You are on page 1of 15

ev

ns

co

co

nc

ec

ca

ec

ca
tio

es

thi
pli

wi

wi
-I,

er

ra

or

ur

re

re

ar
at

nt

to

et

th

nt

th

n,

ut
of
M

m
ai

ct

pl

ui

ni
C

ifi

is
S
T
h
o

o
s

if

s
l
CONTROL SCHEME FOR ACB BUS-COUPLER
– MCC- (DAE)

Digitally signed
Signature Not Verified
by Sunny
Date: 2019.06.10 UTTAR PRADESH RAJYA VIDYUT
11:02:51 IST UTPADAN NIGAM LIMITED
(A UP GOVERNMENT UNDERTAKING)
Reason: CAT I
Location: DEVELOPMENT CONSULTANTS
PRIVATE LIMITED, KOLKATA
NTPCEOC DOOSAN POWER SYSTEMS
INDIA PVT. LTD

C&S ELECTRIC LTD.


C-59 NO IDA PHASE -II,NO IDA -201305
DIS T. G AUTA M BUDH NAGAR(U.P)

NOTES:- SUB-SUPPLIER NAME

1. FOR LEGENDS REF DRG NO.-DP16004-YR02-90BGE-144581 OBRA'C' 2x660 MW THERMAL POWER


EXTENSION PROJECT
NTPC COMMENTS RESPONSE SHEET
Project: OBRA C 2 x 660 MW THERMAL POWER EXTENSION PROJECT
Contractor DOOSAN POWER SYSTEMS INDIA, Gurgaon

Owner UTTAR PRADESH RAJYA VIDYUT UTPADAN NIGAM LIMITED, Lucknow

Owner's Consultant DEVELOPMENT CONSULTANTS PRIVATE LIMITED, Kolkata

Review Engineering Consultant NATIONAL THERMAL POWER CORPORATION, Noida
DPSI Correspondence No. Date:
NTPC Doc No. Date:

Document / Drawing Number Document / Drawing Title Revision Assigned Approval Category*


Control Scheme for ACB Bus Coupler _ MCC (DAE)
DP16004-YS01-90BGE-144572 1 II

No. NTPC Comment C&S/DPSI Response NTPC Resolution


To be provided irrespective of BUS PT Module as per spec requirement: Voltmeters have been already provided in Bus PTs (for both 
1 Voltmeter with voltage selector switch for Bus A the buses) to indicate the bus voltages (refer scheme 9878‐
Voltmeter with voltage selector switch for Bus B DP16004‐YS01‐90BGE‐144570)

* NTPC Approval Categories:
1 = Approved
2 = Approved, subject to incorporation of comments /modifications as noted. Resubmit revised drawing / documents after incorporation for final approval.
3 = Not Approved. Resubmit revised drawing/ documents after incorporation of comments for approval
4 = For information and records
4R = Additional information / detail required. Revised drawings to be submitted (in  case of drawings required to be submitted to NTPC for information only).

You might also like