MR1 1.90 3.40 6.82 1.90 4.42
1033 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
4.52 N/A MR1 1.87 3.08 7.92 1.87 4.40
1034 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
4.47 N/A MR1 1.85 3.05 7.86 1.85 4.36
1035 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
4.59 N/A MR1 1.89 3.25 7.06 1.89 4.37
1036 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
4.54 N/A MR1 1.87 3.22 7.01 1.87 4.33
1037 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
4.67 N/A MR1 1.94 3.28 7.41 1.94 4.37
1038 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
4.61 N/A MR1 1.92 3.25 7.35 1.92 4.33
1039 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
4.34 N/A MR1 1.89 3.42 7.36 1.89 4.46
1040 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
4.29 N/A MR1 1.87 3.40 7.31 1.87 4.42
1041 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.88 N/A MR1 1.98 3.35 7.80 1.98 4.62

F
1042 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.86 N/A MR1 1.97 3.32 7.74 1.97 4.58
1043 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.94 N/A MR1 2.00 3.41 6.96 2.00 4.62
1044 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.92 N/A MR1 1.99 3.38 6.92 1.99 4.58
1045 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.74 N/A MR1 2.01 3.55 7.30 2.01 4.62
1046 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.72 N/A MR1 1.99 3.51 7.25 1.99 4.57

PD
1047 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.73 N/A MR1 2.00 3.58 7.25 2.00 4.68
1048 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.68 N/A MR1 1.98 3.55 7.20 1.98 4.64
1049 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.73 N/A MR1 1.95 3.20 8.44 1.95 4.62
1050 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.67 N/A MR1 1.93 3.17 8.37 1.93 4.58
1051 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.80 N/A MR1 1.97 3.39 7.47 1.97 4.59
1052 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.75 N/A MR1 1.95 3.36 7.42 1.95 4.55
1053 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.89 N/A MR1 2.02 3.42 7.85 2.02 4.59
1054 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.83 N/A MR1 2.00 3.39 7.79 2.00 4.54
1055 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.53 N/A MR1 1.97 3.58 7.80 1.97 4.69
1056 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.48 N/A MR1 1.95 3.55 7.74 1.95 4.65
1057 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.90 N/A MR1 1.94 3.18 8.31 1.94 4.56
1058 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.87 N/A MR1 1.92 3.13 8.20 1.92 4.50
1059 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+0.9 TEMP1+1.35
5.00 N/A MR1 1.97 3.28 6.85 1.97 4.61
1060 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.96 N/A MR1 1.95 3.24 6.78 1.95 4.54
te r
1061 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.67 N/A MR1 1.98 3.51 7.42 1.98 4.60
1062 1.148 DL1+1.5
N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.64 N/A MR1 1.96 3.45 7.33 1.96 4.52
1063 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.70 N/A MR1 1.99 3.54 7.34 1.99 4.67
1064 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.60 N/A MR1 1.96 3.50 7.25 1.96 4.60
1065 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.83 N/A MR1 1.92 3.05 9.03 1.92 4.57
1066 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.73 N/A MR1 1.89 3.00 8.90 1.89 4.50
1067 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.96 N/A MR1 1.95 3.27 7.34 1.95 4.58
1068 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.86 N/A MR1 1.92 3.23 7.25 1.92 4.51
1069 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.86 N/A MR1 2.01 3.39 7.99 2.01 4.57
as

1070 1.148 DL1+1.5


N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.83 N/A MR1 1.99 3.34 7.88 1.99 4.49
1071 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.50 N/A MR1 1.95 3.54 7.90 1.95 4.67
1072 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.41 N/A MR1 1.92 3.50 7.80 1.92 4.60
1073 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a 6.48 N/A 2.49 3.13 14.45 2.49 6.58
1074 1 DL1+0.8
N/a LL1+1 SL2
N/a N/a 7.11 N/A 2.93 4.99 13.09 2.93 7.45
1075 1 DL1+0.8
N/a LL1+-1 SL1
N/a N/a 8.88 N/A 3.22 4.68 11.87 3.22 9.29
1076 1 DL1+0.8
N/a LL1+-1 SL2
N/a N/a 7.77 N/A 3.16 5.67 13.88 3.16 8.17
2001 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+16.62
MR1N/A 2.64 4.51 11.59 2.64 6.53
nM

2002 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+16.59
MR1N/A 2.62 4.47 11.50 2.62 6.48
2003 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+16.69
MR1N/A 2.66 4.64 10.36 2.66 6.53
2004 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+16.66
MR1N/A 2.65 4.61 10.29 2.65 6.48
2005 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+16.45
MR1N/A 2.67 4.80 10.85 2.67 6.53
2006 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+16.42
MR1N/A 2.65 4.75 10.78 2.65 6.47
2007 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+16.43
MR1N/A 2.66 4.86 10.79 2.66 6.62
2008 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+16.36
MR1N/A 2.64 4.83 10.71 2.64 6.56
2009 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1 6.42
MR1N/A 2.60 4.33 12.52 2.60 6.54
2010 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1 6.35
MR1N/A 2.58 4.30 12.42 2.58 6.48
2011 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1 6.51
MR1N/A 2.62 4.62 11.10 2.62 6.49
2012 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1 6.44
MR1N/A 2.60 4.59 11.03 2.60 6.44
2013 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1 6.62
MR1N/A 2.68 4.60 11.67 2.68 6.49
2014 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1 6.54
MR1N/A 2.66 4.56 11.58 2.66 6.43
2015 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1 6.18
MR1N/A 2.62 4.86 11.59 2.62 6.62
di

2016 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1 6.11
MR1N/A 2.60 4.83 11.50 2.60 6.57
2017 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+16.64
MR1N/A 2.59 4.30 12.34 2.59 6.46
2018 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+16.60
MR1N/A 2.57 4.25 12.18 2.57 6.37
2019 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+16.76
MR1N/A 2.62 4.49 10.19 2.62 6.51
2020 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+16.72
MR1N/A 2.60 4.44 10.09 2.60 6.42
2021 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+16.36
MR1N/A 2.64 4.76 11.03 2.64 6.50
2022 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+16.32
MR1N/A 2.62 4.69 10.89 2.62 6.40
2023 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+16.38
MR1N/A 2.64 4.82 10.91 2.64 6.60
a te

2024 1 DL1+1.0
N/a LL1+1 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+16.27
MR1N/A 2.61 4.76 10.78 2.61 6.51
2025 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1 6.54
MR1N/A 2.56 4.14 13.40 2.56 6.46
2026 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1 6.42
MR1N/A 2.53 4.09 13.21 2.53 6.38
2027 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1 6.71
MR1N/A 2.60 4.47 10.91 2.60 6.47
2028 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1 6.58
MR1N/A 2.57 4.42 10.79 2.57 6.38
2029 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1 6.60
MR1N/A 2.67 4.56 11.87 2.67 6.46
2030 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1 6.55
MR1N/A 2.65 4.50 11.71 2.65 6.36
2031 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1 6.14
MR1N/A 2.60 4.82 11.73 2.60 6.60
2032 1 DL1+0.7
N/a LL1+1 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1 6.03
MR1N/A 2.56 4.76 11.59 2.56 6.52
2033 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a 6.48 N/A 2.49 3.13 14.45 2.49 6.58
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
Ed
F
PD
WATER TABLE AT -5.1M
te r
as
nM
di
a te
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
FOUNDATION DESIGN
FOUNDATION FOR PEDESTAL (P3) (P4) (P9) (P10) (P1) (P5) (P6) (P11) (P2) (P7)
(P8) (P12)-(Pile Capacity Check)

Ed
LOAD CASE: 523 1 DL1+1.0
523 LL1+0.75
1 DL1+0.75
W L6+1
LL1+0.75
EQUIP1
W L6+1 EQUIP1

G E N E RA L PI L E C A P DI ME N SI O N S, PO SI T I O N
Concrete Density 2.5 ton/m 3 Pile ca p thickne ss 2.300 m
Soil Density 2 ton/m 3 Z cordinate of center of the pilecap -13.413 m
Grade of Concrete (Cylinder) C 30 X cordinate of center of the pilecap 4.838 m
Grade of Steel Fe 500 Le ngth a long a x is Z, L z 25.580 m
Level of Base of pilecap -5.1 m Le ngth a long a x is X, L x 13.898 m
Finished Ground level 0 m Area of base of pilecap, A 347.90 m2
Level of max water table -5.1 m

PE DE ST A L ( C O L U MN ) DI ME N SI O N S, PO SI T I O N S & L O A DS
C.G. of Pedestal Ped top P + W ped
Pedestal ID Lz-z (m) Lx-x (m) P (T) Hz (T) Mx (T-m) Hx (T) Mz (T-m)
Z X [Level of (T)

F
P3 1.250 1.250 -24.500 3.500 -5.100 -171.31 31.54 126.68 -1.50 -0.62 -171.31
P4 1.250 1.250 -21.000 3.500 -5.100 44.23 33.88 140.94 -3.48 -12.04 44.23
P9 1.250 1.250 -24.500 9.500 -5.100 10.59 30.65 130.40 0.61 1.78 10.59
P10 1.600 1.600 -21.000 9.500 -5.100 424.93 77.40 361.19 -8.67 -33.12 424.93
P1 1.250 1.250 -15.800 0.000 -5.100 148.93 21.65 105.52 -9.86 -48.67 148.93
P5 1.250 1.250 -15.800 3.500 -5.100 210.53 37.14 159.97 -10.19 -46.02 210.53
P6 1.250 1.250 -12.000 3.500 -5.100 191.66 45.51 164.10 -5.98 -37.65 191.66

PD
P11 1.250 1.250 -12.000 9.500 -5.100 254.65 32.65 186.67 -6.00 -28.23 254.65
P2 1.250 1.250 -8.200 0.000 -5.100 175.30 22.61 109.58 -2.76 -12.05 175.30
P7 1.250 1.250 -8.200 3.500 -5.100 108.10 39.21 176.39 -0.22 -9.18 108.10
P8 1.250 1.250 -3.000 3.500 -5.100 528.45 37.84 169.79 2.48 11.31 528.45
P12 1.600 1.600 -3.000 9.500 -5.100 835.47 85.14 419.06 4.48 37.35 835.47

PI L E DE T A I L S
Number of Piles 73 CGz of Pile group -13.413 m
Diameter of Piles 760 mm CGx of Pile group 4.838 m
2
Compressive capacity of piles 192 T SUM[(Xi-Xc g)2] of Pile group 1277.601 m
2
Tensile capacity of piles 40 T SUM[(Zi-Zc g)2] of Pile group 3903.652 m
Shear capacity of piles 11.5 T

W eight of soil, W s oil 3548.57 T


W eight of footing, W f oot ing 400.08 T
Axial load due to [P+ W ped] 2761.54 T
Total axial Load 6710.20 T

Mz due to [Mz+(P+W ped)*ex ] 4146.97 Ton-m Mx due to [Mx+(P+W ped)*ez] 15925.16 Ton-m
te r
Eccentricity between Pilecap and Pile group 0.00 mm Eccentricity between Pilecap and Pile group 0.00 mm
Mz due to pilecap and pile group eccentricity 0.00 Ton-m Mx due to pilecap and pile group eccentricity 0.00 Ton-m
Total Mz 4146.97 Ton-m Total Mx 15925.16 Ton-m

Distance Distance P due to


from pile from pile Axial P due to P due to
Pile ID CGx CGz group CGx group CGz Load (T) Mx (T) Mz (T) Total P (T) Shear (T)
PCG-1-1 -1.48 -24.36 -6.32 -10.94 91.92 -44.65 -20.51 26.76 6.81
PCG-1-2 -1.48 -21.92 -6.32 -8.51 91.92 -34.73 -20.51 36.68 6.81
PCG-1-3 -1.48 -19.49 -6.32 -6.08 91.92 -24.80 -20.51 46.61 6.81
PCG-1-4 -1.48 -17.06 -6.32 -3.65 91.92 -14.88 -20.51 56.53 6.81
PCG-1-5 -1.48 -14.63 -6.32 -1.22 91.92 -4.96 -20.51 66.45 6.81
as

PCG-1-6 -1.48 -12.20 -6.32 1.22 91.92 4.96 -20.51 76.37 6.81
PCG-1-7 -1.48 -9.77 -6.32 3.65 91.92 14.88 -20.51 86.29 6.81
PCG-1-8 -1.48 -7.33 -6.32 6.08 91.92 24.80 -20.51 96.21 6.81
PCG-1-9 -1.48 -4.90 -6.32 8.51 91.92 34.73 -20.51 106.13 6.81
PCG-1-10 -1.48 -2.47 -6.32 10.94 91.92 44.65 -20.51 116.06 6.81
PCG-1-11 0.63 -25.57 -4.21 -12.16 91.92 -49.61 -13.67 28.64 6.81
PCG-1-12 0.63 -23.14 -4.21 -9.73 91.92 -39.69 -13.67 38.56 6.81
PCG-1-13 0.63 -20.71 -4.21 -7.30 91.92 -29.76 -13.67 48.48 6.81
PCG-1-14 0.63 -18.28 -4.21 -4.86 91.92 -19.84 -13.67 58.41 6.81
PCG-1-15 0.63 -15.85 -4.21 -2.43 91.92 -9.92 -13.67 68.33 6.81
PCG-1-16 0.63 -13.41 -4.21 0.00 91.92 0.00 -13.67 78.25 6.81
PCG-1-17 0.63 -10.98 -4.21 2.43 91.92 9.92 -13.67 88.17 6.81
PCG-1-18 0.63 -8.55 -4.21 4.86 91.92 19.84 -13.67 98.09 6.81
nM

PCG-1-19 0.63 -6.12 -4.21 7.30 91.92 29.76 -13.67 108.01 6.81
PCG-1-20 0.63 -3.68 -4.21 9.73 91.92 39.69 -13.67 117.93 6.81
PCG-1-21 0.63 -1.25 -4.21 12.16 91.92 49.61 -13.67 127.86 6.81
PCG-1-22 2.73 -24.36 -2.11 -10.94 91.92 -44.65 -6.84 40.44 6.81
PCG-1-23 2.73 -21.92 -2.11 -8.51 91.92 -34.73 -6.84 50.36 6.81
PCG-1-24 2.73 -19.49 -2.11 -6.08 91.92 -24.80 -6.84 60.28 6.81
PCG-1-25 2.73 -17.06 -2.11 -3.65 91.92 -14.88 -6.84 70.20 6.81
PCG-1-26 2.73 -14.63 -2.11 -1.22 91.92 -4.96 -6.84 80.12 6.81
PCG-1-27 2.73 -12.20 -2.11 1.22 91.92 4.96 -6.84 90.05 6.81
PCG-1-28 2.73 -9.77 -2.11 3.65 91.92 14.88 -6.84 99.97 6.81
PCG-1-29 2.73 -7.33 -2.11 6.08 91.92 24.80 -6.84 109.89 6.81
PCG-1-30 2.73 -4.90 -2.11 8.51 91.92 34.73 -6.84 119.81 6.81
PCG-1-31 2.73 -2.47 -2.11 10.94 91.92 44.65 -6.84 129.73 6.81
PCG-1-32 4.84 -25.57 0.00 -12.16 91.92 -49.61 0.00 42.31 6.81
PCG-1-33 4.84 -23.14 0.00 -9.73 91.92 -39.69 0.00 52.23 6.81
PCG-1-34 4.84 -20.71 0.00 -7.30 91.92 -29.76 0.00 62.16 6.81
PCG-1-35 4.84 -18.28 0.00 -4.86 91.92 -19.84 0.00 72.08 6.81
PCG-1-36 4.84 -15.85 0.00 -2.43 91.92 -9.92 0.00 82.00 6.81
PCG-1-37 4.84 -13.41 0.00 0.00 91.92 0.00 0.00 91.92 6.81
di

PCG-1-38 4.84 -10.98 0.00 2.43 91.92 9.92 0.00 101.84 6.81
PCG-1-39 4.84 -8.55 0.00 4.86 91.92 19.84 0.00 111.76 6.81
PCG-1-40 4.84 -6.12 0.00 7.30 91.92 29.76 0.00 121.68 6.81
PCG-1-41 4.84 -3.68 0.00 9.73 91.92 39.69 0.00 131.61 6.81
PCG-1-42 4.84 -1.25 0.00 12.16 91.92 49.61 0.00 141.53 6.81
PCG-1-43 6.94 -24.36 2.11 -10.94 91.92 -44.65 6.84 54.11 6.81
PCG-1-44 6.94 -21.92 2.11 -8.51 91.92 -34.73 6.84 64.03 6.81
PCG-1-45 6.94 -19.49 2.11 -6.08 91.92 -24.80 6.84 73.95 6.81
PCG-1-46 6.94 -17.06 2.11 -3.65 91.92 -14.88 6.84 83.87 6.81
PCG-1-47 6.94 -14.63 2.11 -1.22 91.92 -4.96 6.84 93.80 6.81
PCG-1-48 6.94 -12.20 2.11 1.22 91.92 4.96 6.84 103.72 6.81
PCG-1-49 6.94 -9.77 2.11 3.65 91.92 14.88 6.84 113.64 6.81
PCG-1-50 6.94 -7.33 2.11 6.08 91.92 24.80 6.84 123.56 6.81
a te

PCG-1-51 6.94 -4.90 2.11 8.51 91.92 34.73 6.84 133.48 6.81
PCG-1-52 6.94 -2.47 2.11 10.94 91.92 44.65 6.84 143.40 6.81
PCG-1-53 9.05 -25.57 4.21 -12.16 91.92 -49.61 13.67 55.98 6.81
PCG-1-54 9.05 -23.14 4.21 -9.73 91.92 -39.69 13.67 65.91 6.81
PCG-1-55 9.05 -20.71 4.21 -7.30 91.92 -29.76 13.67 75.83 6.81
PCG-1-56 9.05 -18.28 4.21 -4.86 91.92 -19.84 13.67 85.75 6.81
PCG-1-57 9.05 -15.85 4.21 -2.43 91.92 -9.92 13.67 95.67 6.81
PCG-1-58 9.05 -13.41 4.21 0.00 91.92 0.00 13.67 105.59 6.81
PCG-1-59 9.05 -10.98 4.21 2.43 91.92 9.92 13.67 115.51 6.81
PCG-1-60 9.05 -8.55 4.21 4.86 91.92 19.84 13.67 125.44 6.81
PCG-1-61 9.05 -6.12 4.21 7.30 91.92 29.76 13.67 135.36 6.81
PCG-1-62 9.05 -3.68 4.21 9.73 91.92 39.69 13.67 145.28 6.81
PCG-1-63 9.05 -1.25 4.21 12.16 91.92 49.61 13.67 155.20 6.81
PCG-1-64 11.16 -24.36 6.32 -10.94 91.92 -44.65 20.51 67.78 6.81
PCG-1-65 11.16 -21.92 6.32 -8.51 91.92 -34.73 20.51 77.71 6.81
PCG-1-66 11.16 -19.49 6.32 -6.08 91.92 -24.80 20.51 87.63 6.81
re

PCG-1-67 11.16 -17.06 6.32 -3.65 91.92 -14.88 20.51 97.55 6.81
PCG-1-68 11.16 -14.63 6.32 -1.22 91.92 -4.96 20.51 107.47 6.81
PCG-1-69 11.16 -12.20 6.32 1.22 91.92 4.96 20.51 117.39 6.81
PCG-1-70 11.16 -9.77 6.32 3.65 91.92 14.88 20.51 127.31 6.81
PCG-1-71 11.16 -7.33 6.32 6.08 91.92 24.80 20.51 137.24 6.81
PCG-1-72 11.16 -4.90 6.32 8.51 91.92 34.73 20.51 147.16 6.81
PCG-1-73 11.16 -2.47 6.32 10.94 91.92 44.65 20.51 157.08 6.81
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
F AC TOR OF SAF ETY F OR ALL LOAD C ASES ( Per mis s ible/ Ac tual)

Pile Reaction ALONG Z-Z ALONG X-X


Compressi pt at Shear pt at Shear

Ed
Load case pt at top pt at top Punching
on Tension Shear bottom stress bottom stress
500 1 DL1+1 LL1+11.66
EQUIP1
N/a 42.34 N/A N/A N/A N/A N/A N/A N/A
501 1 DL1+1 LL1+11.68
EQUIP1+1
N/a TEMP1 10.09 N/A N/A N/A N/A N/A N/A N/A
502 1 DL1+1 WL1 2.46 N/a 4.33 N/A N/A N/A N/A N/A N/A N/A
503 1 DL1+1 WL2 2.43 N/a 3.97 N/A N/A N/A N/A N/A N/A N/A
504 1 DL1+1 WL3 2.43 N/a 4.10 N/A N/A N/A N/A N/A N/A N/A
505 1 DL1+1 WL4 2.38 N/a 4.50 N/A N/A N/A N/A N/A N/A N/A
506 1 DL1+1 WL5 1.41 N/a 1.24 N/A N/A N/A N/A N/A N/A N/A
507 1 DL1+1 WL6 1.39 N/a 1.24 N/A N/A N/A N/A N/A N/A N/A
508 1 DL1+1 WL7 1.44 N/a 1.23 N/A N/A N/A N/A N/A N/A N/A

F
509 1 DL1+1 WL8 1.43 N/a 1.23 N/A N/A N/A N/A N/A N/A N/A
510 1 DL1+0.7 WL12.46 N/a 6.24 N/A N/A N/A N/A N/A N/A N/A
511 1 DL1+0.7 WL22.44 N/a 5.72 N/A N/A N/A N/A N/A N/A N/A
512 1 DL1+0.7 WL32.43 N/a 5.79 N/A N/A N/A N/A N/A N/A N/A

PD
513 1 DL1+0.7 WL42.39 N/a 6.36 N/A N/A N/A N/A N/A N/A N/A
514 1 DL1+0.7 WL51.62 N/a 1.77 N/A N/A N/A N/A N/A N/A N/A
515 1 DL1+0.7 WL61.60 N/a 1.77 N/A N/A N/A N/A N/A N/A N/A
516 1 DL1+0.7 WL71.66 N/a 1.75 N/A N/A N/A N/A N/A N/A N/A
517 1 DL1+0.7 WL81.65 N/a 1.75 N/A N/A N/A N/A N/A N/A N/A
518 1 DL1+ 1LL1+0.75
1.71WL1+1
N/a EQUIP1 5.95 N/A N/A N/A N/A N/A N/A N/A
519 1 DL1+1.0 LL1+0.75
1.69 N/a
WL2+1 EQUIP1 5.45 N/A N/A N/A N/A N/A N/A N/A
520 1 DL1+1.0 LL1+0.75
1.66 N/a
WL3+1 EQUIP1 5.25 N/A N/A N/A N/A N/A N/A N/A
521 1 DL1+1.0 LL1+0.75
1.64 N/a
WL4+1 EQUIP1 5.74 N/A N/A N/A N/A N/A N/A N/A
522 1 DL1+1.0 LL1+0.75
1.23 N/a
WL5+1 EQUIP1 1.69 N/A N/A N/A N/A N/A N/A N/A
523 1 DL1+1.0 LL1+0.75
1.22 N/a
WL6+1 EQUIP1 1.69 N/A N/A N/A N/A N/A N/A N/A
te r
524 1 DL1+1.0 LL1+0.75
1.28 N/a
WL7+1 EQUIP1 1.59 N/A N/A N/A N/A N/A N/A N/A
525 1 DL1+1.0 LL1+0.75
1.28 N/a
WL8+1 EQUIP1 1.60 N/A N/A N/A N/A N/A N/A N/A
526 1 DL1+1.0 LL1+11.53
EQUIP1+0.525
N/a SL1 4.47 N/A N/A N/A N/A N/A N/A N/A
527 1 DL1+1.0 LL1+11.54
EQUIP1+0.525
N/a SL2 4.18 N/A N/A N/A N/A N/A N/A N/A
528 0.6 DL1+1 WL12.80 N/a 4.28 N/A N/A N/A N/A N/A N/A N/A
529 0.6 DL1+1 WL22.75 N/a 3.93 N/A N/A N/A N/A N/A N/A N/A
530 0.6 DL1+1 WL32.73 N/a 4.14 N/A N/A N/A N/A N/A N/A N/A
531 0.6 DL1+1 WL42.68 N/a 4.55 N/A N/A N/A N/A N/A N/A N/A
as

532 0.6 DL1+1 WL51.51 16.73 1.23 N/A N/A N/A N/A N/A N/A N/A
533 0.6 DL1+1 WL61.49 20.18 1.23 N/A N/A N/A N/A N/A N/A N/A
534 0.6 DL1+1 WL71.54 58.50 1.23 N/A N/A N/A N/A N/A N/A N/A
535 0.6 DL1+1 WL81.53 N/a 1.23 N/A N/A N/A N/A N/A N/A N/A
536 0.6 DL1+0.7 SL12.20 N/a 3.57 N/A N/A N/A N/A N/A N/A N/A
537 0.6 DL1+0.7 SL22.23 N/a 3.40 N/A N/A N/A N/A N/A N/A N/A
1001 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1 N/A N/A N/A N/A N/A N/A N/A
nM

1002 1.35 DL1+1.5


N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1N/A N/A N/A N/A N/A N/A N/A
1003 1.35 DL1+1.5
N/a WL1+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1004 1.35 DL1+1.5
N/a WL2+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1005 1.35 DL1+1.5
N/a WL3+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1006 1.35 DL1+1.5
N/a WL4+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1007 1.35 DL1+1.5
N/a WL5+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1008 1.35 DL1+1.5
N/a WL6+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1009 1.35 DL1+1.5
N/a WL7+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1010 1.35 DL1+1.5
N/a WL8+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1011 1.35 DL1+1.5
N/a WL1+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1012 1.35 DL1+1.5
N/a WL2+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
di

1013 1.35 DL1+1.5


N/a WL3+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1014 1.35 DL1+1.5
N/a WL4+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1015 1.35 DL1+1.5
N/a WL5+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1016 1.35 DL1+1.5
N/a WL6+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1017 1.35 DL1+1.5
N/a WL7+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1018 1.35 DL1+1.5
N/a WL8+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1019 1.35 DL1+0.9
N/a TEMP1+1.35
N/a MR1
N/a N/A N/A N/A N/A N/A N/A N/A
a te

1020 1.35 DL1+-0.9


N/a TEMP1+1.35
N/a MR1
N/a N/A N/A N/A N/A N/A N/A N/A
1021 1.35 DL1+1.5LL1+1.5
N/a N/aEQUIP1+0.9
N/a TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A N/A
1022 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1023 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1024 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1028 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1029 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

Ed
1030 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1031 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1032 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1033 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1034 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1035 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1036 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1037 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1038 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1039 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1040 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1041 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

F
1042 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1043 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1044 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1045 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1046 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

PD
1047 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1048 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1049 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1050 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1051 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1052 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1053 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1054 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1055 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1056 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1057 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1058 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1059 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1060 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
te r
1061 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1062 1.148 DL1+1.5
N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1063 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1064 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1065 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1066 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1067 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1068 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1069 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
as

1070 1.148 DL1+1.5


N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1071 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1072 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1073 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1074 1 DL1+0.8
N/a LL1+1 SL2
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1075 1 DL1+0.8
N/a LL1+-1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1076 1 DL1+0.8
N/a LL1+-1 SL2
N/a N/a N/A N/A N/A N/A N/A N/A N/A
2001 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
nM

2002 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2003 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2004 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2005 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2006 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2007 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2008 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2009 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2010 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2011 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2012 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2013 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2014 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2015 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
di

2016 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2017 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2018 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2019 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2020 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2021 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2022 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2023 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
a te

2024 1 DL1+1.0
N/a LL1+1 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2025 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2026 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2027 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2028 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2029 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2030 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2031 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2032 1 DL1+0.7
N/a LL1+1 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2033 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
FOUNDATION FOR PEDESTAL (P3) (P4) (P9) (P10) (P1) (P5) (P6) (P11) (P2) (P7)
(P8) (P12)-(Pilecap Design)

Ed
LOAD CASE: 1062 1.1481062
DL1+1.5
1.148
LL1+1.5
DL1+1.05
W L6+1.5
LL1+1.5
EQUIP1+0.9
W L6+1.05 TEMP1+1.35
EQUIP1+0.9 TEMP1+1.35
MR1 MR1

G E N E RA L PI L E C A P DI ME N SI O N S, PO SI T I O N
Concrete Density 2.5 ton/m 3 Pile ca p thickne ss 2.300 m
Soil Density 2 ton/m 3 Z cordinate of center of the pilecap -13.413 m
Grade of Concrete (Cylinder) C 30 X cordinate of center of the pilecap 4.838 m
Grade of Steel Fe 500 Le ngth a long a x is Z, L z 25.580 m
Level of Base of pilecap -5.1 m Le ngth a long a x is X, L x 13.898 m
Finished Ground level 0 m Area of base of pilecap, A 347.90 m2
Level of max water table -5.1 m

PE DE ST A L ( C O L U MN ) DI ME N SI O N S, PO SI T I O N S & L O A DS
C.G. of Pedestal Ped top P + W ped
Pedestal ID Lz-z (m) Lx-x (m) P (T) Hz (T) Mx (T-m) Hx (T) Mz (T-m)
Z X [Level of (T)

F
P3 1.250 1.250 -24.500 3.500 -5.100 -425.79 57.11 229.21 -5.30 -13.37 -425.79
P4 1.250 1.250 -21.000 3.500 -5.100 -35.92 63.58 265.65 -13.89 -56.87 -35.92
P9 1.250 1.250 -24.500 9.500 -5.100 -111.29 58.66 248.83 2.57 10.57 -111.29
P10 1.600 1.600 -21.000 9.500 -5.100 541.50 151.20 713.61 -25.21 -106.69 541.50
P1 1.250 1.250 -15.800 0.000 -5.100 226.19 40.85 198.90 -21.63 -107.13 226.19
P5 1.250 1.250 -15.800 3.500 -5.100 318.09 72.16 313.96 -21.17 -91.32 318.09
P6 1.250 1.250 -12.000 3.500 -5.100 280.53 91.60 330.32 -20.00 -105.79 280.53

PD
P11 1.250 1.250 -12.000 9.500 -5.100 361.88 67.98 387.64 -16.49 -74.70 361.88
P2 1.250 1.250 -8.200 0.000 -5.100 272.79 47.33 229.63 -7.69 -35.26 272.79
P7 1.250 1.250 -8.200 3.500 -5.100 110.41 81.96 363.41 -1.54 -18.95 110.41
P8 1.250 1.250 -3.000 3.500 -5.100 903.01 80.73 361.61 -4.29 -20.70 903.01
P12 1.600 1.600 -3.000 9.500 -5.100 1325.71 187.39 911.42 -4.75 3.20 1325.71

PI L E DE T A I L S
Number of Piles 73 CGz of Pile group -13.413 m
Diameter of Piles 760 mm CGx of Pile group 4.838 m
2
Compressive capacity of piles 192 T SUM[(Xi-Xc g)2] of Pile group 1277.601 m
2
Tensile capacity of piles 40 T SUM[(Zi-Zc g)2] of Pile group 3903.652 m
Shear capacity of piles 11.5 T

W eight of soil, W s oil 4790.57 T


W eight of footing, W f oot ing 540.11 T
Axial load due to [P+ W ped] 3767.11 T
Total axial Load 9097.80 T

Mz due to [Mz+(P+W ped)*ex ] 5302.94 Ton-m Mx due to [Mx+(P+W ped)*ez] 31486.80 Ton-m
te r
Eccentricity between Pilecap and Pile group 0.00 mm Eccentricity between Pilecap and Pile group 0.00 mm
Mz due to pilecap and pile group eccentricity 0.00 Ton-m Mx due to pilecap and pile group eccentricity 0.00 Ton-m
Total Mz 5302.94 Ton-m Total Mx 31486.80 Ton-m

Distance Distance P due to


from pile from pile Axial P due to P due to
Pile ID CGx CGz group CGx group CGz Load (T) Mx (T) Mz (T) Total P (T) Shear (T)
PCG-1-1 -1.48 -24.36 -6.32 -10.94 124.63 -88.27 -26.23 10.12 13.84
PCG-1-2 -1.48 -21.92 -6.32 -8.51 124.63 -68.66 -26.23 29.74 13.84
PCG-1-3 -1.48 -19.49 -6.32 -6.08 124.63 -49.04 -26.23 49.36 13.84
PCG-1-4 -1.48 -17.06 -6.32 -3.65 124.63 -29.42 -26.23 68.97 13.84
PCG-1-5 -1.48 -14.63 -6.32 -1.22 124.63 -9.81 -26.23 88.59 13.84
as

PCG-1-6 -1.48 -12.20 -6.32 1.22 124.63 9.81 -26.23 108.21 13.84
PCG-1-7 -1.48 -9.77 -6.32 3.65 124.63 29.42 -26.23 127.82 13.84
PCG-1-8 -1.48 -7.33 -6.32 6.08 124.63 49.04 -26.23 147.44 13.84
PCG-1-9 -1.48 -4.90 -6.32 8.51 124.63 68.66 -26.23 167.06 13.84
PCG-1-10 -1.48 -2.47 -6.32 10.94 124.63 88.27 -26.23 186.67 13.84
PCG-1-11 0.63 -25.57 -4.21 -12.16 124.63 -98.08 -17.48 9.06 13.84
PCG-1-12 0.63 -23.14 -4.21 -9.73 124.63 -78.47 -17.48 28.68 13.84
PCG-1-13 0.63 -20.71 -4.21 -7.30 124.63 -58.85 -17.48 48.30 13.84
PCG-1-14 0.63 -18.28 -4.21 -4.86 124.63 -39.23 -17.48 67.91 13.84
PCG-1-15 0.63 -15.85 -4.21 -2.43 124.63 -19.62 -17.48 87.53 13.84
PCG-1-16 0.63 -13.41 -4.21 0.00 124.63 0.00 -17.48 107.14 13.84
PCG-1-17 0.63 -10.98 -4.21 2.43 124.63 19.62 -17.48 126.76 13.84
PCG-1-18 0.63 -8.55 -4.21 4.86 124.63 39.23 -17.48 146.38 13.84
nM

PCG-1-19 0.63 -6.12 -4.21 7.30 124.63 58.85 -17.48 165.99 13.84
PCG-1-20 0.63 -3.68 -4.21 9.73 124.63 78.47 -17.48 185.61 13.84
PCG-1-21 0.63 -1.25 -4.21 12.16 124.63 98.08 -17.48 205.23 13.84
PCG-1-22 2.73 -24.36 -2.11 -10.94 124.63 -88.27 -8.74 27.61 13.84
PCG-1-23 2.73 -21.92 -2.11 -8.51 124.63 -68.66 -8.74 47.23 13.84
PCG-1-24 2.73 -19.49 -2.11 -6.08 124.63 -49.04 -8.74 66.84 13.84
PCG-1-25 2.73 -17.06 -2.11 -3.65 124.63 -29.42 -8.74 86.46 13.84
PCG-1-26 2.73 -14.63 -2.11 -1.22 124.63 -9.81 -8.74 106.08 13.84
PCG-1-27 2.73 -12.20 -2.11 1.22 124.63 9.81 -8.74 125.69 13.84
PCG-1-28 2.73 -9.77 -2.11 3.65 124.63 29.42 -8.74 145.31 13.84
PCG-1-29 2.73 -7.33 -2.11 6.08 124.63 49.04 -8.74 164.93 13.84
PCG-1-30 2.73 -4.90 -2.11 8.51 124.63 68.66 -8.74 184.54 13.84
PCG-1-31 2.73 -2.47 -2.11 10.94 124.63 88.27 -8.74 204.16 13.84
PCG-1-32 4.84 -25.57 0.00 -12.16 124.63 -98.08 0.00 26.54 13.84
PCG-1-33 4.84 -23.14 0.00 -9.73 124.63 -78.47 0.00 46.16 13.84
PCG-1-34 4.84 -20.71 0.00 -7.30 124.63 -58.85 0.00 65.78 13.84
PCG-1-35 4.84 -18.28 0.00 -4.86 124.63 -39.23 0.00 85.39 13.84
PCG-1-36 4.84 -15.85 0.00 -2.43 124.63 -19.62 0.00 105.01 13.84
PCG-1-37 4.84 -13.41 0.00 0.00 124.63 0.00 0.00 124.63 13.84
di

PCG-1-38 4.84 -10.98 0.00 2.43 124.63 19.62 0.00 144.24 13.84
PCG-1-39 4.84 -8.55 0.00 4.86 124.63 39.23 0.00 163.86 13.84
PCG-1-40 4.84 -6.12 0.00 7.30 124.63 58.85 0.00 183.48 13.84
PCG-1-41 4.84 -3.68 0.00 9.73 124.63 78.47 0.00 203.09 13.84
PCG-1-42 4.84 -1.25 0.00 12.16 124.63 98.08 0.00 222.71 13.84
PCG-1-43 6.94 -24.36 2.11 -10.94 124.63 -88.27 8.74 45.09 13.84
PCG-1-44 6.94 -21.92 2.11 -8.51 124.63 -68.66 8.74 64.71 13.84
PCG-1-45 6.94 -19.49 2.11 -6.08 124.63 -49.04 8.74 84.33 13.84
PCG-1-46 6.94 -17.06 2.11 -3.65 124.63 -29.42 8.74 103.94 13.84
PCG-1-47 6.94 -14.63 2.11 -1.22 124.63 -9.81 8.74 123.56 13.84
PCG-1-48 6.94 -12.20 2.11 1.22 124.63 9.81 8.74 143.18 13.84
PCG-1-49 6.94 -9.77 2.11 3.65 124.63 29.42 8.74 162.79 13.84
PCG-1-50 6.94 -7.33 2.11 6.08 124.63 49.04 8.74 182.41 13.84
a te

PCG-1-51 6.94 -4.90 2.11 8.51 124.63 68.66 8.74 202.03 13.84
PCG-1-52 6.94 -2.47 2.11 10.94 124.63 88.27 8.74 221.64 13.84
PCG-1-53 9.05 -25.57 4.21 -12.16 124.63 -98.08 17.48 44.03 13.84
PCG-1-54 9.05 -23.14 4.21 -9.73 124.63 -78.47 17.48 63.64 13.84
PCG-1-55 9.05 -20.71 4.21 -7.30 124.63 -58.85 17.48 83.26 13.84
PCG-1-56 9.05 -18.28 4.21 -4.86 124.63 -39.23 17.48 102.88 13.84
PCG-1-57 9.05 -15.85 4.21 -2.43 124.63 -19.62 17.48 122.49 13.84
PCG-1-58 9.05 -13.41 4.21 0.00 124.63 0.00 17.48 142.11 13.84
PCG-1-59 9.05 -10.98 4.21 2.43 124.63 19.62 17.48 161.73 13.84
PCG-1-60 9.05 -8.55 4.21 4.86 124.63 39.23 17.48 181.34 13.84
PCG-1-61 9.05 -6.12 4.21 7.30 124.63 58.85 17.48 200.96 13.84
PCG-1-62 9.05 -3.68 4.21 9.73 124.63 78.47 17.48 220.58 13.84
PCG-1-63 9.05 -1.25 4.21 12.16 124.63 98.08 17.48 240.19 13.84
PCG-1-64 11.16 -24.36 6.32 -10.94 124.63 -88.27 26.23 62.58 13.84
PCG-1-65 11.16 -21.92 6.32 -8.51 124.63 -68.66 26.23 82.20 13.84
PCG-1-66 11.16 -19.49 6.32 -6.08 124.63 -49.04 26.23 101.81 13.84
re

PCG-1-67 11.16 -17.06 6.32 -3.65 124.63 -29.42 26.23 121.43 13.84
PCG-1-68 11.16 -14.63 6.32 -1.22 124.63 -9.81 26.23 141.05 13.84
PCG-1-69 11.16 -12.20 6.32 1.22 124.63 9.81 26.23 160.66 13.84
PCG-1-70 11.16 -9.77 6.32 3.65 124.63 29.42 26.23 180.28 13.84
PCG-1-71 11.16 -7.33 6.32 6.08 124.63 49.04 26.23 199.90 13.84
PCG-1-72 11.16 -4.90 6.32 8.51 124.63 68.66 26.23 219.51 13.84
PCG-1-73 11.16 -2.47 6.32 10.94 124.63 88.27 26.23 239.13 13.84
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
Load factor for Limit State design 1 Along Axis -----> Z-Z X-X
Ultimate sagging(+)
Moment,Mup(Tm/width) 126.57 38.74
Along Axis -----> Z-Z X-X Effective Depth (for + M), d (m) 2.152 2.152

Ed
Ultimate Shear force (In sagging zone)(T/width) 30.94 28.78 Mup/bd2 (N/mm2) 0.27 0.08
Nominal shear stress (N/mm 2) 0.14 0.13 Tensile steel required at bottom (%) 0.06 0.02
Max allowable shear stress (N/mm 2) 0.31 0.31 Provide bars of dia (mm) 32 32
Ultimate Shear force (In hogging zone)(T) 48.21 7.05 at c/c distance (mm) 150 150
Nominal shear stress (N/mm 2) 0.22 0.03 Tensile steel provided at bottom (%) 0.25 0.25
Max allowable shear stress (N/mm 2) 0.31 0.31 Ultimate hogging(-)
Stirrup Diameter (mm) 12 Moment,Mun(Tm/meter width) -179.54 0.00
Stirrup spacing (N/mm 2) 150 150 Mun/bd2 (N/mm2) 0.39 0.00

F
Stress in stirrup (N/mm 2) 19.82 11.83 Tensile steel required at top (%) 0.09 0.00
Total Stirrup stress (N/mm 2) 31.65 Provide bars of dia (mm) 32 32
Permissible Stirrup stress (N/mm 2) 434.78 at c/c distance (mm) 150 150

PD
Tensile steel provided at top (%) 0.25 0.25
Effective Depth (for - M), d (m) 2.152 2.152
P UNCH ING SH EAR FO R P EDESTALS
Pedestal ID Ultimate Design Area for resisting Punching Shear Allowable punching
P3 526.10 Ton 29.28 m2 0.18 N/mm2 1.37 N/mm2
P4 215.77 Ton 29.28 m2 0.07 N/mm2 1.37 N/mm2
P9 281.55 Ton 29.28 m2 0.10 N/mm2 1.37 N/mm2
P10 274.23 Ton 32.30 m2 0.08 N/mm2 1.37 N/mm2
P1 18.90 Ton 29.28 m2 0.01 N/mm2 1.37 N/mm2
P5 20.54 Ton 29.28 m2 0.01 N/mm2 1.37 N/mm2
P6 114.04 Ton 29.28 m2 0.04 N/mm2 1.37 N/mm2
te r
P11 102.62 Ton 29.28 m2 0.04 N/mm2 1.37 N/mm2
P2 148.85 Ton 29.28 m2 0.05 N/mm2 1.37 N/mm2
P7 363.69 Ton 29.28 m2 0.12 N/mm2 1.37 N/mm2
P8 495.76 Ton 29.28 m2 0.17 N/mm2 1.37 N/mm2
P12 625.81 Ton 32.30 m2 0.19 N/mm2 1.37 N/mm2
as
nM
di
a te
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
F AC TOR OF SAF ETY F OR ALL LOAD C ASES ( Per mis s ible/ Ac tual)

Pile Reaction ALONG Z-Z ALONG X-X


Compressi pt at Shear pt at Shear

Ed
Load case pt at top pt at top Punching
on Tension Shear bottom stress bottom stress
500 1 DL1+1N/a
LL1+1 EQUIP1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
501 1 DL1+1N/a
LL1+1 EQUIP1+1
N/a TEMP1
N/a N/A N/A N/A N/A N/A N/A N/A
502 1 DL1+1N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
503 1 DL1+1N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
504 1 DL1+1N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A
505 1 DL1+1N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
506 1 DL1+1N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
507 1 DL1+1N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
508 1 DL1+1N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A

F
509 1 DL1+1N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
510 1 DL1+0.7
N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
511 1 DL1+0.7
N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
512 1 DL1+0.7
N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A

PD
513 1 DL1+0.7
N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
514 1 DL1+0.7
N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
515 1 DL1+0.7
N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
516 1 DL1+0.7
N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A
517 1 DL1+0.7
N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
518 1 DL1+ 1LL1+0.75
N/a WL1+1
N/a EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
519 1 DL1+1.0
N/a
LL1+0.75 N/a
WL2+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
520 1 DL1+1.0
N/a
LL1+0.75 N/a
WL3+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
521 1 DL1+1.0
N/a
LL1+0.75 N/a
WL4+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
522 1 DL1+1.0
N/a
LL1+0.75 N/a
WL5+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
523 1 DL1+1.0
N/a
LL1+0.75 N/a
WL6+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
te r
524 1 DL1+1.0
N/a
LL1+0.75 N/a
WL7+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
525 1 DL1+1.0
N/a
LL1+0.75 N/a
WL8+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
526 1 DL1+1.0
N/a
LL1+1 EQUIP1+0.525
N/a N/a
SL1 N/A N/A N/A N/A N/A N/A N/A
527 1 DL1+1.0
N/a
LL1+1 EQUIP1+0.525
N/a N/a
SL2 N/A N/A N/A N/A N/A N/A N/A
528 0.6 DL1+1
N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
529 0.6 DL1+1
N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
530 0.6 DL1+1
N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A
531 0.6 DL1+1
N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
as

532 0.6 DL1+1


N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
533 0.6 DL1+1
N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
534 0.6 DL1+1
N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A
535 0.6 DL1+1
N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
536 0.6 DL1+0.7
N/a SL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
537 0.6 DL1+0.7
N/a SL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
1001 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1 40.23 3.60 17.38 8.83 N/A 17.38 12.22
nM

1002 1.35 DL1+1.5


N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1 40.39 4.27 18.20 8.79 N/A 18.20 12.49
1003 1.35 DL1+1.5
N/a WL1+0.9
N/a TEMP1 N/a 198.80 13.35 39.14 10.17 N/A 39.14 14.06
1004 1.35 DL1+1.5
N/a WL2+0.9
N/a TEMP1 N/a 168.12 14.08 37.27 9.20 N/A 37.27 14.35
1005 1.35 DL1+1.5
N/a WL3+0.9
N/a TEMP1 N/a 71.23 10.04 29.94 10.89 N/A 29.94 14.98
1006 1.35 DL1+1.5
N/a WL4+0.9
N/a TEMP1 N/a 65.36 10.61 30.40 10.84 N/A 30.40 15.91
1007 1.35 DL1+1.5
N/a WL5+0.9
N/a TEMP1 N/a 3.36 4.65 15.71 21.15 N/A 15.71 7.30
1008 1.35 DL1+1.5
N/a WL6+0.9
N/a TEMP1 N/a 3.31 4.73 15.90 20.76 N/A 15.90 7.35
1009 1.35 DL1+1.5
N/a WL7+0.9
N/a TEMP1 N/a 7.41 2.89 18.80 9.84 N/A 18.80 9.15
1010 1.35 DL1+1.5
N/a WL8+0.9
N/a TEMP1 N/a 7.27 2.93 18.71 9.21 N/A 18.71 9.38
1011 1.35 DL1+1.5
N/a WL1+-0.9
N/a TEMP1 N/a 184.60 31.26 36.75 9.45 N/A 36.75 13.88
1012 1.35 DL1+1.5
N/a WL2+-0.9
N/a TEMP1 N/a 134.10 34.98 35.15 8.61 N/A 35.15 14.16
di

1013 1.35 DL1+1.5


N/a WL3+-0.9
N/a TEMP1 N/a 34.90 18.77 32.45 12.66 N/A 32.45 15.88
1014 1.35 DL1+1.5
N/a WL4+-0.9
N/a TEMP1 N/a 30.99 20.87 33.00 12.24 N/A 33.00 16.92
1015 1.35 DL1+1.5
N/a WL5+-0.9
N/a TEMP1 N/a 3.00 5.39 16.02 25.49 N/A 16.02 7.23
1016 1.35 DL1+1.5
N/a WL6+-0.9
N/a TEMP1 N/a 2.96 5.49 16.23 24.61 N/A 16.23 7.29
1017 1.35 DL1+1.5
N/a WL7+-0.9
N/a TEMP1 N/a 6.12 3.24 17.98 9.83 N/A 17.98 8.94
1018 1.35 DL1+1.5
N/a WL8+-0.9
N/a TEMP1 N/a 6.03 3.30 17.83 8.92 N/A 17.83 9.16
1019 1.35 DL1+0.9
N/a TEMP1+1.35
N/a MR1
N/a 86.27 12.79 41.91 11.92 N/A 41.91 20.75
a te

1020 1.35 DL1+-0.9


N/a TEMP1+1.35
N/a MR1
N/a 39.07 28.00 39.24 11.04 N/A 39.24 19.69
1021 1.35 DL1+1.5LL1+1.5
N/a N/aEQUIP1+0.9
N/a TEMP1+1.35 39.30
MR1 3.56 17.16 8.65 N/A 17.16 11.80
1022 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
39.45
MR1 4.20 17.95 8.62 N/A 17.95 12.05
1023 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1+1.35
41.69
MR1 3.71 17.93 9.13 N/A 17.93 12.83
1024 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
41.86MR1 4.42 18.79 9.05 N/A 18.79 13.12
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
45.77 3.56
MR1 19.40 8.40 N/A 19.40 13.11
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
44.61 3.58
MR1 19.06 7.98 N/A 19.06 12.89
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
36.67 3.39
MR1 15.69 8.62 N/A 15.69 11.48
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+0.9 TEMP1+1.35
45.77 3.56
MR1 19.40 8.40 N/A 19.40 13.11
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+0.9 TEMP1+1.35
44.61 3.58
MR1 19.06 7.98 N/A 19.06 12.89
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+0.9 TEMP1+1.35
36.67 3.39
MR1 15.69 8.62 N/A 15.69 11.48
1028 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+0.9 TEMP1+1.35
35.95 3.42
MR1 15.71 8.32 N/A 15.71 11.32
1029 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+0.9 TEMP1+1.35
8.19 3.07
MR1 15.30 11.16 N/A 15.30 8.23

Ed
1030 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+0.9 TEMP1+1.35
8.00 3.10
MR1 15.32 10.68 N/A 15.32 8.14
1031 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+0.9 TEMP1+1.35
18.87 2.51
MR1 20.06 7.83 N/A 20.06 14.56
1032 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+0.9 TEMP1+1.35
18.02 2.54
MR1 20.08 7.59 N/A 20.08 15.06
1033 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
45.98 4.21
MR1 18.81 7.90 N/A 18.81 13.42
1034 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
44.82 4.24
MR1 18.49 7.53 N/A 18.49 13.18
1035 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
36.80 4.02
MR1 16.35 9.21 N/A 16.35 11.72
1036 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
36.07 4.04
MR1 16.38 8.87 N/A 16.38 11.54
1037 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
6.37 3.52
MR1 15.92 12.16 N/A 15.92 8.35
1038 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
6.26 3.55
MR1 15.95 11.47 N/A 15.95 8.25
1039 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
12.63 2.85
MR1 21.15 8.06 N/A 21.15 15.40
1040 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
12.25 2.88
MR1 21.17 7.68 N/A 21.17 15.97
1041 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+0.9 TEMP1+1.35
49.04 3.72
MR1 20.28 8.81 N/A 20.28 14.40

F
1042 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+0.9 TEMP1+1.35
47.73 3.74
MR1 19.91 8.36 N/A 19.91 14.13
1043 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+0.9 TEMP1+1.35
38.74 3.53
MR1 16.33 9.09 N/A 16.33 12.45
1044 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+0.9 TEMP1+1.35
37.94 3.56
MR1 16.36 8.76 N/A 16.36 12.26
1045 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+0.9 TEMP1+1.35
8.04 3.17
MR1 15.91 11.95 N/A 15.91 8.72
1046 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+0.9 TEMP1+1.35
7.87 3.20
MR1 15.93 11.41 N/A 15.93 8.61

PD
1047 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+0.9 TEMP1+1.35
18.62 2.58
MR1 21.12 8.22 N/A 21.12 14.17
1048 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+0.9 TEMP1+1.35
17.79 2.61
MR1 21.14 7.95 N/A 21.14 14.65
1049 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+-0.9 49.28
TEMP1+1.35
4.43
MR1 19.64 8.27 N/A 19.64 14.77
1050 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+-0.9 47.95
TEMP1+1.35
4.46
MR1 19.29 7.86 N/A 19.29 14.48
1051 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+-0.9 38.89
TEMP1+1.35
4.21
MR1 17.05 9.74 N/A 17.05 12.73
1052 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+-0.9 38.08
TEMP1+1.35
4.24
MR1 17.08 9.37 N/A 17.08 12.52
1053 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
6.28 3.65
MR1 16.58 13.11 N/A 16.58 8.85
1054 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
6.17 3.69
MR1 16.61 12.25 N/A 16.61 8.75
1055 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+-0.9 12.52
TEMP1+1.35
2.93
MR1 22.33 8.44 N/A 22.33 14.97
1056 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+-0.9 12.14
TEMP1+1.35
2.97
MR1 22.35 8.02 N/A 22.35 15.51
1057 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+0.9 TEMP1+1.35
55.58 3.71
MR1 19.91 8.30 N/A 19.91 15.67
1058 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+0.9 TEMP1+1.35
52.83 3.75
MR1 19.32 7.64 N/A 19.32 15.14
1059 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+0.9 TEMP1+1.35
36.99 3.40
MR1 15.42 8.22 N/A 15.42 11.07
1060 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+0.9 TEMP1+1.35
35.79 3.45
MR1 15.46 8.19 N/A 15.46 11.02
te r
1061 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.02 2.74
MR1 13.59 13.09 N/A 13.59 7.18
1062 1.148 DL1+1.5
N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+0.9 TEMP1+1.35
3.95 2.77
MR1 13.74 12.97 N/A 13.74 7.07
1063 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+0.9 TEMP1+1.35
9.49 2.06
MR1 17.05 7.71 N/A 17.05 10.76
1064 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+0.9 TEMP1+1.35
9.13 2.09
MR1 17.09 7.32 N/A 17.09 11.23
1065 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+-0.9 55.88
TEMP1+1.35
4.43
MR1 19.29 7.82 N/A 19.29 16.11
1066 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+-0.9 53.10
TEMP1+1.35
4.48
MR1 18.74 7.23 N/A 18.74 15.55
1067 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+-0.9 37.14
TEMP1+1.35
4.06
MR1 16.06 9.19 N/A 16.06 11.54
1068 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+-0.9 35.92
TEMP1+1.35
4.13
MR1 16.09 9.11 N/A 16.09 11.49
1069 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
3.52 3.09
MR1 13.83 13.65 N/A 13.83 7.27
as

1070 1.148 DL1+1.5


N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
3.47 3.13
MR1 13.98 13.39 N/A 13.98 7.15
1071 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
7.60 2.24
MR1 17.84 8.07 N/A 17.84 11.22
1072 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
7.36 2.28
MR1 17.59 7.45 N/A 17.59 11.72
1073 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a 28.74 6.14 22.52 11.87 N/A 22.52 14.88
1074 1 DL1+0.8
N/a LL1+1 SL2
N/a N/a 41.41 2.90 16.79 7.09 N/A 16.79 15.37
1075 1 DL1+0.8
N/a LL1+-1 SL1
N/a N/a 83.22 8.15 31.03 8.95 N/A 31.03 13.73
1076 1 DL1+0.8
N/a LL1+-1 SL2
N/a N/a 7.01 27.55 30.58 20.30 N/A 30.58 11.47
2001 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1 63.56
MR1 5.41 25.98 10.19 N/A 25.98 19.73
nM

2002 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1 62.08
MR1 5.44 25.57 9.78 N/A 25.57 19.49
2003 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1 51.69
MR1 5.20 22.08 10.74 N/A 22.08 20.10
2004 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1 50.74
MR1 5.23 22.11 10.44 N/A 22.11 20.49
2005 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+1 11.52
MR1 4.68 21.55 13.24 N/A 21.55 12.27
2006 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+1 11.28
MR1 4.72 21.58 12.79 N/A 21.58 12.33
2007 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+1 26.33
MR1 3.84 27.74 9.92 N/A 27.74 15.88
2008 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+1 25.23
MR1 3.87 27.76 9.65 N/A 27.76 16.28
2009 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+163.83
MR1 6.41 25.27 9.70 N/A 25.27 19.88
2010 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+162.33
MR1 6.45 24.89 9.33 N/A 24.89 19.65
2011 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+151.87
MR1 6.11 22.95 11.34 N/A 22.95 19.96
2012 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+150.91
MR1 6.15 22.98 11.00 N/A 22.98 20.15
2013 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1 9.09
MR1 5.37 22.38 13.73 N/A 22.38 12.15
2014 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1 8.94
MR1 5.42 22.41 13.01 N/A 22.41 12.21
2015 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+118.05
MR1 4.36 29.12 9.86 N/A 29.12 16.54
di

2016 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+117.52
MR1 4.40 28.68 9.47 N/A 28.68 16.98
2017 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1 70.75
MR1 5.42 25.58 9.73 N/A 25.58 17.98
2018 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1 67.75
MR1 5.47 24.93 9.12 N/A 24.93 17.90
2019 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1 49.61
MR1 5.02 20.96 10.69 N/A 20.96 17.96
2020 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1 48.16
MR1 5.09 21.00 10.22 N/A 21.00 18.84
2021 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+15.90
MR1 4.06 18.54 15.62 N/A 18.54 9.50
2022 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+15.80
MR1 4.11 18.72 14.60 N/A 18.72 9.56
2023 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+1 13.82
MR1 3.07 23.81 9.42 N/A 23.81 12.84
a te

2024 1 DL1+1.0
N/a LL1+1 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+1 13.31
MR1 3.11 24.24 9.03 N/A 24.24 13.28
2025 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+171.08
MR1 6.41 24.89 9.28 N/A 24.89 17.79
2026 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+168.05
MR1 6.49 24.27 8.72 N/A 24.27 18.03
2027 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+149.78
MR1 5.93 21.74 11.32 N/A 21.74 18.81
2028 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+146.36
MR1 5.99 21.79 10.76 N/A 21.79 19.38
2029 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1 5.19
MR1 4.57 18.84 16.92 N/A 18.84 9.43
2030 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1 5.11
MR1 4.63 19.02 15.60 N/A 19.02 9.49
2031 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+111.13
MR1 3.34 23.98 9.52 N/A 23.98 13.27
2032 1 DL1+0.7
N/a LL1+1 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+110.80
MR1 3.39 23.80 8.94 N/A 23.80 13.74
2033 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a 28.74 6.14 22.52 11.87 N/A 22.52 14.88
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
FOUNDATION FOR PEDESTAL (P13)-(Pile Capacity Check)

Ed
LOAD CASE: 526 1 DL1+1.0
526 LL1+1
1 DL1+0.75
EQUIP1+0.525
LL1+1 EQUIP1+0.525
SL1 SL1

GENERAL PILECAP DIMENSIONS, POSITION


Concrete Density 2.5 ton/m3 Pilecap thickness 1.400 m
Soil Density 2 ton/m3 Z cordinate of center of the pilecap -21.000 m
Grade of Concrete (Cylinder) C 30 X cordinate of center of the pilecap 18.250 m
Grade of Steel Fe 500 Length along axis Z, L z 5.820 m
Level of Base of pilecap -5.1 m Length along axis X, L x 5.820 m

F
Finished Ground level 0 m Area of base of pilecap, A 33.87 m2
Level of max water table -5.1 m

PD
PEDESTAL (COLUMN) DIMENSIONS, POSITIONS & LOADS
C.G. of Pedestal Ped top P + W ped
Pedestal ID Lz-z (m) Lx-x (m) P (T) Hz (T) Mx (T-m) Hx (T) Mz (T-m)
Z X [Level of (T)
P13 1.600 1.600 -21.000 18.250 -5.100 1024.72 -10.21 -44.73 -53.04 192.30 1024.72

PILE DETAILS
Number of Piles 9 CGz of Pile group -21 m
Diameter of Piles 760 mm CGx of Pile group 18.25 m
2
Compressive capacity of piles 192 T SUM[(Xi-Xcg)2] of Pile group 31.190 m
2
SUM[(Zi-Zcg)2] of Pile group
te r
Tensile capacity of piles 40 T 31.190 m
Shear capacity of piles 11.5 T

Weight of soil, W soil 345.50 T


Weight of footing, W f ooting 23.71 T
Axial load due to [P+ W ped] 1024.72 T
Total axial Load 1393.93 T
as

Mz due to [Mz+(P+W ped)*ex ] 192.30 Ton-m Mx due to [Mx+(P+W ped)*ez] -44.73 Ton-m
Eccentricity between Pilecap and Pile group 0.00 mm Eccentricity between Pilecap and Pile group 0.00 mm
Mz due to pilecap and pile group eccentricity 0.00 Ton-m Mx due to pilecap and pile group eccentricity 0.00 Ton-m
Total Mz 192.30 Ton-m Total Mx -44.73 Ton-m
nM

Distance Distance P due to


from pile from pile Axial P due to P due to
Pile ID CGx CGz group CGx group CGz Load (T) Mx (T) Mz (T) Total P (T) Shear (T)
PCG-2-1 15.97 -23.28 -2.28 -2.28 154.88 3.27 -14.06 144.09 6.00
PCG-2-2 15.97 -21.00 -2.28 0.00 154.88 0.00 -14.06 140.82 6.00
PCG-2-3 15.97 -18.72 -2.28 2.28 154.88 -3.27 -14.06 137.55 6.00
PCG-2-4 18.25 -23.28 0.00 -2.28 154.88 3.27 0.00 158.15 6.00
PCG-2-5 18.25 -21.00 0.00 0.00 154.88 0.00 0.00 154.88 6.00
PCG-2-6 18.25 -18.72 0.00 2.28 154.88 -3.27 0.00 151.61 6.00
di

PCG-2-7 20.53 -23.28 2.28 -2.28 154.88 3.27 14.06 172.21 6.00
PCG-2-8 20.53 -21.00 2.28 0.00 154.88 0.00 14.06 168.94 6.00
PCG-2-9 20.53 -18.72 2.28 2.28 154.88 -3.27 14.06 165.67 6.00
a te
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
F AC TOR OF SAF ETY F OR ALL LOAD C ASES ( Per mis s ible/ Ac tual)

Pile Reaction ALONG Z-Z ALONG X-X


Compressi pt at Shear pt at Shear

Ed
Load case pt at top pt at top Punching
on Tension Shear bottom stress bottom stress
500 1 DL1+1 LL1+11.24
EQUIP1
N/a 8.17 N/A N/A N/A N/A N/A N/A N/A
501 1 DL1+1 LL1+11.20
EQUIP1+1
N/a TEMP1 4.04 N/A N/A N/A N/A N/A N/A N/A
502 1 DL1+1 WL1 2.09 N/a 3.11 N/A N/A N/A N/A N/A N/A N/A
503 1 DL1+1 WL2 2.07 N/a 3.10 N/A N/A N/A N/A N/A N/A N/A
504 1 DL1+1 WL3 2.18 N/a 2.41 N/A N/A N/A N/A N/A N/A N/A
505 1 DL1+1 WL4 2.17 N/a 2.45 N/A N/A N/A N/A N/A N/A N/A
506 1 DL1+1 WL5 2.28 N/a 5.08 N/A N/A N/A N/A N/A N/A N/A
507 1 DL1+1 WL6 2.22 N/a 4.72 N/A N/A N/A N/A N/A N/A N/A
508 1 DL1+1 WL7 2.36 N/a 4.65 N/A N/A N/A N/A N/A N/A N/A

F
509 1 DL1+1 WL8 2.34 N/a 5.04 N/A N/A N/A N/A N/A N/A N/A
510 1 DL1+0.7 WL12.19 N/a 4.69 N/A N/A N/A N/A N/A N/A N/A
511 1 DL1+0.7 WL22.17 N/a 4.69 N/A N/A N/A N/A N/A N/A N/A
512 1 DL1+0.7 WL32.25 N/a 3.30 N/A N/A N/A N/A N/A N/A N/A

PD
513 1 DL1+0.7 WL42.24 N/a 3.35 N/A N/A N/A N/A N/A N/A N/A
514 1 DL1+0.7 WL52.32 N/a 7.13 N/A N/A N/A N/A N/A N/A N/A
515 1 DL1+0.7 WL62.28 N/a 6.65 N/A N/A N/A N/A N/A N/A N/A
516 1 DL1+0.7 WL72.38 N/a 6.46 N/A N/A N/A N/A N/A N/A N/A
517 1 DL1+0.7 WL82.36 N/a 6.98 N/A N/A N/A N/A N/A N/A N/A
518 1 DL1+ 1LL1+0.75
1.18WL1+1
N/a EQUIP1 4.38 N/A N/A N/A N/A N/A N/A N/A
519 1 DL1+1.0 LL1+0.75
1.18 N/a
WL2+1 EQUIP1 4.48 N/A N/A N/A N/A N/A N/A N/A
520 1 DL1+1.0 LL1+0.75
1.19 N/a
WL3+1 EQUIP1 2.62 N/A N/A N/A N/A N/A N/A N/A
521 1 DL1+1.0 LL1+0.75
1.18 N/a
WL4+1 EQUIP1 2.67 N/A N/A N/A N/A N/A N/A N/A
522 1 DL1+1.0 LL1+0.75
1.25 N/a
WL5+1 EQUIP1 9.62 N/A N/A N/A N/A N/A N/A N/A
523 1 DL1+1.0 LL1+0.75
1.24 N/a
WL6+1 EQUIP1 9.15 N/A N/A N/A N/A N/A N/A N/A
te r
524 1 DL1+1.0 LL1+0.75
1.22 N/a
WL7+1 EQUIP1 3.86 N/A N/A N/A N/A N/A N/A N/A
525 1 DL1+1.0 LL1+0.75
1.22 N/a
WL8+1 EQUIP1 4.05 N/A N/A N/A N/A N/A N/A N/A
526 1 DL1+1.0 LL1+11.11
EQUIP1+0.525
N/a SL1 1.92 N/A N/A N/A N/A N/A N/A N/A
527 1 DL1+1.0 LL1+11.23
EQUIP1+0.525
N/a SL2 5.84 N/A N/A N/A N/A N/A N/A N/A
528 0.6 DL1+1 WL12.50 N/a 2.96 N/A N/A N/A N/A N/A N/A N/A
529 0.6 DL1+1 WL22.47 N/a 2.95 N/A N/A N/A N/A N/A N/A N/A
530 0.6 DL1+1 WL32.64 N/a 2.51 N/A N/A N/A N/A N/A N/A N/A
531 0.6 DL1+1 WL42.62 N/a 2.56 N/A N/A N/A N/A N/A N/A N/A
as

532 0.6 DL1+1 WL52.78 N/a 5.12 N/A N/A N/A N/A N/A N/A N/A
533 0.6 DL1+1 WL62.69 N/a 4.75 N/A N/A N/A N/A N/A N/A N/A
534 0.6 DL1+1 WL72.91 N/a 4.75 N/A N/A N/A N/A N/A N/A N/A
535 0.6 DL1+1 WL82.88 N/a 5.15 N/A N/A N/A N/A N/A N/A N/A
536 0.6 DL1+0.7 SL12.13 N/a 1.67 N/A N/A N/A N/A N/A N/A N/A
537 0.6 DL1+0.7 SL22.83 N/a 11.10 N/A N/A N/A N/A N/A N/A N/A
1001 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1 N/A N/A N/A N/A N/A N/A N/A
nM

1002 1.35 DL1+1.5


N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1N/A N/A N/A N/A N/A N/A N/A
1003 1.35 DL1+1.5
N/a WL1+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1004 1.35 DL1+1.5
N/a WL2+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1005 1.35 DL1+1.5
N/a WL3+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1006 1.35 DL1+1.5
N/a WL4+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1007 1.35 DL1+1.5
N/a WL5+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1008 1.35 DL1+1.5
N/a WL6+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1009 1.35 DL1+1.5
N/a WL7+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1010 1.35 DL1+1.5
N/a WL8+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1011 1.35 DL1+1.5
N/a WL1+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1012 1.35 DL1+1.5
N/a WL2+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
di

1013 1.35 DL1+1.5


N/a WL3+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1014 1.35 DL1+1.5
N/a WL4+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1015 1.35 DL1+1.5
N/a WL5+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1016 1.35 DL1+1.5
N/a WL6+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1017 1.35 DL1+1.5
N/a WL7+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1018 1.35 DL1+1.5
N/a WL8+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1019 1.35 DL1+0.9
N/a TEMP1+1.35
N/a MR1
N/a N/A N/A N/A N/A N/A N/A N/A
a te

1020 1.35 DL1+-0.9


N/a TEMP1+1.35
N/a MR1
N/a N/A N/A N/A N/A N/A N/A N/A
1021 1.35 DL1+1.5LL1+1.5
N/a N/aEQUIP1+0.9
N/a TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A N/A
1022 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1023 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1024 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1028 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1029 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

Ed
1030 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1031 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1032 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1033 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1034 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1035 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1036 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1037 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1038 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1039 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1040 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1041 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

F
1042 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1043 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1044 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1045 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1046 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

PD
1047 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1048 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1049 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1050 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1051 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1052 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1053 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1054 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1055 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1056 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1057 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1058 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1059 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1060 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
te r
1061 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1062 1.148 DL1+1.5
N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1063 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1064 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1065 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1066 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1067 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1068 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1069 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
as

1070 1.148 DL1+1.5


N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1071 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1072 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1073 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1074 1 DL1+0.8
N/a LL1+1 SL2
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1075 1 DL1+0.8
N/a LL1+-1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1076 1 DL1+0.8
N/a LL1+-1 SL2
N/a N/a N/A N/A N/A N/A N/A N/A N/A
2001 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
nM

2002 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2003 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2004 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2005 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2006 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2007 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2008 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2009 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2010 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2011 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2012 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2013 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2014 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2015 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
di

2016 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2017 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2018 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2019 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2020 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2021 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2022 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2023 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
a te

2024 1 DL1+1.0
N/a LL1+1 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2025 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2026 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2027 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2028 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2029 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2030 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2031 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2032 1 DL1+0.7
N/a LL1+1 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2033 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
FOUNDATION FOR PEDESTAL (P13)-(Pilecap Design)

Ed
LOAD CASE: 1028 1.35 DL1+1.5
1028 1.35
LL1+0.9
DL1+1.05
WL4+1.5
LL1+0.9
EQUIP1+0.9
WL4+1.05 TEMP1+1.35
EQUIP1+0.9 TEMP1+1.35
MR1 MR1

GENERAL PILECAP DIMENSIONS, POSITION


Concrete Density 2.5 ton/m3 Pilecap thickness 1.400 m
Soil Density 2 ton/m3 Z cordinate of center of the pilecap -21.000 m
Grade of Concrete (Cylinder) C 30 X cordinate of center of the pilecap 18.250 m
Grade of Steel Fe 500 Length along axis Z, L z 5.820 m
Level of Base of pilecap -5.1 m Length along axis X, L x 5.820 m
Finished Ground level 0 m Area of base of pilecap, A 33.87 m2

F
Level of max water table -5.1 m

PEDESTAL (COLUMN) DIMENSIONS, POSITIONS & LOADS

PD
C.G. of Pedestal Ped top P + W ped
Pedestal ID Lz-z (m) Lx-x (m) P (T) Hz (T) Mx (T-m) Hx (T) Mz (T-m)
Z X [Level of (T)
P13 1.600 1.600 -21.000 18.250 -5.100 1391.94 -29.07 -133.56 -50.44 -212.41 1391.94

PILE DETAILS
Number of Piles 9 CGz of Pile group -21 m
Diameter of Piles 760 mm CGx of Pile group 18.25 m
2
Compressive capacity of piles 192 T SUM[(Xi-Xcg)2] of Pile group 31.190 m
2
Tensile capacity of piles 40 T SUM[(Zi-Zcg)2] of Pile group 31.190 m
Shear capacity of piles 11.5 T
te r
Weight of soil, W soil 466.42 T
Weight of footing, W f ooting 32.01 T
Axial load due to [P+ W ped] 1391.94 T
Total axial Load 1890.37 T

Mz due to [Mz+(P+W ped)*ex ] -212.41 Ton-m Mx due to [Mx+(P+W ped)*ez] -133.56 Ton-m
Eccentricity between Pilecap and Pile group 0.00 mm Eccentricity between Pilecap and Pile group 0.00 mm
Mz due to pilecap and pile group eccentricity 0.00 Ton-m Mx due to pilecap and pile group eccentricity 0.00 Ton-m
as

Total Mz -212.41 Ton-m Total Mx -133.56 Ton-m

Distance Distance P due to


from pile from pile Axial P due to P due to
Pile ID CGx CGz group CGx group CGz Load (T) Mx (T) Mz (T) Total P (T) Shear (T)
PCG-2-1 15.97 -23.28 -2.28 -2.28 210.04 9.76 15.53 235.33 6.47
nM

PCG-2-2 15.97 -21.00 -2.28 0.00 210.04 0.00 15.53 225.57 6.47
PCG-2-3 15.97 -18.72 -2.28 2.28 210.04 -9.76 15.53 215.80 6.47
PCG-2-4 18.25 -23.28 0.00 -2.28 210.04 9.76 0.00 219.80 6.47
PCG-2-5 18.25 -21.00 0.00 0.00 210.04 0.00 0.00 210.04 6.47
PCG-2-6 18.25 -18.72 0.00 2.28 210.04 -9.76 0.00 200.28 6.47
PCG-2-7 20.53 -23.28 2.28 -2.28 210.04 9.76 -15.53 204.28 6.47
PCG-2-8 20.53 -21.00 2.28 0.00 210.04 0.00 -15.53 194.51 6.47
PCG-2-9 20.53 -18.72 2.28 2.28 210.04 -9.76 -15.53 184.75 6.47

Load factor for Limit State design 1 Along Axis -----> Z-Z X-X
di

Ultimate sagging(+)
Moment,Mup(Tm/width) 135.15 139.55
Along Axis -----> Z-Z X-X Effective Depth (for + M), d (m) 1.2625 1.2625
Ultimate Shear force (In sagging zone)(T/width) 98.40 101.37 Mup/bd2 (N/mm2) 0.85 0.88
Nominal shear stress (N/mm 2) 0.78 0.80 Tensile steel required at bottom (%) 0.20 0.21
Max allowable shear stress (N/mm 2) 0.33 0.33 Provide bars of dia (mm) 25 25
Ultimate Shear force (In hogging zone)(T) 11.21 11.65 at c/c distance (mm) 150 150
a te

Nominal shear stress (N/mm 2) 0.09 0.09 Tensile steel provided at bottom (%) 0.26 0.26
Max allowable shear stress (N/mm 2) 0.33 0.33 Ultimate hogging(-)
Stirrup Diameter (mm) 12 Moment,Mun(Tm/meter width) 0.00 0.00
Stirrup spacing (N/mm 2) 150 150 Mun/bd2 (N/mm2) 0.00 0.00
Stress in stirrup (N/mm 2) 68.94 71.03 Tensile steel required at top (%) 0.00 0.00
Total Stirrup stress (N/mm 2) 139.97 Provide bars of dia (mm) 25 25
Permissible Stirrup stress (N/mm 2) 434.78 at c/c distance (mm) 150 150
Tensile steel provided at top (%) 0.26 0.26
Effective Depth (for - M), d (m) 1.262 1.262
re

P U N C H I N G S H EAR FO R P EDES TALS


Pedestal ID Ultimate Design Area for resisting Punching Shear Allowable punching
P13 1181.90 Ton 14.46 m2 0.82 N/mm2 1.37 N/mm2
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
F AC TOR OF SAF ETY F OR ALL LOAD C ASES ( Per mis s ible/ Ac tual)

Pile Reaction ALONG Z-Z ALONG X-X


Compressi pt at Shear pt at Shear

Ed
Load case pt at top pt at top Punching
on Tension Shear bottom stress bottom stress
500 1 DL1+1N/a
LL1+1 EQUIP1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
501 1 DL1+1N/a
LL1+1 EQUIP1+1
N/a TEMP1
N/a N/A N/A N/A N/A N/A N/A N/A
502 1 DL1+1N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
503 1 DL1+1N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
504 1 DL1+1N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A
505 1 DL1+1N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
506 1 DL1+1N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
507 1 DL1+1N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
508 1 DL1+1N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A

F
509 1 DL1+1N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
510 1 DL1+0.7
N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
511 1 DL1+0.7
N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
512 1 DL1+0.7
N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A

PD
513 1 DL1+0.7
N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
514 1 DL1+0.7
N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
515 1 DL1+0.7
N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
516 1 DL1+0.7
N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A
517 1 DL1+0.7
N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
518 1 DL1+ 1LL1+0.75
N/a WL1+1
N/a EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
519 1 DL1+1.0
N/a
LL1+0.75 N/a
WL2+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
520 1 DL1+1.0
N/a
LL1+0.75 N/a
WL3+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
521 1 DL1+1.0
N/a
LL1+0.75 N/a
WL4+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
522 1 DL1+1.0
N/a
LL1+0.75 N/a
WL5+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
523 1 DL1+1.0
N/a
LL1+0.75 N/a
WL6+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
te r
524 1 DL1+1.0
N/a
LL1+0.75 N/a
WL7+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
525 1 DL1+1.0
N/a
LL1+0.75 N/a
WL8+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
526 1 DL1+1.0
N/a
LL1+1 EQUIP1+0.525
N/a N/a
SL1 N/A N/A N/A N/A N/A N/A N/A
527 1 DL1+1.0
N/a
LL1+1 EQUIP1+0.525
N/a N/a
SL2 N/A N/A N/A N/A N/A N/A N/A
528 0.6 DL1+1
N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
529 0.6 DL1+1
N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
530 0.6 DL1+1
N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A
531 0.6 DL1+1
N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
as

532 0.6 DL1+1


N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
533 0.6 DL1+1
N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
534 0.6 DL1+1
N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A
535 0.6 DL1+1
N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
536 0.6 DL1+0.7
N/a SL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
537 0.6 DL1+0.7
N/a SL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
1001 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1 1.28 N/A 3.15 1.32 N/A 3.15 1.63
nM

1002 1.35 DL1+1.5


N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1 1.33 N/A 3.22 1.33 N/A 3.22 1.62
1003 1.35 DL1+1.5
N/a WL1+0.9
N/a TEMP1 N/a 3.48 N/A 6.99 3.05 N/A 6.99 6.17
1004 1.35 DL1+1.5
N/a WL2+0.9
N/a TEMP1 N/a 3.41 N/A 6.85 2.95 N/A 6.85 5.83
1005 1.35 DL1+1.5
N/a WL3+0.9
N/a TEMP1 N/a 3.92 N/A 7.44 3.15 N/A 7.44 7.58
1006 1.35 DL1+1.5
N/a WL4+0.9
N/a TEMP1 N/a 3.84 N/A 7.30 3.07 N/A 7.30 7.09
1007 1.35 DL1+1.5
N/a WL5+0.9
N/a TEMP1 N/a 3.55 N/A 7.73 3.80 N/A 7.73 6.26
1008 1.35 DL1+1.5
N/a WL6+0.9
N/a TEMP1 N/a 3.38 N/A 7.47 3.67 N/A 7.47 5.92
1009 1.35 DL1+1.5
N/a WL7+0.9
N/a TEMP1 N/a 3.36 N/A 7.86 4.21 N/A 7.86 7.26
1010 1.35 DL1+1.5
N/a WL8+0.9
N/a TEMP1 N/a 3.30 N/A 7.69 4.06 N/A 7.69 6.80
1011 1.35 DL1+1.5
N/a WL1+-0.9
N/a TEMP1 N/a 3.84 N/A 7.09 2.89 N/A 7.09 5.99
1012 1.35 DL1+1.5
N/a WL2+-0.9
N/a TEMP1 N/a 3.67 N/A 6.87 2.81 N/A 6.87 5.67
di

1013 1.35 DL1+1.5


N/a WL3+-0.9
N/a TEMP1 N/a 4.40 N/A 7.82 3.22 N/A 7.82 7.32
1014 1.35 DL1+1.5
N/a WL4+-0.9
N/a TEMP1 N/a 4.16 N/A 7.57 3.13 N/A 7.57 6.85
1015 1.35 DL1+1.5
N/a WL5+-0.9
N/a TEMP1 N/a 3.13 N/A 7.39 3.90 N/A 7.39 6.08
1016 1.35 DL1+1.5
N/a WL6+-0.9
N/a TEMP1 N/a 3.00 N/A 7.14 3.75 N/A 7.14 5.76
1017 1.35 DL1+1.5
N/a WL7+-0.9
N/a TEMP1 N/a 3.70 N/A 8.22 4.25 N/A 8.22 7.02
1018 1.35 DL1+1.5
N/a WL8+-0.9
N/a TEMP1 N/a 3.63 N/A 8.02 4.07 N/A 8.02 6.59
1019 1.35 DL1+0.9
N/a TEMP1+1.35
N/a MR1
N/a 3.43 N/A 7.42 3.54 N/A 7.42 5.56
a te

1020 1.35 DL1+-0.9


N/a TEMP1+1.35
N/a MR1
N/a 3.43 N/A 7.43 3.57 N/A 7.43 5.41
1021 1.35 DL1+1.5LL1+1.5
N/a N/aEQUIP1+0.9
N/a TEMP1+1.35 1.27
MR1N/A 3.13 1.31 N/A 3.13 1.62
1022 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35 1.32
MR1N/A 3.20 1.32 N/A 3.20 1.61
1023 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1+1.35 1.33
MR1N/A 3.26 1.37 N/A 3.26 1.70
1024 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.351.38
MR1
N/A 3.33 1.38 N/A 3.33 1.69
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
1.27 N/A MR1 3.11 1.29 N/A 3.11 1.64
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
1.27 N/A MR1 3.09 1.28 N/A 3.09 1.63
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
1.31 N/A MR1 3.12 1.27 N/A 3.12 1.69
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+0.9 TEMP1+1.35
1.27 N/A MR1 3.11 1.29 N/A 3.11 1.64
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+0.9 TEMP1+1.35
1.27 N/A MR1 3.09 1.28 N/A 3.09 1.63
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+0.9 TEMP1+1.35
1.31 N/A MR1 3.12 1.27 N/A 3.12 1.69
1028 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+0.9 TEMP1+1.35
1.30 N/A MR1 3.11 1.26 N/A 3.11 1.67
1029 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+0.9 TEMP1+1.35
1.34 N/A MR1 3.22 1.32 N/A 3.22 1.64

Ed
1030 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+0.9 TEMP1+1.35
1.34 N/A MR1 3.21 1.31 N/A 3.21 1.63
1031 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+0.9 TEMP1+1.35
1.26 N/A MR1 3.16 1.35 N/A 3.16 1.68
1032 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+0.9 TEMP1+1.35
1.26 N/A MR1 3.15 1.34 N/A 3.15 1.67
1033 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
1.32 N/A MR1 3.13 1.27 N/A 3.13 1.63
1034 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
1.31 N/A MR1 3.11 1.25 N/A 3.11 1.61
1035 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
1.36 N/A MR1 3.19 1.28 N/A 3.19 1.68
1036 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
1.35 N/A MR1 3.17 1.27 N/A 3.17 1.66
1037 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
1.30 N/A MR1 3.19 1.33 N/A 3.19 1.63
1038 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
1.29 N/A MR1 3.16 1.32 N/A 3.16 1.62
1039 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
1.31 N/A MR1 3.23 1.36 N/A 3.23 1.67
1040 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
1.30 N/A MR1 3.21 1.35 N/A 3.21 1.65
1041 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.33 N/A MR1 3.24 1.35 N/A 3.24 1.73

F
1042 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.32 N/A MR1 3.22 1.34 N/A 3.22 1.71
1043 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.37 N/A MR1 3.25 1.32 N/A 3.25 1.78
1044 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.36 N/A MR1 3.23 1.31 N/A 3.23 1.77
1045 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.41 N/A MR1 3.36 1.39 N/A 3.36 1.73
1046 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.40 N/A MR1 3.34 1.37 N/A 3.34 1.72

PD
1047 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.32 N/A MR1 3.30 1.42 N/A 3.30 1.77
1048 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.31 N/A MR1 3.28 1.41 N/A 3.28 1.75
1049 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.38 N/A MR1 3.26 1.32 N/A 3.26 1.71
1050 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.38 N/A MR1 3.24 1.31 N/A 3.24 1.70
1051 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.42 N/A MR1 3.32 1.34 N/A 3.32 1.77
1052 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.41 N/A MR1 3.31 1.33 N/A 3.31 1.75
1053 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.36 N/A MR1 3.32 1.40 N/A 3.32 1.72
1054 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.35 N/A MR1 3.29 1.39 N/A 3.29 1.70
1055 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.37 N/A MR1 3.37 1.43 N/A 3.37 1.76
1056 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.36 N/A MR1 3.35 1.42 N/A 3.35 1.74
1057 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.33 N/A MR1 3.18 1.30 N/A 3.18 1.74
1058 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.32 N/A MR1 3.15 1.28 N/A 3.15 1.72
1059 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.39 N/A MR1 3.24 1.30 N/A 3.24 1.84
1060 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.38 N/A MR1 3.22 1.28 N/A 3.22 1.81
te r
1061 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.41 N/A MR1 3.37 1.40 N/A 3.37 1.75
1062 1.148 DL1+1.5
N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.38 N/A MR1 3.32 1.38 N/A 3.32 1.72
1063 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.31 N/A MR1 3.32 1.45 N/A 3.32 1.82
1064 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.30 N/A MR1 3.29 1.43 N/A 3.29 1.79
1065 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.38 N/A MR1 3.20 1.27 N/A 3.20 1.73
1066 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.37 N/A MR1 3.17 1.26 N/A 3.17 1.70
1067 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.45 N/A MR1 3.31 1.31 N/A 3.31 1.82
1068 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.44 N/A MR1 3.29 1.29 N/A 3.29 1.79
1069 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.34 N/A MR1 3.31 1.41 N/A 3.31 1.74
as

1070 1.148 DL1+1.5


N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.31 N/A MR1 3.26 1.39 N/A 3.26 1.71
1071 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.36 N/A MR1 3.40 1.47 N/A 3.40 1.80
1072 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.35 N/A MR1 3.36 1.45 N/A 3.36 1.78
1073 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a 2.00 N/A 4.18 1.62 N/A 4.18 2.58
1074 1 DL1+0.8
N/a LL1+1 SL2
N/a N/a 2.09 N/A 4.82 2.11 N/A 4.82 2.76
1075 1 DL1+0.8
N/a LL1+-1 SL1
N/a N/a 2.33 N/A 4.64 1.77 N/A 4.64 3.07
1076 1 DL1+0.8
N/a LL1+-1 SL2
N/a N/a 2.16 N/A 4.89 2.10 N/A 4.89 2.85
2001 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+11.80
MR1N/A 4.25 1.83 N/A 4.25 2.42
nM

2002 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+11.80
MR1N/A 4.23 1.82 N/A 4.23 2.40
2003 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+11.85
MR1N/A 4.26 1.79 N/A 4.26 2.50
2004 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+11.84
MR1N/A 4.24 1.78 N/A 4.24 2.47
2005 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+11.90
MR1N/A 4.39 1.87 N/A 4.39 2.43
2006 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+11.89
MR1N/A 4.37 1.86 N/A 4.37 2.41
2007 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+11.79
MR1N/A 4.31 1.91 N/A 4.31 2.48
2008 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+11.78
MR1N/A 4.29 1.89 N/A 4.29 2.46
2009 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.86
MR1N/A 4.27 1.80 N/A 4.27 2.40
2010 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.86
MR1N/A 4.25 1.78 N/A 4.25 2.38
2011 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.91
MR1N/A 4.34 1.81 N/A 4.34 2.48
2012 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.90
MR1N/A 4.32 1.80 N/A 4.32 2.45
2013 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.84
MR1N/A 4.35 1.88 N/A 4.35 2.41
2014 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.83
MR1N/A 4.31 1.87 N/A 4.31 2.39
2015 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.85
MR1N/A 4.40 1.92 N/A 4.40 2.46
di

2016 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.84
MR1N/A 4.38 1.91 N/A 4.38 2.44
2017 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+11.80
MR1N/A 4.18 1.77 N/A 4.18 2.44
2018 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+11.79
MR1N/A 4.15 1.75 N/A 4.15 2.41
2019 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+11.88
MR1N/A 4.25 1.76 N/A 4.25 2.57
2020 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+11.86
MR1N/A 4.22 1.74 N/A 4.22 2.53
2021 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+11.90
MR1N/A 4.40 1.88 N/A 4.40 2.45
2022 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+11.87
MR1N/A 4.35 1.86 N/A 4.35 2.42
2023 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+11.78
MR1N/A 4.34 1.95 N/A 4.34 2.54
a te

2024 1 DL1+1.0
N/a LL1+1 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+11.77
MR1N/A 4.31 1.92 N/A 4.31 2.51
2025 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.86
MR1N/A 4.21 1.74 N/A 4.21 2.42
2026 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.85
MR1N/A 4.17 1.71 N/A 4.17 2.39
2027 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.94
MR1N/A 4.33 1.77 N/A 4.33 2.55
2028 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.93
MR1N/A 4.30 1.76 N/A 4.30 2.51
2029 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.82
MR1N/A 4.33 1.90 N/A 4.33 2.43
2030 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.78
MR1N/A 4.27 1.88 N/A 4.27 2.40
2031 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.84
MR1N/A 4.42 1.96 N/A 4.42 2.52
2032 1 DL1+0.7
N/a LL1+1 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.83
MR1N/A 4.39 1.94 N/A 4.39 2.49
2033 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a 2.00 N/A 4.18 1.62 N/A 4.18 2.58
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
FOUNDATION FOR PEDESTAL (P14)-(Pile Capacity Check)

Ed
LOAD CASE: 520 1 DL1+1.0
520 LL1+0.75
1 DL1+0.75
WL3+1
LL1+0.75
EQUIP1
WL3+1 EQUIP1

GENERAL PILECAP DIMENSIONS, POSITION


Concrete Density 2.5 ton/m3 Pilecap thickness 1.300 m
Soil Density 2 ton/m3 Z cordinate of center of the pilecap -12.000 m
Grade of Concrete (Cylinder) C 30 X cordinate of center of the pilecap 18.250 m
Grade of Steel Fe 500 Length along axis Z, L z 3.540 m
Level of Base of pilecap -5.1 m Length along axis X, L x 3.540 m

F
Finished Ground level 0 m Area of base of pilecap, A 12.53 m2
Level of max water table -5.1 m

PD
PEDESTAL (COLUMN) DIMENSIONS, POSITIONS & LOADS
C.G. of Pedestal Ped top P + W ped
Pedestal ID Lz-z (m) Lx-x (m) P (T) Hz (T) Mx (T-m) Hx (T) Mz (T-m)
Z X [Level of (T)
P14 1.250 1.250 -12.000 18.250 -5.100 186.11 -1.31 -15.95 -30.98 -85.13 186.11

PILE DETAILS
Number of Piles 4 CGz of Pile group -12 m
Diameter of Piles 760 mm CGx of Pile group 18.25 m
2
Compressive capacity of piles 192 T SUM[(Xi-Xcg)2] of Pile group 5.198 m
2
SUM[(Zi-Zcg)2] of Pile group
te r
Tensile capacity of piles 40 T 5.198 m
Shear capacity of piles 11.5 T

Weight of soil, W soil 127.82 T


Weight of footing, W f ooting 8.15 T
Axial load due to [P+ W ped] 186.11 T
Total axial Load 322.08 T
as

Mz due to [Mz+(P+W ped)*ex ] -85.13 Ton-m Mx due to [Mx+(P+W ped)*ez] -15.95 Ton-m
Eccentricity between Pilecap and Pile group 0.00 mm Eccentricity between Pilecap and Pile group 0.00 mm
Mz due to pilecap and pile group eccentricity 0.00 Ton-m Mx due to pilecap and pile group eccentricity 0.00 Ton-m
Total Mz -85.13 Ton-m Total Mx -15.95 Ton-m
nM

Distance Distance P due to


from pile from pile Axial P due to P due to
Pile ID CGx CGz group CGx group CGz Load (T) Mx (T) Mz (T) Total P (T) Shear (T)
PCG-3-1 17.11 -13.14 -1.14 -1.14 80.52 3.50 18.67 102.69 7.75
PCG-3-2 17.11 -10.86 -1.14 1.14 80.52 -3.50 18.67 95.69 7.75
PCG-3-3 19.39 -13.14 1.14 -1.14 80.52 3.50 -18.67 65.35 7.75
PCG-3-4 19.39 -10.86 1.14 1.14 80.52 -3.50 -18.67 58.35 7.75
di
a te
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
F AC TOR OF SAF ETY F OR ALL LOAD C ASES ( Per mis s ible/ Ac tual)

Pile Reaction ALONG Z-Z ALONG X-X


Compressi pt at Shear pt at Shear

Ed
Load case pt at top pt at top Punching
on Tension Shear bottom stress bottom stress
500 1 DL1+1 LL1+11.98
EQUIP1
N/a 2.81 N/A N/A N/A N/A N/A N/A N/A
501 1 DL1+1 LL1+11.94
EQUIP1+1
N/a TEMP1 2.39 N/A N/A N/A N/A N/A N/A N/A
502 1 DL1+1 WL1 2.10 N/a 4.56 N/A N/A N/A N/A N/A N/A N/A
503 1 DL1+1 WL2 2.07 N/a 4.48 N/A N/A N/A N/A N/A N/A N/A
504 1 DL1+1 WL3 2.60 N/a 1.57 N/A N/A N/A N/A N/A N/A N/A
505 1 DL1+1 WL4 2.58 N/a 1.58 N/A N/A N/A N/A N/A N/A N/A
506 1 DL1+1 WL5 2.64 N/a 2.85 N/A N/A N/A N/A N/A N/A N/A
507 1 DL1+1 WL6 2.62 N/a 2.87 N/A N/A N/A N/A N/A N/A N/A
508 1 DL1+1 WL7 2.67 N/a 4.10 N/A N/A N/A N/A N/A N/A N/A

F
509 1 DL1+1 WL8 2.65 N/a 4.16 N/A N/A N/A N/A N/A N/A N/A
510 1 DL1+0.7 WL12.33 N/a 10.19 N/A N/A N/A N/A N/A N/A N/A
511 1 DL1+0.7 WL22.31 N/a 9.90 N/A N/A N/A N/A N/A N/A N/A
512 1 DL1+0.7 WL32.68 N/a 1.96 N/A N/A N/A N/A N/A N/A N/A

PD
513 1 DL1+0.7 WL42.67 N/a 1.97 N/A N/A N/A N/A N/A N/A N/A
514 1 DL1+0.7 WL52.71 N/a 3.29 N/A N/A N/A N/A N/A N/A N/A
515 1 DL1+0.7 WL62.70 N/a 3.32 N/A N/A N/A N/A N/A N/A N/A
516 1 DL1+0.7 WL72.74 N/a 4.58 N/A N/A N/A N/A N/A N/A N/A
517 1 DL1+0.7 WL82.73 N/a 4.64 N/A N/A N/A N/A N/A N/A N/A
518 1 DL1+ 1LL1+0.75
1.73WL1+1
N/a EQUIP1 22.84 N/A N/A N/A N/A N/A N/A N/A
519 1 DL1+1.0 LL1+0.75
1.72 N/a
WL2+1 EQUIP1 24.48 N/A N/A N/A N/A N/A N/A N/A
520 1 DL1+1.0 LL1+0.75
1.87 N/a
WL3+1 EQUIP1 1.48 N/A N/A N/A N/A N/A N/A N/A
521 1 DL1+1.0 LL1+0.75
1.86 N/a
WL4+1 EQUIP1 1.49 N/A N/A N/A N/A N/A N/A N/A
522 1 DL1+1.0 LL1+0.75
2.02 N/a
WL5+1 EQUIP1 2.45 N/A N/A N/A N/A N/A N/A N/A
523 1 DL1+1.0 LL1+0.75
2.02 N/a
WL6+1 EQUIP1 2.47 N/A N/A N/A N/A N/A N/A N/A
te r
524 1 DL1+1.0 LL1+0.75
1.89 N/a
WL7+1 EQUIP1 2.61 N/A N/A N/A N/A N/A N/A N/A
525 1 DL1+1.0 LL1+0.75
1.88 N/a
WL8+1 EQUIP1 2.64 N/A N/A N/A N/A N/A N/A N/A
526 1 DL1+1.0 LL1+11.79
EQUIP1+0.525
N/a SL1 1.62 N/A N/A N/A N/A N/A N/A N/A
527 1 DL1+1.0 LL1+11.96
EQUIP1+0.525
N/a SL2 2.60 N/A N/A N/A N/A N/A N/A N/A
528 0.6 DL1+1 WL12.38 N/a 3.33 N/A N/A N/A N/A N/A N/A N/A
529 0.6 DL1+1 WL22.35 N/a 3.29 N/A N/A N/A N/A N/A N/A N/A
530 0.6 DL1+1 WL33.14 N/a 1.81 N/A N/A N/A N/A N/A N/A N/A
531 0.6 DL1+1 WL43.11 N/a 1.83 N/A N/A N/A N/A N/A N/A N/A
as

532 0.6 DL1+1 WL53.20 N/a 3.56 N/A N/A N/A N/A N/A N/A N/A
533 0.6 DL1+1 WL63.17 N/a 3.59 N/A N/A N/A N/A N/A N/A N/A
534 0.6 DL1+1 WL73.24 N/a 5.01 N/A N/A N/A N/A N/A N/A N/A
535 0.6 DL1+1 WL83.20 N/a 5.08 N/A N/A N/A N/A N/A N/A N/A
536 0.6 DL1+0.7 SL12.55 N/a 2.11 N/A N/A N/A N/A N/A N/A N/A
537 0.6 DL1+0.7 SL23.54 N/a 6.18 N/A N/A N/A N/A N/A N/A N/A
1001 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1 N/A N/A N/A N/A N/A N/A N/A
nM

1002 1.35 DL1+1.5


N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1N/A N/A N/A N/A N/A N/A N/A
1003 1.35 DL1+1.5
N/a WL1+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1004 1.35 DL1+1.5
N/a WL2+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1005 1.35 DL1+1.5
N/a WL3+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1006 1.35 DL1+1.5
N/a WL4+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1007 1.35 DL1+1.5
N/a WL5+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1008 1.35 DL1+1.5
N/a WL6+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1009 1.35 DL1+1.5
N/a WL7+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1010 1.35 DL1+1.5
N/a WL8+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1011 1.35 DL1+1.5
N/a WL1+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1012 1.35 DL1+1.5
N/a WL2+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
di

1013 1.35 DL1+1.5


N/a WL3+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1014 1.35 DL1+1.5
N/a WL4+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1015 1.35 DL1+1.5
N/a WL5+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1016 1.35 DL1+1.5
N/a WL6+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1017 1.35 DL1+1.5
N/a WL7+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1018 1.35 DL1+1.5
N/a WL8+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1019 1.35 DL1+0.9
N/a TEMP1+1.35
N/a MR1
N/a N/A N/A N/A N/A N/A N/A N/A
a te

1020 1.35 DL1+-0.9


N/a TEMP1+1.35
N/a MR1
N/a N/A N/A N/A N/A N/A N/A N/A
1021 1.35 DL1+1.5LL1+1.5
N/a N/aEQUIP1+0.9
N/a TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A N/A
1022 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1023 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1024 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1028 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1029 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

Ed
1030 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1031 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1032 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1033 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1034 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1035 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1036 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1037 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1038 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1039 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1040 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1041 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

F
1042 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1043 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1044 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1045 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1046 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

PD
1047 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1048 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1049 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1050 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1051 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1052 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1053 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1054 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1055 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1056 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1057 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1058 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1059 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1060 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
te r
1061 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1062 1.148 DL1+1.5
N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1063 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1064 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1065 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1066 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1067 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1068 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1069 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
as

1070 1.148 DL1+1.5


N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1071 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1072 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1073 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1074 1 DL1+0.8
N/a LL1+1 SL2
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1075 1 DL1+0.8
N/a LL1+-1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1076 1 DL1+0.8
N/a LL1+-1 SL2
N/a N/a N/A N/A N/A N/A N/A N/A N/A
2001 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
nM

2002 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2003 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2004 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2005 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2006 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2007 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2008 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2009 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2010 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2011 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2012 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2013 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2014 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2015 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
di

2016 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2017 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2018 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2019 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2020 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2021 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2022 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2023 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
a te

2024 1 DL1+1.0
N/a LL1+1 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2025 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2026 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2027 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2028 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2029 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2030 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2031 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2032 1 DL1+0.7
N/a LL1+1 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2033 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
FOUNDATION FOR PEDESTAL (P14)-(Pilecap Design)

Ed
LOAD CASE: 1066 1.1481066
DL1+1.5
1.148
LL1+1.5
DL1+1.05
WL2+1.5
LL1+1.5
EQUIP1+-0.9
WL2+1.05 EQUIP1+-0.9
TEMP1+1.35 TEMP1+1.35
MR1 MR1

GENERAL PILECAP DIMENSIONS, POSITION


Concrete Density 2.5 ton/m3 Pilecap thickness 1.300 m
Soil Density 2 ton/m3 Z cordinate of center of the pilecap -12.000 m
Grade of Concrete (Cylinder) C 30 X cordinate of center of the pilecap 18.250 m
Grade of Steel Fe 500 Length along axis Z, L z 3.540 m
Level of Base of pilecap -5.1 m Length along axis X, L x 3.540 m
m2

F
Finished Ground level 0 m Area of base of pilecap, A 12.53
Level of max water table -5.1 m

PD
PEDESTAL (COLUMN) DIMENSIONS, POSITIONS & LOADS
C.G. of Pedestal Ped top P + W ped
Pedestal ID Lz-z (m) Lx-x (m) P (T) Hz (T) Mx (T-m) Hx (T) Mz (T-m)
Z X [Level of (T)
P14 1.250 1.250 -12.000 18.250 -5.100 365.08 -2.26 -25.62 11.09 116.75 365.08

PILE DETAILS
Number of Piles 4 CGz of Pile group -12 m
Diameter of Piles 760 mm CGx of Pile group 18.25 m
2
Compressive capacity of piles 192 T SUM[(Xi-Xcg)2] of Pile group 5.198 m
2
Tensile capacity of piles 40 T SUM[(Zi-Zcg)2] of Pile group 5.198 m
Shear capacity of piles 11.5 T
te r
Weight of soil, W soil 172.56 T
Weight of footing, W f ooting 11.00 T
Axial load due to [P+ W ped] 365.08 T
Total axial Load 548.64 T

Mz due to [Mz+(P+W ped)*ex ] 116.75 Ton-m Mx due to [Mx+(P+W ped)*ez] -25.62 Ton-m
as

Eccentricity between Pilecap and Pile group 0.00 mm Eccentricity between Pilecap and Pile group 0.00 mm
Mz due to pilecap and pile group eccentricity 0.00 Ton-m Mx due to pilecap and pile group eccentricity 0.00 Ton-m
Total Mz 116.75 Ton-m Total Mx -25.62 Ton-m

Distance Distance P due to


from pile from pile Axial P due to P due to
nM

Pile ID CGx CGz group CGx group CGz Load (T) Mx (T) Mz (T) Total P (T) Shear (T)
PCG-3-1 17.11 -13.14 -1.14 -1.14 137.16 5.62 -25.60 117.18 2.83
PCG-3-2 17.11 -10.86 -1.14 1.14 137.16 -5.62 -25.60 105.94 2.83
PCG-3-3 19.39 -13.14 1.14 -1.14 137.16 5.62 25.60 168.38 2.83
PCG-3-4 19.39 -10.86 1.14 1.14 137.16 -5.62 25.60 157.14 2.83

Load factor for Limit State design 1 Along Axis -----> Z-Z X-X
Ultimate sagging(+)
di

Moment,Mup(Tm/width) 31.84 37.37


Along Axis -----> Z-Z X-X Effective Depth (for + M), d (m) 1.17 1.17
Ultimate Shear force (In sagging zone)(T/width) 24.64 28.86 Mup/bd2 (N/mm2) 0.23 0.27
Nominal shear stress (N/mm 2) 0.21 0.25 Tensile steel required at bottom (%) 0.05 0.06
Max allowable shear stress (N/mm 2) 0.32 0.32 Provide bars of dia (mm) 20 20
Ultimate Shear force (In hogging zone)(T) 9.74 10.41 at c/c distance (mm) 150 150
Nominal shear stress (N/mm 2) 0.08 0.09 Tensile steel provided at bottom (%) 0.18 0.18
a te

Max allowable shear stress (N/mm 2) 0.32 0.32 Ultimate hogging(-)


Stirrup Diameter (mm) 12 Moment,Mun(Tm/meter width) 0.00 0.00
Stirrup spacing (N/mm 2) 150 150 Mun/bd2 (N/mm2) 0.00 0.00
Stress in stirrup (N/mm 2) 18.63 21.82 Tensile steel required at top (%) 0.00 0.00
Total Stirrup stress (N/mm 2) 40.45 Provide bars of dia (mm) 20 20
Permissible Stirrup stress (N/mm 2) 434.78 at c/c distance (mm) 150 150
Tensile steel provided at top (%) 0.18 0.18
Effective Depth (for - M), d (m) 1.170 1.170
re

P UNC H I NG S H EAR FO R P EDES TALS


Pedestal ID Ultimate Design Area for resisting Punching Shear Allowable punching
P14 183.56 Ton 11.33 m2 0.16 N/mm2 1.37 N/mm2
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
F AC TOR OF SAF ETY F OR ALL LOAD C ASES ( Per mis s ible/ Ac tual)

Pile Reaction ALONG Z-Z ALONG X-X


Compressi pt at Shear pt at Shear

Ed
Load case pt at top pt at top Punching
on Tension Shear bottom stress bottom stress
500 1 DL1+1N/a
LL1+1 EQUIP1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
501 1 DL1+1N/a
LL1+1 EQUIP1+1
N/a TEMP1
N/a N/A N/A N/A N/A N/A N/A N/A
502 1 DL1+1N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
503 1 DL1+1N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
504 1 DL1+1N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A
505 1 DL1+1N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
506 1 DL1+1N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
507 1 DL1+1N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
508 1 DL1+1N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A

F
509 1 DL1+1N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
510 1 DL1+0.7
N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
511 1 DL1+0.7
N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
512 1 DL1+0.7
N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A

PD
513 1 DL1+0.7
N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
514 1 DL1+0.7
N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
515 1 DL1+0.7
N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
516 1 DL1+0.7
N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A
517 1 DL1+0.7
N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
518 1 DL1+ 1LL1+0.75
N/a WL1+1
N/a EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
519 1 DL1+1.0
N/a
LL1+0.75 N/a
WL2+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
520 1 DL1+1.0
N/a
LL1+0.75 N/a
WL3+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
521 1 DL1+1.0
N/a
LL1+0.75 N/a
WL4+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
522 1 DL1+1.0
N/a
LL1+0.75 N/a
WL5+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
523 1 DL1+1.0
N/a
LL1+0.75 N/a
WL6+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
te r
524 1 DL1+1.0
N/a
LL1+0.75 N/a
WL7+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
525 1 DL1+1.0
N/a
LL1+0.75 N/a
WL8+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
526 1 DL1+1.0
N/a
LL1+1 EQUIP1+0.525
N/a N/a
SL1 N/A N/A N/A N/A N/A N/A N/A
527 1 DL1+1.0
N/a
LL1+1 EQUIP1+0.525
N/a N/a
SL2 N/A N/A N/A N/A N/A N/A N/A
528 0.6 DL1+1
N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
529 0.6 DL1+1
N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
530 0.6 DL1+1
N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A
531 0.6 DL1+1
N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
as

532 0.6 DL1+1


N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
533 0.6 DL1+1
N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
534 0.6 DL1+1
N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A
535 0.6 DL1+1
N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
536 0.6 DL1+0.7
N/a SL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
537 0.6 DL1+0.7
N/a SL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
1001 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1 3.83 N/A 13.17 3.70 N/A 13.17 8.45
nM

1002 1.35 DL1+1.5


N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1 3.81 N/A 13.43 3.86 N/A 13.43 8.45
1003 1.35 DL1+1.5
N/a WL1+0.9
N/a TEMP1 N/a 5.32 N/A 16.16 4.02 N/A 16.16 8.45
1004 1.35 DL1+1.5
N/a WL2+0.9
N/a TEMP1 N/a 5.22 N/A 15.82 3.93 N/A 15.82 8.45
1005 1.35 DL1+1.5
N/a WL3+0.9
N/a TEMP1 N/a 10.40 N/A 25.13 5.29 N/A 25.13 8.45
1006 1.35 DL1+1.5
N/a WL4+0.9
N/a TEMP1 N/a 9.99 N/A 24.55 5.22 N/A 24.55 8.45
1007 1.35 DL1+1.5
N/a WL5+0.9
N/a TEMP1 N/a 6.30 N/A 23.16 6.67 N/A 23.16 8.45
1008 1.35 DL1+1.5
N/a WL6+0.9
N/a TEMP1 N/a 6.15 N/A 22.67 6.56 N/A 22.67 8.45
1009 1.35 DL1+1.5
N/a WL7+0.9
N/a TEMP1 N/a 5.96 N/A 22.45 6.71 N/A 22.45 8.45
1010 1.35 DL1+1.5
N/a WL8+0.9
N/a TEMP1 N/a 5.82 N/A 21.99 6.60 N/A 21.99 8.45
1011 1.35 DL1+1.5
N/a WL1+-0.9
N/a TEMP1 N/a 5.29 N/A 15.59 3.80 N/A 15.59 8.45
1012 1.35 DL1+1.5
N/a WL2+-0.9
N/a TEMP1 N/a 5.18 N/A 15.28 3.73 N/A 15.28 8.45
di

1013 1.35 DL1+1.5


N/a WL3+-0.9
N/a TEMP1 N/a 10.19 N/A 26.00 5.61 N/A 26.00 8.45
1014 1.35 DL1+1.5
N/a WL4+-0.9
N/a TEMP1 N/a 9.79 N/A 25.37 5.54 N/A 25.37 8.45
1015 1.35 DL1+1.5
N/a WL5+-0.9
N/a TEMP1 N/a 6.22 N/A 23.89 7.20 N/A 23.89 8.45
1016 1.35 DL1+1.5
N/a WL6+-0.9
N/a TEMP1 N/a 6.08 N/A 23.37 7.07 N/A 23.37 8.45
1017 1.35 DL1+1.5
N/a WL7+-0.9
N/a TEMP1 N/a 5.91 N/A 23.19 7.25 N/A 23.19 8.45
1018 1.35 DL1+1.5
N/a WL8+-0.9
N/a TEMP1 N/a 5.78 N/A 22.70 7.12 N/A 22.70 8.45
1019 1.35 DL1+0.9
N/a TEMP1+1.35
N/a MR1
N/a 7.02 N/A 23.67 6.30 N/A 23.67 8.45
a te

1020 1.35 DL1+-0.9


N/a TEMP1+1.35
N/a MR1
N/a 6.93 N/A 24.50 6.77 N/A 24.50 8.45
1021 1.35 DL1+1.5LL1+1.5
N/a N/aEQUIP1+0.9
N/a TEMP1+1.35 3.80
MR1N/A 13.10 3.69 N/A 13.10 8.45
1022 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35 3.79
MR1N/A 13.35 3.84 N/A 13.35 8.45
1023 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1+1.35 4.05
MR1N/A 14.00 3.94 N/A 14.00 8.45
1024 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.354.03
MR1
N/A 14.29 4.12 N/A 14.29 8.45
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
3.43 N/A MR1 11.91 3.37 N/A 11.91 8.45
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
3.41 N/A MR1 11.80 3.33 N/A 11.80 8.45
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
4.25 N/A MR1 13.31 3.44 N/A 13.31 8.45
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+0.9 TEMP1+1.35
3.43 N/A MR1 11.91 3.37 N/A 11.91 8.45
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+0.9 TEMP1+1.35
3.41 N/A MR1 11.80 3.33 N/A 11.80 8.45
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+0.9 TEMP1+1.35
4.25 N/A MR1 13.31 3.44 N/A 13.31 8.45
1028 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+0.9 TEMP1+1.35
4.21 N/A MR1 13.21 3.42 N/A 13.21 8.45
1029 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+0.9 TEMP1+1.35
4.14 N/A MR1 13.82 3.75 N/A 13.82 8.45

Ed
1030 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+0.9 TEMP1+1.35
4.10 N/A MR1 13.72 3.73 N/A 13.72 8.45
1031 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+0.9 TEMP1+1.35
3.58 N/A MR1 12.82 3.75 N/A 12.82 8.45
1032 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+0.9 TEMP1+1.35
3.55 N/A MR1 12.73 3.73 N/A 12.73 8.45
1033 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
3.42 N/A MR1 11.60 3.21 N/A 11.60 8.45
1034 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
3.39 N/A MR1 11.49 3.18 N/A 11.49 8.45
1035 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
4.23 N/A MR1 13.57 3.58 N/A 13.57 8.45
1036 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
4.19 N/A MR1 13.47 3.56 N/A 13.47 8.45
1037 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
4.11 N/A MR1 14.08 3.91 N/A 14.08 8.45
1038 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
4.07 N/A MR1 13.97 3.89 N/A 13.97 8.45
1039 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
3.57 N/A MR1 13.06 3.92 N/A 13.06 8.45
1040 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
3.54 N/A MR1 12.97 3.89 N/A 12.97 8.45
1041 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+0.9 TEMP1+1.35
3.63 N/A MR1 12.58 3.54 N/A 12.58 8.45

F
1042 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+0.9 TEMP1+1.35
3.60 N/A MR1 12.46 3.50 N/A 12.46 8.45
1043 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.56 N/A MR1 14.24 3.66 N/A 14.24 8.45
1044 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.51 N/A MR1 14.13 3.64 N/A 14.13 8.45
1045 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.44 N/A MR1 14.83 4.01 N/A 14.83 8.45
1046 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.40 N/A MR1 14.71 3.99 N/A 14.71 8.45

PD
1047 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+0.9 TEMP1+1.35
3.80 N/A MR1 13.68 4.02 N/A 13.68 8.45
1048 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+0.9 TEMP1+1.35
3.77 N/A MR1 13.58 4.00 N/A 13.58 8.45
1049 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
3.62 N/A MR1 12.23 3.37 N/A 12.23 8.45
1050 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
3.59 N/A MR1 12.12 3.34 N/A 12.12 8.45
1051 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.54 N/A MR1 14.54 3.82 N/A 14.54 8.45
1052 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.49 N/A MR1 14.42 3.80 N/A 14.42 8.45
1053 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.40 N/A MR1 15.13 4.20 N/A 15.13 8.45
1054 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.36 N/A MR1 15.00 4.17 N/A 15.00 8.45
1055 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
3.78 N/A MR1 13.96 4.21 N/A 13.96 8.45
1056 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
3.75 N/A MR1 13.85 4.18 N/A 13.85 8.45
1057 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+0.9 TEMP1+1.35
3.40 N/A MR1 11.18 3.01 N/A 11.18 8.45
1058 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+0.9 TEMP1+1.35
3.36 N/A MR1 11.02 2.97 N/A 11.02 8.45
1059 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.98 N/A MR1 14.41 3.50 N/A 14.41 8.45
1060 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.88 N/A MR1 14.22 3.47 N/A 14.22 8.45
te r
1061 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.31 N/A MR1 14.71 4.06 N/A 14.71 8.45
1062 1.148 DL1+1.5
N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.24 N/A MR1 14.51 4.02 N/A 14.51 8.45
1063 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+0.9 TEMP1+1.35
3.65 N/A MR1 13.48 4.08 N/A 13.48 8.45
1064 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+0.9 TEMP1+1.35
3.60 N/A MR1 13.31 4.03 N/A 13.31 8.45
1065 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
3.39 N/A MR1 10.90 2.89 N/A 10.90 8.45
1066 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
3.34 N/A MR1 10.75 2.85 N/A 10.75 8.45
1067 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.95 N/A MR1 14.72 3.64 N/A 14.72 8.45
1068 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.85 N/A MR1 14.52 3.61 N/A 14.52 8.45
1069 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.27 N/A MR1 15.00 4.25 N/A 15.00 8.45
as

1070 1.148 DL1+1.5


N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.20 N/A MR1 14.80 4.21 N/A 14.80 8.45
1071 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
3.63 N/A MR1 13.75 4.27 N/A 13.75 8.45
1072 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
3.58 N/A MR1 13.57 4.22 N/A 13.57 8.45
1073 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a 4.83 N/A 15.29 3.94 N/A 15.29 8.45
1074 1 DL1+0.8
N/a LL1+1 SL2
N/a N/a 5.59 N/A 19.82 5.60 N/A 19.82 8.45
1075 1 DL1+0.8
N/a LL1+-1 SL1
N/a N/a 7.47 N/A 21.11 4.92 N/A 21.11 8.45
1076 1 DL1+0.8
N/a LL1+-1 SL2
N/a N/a 5.89 N/A 20.27 5.53 N/A 20.27 8.45
2001 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+14.68
MR1N/A 16.41 4.62 N/A 16.41 8.45
nM

2002 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+14.65
MR1N/A 16.27 4.57 N/A 16.27 8.45
2003 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+15.67
MR1N/A 18.09 4.68 N/A 18.09 8.45
2004 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+15.62
MR1N/A 17.97 4.66 N/A 17.97 8.45
2005 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+15.55
MR1N/A 18.73 5.05 N/A 18.73 8.45
2006 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+15.50
MR1N/A 18.60 5.02 N/A 18.60 8.45
2007 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+14.87
MR1N/A 17.48 5.06 N/A 17.48 8.45
2008 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+14.83
MR1N/A 17.37 5.03 N/A 17.37 8.45
2009 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1 4.67
MR1N/A 16.02 4.42 N/A 16.02 8.45
2010 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1 4.63
MR1N/A 15.88 4.38 N/A 15.88 8.45
2011 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1 5.65
MR1N/A 18.41 4.84 N/A 18.41 8.45
2012 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1 5.60
MR1N/A 18.28 4.82 N/A 18.28 8.45
2013 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1 5.51
MR1N/A 19.04 5.24 N/A 19.04 8.45
2014 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1 5.46
MR1N/A 18.91 5.22 N/A 18.91 8.45
2015 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1 4.85
MR1N/A 17.78 5.25 N/A 17.78 8.45
di

2016 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1 4.81
MR1N/A 17.66 5.23 N/A 17.66 8.45
2017 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+14.42
MR1N/A 14.80 4.01 N/A 14.80 8.45
2018 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+14.37
MR1N/A 14.61 3.95 N/A 14.61 8.45
2019 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+16.09
MR1N/A 18.27 4.50 N/A 18.27 8.45
2020 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+16.00
MR1N/A 18.06 4.46 N/A 18.06 8.45
2021 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+15.41
MR1N/A 18.60 5.10 N/A 18.60 8.45
2022 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+15.33
MR1N/A 18.38 5.06 N/A 18.38 8.45
2023 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+14.70
MR1N/A 17.26 5.12 N/A 17.26 8.45
a te

2024 1 DL1+1.0
N/a LL1+1 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+14.65
MR1N/A 17.08 5.07 N/A 17.08 8.45
2025 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1 4.41
MR1N/A 14.48 3.86 N/A 14.48 8.45
2026 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1 4.36
MR1N/A 14.29 3.81 N/A 14.29 8.45
2027 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1 6.06
MR1N/A 18.59 4.65 N/A 18.59 8.45
2028 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1 5.97
MR1N/A 18.38 4.62 N/A 18.38 8.45
2029 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1 5.37
MR1N/A 18.91 5.30 N/A 18.91 8.45
2030 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1 5.30
MR1N/A 18.69 5.25 N/A 18.69 8.45
2031 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1 4.68
MR1N/A 17.55 5.31 N/A 17.55 8.45
2032 1 DL1+0.7
N/a LL1+1 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1 4.63
MR1N/A 17.36 5.27 N/A 17.36 8.45
2033 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a 4.83 N/A 15.29 3.94 N/A 15.29 8.45
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
FOUNDATION FOR PEDESTAL (P17)-(Pile Capacity Check)

Ed
LOAD CASE: 518 1 DL1+518
1LL1+0.75
1 DL1+0.75
WL1+1
LL1+0.75
EQUIP1WL1+1 EQUIP1

GENERAL PILECAP DIMENSIONS, POSITION


Concrete Density 2.5 ton/m3 Pilecap thickness 1.300 m
Soil Density 2 ton/m3 Z cordinate of center of the pilecap -12.000 m
Grade of Concrete (Cylinder) C 30 X cordinate of center of the pilecap 26.750 m
Grade of Steel Fe 500 Length along axis Z, L z 3.540 m
Level of Base of pilecap -5.1 m Length along axis X, L x 3.540 m

F
Finished Ground level 0 m Area of base of pilecap, A 12.53 m2
Level of max water table -5.1 m

PD
PEDESTAL (COLUMN) DIMENSIONS, POSITIONS & LOADS
C.G. of Pedestal Ped top P + W ped
Pedestal ID Lz-z (m) Lx-x (m) P (T) Hz (T) Mx (T-m) Hx (T) Mz (T-m)
Z X [Level of (T)
P17 1.250 1.250 -12.000 26.750 -5.100 203.34 -1.50 -18.22 30.08 80.03 203.34

PILE DETAILS
Number of Piles 4 CGz of Pile group -12 m
Diameter of Piles 760 mm CGx of Pile group 26.75 m
2
Compressive capacity of piles 192 T SUM[(Xi-Xcg)2] of Pile group 5.198 m
2
SUM[(Zi-Zcg)2] of Pile group
te r
Tensile capacity of piles 40 T 5.198 m
Shear capacity of piles 11.5 T

Weight of soil, W soil 127.82 T


Weight of footing, W f ooting 8.15 T
Axial load due to [P+ W ped] 203.34 T
Total axial Load 339.31 T
as

Mz due to [Mz+(P+W ped)*ex ] 80.03 Ton-m Mx due to [Mx+(P+W ped)*ez] -18.22 Ton-m
Eccentricity between Pilecap and Pile group 0.00 mm Eccentricity between Pilecap and Pile group 0.00 mm
Mz due to pilecap and pile group eccentricity 0.00 Ton-m Mx due to pilecap and pile group eccentricity 0.00 Ton-m
Total Mz 80.03 Ton-m Total Mx -18.22 Ton-m
nM

Distance Distance P due to


from pile from pile Axial P due to P due to
Pile ID CGx CGz group CGx group CGz Load (T) Mx (T) Mz (T) Total P (T) Shear (T)
PCG-5-1 25.61 -13.14 -1.14 -1.14 84.83 4.00 -17.55 71.27 7.53
PCG-5-2 25.61 -10.86 -1.14 1.14 84.83 -4.00 -17.55 63.28 7.53
PCG-5-3 27.89 -13.14 1.14 -1.14 84.83 4.00 17.55 106.37 7.53
PCG-5-4 27.89 -10.86 1.14 1.14 84.83 -4.00 17.55 98.38 7.53
di
a te
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
F AC TOR OF SAF ETY F OR ALL LOAD C ASES ( Per mis s ible/ Ac tual)

Pile Reaction ALONG Z-Z ALONG X-X


Compressi pt at Shear pt at Shear

Ed
Load case pt at top pt at top Punching
on Tension Shear bottom stress bottom stress
500 1 DL1+1 LL1+11.92
EQUIP1
N/a 2.98 N/A N/A N/A N/A N/A N/A N/A
501 1 DL1+1 LL1+11.87
EQUIP1+1
N/a TEMP1 2.50 N/A N/A N/A N/A N/A N/A N/A
502 1 DL1+1 WL1 2.58 N/a 1.57 N/A N/A N/A N/A N/A N/A N/A
503 1 DL1+1 WL2 2.56 N/a 1.57 N/A N/A N/A N/A N/A N/A N/A
504 1 DL1+1 WL3 2.07 N/a 4.46 N/A N/A N/A N/A N/A N/A N/A
505 1 DL1+1 WL4 2.05 N/a 4.43 N/A N/A N/A N/A N/A N/A N/A
506 1 DL1+1 WL5 2.71 N/a 3.37 N/A N/A N/A N/A N/A N/A N/A
507 1 DL1+1 WL6 2.68 N/a 3.38 N/A N/A N/A N/A N/A N/A N/A
508 1 DL1+1 WL7 2.58 N/a 3.47 N/A N/A N/A N/A N/A N/A N/A

F
509 1 DL1+1 WL8 2.56 N/a 3.50 N/A N/A N/A N/A N/A N/A N/A
510 1 DL1+0.7 WL12.67 N/a 1.96 N/A N/A N/A N/A N/A N/A N/A
511 1 DL1+0.7 WL22.65 N/a 1.96 N/A N/A N/A N/A N/A N/A N/A
512 1 DL1+0.7 WL32.30 N/a 9.46 N/A N/A N/A N/A N/A N/A N/A

PD
513 1 DL1+0.7 WL42.28 N/a 9.36 N/A N/A N/A N/A N/A N/A N/A
514 1 DL1+0.7 WL52.75 N/a 3.83 N/A N/A N/A N/A N/A N/A N/A
515 1 DL1+0.7 WL62.74 N/a 3.83 N/A N/A N/A N/A N/A N/A N/A
516 1 DL1+0.7 WL72.67 N/a 3.94 N/A N/A N/A N/A N/A N/A N/A
517 1 DL1+0.7 WL82.66 N/a 3.96 N/A N/A N/A N/A N/A N/A N/A
518 1 DL1+ 1LL1+0.75
1.80WL1+1
N/a EQUIP1 1.53 N/A N/A N/A N/A N/A N/A N/A
519 1 DL1+1.0 LL1+0.75
1.80 N/a
WL2+1 EQUIP1 1.53 N/A N/A N/A N/A N/A N/A N/A
520 1 DL1+1.0 LL1+0.75
1.65 N/a
WL3+1 EQUIP1 48.23 N/A N/A N/A N/A N/A N/A N/A
521 1 DL1+1.0 LL1+0.75
1.64 N/a
WL4+1 EQUIP1 51.59 N/A N/A N/A N/A N/A N/A N/A
522 1 DL1+1.0 LL1+0.75
2.00 N/a
WL5+1 EQUIP1 3.01 N/A N/A N/A N/A N/A N/A N/A
523 1 DL1+1.0 LL1+0.75
1.99 N/a
WL6+1 EQUIP1 3.03 N/A N/A N/A N/A N/A N/A N/A
te r
524 1 DL1+1.0 LL1+0.75
1.81 N/a
WL7+1 EQUIP1 2.49 N/A N/A N/A N/A N/A N/A N/A
525 1 DL1+1.0 LL1+0.75
1.80 N/a
WL8+1 EQUIP1 2.50 N/A N/A N/A N/A N/A N/A N/A
526 1 DL1+1.0 LL1+11.60
EQUIP1+0.525
N/a SL111.93 N/A N/A N/A N/A N/A N/A N/A
527 1 DL1+1.0 LL1+11.86
EQUIP1+0.525
N/a SL2 3.21 N/A N/A N/A N/A N/A N/A N/A
528 0.6 DL1+1 WL13.12 N/a 1.81 N/A N/A N/A N/A N/A N/A N/A
529 0.6 DL1+1 WL23.09 N/a 1.82 N/A N/A N/A N/A N/A N/A N/A
530 0.6 DL1+1 WL32.36 N/a 3.31 N/A N/A N/A N/A N/A N/A N/A
531 0.6 DL1+1 WL42.32 N/a 3.29 N/A N/A N/A N/A N/A N/A N/A
as

532 0.6 DL1+1 WL53.32 N/a 4.25 N/A N/A N/A N/A N/A N/A N/A
533 0.6 DL1+1 WL63.28 N/a 4.24 N/A N/A N/A N/A N/A N/A N/A
534 0.6 DL1+1 WL73.13 N/a 4.32 N/A N/A N/A N/A N/A N/A N/A
535 0.6 DL1+1 WL83.10 N/a 4.37 N/A N/A N/A N/A N/A N/A N/A
536 0.6 DL1+0.7 SL12.41 N/a 4.51 N/A N/A N/A N/A N/A N/A N/A
537 0.6 DL1+0.7 SL23.36 N/a 10.96 N/A N/A N/A N/A N/A N/A N/A
1001 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1 N/A N/A N/A N/A N/A N/A N/A
nM

1002 1.35 DL1+1.5


N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1N/A N/A N/A N/A N/A N/A N/A
1003 1.35 DL1+1.5
N/a WL1+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1004 1.35 DL1+1.5
N/a WL2+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1005 1.35 DL1+1.5
N/a WL3+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1006 1.35 DL1+1.5
N/a WL4+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1007 1.35 DL1+1.5
N/a WL5+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1008 1.35 DL1+1.5
N/a WL6+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1009 1.35 DL1+1.5
N/a WL7+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1010 1.35 DL1+1.5
N/a WL8+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1011 1.35 DL1+1.5
N/a WL1+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1012 1.35 DL1+1.5
N/a WL2+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
di

1013 1.35 DL1+1.5


N/a WL3+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1014 1.35 DL1+1.5
N/a WL4+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1015 1.35 DL1+1.5
N/a WL5+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1016 1.35 DL1+1.5
N/a WL6+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1017 1.35 DL1+1.5
N/a WL7+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1018 1.35 DL1+1.5
N/a WL8+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1019 1.35 DL1+0.9
N/a TEMP1+1.35
N/a MR1
N/a N/A N/A N/A N/A N/A N/A N/A
a te

1020 1.35 DL1+-0.9


N/a TEMP1+1.35
N/a MR1
N/a N/A N/A N/A N/A N/A N/A N/A
1021 1.35 DL1+1.5LL1+1.5
N/a N/aEQUIP1+0.9
N/a TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A N/A
1022 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1023 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1024 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1028 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1029 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

Ed
1030 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1031 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1032 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1033 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1034 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1035 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1036 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1037 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1038 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1039 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1040 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1041 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

F
1042 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1043 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1044 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1045 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1046 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

PD
1047 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1048 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1049 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1050 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1051 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1052 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1053 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1054 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1055 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1056 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1057 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1058 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1059 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1060 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
te r
1061 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1062 1.148 DL1+1.5
N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1063 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1064 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1065 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1066 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1067 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1068 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1069 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
as

1070 1.148 DL1+1.5


N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1071 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1072 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1073 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1074 1 DL1+0.8
N/a LL1+1 SL2
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1075 1 DL1+0.8
N/a LL1+-1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1076 1 DL1+0.8
N/a LL1+-1 SL2
N/a N/a N/A N/A N/A N/A N/A N/A N/A
2001 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
nM

2002 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2003 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2004 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2005 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2006 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2007 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2008 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2009 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2010 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2011 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2012 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2013 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2014 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2015 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
di

2016 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2017 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2018 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2019 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2020 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2021 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2022 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2023 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
a te

2024 1 DL1+1.0
N/a LL1+1 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2025 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2026 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2027 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2028 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2029 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2030 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2031 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2032 1 DL1+0.7
N/a LL1+1 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2033 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
FOUNDATION FOR PEDESTAL (P17)-(Pilecap Design)

Ed
LOAD CASE: 1068 1.1481068
DL1+1.5
1.148
LL1+1.5
DL1+1.05
WL4+1.5
LL1+1.5
EQUIP1+-0.9
WL4+1.05 EQUIP1+-0.9
TEMP1+1.35 TEMP1+1.35
MR1 MR1

GENERAL PILECAP DIMENSIONS, POSITION


Concrete Density 2.5 ton/m3 Pilecap thickness 1.300 m
Soil Density 2 ton/m3 Z cordinate of center of the pilecap -12.000 m
Grade of Concrete (Cylinder) C 30 X cordinate of center of the pilecap 26.750 m
Grade of Steel Fe 500 Length along axis Z, L z 3.540 m
Level of Base of pilecap -5.1 m Length along axis X, L x 3.540 m
m2

F
Finished Ground level 0 m Area of base of pilecap, A 12.53
Level of max water table -5.1 m

PD
PEDESTAL (COLUMN) DIMENSIONS, POSITIONS & LOADS
C.G. of Pedestal Ped top P + W ped
Pedestal ID Lz-z (m) Lx-x (m) P (T) Hz (T) Mx (T-m) Hx (T) Mz (T-m)
Z X [Level of (T)
P17 1.250 1.250 -12.000 26.750 -5.100 388.58 -1.18 -22.64 -12.39 -123.70 388.58

PILE DETAILS
Number of Piles 4 CGz of Pile group -12 m
Diameter of Piles 760 mm CGx of Pile group 26.75 m
2
Compressive capacity of piles 192 T SUM[(Xi-Xcg)2] of Pile group 5.198 m
2
Tensile capacity of piles 40 T SUM[(Zi-Zcg)2] of Pile group 5.198 m
Shear capacity of piles 11.5 T
te r
Weight of soil, W soil 172.56 T
Weight of footing, W f ooting 11.00 T
Axial load due to [P+ W ped] 388.58 T
Total axial Load 572.13 T

Mz due to [Mz+(P+W ped)*ex ] -123.70 Ton-m Mx due to [Mx+(P+W ped)*ez] -22.64 Ton-m
as

Eccentricity between Pilecap and Pile group 0.00 mm Eccentricity between Pilecap and Pile group 0.00 mm
Mz due to pilecap and pile group eccentricity 0.00 Ton-m Mx due to pilecap and pile group eccentricity 0.00 Ton-m
Total Mz -123.70 Ton-m Total Mx -22.64 Ton-m

Distance Distance P due to


from pile from pile Axial P due to P due to
nM

Pile ID CGx CGz group CGx group CGz Load (T) Mx (T) Mz (T) Total P (T) Shear (T)
PCG-5-1 25.61 -13.14 -1.14 -1.14 143.03 4.96 27.13 175.12 3.11
PCG-5-2 25.61 -10.86 -1.14 1.14 143.03 -4.96 27.13 165.20 3.11
PCG-5-3 27.89 -13.14 1.14 -1.14 143.03 4.96 -27.13 120.87 3.11
PCG-5-4 27.89 -10.86 1.14 1.14 143.03 -4.96 -27.13 110.94 3.11

Load factor for Limit State design 1 Along Axis -----> Z-Z X-X
Ultimate sagging(+)
di

Moment,Mup(Tm/width) 33.35 39.78


Along Axis -----> Z-Z X-X Effective Depth (for + M), d (m) 1.17 1.17
Ultimate Shear force (In sagging zone)(T/width) 25.84 30.93 Mup/bd2 (N/mm2) 0.24 0.29
Nominal shear stress (N/mm 2) 0.22 0.26 Tensile steel required at bottom (%) 0.06 0.07
Max allowable shear stress (N/mm 2) 0.32 0.32 Provide bars of dia (mm) 20 20
Ultimate Shear force (In hogging zone)(T) 9.97 10.74 at c/c distance (mm) 150 150
Nominal shear stress (N/mm 2) 0.09 0.09 Tensile steel provided at bottom (%) 0.18 0.18
a te

Max allowable shear stress (N/mm 2) 0.32 0.32 Ultimate hogging(-)


Stirrup Diameter (mm) 12 Moment,Mun(Tm/meter width) 0.00 0.00
Stirrup spacing (N/mm 2) 150 150 Mun/bd2 (N/mm2) 0.00 0.00
Stress in stirrup (N/mm 2) 19.54 23.39 Tensile steel required at top (%) 0.00 0.00
Total Stirrup stress (N/mm 2) 42.92 Provide bars of dia (mm) 20 20
Permissible Stirrup stress (N/mm 2) 434.78 at c/c distance (mm) 150 150
Tensile steel provided at top (%) 0.18 0.18
Effective Depth (for - M), d (m) 1.170 1.170
re

P UNC H I NG S H EAR FO R P EDES TALS


Pedestal ID Ultimate Design Area for resisting Punching Shear Allowable punching
P17 183.56 Ton 11.33 m2 0.16 N/mm2 1.37 N/mm2
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
F AC TOR OF SAF ETY F OR ALL LOAD C ASES ( Per mis s ible/ Ac tual)

Pile Reaction ALONG Z-Z ALONG X-X


Compressi pt at Shear pt at Shear

Ed
Load case pt at top pt at top Punching
on Tension Shear bottom stress bottom stress
500 1 DL1+1N/a
LL1+1 EQUIP1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
501 1 DL1+1N/a
LL1+1 EQUIP1+1
N/a TEMP1
N/a N/A N/A N/A N/A N/A N/A N/A
502 1 DL1+1N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
503 1 DL1+1N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
504 1 DL1+1N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A
505 1 DL1+1N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
506 1 DL1+1N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
507 1 DL1+1N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
508 1 DL1+1N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A

F
509 1 DL1+1N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
510 1 DL1+0.7
N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
511 1 DL1+0.7
N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
512 1 DL1+0.7
N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A

PD
513 1 DL1+0.7
N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
514 1 DL1+0.7
N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
515 1 DL1+0.7
N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
516 1 DL1+0.7
N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A
517 1 DL1+0.7
N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
518 1 DL1+ 1LL1+0.75
N/a WL1+1
N/a EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
519 1 DL1+1.0
N/a
LL1+0.75 N/a
WL2+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
520 1 DL1+1.0
N/a
LL1+0.75 N/a
WL3+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
521 1 DL1+1.0
N/a
LL1+0.75 N/a
WL4+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
522 1 DL1+1.0
N/a
LL1+0.75 N/a
WL5+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
523 1 DL1+1.0
N/a
LL1+0.75 N/a
WL6+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
te r
524 1 DL1+1.0
N/a
LL1+0.75 N/a
WL7+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
525 1 DL1+1.0
N/a
LL1+0.75 N/a
WL8+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
526 1 DL1+1.0
N/a
LL1+1 EQUIP1+0.525
N/a N/a
SL1 N/A N/A N/A N/A N/A N/A N/A
527 1 DL1+1.0
N/a
LL1+1 EQUIP1+0.525
N/a N/a
SL2 N/A N/A N/A N/A N/A N/A N/A
528 0.6 DL1+1
N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
529 0.6 DL1+1
N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
530 0.6 DL1+1
N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A
531 0.6 DL1+1
N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
as

532 0.6 DL1+1


N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
533 0.6 DL1+1
N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
534 0.6 DL1+1
N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A
535 0.6 DL1+1
N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
536 0.6 DL1+0.7
N/a SL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
537 0.6 DL1+0.7
N/a SL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
1001 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1 3.57 N/A 12.51 3.56 N/A 12.51 8.45
nM

1002 1.35 DL1+1.5


N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1 3.57 N/A 12.75 3.71 N/A 12.75 8.45
1003 1.35 DL1+1.5
N/a WL1+0.9
N/a TEMP1 N/a 9.97 N/A 24.67 5.25 N/A 24.67 8.45
1004 1.35 DL1+1.5
N/a WL2+0.9
N/a TEMP1 N/a 9.64 N/A 24.14 5.18 N/A 24.14 8.45
1005 1.35 DL1+1.5
N/a WL3+0.9
N/a TEMP1 N/a 5.23 N/A 15.83 3.94 N/A 15.83 8.45
1006 1.35 DL1+1.5
N/a WL4+0.9
N/a TEMP1 N/a 5.13 N/A 15.54 3.87 N/A 15.54 8.45
1007 1.35 DL1+1.5
N/a WL5+0.9
N/a TEMP1 N/a 6.11 N/A 23.41 7.00 N/A 23.41 8.45
1008 1.35 DL1+1.5
N/a WL6+0.9
N/a TEMP1 N/a 5.97 N/A 22.90 6.88 N/A 22.90 8.45
1009 1.35 DL1+1.5
N/a WL7+0.9
N/a TEMP1 N/a 5.93 N/A 21.80 6.31 N/A 21.80 8.45
1010 1.35 DL1+1.5
N/a WL8+0.9
N/a TEMP1 N/a 5.82 N/A 21.39 6.21 N/A 21.39 8.45
1011 1.35 DL1+1.5
N/a WL1+-0.9
N/a TEMP1 N/a 9.91 N/A 25.64 5.57 N/A 25.64 8.45
1012 1.35 DL1+1.5
N/a WL2+-0.9
N/a TEMP1 N/a 9.59 N/A 25.06 5.49 N/A 25.06 8.45
di

1013 1.35 DL1+1.5


N/a WL3+-0.9
N/a TEMP1 N/a 5.15 N/A 15.21 3.72 N/A 15.21 8.45
1014 1.35 DL1+1.5
N/a WL4+-0.9
N/a TEMP1 N/a 5.05 N/A 14.94 3.66 N/A 14.94 8.45
1015 1.35 DL1+1.5
N/a WL5+-0.9
N/a TEMP1 N/a 6.00 N/A 23.81 7.46 N/A 23.81 8.45
1016 1.35 DL1+1.5
N/a WL6+-0.9
N/a TEMP1 N/a 5.87 N/A 23.13 7.21 N/A 23.13 8.45
1017 1.35 DL1+1.5
N/a WL7+-0.9
N/a TEMP1 N/a 5.92 N/A 22.55 6.78 N/A 22.55 8.45
1018 1.35 DL1+1.5
N/a WL8+-0.9
N/a TEMP1 N/a 5.80 N/A 22.11 6.66 N/A 22.11 8.45
1019 1.35 DL1+0.9
N/a TEMP1+1.35
N/a MR1
N/a 6.86 N/A 23.41 6.26 N/A 23.41 8.45
a te

1020 1.35 DL1+-0.9


N/a TEMP1+1.35
N/a MR1
N/a 6.75 N/A 24.19 6.72 N/A 24.19 8.45
1021 1.35 DL1+1.5LL1+1.5
N/a N/aEQUIP1+0.9
N/a TEMP1+1.35 3.56
MR1N/A 12.46 3.55 N/A 12.46 8.45
1022 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35 3.55
MR1N/A 12.70 3.69 N/A 12.70 8.45
1023 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1+1.35 3.78
MR1N/A 13.29 3.79 N/A 13.29 8.45
1024 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.353.78
MR1
N/A 13.56 3.95 N/A 13.56 8.45
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
3.93 N/A MR1 12.63 3.32 N/A 12.63 8.45
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
3.90 N/A MR1 12.55 3.31 N/A 12.55 8.45
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
3.25 N/A MR1 11.09 3.12 N/A 11.09 8.45
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+0.9 TEMP1+1.35
3.93 N/A MR1 12.63 3.32 N/A 12.63 8.45
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+0.9 TEMP1+1.35
3.90 N/A MR1 12.55 3.31 N/A 12.55 8.45
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+0.9 TEMP1+1.35
3.25 N/A MR1 11.09 3.12 N/A 11.09 8.45
1028 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+0.9 TEMP1+1.35
3.22 N/A MR1 11.01 3.09 N/A 11.01 8.45
1029 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+0.9 TEMP1+1.35
3.86 N/A MR1 13.26 3.67 N/A 13.26 8.45

Ed
1030 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+0.9 TEMP1+1.35
3.83 N/A MR1 13.16 3.65 N/A 13.16 8.45
1031 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+0.9 TEMP1+1.35
3.38 N/A MR1 12.14 3.55 N/A 12.14 8.45
1032 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+0.9 TEMP1+1.35
3.36 N/A MR1 12.06 3.53 N/A 12.06 8.45
1033 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
3.92 N/A MR1 12.88 3.45 N/A 12.88 8.45
1034 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
3.89 N/A MR1 12.79 3.43 N/A 12.79 8.45
1035 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
3.24 N/A MR1 10.83 2.98 N/A 10.83 8.45
1036 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
3.22 N/A MR1 10.75 2.96 N/A 10.75 8.45
1037 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
3.82 N/A MR1 13.47 3.83 N/A 13.47 8.45
1038 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
3.79 N/A MR1 13.37 3.81 N/A 13.37 8.45
1039 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
3.38 N/A MR1 12.37 3.70 N/A 12.37 8.45
1040 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
3.36 N/A MR1 12.29 3.67 N/A 12.29 8.45
1041 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.21 N/A MR1 13.49 3.53 N/A 13.49 8.45

F
1042 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.17 N/A MR1 13.39 3.51 N/A 13.39 8.45
1043 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+0.9 TEMP1+1.35
3.43 N/A MR1 11.70 3.27 N/A 11.70 8.45
1044 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+0.9 TEMP1+1.35
3.41 N/A MR1 11.61 3.25 N/A 11.61 8.45
1045 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.13 N/A MR1 14.21 3.93 N/A 14.21 8.45
1046 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.09 N/A MR1 14.09 3.91 N/A 14.09 8.45

PD
1047 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+0.9 TEMP1+1.35
3.59 N/A MR1 12.93 3.79 N/A 12.93 8.45
1048 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+0.9 TEMP1+1.35
3.56 N/A MR1 12.84 3.77 N/A 12.84 8.45
1049 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.20 N/A MR1 13.77 3.68 N/A 13.77 8.45
1050 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.16 N/A MR1 13.67 3.66 N/A 13.67 8.45
1051 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
3.42 N/A MR1 11.40 3.12 N/A 11.40 8.45
1052 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
3.40 N/A MR1 11.32 3.10 N/A 11.32 8.45
1053 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.08 N/A MR1 14.45 4.11 N/A 14.45 8.45
1054 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.04 N/A MR1 14.33 4.08 N/A 14.33 8.45
1055 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
3.58 N/A MR1 13.19 3.96 N/A 13.19 8.45
1056 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
3.55 N/A MR1 13.10 3.93 N/A 13.10 8.45
1057 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.55 N/A MR1 13.63 3.38 N/A 13.63 8.45
1058 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.48 N/A MR1 13.46 3.35 N/A 13.46 8.45
1059 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+0.9 TEMP1+1.35
3.23 N/A MR1 10.48 2.81 N/A 10.48 8.45
1060 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+0.9 TEMP1+1.35
3.20 N/A MR1 10.36 2.78 N/A 10.36 8.45
te r
1061 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.00 N/A MR1 14.17 4.03 N/A 14.17 8.45
1062 1.148 DL1+1.5
N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+0.9 TEMP1+1.35
3.94 N/A MR1 13.98 3.99 N/A 13.98 8.45
1063 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+0.9 TEMP1+1.35
3.47 N/A MR1 12.70 3.80 N/A 12.70 8.45
1064 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+0.9 TEMP1+1.35
3.42 N/A MR1 12.56 3.76 N/A 12.56 8.45
1065 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.53 N/A MR1 13.92 3.51 N/A 13.92 8.45
1066 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.46 N/A MR1 13.74 3.48 N/A 13.74 8.45
1067 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
3.23 N/A MR1 10.25 2.70 N/A 10.25 8.45
1068 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
3.19 N/A MR1 10.13 2.67 N/A 10.13 8.45
1069 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
3.96 N/A MR1 14.41 4.22 N/A 14.41 8.45
as

1070 1.148 DL1+1.5


N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
3.90 N/A MR1 14.18 4.18 N/A 14.18 8.45
1071 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
3.46 N/A MR1 12.95 3.96 N/A 12.95 8.45
1072 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
3.42 N/A MR1 12.81 3.92 N/A 12.81 8.45
1073 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a 4.56 N/A 13.96 3.52 N/A 13.96 8.45
1074 1 DL1+0.8
N/a LL1+1 SL2
N/a N/a 5.36 N/A 18.57 5.13 N/A 18.57 8.45
1075 1 DL1+0.8
N/a LL1+-1 SL1
N/a N/a 6.90 N/A 21.03 5.17 N/A 21.03 8.45
1076 1 DL1+0.8
N/a LL1+-1 SL2
N/a N/a 5.50 N/A 19.83 5.63 N/A 19.83 8.45
2001 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+15.29
MR1N/A 17.25 4.53 N/A 17.25 8.45
nM

2002 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+15.25
MR1N/A 17.14 4.51 N/A 17.14 8.45
2003 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+14.45
MR1N/A 15.34 4.29 N/A 15.34 8.45
2004 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+14.42
MR1N/A 15.24 4.26 N/A 15.24 8.45
2005 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+15.20
MR1N/A 18.03 4.96 N/A 18.03 8.45
2006 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+15.16
MR1N/A 17.91 4.93 N/A 17.91 8.45
2007 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+14.62
MR1N/A 16.64 4.81 N/A 16.64 8.45
2008 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+14.59
MR1N/A 16.54 4.79 N/A 16.54 8.45
2009 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1 5.28
MR1N/A 17.56 4.69 N/A 17.56 8.45
2010 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1 5.24
MR1N/A 17.45 4.66 N/A 17.45 8.45
2011 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1 4.44
MR1N/A 15.00 4.12 N/A 15.00 8.45
2012 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1 4.41
MR1N/A 14.90 4.09 N/A 14.90 8.45
2013 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1 5.15
MR1N/A 18.29 5.15 N/A 18.29 8.45
2014 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1 5.11
MR1N/A 18.17 5.12 N/A 18.17 8.45
2015 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1 4.61
MR1N/A 16.92 4.99 N/A 16.92 8.45
di

2016 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1 4.58
MR1N/A 16.82 4.96 N/A 16.82 8.45
2017 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+15.64
MR1N/A 17.40 4.36 N/A 17.40 8.45
2018 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+15.57
MR1N/A 17.22 4.33 N/A 17.22 8.45
2019 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+14.22
MR1N/A 13.93 3.76 N/A 13.93 8.45
2020 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+14.18
MR1N/A 13.79 3.72 N/A 13.79 8.45
2021 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+15.07
MR1N/A 17.99 5.07 N/A 17.99 8.45
2022 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+15.00
MR1N/A 17.79 5.02 N/A 17.79 8.45
2023 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+14.49
MR1N/A 16.38 4.81 N/A 16.38 8.45
a te

2024 1 DL1+1.0
N/a LL1+1 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+14.44
MR1N/A 16.23 4.77 N/A 16.23 8.45
2025 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1 5.63
MR1N/A 17.71 4.51 N/A 17.71 8.45
2026 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1 5.56
MR1N/A 17.53 4.47 N/A 17.53 8.45
2027 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1 4.21
MR1N/A 13.65 3.63 N/A 13.65 8.45
2028 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1 4.18
MR1N/A 13.51 3.59 N/A 13.51 8.45
2029 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1 5.02
MR1N/A 18.25 5.26 N/A 18.25 8.45
2030 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1 4.96
MR1N/A 18.04 5.21 N/A 18.04 8.45
2031 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1 4.48
MR1N/A 16.66 4.99 N/A 16.66 8.45
2032 1 DL1+0.7
N/a LL1+1 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1 4.43
MR1N/A 16.50 4.95 N/A 16.50 8.45
2033 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a 4.56 N/A 13.96 3.52 N/A 13.96 8.45
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
FOUNDATION FOR PEDESTAL (P16)-(Pile Capacity Check)

Ed
LOAD CASE: 526 1 DL1+1.0
526 LL1+1
1 DL1+0.75
EQUIP1+0.525
LL1+1 EQUIP1+0.525
SL1 SL1

GENERAL PILECAP DIMENSIONS, POSITION


Concrete Density 2.5 ton/m3 Pilecap thickness 1.400 m
Soil Density 2 ton/m3 Z cordinate of center of the pilecap -21.000 m
Grade of Concrete (Cylinder) C 30 X cordinate of center of the pilecap 26.750 m
Grade of Steel Fe 500 Length along axis Z, L z 5.820 m
Level of Base of pilecap -5.1 m Length along axis X, L x 5.820 m

F
Finished Ground level 0 m Area of base of pilecap, A 33.87 m2
Level of max water table -5.1 m

PD
PEDESTAL (COLUMN) DIMENSIONS, POSITIONS & LOADS
C.G. of Pedestal Ped top P + W ped
Pedestal ID Lz-z (m) Lx-x (m) P (T) Hz (T) Mx (T-m) Hx (T) Mz (T-m)
Z X [Level of (T)
P16 1.600 1.600 -21.000 26.750 -5.100 1057.72 -11.20 -49.31 -46.60 212.64 1057.72

PILE DETAILS
Number of Piles 9 CGz of Pile group -21 m
Diameter of Piles 760 mm CGx of Pile group 26.75 m
2
Compressive capacity of piles 192 T SUM[(Xi-Xcg)2] of Pile group 31.190 m
2
SUM[(Zi-Zcg)2] of Pile group
te r
Tensile capacity of piles 40 T 31.190 m
Shear capacity of piles 11.5 T

Weight of soil, W soil 345.50 T


Weight of footing, W f ooting 23.71 T
Axial load due to [P+ W ped] 1057.72 T
Total axial Load 1426.93 T
as

Mz due to [Mz+(P+W ped)*ex ] 212.64 Ton-m Mx due to [Mx+(P+W ped)*ez] -49.31 Ton-m
Eccentricity between Pilecap and Pile group 0.00 mm Eccentricity between Pilecap and Pile group 0.00 mm
Mz due to pilecap and pile group eccentricity 0.00 Ton-m Mx due to pilecap and pile group eccentricity 0.00 Ton-m
Total Mz 212.64 Ton-m Total Mx -49.31 Ton-m
nM

Distance Distance P due to


from pile from pile Axial P due to P due to
Pile ID CGx CGz group CGx group CGz Load (T) Mx (T) Mz (T) Total P (T) Shear (T)
PCG-6-1 24.47 -23.28 -2.28 -2.28 158.55 3.60 -15.54 146.61 5.33
PCG-6-2 24.47 -21.00 -2.28 0.00 158.55 0.00 -15.54 143.00 5.33
PCG-6-3 24.47 -18.72 -2.28 2.28 158.55 -3.60 -15.54 139.40 5.33
PCG-6-4 26.75 -23.28 0.00 -2.28 158.55 3.60 0.00 162.15 5.33
PCG-6-5 26.75 -21.00 0.00 0.00 158.55 0.00 0.00 158.55 5.33
PCG-6-6 26.75 -18.72 0.00 2.28 158.55 -3.60 0.00 154.94 5.33
di

PCG-6-7 29.03 -23.28 2.28 -2.28 158.55 3.60 15.54 177.70 5.33
PCG-6-8 29.03 -21.00 2.28 0.00 158.55 0.00 15.54 174.09 5.33
PCG-6-9 29.03 -18.72 2.28 2.28 158.55 -3.60 15.54 170.49 5.33
a te
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
F AC TOR OF SAF ETY F OR ALL LOAD C ASES ( Per mis s ible/ Ac tual)

Pile Reaction ALONG Z-Z ALONG X-X


Compressi pt at Shear pt at Shear

Ed
Load case pt at top pt at top Punching
on Tension Shear bottom stress bottom stress
500 1 DL1+1 LL1+11.22
EQUIP1
N/a 10.75 N/A N/A N/A N/A N/A N/A N/A
501 1 DL1+1 LL1+11.19
EQUIP1+1
N/a TEMP1 4.43 N/A N/A N/A N/A N/A N/A N/A
502 1 DL1+1 WL1 2.17 N/a 2.45 N/A N/A N/A N/A N/A N/A N/A
503 1 DL1+1 WL2 2.15 N/a 2.49 N/A N/A N/A N/A N/A N/A N/A
504 1 DL1+1 WL3 2.01 N/a 2.64 N/A N/A N/A N/A N/A N/A N/A
505 1 DL1+1 WL4 1.99 N/a 2.64 N/A N/A N/A N/A N/A N/A N/A
506 1 DL1+1 WL5 2.49 N/a 5.30 N/A N/A N/A N/A N/A N/A N/A
507 1 DL1+1 WL6 2.43 N/a 4.91 N/A N/A N/A N/A N/A N/A N/A
508 1 DL1+1 WL7 2.14 N/a 4.88 N/A N/A N/A N/A N/A N/A N/A

F
509 1 DL1+1 WL8 2.12 N/a 5.32 N/A N/A N/A N/A N/A N/A N/A
510 1 DL1+0.7 WL12.23 N/a 3.43 N/A N/A N/A N/A N/A N/A N/A
511 1 DL1+0.7 WL22.22 N/a 3.49 N/A N/A N/A N/A N/A N/A N/A
512 1 DL1+0.7 WL32.11 N/a 3.85 N/A N/A N/A N/A N/A N/A N/A

PD
513 1 DL1+0.7 WL42.10 N/a 3.85 N/A N/A N/A N/A N/A N/A N/A
514 1 DL1+0.7 WL52.47 N/a 7.55 N/A N/A N/A N/A N/A N/A N/A
515 1 DL1+0.7 WL62.43 N/a 7.01 N/A N/A N/A N/A N/A N/A N/A
516 1 DL1+0.7 WL72.21 N/a 6.89 N/A N/A N/A N/A N/A N/A N/A
517 1 DL1+0.7 WL82.20 N/a 7.50 N/A N/A N/A N/A N/A N/A N/A
518 1 DL1+ 1LL1+0.75
1.18WL1+1
N/a EQUIP1 3.03 N/A N/A N/A N/A N/A N/A N/A
519 1 DL1+1.0 LL1+0.75
1.18 N/a
WL2+1 EQUIP1 3.11 N/A N/A N/A N/A N/A N/A N/A
520 1 DL1+1.0 LL1+0.75
1.14 N/a
WL3+1 EQUIP1 3.21 N/A N/A N/A N/A N/A N/A N/A
521 1 DL1+1.0 LL1+0.75
1.13 N/a
WL4+1 EQUIP1 3.25 N/A N/A N/A N/A N/A N/A N/A
522 1 DL1+1.0 LL1+0.75
1.29 N/a
WL5+1 EQUIP1 16.53 N/A N/A N/A N/A N/A N/A N/A
523 1 DL1+1.0 LL1+0.75
1.28 N/a
WL6+1 EQUIP1 14.52 N/A N/A N/A N/A N/A N/A N/A
te r
524 1 DL1+1.0 LL1+0.75
1.17 N/a
WL7+1 EQUIP1 4.13 N/A N/A N/A N/A N/A N/A N/A
525 1 DL1+1.0 LL1+0.75
1.16 N/a
WL8+1 EQUIP1 4.35 N/A N/A N/A N/A N/A N/A N/A
526 1 DL1+1.0 LL1+11.08
EQUIP1+0.525
N/a SL1 2.16 N/A N/A N/A N/A N/A N/A N/A
527 1 DL1+1.0 LL1+11.20
EQUIP1+0.525
N/a SL2 8.15 N/A N/A N/A N/A N/A N/A N/A
528 0.6 DL1+1 WL12.63 N/a 2.49 N/A N/A N/A N/A N/A N/A N/A
529 0.6 DL1+1 WL22.61 N/a 2.53 N/A N/A N/A N/A N/A N/A N/A
530 0.6 DL1+1 WL32.41 N/a 2.60 N/A N/A N/A N/A N/A N/A N/A
531 0.6 DL1+1 WL42.38 N/a 2.59 N/A N/A N/A N/A N/A N/A N/A
as

532 0.6 DL1+1 WL53.11 N/a 5.30 N/A N/A N/A N/A N/A N/A N/A
533 0.6 DL1+1 WL63.01 N/a 4.91 N/A N/A N/A N/A N/A N/A N/A
534 0.6 DL1+1 WL72.60 N/a 4.93 N/A N/A N/A N/A N/A N/A N/A
535 0.6 DL1+1 WL82.57 N/a 5.37 N/A N/A N/A N/A N/A N/A N/A
536 0.6 DL1+0.7 SL12.06 N/a 1.65 N/A N/A N/A N/A N/A N/A N/A
537 0.6 DL1+0.7 SL22.77 N/a 17.13 N/A N/A N/A N/A N/A N/A N/A
1001 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1 N/A N/A N/A N/A N/A N/A N/A
nM

1002 1.35 DL1+1.5


N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1N/A N/A N/A N/A N/A N/A N/A
1003 1.35 DL1+1.5
N/a WL1+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1004 1.35 DL1+1.5
N/a WL2+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1005 1.35 DL1+1.5
N/a WL3+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1006 1.35 DL1+1.5
N/a WL4+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1007 1.35 DL1+1.5
N/a WL5+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1008 1.35 DL1+1.5
N/a WL6+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1009 1.35 DL1+1.5
N/a WL7+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1010 1.35 DL1+1.5
N/a WL8+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1011 1.35 DL1+1.5
N/a WL1+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1012 1.35 DL1+1.5
N/a WL2+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
di

1013 1.35 DL1+1.5


N/a WL3+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1014 1.35 DL1+1.5
N/a WL4+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1015 1.35 DL1+1.5
N/a WL5+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1016 1.35 DL1+1.5
N/a WL6+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1017 1.35 DL1+1.5
N/a WL7+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1018 1.35 DL1+1.5
N/a WL8+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1019 1.35 DL1+0.9
N/a TEMP1+1.35
N/a MR1
N/a N/A N/A N/A N/A N/A N/A N/A
a te

1020 1.35 DL1+-0.9


N/a TEMP1+1.35
N/a MR1
N/a N/A N/A N/A N/A N/A N/A N/A
1021 1.35 DL1+1.5LL1+1.5
N/a N/aEQUIP1+0.9
N/a TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A N/A
1022 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1023 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1024 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1028 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1029 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

Ed
1030 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1031 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1032 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1033 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1034 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1035 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1036 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1037 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1038 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1039 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1040 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1041 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

F
1042 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1043 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1044 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1045 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1046 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

PD
1047 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1048 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1049 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1050 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1051 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1052 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1053 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1054 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1055 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1056 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1057 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1058 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1059 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1060 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
te r
1061 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1062 1.148 DL1+1.5
N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1063 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1064 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1065 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1066 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1067 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1068 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1069 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
as

1070 1.148 DL1+1.5


N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1071 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1072 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1073 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1074 1 DL1+0.8
N/a LL1+1 SL2
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1075 1 DL1+0.8
N/a LL1+-1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1076 1 DL1+0.8
N/a LL1+-1 SL2
N/a N/a N/A N/A N/A N/A N/A N/A N/A
2001 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
nM

2002 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2003 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2004 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2005 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2006 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2007 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2008 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2009 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2010 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2011 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2012 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2013 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2014 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2015 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
di

2016 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2017 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2018 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2019 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2020 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2021 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2022 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2023 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
a te

2024 1 DL1+1.0
N/a LL1+1 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2025 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2026 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2027 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2028 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2029 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2030 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2031 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2032 1 DL1+0.7
N/a LL1+1 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2033 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
FOUNDATION FOR PEDESTAL (P16)-(Pilecap Design)

Ed
LOAD CASE: 1068 1.1481068
DL1+1.5
1.148
LL1+1.5
DL1+1.05
WL4+1.5
LL1+1.5
EQUIP1+-0.9
WL4+1.05 EQUIP1+-0.9
TEMP1+1.35 TEMP1+1.35
MR1 MR1

GENERAL PILECAP DIMENSIONS, POSITION


Concrete Density 2.5 ton/m3 Pilecap thickness 1.400 m
Soil Density 2 ton/m3 Z cordinate of center of the pilecap -21.000 m
Grade of Concrete (Cylinder) C 30 X cordinate of center of the pilecap 26.750 m
Grade of Steel Fe 500 Length along axis Z, L z 5.820 m
Level of Base of pilecap -5.1 m Length along axis X, L x 5.820 m
Finished Ground level 0 m Area of base of pilecap, A 33.87 m2

F
Level of max water table -5.1 m

PEDESTAL (COLUMN) DIMENSIONS, POSITIONS & LOADS

PD
C.G. of Pedestal Ped top P + W ped
Pedestal ID Lz-z (m) Lx-x (m) P (T) Hz (T) Mx (T-m) Hx (T) Mz (T-m)
Z X [Level of (T)
P16 1.600 1.600 -21.000 26.750 -5.100 1422.43 -7.11 -33.84 -64.98 -328.97 1422.43

PILE DETAILS
Number of Piles 9 CGz of Pile group -21 m
Diameter of Piles 760 mm CGx of Pile group 26.75 m
2
Compressive capacity of piles 192 T SUM[(Xi-Xcg)2] of Pile group 31.190 m
2
Tensile capacity of piles 40 T SUM[(Zi-Zcg)2] of Pile group 31.190 m
Shear capacity of piles 11.5 T
te r
Weight of soil, W soil 466.42 T
Weight of footing, W f ooting 32.01 T
Axial load due to [P+ W ped] 1422.43 T
Total axial Load 1920.86 T

Mz due to [Mz+(P+W ped)*ex ] -328.97 Ton-m Mx due to [Mx+(P+W ped)*ez] -33.84 Ton-m
Eccentricity between Pilecap and Pile group 0.00 mm Eccentricity between Pilecap and Pile group 0.00 mm
Mz due to pilecap and pile group eccentricity 0.00 Ton-m Mx due to pilecap and pile group eccentricity 0.00 Ton-m
as

Total Mz -328.97 Ton-m Total Mx -33.84 Ton-m

Distance Distance P due to


from pile from pile Axial P due to P due to
Pile ID CGx CGz group CGx group CGz Load (T) Mx (T) Mz (T) Total P (T) Shear (T)
PCG-6-1 24.47 -23.28 -2.28 -2.28 213.43 2.47 24.05 239.95 7.26
nM

PCG-6-2 24.47 -21.00 -2.28 0.00 213.43 0.00 24.05 237.48 7.26
PCG-6-3 24.47 -18.72 -2.28 2.28 213.43 -2.47 24.05 235.00 7.26
PCG-6-4 26.75 -23.28 0.00 -2.28 213.43 2.47 0.00 215.90 7.26
PCG-6-5 26.75 -21.00 0.00 0.00 213.43 0.00 0.00 213.43 7.26
PCG-6-6 26.75 -18.72 0.00 2.28 213.43 -2.47 0.00 210.96 7.26
PCG-6-7 29.03 -23.28 2.28 -2.28 213.43 2.47 -24.05 191.86 7.26
PCG-6-8 29.03 -21.00 2.28 0.00 213.43 0.00 -24.05 189.38 7.26
PCG-6-9 29.03 -18.72 2.28 2.28 213.43 -2.47 -24.05 186.91 7.26

Load factor for Limit State design 1 Along Axis -----> Z-Z X-X
di

Ultimate sagging(+)
Moment,Mup(Tm/width) 132.17 148.65
Along Axis -----> Z-Z X-X Effective Depth (for + M), d (m) 1.2625 1.2625
Ultimate Shear force (In sagging zone)(T/width) 96.39 107.51 Mup/bd2 (N/mm2) 0.83 0.93
Nominal shear stress (N/mm 2) 0.76 0.85 Tensile steel required at bottom (%) 0.20 0.22
Max allowable shear stress (N/mm 2) 0.33 0.33 Provide bars of dia (mm) 25 25
Ultimate Shear force (In hogging zone)(T) 11.30 11.69 at c/c distance (mm) 150 150
a te

Nominal shear stress (N/mm 2) 0.09 0.09 Tensile steel provided at bottom (%) 0.26 0.26
Max allowable shear stress (N/mm 2) 0.33 0.33 Ultimate hogging(-)
Stirrup Diameter (mm) 12 Moment,Mun(Tm/meter width) 0.00 0.00
Stirrup spacing (N/mm 2) 150 150 Mun/bd2 (N/mm2) 0.00 0.00
Stress in stirrup (N/mm 2) 67.54 75.33 Tensile steel required at top (%) 0.00 0.00
Total Stirrup stress (N/mm 2) 142.86 Provide bars of dia (mm) 25 25
Permissible Stirrup stress (N/mm 2) 434.78 at c/c distance (mm) 150 150
Tensile steel provided at top (%) 0.26 0.26
Effective Depth (for - M), d (m) 1.262 1.262
re

P U N C H I N G S H EAR FO R P EDES TALS


Pedestal ID Ultimate Design Area for resisting Punching Shear Allowable punching
P16 1209.00 Ton 14.46 m2 0.84 N/mm2 1.37 N/mm2
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
F AC TOR OF SAF ETY F OR ALL LOAD C ASES ( Per mis s ible/ Ac tual)

Pile Reaction ALONG Z-Z ALONG X-X


Compressi pt at Shear pt at Shear

Ed
Load case pt at top pt at top Punching
on Tension Shear bottom stress bottom stress
500 1 DL1+1N/a
LL1+1 EQUIP1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
501 1 DL1+1N/a
LL1+1 EQUIP1+1
N/a TEMP1
N/a N/A N/A N/A N/A N/A N/A N/A
502 1 DL1+1N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
503 1 DL1+1N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
504 1 DL1+1N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A
505 1 DL1+1N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
506 1 DL1+1N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
507 1 DL1+1N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
508 1 DL1+1N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A

F
509 1 DL1+1N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
510 1 DL1+0.7
N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
511 1 DL1+0.7
N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
512 1 DL1+0.7
N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A

PD
513 1 DL1+0.7
N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
514 1 DL1+0.7
N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
515 1 DL1+0.7
N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
516 1 DL1+0.7
N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A
517 1 DL1+0.7
N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
518 1 DL1+ 1LL1+0.75
N/a WL1+1
N/a EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
519 1 DL1+1.0
N/a
LL1+0.75 N/a
WL2+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
520 1 DL1+1.0
N/a
LL1+0.75 N/a
WL3+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
521 1 DL1+1.0
N/a
LL1+0.75 N/a
WL4+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
522 1 DL1+1.0
N/a
LL1+0.75 N/a
WL5+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
523 1 DL1+1.0
N/a
LL1+0.75 N/a
WL6+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
te r
524 1 DL1+1.0
N/a
LL1+0.75 N/a
WL7+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
525 1 DL1+1.0
N/a
LL1+0.75 N/a
WL8+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
526 1 DL1+1.0
N/a
LL1+1 EQUIP1+0.525
N/a N/a
SL1 N/A N/A N/A N/A N/A N/A N/A
527 1 DL1+1.0
N/a
LL1+1 EQUIP1+0.525
N/a N/a
SL2 N/A N/A N/A N/A N/A N/A N/A
528 0.6 DL1+1
N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
529 0.6 DL1+1
N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
530 0.6 DL1+1
N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A
531 0.6 DL1+1
N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
as

532 0.6 DL1+1


N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
533 0.6 DL1+1
N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
534 0.6 DL1+1
N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A
535 0.6 DL1+1
N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
536 0.6 DL1+0.7
N/a SL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
537 0.6 DL1+0.7
N/a SL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
1001 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1 1.25 N/A 3.11 1.31 N/A 3.11 1.59
nM

1002 1.35 DL1+1.5


N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1 1.30 N/A 3.13 1.28 N/A 3.13 1.58
1003 1.35 DL1+1.5
N/a WL1+0.9
N/a TEMP1 N/a 3.83 N/A 7.35 3.14 N/A 7.35 7.38
1004 1.35 DL1+1.5
N/a WL2+0.9
N/a TEMP1 N/a 3.76 N/A 7.21 3.06 N/A 7.21 6.92
1005 1.35 DL1+1.5
N/a WL3+0.9
N/a TEMP1 N/a 3.32 N/A 6.63 2.81 N/A 6.63 5.67
1006 1.35 DL1+1.5
N/a WL4+0.9
N/a TEMP1 N/a 3.27 N/A 6.51 2.73 N/A 6.51 5.39
1007 1.35 DL1+1.5
N/a WL5+0.9
N/a TEMP1 N/a 4.27 N/A 8.96 4.58 N/A 8.96 8.48
1008 1.35 DL1+1.5
N/a WL6+0.9
N/a TEMP1 N/a 4.03 N/A 8.62 4.41 N/A 8.62 7.90
1009 1.35 DL1+1.5
N/a WL7+0.9
N/a TEMP1 N/a 2.84 N/A 6.79 3.49 N/A 6.79 5.27
1010 1.35 DL1+1.5
N/a WL8+0.9
N/a TEMP1 N/a 2.80 N/A 6.67 3.39 N/A 6.67 5.04
1011 1.35 DL1+1.5
N/a WL1+-0.9
N/a TEMP1 N/a 4.32 N/A 7.77 3.23 N/A 7.77 7.19
1012 1.35 DL1+1.5
N/a WL2+-0.9
N/a TEMP1 N/a 4.14 N/A 7.56 3.14 N/A 7.56 6.75
di

1013 1.35 DL1+1.5


N/a WL3+-0.9
N/a TEMP1 N/a 3.64 N/A 6.71 2.68 N/A 6.71 5.55
1014 1.35 DL1+1.5
N/a WL4+-0.9
N/a TEMP1 N/a 3.46 N/A 6.51 2.61 N/A 6.51 5.29
1015 1.35 DL1+1.5
N/a WL5+-0.9
N/a TEMP1 N/a 3.68 N/A 8.52 4.73 N/A 8.52 8.23
1016 1.35 DL1+1.5
N/a WL6+-0.9
N/a TEMP1 N/a 3.50 N/A 8.19 4.51 N/A 8.19 7.68
1017 1.35 DL1+1.5
N/a WL7+-0.9
N/a TEMP1 N/a 3.10 N/A 6.98 3.38 N/A 6.98 5.17
1018 1.35 DL1+1.5
N/a WL8+-0.9
N/a TEMP1 N/a 3.06 N/A 6.84 3.26 N/A 6.84 4.95
1019 1.35 DL1+0.9
N/a TEMP1+1.35
N/a MR1
N/a 3.34 N/A 7.31 3.52 N/A 7.31 5.34
a te

1020 1.35 DL1+-0.9


N/a TEMP1+1.35
N/a MR1
N/a 3.34 N/A 7.22 3.41 N/A 7.22 5.24
1021 1.35 DL1+1.5LL1+1.5
N/a N/aEQUIP1+0.9
N/a TEMP1+1.35 1.24
MR1N/A 3.09 1.30 N/A 3.09 1.57
1022 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35 1.29
MR1N/A 3.11 1.27 N/A 3.11 1.56
1023 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1+1.35 1.30
MR1N/A 3.22 1.36 N/A 3.22 1.66
1024 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.351.35
MR1
N/A 3.25 1.33 N/A 3.25 1.65
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
1.27 N/A MR1 3.08 1.27 N/A 3.08 1.65
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
1.27 N/A MR1 3.07 1.26 N/A 3.07 1.63
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
1.23 N/A MR1 2.99 1.22 N/A 2.99 1.58
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+0.9 TEMP1+1.35
1.27 N/A MR1 3.08 1.27 N/A 3.08 1.65
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+0.9 TEMP1+1.35
1.27 N/A MR1 3.07 1.26 N/A 3.07 1.63
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+0.9 TEMP1+1.35
1.23 N/A MR1 2.99 1.22 N/A 2.99 1.58
1028 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+0.9 TEMP1+1.35
1.23 N/A MR1 2.98 1.21 N/A 2.98 1.57
1029 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+0.9 TEMP1+1.35
1.36 N/A MR1 3.30 1.37 N/A 3.30 1.67

Ed
1030 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+0.9 TEMP1+1.35
1.36 N/A MR1 3.28 1.36 N/A 3.28 1.66
1031 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+0.9 TEMP1+1.35
1.19 N/A MR1 3.02 1.29 N/A 3.02 1.56
1032 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+0.9 TEMP1+1.35
1.18 N/A MR1 3.00 1.28 N/A 3.00 1.55
1033 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
1.32 N/A MR1 3.15 1.28 N/A 3.15 1.64
1034 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
1.32 N/A MR1 3.14 1.27 N/A 3.14 1.62
1035 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
1.28 N/A MR1 3.01 1.19 N/A 3.01 1.57
1036 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
1.28 N/A MR1 3.00 1.18 N/A 3.00 1.56
1037 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
1.33 N/A MR1 3.24 1.35 N/A 3.24 1.66
1038 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
1.31 N/A MR1 3.21 1.34 N/A 3.21 1.65
1039 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
1.23 N/A MR1 3.04 1.26 N/A 3.04 1.55
1040 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
1.23 N/A MR1 3.02 1.25 N/A 3.02 1.54
1041 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.33 N/A MR1 3.21 1.32 N/A 3.21 1.74

F
1042 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.33 N/A MR1 3.19 1.32 N/A 3.19 1.72
1043 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.29 N/A MR1 3.11 1.27 N/A 3.11 1.66
1044 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.29 N/A MR1 3.10 1.26 N/A 3.10 1.65
1045 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.43 N/A MR1 3.44 1.44 N/A 3.44 1.77
1046 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.42 N/A MR1 3.43 1.43 N/A 3.43 1.75

PD
1047 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.24 N/A MR1 3.14 1.35 N/A 3.14 1.64
1048 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.24 N/A MR1 3.12 1.34 N/A 3.12 1.63
1049 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.39 N/A MR1 3.29 1.34 N/A 3.29 1.73
1050 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.38 N/A MR1 3.27 1.33 N/A 3.27 1.71
1051 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.34 N/A MR1 3.14 1.25 N/A 3.14 1.66
1052 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.34 N/A MR1 3.12 1.24 N/A 3.12 1.64
1053 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.39 N/A MR1 3.38 1.42 N/A 3.38 1.76
1054 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.37 N/A MR1 3.35 1.41 N/A 3.35 1.74
1055 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.29 N/A MR1 3.17 1.32 N/A 3.17 1.63
1056 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.28 N/A MR1 3.15 1.31 N/A 3.15 1.62
1057 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.36 N/A MR1 3.21 1.30 N/A 3.21 1.79
1058 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.35 N/A MR1 3.18 1.28 N/A 3.18 1.77
1059 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.29 N/A MR1 3.05 1.22 N/A 3.05 1.67
1060 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.28 N/A MR1 3.02 1.20 N/A 3.02 1.65
te r
1061 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.49 N/A MR1 3.56 1.50 N/A 3.56 1.85
1062 1.148 DL1+1.5
N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.46 N/A MR1 3.51 1.48 N/A 3.51 1.82
1063 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.20 N/A MR1 3.09 1.35 N/A 3.09 1.64
1064 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+0.9 TEMP1+1.35
1.20 N/A MR1 3.06 1.33 N/A 3.06 1.61
1065 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.42 N/A MR1 3.28 1.31 N/A 3.28 1.78
1066 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.41 N/A MR1 3.26 1.30 N/A 3.26 1.75
1067 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.34 N/A MR1 3.07 1.19 N/A 3.07 1.66
1068 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.33 N/A MR1 3.04 1.18 N/A 3.04 1.64
1069 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.41 N/A MR1 3.47 1.49 N/A 3.47 1.84
as

1070 1.148 DL1+1.5


N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.38 N/A MR1 3.41 1.47 N/A 3.41 1.81
1071 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.25 N/A MR1 3.12 1.32 N/A 3.12 1.63
1072 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
1.24 N/A MR1 3.09 1.30 N/A 3.09 1.60
1073 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a 1.92 N/A 4.03 1.55 N/A 4.03 2.48
1074 1 DL1+0.8
N/a LL1+1 SL2
N/a N/a 2.02 N/A 4.68 2.03 N/A 4.68 2.66
1075 1 DL1+0.8
N/a LL1+-1 SL1
N/a N/a 2.28 N/A 4.56 1.73 N/A 4.56 3.02
1076 1 DL1+0.8
N/a LL1+-1 SL2
N/a N/a 2.13 N/A 4.83 2.08 N/A 4.83 2.79
2001 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+11.80
MR1N/A 4.21 1.79 N/A 4.21 2.43
nM

2002 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+11.80
MR1N/A 4.19 1.78 N/A 4.19 2.41
2003 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+11.75
MR1N/A 4.09 1.73 N/A 4.09 2.33
2004 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+11.75
MR1N/A 4.08 1.72 N/A 4.08 2.32
2005 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+11.92
MR1N/A 4.47 1.94 N/A 4.47 2.47
2006 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+11.91
MR1N/A 4.45 1.92 N/A 4.45 2.45
2007 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+11.69
MR1N/A 4.13 1.83 N/A 4.13 2.31
2008 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+11.68
MR1N/A 4.11 1.81 N/A 4.11 2.29
2009 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.87
MR1N/A 4.30 1.81 N/A 4.30 2.41
2010 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.86
MR1N/A 4.28 1.80 N/A 4.28 2.39
2011 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.82
MR1N/A 4.12 1.70 N/A 4.12 2.32
2012 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.81
MR1N/A 4.10 1.68 N/A 4.10 2.30
2013 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.87
MR1N/A 4.40 1.91 N/A 4.40 2.46
2014 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.86
MR1N/A 4.37 1.89 N/A 4.37 2.43
2015 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.75
MR1N/A 4.16 1.79 N/A 4.16 2.29
di

2016 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.74
MR1N/A 4.14 1.78 N/A 4.14 2.28
2017 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+11.83
MR1N/A 4.20 1.76 N/A 4.20 2.50
2018 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+11.82
MR1N/A 4.17 1.74 N/A 4.17 2.47
2019 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+11.75
MR1N/A 4.02 1.66 N/A 4.02 2.34
2020 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+11.74
MR1N/A 3.99 1.64 N/A 3.99 2.31
2021 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+11.99
MR1N/A 4.61 2.00 N/A 4.61 2.58
2022 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+11.96
MR1N/A 4.55 1.98 N/A 4.55 2.54
2023 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+11.65
MR1N/A 4.07 1.82 N/A 4.07 2.30
a te

2024 1 DL1+1.0
N/a LL1+1 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+11.64
MR1N/A 4.04 1.80 N/A 4.04 2.26
2025 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.90
MR1N/A 4.29 1.78 N/A 4.29 2.49
2026 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.89
MR1N/A 4.26 1.76 N/A 4.26 2.45
2027 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.81
MR1N/A 4.04 1.63 N/A 4.04 2.33
2028 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.80
MR1N/A 4.01 1.61 N/A 4.01 2.30
2029 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.90
MR1N/A 4.50 1.99 N/A 4.50 2.56
2030 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.86
MR1N/A 4.44 1.96 N/A 4.44 2.53
2031 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.70
MR1N/A 4.10 1.78 N/A 4.10 2.28
2032 1 DL1+0.7
N/a LL1+1 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1 1.69
MR1N/A 4.07 1.76 N/A 4.07 2.25
2033 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a 1.92 N/A 4.03 1.55 N/A 4.03 2.48
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
FOUNDATION DESIGN
FOUNDATION FOR PEDESTAL (P19) (P23) (P24) (P29) (P20) (P25) (P26) (P30)
(P21) (P27) (P22) (P28)-(Pile Capacity Check)

Ed
LOAD CASE: 525 1 DL1+1.0
525 LL1+0.75
1 DL1+0.75
W L8+1
LL1+0.75
EQUIP1
W L8+1 EQUIP1

G E N E RA L PI L E C A P DI ME N SI O N S, PO SI T I O N
Concrete Density 2.5 ton/m 3 Pile ca p thickne ss 2.100 m
Soil Density 2 ton/m 3 Z cordinate of center of the pilecap -10.588 m
Grade of Concrete (Cylinder) C 30 X cordinate of center of the pilecap 40.163 m
Grade of Steel Fe 500 Le ngth a long a x is Z, L z 24.060 m
Level of Base of pilecap -5.1 m Le ngth a long a x is X, L x 12.660 m
Finished Ground level 0 m Area of base of pilecap, A 304.60 m2
Level of max water table -5.1 m

PE DE ST A L ( C O L U MN ) DI ME N SI O N S, PO SI T I O N S & L O A DS
C.G. of Pedestal Ped top P + W ped
Pedestal ID Lz-z (m) Lx-x (m) P (T) Hz (T) Mx (T-m) Hx (T) Mz (T-m)

F
Z X [Level of (T)
P19 1.600 1.600 -21.000 35.500 -5.100 832.49 -88.85 -437.72 -4.23 -34.15 832.49
P23 1.250 1.250 -21.000 41.500 -5.100 537.82 -37.29 -167.96 -2.22 -10.25 537.82
P24 1.250 1.250 -15.800 41.500 -5.100 119.50 -38.61 -173.61 -0.05 7.95 119.50
P29 1.250 1.250 -15.800 45.000 -5.100 188.90 -21.57 -104.93 2.50 10.78 188.90
P20 1.250 1.250 -12.000 35.500 -5.100 286.51 -33.31 -192.56 4.94 24.09 286.51
P25 1.250 1.250 -12.000 41.500 -5.100 208.23 -44.65 -160.89 5.22 34.10 208.23

PD
P26 1.250 1.250 -8.200 41.500 -5.100 233.28 -36.46 -156.23 10.27 46.24 233.28
P30 1.250 1.250 -8.200 45.000 -5.100 172.44 -20.65 -100.23 9.88 48.93 172.44
P21 1.600 1.600 -3.000 35.500 -5.100 440.48 -77.45 -358.56 6.53 17.72 440.48
P27 1.250 1.250 -3.000 41.500 -5.100 60.52 -34.82 -139.21 1.75 5.09 60.52
P22 1.250 1.250 0.500 35.500 -5.100 2.97 -30.28 -128.93 -2.73 -11.98 2.97
P28 1.250 1.250 0.500 41.500 -5.100 -179.93 -30.45 -129.95 -0.64 -9.67 -179.93

PI L E DE T A I L S
Number of Piles 66 CGz of Pile group -10.588 m
Diameter of Piles 760 mm CGx of Pile group 40.163 m
2
Compressive capacity of piles 192 T SUM[(Xi-Xc g)2] of Pile group 1000.692 m
2
Tensile capacity of piles 40 T SUM[(Zi-Zc g)2] of Pile group 3430.944 m
Shear capacity of piles 11.5 T

W eight of soil, W s oil 3106.92 T


W eight of footing, W f oot ing 319.83 T
Axial load due to [P+ W ped] 2903.20 T
te r
Total axial Load 6329.94 T

Mz due to [Mz+(P+W ped)*ex ] -4099.62 Ton-m Mx due to [Mx+(P+W ped)*ez] -16016.07 Ton-m
Eccentricity between Pilecap and Pile group 0.00 mm Eccentricity between Pilecap and Pile group 0.00 mm
Mz due to pilecap and pile group eccentricity 0.00 Ton-m Mx due to pilecap and pile group eccentricity 0.00 Ton-m
Total Mz -4099.62 Ton-m Total Mx -16016.07 Ton-m

Distance Distance P due to


from pile from pile Axial P due to P due to
Pile ID CGx CGz group CGx group CGz Load (T) Mx (T) Mz (T) Total P (T) Shear (T)
PCG-8-1 34.46 -21.99 -5.70 -11.40 95.91 53.22 23.35 172.48 7.51
PCG-8-2 34.46 -19.71 -5.70 -9.12 95.91 42.57 23.35 161.83 7.51
as

PCG-8-3 34.46 -17.43 -5.70 -6.84 95.91 31.93 23.35 151.19 7.51
PCG-8-4 34.46 -15.15 -5.70 -4.56 95.91 21.29 23.35 140.55 7.51
PCG-8-5 34.46 -12.87 -5.70 -2.28 95.91 10.64 23.35 129.90 7.51
PCG-8-6 34.46 -10.59 -5.70 0.00 95.91 0.00 23.35 119.26 7.51
PCG-8-7 34.46 -8.31 -5.70 2.28 95.91 -10.64 23.35 108.62 7.51
PCG-8-8 34.46 -6.03 -5.70 4.56 95.91 -21.29 23.35 97.97 7.51
PCG-8-9 34.46 -3.75 -5.70 6.84 95.91 -31.93 23.35 87.33 7.51
PCG-8-10 34.46 -1.47 -5.70 9.12 95.91 -42.57 23.35 76.69 7.51
PCG-8-11 34.46 0.81 -5.70 11.40 95.91 -53.22 23.35 66.04 7.51
PCG-8-12 36.74 -21.99 -3.42 -11.40 95.91 53.22 14.01 163.14 7.51
PCG-8-13 36.74 -19.71 -3.42 -9.12 95.91 42.57 14.01 152.49 7.51
PCG-8-14 36.74 -17.43 -3.42 -6.84 95.91 31.93 14.01 141.85 7.51
nM

PCG-8-15 36.74 -15.15 -3.42 -4.56 95.91 21.29 14.01 131.21 7.51
PCG-8-16 36.74 -12.87 -3.42 -2.28 95.91 10.64 14.01 120.56 7.51
PCG-8-17 36.74 -10.59 -3.42 0.00 95.91 0.00 14.01 109.92 7.51
PCG-8-18 36.74 -8.31 -3.42 2.28 95.91 -10.64 14.01 99.28 7.51
PCG-8-19 36.74 -6.03 -3.42 4.56 95.91 -21.29 14.01 88.63 7.51
PCG-8-20 36.74 -3.75 -3.42 6.84 95.91 -31.93 14.01 77.99 7.51
PCG-8-21 36.74 -1.47 -3.42 9.12 95.91 -42.57 14.01 67.35 7.51
PCG-8-22 36.74 0.81 -3.42 11.40 95.91 -53.22 14.01 56.70 7.51
PCG-8-23 39.02 -21.99 -1.14 -11.40 95.91 53.22 4.67 153.80 7.51
PCG-8-24 39.02 -19.71 -1.14 -9.12 95.91 42.57 4.67 143.15 7.51
PCG-8-25 39.02 -17.43 -1.14 -6.84 95.91 31.93 4.67 132.51 7.51
PCG-8-26 39.02 -15.15 -1.14 -4.56 95.91 21.29 4.67 121.87 7.51
PCG-8-27 39.02 -12.87 -1.14 -2.28 95.91 10.64 4.67 111.22 7.51
PCG-8-28 39.02 -10.59 -1.14 0.00 95.91 0.00 4.67 100.58 7.51
PCG-8-29 39.02 -8.31 -1.14 2.28 95.91 -10.64 4.67 89.94 7.51
PCG-8-30 39.02 -6.03 -1.14 4.56 95.91 -21.29 4.67 79.29 7.51
PCG-8-31 39.02 -3.75 -1.14 6.84 95.91 -31.93 4.67 68.65 7.51
PCG-8-32 39.02 -1.47 -1.14 9.12 95.91 -42.57 4.67 58.01 7.51
di

PCG-8-33 39.02 0.81 -1.14 11.40 95.91 -53.22 4.67 47.36 7.51
PCG-8-34 41.30 -21.99 1.14 -11.40 95.91 53.22 -4.67 144.45 7.51
PCG-8-35 41.30 -19.71 1.14 -9.12 95.91 42.57 -4.67 133.81 7.51
PCG-8-36 41.30 -17.43 1.14 -6.84 95.91 31.93 -4.67 123.17 7.51
PCG-8-37 41.30 -15.15 1.14 -4.56 95.91 21.29 -4.67 112.52 7.51
PCG-8-38 41.30 -12.87 1.14 -2.28 95.91 10.64 -4.67 101.88 7.51
PCG-8-39 41.30 -10.59 1.14 0.00 95.91 0.00 -4.67 91.24 7.51
PCG-8-40 41.30 -8.31 1.14 2.28 95.91 -10.64 -4.67 80.59 7.51
PCG-8-41 41.30 -6.03 1.14 4.56 95.91 -21.29 -4.67 69.95 7.51
PCG-8-42 41.30 -3.75 1.14 6.84 95.91 -31.93 -4.67 59.31 7.51
PCG-8-43 41.30 -1.47 1.14 9.12 95.91 -42.57 -4.67 48.66 7.51
PCG-8-44 41.30 0.81 1.14 11.40 95.91 -53.22 -4.67 38.02 7.51
a te

PCG-8-45 43.58 -21.99 3.42 -11.40 95.91 53.22 -14.01 135.11 7.51
PCG-8-46 43.58 -19.71 3.42 -9.12 95.91 42.57 -14.01 124.47 7.51
PCG-8-47 43.58 -17.43 3.42 -6.84 95.91 31.93 -14.01 113.83 7.51
PCG-8-48 43.58 -15.15 3.42 -4.56 95.91 21.29 -14.01 103.18 7.51
PCG-8-49 43.58 -12.87 3.42 -2.28 95.91 10.64 -14.01 92.54 7.51
PCG-8-50 43.58 -10.59 3.42 0.00 95.91 0.00 -14.01 81.90 7.51
PCG-8-51 43.58 -8.31 3.42 2.28 95.91 -10.64 -14.01 71.25 7.51
PCG-8-52 43.58 -6.03 3.42 4.56 95.91 -21.29 -14.01 60.61 7.51
PCG-8-53 43.58 -3.75 3.42 6.84 95.91 -31.93 -14.01 49.97 7.51
PCG-8-54 43.58 -1.47 3.42 9.12 95.91 -42.57 -14.01 39.32 7.51
PCG-8-55 43.58 0.81 3.42 11.40 95.91 -53.22 -14.01 28.68 7.51
PCG-8-56 45.86 -21.99 5.70 -11.40 95.91 53.22 -23.35 125.77 7.51
PCG-8-57 45.86 -19.71 5.70 -9.12 95.91 42.57 -23.35 115.13 7.51
PCG-8-58 45.86 -17.43 5.70 -6.84 95.91 31.93 -23.35 104.49 7.51
PCG-8-59 45.86 -15.15 5.70 -4.56 95.91 21.29 -23.35 93.84 7.51
PCG-8-60 45.86 -12.87 5.70 -2.28 95.91 10.64 -23.35 83.20 7.51
re

PCG-8-61 45.86 -10.59 5.70 0.00 95.91 0.00 -23.35 72.56 7.51
PCG-8-62 45.86 -8.31 5.70 2.28 95.91 -10.64 -23.35 61.91 7.51
PCG-8-63 45.86 -6.03 5.70 4.56 95.91 -21.29 -23.35 51.27 7.51
PCG-8-64 45.86 -3.75 5.70 6.84 95.91 -31.93 -23.35 40.63 7.51
PCG-8-65 45.86 -1.47 5.70 9.12 95.91 -42.57 -23.35 29.98 7.51
PCG-8-66 45.86 0.81 5.70 11.40 95.91 -53.22 -23.35 19.34 7.51
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
F AC TOR OF SAF ETY F OR ALL LOAD C ASES ( Per mis s ible/ Ac tual)

Pile Reaction ALONG Z-Z ALONG X-X


Compressi pt at Shear pt at Shear

Ed
Load case pt at top pt at top Punching
on Tension Shear bottom stress bottom stress
500 1 DL1+1 LL1+11.55
EQUIP1
N/a 35.42 N/A N/A N/A N/A N/A N/A N/A
501 1 DL1+1 LL1+11.58
EQUIP1+1
N/a TEMP1 8.93 N/A N/A N/A N/A N/A N/A N/A
502 1 DL1+1 WL1 2.35 N/a 3.82 N/A N/A N/A N/A N/A N/A N/A
503 1 DL1+1 WL2 2.30 N/a 4.19 N/A N/A N/A N/A N/A N/A N/A
504 1 DL1+1 WL3 2.31 N/a 3.99 N/A N/A N/A N/A N/A N/A N/A
505 1 DL1+1 WL4 2.28 N/a 3.66 N/A N/A N/A N/A N/A N/A N/A
506 1 DL1+1 WL5 1.37 26.58 1.10 N/A N/A N/A N/A N/A N/A N/A
507 1 DL1+1 WL6 1.36 154.88 1.10 N/A N/A N/A N/A N/A N/A N/A
508 1 DL1+1 WL7 1.34 6.25 1.11 N/A N/A N/A N/A N/A N/A N/A

F
509 1 DL1+1 WL8 1.32 7.24 1.12 N/A N/A N/A N/A N/A N/A N/A
510 1 DL1+0.7 WL12.36 N/a 5.40 N/A N/A N/A N/A N/A N/A N/A
511 1 DL1+0.7 WL22.33 N/a 5.92 N/A N/A N/A N/A N/A N/A N/A
512 1 DL1+0.7 WL32.35 N/a 5.77 N/A N/A N/A N/A N/A N/A N/A

PD
513 1 DL1+0.7 WL42.33 N/a 5.29 N/A N/A N/A N/A N/A N/A N/A
514 1 DL1+0.7 WL51.58 N/a 1.57 N/A N/A N/A N/A N/A N/A N/A
515 1 DL1+0.7 WL61.57 N/a 1.56 N/A N/A N/A N/A N/A N/A N/A
516 1 DL1+0.7 WL71.54 N/a 1.60 N/A N/A N/A N/A N/A N/A N/A
517 1 DL1+0.7 WL81.53 N/a 1.60 N/A N/A N/A N/A N/A N/A N/A
518 1 DL1+ 1LL1+0.75
1.54WL1+1
N/a EQUIP1 4.87 N/A N/A N/A N/A N/A N/A N/A
519 1 DL1+1.0 LL1+0.75
1.52 N/a
WL2+1 EQUIP1 5.33 N/A N/A N/A N/A N/A N/A N/A
520 1 DL1+1.0 LL1+0.75
1.57 N/a
WL3+1 EQUIP1 5.49 N/A N/A N/A N/A N/A N/A N/A
521 1 DL1+1.0 LL1+0.75
1.56 N/a
WL4+1 EQUIP1 5.03 N/A N/A N/A N/A N/A N/A N/A
522 1 DL1+1.0 LL1+0.75
1.17 N/a
WL5+1 EQUIP1 1.42 N/A N/A N/A N/A N/A N/A N/A
523 1 DL1+1.0 LL1+0.75
1.16 N/a
WL6+1 EQUIP1 1.42 N/A N/A N/A N/A N/A N/A N/A
te r
524 1 DL1+1.0 LL1+0.75
1.12 N/a
WL7+1 EQUIP1 1.53 N/A N/A N/A N/A N/A N/A N/A
525 1 DL1+1.0 LL1+0.75
1.11 N/a
WL8+1 EQUIP1 1.53 N/A N/A N/A N/A N/A N/A N/A
526 1 DL1+1.0 LL1+11.48
EQUIP1+0.525
N/a SL1 4.98 N/A N/A N/A N/A N/A N/A N/A
527 1 DL1+1.0 LL1+11.41
EQUIP1+0.525
N/a SL2 4.55 N/A N/A N/A N/A N/A N/A N/A
528 0.6 DL1+1 WL12.64 N/a 3.86 N/A N/A N/A N/A N/A N/A N/A
529 0.6 DL1+1 WL22.58 N/a 4.24 N/A N/A N/A N/A N/A N/A N/A
530 0.6 DL1+1 WL32.64 N/a 3.95 N/A N/A N/A N/A N/A N/A N/A
531 0.6 DL1+1 WL42.60 N/a 3.63 N/A N/A N/A N/A N/A N/A N/A
as

532 0.6 DL1+1 WL51.49 6.28 1.10 N/A N/A N/A N/A N/A N/A N/A
533 0.6 DL1+1 WL61.47 7.81 1.10 N/A N/A N/A N/A N/A N/A N/A
534 0.6 DL1+1 WL71.45 3.81 1.11 N/A N/A N/A N/A N/A N/A N/A
535 0.6 DL1+1 WL81.44 4.15 1.11 N/A N/A N/A N/A N/A N/A N/A
536 0.6 DL1+0.7 SL12.45 N/a 3.51 N/A N/A N/A N/A N/A N/A N/A
537 0.6 DL1+0.7 SL22.25 N/a 3.09 N/A N/A N/A N/A N/A N/A N/A
1001 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1 N/A N/A N/A N/A N/A N/A N/A
nM

1002 1.35 DL1+1.5


N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1N/A N/A N/A N/A N/A N/A N/A
1003 1.35 DL1+1.5
N/a WL1+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1004 1.35 DL1+1.5
N/a WL2+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1005 1.35 DL1+1.5
N/a WL3+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1006 1.35 DL1+1.5
N/a WL4+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1007 1.35 DL1+1.5
N/a WL5+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1008 1.35 DL1+1.5
N/a WL6+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1009 1.35 DL1+1.5
N/a WL7+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1010 1.35 DL1+1.5
N/a WL8+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1011 1.35 DL1+1.5
N/a WL1+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1012 1.35 DL1+1.5
N/a WL2+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
di

1013 1.35 DL1+1.5


N/a WL3+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1014 1.35 DL1+1.5
N/a WL4+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1015 1.35 DL1+1.5
N/a WL5+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1016 1.35 DL1+1.5
N/a WL6+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1017 1.35 DL1+1.5
N/a WL7+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1018 1.35 DL1+1.5
N/a WL8+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1019 1.35 DL1+0.9
N/a TEMP1+1.35
N/a MR1
N/a N/A N/A N/A N/A N/A N/A N/A
a te

1020 1.35 DL1+-0.9


N/a TEMP1+1.35
N/a MR1
N/a N/A N/A N/A N/A N/A N/A N/A
1021 1.35 DL1+1.5LL1+1.5
N/a N/aEQUIP1+0.9
N/a TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A N/A
1022 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1023 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1024 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1028 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1029 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

Ed
1030 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1031 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1032 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1033 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1034 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1035 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1036 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1037 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1038 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1039 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1040 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1041 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

F
1042 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1043 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1044 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1045 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1046 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

PD
1047 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1048 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1049 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1050 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1051 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1052 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1053 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1054 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1055 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1056 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1057 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1058 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1059 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1060 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
te r
1061 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1062 1.148 DL1+1.5
N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1063 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1064 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1065 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1066 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1067 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1068 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1069 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
as

1070 1.148 DL1+1.5


N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1071 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1072 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1073 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1074 1 DL1+0.8
N/a LL1+1 SL2
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1075 1 DL1+0.8
N/a LL1+-1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1076 1 DL1+0.8
N/a LL1+-1 SL2
N/a N/a N/A N/A N/A N/A N/A N/A N/A
2001 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
nM

2002 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2003 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2004 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2005 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2006 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2007 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2008 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2009 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2010 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2011 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2012 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2013 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2014 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2015 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
di

2016 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2017 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2018 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2019 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2020 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2021 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2022 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2023 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
a te

2024 1 DL1+1.0
N/a LL1+1 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2025 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2026 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2027 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2028 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2029 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2030 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2031 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2032 1 DL1+0.7
N/a LL1+1 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2033 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
FOUNDATION FOR PEDESTAL (P19) (P23) (P24) (P29) (P20) (P25) (P26) (P30)
(P21) (P27) (P22) (P28)-(Pilecap Design)

Ed
LOAD CASE: 1064 1.1481064
DL1+1.5
1.148
LL1+1.5
DL1+1.05
W L8+1.5
LL1+1.5
EQUIP1+0.9
W L8+1.05 TEMP1+1.35
EQUIP1+0.9 TEMP1+1.35
MR1 MR1

G E N E RA L PI L E C A P DI ME N SI O N S, PO SI T I O N
Concrete Density 2.5 ton/m 3 Pile ca p thickne ss 2.100 m
Soil Density 2 ton/m 3 Z cordinate of center of the pilecap -10.588 m
Grade of Concrete (Cylinder) C 30 X cordinate of center of the pilecap 40.163 m
Grade of Steel Fe 500 Le ngth a long a x is Z, L z 24.060 m
Level of Base of pilecap -5.1 m Le ngth a long a x is X, L x 12.660 m
Finished Ground level 0 m Area of base of pilecap, A 304.60 m2
Level of max water table -5.1 m

PE DE ST A L ( C O L U MN ) DI ME N SI O N S, PO SI T I O N S & L O A DS
C.G. of Pedestal Ped top P + W ped
Pedestal ID Lz-z (m) Lx-x (m) P (T) Hz (T) Mx (T-m) Hx (T) Mz (T-m)

F
Z X [Level of (T)
P19 1.600 1.600 -21.000 35.500 -5.100 1308.80 -192.54 -937.25 4.76 -0.16 1308.80
P23 1.250 1.250 -21.000 41.500 -5.100 913.74 -79.75 -358.50 4.51 21.65 913.74
P24 1.250 1.250 -15.800 41.500 -5.100 127.47 -81.03 -358.53 1.07 16.89 127.47
P29 1.250 1.250 -15.800 45.000 -5.100 293.07 -44.69 -217.30 7.26 33.11 293.07
P20 1.250 1.250 -12.000 35.500 -5.100 415.90 -68.88 -395.83 14.98 68.81 415.90
P25 1.250 1.250 -12.000 41.500 -5.100 300.95 -90.19 -325.17 18.94 101.08 300.95

PD
P26 1.250 1.250 -8.200 41.500 -5.100 347.57 -71.34 -308.68 21.40 92.14 347.57
P30 1.250 1.250 -8.200 45.000 -5.100 256.97 -38.25 -185.71 21.76 108.04 256.97
P21 1.600 1.600 -3.000 35.500 -5.100 555.90 -151.26 -709.70 20.33 74.70 555.90
P27 1.250 1.250 -3.000 41.500 -5.100 -9.48 -66.20 -265.52 10.35 42.81 -9.48
P22 1.250 1.250 0.500 35.500 -5.100 -121.84 -58.13 -246.74 -6.16 -27.76 -121.84
P28 1.250 1.250 0.500 41.500 -5.100 -446.15 -55.70 -239.08 1.73 -3.96 -446.15

PI L E DE T A I L S
Number of Piles 66 CGz of Pile group -10.588 m
Diameter of Piles 760 mm CGx of Pile group 40.163 m
2
Compressive capacity of piles 192 T SUM[(Xi-Xc g)2] of Pile group 1000.692 m
2
Tensile capacity of piles 40 T SUM[(Zi-Zc g)2] of Pile group 3430.944 m
Shear capacity of piles 11.5 T

W eight of soil, W s oil 4194.34 T


W eight of footing, W f oot ing 431.77 T
Axial load due to [P+ W ped] 3942.91 T
te r
Total axial Load 8569.01 T

Mz due to [Mz+(P+W ped)*ex ] -5228.42 Ton-m Mx due to [Mx+(P+W ped)*ez] -31601.06 Ton-m
Eccentricity between Pilecap and Pile group 0.00 mm Eccentricity between Pilecap and Pile group 0.00 mm
Mz due to pilecap and pile group eccentricity 0.00 Ton-m Mx due to pilecap and pile group eccentricity 0.00 Ton-m
Total Mz -5228.42 Ton-m Total Mx -31601.06 Ton-m

Distance Distance P due to


from pile from pile Axial P due to P due to
Pile ID CGx CGz group CGx group CGz Load (T) Mx (T) Mz (T) Total P (T) Shear (T)
PCG-8-1 34.46 -21.99 -5.70 -11.40 129.83 105.00 29.78 264.62 15.23
PCG-8-2 34.46 -19.71 -5.70 -9.12 129.83 84.00 29.78 243.62 15.23
as

PCG-8-3 34.46 -17.43 -5.70 -6.84 129.83 63.00 29.78 222.62 15.23
PCG-8-4 34.46 -15.15 -5.70 -4.56 129.83 42.00 29.78 201.62 15.23
PCG-8-5 34.46 -12.87 -5.70 -2.28 129.83 21.00 29.78 180.62 15.23
PCG-8-6 34.46 -10.59 -5.70 0.00 129.83 0.00 29.78 159.61 15.23
PCG-8-7 34.46 -8.31 -5.70 2.28 129.83 -21.00 29.78 138.61 15.23
PCG-8-8 34.46 -6.03 -5.70 4.56 129.83 -42.00 29.78 117.61 15.23
PCG-8-9 34.46 -3.75 -5.70 6.84 129.83 -63.00 29.78 96.61 15.23
PCG-8-10 34.46 -1.47 -5.70 9.12 129.83 -84.00 29.78 75.61 15.23
PCG-8-11 34.46 0.81 -5.70 11.40 129.83 -105.00 29.78 54.61 15.23
PCG-8-12 36.74 -21.99 -3.42 -11.40 129.83 105.00 17.87 252.70 15.23
PCG-8-13 36.74 -19.71 -3.42 -9.12 129.83 84.00 17.87 231.70 15.23
PCG-8-14 36.74 -17.43 -3.42 -6.84 129.83 63.00 17.87 210.70 15.23
nM

PCG-8-15 36.74 -15.15 -3.42 -4.56 129.83 42.00 17.87 189.70 15.23
PCG-8-16 36.74 -12.87 -3.42 -2.28 129.83 21.00 17.87 168.70 15.23
PCG-8-17 36.74 -10.59 -3.42 0.00 129.83 0.00 17.87 147.70 15.23
PCG-8-18 36.74 -8.31 -3.42 2.28 129.83 -21.00 17.87 126.70 15.23
PCG-8-19 36.74 -6.03 -3.42 4.56 129.83 -42.00 17.87 105.70 15.23
PCG-8-20 36.74 -3.75 -3.42 6.84 129.83 -63.00 17.87 84.70 15.23
PCG-8-21 36.74 -1.47 -3.42 9.12 129.83 -84.00 17.87 63.70 15.23
PCG-8-22 36.74 0.81 -3.42 11.40 129.83 -105.00 17.87 42.70 15.23
PCG-8-23 39.02 -21.99 -1.14 -11.40 129.83 105.00 5.96 240.79 15.23
PCG-8-24 39.02 -19.71 -1.14 -9.12 129.83 84.00 5.96 219.79 15.23
PCG-8-25 39.02 -17.43 -1.14 -6.84 129.83 63.00 5.96 198.79 15.23
PCG-8-26 39.02 -15.15 -1.14 -4.56 129.83 42.00 5.96 177.79 15.23
PCG-8-27 39.02 -12.87 -1.14 -2.28 129.83 21.00 5.96 156.79 15.23
PCG-8-28 39.02 -10.59 -1.14 0.00 129.83 0.00 5.96 135.79 15.23
PCG-8-29 39.02 -8.31 -1.14 2.28 129.83 -21.00 5.96 114.79 15.23
PCG-8-30 39.02 -6.03 -1.14 4.56 129.83 -42.00 5.96 93.79 15.23
PCG-8-31 39.02 -3.75 -1.14 6.84 129.83 -63.00 5.96 72.79 15.23
PCG-8-32 39.02 -1.47 -1.14 9.12 129.83 -84.00 5.96 51.79 15.23
di

PCG-8-33 39.02 0.81 -1.14 11.40 129.83 -105.00 5.96 30.79 15.23
PCG-8-34 41.30 -21.99 1.14 -11.40 129.83 105.00 -5.96 228.88 15.23
PCG-8-35 41.30 -19.71 1.14 -9.12 129.83 84.00 -5.96 207.88 15.23
PCG-8-36 41.30 -17.43 1.14 -6.84 129.83 63.00 -5.96 186.88 15.23
PCG-8-37 41.30 -15.15 1.14 -4.56 129.83 42.00 -5.96 165.88 15.23
PCG-8-38 41.30 -12.87 1.14 -2.28 129.83 21.00 -5.96 144.88 15.23
PCG-8-39 41.30 -10.59 1.14 0.00 129.83 0.00 -5.96 123.88 15.23
PCG-8-40 41.30 -8.31 1.14 2.28 129.83 -21.00 -5.96 102.88 15.23
PCG-8-41 41.30 -6.03 1.14 4.56 129.83 -42.00 -5.96 81.88 15.23
PCG-8-42 41.30 -3.75 1.14 6.84 129.83 -63.00 -5.96 60.88 15.23
PCG-8-43 41.30 -1.47 1.14 9.12 129.83 -84.00 -5.96 39.88 15.23
PCG-8-44 41.30 0.81 1.14 11.40 129.83 -105.00 -5.96 18.88 15.23
a te

PCG-8-45 43.58 -21.99 3.42 -11.40 129.83 105.00 -17.87 216.97 15.23
PCG-8-46 43.58 -19.71 3.42 -9.12 129.83 84.00 -17.87 195.97 15.23
PCG-8-47 43.58 -17.43 3.42 -6.84 129.83 63.00 -17.87 174.97 15.23
PCG-8-48 43.58 -15.15 3.42 -4.56 129.83 42.00 -17.87 153.97 15.23
PCG-8-49 43.58 -12.87 3.42 -2.28 129.83 21.00 -17.87 132.96 15.23
PCG-8-50 43.58 -10.59 3.42 0.00 129.83 0.00 -17.87 111.96 15.23
PCG-8-51 43.58 -8.31 3.42 2.28 129.83 -21.00 -17.87 90.96 15.23
PCG-8-52 43.58 -6.03 3.42 4.56 129.83 -42.00 -17.87 69.96 15.23
PCG-8-53 43.58 -3.75 3.42 6.84 129.83 -63.00 -17.87 48.96 15.23
PCG-8-54 43.58 -1.47 3.42 9.12 129.83 -84.00 -17.87 27.96 15.23
PCG-8-55 43.58 0.81 3.42 11.40 129.83 -105.00 -17.87 6.96 15.23
PCG-8-56 45.86 -21.99 5.70 -11.40 129.83 105.00 -29.78 205.05 15.23
PCG-8-57 45.86 -19.71 5.70 -9.12 129.83 84.00 -29.78 184.05 15.23
PCG-8-58 45.86 -17.43 5.70 -6.84 129.83 63.00 -29.78 163.05 15.23
PCG-8-59 45.86 -15.15 5.70 -4.56 129.83 42.00 -29.78 142.05 15.23
PCG-8-60 45.86 -12.87 5.70 -2.28 129.83 21.00 -29.78 121.05 15.23
re

PCG-8-61 45.86 -10.59 5.70 0.00 129.83 0.00 -29.78 100.05 15.23
PCG-8-62 45.86 -8.31 5.70 2.28 129.83 -21.00 -29.78 79.05 15.23
PCG-8-63 45.86 -6.03 5.70 4.56 129.83 -42.00 -29.78 58.05 15.23
PCG-8-64 45.86 -3.75 5.70 6.84 129.83 -63.00 -29.78 37.05 15.23
PCG-8-65 45.86 -1.47 5.70 9.12 129.83 -84.00 -29.78 16.05 15.23
PCG-8-66 45.86 0.81 5.70 11.40 129.83 -105.00 -29.78 -4.95 15.23
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
Load factor for Limit State design 1 Along Axis -----> Z-Z X-X
Ultimate sagging(+)
Moment,Mup(Tm/width) 173.87 29.05
Along Axis -----> Z-Z X-X Effective Depth (for + M), d (m) 1.952 1.952

Ed
Ultimate Shear force (In sagging zone)(T/width) 62.71 24.08 Mup/bd2 (N/mm2) 0.46 0.08
Nominal shear stress (N/mm 2) 0.32 0.12 Tensile steel required at bottom (%) 0.11 0.02
Max allowable shear stress (N/mm 2) 0.32 0.32 Provide bars of dia (mm) 32 32
Ultimate Shear force (In hogging zone)(T) 64.54 28.26 at c/c distance (mm) 150 150
Nominal shear stress (N/mm 2) 0.33 0.14 Tensile steel provided at bottom (%) 0.27 0.27
Max allowable shear stress (N/mm 2) 0.32 0.32 Ultimate hogging(-)
Stirrup Diameter (mm) 12 Moment,Mun(Tm/meter width) -186.79 -23.28
Stirrup spacing (N/mm 2) 150 150 Mun/bd2 (N/mm2) 0.49 0.06

F
Stress in stirrup (N/mm 2) 29.25 12.81 Tensile steel required at top (%) 0.11 0.01
Total Stirrup stress (N/mm 2) 42.05 Provide bars of dia (mm) 32 32
Permissible Stirrup stress (N/mm 2) 434.78 at c/c distance (mm) 150 150

PD
Tensile steel provided at top (%) 0.27 0.27
Effective Depth (for - M), d (m) 1.952 1.952
P UNCH ING SH EAR FO R P EDESTALS
Pedestal ID Ultimate Design Area for resisting Punching Shear Allowable punching
P19 316.17 Ton 13.35 m2 0.24 N/mm2 1.37 N/mm2
P23 476.98 Ton 25.00 m2 0.19 N/mm2 1.37 N/mm2
P24 38.41 Ton 25.00 m2 0.02 N/mm2 1.37 N/mm2
P29 2.95 Ton 18.33 m2 0.00 N/mm2 1.37 N/mm2
P20 240.74 Ton 25.00 m2 0.10 N/mm2 1.37 N/mm2
P25 32.20 Ton 25.00 m2 0.01 N/mm2 1.37 N/mm2
P26 244.70 Ton 25.00 m2 0.10 N/mm2 1.37 N/mm2
te r
P30 86.96 Ton 18.33 m2 0.05 N/mm2 1.37 N/mm2
P21 235.27 Ton 20.37 m2 0.12 N/mm2 1.37 N/mm2
P27 110.23 Ton 25.00 m2 0.04 N/mm2 1.37 N/mm2
P22 219.16 Ton 16.18 m2 0.14 N/mm2 1.37 N/mm2
P28 465.03 Ton 16.18 m2 0.29 N/mm2 1.37 N/mm2
as
nM
di
a te
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
F AC TOR OF SAF ETY F OR ALL LOAD C ASES ( Per mis s ible/ Ac tual)

Pile Reaction ALONG Z-Z ALONG X-X


Compressi pt at Shear pt at Shear

Ed
Load case pt at top pt at top Punching
on Tension Shear bottom stress bottom stress
500 1 DL1+1N/a
LL1+1 EQUIP1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
501 1 DL1+1N/a
LL1+1 EQUIP1+1
N/a TEMP1
N/a N/A N/A N/A N/A N/A N/A N/A
502 1 DL1+1N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
503 1 DL1+1N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
504 1 DL1+1N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A
505 1 DL1+1N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
506 1 DL1+1N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
507 1 DL1+1N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
508 1 DL1+1N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A

F
509 1 DL1+1N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
510 1 DL1+0.7
N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
511 1 DL1+0.7
N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
512 1 DL1+0.7
N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A

PD
513 1 DL1+0.7
N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
514 1 DL1+0.7
N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
515 1 DL1+0.7
N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
516 1 DL1+0.7
N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A
517 1 DL1+0.7
N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
518 1 DL1+ 1LL1+0.75
N/a WL1+1
N/a EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
519 1 DL1+1.0
N/a
LL1+0.75 N/a
WL2+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
520 1 DL1+1.0
N/a
LL1+0.75 N/a
WL3+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
521 1 DL1+1.0
N/a
LL1+0.75 N/a
WL4+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
522 1 DL1+1.0
N/a
LL1+0.75 N/a
WL5+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
523 1 DL1+1.0
N/a
LL1+0.75 N/a
WL6+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
te r
524 1 DL1+1.0
N/a
LL1+0.75 N/a
WL7+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
525 1 DL1+1.0
N/a
LL1+0.75 N/a
WL8+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
526 1 DL1+1.0
N/a
LL1+1 EQUIP1+0.525
N/a N/a
SL1 N/A N/A N/A N/A N/A N/A N/A
527 1 DL1+1.0
N/a
LL1+1 EQUIP1+0.525
N/a N/a
SL2 N/A N/A N/A N/A N/A N/A N/A
528 0.6 DL1+1
N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
529 0.6 DL1+1
N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
530 0.6 DL1+1
N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A
531 0.6 DL1+1
N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
as

532 0.6 DL1+1


N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
533 0.6 DL1+1
N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
534 0.6 DL1+1
N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A
535 0.6 DL1+1
N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
536 0.6 DL1+0.7
N/a SL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
537 0.6 DL1+0.7
N/a SL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
1001 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1 30.55 3.43 12.38 8.50 N/A 12.38 10.71
nM

1002 1.35 DL1+1.5


N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1 18.00 4.31 12.03 9.25 N/A 12.03 11.29
1003 1.35 DL1+1.5
N/a WL1+0.9
N/a TEMP1 N/a 32.80 11.19 19.63 11.51 N/A 19.63 12.01
1004 1.35 DL1+1.5
N/a WL2+0.9
N/a TEMP1 N/a 27.97 11.93 19.31 10.62 N/A 19.31 11.97
1005 1.35 DL1+1.5
N/a WL3+0.9
N/a TEMP1 N/a 59.50 24.18 23.79 10.29 N/A 23.79 8.83
1006 1.35 DL1+1.5
N/a WL4+0.9
N/a TEMP1 N/a 45.23 27.73 22.74 9.24 N/A 22.74 9.07
1007 1.35 DL1+1.5
N/a WL5+0.9
N/a TEMP1 N/a 4.64 2.20 11.93 8.42 N/A 11.93 4.11
1008 1.35 DL1+1.5
N/a WL6+0.9
N/a TEMP1 N/a 4.58 2.25 11.81 7.92 N/A 11.81 4.04
1009 1.35 DL1+1.5
N/a WL7+0.9
N/a TEMP1 N/a 2.19 3.83 12.77 29.82 N/A 12.77 4.02
1010 1.35 DL1+1.5
N/a WL8+0.9
N/a TEMP1 N/a 2.15 3.88 12.66 24.70 N/A 12.66 4.07
1011 1.35 DL1+1.5
N/a WL1+-0.9
N/a TEMP1 N/a 18.76 26.26 20.84 12.92 N/A 20.84 12.01
1012 1.35 DL1+1.5
N/a WL2+-0.9
N/a TEMP1 N/a 17.08 28.84 20.48 11.81 N/A 20.48 11.96
di

1013 1.35 DL1+1.5


N/a WL3+-0.9
N/a TEMP1 N/a 25.26 N/A 22.51 9.44 N/A 22.51 8.24
1014 1.35 DL1+1.5
N/a WL4+-0.9
N/a TEMP1 N/a 22.27 N/A 21.28 8.55 N/A 21.28 8.45
1015 1.35 DL1+1.5
N/a WL5+-0.9
N/a TEMP1 N/a 3.99 2.46 12.42 9.16 N/A 12.42 4.21
1016 1.35 DL1+1.5
N/a WL6+-0.9
N/a TEMP1 N/a 3.94 2.53 12.29 8.57 N/A 12.29 4.15
1017 1.35 DL1+1.5
N/a WL7+-0.9
N/a TEMP1 N/a 1.98 4.46 13.00 41.56 N/A 13.00 3.93
1018 1.35 DL1+1.5
N/a WL8+-0.9
N/a TEMP1 N/a 1.95 4.53 12.52 32.13 N/A 12.52 3.98
1019 1.35 DL1+0.9
N/a TEMP1+1.35
N/a MR1
N/a 24.89 21.64 22.10 11.08 N/A 22.10 12.44
a te

1020 1.35 DL1+-0.9


N/a TEMP1+1.35
N/a MR1
N/a 15.88 N/A 22.04 12.40 N/A 22.04 12.43
1021 1.35 DL1+1.5LL1+1.5
N/a N/aEQUIP1+0.9
N/a TEMP1+1.35 31.22
MR1 3.41 12.27 8.41 N/A 12.27 10.58
1022 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
18.24
MR1 4.27 11.93 9.14 44.44 11.93 11.41
1023 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1+1.35
31.24
MR1 3.60 12.82 8.81 N/A 12.82 11.41
1024 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
18.24MR1 4.58 12.45 9.61 N/A 12.45 11.40
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
38.75 3.11
MR1 12.32 8.50 40.35 12.32 8.77
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
34.53 3.15
MR1 12.24 8.19 44.49 12.24 8.64
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
56.82 3.43
MR1 12.30 8.87 N/A 12.30 11.21
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+0.9 TEMP1+1.35
38.75 3.11
MR1 12.32 8.50 40.35 12.32 8.77
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+0.9 TEMP1+1.35
34.53 3.15
MR1 12.24 8.19 44.49 12.24 8.64
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+0.9 TEMP1+1.35
56.82 3.43
MR1 12.30 8.87 N/A 12.30 11.21
1028 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+0.9 TEMP1+1.35
48.13 3.47
MR1 12.13 8.53 N/A 12.13 11.18
1029 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+0.9 TEMP1+1.35
11.91 2.11
MR1 12.56 7.31 N/A 12.56 5.34

Ed
1030 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+0.9 TEMP1+1.35
11.55 2.14
MR1 12.41 7.07 N/A 12.41 5.27
1031 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+0.9 TEMP1+1.35
4.95 2.74
MR1 12.33 11.71 23.47 12.33 6.78
1032 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+0.9 TEMP1+1.35
4.83 2.76
MR1 12.07 11.14 24.81 12.07 6.70
1033 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
20.58 3.82
MR1 12.27 9.25 36.00 12.27 9.44
1034 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
19.32 3.87
MR1 12.09 8.89 39.18 12.09 9.29
1035 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
24.76 4.30
MR1 11.96 9.37 N/A 11.96 11.20
1036 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
22.95 4.36
MR1 11.80 8.82 N/A 11.80 11.17
1037 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
8.60 2.35
MR1 12.21 7.86 N/A 12.21 5.51
1038 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
8.41 2.39
MR1 12.07 7.59 N/A 12.07 5.45
1039 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
4.04 3.16
MR1 11.97 13.18 21.89 11.97 7.18
1040 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
3.96 3.18
MR1 11.73 12.46 23.01 11.73 7.09
1041 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+0.9 TEMP1+1.35
38.79 3.28
MR1 12.80 8.90 44.84 12.80 9.85

F
1042 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+0.9 TEMP1+1.35
34.56 3.32
MR1 12.72 8.57 N/A 12.72 9.69
1043 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+0.9 TEMP1+1.35
56.91 3.63
MR1 12.85 9.31 N/A 12.85 11.20
1044 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+0.9 TEMP1+1.35
48.19 3.67
MR1 12.66 8.94 N/A 12.66 11.17
1045 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+0.9 TEMP1+1.35
11.62 2.17
MR1 13.06 7.61 N/A 13.06 5.47
1046 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+0.9 TEMP1+1.35
11.28 2.20
MR1 12.97 7.35 N/A 12.97 5.41

PD
1047 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.84 2.85
MR1 12.68 12.49 24.94 12.68 7.41
1048 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.73 2.88
MR1 12.41 11.84 26.45 12.41 7.32
1049 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+-0.9 20.59
TEMP1+1.35 4.07
MR1 12.82 9.73 39.60 12.82 10.70
1050 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+-0.9 19.33
TEMP1+1.35 4.13
MR1 12.63 9.33 43.49 12.63 10.52
1051 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+-0.9 24.78
TEMP1+1.35 4.62
MR1 12.48 9.73 N/A 12.48 11.19
1052 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+-0.9 22.97
TEMP1+1.35 4.69
MR1 12.30 9.13 N/A 12.30 11.16
1053 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
8.45 2.43
MR1 12.76 8.20 N/A 12.76 5.66
1054 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
8.27 2.47
MR1 12.60 7.91 N/A 12.60 5.59
1055 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
3.96 3.30
MR1 12.31 14.18 23.18 12.31 7.89
1056 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
3.89 3.32
MR1 12.05 13.35 24.45 12.05 7.78
1057 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+0.9 TEMP1+1.35
45.92 3.09
MR1 12.40 8.96 37.75 12.40 8.73
1058 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+0.9 TEMP1+1.35
37.20 3.15
MR1 12.27 8.41 44.42 12.27 8.52
1059 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+0.9 TEMP1+1.35
67.51 3.64
MR1 12.88 9.46 N/A 12.88 11.06
1060 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+0.9 TEMP1+1.35
64.86 3.72
MR1 12.56 8.56 N/A 12.56 11.02
te r
1061 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+0.9 TEMP1+1.35
6.28 1.58
MR1 10.55 6.97 N/A 10.55 3.58
1062 1.148 DL1+1.5
N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+0.9 TEMP1+1.35
6.11 1.61
MR1 10.46 6.62 N/A 10.46 3.54
1063 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+0.9 TEMP1+1.35
2.59 2.34
MR1 10.66 17.30 17.84 10.66 4.69
1064 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+0.9 TEMP1+1.35
2.54 2.36
MR1 10.34 15.37 19.19 10.34 4.76
1065 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+-0.9 22.51
TEMP1+1.35 3.79
MR1 12.87 9.80 34.25 12.87 9.39
1066 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+-0.9 20.13
TEMP1+1.35 3.87
MR1 12.74 9.15 39.50 12.74 9.15
1067 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+-0.9 32.55
TEMP1+1.35 4.64
MR1 12.51 8.74 33.04 12.51 11.05
1068 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+-0.9 27.75
TEMP1+1.35 4.76
MR1 12.21 7.97 33.28 12.21 11.01
1069 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
5.21 1.72
MR1 10.70 7.47 N/A 10.70 3.66
as

1070 1.148 DL1+1.5


N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
5.10 1.75
MR1 10.48 7.07 N/A 10.48 3.61
1071 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
2.31 2.57
MR1 10.39 20.72 16.98 10.39 4.57
1072 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
2.27 2.59
MR1 10.09 18.01 18.16 10.09 4.63
1073 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a 15.38 5.93 14.35 7.97 N/A 14.35 11.07
1074 1 DL1+0.8
N/a LL1+1 SL2
N/a N/a 30.57 2.49 11.46 6.83 N/A 11.46 8.79
1075 1 DL1+0.8
N/a LL1+-1 SL1
N/a N/a 33.25 12.76 18.63 14.82 26.92 18.63 12.48
1076 1 DL1+0.8
N/a LL1+-1 SL2
N/a N/a 5.21 N/A 24.66 31.88 N/A 24.66 11.05
2001 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1 28.96
MR1 5.24 15.81 10.27 N/A 15.81 11.59
nM

2002 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1 27.30
MR1 5.30 15.72 9.97 N/A 15.72 11.57
2003 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1 34.42
MR1 5.83 15.95 10.63 N/A 15.95 11.54
2004 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1 32.08
MR1 5.91 15.75 10.31 N/A 15.75 11.52
2005 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+1 15.12
MR1 3.39 16.07 9.09 N/A 16.07 8.56
2006 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+1 14.73
MR1 3.44 16.01 8.84 N/A 16.01 8.45
2007 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+16.59
MR1 4.47 15.89 13.19 N/A 15.89 12.50
2008 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+16.45
MR1 4.51 15.60 12.70 N/A 15.60 12.70
2009 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+120.11
MR1 6.60 15.91 10.99 N/A 15.91 11.58
2010 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+119.29
MR1 6.70 15.72 10.65 N/A 15.72 11.56
2011 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+122.60
MR1 7.56 15.57 11.29 N/A 15.57 11.53
2012 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+121.57
MR1 7.69 15.38 10.75 N/A 15.38 11.51
2013 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+111.41
MR1 3.81 15.85 9.64 N/A 15.85 8.87
2014 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+111.19
MR1 3.87 15.69 9.37 N/A 15.69 8.75
2015 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1 5.49
MR1 5.08 15.49 14.39 N/A 15.49 11.90
di

2016 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1 5.40
MR1 5.12 15.22 13.82 N/A 15.22 12.08
2017 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1 31.49
MR1 4.93 15.40 10.33 N/A 15.40 11.52
2018 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1 28.36
MR1 5.02 15.27 9.84 N/A 15.27 11.49
2019 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1 44.18
MR1 5.86 15.97 10.95 N/A 15.97 11.44
2020 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1 38.21
MR1 5.98 15.65 10.22 N/A 15.65 11.41
2021 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+18.70
MR1 2.45 14.05 8.47 N/A 14.05 5.53
2022 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+18.49
MR1 2.50 13.94 8.13 N/A 13.94 5.45
2023 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+13.70
MR1 3.59 13.71 16.40 36.95 13.71 6.80
a te

2024 1 DL1+1.0
N/a LL1+1 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+13.62
MR1 3.62 13.36 15.19 40.86 13.36 6.90
2025 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+121.30
MR1 6.11 15.88 11.06 N/A 15.88 11.51
2026 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+119.82
MR1 6.25 15.74 10.49 N/A 15.74 11.48
2027 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+126.44
MR1 7.61 15.59 10.38 N/A 15.59 11.44
2028 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+124.18
MR1 7.82 15.28 9.64 N/A 15.28 11.40
2029 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1 7.33
MR1 2.67 14.29 8.96 N/A 14.29 5.65
2030 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1 7.18
MR1 2.72 14.03 8.57 N/A 14.03 5.57
2031 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1 3.32
MR1 3.94 13.42 18.31 34.49 13.42 6.62
2032 1 DL1+0.7
N/a LL1+1 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1 3.26
MR1 3.97 13.08 16.82 37.79 13.08 6.71
2033 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a 15.38 5.93 14.35 7.97 N/A 14.35 11.07
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
FOUNDATION FOR PEDESTAL (P31) (P32) (P33) (P34) (P35) (P36) (P37) (P38)-
(Pile Capacity Check)

Ed
LOAD CASE: 524 1 DL1+1.0
524 LL1+0.75
1 DL1+0.75
WL7+1
LL1+0.75
EQUIP1
WL7+1 EQUIP1

GENERAL PILECAP DIMENSIONS, POSITION


Concrete Density 2.5 ton/m3 Pilecap thickness 0.550 m
Soil Density 2 ton/m3 Z cordinate of center of the pilecap -7.200 m
Grade of Concrete (Cylinder) C 30 X cordinate of center of the pilecap 22.500 m
Grade of Steel Fe 500 Length along axis Z, L z 2.480 m
Level of Base of pilecap -5.1 m Length along axis X, L x 6.250 m

F
Finished Ground level 0 m Area of base of pilecap, A 15.50 m2
Level of max water table -5.1 m

PD
PEDESTAL (COLUMN) DIMENSIONS, POSITIONS & LOADS
C.G. of Pedestal Ped top P + W ped
Pedestal ID Lz-z (m) Lx-x (m) P (T) Hz (T) Mx (T-m) Hx (T) Mz (T-m)
Z X [Level of (T)
P31 0.600 0.400 -7.700 19.800 -5.100 17.34 -0.98 -3.83 -0.03 -0.04 17.34
P32 0.600 0.400 -6.700 19.800 -5.100 -1.42 -0.87 -3.70 0.30 0.53 -1.42
P33 0.600 0.400 -7.700 21.900 -5.100 20.63 -1.22 -5.40 0.01 0.04 20.63
P34 0.600 0.400 -6.700 21.900 -5.100 -5.60 -1.55 -5.92 0.04 0.10 -5.60
P35 0.600 0.400 -7.700 23.100 -5.100 20.68 -1.19 -5.33 0.06 0.14 20.68
P36 0.600 0.400 -6.700 23.100 -5.100 -5.50 -1.53 -5.86 0.04 0.08 -5.50
P37 0.600 0.400 -7.700 25.200 -5.100 17.32 -0.91 -3.65 0.09 0.20 17.32
te r
P38 0.600 0.400 -6.700 25.200 -5.100 -1.28 -0.83 -3.56 -0.25 -0.37 -1.28

PILE DETAILS
Number of Piles 8 CGz of Pile group -7.2 m
Diameter of Piles 450 mm CGx of Pile group 22.5 m
2
Compressive capacity of piles 73 T SUM[(Xi-Xcg)2] of Pile group 31.601 m
2
Tensile capacity of piles 19 T SUM[(Zi-Zcg)2] of Pile group 3.511 m
as

Shear capacity of piles 7T

Weight of soil, W soil 158.10 T


Weight of footing, W f ooting 4.26 T
Axial load due to [P+ W ped] 62.17 T
nM

Total axial Load 224.54 T

Mz due to [Mz+(P+W ped)*ex ] 1.08 Ton-m Mx due to [Mx+(P+W ped)*ez] -82.13 Ton-m
Eccentricity between Pilecap and Pile group 0.00 mm Eccentricity between Pilecap and Pile group 0.00 mm
Mz due to pilecap and pile group eccentricity 0.00 Ton-m Mx due to pilecap and pile group eccentricity 0.00 Ton-m
Total Mz 1.08 Ton-m Total Mx -82.13 Ton-m

Distance Distance P due to


from pile from pile Axial P due to P due to
di

Pile ID CGx CGz group CGx group CGz Load (T) Mx (T) Mz (T) Total P (T) Shear (T)
PCG-9-1 19.85 -7.97 -2.65 -0.77 28.07 17.89 -0.09 45.87 1.13
PCG-9-2 19.85 -6.43 -2.65 0.76 28.07 -17.89 -0.09 10.08 1.13
PCG-9-3 21.17 -7.20 -1.33 0.00 28.07 0.00 -0.05 28.02 1.13
PCG-9-4 22.50 -7.97 0.00 -0.77 28.07 17.89 0.00 45.96 1.13
PCG-9-5 22.50 -6.43 0.00 0.76 28.07 -17.89 0.00 10.17 1.13
PCG-9-6 23.83 -7.20 1.33 0.00 28.07 0.00 0.05 28.11 1.13
a te

PCG-9-7 25.15 -7.97 2.65 -0.77 28.07 17.89 0.09 46.05 1.13
PCG-9-8 25.15 -6.43 2.65 0.76 28.07 -17.89 0.09 10.26 1.13
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
F AC TOR OF SAF ETY F OR ALL LOAD C ASES ( Per mis s ible/ Ac tual)

Pile Reaction ALONG Z-Z ALONG X-X


Compressi pt at Shear pt at Shear

Ed
Load case pt at top pt at top Punching
on Tension Shear bottom stress bottom stress
500 1 DL1+1 LL1+11.68
EQUIP1
N/a 9.41 N/A N/A N/A N/A N/A N/A N/A
501 1 DL1+1 LL1+11.77
EQUIP1+1
N/a TEMP1 13.32 N/A N/A N/A N/A N/A N/A N/A
502 1 DL1+1 WL1 2.54 N/a 18.05 N/A N/A N/A N/A N/A N/A N/A
503 1 DL1+1 WL2 2.54 N/a 17.87 N/A N/A N/A N/A N/A N/A N/A
504 1 DL1+1 WL3 2.55 N/a 18.12 N/A N/A N/A N/A N/A N/A N/A
505 1 DL1+1 WL4 2.55 N/a 17.99 N/A N/A N/A N/A N/A N/A N/A
506 1 DL1+1 WL5 2.53 N/a 10.48 N/A N/A N/A N/A N/A N/A N/A
507 1 DL1+1 WL6 2.52 N/a 10.31 N/A N/A N/A N/A N/A N/A N/A
508 1 DL1+1 WL7 2.34 N/a 19.50 N/A N/A N/A N/A N/A N/A N/A

F
509 1 DL1+1 WL8 2.34 N/a 20.13 N/A N/A N/A N/A N/A N/A N/A
510 1 DL1+0.7 WL12.56 N/a 24.11 N/A N/A N/A N/A N/A N/A N/A
511 1 DL1+0.7 WL22.57 N/a 23.78 N/A N/A N/A N/A N/A N/A N/A
512 1 DL1+0.7 WL32.57 N/a 24.08 N/A N/A N/A N/A N/A N/A N/A

PD
513 1 DL1+0.7 WL42.57 N/a 23.81 N/A N/A N/A N/A N/A N/A N/A
514 1 DL1+0.7 WL52.63 N/a 13.57 N/A N/A N/A N/A N/A N/A N/A
515 1 DL1+0.7 WL62.62 N/a 13.36 N/A N/A N/A N/A N/A N/A N/A
516 1 DL1+0.7 WL72.42 N/a 34.45 N/A N/A N/A N/A N/A N/A N/A
517 1 DL1+0.7 WL82.42 N/a 35.86 N/A N/A N/A N/A N/A N/A N/A
518 1 DL1+ 1LL1+0.75
1.65WL1+1
N/a EQUIP1 8.43 N/A N/A N/A N/A N/A N/A N/A
519 1 DL1+1.0 LL1+0.75
1.65 N/a
WL2+1 EQUIP1 8.51 N/A N/A N/A N/A N/A N/A N/A
520 1 DL1+1.0 LL1+0.75
1.66 N/a
WL3+1 EQUIP1 8.73 N/A N/A N/A N/A N/A N/A N/A
521 1 DL1+1.0 LL1+0.75
1.66 N/a
WL4+1 EQUIP1 8.82 N/A N/A N/A N/A N/A N/A N/A
522 1 DL1+1.0 LL1+0.75
1.79 N/a
WL5+1 EQUIP1 19.22 N/A N/A N/A N/A N/A N/A N/A
523 1 DL1+1.0 LL1+0.75
1.79 N/a
WL6+1 EQUIP1 19.67 N/A N/A N/A N/A N/A N/A N/A
te r
524 1 DL1+1.0 LL1+0.75
1.59 N/a
WL7+1 EQUIP1 6.17 N/A N/A N/A N/A N/A N/A N/A
525 1 DL1+1.0 LL1+0.75
1.59 N/a
WL8+1 EQUIP1 6.22 N/A N/A N/A N/A N/A N/A N/A
526 1 DL1+1.0 LL1+11.65
EQUIP1+0.525
N/a SL1 8.44 N/A N/A N/A N/A N/A N/A N/A
527 1 DL1+1.0 LL1+11.66
EQUIP1+0.525
N/a SL2 8.60 N/A N/A N/A N/A N/A N/A N/A
528 0.6 DL1+1 WL12.83 N/a 18.79 N/A N/A N/A N/A N/A N/A N/A
529 0.6 DL1+1 WL22.84 N/a 18.69 N/A N/A N/A N/A N/A N/A N/A
530 0.6 DL1+1 WL32.85 N/a 18.98 N/A N/A N/A N/A N/A N/A N/A
531 0.6 DL1+1 WL42.86 N/a 18.91 N/A N/A N/A N/A N/A N/A N/A
as

532 0.6 DL1+1 WL52.71 N/a 11.60 N/A N/A N/A N/A N/A N/A N/A
533 0.6 DL1+1 WL62.71 N/a 11.39 N/A N/A N/A N/A N/A N/A N/A
534 0.6 DL1+1 WL72.59 N/a 16.53 N/A N/A N/A N/A N/A N/A N/A
535 0.6 DL1+1 WL82.59 N/a 16.99 N/A N/A N/A N/A N/A N/A N/A
536 0.6 DL1+0.7 SL12.82 N/a 19.95 N/A N/A N/A N/A N/A N/A N/A
537 0.6 DL1+0.7 SL22.86 N/a 207.42 N/A N/A N/A N/A N/A N/A N/A
1001 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1 N/A N/A N/A N/A N/A N/A N/A
nM

1002 1.35 DL1+1.5


N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1N/A N/A N/A N/A N/A N/A N/A
1003 1.35 DL1+1.5
N/a WL1+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1004 1.35 DL1+1.5
N/a WL2+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1005 1.35 DL1+1.5
N/a WL3+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1006 1.35 DL1+1.5
N/a WL4+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1007 1.35 DL1+1.5
N/a WL5+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1008 1.35 DL1+1.5
N/a WL6+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1009 1.35 DL1+1.5
N/a WL7+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1010 1.35 DL1+1.5
N/a WL8+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1011 1.35 DL1+1.5
N/a WL1+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1012 1.35 DL1+1.5
N/a WL2+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
di

1013 1.35 DL1+1.5


N/a WL3+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1014 1.35 DL1+1.5
N/a WL4+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1015 1.35 DL1+1.5
N/a WL5+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1016 1.35 DL1+1.5
N/a WL6+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1017 1.35 DL1+1.5
N/a WL7+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1018 1.35 DL1+1.5
N/a WL8+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1019 1.35 DL1+0.9
N/a TEMP1+1.35
N/a MR1
N/a N/A N/A N/A N/A N/A N/A N/A
a te

1020 1.35 DL1+-0.9


N/a TEMP1+1.35
N/a MR1
N/a N/A N/A N/A N/A N/A N/A N/A
1021 1.35 DL1+1.5LL1+1.5
N/a N/aEQUIP1+0.9
N/a TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A N/A
1022 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1023 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1024 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1028 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1029 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

Ed
1030 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1031 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1032 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1033 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1034 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1035 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1036 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1037 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1038 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1039 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1040 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1041 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

F
1042 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1043 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1044 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1045 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1046 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

PD
1047 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1048 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1049 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1050 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1051 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1052 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1053 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1054 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1055 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1056 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1057 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1058 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1059 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1060 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
te r
1061 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1062 1.148 DL1+1.5
N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1063 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1064 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1065 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1066 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1067 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1068 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1069 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
as

1070 1.148 DL1+1.5


N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1071 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1072 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1073 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1074 1 DL1+0.8
N/a LL1+1 SL2
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1075 1 DL1+0.8
N/a LL1+-1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1076 1 DL1+0.8
N/a LL1+-1 SL2
N/a N/a N/A N/A N/A N/A N/A N/A N/A
2001 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
nM

2002 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2003 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2004 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2005 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2006 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2007 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2008 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2009 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2010 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2011 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2012 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2013 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2014 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2015 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
di

2016 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2017 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2018 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2019 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2020 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2021 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2022 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2023 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
a te

2024 1 DL1+1.0
N/a LL1+1 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2025 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2026 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2027 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2028 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2029 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2030 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2031 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2032 1 DL1+0.7
N/a LL1+1 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2033 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
FOUNDATION FOR PEDESTAL (P31) (P32) (P33) (P34) (P35) (P36) (P37) (P38)-
(Pilecap Design)

Ed
LOAD CASE: 1067 1.1481067
DL1+1.5
1.148
LL1+1.5
DL1+1.05
WL3+1.5
LL1+1.5
EQUIP1+-0.9
WL3+1.05 EQUIP1+-0.9
TEMP1+1.35 TEMP1+1.35
MR1 MR1

GENERAL PILECAP DIMENSIONS, POSITION


Concrete Density 2.5 ton/m3 Pilecap thickness 0.550 m
Soil Density 2 ton/m3 Z cordinate of center of the pilecap -7.200 m
Grade of Concrete (Cylinder) C 30 X cordinate of center of the pilecap 22.500 m
Grade of Steel Fe 500 Length along axis Z, L z 2.480 m
Level of Base of pilecap -5.1 m Length along axis X, L x 6.250 m

F
Finished Ground level 0 m Area of base of pilecap, A 15.50 m2
Level of max water table -5.1 m

PD
PEDESTAL (COLUMN) DIMENSIONS, POSITIONS & LOADS
C.G. of Pedestal Ped top P + W ped
Pedestal ID Lz-z (m) Lx-x (m) P (T) Hz (T) Mx (T-m) Hx (T) Mz (T-m)
Z X [Level of (T)
P31 0.600 0.400 -7.700 19.800 -5.100 22.97 -1.18 -4.74 -0.44 -1.24 22.97
P32 0.600 0.400 -6.700 19.800 -5.100 -2.94 -1.00 -4.60 0.03 -0.37 -2.94
P33 0.600 0.400 -7.700 21.900 -5.100 28.19 -1.70 -7.46 -0.64 -1.59 28.19
P34 0.600 0.400 -6.700 21.900 -5.100 -8.67 -2.13 -8.24 -0.52 -1.33 -8.67
P35 0.600 0.400 -7.700 23.100 -5.100 27.81 -1.50 -7.11 -0.60 -1.54 27.81
P36 0.600 0.400 -6.700 23.100 -5.100 -9.75 -2.10 -8.16 -0.58 -1.50 -9.75
P37 0.600 0.400 -7.700 25.200 -5.100 24.24 -0.71 -3.95 -0.50 -1.44 24.24
te r
P38 0.600 0.400 -6.700 25.200 -5.100 -3.67 -0.96 -4.45 -0.90 -2.13 -3.67

PILE DETAILS
Number of Piles 8 CGz of Pile group -7.2 m
Diameter of Piles 450 mm CGx of Pile group 22.5 m
2
Compressive capacity of piles 73 T SUM[(Xi-Xcg)2] of Pile group 31.601 m
2
Tensile capacity of piles 19 T SUM[(Zi-Zcg)2] of Pile group 3.511 m
as

Shear capacity of piles 7T

Weight of soil, W soil 213.43 T


Weight of footing, W f ooting 5.75 T
Axial load due to [P+ W ped] 78.19 T
nM

Total axial Load 297.38 T

Mz due to [Mz+(P+W ped)*ex ] -10.54 Ton-m Mx due to [Mx+(P+W ped)*ez] -112.84 Ton-m
Eccentricity between Pilecap and Pile group 0.00 mm Eccentricity between Pilecap and Pile group 0.00 mm
Mz due to pilecap and pile group eccentricity 0.00 Ton-m Mx due to pilecap and pile group eccentricity 0.00 Ton-m
Total Mz -10.54 Ton-m Total Mx -112.84 Ton-m

Distance Distance P due to


from pile from pile Axial P due to P due to
di

Pile ID CGx CGz group CGx group CGz Load (T) Mx (T) Mz (T) Total P (T) Shear (T)
PCG-9-1 19.85 -7.97 -2.65 -0.77 37.17 24.58 0.88 62.64 1.50
PCG-9-2 19.85 -6.43 -2.65 0.76 37.17 -24.58 0.88 13.47 1.50
PCG-9-3 21.17 -7.20 -1.33 0.00 37.17 0.00 0.44 37.61 1.50
PCG-9-4 22.50 -7.97 0.00 -0.77 37.17 24.58 0.00 61.76 1.50
PCG-9-5 22.50 -6.43 0.00 0.76 37.17 -24.58 0.00 12.59 1.50
PCG-9-6 23.83 -7.20 1.33 0.00 37.17 0.00 -0.44 36.73 1.50
a te

PCG-9-7 25.15 -7.97 2.65 -0.77 37.17 24.58 -0.88 60.87 1.50
PCG-9-8 25.15 -6.43 2.65 0.76 37.17 -24.58 -0.88 11.70 1.50
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
Load factor for Limit State design 1 Along Axis -----> Z-Z X-X
Ultimate sagging(+)
Moment,Mup(Tm/width) 1.05 10.53
Along Axis -----> Z-Z X-X Effective Depth (for + M), d (m) 0.432 0.432

Ed
Ultimate Shear force (In sagging zone)(T/width) 0.14 10.59 Mup/bd2 (N/mm2) 0.06 0.56
Nominal shear stress (N/mm 2) 0.00 0.25 Tensile steel required at bottom (%) 0.01 0.13
Max allowable shear stress (N/mm 2) 0.42 0.42 Provide bars of dia (mm) 12 12
Ultimate Shear force (In hogging zone)(T) 3.16 0.09 at c/c distance (mm) 160 160
Nominal shear stress (N/mm 2) 0.07 0.00 Tensile steel provided at bottom (%) 0.17 0.17
Max allowable shear stress (N/mm 2) 0.42 0.42 Ultimate hogging(-)
Stirrup Diameter (mm) NA Moment,Mun(Tm/meter width) -1.11 0.00
Stirrup spacing (N/mm 2) NA NA Mun/bd2 (N/mm2) 0.06 0.00

F
Stress in stirrup (N/mm 2) NA NA Tensile steel required at top (%) 0.01 0.00
Total Stirrup stress (N/mm 2) NA Provide bars of dia (mm) 12 12
Permissible Stirrup stress (N/mm 2) NA at c/c distance (mm) 160 160

PD
Tensile steel provided at top (%) 0.17 0.17
Effective Depth (for - M), d (m) 0.432 0.432
P UNCH ING SH EAR FO R P EDESTALS
Pedestal ID Ultimate Design Area for resisting Punching Shear Allowable punching
P31 39.67 Ton 1.61 m2 0.25 N/mm2 1.37 N/mm2
P32 16.42 Ton 1.61 m2 0.10 N/mm2 1.37 N/mm2
P33 28.19 Ton 1.61 m2 0.18 N/mm2 1.37 N/mm2
P34 8.67 Ton 1.61 m2 0.05 N/mm2 1.37 N/mm2
P35 27.81 Ton 1.61 m2 0.17 N/mm2 1.37 N/mm2
P36 9.75 Ton 1.61 m2 0.06 N/mm2 1.37 N/mm2
P37 36.63 Ton 1.61 m2 0.23 N/mm2 1.37 N/mm2
te r
P38 15.37 Ton 1.61 m2 0.10 N/mm2 1.37 N/mm2
as
nM
di
a te
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
F AC TOR OF SAF ETY F OR ALL LOAD C ASES ( Per mis s ible/ Ac tual)

Pile Reaction ALONG Z-Z ALONG X-X


Compressi pt at Shear pt at Shear

Ed
Load case pt at top pt at top Punching
on Tension Shear bottom stress bottom stress
500 1 DL1+1N/a
LL1+1 EQUIP1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
501 1 DL1+1N/a
LL1+1 EQUIP1+1
N/a TEMP1
N/a N/A N/A N/A N/A N/A N/A N/A
502 1 DL1+1N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
503 1 DL1+1N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
504 1 DL1+1N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A
505 1 DL1+1N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
506 1 DL1+1N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
507 1 DL1+1N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
508 1 DL1+1N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A

F
509 1 DL1+1N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
510 1 DL1+0.7
N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
511 1 DL1+0.7
N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
512 1 DL1+0.7
N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A

PD
513 1 DL1+0.7
N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
514 1 DL1+0.7
N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
515 1 DL1+0.7
N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
516 1 DL1+0.7
N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A
517 1 DL1+0.7
N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
518 1 DL1+ 1LL1+0.75
N/a WL1+1
N/a EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
519 1 DL1+1.0
N/a
LL1+0.75 N/a
WL2+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
520 1 DL1+1.0
N/a
LL1+0.75 N/a
WL3+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
521 1 DL1+1.0
N/a
LL1+0.75 N/a
WL4+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
522 1 DL1+1.0
N/a
LL1+0.75 N/a
WL5+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
523 1 DL1+1.0
N/a
LL1+0.75 N/a
WL6+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
te r
524 1 DL1+1.0
N/a
LL1+0.75 N/a
WL7+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
525 1 DL1+1.0
N/a
LL1+0.75 N/a
WL8+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
526 1 DL1+1.0
N/a
LL1+1 EQUIP1+0.525
N/a N/a
SL1 N/A N/A N/A N/A N/A N/A N/A
527 1 DL1+1.0
N/a
LL1+1 EQUIP1+0.525
N/a N/a
SL2 N/A N/A N/A N/A N/A N/A N/A
528 0.6 DL1+1
N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
529 0.6 DL1+1
N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
530 0.6 DL1+1
N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A
531 0.6 DL1+1
N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
as

532 0.6 DL1+1


N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
533 0.6 DL1+1
N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
534 0.6 DL1+1
N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A
535 0.6 DL1+1
N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
536 0.6 DL1+0.7
N/a SL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
537 0.6 DL1+0.7
N/a SL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
1001 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1 16.81 13.36 5.72 1.37 N/A 1.79 6.10
nM

1002 1.35 DL1+1.5


N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1 11.82 12.67 5.72 1.35 N/A 1.82 5.81
1003 1.35 DL1+1.5
N/a WL1+0.9
N/a TEMP1 N/a 17.69 19.41 5.72 1.33 18.55 1.64 7.73
1004 1.35 DL1+1.5
N/a WL2+0.9
N/a TEMP1 N/a 17.35 19.45 5.72 1.33 18.67 1.64 7.72
1005 1.35 DL1+1.5
N/a WL3+0.9
N/a TEMP1 N/a 17.33 19.47 5.72 1.33 20.84 1.66 7.69
1006 1.35 DL1+1.5
N/a WL4+0.9
N/a TEMP1 N/a 17.01 19.51 5.72 1.33 21.11 1.66 7.68
1007 1.35 DL1+1.5
N/a WL5+0.9
N/a TEMP1 N/a 11.49 17.59 5.72 1.42 N/A 1.80 6.88
1008 1.35 DL1+1.5
N/a WL6+0.9
N/a TEMP1 N/a 11.34 17.56 5.72 1.43 N/A 1.80 6.88
1009 1.35 DL1+1.5
N/a WL7+0.9
N/a TEMP1 N/a 22.01 17.53 5.72 1.41 N/A 1.78 7.26
1010 1.35 DL1+1.5
N/a WL8+0.9
N/a TEMP1 N/a 21.97 17.59 5.72 1.42 N/A 1.78 7.28
1011 1.35 DL1+1.5
N/a WL1+-0.9
N/a TEMP1 N/a 16.93 18.28 5.72 1.31 N/A 1.68 7.32
1012 1.35 DL1+1.5
N/a WL2+-0.9
N/a TEMP1 N/a 16.61 18.33 5.72 1.32 N/A 1.68 7.34
di

1013 1.35 DL1+1.5


N/a WL3+-0.9
N/a TEMP1 N/a 16.60 18.36 5.72 1.31 N/A 1.70 7.37
1014 1.35 DL1+1.5
N/a WL4+-0.9
N/a TEMP1 N/a 16.30 18.41 5.72 1.32 N/A 1.70 7.39
1015 1.35 DL1+1.5
N/a WL5+-0.9
N/a TEMP1 N/a 11.16 19.16 5.72 1.40 N/A 1.85 7.45
1016 1.35 DL1+1.5
N/a WL6+-0.9
N/a TEMP1 N/a 11.03 19.14 5.72 1.41 N/A 1.85 7.44
1017 1.35 DL1+1.5
N/a WL7+-0.9
N/a TEMP1 N/a 14.19 16.35 5.72 1.40 N/A 1.82 6.86
1018 1.35 DL1+1.5
N/a WL8+-0.9
N/a TEMP1 N/a 14.17 16.40 5.72 1.40 N/A 1.83 6.88
1019 1.35 DL1+0.9
N/a TEMP1+1.35
N/a MR1
N/a 16.91 19.58 5.72 1.43 N/A 1.79 7.83
a te

1020 1.35 DL1+-0.9


N/a TEMP1+1.35
N/a MR1
N/a 16.22 18.49 5.72 1.41 N/A 1.84 7.83
1021 1.35 DL1+1.5LL1+1.5
N/a N/aEQUIP1+0.9
N/a TEMP1+1.35 16.75
MR1 13.36 5.72 1.37 N/A 1.79 6.09
1022 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
11.80
MR1 12.66 5.72 1.35 N/A 1.82 5.81
1023 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1+1.35
19.59
MR1 13.12 5.72 1.39 N/A 1.79 6.09
1024 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
13.14MR1 12.45 5.72 1.38 N/A 1.83 5.80
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
16.58 13.28
MR1 5.72 1.31 N/A 1.70 5.90
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
16.56 13.30
MR1 5.72 1.32 N/A 1.70 5.91
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
16.72 13.30
MR1 5.72 1.32 N/A 1.73 5.94
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+0.9 TEMP1+1.35
16.58 13.28
MR1 5.72 1.31 N/A 1.70 5.90
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+0.9 TEMP1+1.35
16.56 13.30
MR1 5.72 1.32 N/A 1.70 5.91
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+0.9 TEMP1+1.35
16.72 13.30
MR1 5.72 1.32 N/A 1.73 5.94
1028 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+0.9 TEMP1+1.35
16.70 13.32
MR1 5.72 1.32 N/A 1.73 5.95
1029 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+0.9 TEMP1+1.35
17.16 14.17
MR1 5.72 1.37 N/A 1.80 6.52

Ed
1030 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+0.9 TEMP1+1.35
16.97 14.19
MR1 5.72 1.37 N/A 1.80 6.53
1031 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+0.9 TEMP1+1.35
14.50 12.62
MR1 5.72 1.36 N/A 1.78 5.71
1032 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+0.9 TEMP1+1.35
14.49 12.64
MR1 5.72 1.36 N/A 1.79 5.72
1033 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
11.71 12.59
MR1 5.72 1.30 N/A 1.74 5.63
1034 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
11.70 12.60
MR1 5.72 1.30 N/A 1.74 5.64
1035 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
11.78 12.61
MR1 5.72 1.30 N/A 1.74 5.67
1036 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
11.77 12.63
MR1 5.72 1.30 N/A 1.74 5.68
1037 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
13.44 13.39
MR1 5.72 1.36 N/A 1.81 6.19
1038 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
13.43 13.41
MR1 5.72 1.36 N/A 1.81 6.20
1039 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
10.63 12.00
MR1 5.72 1.34 N/A 1.83 5.46
1040 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
10.63 12.01
MR1 5.72 1.35 N/A 1.83 5.47
1041 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+0.9 TEMP1+1.35
19.36 13.04
MR1 5.72 1.34 N/A 1.69 5.89

F
1042 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+0.9 TEMP1+1.35
19.33 13.06
MR1 5.72 1.34 N/A 1.70 5.90
1043 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+0.9 TEMP1+1.35
19.55 13.07
MR1 5.72 1.34 N/A 1.72 5.93
1044 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+0.9 TEMP1+1.35
19.52 13.09
MR1 5.72 1.34 N/A 1.72 5.94
1045 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+0.9 TEMP1+1.35
21.33 13.91
MR1 5.72 1.40 N/A 1.80 6.51
1046 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+0.9 TEMP1+1.35
21.03 13.92
MR1 5.72 1.40 N/A 1.80 6.52

PD
1047 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+0.9 TEMP1+1.35
16.59 12.41
MR1 5.72 1.39 N/A 1.78 5.71
1048 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+0.9 TEMP1+1.35
16.57 12.42
MR1 5.72 1.39 N/A 1.78 5.72
1049 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+-0.9 13.04
TEMP1+1.35
12.38
MR1 5.72 1.32 N/A 1.74 5.63
1050 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+-0.9 13.03
TEMP1+1.35
12.39
MR1 5.72 1.32 N/A 1.74 5.63
1051 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+-0.9 13.12
TEMP1+1.35
12.40
MR1 5.72 1.32 N/A 1.76 5.66
1052 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+-0.9 13.11
TEMP1+1.35
12.42
MR1 5.72 1.33 N/A 1.77 5.67
1053 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+-0.9 15.21
TEMP1+1.35
13.15
MR1 5.72 1.38 N/A 1.84 6.19
1054 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+-0.9 15.19
TEMP1+1.35
13.17
MR1 5.72 1.38 N/A 1.84 6.20
1055 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+-0.9 11.72
TEMP1+1.35
11.81
MR1 5.72 1.37 N/A 1.82 5.46
1056 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+-0.9 11.70
TEMP1+1.35
11.82
MR1 5.72 1.37 N/A 1.83 5.46
1057 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+0.9 TEMP1+1.35
19.21 12.99
MR1 5.72 1.30 17.24 1.64 5.77
1058 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+0.9 TEMP1+1.35
19.17 13.02
MR1 5.72 1.30 17.35 1.64 5.79
1059 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+0.9 TEMP1+1.35
19.52 13.04
MR1 5.72 1.30 21.77 1.66 5.82
1060 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+0.9 TEMP1+1.35
19.48 13.07
MR1 5.72 1.31 22.06 1.67 5.83
te r
1061 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+0.9 TEMP1+1.35
17.25 14.48
MR1 5.72 1.40 N/A 1.80 6.81
1062 1.148 DL1+1.5
N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+0.9 TEMP1+1.35
16.92 14.52
MR1 5.72 1.40 N/A 1.80 6.83
1063 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+0.9 TEMP1+1.35
15.04 11.98
MR1 5.72 1.38 N/A 1.77 5.48
1064 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+0.9 TEMP1+1.35
15.02 12.00
MR1 5.72 1.38 N/A 1.78 5.49
1065 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+-0.9 12.97
TEMP1+1.35
12.33
MR1 5.72 1.29 N/A 1.68 5.51
1066 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+-0.9 12.95
TEMP1+1.35
12.36
MR1 5.72 1.29 N/A 1.68 5.53
1067 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+-0.9 13.11
TEMP1+1.35
12.37
MR1 5.72 1.29 N/A 1.70 5.56
1068 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+-0.9 13.09
TEMP1+1.35
12.40
MR1 5.72 1.29 N/A 1.71 5.57
1069 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+-0.9 16.52
TEMP1+1.35
13.67
MR1 5.72 1.38 N/A 1.85 6.46
as

1070 1.148 DL1+1.5


N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+-0.9 16.23
TEMP1+1.35
13.70
MR1 5.72 1.38 N/A 1.85 6.48
1071 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+-0.9 10.92
TEMP1+1.35
11.41
MR1 5.72 1.36 N/A 1.82 5.25
1072 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+-0.9 10.91
TEMP1+1.35
11.44
MR1 5.72 1.37 N/A 1.82 5.26
1073 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a 18.55 18.64 5.72 1.36 N/A 1.68 7.74
1074 1 DL1+0.8
N/a LL1+1 SL2
N/a N/a 19.17 18.46 5.72 1.42 N/A 1.79 7.86
1075 1 DL1+0.8
N/a LL1+-1 SL1
N/a N/a 16.87 18.61 5.72 1.39 N/A 1.70 7.83
1076 1 DL1+0.8
N/a LL1+-1 SL2
N/a N/a 16.39 18.78 5.72 1.44 N/A 1.82 7.94
2001 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1 25.39
MR1 14.32 5.72 1.39 N/A 1.73 6.48
nM

2002 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1 25.36
MR1 14.33 5.72 1.39 N/A 1.73 6.48
2003 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1 25.60
MR1 14.34 5.72 1.39 N/A 1.75 6.51
2004 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1 25.57
MR1 14.36 5.72 1.39 N/A 1.75 6.52
2005 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+1 25.44
MR1 15.00 5.72 1.43 N/A 1.80 6.96
2006 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+1 25.15
MR1 15.02 5.72 1.43 N/A 1.80 6.97
2007 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+1 22.15
MR1 13.80 5.72 1.42 N/A 1.78 6.33
2008 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+1 22.13
MR1 13.82 5.72 1.42 N/A 1.79 6.33
2009 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+117.82
MR1 13.78 5.72 1.38 N/A 1.76 6.26
2010 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+117.81
MR1 13.79 5.72 1.38 N/A 1.76 6.26
2011 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+117.93
MR1 13.80 5.72 1.38 N/A 1.78 6.29
2012 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+117.92
MR1 13.81 5.72 1.38 N/A 1.78 6.30
2013 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+120.50
MR1 14.41 5.72 1.42 N/A 1.83 6.71
2014 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+120.47
MR1 14.42 5.72 1.42 N/A 1.83 6.72
2015 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+116.17
MR1 13.30 5.72 1.41 N/A 1.81 6.12
di

2016 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+116.15
MR1 13.31 5.72 1.41 N/A 1.82 6.12
2017 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1 25.21
MR1 14.28 5.72 1.36 N/A 1.69 6.38
2018 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1 25.16
MR1 14.30 5.72 1.36 N/A 1.69 6.39
2019 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1 25.56
MR1 14.31 5.72 1.36 N/A 1.71 6.42
2020 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1 25.51
MR1 14.34 5.72 1.37 N/A 1.71 6.43
2021 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+1 21.41
MR1 15.44 5.72 1.43 N/A 1.80 7.19
2022 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+1 21.08
MR1 15.47 5.72 1.43 N/A 1.80 7.20
2023 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+1 20.29
MR1 13.44 5.72 1.42 N/A 1.78 6.14
a te

2024 1 DL1+1.0
N/a LL1+1 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+1 20.26
MR1 13.46 5.72 1.42 N/A 1.78 6.15
2025 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+117.74
MR1 13.74 5.72 1.35 N/A 1.71 6.16
2026 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+117.72
MR1 13.76 5.72 1.35 N/A 1.72 6.18
2027 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+117.92
MR1 13.77 5.72 1.35 N/A 1.74 6.20
2028 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+117.89
MR1 13.79 5.72 1.36 N/A 1.74 6.22
2029 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+120.67
MR1 14.82 5.72 1.42 N/A 1.83 6.92
2030 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+120.36
MR1 14.84 5.72 1.42 N/A 1.83 6.93
2031 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+115.16
MR1 12.97 5.72 1.41 N/A 1.81 5.94
2032 1 DL1+0.7
N/a LL1+1 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+115.14
MR1 12.99 5.72 1.41 N/A 1.81 5.95
2033 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a 18.55 18.64 5.72 1.36 N/A 1.68 7.74
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
FOUNDATION FOR PEDESTAL (P15) (P18)-(Pile Capacity Check)

Ed
LOAD CASE: 526 1 DL1+1.0
526 LL1+1
1 DL1+0.75
EQUIP1+0.525
LL1+1 EQUIP1+0.525
SL1 SL1

GENERAL PILECAP DIMENSIONS, POSITION


Concrete Density 2.5 ton/m3 Pilecap thickness 2.500 m
Soil Density 2 ton/m3 Z cordinate of center of the pilecap -3.000 m
Grade of Concrete (Cylinder) C 30 X cordinate of center of the pilecap 22.500 m
Grade of Steel Fe 500 Length along axis Z, L z 5.820 m
Level of Base of pilecap -5.1 m Length along axis X, L x 14.940 m

F
Finished Ground level 0 m Area of base of pilecap, A 86.95 m2
Level of max water table -5.1 m

PD
PEDESTAL (COLUMN) DIMENSIONS, POSITIONS & LOADS
C.G. of Pedestal Ped top P + W ped
Pedestal ID Lz-z (m) Lx-x (m) P (T) Hz (T) Mx (T-m) Hx (T) Mz (T-m)
Z X [Level of (T)
P15 1.600 1.600 -3.000 18.250 -5.100 1077.60 -10.86 -41.12 -46.71 285.21 1077.60
P18 1.600 1.600 -3.000 26.750 -5.100 1098.34 -12.46 -49.22 -36.72 211.71 1098.34

PILE DETAILS
Number of Piles 21 CGz of Pile group -3 m
Diameter of Piles 760 mm CGx of Pile group 22.5 m
2
Compressive capacity of piles 192 T SUM[(Xi-Xcg)2] of Pile group 436.666 m
te r
2
Tensile capacity of piles 40 T SUM[(Zi-Zcg)2] of Pile group 72.778 m
Shear capacity of piles 11.5 T

Weight of soil, W soil 886.90 T


Weight of footing, W f ooting 108.69 T
Axial load due to [P+ W ped] 2175.94 T
as

Total axial Load 3171.53 T

Mz due to [Mz+(P+W ped)*ex ] 585.06 Ton-m Mx due to [Mx+(P+W ped)*ez] -90.34 Ton-m
Eccentricity between Pilecap and Pile group 0.00 mm Eccentricity between Pilecap and Pile group 0.00 mm
Mz due to pilecap and pile group eccentricity 0.00 Ton-m Mx due to pilecap and pile group eccentricity 0.00 Ton-m
Total Mz 585.06 Ton-m Total Mx -90.34 Ton-m
nM

Distance Distance P due to


from pile from pile Axial P due to P due to
Pile ID CGx CGz group CGx group CGz Load (T) Mx (T) Mz (T) Total P (T) Shear (T)
PCG-4-1 15.66 -5.28 -6.84 -2.28 151.03 2.83 -9.16 144.69 4.12
PCG-4-2 15.66 -3.00 -6.84 0.00 151.03 0.00 -9.16 141.86 4.12
PCG-4-3 15.66 -0.72 -6.84 2.28 151.03 -2.83 -9.16 139.03 4.12
PCG-4-4 17.94 -5.28 -4.56 -2.28 151.03 2.83 -6.11 147.75 4.12
PCG-4-5 17.94 -3.00 -4.56 0.00 151.03 0.00 -6.11 144.92 4.12
di

PCG-4-6 17.94 -0.72 -4.56 2.28 151.03 -2.83 -6.11 142.09 4.12
PCG-4-7 20.22 -5.28 -2.28 -2.28 151.03 2.83 -3.05 150.80 4.12
PCG-4-8 20.22 -3.00 -2.28 0.00 151.03 0.00 -3.05 147.97 4.12
PCG-4-9 20.22 -0.72 -2.28 2.28 151.03 -2.83 -3.05 145.14 4.12
PCG-4-10 22.50 -5.28 0.00 -2.28 151.03 2.83 0.00 153.86 4.12
PCG-4-11 22.50 -3.00 0.00 0.00 151.03 0.00 0.00 151.03 4.12
PCG-4-12 22.50 -0.72 0.00 2.28 151.03 -2.83 0.00 148.19 4.12
a te

PCG-4-13 24.78 -5.28 2.28 -2.28 151.03 2.83 3.05 156.91 4.12
PCG-4-14 24.78 -3.00 2.28 0.00 151.03 0.00 3.05 154.08 4.12
PCG-4-15 24.78 -0.72 2.28 2.28 151.03 -2.83 3.05 151.25 4.12
PCG-4-16 27.06 -5.28 4.56 -2.28 151.03 2.83 6.11 159.97 4.12
PCG-4-17 27.06 -3.00 4.56 0.00 151.03 0.00 6.11 157.13 4.12
PCG-4-18 27.06 -0.72 4.56 2.28 151.03 -2.83 6.11 154.30 4.12
PCG-4-19 29.34 -5.28 6.84 -2.28 151.03 2.83 9.16 163.02 4.12
PCG-4-20 29.34 -3.00 6.84 0.00 151.03 0.00 9.16 160.19 4.12
re

PCG-4-21 29.34 -0.72 6.84 2.28 151.03 -2.83 9.16 157.36 4.12
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
F AC TOR OF SAF ETY F OR ALL LOAD C ASES ( Per mis s ible/ Ac tual)

Pile Reaction ALONG Z-Z ALONG X-X


Compressi pt at Shear pt at Shear

Ed
Load case pt at top pt at top Punching
on Tension Shear bottom stress bottom stress
500 1 DL1+1 LL1+11.31
EQUIP1
N/a 10.93 N/A N/A N/A N/A N/A N/A N/A
501 1 DL1+1 LL1+11.33
EQUIP1+1
N/a TEMP1 32.02 N/A N/A N/A N/A N/A N/A N/A
502 1 DL1+1 WL1 2.07 N/a 3.15 N/A N/A N/A N/A N/A N/A N/A
503 1 DL1+1 WL2 2.06 N/a 3.14 N/A N/A N/A N/A N/A N/A N/A
504 1 DL1+1 WL3 2.10 N/a 3.35 N/A N/A N/A N/A N/A N/A N/A
505 1 DL1+1 WL4 2.09 N/a 3.39 N/A N/A N/A N/A N/A N/A N/A
506 1 DL1+1 WL5 2.15 N/a 6.49 N/A N/A N/A N/A N/A N/A N/A
507 1 DL1+1 WL6 2.13 N/a 7.18 N/A N/A N/A N/A N/A N/A N/A
508 1 DL1+1 WL7 2.16 N/a 5.36 N/A N/A N/A N/A N/A N/A N/A

F
509 1 DL1+1 WL8 2.11 N/a 4.97 N/A N/A N/A N/A N/A N/A N/A
510 1 DL1+0.7 WL12.16 N/a 4.44 N/A N/A N/A N/A N/A N/A N/A
511 1 DL1+0.7 WL22.15 N/a 4.43 N/A N/A N/A N/A N/A N/A N/A
512 1 DL1+0.7 WL32.19 N/a 4.87 N/A N/A N/A N/A N/A N/A N/A

PD
513 1 DL1+0.7 WL42.18 N/a 4.92 N/A N/A N/A N/A N/A N/A N/A
514 1 DL1+0.7 WL52.22 N/a 9.88 N/A N/A N/A N/A N/A N/A N/A
515 1 DL1+0.7 WL62.21 N/a 11.00 N/A N/A N/A N/A N/A N/A N/A
516 1 DL1+0.7 WL72.22 N/a 7.28 N/A N/A N/A N/A N/A N/A N/A
517 1 DL1+0.7 WL82.19 N/a 6.77 N/A N/A N/A N/A N/A N/A N/A
518 1 DL1+ 1LL1+0.75
1.26WL1+1
N/a EQUIP1 3.71 N/A N/A N/A N/A N/A N/A N/A
519 1 DL1+1.0 LL1+0.75
1.24 N/a
WL2+1 EQUIP1 3.67 N/A N/A N/A N/A N/A N/A N/A
520 1 DL1+1.0 LL1+0.75
1.27 N/a
WL3+1 EQUIP1 4.97 N/A N/A N/A N/A N/A N/A N/A
521 1 DL1+1.0 LL1+0.75
1.26 N/a
WL4+1 EQUIP1 4.95 N/A N/A N/A N/A N/A N/A N/A
522 1 DL1+1.0 LL1+0.75
1.29 N/a
WL5+1 EQUIP1 19.14 N/A N/A N/A N/A N/A N/A N/A
523 1 DL1+1.0 LL1+0.75
1.29 N/a
WL6+1 EQUIP1 23.31 N/A N/A N/A N/A N/A N/A N/A
te r
524 1 DL1+1.0 LL1+0.75
1.26 N/a
WL7+1 EQUIP1 4.73 N/A N/A N/A N/A N/A N/A N/A
525 1 DL1+1.0 LL1+0.75
1.25 N/a
WL8+1 EQUIP1 4.50 N/A N/A N/A N/A N/A N/A N/A
526 1 DL1+1.0 LL1+11.18
EQUIP1+0.525
N/a SL1 2.79 N/A N/A N/A N/A N/A N/A N/A
527 1 DL1+1.0 LL1+11.28
EQUIP1+0.525
N/a SL2 9.26 N/A N/A N/A N/A N/A N/A N/A
528 0.6 DL1+1 WL12.41 N/a 3.18 N/A N/A N/A N/A N/A N/A N/A
529 0.6 DL1+1 WL22.39 N/a 3.18 N/A N/A N/A N/A N/A N/A N/A
530 0.6 DL1+1 WL32.45 N/a 3.29 N/A N/A N/A N/A N/A N/A N/A
531 0.6 DL1+1 WL42.43 N/a 3.34 N/A N/A N/A N/A N/A N/A N/A
as

532 0.6 DL1+1 WL52.52 N/a 6.14 N/A N/A N/A N/A N/A N/A N/A
533 0.6 DL1+1 WL62.49 N/a 6.75 N/A N/A N/A N/A N/A N/A N/A
534 0.6 DL1+1 WL72.53 N/a 5.63 N/A N/A N/A N/A N/A N/A N/A
535 0.6 DL1+1 WL82.47 N/a 5.20 N/A N/A N/A N/A N/A N/A N/A
536 0.6 DL1+0.7 SL12.15 N/a 2.00 N/A N/A N/A N/A N/A N/A N/A
537 0.6 DL1+0.7 SL22.68 N/a 15.95 N/A N/A N/A N/A N/A N/A N/A
1001 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1 N/A N/A N/A N/A N/A N/A N/A
nM

1002 1.35 DL1+1.5


N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1N/A N/A N/A N/A N/A N/A N/A
1003 1.35 DL1+1.5
N/a WL1+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1004 1.35 DL1+1.5
N/a WL2+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1005 1.35 DL1+1.5
N/a WL3+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1006 1.35 DL1+1.5
N/a WL4+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1007 1.35 DL1+1.5
N/a WL5+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1008 1.35 DL1+1.5
N/a WL6+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1009 1.35 DL1+1.5
N/a WL7+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1010 1.35 DL1+1.5
N/a WL8+0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1011 1.35 DL1+1.5
N/a WL1+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1012 1.35 DL1+1.5
N/a WL2+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
di

1013 1.35 DL1+1.5


N/a WL3+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1014 1.35 DL1+1.5
N/a WL4+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1015 1.35 DL1+1.5
N/a WL5+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1016 1.35 DL1+1.5
N/a WL6+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1017 1.35 DL1+1.5
N/a WL7+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1018 1.35 DL1+1.5
N/a WL8+-0.9
N/a TEMP1 N/a N/A N/A N/A N/A N/A N/A N/A
1019 1.35 DL1+0.9
N/a TEMP1+1.35
N/a MR1
N/a N/A N/A N/A N/A N/A N/A N/A
a te

1020 1.35 DL1+-0.9


N/a TEMP1+1.35
N/a MR1
N/a N/A N/A N/A N/A N/A N/A N/A
1021 1.35 DL1+1.5LL1+1.5
N/a N/aEQUIP1+0.9
N/a TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A N/A
1022 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1023 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1024 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A N/A
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a
EQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1028 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1029 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

Ed
1030 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1031 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1032 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+0.9
N/ATEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1033 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1034 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1035 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1036 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1037 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1038 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1039 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1040 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1041 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

F
1042 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1043 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1044 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1045 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1046 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A

PD
1047 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1048 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1049 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1050 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1051 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1052 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1053 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1054 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1055 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1056 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1057 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1058 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1059 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1060 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
te r
1061 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1062 1.148 DL1+1.5
N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1063 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1064 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+0.9
N/A TEMP1+1.35
N/A MR1N/A N/A N/A N/A N/A
1065 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1066 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1067 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1068 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1069 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
as

1070 1.148 DL1+1.5


N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1071 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1072 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+-0.9
N/A TEMP1+1.35
N/A MR1
N/A N/A N/A N/A N/A
1073 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1074 1 DL1+0.8
N/a LL1+1 SL2
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1075 1 DL1+0.8
N/a LL1+-1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
1076 1 DL1+0.8
N/a LL1+-1 SL2
N/a N/a N/A N/A N/A N/A N/A N/A N/A
2001 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
nM

2002 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2003 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2004 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2005 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2006 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2007 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2008 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2009 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2010 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2011 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2012 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2013 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2014 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2015 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
di

2016 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2017 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2018 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2019 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2020 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2021 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2022 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2023 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
a te

2024 1 DL1+1.0
N/a LL1+1 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+1
N/A MR1N/A N/A N/A N/A N/A N/A
2025 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2026 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2027 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2028 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2029 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2030 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2031 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2032 1 DL1+0.7
N/a LL1+1 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1
N/A MR1
N/A N/A N/A N/A N/A N/A
2033 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
FOUNDATION FOR PEDESTAL (P15) (P18)-(Pilecap Design)

Ed
LOAD CASE: 1034 1.35 DL1+1.5
1034 1.35
LL1+0.9
DL1+1.05
WL2+1.5
LL1+0.9
EQUIP1+-0.9
WL2+1.05 EQUIP1+-0.9
TEMP1+1.35 TEMP1+1.35
MR1 MR1

GENERAL PILECAP DIMENSIONS, POSITION


Concrete Density 2.5 ton/m3 Pilecap thickness 2.500 m
Soil Density 2 ton/m3 Z cordinate of center of the pilecap -3.000 m
Grade of Concrete (Cylinder) C 30 X cordinate of center of the pilecap 22.500 m
Grade of Steel Fe 500 Length along axis Z, L z 5.820 m
Level of Base of pilecap -5.1 m Length along axis X, L x 14.940 m

F
Finished Ground level 0 m Area of base of pilecap, A 86.95 m2
Level of max water table -5.1 m

PD
PEDESTAL (COLUMN) DIMENSIONS, POSITIONS & LOADS
C.G. of Pedestal Ped top P + W ped
Pedestal ID Lz-z (m) Lx-x (m) P (T) Hz (T) Mx (T-m) Hx (T) Mz (T-m)
Z X [Level of (T)
P15 1.600 1.600 -3.000 18.250 -5.100 1427.07 -22.43 -84.08 49.65 242.60 1427.07
P18 1.600 1.600 -3.000 26.750 -5.100 1515.48 -23.37 -90.23 31.31 156.13 1515.48

PILE DETAILS
Number of Piles 21 CGz of Pile group -3 m
Diameter of Piles 760 mm CGx of Pile group 22.5 m
2
Compressive capacity of piles 192 T SUM[(Xi-Xcg)2] of Pile group 436.666 m
te r
2
Tensile capacity of piles 40 T SUM[(Zi-Zcg)2] of Pile group 72.778 m
Shear capacity of piles 11.5 T

Weight of soil, W soil 1197.31 T


Weight of footing, W f ooting 146.73 T
Axial load due to [P+ W ped] 2942.56 T
as

Total axial Load 4286.60 T

Mz due to [Mz+(P+W ped)*ex ] 774.49 Ton-m Mx due to [Mx+(P+W ped)*ez] -174.31 Ton-m
Eccentricity between Pilecap and Pile group 0.00 mm Eccentricity between Pilecap and Pile group 0.00 mm
Mz due to pilecap and pile group eccentricity 0.00 Ton-m Mx due to pilecap and pile group eccentricity 0.00 Ton-m
Total Mz 774.49 Ton-m Total Mx -174.31 Ton-m
nM

Distance Distance P due to


from pile from pile Axial P due to P due to
Pile ID CGx CGz group CGx group CGz Load (T) Mx (T) Mz (T) Total P (T) Shear (T)
PCG-4-1 15.66 -5.28 -6.84 -2.28 204.12 5.46 -12.13 197.45 4.43
PCG-4-2 15.66 -3.00 -6.84 0.00 204.12 0.00 -12.13 191.99 4.43
PCG-4-3 15.66 -0.72 -6.84 2.28 204.12 -5.46 -12.13 186.53 4.43
PCG-4-4 17.94 -5.28 -4.56 -2.28 204.12 5.46 -8.09 201.50 4.43
PCG-4-5 17.94 -3.00 -4.56 0.00 204.12 0.00 -8.09 196.04 4.43
di

PCG-4-6 17.94 -0.72 -4.56 2.28 204.12 -5.46 -8.09 190.58 4.43
PCG-4-7 20.22 -5.28 -2.28 -2.28 204.12 5.46 -4.04 205.54 4.43
PCG-4-8 20.22 -3.00 -2.28 0.00 204.12 0.00 -4.04 200.08 4.43
PCG-4-9 20.22 -0.72 -2.28 2.28 204.12 -5.46 -4.04 194.62 4.43
PCG-4-10 22.50 -5.28 0.00 -2.28 204.12 5.46 0.00 209.58 4.43
PCG-4-11 22.50 -3.00 0.00 0.00 204.12 0.00 0.00 204.12 4.43
PCG-4-12 22.50 -0.72 0.00 2.28 204.12 -5.46 0.00 198.66 4.43
a te

PCG-4-13 24.78 -5.28 2.28 -2.28 204.12 5.46 4.04 213.63 4.43
PCG-4-14 24.78 -3.00 2.28 0.00 204.12 0.00 4.04 208.17 4.43
PCG-4-15 24.78 -0.72 2.28 2.28 204.12 -5.46 4.04 202.71 4.43
PCG-4-16 27.06 -5.28 4.56 -2.28 204.12 5.46 8.09 217.67 4.43
PCG-4-17 27.06 -3.00 4.56 0.00 204.12 0.00 8.09 212.21 4.43
PCG-4-18 27.06 -0.72 4.56 2.28 204.12 -5.46 8.09 206.75 4.43
PCG-4-19 29.34 -5.28 6.84 -2.28 204.12 5.46 12.13 221.72 4.43
PCG-4-20 29.34 -3.00 6.84 0.00 204.12 0.00 12.13 216.26 4.43
re

PCG-4-21 29.34 -0.72 6.84 2.28 204.12 -5.46 12.13 210.79 4.43
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
Load factor for Limit State design 1 Along Axis -----> Z-Z X-X
Ultimate sagging(+)
Moment,Mup(Tm/width) 111.10 166.80
Along Axis -----> Z-Z X-X Effective Depth (for + M), d (m) 2.3415 2.3415

Ed
Ultimate Shear force (In sagging zone)(T/width) 74.29 95.77 Mup/bd2 (N/mm2) 0.20 0.30
Nominal shear stress (N/mm 2) 0.32 0.41 Tensile steel required at bottom (%) 0.05 0.07
Max allowable shear stress (N/mm 2) 0.28 0.28 Provide bars of dia (mm) 39 39
Ultimate Shear force (In hogging zone)(T) 10.73 51.52 at c/c distance (mm) 250 250
Nominal shear stress (N/mm 2) 0.05 0.22 Tensile steel provided at bottom (%) 0.2 0.2
Max allowable shear stress (N/mm 2) 0.28 0.28 Ultimate hogging(-)
Stirrup Diameter (mm) 10 Moment,Mun(Tm/meter width) 0.00 -48.94
Stirrup spacing (N/mm 2) 250 250 Mun/bd2 (N/mm2) 0.00 0.09

F
Stress in stirrup (N/mm 2) 112.25 144.72 Tensile steel required at top (%) 0.00 0.02
Total Stirrup stress (N/mm 2) 256.98 Provide bars of dia (mm) 39 39
Permissible Stirrup stress (N/mm 2) 434.78 at c/c distance (mm) 250 250

PD
Tensile steel provided at top (%) 0.2 0.2
Effective Depth (for - M), d (m) 2.342 2.342
P UNCH ING SH EAR FO R P EDESTALS
Pedestal ID Ultimate Design Area for resisting Punching Shear Allowable punching
P15 1030.96 Ton 36.92 m2 0.28 N/mm2 1.37 N/mm2
P18 1095.10 Ton 36.92 m2 0.30 N/mm2 1.37 N/mm2
te r
as
nM
di
a te
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
F AC TOR OF SAF ETY F OR ALL LOAD C ASES ( Per mis s ible/ Ac tual)

Pile Reaction ALONG Z-Z ALONG X-X


Compressi pt at Shear pt at Shear

Ed
Load case pt at top pt at top Punching
on Tension Shear bottom stress bottom stress
500 1 DL1+1N/a
LL1+1 EQUIP1
N/a N/a N/A N/A N/A N/A N/A N/A N/A
501 1 DL1+1N/a
LL1+1 EQUIP1+1
N/a TEMP1
N/a N/A N/A N/A N/A N/A N/A N/A
502 1 DL1+1N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
503 1 DL1+1N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
504 1 DL1+1N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A
505 1 DL1+1N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
506 1 DL1+1N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
507 1 DL1+1N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
508 1 DL1+1N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A

F
509 1 DL1+1N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
510 1 DL1+0.7
N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
511 1 DL1+0.7
N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
512 1 DL1+0.7
N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A

PD
513 1 DL1+0.7
N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
514 1 DL1+0.7
N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
515 1 DL1+0.7
N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
516 1 DL1+0.7
N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A
517 1 DL1+0.7
N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
518 1 DL1+ 1LL1+0.75
N/a WL1+1
N/a EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
519 1 DL1+1.0
N/a
LL1+0.75 N/a
WL2+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
520 1 DL1+1.0
N/a
LL1+0.75 N/a
WL3+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
521 1 DL1+1.0
N/a
LL1+0.75 N/a
WL4+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
522 1 DL1+1.0
N/a
LL1+0.75 N/a
WL5+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
523 1 DL1+1.0
N/a
LL1+0.75 N/a
WL6+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
te r
524 1 DL1+1.0
N/a
LL1+0.75 N/a
WL7+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
525 1 DL1+1.0
N/a
LL1+0.75 N/a
WL8+1 EQUIP1
N/a N/A N/A N/A N/A N/A N/A N/A
526 1 DL1+1.0
N/a
LL1+1 EQUIP1+0.525
N/a N/a
SL1 N/A N/A N/A N/A N/A N/A N/A
527 1 DL1+1.0
N/a
LL1+1 EQUIP1+0.525
N/a N/a
SL2 N/A N/A N/A N/A N/A N/A N/A
528 0.6 DL1+1
N/a
WL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
529 0.6 DL1+1
N/a
WL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
530 0.6 DL1+1
N/a
WL3 N/a N/a N/A N/A N/A N/A N/A N/A N/A
531 0.6 DL1+1
N/a
WL4 N/a N/a N/A N/A N/A N/A N/A N/A N/A
as

532 0.6 DL1+1


N/a
WL5 N/a N/a N/A N/A N/A N/A N/A N/A N/A
533 0.6 DL1+1
N/a
WL6 N/a N/a N/A N/A N/A N/A N/A N/A N/A
534 0.6 DL1+1
N/a
WL7 N/a N/a N/A N/A N/A N/A N/A N/A N/A
535 0.6 DL1+1
N/a
WL8 N/a N/a N/A N/A N/A N/A N/A N/A N/A
536 0.6 DL1+0.7
N/a SL1 N/a N/a N/A N/A N/A N/A N/A N/A N/A
537 0.6 DL1+0.7
N/a SL2 N/a N/a N/A N/A N/A N/A N/A N/A N/A
1001 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1 4.42 N/A 1.78 3.24 8.22 1.78 4.75
nM

1002 1.35 DL1+1.5


N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1 4.24 N/A 1.75 3.10 8.93 1.75 4.72
1003 1.35 DL1+1.5
N/a WL1+0.9
N/a TEMP1 N/a 11.61 N/A 3.61 6.05 N/A 3.61 18.26
1004 1.35 DL1+1.5
N/a WL2+0.9
N/a TEMP1 N/a 11.42 N/A 3.55 5.88 N/A 3.55 17.28
1005 1.35 DL1+1.5
N/a WL3+0.9
N/a TEMP1 N/a 12.17 N/A 3.73 7.12 N/A 3.73 19.96
1006 1.35 DL1+1.5
N/a WL4+0.9
N/a TEMP1 N/a 11.96 N/A 3.67 6.93 N/A 3.67 18.70
1007 1.35 DL1+1.5
N/a WL5+0.9
N/a TEMP1 N/a 10.40 N/A 3.79 7.57 N/A 3.79 19.77
1008 1.35 DL1+1.5
N/a WL6+0.9
N/a TEMP1 N/a 10.25 N/A 3.71 7.30 N/A 3.71 18.48
1009 1.35 DL1+1.5
N/a WL7+0.9
N/a TEMP1 N/a 11.76 N/A 3.94 7.74 N/A 3.94 20.08
1010 1.35 DL1+1.5
N/a WL8+0.9
N/a TEMP1 N/a 11.20 N/A 3.83 7.51 N/A 3.83 18.90
1011 1.35 DL1+1.5
N/a WL1+-0.9
N/a TEMP1 N/a 12.63 N/A 3.69 5.59 N/A 3.69 18.32
1012 1.35 DL1+1.5
N/a WL2+-0.9
N/a TEMP1 N/a 11.98 N/A 3.59 5.45 N/A 3.59 17.33
di

1013 1.35 DL1+1.5


N/a WL3+-0.9
N/a TEMP1 N/a 13.54 N/A 3.83 7.05 N/A 3.83 19.41
1014 1.35 DL1+1.5
N/a WL4+-0.9
N/a TEMP1 N/a 12.83 N/A 3.72 6.86 N/A 3.72 18.22
1015 1.35 DL1+1.5
N/a WL5+-0.9
N/a TEMP1 N/a 11.39 N/A 3.89 6.87 N/A 3.89 19.24
1016 1.35 DL1+1.5
N/a WL6+-0.9
N/a TEMP1 N/a 11.20 N/A 3.81 6.65 N/A 3.81 18.01
1017 1.35 DL1+1.5
N/a WL7+-0.9
N/a TEMP1 N/a 10.59 N/A 3.80 7.29 N/A 3.80 20.16
1018 1.35 DL1+1.5
N/a WL8+-0.9
N/a TEMP1 N/a 10.13 N/A 3.69 7.09 N/A 3.69 18.97
1019 1.35 DL1+0.9
N/a TEMP1+1.35
N/a MR1
N/a 11.02 N/A 3.92 7.70 N/A 3.92 19.56
a te

1020 1.35 DL1+-0.9


N/a TEMP1+1.35
N/a MR1
N/a 10.79 N/A 3.86 6.97 N/A 3.86 19.03
1021 1.35 DL1+1.5LL1+1.5
N/a N/aEQUIP1+0.9
N/a TEMP1+1.35 4.37
MR1N/A 1.77 3.20 8.09 1.77 4.68
1022 1.35 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.35 4.20
MR1N/A 1.73 3.06 8.78 1.73 4.65
1023 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+0.9
N/a TEMP1+1.35 4.56
MR1N/A 1.84 3.33 8.63 1.84 4.94
1024 1.148 DL1+1.5
N/a LL1+1.5
N/a EQUIP1+-0.9
N/a TEMP1+1.354.37
MR1
N/A 1.80 3.19 9.42 1.80 4.90
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
4.44 N/A MR1 1.73 2.97 8.97 1.73 4.65
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
4.43 N/A MR1 1.72 2.95 8.89 1.72 4.61
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a
EQUIP1+0.9 TEMP1+1.35
4.49 N/A MR1 1.74 3.11 7.88 1.74 4.66
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

i to
1025 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+0.9 TEMP1+1.35
4.44 N/A MR1 1.73 2.97 8.97 1.73 4.65
1026 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+0.9 TEMP1+1.35
4.43 N/A MR1 1.72 2.95 8.89 1.72 4.61
1027 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+0.9 TEMP1+1.35
4.49 N/A MR1 1.74 3.11 7.88 1.74 4.66
1028 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+0.9 TEMP1+1.35
4.47 N/A MR1 1.74 3.09 7.82 1.74 4.61
1029 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+0.9 TEMP1+1.35
4.33 N/A MR1 1.75 3.16 8.31 1.75 4.65

Ed
1030 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+0.9 TEMP1+1.35
4.31 N/A MR1 1.74 3.13 8.24 1.74 4.60
1031 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+0.9 TEMP1+1.35
4.32 N/A MR1 1.75 3.26 8.25 1.75 4.72
1032 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+0.9 TEMP1+1.35
4.27 N/A MR1 1.73 3.24 8.18 1.73 4.68
1033 1.35 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
4.32 N/A MR1 1.71 2.86 9.81 1.71 4.66
1034 1.35 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
4.27 N/A MR1 1.69 2.83 9.72 1.69 4.62
1035 1.35 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
4.38 N/A MR1 1.72 3.10 8.53 1.72 4.63
1036 1.35 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
4.33 N/A MR1 1.70 3.08 8.46 1.70 4.58
1037 1.35 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
4.45 N/A MR1 1.76 3.03 9.03 1.76 4.62
1038 1.35 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
4.40 N/A MR1 1.75 3.00 8.95 1.75 4.57
1039 1.35 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
4.15 N/A MR1 1.72 3.22 8.96 1.72 4.72
1040 1.35 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/aEQUIP1+-0.9 TEMP1+1.35
4.11 N/A MR1 1.71 3.20 8.89 1.71 4.68
1041 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.64 N/A MR1 1.80 3.09 9.63 1.80 4.90

F
1042 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.62 N/A MR1 1.79 3.06 9.54 1.79 4.86
1043 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.69 N/A MR1 1.81 3.24 8.39 1.81 4.91
1044 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.67 N/A MR1 1.80 3.22 8.32 1.80 4.86
1045 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.52 N/A MR1 1.82 3.29 8.88 1.82 4.90
1046 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.50 N/A MR1 1.81 3.26 8.80 1.81 4.85

PD
1047 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.51 N/A MR1 1.81 3.40 8.81 1.81 4.98
1048 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.46 N/A MR1 1.80 3.38 8.73 1.80 4.93
1049 1.148 DL1+1.5
N/a LL1+0.9
N/a WL1+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.50 N/A MR1 1.77 2.96 10.62 1.77 4.91
1050 1.148 DL1+1.5
N/a LL1+0.9
N/a WL2+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.45 N/A MR1 1.76 2.94 10.51 1.76 4.86
1051 1.148 DL1+1.5
N/a LL1+0.9
N/a WL3+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.57 N/A MR1 1.78 3.23 9.13 1.78 4.88
1052 1.148 DL1+1.5
N/a LL1+0.9
N/a WL4+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.52 N/A MR1 1.77 3.21 9.05 1.77 4.83
1053 1.148 DL1+1.5
N/a LL1+0.9
N/a WL5+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.65 N/A MR1 1.83 3.15 9.71 1.83 4.87
1054 1.148 DL1+1.5
N/a LL1+0.9
N/a WL6+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.59 N/A MR1 1.81 3.12 9.62 1.81 4.82
1055 1.148 DL1+1.5
N/a LL1+0.9
N/a WL7+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.33 N/A MR1 1.78 3.35 9.63 1.78 4.98
1056 1.148 DL1+1.5
N/a LL1+0.9
N/a WL8+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.28 N/A MR1 1.77 3.33 9.54 1.77 4.93
1057 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.66 N/A MR1 1.76 2.95 10.42 1.76 4.84
1058 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.63 N/A MR1 1.75 2.90 10.25 1.75 4.77
1059 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.75 N/A MR1 1.79 3.13 8.22 1.79 4.89
1060 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.72 N/A MR1 1.77 3.10 8.12 1.77 4.81
te r
1061 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.45 N/A MR1 1.80 3.27 9.05 1.80 4.88
1062 1.148 DL1+1.5
N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.42 N/A MR1 1.78 3.22 8.92 1.78 4.80
1063 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.48 N/A MR1 1.80 3.37 8.93 1.80 4.96
1064 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+0.9 TEMP1+1.35
4.39 N/A MR1 1.78 3.33 8.80 1.78 4.88
1065 1.148 DL1+1.5
N/a LL1+1.5
N/a WL1+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.60 N/A MR1 1.75 2.83 11.58 1.75 4.84
1066 1.148 DL1+1.5
N/a LL1+1.5
N/a WL2+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.51 N/A MR1 1.72 2.79 11.37 1.72 4.77
1067 1.148 DL1+1.5
N/a LL1+1.5
N/a WL3+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.72 N/A MR1 1.77 3.12 8.93 1.77 4.86
1068 1.148 DL1+1.5
N/a LL1+1.5
N/a WL4+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.62 N/A MR1 1.75 3.08 8.81 1.75 4.78
1069 1.148 DL1+1.5
N/a LL1+1.5
N/a WL5+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.63 N/A MR1 1.82 3.13 9.92 1.82 4.85
as

1070 1.148 DL1+1.5


N/a LL1+1.5
N/a WL6+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.59 N/A MR1 1.80 3.08 9.76 1.80 4.76
1071 1.148 DL1+1.5
N/a LL1+1.5
N/a WL7+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.29 N/A MR1 1.77 3.33 9.78 1.77 4.96
1072 1.148 DL1+1.5
N/a LL1+1.5
N/a WL8+1.5
N/a EQUIP1+-0.9 TEMP1+1.35
4.22 N/A MR1 1.75 3.29 9.62 1.75 4.89
1073 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a 6.06 N/A 2.20 2.90 22.43 2.20 7.18
1074 1 DL1+0.8
N/a LL1+1 SL2
N/a N/a 6.62 N/A 2.54 4.44 19.19 2.54 8.23
1075 1 DL1+0.8
N/a LL1+-1 SL1
N/a N/a 8.12 N/A 2.76 4.19 16.80 2.76 10.52
1076 1 DL1+0.8
N/a LL1+-1 SL2
N/a N/a 7.18 N/A 2.72 4.97 20.93 2.72 9.11
2001 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+16.19
MR1N/A 2.32 4.05 16.14 2.32 7.12
nM

2002 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+16.17
MR1N/A 2.31 4.02 15.97 2.31 7.06
2003 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+16.25
MR1N/A 2.34 4.35 13.84 2.34 7.12
2004 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+16.23
MR1N/A 2.33 4.32 13.73 2.33 7.05
2005 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+16.04
MR1N/A 2.35 4.28 14.74 2.35 7.11
2006 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+16.02
MR1N/A 2.33 4.25 14.60 2.33 7.04
2007 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+16.02
MR1N/A 2.34 4.47 14.62 2.34 7.22
2008 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+15.96
MR1N/A 2.32 4.44 14.48 2.32 7.16
2009 1 DL1+1N/a
LL1+0.6 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1 6.02
MR1N/A 2.29 3.91 18.00 2.29 7.12
2010 1 DL1+1N/a
LL1+0.6 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1 5.96
MR1N/A 2.27 3.88 17.79 2.27 7.06
2011 1 DL1+1N/a
LL1+0.6 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1 6.10
MR1N/A 2.31 4.33 15.20 2.31 7.07
2012 1 DL1+1N/a
LL1+0.6 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1 6.03
MR1N/A 2.29 4.30 15.06 2.29 7.01
2013 1 DL1+1N/a
LL1+0.6 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1 6.19
MR1N/A 2.36 4.12 16.28 2.36 7.06
2014 1 DL1+1N/a
LL1+0.6 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1 6.12
MR1N/A 2.34 4.09 16.11 2.34 6.99
2015 1 DL1+1N/a
LL1+0.6 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1 5.80
MR1N/A 2.31 4.37 16.13 2.31 7.23
di

2016 1 DL1+1N/a
LL1+0.6 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1 5.75
MR1N/A 2.29 4.34 15.96 2.29 7.16
2017 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+0.6
N/a TEMP1+16.21
MR1N/A 2.28 3.89 17.64 2.28 7.03
2018 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+0.6
N/a TEMP1+16.17
MR1N/A 2.27 3.84 17.31 2.27 6.93
2019 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+0.6
N/a TEMP1+16.32
MR1N/A 2.31 4.22 13.55 2.31 7.09
2020 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+0.6
N/a TEMP1+16.28
MR1N/A 2.29 4.17 13.36 2.29 6.98
2021 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+0.6
N/a TEMP1+15.96
MR1N/A 2.32 4.25 15.06 2.32 7.08
2022 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+0.6
N/a TEMP1+15.93
MR1N/A 2.31 4.20 14.81 2.31 6.96
2023 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+0.6
N/a TEMP1+15.98
MR1N/A 2.32 4.45 14.84 2.32 7.20
a te

2024 1 DL1+1.0
N/a LL1+1 WL8+1
N/a EQUIP1+0.6
N/a TEMP1+15.88
MR1N/A 2.30 4.40 14.61 2.30 7.09
2025 1 DL1+1.0
N/a LL1+1 WL1+1
N/a EQUIP1+-0.6
N/a TEMP1+1 6.12
MR1N/A 2.26 3.75 19.89 2.26 7.04
2026 1 DL1+1.0
N/a LL1+1 WL2+1
N/a EQUIP1+-0.6
N/a TEMP1+1 6.02
MR1N/A 2.24 3.71 19.46 2.24 6.94
2027 1 DL1+1.0
N/a LL1+1 WL3+1
N/a EQUIP1+-0.6
N/a TEMP1+1 6.27
MR1N/A 2.29 4.20 14.85 2.29 7.05
2028 1 DL1+1.0
N/a LL1+1 WL4+1
N/a EQUIP1+-0.6
N/a TEMP1+1 6.16
MR1N/A 2.27 4.16 14.62 2.27 6.94
2029 1 DL1+1.0
N/a LL1+1 WL5+1
N/a EQUIP1+-0.6
N/a TEMP1+1 6.17
MR1N/A 2.35 4.10 16.67 2.35 7.03
2030 1 DL1+1.0
N/a LL1+1 WL6+1
N/a EQUIP1+-0.6
N/a TEMP1+1 6.13
MR1N/A 2.33 4.04 16.37 2.33 6.91
2031 1 DL1+1.0
N/a LL1+1 WL7+1
N/a EQUIP1+-0.6
N/a TEMP1+1 5.76
MR1N/A 2.29 4.34 16.41 2.29 7.20
2032 1 DL1+0.7
N/a LL1+1 WL8+1
N/a EQUIP1+-0.6
N/a TEMP1+1 5.67
MR1N/A 2.26 4.30 16.12 2.26 7.10
2033 1 DL1+0.8
N/a LL1+1 SL1
N/a N/a 6.06 N/A 2.20 2.90 22.43 2.20 7.18
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

to
di
FACTOR OF SAFETY OF PILE GROUP
Water table @ -0.6 M LVL

E
Group Name PCG-1 PCG-2 PCG-3 PCG-5 PCG-6 PCG-8 PCG-9 PCG-4
Pile compression 1.25 1.14 1.78 1.65 1.11 1.13 1.67 1.21

F
Pile tension 1.33 N/A N/A N/A N/A 1.07 19.77 N/A
Pile Shear 1.23 1.67 1.48 1.53 1.65 1.10 6.17 2.00

D
Tensile steel along Z (bottom) 3.50 1.30 3.56 3.39 1.23 2.35 9.76 4.29

rP
Tensile steel along Z (top) 2.23 N/A N/A N/A N/A 1.71 18.37 N/A
Shear stress along Z 13.20 3.33 11.26 10.59 3.19 10.85 12.54 1.85
Tensile steel along X (bottom) 8.52 1.30 3.00 2.81 1.22 7.92 2.30 3.00

te
Tensile steel along X (top) 29.44 N/A N/A N/A N/A 12.66 11.72 6.57
Shear stress along X 13.20 3.33 11.26 10.59 3.19 10.85 2.61 1.85

as
Water table @ -5.1 M LVL
Group Name PCG-1 PCG-2 PCG-3 PCG-5 PCG-6 PCG-8 PCG-9 PCG-4
Pile compression 1.22 1.11 1.72 1.60 1.08 1.11 1.59 1.18
M
Pile tension 16.73 N/A N/A N/A N/A 3.81 N/A N/A
Pile Shear 1.23 1.67 1.48 1.53 1.65 1.10 6.18 2.00
Tensile steel along Z (bottom)
in

2.96 1.26 3.34 3.19 1.18 1.95 10.63 4.11


Tensile steel along Z (top) 2.06 N/A N/A N/A N/A 1.58 11.41 N/A
Shear stress along Z 13.59 3.09 10.75 10.13 2.98 10.09 5.72 1.69
ed

Tensile steel along X (bottom) 7.09 1.25 2.85 2.67 1.18 6.62 1.28 2.79
Tensile steel along X (top) N/A N/A N/A N/A N/A 16.98 17.14 7.82
at

Shear stress along X 13.59 3.09 10.75 10.13 2.98 10.09 1.64 1.69
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

to
DESIGN SUMMARY
Group Name PCG-1 PCG-2 PCG-3 PCG-5 PCG-6 PCG-8 PCG-9 PCG-4

di
Depth of pilecap, D (m) 2.300 1.400 1.300 1.300 1.400 2.100 0.550 2.500
Reinforcement along Z (bottom)

E
Dia of Bar (mm) 32 25 20 20 25 32 12 39
Spacing of bar (mm) 150 150 150 150 150 150 160 250

F
Reinforcement along Z (top)
Dia of Bar (mm) 32 25 20 20 25 32 12 39

D
Spacing of bar (mm) 150 150 150 150 150 150 160 250
Reinforcement along X (bottom)

rP
Dia of Bar (mm) 32 25 20 20 25 32 12 39
Spacing of bar (mm) 150 150 150 150 150 150 160 250
Reinforcement along X (top)

te
Dia of Bar (mm) 32 25 20 20 25 32 12 39
Spacing of bar (mm) 150 150 150 150 150 150 160 250

as
Dia of shear reinforcement (mm) 12 12 12 12 12 12 10
Spacing of shear reinforcement along Z(mm) 150 150 150 150 150 150 250
Spacing of shear reinforcement along X(mm) 150 150 150 150 150 150 250
M
in
ed
at
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 1

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Members
Member Element Node Node Property Emt Length O. Length
A B (m) (m)
M74 6495 5003 1581 1250 x 1250 4.600 4.600
M75 6501 5009 1588 1250 x 1250 4.600 4.600
M76 6493 5002 1576 1250 x 1250 4.600 4.600

F
M77 6494 5001 1582 1250 x 1250 4.600 4.600
M80 6498 5006 1578 1250 x 1250 4.600 4.600
M82 6500 5008 1568 1250 x 1250 4.600 4.600

PD
M84 6503 5011 1583 1250 x 1250 4.600 4.600
M93 6512 5020 1584 1250 x 1250 4.600 4.600
M96 6515 5023 1591 1250 x 1250 4.600 4.600
M98 6517 5025 1585 1250 x 1250 4.600 4.600
M99 6518 5029 1586 1250 x 1250 4.600 4.600
M101 6520 5030 1574 1250 x 1250 4.600 4.600
M102 6521 5028 1572 1250 x 1250 4.600 4.600
M104 6523 5061 580 600 x 400 4.600 4.600
te r
M105 6525 5062 581 600 x 400 4.600 4.600
M106 6528 5063 578 600 x 400 4.600 4.600
M107 6530 5064 579 600 x 400 4.600 4.600
M108 6533 5065 574 600 x 400 4.600 4.600
M109 6535 5066 575 600 x 400 4.600 4.600
M110 6538 5067 576 600 x 400 4.600 4.600
as

M111 6540 5068 577 600 x 400 4.600 4.600


M114 6505 5013 589 1600 x 1600 4.600 4.600
M115 6508 5016 587 1600 x 1600 4.600 4.600
M116 6507 5015 588 1600 x 1600 4.600 4.600
M117 6510 5018 586 1600 x 1600 4.600 4.600
M118 6506 5014 572 1250 x 1250 4.600 4.600
nM

M119 6509 5017 573 1250 x 1250 4.600 4.600

Column Input Data


Eff. Length Factors Braced
Member Type Length Major Minor Major Minor Cover Link
(m) (cm) Size
M74 Column 4.600 1.20 1.20 Yes Yes 6.0 10
di

M75 Column 4.600 1.20 1.20 Yes Yes 6.0 10


M76 Column 4.600 1.20 1.20 Yes Yes 6.0 10
M77 Column 4.600 1.20 1.20 Yes Yes 6.0 10
M80 Column 4.600 1.20 1.20 Yes Yes 6.0 10
M82 Column 4.600 1.20 1.20 Yes Yes 6.0 10
a te

M84 Column 4.600 1.20 1.20 Yes Yes 6.0 10


M93 Column 4.600 1.20 1.20 Yes Yes 6.0 10
M96 Column 4.600 1.20 1.20 Yes Yes 6.0 10
M98 Column 4.600 1.20 1.20 Yes Yes 6.0 10
M99 Column 4.600 1.20 1.20 Yes Yes 6.0 10
M101 Column 4.600 1.20 1.20 Yes Yes 6.0 10
M102 Column 4.600 1.20 1.20 Yes Yes 6.0 10
re

M104 Column 4.600 1.20 1.20 Yes Yes 6.0 10


M105 Column 4.600 1.20 1.20 Yes Yes 6.0 10

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 1 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 2

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Column Input Data Cont...
Eff. Length Factors Braced
Member Type Length Major Minor Major Minor Cover Link
(m) (cm) Size
M106 Column 4.600 1.20 1.20 Yes Yes 6.0 10
M107 Column 4.600 1.20 1.20 Yes Yes 6.0 10

F
M108 Column 4.600 1.20 1.20 Yes Yes 6.0 10
M109 Column 4.600 1.20 1.20 Yes Yes 6.0 10
M110 Column 4.600 1.20 1.20 Yes Yes 6.0 10

PD
M111 Column 4.600 1.20 1.20 Yes Yes 6.0 10
M114 Column 4.600 1.20 1.20 Yes Yes 6.0 10
M115 Column 4.600 1.20 1.20 Yes Yes 6.0 10
M116 Column 4.600 1.20 1.20 Yes Yes 6.0 10
M117 Column 4.600 1.20 1.20 Yes Yes 6.0 10
M118 Column 4.600 1.20 1.20 Yes Yes 6.0 10
M119 Column 4.600 1.20 1.20 Yes Yes 6.0 10
te r
Column Main Reinforcement
Member L/C Axial Major Minor Design Unity Total As Prov.
(kN) (kN-m) (kN-m) Axis Ratio Bars (mm2)
M74 C1015 -5456.842 3023.172 356.524 Biaxl maj 0.805 24H40 30159
M75 C1016 -3111.948 3151.158 149.393 Biaxl maj 0.895 28H32 22519
as

M76 C1017 119.801 781.242 2046.845 Biaxl min 0.895 16H32 12868
M77 C1015 1141.490 996.733 2112.083 Biaxl min 0.844 16H32 12868
M80 C1007 1881.337 3251.013 1051.284 Biaxl maj 0.915 20H32 16085
M82 C1017 -4375.573 3498.883 342.835 Biaxl maj 0.806 24H40 30159
M84 C1009 435.184 459.986 4005.980 Biaxl min 0.944 24H32 19302
nM

M93 C1007 337.747 415.352 4036.421 Biaxl min 0.950 24H32 19302
M96 C1015 -4347.648 3467.690 278.027 Biaxl maj 0.783 24H40 30159
M98 C1009 1774.605 3221.806 1027.118 Biaxl maj 0.913 20H32 16085
M99 C1015 167.109 801.641 2028.993 Biaxl min 0.888 16H32 12868
M101 C1017 1247.758 1039.102 2081.616 Biaxl min 0.836 16H32 12868
M102 C1017 -5875.092 3198.733 742.296 Biaxl maj 0.992 24H40 30159
M104 C1071 242.497 7.352 74.501 Biaxl min 0.520 8H12 905
M105 C1072 -75.443 16.717 69.452 Biaxl min 0.697 12H12 1357
M106 C1065 272.691 22.147 77.234 Biaxl min 0.646 8H12 905
di

M107 C1065 -127.188 18.989 84.154 Biaxl min 0.911 12H12 1357
M108 C1065 277.687 22.610 78.456 Biaxl min 0.653 8H12 905
M109 C1067 -125.469 17.257 82.526 Biaxl min 0.874 12H12 1357
M110 C1071 241.898 5.176 71.342 Biaxl min 0.482 8H12 905
M111 C1071 -73.619 15.137 67.074 Biaxl min 0.660 12H12 1357
a te

M114 C1005 3490.708 1210.915 3153.335 Biaxl min 0.967 20H20 6283
M115 C1003 3570.906 1297.248 3095.234 Biaxl min 0.962 20H20 6283
M116 C1003 3115.104 1105.407 3214.447 Biaxl min 0.931 24H20 7540
M117 C1005 2740.063 1123.959 2292.935 Biaxl min 0.897 28H16 5630
M118 C1005 883.425 1565.883 123.325 Biaxl maj 0.964 16H20 5027
M119 C1003 927.182 1561.358 139.692 Biaxl maj 0.958 16H20 5027
Summary: the group is unsafe
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 2 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 3

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Column Shear Reinforcement
Max Shear in local y Max Shear in local z
Member L/C Value Position L/C Value Position Asw Reqd. Link Spacing
(kN) (m) (kN) (m) (mm2) Size (cm)
M74 C1015 700.632 0.000 C1001 30.734 0.000 Min 10 40.0
M75 C1008 610.002 0.000 C1001 15.991 0.000 Min 10 40.0

F
M76 C1001 40.291 0.000 C1001 48.285 0.000 Min 10 40.0
M77 C1001 46.971 0.000 C1001 18.117 0.000 Min 10 40.0
M80 C1001 34.149 0.000 C1001 127.076 0.000 Min 10 40.0

PD
M82 C1010 587.593 0.000 C1001 63.538 0.000 Min 10 40.0
M84 C1001 97.124 0.000 C1001 35.209 0.000 Min 10 40.0
M93 C1001 83.579 0.000 C1001 31.878 0.000 Min 10 40.0
M96 C1007 581.633 0.000 C1001 74.589 0.000 Min 10 40.0
M98 C1001 27.579 0.000 C1001 117.581 0.000 Min 10 40.0
M99 C1001 38.690 0.000 C1001 49.333 0.000 Min 10 40.0
M101 C1001 44.109 0.000 C1001 16.433 0.000 Min 10 40.0
M102 C1018 699.470 0.000 C1001 65.537 0.000 Min 10 40.0
te r
M104 C1001 1.869 0.000 C1001 5.771 0.000 Min 10 22.5
M105 C1001 2.341 0.000 C1001 4.446 0.000 Min 10 22.5
M106 C1001 0.358 0.000 C1001 11.732 0.000 Min 10 22.5
M107 C1001 0.178 0.000 C1001 16.027 0.000 Min 10 22.5
M108 C1001 0.872 0.000 C1001 11.285 0.000 Min 10 22.5
M109 C1001 0.427 0.000 C1001 15.752 0.000 Min 10 22.5
as

M110 C1001 2.347 0.000 C1001 4.955 0.000 Min 10 22.5


M111 C1001 1.873 0.000 C1001 4.023 0.000 Min 10 22.5
M114 C1001 248.547 0.000 C1001 159.206 0.000 Min 10 40.0
M115 C1001 254.691 0.000 C1001 56.515 0.000 Min 10 40.0
M116 C1001 34.863 0.000 C1001 35.201 0.000 Min 10 40.0
M117 C1001 46.692 0.000 C1001 69.023 0.000 Min 10 30.0
nM

M118 C1001 251.559 0.000 C1001 22.784 0.000 Min 10 40.0


M119 C1001 237.914 0.000 C1001 22.471 0.000 Min 10 40.0
Summary: the group is unsafe
di
a te
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 3 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 4

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 74 - Detailed EC2 Design Requirements
Section Property: 1250 x 1250
Storey height = 4.600 m
Rectangular section: Width = 1250 mm Depth = 1250 mm
Cover = 60 mm

F
Member 74 - Detailed EC2 Main Reinforcement

PD
Axial N = -5456.84 kN
Major M, end 1, = -2795.80 kNm
end 2, = 427.11 kNm
Minor M, end 1, = 126.42 kNm
end 2, = 129.16 kNm

Slenderness
λlim = 20 ABC / √n (5.13N)
n = NEd / (Ac fcd) = -5457 ×103 / (1562500 × 20.0) = -0.175
te r
Major λlim, y = 20 × 1.00 × 1.36 × 1.92 / √-0.175 = 1916487.11
Minor λlim, z = 20 × 1.00 × 1.36 × 0.71 / √-0.175 = 707673.30
λ = l0 / i (5.14)
λy = 5520 / 360.84 = 15.30
λz = 5520 / 360.84 = 15.30
Column is NOT SLENDER
as

Axial Capacity NRd = 43759.55 kN


Axial capacity ratio NEd / NRd = -0.12
Axial Capacity ≥ Axial ∴OK for axial resistance
Major Axis Capacity MRdy = 4196.55 kNm
nM

Major Axis Capacity Ratio MEdy / MRdy = 0.72


Major Axis Capacity ≥ Major Axis Moment ∴OK for moment resistance
Minor Axis Capacity MRdz = 4196.55 kNm
Minor Axis Capacity Ratio MEdz / MRdz = 0.08
Minor Axis Capacity ≥ Minor Axis Moment ∴OK for moment resistance
a a
MEdz  MEdy
Biaxial Interaction Equation =  +  ≤ 1,0 (5.39)
MRdz MRdy
Where exponent a = 1.00
1.00 1.00
 356.52  3023.17
di

Biaxial Interaction Equation =  +  = 0.81


4196.55 4196.55
Biaxial Interaction Result ≤ 1.0 ∴OK for biaxial resistance

Max distance between bars = 300 mm


Largest actual space between bars = 138 mm
a te

Min distance between bars = max bar diameter = 40 mm 8.2 (2)


Smallest actual space between bars = 138 mm
∴OK for spacing
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 4 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 5

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 74 - Detailed EC2 Main Reinforcement Cont...
Min area of reinforcement = 2353 mm2 9.5.2 (2)
Max area of reinforcement (even at laps) = 125000 mm2 9.5.2 (3)
Actual area of main reinforcement (24H40) = 30159 mm2
∴ area by which steel can increase at laps = 94841 mm2
Starter bar area = 804 mm2

F
∴OK

PD
Member 74 - Detailed EC2 Shear Reinforcement
Spacing provided, s = 400 mm

Major axis:
Shear force, VEd = 700.63 kN
VRd,c = [CRd,c k (100 ρl fck)1/3 + k1σcp] bw d (6.2.a)
= [0.120 × 1.415 × (100 × 0.020 × 30)1/3 + 0.15 × -3.492] × 1250 × 1160
= 204.44 kN
te r
But ≥ (vmin + k1σcp) bwd (6.2.b)
= (0.32 + 0.15 × -3.492) × 1250 × 1160 = -291.60 kN
Hence, VRd,c = 204.44 kN
VEd > VRd,c ∴provide links such that VEd ≤ VRd 6.2.1(5)
VRd,max = αcwbwz ν1 fcd / (cot θ + tan θ) (6.9)
= 1.00 × 1250 × 1112 × 0.53 ×20.0 / (1.00 + 1.00) = 7336.12 kN
as

Asw VRd,max
∴required = Provided R/f is much higher than than
s z fywd cot θ
the R/F considered by staad for
7336115.71
= = 15.180 checking. Hence provided R/f is on higer
1112 × 435 × 1.00
side. I.e. staad is considering 11Y10 dia
for shear check of 7336.12kN. But it shall
nM

Area of links provided (11H10), Asw = 863.94 mm2 check w.r.t to actual shear of 700.63kN.
Hence provided shear is ok.
Minor axis:
Shear force, VEd = 30.73 kN
VRd,c = [CRd,c k (100 ρl fck)1/3 + k1σcp] bw d (6.2.a)
= [0.120 × 1.451 × (100 × 0.020 × 30)1/3 + 0.15 × 1.225] × 1250 × 982
= 1062.22 kN
But ≥ (vmin + k1σcp) bwd (6.2.b)
= (0.34 + 0.15 × 1.225) × 1250 × 982 = 636.86 kN
di

Hence, VRd,c = 1062.22 kN


VEd ≤ VRd,c ∴only nominal links required 6.2.1(5)

Area of links provided (11H10), Asw = 863.94 mm2


a te

Minimum size of link bars = 10 mm 9.5.3 (1)


Actual size of link bars = 10 mm
∴ NOT OK
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 5 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 6

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 75 - Detailed EC2 Design Requirements
Section Property: 1250 x 1250
Storey height = 4.600 m
Rectangular section: Width = 1250 mm Depth = 1250 mm
Cover = 60 mm

F
Member 75 - Detailed EC2 Main Reinforcement

PD
Axial N = -3111.95 kN
Major M, end 1, = -3021.49 kNm
end 2, = 263.76 kNm
Minor M, end 1, = -19.73 kNm
end 2, = -13.85 kNm

Slenderness
λlim = 20 ABC / √n (5.13N)
n = NEd / (Ac fcd) = -3112 ×103 / (1562500 × 20.0) = -0.100
te r
Major λlim, y = 20 × 1.00 × 1.28 × 1.82 / √-0.100 = 1824851.88
Minor λlim, z = 20 × 1.00 × 1.28 × 0.70 / √-0.100 = 700000.00
λ = l0 / i (5.14)
λy = 5520 / 360.84 = 15.30
λz = 5520 / 360.84 = 15.30
Column is NOT SLENDER
as

Axial Capacity NRd = 40590.47 kN


Axial capacity ratio NEd / NRd = -0.08
Axial Capacity ≥ Axial ∴OK for axial resistance
Major Axis Capacity MRdy = 3689.22 kNm
nM

Major Axis Capacity Ratio MEdy / MRdy = 0.85


Major Axis Capacity ≥ Major Axis Moment ∴OK for moment resistance
Minor Axis Capacity MRdz = 3689.22 kNm
Minor Axis Capacity Ratio MEdz / MRdz = 0.04
Minor Axis Capacity ≥ Minor Axis Moment ∴OK for moment resistance
a a
MEdz  MEdy
Biaxial Interaction Equation =  +  ≤ 1,0 (5.39)
MRdz MRdy
Where exponent a = 1.00
1.00 1.00
 149.39  3151.16
di

Biaxial Interaction Equation =  +  = 0.89


3689.22 3689.22
Biaxial Interaction Result ≤ 1.0 ∴OK for biaxial resistance

Max distance between bars = 300 mm


Largest actual space between bars = 122 mm
a te

Min distance between bars = max bar diameter = 32 mm 8.2 (2)


Smallest actual space between bars = 122 mm
∴OK for spacing
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 6 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 7

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 75 - Detailed EC2 Main Reinforcement Cont...
Min area of reinforcement = 2353 mm2 9.5.2 (2)
Max area of reinforcement (even at laps) = 125000 mm2 9.5.2 (3)
Actual area of main reinforcement (28H32) = 22519 mm2
∴ area by which steel can increase at laps = 102481 mm2
Starter bar area = 804 mm2

F
∴OK

PD
Member 75 - Detailed EC2 Shear Reinforcement
Spacing provided, s = 400 mm

Major axis:
Shear force, VEd = 610.00 kN
VRd,c = [CRd,c k (100 ρl fck)1/3 + k1σcp] bw d (6.2.a)
= [0.120 × 1.415 × (100 × 0.015 × 30)1/3 + 0.15 × -1.969] × 1250 × 1164
= 457.91 kN
te r
But ≥ (vmin + k1σcp) bwd (6.2.b)
= (0.32 + 0.15 × -1.969) × 1250 × 1164 = 39.48 kN
Hence, VRd,c = 457.91 kN
VEd > VRd,c ∴provide links such that VEd ≤ VRd 6.2.1(5)
VRd,max = αcwbwz ν1 fcd / (cot θ + tan θ) (6.9)
= 1.00 × 1250 × 1113 × 0.53 ×20.0 / (1.00 + 1.00) = 7344.02 kN
as

Asw VRd,max
∴required =
s z fywd cot θ
7344022.50
= = 15.180
1113 × 435 × 1.00
nM

Area of links provided (12H10), Asw = 942.48 mm2

Minor axis:
Shear force, VEd = 15.99 kN
VRd,c = [CRd,c k (100 ρl fck)1/3 + k1σcp] bw d (6.2.a)
= [0.120 × 1.452 × (100 × 0.018 × 30)1/3 + 0.15 × 1.933] × 1250 × 978
= 1165.74 kN
But ≥ (vmin + k1σcp) bwd (6.2.b)
= (0.34 + 0.15 × 1.933) × 1250 × 978 = 764.43 kN
di

Hence, VRd,c = 1165.74 kN


VEd ≤ VRd,c ∴only nominal links required 6.2.1(5)

Area of links provided (12H10), Asw = 942.48 mm2


a te

Minimum size of link bars = 10 mm 9.5.3 (1)


Actual size of link bars = 10 mm
∴ OK
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 7 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 8

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 76 - Detailed EC2 Design Requirements
Section Property: 1250 x 1250
Storey height = 4.600 m
Rectangular section: Width = 1250 mm Depth = 1250 mm
Cover = 60 mm

F
Member 76 - Detailed EC2 Main Reinforcement

PD
Axial N = 119.80 kN
Major M, end 1, = -776.25 kNm
end 2, = -50.13 kNm
Minor M, end 1, = -2041.85 kNm
end 2, = -130.14 kNm

Slenderness
λlim = 20 ABC / √n (5.13N)
n = NEd / (Ac fcd) = 120 ×103 / (1562500 × 20.0) = 0.004
te r
Major λlim, y = 20 × 1.00 × 1.17 × 1.63 / √0.004 = 613.37
Minor λlim, z = 20 × 1.00 × 1.17 × 1.63 / √0.004 = 615.08
λ = l0 / i (5.14)
λy = 5520 / 360.84 = 15.30
λz = 5520 / 360.84 = 15.30
Column is NOT SLENDER
as

Axial Capacity NRd = 36587.41 kN


Axial capacity ratio NEd / NRd = 0.00
Axial Capacity ≥ Axial ∴OK for axial resistance
Major Axis Capacity MRdy = 3161.33 kNm
nM

Major Axis Capacity Ratio MEdy / MRdy = 0.25


Major Axis Capacity ≥ Major Axis Moment ∴OK for moment resistance
Minor Axis Capacity MRdz = 3161.33 kNm
Minor Axis Capacity Ratio MEdz / MRdz = 0.65
Minor Axis Capacity ≥ Minor Axis Moment ∴OK for moment resistance
a a
MEdz  MEdy
Biaxial Interaction Equation =  +  ≤ 1,0 (5.39)
MRdz MRdy
Where exponent a = 1.00
1.00 1.00
2046.84  781.24 
di

Biaxial Interaction Equation =  +  = 0.89


3161.33 3161.33
Biaxial Interaction Result ≤ 1.0 ∴OK for biaxial resistance

Max distance between bars = 300 mm


Largest actual space between bars = 238 mm
a te

Min distance between bars = max bar diameter = 32 mm 8.2 (2)


Smallest actual space between bars = 238 mm
∴OK for spacing
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 8 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 9

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 76 - Detailed EC2 Main Reinforcement Cont...
Min area of reinforcement = 3125 mm2 9.5.2 (2)
Max area of reinforcement (even at laps) = 125000 mm2 9.5.2 (3)
Actual area of main reinforcement (16H32) = 12868 mm2
∴ area by which steel can increase at laps = 112132 mm2
Starter bar area = 804 mm2

F
∴OK

PD
Member 76 - Detailed EC2 Shear Reinforcement
Spacing provided, s = 400 mm

Major axis:
Shear force, VEd = 40.29 kN
VRd,c = [CRd,c k (100 ρl fck)1/3 + k1σcp] bw d (6.2.a)
= [0.120 × 1.415 × (100 × 0.009 × 30)1/3 + 0.15 × 1.217] × 1250 × 1164
= 1002.23 kN
te r
But ≥ (vmin + k1σcp) bwd (6.2.b)
= (0.32 + 0.15 × 1.217) × 1250 × 1164 = 734.86 kN
Hence, VRd,c = 1002.23 kN
VEd ≤ VRd,c ∴only nominal links required 6.2.1(5)

Area of links provided (7H10), Asw = 549.78 mm2


as

Minor axis:
Shear force, VEd = 48.29 kN
VRd,c = [CRd,c k (100 ρl fck)1/3 + k1σcp] bw d (6.2.a)
= [0.120 × 1.446 × (100 × 0.010 × 30)1/3 + 0.15 × 1.217] × 1250 × 1006
nM

= 912.80 kN
But ≥ (vmin + k1σcp) bwd (6.2.b)
= (0.33 + 0.15 × 1.217) × 1250 × 1006 = 648.75 kN
Hence, VRd,c = 912.80 kN
VEd ≤ VRd,c ∴only nominal links required 6.2.1(5)

Area of links provided (7H10), Asw = 549.78 mm2

Minimum size of link bars = 10 mm 9.5.3 (1)


di

Actual size of link bars = 10 mm


∴ OK
a te
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 9 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 10

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 77 - Detailed EC2 Design Requirements
Section Property: 1250 x 1250
Storey height = 4.600 m
Rectangular section: Width = 1250 mm Depth = 1250 mm
Cover = 60 mm

F
Member 77 - Detailed EC2 Main Reinforcement

PD
Axial N = 1141.49 kN
Major M, end 1, = -949.17 kNm
end 2, = -73.08 kNm
Minor M, end 1, = 2064.52 kNm
end 2, = 117.74 kNm

Slenderness
λlim = 20 ABC / √n (5.13N)
n = NEd / (Ac fcd) = 1141 ×103 / (1562500 × 20.0) = 0.037
te r
Major λlim, y = 20 × 1.00 × 1.17 × 1.58 / √0.037 = 192.55
Minor λlim, z = 20 × 1.00 × 1.17 × 1.62 / √0.037 = 197.77
λ = l0 / i (5.14)
λy = 5520 / 360.84 = 15.30
λz = 5520 / 360.84 = 15.30
Column is NOT SLENDER
as

Axial Capacity NRd = 36587.41 kN


Axial capacity ratio NEd / NRd = 0.03
Axial Capacity ≥ Axial ∴OK for axial resistance
Major Axis Capacity MRdy = 3681.31 kNm
nM

Major Axis Capacity Ratio MEdy / MRdy = 0.27


Major Axis Capacity ≥ Major Axis Moment ∴OK for moment resistance
Minor Axis Capacity MRdz = 3681.31 kNm
Minor Axis Capacity Ratio MEdz / MRdz = 0.57
Minor Axis Capacity ≥ Minor Axis Moment ∴OK for moment resistance
a a
MEdz  MEdy
Biaxial Interaction Equation =  +  ≤ 1,0 (5.39)
MRdz MRdy
Where exponent a = 1.00
1.00 1.00
2112.08  996.73 
di

Biaxial Interaction Equation =  +  = 0.84


3681.31 3681.31
Biaxial Interaction Result ≤ 1.0 ∴OK for biaxial resistance

Max distance between bars = 300 mm


Largest actual space between bars = 238 mm
a te

Min distance between bars = max bar diameter = 32 mm 8.2 (2)


Smallest actual space between bars = 238 mm
∴OK for spacing
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 10 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 11

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 77 - Detailed EC2 Main Reinforcement Cont...
Min area of reinforcement = 3125 mm2 9.5.2 (2)
Max area of reinforcement (even at laps) = 125000 mm2 9.5.2 (3)
Actual area of main reinforcement (16H32) = 12868 mm2
∴ area by which steel can increase at laps = 112132 mm2
Starter bar area = 804 mm2

F
∴OK

PD
Member 77 - Detailed EC2 Shear Reinforcement
Spacing provided, s = 400 mm

Major axis:
Shear force, VEd = 46.97 kN
VRd,c = [CRd,c k (100 ρl fck)1/3 + k1σcp] bw d (6.2.a)
= [0.120 × 1.415 × (100 × 0.009 × 30)1/3 + 0.15 × 1.198] × 1250 × 1164
= 998.00 kN
te r
But ≥ (vmin + k1σcp) bwd (6.2.b)
= (0.32 + 0.15 × 1.198) × 1250 × 1164 = 730.63 kN
Hence, VRd,c = 998.00 kN
VEd ≤ VRd,c ∴only nominal links required 6.2.1(5)

Area of links provided (7H10), Asw = 549.78 mm2


as

Minor axis:
Shear force, VEd = 18.12 kN
VRd,c = [CRd,c k (100 ρl fck)1/3 + k1σcp] bw d (6.2.a)
= [0.120 × 1.446 × (100 × 0.010 × 30)1/3 + 0.15 × 1.198] × 1250 × 1006
nM

= 909.15 kN
But ≥ (vmin + k1σcp) bwd (6.2.b)
= (0.33 + 0.15 × 1.198) × 1250 × 1006 = 645.09 kN
Hence, VRd,c = 909.15 kN
VEd ≤ VRd,c ∴only nominal links required 6.2.1(5)

Area of links provided (7H10), Asw = 549.78 mm2

Minimum size of link bars = 10 mm 9.5.3 (1)


di

Actual size of link bars = 10 mm


∴ OK
a te
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 11 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 12

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 80 - Detailed EC2 Design Requirements
Section Property: 1250 x 1250
Storey height = 4.600 m
Rectangular section: Width = 1250 mm Depth = 1250 mm
Cover = 60 mm

F
Member 80 - Detailed EC2 Main Reinforcement

PD
Axial N = 1881.34 kN
Major M, end 1, = -3172.62 kNm
end 2, = 873.37 kNm
Minor M, end 1, = -972.90 kNm
end 2, = -132.40 kNm

Slenderness
λlim = 20 ABC / √n (5.13N)
n = NEd / (Ac fcd) = 1881 ×103 / (1562500 × 20.0) = 0.060
te r
Major λlim, y = 20 × 1.00 × 1.20 × 1.99 / √0.060 = 195.43
Minor λlim, z = 20 × 1.00 × 1.20 × 1.50 / √0.060 = 147.06
λ = l0 / i (5.14)
λy = 5520 / 360.84 = 15.30
λz = 5520 / 360.84 = 15.30
Column is NOT SLENDER
as

Axial Capacity NRd = 37921.76 kN


Axial capacity ratio NEd / NRd = 0.05
Axial Capacity ≥ Axial ∴OK for axial resistance
Major Axis Capacity MRdy = 4700.39 kNm
nM

Major Axis Capacity Ratio MEdy / MRdy = 0.69


Major Axis Capacity ≥ Major Axis Moment ∴OK for moment resistance
Minor Axis Capacity MRdz = 4700.39 kNm
Minor Axis Capacity Ratio MEdz / MRdz = 0.22
Minor Axis Capacity ≥ Minor Axis Moment ∴OK for moment resistance
a a
MEdz  MEdy
Biaxial Interaction Equation =  +  ≤ 1,0 (5.39)
MRdz MRdy
Where exponent a = 1.00
1.00 1.00
1051.28 3251.01
di

Biaxial Interaction Equation =  +  = 0.92


4700.39 4700.39
Biaxial Interaction Result ≤ 1.0 ∴OK for biaxial resistance

Max distance between bars = 300 mm


Largest actual space between bars = 184 mm
a te

Min distance between bars = max bar diameter = 32 mm 8.2 (2)


Smallest actual space between bars = 184 mm
∴OK for spacing
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 12 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 13

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 80 - Detailed EC2 Main Reinforcement Cont...
Min area of reinforcement = 3125 mm2 9.5.2 (2)
Max area of reinforcement (even at laps) = 125000 mm2 9.5.2 (3)
Actual area of main reinforcement (20H32) = 16085 mm2
∴ area by which steel can increase at laps = 108915 mm2
Starter bar area = 804 mm2

F
∴OK

PD
Member 80 - Detailed EC2 Shear Reinforcement
Spacing provided, s = 400 mm

Major axis:
Shear force, VEd = 34.15 kN
VRd,c = [CRd,c k (100 ρl fck)1/3 + k1σcp] bw d (6.2.a)
= [0.120 × 1.415 × (100 × 0.011 × 30)1/3 + 0.15 × 1.347] × 1250 × 1164
= 1087.57 kN
te r
But ≥ (vmin + k1σcp) bwd (6.2.b)
= (0.32 + 0.15 × 1.347) × 1250 × 1164 = 763.32 kN
Hence, VRd,c = 1087.57 kN
VEd ≤ VRd,c ∴only nominal links required 6.2.1(5)

Area of links provided (8H10), Asw = 628.32 mm2


as

Minor axis:
Shear force, VEd = 127.08 kN
VRd,c = [CRd,c k (100 ρl fck)1/3 + k1σcp] bw d (6.2.a)
= [0.120 × 1.449 × (100 × 0.013 × 30)1/3 + 0.15 × 1.347] × 1250 × 993
nM

= 982.04 kN
But ≥ (vmin + k1σcp) bwd (6.2.b)
= (0.33 + 0.15 × 1.347) × 1250 × 993 = 665.94 kN
Hence, VRd,c = 982.04 kN
VEd ≤ VRd,c ∴only nominal links required 6.2.1(5)

Area of links provided (8H10), Asw = 628.32 mm2

Minimum size of link bars = 10 mm 9.5.3 (1)


di

Actual size of link bars = 10 mm


∴ OK
a te
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 13 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 14

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 82 - Detailed EC2 Design Requirements
Section Property: 1250 x 1250
Storey height = 4.600 m
Rectangular section: Width = 1250 mm Depth = 1250 mm
Cover = 60 mm

F
Member 82 - Detailed EC2 Main Reinforcement

PD
Axial N = -4375.57 kN
Major M, end 1, = 3316.57 kNm
end 2, = -51.58 kNm
Minor M, end 1, = 160.52 kNm
end 2, = 87.35 kNm

Slenderness
λlim = 20 ABC / √n (5.13N)
n = NEd / (Ac fcd) = -4376 ×103 / (1562500 × 20.0) = -0.140
te r
Major λlim, y = 20 × 1.00 × 1.36 × 1.77 / √-0.140 = 1766848.83
Minor λlim, z = 20 × 1.00 × 1.36 × 0.91 / √-0.140 = 913429.71
λ = l0 / i (5.14)
λy = 5520 / 360.84 = 15.30
λz = 5520 / 360.84 = 15.30
Column is NOT SLENDER
as

Axial Capacity NRd = 43759.55 kN


Axial capacity ratio NEd / NRd = -0.10
Axial Capacity ≥ Axial ∴OK for axial resistance
Major Axis Capacity MRdy = 4768.73 kNm
nM

Major Axis Capacity Ratio MEdy / MRdy = 0.73


Major Axis Capacity ≥ Major Axis Moment ∴OK for moment resistance
Minor Axis Capacity MRdz = 4768.73 kNm
Minor Axis Capacity Ratio MEdz / MRdz = 0.07
Minor Axis Capacity ≥ Minor Axis Moment ∴OK for moment resistance
a a
MEdz  MEdy
Biaxial Interaction Equation =  +  ≤ 1,0 (5.39)
MRdz MRdy
Where exponent a = 1.00
1.00 1.00
 342.83  3498.88
di

Biaxial Interaction Equation =  +  = 0.81


4768.73 4768.73
Biaxial Interaction Result ≤ 1.0 ∴OK for biaxial resistance

Max distance between bars = 300 mm


Largest actual space between bars = 138 mm
a te

Min distance between bars = max bar diameter = 40 mm 8.2 (2)


Smallest actual space between bars = 138 mm
∴OK for spacing
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 14 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 15

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 82 - Detailed EC2 Main Reinforcement Cont...
Min area of reinforcement = 2353 mm2 9.5.2 (2)
Max area of reinforcement (even at laps) = 125000 mm2 9.5.2 (3)
Actual area of main reinforcement (24H40) = 30159 mm2
∴ area by which steel can increase at laps = 94841 mm2
Starter bar area = 804 mm2

F
∴OK

PD
Member 82 - Detailed EC2 Shear Reinforcement
Spacing provided, s = 400 mm

Major axis:
Shear force, VEd = 587.59 kN
VRd,c = [CRd,c k (100 ρl fck)1/3 + k1σcp] bw d (6.2.a)
= [0.120 × 1.415 × (100 × 0.020 × 30)1/3 + 0.15 × -2.631] × 1250 × 1160
= 391.73 kN
te r
But ≥ (vmin + k1σcp) bwd (6.2.b)
= (0.32 + 0.15 × -2.631) × 1250 × 1160 = -104.31 kN
Hence, VRd,c = 391.73 kN
VEd > VRd,c ∴provide links such that VEd ≤ VRd 6.2.1(5)
VRd,max = αcwbwz ν1 fcd / (cot θ + tan θ) (6.9)
= 1.00 × 1250 × 1101 × 0.53 ×20.0 / (1.00 + 1.00) = 7266.46 kN
as

Asw VRd,max
∴required =
s z fywd cot θ
7266463.74
= = 15.180
1101 × 435 × 1.00
nM

Area of links provided (11H10), Asw = 863.94 mm2

Minor axis:
Shear force, VEd = 63.54 kN
VRd,c = [CRd,c k (100 ρl fck)1/3 + k1σcp] bw d (6.2.a)
= [0.120 × 1.451 × (100 × 0.020 × 30)1/3 + 0.15 × 2.361] × 1250 × 982
= 1271.18 kN
But ≥ (vmin + k1σcp) bwd (6.2.b)
= (0.34 + 0.15 × 2.361) × 1250 × 982 = 845.82 kN
di

Hence, VRd,c = 1271.18 kN


VEd ≤ VRd,c ∴only nominal links required 6.2.1(5)

Area of links provided (11H10), Asw = 863.94 mm2


a te

Minimum size of link bars = 10 mm 9.5.3 (1)


Actual size of link bars = 10 mm
∴ OK
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 15 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 16

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 84 - Detailed EC2 Design Requirements
Section Property: 1250 x 1250
Storey height = 4.600 m
Rectangular section: Width = 1250 mm Depth = 1250 mm
Cover = 60 mm

F
Member 84 - Detailed EC2 Main Reinforcement

PD
Axial N = 435.18 kN
Major M, end 1, = -441.85 kNm
end 2, = 27.03 kNm
Minor M, end 1, = -3987.85 kNm
end 2, = -794.81 kNm

Slenderness
λlim = 20 ABC / √n (5.13N)
n = NEd / (Ac fcd) = 435 ×103 / (1562500 × 20.0) = 0.014
te r
Major λlim, y = 20 × 1.00 × 1.24 × 1.80 / √0.014 = 377.84
Minor λlim, z = 20 × 1.00 × 1.24 × 1.50 / √0.014 = 314.57
λ = l0 / i (5.14)
λy = 5520 / 360.84 = 15.30
λz = 5520 / 360.84 = 15.30
Column is NOT SLENDER
as

Axial Capacity NRd = 39256.11 kN


Axial capacity ratio NEd / NRd = 0.01
Axial Capacity ≥ Axial ∴OK for axial resistance
Major Axis Capacity MRdy = 4729.24 kNm
nM

Major Axis Capacity Ratio MEdy / MRdy = 0.10


Major Axis Capacity ≥ Major Axis Moment ∴OK for moment resistance
Minor Axis Capacity MRdz = 4729.24 kNm
Minor Axis Capacity Ratio MEdz / MRdz = 0.85
Minor Axis Capacity ≥ Minor Axis Moment ∴OK for moment resistance
a a
MEdz  MEdy
Biaxial Interaction Equation =  +  ≤ 1,0 (5.39)
MRdz MRdy
Where exponent a = 1.00
1.00 1.00
4005.98  459.99 
di

Biaxial Interaction Equation =  +  = 0.94


4729.24 4729.24
Biaxial Interaction Result ≤ 1.0 ∴OK for biaxial resistance

Max distance between bars = 300 mm


Largest actual space between bars = 148 mm
a te

Min distance between bars = max bar diameter = 32 mm 8.2 (2)


Smallest actual space between bars = 148 mm
∴OK for spacing
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 16 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 17

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 84 - Detailed EC2 Main Reinforcement Cont...
Min area of reinforcement = 3125 mm2 9.5.2 (2)
Max area of reinforcement (even at laps) = 125000 mm2 9.5.2 (3)
Actual area of main reinforcement (24H32) = 19302 mm2
∴ area by which steel can increase at laps = 105698 mm2
Starter bar area = 804 mm2

F
∴OK

PD
Member 84 - Detailed EC2 Shear Reinforcement
Spacing provided, s = 400 mm

Major axis:
Shear force, VEd = 97.12 kN
VRd,c = [CRd,c k (100 ρl fck)1/3 + k1σcp] bw d (6.2.a)
= [0.120 × 1.415 × (100 × 0.013 × 30)1/3 + 0.15 × 1.922] × 1250 × 1164
= 1262.76 kN
te r
But ≥ (vmin + k1σcp) bwd (6.2.b)
= (0.32 + 0.15 × 1.922) × 1250 × 1164 = 888.79 kN
Hence, VRd,c = 1262.76 kN
VEd ≤ VRd,c ∴only nominal links required 6.2.1(5)

Area of links provided (11H10), Asw = 863.94 mm2


as

Minor axis:
Shear force, VEd = 35.21 kN
VRd,c = [CRd,c k (100 ρl fck)1/3 + k1σcp] bw d (6.2.a)
= [0.120 × 1.451 × (100 × 0.016 × 30)1/3 + 0.15 × 1.922] × 1250 × 984
nM

= 1128.15 kN
But ≥ (vmin + k1σcp) bwd (6.2.b)
= (0.33 + 0.15 × 1.922) × 1250 × 984 = 766.95 kN
Hence, VRd,c = 1128.15 kN
VEd ≤ VRd,c ∴only nominal links required 6.2.1(5)

Area of links provided (11H10), Asw = 863.94 mm2

Minimum size of link bars = 10 mm 9.5.3 (1)


di

Actual size of link bars = 10 mm


∴ OK
a te
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 17 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 18

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 93 - Detailed EC2 Design Requirements
Section Property: 1250 x 1250
Storey height = 4.600 m
Rectangular section: Width = 1250 mm Depth = 1250 mm
Cover = 60 mm

F
Member 93 - Detailed EC2 Main Reinforcement

PD
Axial N = 337.75 kN
Major M, end 1, = 401.28 kNm
end 2, = -24.95 kNm
Minor M, end 1, = 4022.35 kNm
end 2, = 798.74 kNm

Slenderness
λlim = 20 ABC / √n (5.13N)
n = NEd / (Ac fcd) = 338 ×103 / (1562500 × 20.0) = 0.011
te r
Major λlim, y = 20 × 1.00 × 1.24 × 1.79 / √0.011 = 427.88
Minor λlim, z = 20 × 1.00 × 1.24 × 1.50 / √0.011 = 357.44
λ = l0 / i (5.14)
λy = 5520 / 360.84 = 15.30
λz = 5520 / 360.84 = 15.30
Column is NOT SLENDER
as

Axial Capacity NRd = 39256.11 kN


Axial capacity ratio NEd / NRd = 0.01
Axial Capacity ≥ Axial ∴OK for axial resistance
Major Axis Capacity MRdy = 4684.22 kNm
nM

Major Axis Capacity Ratio MEdy / MRdy = 0.09


Major Axis Capacity ≥ Major Axis Moment ∴OK for moment resistance
Minor Axis Capacity MRdz = 4684.22 kNm
Minor Axis Capacity Ratio MEdz / MRdz = 0.86
Minor Axis Capacity ≥ Minor Axis Moment ∴OK for moment resistance
a a
MEdz  MEdy
Biaxial Interaction Equation =  +  ≤ 1,0 (5.39)
MRdz MRdy
Where exponent a = 1.00
1.00 1.00
4036.42  415.35 
di

Biaxial Interaction Equation =  +  = 0.95


4684.22 4684.22
Biaxial Interaction Result ≤ 1.0 ∴OK for biaxial resistance

Max distance between bars = 300 mm


Largest actual space between bars = 148 mm
a te

Min distance between bars = max bar diameter = 32 mm 8.2 (2)


Smallest actual space between bars = 148 mm
∴OK for spacing
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 18 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 19

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 93 - Detailed EC2 Main Reinforcement Cont...
Min area of reinforcement = 3125 mm2 9.5.2 (2)
Max area of reinforcement (even at laps) = 125000 mm2 9.5.2 (3)
Actual area of main reinforcement (24H32) = 19302 mm2
∴ area by which steel can increase at laps = 105698 mm2
Starter bar area = 804 mm2

F
∴OK

PD
Member 93 - Detailed EC2 Shear Reinforcement
Spacing provided, s = 400 mm

Major axis:
Shear force, VEd = 83.58 kN
VRd,c = [CRd,c k (100 ρl fck)1/3 + k1σcp] bw d (6.2.a)
= [0.120 × 1.415 × (100 × 0.013 × 30)1/3 + 0.15 × 2.152] × 1250 × 1164
= 1312.84 kN
te r
But ≥ (vmin + k1σcp) bwd (6.2.b)
= (0.32 + 0.15 × 2.152) × 1250 × 1164 = 938.87 kN
Hence, VRd,c = 1312.84 kN
VEd ≤ VRd,c ∴only nominal links required 6.2.1(5)

Area of links provided (11H10), Asw = 863.94 mm2


as

Minor axis:
Shear force, VEd = 31.88 kN
VRd,c = [CRd,c k (100 ρl fck)1/3 + k1σcp] bw d (6.2.a)
= [0.120 × 1.451 × (100 × 0.016 × 30)1/3 + 0.15 × 2.152] × 1250 × 984
nM

= 1170.50 kN
But ≥ (vmin + k1σcp) bwd (6.2.b)
= (0.33 + 0.15 × 2.152) × 1250 × 984 = 809.31 kN
Hence, VRd,c = 1170.50 kN
VEd ≤ VRd,c ∴only nominal links required 6.2.1(5)

Area of links provided (11H10), Asw = 863.94 mm2

Minimum size of link bars = 10 mm 9.5.3 (1)


di

Actual size of link bars = 10 mm


∴ OK
a te
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 19 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 20

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 96 - Detailed EC2 Design Requirements
Section Property: 1250 x 1250
Storey height = 4.600 m
Rectangular section: Width = 1250 mm Depth = 1250 mm
Cover = 60 mm

F
Member 96 - Detailed EC2 Main Reinforcement

PD
Axial N = -4347.65 kN
Major M, end 1, = -3286.54 kNm
end 2, = 50.39 kNm
Minor M, end 1, = -96.87 kNm
end 2, = -94.66 kNm

Slenderness
λlim = 20 ABC / √n (5.13N)
n = NEd / (Ac fcd) = -4348 ×103 / (1562500 × 20.0) = -0.139
te r
Major λlim, y = 20 × 1.00 × 1.36 × 1.77 / √-0.139 = 1766771.24
Minor λlim, z = 20 × 1.00 × 1.36 × 0.71 / √-0.139 = 707980.13
λ = l0 / i (5.14)
λy = 5520 / 360.84 = 15.30
λz = 5520 / 360.84 = 15.30
Column is NOT SLENDER
as

Axial Capacity NRd = 43759.55 kN


Axial capacity ratio NEd / NRd = -0.10
Axial Capacity ≥ Axial ∴OK for axial resistance
Major Axis Capacity MRdy = 4783.39 kNm
nM

Major Axis Capacity Ratio MEdy / MRdy = 0.72


Major Axis Capacity ≥ Major Axis Moment ∴OK for moment resistance
Minor Axis Capacity MRdz = 4783.39 kNm
Minor Axis Capacity Ratio MEdz / MRdz = 0.06
Minor Axis Capacity ≥ Minor Axis Moment ∴OK for moment resistance
a a
MEdz  MEdy
Biaxial Interaction Equation =  +  ≤ 1,0 (5.39)
MRdz MRdy
Where exponent a = 1.00
1.00 1.00
 278.03  3467.69
di

Biaxial Interaction Equation =  +  = 0.78


4783.39 4783.39
Biaxial Interaction Result ≤ 1.0 ∴OK for biaxial resistance

Max distance between bars = 300 mm


Largest actual space between bars = 138 mm
a te

Min distance between bars = max bar diameter = 40 mm 8.2 (2)


Smallest actual space between bars = 138 mm
∴OK for spacing
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 20 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 21

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 96 - Detailed EC2 Main Reinforcement Cont...
Min area of reinforcement = 2353 mm2 9.5.2 (2)
Max area of reinforcement (even at laps) = 125000 mm2 9.5.2 (3)
Actual area of main reinforcement (24H40) = 30159 mm2
∴ area by which steel can increase at laps = 94841 mm2
Starter bar area = 804 mm2

F
∴OK

PD
Member 96 - Detailed EC2 Shear Reinforcement
Spacing provided, s = 400 mm

Major axis:
Shear force, VEd = 581.63 kN
VRd,c = [CRd,c k (100 ρl fck)1/3 + k1σcp] bw d (6.2.a)
= [0.120 × 1.415 × (100 × 0.020 × 30)1/3 + 0.15 × -2.712] × 1250 × 1160
= 374.21 kN
te r
But ≥ (vmin + k1σcp) bwd (6.2.b)
= (0.32 + 0.15 × -2.712) × 1250 × 1160 = -121.84 kN
Hence, VRd,c = 374.21 kN
VEd > VRd,c ∴provide links such that VEd ≤ VRd 6.2.1(5)
VRd,max = αcwbwz ν1 fcd / (cot θ + tan θ) (6.9)
= 1.00 × 1250 × 1102 × 0.53 ×20.0 / (1.00 + 1.00) = 7273.70 kN
as

Asw VRd,max
∴required =
s z fywd cot θ
7273699.11
= = 15.180
1102 × 435 × 1.00
nM

Area of links provided (11H10), Asw = 863.94 mm2

Minor axis:
Shear force, VEd = 74.59 kN
VRd,c = [CRd,c k (100 ρl fck)1/3 + k1σcp] bw d (6.2.a)
= [0.120 × 1.451 × (100 × 0.020 × 30)1/3 + 0.15 × 2.452] × 1250 × 982
= 1287.96 kN
But ≥ (vmin + k1σcp) bwd (6.2.b)
= (0.34 + 0.15 × 2.452) × 1250 × 982 = 862.61 kN
di

Hence, VRd,c = 1287.96 kN


VEd ≤ VRd,c ∴only nominal links required 6.2.1(5)

Area of links provided (11H10), Asw = 863.94 mm2


a te

Minimum size of link bars = 10 mm 9.5.3 (1)


Actual size of link bars = 10 mm
∴ OK
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 21 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 22

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 98 - Detailed EC2 Design Requirements
Section Property: 1250 x 1250
Storey height = 4.600 m
Rectangular section: Width = 1250 mm Depth = 1250 mm
Cover = 60 mm

F
Member 98 - Detailed EC2 Main Reinforcement

PD
Axial N = 1774.61 kN
Major M, end 1, = 3147.86 kNm
end 2, = -868.59 kNm
Minor M, end 1, = 953.18 kNm
end 2, = 134.13 kNm

Slenderness
λlim = 20 ABC / √n (5.13N)
n = NEd / (Ac fcd) = 1775 ×103 / (1562500 × 20.0) = 0.057
te r
Major λlim, y = 20 × 1.00 × 1.20 × 1.99 / √0.057 = 201.20
Minor λlim, z = 20 × 1.00 × 1.20 × 1.50 / √0.057 = 151.21
λ = l0 / i (5.14)
λy = 5520 / 360.84 = 15.30
λz = 5520 / 360.84 = 15.30
Column is NOT SLENDER
as

Axial Capacity NRd = 37921.76 kN


Axial capacity ratio NEd / NRd = 0.05
Axial Capacity ≥ Axial ∴OK for axial resistance
Major Axis Capacity MRdy = 4653.69 kNm
nM

Major Axis Capacity Ratio MEdy / MRdy = 0.69


Major Axis Capacity ≥ Major Axis Moment ∴OK for moment resistance
Minor Axis Capacity MRdz = 4653.69 kNm
Minor Axis Capacity Ratio MEdz / MRdz = 0.22
Minor Axis Capacity ≥ Minor Axis Moment ∴OK for moment resistance
a a
MEdz  MEdy
Biaxial Interaction Equation =  +  ≤ 1,0 (5.39)
MRdz MRdy
Where exponent a = 1.00
1.00 1.00
1027.12 3221.81
di

Biaxial Interaction Equation =  +  = 0.91


4653.69 4653.69
Biaxial Interaction Result ≤ 1.0 ∴OK for biaxial resistance

Max distance between bars = 300 mm


Largest actual space between bars = 184 mm
a te

Min distance between bars = max bar diameter = 32 mm 8.2 (2)


Smallest actual space between bars = 184 mm
∴OK for spacing
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 22 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 23

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 98 - Detailed EC2 Main Reinforcement Cont...
Min area of reinforcement = 3125 mm2 9.5.2 (2)
Max area of reinforcement (even at laps) = 125000 mm2 9.5.2 (3)
Actual area of main reinforcement (20H32) = 16085 mm2
∴ area by which steel can increase at laps = 108915 mm2
Starter bar area = 804 mm2

F
∴OK

PD
Member 98 - Detailed EC2 Shear Reinforcement
Spacing provided, s = 400 mm

Major axis:
Shear force, VEd = 27.58 kN
VRd,c = [CRd,c k (100 ρl fck)1/3 + k1σcp] bw d (6.2.a)
= [0.120 × 1.415 × (100 × 0.011 × 30)1/3 + 0.15 × 1.571] × 1250 × 1164
= 1136.31 kN
te r
But ≥ (vmin + k1σcp) bwd (6.2.b)
= (0.32 + 0.15 × 1.571) × 1250 × 1164 = 812.06 kN
Hence, VRd,c = 1136.31 kN
VEd ≤ VRd,c ∴only nominal links required 6.2.1(5)

Area of links provided (8H10), Asw = 628.32 mm2


as

Minor axis:
Shear force, VEd = 117.58 kN
VRd,c = [CRd,c k (100 ρl fck)1/3 + k1σcp] bw d (6.2.a)
= [0.120 × 1.449 × (100 × 0.013 × 30)1/3 + 0.15 × 1.571] × 1250 × 993
nM

= 1023.62 kN
But ≥ (vmin + k1σcp) bwd (6.2.b)
= (0.33 + 0.15 × 1.571) × 1250 × 993 = 707.53 kN
Hence, VRd,c = 1023.62 kN
VEd ≤ VRd,c ∴only nominal links required 6.2.1(5)

Area of links provided (8H10), Asw = 628.32 mm2

Minimum size of link bars = 10 mm 9.5.3 (1)


di

Actual size of link bars = 10 mm


∴ OK
a te
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 23 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 24

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 99 - Detailed EC2 Design Requirements
Section Property: 1250 x 1250
Storey height = 4.600 m
Rectangular section: Width = 1250 mm Depth = 1250 mm
Cover = 60 mm

F
Member 99 - Detailed EC2 Main Reinforcement

PD
Axial N = 167.11 kN
Major M, end 1, = 794.68 kNm
end 2, = 52.41 kNm
Minor M, end 1, = 2022.03 kNm
end 2, = 127.32 kNm

Slenderness
λlim = 20 ABC / √n (5.13N)
n = NEd / (Ac fcd) = 167 ×103 / (1562500 × 20.0) = 0.005
te r
Major λlim, y = 20 × 1.00 × 1.17 × 1.63 / √0.005 = 518.22
Minor λlim, z = 20 × 1.00 × 1.17 × 1.63 / √0.005 = 520.74
λ = l0 / i (5.14)
λy = 5520 / 360.84 = 15.30
λz = 5520 / 360.84 = 15.30
Column is NOT SLENDER
as

Axial Capacity NRd = 36587.41 kN


Axial capacity ratio NEd / NRd = 0.00
Axial Capacity ≥ Axial ∴OK for axial resistance
Major Axis Capacity MRdy = 3185.90 kNm
nM

Major Axis Capacity Ratio MEdy / MRdy = 0.25


Major Axis Capacity ≥ Major Axis Moment ∴OK for moment resistance
Minor Axis Capacity MRdz = 3185.90 kNm
Minor Axis Capacity Ratio MEdz / MRdz = 0.64
Minor Axis Capacity ≥ Minor Axis Moment ∴OK for moment resistance
a a
MEdz  MEdy
Biaxial Interaction Equation =  +  ≤ 1,0 (5.39)
MRdz MRdy
Where exponent a = 1.00
1.00 1.00
2028.99  801.64 
di

Biaxial Interaction Equation =  +  = 0.89


3185.90 3185.90
Biaxial Interaction Result ≤ 1.0 ∴OK for biaxial resistance

Max distance between bars = 300 mm


Largest actual space between bars = 238 mm
a te

Min distance between bars = max bar diameter = 32 mm 8.2 (2)


Smallest actual space between bars = 238 mm
∴OK for spacing
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 24 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 25

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 99 - Detailed EC2 Main Reinforcement Cont...
Min area of reinforcement = 3125 mm2 9.5.2 (2)
Max area of reinforcement (even at laps) = 125000 mm2 9.5.2 (3)
Actual area of main reinforcement (16H32) = 12868 mm2
∴ area by which steel can increase at laps = 112132 mm2
Starter bar area = 804 mm2

F
∴OK

PD
Member 99 - Detailed EC2 Shear Reinforcement
Spacing provided, s = 400 mm

Major axis:
Shear force, VEd = 38.69 kN
VRd,c = [CRd,c k (100 ρl fck)1/3 + k1σcp] bw d (6.2.a)
= [0.120 × 1.415 × (100 × 0.009 × 30)1/3 + 0.15 × 1.402] × 1250 × 1164
= 1042.53 kN
te r
But ≥ (vmin + k1σcp) bwd (6.2.b)
= (0.32 + 0.15 × 1.402) × 1250 × 1164 = 775.16 kN
Hence, VRd,c = 1042.53 kN
VEd ≤ VRd,c ∴only nominal links required 6.2.1(5)

Area of links provided (7H10), Asw = 549.78 mm2


as

Minor axis:
Shear force, VEd = 49.33 kN
VRd,c = [CRd,c k (100 ρl fck)1/3 + k1σcp] bw d (6.2.a)
= [0.120 × 1.446 × (100 × 0.010 × 30)1/3 + 0.15 × 1.402] × 1250 × 1006
nM

= 947.64 kN
But ≥ (vmin + k1σcp) bwd (6.2.b)
= (0.33 + 0.15 × 1.402) × 1250 × 1006 = 683.58 kN
Hence, VRd,c = 947.64 kN
VEd ≤ VRd,c ∴only nominal links required 6.2.1(5)

Area of links provided (7H10), Asw = 549.78 mm2

Minimum size of link bars = 10 mm 9.5.3 (1)


di

Actual size of link bars = 10 mm


∴ OK
a te
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 25 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 26

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 101 - Detailed EC2 Design Requirements
Section Property: 1250 x 1250
Storey height = 4.600 m
Rectangular section: Width = 1250 mm Depth = 1250 mm
Cover = 60 mm

F
Member 101 - Detailed EC2 Main Reinforcement

PD
Axial N = 1247.76 kN
Major M, end 1, = 987.11 kNm
end 2, = 78.14 kNm
Minor M, end 1, = -2029.63 kNm
end 2, = -116.10 kNm

Slenderness
λlim = 20 ABC / √n (5.13N)
n = NEd / (Ac fcd) = 1248 ×103 / (1562500 × 20.0) = 0.040
te r
Major λlim, y = 20 × 1.00 × 1.17 × 1.57 / √0.040 = 183.68
Minor λlim, z = 20 × 1.00 × 1.17 × 1.62 / √0.040 = 188.87
λ = l0 / i (5.14)
λy = 5520 / 360.84 = 15.30
λz = 5520 / 360.84 = 15.30
Column is NOT SLENDER
as

Axial Capacity NRd = 36587.41 kN


Axial capacity ratio NEd / NRd = 0.03
Axial Capacity ≥ Axial ∴OK for axial resistance
Major Axis Capacity MRdy = 3733.59 kNm
nM

Major Axis Capacity Ratio MEdy / MRdy = 0.28


Major Axis Capacity ≥ Major Axis Moment ∴OK for moment resistance
Minor Axis Capacity MRdz = 3733.59 kNm
Minor Axis Capacity Ratio MEdz / MRdz = 0.56
Minor Axis Capacity ≥ Minor Axis Moment ∴OK for moment resistance
a a
MEdz  MEdy
Biaxial Interaction Equation =  +  ≤ 1,0 (5.39)
MRdz MRdy
Where exponent a = 1.00
1.00 1.00
2081.62 1039.10
di

Biaxial Interaction Equation =  +  = 0.84


3733.59 3733.59
Biaxial Interaction Result ≤ 1.0 ∴OK for biaxial resistance

Max distance between bars = 300 mm


Largest actual space between bars = 238 mm
a te

Min distance between bars = max bar diameter = 32 mm 8.2 (2)


Smallest actual space between bars = 238 mm
∴OK for spacing
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 26 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 27

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 101 - Detailed EC2 Main Reinforcement Cont...
Min area of reinforcement = 3125 mm2 9.5.2 (2)
Max area of reinforcement (even at laps) = 125000 mm2 9.5.2 (3)
Actual area of main reinforcement (16H32) = 12868 mm2
∴ area by which steel can increase at laps = 112132 mm2
Starter bar area = 804 mm2

F
∴OK

PD
Member 101 - Detailed EC2 Shear Reinforcement
Spacing provided, s = 400 mm

Major axis:
Shear force, VEd = 44.11 kN
VRd,c = [CRd,c k (100 ρl fck)1/3 + k1σcp] bw d (6.2.a)
= [0.120 × 1.415 × (100 × 0.009 × 30)1/3 + 0.15 × 1.349] × 1250 × 1164
= 1031.03 kN
te r
But ≥ (vmin + k1σcp) bwd (6.2.b)
= (0.32 + 0.15 × 1.349) × 1250 × 1164 = 763.66 kN
Hence, VRd,c = 1031.03 kN
VEd ≤ VRd,c ∴only nominal links required 6.2.1(5)

Area of links provided (7H10), Asw = 549.78 mm2


as

Minor axis:
Shear force, VEd = 16.43 kN
VRd,c = [CRd,c k (100 ρl fck)1/3 + k1σcp] bw d (6.2.a)
= [0.120 × 1.446 × (100 × 0.010 × 30)1/3 + 0.15 × 1.349] × 1250 × 1006
nM

= 937.70 kN
But ≥ (vmin + k1σcp) bwd (6.2.b)
= (0.33 + 0.15 × 1.349) × 1250 × 1006 = 673.64 kN
Hence, VRd,c = 937.70 kN
VEd ≤ VRd,c ∴only nominal links required 6.2.1(5)

Area of links provided (7H10), Asw = 549.78 mm2

Minimum size of link bars = 10 mm 9.5.3 (1)


di

Actual size of link bars = 10 mm


∴ OK
a te
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 27 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 28

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 102 - Detailed EC2 Design Requirements
Section Property: 1250 x 1250
Storey height = 4.600 m
Rectangular section: Width = 1250 mm Depth = 1250 mm
Cover = 60 mm

F
Member 102 - Detailed EC2 Main Reinforcement

PD
Axial N = -5875.09 kN
Major M, end 1, = 2953.94 kNm
end 2, = -252.76 kNm
Minor M, end 1, = -497.50 kNm
end 2, = -149.11 kNm

Slenderness
λlim = 20 ABC / √n (5.13N)
n = NEd / (Ac fcd) = -5875 ×103 / (1562500 × 20.0) = -0.188
te r
Major λlim, y = 20 × 1.00 × 1.36 × 1.86 / √-0.188 = 1855548.60
Minor λlim, z = 20 × 1.00 × 1.36 × 1.17 / √-0.188 = 1169346.90
λ = l0 / i (5.14)
λy = 5520 / 360.84 = 15.30
λz = 5520 / 360.84 = 15.30
Column is NOT SLENDER
as

Axial Capacity NRd = 43759.55 kN


Axial capacity ratio NEd / NRd = -0.13
Axial Capacity ≥ Axial ∴OK for axial resistance
Major Axis Capacity MRdy = 3973.37 kNm
nM

Major Axis Capacity Ratio MEdy / MRdy = 0.81


Major Axis Capacity ≥ Major Axis Moment ∴OK for moment resistance
Minor Axis Capacity MRdz = 3973.37 kNm
Minor Axis Capacity Ratio MEdz / MRdz = 0.19
Minor Axis Capacity ≥ Minor Axis Moment ∴OK for moment resistance
a a
MEdz  MEdy
Biaxial Interaction Equation =  +  ≤ 1,0 (5.39)
MRdz MRdy
Where exponent a = 1.00
1.00 1.00
 742.30  3198.73
di

Biaxial Interaction Equation =  +  = 0.99


3973.37 3973.37
Biaxial Interaction Result ≤ 1.0 ∴OK for biaxial resistance

Max distance between bars = 300 mm


Largest actual space between bars = 138 mm
a te

Min distance between bars = max bar diameter = 40 mm 8.2 (2)


Smallest actual space between bars = 138 mm
∴OK for spacing
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 28 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 29

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 102 - Detailed EC2 Main Reinforcement Cont...
Min area of reinforcement = 2353 mm2 9.5.2 (2)
Max area of reinforcement (even at laps) = 125000 mm2 9.5.2 (3)
Actual area of main reinforcement (24H40) = 30159 mm2
∴ area by which steel can increase at laps = 94841 mm2
Starter bar area = 804 mm2

F
∴OK

PD
Member 102 - Detailed EC2 Shear Reinforcement
Spacing provided, s = 400 mm

Major axis:
Shear force, VEd = 699.47 kN
VRd,c = [CRd,c k (100 ρl fck)1/3 + k1σcp] bw d (6.2.a)
= [0.120 × 1.415 × (100 × 0.020 × 30)1/3 + 0.15 × -3.708] × 1250 × 1160
= 157.54 kN
te r
But ≥ (vmin + k1σcp) bwd (6.2.b)
= (0.32 + 0.15 × -3.708) × 1250 × 1160 = -338.50 kN
Hence, VRd,c = 157.54 kN
VEd > VRd,c ∴provide links such that VEd ≤ VRd 6.2.1(5)
VRd,max = αcwbwz ν1 fcd / (cot θ + tan θ) (6.9)
= 1.00 × 1250 × 1114 × 0.53 ×20.0 / (1.00 + 1.00) = 7351.04 kN
as

Asw VRd,max Provided R/f is much higher than than


∴required =
s z fywd cot θ the R/F considered by staad for
7351041.61 checking. Hence provided R/f is on higer
= = 15.180
1114 × 435 × 1.00 side.
nM

Area of links provided (11H10), Asw = 863.94 mm2

Minor axis:
Shear force, VEd = 65.54 kN
VRd,c = [CRd,c k (100 ρl fck)1/3 + k1σcp] bw d (6.2.a)
= [0.120 × 1.451 × (100 × 0.020 × 30)1/3 + 0.15 × 1.358] × 1250 × 982
= 1086.64 kN
But ≥ (vmin + k1σcp) bwd (6.2.b)
= (0.34 + 0.15 × 1.358) × 1250 × 982 = 661.29 kN
di

Hence, VRd,c = 1086.64 kN


VEd ≤ VRd,c ∴only nominal links required 6.2.1(5)

Area of links provided (11H10), Asw = 863.94 mm2


a te

Minimum size of link bars = 10 mm 9.5.3 (1)


Actual size of link bars = 10 mm
∴ NOT OK
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 29 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 30

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 104 - Detailed EC2 Design Requirements
Section Property: 600 x 400
Storey height = 4.600 m
Rectangular section: Width = 600 mm Depth = 400 mm
Cover = 60 mm

F
Member 104 - Detailed EC2 Main Reinforcement

PD
Axial N = 242.50 kN
Major M, end 1, = 2.50 kNm
end 2, = -1.18 kNm
Minor M, end 1, = -69.65 kNm
end 2, = 18.64 kNm

Slenderness
λlim = 20 ABC / √n (5.13N)
n = NEd / (Ac fcd) = 242 ×103 / (240000 × 20.0) = 0.051
te r
Major λlim, y = 20 × 1.00 × 1.08 × 2.52 / √0.051 = 241.87
Minor λlim, z = 20 × 1.00 × 1.08 × 2.02 / √0.051 = 193.46
λ = l0 / i (5.14)
λy = 5520 / 115.47 = 47.80
λz = 5520 / 173.21 = 31.87
Column is NOT SLENDER
as

Axial Capacity NRd = 5175.29 kN


Axial capacity ratio NEd / NRd = 0.05
Axial Capacity ≥ Axial ∴OK for axial resistance
Major Axis Capacity MRdy = 108.35 kNm
nM

Major Axis Capacity Ratio MEdy / MRdy = 0.07


Major Axis Capacity ≥ Major Axis Moment ∴OK for moment resistance
Minor Axis Capacity MRdz = 164.64 kNm
Minor Axis Capacity Ratio MEdz / MRdz = 0.45
Minor Axis Capacity ≥ Minor Axis Moment ∴OK for moment resistance
a a
MEdz  MEdy
Biaxial Interaction Equation =  +  ≤ 1,0 (5.39)
MRdz MRdy
Where exponent a = 1.00
1.00 1.00
 74.50   7.35 
di

Biaxial Interaction Equation =  +  = 0.52


164.64 108.35
Biaxial Interaction Result ≤ 1.0 ∴OK for biaxial resistance

Max distance between bars = 300 mm


Largest actual space between bars = 212 mm
a te

Min distance between bars = dg + 5 mm = 25 mm 8.2 (2)


Smallest actual space between bars = 112 mm
∴OK for spacing
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 30 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 31

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 104 - Detailed EC2 Main Reinforcement Cont...
Min area of reinforcement = 480 mm2 9.5.2 (2)
Max area of reinforcement (even at laps) = 19200 mm2 9.5.2 (3)
Actual area of main reinforcement (8H12) = 905 mm2
∴ area by which steel can increase at laps = 18295 mm2
Starter bar area = 804 mm2

F
∴OK

PD
Member 104 - Detailed EC2 Shear Reinforcement
Spacing provided, s = 225 mm

Major axis:
Shear force, VEd = 1.87 kN
VRd,c = [CRd,c k (100 ρl fck)1/3 + k1σcp] bw d (6.2.a)
= [0.120 × 1.786 × (100 × 0.005 × 30)1/3 + 0.15 × 0.936] × 600 × 324
= 127.60 kN
te r
But ≥ (vmin + k1σcp) bwd (6.2.b)
= (0.46 + 0.15 × 0.936) × 600 × 324 = 116.22 kN
Hence, VRd,c = 127.60 kN
VEd ≤ VRd,c ∴only nominal links required 6.2.1(5)

Area of links provided (3H10), Asw = 235.62 mm2


as

Minor axis:
Shear force, VEd = 5.77 kN
VRd,c = [CRd,c k (100 ρl fck)1/3 + k1σcp] bw d (6.2.a)
= [0.120 × 1.644 × (100 × 0.005 × 30)1/3 + 0.15 × 0.936] × 400 × 483
nM

= 119.05 kN
But ≥ (vmin + k1σcp) bwd (6.2.b)
= (0.40 + 0.15 × 0.936) × 400 × 483 = 105.14 kN
Hence, VRd,c = 119.05 kN
VEd ≤ VRd,c ∴only nominal links required 6.2.1(5)

Area of links provided (2H10), Asw = 157.08 mm2

Minimum size of link bars = 10 mm 9.5.3 (1)


di

Actual size of link bars = 10 mm


∴ OK
a te
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 31 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 32

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 105 - Detailed EC2 Design Requirements
Section Property: 600 x 400
Storey height = 4.600 m
Rectangular section: Width = 600 mm Depth = 400 mm
Cover = 60 mm

F
Member 105 - Detailed EC2 Main Reinforcement

PD
Axial N = -75.44 kN
Major M, end 1, = 10.73 kNm
end 2, = -15.21 kNm
Minor M, end 1, = -67.94 kNm
end 2, = 11.79 kNm

Slenderness
λlim = 20 ABC / √n (5.13N)
n = NEd / (Ac fcd) = -75 ×103 / (240000 × 20.0) = -0.016
te r
Major λlim, y = 20 × 1.00 × 1.12 × 2.43 / √-0.016 = 2432251.45
Minor λlim, z = 20 × 1.00 × 1.12 × 1.89 / √-0.016 = 1891507.95
λ = l0 / i (5.14)
λy = 5520 / 115.47 = 47.80
λz = 5520 / 173.21 = 31.87
Column is NOT SLENDER
as

Axial Capacity NRd = 5362.93 kN


Axial capacity ratio NEd / NRd = -0.01
Axial Capacity ≥ Axial ∴OK for axial resistance
Major Axis Capacity MRdy = 90.74 kNm
nM

Major Axis Capacity Ratio MEdy / MRdy = 0.18


Major Axis Capacity ≥ Major Axis Moment ∴OK for moment resistance
Minor Axis Capacity MRdz = 135.49 kNm
Minor Axis Capacity Ratio MEdz / MRdz = 0.51
Minor Axis Capacity ≥ Minor Axis Moment ∴OK for moment resistance
a a
MEdz  MEdy
Biaxial Interaction Equation =  +  ≤ 1,0 (5.39)
MRdz MRdy
Where exponent a = 1.00
1.00 1.00
 69.45  16.72
di

Biaxial Interaction Equation =  +  = 0.70


135.49 90.74
Biaxial Interaction Result ≤ 1.0 ∴OK for biaxial resistance

Max distance between bars = 300 mm


Largest actual space between bars = 137 mm
a te

Min distance between bars = dg + 5 mm = 25 mm 8.2 (2)


Smallest actual space between bars = 71 mm
∴OK for spacing
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 32 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 33

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 105 - Detailed EC2 Main Reinforcement Cont...
Min area of reinforcement = 361 mm2 9.5.2 (2)
Max area of reinforcement (even at laps) = 19200 mm2 9.5.2 (3)
Actual area of main reinforcement (12H12) = 1357 mm2
∴ area by which steel can increase at laps = 17843 mm2
Starter bar area = 804 mm2

F
∴OK

PD
Member 105 - Detailed EC2 Shear Reinforcement
Spacing provided, s = 225 mm

Major axis:
Shear force, VEd = 2.34 kN
VRd,c = [CRd,c k (100 ρl fck)1/3 + k1σcp] bw d (6.2.a)
= [0.120 × 1.786 × (100 × 0.007 × 30)1/3 + 0.15 × -0.201] × 600 × 324
= 108.95 kN
te r
But ≥ (vmin + k1σcp) bwd (6.2.b)
= (0.46 + 0.15 × -0.201) × 600 × 324 = 83.05 kN
Hence, VRd,c = 108.95 kN
VEd ≤ VRd,c ∴only nominal links required 6.2.1(5)

Area of links provided (2H10), Asw = 157.08 mm2


as

Minor axis:
Shear force, VEd = 4.45 kN
VRd,c = [CRd,c k (100 ρl fck)1/3 + k1σcp] bw d (6.2.a)
= [0.120 × 1.654 × (100 × 0.007 × 30)1/3 + 0.15 × -0.201] × 400 × 467
nM

= 97.95 kN
But ≥ (vmin + k1σcp) bwd (6.2.b)
= (0.41 + 0.15 × -0.201) × 400 × 467 = 70.56 kN
Hence, VRd,c = 97.95 kN
VEd ≤ VRd,c ∴only nominal links required 6.2.1(5)

Area of links provided (2H10), Asw = 157.08 mm2

Minimum size of link bars = 10 mm 9.5.3 (1)


di

Actual size of link bars = 10 mm


∴ OK
a te
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 33 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 34

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 106 - Detailed EC2 Design Requirements
Section Property: 600 x 400
Storey height = 4.600 m
Rectangular section: Width = 600 mm Depth = 400 mm
Cover = 60 mm

F
Member 106 - Detailed EC2 Main Reinforcement

PD
Axial N = 272.69 kN
Major M, end 1, = 16.69 kNm
end 2, = -13.06 kNm
Minor M, end 1, = -71.78 kNm
end 2, = -0.79 kNm

Slenderness
λlim = 20 ABC / √n (5.13N)
n = NEd / (Ac fcd) = 273 ×103 / (240000 × 20.0) = 0.057
te r
Major λlim, y = 20 × 1.00 × 1.08 × 2.54 / √0.057 = 229.59
Minor λlim, z = 20 × 1.00 × 1.08 × 1.62 / √0.057 = 146.57
λ = l0 / i (5.14)
λy = 5520 / 115.47 = 47.80
λz = 5520 / 173.21 = 31.87
Column is NOT SLENDER
as

Axial Capacity NRd = 5175.29 kN


Axial capacity ratio NEd / NRd = 0.05
Axial Capacity ≥ Axial ∴OK for axial resistance
Major Axis Capacity MRdy = 112.65 kNm
nM

Major Axis Capacity Ratio MEdy / MRdy = 0.20


Major Axis Capacity ≥ Major Axis Moment ∴OK for moment resistance
Minor Axis Capacity MRdz = 171.67 kNm
Minor Axis Capacity Ratio MEdz / MRdz = 0.45
Minor Axis Capacity ≥ Minor Axis Moment ∴OK for moment resistance
a a
MEdz  MEdy
Biaxial Interaction Equation =  +  ≤ 1,0 (5.39)
MRdz MRdy
Where exponent a = 1.00
1.00 1.00
 77.23   22.15 
di

Biaxial Interaction Equation =  +  = 0.65


171.67 112.65
Biaxial Interaction Result ≤ 1.0 ∴OK for biaxial resistance

Max distance between bars = 300 mm


Largest actual space between bars = 212 mm
a te

Min distance between bars = dg + 5 mm = 25 mm 8.2 (2)


Smallest actual space between bars = 112 mm
∴OK for spacing
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 34 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 35

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 106 - Detailed EC2 Main Reinforcement Cont...
Min area of reinforcement = 480 mm2 9.5.2 (2)
Max area of reinforcement (even at laps) = 19200 mm2 9.5.2 (3)
Actual area of main reinforcement (8H12) = 905 mm2
∴ area by which steel can increase at laps = 18295 mm2
Starter bar area = 804 mm2

F
∴OK

PD
Member 106 - Detailed EC2 Shear Reinforcement
Spacing provided, s = 225 mm

Major axis:
Shear force, VEd = 0.36 kN
VRd,c = [CRd,c k (100 ρl fck)1/3 + k1σcp] bw d (6.2.a)
= [0.120 × 1.786 × (100 × 0.005 × 30)1/3 + 0.15 × 1.141] × 600 × 324
= 133.58 kN
te r
But ≥ (vmin + k1σcp) bwd (6.2.b)
= (0.46 + 0.15 × 1.141) × 600 × 324 = 122.19 kN
Hence, VRd,c = 133.58 kN
VEd ≤ VRd,c ∴only nominal links required 6.2.1(5)

Area of links provided (3H10), Asw = 235.62 mm2


as

Minor axis:
Shear force, VEd = 11.73 kN
VRd,c = [CRd,c k (100 ρl fck)1/3 + k1σcp] bw d (6.2.a)
= [0.120 × 1.644 × (100 × 0.005 × 30)1/3 + 0.15 × 1.141] × 400 × 483
nM

= 124.99 kN
But ≥ (vmin + k1σcp) bwd (6.2.b)
= (0.40 + 0.15 × 1.141) × 400 × 483 = 111.08 kN
Hence, VRd,c = 124.99 kN
VEd ≤ VRd,c ∴only nominal links required 6.2.1(5)

Area of links provided (2H10), Asw = 157.08 mm2

Minimum size of link bars = 10 mm 9.5.3 (1)


di

Actual size of link bars = 10 mm


∴ OK
a te
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 35 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 36

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 107 - Detailed EC2 Design Requirements
Section Property: 600 x 400
Storey height = 4.600 m
Rectangular section: Width = 600 mm Depth = 400 mm
Cover = 60 mm

F
Member 107 - Detailed EC2 Main Reinforcement

PD
Axial N = -127.19 kN
Major M, end 1, = 16.45 kNm
end 2, = -12.62 kNm
Minor M, end 1, = -81.61 kNm
end 2, = 15.63 kNm

Slenderness
λlim = 20 ABC / √n (5.13N)
n = NEd / (Ac fcd) = -127 ×103 / (240000 × 20.0) = -0.026
te r
Major λlim, y = 20 × 1.00 × 1.12 × 2.50 / √-0.026 = 2498606.29
Minor λlim, z = 20 × 1.00 × 1.12 × 1.92 / √-0.026 = 1915974.04
λ = l0 / i (5.14)
λy = 5520 / 115.47 = 47.80
λz = 5520 / 173.21 = 31.87
Column is NOT SLENDER
as

Axial Capacity NRd = 5362.93 kN


Axial capacity ratio NEd / NRd = -0.02
Axial Capacity ≥ Axial ∴OK for axial resistance
Major Axis Capacity MRdy = 83.39 kNm
nM

Major Axis Capacity Ratio MEdy / MRdy = 0.23


Major Axis Capacity ≥ Major Axis Moment ∴OK for moment resistance
Minor Axis Capacity MRdz = 123.19 kNm
Minor Axis Capacity Ratio MEdz / MRdz = 0.68
Minor Axis Capacity ≥ Minor Axis Moment ∴OK for moment resistance
a a
MEdz  MEdy
Biaxial Interaction Equation =  +  ≤ 1,0 (5.39)
MRdz MRdy
Where exponent a = 1.00
1.00 1.00
 84.15  18.99
di

Biaxial Interaction Equation =  +  = 0.91


123.19 83.39
Biaxial Interaction Result ≤ 1.0 ∴OK for biaxial resistance

Max distance between bars = 300 mm


Largest actual space between bars = 137 mm
a te

Min distance between bars = dg + 5 mm = 25 mm 8.2 (2)


Smallest actual space between bars = 71 mm
∴OK for spacing
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 36 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 37

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 107 - Detailed EC2 Main Reinforcement Cont...
Min area of reinforcement = 361 mm2 9.5.2 (2)
Max area of reinforcement (even at laps) = 19200 mm2 9.5.2 (3)
Actual area of main reinforcement (12H12) = 1357 mm2
∴ area by which steel can increase at laps = 17843 mm2
Starter bar area = 804 mm2

F
∴OK

PD
Member 107 - Detailed EC2 Shear Reinforcement
Spacing provided, s = 225 mm

Major axis:
Shear force, VEd = 0.18 kN
VRd,c = [CRd,c k (100 ρl fck)1/3 + k1σcp] bw d (6.2.a)
= [0.120 × 1.786 × (100 × 0.007 × 30)1/3 + 0.15 × -0.437] × 600 × 324
= 102.08 kN
te r
But ≥ (vmin + k1σcp) bwd (6.2.b)
= (0.46 + 0.15 × -0.437) × 600 × 324 = 76.18 kN
Hence, VRd,c = 102.08 kN
VEd ≤ VRd,c ∴only nominal links required 6.2.1(5)

Area of links provided (2H10), Asw = 157.08 mm2


as

Minor axis:
Shear force, VEd = 16.03 kN
VRd,c = [CRd,c k (100 ρl fck)1/3 + k1σcp] bw d (6.2.a)
= [0.120 × 1.654 × (100 × 0.007 × 30)1/3 + 0.15 × -0.437] × 400 × 467
nM

= 91.34 kN
But ≥ (vmin + k1σcp) bwd (6.2.b)
= (0.41 + 0.15 × -0.437) × 400 × 467 = 63.95 kN
Hence, VRd,c = 91.34 kN
VEd ≤ VRd,c ∴only nominal links required 6.2.1(5)

Area of links provided (2H10), Asw = 157.08 mm2

Minimum size of link bars = 10 mm 9.5.3 (1)


di

Actual size of link bars = 10 mm


∴ OK
a te
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 37 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 38

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 108 - Detailed EC2 Design Requirements
Section Property: 600 x 400
Storey height = 4.600 m
Rectangular section: Width = 600 mm Depth = 400 mm
Cover = 60 mm

F
Member 108 - Detailed EC2 Main Reinforcement

PD
Axial N = 277.69 kN
Major M, end 1, = 17.06 kNm
end 2, = -14.46 kNm
Minor M, end 1, = -72.90 kNm
end 2, = 2.95 kNm

Slenderness
λlim = 20 ABC / √n (5.13N)
n = NEd / (Ac fcd) = 278 ×103 / (240000 × 20.0) = 0.058
te r
Major λlim, y = 20 × 1.00 × 1.08 × 2.59 / √0.058 = 231.92
Minor λlim, z = 20 × 1.00 × 1.08 × 1.81 / √0.058 = 162.23
λ = l0 / i (5.14)
λy = 5520 / 115.47 = 47.80
λz = 5520 / 173.21 = 31.87
Column is NOT SLENDER
as

Axial Capacity NRd = 5175.29 kN


Axial capacity ratio NEd / NRd = 0.05
Axial Capacity ≥ Axial ∴OK for axial resistance
Major Axis Capacity MRdy = 113.36 kNm
nM

Major Axis Capacity Ratio MEdy / MRdy = 0.20


Major Axis Capacity ≥ Major Axis Moment ∴OK for moment resistance
Minor Axis Capacity MRdz = 172.84 kNm
Minor Axis Capacity Ratio MEdz / MRdz = 0.45
Minor Axis Capacity ≥ Minor Axis Moment ∴OK for moment resistance
a a
MEdz  MEdy
Biaxial Interaction Equation =  +  ≤ 1,0 (5.39)
MRdz MRdy
Where exponent a = 1.00
1.00 1.00
 78.46   22.61 
di

Biaxial Interaction Equation =  +  = 0.65


172.84 113.36
Biaxial Interaction Result ≤ 1.0 ∴OK for biaxial resistance

Max distance between bars = 300 mm


Largest actual space between bars = 212 mm
a te

Min distance between bars = dg + 5 mm = 25 mm 8.2 (2)


Smallest actual space between bars = 112 mm
∴OK for spacing
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 38 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 39

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 108 - Detailed EC2 Main Reinforcement Cont...
Min area of reinforcement = 480 mm2 9.5.2 (2)
Max area of reinforcement (even at laps) = 19200 mm2 9.5.2 (3)
Actual area of main reinforcement (8H12) = 905 mm2
∴ area by which steel can increase at laps = 18295 mm2
Starter bar area = 804 mm2

F
∴OK

PD
Member 108 - Detailed EC2 Shear Reinforcement
Spacing provided, s = 225 mm

Major axis:
Shear force, VEd = 0.87 kN
VRd,c = [CRd,c k (100 ρl fck)1/3 + k1σcp] bw d (6.2.a)
= [0.120 × 1.786 × (100 × 0.005 × 30)1/3 + 0.15 × 1.143] × 600 × 324
= 133.65 kN
te r
But ≥ (vmin + k1σcp) bwd (6.2.b)
= (0.46 + 0.15 × 1.143) × 600 × 324 = 122.27 kN
Hence, VRd,c = 133.65 kN
VEd ≤ VRd,c ∴only nominal links required 6.2.1(5)

Area of links provided (3H10), Asw = 235.62 mm2


as

Minor axis:
Shear force, VEd = 11.28 kN
VRd,c = [CRd,c k (100 ρl fck)1/3 + k1σcp] bw d (6.2.a)
= [0.120 × 1.644 × (100 × 0.005 × 30)1/3 + 0.15 × 1.143] × 400 × 483
nM

= 125.06 kN
But ≥ (vmin + k1σcp) bwd (6.2.b)
= (0.40 + 0.15 × 1.143) × 400 × 483 = 111.15 kN
Hence, VRd,c = 125.06 kN
VEd ≤ VRd,c ∴only nominal links required 6.2.1(5)

Area of links provided (2H10), Asw = 157.08 mm2

Minimum size of link bars = 10 mm 9.5.3 (1)


di

Actual size of link bars = 10 mm


∴ OK
a te
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 39 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 40

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 109 - Detailed EC2 Design Requirements
Section Property: 600 x 400
Storey height = 4.600 m
Rectangular section: Width = 600 mm Depth = 400 mm
Cover = 60 mm

F
Member 109 - Detailed EC2 Main Reinforcement

PD
Axial N = -125.47 kN
Major M, end 1, = -14.75 kNm
end 2, = 11.32 kNm
Minor M, end 1, = -80.02 kNm
end 2, = 14.89 kNm

Slenderness
λlim = 20 ABC / √n (5.13N)
n = NEd / (Ac fcd) = -125 ×103 / (240000 × 20.0) = -0.026
te r
Major λlim, y = 20 × 1.00 × 1.12 × 2.50 / √-0.026 = 2501144.81
Minor λlim, z = 20 × 1.00 × 1.12 × 1.91 / √-0.026 = 1910864.19
λ = l0 / i (5.14)
λy = 5520 / 115.47 = 47.80
λz = 5520 / 173.21 = 31.87
Column is NOT SLENDER
as

Axial Capacity NRd = 5362.93 kN


Axial capacity ratio NEd / NRd = -0.02
Axial Capacity ≥ Axial ∴OK for axial resistance
Major Axis Capacity MRdy = 83.64 kNm
nM

Major Axis Capacity Ratio MEdy / MRdy = 0.21


Major Axis Capacity ≥ Major Axis Moment ∴OK for moment resistance
Minor Axis Capacity MRdz = 123.60 kNm
Minor Axis Capacity Ratio MEdz / MRdz = 0.67
Minor Axis Capacity ≥ Minor Axis Moment ∴OK for moment resistance
a a
MEdz  MEdy
Biaxial Interaction Equation =  +  ≤ 1,0 (5.39)
MRdz MRdy
Where exponent a = 1.00
1.00 1.00
 82.53  17.26
di

Biaxial Interaction Equation =  +  = 0.87


123.60 83.64
Biaxial Interaction Result ≤ 1.0 ∴OK for biaxial resistance

Max distance between bars = 300 mm


Largest actual space between bars = 137 mm
a te

Min distance between bars = dg + 5 mm = 25 mm 8.2 (2)


Smallest actual space between bars = 71 mm
∴OK for spacing
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 40 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 41

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 109 - Detailed EC2 Main Reinforcement Cont...
Min area of reinforcement = 361 mm2 9.5.2 (2)
Max area of reinforcement (even at laps) = 19200 mm2 9.5.2 (3)
Actual area of main reinforcement (12H12) = 1357 mm2
∴ area by which steel can increase at laps = 17843 mm2
Starter bar area = 804 mm2

F
∴OK

PD
Member 109 - Detailed EC2 Shear Reinforcement
Spacing provided, s = 225 mm

Major axis:
Shear force, VEd = 0.43 kN
VRd,c = [CRd,c k (100 ρl fck)1/3 + k1σcp] bw d (6.2.a)
= [0.120 × 1.786 × (100 × 0.007 × 30)1/3 + 0.15 × -0.433] × 600 × 324
= 102.21 kN
te r
But ≥ (vmin + k1σcp) bwd (6.2.b)
= (0.46 + 0.15 × -0.433) × 600 × 324 = 76.31 kN
Hence, VRd,c = 102.21 kN
VEd ≤ VRd,c ∴only nominal links required 6.2.1(5)

Area of links provided (2H10), Asw = 157.08 mm2


as

Minor axis:
Shear force, VEd = 15.75 kN
VRd,c = [CRd,c k (100 ρl fck)1/3 + k1σcp] bw d (6.2.a)
= [0.120 × 1.654 × (100 × 0.007 × 30)1/3 + 0.15 × -0.433] × 400 × 467
nM

= 91.46 kN
But ≥ (vmin + k1σcp) bwd (6.2.b)
= (0.41 + 0.15 × -0.433) × 400 × 467 = 64.07 kN
Hence, VRd,c = 91.46 kN
VEd ≤ VRd,c ∴only nominal links required 6.2.1(5)

Area of links provided (2H10), Asw = 157.08 mm2

Minimum size of link bars = 10 mm 9.5.3 (1)


di

Actual size of link bars = 10 mm


∴ OK
a te
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 41 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 42

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 110 - Detailed EC2 Design Requirements
Section Property: 600 x 400
Storey height = 4.600 m
Rectangular section: Width = 600 mm Depth = 400 mm
Cover = 60 mm

F
Member 110 - Detailed EC2 Main Reinforcement

PD
Axial N = 241.90 kN
Major M, end 1, = 0.13 kNm
end 2, = -0.34 kNm
Minor M, end 1, = -66.50 kNm
end 2, = 16.35 kNm

Slenderness
λlim = 20 ABC / √n (5.13N)
n = NEd / (Ac fcd) = 242 ×103 / (240000 × 20.0) = 0.050
te r
Major λlim, y = 20 × 1.00 × 1.08 × 0.70 / √0.050 = 67.28
Minor λlim, z = 20 × 1.00 × 1.08 × 2.00 / √0.050 = 191.95
λ = l0 / i (5.14)
λy = 5520 / 115.47 = 47.80
λz = 5520 / 173.21 = 31.87
Column is NOT SLENDER
as

Axial Capacity NRd = 5175.29 kN


Axial capacity ratio NEd / NRd = 0.05
Axial Capacity ≥ Axial ∴OK for axial resistance
Major Axis Capacity MRdy = 108.26 kNm
nM

Major Axis Capacity Ratio MEdy / MRdy = 0.05


Major Axis Capacity ≥ Major Axis Moment ∴OK for moment resistance
Minor Axis Capacity MRdz = 164.50 kNm
Minor Axis Capacity Ratio MEdz / MRdz = 0.43
Minor Axis Capacity ≥ Minor Axis Moment ∴OK for moment resistance
a a
MEdz  MEdy
Biaxial Interaction Equation =  +  ≤ 1,0 (5.39)
MRdz MRdy
Where exponent a = 1.00
1.00 1.00
 71.34   5.18 
di

Biaxial Interaction Equation =  +  = 0.48


164.50 108.26
Biaxial Interaction Result ≤ 1.0 ∴OK for biaxial resistance

Max distance between bars = 300 mm


Largest actual space between bars = 212 mm
a te

Min distance between bars = dg + 5 mm = 25 mm 8.2 (2)


Smallest actual space between bars = 112 mm
∴OK for spacing
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 42 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 43

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 110 - Detailed EC2 Main Reinforcement Cont...
Min area of reinforcement = 480 mm2 9.5.2 (2)
Max area of reinforcement (even at laps) = 19200 mm2 9.5.2 (3)
Actual area of main reinforcement (8H12) = 905 mm2
∴ area by which steel can increase at laps = 18295 mm2
Starter bar area = 804 mm2

F
∴OK

PD
Member 110 - Detailed EC2 Shear Reinforcement
Spacing provided, s = 225 mm

Major axis:
Shear force, VEd = 2.35 kN
VRd,c = [CRd,c k (100 ρl fck)1/3 + k1σcp] bw d (6.2.a)
= [0.120 × 1.786 × (100 × 0.005 × 30)1/3 + 0.15 × 0.937] × 600 × 324
= 127.64 kN
te r
But ≥ (vmin + k1σcp) bwd (6.2.b)
= (0.46 + 0.15 × 0.937) × 600 × 324 = 116.26 kN
Hence, VRd,c = 127.64 kN
VEd ≤ VRd,c ∴only nominal links required 6.2.1(5)

Area of links provided (3H10), Asw = 235.62 mm2


as

Minor axis:
Shear force, VEd = 4.95 kN
VRd,c = [CRd,c k (100 ρl fck)1/3 + k1σcp] bw d (6.2.a)
= [0.120 × 1.644 × (100 × 0.005 × 30)1/3 + 0.15 × 0.937] × 400 × 483
nM

= 119.09 kN
But ≥ (vmin + k1σcp) bwd (6.2.b)
= (0.40 + 0.15 × 0.937) × 400 × 483 = 105.18 kN
Hence, VRd,c = 119.09 kN
VEd ≤ VRd,c ∴only nominal links required 6.2.1(5)

Area of links provided (2H10), Asw = 157.08 mm2

Minimum size of link bars = 10 mm 9.5.3 (1)


di

Actual size of link bars = 10 mm


∴ OK
a te
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 43 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 44

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 111 - Detailed EC2 Design Requirements
Section Property: 600 x 400
Storey height = 4.600 m
Rectangular section: Width = 600 mm Depth = 400 mm
Cover = 60 mm

F
Member 111 - Detailed EC2 Main Reinforcement

PD
Axial N = -73.62 kN
Major M, end 1, = -8.08 kNm
end 2, = 13.66 kNm
Minor M, end 1, = -65.60 kNm
end 2, = 10.63 kNm

Slenderness
λlim = 20 ABC / √n (5.13N)
n = NEd / (Ac fcd) = -74 ×103 / (240000 × 20.0) = -0.015
te r
Major λlim, y = 20 × 1.00 × 1.12 × 2.33 / √-0.015 = 2331108.54
Minor λlim, z = 20 × 1.00 × 1.12 × 1.88 / √-0.015 = 1880391.85
λ = l0 / i (5.14)
λy = 5520 / 115.47 = 47.80
λz = 5520 / 173.21 = 31.87
Column is NOT SLENDER
as

Axial Capacity NRd = 5362.93 kN


Axial capacity ratio NEd / NRd = -0.01
Axial Capacity ≥ Axial ∴OK for axial resistance
Major Axis Capacity MRdy = 91.00 kNm
nM

Major Axis Capacity Ratio MEdy / MRdy = 0.17


Major Axis Capacity ≥ Major Axis Moment ∴OK for moment resistance
Minor Axis Capacity MRdz = 135.93 kNm
Minor Axis Capacity Ratio MEdz / MRdz = 0.49
Minor Axis Capacity ≥ Minor Axis Moment ∴OK for moment resistance
a a
MEdz  MEdy
Biaxial Interaction Equation =  +  ≤ 1,0 (5.39)
MRdz MRdy
Where exponent a = 1.00
1.00 1.00
 67.07  15.14
di

Biaxial Interaction Equation =  +  = 0.66


135.93 91.00
Biaxial Interaction Result ≤ 1.0 ∴OK for biaxial resistance

Max distance between bars = 300 mm


Largest actual space between bars = 137 mm
a te

Min distance between bars = dg + 5 mm = 25 mm 8.2 (2)


Smallest actual space between bars = 71 mm
∴OK for spacing
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 44 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 45

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 111 - Detailed EC2 Main Reinforcement Cont...
Min area of reinforcement = 361 mm2 9.5.2 (2)
Max area of reinforcement (even at laps) = 19200 mm2 9.5.2 (3)
Actual area of main reinforcement (12H12) = 1357 mm2
∴ area by which steel can increase at laps = 17843 mm2
Starter bar area = 804 mm2

F
∴OK

PD
Member 111 - Detailed EC2 Shear Reinforcement
Spacing provided, s = 225 mm

Major axis:
Shear force, VEd = 1.87 kN
VRd,c = [CRd,c k (100 ρl fck)1/3 + k1σcp] bw d (6.2.a)
= [0.120 × 1.786 × (100 × 0.007 × 30)1/3 + 0.15 × -0.198] × 600 × 324
= 109.05 kN
te r
But ≥ (vmin + k1σcp) bwd (6.2.b)
= (0.46 + 0.15 × -0.198) × 600 × 324 = 83.16 kN
Hence, VRd,c = 109.05 kN
VEd ≤ VRd,c ∴only nominal links required 6.2.1(5)

Area of links provided (2H10), Asw = 157.08 mm2


as

Minor axis:
Shear force, VEd = 4.02 kN
VRd,c = [CRd,c k (100 ρl fck)1/3 + k1σcp] bw d (6.2.a)
= [0.120 × 1.654 × (100 × 0.007 × 30)1/3 + 0.15 × -0.198] × 400 × 467
nM

= 98.04 kN
But ≥ (vmin + k1σcp) bwd (6.2.b)
= (0.41 + 0.15 × -0.198) × 400 × 467 = 70.65 kN
Hence, VRd,c = 98.04 kN
VEd ≤ VRd,c ∴only nominal links required 6.2.1(5)

Area of links provided (2H10), Asw = 157.08 mm2

Minimum size of link bars = 10 mm 9.5.3 (1)


di

Actual size of link bars = 10 mm


∴ OK
a te
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 45 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 46

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 114 - Detailed EC2 Design Requirements
Section Property: 1600 x 1600
Storey height = 4.600 m
Rectangular section: Width = 1600 mm Depth = 1600 mm
Cover = 60 mm

F
Member 114 - Detailed EC2 Main Reinforcement

PD
Axial N = 3490.71 kN
Major M, end 1, = 1024.74 kNm
end 2, = 119.73 kNm
Minor M, end 1, = -2967.16 kNm
end 2, = 67.09 kNm

Slenderness
λlim = 20 ABC / √n (5.13N)
n = NEd / (Ac fcd) = 3491 ×103 / (2560000 × 20.0) = 0.068
te r
Major λlim, y = 20 × 1.00 × 1.05 × 1.45 / √0.068 = 116.63
Minor λlim, z = 20 × 1.00 × 1.05 × 1.78 / √0.068 = 143.46
λ = l0 / i (5.14)
λy = 5520 / 461.88 = 11.95
λz = 5520 / 461.88 = 11.95
Column is NOT SLENDER
as

Axial Capacity NRd = 53806.15 kN


Axial capacity ratio NEd / NRd = 0.06
Axial Capacity ≥ Axial ∴OK for axial resistance
Major Axis Capacity MRdy = 4511.25 kNm
nM

Major Axis Capacity Ratio MEdy / MRdy = 0.27


Major Axis Capacity ≥ Major Axis Moment ∴OK for moment resistance
Minor Axis Capacity MRdz = 4511.25 kNm
Minor Axis Capacity Ratio MEdz / MRdz = 0.70
Minor Axis Capacity ≥ Minor Axis Moment ∴OK for moment resistance
a a
MEdz  MEdy
Biaxial Interaction Equation =  +  ≤ 1,0 (5.39)
MRdz MRdy
Where exponent a = 1.00
1.00 1.00
3153.33 1210.92
di

Biaxial Interaction Equation =  +  = 0.97


4511.25 4511.25
Biaxial Interaction Result ≤ 1.0 ∴OK for biaxial resistance

Max distance between bars = 300 mm


Largest actual space between bars = 268 mm
a te

Min distance between bars = dg + 5 mm = 25 mm 8.2 (2)


Smallest actual space between bars = 268 mm
∴OK for spacing
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 46 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 47

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 114 - Detailed EC2 Main Reinforcement Cont...
Min area of reinforcement = 5120 mm2 9.5.2 (2)
Max area of reinforcement (even at laps) = 204800 mm2 9.5.2 (3)
Actual area of main reinforcement (20H20) = 6283 mm2
∴ area by which steel can increase at laps = 198517 mm2
Starter bar area = 804 mm2

F
∴OK

PD
Member 114 - Detailed EC2 Shear Reinforcement
Spacing provided, s = 400 mm

Major axis:
Shear force, VEd = 248.55 kN
VRd,c = [CRd,c k (100 ρl fck)1/3 + k1σcp] bw d (6.2.a)
= [0.120 × 1.363 × (100 × 0.003 × 30)1/3 + 0.15 × 4.000] × 1600 × 1520
= 2246.25 kN
te r
But ≥ (vmin + k1σcp) bwd (6.2.b)
= (0.30 + 0.15 × 4.000) × 1600 × 1520 = 2200.87 kN
Hence, VRd,c = 2246.25 kN
VEd ≤ VRd,c ∴only nominal links required 6.2.1(5)

Area of links provided (10H10), Asw = 785.40 mm2


as

Minor axis:
Shear force, VEd = 159.21 kN
VRd,c = [CRd,c k (100 ρl fck)1/3 + k1σcp] bw d (6.2.a)
= [0.120 × 1.393 × (100 × 0.003 × 30)1/3 + 0.15 × 4.000] × 1600 × 1292
nM

= 1962.28 kN
But ≥ (vmin + k1σcp) bwd (6.2.b)
= (0.32 + 0.15 × 4.000) × 1600 × 1292 = 1891.97 kN
Hence, VRd,c = 1962.28 kN
VEd ≤ VRd,c ∴only nominal links required 6.2.1(5)

Area of links provided (10H10), Asw = 785.40 mm2

Minimum size of link bars = 10 mm 9.5.3 (1)


di

Actual size of link bars = 10 mm


∴ OK
a te
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 47 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 48

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 115 - Detailed EC2 Design Requirements
Section Property: 1600 x 1600
Storey height = 4.600 m
Rectangular section: Width = 1600 mm Depth = 1600 mm
Cover = 60 mm

F
Member 115 - Detailed EC2 Main Reinforcement

PD
Axial N = 3570.91 kN
Major M, end 1, = 1106.80 kNm
end 2, = 122.77 kNm
Minor M, end 1, = 2904.79 kNm
end 2, = -104.59 kNm

Slenderness
λlim = 20 ABC / √n (5.13N)
n = NEd / (Ac fcd) = 3571 ×103 / (2560000 × 20.0) = 0.070
te r
Major λlim, y = 20 × 1.00 × 1.05 × 1.46 / √0.070 = 116.20
Minor λlim, z = 20 × 1.00 × 1.05 × 1.80 / √0.070 = 143.03
λ = l0 / i (5.14)
λy = 5520 / 461.88 = 11.95
λz = 5520 / 461.88 = 11.95
Column is NOT SLENDER
as

Axial Capacity NRd = 53806.15 kN


Axial capacity ratio NEd / NRd = 0.07
Axial Capacity ≥ Axial ∴OK for axial resistance
Major Axis Capacity MRdy = 4564.14 kNm
nM

Major Axis Capacity Ratio MEdy / MRdy = 0.28


Major Axis Capacity ≥ Major Axis Moment ∴OK for moment resistance
Minor Axis Capacity MRdz = 4564.14 kNm
Minor Axis Capacity Ratio MEdz / MRdz = 0.68
Minor Axis Capacity ≥ Minor Axis Moment ∴OK for moment resistance
a a
MEdz  MEdy
Biaxial Interaction Equation =  +  ≤ 1,0 (5.39)
MRdz MRdy
Where exponent a = 1.00
1.00 1.00
3095.23 1297.25
di

Biaxial Interaction Equation =  +  = 0.96


4564.14 4564.14
Biaxial Interaction Result ≤ 1.0 ∴OK for biaxial resistance

Max distance between bars = 300 mm


Largest actual space between bars = 268 mm
a te

Min distance between bars = dg + 5 mm = 25 mm 8.2 (2)


Smallest actual space between bars = 268 mm
∴OK for spacing
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 48 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 49

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 115 - Detailed EC2 Main Reinforcement Cont...
Min area of reinforcement = 5120 mm2 9.5.2 (2)
Max area of reinforcement (even at laps) = 204800 mm2 9.5.2 (3)
Actual area of main reinforcement (20H20) = 6283 mm2
∴ area by which steel can increase at laps = 198517 mm2
Starter bar area = 804 mm2

F
∴OK

PD
Member 115 - Detailed EC2 Shear Reinforcement
Spacing provided, s = 400 mm

Major axis:
Shear force, VEd = 254.69 kN
VRd,c = [CRd,c k (100 ρl fck)1/3 + k1σcp] bw d (6.2.a)
= [0.120 × 1.363 × (100 × 0.003 × 30)1/3 + 0.15 × 4.000] × 1600 × 1520
= 2246.25 kN
te r
But ≥ (vmin + k1σcp) bwd (6.2.b)
= (0.30 + 0.15 × 4.000) × 1600 × 1520 = 2200.87 kN
Hence, VRd,c = 2246.25 kN
VEd ≤ VRd,c ∴only nominal links required 6.2.1(5)

Area of links provided (10H10), Asw = 785.40 mm2


as

Minor axis:
Shear force, VEd = 56.51 kN
VRd,c = [CRd,c k (100 ρl fck)1/3 + k1σcp] bw d (6.2.a)
= [0.120 × 1.393 × (100 × 0.003 × 30)1/3 + 0.15 × 4.000] × 1600 × 1292
nM

= 1962.28 kN
But ≥ (vmin + k1σcp) bwd (6.2.b)
= (0.32 + 0.15 × 4.000) × 1600 × 1292 = 1891.97 kN
Hence, VRd,c = 1962.28 kN
VEd ≤ VRd,c ∴only nominal links required 6.2.1(5)

Area of links provided (10H10), Asw = 785.40 mm2

Minimum size of link bars = 10 mm 9.5.3 (1)


di

Actual size of link bars = 10 mm


∴ OK
a te
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 49 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 50

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 116 - Detailed EC2 Design Requirements
Section Property: 1600 x 1600
Storey height = 4.600 m
Rectangular section: Width = 1600 mm Depth = 1600 mm
Cover = 60 mm

F
Member 116 - Detailed EC2 Main Reinforcement

PD
Axial N = 3115.10 kN
Major M, end 1, = -939.27 kNm
end 2, = -216.80 kNm
Minor M, end 1, = 3048.31 kNm
end 2, = 268.99 kNm

Slenderness
λlim = 20 ABC / √n (5.13N)
n = NEd / (Ac fcd) = 3115 ×103 / (2560000 × 20.0) = 0.061
te r
Major λlim, y = 20 × 1.00 × 1.06 × 1.35 / √0.061 = 116.57
Minor λlim, z = 20 × 1.00 × 1.06 × 1.56 / √0.061 = 134.74
λ = l0 / i (5.14)
λy = 5520 / 461.88 = 11.95
λz = 5520 / 461.88 = 11.95
Column is NOT SLENDER
as

Axial Capacity NRd = 54327.38 kN


Axial capacity ratio NEd / NRd = 0.06
Axial Capacity ≥ Axial ∴OK for axial resistance
Major Axis Capacity MRdy = 4638.93 kNm
nM

Major Axis Capacity Ratio MEdy / MRdy = 0.24


Major Axis Capacity ≥ Major Axis Moment ∴OK for moment resistance
Minor Axis Capacity MRdz = 4638.93 kNm
Minor Axis Capacity Ratio MEdz / MRdz = 0.69
Minor Axis Capacity ≥ Minor Axis Moment ∴OK for moment resistance
a a
MEdz  MEdy
Biaxial Interaction Equation =  +  ≤ 1,0 (5.39)
MRdz MRdy
Where exponent a = 1.00
1.00 1.00
3214.45 1105.41
di

Biaxial Interaction Equation =  +  = 0.93


4638.93 4638.93
Biaxial Interaction Result ≤ 1.0 ∴OK for biaxial resistance

Max distance between bars = 300 mm


Largest actual space between bars = 220 mm
a te

Min distance between bars = dg + 5 mm = 25 mm 8.2 (2)


Smallest actual space between bars = 220 mm
∴OK for spacing
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 50 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 51

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 116 - Detailed EC2 Main Reinforcement Cont...
Min area of reinforcement = 5120 mm2 9.5.2 (2)
Max area of reinforcement (even at laps) = 204800 mm2 9.5.2 (3)
Actual area of main reinforcement (24H20) = 7540 mm2
∴ area by which steel can increase at laps = 197260 mm2
Starter bar area = 804 mm2

F
∴OK

PD
Member 116 - Detailed EC2 Shear Reinforcement
Spacing provided, s = 400 mm

Major axis:
Shear force, VEd = 34.86 kN
VRd,c = [CRd,c k (100 ρl fck)1/3 + k1σcp] bw d (6.2.a)
= [0.120 × 1.363 × (100 × 0.003 × 30)1/3 + 0.15 × 4.000] × 1600 × 1520
= 2295.57 kN
te r
But ≥ (vmin + k1σcp) bwd (6.2.b)
= (0.30 + 0.15 × 4.000) × 1600 × 1520 = 2200.87 kN
Hence, VRd,c = 2295.57 kN
VEd ≤ VRd,c ∴only nominal links required 6.2.1(5)

Area of links provided (11H10), Asw = 863.94 mm2


as

Minor axis:
Shear force, VEd = 35.20 kN
VRd,c = [CRd,c k (100 ρl fck)1/3 + k1σcp] bw d (6.2.a)
= [0.120 × 1.395 × (100 × 0.004 × 30)1/3 + 0.15 × 4.000] × 1600 × 1280
nM

= 1992.44 kN
But ≥ (vmin + k1σcp) bwd (6.2.b)
= (0.32 + 0.15 × 4.000) × 1600 × 1280 = 1875.87 kN
Hence, VRd,c = 1992.44 kN
VEd ≤ VRd,c ∴only nominal links required 6.2.1(5)

Area of links provided (11H10), Asw = 863.94 mm2

Minimum size of link bars = 10 mm 9.5.3 (1)


di

Actual size of link bars = 10 mm


∴ OK
a te
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 51 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 52

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 117 - Detailed EC2 Design Requirements
Section Property: 1600 x 1600
Storey height = 4.600 m
Rectangular section: Width = 1600 mm Depth = 1600 mm
Cover = 60 mm

F
Member 117 - Detailed EC2 Main Reinforcement

PD
Axial N = 2740.06 kN
Major M, end 1, = -977.82 kNm
end 2, = -215.05 kNm
Minor M, end 1, = -2146.80 kNm
end 2, = -94.90 kNm

Slenderness
λlim = 20 ABC / √n (5.13N)
n = NEd / (Ac fcd) = 2740 ×103 / (2560000 × 20.0) = 0.054
te r
Major λlim, y = 20 × 1.00 × 1.05 × 1.38 / √0.054 = 124.76
Minor λlim, z = 20 × 1.00 × 1.05 × 1.59 / √0.054 = 144.32
λ = l0 / i (5.14)
λy = 5520 / 461.88 = 11.95
λz = 5520 / 461.88 = 11.95
Column is NOT SLENDER
as

Axial Capacity NRd = 53535.12 kN


Axial capacity ratio NEd / NRd = 0.05
Axial Capacity ≥ Axial ∴OK for axial resistance
Major Axis Capacity MRdy = 3808.87 kNm
nM

Major Axis Capacity Ratio MEdy / MRdy = 0.30


Major Axis Capacity ≥ Major Axis Moment ∴OK for moment resistance
Minor Axis Capacity MRdz = 3808.87 kNm
Minor Axis Capacity Ratio MEdz / MRdz = 0.60
Minor Axis Capacity ≥ Minor Axis Moment ∴OK for moment resistance
a a
MEdz  MEdy
Biaxial Interaction Equation =  +  ≤ 1,0 (5.39)
MRdz MRdy
Where exponent a = 1.00
1.00 1.00
2292.93 1123.96
di

Biaxial Interaction Equation =  +  = 0.90


3808.87 3808.87
Biaxial Interaction Result ≤ 1.0 ∴OK for biaxial resistance

Max distance between bars = 300 mm


Largest actual space between bars = 190 mm
a te

Min distance between bars = dg + 5 mm = 25 mm 8.2 (2)


Smallest actual space between bars = 190 mm
∴OK for spacing
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 52 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 53

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 117 - Detailed EC2 Main Reinforcement Cont...
Min area of reinforcement = 5120 mm2 9.5.2 (2)
Max area of reinforcement (even at laps) = 204800 mm2 9.5.2 (3)
Actual area of main reinforcement (28H16) = 5630 mm2
∴ area by which steel can increase at laps = 199170 mm2
Starter bar area = 804 mm2

F
∴OK

PD
Member 117 - Detailed EC2 Shear Reinforcement
Spacing provided, s = 300 mm

Major axis:
Shear force, VEd = 46.69 kN
VRd,c = [CRd,c k (100 ρl fck)1/3 + k1σcp] bw d (6.2.a)
= [0.120 × 1.362 × (100 × 0.002 × 30)1/3 + 0.15 × 4.000] × 1600 × 1522
= 2220.41 kN
te r
But ≥ (vmin + k1σcp) bwd (6.2.b)
= (0.30 + 0.15 × 4.000) × 1600 × 1522 = 2203.57 kN
Hence, VRd,c = 2220.41 kN
VEd ≤ VRd,c ∴only nominal links required 6.2.1(5)

Area of links provided (14H10), Asw = 1099.56 mm2


as

Minor axis:
Shear force, VEd = 69.02 kN
VRd,c = [CRd,c k (100 ρl fck)1/3 + k1σcp] bw d (6.2.a)
= [0.120 × 1.396 × (100 × 0.003 × 30)1/3 + 0.15 × 4.000] × 1600 × 1273
nM

= 1912.45 kN
But ≥ (vmin + k1σcp) bwd (6.2.b)
= (0.32 + 0.15 × 4.000) × 1600 × 1273 = 1865.90 kN
Hence, VRd,c = 1912.45 kN
VEd ≤ VRd,c ∴only nominal links required 6.2.1(5)

Area of links provided (14H10), Asw = 1099.56 mm2

Minimum size of link bars = 10 mm 9.5.3 (1)


di

Actual size of link bars = 10 mm


∴ OK
a te
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 53 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 54

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 118 - Detailed EC2 Design Requirements
Section Property: 1250 x 1250
Storey height = 4.600 m
Rectangular section: Width = 1250 mm Depth = 1250 mm
Cover = 60 mm

F
Member 118 - Detailed EC2 Main Reinforcement

PD
Axial N = 883.43 kN
Major M, end 1, = -1529.07 kNm
end 2, = 500.96 kNm
Minor M, end 1, = 14.22 kNm
end 2, = -86.52 kNm

Slenderness
λlim = 20 ABC / √n (5.13N)
n = NEd / (Ac fcd) = 883 ×103 / (1562500 × 20.0) = 0.028
te r
Major λlim, y = 20 × 1.00 × 1.07 × 2.04 / √0.028 = 259.51
Minor λlim, z = 20 × 1.00 × 1.07 × 2.11 / √0.028 = 268.45
λ = l0 / i (5.14)
λy = 5520 / 360.84 = 15.30
λz = 5520 / 360.84 = 15.30
Column is NOT SLENDER
as

Axial Capacity NRd = 33334.92 kN


Axial capacity ratio NEd / NRd = 0.03
Axial Capacity ≥ Axial ∴OK for axial resistance
Major Axis Capacity MRdy = 1752.15 kNm
nM

Major Axis Capacity Ratio MEdy / MRdy = 0.89


Major Axis Capacity ≥ Major Axis Moment ∴OK for moment resistance
Minor Axis Capacity MRdz = 1752.15 kNm
Minor Axis Capacity Ratio MEdz / MRdz = 0.07
Minor Axis Capacity ≥ Minor Axis Moment ∴OK for moment resistance
a a
MEdz  MEdy
Biaxial Interaction Equation =  +  ≤ 1,0 (5.39)
MRdz MRdy
Where exponent a = 1.00
1.00 1.00
 123.32  1565.88
di

Biaxial Interaction Equation =  +  = 0.96


1752.15 1752.15
Biaxial Interaction Result ≤ 1.0 ∴OK for biaxial resistance

Max distance between bars = 300 mm


Largest actual space between bars = 253 mm
a te

Min distance between bars = dg + 5 mm = 25 mm 8.2 (2)


Smallest actual space between bars = 253 mm
∴OK for spacing
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 54 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 55

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 118 - Detailed EC2 Main Reinforcement Cont...
Min area of reinforcement = 3125 mm2 9.5.2 (2)
Max area of reinforcement (even at laps) = 125000 mm2 9.5.2 (3)
Actual area of main reinforcement (16H20) = 5027 mm2
∴ area by which steel can increase at laps = 119973 mm2
Starter bar area = 804 mm2

F
∴OK

PD
Member 118 - Detailed EC2 Shear Reinforcement
Spacing provided, s = 400 mm

Major axis:
Shear force, VEd = 251.56 kN
VRd,c = [CRd,c k (100 ρl fck)1/3 + k1σcp] bw d (6.2.a)
= [0.120 × 1.413 × (100 × 0.003 × 30)1/3 + 0.15 × 1.951] × 1250 × 1170
= 967.82 kN
te r
But ≥ (vmin + k1σcp) bwd (6.2.b)
= (0.32 + 0.15 × 1.951) × 1250 × 1170 = 899.04 kN
Hence, VRd,c = 967.82 kN
VEd ≤ VRd,c ∴only nominal links required 6.2.1(5)

Area of links provided (7H10), Asw = 549.78 mm2


as

Minor axis:
Shear force, VEd = 22.78 kN
VRd,c = [CRd,c k (100 ρl fck)1/3 + k1σcp] bw d (6.2.a)
= [0.120 × 1.445 × (100 × 0.004 × 30)1/3 + 0.15 × 1.951] × 1250 × 1010
nM

= 870.04 kN
But ≥ (vmin + k1σcp) bwd (6.2.b)
= (0.33 + 0.15 × 1.951) × 1250 × 1010 = 790.04 kN
Hence, VRd,c = 870.04 kN
VEd ≤ VRd,c ∴only nominal links required 6.2.1(5)

Area of links provided (7H10), Asw = 549.78 mm2

Minimum size of link bars = 10 mm 9.5.3 (1)


di

Actual size of link bars = 10 mm


∴ OK
a te
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 55 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 56

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 119 - Detailed EC2 Design Requirements
Section Property: 1250 x 1250
Storey height = 4.600 m
Rectangular section: Width = 1250 mm Depth = 1250 mm
Cover = 60 mm

F
Member 119 - Detailed EC2 Main Reinforcement

PD
Axial N = 927.18 kN
Major M, end 1, = 1522.73 kNm
end 2, = -511.90 kNm
Minor M, end 1, = -21.33 kNm
end 2, = -101.06 kNm

Slenderness
λlim = 20 ABC / √n (5.13N)
n = NEd / (Ac fcd) = 927 ×103 / (1562500 × 20.0) = 0.030
te r
Major λlim, y = 20 × 1.00 × 1.07 × 2.05 / √0.030 = 254.45
Minor λlim, z = 20 × 1.00 × 1.07 × 1.27 / √0.030 = 157.53
λ = l0 / i (5.14)
λy = 5520 / 360.84 = 15.30
λz = 5520 / 360.84 = 15.30
Column is NOT SLENDER
as

Axial Capacity NRd = 33334.92 kN


Axial capacity ratio NEd / NRd = 0.03
Axial Capacity ≥ Axial ∴OK for axial resistance
Major Axis Capacity MRdy = 1775.80 kNm
nM

Major Axis Capacity Ratio MEdy / MRdy = 0.88


Major Axis Capacity ≥ Major Axis Moment ∴OK for moment resistance
Minor Axis Capacity MRdz = 1775.80 kNm
Minor Axis Capacity Ratio MEdz / MRdz = 0.08
Minor Axis Capacity ≥ Minor Axis Moment ∴OK for moment resistance
a a
MEdz  MEdy
Biaxial Interaction Equation =  +  ≤ 1,0 (5.39)
MRdz MRdy
Where exponent a = 1.00
1.00 1.00
 139.69  1561.36
di

Biaxial Interaction Equation =  +  = 0.96


1775.80 1775.80
Biaxial Interaction Result ≤ 1.0 ∴OK for biaxial resistance

Max distance between bars = 300 mm


Largest actual space between bars = 253 mm
a te

Min distance between bars = dg + 5 mm = 25 mm 8.2 (2)


Smallest actual space between bars = 253 mm
∴OK for spacing
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 56 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 57

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 119 - Detailed EC2 Main Reinforcement Cont...
Min area of reinforcement = 3125 mm2 9.5.2 (2)
Max area of reinforcement (even at laps) = 125000 mm2 9.5.2 (3)
Actual area of main reinforcement (16H20) = 5027 mm2
∴ area by which steel can increase at laps = 119973 mm2
Starter bar area = 804 mm2

F
∴OK

PD
Member 119 - Detailed EC2 Shear Reinforcement
Spacing provided, s = 400 mm

Major axis:
Shear force, VEd = 237.91 kN
VRd,c = [CRd,c k (100 ρl fck)1/3 + k1σcp] bw d (6.2.a)
= [0.120 × 1.413 × (100 × 0.003 × 30)1/3 + 0.15 × 2.110] × 1250 × 1170
= 1002.85 kN
te r
But ≥ (vmin + k1σcp) bwd (6.2.b)
= (0.32 + 0.15 × 2.110) × 1250 × 1170 = 934.07 kN
Hence, VRd,c = 1002.85 kN
VEd ≤ VRd,c ∴only nominal links required 6.2.1(5)

Area of links provided (7H10), Asw = 549.78 mm2


as

Minor axis:
Shear force, VEd = 22.47 kN
VRd,c = [CRd,c k (100 ρl fck)1/3 + k1σcp] bw d (6.2.a)
= [0.120 × 1.445 × (100 × 0.004 × 30)1/3 + 0.15 × 2.110] × 1250 × 1010
nM

= 900.29 kN
But ≥ (vmin + k1σcp) bwd (6.2.b)
= (0.33 + 0.15 × 2.110) × 1250 × 1010 = 820.29 kN
Hence, VRd,c = 900.29 kN
VEd ≤ VRd,c ∴only nominal links required 6.2.1(5)

Area of links provided (7H10), Asw = 549.78 mm2

Minimum size of link bars = 10 mm 9.5.3 (1)


di

Actual size of link bars = 10 mm


∴ OK
a te
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 57 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 58

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 75 - Scheduled Bars
Bar Type and No. of Bar Length Shape A B C D E/R
Mark size bars (mm) code (mm) (mm) (mm) (mm) (mm)
01 H32 28 4625 20
02 H10 11 4650 61 1130 1130
03 H10 11 4050 61 830 1130

F
04 H10 11 3425 61 520 1130
05 H10 44 1325 85 100 1130 60
06 H10 11 4050 61 1130 830

PD
07 H10 11 3425 61 1130 520

Member 76 - Scheduled Bars


Bar Type and No. of Bar Length Shape A B C D E/R
Mark size bars (mm) code (mm) (mm) (mm) (mm) (mm)
01 H32 16 4625 20
02 H10 11 4650 61 1130 1130
te r
03 H10 11 3575 61 595 1130
04 H10 22 1325 85 100 1130 60
05 H10 11 3575 61 1130 595

Member 77 - Scheduled Bars


as

Bar Type and No. of Bar Length Shape A B C D E/R


Mark size bars (mm) code (mm) (mm) (mm) (mm) (mm)
01 H32 16 4625 20
02 H10 11 4650 61 1130 1130
03 H10 11 3575 61 595 1130
nM

04 H10 22 1325 85 100 1130 60


05 H10 11 3575 61 1130 595

Member 80 - Scheduled Bars


Bar Type and No. of Bar Length Shape A B C D E/R
Mark size bars (mm) code (mm) (mm) (mm) (mm) (mm)
01 H32 20 4625 20
di

02 H10 11 4650 61 1130 1130


03 H10 11 3800 61 705 1130
04 H10 44 1325 85 100 1130 60
05 H10 11 3800 61 1130 705
a te
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 58 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 59

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 82 - Scheduled Bars
Bar Type and No. of Bar Length Shape A B C D E/R
Mark size bars (mm) code (mm) (mm) (mm) (mm) (mm)
01 H40 24 4625 20
02 H10 11 4650 61 1130 1130
03 H10 11 3925 61 770 1130

F
04 H10 11 3225 61 415 1130
05 H10 22 1325 85 100 1130 60
06 H10 11 3925 61 1130 770

PD
07 H10 11 3225 61 1130 415

Member 84 - Scheduled Bars


Bar Type and No. of Bar Length Shape A B C D E/R
Mark size bars (mm) code (mm) (mm) (mm) (mm) (mm)
01 H32 24 4625 20
02 H10 11 4650 61 1130 1130
te r
03 H10 11 3950 61 775 1130
04 H10 11 3225 61 415 1130
05 H10 22 1325 85 100 1130 60
06 H10 11 3950 61 1130 775
07 H10 11 3225 61 1130 415
as

Member 93 - Scheduled Bars


Bar Type and No. of Bar Length Shape A B C D E/R
Mark size bars (mm) code (mm) (mm) (mm) (mm) (mm)
01 H32 24 4625 20
nM

02 H10 11 4650 61 1130 1130


03 H10 11 3950 61 775 1130
04 H10 11 3225 61 415 1130
05 H10 22 1325 85 100 1130 60
06 H10 11 3950 61 1130 775
07 H10 11 3225 61 1130 415
di

Member 96 - Scheduled Bars


Bar Type and No. of Bar Length Shape A B C D E/R
Mark size bars (mm) code (mm) (mm) (mm) (mm) (mm)
01 H40 24 4625 20
02 H10 11 4650 61 1130 1130
a te

03 H10 11 3925 61 770 1130


04 H10 11 3225 61 415 1130
05 H10 22 1325 85 100 1130 60
06 H10 11 3925 61 1130 770
07 H10 11 3225 61 1130 415
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 59 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 60

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 98 - Scheduled Bars
Bar Type and No. of Bar Length Shape A B C D E/R
Mark size bars (mm) code (mm) (mm) (mm) (mm) (mm)
01 H32 20 4625 20
02 H10 11 4650 61 1130 1130
03 H10 11 3800 61 705 1130

F
04 H10 44 1325 85 100 1130 60
05 H10 11 3800 61 1130 705

PD
Member 99 - Scheduled Bars
Bar Type and No. of Bar Length Shape A B C D E/R
Mark size bars (mm) code (mm) (mm) (mm) (mm) (mm)
01 H32 16 4625 20
02 H10 11 4650 61 1130 1130
03 H10 11 3575 61 595 1130
04 H10 22 1325 85 100 1130 60
te r
05 H10 11 3575 61 1130 595

Member 101 - Scheduled Bars


Bar Type and No. of Bar Length Shape A B C D E/R
as

Mark size bars (mm) code (mm) (mm) (mm) (mm) (mm)
01 H32 16 4625 20
02 H10 11 4650 61 1130 1130
03 H10 11 3575 61 595 1130
04 H10 22 1325 85 100 1130 60
05 H10 11 3575 61 1130 595
nM

Member 102 - Scheduled Bars


Bar Type and No. of Bar Length Shape A B C D E/R
Mark size bars (mm) code (mm) (mm) (mm) (mm) (mm)
01 H40 24 4625 20
02 H10 11 4650 61 1130 1130
03 H10 11 3925 61 770 1130
di

04 H10 11 3225 61 415 1130


05 H10 22 1325 85 100 1130 60
06 H10 11 3925 61 1130 770
07 H10 11 3225 61 1130 415
a te

Member 104 - Scheduled Bars


Bar Type and No. of Bar Length Shape A B C D E/R
Mark size bars (mm) code (mm) (mm) (mm) (mm) (mm)
01 H12 8 4600 20
02 H10 20 1650 61 280 480
re

03 H10 20 475 85 100 280 60

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 60 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 61

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 105 - Scheduled Bars
Bar Type and No. of Bar Length Shape A B C D E/R
Mark size bars (mm) code (mm) (mm) (mm) (mm) (mm)
01 H12 12 4600 20
02 H10 20 1650 61 280 480

F
Member 106 - Scheduled Bars

PD
Bar Type and No. of Bar Length Shape A B C D E/R
Mark size bars (mm) code (mm) (mm) (mm) (mm) (mm)
01 H12 8 4600 20
02 H10 20 1650 61 280 480
03 H10 20 475 85 100 280 60

Member 107 - Scheduled Bars


te r
Bar Type and No. of Bar Length Shape A B C D E/R
Mark size bars (mm) code (mm) (mm) (mm) (mm) (mm)
01 H12 12 4600 20
02 H10 20 1650 61 280 480
as

Member 108 - Scheduled Bars


Bar Type and No. of Bar Length Shape A B C D E/R
Mark size bars (mm) code (mm) (mm) (mm) (mm) (mm)
01 H12 8 4600 20
02 H10 20 1650 61 280 480
nM

03 H10 20 475 85 100 280 60

Member 109 - Scheduled Bars


Bar Type and No. of Bar Length Shape A B C D E/R
Mark size bars (mm) code (mm) (mm) (mm) (mm) (mm)
01 H12 12 4600 20
02 H10 20 1650 61 280 480
di

Member 110 - Scheduled Bars


Bar Type and No. of Bar Length Shape A B C D E/R
Mark size bars (mm) code (mm) (mm) (mm) (mm) (mm)
a te

01 H12 8 4600 20
02 H10 20 1650 61 280 480
03 H10 20 475 85 100 280 60
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 61 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 62

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 111 - Scheduled Bars
Bar Type and No. of Bar Length Shape A B C D E/R
Mark size bars (mm) code (mm) (mm) (mm) (mm) (mm)
01 H12 12 4600 20
02 H10 20 1650 61 280 480

F
Member 114 - Scheduled Bars

PD
Bar Type and No. of Bar Length Shape A B C D E/R
Mark size bars (mm) code (mm) (mm) (mm) (mm) (mm)
01 H20 20 4625 20
02 H10 11 6050 61 1480 1480
03 H10 11 4925 61 920 1480
04 H10 11 3775 61 345 1480
05 H10 11 4925 61 1480 920
06 H10 11 3775 61 1480 345
te r
Member 115 - Scheduled Bars
Bar Type and No. of Bar Length Shape A B C D E/R
Mark size bars (mm) code (mm) (mm) (mm) (mm) (mm)
01 H20 20 4625 20
as

02 H10 11 6050 61 1480 1480


03 H10 11 4925 61 920 1480
04 H10 11 3775 61 345 1480
05 H10 11 4925 61 1480 920
06 H10 11 3775 61 1480 345
nM

Member 116 - Scheduled Bars


Bar Type and No. of Bar Length Shape A B C D E/R
Mark size bars (mm) code (mm) (mm) (mm) (mm) (mm)
01 H20 24 4625 20
02 H10 11 6050 61 1480 1480
03 H10 11 5125 61 1020 1480
04 H10 11 4175 61 540 1480
di

05 H10 22 1675 85 100 1480 60


06 H10 11 5125 61 1480 1020
07 H10 11 4175 61 1480 540
a te
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 62 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 63

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 117 - Scheduled Bars
Bar Type and No. of Bar Length Shape A B C D E/R
Mark size bars (mm) code (mm) (mm) (mm) (mm) (mm)
01 H16 28 4625 20
02 H10 15 6050 61 1480 1480
03 H10 15 5275 61 1090 1480

F
04 H10 15 4450 61 675 1480
05 H10 15 3625 61 265 1480
06 H10 15 5275 61 1480 1090

PD
07 H10 15 4450 61 1480 675
08 H10 15 3625 61 1480 265

Member 118 - Scheduled Bars


Bar Type and No. of Bar Length Shape A B C D E/R
Mark size bars (mm) code (mm) (mm) (mm) (mm) (mm)
01 H20 16 4625 20
te r
02 H10 11 4650 61 1130 1130
03 H10 11 3600 61 605 1130
04 H10 22 1325 85 100 1130 60
05 H10 11 3600 61 1130 605
as

Member 119 - Scheduled Bars


Bar Type and No. of Bar Length Shape A B C D E/R
Mark size bars (mm) code (mm) (mm) (mm) (mm) (mm)
01 H20 16 4625 20
02 H10 11 4650 61 1130 1130
nM

03 H10 11 3600 61 605 1130


04 H10 22 1325 85 100 1130 60
05 H10 11 3600 61 1130 605
di
a te
re

Print Time/Date: 28/02/2019 16:22 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 63 of 63
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 1

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Column Main Reinforcement
Member L/C Axial Major Minor Design As Req. Total As Prov.
(kN) (kN-m) (kN-m) Axis (mm2) Bars (mm2)
M78 C1001 2705.814 288.482 441.933 Biaxl min 17593 56T20 0
M79 C1001 2110.641 61.870 47.873 Biaxl maj 16085 20T32 0
M81 C1001 2090.957 67.355 297.842 Biaxl min 16889 84T16 0

F
M83 C1001 7068.661 936.978 800.334 Biaxl maj 24932 124T16 0
M94 C1001 7419.594 1083.608 535.768 Biaxl maj 26389 84T20 0
M95 C1001 2865.751 519.131 111.662 Biaxl maj 21363 68T20 0

PD
M97 C1001 2358.590 67.001 294.074 Biaxl min 16889 84T16 0
M100 C1001 2334.102 61.544 87.191 Biaxl min 16889 84T16 0
M103 C1001 2759.874 351.379 356.057 Biaxl min 17593 56T20 0

Members
Member Element Node Node Property Emt Length O. Length
A B (m) (m)
te r
M78 6496 5004 1580 1250 x 1250 4.600 4.600
M79 6497 5005 1579 1250 x 1250 4.600 4.600
M81 6499 5007 1577 1250 x 1250 4.600 4.600
M83 6502 5010 1589 1600 x 1600 4.600 4.600
M94 6513 5021 1570 1600 x 1600 4.600 4.600
M95 6514 5022 1573 1250 x 1250 4.600 4.600
as

M97 6516 5024 1587 1250 x 1250 4.600 4.600


M100 6519 5026 1575 1250 x 1250 4.600 4.600
M103 6522 5027 1571 1250 x 1250 4.600 4.600
nM
di
a te
re

Print Time/Date: 28/02/2019 16:23 STAAD.Pro - RC IS456 Version 1.0 Print Run 1 of 19
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 2

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 78 - Detailed IS456 Design Requirements
Design of Column is done as per IS:456-2000
Section Property: 1250 x 1250
Storey height = 4.600 m
Rectangular section: Width = 1250 mm Depth = 1250 mm
Cover = 60 mm

F
Member 78 - Detailed IS456 Main Reinforcement

PD
Unsupported Length of column = 4.60 m
Slenderness checks:
Effective length Major, lex = 5.520 m
Effective length Minor, ley = 5.520 m
Slenderness ratio Major, (lex/H) = 4.416
Slenderness ratio Minor, (ley/B) = 4.416
Slenderness Limit = 12.000
∴NOT SLENDER
te r
Critical Loadcase: LOADCASE 1001
Axial Load P, = 2705.81 kN
Major M, End 1, = 288.48 kNm
End 2, = -42.40 kNm
Minor M, End 1, = -441.93 kNm
as

End 2, = 133.30 kNm

Minimum eccentricity about major axis = 50.87 mm


Minimum eccentricity about minor axis = 50.87 mm
Moment Due to Min Ecc Major = 137.64 kNm
nM

Moment Due to Min Ecc Minor = 137.64 kNm

Min. Eccentricity moment about major axis ignored as per Cl 39.3


Min. Eccentricity moment about minor axis ignored as per Cl 39.3
Design Moment Major = 288.48 kNm
Design Moment Minor = 441.93 kNm
Steel area required = 12566mm2 (40 No. 20 dia. bars)
Total steel area provided = 17593mm2
Pure Axial Capacity Pu =27453.585 KN
di

Axial Capacity Ratio P/Pu =0.099


Axial Capacity ≥ Axial Load ∴OK for axial resistance
Major Axis Capacity Mux1 =4995.045 KNm
Major Axis Capacity Ratio Mux / Mux1 =0.058
Major Axis Capacity ≥ Major Axis Moment ∴OK for moment resistance
a te

Minor Axis Capacity Muy1 =4995.045 KNm


Minor Axis Capacity Ratio Muy / Muy1 =0.088
Minor Axis Capacity ≥ Minor Axis Moment ∴OK for moment resistance
re

Print Time/Date: 28/02/2019 16:23 STAAD.Pro - RC IS456 Version 1.0 Print Run 2 of 19
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 3

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 78 - Detailed IS456 Main Reinforcement Cont...
an an
 Mx   My 
Biaxial Interaction equation =  +  ≤ 1,0
Mux1 Muy1
where exponent, αn = 1.000

1.00 1.00
 288.48   441.93 

F
Biaxial Interaction equation =  +  = 0.15
4995.05 4995.05
Biaxial Interaction Result < 1.0 ∴OK for biaxial resistance

PD
Member 78 - IS456 Transverse Reinforcement
Distance between compression bar and a restrained bar in major axis > 150 mm 25.5.3.2

te r
as
nM
di
a te
re

Print Time/Date: 28/02/2019 16:23 STAAD.Pro - RC IS456 Version 1.0 Print Run 3 of 19
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 4

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 79 - Detailed IS456 Design Requirements
Design of Column is done as per IS:456-2000
Section Property: 1250 x 1250
Storey height = 4.600 m
Rectangular section: Width = 1250 mm Depth = 1250 mm
Cover = 60 mm

F
Member 79 - Detailed IS456 Main Reinforcement

PD
Unsupported Length of column = 4.60 m
Slenderness checks:
Effective length Major, lex = 5.520 m
Effective length Minor, ley = 5.520 m
Slenderness ratio Major, (lex/H) = 4.416
Slenderness ratio Minor, (ley/B) = 4.416
Slenderness Limit = 12.000
∴NOT SLENDER
te r
Critical Loadcase: LOADCASE 1001
Axial Load P, = 2110.64 kN
Major M, End 1, = -61.87 kNm
End 2, = -61.27 kNm
Minor M, End 1, = -41.52 kNm
as

End 2, = -47.87 kNm

Minimum eccentricity about major axis = 50.87 mm


Minimum eccentricity about minor axis = 50.87 mm
Moment Due to Min Ecc Major = 107.36 kNm
nM

Moment Due to Min Ecc Minor = 107.36 kNm

Min. Eccentricity moment about major axis ignored as per Cl 39.3


Min. Eccentricity moment about minor axis ignored as per Cl 39.3
Design Moment Major = 61.87 kNm
Design Moment Minor = 47.87 kNm
Steel area required = 12868mm2 (16 No. 32 dia. bars)
Total steel area provided = 16085mm2
Pure Axial Capacity Pu =26908.463 KN
di

Axial Capacity Ratio P/Pu =0.078


Axial Capacity ≥ Axial Load ∴OK for axial resistance
Major Axis Capacity Mux1 =4518.611 KNm
Major Axis Capacity Ratio Mux / Mux1 =0.014
Major Axis Capacity ≥ Major Axis Moment ∴OK for moment resistance
a te

Minor Axis Capacity Muy1 =4518.611 KNm


Minor Axis Capacity Ratio Muy / Muy1 =0.011
Minor Axis Capacity ≥ Minor Axis Moment ∴OK for moment resistance
re

Print Time/Date: 28/02/2019 16:23 STAAD.Pro - RC IS456 Version 1.0 Print Run 4 of 19
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 5

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 79 - Detailed IS456 Main Reinforcement Cont...
an an
 Mx   My 
Biaxial Interaction equation =  +  ≤ 1,0
Mux1 Muy1
where exponent, αn = 1.000

1.00 1.00
 61.87   47.87 

F
Biaxial Interaction equation =  +  = 0.08
4518.61 4518.61
Biaxial Interaction Result < 1.0 ∴OK for biaxial resistance

PD
Member 79 - IS456 Transverse Reinforcement
Distance between compression bar and a restrained bar in major axis > 150 mm 25.5.3.2

te r
as
nM
di
a te
re

Print Time/Date: 28/02/2019 16:23 STAAD.Pro - RC IS456 Version 1.0 Print Run 5 of 19
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 6

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 81 - Detailed IS456 Design Requirements
Design of Column is done as per IS:456-2000
Section Property: 1250 x 1250
Storey height = 4.600 m
Rectangular section: Width = 1250 mm Depth = 1250 mm
Cover = 60 mm

F
Member 81 - Detailed IS456 Main Reinforcement

PD
Unsupported Length of column = 4.60 m
Slenderness checks:
Effective length Major, lex = 5.520 m
Effective length Minor, ley = 5.520 m
Slenderness ratio Major, (lex/H) = 4.416
Slenderness ratio Minor, (ley/B) = 4.416
Slenderness Limit = 12.000
∴NOT SLENDER
te r
Critical Loadcase: LOADCASE 1001
Axial Load P, = 2090.96 kN
Major M, End 1, = -27.81 kNm
End 2, = -67.35 kNm
Minor M, End 1, = 297.84 kNm
as

End 2, = 18.43 kNm

Minimum eccentricity about major axis = 50.87 mm


Minimum eccentricity about minor axis = 50.87 mm
Moment Due to Min Ecc Major = 106.36 kNm
nM

Moment Due to Min Ecc Minor = 106.36 kNm

Min. Eccentricity moment about major axis ignored as per Cl 39.3


Min. Eccentricity moment about minor axis ignored as per Cl 39.3
Design Moment Major = 67.35 kNm
Design Moment Minor = 297.84 kNm
Steel area required = 12868mm2 (64 No. 16 dia. bars)
Total steel area provided = 16889mm2
Pure Axial Capacity Pu =27199.199 KN
di

Axial Capacity Ratio P/Pu =0.077


Axial Capacity ≥ Axial Load ∴OK for axial resistance
Major Axis Capacity Mux1 =4678.396 KNm
Major Axis Capacity Ratio Mux / Mux1 =0.014
Major Axis Capacity ≥ Major Axis Moment ∴OK for moment resistance
a te

Minor Axis Capacity Muy1 =4678.396 KNm


Minor Axis Capacity Ratio Muy / Muy1 =0.064
Minor Axis Capacity ≥ Minor Axis Moment ∴OK for moment resistance
re

Print Time/Date: 28/02/2019 16:23 STAAD.Pro - RC IS456 Version 1.0 Print Run 6 of 19
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 7

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 81 - Detailed IS456 Main Reinforcement Cont...
an an
 Mx   My 
Biaxial Interaction equation =  +  ≤ 1,0
Mux1 Muy1
where exponent, αn = 1.000

1.00 1.00
 67.35   297.84 

F
Biaxial Interaction equation =  +  = 0.08
4678.40 4678.40
Biaxial Interaction Result < 1.0 ∴OK for biaxial resistance

PD
Member 81 - IS456 Transverse Reinforcement
Distance between compression bar and a restrained bar in major axis > 150 mm 25.5.3.2

te r
as
nM
di
a te
re

Print Time/Date: 28/02/2019 16:23 STAAD.Pro - RC IS456 Version 1.0 Print Run 7 of 19
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 8

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 83 - Detailed IS456 Design Requirements
Design of Column is done as per IS:456-2000
Section Property: 1600 x 1600
Storey height = 4.600 m
Rectangular section: Width = 1600 mm Depth = 1600 mm
Cover = 60 mm

F
Member 83 - Detailed IS456 Main Reinforcement

PD
Unsupported Length of column = 4.60 m
Slenderness checks:
Effective length Major, lex = 5.520 m
Effective length Minor, ley = 5.520 m
Slenderness ratio Major, (lex/H) = 3.450
Slenderness ratio Minor, (ley/B) = 3.450
Slenderness Limit = 12.000
∴NOT SLENDER
te r
Critical Loadcase: LOADCASE 1001
Axial Load P, = 7068.66 kN
Major M, End 1, = 936.98 kNm
End 2, = 88.16 kNm
Minor M, End 1, = -800.33 kNm
as

End 2, = 121.27 kNm

Minimum eccentricity about major axis = 62.53 mm


Minimum eccentricity about minor axis = 62.53 mm
Moment Due to Min Ecc Major = 442.03 kNm
nM

Moment Due to Min Ecc Minor = 442.03 kNm

Min. Eccentricity moment about major axis ignored as per Cl 39.3


Min. Eccentricity moment about minor axis ignored as per Cl 39.3
Design Moment Major = 936.98 kNm
Design Moment Minor = 800.33 kNm
Steel area required = 20910mm2 (104 No. 16 dia. bars)
Total steel area provided = 24932mm2
Pure Axial Capacity Pu =43572.805 KN
di

Axial Capacity Ratio P/Pu =0.162


Axial Capacity ≥ Axial Load ∴OK for axial resistance
Major Axis Capacity Mux1 =10627.583 KNm
Major Axis Capacity Ratio Mux / Mux1 =0.088
Major Axis Capacity ≥ Major Axis Moment ∴OK for moment resistance
a te

Minor Axis Capacity Muy1 =10627.583 KNm


Minor Axis Capacity Ratio Muy / Muy1 =0.075
Minor Axis Capacity ≥ Minor Axis Moment ∴OK for moment resistance
re

Print Time/Date: 28/02/2019 16:23 STAAD.Pro - RC IS456 Version 1.0 Print Run 8 of 19
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 9

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 83 - Detailed IS456 Main Reinforcement Cont...
an an
 Mx   My 
Biaxial Interaction equation =  +  ≤ 1,0
Mux1 Muy1
where exponent, αn = 1.000

1.00 1.00
 936.98   800.33 

F
Biaxial Interaction equation =  +  = 0.16
10627.58 10627.58
Biaxial Interaction Result < 1.0 ∴OK for biaxial resistance

PD
Member 83 - IS456 Transverse Reinforcement
Distance between compression bar and a restrained bar in major axis > 150 mm 25.5.3.2

te r
as
nM
di
a te
re

Print Time/Date: 28/02/2019 16:23 STAAD.Pro - RC IS456 Version 1.0 Print Run 9 of 19
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 10

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 94 - Detailed IS456 Design Requirements
Design of Column is done as per IS:456-2000
Section Property: 1600 x 1600
Storey height = 4.600 m
Rectangular section: Width = 1600 mm Depth = 1600 mm
Cover = 60 mm

F
Member 94 - Detailed IS456 Main Reinforcement

PD
Unsupported Length of column = 4.60 m
Slenderness checks:
Effective length Major, lex = 5.520 m
Effective length Minor, ley = 5.520 m
Slenderness ratio Major, (lex/H) = 3.450
Slenderness ratio Minor, (ley/B) = 3.450
Slenderness Limit = 12.000
∴NOT SLENDER
te r
Critical Loadcase: LOADCASE 1001
Axial Load P, = 7419.59 kN
Major M, End 1, = -1083.61 kNm
End 2, = -135.84 kNm
Minor M, End 1, = 535.77 kNm
as

End 2, = -180.37 kNm

Minimum eccentricity about major axis = 62.53 mm


Minimum eccentricity about minor axis = 62.53 mm
Moment Due to Min Ecc Major = 463.97 kNm
nM

Moment Due to Min Ecc Minor = 463.97 kNm

Min. Eccentricity moment about major axis ignored as per Cl 39.3


Min. Eccentricity moment about minor axis ignored as per Cl 39.3
Design Moment Major = 1083.61 kNm
Design Moment Minor = 535.77 kNm
Steel area required = 21363mm2 (68 No. 20 dia. bars)
Total steel area provided = 26389mm2
Pure Axial Capacity Pu =44099.752 KN
di

Axial Capacity Ratio P/Pu =0.168


Axial Capacity ≥ Axial Load ∴OK for axial resistance
Major Axis Capacity Mux1 =11060.613 KNm
Major Axis Capacity Ratio Mux / Mux1 =0.098
Major Axis Capacity ≥ Major Axis Moment ∴OK for moment resistance
a te

Minor Axis Capacity Muy1 =11060.613 KNm


Minor Axis Capacity Ratio Muy / Muy1 =0.048
Minor Axis Capacity ≥ Minor Axis Moment ∴OK for moment resistance
re

Print Time/Date: 28/02/2019 16:23 STAAD.Pro - RC IS456 Version 1.0 Print Run 10 of 19
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 11

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 94 - Detailed IS456 Main Reinforcement Cont...
an an
 Mx   My 
Biaxial Interaction equation =  +  ≤ 1,0
Mux1 Muy1
where exponent, αn = 1.000

1.00 1.00
 1083.61   535.77 

F
Biaxial Interaction equation =  +  = 0.17
11060.61 11060.61
Biaxial Interaction Result < 1.0 ∴OK for biaxial resistance

PD
Member 94 - IS456 Transverse Reinforcement
Distance between compression bar and a restrained bar in major axis > 150 mm 25.5.3.2

te r
as
nM
di
a te
re

Print Time/Date: 28/02/2019 16:23 STAAD.Pro - RC IS456 Version 1.0 Print Run 11 of 19
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 12

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 95 - Detailed IS456 Design Requirements
Design of Column is done as per IS:456-2000
Section Property: 1250 x 1250
Storey height = 4.600 m
Rectangular section: Width = 1250 mm Depth = 1250 mm
Cover = 60 mm

F
Member 95 - Detailed IS456 Main Reinforcement

PD
Unsupported Length of column = 4.60 m
Slenderness checks:
Effective length Major, lex = 5.520 m
Effective length Minor, ley = 5.520 m
Slenderness ratio Major, (lex/H) = 4.416
Slenderness ratio Minor, (ley/B) = 4.416
Slenderness Limit = 12.000
∴NOT SLENDER
te r
Critical Loadcase: LOADCASE 1001
Axial Load P, = 2865.75 kN
Major M, End 1, = -519.13 kNm
End 2, = 63.31 kNm
Minor M, End 1, = 111.66 kNm
as

End 2, = 22.51 kNm

Minimum eccentricity about major axis = 50.87 mm


Minimum eccentricity about minor axis = 50.87 mm
Moment Due to Min Ecc Major = 145.77 kNm
nM

Moment Due to Min Ecc Minor = 145.77 kNm

Min. Eccentricity moment about major axis ignored as per Cl 39.3


Min. Eccentricity moment about minor axis ignored as per Cl 39.3
Design Moment Major = 519.13 kNm
Design Moment Minor = 111.66 kNm
Steel area required = 12566mm2 (40 No. 20 dia. bars)
Total steel area provided = 21363mm2
Pure Axial Capacity Pu =28816.407 KN
di

Axial Capacity Ratio P/Pu =0.099


Axial Capacity ≥ Axial Load ∴OK for axial resistance
Major Axis Capacity Mux1 =5742.178 KNm
Major Axis Capacity Ratio Mux / Mux1 =0.090
Major Axis Capacity ≥ Major Axis Moment ∴OK for moment resistance
a te

Minor Axis Capacity Muy1 =5742.178 KNm


Minor Axis Capacity Ratio Muy / Muy1 =0.019
Minor Axis Capacity ≥ Minor Axis Moment ∴OK for moment resistance
re

Print Time/Date: 28/02/2019 16:23 STAAD.Pro - RC IS456 Version 1.0 Print Run 12 of 19
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 13

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 95 - Detailed IS456 Main Reinforcement Cont...
an an
 Mx   My 
Biaxial Interaction equation =  +  ≤ 1,0
Mux1 Muy1
where exponent, αn = 1.000

1.00 1.00
 519.13   111.66 

F
Biaxial Interaction equation =  +  = 0.11
5742.18 5742.18
Biaxial Interaction Result < 1.0 ∴OK for biaxial resistance

PD
Member 95 - IS456 Transverse Reinforcement
Distance between compression bar and a restrained bar in major axis > 150 mm 25.5.3.2

te r
as
nM
di
a te
re

Print Time/Date: 28/02/2019 16:23 STAAD.Pro - RC IS456 Version 1.0 Print Run 13 of 19
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 14

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 97 - Detailed IS456 Design Requirements
Design of Column is done as per IS:456-2000
Section Property: 1250 x 1250
Storey height = 4.600 m
Rectangular section: Width = 1250 mm Depth = 1250 mm
Cover = 60 mm

F
Member 97 - Detailed IS456 Main Reinforcement

PD
Unsupported Length of column = 4.60 m
Slenderness checks:
Effective length Major, lex = 5.520 m
Effective length Minor, ley = 5.520 m
Slenderness ratio Major, (lex/H) = 4.416
Slenderness ratio Minor, (ley/B) = 4.416
Slenderness Limit = 12.000
∴NOT SLENDER
te r
Critical Loadcase: LOADCASE 1001
Axial Load P, = 2358.59 kN
Major M, End 1, = 20.68 kNm
End 2, = 67.00 kNm
Minor M, End 1, = -294.07 kNm
as

End 2, = -25.63 kNm

Minimum eccentricity about major axis = 50.87 mm


Minimum eccentricity about minor axis = 50.87 mm
Moment Due to Min Ecc Major = 119.97 kNm
nM

Moment Due to Min Ecc Minor = 119.97 kNm

Min. Eccentricity moment about major axis ignored as per Cl 39.3


Min. Eccentricity moment about minor axis ignored as per Cl 39.3
Design Moment Major = 67.00 kNm
Design Moment Minor = 294.07 kNm
Steel area required = 12868mm2 (64 No. 16 dia. bars)
Total steel area provided = 16889mm2
Pure Axial Capacity Pu =27199.199 KN
di

Axial Capacity Ratio P/Pu =0.087


Axial Capacity ≥ Axial Load ∴OK for axial resistance
Major Axis Capacity Mux1 =4764.037 KNm
Major Axis Capacity Ratio Mux / Mux1 =0.014
Major Axis Capacity ≥ Major Axis Moment ∴OK for moment resistance
a te

Minor Axis Capacity Muy1 =4764.037 KNm


Minor Axis Capacity Ratio Muy / Muy1 =0.062
Minor Axis Capacity ≥ Minor Axis Moment ∴OK for moment resistance
re

Print Time/Date: 28/02/2019 16:23 STAAD.Pro - RC IS456 Version 1.0 Print Run 14 of 19
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 15

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 97 - Detailed IS456 Main Reinforcement Cont...
an an
 Mx   My 
Biaxial Interaction equation =  +  ≤ 1,0
Mux1 Muy1
where exponent, αn = 1.000

1.00 1.00
 67.00   294.07 

F
Biaxial Interaction equation =  +  = 0.09
4764.04 4764.04
Biaxial Interaction Result < 1.0 ∴OK for biaxial resistance

PD
Member 97 - IS456 Transverse Reinforcement
Distance between compression bar and a restrained bar in major axis > 150 mm 25.5.3.2

te r
as
nM
di
a te
re

Print Time/Date: 28/02/2019 16:23 STAAD.Pro - RC IS456 Version 1.0 Print Run 15 of 19
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 16

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 100 - Detailed IS456 Design Requirements
Design of Column is done as per IS:456-2000
Section Property: 1250 x 1250
Storey height = 4.600 m
Rectangular section: Width = 1250 mm Depth = 1250 mm
Cover = 60 mm

F
Member 100 - Detailed IS456 Main Reinforcement

PD
Unsupported Length of column = 4.60 m
Slenderness checks:
Effective length Major, lex = 5.520 m
Effective length Minor, ley = 5.520 m
Slenderness ratio Major, (lex/H) = 4.416
Slenderness ratio Minor, (ley/B) = 4.416
Slenderness Limit = 12.000
∴NOT SLENDER
te r
Critical Loadcase: LOADCASE 1001
Axial Load P, = 2334.10 kN
Major M, End 1, = 48.43 kNm
End 2, = 61.54 kNm
Minor M, End 1, = 87.19 kNm
as

End 2, = 46.78 kNm

Minimum eccentricity about major axis = 50.87 mm


Minimum eccentricity about minor axis = 50.87 mm
Moment Due to Min Ecc Major = 118.73 kNm
nM

Moment Due to Min Ecc Minor = 118.73 kNm

Min. Eccentricity moment about major axis ignored as per Cl 39.3


Min. Eccentricity moment about minor axis ignored as per Cl 39.3
Design Moment Major = 61.54 kNm
Design Moment Minor = 87.19 kNm
Steel area required = 12868mm2 (64 No. 16 dia. bars)
Total steel area provided = 16889mm2
Pure Axial Capacity Pu =27199.199 KN
di

Axial Capacity Ratio P/Pu =0.086


Axial Capacity ≥ Axial Load ∴OK for axial resistance
Major Axis Capacity Mux1 =4756.364 KNm
Major Axis Capacity Ratio Mux / Mux1 =0.013
Major Axis Capacity ≥ Major Axis Moment ∴OK for moment resistance
a te

Minor Axis Capacity Muy1 =4756.364 KNm


Minor Axis Capacity Ratio Muy / Muy1 =0.018
Minor Axis Capacity ≥ Minor Axis Moment ∴OK for moment resistance
re

Print Time/Date: 28/02/2019 16:23 STAAD.Pro - RC IS456 Version 1.0 Print Run 16 of 19
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 17

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 100 - Detailed IS456 Main Reinforcement Cont...
an an
 Mx   My 
Biaxial Interaction equation =  +  ≤ 1,0
Mux1 Muy1
where exponent, αn = 1.000

1.00 1.00
 61.54   87.19 

F
Biaxial Interaction equation =  +  = 0.09
4756.36 4756.36
Biaxial Interaction Result < 1.0 ∴OK for biaxial resistance

PD
Member 100 - IS456 Transverse Reinforcement
Distance between compression bar and a restrained bar in major axis > 150 mm 25.5.3.2

te r
as
nM
di
a te
re

Print Time/Date: 28/02/2019 16:23 STAAD.Pro - RC IS456 Version 1.0 Print Run 17 of 19
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 18

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 103 - Detailed IS456 Design Requirements
Design of Column is done as per IS:456-2000
Section Property: 1250 x 1250
Storey height = 4.600 m
Rectangular section: Width = 1250 mm Depth = 1250 mm
Cover = 60 mm

F
Member 103 - Detailed IS456 Main Reinforcement

PD
Unsupported Length of column = 4.60 m
Slenderness checks:
Effective length Major, lex = 5.520 m
Effective length Minor, ley = 5.520 m
Slenderness ratio Major, (lex/H) = 4.416
Slenderness ratio Minor, (ley/B) = 4.416
Slenderness Limit = 12.000
∴NOT SLENDER
te r
Critical Loadcase: LOADCASE 1001
Axial Load P, = 2759.87 kN
Major M, End 1, = -351.38 kNm
End 2, = 52.44 kNm
Minor M, End 1, = 356.06 kNm
as

End 2, = -121.26 kNm

Minimum eccentricity about major axis = 50.87 mm


Minimum eccentricity about minor axis = 50.87 mm
Moment Due to Min Ecc Major = 140.39 kNm
nM

Moment Due to Min Ecc Minor = 140.39 kNm

Min. Eccentricity moment about major axis ignored as per Cl 39.3


Min. Eccentricity moment about minor axis ignored as per Cl 39.3
Design Moment Major = 351.38 kNm
Design Moment Minor = 356.06 kNm
Steel area required = 12566mm2 (40 No. 20 dia. bars)
Total steel area provided = 17593mm2
Pure Axial Capacity Pu =27453.585 KN
di

Axial Capacity Ratio P/Pu =0.101


Axial Capacity ≥ Axial Load ∴OK for axial resistance
Major Axis Capacity Mux1 =5011.128 KNm
Major Axis Capacity Ratio Mux / Mux1 =0.070
Major Axis Capacity ≥ Major Axis Moment ∴OK for moment resistance
a te

Minor Axis Capacity Muy1 =5011.128 KNm


Minor Axis Capacity Ratio Muy / Muy1 =0.071
Minor Axis Capacity ≥ Minor Axis Moment ∴OK for moment resistance
re

Print Time/Date: 28/02/2019 16:23 STAAD.Pro - RC IS456 Version 1.0 Print Run 18 of 19
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 19

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 103 - Detailed IS456 Main Reinforcement Cont...
an an
 Mx   My 
Biaxial Interaction equation =  +  ≤ 1,0
Mux1 Muy1
where exponent, αn = 1.000

1.00 1.00
 351.38   356.06 

F
Biaxial Interaction equation =  +  = 0.14
5011.13 5011.13
Biaxial Interaction Result < 1.0 ∴OK for biaxial resistance

PD
Member 103 - IS456 Transverse Reinforcement
Distance between compression bar and a restrained bar in major axis > 150 mm 25.5.3.2

te r
as
nM
di
a te
re

Print Time/Date: 28/02/2019 16:23 STAAD.Pro - RC IS456 Version 1.0 Print Run 19 of 19
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 1

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Members
Member Element Node Node Property Emt Length O. Length
A B (m) (m)
M112 6504 5012 1569 1600 x 1600 4.600 4.600
M113 6511 5019 1590 1600 x 1600 4.600 4.600

F
Column Main Reinforcement

PD
Member L/C Axial Major Minor Design As Req. Total As Prov.
(kN) (kN-m) (kN-m) Axis (mm2) Bars (mm2)
M112 C1001 8082.523 99.676 194.233 Biaxl min 38956 124T20 0
M113 C1001 8137.493 329.104 239.590 Biaxl maj 38604 48T32 0

te r
as
nM
di
a te
re

Print Time/Date: 28/02/2019 16:23 STAAD.Pro - RC IS456 Version 1.0 Print Run 1 of 5
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 2

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 112 - Detailed IS456 Design Requirements
Design of Column is done as per IS:456-2000
Section Property: 1600 x 1600
Storey height = 4.600 m
Rectangular section: Width = 1600 mm Depth = 1600 mm
Cover = 60 mm

F
Member 112 - Detailed IS456 Main Reinforcement

PD
Unsupported Length of column = 4.60 m
Slenderness checks:
Effective length Major, lex = 5.520 m
Effective length Minor, ley = 5.520 m
Slenderness ratio Major, (lex/H) = 3.450
Slenderness ratio Minor, (ley/B) = 3.450
Slenderness Limit = 12.000
∴NOT SLENDER
te r
Critical Loadcase: LOADCASE 1001
Axial Load P, = 8082.52 kN
Major M, End 1, = -99.68 kNm
End 2, = -74.62 kNm
Minor M, End 1, = -98.50 kNm
as

End 2, = 194.23 kNm

Minimum eccentricity about major axis = 62.53 mm


Minimum eccentricity about minor axis = 62.53 mm
Moment Due to Min Ecc Major = 505.43 kNm
nM

Moment Due to Min Ecc Minor = 505.43 kNm

Min. Eccentricity moment about major axis ignored as per Cl 39.3


Min. Eccentricity moment about minor axis ignored as per Cl 39.3
Design Moment Major = 99.68 kNm
Design Moment Minor = 194.23 kNm
Steel area required = 21363mm2 (68 No. 20 dia. bars)
Total steel area provided = 38956mm2
Pure Axial Capacity Pu =48642.491 KN
di

Axial Capacity Ratio P/Pu =0.166


Axial Capacity ≥ Axial Load ∴OK for axial resistance
Major Axis Capacity Mux1 =14135.834 KNm
Major Axis Capacity Ratio Mux / Mux1 =0.007
Major Axis Capacity ≥ Major Axis Moment ∴OK for moment resistance
a te

Minor Axis Capacity Muy1 =14135.834 KNm


Minor Axis Capacity Ratio Muy / Muy1 =0.014
Minor Axis Capacity ≥ Minor Axis Moment ∴OK for moment resistance
re

Print Time/Date: 28/02/2019 16:23 STAAD.Pro - RC IS456 Version 1.0 Print Run 2 of 5
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 3

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 112 - Detailed IS456 Main Reinforcement Cont...
an an
 Mx   My 
Biaxial Interaction equation =  +  ≤ 1,0
Mux1 Muy1
where exponent, αn = 1.000

1.00 1.00
 99.68   194.23 

F
Biaxial Interaction equation =  +  = 0.17
14135.83 14135.83
Biaxial Interaction Result < 1.0 ∴OK for biaxial resistance

PD
Member 112 - IS456 Transverse Reinforcement
Distance between compression bar and a restrained bar in major axis > 150 mm 25.5.3.2

te r
as
nM
di
a te
re

Print Time/Date: 28/02/2019 16:23 STAAD.Pro - RC IS456 Version 1.0 Print Run 3 of 5
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 4

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 113 - Detailed IS456 Design Requirements
Design of Column is done as per IS:456-2000
Section Property: 1600 x 1600
Storey height = 4.600 m
Rectangular section: Width = 1600 mm Depth = 1600 mm
Cover = 60 mm

F
Member 113 - Detailed IS456 Main Reinforcement

PD
Unsupported Length of column = 4.60 m
Slenderness checks:
Effective length Major, lex = 5.520 m
Effective length Minor, ley = 5.520 m
Slenderness ratio Major, (lex/H) = 3.450
Slenderness ratio Minor, (ley/B) = 3.450
Slenderness Limit = 12.000
∴NOT SLENDER
te r
Critical Loadcase: LOADCASE 1001
Axial Load P, = 8137.49 kN
Major M, End 1, = 329.10 kNm
End 2, = 102.81 kNm
Minor M, End 1, = 239.59 kNm
as

End 2, = -176.10 kNm

Minimum eccentricity about major axis = 62.53 mm


Minimum eccentricity about minor axis = 62.53 mm
Moment Due to Min Ecc Major = 508.86 kNm
nM

Moment Due to Min Ecc Minor = 508.86 kNm

Min. Eccentricity moment about major axis ignored as per Cl 39.3


Min. Eccentricity moment about minor axis ignored as per Cl 39.3
Design Moment Major = 329.10 kNm
Design Moment Minor = 239.59 kNm
Steel area required = 22519mm2 (28 No. 32 dia. bars)
Total steel area provided = 38604mm2
Pure Axial Capacity Pu =48515.311 KN
di

Axial Capacity Ratio P/Pu =0.168


Axial Capacity ≥ Axial Load ∴OK for axial resistance
Major Axis Capacity Mux1 =14002.209 KNm
Major Axis Capacity Ratio Mux / Mux1 =0.024
Major Axis Capacity ≥ Major Axis Moment ∴OK for moment resistance
a te

Minor Axis Capacity Muy1 =14002.209 KNm


Minor Axis Capacity Ratio Muy / Muy1 =0.017
Minor Axis Capacity ≥ Minor Axis Moment ∴OK for moment resistance
re

Print Time/Date: 28/02/2019 16:23 STAAD.Pro - RC IS456 Version 1.0 Print Run 4 of 5
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 5

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 113 - Detailed IS456 Main Reinforcement Cont...
an an
 Mx   My 
Biaxial Interaction equation =  +  ≤ 1,0
Mux1 Muy1
where exponent, αn = 1.000

1.00 1.00
 329.10   239.59 

F
Biaxial Interaction equation =  +  = 0.17
14002.21 14002.21
Biaxial Interaction Result < 1.0 ∴OK for biaxial resistance

PD
Member 113 - IS456 Transverse Reinforcement
Distance between compression bar and a restrained bar in major axis > 150 mm 25.5.3.2

te r
as
nM
di
a te
re

Print Time/Date: 28/02/2019 16:23 STAAD.Pro - RC IS456 Version 1.0 Print Run 5 of 5
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

COLUMN R/F DETAIL SUMMARY

to
STAAD MARKING M74 M75 M78 M83 M114 M115 M113 M96 M77 M79 M97 M99 M80 M84 M118 M119 M93 M98
PEDESTAL DIMENTIONS A3' B3' A3 B3 C3 D3 E3 F3 A'2' A2' F2' F'2' A2 B2 C2 D2 E2 F2
Depth(mm) 1250 x 1250 x 1250 x 1600 x 1600 x 1600 x 1200 x 1250 x 1250 x 1250 x 1250 x 1250 x 1250 x 1250 x 1250 x 1250 x 1250 x 1250 x

di
Width(mm) 1250 x 1250 x 1250 x 1600 x 1600 x 1600 x 1200 x 1250 x 1250 x 1250 x 1250 x 1250 x 1250 x 1250 x 1250 x 1250 x 1250 x 1250 x
Clear Height (mm)(Z) 3800 3800 3800 3800 3800 3800 3800 3800 3800 3800 3800 3800 3800 3800 3800 3800 3800 3800
Clear Height (mm)(Y) 3800 3800 3800 3800 3800 3800 3800 3800 3800 3800 3800 3800 3800 3800 3800 3800 3800 3800
CONCRETE Characteristic strength(Cylindrical) (N/mm2) 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30

E
Clear cover (mm) 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60
Reinf. Characteristic strength (N/mm2) 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500
Main Reinfocement Details FINAL 32H36 32H36 32H36 44H36 32H36 32H36 44H36 32H36 16H32 20H36 20H36 16H32 20H36 32H36 32H36 32H36 32H36 32H36
Shear Dia of Bar mm 10 10 10 10 10 10 8 10 10 10 10 10 10 10 10 10 10 10
Reinforcement Spacing mm 400 400 400 400 400 400 300 400 400 400 400 400 400 400 400 400 400 400

F
Maximum Interaction ratio 0.786 0.898 0.936 0.987 0.926 0.93 0 0.77 0.939 0.855 0.879 0.927 0.905 0.942 0.964 0.958 0.948 0.903

STAAD MARKING M76 M81 M100 M101 M82 M112 M116 M117 M94 M103 M95 M102 M104 M105 M106 M107 M108 M109 M110 M111

D
PEDESTAL DIMENTIONS A'1' A1' F1' F'1' A1 B1 C1 D1 E1 F1 E1" F1" BF1 BF2 BF1 BF2 BF1 BF2 BF1 BF2
Depth(mm) 1250x x 1250
1250 1250
x x 1250
1250x x 1250
1250 x x 1250
1250x x 1200
1200x x 1600
1600x x 1600
1600x x 1600
1600x x 1250
1250x x 1250
1250x x 1250
1250
x x 600 x 400 600 x 400 600 x 400 600 x 400 600
600x x 600
600x x 600
600x x 600
600x x
Width(mm) 1250
1250 1250
1250 1250 1250
1250 1250 1250 1250 1200 1200 1600 1600 1600 1600
1600 1600 1250 1250 1250 1250 1250 600 x 400 600 x 400 600 x 400 600 x 400
1250 400400 400400 400400 400400

rP
Clear Height (mm)(Z) 3800 3800 3800 3800 3800 3800 3800 3800 3800 3800 3800 3800 3800 3800 3800 3800 3800 3800 3800 3800
Clear Height (mm)(Y) 3800 3800 3800 3800 3800 3800 3800 3800 3800 3800 3800 3800 3800 3800 3800 3800 3800 3800 3800 3800
2 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30
CONCRETE Characteristic strength(Cylindrical) (N/mm )
Clear cover (mm) 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60
Reinf. Characteristic strength (N/mm2) 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500
Main Reinfocement Details FINAL 16H32 20H36 20H36 16H32 32H36 44H36 32H36 32H36 44H36 32H36 36H36 36H36 12H16 12H16 12H16 12H16 12H16 12H16 12H16 12H16

te
Shear Dia of Bar mm 10 10 10 10 10 8 10 10 10 10 10 10 10 10 10 10 10 10 10 10
Reinforcement Spacing mm 400 400 400 400 400 300 400 300 400 400 400 400 225 225 225 225 225 225 225 225
Maximum Interaction ratio 0.934 0.883 0.879 0.928 0.789 0 0.967 0.946 0.869 0.928 0.866 0.974 0.533 0.697 0.645 0.911 0.656 0.874 0.494 0.66

as
M
in
ed
at
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as
Job No Sheet No Rev
Company Name

r
specified in the Contract.

1000 1

i to
Job Title TEKLA OY
BEAM DESIGN Part

Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
DF
rP
te
as

Y
X
Z
M

<Untitled 1>*
in
ed
at
re

Print Time/Date: 04/01/2019 16:45 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 1 of 1
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as

r
specified in the Contract.

to
BEAM REINFORCEMENT SUMMARY
Beam No Beam No MAIN REINFORCEMENT SHEAR REINFORCEMENT
Beam

di
as per as per Member Bottom Layer Top Layer
Dimension
Staad Staad Details Area Area Spacing
(mm) Bars Bars No. of legs Link size
model Concrete (mm^2) (mm^2) (mm)

E
6465 M19 300x600 TIE BEAM 3-25 Y + 2-12 Y 1700 4-28 Y + 2-12 Y 2690 2 8 150
6483 M12 300x750 TIE BEAM 4-28 Y + 2-12 Y 2690 4-28 Y + 2-12 Y 2690 2 8 150
2990 M43 400x750 TIE BEAM 4-25 Y + 2-12 Y 2190 4-32 Y + 2-20 Y 3846 2 8 150

F
3018 M51 300x300 TIE BEAM 3-20 Y 943 3-20 Y 943 2 8 150

D
rP
te
as
M
in
ed
at
re
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 1

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 1 - Main Steel Summary
Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kN-m) (mm2) (mm2) Bars Area Bars Area
0.000 1(s) 244.205 849 0 3H12 339 3H20 942
-45.050 314 0
0.500 1 171.224 587 0 3H12 339 3H20 942

F
-62.420 314 0
0.625 1 155.736 532 0 3H12 339 2H20 628
-64.916 314 0

PD
1.000 1 109.271 370 0 3H12 339 2H20 628
-72.405 314 0
1.500 1 57.486 313 0 3H12 339 2H20 628
-81.998 314 0
2.000 1 13.596 313 0 3H12 339 2H20 628
-84.587 314 0
2.500 1 0.000 0 0 3H12 339 2H20 628
-77.206 314 0
te r
3.000 1 0.000 0 0 3H12 339 0
-67.393 314 0
3.500 1 0.000 0 0 3H12 339 2H20 628
-78.069 314 0
4.000 1 22.749 313 0 3H12 339 2H20 628
-88.124 314 0
as

4.500 1 64.452 313 0 3H12 339 2H20 628


-95.094 320 0
5.000 1 113.540 385 0 3H12 339 2H20 628
-94.679 318 0
5.200 1 136.129 464 0 3H12 339 2H20 628
-91.560 314 0
nM

5.500 1 176.417 606 0 3H12 339 3H20 942


-86.880 314 0
6.000 1(e) 253.578 884 0 3H12 339 3H20 942
-71.697 314 0
Summary: the member is safe

Member 2 - Main Steel Summary


di

Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kN-m) (mm2) (mm2) Bars Area Bars Area
0.000 1(s) 340.579 1208 0 4H12 452 4H20 1257
-29.844 314 0
0.729 1 209.622 724 0 4H12 452 4H20 1257
a te

0.000 0 0
0.800 1 198.959 686 0 4H12 452 4H20 1257
0.000 0 0
1.458 1 107.804 365 0 4H12 452 4H20 1257
-34.742 314 0
2.188 1 33.217 313 0 4H12 452 2H20 628
-74.547 314 0
re

2.917 1 0.000 0 0 4H12 452 2H20 628


-113.357 382 0

Print Time/Date: 25/07/2019 18:47 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 1 of 223
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 2

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 2 - Main Steel Summary Cont...
Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kN-m) (mm2) (mm2) Bars Area Bars Area
3.646 1 0.000 0 0 4H12 452 0
-130.965 443 0
4.375 1 0.000 0 0 4H12 452 0

F
-130.272 441 0
5.104 1 0.000 0 0 4H12 452 0
-130.911 443 0

PD
5.833 1 0.000 0 0 4H12 452 2H20 628
-113.464 383 0
6.563 1 31.036 313 0 4H12 452 2H20 628
-84.524 314 0
7.292 1 103.249 350 0 4H12 452 4H20 1257
-49.183 314 0
7.950 1 197.948 682 0 4H12 452 4H20 1257
-3.097 314 0
te r
8.021 1 208.594 720 0 4H12 452 4H20 1257
0.000 0 0
8.750 1(e) 339.389 1204 0 4H12 452 4H20 1257
-29.844 314 0
Summary: the member is safe
as

Member 3 - Main Steel Summary


Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kN-m) (mm2) (mm2) Bars Area Bars Area
0.000 1(s) 593.943 2157 0 2H25 982 7H20 2199
nM

-50.718 415 0
0.708 1 364.387 1275 0 2H25 982 7H20 2199
0.000 0 0
0.800 1 338.117 1178 0 2H25 982 6H20 1885
0.000 0 0
1.417 1 184.431 629 0 2H25 982 4H20 1257
-46.652 415 0
1.672 1 126.873 429 0 2H25 982 4H20 1257
-92.957 415 0
di

2.125 1 41.887 417 0 2H25 982 2H20 628


-130.454 443 0
2.833 1 0.000 0 0 2H25 982 2H20 628
-194.997 668 0
3.528 1 0.000 0 0 2H25 982 0
a te

-272.849 945 0
3.542 1 0.000 0 0 2H25 982 0
-273.044 946 0
4.250 1 0.000 0 0 2H25 982 0
-274.999 953 0
4.731 1 0.000 0 0 2H25 982 0
-279.276 969 0
re

4.958 1 0.000 0 0 2H25 982 0


-277.865 963 0

Print Time/Date: 25/07/2019 18:47 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 2 of 223
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 3

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 3 - Main Steel Summary Cont...
Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kN-m) (mm2) (mm2) Bars Area Bars Area
4.972 1 0.000 0 0 2H25 982 0
-277.743 963 0
5.667 1 0.000 0 0 2H25 982 2H20 628

F
-203.527 698 0
6.375 1 38.336 417 0 2H25 982 2H20 628
-139.304 474 0

PD
6.828 1 121.443 417 0 2H25 982 2H20 628
-103.224 415 0
7.083 1 178.387 607 0 2H25 982 4H20 1257
-58.203 415 0
7.700 1 324.245 1128 0 2H25 982 4H20 1257
0.000 0 0
7.792 1 346.905 1211 0 2H25 982 7H20 2199
0.000 0 0
te r
8.500 1(e) 571.153 2066 0 2H25 982 7H20 2199
-50.718 415 0
Summary: the member is safe

Member 4 - Main Steel Summary


as

Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kN-m) (mm2) (mm2) Bars Area Bars Area
0.000 1(s) 358.726 1283 0 6H10 471 3H25 1473
-31.942 315 0
0.729 1 223.979 779 0 6H10 471 3H25 1473
nM

-6.198 315 0
0.800 1 212.949 739 0 6H10 471 2H25 982
-10.901 315 0
1.458 1 121.079 413 0 6H10 471 2H25 982
-54.615 315 0
2.188 1 42.877 312 0 6H10 471 2H25 982
-87.328 315 0
2.917 1 0.000 0 0 6H10 471 2H25 982
-112.487 379 0
di

3.646 1 0.000 0 0 6H10 471 0


-128.631 434 0
4.375 1 0.000 0 0 6H10 471 0
-131.746 445 0
5.104 1 0.000 0 0 6H10 471 0
a te

-139.289 471 0
5.833 1 0.000 0 0 6H10 471 2H25 982
-125.632 424 0
6.563 1 46.180 312 0 6H10 471 2H25 982
-96.551 324 0
7.292 1 123.395 421 0 6H10 471 2H25 982
-64.824 315 0
re

7.950 1 209.554 727 0 6H10 471 2H25 982


-22.001 315 0

Print Time/Date: 25/07/2019 18:47 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 3 of 223
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 4

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 4 - Main Steel Summary Cont...
Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kN-m) (mm2) (mm2) Bars Area Bars Area
8.021 1 220.351 766 0 6H10 471 3H25 1473
-17.394 315 0
8.750 1(e) 352.701 1260 0 6H10 471 3H25 1473

F
-31.942 315 0
Summary: the member is safe

PD
Member 5 - Main Steel Summary
Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kN-m) (mm2) (mm2) Bars Area Bars Area
0.000 1(s) 290.660 1021 0 5H10 393 4H20 1257
-90.277 315 0
0.500 1 216.064 747 0 5H10 393 4H20 1257
-102.683 345 0
te r
0.800 1 177.107 608 0 5H10 393 4H20 1257
-105.696 355 0
1.000 1 151.136 516 0 5H10 393 2H20 628
-107.705 362 0
1.500 1 93.591 316 0 5H10 393 2H20 628
-105.342 354 0
as

2.000 1 43.431 313 0 5H10 393 2H20 628


-95.595 321 0
2.500 1 0.655 313 0 5H10 393 2H20 628
-81.676 315 0
3.000 1 0.000 0 0 5H10 393 2H20 628
nM

-68.772 315 0
3.500 1 0.000 0 0 5H10 393 2H20 628
-80.969 315 0
4.000 1 17.233 313 0 5H10 393 2H20 628
-94.185 316 0
4.500 1 63.900 313 0 5H10 393 2H20 628
-97.432 327 0
5.000 1 117.952 400 0 5H10 393 2H20 628
-102.463 344 0
di

5.375 1 164.029 562 0 5H10 393 2H20 628


-101.316 340 0
5.500 1 180.444 620 0 5H10 393 4H20 1257
-100.934 339 0
6.000 1(e) 259.021 904 0 5H10 393 4H20 1257
a te

-92.021 315 0
Summary: the member is safe
re

Print Time/Date: 25/07/2019 18:47 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 4 of 223
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 5

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 6 - Main Steel Summary
Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kN-m) (mm2) (mm2) Bars Area Bars Area
0.000 1(s) 258.513 902 0 5H10 393 4H20 1257
-100.333 337 0
0.500 1 182.224 626 0 5H10 393 4H20 1257

F
-107.868 363 0
0.625 1 166.745 571 0 5H10 393 2H20 628
-107.905 363 0

PD
1.000 1 120.311 409 0 5H10 393 2H20 628
-108.018 363 0
1.500 1 65.782 313 0 5H10 393 2H20 628
-100.784 339 0
2.000 1 18.637 313 0 5H10 393 2H20 628
-93.899 315 0
2.500 1 0.000 0 0 5H10 393 2H20 628
-81.052 315 0
te r
3.000 1 0.000 0 0 5H10 393 2H20 628
-68.381 315 0
3.500 1 1.992 313 0 5H10 393 2H20 628
-81.126 315 0
4.000 1 46.147 313 0 5H10 393 2H20 628
-96.100 323 0
as

4.500 1 97.685 330 0 5H10 393 2H20 628


-106.324 357 0
5.000 1 156.608 536 0 5H10 393 4H20 1257
-109.164 367 0
5.200 1 183.131 629 0 5H10 393 4H20 1257
-107.346 361 0
nM

5.500 1 222.915 772 0 5H10 393 4H20 1257


-104.620 352 0
6.000 1(e) 296.606 1043 0 5H10 393 4H20 1257
-92.691 315 0
Summary: the member is safe

Member 7 - Main Steel Summary


di

Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kN-m) (mm2) (mm2) Bars Area Bars Area
0.000 1(s) 360.840 1291 0 6H10 471 3H25 1473
-33.952 315 0
0.729 1 229.350 799 0 6H10 471 3H25 1473
a te

-31.191 315 0
0.800 1 219.968 764 0 6H10 471 2H25 982
-35.462 315 0
1.458 1 132.766 454 0 6H10 471 2H25 982
-75.160 315 0
2.188 1 51.886 312 0 6H10 471 2H25 982
-103.425 348 0
re

2.917 1 0.000 0 0 6H10 471 2H25 982


-125.684 424 0

Print Time/Date: 25/07/2019 18:47 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 5 of 223
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 6

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 7 - Main Steel Summary Cont...
Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kN-m) (mm2) (mm2) Bars Area Bars Area
3.646 1 0.000 0 0 6H10 471 0
-138.337 468 0
4.375 1 0.000 0 0 6H10 471 0

F
-132.311 447 0
5.104 1 0.000 0 0 6H10 471 0
-134.297 454 0

PD
5.833 1 0.000 0 0 6H10 471 2H25 982
-119.819 404 0
6.563 1 56.771 312 0 6H10 471 2H25 982
-103.607 348 0
7.292 1 138.435 474 0 6H10 471 2H25 982
-74.558 315 0
7.950 1 226.344 788 0 6H10 471 2H25 982
-34.152 315 0
te r
8.021 1 235.803 822 0 6H10 471 3H25 1473
-29.805 315 0
8.750 1(e) 366.708 1314 0 6H10 471 3H25 1473
-33.952 315 0
Summary: the member is safe
as

Member 8 - Main Steel Summary


Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kN-m) (mm2) (mm2) Bars Area Bars Area
0.000 1(s) 331.048 1172 0 4H12 452 4H20 1257
nM

-30.359 314 0
0.708 1 213.857 739 0 4H12 452 4H20 1257
-30.224 314 0
0.800 1 202.393 698 0 4H12 452 4H20 1257
-35.786 314 0
1.417 1 125.273 426 0 4H12 452 4H20 1257
-73.201 314 0
2.125 1 51.509 313 0 4H12 452 2H20 628
-101.359 341 0
di

2.833 1 0.000 0 0 4H12 452 2H20 628


-116.709 394 0
3.542 1 0.000 0 0 4H12 452 0
-131.706 446 0
4.250 1 0.000 0 0 4H12 452 0
a te

-126.698 428 0
4.958 1 0.000 0 0 4H12 452 0
-120.364 406 0
5.667 1 0.000 0 0 4H12 452 2H20 628
-104.073 350 0
6.375 1 40.908 313 0 4H12 452 2H20 628
-79.865 314 0
re

7.083 1 116.487 395 0 4H12 452 4H20 1257


-49.893 314 0

Print Time/Date: 25/07/2019 18:47 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 6 of 223
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 7

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 8 - Main Steel Summary Cont...
Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kN-m) (mm2) (mm2) Bars Area Bars Area
7.700 1 195.188 672 0 4H12 452 4H20 1257
-10.897 314 0
7.792 1 206.886 714 0 4H12 452 4H20 1257

F
-5.100 314 0
8.500 1(e) 324.652 1148 0 4H12 452 4H20 1257
-30.359 314 0

PD
Summary: the member is safe

Member 10 - Main Steel Summary


Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kN-m) (mm2) (mm2) Bars Area Bars Area
0.000 1(s) 204.919 705 0 3H12 339 4H16 804
-17.644 314 0
te r
0.500 1 135.314 459 0 3H12 339 4H16 804
-25.657 314 0
0.800 1 99.532 336 0 3H12 339 4H16 804
-37.020 314 0
1.000 1 75.677 314 0 3H12 339 2H16 402
-44.596 314 0
as

1.500 1 30.451 314 0 3H12 339 2H16 402


-56.150 314 0
2.000 1 0.000 0 0 3H12 339 2H16 402
-63.823 314 0
2.500 1 0.000 0 0 3H12 339 0
nM

-65.878 314 0
3.000 1 0.000 0 0 3H12 339 0
-64.055 314 0
3.500 1 0.000 0 0 3H12 339 0
-72.976 314 0
4.000 1 0.000 0 0 3H12 339 2H16 402
-72.801 314 0
4.500 1 33.363 314 0 3H12 339 2H16 402
-62.657 314 0
di

5.000 1 77.879 314 0 3H12 339 2H16 402


-42.545 314 0
5.375 1 117.624 398 0 3H12 339 4H16 804
-23.164 314 0
5.500 1 131.132 445 0 3H12 339 4H16 804
a te

-18.224 314 0
6.000 1(e) 198.857 683 0 3H12 339 4H16 804
-17.644 314 0
Summary: the member is safe
re

Print Time/Date: 25/07/2019 18:47 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 7 of 223
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 8

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 11 - Main Steel Summary
Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kN-m) (mm2) (mm2) Bars Area Bars Area
0.000 1(s) 472.041 1732 0 4H20 1257 4H25 1963
-281.611 987 0
0.433 1 371.322 1332 0 4H20 1257 4H25 1963

F
-261.316 912 0
0.625 1 329.589 1172 0 4H20 1257 4H25 1963
-249.027 867 0

PD
0.867 1 276.970 974 0 4H20 1257 4H25 1963
-233.533 811 0
1.300 1 188.985 653 0 4H20 1257 2H25 982
-198.263 683 0
1.733 1 107.368 365 0 4H20 1257 2H25 982
-155.505 532 0
2.167 1 32.118 312 0 2H20 628 2H25 982
-105.260 357 0
te r
2.600 1 0.000 0 0 2H20 628 2H25 982
-52.725 313 0
3.033 1 23.526 312 0 2H20 628 2H25 982
-105.116 356 0
3.467 1 92.486 314 0 4H20 1257 2H25 982
-157.515 539 0
as

3.900 1 170.596 587 0 4H20 1257 2H25 982


-205.212 708 0
4.333 1 258.279 905 0 4H20 1257 4H25 1963
-248.626 866 0
4.575 1 311.355 1102 0 4H20 1257 4H25 1963
-269.287 941 0
nM

4.767 1 353.449 1263 0 4H20 1257 4H25 1963


-285.674 1002 0
5.200 1(e) 456.107 1668 0 4H20 1257 4H25 1963
-316.354 1117 0
Summary: the member is safe

Member 15 - Main Steel Summary


di

Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kN-m) (mm2) (mm2) Bars Area Bars Area
0.000 1(s) 461.746 1690 0 4H25 1963 4H25 1963
-487.286 1795 0
0.250 1 382.664 1376 0 4H25 1963 4H25 1963
a te

-406.777 1471 0
0.500 1 304.030 1075 0 4H25 1963 4H25 1963
-325.887 1157 0
0.625 1 264.936 929 0 4H25 1963 4H25 1963
-285.252 1005 0
0.750 1 225.843 786 0 4H25 1963 2H25 982
-244.617 854 0
re

1.000 1 148.103 508 0 2H25 982 2H25 982


-162.967 560 0

Print Time/Date: 25/07/2019 18:47 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 8 of 223
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 9

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 15 - Main Steel Summary Cont...
Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kN-m) (mm2) (mm2) Bars Area Bars Area
1.250 1 71.004 312 0 2H25 982 2H25 982
-80.937 312 0
1.500 1 2.337 312 0 2H25 982 2H25 982

F
-6.555 312 0
1.750 1 84.598 312 0 2H25 982 2H25 982
-82.432 312 0

PD
2.000 1 167.682 577 0 2H25 982 2H25 982
-158.382 544 0
2.250 1 251.146 878 0 2H25 982 4H25 1963
-233.885 815 0
2.375 1 293.068 1034 0 4H25 1963 4H25 1963
-271.413 953 0
2.500 1 334.990 1192 0 4H25 1963 4H25 1963
-308.941 1093 0
te r
2.750 1 419.235 1520 0 4H25 1963 4H25 1963
-383.549 1379 0
3.000 1(e) 503.928 1863 0 4H25 1963 4H25 1963
-457.711 1674 0
Summary: the member is safe
as

Member 17 - Main Steel Summary


Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kN-m) (mm2) (mm2) Bars Area Bars Area
0.000 1(s) 62.810 269 0 5H8 251 3H12 339
nM

-48.859 248 0
0.500 1 48.613 247 0 5H8 251 3H12 339
-44.440 248 0
0.625 1 45.329 247 0 5H8 251 3H12 339
-43.070 248 0
1.000 1 35.476 247 0 5H8 251 3H12 339
-38.960 248 0
1.500 1 23.399 247 0 5H8 251 3H12 339
-32.421 248 0
di

2.000 1 12.382 247 0 5H8 251 3H12 339


-24.821 248 0
2.500 1 2.426 247 0 5H8 251 3H12 339
-16.160 248 0
3.000 1 0.000 0 0 5H8 251 3H12 339
a te

-11.611 248 0
3.500 1 4.341 247 0 5H8 251 3H12 339
-16.498 248 0
4.000 1 16.182 247 0 5H8 251 3H12 339
-21.081 248 0
4.500 1 29.083 247 0 5H8 251 3H12 339
-26.797 248 0
re

5.000 1 43.045 247 0 5H8 251 3H12 339


-31.452 248 0

Print Time/Date: 25/07/2019 18:47 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 9 of 223
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 10

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 17 - Main Steel Summary Cont...
Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kN-m) (mm2) (mm2) Bars Area Bars Area
5.375 1 54.311 247 0 5H8 251 3H12 339
-34.148 248 0
5.500 1 58.067 249 0 5H8 251 3H12 339

F
-35.046 248 0
6.000 1(e) 74.149 319 0 5H8 251 3H12 339
-37.581 248 0

PD
Summary: the member is safe

Member 18 - Main Steel Summary


Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kN-m) (mm2) (mm2) Bars Area Bars Area
0.000 1(s) 28.810 248 0 5H8 251 5H8 251
-2.726 248 0
te r
0.500 1 20.050 248 0 5H8 251 5H8 251
-2.692 248 0
0.625 1 18.173 248 0 5H8 251 5H8 251
-3.412 248 0
1.000 1 12.541 248 0 5H8 251 5H8 251
-5.575 248 0
as

1.500 1 6.249 248 0 5H8 251 5H8 251


-7.397 248 0
2.000 1 1.175 248 0 5H8 251 5H8 251
-9.960 248 0
2.500 1 0.000 0 0 5H8 251 5H8 251
nM

-11.092 248 0
3.000 1 0.000 0 0 5H8 251 0
-11.565 248 0
3.500 1 0.000 0 0 5H8 251 0
-10.974 248 0
4.000 1 0.000 0 0 5H8 251 5H8 251
-9.783 248 0
4.500 1 3.935 248 0 5H8 251 5H8 251
-9.554 248 0
di

5.000 1 9.534 248 0 5H8 251 5H8 251


-8.468 248 0
5.375 1 14.529 248 0 5H8 251 5H8 251
-6.858 248 0
5.500 1 16.194 248 0 5H8 251 5H8 251
a te

-6.322 248 0
6.000 1(e) 23.913 248 0 5H8 251 5H8 251
-3.116 248 0
Summary: the member is safe
re

Print Time/Date: 25/07/2019 18:47 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 10 of 223
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 11

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 22 - Main Steel Summary
Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kN-m) (mm2) (mm2) Bars Area Bars Area
0.000 1(s) 547.036 2058 0 4H25 1963 3H32 2413
-442.242 1612 0
0.317 1 446.439 1639 0 4H25 1963 3H32 2413

F
-384.227 1382 0
0.625 1 349.842 1256 0 4H25 1963 3H32 2413
-322.811 1146 0

PD
0.633 1 349.842 1256 0 4H25 1963 2H32 1608
-322.811 1146 0
0.950 1 258.619 911 0 4H25 1963 2H32 1608
-259.371 909 0
1.267 1 171.699 594 0 2H25 982 2H32 1608
-192.836 667 0
1.583 1 88.179 310 0 2H25 982 2H32 1608
-122.302 417 0
te r
1.900 1 8.059 310 0 2H25 982 2H32 1608
-47.769 312 0
2.217 1 37.935 310 0 2H25 982 2H32 1608
-75.834 312 0
2.533 1 117.125 401 0 2H25 982 2H32 1608
-145.813 500 0
as

2.850 1 202.306 704 0 2H25 982 2H32 1608


-214.385 744 0
3.167 1 290.923 1032 0 2H25 982 2H32 1608
-278.994 981 0
3.175 1 290.923 1032 0 4H25 1963 2H32 1608
-278.994 981 0
nM

3.483 1 384.871 1393 0 4H25 1963 3H32 2413


-341.536 1217 0
3.800 1(e) 483.395 1790 0 4H25 1963 3H32 2413
-401.255 1449 0
Summary: the member is safe

Member 24 - Main Steel Summary


di

Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kN-m) (mm2) (mm2) Bars Area Bars Area
0.000 1(s) 460.153 1684 0 4H20 1257 4H25 1963
-321.036 1134 0
0.433 1 356.872 1276 0 4H20 1257 4H25 1963
a te

-289.737 1017 0
0.625 1 314.501 1114 0 4H20 1257 4H25 1963
-273.077 955 0
0.867 1 261.077 915 0 4H20 1257 4H25 1963
-252.071 878 0
1.300 1 172.771 595 0 4H20 1257 2H25 982
-208.037 718 0
re

1.733 1 94.485 321 0 4H20 1257 2H25 982


-160.171 548 0

Print Time/Date: 25/07/2019 18:47 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 11 of 223
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 12

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 24 - Main Steel Summary Cont...
Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kN-m) (mm2) (mm2) Bars Area Bars Area
2.167 1 24.510 312 0 2H20 628 2H25 982
-106.692 361 0
2.600 1 0.000 0 0 2H20 628 2H25 982

F
-53.061 313 0
3.033 1 31.801 312 0 2H20 628 2H25 982
-105.581 358 0

PD
3.467 1 107.637 366 0 4H20 1257 2H25 982
-156.450 535 0
3.900 1 189.873 656 0 4H20 1257 2H25 982
-199.831 689 0
4.333 1 278.476 979 0 4H20 1257 4H25 1963
-235.725 819 0
4.575 1 331.441 1179 0 4H20 1257 4H25 1963
-251.567 876 0
te r
4.767 1 373.447 1340 0 4H20 1257 4H25 1963
-264.132 922 0
5.200 1(e) 477.310 1754 0 4H20 1257 4H25 1963
-287.576 1009 0
Summary: the member is safe
as

Member 25 - Main Steel Summary


Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kN-m) (mm2) (mm2) Bars Area Bars Area
0.000 1(s) 130.212 572 0 4H12 452 3H16 603
nM

-103.264 448 0
0.292 1 107.974 471 0 4H12 452 3H16 603
-88.907 384 0
0.583 1 86.150 374 0 4H12 452 3H16 603
-74.062 319 0
0.625 1 83.091 360 0 4H12 452 2H16 402
-71.872 309 0
0.875 1 64.740 279 0 4H12 452 2H16 402
-58.731 252 0
di

1.167 1 43.744 246 0 4H12 452 2H16 402


-42.912 247 0
1.458 1 23.162 246 0 4H12 452 2H16 402
-26.607 247 0
1.750 1 2.995 246 0 4H12 452 2H16 402
a te

-9.814 247 0
2.042 1 9.940 246 0 4H12 452 2H16 402
-19.233 247 0
2.333 1 25.279 246 0 4H12 452 2H16 402
-36.144 247 0
2.625 1 43.487 246 0 4H12 452 2H16 402
-55.023 247 0
re

2.875 1 59.551 256 0 4H12 452 2H16 402


-70.889 305 0

Print Time/Date: 25/07/2019 18:47 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 12 of 223
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 13

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 25 - Main Steel Summary Cont...
Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kN-m) (mm2) (mm2) Bars Area Bars Area
2.917 1 62.228 268 0 4H12 452 2H16 402
-73.533 316 0
3.208 1 81.456 353 0 5H12 565 3H16 603

F
-91.630 396 0
3.500 1(e) 101.171 441 0 5H12 565 3H16 603
-109.312 475 0

PD
Summary: the member is safe

Member 28 - Main Steel Summary


Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kN-m) (mm2) (mm2) Bars Area Bars Area
0.000 1(s) 144.423 635 0 2H16 402 6H12 679
-21.663 246 0
te r
0.750 1 62.219 267 0 2H16 402 6H12 679
0.000 0 0
1.500 1 5.461 247 0 2H16 402 4H12 452
-6.036 246 0
2.250 1 0.000 0 0 2H16 402 4H12 452
-55.676 246 0
as

3.000 1 0.000 0 0 3H16 603 0


-82.040 355 0
3.328 1 0.000 0 0 3H16 603 0
-92.580 402 0
3.750 1 0.000 0 0 3H16 603 0
nM

-106.968 467 0
3.800 1 0.000 0 0 3H16 603 0
-107.850 471 0
4.500 1 0.000 0 0 3H16 603 0
-118.663 520 0
5.100 1 0.000 0 0 3H16 603 0
-129.476 569 0
5.250 1 0.000 0 0 3H16 603 0
-128.015 562 0
di

6.000 1 0.000 0 0 3H16 603 0


-116.043 508 0
6.750 1 0.000 0 0 3H16 603 0
-95.194 414 0
7.500 1 0.000 0 0 3H16 603 4H12 452
a te

-52.458 246 0
8.250 1 10.087 247 0 2H16 402 4H12 452
-9.186 246 0
9.000 1(e) 59.639 256 0 2H16 402 4H12 452
-21.663 246 0
Summary: the member is safe
re

Print Time/Date: 25/07/2019 18:47 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 13 of 223
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 14

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 29 - Main Steel Summary
Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kN-m) (mm2) (mm2) Bars Area Bars Area
0.000 1(s) 139.693 618 0 2H16 402 2H20 628
-24.198 246 0
0.750 1 51.173 245 0 2H16 402 2H20 628

F
0.000 0 0
1.500 1 0.000 0 0 2H16 402 2H20 628
-20.186 246 0

PD
2.250 1 0.000 0 0 4H16 804 0
-78.810 341 0
3.000 1 0.000 0 0 4H16 804 0
-111.799 489 0
3.750 1 0.000 0 0 4H16 804 0
-139.441 615 0
3.800 1 0.000 0 0 4H16 804 0
-140.895 621 0
te r
4.500 1 0.000 0 0 4H16 804 0
-152.602 676 0
5.100 1 0.000 0 0 4H16 804 0
-161.323 716 0
5.250 1 0.000 0 0 4H16 804 0
-159.340 707 0
as

6.000 1 0.000 0 0 4H16 804 0


-144.754 639 0
6.750 1 0.000 0 0 4H16 804 0
-121.292 532 0
7.500 1 0.000 0 0 4H16 804 0
-75.942 328 0
nM

8.250 1 0.000 0 0 2H16 402 2H20 628


-25.610 246 0
9.000 1(e) 33.046 245 0 2H16 402 2H20 628
-24.198 246 0
Summary: the member is safe

Member 30 - Main Steel Summary


di

Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kN-m) (mm2) (mm2) Bars Area Bars Area
0.000 1(s) 138.874 615 0 2H16 402 2H20 628
-24.141 246 0
0.750 1 50.803 245 0 2H16 402 2H20 628
a te

0.000 0 0
1.500 1 0.000 0 0 2H16 402 2H20 628
-20.050 246 0
2.250 1 0.000 0 0 4H16 804 0
-78.427 339 0
3.000 1 0.000 0 0 4H16 804 0
-111.169 486 0
re

3.750 1 0.000 0 0 4H16 804 0


-138.484 610 0

Print Time/Date: 25/07/2019 18:47 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 14 of 223
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 15

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 30 - Main Steel Summary Cont...
Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kN-m) (mm2) (mm2) Bars Area Bars Area
3.800 1 0.000 0 0 4H16 804 0
-139.914 617 0
4.500 1 0.000 0 0 4H16 804 0

F
-152.069 673 0
5.100 1 0.000 0 0 4H16 804 0
-160.940 714 0

PD
5.250 1 0.000 0 0 4H16 804 0
-158.994 705 0
6.000 1 0.000 0 0 4H16 804 0
-144.596 638 0
6.750 1 0.000 0 0 4H16 804 0
-121.320 532 0
7.500 1 0.000 0 0 4H16 804 0
-76.157 329 0
te r
8.250 1 0.000 0 0 2H16 402 2H20 628
-26.012 246 0
9.000 1(e) 32.190 245 0 2H16 402 2H20 628
-24.141 246 0
Summary: the member is safe
as

Member 31 - Main Steel Summary


Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kN-m) (mm2) (mm2) Bars Area Bars Area
0.000 1(s) 134.507 592 0 2H16 402 3H16 603
nM

-20.176 246 0
0.427 1 96.895 421 0 2H16 402 3H16 603
0.000 0 0
0.750 1 61.785 266 0 0 3H16 603
0.000 0 0
0.972 1 51.238 246 0 2H16 402 2H16 402
0.000 0 0
1.500 1 9.583 246 0 2H16 402 2H16 402
-2.073 246 0
di

1.927 1 0.000 0 0 2H16 402 2H16 402


-31.154 246 0
2.250 1 0.000 0 0 2H16 402 0
-47.938 246 0
2.472 1 0.000 0 0 2H16 402 0
a te

-57.990 249 0
3.000 1 0.000 0 0 3H16 603 0
-77.656 336 0
3.689 1 0.000 0 0 3H16 603 0
-110.261 482 0
3.750 1 0.000 0 0 3H16 603 0
-111.315 486 0
re

4.500 1 0.000 0 0 3H16 603 0


-121.477 532 0

Print Time/Date: 25/07/2019 18:47 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 15 of 223
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 16

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 31 - Main Steel Summary Cont...
Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kN-m) (mm2) (mm2) Bars Area Bars Area
5.100 1 0.000 0 0 3H16 603 0
-131.768 579 0
5.250 1 0.000 0 0 3H16 603 0

F
-130.177 572 0
6.000 1 0.000 0 0 3H16 603 0
-117.553 515 0

PD
6.750 1 0.000 0 0 3H16 603 0
-96.052 418 0
7.500 1 0.000 0 0 3H16 603 2H16 402
-52.664 246 0
8.250 1 9.594 246 0 2H16 402 2H16 402
-8.318 246 0
9.000 1(e) 59.864 258 0 2H16 402 2H16 402
-20.176 246 0
te r
Summary: the member is safe

Member 32 - Main Steel Summary


Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kN-m) (mm2) (mm2) Bars Area Bars Area
as

0.000 1(s) 114.474 499 0 4H10 314 6H12 679


-13.083 247 0
0.750 1 78.418 338 0 4H10 314 6H12 679
0.000 0 0
0.800 1 76.169 328 0 0 4H12 452
nM

0.000 0 0
1.500 1 46.443 247 0 4H10 314 4H12 452
0.000 0 0
2.250 1 17.140 247 0 4H10 314 4H12 452
-16.948 247 0
3.000 1 0.000 0 0 4H10 314 4H12 452
-31.223 247 0
3.750 1 0.000 0 0 4H10 314 0
-49.462 247 0
di

4.500 1 0.000 0 0 5H10 393 0


-64.896 278 0
5.200 1 0.000 0 0 5H10 393 0
-80.022 344 0
5.250 1 0.000 0 0 5H10 393 0
a te

-74.035 318 0
6.000 1 0.000 0 0 5H10 393 0
-60.400 258 0
6.528 1 0.000 0 0 4H10 314 0
-49.327 247 0
6.750 1 0.000 0 0 4H10 314 4H12 452
-35.435 247 0
re

7.073 1 5.925 247 0 4H10 314 4H12 452


-25.829 247 0

Print Time/Date: 25/07/2019 18:47 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 16 of 223
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 17

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 32 - Main Steel Summary Cont...
Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kN-m) (mm2) (mm2) Bars Area Bars Area
7.500 1 26.313 247 0 4H10 314 4H12 452
-2.700 247 0
8.028 1 62.299 267 0 4H10 314 4H12 452

F
0.000 0 0
8.250 1 77.932 336 0 0 4H12 452
0.000 0 0

PD
8.375 1 87.221 377 0 0 6H12 679
0.000 0 0
8.573 1 110.275 480 0 4H10 314 6H12 679
0.000 0 0
9.000 1(e) 150.452 663 0 4H10 314 6H12 679
-13.083 247 0
Summary: the member is safe
te r
Member 35 - Main Steel Summary
Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kN-m) (mm2) (mm2) Bars Area Bars Area
0.000 1(s) 61.526 263 0 5H8 251 6H8 302
-6.859 248 0
as

0.625 1 45.725 248 0 5H8 251 6H8 302


-6.424 248 0
0.750 1 43.084 248 0 5H8 251 6H8 302
-7.213 248 0
1.500 1 27.314 248 0 5H8 251 6H8 302
nM

-10.865 248 0
2.250 1 15.552 248 0 5H8 251 6H8 302
-12.598 248 0
3.000 1 8.856 248 0 5H8 251 6H8 302
-13.302 248 0
3.750 1 9.293 248 0 5H8 251 6H8 302
-15.920 248 0
3.800 1 14.497 248 0 5H8 251 6H8 302
-16.169 248 0
di

4.500 1 12.017 248 0 5H8 251 6H8 302


-16.468 248 0
4.800 1 17.148 248 0 5H8 251 6H8 302
-16.353 248 0
5.250 1 9.652 248 0 5H8 251 6H8 302
a te

-14.546 248 0
6.000 1 1.302 248 0 5H8 251 6H8 302
-15.509 248 0
6.750 1 9.345 248 0 5H8 251 6H8 302
-25.105 248 0
7.500 1 22.953 248 0 5H8 251 6H8 302
-34.333 248 0
re

8.200 1 38.572 248 0 5H8 251 6H8 302


-40.464 248 0

Print Time/Date: 25/07/2019 18:47 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 17 of 223
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 18

i to
Part
HP Inc.
Job Title TEKLA OY Ref

By Date 06.12.2018 Chd

Client File Date/Time

Ed
Member 35 - Main Steel Summary Cont...
Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kN-m) (mm2) (mm2) Bars Area Bars Area
8.250 1 39.767 248 0 5H8 251 6H8 302
-40.835 248 0
9.000 1(e) 59.787 255 0 5H8 251 6H8 302

F
-44.611 248 0
Summary: the member is safe

PD
Member 37 - Main Steel Summary
Distance Span Moment As Req. As' Req. Bottom Layers Top Layers
(m) (kN-m) (mm2) (mm2) Bars Area Bars Area
0.000 1(s) 116.289 507 0 4H10 314 5H12 565
-12.583 247 0
0.750 1 79.879 344 0 4H10 314 5H12 565
0.000 0 0
te r
0.800 1 77.576 334 0 4H10 314 4H12 452
0.000 0 0
1.500 1 47.098 247 0 4H10 314 4H12 452
-1.243 247 0
2.250 1 16.990 247 0 4H10 314 4H12 452
-18.552 247 0
as

3.000 1 0.000 0 0 4H10 314 4H12 452


-33.327 247 0
3.750 1 0.000 0 0 4H10 314 0
-52.044 247 0
4.500 1 0.000 0 0 5H10 393 0
nM

-68.069 292 0
5.200 1 0.000 0 0 5H10 393 0
-83.885 361 0
5.250 1 0.000 0 0 5H10 393 0
-78.774 339 0
5.672 1 0.000 0 0 5H10 393 0
-73.164 314 0
6.000 1 0.000 0 0 5H10 393 4H12 452
-54.813 247 0
di

6.750 1 0.464 247 0 4H10 314 4H12 452


-25.810 247 0
7.500 1 35.060 247 0 4H10 314 4H12 452
0.000 0 0
8.250 1 76.423 329 0 0 4H12 452
a te

0.000 0 0
8.375 1 83.714 361 0 4H10 314 5H12 565
0.000 0 0
9.000 1(e) 123.540 540 0 4H10 314 5H12 565
-12.583 247 0
Summary: the member is safe
re

Print Time/Date: 25/07/2019 18:47 STAAD.Pro - RC Eurocode 2:2004 Version 1.2 Print Run 18 of 223
APPROVED
Checked and Approved.

Date: 08-Nov-2019

*Approval doesn’t absolve the EPC


contractor of it’s responsibility as Job No Sheet No Rev
Company Name

r
specified in the Contract.
1000 19

i to
Part
HP Inc.
Job Title TEKLA OY Ref

You might also like