Cat-I, however Main Contractor to ensure complete compliance with requirements with Technical Specification, if arises out of this

document or
elsewhere

CONTROL SCHEME - ISOLATION


TRANSFORMER WITH 1-PH MCB OUTGOING
FEEDERS (MODULE TYPE-ISOL+MCB)

Digitally signed
Signature Not Verified
by Sunny
Date: 2019.04.03 UTTAR PRADESH RAJYA VIDYUT
11:45:03 IST UTPADAN NIGAM LIMITED
(A UP GOVERNMENT UNDERTAKING)
Reason: CAT I
Location: DEVELOPMENT CONSULTANTS
PRIVATE LIMITED, KOLKATA
NTPCEOC DOOSAN POWER SYSTEMS
INDIA PVT. LTD

C&S ELECTRIC LTD.


C-59 NO IDA PHASE -II,NO IDA -201305
DIS T. G AUTA M BUDH NAGAR(U.P)

SUB-SUPPLIER NAME

OBRA'C' 2x660 MW THERMAL POWER


EXTENSION PROJECT
A

III - IV - OWNER`S DRG. NO. DP16004-YS01-90BGE-144579


REV.
I - REVISED AS PER COMMENTS DATED : 21.09.18 II - REVISED AS PER COMMENTS DATED : 27.12.18 DRG. NO.

Date Name PROJECT:- Client DOOSAN POWER SYSTEMS INDIA LTD. DRG. NO. REV.
OBRA`C` 2X660MW THERMAL C&S ELECTRIC LTD.
POWER EXTENSION PROJECT ISOL. TRF. WITH 1-PH MCB OUTGOING
F Drawn 19.03.19 SATENDRA C-59, NOIDA PHASE II, NOIDA - 201305 Work
FEEDERS (MODULE TYPE-ISOL+MCB) DPSIL/J3275/513 02
DIST. GAUTAM BUDH NAGAR (U.P)
Checked 19.03.19 SATYAM FORMAT No. : QAF-04/04 Details SCHEMATIC DIAGRAM
SHEET NO. 2
Approved 19.03.19 D. GIRI electric Order No. 2018000270, Dated:05.03.2018 SCALE: NTS
NO. OF SHEET 2
NTPC COMMENTS RESPONSE SHEET
Project: OBRA C 2 x 660 MW THERMAL POWER EXTENSION PROJECT
Contractor DOOSAN POWER SYSTEMS INDIA, Gurgaon

Owner UTTAR PRADESH RAJYA VIDYUT UTPADAN NIGAM LIMITED, Lucknow

Owner's Consultant DEVELOPMENT CONSULTANTS PRIVATE LIMITED, Kolkata

Review Engineering Consultant NATIONAL THERMAL POWER CORPORATION, Noida
DPSI Correspondence No. Date:
NTPC Doc No. Date:

Document / Drawing Number Document / Drawing Title Revision Assigned Approval Category*


CONTROL SCHEME ISOLATION TRANSFORMER WITH 
DP16004‐YS01‐90BGE‐144579 1 II
1PH MCB O/G FEEDER

No. NTPC Comment C & S Response NTPC Resolution


Schem is applicable for Boiler MCC/ Station ACDB/ Emg 
Please specify the name of boards/switchgear where this scheme is
1 PMCC for unit 1 & 2.
applicable

* NTPC Approval Categories:
1 = Approved
2 = Approved, subject to incorporation of comments /modifications as noted. Resubmit revised drawing / documents after incorporation for final approval.
3 = Not Approved. Resubmit revised drawing/ documents after incorporation of comments for approval
4 = For information and records
4R = Additional information / detail required. Revised drawings to be submitted (in  case of drawings required to be submitted to NTPC for information only).